Loading...
HomeMy WebLinkAbout2016-10-25 - AGENDA REPORTS - AWARD CONTRACT TREE MAINT (2)Agenda Item• 8 CITY OF SANTA CLARITA Q) AGENDA REPORT CONSENT CALENDAR CITY MANAGER APPROVAL: fAl DATE: October 25, 2016 SUBJECT: AWARD CONTRACT FOR TREE MAINTENANCE DEPARTMENT: Neighborhood Services PRESENTER: Kevin Tonoian RECOMMENDED ACTION City Council: 1. Award a one-year contract to Stay Green, Inc. to provide contractual tree maintenance services for all City maintained trees for an annual amount of $1,100,000; and authorize an annual contingency in the amount of $220,000, for a total one-year amount not to exceed $1,320,000. 2. Authorize the City Manager or designee to execute all contracts and associated documents or modify the awards in the event impossibility of performance arise, contingent upon the appropriation of funds by the City Council in the annual budget for such Fiscal Year, and execute all documents subject to City Attorney approval. 3. Authorize the City Manager or designee to execute up to four additional one-year renewal options beginning in year two, not to exceed the base annual contract (inclusive of contingency) of $1,320,000, plus the appropriate CPI adjustment, upon request of the contractor. BACKGROUND The City of Santa Clarita (City) performs proactive routine maintenance to an urban forest encompassing over 120,000 trees throughout the City, with half of those trees being funded by Landscape Maintenance Districts and the other half funded by the General Fund. Proactive maintenance leads to more efficient management of our urban forestry, with regular maintenance improving the overall health and vitality of our trees while mitigating potential large branch or entire tree failures due to factors such as age, drought or significant wind events. Bid Number UF -16-17-01 for the proactive maintenance of all City maintained trees was Yl Page 1 Packet Pg. 44 published and circulated via the PlanetBids system on July 5, 2016. The request for bid was sent to 344 vendors, and was downloaded by 24 companies. Three companies responded to the bid with one submitted incomplete. Bid Vendor Location Total Bid Responsive Bid Amount (Yes/No) Bid 1 Stay Green, hic Santa Clarita, $1,77400 Yes (Recommended) CA Bid 2 West Coast Anaheim, CA $2,3921320 Yes Arborists Bid 3 Mariposa Irwindale, CA $3,04500 No (Did not Landscape include Bid Bond) A thorough evaluation of bids has determined the proposal submitted by Stay Green, Inc. (Stay Green) to be the lowest cost and most responsive bid. To improve maintenance standards and enforce accountability, UF -16-17-01 encompasses an updated scope of work. In addition to more clearly detailing performance expectations, the proposed agreement provides staff with the ability to impose payment reductions when maintenance standards are not met or work is not completed within required time lines. In preparing bid specifications, the City instructed proposers to calculate their bid for re- occurring services based upon pruning 3,000 trees per month. As such, the above bid amounts reflect annual costs based on this quantity. Staff is basing the recommended award of contract upon funds appropriated within the Urban Forestry and Landscape Maintenance District (LMD) operational budget which have been identified to support the City's annual tree pruning program which for Fiscal Year 2016-17 is $1,100,000. Based on bid pricing and the appropriated operational budget for Urban Forestry and LMD, staff will have the operational capacity to proactively prune approximately 1,500 trees per month or 20,000 trees per year. This equates to a six-year average tree pruning cycle which is well within the industry standard for how often a municipality should prune their tree inventory. In evaluating bid pricing, the average per tree pruning cost equals $55. In reviewing recent tree pruning bid awards, staff believes bid pricing received through this solicitation is competitive with the pricing experience of other cities. The City of Monrovia awarded a tree maintenance contract in July 2016 which reflected an average pruning price point of $63 per tree. The cities of Azusa, Santa Ana and Arcadia all maintain similar per tree pricing, while the City of San Fernando pruning price point is $65.50 per tree. Staff has completed a due -diligence review of Stay Green's professional references and determined they have the ability to meet the City's high performance standards. Further, representatives from Special Districts met with Stay Green to ensure they have a full understanding of all contract requirements and verified Stay Green is capable of meeting the City's expectations within the bid pricing as submitted. Page 2 Packet Pg. 45 Finally, in addition to the annual base contract amount, staff is requesting a 20% contingency authorization in the amount of $220,000. Expenditure of these additional funds will only be necessary in the event of high tree mortality, unforeseen emergencies and/or necessary tree work associated with other City projects. ALTERNATIVE ACTION 1. Do not award contract to Stay Green, Inc. 2. Other action as determined by the City Council. FISCAL IMPACT Adequate funds have previously been appropriated as part of the Fiscal Year 2016-17 budget to support this recommended contract. Funds for future fiscal years are contingent upon appropriation of monies by the City Council during the annual budget process. This contract will be funded equally by Landscape Maintenance Districts and General Fund monies. ATTACHMENTS UF -16-17-01 Stay Green (available in the City Clerk's Reading File) Page Packet Pg. 46 CITY OF SANTA CLARITA INVITATION FOR BID BID # UF -16-17-01 BID OPENING: August 5, 2016 The City of Santa Clarita invites electronically sealed bids for: CITY OF SANTA CLARITA TREE MAINTENANCE PROGRAM 1. Electronic Bids must be ELECTRONICALLY received at: http://www.planetbds.com/portal/portal.cfm?CompanvlD=16840# 2. Prices shall be D.D.P. City of Santa Clarita Receiving dock Incoterms 2000 or for the service rendered. 3. Bidder shall honor bid prices for ninety (90) days or for the stated contract period, whichever is longer. 4. Bids must be on this Bid forth. Submission of a proposal acknowledges the proposer has read and understands the requirements contained on pages 1 to 43 and Exhibits A and B and Attachments A to C. 5. Bid Questions. Questions should be submitted electronicallyto: http://www.olanetbids.cam/nodal/oortal.cfm?Comoanvl D=16840# The last day for questions will be 5:00 PM, July 28, 2016. 6. The vendor is responsible for the accuracy and completeness of any solicitation form not obtained directly from the City. 7. Renewal and Pricinc Adjustment. Contracts entered into pursuant to this Invitation to Bid may be renewed annually up to 3 times, in accordance with the terms of the contract. If not otherwise stated, the contract may be renewed if the new pricing of the contract does not change more than the Consumer Price Index identified in the most recently City Council approved City of Santa Clarita Combined Engineer's Report for Landscape Maintenance Districts. Name (Print): Michael Clack Email: mclack0stayareen.com Company Phone No.'(661)291-2800 Bid # UF -16-17-01 Company:Stay Green Inc. Address 26415 Summit Circle City: Santa Clarita State/Zip: CA, 81350 CITY OF SANTA CLARITA TREE MAINTENANCE PROGRAM UF -16-17-01 DOCUMENTS CHECKLIST The following documents are required to be completed and submitted by the Contractor at the times specified by an X opposite each title. If no column is marked, document will not be required. DO NOT send more information than is requested. DO send the REQUESTED information. With Bid Proposal (All Bidders) With Agreement (Awardee only) Prior to Starting Work (Awardee only) X Proposal — electronic X Proof of Contractor's License -license number will suffice X Bidder's Bond (MUST be received at City Hall prior to bid due date) X List of Subcontractors — if none, write "n/a". Do NOT leave blank X References X Bid Schedule — Use the City supplied pricing page only X Pricing pages that require initials X Required certificates/qualifications (as identified in solicitation including but not limited to, License C27, D29 certification) X Acknowledgement X Exhibit A (complete) X Exhibit B (complete) X Contract Agreement X Insurance Requirements — Return onlyifAwardee X Bond for Faithful Performance X Certification of Public Liability and Property Damage Insurance X Certification of Worker's Compensation Insurance X Certification of Fire and Extended Coverage Insurance X Maintenance Meeting X Emergency Contact Information Bid 9 UF -16-17-D1 43 W1-arPvfeowivnj1Lv:dsrjpeSetay Green Inc. The a to ul Crnirr ;w Contractor's License Stay Green Inc. 26a 15 Summit Circle, Sanm Clarita, CA 91350 o (800)858-5508 -(661)2912800 • Fax:(661)'05-2089 mM,ov.smygreenxmn • C-27, C-61 License #346620 g- . Stay Green Inc. r� 7ar �uturat cr n,.r far Rraf uinna(! nm4capr S-m,rae State Of CONTRACTORS STATE LICENSE BOARD ACTIVE LICENSE 346620 mCORP STAY - GREEN INC C2 C611049 e•....,.. 12/31/201(5 www cslt ca gov Stay Green Inc. 26415 Summit Circle, Santa Clarita, CA 91350 • (800)858-SS08 • (661)291-2800 • rax: (661)-05-2089 "' %ostaygrccn.com • C-27, C-61 License #346620 W1ar1Orafcaipn,dLdw&a;pcSmv;=tay GreenInc. 26ti anal C17akc Bid Bond Stay Green Inc. 26415 Summit Circle, Santa Clarim, CA91350 • (800)858-5508 • (661)291-2800 • Fax:{661'x'052089 mwwstaYBrccn.com • C-27, C-61 License 0346620 PROPOSAL GUARANTEE BID BOND CITY OF SANTA CLARITA TREE MAINTENANCE PROGRAM UF -16-17-01 City of Santa Clarlfa, CalUomia KNOW ALL MEN BY THESE PRESENTS that Stay Green, Inc. AS BIDDER, and _Nationwide Mutum al Insurance ooany as SURETY, are held and firmly bound unto the City of Santa ClarHa, as AGENCY, in the penal sum of Ten Percent of Amount Bid dollars ($10% ). which Is ten percent (10%) of the total of first contract year (365 days) amount which is bid by BIDDER, to AGENCY for the above -staled project, for the payment of which sum, BIDDER and SURETY agree to be bound, jointly and severally, finely by these presents. THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER Is about to submit a bid to AGENCY for the above -stated project, If said bid Is rejected, or if said bid is accepted and the contract Is awarded and entered into by BIDDER in the manner and "me specified, then this obligation shall be null and void, otherwise it shall remain in full force and effect in favor of AGENCY. IN WITNESS WHEREAS, the parties hereto have set their names, titles, hands, and seals, this 21st day of July 2016 Shauna Lucero, Attomey-In-Fact Subscn'bedwW sworn to this- day of . 20� NOTARY PUBLIC SEE ATTACHED CALIFORNIA NOTARY ACKNOWLEDGEMENT 'Provide BIDDER and SURETY name, address, and telephone number and the name, Mle, address, and telephone number for authorized representative. IMPORTANT - Surety Companies executing Bonds must appear on the Treasury DepartmenCs most current list (Circular 570, as amended) and be authorized to transact business in the State where the project Is located. Bidder Surety. Agent Stay Green, Inc Nationwide Mutual Insurance Company Landscape Contractors Insurance Services, Inc 26415 Summit Circle Josh Severson, Sr. Contract Bond Underwriter Shauna Luceno, Bond Specialist Santa Cladta, CA 91350 P O Box 1820 1835 N Fine Ave. Phone WO -856-5509 LeMesa, CA 91944-1820 Fresno, CA 93727 BM822.38M 559-650-3555 BM 0 UF- 16-17 01 22 ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of Fresno On A21 711\4 )-M before me, Pamela Severson, Notary Public (insert name and title of the officer) personally appeared Shauna Lucero who proved to me on the basis of satisfactory evidence to be the person(rr)-whose nameWis(Aw subscribed to the within instrument and acknowledged to me that wsheBibey executed the same in his/her/tyeir authorized capacity(iaa}, and that by pisfher/Am* signature(sron the instrument the persort(ej; or the entity upon behalf of which the persoruaj'acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. PAMELA SE VERBON 3 NOTARY PUBLIC . CALIFORNIA f r COMMISSION N 2f038BI FRE9N0 COUNTY C My Comm. Exp. AAAI 15, perp Signature �.�,_ �..o.�.s-S� (Seal) KNOW ALL MEN BY THESE PRESENTS THAT: Nationwide Mutual Insurance Company, an Ohio corporation Farmland Mutual Insurance Company, an Iowa corporation Nationwide Agribusiness Insurance Company, an Iowa corporation Power of Attorney AMCO Insurance Company, an Iowa corporation Allied Property and Casualty Insurance Company, an Iowa corporation Depositors Insurance Company, an Iowa corporation heminsfier referred to severally as the'Company' and collectively as the "Companies," each does hereby make, constitute and appoint Shauna Lucero Fresno, CA each In their individual capacity, Its true and lawful atomey-In-fad, with full power and authority to sign, seal, and execute on Its behalf any and all bonds and undertakings and other obligatory Instruments of similar nature, in penalties not exceeding the sum of Two Million and nollOg S2,0009000.00 and to bind the Company thereby, as fully and to the same extent as If such Instruments were signed by the duly authorized officers of the Company; and all acts of said Attorney pursuant to the authority given are hereby ratified and confirmed. This power of attorney Is made and executed pursuant to and by authority of the following resolution duly adopted by the board of directors of the Company- -RESOLVED. ompany-RESOLVED, that the president, or any vice president be, and each hereby Is, authorized and empowered to appoint atomeys-in-fact of the Company, and b authorize them to execute and deliver an behalf of the Company any and all bonds, forms, applications, memorandums, undertakings, recognizances, transfers contracts of Indemnity, policies, contracts guaranteeing the fidelity of persons holding positions of public or private trust, and other writings obligatory in nature that the business of the Company may require; and to modify or revoke, with of withoutcouse, any such appointment or authority; provided, however, that the authoritygrantet hereby shall in no way limit the authority of other duly authorized agents to sign and munlersign any of said documents on behalf of the Company." 'RESOLVED FURTHER, that such atomeys-In-fad shall have full power and authority to execute and deliver any and all such documents and to bind the Compan7 subject to the terms and limitations of the power of attorney issued to them, and to affix the seal of the Company thereto; provided, however, that mid seal shall not M necessary for the validity of any such documents. - This power of attorney is signed and sealed under and by the following bylaws duly adopted by the board of directors of the Company. Execution of Instruments. Any vice president, any assistant secretary or any assistant treasurer shall have the power and authority to sign ar attest all approver tlmuments, instruments, contacts, or other papers In connection with the operation ofthe business of the companyin addition to the chairman of the board, the chie executive officer, president, treasurer or secretary; provided, however, the signature ofany of gram may be printed, engraved, orslamped on any approved document contract, Instrument, or other papers of the Company. INWITNESS WHEREOF, the Company has caused this instrument to be sealed an duly attested by the signature of its officer the jf. day of February , 14 . I&00et\Terrance Williams, President and Chief Operating Officer of Nationwide Agribusiness Insurance Company / +"• 99p ®j° and Farmland Mutual Insurance Company; and Vice President of Nationwide Mutual Insurance Company, SEAL,!% /S.SEAd AMCO Insurance Company, Allied Properly and Casualty Insurance Company, and Depositors Insurance �t %44 Company \✓,�p' ACKNOWLEDGMENT ��Xuva, -!IW\, STATE OF N IOWA, COUNTY OF POLK. as ��i" t On this l�7_day of February 2014, before me came the above-named officer for the Companies aforesaid, / i�jrAL� 1wm� �/ to me personally known to be file officer described in and who executed the preceding Instrument, and he SEAL , acknowledged the execution of the same, and being by me duly sworn, deposes and says, that he is the ofgrar of the Companies aforesaid, that the seals affixed hereto are the corporate seals of said Companies, \t• \�� and the said corporate seals and his signature were duly affixed and subscribed to said Instrument by the authority and direction of said Comoanias Sandy ABU ,, / NMaterialn Seal - lae K /,:SEAL y / '.SEAL � Commivioe Number 152785 Ar 1 . Ar My Comminina Eaplres March, 24, 3017 Notary Public ��` �� ��\Ii My Commission Expires CERTIFICATE March 24, 2017 I, Robert W Homer III, Assistant Secretary of the Companies, do hereby certify that the foregoing Is a full, Into and coned copy of the original power of attorney Issued by the Company; that the resolution Included therein is a two and coned transcript from the minutes of the meetings of the boards of directors and the same has not been revoked or amended In any manner, that said Terrance Williams was on the date of the execution of the foregoing power of attorney the duly elected officer of the Companies, and the corporate seals and his signature as officer were duly affixed and subscribed to the said Instrument by the authority of said board ofdirectors; and the foregoing power of attorney is still in full force and effect. IN WITNESS WHEREOF, I have hereunto subscribed my name as Assistant Secretary, and affixed the corporate seals of said Companies this 21eu day or July. 20 16 yLw Assistant Secretary This Power of Attorney Expires March 24, 2017 BDJ 1(04-14)00 'StayGreen Inc. ne..:rh,rar crnlre lorl4wf"ional Landrrufe Smite Subcontractors Stay Green Inc. 26415 Summit Circle, Santa Claris, CA 91350 • (8001858 5508 • {6611291 2800 • Fax: 16611'05 2089 u-% .sravgrecn.cam • C-2', C-61 License #346620 DESIGNATION OF SUBCONTRACTORS CITY OF SANTA CLARITA TREE MAINTENANCE PROGRAM UF -1647-01 City of Santa Clarite, California Listed below are the names and locations of the places of business of each subcontractor, supplier, and vendor who will perform work or labor or render service in excess of Y, of 1 percent of the prime contractor's total bid: DBE status, age of firm, certifying agency and annual gross receipts are required if sub contractor is participating as a DBE. The form MUST be retumed with bid, filled in or annotated with "No Subcontractors" if none will be used Subcontractor No Subcontractors DBC S 1 A rUS: Age of firm: Certifvin • Agency ollar alue rk FAnnauIV]Jross07Rcctc'ipt5: Location and Place of Business Location and Place of Business Bid Schedule Item Nos: Description o Work Description of Work License No. Lxp. Date. Phone ( ) Subcontractor Age of firm: DBE STATUS- Certifying Agency. Dollar Value of Work Annual Gross Receipts: Location and Place of Business Bid Schedule Item Nos: Description of Work License No. Exp. Date: I I Phone ( ) Subcontractor Age of firm: DBE STATUS: Ccrtif ing A enc : Dollar Value of Work Annual Gross Receipts: Location and Place ol'Business Bid Schedule Item Nos: Description of Work License No. Exp. Date: / 1 Phone ( ) NOTE: A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of section 4104 of the Public Contract Code, or engage In the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1726.6 of the Labor Code. It Is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Secdon 10164 or 20103.6 of the Public Contract Code, provided the contractor Is registered to perform public work pursuant to Section 1726.6 of the Labor Code at the time the contract is awarded. Bid 9 UF -16.17-01 40 DESIGNATION OF SUBCONTRACTORS CITY OF SANTA CLARITA TREE MAINTENANCE PROGRAM UF -16-17-01 City of Santa Clarita, California Subcontractor No Subcontractors A e of firm: DBE STATUS: Certifying Agency: Dollar Value of Work Annual Gross Receipts. Location and Place of Business Description of Work License No. Bid Schedule Item Nos: Description of Work License No. Exp. Date: 1 i Phone I ) Subcontractor Are of firm: DBI: STATUS: Certillving Agency, Dollar Value of Work Annual Gross Receipts: Location and Place ol'Business Description of Work License No. Bid Schedule Item Nos: Description o l'Work License No. Exp. Date: I 1 Phone I ) Subcontractor DBL STATUS: Age of firm: Ccnif in g Agency: Dollar Value of Work Annual Gross Receipts! Location and Place of Business Bid Schedule Item Nos: Description of Work License No. Exp. Date: Phone ( ) NOTE: A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined In this chapter, unless currently registered and qualified to perform public work pursuant to Section 1726.6 of the Labor Code. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.6 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1726.6 of the Labor Code at the time the contract Is awarded. Bid * UF -16-17-01 41 Stay GreenInc. 77rr.1'atnnlCbmrr Inrprofrstian.,l LandtuprSrrvint References Stay Green Inc. 26415 Summit Circle, Santa Clariva, CA 91350 • (800)858-5508 • (6611291 2800 • Fax:[661� 705.2089 uww.staYBrcen.cmn • C-2'?, C-61 License#346620 CITY OF SANTA CLARITA TREE MAINTENANCE PROGRAM OF -16-1741 City of Santa Clarita, California The following are the names, addresses, and telephone numbers of three public agencies for which BIDDER has performed work of a similar scope and size within the past 3 years: 1 City of Bakersfield - 1600 Truxton Avenue, Bakersfield, CA 93301 Name and Address of Owner / Agency Kim Berrigan (661)326-3744 Name and Telephone Number of Person Familiar with Project $300,000 Annually Tree Care 12131/2014 Contract Amount Type of Work Date Completed Rancho Simi Recreation and Park District 2. 