CITY OF SANTA CLARITA
Q) AGENDA REPORT
CONSENT CALENDAR
CITY MANAGER APPROVAL:
DATE:
July 14, 2015
SUBJECT:
2014-15 ANNUAL OVERLAY AND SLURRY SEAL PROGRAM,
PROJECT M0102 - AWARD CONSTRUCTION CONTRACT FOR
THE SLURRY SEAL P14ASE 11 PORTION
DEPARTMENT:
Public Works
PRESENTER:
Damon Letz
RECOMMENDED ACTION
City Council:
I . Approve the plans and specifications for the Slurry Sea] Phase 11 portion of the 2014-15
Annual Overlay and Slurry Seal Program, Project MO 102.
2. Award the construction contract to Intermountain Slurry Seal, Inc., in the amount of
$888,001 and authorize a contingency in the amount of $44,400 for a total contract amount
not to exceed $932,401.
3. Authorize the continued appropriations of $735,380 in Gas Tax funds (Fund 230) and
$ 130,000 in Measure R Local funds (Fund 264) from Fiscal Year 2014-15 to Fiscal Year
2015-16 and appropriate to the 2014-15 Overlay and Slurry Seal Program expenditure
accounts MO 102230-5 16 1.001 and MOI 02264-5 161.00 1, respectively.
4. Authorize an expenditure in the amount of $15,000 to Twining, Inc., for a proressional
services contract to provide for project inspection and materials testing.
5. Authorize the City Manager or designee to execute all documents, subject to City Attorney
approval.
BACKGROUND
The Annual Slurry Seal project is an integral part of the City of Santa Clarita's (City) pavement
management program. Each year, streets are evaluated and identified for the need of pavement
preservation and preventative maintenance treatments. The 20 14-15 project will seal cracks and
Page 1
_0 Packet Pg. 42
PH
Apr PROVED
coat the surface of streets in various areas of the City (see attached project street list). This
treatment will provide a smoother ride for vehicles, enhance the appearance of the roadway and
surrounding areas, and extend the life of the roadway for a minimum of three years. This year's
project is expected to begin construction in July 2015 and be completed by the end of October
2015.
The City has a new five-year strategic plan, Santa Clarita 2020. The Annual Overlay and Slurry
Seal Program is identified as one of the components of the plan to sustain public infrastructure.
This is the second slurry sea[ project, Slurry Seal Phase 11 Portion (Phase 11) for the 2014-15
Annual Overlay and Slurry Seal Program, Project MO 102. Due to the competitive bidding for
this project, staff was able to assemble a second slurry sea] project within the original project
budget, adding 58 more streets to the project. The City Council awarded the construction
contracts for the original overlay and slurry sea] program on May 26, 2015.
An invitation to bid for Phase 11 was prepared, published three times May 14, May 16, and
May 20, 2015. and posted on the City's website. Plans and specifications were also sent to area
plan rooms. Bids were Submitted to the City and opened by Purchasing on June 16, 2015.
The results of the bids are shown below:
Companv Location Bid Amount
Intermountain Slurry Seal, Inc. Reno, NV $ 888�001.00
Pavement Coatings Airupa Valley, CA $ 959�300.62
VSS International West Sacramento, CA $1,005�000.00
All American Asphalt Corona, CA $L 120,285. 10
Staff recommends awarding the construction contract to the lowest responsible bidder,
Intermountain Slurry Seal, Inc. The contractor possesses a valid state contractor license and is in
good standing with the Contractors State License Board. The bid from Intermountain Slurry
Seal, Inc., was reviewed for accuracy and conformance to the contract documents and found to
be complete.
The requested construction contingency will cover the cost lor unforeseen site conditions, such
as potential utility conflicts, abandoned utilities not shown in record drawings, change order
requests made by the contractor, and change orders for additional street surfacing ordered by the
City.
To ensure efficient and proper procedures in construction inspection and materials testing, costs
for these services were anticipated and identified in the original budget. Accordingly, a Request
For Proposal (RFP) was sent to*five qualified engineering firms. The results of that process were
included in the May 26, 2015, agenda item.
Based on the results of the original RFP, which included recent experience in similar projects. -
qualification of team and resources; understanding of key development items; quality of proposal
and proposed services in relation to the project's scope; scheduling and availability; and
references, staff recommends awarding the construction inspection and materials testing services
contract to Twining, Inc., in an amount not to exceed $1 5�000.
Page 2
Packet Pg
California Government Code 4526 prescribes selection of architectural and engineering services
to be based on demonstrated competence and professional qualification necessary for the
satisfactory performance of the services required and does not authorize the selection of
professional architectural and engineering services based on cost.
At the time of the May 26 agenda item, the anticipated miscellaneous project costs for the
overlay effort were estimated at $485,000. The revised estimated cost for miscellaneous project
costs is $442,133, bringing the anticipated overlay costs to $8,143,597. The revised cost
breakdown for all efforts associated with the 2014-15 Annual Overlay and Slurry Seal Program,
Project MO 102 is:
Slurry Seal Phase 11 $ 947,401
Slurry Seat Portion (Awarded at May 26, 2015, City Council meeting) $ 1,540,357
Overlay Portion (Awarded at May 26, 2015� City Council meeting) $ & 143.597
Total
ALTERNATIVE ACTION
Other action as determined by the City Council.
FISCAL IMPACT
Gas Tax funds (Fund 230) in the amount of $150,000 are currently appropriated in expenditure
account MOI 02230-5 161.001. In addition to the current Gas Tax appropriation, the requested
continuance of $735.380 in Gas Tax funds (Fund 230) and $130,000 in Measure R Local funds
(Fund 264), trom Fiscal Year 2014-15 to Fiscal Year 2015-16, and their respective appropriation
to expenditure accounts MO 102230-516 1.001 and M01 02264-5161.001 will create a budget of
S L0 15,380. This amount will adequately provide for contract award for the Slurry Seal Phase 11
portion of 2014-15 Annual Overlay and Slurry Seal Program, construction support and materials
testing, project administration, and all anticipated project costs.
