SUBJECT: A REVISION TO VESTING TENTATIVE TRACT MAP 060258
(MASTER CASE 0 15-034) FOR AN EXPANSION TO THE
APPROVED YMCA, A NEW SENIOR CENTER, AND 154 AGE -
RESTRICTED UNITS IN FIVE KNOLLS
DEPARTMENT: Community Development
PRESENTER: Patrick Leclair
RECOMMENDED ACTION
The City Council:
1. Conduct a public hearing for the revised Five Knolls project.
2. Adopt a resolution to:
a. Adopt an addendum to the certified Keystone Final Environmental Impact Report;
b. Adopt a new Statement of Overriding Considerations in accordance with the
addendum prepared for the revised Five Knolls project;
c. Approve Master Case 9 15-304 to revise Vesting Tentative Tract Map 060258,
approve a Conditional Use Permit, and approve a Development Review for the
construction of 154 age -restricted, single-family detached condominiums. a senior
center, and an expansion to the previously approved YMCA on the project site,
subject to the attached Conditions of Approval, and
d. Direct staff to execute and record all necessary documents to release tile "public
benefit" covenant from lot 129.
BACKGROUND
Original Keystone Project
On April 25, 2006, the City Council approved Master Case 403-358 for the Keystone project.
Entitlements associated with Master Case #03-358 included a Zone Change, General Plan
Amendment, Vesting Tentative Tract Map (VTTM), Conditional Use Permit (CUP), and Oak
Tree Permit to create 499 residential units, including 96 sing -le -family units, 223) single-family
PPROVED Adepte-6,4JO Page I
Packet Pg. 115
detached condominium units, 180 townhonie units, a parcel for the YMCA, and a parcel for the
Williarn S. Hart Union High School District for a future junior high school site.
Following the Keystone project approval, the William S. Hart Union High School District
notified the City that the District Would not move forward with the acquisition of the future
junior high school site, opting to focus on other facility needs throughout the District.
Previous Project Revisions - Keystone to Five Knolls
On April 16, 2013, the Planning Commission approved a revision to VTTM 060258 to change
the layout of the residential units to the west and north of the proposed Golden Valley Road,
along with a time extension to extend the life of the subdivision by four years. The approval also
renamed the project Five Knolls. At that time, no changes were proposed to tile development of
the YMCA or the school site on the south side of the proposed Golden Valley Road, identified as
lots 127 and 128 on the revised VTTM..
On June 3, 2015, a Minor Use Permit (MUP) was approved for the import of up to 99,999 cubic
yards of earth to the project site. During grading operations, there was a greater amount of soil
shrinkage than originally anticipated, causing a shortage of earth. Import is under way, with an
anticipated completion in September 2015.
Final Map Recordation
On October 28, 2014, the City Council approved the first phase of the revised Five Knolls tract
map for recordation. As a part of that approval, a covenant was to be recorded on lots 127 and
128, requiring "components of community benefit (including by way of example, but without
limitation, a school, or a recreation or community center or facility such as a YMCA)." This
covenant was executed and recorded on December 2, 2014.
On January 27, 2015, the City Council approved the second phase of the revised Five Knolls
tract map for recordation.
Construction Status
The Five Knolls project is under construction. Five home builders, including Brookfield Homes.
Christopher Homes, KB Homes, TriPointe, and Meritage Homes, are grading and beginning
construction of their individual development areas. In addition, the extension of Golden Valley
Road is nearing completion. with an anticipated opening date of early summer Prior to
Certificates of Occupancy for any homes, Golden Valley Road must be completed. Model
homes are anticipated to open beginning mid -summer and continue to open through fall.
PROJECT DESCRIPTION
Oil February 19, 2015, Ermine Street, LLC, submitted an application for development lots 127
and 128 of the Five Knolls project. The application included a revision to VTTM 060258 to
allow for the creation of three lots (lots 127, 128, and 129) for the development of the following:
Page 2
Packet Pg. 171i]
1. YMCA
The Keystone project originally approved a CUP for a 30,000 square -foot YMCA facility
on a dedicated 3.8 -acre parcel (lot 127). The proposed revision to the Five Knolls project
includes a CUP to allow for a 9.000 square -foot expansion to the approved facility to
allow for a YMCA facility of approximately 39,000 square feet. The YMCA will be
responsible for construction of the facility..