1692 Sycamore Drive, Simi Valley, CA 93065 Name and Address of Owner /Agency Paul Friedbom (805)584-4400 Name and Telephone Number of Person Familiar with Project $80,000 Annually Tree Care In Production Contract Amount Type of Work Date Completed 3. City of Santa Clarita - 23920 Valencia Boulevard, Valencia, CA 91355 Name and Address of Owner / Agency Susan Nelson (661)294-2518 Name and Telephone Number of Person Familiar with Project $1,200,000 Annually Tree Care In Production Contract Amount Type of Work Date Completed The following are the names, addresses, and telephone numbers of all brokers and sureties from whom BIDDER intends to procure insurance bonds: Shauna Lucero - LCIS Inc. -1835 N. Fine Ave, Fresno, CA 93727 - (559)650-3555 Josh Severson, Nationwide - P.O. Box 1820, La Mesa, CA 91944 - (800)822-3666 Bld * UF -16-17-01 42 M Stay Green Inc. 76e Er. Clone farl7afru+on,tJL.tndttapeSrrvitn Bid Schedule Stay Green Inc. 26415 Summit Circle, Santa Clarita, CA 91350 • (800::858-5508 • f6611291 2800 • Fax:(6611705.2089 uuwsray8recnxmn • C 27, C 61 Liccnw #3346620 E. BID SCHEDULE (6 PAGES) CITY OF SANTA CLARITA TREE MAINTENANCE PROGRAM UF -16-17-01 The City of Santa Clarita reserves the right to award any or part of the entire bid to one or more vendors, solely at the City's discretion. PRICING FOR URBAN FORESTRY TREES 1. TRIMMING Unit pricing to prune trees regardless of species (except for palm trees) based on DBH. Provide pricing to trim the following trees as a per tree cost based on DBH. The number in parentheses is an estimated number of trees that will be trimmed annually for the respective DBH. It is not a guarantee there will be that number of trees in each diameter. Depending on available funds the overall quantity may change up or down URBAN FORESTRYTREES-TRIMMING DBH Unit Price Units (Annual Quantity) Extended Price 0"-3.99" $15,00 x 1200 = $ 411-6.99" $21.00 x 3500 = $73,500.00 7"-12.99" $37.00 x 4900 = $181 300.00 13"-18.99" $75.00 x 3400 = $255,000.00 19"-24.99" $96.00 x 2200 = $211200.00 25".30.99" $117.00 x 580 = $ 67 860.00 31"-36.99" $156.00 x 200 = $ 31,200.00 37"-42.99" $190.00 x 100 = $ 19,000.00 43" and up $234.00 x 120 = $28,080.00 Palm Tree (Average height 40') $90.00 x 24 = $ 2,160.00 Urban Forestry Tree Trimming Total (Total Extended Price):$ 887,300.00 Old # UF -16.17.01 32 2. REMOVALS Unit pricing to remove trees regardless of species (except for palm trees) based on DBH. Provide pricing to remove the fallowing trees as a per tree cost based on DBH. The number in parentheses is an estimated number of trees that will be removed annually for the respective DBH. It is not a guarantee there will be that number of trees in each diameter. Deoending on available funds the overall quantity may change m or down URBAN FORESTRY TREES - REMOVALS DBH Unit Price Units (Annual Quantity) Extended Price 0"-3.99" $19.00 x 50 = $ 950.00 4"-6.99" $30.00 x 50 = $ 1,500.00 76-12.99" $70.00 x 50 = $ 3,500.00 1361-18.99" $120.00 x 50 = $ 61000a00 1911-24.99" $400.00 x 50 = $ 20 000.00 2511-30.99" $11000.00 x 25 = $ 25 000.00 3111-36.99" $1,200.00 x 25 = $ 30 000.00 37"-42.99" $1,800.00 x 20 = $ 3600000 43" and up $29400.00 x 10 = $ 24,Q00-00 Palm Tree (Average height 40') $400.00 x 20 = $8,000.00 Urban Forestry Tree Removal Total (Total Extended Price): $ 1549950.00 Bid # UF -16-17-01 33 BID SCHEDULE CITY OF SANTA CLARITA TREE MAINTENANCE PROGRAM UF -16-17-01 The City of Santa Clarita reserves the right to award any or part of the entire bid to one or more vendors, solely at the City's discretion. PRICING FOR LANDSCAPE MAINTENANCE DISTRICT (LMD) TREES 3. TRIMMING Unit pricing to prune trees regardless of species (except for palm trees) based on D8H. Provide pricing to trim the following trees as a per tree cost based on DBH. The number in parentheses is an estimated number of trees that will be trimmed annually for the respective DBH. It is not a guarantee there will be that number of trees in each diameter. Dependinq on available funds the overall quantity may change up or down. !MD TREES -TRIMMING DBH Unit Price Units (Annual Quantity) Extended Price 011-3.99" $ 15.00 x 1200 = $ 18 000.00 411-6.99" $ 21.00 x 3500 = $ 73 500.00 7"-12.99" $ 37.00 x 4900 = $ 181 300.00 13"-18.99" $ 75.00 x 3400 = $ 255 000.00 19"-24.99" $ 96.00 x 2200 = $ 211 200.00 25"-30.99" $ 117.00 x 1 580 =1 $ 67 860.00 31"-36.99" $ 156.00 x 200 = $ 31 200.00 37"-42.99" $ 190.00 x 100 = $ 19 000.00 43" and up $ 234.00 x 120 = $ 28 080.00 Palm Tree (Average height 40') $ 90.00 x 24 = $ 2,160.00 LMD Tree Trimming Total (Total Extended Price): $ 887,300.60 Bid * UF -16-17-01 34 4. REMOVALS Unit pricing to remove trees regardless of species (except for palm trees) based on DBH. Provide pricing to remove the following trees as a per tree cost based on DBH. The number in parentheses is an estimated number of trees that will be removed annually for the respective DBH. It is not a guarantee there will be that number of trees in each diameter. Depending on available funds the overall quantity may change up or down LIVID - REMOVALS D8H Unit Price Units (Annual Quantity) Extended Price 0"-3.99" $19.00 x 50 = $ 950.00 4"-6.99" $30.00 x 50 = $1,500.00 7"-12.99" $70.00 x 50 = $39500.00 131? -18.99" $120.00 x 50 = $600000 19"-24.99" $400.00 x 50 = $20,000.00 25"-30.99" $1 000.00 x 25 = $25.000.00 3111-36.99" $1.200.00 x 25 = $3000000 37"-42.99" $1,800.00 x 20 = $36.000.00 43" and up $2,400.00 x 10 = $ 24,000.00 Palm Tree (Average Height 40') $400.00 x 20 = $ 8,000.00 LMD Tree Removal Total (Total Extended Price): $ 154,950.00 Bid # UF -16.17-01 35 PRICING FOR CITY WIDE TREE WORK 5. TREE INVENTORYING Tree inventorying, regardless of the trees species or size. (See Section 3-20, for specifications.) $ 2.00 x 5,000 trees = $ 1.01000.00 (unit price) (extended price) 6. THREE MAN SERVICE REQUEST CREW Price per eight hour day for three-man crew and equipment that meets the following requirements: A three (3) person crew to consist of: one (1) supervisor/climber/trimmer— Certified Tree Worker, one (1) climber/trimmer, and one (1) grounds man; equipment and tools to complete general tree trimming and tree removals. Stump grinder to be included when work assigned includes tree removals. Depending on available funds the overall quantity may change up or down $ 11200.00 x 50 = $ 601000,00 (crew daily rate) (annual work days) (extended price) 7. SIX MAN SERVICE REQUEST CREW Price per eight hour day for six -man crew and equipment that meets the following requirements - A six (6) person tree crew to consist of one (1) supervisor / climber / trimmer - Certified Tree Worker, three (3) climbers / trimmers/ Certified Tree Workers, equipment and tools to complete general tree trimming and tree removals. Stump grinder to be included when work assigned includes tree removals. $ 2,400.00 x 50 = $ 1209000.00 (crew daily rate) (annual work days) (total extended price) Bid # UF -16-17-01 36 Includes: 1. OF Trimming Total Price 2. OF Removal Total Price 3. LMD Trimming Total Price 4. LMD Removal Total Price 5. Tree Inventorying Total Price 6. Three Man Crew Total Price 7. Six Man Crew Total Price TOTAL COST FOR ITEMS #1-7 BID PRICING TOTALS $ 887,300.00 $ 1549950.00 $ 8879300.00 $ 154.950.00 $ 104000.00 $ 600000.00 $ 120.000.00 21274,500.00 (GRAND TOTAL) Bid # UF -16-17-01 37 ADDITIONAL PRICING (1 page) TREE PLANTING and WATERING (DO NOT INCLUDE THIS COST IN YOUR BID PRICING TOTAL) Please list the unit price for the following tasks. These rates will be used in evaluating the bid, and will be used in evaluating cost estimates for additional work requested by the City under this Contract. See page "Attachment B" for tree planting and tree staking specifications. AFTER HOURS EMERGENCY RESPONSE RATES Contractor shall be compensated a minimum of two (2) hours for afterhours field response Certified Tree Trimmer Tree Trimmer/ Climber Groundsman Hourly Rate: $112.00 Hourly Rate: $105.00 Hourly Rate: $ 97.00 Bid # UF•16.17.01 38 EXTENDED LINE DESCRIPTION UNIT OF UNIT ANNUAL PRICE MEASURE PRICE QUANTITY (unit price x quantity) 1 Installation of tree — 15 gallon tree (60) 15 gallon container $150.00 Sixty $ 9,000.00 2 Installation of tree — 24 inch box tree (60) 24 inch box container. $ 325.00 Sixty $ 19,500.00 3 Deep root water per tree (60) established tree $180.00 Sixty $102800.00 See page "Attachment B" for tree planting and tree staking specifications. AFTER HOURS EMERGENCY RESPONSE RATES Contractor shall be compensated a minimum of two (2) hours for afterhours field response Certified Tree Trimmer Tree Trimmer/ Climber Groundsman Hourly Rate: $112.00 Hourly Rate: $105.00 Hourly Rate: $ 97.00 Bid # UF•16.17.01 38 StayGreen Inc. 71m.\EF Choice for Prafeuional Landrwpe Sereicn Exhibit A Stay Green Inc. 26415 Summit Circle, Santa Clarica, CA 91350 • (800; 858-5508 • X661) 291-2800 • Fax; (661Y"05-2089 %�.scaygrccn.com•C-2',C-61 License #346620 EXHIBIT A Violation Records 1) Please attach the last six (6) months of tailgate safety meeting sign in sheets and topics covered. 2) In the year of 2015, what was the longest stretch of days worked without an accident in the landscape maintenance division? a. 365 3) Please provide any sustained complaints made to your company within the past four (4) years to Cal-Osha. a. 4} Please provide any sustained complaints made to your company within the past four (4) years to the California State Contractor Board in regards to your C-27 license. a. Bid # UF -16-17-01 (qr Stay Green Inc. Dir.\amntl Cboim ivr!'iafiviarinlLand�wpc Srrvirn TAILGATE SAFETY MEETING SGI Meeting Record Page/Pagina 1 or/de: 2 Date / Fecha: Z v� Department / Depa amento Meeting was conducted by La close fue dirigida par Hour_ / Hors:v ITC I &k M - ( 6:30 AM/PM Subjects Presented and Discussed or Accident and Injuries Reviewed (Attach a copy) Tema presentado y discutido o Accidente y Lastimadurn Revisada Ad'unte uas copia) i ® Victor Rojas 1 • i u i ® Victor Rojas / 7 IF RM ® 1: •• �i eir ® W�� 0: i fie TAILGATE SAFETY MEETING SGI Meeting Record Page/pigina 2 of/de: 2 Employee # NAME Si o / Firme. 5655 Luis Aguilar Barragan 6155 Jaime Aguilar AlKk U1 6170 Jesus Figueroa 6170 Filiberto Pantoja 1 ' L J r. SGI Meeting Record Page/Pdgina 1 oVde: 2 Date / Fecha: Z5 1 it, Sign / Firme. Hour/ Horn: 1.400 -4'U M Department/Depaitamento: T 5886 Pedro Pelayo 5655 Aguilar Barragan, Luis Meeting was conductby La ciase fue dirigida por Victor Rojas Subjects Presented and Discussed or Accident and Injuries Reviewed (Attach a copy) Tema resentado y discutido o Accidence y Lastimadurn Revisada Ad'unte non cois Qh H (� S �6% C7 �Jo 5619 Employee NAME Sign / Firme. 5926 Aaron Rosales 5886 Pedro Pelayo 5655 Aguilar Barragan, Luis 5678 Victor Rojas 5602 Pelayo Marlin (� 5216 David Pelayo C7 �Jo 5619 Quintanilla, Siivestre 5721 Servero Lorenzo t 5320 Joan Andrade cO 5892 Francisco Pena r - 5937 Adrian Hernandez 5890 Marcos Romero SGI Meeting Record Pagelogina 2 of/de: 2 Employee # NAME Sign / Firme. 5655 Luis Aguilar Barragan 6155 Jaime Aguilar 6170 Jesus Figueroa 6170 FBlherto Pantoja , 1 im f % I - Stay Green Inc. 7hrNkftmdC' {r_ l TAILGATEwkr 1 1 Date / Fechn: Hour/ Hors: 7:00 AM/PM Department/Departamento: TC ® Meeting was conducted by La close fae dirigida por ® Cfos Subjects Presented and Discussed or Accident and Injuries Reviewed (Attach a copy) Tema presentado y discutido o Accidente y Lastimadura Revisade Ad'unle una co la rw�w G� ,F. ® FRAN l p Ly ® iso: i �0ME ,F. 11 ,3Se- moi' -Stay Green Inc. Emp#oyee NAME Sign / Firme. 5655 Luis Aguilar Barragan 6155 Jaime Aguilar Iql `1 6170 Jesus Figueroa 6170 F'diberto Pantoja x� ' r rill..' . _i .� .. r SGI Meeting Record Page/Pfigina 1 of/de: 2 Date/ Fecba: •I Hour/ Horn: 6:30 AM/PM Department / Departamento I CrCA Aguilar Barragan, Luis ® /.. NEW r.J.a Meeting was conducted by La clase foe dirigida por David (Ui f'cr/A D o 1j� t Subjects Presented and Discussed or Accident and Injuries Reviewed (Attach a copy) Tema presentado y discutido o Accidente Z Lastimadura Revisade Ad urate una co la _ WE •I OW Aguilar Barragan, Luis ® /.. NEW r.J.a David ��■,., _ ®Adrian Hernandez /_w KIM: i WE W!Treu t l TAMGATE SAFETY MEETING Employee NAME S'7a / Firme. 5655 Luis Aguilar Barragan 6155 Jaime Aguilar 6170 Jesus Figueroa 6170 Filiberto Pantoja ,..I,. '.r 4. .. _ ELIO. .. .. r ..� ., - ... rin 1 i\ .. [ GYLI� '. U:uL 11'uvS'�. +'.ua•. f @ 1 .i, :1 a D1 Of I SGI Meeting Record Page/Pkgina 1 of/de: 2 Date / Fechn: 1 �i u• Hour / Hora: 6:30 M Department/ Departamento I TC � r Meeting was conducted by La clase fue dirigida por ^ % 6;1 1'er to Q AWirl [r r Subjects Presented nod Discussed or Accident and Injuries Reviewed (Attach a copy) Tema presentudo y discutido o Accidente y Lastimadura Revisada Ad unte one co is ® r' ® .•Oepro _., 1 �i u• ZOW � r i ® r' ® A , j " 1 .•Oepro _., TAILGATE1 1 Employee NAME Sign / Firme. 5655 Luis Aguilar Barragan 6155 Jaime Aguilar 6170 Jesus Figueroa 6170 Fillberto Pantoj I� __ 6 "i9v Stay , Le Green Inc. CGaire FW pmfwianalIa &Cjpe Srroim TAILGATE SAFETY MEETING SGI Meeting Record Page/Ptigine I Ode: 2 Date / Feeha: NAME Sir/ Fir e. Hour/ Hors. 6:30 M Department / Departamento : TC !L 5655 Aguilar Barragan, Luis 5678 Victor Rojas / Meeting was conducted by La elm fue dirigide por 69/ ui if% erns d Aqui-lar Subjects Presented end Discussed or Accident and Injuries Reviewed (Attach a copy) Tema presentado y discutido o Accidence I Lastimad urn Revisada (Ad urate una copia) re P a 5619 Quintaaipa, Silvestre i I Yt cAi 5721 Servero Lorenzo Employee NAME Sir/ Fir e. 5926 Aaron Rosales 5886 Pedro Pelayo !L 5655 Aguilar Barragan, Luis 5678 Victor Rojas / 5602 Pelayo Martin �( 5216 David Pelayo 5619 Quintaaipa, Silvestre i I Yt cAi 5721 Servero Lorenzo 5320 Jaen Andrade 5892 Francisco Pena 5937 Adrian Hernandez 5890 Marcos Romero MKJ _ .. _. Q &11 P4 1 � f � SLI. Stayra�,wGreenlnc. forlivfatinna! 1 aniLcip. Srtvim TAILGATE SAFETY MEETING SGI Meeting Record Page/p3gina 2 of/de: 2 Employee NAME Sign / Firme. 5655 Luis Aguilar Barragan 6155 Jaime Aguilar 6170 Jesus Figueroa 6170 Filiberto Pa a ase 1 IOML4 :.tom_ :al h ria Ovemsw Should a far ererstart an your -job site, tlnrrk fest of your snfrty 4nd tle safety of oilers. Then sward the aham if aoailable, and aidt fhe far depart nent. Only by to put out thefim if you haw been bained to use estinguislen and if the fire is smallor tame enough to beeitinguWied by a lumd-leld =finguisher. Offer appropriate for fightrngequipmentorsuppitesmrry be aoa>7able to you on dee job site, ie., dirt or sand toex inguishasmall flame, !f you use a f rWinguisher, be sun to use one daigned for the nature ofthe far at hand !sing the rormrg agent on a fee may increase the intensity of the far. noticed that there are operating Instructions printed an them. You need to mad the Insbuction labels on lim, fire vdinguishers and become famillar with them. Min Anotim class of extinguisher contains water. You can locabe Hwne " of exbrguisims mounted on walls in buildingit. These an hitanded far use on firts involving wood, paper, cloth and rubbish where dw affectofwater u will float an the water causing the fire to spread. They should not be used on live electrical equipment since water is a good conductor of electricity. Fire extinguishers should be labeled with the classes of fires they octinguish. The labels should indicate 01 and will handle all fires. When using a typical oftgalsher, follow the 'PASr method. To coffectly use a fire 11MIF Mull r .6 isiof W off E a I IX '14:A 03 1 Nel:Q• Von T1111 r o1r Most 0 NOW c •, Stay Green Inc. TIM J%1WW41CWU farl4vrauvira(l ,ms Jrmm TAILGATE SAFETY MEETING SGI Meeting Record Page/P6gins I of/de: 2 Date / Fecha: 0 Sign / FIe. Hour / Hsra: 6:30 VAIWPM Department / Departamento : TC 5655 Aguilar Barragan, Luis 5678 Victor Rojas Meeting was conducted by La claw fue dirigida por ( u / erryv A7"N� o Subjects Presented and Discussed or Accident and Injuries Reviewed (Attach a copy) Tema presentado y discutido o Accidents y Lastimadurs Revbuda (Ad unte Una Capin) 5216 David Pelayo 6 5619 Quinlaaills, Silvestre 5' ,�� 5721 Employee NAME Sign / FIe. 5926 Aaron Rosales 5886 Pedro Pelayo 5655 Aguilar Barragan, Luis 5678 Victor Rojas 5602 Pelayo Martin 5216 David Pelayo 6 5619 Quinlaaills, Silvestre 5' ,�� 5721 Servers Lorenzo 5320 Juan Andrade y 5655 Luis Aguilar Barragan 5937 Adrian Hernandez 5890 Marcos Romero (`�rC'� TIM c ,- r StayGreenbc. +. 7br MalaralOvict For prgmaaal 1. M&C." Srrrira TAILGATE SAFETY MEETING SGI Meeting Record Page/pagina 2 of/de: 2 Employee (NAME Sign / Firme. 6170 Jesus Figueroa 6173 Filiberlo Pantoja Artt at l ( vt Min ,- INGRESOS A LOS ESPACIOS CONFINADOS N I fell. lollf rTT Stay Green Inc. ., For!'�vfrniw�all.+ndicyic S'mrim TAILGATE SAFETY MEETING SGI Meeting Record Page/PAginn I of/de: 2 Date / Fechn: NAME Hour / Hora: 1 6:30 1AWM Department / Departamento : TC Pedro Pelayo 5655 Aguilar Barragan, Lulu 5678 Victor Rojas Meeting was conducted by La clase fue diril por(5V1, / )JJJ �� 11(2rmo ) Subjects Presented and Discussed or Accident and Injuries Reviewed (Attach a copy) Tema presentado y discutido o Accidents y Lastimadura Revisada Ad unte ung co is i (j 5216 David Pelaye Employee NAME Sign / Fire. 5926 Aaron Rosales 5886 Pedro Pelayo 5655 Aguilar Barragan, Lulu 5678 Victor Rojas 5602 Pelayo Martin i (j 5216 David Pelaye 6Jpt'oj G 5619 QulntanWa, Silvestro 42 5721 Severn Lorenzo 5320 Juan Andrade 5655 Luis Aguilar Barragan 5937 Adrian Hernandez PF 5890 Marcos Romero WIT StayGreenInc. �� 7be \'atun,lCheia a Eorl'sofaiiwm/Gtndtuy:t5nritGt TAILGATE SAFETY MEETING SGI Meeting Record Page/pegino 2 of/de: 2 Employee # NAME Sign / Firme. 6170 Jesus Figueroa 6170 ? �} (n Filiberto Pantoja k k� ixf Poo pi.v, Uo=u—�. j.q on.. 1 ! 1 1 1 I Tj En cam de uta emergencia a debide de un derrame de quimicos y1b bio-ternorismo, las autoridades locales tal vez le que se mfugie end sitio en qua se eacuentra en lugar do evacuar el Area. A veces puede msultar mucho mAs segum permanecer on on sitio b* techo haste que pace In omergencia quo Ir altrem donde el aim puede ester contaminado y peligmso par respimr. .iii �771 � 7 7�� • Conserve la calms y dirgasc al Werior del sitio. Si se (ratan sus Ojos, nariz a gergenta, se pueda agreW protecei6a adieionai cubriendo la boca y nariz con palluelos o trApos bfimedos y resIp(rando de fama frecuente y porn pmflrndo. - Clam lode las ventanes y puertas. No utilise el aim acondicionado, calefacci6n ochimenaa Es posible quo necesite usar tints adhesiva pars sellar las ranums a abertumsehededor de puwm y vents= con el & de avitarquo los contaminentes se fllaw Al mlbgio. l'sto proporcionari mayor protecci6n. (La cbda adhesiva es un articulo que se aconscja agmgar a su estuche de emergencias). • sirAmice su estsci6n de radio o lelevisi6n de emergencies local. Las autoridades loceImpmporcionerin informact6n acerin de emergencies a tmvds do las eslaciorm de radio y televisi6n mAs importsntes. • Use el teldfomo solemente encaso de emergencia; no to use a menos quo smindispenseble. En caro de emergencia, marque of 9111 oil • Evacrie s6lo A asi se to indican las autoridades locales. • Conserve In calm y mina ardwlos imporlantes (pmvisiones para su beb6, medicines, licencla de condueir, dinero, etc.). • Ocripeso do sus mescotas notes de abandonar su hogar. • Mantenga cemdas todas las venumas y conductos de Aim do su auto. • Ualiee las rutas de evaeusci6n apeciabneme designadas por las autoridades locales. Rem*ftrio a los Padres.... Si sus hijos esdAn on In escuela: NO VAya a Is eseuela a mcoger a ars RMOS A MOM que asi se to indiiquen las atnorWedes de la escuela. Al it a In es=ta, usted y sus nilios pueden War err peligm cuando se abren las puertas pas retirar a sus nillos de la srguridad de su rePoglo. NO intente Ilamar A Is escuala. DuraNe uns emergencia, las Tineas tdef6nieas sedn neeesaries pare amntos oficiales. Los estudiames penmanecerin en las escuelas y strict atendidos o evawndos on autobus haste on mrugio sepro. Depmfame o da fturm do Tema (MQ, Linea Direcia de Yrataciones de SeSwidad M4d6n do Conrparao86n para Tnbaiedoms (DWC) 1-800.452-9595 cortao akdrdrdm riaseurvc�Jtolo 11A o Ilene of 14800.687.7080 pam m6s inhumad6n. safetyhofiin9@Idi.state.bLus StayGreenlnc. a 76e.\'afuntl Cbela• forl4nfminml LandttymSerolrer TAILGATE SAFETY MEETING SGI Meeting Record Page/Pdgina I of/de: 2 Date/ Fecha: 104115116 Hour/ Hora: 6:30 A M Department/ Departamento : TC 5886 Pedro Pelayo /We Z;�O -rrif Meeting was conducted by La close fue diril por Guillermo Aguilar Subjects Presented and Discussed or Accident and Injuries Reviewed (Attach a copy) Tema presentodoydiscutide oAccidenicy Lastimadura Revisada (Ad•unte una coin 5602 afltrf'0. I!h 4 () 5216 d ❑ aw 1Pai Q Employee NAME Sign / Firme. 5926 Aaron Rosales 5886 Pedro Pelayo /We Z;�O -rrif 5678 Victor Rojas I 5602 Pelayo Martin I!h 4 () 5216 David Pelayo 1Pai Q 5619 Quiatanilla, Silvestrc 112 5721 SQVero Lorenzo 5310 Juan Andrade 5655 Luis Aguilar Barragan 5937 Adrian Hernandez 5890 Marcos Romero Mir Stay Green Inc. Far FYv/minnal7trLetpeSrrrita TAILGATE SAFETY MEETING SGI Meeting Record Pagelpegina 2 oVde: 2 Employee NAME Sign / Firme. 6170 Jesus Figueroa i 6170 Fillberto Pantoja JQ- ' U rro 6 arCA C t MM 1 0 6 w A : . MIS N 1 :1 .e i i }1�y, Stay Green Inc. 77m \atur41Cbvi= for Prurmsonal I4nduape Sm"iru 04119/16TAILGATE SAFETY MEETING SGI Meeting Record Page/Pigina 1 of/de: 2 r Date / Fecha: 04/19/16 _ Hour/ Hera: 1 6:30 Department/ Departamento : TIC j T Meeting was conducted by La close fue dirigida por Guillermo Aguilar Subjects Presented and Discussed or Accident and Injuries Revi" ` Tema presentado y discutido It Accidente y Lastimadura Revisoda Extinguishers It a copy) Una coni: Employee # NAME Sign / ' me. 5926 Aaron Rosales 00000 5886 Pedro Pelayo 1 5655 Aguilar Barragan, Luis rte' 5678 Victor Rojas 5602 Pelayo Martin 5216 David Pelayo it 5619 Quintanilla, Silvestre Severn Lorenzo 5721 5320 Juan Andrade Julio Garcia 5937 Adrian Hernandez Marcos Romero 5890 TAILGATE SAFETY MEETIN LTJ BW40L Talm los anplendm foumntm Imincm que In munhon foe nalimda a Incks am EspoAol. o hhSwlhh hTThlbar idhnmm Iwo la redeem mm- pmmidn de lo" Im Inescolm de Im tanm hk scguMod tntalos Qoc a hods mmsdn SGI let ncue+do We n pork ICIS ndhkn 00 11 emarr" Ikvor ndAnit un tr.Mh ressmawblr. boaeuu Y rRum Talm {m emp" - �)m susnuhmcm wabrhh que hs ennbhulos hk eM rmmlhM son prose de to palhia m mokno de wpndod de SOI ) quc formann pone de Im I= penddicas de crHuecidn del rmorul ENGLISH All lhesignomryemplo)cescmify ihm the we Ing win phmrmed in Engltsh a Spaah, or mind both hngadm fm elan uuMunndmF Drell imwcdei*q=ofsecurIq lnanmcctmp SGlrennlst mdwaifnarlaftherdkrofrh amNovt neform rsnwndbk bout" mod wk work All the ernrb)as oho put secoid thin Ihemmhmis of W s meeting me pan of the rhd¢) in the nwmr afs¢vrny ofSGI and are phm of the pssnedie m9 of S.0 Stay Green Inc. ;� 7beA'at,vt(CB.ftr For Pmfo,inaa11."c+pE3rWwr SGI Meeting Record Page/pegina 2 of/do: 2 Employee 14 NAME Sign / Firme. 6170 Jesus Figueroa 6170 / Filiberto Pantoja Juan A Garcia Daniel Navarro Rafael Del Val GSPANOL Todds Im emphxdm 1k mm*o cenjr1= qua la n fizn fuc smlimh M Ingks o"Csix" o uuvdn mnh, Idtam pm h psrk. h mm- P=i6n do woos hs Ptcsema de Im kttm de seglmdad WA$dW Queen Iaslu,aaoidn SGI la rtusndo qua sstalrk de h ndltka dr h rmnrna Ilenr addwr 23 t bub reutnnobir, bon"19 Todm bs smpkvlw mnnattcio tmnhkn qua la camcnhkn de cua rtunidn an purse de h pulhio w moteno de wilunddde SGI y qua I annum s Porte do Ins IW puiddkm de minwidn dot pehmd ENGLLSII All the sipudW cWcq cs=i6 out de meetmg um pn:uanal in Cnglhh wSpaish us using both tm%;mp� rnr.ksu un&riwnding of dl Iralal subpch ofsccmay In At 11p s5G1 reouds themtlut n ILME, of thr snikr orthe n ct roan Ummosibleh a t mad gkwprk All We css&g= also put mord" the owaa s un ha mttlmg uc pon or IL policy m the t orsccumy orSGi ad= pat of the prrimic les? or Lm W TVW •••a ■. ua . • 22 41010 Fog 1-41. %1 _ I I rrr _ I C f Stay Green Inc. ➢ { �,.��,� fx AvfC owl I. &rjpe morn, 04/19/16TAILGATE SAFETY MEETING SGI Meeting Record Page/Pigina I oVde: 2 Date / Fecba: 04/16/16 Hour/ Hora: 6:30 AM/FM Department/ Departamento : TC Pedro Pelayo 5655 Aguilar Barragan, Luis 5678 Victor Rojas Meeting was conducted by La ciase fuc dirigida por Guillermo Aguilar Subjects Presented and Discussed or Accident and Injuries Reviewed (Attach a copy) Tema presentado y discutido o Accideatc yLastimadurn Revisada (Ad'unte una capia) i 5216 David Pelayo r 5619 Quintanilla, SUvestre Employee NAME Sign / Firme. 5926 Aaron Rosales 5886 Pedro Pelayo 5655 Aguilar Barragan, Luis 5678 Victor Rojas 5602 Pelayo Martin i 5216 David Pelayo r 5619 Quintanilla, SUvestre 5721 Severo Lorenzo 5320 Juan Andrade Julio Garcia 5937 Adrian Hernandez 5890 Marcos Romero TAILGATE SAFETY MEETIN •^ l ' 1RIP SCI Meeting Record Page/pdgina 2 of/de: 2 Employee # NAME Sign / Firme• 6170 Jesus Figueroa 6170 17 Filiberto Paatoja Juan A Garcia Daniel Navarro Rafael Del Val .. . l L.' ...L: f it J @.L'.:&L. J.t .H' Y ,... .. .. _...... u.... a n, n .. .. .. ..... • . Res=en 00 En cuantDa las normas de .S posNesdarturibm(2)frulkwicnandabilude At Una Davin inesimada pod* J wbrecarp y r*duras par a] peso en el borde o cm= do 11 an la zanjL harrandenta uns I= do Im ... O%M requiem qua AL com WO A A a L-., . . 0 014010 , amerdo a las regbarientas de OSHA Pam (1) _46 As PBP�Ill His Of StayGreenlnc. ,�".�.- 77x �aJuntlCGoia h•r/iv%w+aua(l.+rt+llu/u S'rrn+m 04/19/16TAILGATE SAFETY MEETING SGl Meeting Record Page/Pdiglou 1 oVde: 2 Date/ Fech_o: OS/03/16 Hour/ Hors:_ 6:30 AM/PM Department/Depertamealo: TC - Meeting was conducted by La class foe dirigida por Guillermo Aguilar Subjects Presented and Discussed or Accident and Injuries Reviewed (Attach a copy) Tema resentodo y discutido o Accidente y Lastimadura Revisada (Adjunte ona copia) First Aid and medical treatment Employee NAME Sign / F' me. 5926 Aaron Rosales 5886 Pedro Pelayo 5655 Aguilar Barragan, Luis 5678 Victor Rojas 5602 Pelayo Martin 5216 David Pelayo G 5619 Quintanilla, Silvestro 5721 Severo Lorenzo 5320 Juan Andrade Julio Garcia 5937 Adrian Hernondez 5890 Marcos Romero jet !! "CONS411 n' StayGreenlnc. 77wAalwil amicr far PmfenianalI aadnape&wira SGI Meeting Record Pagelp igins 2 oVde: 2 Employee NAME Sign / Firme. 6170 Jesus Figueroa 6170 Filibcrto Pantoja Juan A Garcia Daniel Navarra Rafael Del Val VA 1 �' • tl 1 • tlaIf tali,t "i Mf� ROAM —= El • OSHA, ..t r. t.. Stay Green Inc. terl4vfurionall ,,,rlruprSmim Q,J/10/16TAILGATE SAFETY MEETING SGI Meeting Record Page/Pkgina 1 of/de: 2 Date/Fecha: 05/10/16 Sign / Firme. Hoar/Nara: 7:00 CAWPM Department/ Departamento : TC 5655 Aguilar Barragan, Luis 5678 Victor Rojas Meeting was conducted by La clase fue dirigida per 5602 Guillermo Aguilar Subjects Presented and Discussed or Accident and Injuries Reviewed (Attach a copy) Tema presentado y discutido o Accidente • Lastimadura Revisada (Ad'unte one co is 5216 David Pelayo G 5619 Quintanilla, Silvestre f� Employee NAME Sign / Firme. 5926 Aaron Rosales 5886 Pedro Pelayo 5655 Aguilar Barragan, Luis 5678 Victor Rojas LL 5602 Pelayo Martin VOL/ Am 5216 David Pelayo G 5619 Quintanilla, Silvestre f� 5721 Severe Lorenzo 5320 Juan Andrade w 6402 Julio Garcia 5937 Adrian Hernandez 5890 Marcos Romero ! (fit 14j r SGI Meeting Record Page/pigins 2 of/de: 2 Employee NAME Sign / Firme. 6170 Jesus Figueroa 6170 r Cr Filiberto Pantoja Juan A Garcia Daniel Navarro 6127 Rafael Dcl Val 0 No*o Informafiva para Mane jar Prudentemente HSO4-038C (04-10) a, li: Y a ' ,.3 i YI ..� tail I'• LPuede usied interptetarel emnine? IQuizis se sorprenda can lodo to clue aprendaI L 3. 