HomeMy WebLinkAbout2015-09-22 - ORDINANCES - ROOFTOP SOLAR ENERGY SYSTEMS (2)ORDINANCE NO. 15-07
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF SANTA CLARITA, CALIFORNIA,
ADDING CHAPTER 25.02 OF TITLE 25, TO THE SANTA CLARITA MUNICIPAL CODE
CONCERNING SMALL RESIDENTIAL ROOFTOP SOLAR ENERGY SYSTEMS
WHEREAS, the City Council of the City of Santa Clarita wishes to advance the use of solar
energy by all of its citizens, businesses, and industries; and
WHEREAS, the City Council of the City of Santa Clarita seeks to meet the climate action goals
set by the State; and
WHEREAS, the City Council of the City of Santa Clarita recognizes solar energy provides
reliable energy and pricing for its residents and businesses; and
WHEREAS, solar energy systems create local jobs and economic opportunity; and
WHEREAS, it is in the interest of the health, welfare, and safety of the people of the City of
Santa Clarita to provide an expedited permitting process to assure the effective deployment of solar
technology; and
WHEREAS, the City Council of the City of Santa Clarita seeks to implement Assembly Bill
2188 (Chapter 521, Statutes 2014) through the creation of an expedited, streamlined permitting process
for small residential rooftop solar energy systems.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SANTA CLARITA,
CALIFORNIA, DOES HEREBY ORDAIN AS FOLLOWS:
SECTION 1. That Chapter 25.02 of Title 25 is added to the Santa Clarita Municipal Code to
read as follows:
Chapter 25.02 SMALL RESIDENTIAL ROOFTOP SOLAR ENERGY SYSTEMS
25.02.010 PURPOSE
The purpose of this chapter is to provide an expedited, streamlined solar permitting process that.
complies with the Solar Rights Act and Assembly Bill 2188 (Chapter 521, Statutes 2014) to achieve
timely and cost-effective installations of small residential rooftop solar energy systems.
25.02.020 APPLICABILITY
This chapter applies to the permitting and inspecting of all small residential rooftopsolar
energy systems in the City of Santa Clarita.
25.02.030 DEFINITIONS
1. A "small residential rooftop solar energy system" means a solar energy system that
meets all of the following:
a. The system is installed on the roof of a single or duplex family dwelling.
b. The system is no larger than 10 kilowatts alternating current nameplate rating or
30 kilowatts thermal
2. "Electronic submittal" means the utilization of one or more of the following:
a. The City of Santa Clarita's ePlans system
b. - Email
c. The Internet
d. Facsimile
25.02.040 SOLAR ENERGY SYSTEM REQUIREMENTS
1. A solar energy system designed for producing electricity shall meet all applicable safety
and performance standards established by:
a. The City of Santa Clarity Electrical Code
b. The City of Santa Clarity Building Code
c. The City of Santa Clarity Fire Code
2. The module array or individual solar panel shall not exceed the maximum legal building
height as defined by the Santa Clarity Municipal Code.
3. The system shall be tested and labeled by an accredited testing laboratory such as
Underwriters Laboratories, and be installed in accordance with any applicable rules of
the Public Utilities Commission.
4. A solar energy system for heating water in a single family residence and solar collectors
used for heating water in swimming pool applications shall be certified by an accredited
listing agency as defined by the City of Santa Clarity Plumbing and Mechanical Codes.
25.02.050 SUBMITTAL DOCUMENTS
All forms, checklists, or other documentation required for the submission of an expedited solar
energy system application shall be made available to the public on the City of Santa Clarita's website.
All required documents may be submitted either in paper hard copy format or as an electronic
submittal.
25.02.060 ELIGIBILITY CHECKLIST
To be eligible for expedited solar photovoltaic (PV) permitting a small residential rooftop solar energy
system must comply with all of the following requirements:
1. General Requirements
a. The system size is 10 kW AC CEC rating or less.
b. The solar array is roof -mounted on a one- or two-family dwelling or accessory
structure.
c. The solar panel/module arrays will not exceed the maximum legal building
height.
d. The solar system is utility interactive and without battery storage.
e. A completed application for a permit from the City of Santa Clarity is attached
with the required documentation.
2. Electrical Requirements
a. No more than four PV module strings are connected to each Maximum Power
Point Tracking (MPPT) input where source circuit fusing is included in the
inverter.
b. No more than two strings per MPPT input where source circuit fusing is not
included in the inverter.
c. Fuses (if needed) are rated to the series fuse rating of the PV module.
d. No more than one noninverter-integrated DC combiner is utilized per inverter.
e. For central inverter systems, no more than two inverters are utilized.
f. The PV system is interconnected to a single-phase AC service panel of nominal
120/220 Vac with a bus bar rating of 225 A or less.