2. Senior Center
The proposed revision to the Five Knolls project includes the creation of a new parcel (lot
128), along with a CUP, for a new senior center for the Santa Clarita Valley. The current
Santa Clarita Valley Senior Center is located on Market Street in Newhall, and is under-
sized to provide the needed services to the senior community. The applicant is proposing
to dedicate 2.5 acres to the Santa Clarita Valley Senior Center for the construction of a
new 30,400 square -foot facility to accommodate the services they provide to the
community. The Santa Clarita Valley Senior Center will be responsible for construction
of the new facility. The City of Santa Clarita also has a new five year strategic plan called
Santa Clarita 2020. It identifies the construction of a new Santa Clarita Valley Senior
Center to enrich a growing and diverse community.
3. Age-restrieledCommunily
T . he applicant is proposing to revise VTTM 060258 to create a new parcel of land (lot
129) for the condominium (air space) subdivision and construction of 154 age -restricted,
single-family detached condominiums (age -restricted condom in i Luns). Lot 129 would
include 17.2 acres and a density of 10.7 units per acre. The community is proposed as
alley -loaded units in four, six, and eight -unit clusters. A recreation facility is proposed to
provide a pool and community gathering space, along with pedestrian connections to the
senior center, YMCA facilities, as well as the City's River Trail that runs west of the
project site.
Porking
The project site is consistent with the parking requirements identified in the Unified
Development Code (UDQ. The YMCA requires 248 parking stalls, while the senior center will
require 143 parking stalls, for a total of 391 required parking stalls. The YMCA and senior
center will provide parking on-site, and a reciprocal parking agreement will be recorded on each
parcel allowing parking to be accessed by both the YMCA and the senior center. The applicant
is providing 404 parking stalls for the YMCA and the senior center, providing a 13 -stall surplus
over UDC -required parking on the project site.
In order to ensure parking will be sufficient, the applicant had a parking demand analysis
prepared by Stantec Consulting Services, Inc. The parking analysis evaluated the current
operations of the existing YMCA and senior center facilities to determine how the expanded
facilities would likely operate. The analysis finds that the YMCA and senior center have peak
hours at different times throughout the day, with a maximum parking demand of approximately
374 parking stalls at the peak of both users. Therefore, the 404 parking stalls provided for the
Page 3
Pa
YMCA and senior center exceed the * 'parking stalls required by the UDC, as well as the 374
parking stalls for the peak hours of each use.
The UDC requires single-family detached condominium projects to provide a two -car garage for
each unit, as well as guest parking stalls (I stall for every 2 units) evenly distributed throughout
the development. Each proposed residential unit has a two -car garage, and the project site
provides 82 guest parking stalls (in excess of the 77 UDC -required guest parking stalls)
distributed throughout the project site.
Architecture
The proposed buildings were reviewed by the City's architectural design consultant, RRM
Design Group. The architectural style lor the proposed senior center, YMCA buildings, as well
as the proposed residences, is consistent with the City's Community Character and Design
Guidelines. To ensure consistency with the approved architectural elevations, a condition of
approval requires Architectural Design Review by the Director of Community Development and
may require review by the Planning Commission for any changes to the approved elevations.
Connininitly Benefit
Prior to the recordation of the first phase of the revised Five Knolls Final Map, the City Council
entered into an agreement with the developer to record a covenant requiring a community benefit
on lots 127 and 128 of the Five Knolls VTTM 060258. In order to comply with the covenant,
the applicant is proposing to revise the Five Knolls project to allow for an expansion to the
previously approved YMCA, a new senior center, and 154 age -restricted condominiums. The
applicant will dedicate land to both the YMCA and senior center for the future construction of
their facilities. The 154 age -restricted condominiums will provide seniors with a housing
alternative, as well as to create a synergy of land uses in close proximity to the proposed YMCA
and senior center.
Planning Commission Recommendation
At the June 2, 2015, Planning Commission meeting, the Commission heard the staff
presentation, applicant presentation, and public comment on the proposed project. Following
discussion by the Commission, they voted 5-0 to recommend the City Council approve the
proposed revisions associated with Master Case 4 15-034 with a revision to condition EN8 to
specifically note the applicant shall comply with California law regarding water.