4. S. LCiedo o Falso? Lm rayas amarillas on el carcina sepman el Wen quo vinja on is mama dim"i6m Respuesta: Felso. Las rayas amadilas on el camino, ya sem s6lides o bacimhentes, generalmeme sepamn el Wen que va on dimcdones opuestas. LSabe usted qui signifies un panel amarillo que indica EXIT ONLY debq)o de ons sefW verde de carretem? RopueVx Un panel amarillo que indica b70T ONLY debojo de uns seeal verde de anetem significa que of cavil debgjo del panel se convierte on el earril do Salida Si usted se queda on ese arril, Gene que salir de In carmtom Loud signigeado time use scfW intermilente o con- stants de DON'T WALK? Ropuesta: Un slmbolo Intermiferne o constants de DON'T WALK India a los peatones que ya esiin on Is calk que debet seguir cn,mndo Is calls, pero que Ian patones qua se encoenttan on in banquets no dellen empezer a erwu. Una vez que dojo de prcrder y apagar intennitmmmente to sonnei y se muestra un memje constants de DON'T WALK, los peatones no se debet bojar de In banquets. LEs permiddo cttmr una doble rays s6lida amarills? Respuesta: La Anis vez qua se permits crurer una doble mya amatills s6lida as eua do va a voltear hada Is izquierda para Ingram a un amino de entrada o a on estableehnimrm. LQd signifies una sdW an farina de pmg*no? Respuesta: La sdW on fomla de pentigono con Is punts Irseia arriba nos dviene toner premuei6a inn niRos on Ian zonas escolares. EI nuevo color optional de este seaales — amadilo-limdn fosformerde — es mucho miss Bell de ver euedo hay you luz y on tiempo de neblinaflluvia. LQa significm porn ins conductores los corocidos escudos de color rojq, blanco, y azul? Respumv. EI con celdo escudo de color rojo, Manta, y azul indica a Ian eonductom que estin via}ando on una camtera Inlenslmal. Las earmcm con mnneros pares de dos dighm van de este a oesle; las carretaas con n6mems nones do dm digkm van de name a sur. Lm now intereslatales de Ines digits son perifiricos, de circunvolachin, o now do rmW. 7. ZCudl is cl ptap6sho de los indladom de millas de color verde y blanco7 Respaura: Las indicadorrs de millas on color verde y blaneo nos ayudan a calcular In distancia que homes mamjado, o Is distancia quo temmas quo manejar par un esudo, o pueden uam pam Idenniflculaubicaci6n en Casa de una emergencla B. LPara qud se usan las zellales on color anmwjado on forme de dtamante7 Rmpnesta: Las whales de conmucei6n son diamanies on color anemajado usados especlgcameme pars dverdr a los conduatores sabre salviddes on Innis de constnxci6n y de trabgjo. No olvide f cnary darks a Ins trabajdares Is Ineferencia Recuerde que on uns zona de tmbajo Is persons que didge las shales tiene is misau autoridad que wa sdW regulation; to coal signifies qua usted puede ser muhdo pordnobodecer sus imwcdom. 9. En uns secc16n de confluencie on In coal el trdflco intra y sale de on tante de arrdero, Lquidn Gene que ceder el paso? Respaerla: Una de las situndones mds pellgrom de manejo on los arriles arum cmmndo d Wen de Is carretero entre y sale on la misma Area. Dumnte ests 3ituaci6n do cordlueneia, los vehtculos qua entrap a Is carrcicm Ileacs qua ceder of paso d trMco de Ia carresera y a) que estd ss. tan& 10. LPs qui tipo de carretero asu usted vigjando 31 se amuenba en Is carrefm iderestatal 14947 Rapuata: Si usled se encuemm on una eamiera interestatal can el nfimem 1494, probabtemente estd viejando on un periWico, uns circunvalac16n o una ruts de ramal. Recaerde poner en prddkv fa segurfdad No fa aprenda par accidents. Esta hoja informaGva fin publicads con informecidn proporcionsda par la Rd de Empleedem para In Seguridd %isl (Network ofEmptoyers forTralge Safety, porsu nombre en Inglis) y el Departamento de Segmm de Texas. Divisl6n de Compensmi6n para Trabajdares (Texas Department of lammrncc, Division of Workers' Compensation -TDI-D WC) y as considerds corrects al mommto de an publicad6n. ,., 1'1 I IT StayGreenlnc. nrnanv�lCbolm ForPrvJmionatLuuLr prser#ku iTAILGATE SAFETY MEETING SGI Meeting Record Page/Pkgina 1 oUde: 2 Date / Fecha: 1051111 1 Hour/ Hora: 7:00 rAWPM Department/ Depanamento : I TC 5886 Pedro Pelayo 5655 Aguilar Barragan, Luis Meeting was conducted by La clase fue dirig I Guillermo Aguilar Subjects Presented and Discussed or Accident and Injuries Reviewed (Attach a copy) Tema presentado y discutido o Accidente y Lastimadura Revisada Ad unte no co la 5602 Pelayo Martin (f 5216 David Pelayo Employee NAME S�Ogn / time. 5926 Aaron Rosales 5886 Pedro Pelayo 5655 Aguilar Barragan, Luis 5678 Victor Rojas 5602 Pelayo Martin (f 5216 David Pelayo G 5619 Quintanills, Silvestre 5721 Severo Lareazo 5320 Juan Andrade 6002 Julio Garda 5937 Adrian Hernandez 5890 Marcos Romero TAILGATE SAFETY MEETIN .x oil LLLLLLLLLLLL SGI Meeting Record Page/p6gins 2 of/de: 2 Employee NAME Sign / Firme. 6170 Jesus Figueroa 6170 �O Filiberto Pantain Juan A Garcia Daniel Navarro 6127 Rafael Del Val ad LA GASOUNA Y LOS PROBLEMAS DE INCENDIOS F' ■ �n v (731=71=16 to JI� .r_ s ,Xog k = 05/24/16 TAILGATE SAFETY MEETING SGI Meeting Record Page/Pfgina 1 of/de: 2 Date / Feehae 05/24/16 Hour/ Hera: 7:00 M Department / Departamento : Meeting was conducted by Le claw fue diril I Guillermo Aguilar Subjects Presented and Discussed or Accident and Injuries Reviewed (Attach a copy) Tema resentado y discutido o Accidents y Lastimadurn Revisada Ad ante unn co le) Heat Stress Employee NAME Sign / Firme. 5926 Aaron Rosales 5886 Pedro Pelayo 5655 Aguilar Barragan, Luis OF 5678 Victor Rojas i 5602 Pelayo Martie f JA XI 4 6 5216 David Pelayo 5619 Quintanille, Silvestre r 5721 Severe Lorenzo -- 5320 Juan Andrade Julio Garcia 5937 Adrian Hernandez 5890 Marcos Romero SAFETYTAILGATE MEETING .. ... •jai. �1 � 1 SGI Meeting Record Page/pegins 2 of/do: 2 Employee NAME Sign / Fume. 6170 Jesus Figueroa 6170 Gn Filiberto Pantoja David Fajardo Daniel Navarro 1 Rafael Del Val •' •; � rl•irn LL 1] •Lt• r 0 L'A.SAUA A.IAM PA 1.u P.ulL L M.- I1W.101, 4 PIM —r *I� Estres Ocasionado 1'ilY �IHMIMf Meta el Calor 1.110MA. .1111.10 jrnmg Peligros a la Salud r id L RIMINI ff. III 1. Sudsals 2 Reduredte de napnaeida ddodordalopiel I (Colpda■ do to tmae a eeohaedladt*AkmeYn. Od1V.e6dm hoptap:dm da mthgo, Nod¢apmieia■■.hoeaepeaemrr■ha hmee- dad, mg0r de Ip. aedimmoft, r0dr■adado rdadsode d CAN pn+iac redmee Wet■dedrWsaskehd.sapdadapardafirs de SW 0 dom47e / apeaai a¢ d Users i I Kd!iaaes3eu,Vft0tl<mmc m.pd bobadeakl0hap tombs a mds RBCUrso5 Para informaeddn mmpkta sobre aarmas y realm fawn de mrairse a so CURV 29 de Nomas Fadereles 1910.5(aX I). Linea Direda de R4olmloner de Segw*bd 1400452-9595 sofelyhotline@tdistatmi)LL ■ StayGreenlnc. FerJ'rvfiiif.na!l unlLty�s S'nvJcm 05/31/16 TAILGATE SAFETY MEETING SGI Meeting Record Pagc/Pegina 1 of/de: 2 Date / Fecha: 05/31/16 Sign Firme.■� Hour/ Hors: 7:00 LAMIEM Department/ Departamento : TC Meeting was conducted by La clase fue dirij I Guillermo Aguilar Subjects Presented and Discussed or Accident and Injuries Reviewed (Attach a copy) Tema presentudo y discutido o Accidents y Lastimadurn Revisada (Ad'unte una co is E% TAILGATE SAFETY MEETIN i Sign Firme.■� r�nr� TAILGATE SAFETY MEETIN i r„ fid%Ki . SGI Meeting Record Pagetpigina 2 of/de: 2 Employee NAME Sign / Firma 6170 Jesus Figueroa 6170*17e,2 L Filib o Pantoin I David Fajardo Daniel Navarro Rafael Dal Val ION 1 06/11416 TAILGATE SAFETY MEETING SGI Meeting Record Page/Pigina 1 of/de: 2 Date / Feche: 06/14/16 Hour/ Ho ra: 7:00 AM/PM Department/De artamento: TC Pedro Pelayo 5655 Aguilar Barragan, Luis 5678 Meeting was conducted by La clase foe diril Guillermo Aguilar Subjects Presented and Discussed or Accident and Injuries Reviewed (Attach a copy) Tema presentado y discutido o Accidente y Lastimadurn Revisada Ad'unte una co is Pelayo Martin Heat Exposure David Pelayo b , Employee NAME Sign/ F'rme. 5926 Aaron Rosales 5886 Pedro Pelayo 5655 Aguilar Barragan, Luis 5678 Victor Rojas 5602 Pelayo Martin 5216 David Pelayo b , 5619 Quintanilla, Silvestre 5721 Severo Lorenzo 5320 Juan Andrade 6002 Julio Garcia 5937 Adrian Hernandez 5890 Marcos Romero TAILGATE SAFETY MEET )*'Stay 'Stay Green Inc. Ahe Aramrar eb.irt Fx Prnfcniona/ Lau6up. Srrni ra SGl Meeting Record Page/pigina 2 of/de: 2 Employee NAME Sign / Firme. 6170 Jesus Figueroa 6170 [-✓1 p FiGberto Pantoja David Fajardo Daniel Navarro F. .'i..P.R. PROT9JASE DE LA EXPOSI06N SOLAR .r-- q - '.Pm i Presentad6n. 1 p. solar de las que hmemos que ester atm 2. Catuatamlosojos 3. Quandmusoliam M4hmvmLucdncar& Is pK se dammUs an In I. brms Y en in pmxte deb* de Ins pimm, De �v' 1�f Stay Green Inc. Fer Pmfe "ILmduafe Sm;m 06/22/16 TAILGATE SAFETY MEETING SGl Meeting Record Page/Pigina 1 oVde: 2 Date / Fecha: 06/12/16 Honr/Horne 7:00 _J A % Department/ Departamento : TC i Meeting was conducted by Le lase fue dirig I Guillermo Aguilar Subjects Presented and Discussed or Accident and Injuries Reviewed (Attach a copy) Tema presculado ydiscutidoeAccidente y Lastimadura Revisada (Ad'unte una co ie) Prevent lnlury from Trees and Limbs Chainsaw Operations TAILGATE SAFETY MEET some TAILGATE SAFETY MEET c StayGree>nlnc. 7trNaraui r/mkr Far 1 hafurl onaf G,nd,rapr Suri rrt SCI Meeting Record Page/pigina 2 of/de: 2 Employee # NAME Sign / Firme. 6170 Jesus Figueroa 6170 G� FilibertoPautoja 6226 David Fajardo 6212 Daniel Navarro i Roe FSPAAOL Taloa los emlieWm annamc ocrtifian puc b reunx5n fue mlaada sr Galls a rn f rpnllai. a usando am6m sJiomns pa la lctfr m . it a Lesson 4 Objectives 1. Recognize ways to avoid being struck by trees and limbs. 2. Develop safe chain saw operating procedures. 3. Identify tree felling danger zones. 4. Compare different felling techniques. 18—Tree Trimming safety Avoid Being Struck by Trees or Limbs Prevent Injury from Trees and Limbs ► Limbs that cannot be dropped safely should be lowered with a rope. ! Do nor lave cut branches in a tree Drop or lower them safely to the ground ► Do not turn your back on a era where branches arc being cur or a see Is being &fled. ► Follow a rwo-erre rule when felling. No one (other than the feller) should be within two tree lengths of the uec being felled. ► Maintain a grater distance: when trimming or filling on a slope where logs could roll or slide. ► Always be aware of your surroundings. Tall: with coworkers to ensure you know what kind of work drey are doing and wherry kmiprrydO6NAAoddmt1mpeabn 111100657 An employee turned his back to a tree that was being trimmed. A limb struck the employee on the back of the head and killed him. QNesratomyourbook loacmbefog v(mmed. O"AaMM Wpeedar 175907866 An emplayee was using a chain saw to cut a 3 inch diameter branch. After he had made the final cut, the branch fell and bounced after hitting a concrete walk The cut limb struck the employee in the face and the chain saw muck his right arm. He suffered deep Darts as well as nerve and ren don damage Q5lowlyhwrerlfmbswftharope when working above ahardsutfoce. r� r�� JS�ts Green Inc. fa6 TAILGATE SAFETY MEETING meeting was conuuctea ny La clase fue dirigida por I Guillermo Aguilar Subjecls Presented and Discussed or Accident and Injuries Reviewed (Attach a copy) Tema presentado y discutido o Accidents y Lastimadura Revisada (Ad untc una copin) TAILGATE WETY MEETUqG .. Pfffcclz 6044"Oml PON R 1.10T. t 'O _. n3 .: A �t ri�►rs7' ® Adrian Hernandez .11Gi4i 0 TAILGATE WETY MEETUqG .. Pfffcclz 6044"Oml PON R 1.10T. t 'O r SGI Meeting Record Page/pigina 2 odde: 2 Employee NAME Sign / Firme. 6170 Jesus Figueroa 6170 Id Filiberto Pantoja 6226 David Fajardo 6212 Daniel Navarro J JUBGOS BRUSCOS brc�r. B hqu de conskucd6ftn nunma es] W owl is I 0 IT 1 111;1 To 11411V73 is I Is 07/06/16 TAILGATE SAFETY MEETING SGI Meeting Record Page/Pigina I oVde: 2 Date / Fecha: 07/06/16 Hour/ Hors: 7:00 AM/PM Department/ Departamento : TC Meeting was conducted by La close fue dirigida por Guillermo Aguilar Subjects Presented and Discussed or Accident and Injuries Reviewed (Attach a copy) Tema presentad�_y dt utido o Accidcntey Lastimadum Revisada (ate una co iP a1 Employee NAME Sign / Firme. 5926 Aaron Rosales 5886 Pedro Pelayo Y 5655 Aguilar Barragen, Luis 5670 Victor Rojas 5602 Pelayo Martin 5216 David Pelayo 5619 Quintanilla, Silvestre 5721 Severo Lorenzo 5320 Juan Andrade 6002 Julio Garcia 5937 Adrian Hernandez 5890 Marcos Romero --411 11A -i all lot All aK aMAnva also pta nand shx lhamwo +pr SGI Meeting Record Pagelpagina 2 Ode: 2 Employee NAME Sign / Firme. 6170 Jesus Figueroa 6170 6226 FilibertoPantoja David Fajardo 6212 Daniel Navarro HEAT EXHAUSTION Overview Healy hf}ing, stretching, sfinh ingand dinegard forsound health habits are semW teat's m ommmt ourselves. Mum the body is unable to cool Reny through mwffng, serfous heat illnesses may occur. 71e most severe lent - induced illnesses are heat exhaustion and heat stroke. If action is not taken to treat heat exhaustion, the illness could progress to heat stroke andpossrble death. in the summer months, Cohen the days are long and hot, roe should be thinking of meamm to proled ourselves from npturrre to excessive heat whiler marking. Fat Discussion... Recognizing the rust symptom of heat exhaustion is important so proper first aid measures can be taken The fust signs are usually headaches, dizziness and staggering, light-headedness and physical weakness, followed by mood changes (irritable, or confused and can't think straight); nausea, vomiting or throwing up, fainting and pale clammy skin may follow. Frequently, breathing is shallow - 1. If the person is dizzy or light-headed, lay them down on their back and raise their legs about 6 to 8 inches. If the person is meek to their stomach lay them on their side. T 2 Loosen and remove any heavy clothing. 3. Have the person drink some mel water (a small cup every 15 minutes) if" are not feeling sick to their stomach 4. Try to cool the person by fanning them. Cool the skin with a cool spray mist of water or wetcloth. 5. If the person don nothel better in a few minutes, call for an ambulance or 411 for emergency help. WIRRP, -FOR R-1 RRRI i resultinrapidneco my withoutpenrument effects. 'the b3r"f I kiln Ka -Stay Green Inc. 7heboice For Pmfasional Landsrape Serrdca 07/11/16 TAILGATE SAFETY MEETING SGI Meeting Record Page/Pagina I of/de: 2 Date / Fecha: 07/11/16Hour / Hora: 7:00 AM/PM Department/ Departamento : TC PedroPelayu ' r _ ®Aguilar barragan, Luis Meeting was conducted by La clase fuc dirigida por Guillermo Aguilar Subjects Presented and Discussed or Accident and Injuries Reviewed (Attach a copy) Tema presentado y discutido o Accidente y Lastimadura Revisada (Ad•unte una copia) Housekeeping David Pelayo I 1 .Sign Firme. PedroPelayu ' r _ ®Aguilar barragan, Luis Victor Rojas i David Pelayo 1 _ ® Adrian IWA111 �,Ii,`'1 MarcosRomero TAILGATE SAFETY MEETING FSPAIJOL Todos Ins cmplcadas I mallo cm ifican cue to munibn fuc rcalnndu ca Inglis o en Espullul, a usondo umbos idiom" para In perfecta com- prensiAn de lochs los prmcntcs do los Icmas de seguridad vwadns Queen coda rcunuM SGI ks rccucmin qac es parte de 11 nollticl de U cmpreu Ilevar adeMnic un trabalo relooasuble, boncsln y seeuro Todds los cmplcudos dcjan constancia mmbidn que Ins coulenidos de csta rcuni6n son pane do In politica en materia de segundad de SGI y quc formuran pant de his tat peridlscus de "aluact6n dcl personal. ENGLISH All the signatory employees certify that the meeting was presenmd in English or Spanish, or ming bath languages, rm clear understanding of all Ircated subjects of security In all meetings SGI mnids them that it Is part or the wocv of the eamnany to nerform responsible honest and safe work. All the employees also put record thin the contents of this mecling are pan of the policy In the motterufsecurity of SGI and arc pan of the periodic test of Stay Green Inc. For Profasionaf Lrndreape Sarica SGI Meeting Record Page/psgina 2 of/de: 2 Employee NAME Sign / Firme. 6170 Jesus Figueroa 6170 Filiberto Pantoja 6226 David Fajardo 6212 Daniel Navarro lose, lb(012-1�Pz5 lel ESPAF0L Todos las emploados frrmanta eenifican que Is muni6n fue rsalinaln en Inglds a an Espallol, o usondo wnbos idiomas, para Is perfecta com- prensi6a de todos los prmentes de Ins ternm de seguridad tnWos Que en Coda reuni6n SOI les rmawda que a nsrte dr In mlitics de Is eviimesa Ikvar adelante on trabaio mmosable, hooesto v seenro. Todas los anpicades dgun eonstaneia tnmbddn que los conlenidos do ata muni6n son pane do In politics en mmeria de seguriciad de SGI y qua formaran pate de los tat paiddicos de evaluneihn del personal. ENGLISH: All the signatoryemployees cenify that the meeting wes presented in English x Spanish, or using both languages, for clear understanding of all heated subjects of security In all m tings SGI tcmids than that it is nap nr the policy of the company to ncrfarm moan lNe honest and safe wow All the employees also put record that the contents of this mating arc part of the policy in the maga of security of SGI and we pars of the periodic test of '•' • /t MI71' 1 1' w e OSHA. las normas de Wow, IF 4,rr .♦ •r r •r I n r / ro r r r .• n cw r .•r ni r r r• . r .•r .r� OO �•r .r. r u r•r ter. .r. r. rr r. • Pmvime h=dics. • Prevlene lesion's. • Mejom la caudad del trabajo y la cantidad del tmbajo tealindo. MIUMIs ILf MI q_.r n .: J r �_L. 37 �7 TM Tailgate Training Attendance Form •mn er urc cur Company � Y n Training Topic/Session Number Trainers) 6� Date / / Time to a m ---- Signature i ry OXMIffl WMEWMAO _ MOTU ►,. +, , ., A Fes_-.,�_► �� ... I t r !► E "— Folleto Sesion 9 Introduction ANSI Z133 Hay varios tctminos importantcs do Z133 que son fre- cuentcmcntc repetidos en este programa de seguridad: Arborista califtcado. Un individuo que por la posesidn de un titulo, certificado o reputacidn profesional reco- nocida, o a travel de entrenamiento relacionado y experiencia en el trabajo esid familiarizado con el equips y riesgos involucradas en operations arbori- culturales, y que ha demastrado habilidad en el funcionamiento de las ticnicas especiales involucra- das. Aprendk de arborista cal fcado. Un individuo que, a travel de entrenamiento relacionado y experiencia en el trabajo, es1B familiarizado con el equipo ypeligras de limpieza de linea y ba demostrado la habilidad de realizar las tecnicas especiales involucradas. Este individuo puede a no estar actualmente empleada par un contratista de limpiezo de tineas. Conductor electrico. Cualquier aparato electrico par arriba a subterrdneo, capaz de Aevar una corriente elecrrica, incluyendo alambres y cables de contunica- ciones, lineas de poder y otras instalaciones y aparalos. Peligro electrico. Un objeto o situation que presenta el riesgo de lesion o muerte debido a contacto dimcio o indirecto con conductor electrico. Donde bay pre- sentes conductores eleciricos energizados.sin guaniar, se deberdn seguir las distancias minimas de aprosi- macidn basadas en el nivel de entrenamiento del arborisla o trabajador, conforme se manejan en esta norma. Aprobado. Aceptable a la jurisdiccidn federal, estatal o local que Ilene autoridad de cumplimiento. Deberd. Como se maneja en esta norma, denota un requerimiento mandatario. Deberla. Canforme se maneja en esta norma, denota una recomendocion. Pasos a Seguir Cada trabajador do irbol, dcsde trabajudor do suclo hasta el dueno de In compania, debmia revisory conn cer In norma ANSI Z133 y todas las sectiones que se aplican a su trabajo. Los vendedores y Iidens de equipo debcrian vigilar cuidadosamente a sus nuevos empleados. Antes do asignar cualquier trabajo, asegiuese de Iuc In persona esti calificada para hacerlo seguta y conrctamente. ZQuE rates puede dater porn evitar fesiones? R. I? SEGURIDAD TAILGATE ci Tailgate Training Attendance Form rent a utt urt Company Training Topic/Session Number nQ�� n '( e Trainer jsJ Date / 2/ 10 Time 7 to am pm MIMPIPIMAISIR1.11 "j. ® -., I FM MM Will a■+ rx IVA I ro_IN tA t� wo I® I® WtayGreen Inc. 71 a ur4 Choice lar profe.W ona1 Landcucpe,5'mum Exhibit B Stay Green Inc. 26415 Summit Circle, Santa Clarita, CA 91350 • (800) 858-5508 • X661)29 I 1800 • Fax: (661) 705-2089 %w v.staygrccn.cmn • C-27, C-61 Liccnsc #346620 EXHIBIT B RESOURCES FOR TREE MAINTENANCE CREWS The bidder will complete the resource form and return it with the bid. 1. Number of aerial lift trucks (flatbed bucket trucks) with an articulating boom that have a working height of no less than 50 feet. 4 2. Number of chipper dump trucks with a minimum load capacity of 6 yards. 4 3. Number of chippers that meet all OSHA requirements. 5 4. Number of pick-up trucks. 75 5. Number of stump grinders. 3 6. Number of full time tree worker employees. 32 7. Number of ISA Certified Arborists. 4 8. Number of ISA Certified Tree Workers. 2 9. Number of qualified line clearance tree trimmers. 1 10. Number of full time employees. 290 Certified Arborist's name, certificate number and expiration dale: Name: Adam Hall Certificate #: WE•9301A Expiration 1213112016 Certified Arborists' years of experience: 6 Bid rt UF -16-17-01 EXHIBIT B (continued) Provide information on the Certified Arborists, Certified Tree -workers, Pest Control Advisor (PCA), Pest Control Applicators, and crew foremen: including name, certification and whether staff or subcontractor. NAME Qualification License # (If Applicable) Sub Contractor Y/N Rich Angelo PCA 73173 N Adam Hall ISA Certified Arborist WE -9301A N Bronwyn Clack ISA Certified Arborist WE -10393A N Steve Seely ISA Certified Arborist WE -10138A N Julio Matos ISA Certified Arborist WE -9101A N Adam Hall QAL 122279 N Augustin (AJ) Valencia DAL 134487 N Dave Colburn DAL 126919 N Francisco Luna QAL 130175 N Grant Clack QAL 126914 N Rich Angelo CAL 98566 N Julio Matos QAL 124807 N Silvestre Quintana ISA Certified Tree Worker 2151C N Luis Quintanilla ISA Certified Tree Worker 2192C N Silvestre Quintana Certified Line Clearance Tree Trimmer N Luis Quintanilla Certified Line Clearance Tree Trimmer N Luis Garcia Certified Backfiow Tester 3401 N Bid # UF -1617.01 s. Stay Green Inc. 7Le Satural Choice for Profettion,dLandrape Sr ire: PCA L lZillold 211415 SUMMIT CAR t .Id „, A. Stay Grcen Inc. 26f15Summit Circic,Santa Clarita,CA91350 • (800j858.5508 • (661}291-2800 • Fax.