2
3
g. The PV system is connected to the load side of the utility distribution
equipment.
h. A Solar PV Standard Plan and supporting documentation is completed and
attached to the application.
3. Structural Requirements
The applicant has verified through the use of standard engineering evaluation
techniques that the support structure for the small residential rooftop solar energy
system is stable and adequate to transfer all wind, seismic, dead, and live loads
associated with the system to the roof and building structure and foundation. Supporting
documentation is available if requested.
4. Fire Safety Requirements
a. Clear access pathways are provided and shown on the roof plan around the
rooftop system in accordance with Los Angeles County Fire Department
requirements.
b. The fire classification of the solar system meets the requirements for a Class `B'
roof or, if located in the City's Fire Zone, the requirements for a Class `A' roof.
c. Any new roofing installed shall meet or exceed the existing roof s fire safety
classification for Class `A' or Class `B' materials.
d. A note must be shown on the plans that all required markings and labels will be
provided to the building inspector in the field.
e. A diagram of the roof layout of all panels, modules, clear access pathways and
approximate locations of electrical disconnecting means and roof access points
is completed and attached.
25.02.070 PLAN REVIEW AND PERMIT ISSUANCE
1. - An application with associated plans, drawings, and other documentation that satisfies
all requirements set forth in the eligibility checklist for expedited permitting shall be
deemed complete upon review of the associated documents by the City Building
Official. Such review shall be performed in a timely manner and in conformance with
Assembly Bill 2188 (Chapter 521, Statutes 2014). Should the application be deemed
incomplete, the City Building Official shall issue a written correction notice detailing
all deficiencies in the application and any additional information required to be eligible
for expedited permit issuance.
2. Upon confirmation by the City Building Official of the application and supporting
documentation being complete and meeting the requirements of the checklist, the City
Building Official shall administratively approve the application and issue a permit to
perform the work.
3. Such approval for the installation of the solar PV system does not authorize an applicant
to connect the energy system to the local utility provider's electricity grid. The applicant
is responsible for obtaining such approval or permission from the local utility provider.
4. The City of Santa Clarita shall not condition approval of an application on the approval
of a homeowner's association, as defined in Section 4080 of the Civil Code.
25.02.080 INSPECTIONS
1. For a small residential rooftop solar energy system eligible for expedited review, only
one inspection shall be required. The inspection shall be performed in a timely manner
3
and will be scheduled within two (2) business days of a request. A four (4) hour
inspection window may be provided upon request.
2. If a small residential rooftop solar energy system fails inspection, a subsequent
inspection is authorized; however, the subsequent inspection need not conform to the
requirements of this subsection.
3. A reinspection fee may be assessed under any of the following conditions:
a. The installation is not complete and ready for inspection at the scheduled
time.
b. The equipment is not open and accessible for the inspector to view at the
time of inspection.
c. The inspection has failed on two previous occasions.
SECTION 2. EFFECTIVE DATE. This Ordinance shall be in full force and effect thirty (30)
days from its passage and adoption.
SECTION 3. SEVERABILITY. If any portion of this chapter is found to be unconstitutional or
invalid, the City Council hereby declares that it would have enacted the remainder of this
chapter regardless of the absence of any such invalid part.
SECTION 4. The City Clerk shall certify to the passage of this Ordinance and shall cause the
same to be published as required by law.
PASSED, APPROVED, AND ADOPTED this 22nd day of September 2015.
DATE: 10/12-/ /S
El
1
1
1
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES )ss.
CITY OF SANTA CLARITA )
I, Kevin Tonoian, City Clerk of the City of Santa Clarita, do hereby certify that the foregoing
Ordinance No. 15-07 was regularly introduced and placed upon its first reading at a regular meeting of
the City Council on the 8th g
day of September 2015. That thereafter, said Ordinance was dui passed
. 22nd y
and adopted at a regular meeting of the City Council on the 22 day of September 2015, b the
. y
following vote, to wit:
AYES: COUNCILMEMBERS: Weste, Acosta, Kellar, Boydston, McLean
NOES: COUNCILMEMBERS: None
ABSENT: COUNCILMEMBERS: None
AND I FURTHER CERTIFY that the foregoing is the original of Ordinance No. 15-07 and was
published in The Signal newspaper in accordance with State Law (G.C. 408061
5