ENVIRONMENTAL
Certified h-EIR
A Final Environmental Impact Report (FEIR) was certified by the City Council in April 2006 for
the Keystone project, Master Case #03-358, in accordance with the California Environmental
Quality Act (CEQA). The certified FEIR evaluated a project that consisted of 979 mixed
residential units, including townhomes, apartments, and single-family units, a YMCA, City park,
and ajunior high school facility for the William S. Hart Union High School District. The City
Page 4
Packet Pg
Council certified the FEIR, although they approved a reduced project of 499 residential units (96
single-family, 180 townhomes, and 223 apartment units).
2013 Addendum
In 2013, the Planning Commission approved a revision to the Keystone project modifying the
layout of the site plan for the development area north and west of Golden Valley Road. The
approval renanied the project "Five Knolls" and modified the residential unit ruix to include 119
single-family lots, along with 380 single-family detached condominiums. The revisions were
evaluated in accordance with CEQA to determine if there were any new environmental impacts
as a result of the proposed revisions. The addendum determined the Five Knolls project was
consistent with the oriainal Keystone approval and did not create impacts that required further
Study.
2015 Haul Route Addendum
The Keystone project was originally approved with grading of approximately 5.4 million cubic
yards of earth, with approximately 1.8 million cubic yards of remedial grading work. The
movement of the 7.2 million cubic yards of earth was originally anticipated to balance on-site
and did not contemplate import or export of earth. During grading operations, it became
apparent there was a greater amount of shrinkage than originally anticipated. To * balance the
grading on the project site, an MUP was approved on June 3, 2015, to allow for the import up to
99�999 Cubic yards of earth. An addendum was prepared for the haul rOUte. analyzing the import
of earth from two locations in the City of Los Angeles (approved for earth export) to the City of
Santa Clarita. The addendum found that although the grading represents a fraction (0. 14%) of
the total earth movement for the Five Knolls project, all potential impacts will be at a less than
significant level.
2015 Addendionfor the Proposed Project
An addendum to the certified Keystone FEIR has been prepared for the proposed revision to tile
Five Knolls project consisting of 154 age -restricted condominiums, a new senior center, and an
expansion to the previously approved YMCA. In accordance with CEQA, the revised Five
Knolls picilect was compared to the originally approved Keystone project and the certified FEIR
prepared for it. The addendum considered the changes to the project and found that the changes
would not have additional impacts to the environment. The addendum compared each of the
environmental topic areas under CEQA, including specifically:
Water
A Water Needs Assessment was prepared for the Keystone project, evaluating the project at
979 residential units, ajunior high school site, a YMCA, and a City park. That assessment
determined adequate water was available for the Keystone project, including during drought
years. The addendum prepared for the revised Five Knolls project considered tile build -out
of the Five Knolls project with 653 residential units (499 approved units and 154 proposed
units), the 39,000 square -foot YMCA, and 30,400 square -foot senior center. The revised
Five Knolls project is anticipated to require less water than originally considered in the Water
Page 5
Packet Pg 119
Needs Assessment prepared for the Keystone project.
Subsequent to the approval of tire Keystone project in 2006, the Castaic Lake Water Agency
(CLWA) adopted the 20 10 CLWA Urban Water Management Plan (UWMP) to evaluate the
water needs within the CLWA service area. The UWMP takes into account the existing
facilities, as well as all of the approved development within the service area. Staff contacted
the Santa Clarita Water Division (SCWD) and CLWA regarding water availability as it
relates to the revised Five Knolls project and the current drought in California.
The following is from the CLWA regarding water availability as it relates to the drought:
CLWA, in cooperation with the local water retailers, has prepared a 2010 UWMP that
documents the expected demands and supplies within its service area until the year 2050.
The demand projections in the 2010 UWMP were based on the master plans of the four
water retailers in the Santa Clarita Valley. These plans were conservative in that they
assumed a growth rate consistent with past growth rates in both population and demand.