{661"05-2089 %u targrccn-corn • C.27, C-61 License #346620 Intemational Society of Arboriculture Page I c SEAfl(:H SIiE 0 Checkout ISA.International Society of Arboriculture owlago About ISA • Find an Arborist • Nawsreem • Job Bank • Contact Us • Logout Membership Professional Credentials Education and Research • Events • Shop • Public Outreach �" My Profile • My Membership • My Credentials • My Online Quizzes • Component Resources • Cert Proctor/Evaluator • Cert Liaison Arborist Search » Home> Fine an Arborist > Arborist Search > Verity an ISA Credential Find an Arborist CREDENTIAL VERIFICATION CerliHcadon ID search 'WE9301A' returned 1 records Verify an ISA Credential Back to Search ISA Certified free Worker® Hard Hat Decals ISAMembers: $5.00 Non -Members: $5.00 Add to Cart ;antact Us First Last I Ste Name N e P& Country a r Adam Hall Santa CA UNITED Clarita STATES a4't. err. rri:r tr r•+ Credentials ISA Certified Arborist® Learn more: Cesky Deutsch Dansk Dutch Espanol Frartrais Italiano Norsk Portugues Svenska Olntcmaoonal Snncty of drbonculturc 2(8)1--2016 PO Box 3129 • Champvgn, IL 61826, US A • +1217,355 9411 Fmml cnmment4 tout ( icsoons to ISA 'litunday, Augury 04, 2016 4 34 33 PAI (CST; ISA I Icadyuaacts 7imc) 19orc click hcm to vtcw our nmvcv nohcc. lttp://www.isa-arbor.com/findanarborist/verify.aspx 8/4/201 International Society of Arboriculture Page 1 o SEARCH SITE 0 Checkout ISA.Internattional Society of Arboriculture 0borma About ISA • Find an Arbodsl • Nevlsroom + Job Sank + Contact Us • Logout Membership Professional Credentials Education and Research + Events • Shop • Public Outreach �� My Profile • My Membership • My Credentials • My Online Quizzes + Component Resources • Cert Proctor/Evaluator • Cert liaison Arborist Search Find an Arborist Verify an ISA Credential ISA Certified Tree Worker® Hard Hat Decals ISAMembers: $500 Non -Members: $5.00 IWe in us Oraln Add to Cart 7ontact Us Home > Find an Arborist > Arbonst Search > Verify an ISA Credential CREDENTIAL VERIFICATION Name search 'sllvestre quintana' returned 1 records Back la Search Name Name Province state Credentials First Las state Country Silvestre Quintana Santa CA UNITED Clarila STATES +N 1 Y 1!9e1 41 tmPI .11 il:l 111 1:111. ISA Certified Tree Worker Climber Specialists Learn more: Cesky Deutsch Dansk Dutch Espanol Francais Italiano Norsk Portugues Svenska Clmern2w.4al Soacty of Arboncuitum 2m9-2016 PO Bos 3121), Champaign, IL 61826, F"SA • +1217 355 9411 Itmnul comment• and uneeonne to ISA Thunday, Augmt 04, 2(116 4 3124 PAt (f_S VISA 1 Ieadyuarten Time) Pleaac chat here to acv- nur ornzn nolmv. ittp://www.isa-arbor.com/findanarborist/verify.aspx 8/4/201 International Society of Arboriculture Page I o SEARCH SITE 0 Checkout ISA.International Society of Arboriculture ©N090 About ISA • Find an Arhonst • Newsroom • Joh Bank a Contact Us • Loeout Membership Professional Credentials Education and Research a Events • Shop • Public Outreach ®" My Profile • My Membership • My Credentials • My Onlina Quir • Component Rawmces • Cert Pmclor/Evaluator • Cert Liaison Arborist Search Find an Arborist Verify an ISA Credential ISA Certified Tree Worker(q) Hard Hat Decals ISAMembers: $5.00 Non -Members: $5.00 P.ia W[a000.n Add to Cart :ontact Us Home> Find an Arhmist > Artwnsl Search > Verity an ISA Credential CREDENTIAL VERIFICATION Name search 'tins qulntanllle'retumed 1 records Back to Seamh f� Name Last Name 01Y. state Country Credentials ISA Certified Tree Worker Climber Specialist® team more: Cesky Deutsch Dausk Dutch Espadol Francais Italiano Norsk Portuguh Sveuska Olntemauanal Society of Arboncuiturc 2009--2016 PO Box 3129 • Champaign, 11, 61826, USA a +1.217.355 9411 P.mal comment, end pneannn• m ISA 7Lursday, August 04, 2016 4:31123 PAI (CSr/ISA I Icadquartera 7-uvc; Plcas dick here to tim our nnvaty policy. lttp://www.isa-arbor.com/findanarborist/verify.aspx 8/4/201 .p al:l,r • r:.,. t. Luis Quintanilla Santa CA UNITED Clarita STATES Credentials ISA Certified Tree Worker Climber Specialist® team more: Cesky Deutsch Dausk Dutch Espadol Francais Italiano Norsk Portuguh Sveuska Olntemauanal Society of Arboncuiturc 2009--2016 PO Box 3129 • Champaign, 11, 61826, USA a +1.217.355 9411 P.mal comment, end pneannn• m ISA 7Lursday, August 04, 2016 4:31123 PAI (CSr/ISA I Icadquartera 7-uvc; Plcas dick here to tim our nnvaty policy. lttp://www.isa-arbor.com/findanarborist/verify.aspx 8/4/201 .p al:l,r • r:.,. t. Credentials ISA Certified Tree Worker Climber Specialist® team more: Cesky Deutsch Dausk Dutch Espadol Francais Italiano Norsk Portuguh Sveuska Olntemauanal Society of Arboncuiturc 2009--2016 PO Box 3129 • Champaign, 11, 61826, USA a +1.217.355 9411 P.mal comment, end pneannn• m ISA 7Lursday, August 04, 2016 4:31123 PAI (CSr/ISA I Icadquartera 7-uvc; Plcas dick here to tim our nnvaty policy. lttp://www.isa-arbor.com/findanarborist/verify.aspx 8/4/201 4OAR Stray Green Inc. VO 4k 77ie Nitvral Choice kor ProfrssiondLandsupe Services Quality Control Plan Stay Green Inc. 26-115 Summit Circle, Santa Clarna, CA 91350 • (800} 8585508 • (661) 291-2800 • rax: (661; "05-2089 wins. staygmen.com • G27, C-61 Licensc#346620 n in Sota Green In In Stay Green Tree Care Quality Control Plan The quality inspection program was developed by Stay Green, Inc. and adopted 25 years ago. This program was developed for the following reasons. • To keep the highest quality on our projects • Recognition for the workforce • Competition • Development • Safety Stay Green's Quality Control Plan is a comprehensive program to ensure our tree trimming, removal, plant health care, and general tree care work meets and exceeds Stay Green and industry standards. We use certified and trained personnel to monitor our crews to work safely, correctly, and efficiently while pruning, removing, setting up traffic control, working with the public, communicating properly with the City and management, and following work order descriptions. This plan has proven to improve and properly manage the quality of work to meet and exceed client expectations. Account Manager Adam Hall will act as the Account Manager for this project. He is an ISA Certified Arborist, WE -9301 A, and holds his QAL- 122279. He will provide overall supervision and work with the Production Manager to ensure quality control and that the work is being done according to the City's specifications. The Account Manager will also be responsible for the daily operations of the crews. Mr. Hall has complete authority to act on all contract matters, including inspections, quality judging, verbal/written warning, employee reviews, suspensions, terminations, training, incentives and rewards. Production Manager The Production Manager for the project is Guillermo Aguilar. Mr. Aguilar will assist the Account Manager in quality control, crew supervision, correct record keeping, vehicle maintenance, safety enforcement, and follow up on communication and specifications. Mr. Aguilar has full authority in the field including safety and quality inspections, verbal/ written warnings, and control over crews in order to respond to immediate/emergency issues and ensure safe and proper tree work. Crews will be monitored daily to ensure the crews are working safely, efficiently, in the proper areas, according to industry standards and City specifications. Both the Account Manager and Production Manager will do random Quality Inspections and correct any issues found while on site as well as follow up meetings with the crews. Evaluations will be kept on file for the duration of the contract. Stay Green also allows other Stay Green managers to do random inspections to ensure crews are working safely and according to Stay Green Quality Standards. This includes the Stay Green President, CEO, Operation Managers, and Account Managers. They also have authority to stop and correct the crews Stay Green Inc. 26415 Summit Circle, Santa Clarim, CA 91350 • (800) 858-5508 • (661) 291-2800 a F=: (661) 705.2089 w .Smygrcenxom • C-27, C-61 Liccnw #346620 if they are found not working safely or if the trimming work is not found to be to industry and Stay Green standards. Crew Leader also has capability of taking pictures on their cell phones for instant feedback and follow up. Stay Green also has quarterly Corporate Quality Inspections which are done by the President, Operations Managers and Account Managers. Tree work is graded and kept on file for the duration of the contract. Grades below 80% will result in verbal warnings to crew leaders and follow up inspections. Daily Crew Supervision Supervision will include the following: • Truck and equipment inspections • Traffic control setup • Proper reporting and record keeping • Proper clean up and debris removal • Immediate reporting of damage and corrective plan • Proper tree trimming per specifications Weekly Crew Supervision Supervision will include the following: • Review and inspection of next week work • Inspection of completed work • Communication with City Inspector of progress and scheduling Monitoring functions are performed by Account Managers & Production Managers. The project will also be inspected with the City Inspectors to ensure the work is being done according to industry standards and per the Inspectors specifications. When inspecting our projects we focus on the following items: • Future Health of the Trees • Trimming According to ANSI and ISA Standards • Safety • Clean Up We also recognize our workforce by an incentive program created by Stay Green. This program incentivizes the top properties quarterly in our tree care division. We then hold quarterly BBQ where, at that time, awards and incentives are given to the responsible parties of the top properties. Attached is a sample form used for Arbor Care Quality Evaluation. The Arbor Care Quality Evaluation and the Quality Control Plan will constantly be under review for updating and revisions with input from the City Inspectors to insure constant and proactive improvement. Stay Green Inc. 26415 Summit Cirde, Santa Clarim, CA 91350 • (800) 858-5508 • (661) 291-2800 • Fu: (661) 705.2089 w .smygrccn.com • C-27, C-61 License #346620 DISTRICT JOB NAME: PRODUCTION MANAGER: Stay Greenirr Inc. r.r, f run.Jl.,mLL.rp.snnrn ARBOR CARE QUALITY EVALUATION DATE: EVALUATOR: CREW LEADER: SUMMARY 1. CLEAN UP .................. 15 2. DIFFICULTY ............... 15 6. SAFETY .._... .... ............ 15 3. PRUNING .................. 15 7. SIGNAGE ........ 15 4. PROPERTY DAMAGE... 15 5. TREE GROWTH ............ 10 TOTAL POINTS ............ ... POSSIBLE POINTS......... ... 100 % OF TOTAL SCORE...... ... (TOTAL POINTS DIVIDED BY POSSIBLE POINTS) I. CLEAN UP 15 - Flawless, Nothing shown from the below ratings 12 - Markings on ground from trees being dragged 10 - Debris left on ground, building, cars, pool 7 - Hangers left in trees 6 or Less - Oil, gasoline spills; trash, tools left behind TOTAL REMOVED ( 1 TOTAL CLEAN UP POINTS NOTES: 2. DIFFICULTY Overall Appearance 15 — Crew completed job under hours 12 — Large tree removals near building 10 —Working near high traffic areas. 7 - Working on a slope, minimal vehicle access Points Removed for Each Defeat TOTAL DIFFICULTY POINTS NOTES: Stay Green Inc. 3, PRUNING Pruning 15 Pruning up to date - no fertility problem. Uniform growth, trees laced etc. Obvious class I. 10 Some minor (touch up only) pruning needed, no signs of improper pruning. All acceptable to client. 8/7/6 Pruning eye level branches, suckers, stubs. (Degree). 8' clearance over walks & 14' over parking lots, driveways, streets 5 Pruning, stake management questionable, some thinning required. Points Removed TOTAL REMOVED ( ) TOTAL PRUNING POINTS NOTES: 4. PROPERTY DAMAGE Pruning Points Removed 15 - Went above and beyond to insure no property damage. (Using plywood. Tying branches. Before and after pictures) 12 - Damage amount between $1 - $50 10 - Damage amount between $50 - $100 8 - Damage amount between $100 - 200 6 - Damage to amount more than $200.00 5 - or Less - Did not report property damage. TOTAL REMOVED ( } TOTAL SHRUB POINTS NOTES: La �1>s 'r Igg -Stay Green Inc. 7Jriamd :l floim Fm f'rnfruion.J Lan,Lupr.tirrtirr• 5. TREE GROWTH Trees trimmed in a way to think about future growth. 10 —All trees trimmed in a way where issues should not arise in 3 years Points Removed 5-9 — Trees trimmed to avoid future problems such as power lines, Building, lights, pedestrian vehicle clearance 3-4 — Extended weight taken off limbs y- 2 or Less — Not reporting tree issues such as included bark, insects, fungus, decay, girdling root TOTAL REMOVED ( 1 TOTAL TREE POSITION POINTS NOTES: 6. SAFETY Were there any accidents on the property? Near Misses? Near Miss/Workers Comp Points Removed +1 - Reporting all near miss. 14- No Safety Issues 7-13 - Near Miss, (depends on the potential severity rate; 1-7 - Any old workers comp open 0 - Any new workers comp TOTAL SAFETY POINTS NOTES: Stay Green Inc. ffm \jinn! Omirr for Pmjiuiovl /.anbupr,Smirn 7. SIGNAGE Were the no parking signs and tree work signs posted along with safety cones? PPE? 15 —All signs displayed correctly to OSHA & WATCH manual 12—Signs are clean and place in a visible area 10 - Cones and caution tape used to close off work zone 7—All employees wearing hard hot, glosses, gloves, boots, long sleeve b or Less — Each vehicle has at least 5 cones. Large trucks need wheel chock TOTAL OVERALL SIGNAGE POINTS NOTES: Points Removed � StayGreen Inc. 77ir \Snva(Cborce Far!'rafruiamdLmdtctpe Servirrt Safety Manual and Injury and Illness Prevention Program Stay Green Inc. 26415 Summit Circic, Santa Clarita, CA 91350 1 (800) 858.5508 1 (661) 291.2800 1 Fax- (661 ) 705.2089 %�.sravgrcan,cam 1 C-2?, C•61 License #346620 STAY GREEN INC SAFETY MANUAL 0 INJURY & ILLNESS PREVENTION PROGRAM 26415 Summit Circle Santa Clarita, CA 91350 (800)858-5508 Section 1: Section 2: Section 3: Section 4: Section 5: Section 6: Section 7: Section 8: Section 9: Section 10: Section l I: Section 12: Section 13: Section 14: Section l5: Section 16: Section 17: Section 18: Section 19: Section 20: Section 21: Section 22: Section 23: Section 24: Section 25: Section 26: Section 27; Section 28: Section 29: Section 30: STAY GREEN I11C-S Sa&ty Mwuat and IPP Table of Contents Policy Statement on Wety....... ....... ......................................,............. 12 Duties and Responsibilities for Safety .................................................. 3 Etnployae Safety Training....................................».......,...................,... 7 New Employee Safety Orientation. .. .. . ... ... ... I ....... 9 SaferyCommun icaii on...•.................»............,.,...,.,.............»............. 10 Enforcement of Safety Policies........................................................... I I Hazard Identificat onand Evaluation..................................................13 Company Vehicle Policy Receipt.......................................................90 Hazard Correction..........................................»»».............»., Accident Investigation........................................................... ProgramRecords..»................................».........,...,»........,., Emergency Medical Services and First Aid ........................ Hazard Cnmmunication Program ........................................ Fah Protection..................................................................».. Electrical Safety & Lockout I Tag•out Program ................ Fleet & Driving Safety .............................»»....,.......,.......... Trencbing and Excavation ....................................._.......,..., Pesticide and Fertilizer Usage ............................................. 16 17 20 21 24 27 31 .... .,.... ., 36 43 47 Respiratory Protection ... ................. ........... .........,................. .............. 49 Mandatory h6rmation for Empkgnws Using Respirators When Not P gUkW L.60 Emonomics...................................».................................................... 61 Garden Tractors, imp Trucks and Bulido=SLI......»....................... 62 Fire Prevention and Emergency Action Plan ..................................... OfficeSafety...................................................................»....»............68 65 Codeof Safe Practices........................................................................ 72 Code of Safe Practices Receipt........................................................... 83 Hazard Communication Employee Training Handbook .................... 84 Garden Tractor Safety Rules.............................................................. Driving Safety Rules....................................................»............,...... 86 87 Company Vehicle Policy Receipt.......................................................90 Heat & Illness Prevention Program.......................................92 ERwlive 1118116 STAY GREEN INC's Safety Manual and IIPP Policy Statement on Safety The safety and health of each STAY GREEN INC employee is of primary importance to us. As a company, we are committed to maintaining a safe and healthful working environment. Management will provide all necessary safeguards, programs, and equipment required to reduce the potential for accidents and injuries. To achieve this goal, we have developed and implemented a comprehensive Safely Manual and Injury and Illness Prevention Program (IIPP) tailored for our needs as landscapers. This program is designed to prevent workplace accidents, injuries, and illnesses that result from trimming, mowing, cutting, fertilizer and weed killer application, fountain and pond construction and other landscaping activities. A complete copy of the program is maintained at our office at 26415 Summit Circle, Santa Clanta, CA 91350. A copy is also maintained at each job site. You may ask to review it at any time. A copy of relevant portions of the program that are applicable to your specific landscaping assignment will also be provided to you. You may also contact Jorge Donapetry at (800) 858-5508 x-104, if you have any questions or concerns. It is the intent of STAY GREEN INC to comply with all laws relating to occupational safety and health, including pesticide application, fall prevention, and machine guarding. To accomplish this, we require the active participation and assistance of all employees The policies and procedures contained in the following manual are mandatory. You should also be constantly aware of conditions in all work areas that can produce injuries or illness. No employee is required to work at a job that he or she knows is not safe. Never hesitate to inform your foreman or supervisor of any potentially hazardous situation or condition that is beyond your ability or authority to correct immediately. No employee will be discriminated against for reporting safety concerns to management. It is the responsibility of each employee to support the company safety program and to perforin in a manner that assures his or her own personal safety and the safety of others, including customers, visitors and other trades. To be successful in our endeavor, all employees on every level must adopt proper attitudes towards injury and illness prevention. We must also cooperate in all safety and health matters, not only between management and employees, but also between each employee and his or her respective coworkers. Only through such an effort can any safety program be successful. Our objective is a safety and health program that will reduce the total number of injuries and illnesses to an absolute minimum. Our ultimate goal is zero accidents. Rich Angelo President Owner Effmtive 1/18/16 STAY GREEN INC's Salicty Manual and IIPP Duties and Responsibilities for Safety A successful IIPP can only be achieved and maintained when there is active interest, participation, and accountability at all levels of the organization. To ensure this, STAY GREEN INC, delegates the following safety duties by job title. Please keep in mind that this is not an all-inclusive list. In some cases employees will need to perforin safety duties outside their regular responsibilities to prevent accidents. Executive mans eg men< must plan, organize, and administer the program by establishing policy, setting goals and objectives, assigning responsibility, motivating subordinates, and monitoring results. Richard Angelo will support and maintain an ongoing Safety and Injury and Illness Prevention Program through the following: I. Providing clear understanding and direction to all management and union employees regarding the importance of safety through the development, implementation, monitoring and revision of policy and procedures. 2. Providing financial support for the IIPP through the provision of adequate funds for the purchase of necessary safety materials, safety equipment, proper personal protective equipment adequate time for employee safety training, and maintenance of tools and equipment. 3. Overseeing development implementation, and maintenance of the IIPP and other required safety programs. 4. Maintaining a company commitment to accident prevention by expecting safe conduct on the part of all managers, supervisors and employees. 5. Holding all levels of management and employees accountable for accident prevention and safety. 6. Reviewing all accident investigations to determine corrective action. Managers, supervisors (for the purpose of this program includes foremen and crew leaders), and field workers are in a position to anticipate hazards and help prevent safety problems before they occur. They will support our Safety and Injury and Illness Prevention Program through the following: I. Anticipating job hazards prior to the commencement of work at any site. 2. Ensuring the provision of adequate safety equipment for all jobs. 3. Communicating expected safety problems or unique hazards to the supervisor or Project Manager. 4. Providing for necessary equipment and safety precautions in all field assignments. Effective 1/18116 3 STAY GREEN INUS Safety Manual and IIPP 5. Requiring all subcontractors to comply with applicable local, state, and federal safety regulations. 6. Clarifying safety responsibilities from the contract documents Assuring that all individuals and subcontractors follow rules and fulfill theirjob responsibilities. Supervisors play a key role in the prevention of accidents on thejob. They have direct contact with the field workers and know the safety requirements for various jobs. Safety responsibilities for Supervisors include: I. Holding filed workers accountable for safety. 2. Enforcing safe work practices among all employees. 3. Correcting all unsafe acts and conditions that could cause accidents. 4. Verifying corrective action has been taken regarding safety hazards and accident investigations. 5. Conducting periodic inspections of the job sites to identify and correct unsafe actions and conditions that could cause accidents. 6. Investigating all injuries and accidents to determine their cause and potential corrective action. 7. Acting as a leader in company safety policy and setting a good example by following all safety rules. 8. Dealing with safety issues created by other contractors on the job site. 9. Becoming familiar with local, state, and federal safety regulations. The Safety Coordinator is available for assistance. 10. Assuring that toolbox meetings are held with all employees, and the proceedings are recorded on the company form. A copy shall be sent to the office. Supervisors have the greatest influence on motivating employees to work safely and should control unsafe acts or conditions. They have the most daily contact with the employees and have direct control over the job site. Supervisors will: 1. Train all new and existing employees in proper safety procedures and the hazards of the job, including proper lifting techniques, proper pesticide application, and understanding the properties of chemical agents found on material safety data sheets (MSDS). Effective 1/18/16 4 STAY GREEN INCS Safety Manual and IIPP 2. Instruct all employees, under their supervision, in safe work practices and job safety requirements. 3. Hold tailgate safety meetings with employees. 4. Ensure employee proficiency when assigning work requiring specific knowledge, special operations or equipment 5. Ascertain that all machinery, equipment, and tools are maintained in safe working condition and operate properly. 6. Enforce all safety rules in the Code of Safe Practices and ensure safe work procedures. 7. Conduct daily inspections of the work area for unsafe actions or conditions. 8. Correct unsafe acts and conditions that could cause accidents. 9. Communicate with all employees about safety and accident prevention activities. 10. Enforce the wearing of personal protective equipment on the job. This will depend on the circumstance and may include: cut resistant gloves, respirators, etc. 11. Correct the cause of any accident as soon as possible. 12. Act as a leader in company safety policy and set a good example by following all safety rules. 13. Ascertain that proper first aid and fire fighting equipment is maintained and used when conditions warrant its use. 14. Maintain good housekeeping conditions at all times. 15. Investigate all injuries and accidents to determine their cause and potential corrective action. 16. Ascertain that all injuries involving our employees that require medical attention are properly treated and promptly reported to the office. 17. Locating the nearest hospital or medical facility and posting emergency numbers near all phones. The company Safety Coordinator or Safety Officer acts as a safety resource for the company and is responsible for maintaining program records. They will also be our primary person to deal with outside agencies regarding the safety program and its contents. Jorge Donapetry, HR Manager (800) 858-5508 is currently responsible for this role. Additional duties include. 1. Coordination of all loss prevention activities as a representative of management Acting as a Effm ive 1/18/16 5 STAY GREEN INC'S Safety Manual and IIPP consultant to management in the implementation and administration of the Safety Program. 2. Develop and implement loss prevention policies and procedures designed to insure compliance with the applicable rules and regulations of all federal, state, and local agencies, including the California Department of Pesticide Regulation. 3. Review all accident reports to determine cause and preventability. 4. Conduct periodic reviews of the program and job sites to evaluate performance, discuss problems and help solve them. 5. Consult with representatives of our insurance companies in order that their loss control services will support the Safety Program. 6. Review Workers' Compensation Claims. Help supply the insurance carrier with information about injured employees in order to keep loss reserves as low as possible. Every employee is responsible for working safely, both for self-protection and for protection of fellow workers. Employees must also support all company safety efforts. Specific employee safety responsibilities include: I. If you are unsure how to do any task safely, ask your Supervisor. 2. Read and abide by all requirements of the Safety Manual and the IIPP. 3. Know and follow the Code of Safe Practices and all company safety policies and rules. 4. Wear all required personal protective equipment. 5. Report all accidents and injuries, no matter how minor, to your supervisor immediately. 6. Do not operate any equipment you have not been trained and authorized to use. 7. Report any safety hazards or defective equipment immediately to your supervisor. 8. Do not remove, tamper with or defeat any guard, safety device or interlock. 9. Never use any equipment with inoperative or missing guards, safety devices or interlocks. 10. Never possess, or be under the influence of, alcohol or controlled substances while on the premises. 