ATTACHMENTS
Project Street List
Contract for Intermountain Slurry Seal, Inc. (available in the City Clerk's Reading File)
Page 3
Packet Pg
0
9
Pavement Engineering Inc.
You can ride on our reputation
City of Santa Clarita
2014-2015 Annual Slurry Sea[ Project, M0102 PHASE 2
PEI Project No. 140223-01
6/1/2015
PROJECT STREET LIST
IC17- 'Stne–et Name Beq–in-L–ocation End Location
AJA WY
GRATLAND OR
I EAST END
GILBERT DR
ISABELLA PY
IRAINBOW GLEN DR
GRATLAND DR
GROMMAN VVY
I ISABELLA PY
GRAYLN
ISABELLA PY
I NEFF CT
GROMMAN WY
GILBERT DR
IGRATLAND DR
ISABELLA PKWY
VIA PRINCESSA
PRINCESSA
JENNIFER CT
358 W ISABELLA PY
PY
NEFF CT
EAST END
�ISABTELLA
OU H END
SACK CT
GILBERT DR
EAST E�N R
SCHREYPL
GRATLAND DR
EAST E D
STEVIE CT
326 W ISABELLA PY
LISABELLA PY
IS18 'Sfr—eef Name - Begiff-Ldcation - Enbl-Uo—cdtion
BIRCH CANYON WY
I HASKELL CANYON RD
ICOP –80 ft East of Haskell Canyon Road
BIRCH CANYON WY
COP –80 ft East of Haskell Canyon RdO
LID SPANISH TRAIL
BODIE PL
IEND
SILVERKING TR
CANYON HEIGHTS CIR
IROSE CANYON LN (E)
ICOP –275 ft South of Rose Canyon Ln (W)
CANYON HEIGHTS CIR
NNYON LN (W)
OP –275 ft South of Rose Canyon Ln (W)
gHASKELL
CEDAR CANYON CT
END
CANYON RD
COLOMA CT —AND
ISILVERKING TRAIL
HASKELL CANYON RD
C K CANYON DR
ICOPPER HILL DR
KYRA CT
EE 10TD
I HASKELL CANYON RD
OLD SPANISH TRAIL
A ERVILLE TRAIL
LN
ICOPPERHILL DR
PINEWOOD CT
EE DC
IROSE CANYON LN
PLACERVIEWTRAIL
NO
N WK N;G TRAIL
Ly I
ROCK CANYON DR
T
��H KELLCANYONRD
�S —1IRO3E
C A ON LN
ROSE CANYON LN
I HASKELL CANYON RD JAGAJANIAN
DR
Attachment: Project Street List (1305: 2014-15 ANNUAL OVERLAY AND SLURRY SEAL PROGRAM)
1231
Pavement Engineering Inc.
SILVERKING TRAIL YfK(5pf�Vg-N6n our reputation ISOUTH END
STOVER FLAT CT pLR SPANISH TRAIL JEND
ISUTTERS MILL CT END I SILVERKING —TRAIL
LN
END
IS19 S?Meef Na�ffei - BU-gffLoc5ti6n -End Lo-catjon
AGAJANIAN DR
REDWOOD CANYON PL
I COPPER HILL DR
CAROLCT
AGAJANIAN DR
JEND
DEENA-PL
REDWOOD CANYON PL
�END
DENISE LN
AGAJANIAN DR
JEND
FRITZ WY
END
JAGAJANIAN DR
GABRIAL PL
REDWOOD CYN RD
JEND
GOLD CANYON DR
END
IGARNETCANYON
HIDDEN HILLS DR
GOLD CANYON DR
ICOPPER HILL DR
HOMESTEAD PL
PARAGON DR
JEND
INCLINE LN
HIDDEN HILLS DR
IMlLESTONE ST
LYTLE CT
END
I INCLINE LN
MAGEDCT
AGAJANIAN DR
END
MIKHAIL ST
REDWOOD CANYON
�END
MILESTONE ST
END
I HIDDEN HILLS
NATALIE LN
REDWOOD CANYON RD
REDWOOD CANYON PL
ROCK CANYON DR
IAEND
GAJANIAN DR
SUNRISE VIEW PL
END
IHIDDEN HILL LN
SUPERIOR CT
END
I INCLINE LN
TAYLOR CT
AGAJANIAN DR
JEND
IS22 'Sfr—eef R�ame End CoCation
BLACK PINE WY
VALLEY OAK PL
I RAI NTREE LN
CANYON OAK PIL
END
BOXWOOD LN
CEDAR EN CT
END
�RAINTREE LN
CEDAR RIDGE CT
RED PINE WY
!END
IRONWOOD LN
RAINTREE LN
JEND
LOWRIDGE PL
VALLEY OAK PL
IWILLOW TREE CT
RAINTREE LN
VALLEY OAK PL
I STARTREE LN
RED PINE WY
END
I LOW RIDGE PL
REDWOOD CT
END
ICANYON OAK PL
RIM ROCK CT
JEND
I BLACK PINE WY
Attachment: Project Street List (1305: 2014-15 ANNUAL OVERLAY AND SLURRY SEAL PROGRAM)
1231
CIE;
J;J Pavement Engineering Inc.
IEJ You can ride on our reputation
Attachment: Project Street List (1305: 2014-15 ANNUAL OVERLAY AND SLURRY SEAL PROGRAM) /23/�]