They did not recognize constraints that were likely to occur due to land use planning,
suitable land availability or economic conditions. As a check ofthe growth assumptions
in the 2010 UWMP the build out population projections of the OVOV plan were
compared to those of the 2010 UWMP. The 2010 UWMP were higher by approximately
132,000 persons and this is significantly higher in light that a small amount of the area
included in the OVOV planning area is outside of the CLWA service area. The 2050
build out supplies were more than adequate to meet demands in that case with an
assumed modest amount of conservation. Hence we conclude that supplies are sufficient
to meet the demands of the build out of the OVOV plan as well. As long as a project is
consistent with the land use designations in the OVOV plan, and the water demand of the
project is consistent with the land use categories, CLWA and the local water retailers
have an adequate supply to meet the demand.
This adequate long-term Supply is distinct from the short term implications of the
drought. The circumstances of the current drought are extraordinary in that the last seven
of eight years have been classified as "drought" and the last two years [lave had record
breaking dryness. We address this by the methods we document in the 2010 UWMP for
dry -year scenarios including: 1) the careful management of grOLindwater supplies; 2) the
use of stored water from previous years� supply; and 3) purchases of water from other
sources outside of the Santa Clarita Valley. In addition, we need to ask residents to take
action to use water efficiently to meet state conservation mandates and stretch our
supplies to ensure they are adequate ifthe next few years will also be dry. With this good
planning and customer efforts, our supplies in the immediate term are also sufficient to
meet demand.
A representative from CLWA will be present at the City Council meeting to'address
questions regarding this project and water in the Santa Clarita Valley.
Traffic
The certified FEIR determined a total of 11 000 average daily trips (ADT) would be
Page 6
Packet Pg
generated by the 979 residential units, YMCA, City park, and junior high school site. The
traffic study prepared for the project has determined the revised Five Knolls project would
generate approximately 6,955 ADT. As a result of the reduced ADT, project -related traffic
impacts to intersections in the City have been reduced and previous mitigation measures will
not be required for six of the nine intersections in the certified Keystone FEIR. Mitigation
will no longer be required for the following mitigation measures and intersections:
a 0-6:
Bouquet Canyon Road and Soleclad Canyon Road
a 0-7:
Bouquet Canyon Road and Newhall Ranch Road
0 0-8:
Sierra Highway and Placerita Canyon Road
0 0-10:
Whites Canyon Road and Soledad Canyon Road
0 0-11:
Golden Valley Road and Via Princessa
0 0-13:
Sierra Highway and SR14 South -Bound Ramps
Of the three remaining intersections, one intersection has had all mitigation completed (0-9:
Sierra Highway an ' d Golden Valley Road), and two will require. modifications to the
mitigation measures as follows:
0-5: Valencia Boulevard and Magic Mountain Parkway will add a second
westbound, lCft-tUrn lane, but will now remove the dedicated westbound, right -
turn lane to accommodate the new left -turn lane.
0-12: Golden Valley Road and Newhall Ranch Road will construct the
westbound, right -turn lane as a free-flow turn lane. The previous mitigation
measure from the certified FEIR gave the City the option to require a second
westbound, right -turn lane or to require the free-flow lane. Traffic staff has opted
to require the free-flow lane.
Therefore, the proposed revision to the Five Knolls project is anticipated to have a reduced
impact to traffic than originally analyzed under the certified Keystone FEIR.
Slatement of Overriding Considerations
The certified FEIR for the Five Knolls project included a Statement of Overriding
Considerations (SOC). As a result of the replacement of the school site with the proposed
expanded YMCA, senior center, and 154 age -restricted, single-family detached condominiums,
the City Council must inake revisions to the SOC to reflect these changes to the project.
NOTICING
All noticing required by law has been completed for this project including site posting, mailings,
and legal advertisement in The Signal newspaper.
ALTERNATIVE ACTION
Other action as determined by the City Council.
Page 7
Packet Pg
FISCAL IMPACT
There is no direct fiscal impact associated with this project. If developed, the applicant would be
responsible for all applicable development impact fees to offset impacts on City infrastructure.
On November 25, 2014, City Council committed $3,000,000 to support construction of a new
Santa Clarita Valley Senior Center.
ATTACHMENTS
Public Notice
Resolution
Vicinity Map
Architectural Plans
Parking Demand Analysis
Addendum to the Certified FEIR (available in the City Clerk's Reading File)
Planning Commission Staff Report - 06/02/2015 (available in City Clerk's Reading File)
Page 8
Packet Pg. 122