11. Never engage in horseplay or fighting. 12. Participate in, and actively support, the safety program. Effective 1/18/16 6 STAY GREEN INC'S Safety Manual and IIPP Employee Safety Training California law requires that employees be trained in the safe methods of performing their job. STAY GREEN INC is committed to instructing all employees in safe and healthful work practices. Awareness of potential hazards, as well as knowledge of how to control them, is critical to maintaining a safe and healthful work environment and preventing injuries. To achieve this goal, we will provide training to each employee on general safety issues and safety procedures specific to that employee's work assignment. Every new employee will be given instruction by their Supervisor in the general safety requirements of their job. A copy of our Code of Safe Practices shall also be provided to each employee. Tailgate or toolbox safety meetings will be conducted at least every 10 working days. All training will be documented on the forms provided. Supervisors will be trained at least twice per year on various accident prevention topics. Training provides the following benefits; • Makes employees aware ofjob hazards • Teaches employees to perform jobs safely • Promotes two way communication • Encourages safety suggestions • Creates interest to the safety program • Fulfills Cal/OSHA requirements Employee training will be provided at the following times: 1. All new employees will receive a safety orientation their first day on the job. 2. All field employees will receive training at tailgate or toolbox safety meetings held at the job site. 3. All employees given a new job assignment for which training has not been previously provided will be trained before beginning the new assignment. 4. Whenever new substances, processes, procedures or equipment that represent new hazards are introduced into the workplace. 5. Whenever Stay Green Inc. is made aware of a new or previously unrecognized hazard. 6. Whenever management believes that additional training is necessary. 7. After all serious accidents. 8. When employees are not following safe work rules or procedures. Effective 1/18/16 7 STAY GREEN INUS Safety Manual and IIPP Training topics will include, but not be limited to: • Employee's safety responsibility • General safety rules • Code of Safe Practices • Safejob procedures • Use of hazardous materials, including pesticides, insecticides, gasoline and fertilizers. • Use of equipment, including tree pruning equipment, power and hand mowers, chain saws, and posthole diggers • Use of hand tools, including rakes, spades, and picks. • Emergency procedures • Safe lifting and material handling practices • Use of pesticide dispensers, power tillers, and mulchers • Use of fall protection and tree climbing equipment • Contents of safety program Documentation of Tminine All training will be documented on one of the following three fortes. New Employee Safety Orientation Tailgate Safety Meeting Report The following training method should be used. Actual demonstrations of the proper way to perform a task are very helpful in most cases. • Tell them how to do the job safely • Show them how to do the job safely • Have them tell you how to do the job safely • Have them show you how to do the job safely • Follow up to ensure they are still performing the job safely Effective 1:1816 STAY GREEN INC'S Safety Manual and IIPP STAY GREEN INC New Employee Safety Orientation The Supervisor will verbally cover the following items with each new employee on the first day of their employment. Employee time Job site Start Position Instruction has been received in the following areas. ❑ I. Code of Safe Practices." ❑ 2. Hazard Communication (chemicals) Employee Training Handbook.• ❑ 3. Driving Safety Rules.' ❑ 4. Safety rule enforcement procedures. ❑ 5. Necessity of reporting ALL injuries, no matter how minor, IMMEDIATELY. ❑ 6. Proper method of reporting safety hazards ❑ 7. Emergency procedures and First Aid. ❑ 8. Proper work clothing & required personal protective equipment. ❑ 9. List all special equipment, such as lifts, employee is trained and authorized to use. • Give a copy of these items to the employee - 1 agree to abide by all company safety polices and the Code of Safe Practices. 1 also understand that failure to do so may result in disciplinary action and possible termination. Signed . _ „ _ Date Employee Signed Date Eifeetnr 1.15:16 9 STAY GREEN INC's Safety Manual and IIPP Safety Communication This section establishes procedures designed to develop and maintain employee involvement and interest in the Safety Manual and IIPP. These activities will also ensure effective communication between management and employees on safety related issues that are of prime importance to STAY GREEN INC. The following are some of the safety communication methods that may be used: I. Tailgate or toolbox safety meetings with employees that encourage participation and open, two-way communication. 2. New employee safety orientation. 3. Provision and maintenance of employee bulletin boards discussing safety issues, accidents, and general safety suggestions. 4. Written communications from management or the Safety Coordinator, including memos, postings, payroll staffers, and newsletters. 5. Anonymous safety suggestion program. Employees will be kept advised of highlights and changes relating to the safety program. The Supervisors shall relay changes and improvements regarding the safety program to employees, as appmpriate. Employees will be involved in future developments and safety activities, by requesting their opinions and comments, as necessary. All employee -initiated safety related suggestions will be properly answered, either verbally or to writing, by the appropriate level of management. Unresolved issues shall be relayed to Rich Angelo. All employees are encouraged to bring any safety concerns they may have to the attention of management. STAY GREEN INC will not discriminate against any employee for raising safety issues or concerns. STAY GREEN fNC also has a system of anonymous notification whereby employees who wish to inform the company of workplace hazards without identifying themselves may do so by phoning or sending written notification to the following address: Jorge Donapetry, HR Safety 26415 Summit Circle Santa Clarim, CA 91350 (800) 858-5508 x-104 Effective 1/18/16 STAY GREEN INC's Safety Manual and IIPP Enforcement of Safety Policies The compliance of all employees with STAY GREEN INC's Safety Manual and IIPP is mandatory and is a condition of employment. The following programs will be utilized to ensure employee compliance with the safety program and all safety rules. • Training programs • Retraining • Disciplinary action • Optional safety incentive programs Training Programs The importance of safe work practices and the consequences of failing to abide by safety rules will be covered in the New Employee Safety Orientation and at tailgate and toolbox safety meetings. This will help ensure that all employees understand and abide by STAY GREEN INC safety policies. Retraining Employees that are observed performing unsafe acts or not following proper procedures or rules will be retrained by their supervisor. A Safety Contact Report may be completed by the supervisor to document the training. If multiple employees are involved, additional safety meetings will be held Safety Incentive Programs Although strict adherence to safety policies and procedures is required of all employees, the company may choose to periodically provide recognition of safety -conscious employees and job sites without accidents through a safety incentive program. Discinlinary Action: The failure of an employee to adhere to safety policies and procedures established by STAY GREEN INC can have a serious impact on everyone concerned. An unsafe act can threaten not only the health and well being of the employee committing the unsafe act but can also affect the safety of his/her coworkers and customers. Accordingly, any employee who violates any of the companys safety policies will be subject to disciplinary action. Note: Failure to promptly report any on-the-job accident or injury, on the same day as occurrence, is considered a serious violation of the Company's Code of Safe Practices. Any employee who fails to immediately report a work-related accident or injury, no matter how minor shall be subject to disciplinary action. Eff=v ve V] P.A 6 I I STAY GREEN INC'S Safety Manual and IIPP Employees will be disciplined for infractions of safety rules and unsafe work practices that are observed, not just those that result in an injury. Often, when an injury occurs, the accident investigation may reveal that the injury was caused because the employee violated an established safety rule and/or safe work practice(s). In any disciplinary action, the supervisor should be cautious that discipline is given to the employee for safety violations, and not simply because the employee was injured on thejob or filed a Workers' Compensation claim. Violations of safety rules and the Code of Safe Practices are to be considered equal to violations of other company policy. Discipline for safety violations will be administered in a manner that is consistent with STAY GREEN INC'S system of progressive discipline. If, after training, violations occur, disciplinary action will be taken as follows: I. Verbal warning. Document it, including date and facts on the "Safety Contact Report" form. Add any pertinent witness statements. Restate the policy and correct practice(s). 2. Written warning. Retrain as to correct procedure/practice. 3. Written warning with suspension. 4. Termination As in all disciplinary actions, each situation is to be carefully evaluated and investigated. The particular step taken in the disciplinary process will depend on the severity of the violation, employee history, and regard to safety. Supervisors should consult with the office if there is any question about whether or not disciplinary action is justified. Employees may be terminated immediately for willful or extremely serious violations. Union employees are entitled to the grievance process specified by their contract. Effective 1/18116 1'_ STAY GREEN INC'S Safety Manual and IIPP Hazard Identification and Evaluation To assist in the identification and correction of hazards, STAY GREEN INC has developed the following procedures. These procedures are representative only and are not exhaustive of all the measures and methods that will be implemented to guard against injury from recognized hazards in the workplace. As new hazards are identified or improved work procedures developed, they will be promptly incorporated into our Safety Manual. The following methods will be utilized to identify hazards in the workplace: • Analysis of accidents to identify trends • Accident investigations • Employee observations • Employee suggestions • Regulatory requirements for our industry • Outside agencies such as the fire department and insurance carriers • Periodic safety inspections Loss Analysis Periodic loss analyses will be conducted by Jorge Donapetry. These will help identify areas of concern and potential job hazards. The results of these analyses will be communicated to management, supervision, and employees through safety meetings and other appropriate means. Accident Investigations All accidents and injuries will be investigated in accordance with the guidelines contained to this program. Accident investigations will focus on all causal factors and corrective action including the identification and correction of hazards that may have contributed to the accident. Employee Observation Supervisors will continually observe employees for unsafe actions, and take corrective action as necessary. Employee Suggestions Employees are encouraged to report any hazard they observe to their supervisor. No employee of STAY GREEN fNC is to ever be disciplined or discharged for reporting any workplace hazard or unsafe condition. However, employees who do NOT report potential hazards or unsafe conditions that they are aware of will be subject to disciplinary action. Effective 118 16 STAY GREEN INCS Salley Manual and 11PP Reeulatory Reauirements All industries are subject to government regulations relating to safety. Many of these regulations are specific to our type of business. Copies of pertinent regulations can be obtained from the Safety Coordinator. Outside Agencies Several organizations will assist us in identifying hazards in our workplace. These include safety officers from other contractors, insurance carrier safety and health consultants, private industry consultants, the fire department, Cal/OSHA Consultation, and the California Department of Pesticide Regulation. Periodic Safety Inspections Periodic safety inspections ensure that physical and mechanical hazards are under control and identify situations that may become potentially hazardous. Inspections shall include a review of the work habits of employees in all work areas. These inspections will be conducted by Crew Leader, the Supervisor, Safety Coordinator or other designated individual. Periodic safety inspections will be conducted: • Before any work commences at the site by the crew leader/supervisor. • Daily by the crew leader/supervisor on all sites. • When new substances, process, procedures or equipment are used. • When new or previously unrecognized hazards are identified. • Periodically by the supervisor at various job sues. • Periodically by the safety coordinator at various job sites. These inspections will focus on both unsafe employee actions as well as unsafe conditions. The following is a partial list of items to be checked. • The proper use of fall protection. • The proper use, condition, maintenance and grounding of all electrically operated equipment. • The proper use, condition, and maintenance of safeguards for all power -driven equipment. • Compliance with the Code of Safe Practices. • Proper disposal of pesticides and containers.. • Types of chemicals on hand • Methods of storing chemicals (cool, well -ventilated area accessible only to authorized personnel • Proper labeling or chemicals, pesticides, and insecticides • Housekeeping and personal protective equipment. • Provision of first aid equipment and emergency medical services. Efiative 116 16 14 STAY GREEN INUS Safety Manual and IIPP Any and all hazards identified will be corrected as soon as practical in accordance with the STAY GREEN INC hazard correction policy. If imminent or life threatening hazards are identified, which cannot be immediately corrected, all employees must be removed from the area, except those with special training required to correct the hazard, who will be provided necessary safeguards. Documentation of Inspections Safety inspections will be documented to include the following: • Date on which the inspection was performed. • The name and title of person who performed the inspection. • Any hazardous conditions noted or discovered and the steps or procedures taken to correct them. • Signature of the person who performed the inspection One copy of the completed form should be sent to the office. All reports shall be kept on file for a minimum of two (2) years. Effective 1118116 STAY GREEN IMUS Safety Manual and IIPP Hazard Correction The following procedures will be used to evaluate, prioritize and correct identified safety hazards. Hazards will be corrected in order of priority: the most serious hazards will be corrected first. If it is necessary to involve other contractors to correct hazards on a job site, they will be properly notified by the Supervisor, Manager or other designated individual. Hazard Evaluation Factors which will be considered when evaluating hazards include: • Potential severity - The potential for serious injury, illness or fatality • Likelihood of exposure - The probability of the employee coming into contact with the hazard • Frequency of exposure- How often employees come into contact with the hazard • Number of employees exposed • Possible corrective actions - What can be done to minimize or eliminate the hazard • Time necessary to correct - The time necessary to minimize or eliminate the hazard Techniques for Correcting Hazards I. Engineering Controls: Could include machine guarding, ventilation, noise reduction at the source, and provision of material handling equipment. These are the first and preferred methods of control. 2. Administrative Controls: The next most desirable method would include rotation of employees or limiting exposure time. 3. Personal Protective Equipment. Includes back support belts, hearing protection, respirators and safety glasses. These are often the least effective controls for hazards and should be relied upon only when other controls are impractical. Documentation of Corrective Action All corrective action taken to mitigate hazards should be documented. Depending on the circumstances, one of the following forms should be used: • Safety Contact Report • Safety Meeting Report • Memo or letter • Safety inspection form All hazards noted on safety Inspections will be rechecked on each subsequent inspection and notations made as to their status. Elimlive 11E 16 16 STAY GREEN INC'S Safety Manual and IIPP Accident Investigation All work-related accidents will be investigated by the Supervisor, Manager or other designated individual in a timely manner. This includes minor incidents and "near accidents", as well as serious injuries. An accident is defined as any unexpected occurrence which results in injury to personnel, damage to equipment, facilities, or material, or interruption of normal operations. Responsibility for Accident Investigation Immediately upon being notified of an accident, the supervisor, manager or other designated individual shall conduct an investigation. The purpose of the investigation is to determine the cause of the accident and corrective action to prevent future reoccurrence; not to fix blame or find fault. An unbiased approach is necessary in order to obtain objective findings. The Pumose of Accident Investigations• • To prevent or decrease the likelihood of similar accidents. • To identify and correct unsafe work practices and physical hazards. Accidents are often caused by a combination of these two factors. • To identify training needs. This makes training more effective by focusing on factors that are most likely to cause accidents. What Tunes of Incidents Do We Investigate? • Fatalities • Serious injuries • Minor injuries • Property damage • Near misses Procedures for Investigation of Accidents Immediately upon being notified of an accident the supervisor, manager or other designated individual will: I. Visit the accident scene, as soon as possible, while facts and evidence are still fresh and before witnesses forget important details and to make sure hazardous conditions to which other employees or customers could be exposed are corrected or have been removed; 2. Provide for needed fust aid or medical services for the injured employee(s)- 3. If possible, interview the injured worker at the scene of the accident and verbally "walk" him or her through a re-enactment. All interviews should be conducted as privately as possible. Effective 1.18A6 1 STAY GREEN INC S Safety Manual and IIPP Interview all witnesses individually and talk with anyone who has knowledge of the accident, even if they did not actually witness it. 4. Report the accident to the office at (800) 858-5508. Accidents will be reported by the office to the insurance carrier within 24 hours. All serious accidents will be reported to the carrier as soon as possible. 5. Consider taking signed statements to cases where facts are unclear or there is an element of controversy 6. Thoroughly investigate the accident to identify all accident causes and contributing factors. Document details graphically. Use sketches, diagrams and photos as needed. Take measurements when appropriate. 7. All accidents involving death, disfigurement, amputation, loss of consciousness or hospitalization for more than 24 hours will be reported to CaVOSHA immediately. 8. Focus on causes and hazards Develop an analysts of what happened, how it happened, and how it could have been prevented. Determine what caused the accident itself, not just the injury. 9. Every investigation must also include an action plan. How can such accidents be prevented in the future? 10. In the event a third party or defective product contributed to the accident, save any evidence as it could be critical to the recovery of claim costs. Accurate & Prompt Investteauons • Ensures information is available • Causes can be quickly corrected • Helps identify all contributing factors • Reflects management concern • Reduces chance of recurrence Investmatton Tins • Avoid placing blame • Document with photos and diagrams, if needed • Be objective, get the facts • Reconstruct the event • Use open-ended questions Effective 1/18/16 12 STAY GREEN IN('S Safcry Manual and IIPP Ouestions to Ask When investigating accidents, open-ended questions such as who?, what?, when?, where?, why?, and how? This will provide more information than closed -ended questions such as "Were you wearing gloves?' Examples include: • How did it happen? • Why did it happen? • How could it have been prevented? • Who was involved? • Who witnessed the incident? • Where were the witnesses at the time of the incidenC • What was the inured worker doing? • What was the employee working on? • When did it happen? • When was the accident reported? • Where did it happen? • Why was the employee assigned to do the job? The single, most Important question that must be answered as the result of any investigation is: "What do you recommend be done (or have you done) to prevent this type of incident from recurring?" Once the Accident Investigation is Completed: • Take or recommend corrective action • Document corrective action • Management and the safety coordinator will review the results of all investigations • Consider safety program modifications • Information obtained through accident investigations can be used to update and improve our current program Effective 1/18/16 I? STAY GREEN INC'S Safety Manual and IIPP Program Records Jorge Donapetry, HR Manager will ensure the maintenance of all Safety Manual and IIPP records, for the listed periods, including: I. New Employee Safety Orientation forms length of employment 2. Code of Safe Practices Receipt length of employment 3. Disciplinary actions for safety I year 4. Safety inspections 2 years 5. Tailgate or toolbox meeting reports 2 years 6. Safety Contact Reports 2 years 7. Accident investigations 5 years 8. CaVOSHA log of injuries 5 years 9. Inventory of Hazardous Materials forever 10. Employee exposure or medical records forever Records are available for review at 26415 Summit Circle, Santa Clarita, CA 91350 (800) 858-5508 Etfecove 1:18:16 20 STAY GREEN INC's Safety Manual and IIPP Emergency Medical Services and First Aid STAY GREEN INC will ensure the availability of emergency medical services for its employees at ail times. We will also ensure the availability of a suitable number of appropriately trained persons to render first aid. Where more than one employer is involved in a construction project on a given site, we may agree to work with other contractors to ensure employee access to emergency medical services for the combined work force. Each crew will have at least one individual trained in rendering first aid. Jorge Donapetry will maintain a list of trained individuals and take steps to provide training for those that desire it. First -Aid Kits Every job site shall have access to at least one first-aid kit in a weatherproof container. The first- aid kit will be inspected regularly to ensure that it is well stocked, in sanitary condition, and any used items are promptly replaced. The contents of the first-aid kit shall be arranged to be quickly found and remain sanitary. First-aid dressings shall be sterile and in individually sealed packages The following minimum first-aid supplies shall be kept: Type of Supply Required by Number of Employees Dressings in adequate quantities consisting of: 1-5 6-15 16-200 200+ Adhesive dressings X X X X Adhesive tape rolls, 1 -inch wide X X X X Eye dressing packet X X X X 1 -inch gauze bandage roll or compress X X X 2 -inch gauze bandage roll or compress X X X X 4 -inch gauze bandage roll or compress X X X Sterile gauze pads, 2 -inch square X X X X Sterile gauze pads, 4 -inch square X X X X Sterile surgical pads suitable for pressure dressings X X Triangular bandages X X X X Safety pins X X X X Tweezers and scissors X X X X Cotton -tipped applicators* X X Forceps* X X Emesis basin* X X Flashlight* X X Magnifying glass* X X Portable oxygen and its breathing equipment* X Tongue depressors* X Appropriate record forms* X X X X First-aid textbook, manual or equivalent* X X X X *To be readily available but not necessarily within the first-aid kit - Effective 1/18/16 STAY GREEN INUS Safety Manual and IIPP Drugs, antiseptics, eye irrigation solutions, inhalants, medicines, or proprietary preparations shall not be included to STAY GREEN INC first-aid kits unless specifically approved, in writing, by an employer -authorized, licensed physician. Other supplies and equipment, if provided, shall be in accordance with the documented recommendations of an employer-authonzed licensed physician upon consideration of the extent and type of emergency care to be given based upon the anticipated incidence and nature of injuries and illnesses and availability of transportation to medical care. First Aid The designated first aid person on each site will be available at all limes to render appropriate first aid for injuries and illnesses. Proper equipment for the prompt transportation of the injured or ill person to a physician or hospital where emergency care is provided, or an effective communication system for contacting hospitals or other emergency medical facilities, physicians, ambulance and fire services, shall also be provided. The telephone numbers of the following emergency services in the area shall be posted near the job telephone, or otherwise made available to the employees where no job site telephone exists: 1. A company authorized physician or medical clinic, and at least one alternate if available. 2. Hospitals. 3. Ambulance services. 4. Fire -protection services. Prior to the commencement of work at any site, the supervisor will locate the nearest preferred medical facility and establish that transportation or communication methods are available to the event of an employee injury. Each employee shall be informed of the procedures to follow in case of injury or illness through our new employee orientation program, Code of Safe Practices, and tailgate safety meetings. Where the eyes or body of any person may be exposed to injurious or corrosive materials, suitable facilities for drenching the body or Flushing the eyes with clean water shall be conspicuously and readily accessible. Accident Procedures These procedures are to be followed in the event of an employee injury to the course of employment 1. For severe accidents call 911 and request the Paramedics. 2. Employees must report all work related injuries to their supervisor immediately. Even if they do not feel that it requires medical attention. Failure to do so may result to a delay of Workers' Compensation benefits and disciplinary action. Effmtive I IS 16 7.2 STAY GREEN INC's Safety Manual and IIPP 3. The supervisor, employee, and first aid person, should determine whether or not outside medical attention is needed. When uncertainty exists on the part of any individual, the employee should be sent for professional medical care. 4. If medical attention is not desired or the employee refuses treatment, you must still fill out a STAY GREEN INC Accident Report" in case complications arise later. 5. In all cases, if the employee can not transport themselves for any reason, transportation should be provided. 6. In the event of a serious accident involving hospitalization for more than 24 hours, amputation, permanent disfigurement, loss of consciousness or death, phone contact should be made with the office at (800) 858-5508. Contact must also be made with the nearest Cal OSHA. Office. Efttive 1118116 STAY GREEN INC'S Safety Manual and IIPP Hazardous Materials and Chemicals Hazard Communication Program Introduction It is the policy of STAY GREEN INC that the first consideration of work shall be the protection of the safety and health of all employees. We have developed this Hazard Communication Program to ensure that all employees receive adequate information about the possible hazards that may result from the various pesticides, insecticides, fertilizers, and other materials used in our operations. This Hazard Communication Program will be monitored by Jorge Fe:.wn�+SuiZtin4m„ Operations Manager of Plant Health Care who will be responsible for ensuring that all facets of the program are carried out, and that the program is effective. Our program consists of the following elements: 1. Hazardous material inventory. 2. Collection and maintenance of Material Safety Data Sheets. 3. Container labeling. 4. Employee training. The following items are not required to be included in the program and are therefore omiued: • Foods, drugs, cosmetics or tobacco. • Untreated wood products. • Hazardous waste. • Consumer products packaged for sale to and use by the general public, provided that our exposure is not significantly greater than typical consumer exposure. Hazardous Material Inventory Jorge Ca, iti.,�--d:.iljr ..: .ir_, maintains a list of all hazardous materials used in our operations. This list contains the name of the product, the type of product (insecticide, pesticide, etc.) and the name and address of the manufacturer. Material Safetv Data Sheets (MSD Copies of MSDS for all hazardous substances to which our employees may be exposed will be kept in a binder in the office at 26415 Summit Circle, Santa Clarita, CA 91350. These MSDS are available to all employees, at all times, upon request Copies of the most commonly used products will also be kept by the supervisors at the job site or in their vehicles. Jorge C-astaa Donanetry will be responsible for reviewing incoming MSDS for new and significant health/safety information. They will ensure that any new information is passed on to the affected employees. Effective 1/18/16 24 STAY GREEN INC's Safety Manual and IIPP Jorge C maiiedaDexiepc'p?• will also review all incoming MSDS for completeness. If an MSDS is missing or obviously incomplete, a new MSDS will be requested from the manufacturer. CAUOSHA will be notified if a complete MSDS is not received and the manufacturer will not supply one. New materials will not be introduced into the shop or field until a MSDS has been received. The purchasing department will make it an ongoing part of their function to obtain MSDS for all new materials when they are first ordered Container Labeling No container of hazardous substances will be used unless the container is correctly labeled and the label is legible. All chemicals in cans, bags, drums, pails, etc., will be checked by the receiving department to ensure the manufacturer's label is intact, is legible, and has not been damaged in any manner during shipment. Any containers found to have damaged labels will be held until a new label has been installed. New labels will be obtained from the manufacturer. The label must contain: • The chemical name of the contents. • The appropriate hazard warnings. • The name and address of the manufacturer. All secondary containers will be labeled as to their contents with a reference to the original label. Employee Information and Tminine All employees will be provided information and training on the following items through the STAY GREEN INC safety training program and pnor to starting work with hazardous substances: I. An overview of the requirements of the Hazard Communication Standard including their rights under this regulation. 2. Information regarding the use of hazardous substances in their specific work areas. 3. The location and availability of the written hazard communication program. The program will be available from the supervisor and Jorge Ca4a4qcvFaDonapctrv. 4. The physical and health hazards of the hazardous substances in use. 5. Methods and observation techniques used to determine the presence or release of hazardous substances in the work area. 6. The controls, work practices and personal protective equipment which are available for protection against possible exposure. 7. Emergency and first aid procedures to follow if employees are exposed to hazardous substances. Effective 118.16 25 STAY GREEN INC'S Safety Manual and IIPP 8. Ways of detoxifying spills or leaks of pesticides and other chemicals, including use of absorptive clay, hydrated lime or sodium hypochlorite. 9. How to read labels and material safety data sheets to obtain the appropriate hazard information. Hazardous Non -Routine Task Infrequently, employees may be required to perform hazardous non -routine tasks. Prior to staring this work, each involved employee will be given information by his/her supervisor about hazards to which they may be exposed during such activity. This information will include: • The specific hazards. • Protective/safety measures which must be utilized. • The measures the company has taken to lessen the hazards, including special ventilation, respirators, the presence of another employee, emergency procedures, etc. Informing Contractors To ensure that other contractors are not exposed to our hazardous materials, and to ensure the safety of the contractor's employees, it will be the responsibility of the Supervisor to provide other contractors the following information: • The hazardous substances under our control that they may be exposed to while at the site. • Precautions the contractors employees must take to lessen the possibility of exposure. We will obtain from outside contractors the name of any hazardous substances the contractor's employees may be using at a job site or bringing into our facility. The contractor must also supply a copy of the material safety data sheet relevant to these materials. Employee Rights Under The Hazard Communication Standard At any time, an employee has the tight to: • Access the MSDS folder, and the Hazard Communication Program. • Receive a copy of any environmental sampling data collected in the workplace. • See their employment medical records upon request. Etfxtive 1/18/16 M STAY GREEN INC's Safety Manual and IIPP Fall Protection Falls are the leading cause of fatal injuries in the landscaping industry. STAY GREEN INC has the following requirements for fall protection at all of ourjob sites and work areas. Fall Protection is Required: When working where there is a hazard of falling more than 7': feet from the perimeter of a structure and 7 %: feet from unprotected sides and edges of a retaining wall. Fall protection is also required when pruning trees. Fall Protection Types One of the following three types of fall protection systems will be used when our employees are exposed to fall hazards in excess of 7'h feet: 1. Personal fall arrest system 2. Positioning devices 3. Fall restraint systems Effective 118!16 _. STAY GREEN INC'S Safety Manual and IIPP Personal Fall Arrest Systems Personal fall arrest systems consist of a full body harness and a shock absorbing lanyard attached to suitable anchorage. They are also an effective means of preventing fall accidents. The system does not actually stop you from falling, but catches you and safely stops you from hitting the level below. Fall arrest systems will be our preferred means of protection when standard guardrails, safety cables, or covers are not practical. The following rules, in addition to the manufacturer's requirements and OSHA regulations, will be observed: 1. Ropes and straps (webbing) used in lanyards, lifelines, and strength components of body harnesses shall be made from synthetic fibers except when they are used in conjunction with hot work where the lanyard may be exposed to damage from heat or Flame. 2. Anchorages used for attachment of personal fall arrest equipment shall be independent of any anchorage being used to support or suspend platforms and capable of supporting at least 5,000 pounds per employee attached, or shall be designed, installed, and used as part of a complete personal fall arrest system which maintains a safety factor of at least two; and under the supervision of a qualified person. 3. The attachment point of the body belt shall be located in the center of the wearer's back. The attachment point of the body harness shall be located in the center of the wearers back near shoulder level, or above the wearers head. 4. Where practical, the anchor end of the lanyard shall be secured at a level not lower than the employee's waist, limiting the fall distance to a maximum of 4 feet. 5. Harnesses, lanyards, and other components shall be used only for employee protection as part of a personal fall arrest system and not to hoist materials. 6. Personal fall arrest systems and components subjected to impact loading shall be immediately removed from service and shall not be used again for employee protection until inspected and determined by a competent person to be undamaged and suitable for reuse. 7. STAY GREEN INC shall provide for prompt rescue of employees in the event of a fall or shall assure that employees are able to rescue themselves. 8. Personal fall arrest systems shall be inspected prior to each use for wear, damage and other deterioration, and defective components shall be removed from service. 9. Any lanyard, safety harness, or drop line subjected to in-service loading, as distinguished from static load testing, shall be immediately removed from service and shall not be used again for employee safeguarding. 10. Personal fall arrest systems shall not be attached to guardrails, unless the guardrail is capable of safely supporting the load. Effective 1/18/16 28 STAY GREEN INC'S Safety Manml and IIPP 11. Each personal fall arrest system shall be inspected not less than twice annually by a competent person In accordance with the manufacturer's recommmdations. The date of each inspection shall be documented. 12. Personal fall arrest systems will be rigged such that an employee can neither free fall more than 4 feet, nor contact any lower level. 13. Personal fall arrest systems will bring an employee to a complete stop. They will also limit maximum deceleration distance an employee travels to 3.5 feet and have sufficient strength to withstand twice the potential impact energy of an employee free falling a distance of 6 feet, or the free fall distance permitted by the system, whichever is less Positioning Device Systems Positioning device systems are designed to allow employees to work with both hands free at elevated locations. By their very nature, they provide some level of fall protection. They are not as effective as railings or fall arrest systems. Positioning device systems may be used together with a fall arrest system for greater safety. Their use shall conform to the following provisions: 1. Positioning devices shall be rigged such that an employee cannot free fall more than 2 feet. 2. Positioning device systems shall be inspected prior to each use for wear, damage, and other deterioration and defective components shall be removed from service. 3. Body belts, harnesses, and components shall be used only for employee protection (as part of a personal fall arrest system or positioning device system) and not to hoist materials. 4. The use of non-locking snap hooks is prohibited. 5. Anchorage points for positioning device systems shall be capable of supporting two times the intended load or 3,000 pounds, whichever is greater. Personal Fall Restraint Fall restraint systems are designed to prevent the wearer from reaching the edge or danger area and thus prevent them from falling. Body harnesses may be used for personal fall restraint. 1. Anchorage points used for fall restraint shall be capable of supporting 4 times the intended load. 2. Restraint protection shall be rigged to allow the movement of employees only as far as the sides of the working level or working area. Elective 1+18!16 29 STAY GREEN INC'S Safety Manual and UPP In addition, A full body harness and lanyard are required when using boom lifts for tree pruning. Note: All personal fall arrest, personal fall restraint and positioning device systems purchased or placed in service after February 1, 1997, shall be labeled as meeting the requirements contained in ANSI Al 0.14-1991 American National Standard for Construction and Demolition Use, or ANSI 2359.1-1992 American National Standard Safety Requirements for Personal Fall Arrest Systems, Subsystems and Components. Effective I IP I n 39 STAY GREEN INC'S Safety Manual and UPP Electrical Safety & Lock -out / Tag -out Program Contact with electricity is the second leading cause of fatalities in the Landscaping industry. STAY GREEN INC has developed the following procedures to protect our employees and reduce the risk of accidents. We will also conduct a periodic review of electrical safety, energy control procedures, and lockout/tagout, at least annually, to ensure that the procedure and the requirements of this section are being followed. This procedure is binding upon all employees. All employees will be instructed in the significance of electrical safety, energy control procedures, and lockout/tagout. Each new employee shall be instructed by their Supervisor in the purpose and use of these procedures. All Eauinment and Installations I. Only trained, qualified, and authorized employees will be allowed to make electrical repairs or work on electrical equipment or installations. 2. All electrical equipment and systems shall be treated as energized until tested or otherwise proven to be de -energized. 3. All energized equipment and installations will be de -energized prior to the commencement of any work. If the equipment or installation must be energized for test or other purposes, special precautions will be taken to protect against the hazards of electric shock. 4. All equipment shall be locked out to protect against accidental or inadvertent operation when such operation could cause injury to personnel. Do not attempt to operate any switch, valve, or other energy is solating device bearing a lock. 5. Safety grounds shall always be used where there is a danger of shock from back feeding or other hazards. 6. Polyester clothing or other flammable types of clothing shall not be wom near electrical circuits. 7. Suitable eye protection must be worn at all times while working on electrical equipment. 8. Always exercise caution when energizing electrical equipment or installations. Take steps to protect employees from are blast and exploding equipment in the event of a fault. 9. All power tools will be grounded or double insulated. Tools with defective cords or wiring shall not be used. 10. Suitable temporary barriers or barricades shall be installed when access to open enclosures containing exposed energized equipment is not under the control of an authorized person. Effective 1/18/16 31 STAY GREEN INC'S Safety Manual and 11PP Ground Fault Protection To protect employees on landscaping sites from electric shock, STAY GREEN INC will use ground -fault circuit interrupters on all 120 -volt, AC, single-phase, 15- and 20 -ampere receptacle outlets, which are not a part of the permanent wiring of the building or structure. Receptacles on a two -wire, single phase portable or vehicle -mounted generator rated not more than 5 KW, where the circuit conductors of the generator are insulated from the generator frame and all their grounded surfaces, need not be protected with ground -fault circuit interrupters. Feeders supplying 15- and 20 -ampere receptacle branch circuits shall be permitted to be protected by a ground -fault circuit interrupter approved for the purpose in lieu of the above provisions. Energized Eauirrme it or Systems Work shall not be performed on exposed energized pato of equipment or systems until the following conditions are met: I. Responsible supervision has determined that the work is to be performed while the equipment or systems are energized. 2. Involved personnel have received instructions on the work techniques and hazards involved in working on energized equipment and appropriate equipment to perform the job has been provided. 3. Suitable personal protective equipment has been provided and is used. Suitable insulated gloves shall be wom for voltages in excess of 300 volts, nominal. 4. Suitable eye protections, including face shield and safety glasses or goggles, has been provided and are used. 5. Fire resistant clothing such as Nomex suits is wom. 6. Where required, suitable barriers, barricades, tags, or signs are to place for personnel protection. After the required work on an energized system or equipment has been completed, an authorized person shall be responsible for: 1. Removing from the work area any personnel and protective equipment. 2. Reinstalling all permanent barriers or covers. Elrective 1/18/16 __ STAY GREEN INC'S Safety Manual and IIPP De -energized Equipment or Systems A qualified person shall be responsible for completing the following before working on de - energized electrical equipment or systems, unless the equipment is physically removed from the wiring system: 1. Notifying all involved personnel. 2. Locking the disconnecting means in the "open' position with the use of lockable devices, such as padlocks, combination locks or disconnecting of the conductor(s) or other positive methods or procedures which will effectively prevent unexpected or inadvertent energizing of a designated circuit, equipment or appliance. 3. Tagging the disconnecting means with suitable accident prevention tags. 4. Effectively blocking the operation or dissipating the energy of all stored energy devices which present a hazard, such as capacitors or pneumatic, spring-loaded and like mechanisms This may require the installation of safety grounds. 5. Testing the equipment to ensure it is de -energized. Energizing for Re -energizing) Equipment or Systems A qualified and authorized person shall be responsible for completing the following before energizing equipment or systems that have been de -energized: I. Determining that all persons are clear from hazards which might result from the equipment or systems being energized including arc blast or explosions caused by unexpected faults. 2. Removing locking devices and tags. Locking devices and tags may be removed only by the employee who placed them. Locking devices and tags shall be removed upon completion of the work and after the installation of the protective guards and/or safety interlock systems. Accident Prevention Tags Suitable accident prevention tags shall be used to control a specific hazard. Such tags shall provide the following minimum information: 1. Reason for placing tag. 2. Name of person placing the tag and how that person maybe contacted. 3. Date tag was placed. E1Tecrive 1'18.16 3i STAY GREEN INC'S Sarcty Manual and 11PP Lock -out Tae -out Machinery or equipment capable of movement shall be stopped and the power source de - energized or disengaged, and locked out If necessary, the moveable parts shall be mechanically blocked or secured to prevent inadvertent movement during cleaning, servicing or adjusting operations unless the machinery or equipment must be capable of movement during this period in order to perform the specific task. If so, the hazard of movement shall be minimized. Equipment or power driven machines equipped with lockable controls, or readily adaptable to lockable controls, shall be locked out or positively sealed in the "off' position during repair work and setting -up operations. In all cases, accident prevention signs and/or tags shall be placed on the controls of the equipment or machines during repair work. STAY GREEN INC will provide a sufficient number of accident prevention signs or tags and padlocks, seals or other similarly effective means which may be required by any reasonably foreseeable repair. Sequence of Lockout Procedure 1. Notify all affected employees that a lockout is required and the reason therefore. 2. If the equipment is operating; shut it down by the normal stopping procedure (such as: depress stop button, open toggle switch). 3. Operate the switch, valve, or other energy isolating devices so that the energy source(s) (electrical, mechanical, hydraulic, other) is disconnected or isolated from the equipment. 4. Stored energy, such as that in capacitors, springs, elevated machine members, rotating Fly wheels, hydraulic systems, and air, gas, steam or water pressure, must also be dissipated or restrained by methods such as grounding, repositioning, blocking, bleeding down. 5. Lockout energy isolating devices with an assigned individual lock. 6. After ensuring that no personnel are exposed and as a check on having disconnected the energy sources, operate the push button or other normal operating controls to make certain the equipment will not operate. CAUTION: Return operating controls to neutral position after the test. Procedure Involving More Than One Person If more than one individual is required to lock out equipment, each shall place his/her own personal lock on the energy isolating device(s). One designated individual of a work crew or a supervisor, with the knowledge of the crew, may lock out equipment for the whole crew. In such cases, it may be the responsibility of the individual to carry out all steps of the lockout procedure Effective 1/18/16 34 STAY GREEN INC'S Safety Manual and IIPP and inform the crew when it is safe to work on the equipment. Additionally, the designated individual shall not remove a crew lock until it has been verified that all individuals are clear. Testing Equipment Durine Lockout In many maintenance and repair operations, machinery may need to be tested, and for that purpose energized, before additional maintenance work can be performed. This procedure must be followed: 1. Clear all personnel to safety. 2. Clear away tools and materials from equipment. 3. Remove lockout devices and re-energize systems, following the established safe procedure. 4. proceed with tryout or test. 5. Neutralize all energy sources once again, purge all systems, and lockout prior to continuing work. Equipment design and performance limitations may dictate that effective alternative worker protection be provided when the established lock -out procedure is not feasible. Restoring Equipment to Service After the work is completed and the equipment is ready to be returned to normal operation, this procedure must be followed: I. Remove all non-essential items. 2. See that all equipment components are operationally intact, including guards and safety devices. Repair or replace defective guards before removing lockouts. 3. Remove each lockout device using the correct removal sequence. 4. Make a visual check before restoring energy to ensure that everyone is physically clear of the equipment. Erfative 1.18'16 35 STAY GREEN INC's Safety Manual and 11PP Fleet & Driving Safety Motor vehicle accidents are the third leading cause of fatalities in the landscaping industry. STAY GREEN INC has established the following guidelines and procedures for our drivers and vehicles to protect the safety of individuals operating any motor vehicle on company business. Protecting our employee drivers and the public is of the highest priority. The commitment of management and employees is critical to the success of this program. Clear communication of, and strict adherence to, the program's guidelines and procedures are essential. Our primary goal is to maintain a high level of safety awareness and foster responsible driving behavior. Driver safety awareness and responsible driving behavior will significantly decrease the frequency of motor vehicle accidents and reduce the severity of personal injuries and property damage. Drivers must follow the requirements outlined in this program. Violations of this program may result in disciplinary action up to, and including, suspension of driving privileges or dismissal. Our program consists of the following elements: • Driver selection • Driver training • Vehicle use policy • Vehicle inspection & preventive maintenance • Accident investigation Driver Selection Only company authorized and assigned employees are allowed to drive company vehicles at any time. Prior to being authorized and assigned, STAY GREEN INC will check the following items. Drivers must have: • A valid un -restricted driver's license. • A current MVR driving record with no more than 3 points and no serious or major violations in the past 3 years. STAY GREEN MC will also check driving records of all employees authorized to drive on company business on an annual basis. Employees that do not meet these requirements are not authorized or allowed to drive company vehicles or drive their own vehicle on company business. ERecme 1.18.16 16 STAY GREEN INC'S Safety Manual and IIPP Driver Training All employees driving company vehicles, and personal vehicles on company business, will be given a copy of the Driving Safety Rules and Company Vehicle Use Policy and required to read and sign for them. Safe driving will also be periodically covered at company safety meetings. Company Vehicle Use Policy STAY GREEN INC has established the following policies pertaining to company vehicles I. Personal and off duty use of STAY GREEN INC vehicles is prohibited. 2. Only authorized employees may drive STAY GREEN INC vehicles. These vehicles may include pickups, dump trucks, tractor trailers, all-purpose trailers, bulldozers, and trailers with permanently mounted equipment. They may also include garden tractors with tilling, scraper, excavating and pesticide dispenser attachments. 3. No employee is permitted to drive STAY GREEN INC vehicles while impaired by alcohol, illegal or prescription drugs, m over the counter medications. 4. All accidents involving STAY GREEN INC vehicles must be reported to the office immediately. 5. Employees with two or more preventable accidents in a three year period, or that obtain three points on their driving record, will be subject to a loss of their driving privileges or have their driving privileges restricted. Vehicle Insnection & Preventive Maintenance All STAY GREEN INC vehicles must be inspected by the driver prior to each use. Mechanical defects will be repaired immediately. Supervisors and Managers will periodically spot check company vehicles to determine their condition. Vehicle inspections will include • Lights • Tum signals • Emergency Flashers • Tires • Horn • Braces • Fluids • Windshield condition and wiper condition • Mirrors Effective 1/18/16 37 STAY GREEN INC'S Safety Manual and IIPP All vehicles will also be maintained in accordance with the manufacturers' recommendations. It is the responsibility of the individual assigned the vehicle to ensure proper maintenance and repairs are performed. If your vehicle is not safe, do not drive. Accident Invesdization All accidents in STAY GREEN INC vehicles will be investigated by the Supervisor or Jorge Donapetry. Where possible, witness's statements will be obtained and photos used to document the scene of the accident and the damage. Police reports will also be obtained whenever possible. The following guidelines will be used to help determine preventability. Auto Accident Preventability Guide This guide will assist in determining whether our driver could have prevented the accident. An accident is preventable if the driver could have done something to avoid it. Drivers are expected to drive defensively. Which driver was primarily at fault, which received a traffic citation, or whether a claim was paid has no bearing on preventability. If there was anything our driver could have done to avoid the collision, then the accident was preventable. An accident was non preventable when the vehicle was legally and properly parked, or when properly stopped because of a highway patrol officer, a signal, stop sign, or traffic condition. When judging accident preventability, here are some general questions to consider I. Does the investigation indicate that the driver considers the rights of others, or is there evidence of poor driving habits which need to be changed? 2. Does the investigation indicate driver awareness? Such phrases as "1 did not see," "I didn't think," "I didn't expect," or "I thought" are signals indicating there probably was a lack of awareness, and the accident was preventable An aware driver should think, expect, and see hazardous situations in time to avoid collisions. 3. Was the driver under any physical stresses that could have been contributory? Did the accident happen near the end of a long day or long drive? Did overeating contribute to fatigue? Did the driver get prior sufficient sleep? Is the driver's vision faulty? Was the driver feeling ill? 4. Was the vehicle defective without the drivers knowledge? Was a pre-tnp inspection done, and would it have discovered the defect? A car which pulls to the left or right when the driver applies the brakes, faulty windshield wipers, and similar items are excuses, and a driver using them is trying to evade responsibility. Sudden brake failure, loss of steering, or a blowout might be defects beyond the drivers ability to predict. However, pre -trip inspections and regularly scheduled maintenance should prevent most of these problems. If either of these are the cause of the accident, then the accident was probably preventable by the driver. Effmtive 1 "14. IE 31 STAY GREEN INC'S Safety Manual and 11PP 5. Could the driver have exercised better judgment by taking an alternate route through less congested areas to reduce the hazardous situations encountered? 6. Could the driver have done anything to avoid the accident? 7. Was the driver's speed safe for conditions? 8. Did the driver obey all traffic signals? 9. Was the driver's vehicle under control? Intersection Collision Failure of our driver to yield the right-of-way, regardless of who has the right of way, as indicated by stop signs or lights, is preventable. The only exception to this is when the driver is properly proceeding through an intersection protected by lights or stop signs and the driver's vehicle is struck in the extreme rear side of the vehicle. Regardless of stop signs, stoplights, or right-of-way, a defensive driver recognizes that the right-of-way belongs to anyone who assumes it and should yield accordingly. Questions to consider: I. Did the driver approach the intersection at a speed safe for conditions? 2. Was the driver prepared to stop before entering the intersection? 3. At a blind comer, did the driver pull out slowly, ready to apply the brakes? 4. Did the driver look both ways before proceeding through the intersection? Sideswirt Sideswipes are often preventable. Defensive drivers do not get into a position where they can be forced into another vehicle or another vehicle can be forced into them. Defensive clovers continuously check for escape routes to avoid sideswipes. For two lane roads, this means a driver should pass another vehicle only when absolutely certain that he or she can safely complete the pass. A driver should also be ready to slow down and let a passing vehicle that has failed to judge safe passing distance back into the lane. A driver should make no sudden moves that may force another vehicle to swerve. If a driver sideswipes a stationary object while taking evasive action to avoid striking another car or a pedestrian, such an accident may not be preventable. However, you should consider what the driver could have done or failed to do immediately preceding the evasive action to be in the position of no other options. A driver is also expected to anticipate the actions of an oncoming vehicle. Sideswiping an oncoming vehicle is often preventable. Again, evasive action, including leaving the roadway, may be necessary if an oncoming vehicle crosses into the driver's lane. Drivers are expected to allow merging vehicles to merge smoothly with them, and to merge smoothly on controlled Effective 1/18116 39 STAY GREEN INCS Salley Manual and IIPP access highways. Drivers are expected to be able to gauge distances properly when leaving a parking place and enter tmtiic smoothly. Questions to consider: I. Did the driver look to front and rear for approaching and overtaking traffic immediately before starting to pull away from the curb? 2. Did the driver signal before pulling away from the curb? 3. Did the driver look back rather than depend only upon rear-view mirrors? 4. Did the driver start into traffic only when this action would not require traffic to change its speed or direction in order to avoid his or her vehicle? Head-on Collisions A head-on collision with a vehicle traveling in the wrong lane may be preventable if the driver could have pulled off the road or taken other evasive action to prevent a collision. However, the driver should never drive into the other lane to avoid the oncoming vehicle. If the driver swerved off the road to avoid a head-on collision, the accident is non preventable. The driver in this case made a good defensive driving decision, taking the lesser of two evils. Many skidding conditions are caused by min, freezing rain, fog, and snow, which all increase the hazard of travel. Oily road film, which builds up during a period of good weather, causes an especially treacherous condition during the first minutes of a rainfall. Loss of traction can be anticipated, and these accidents usually are preventable. Driving too fast for conditions is the most common reason why these types of accidents are preventable. Questions to consider: I . Was the driver operating at a safe speed considering weather and road conditions? 2. During inclement weather, was the driver keeping at least twice the safe following distance used for dry pavement? 3. Were all actions gradual? 4. Was the driver anticipating ice on bridges, in gutter, ruts, and near the curb? S. Was the driver alert for water, ice or snow in shaded areas, loose gravel, sand, nuts, etc. If a driver goes off the road or strikes another vehicle because of skidding, the accident is preventable. Elfmove 1/18/16 to STAY GREEN INC'S Safety Manual and IIPP Pedestrian Accidents All types of pedestrian accidents, including collisions with pedestrians coming from between parked cars, are usually considered preventable. There are few instances where the action of pedestrians is so unreasonable that the operator could not be expected to anticipate such an occurrence. Questions to consider I. Did the driver go through congested areas expecting that pedestrians would step in front of the vehicle? 2. Was the driver prepared to stop? 3. Did the driver keep as much clearance between his or her vehicle and parked vehicles, as safety permitted? 4. Did the driver stop when other vehicles had stopped to allow pedestrians to cross? 5. Did the driver wait for the green light or slop for the caution light? 6. Was the driver aware of children and prepared to stop if one ran into the street? 7. Did the driver give all pedestrians the right-of-way? 8. Did the driver stop for a school bus which was stopped and properly signaling that passengers were loading or unloading? Backing Accidents Backing a vehicle into another vehicle, an overhead obstruction, or a stationary object are normally preventable. The fact that someone was directing the driver in backing does not relieve the driver of the responsibility to back safely. Questions to consider I. Was it necessary to back? 2. Did the driver plan ahead so that he or she could have pulled forward out of the parking space instead of backing? 3. Was it necessary to drive into the narrow street, dead-end alley, or driveway from which he or she backed? 4. If the driver could not see where he or she was backing: Did the driver try to get someone to guide him or her? 5. Did the driver look all around the vehicle before backing? Did the driver back immediately after looking? 6. Did the driver use the horn while backing? Were the back-up lights working? 7. Did the driver look to the rear without relying totally on the rear-view mirror? 8. If the distance was long, did the driver stop, get out, and look around occasionally? 9. Did the driver back slowly? 10. Did the driver judge clearances accurately? Effective 1 1816 STAY GREEN INCS Safety Manual and IIPP Parking Accidents Doors on our driver's parked vehicle that are damaged when opened on the traffic side are considered preventable accidents. The driver is responsible to see that the traffic side is clear of traffic, before any doors on that side are opened. In most cases, if our driver, while driving, strikes a parked vehicles opening door it is considered preventable. Usually our driver can see from a sufficient distance that the parked vehicle is occupied, and should therefore, be prepared to stop, should move closer to the center line or change lanes. It is a driver's responsibility to park the vehicle so that it will remain stationary. A runaway type accident is preventable and blaming such a collision on defective parking brakes or other holding devices are inadequate excuses. A good pre -trip inspection and maintenance program will eliminate most opportunities for this type of accident being the result of mechanical failure. Accidents occurring when vehicles are properly and legally parked are considered non preventable. Accidents occurring while the vehicle was double parked or in a "No Parking" zone are preventable. Questions to consider: I . Was the vehicle parked on the proper side of the road? 2. Was it necessary to park there or was there a safer, only slightly less convenient place nearby? 3. Did the driver have to park on the traveled part of the highway, on the curve, or on the hill? 4. When required, did the driver want traffic by emergency warning devices? 5. Did the driver park parallel to the curb? 6. Was it necessary to park so close to an alley or directly across from a driveway? Collision With Obstructions Obstructions can be avoided if the driver knows the height and width of the vehicle, pays attention to posted clearances, and takes the time to properly judge clearances. Cargo Accidents The accident should be considered preventable if the investigation shows a mechanical defect of which the driver was aware, a defect the driver should have found by inspecting the vehicle, or the driver caused the accident by rough and abusive handling. It is a driver's responsibility to secure cargo properly to prevent shifting, loss, or damage. Cargo should be safely stowed to prevent flying objects that can strike or distract the driver. Effective 1 1 3: 16 d_ STAY GREEN INC'S Safety Manual and 11PP Trenching and Excavation Our landscaping activities may include the construction of retaining walls, irrigation systems or ponds that occasionally require our employees to work in trenches and excavations. Each year in California, four construction workers die in trench cave-ins. To prevent this from occurring, the following precautions are mandatory when STAY GREEN INC employees work in trenches or excavations that are 5 feet deep or greater. They are also required In trenches less than 5 feet deep if the sod appears unstable. These precautions apply even if we did not dig the trench. General Precautions 1. All trenching and excavation activities will be conducted in accordance with Cal/OSHA regulations. 2. All trenching and excavation work or entry will be supervised by a competent person with the skills, training, and experience to recognize hazards and implement corrective action. 3. All trenches and excavations 5 feet deep or greater will be protected from cave-ins by sloping, shoring, or benching. 4. No employee is permitted to work in any trench or excavation that is not safe. Work will stop until the hazard is corrected. 5. All trenches and excavations will be inspected prior to the start of work and at least daily by the competent person. 6. Suitable access and egress will be maintained at all times Prior to Dieeine I. A trenching and excavation permit will be obtained from Cal/OSHA. 2. The estimated location of utility installations, such as sewer, telephone, fuel, electric, water lines, or any other underground installations that reasonably may be expected to be encountered during excavation work, shall be determined prior to opening an excavation. 3. All Regional Notification Centers in the area involved and all known owners of underground facilities in the area who are not members of a Notification Center shall be advised of the proposed work at least 2 working days prior to the start of any digging or excavation work. EXCEPTION: Emergency repair work to underground facilities. Ellceetive 1/18.16 43 STAY GREET) INC'S Safety Manual and IIPP While Dieeine I. When excavation operations approach the estimated location of underground installations, the exact location of the installations shall be determined by safe and acceptable means. 2. Contact with live electrical lines and gas mains can cause death or serious injury. Extra care should be taken in these areas. If you are unsure, ask your supervisor, or contact Jorge Donapetry, HR Manager at (800) 858-5508 x-104. 3. While the excavation is open, underground installations shall be protected, supported, or removed as necessary to safeguard employees. 4. All surface encumbrances that are located so as to create a hazard to employees shall be removed or supported, as necessary, to safeguard employees. 5. No employee shall be permitted underneath loads handled by lifting or digging equipment. Employees shall be required to stand away from any vehicle being loaded or unloaded to avoid being struck by any spillage or falling materials. 6. Adequate barriers or physical protection shall be provided at all remotely located excavations. All wells, pits, shafts, etc., shall be barricaded or covered. Upon completion of exploration and other similar operations, temporary wells, pits, shafts, etc., shall be back filled. Open Trenches and Excavations 1. Daily inspections of excavations, the adjacent areas, and protective systems shall be made by a competent person for evidence of a situation that could result in possible cave-ins, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions. An inspection shall be conducted by the competent person prior to the start of work and as needed throughout the shift. Inspections shall also be made after every rain storm or other hazard increasing occurrence. These inspections are only required when employee exposure can be reasonably anticipated. 2. Where the competent person finds evidence of a situation that could result in a possible cave- in, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions, exposed employees shall be removed from the hazardous area until the necessary precautions have been taken to ensure their safety. 3. A stairway, ladder, ramp or other safe means of egress shall be located in trench excavations that are 4 feet or more in depth so as to require no more than 25 feet of lateral travel for employees. Effective 1/18/16 44 STAY GREEN INCS Safety Manual and IIPP 4. Where employees or equipment are required or permitted to cross over excavations over 6 feet and wider than 30 inches, walkways or bridges with standard guardrails shall be provided. 5. When mobile equipment is operated adjacent to an excavation, or when such equipment is required to approach the edge of an excavation, and the operator does not have a clear and direct view of the edge of the excavation, a warning system shall be utilized such as barricades, hand or mechanical signals, or stop logs. If possible, the grade should be away from the excavation. 6. Adequate protection shall be provided to protect employees from loose rock or soil that could pose a hazard by falling or rolling from an excavation face. Such protection shall consist of scaling to remove loose material; installation of protective barricades at intervals as necessary on the face to stop and contain falling material; or other means that provide equivalent protection. 7. Employees shall be protected from excavated or other materials or equipment that could pose a hazard by falling or rolling into excavations. protection shall be provided by placing and keeping such materials or equipment at least 2 feet from the edge of excavations, or by the use of retaining devices that are sufficient to prevent materials or equipment from falling or rolling into excavations, or by a combination of both if necessary. 8. Where oxygen deficiency (atmospheres containing less than 19.5 percent oxygen) or a hazardous atmosphere exists or could reasonably be expected to exist, such as in excavations in landfill areas or excavations in areas where hazardous substances are stored nearby, the atmosphere in the excavation shall be tested before employees enter excavations greater than 4 feet in depth. 9. Adequate precautions shall be taken to prevent employee exposure to atmospheres containing less than 19.5 percent oxygen and other hazardous atmospheres. These precautions include providing proper respiratory protection or ventilation. 10. Adequate precautions shall be taken, such as providing ventilation, to prevent employee exposure to an atmosphere containing a concentration of a flammable gas in excess of 20 percent of the lower flammable limit of the gas. 11. When controls are used that are intended to reduce the level of atmospheric contaminants to acceptable levels, testing shall be conducted as often as necessary to ensure that the atmosphere remains safe. 12. Emergency rescue equipment, such as breathing apparatus, a safety harness and line, or a basket stretcher, shall be readily available where hazardous atmospheric conditions exist or may reasonably be expected to develop during work in an excavation. This equipment shall be attended when in use. Effective 1/18/16 45 STAY GREEN INC'S Safety Manual and IIPP 13. Employees shall not work in excavations in which there is accumulated water, or in excavations in which water is accumulating, unless adequate precautions have been taken to protect employees against the hazards posed by water accumulation. The precautions necessary to protect employees adequately vary with each situation, but could include special support or shield systems to protect from cave-ins, water removal to control the level of accumulating water, or use of a safety harness and lifeline. 14. If water is controlled or prevented from accumulating by the use of water removal equipment, the water removal equipment and operations shall be monitored by a competent person to ensure proper operation. 15. If excavation work interrupts the natural drainage of surface water (such as streams), diversion ditches, dikes, or other suitable means shall be used to prevent surface water from entering the excavation and to provide adequate drainage of the area adjacent to the excavation. Excavations subject to mnoff from heavy rains will require an inspection by a competent person. EfTcctive 1 18 16 46 STAY GREEN INCS Safety Manual and 11PP Pesticide and Fertilizer Usage Pesticides are poisonous and must be used with caution. Read the label carefully before opening a container. Precautions and directions must be followed exactly. Special protective equipment as indicated must be used. Storage: Keep all pesticides in original containers only and store separately in a locked shed or area. Keep all pesticides out of thee reach of children, unauthorized personnel, pets and livestock. Do not store with foods, feeds, or fertilizers. Post warning signs on pesticide storage areas Use: The suggestions given in this safety IIPP are based upon best current information. Follow directions: measure accurately to avoid residues exceeding tolerances; use exact amounts as indicated on the label or lesser amounts given in this publication. Use a pesticide only on plants, or animals shown on the label. Container Disposal: Do not transport pesticides in vehicles with foods, feeds, clothing, or other materials, and never in a closed cab with a vehicle driver. Responsibility: The Safety Coordinator responsible for the implementation of the IIPP is also responsible for proper use of pesticides, including drift to other properties, and for excessive residues. Pesticides should not be applies over streams, rivers, ponds, lakes, run-off irrigation, or other aquatic areas except where specific use for that purpose is intended. All employees will be provided training on the following elements relating to the use, storage and neutralization of pesticides, insecticides, and fertilizers through STAY GREEN INC: I. Methods of storage 2. Proximity of storage to groundwater supplies 3. Condition of equipment used for application 4. Emergency detoxification procedures 5. Disposal procedures * Absorptive clay, hydrated lime or sodium hypochlorite will be on hand for emergency detoxification of spills or leaks. Stay Green, Inc. will also ensure proper certification of all workers applying 'restricted use' pesticides. For more information on pesticide application as well as other areas of landscaping safety, workers can refer to the following six websites - 1. hnn> www.Ldpr.«.pn•.: index.Iftm (California Department of Pesticide Regulation) 2. httm.tlaaose.ext.vt.edu/ (American Association of Pesticide Safety Educators) 3. htip: www. anla.nre (American Nursery and Landscape Association) Elf=dW V1816 47 STAY GREEN INC'S Safety Manual and IIPP 4. httM#www.alca.ttmJ (Associated Landscape Contractors of America) 5, blrw:fAvww.ltWBLg l (Professional Grounds Management Society) 6. blow-71rrw j'r ca ewvl (Cal/OSHA) Effective 1 18-16 43 STAY GREEN tNUS Safety Manual and IIPP Respiratory Protection Occasionally our work may necessitate the use of respirators to protect against air contaminants found in the application of pesticides and insecticides. Whenever respirators are required to be used to control exposure to pesticides and other harmful gents, only respiratory equipment approved for that purpose shall be used and such equipment shall be approved by the National Institute for Occupational Safety and Health (NIOSH). Only parts approved for the specific respirator system shall be used for replacement. General Resniratory Protection Guidelines: 1. Atmospheric contamination will be prevented wherever feasible through engineering controls such as enclosure or confinement of the operation, general and local exhaust ventilation, or substitution of less toxic materials. When effective engineering controls are not feasible, or while they are being instituted, appropriate respirators shall be used. '_. STAY GREEN INC shall identify and evaluate the respiratory hazard(s) in the workplace; this evaluation shall include a reasonable estimate of employee exposures to respiratory hazard(s) and an identification of the contaminant's chemical state and physical form. Where we cannot identify or reasonably estimate the employee exposure, the atmosphere shall be considered to be immediately dangerous to life or health (IDLH). 3. Respirators shall be provided when such equipment is necessary to protect the health of the employee. 4. Only NIOSH -certified respirators shall be used. The respirator shall be used in compliance with the conditions of its certification. 5. STAY GREEN INC will provide respirators that are applicable and suitable for the purpose intended. We shall select and provide an appropriate respirator based on the respiratory hazard(s) to which the worker is exposed and workplace and user factors that affect respirator performance and reliability. 6. Respirators shall be selected from a sufficient number of respirator models and sizes so that the respirator is acceptable to, and correctly fits, the user. 7. Jorge C-estanedeDonanctry, Operations Manager of Plant Health Care shall act as the Program Administrator who is qualified by appropriate training or experience that is commensurate with the complexity of the program to administer or oversee the respiratory protection program and conduct the required evaluations of program effectiveness. 8. STAY GREEN INC will provide respirators, training, and medical evaluations at no cost to the employee Effative I/19r 16 49 STAY GREEN INC's Safety Manual and IIPP 9. STAY GREEN INC will provide a medical evaluation to determine the employee's ability to use a respirator, before the employee is fit tested or required to use the respirator in the workplace. We may discontinue an employees medical evaluations when the employee is no longer required to use a respirator. 10. STAY GREEN INC will ensure that employees using a tight -fitting facepiece respirator pass an appropriate qualitative fit test (QLFf) or quantitative fit test (QNFf). 11. STAY GREEN INC will establish and implement procedures for the proper use of respirators. These requirements include prohibiting conditions that may result in facepiece seal leakage, preventing employees from removing respirators in hazardous environments, taking actions to ensure continued effective respirator operation throughout the work shift, and establishing procedures for the use of respirators in IDLH atmospheres. 12. We shall provide each respirator user with a respirator that is clean, sanitary, and in good working order. The Supervisor or Supervisor shall ensure that respirators are cleaned and disinfected. 13. All filters, cartridges and canisters used in the workplace must be legibly labeled and color coded with the NIOSH approval label that must not be removed. 14. Training and information will be provided to employees who are required to use respirators. The training will be comprehensive, understandable, and recur annually or more often if necessary. 15. Jorge Operations Manager of Plant Health Care shall conduct evaluations of the workplace to ensure that the written respiratory protection program is being properly implemented, and to consult with employees to ensure that they are using the respirators properly. 16. Written information regarding medical evaluations, fit testing, and the respirator program shall be retained indefinitely. This information will facilitate employee involvement in the respirator program, assist us in auditing the adequacy of the program, and provide a record for compliance determinations by OSHA. 17. Where respirator use is not required by a particular standard or hazard, STAY GREEN INC may provide respirators at the request of employees or permit employees to use their own respirators, if we determine that such respirator use will not in itself create a hazard. If voluntary respirator use 1s permissible, we shall provide the respirator users with the information contained 1n Appendix D of section 5144 8CCR. ("Information for Employees Using Respirators When Not Required Under the Standard. Effective 1/18/16 51) STAY GREEN INC'S Safety Manual and 11PP Respirator Selection Reauirements The proper respirator for the job and hared shall be selected. This selection will be made in accordance with Cal -OSHA or ANSI Z88.2-1980 standards. The correct respirator shall be specified for each job. The mdisidual issuing them shall be adequately instructed to insure that the correct respirator is used. The manufacturers' recommendations and literature will also be reviewed to determine if the respirator provides protection against the expected contaminants. For instance, dust masks do not provide protection against gasses or vapors. Jorge Go--t,{nwr.al7o .ir -r., Operations Manager of Plant Health Care or another qualified individual shall review and approve all breathing air compressors and installations for compliance with appropriate OSHA regulations and safety procedures prior to use. Respirators for atmospheres that are not IDLH. ' STAY GREEN INC shall provide a respirator that is adequate to protect the health of the employee and ensure compliance with all other OSHA statutory and regulatory requirements, under routine and reasonably foreseeable emergency situations. The respirator selected shall be appropriate for the chemical state and physical form of the contaminant. For protection against gases and vapors: • An atmosphere -supplying respirator, or • An air -purifying respirator, provided that the respirator is equipped with an end -of -service - life indicator (ESLI) certified by NIOSH for the contaminant; or if there is no ESLI appropriate for conditions in the workplace, we will implements a change schedule for canisters and cartridges that is based on objective information or data that will ensure that canisters and cartridges are changed before the end of their service fife. For protection against particulates: • An atmosphere -supplying respirator; or • An air -purifying respirator equipped with a filter certified by NIOSH under 30 CFR part I I as a high efficiency particulate air (NEPA) filter, or an air -purifying respirator equipped with a filter certified for particulates by NIOSH under 42 CFR part 84, or • For contaminants consisting primarily of particles with mass median aerodynamic diameters (MMAD) of at least 2 micrometers, an air -purifying respirator equipped with any filter certified for particulates by NIOSH. Effective I 1N.'16 STAY GREEN INC'S Sant. Manual and IIPP Medical Evaluation Procedures 1. Employees shall not be assigned to tasks requiring the use of respirators unless it has been determined that they are physically able to perform the work while using the required respiratory equipment. 2. STAY GREEN INC shall identify a physician or other Licensed Health Care Professional (PLHCP) to perform medical evaluations. 3. The medical evaluation shall include any medical tests, consultations, or diagnostic procedures that the PLHCP deems necessary to make a final determination. 4. Medical questionnaires and examinations shall be administered confidentially during the employees normal working hours or at a time and place convenient to the employee. 5. The employee shall have an opportunity to discuss the examination results with the PLHCP. 6. The following information must be provided to the PLHCP before the PLHCP makes a recommendation concerning an employee's ability to use a respirator: • The type and weight of the respirator to be used by the employee; • The duration and frequency of respirator use (including use for rescue and escape); • The expected physical work effort; • Additional protective clothing and equipment to be wom; and • Temperature and humidity extremes that may be encountered. 7. STAY GREEN INC shall provide the PLHCP with a copy of this written respiratory protection program and a copy of the OSHA regulations if they do not already have them. 8. In determining the employee's ability to use a respirator, STAY GREEN INC shall obtain a written recommendation regarding the employee's ability to use the respirator from the PLHCP. The recommendation shall provide only the following information: • Any limitations on respirator use related to the medical condition of the employee, or relating to the workplace conditions in which the respirator will be used, including whether or not the employee is medically able to use the respirator; • The need, if any, for follow-up medical evaluations; and • A statement that the PLHCP has provided the employee with a copy of the PLHCP's written recommendation. 9. If the respirator is a negative pressure respirator and the PLHCP finds a medical condition that may place the employee's health at increased risk if the respirator is used, STAY GREEN INC shall provide a PAPR if the PLHCP's medical evaluation finds that the employee can use such a respirator; if a subsequent medical evaluation finds that the employee is medically able to use a negative pressure respirator, then we are no longer required to provide a PAPR. Etramive 1/18/16 52 STAY GREEN INC's Safety Manaal and IIPP 10. STAY GREEN INC shall provide additional medical evaluations that comply with the requirements of this section iF. • An employee reports medical signs or symptoms that are related to ability to use a respirator; • A PLHCP, supervisor, or the respirator program administrator informs the employer that an employee needs to be reevaluated; • Information from the respiratory protection program, including observations made during fit testing and program evaluation, indicates a need for employee reevaluation; or • A change occurs in workplace conditions (e.g., physical work effort, protective clothing, temperature) that may result in a substantial increase in the physiological burden placed on an employee. Fit Testine 1. STAY GREEN INC shall ensure that an employee using a tight -fitting facepiece respirator is fit tested prior to initial use of the respirator, whenever a different respirator facepime (size, style, model or make) is used, and at least annually thereafter. 2. We shall conduct an additional fit test whenever the employee reports, or the employer, PLHCP, supervisor, or program administrator makes visual observations of, changes in the employees physical condition that could affect respirator fit. Such conditions include, but are not limited to, facial scarring, dental changes, cosmetic surgery, or an obvious change in body weight. 3. If after passing a QLFT or QNFr, the employee subsequently notifies the program administrator, supervisor, or PLHCP that the fit of the respirator is unacceptable, the employee shall be given a reasonable opportunity to select a different respirator facepiece and to be retested. 4. The fittest shall be administered using an OSHA -accepted QLFT or QNFT protocol. Usaee Rules I. STAY GREEN INC shall not permit respirators with tight -fitting facepteces to be worn by employees who have: • Facial hair that comes between the sealing surface of the fecepiece and the face or that interferes with valve function; or • Any condition that interferes with the face-to-facepiece seal or valve function. 2. If an employee wears corrective glasses or goggles or other personal protective equipment, we shall ensure that such equipment is worn in a manner that does not interfere with the seal of the facepiece to the face of the user. Effective 1/18/16 53 STAY GREEN INC's Safety Manual and IIPP 3. For all tight -fitting respirators, we shall ensure that employees perform a user seal check each time they put on the respirator. 4. Appropriate surveillance shall be maintained of work area conditions and degree of employee exposure or stress. When there is a change in work area conditions or degree of employee exposure or stress that may affect respirator effectiveness, we shall reevaluate the continued effectiveness of the respirator. 5. Respiratory equipment shall not be passed on from one person to another until it has been cleaned and sanitized. Respirators individually assigned should be marked to indicate to whom it was assigned. This mark shall not affect the respirator performance in any way. The date of issuance should be recorded. 6. When not in use, respirators shall be stored to protect against dust, sunlight, extreme temperatures, excessive moisture, or damaging chemicals. Plastic zip lock bags are suitable for storage. 7. STAY GREEN INC shall ensure that employees leave the respirator use area: • To wash their faces and respirator facepieces as necessary to prevent eye or skin irritation associated with respirator use; or • If they detect vapor or gas breakthrough, changes in breathing resistance, or leakage of the facepiece; or • To replace the respirator or the filter, cartridge, or canister elements. 8. If the employee detects vapor or gas breakthrough, changes in breathing resistance, or leakage of the facepiece, we will replace or repair the respirator before allowing the employee to return to the work area. 9. For all IDLH atmospheres, STAY GREEN INC shall ensure that • One employee or, when needed, more than one employee is located outside the IDLH atmosphere; • Visual, voice, or signal line communication is maintained between the employee(s) in the IDLH atmosphere and the employee(s) located outside the IDLH atmosphere; • The employee(s) located outside the IDLH atmosphere are trained and equipped to provide effective emergency rescue; • The supervisor or designee is notified before the employee(s) located outside the IDLH atmosphere enter the IDLH atmosphere to provide emergency rescue; • The supervisor or designee authorized to do so by STAY GREEN INC, once notified, provides necessary assistance appropriate to the situation; • Employee(s) located outside the IDLH atmospheres are equipped with pressure demand or other positive pressure SCBAs, or a pressure demand or other positive pressure supplied -air respirator with auxiliary SCBA; and either appropriate retrieval equipment Effective 1!1946 54 STAY GREEN INCS Safety Manual and IIPP for removing the employee(s) who enter(s) these hazardous atmospheres where retrieval equipment would contribute to the rescue of the employee(s) and would not increase the ovt:rall risk resulting from entry; or equivalent means for rescue where retrieval equipment is not required. Maintenance. Inspection and Care of Respirators. I. The employer shall ensure that respirators are cleaned and disinfected using procedures recommended by the respirator manufacturer, provided that such procedures are of equivalent effectiveness to OSHA regulations. The respirators shall be cleaned and disinfected at the following intervals: • Respirators issued for the exclusive use of an employee shall be cleaned and disinfected as often as necessary to be maintained in a sanitary condition; • Respirators issued to more than one employee shall be cleaned and disinfected before being wom by different individuals; • Respirators maintained for emergency use shall be cleaned and disinfected after each use; and • Respirators used in fit testing and training shall be cleaned and disinfected after each use. 2. All respirators shall be stored to protect them from damage, contamination, dust, sunlight, extreme temperatures, excessive moisture, and damaging chemicals, and they shall be packed or stored to prevent deformation of the facepiece and exhalation valve. 3. Emergency respirators shall be: • Kept accessible to the work area; • Stored in compartments or in covers that are clearly marked as containing emergency respirators; and • Stored in accordance with any applicable manufacturer instructions. 4. All respirators used in routine situations shall be inspected before each use and during cleaning; 5. All respirators maintained for use in emergency situations shall be inspected at least monthly and in accordance with the manufacturer's recommendations, and shall be checked for proper function before and after each use. 6. Emergency escape only respirators shall be inspected before being carried into the workplace for use. 7. STAY GREEN INC shall ensure that respirator inspections include the following. Effective 1/18/16 STAY GREEN INC's Safety Manual and 11PP • A check of respirator function, tightness of connections, and the condition of the various parts including, but not limited to, the facepiece, head straps, valves, connecting tube, and cartridges, canisters or filters; and • A check of elastomeric parts for pliability and signs of deterioration. 8. In addition to the requirements above, self-contained breathing apparatus shall be inspected monthly. 9. Air and oxygen cylinders shall be maintained in a fully charged state and shall be recharged when the pressure falls to 900/6 of the manufacturer's recommended pressure level. The employer shall determine that the regulator and warning devices function properly. 10. For respirators maintained for emergency use, STAY GREEN INC shall: • Certify the respirator by documenting the date the inspection was performed, the time (or signature) of the person who made the inspection, the findings, required remedial action, and a serial number or other means of identifying the inspected respirator, and • Provide this information on a tag or label that is attached to the storage compartment for the respirator, is kept with the respirator, or is included in inspection reports stored as paper or electronic files. This information shall be maintained until replaced following a subsequent certification. 11. Repairs. STAY GREEN INC shall ensure that respirators that fail an inspection or are otherwise found to be defective are removed from service, and are discarded or repaired or adjusted in accordance with the following procedures: • Repairs or adjustments to respirators are to be made only by persons appropriately trained to perform such operations and shall use only the respirator manufacturer's NIGSH- approved parts designed for the respirator; • Repairs shall be made according to the manufacturer's recommendations and specifications for the type and extent of repairs to be performed; and • Reducing and admission valves, regulators, and alarms shall be adjusted or repaired only by the manufacturer or a technician trained by the manufacturer. Trainine STAY GREEN INC shall ensure that each employee required to use a respirator can demonstrate knowledge of at least the following: • Why the respirator is necessary and how improper fit, usage, or maintenance can compromise the protective effect of the respirator; • What the limitations and capabilities of the respirator are; • How to use the respirator effectively in emergency situations, including situations in which the respirator malfunctions; • How to inspect, put on and remove, use, and check the seals of the respirator, ERective 1118116 56 STAY GREEN INC'S Safcty Manual and IIPP • What the procedures are for maintenance and storage of the respirator, • How to recognize medical signs and symptoms that may limit or prevent the effective use of respirators; and 2. The training shall be conducted in a manner that is understandable to the employee. 3. The training shall be provided prior to requiring the employee to use a respirator in the workplace. 4. Retraining shall be administered annually, and when the following situations occur. • Changes in the workplace or the type of respirator render previous training obsolete; • Inadequacies in the employee's knowledge or use of the respirator indicate that the employee has not retained the requisite understanding or skill; or • Any other situation arises in which retraining appears necessary to ensure safe respirator use. 6. The basic advisory information on respirators, as presented in Appendix D of Section 5144 of the California Code of Regulations (8CCR-5144), shall be provided to employees who wear respirators when such use is not required by this section or by the employer. Program Evaluation I. Jorge Donapetry HR Manager shall conduct evaluations of the workplace as necessary to ensure that the provisions of the current written program are being effectively implemented and that it continues to be effective. 2. Jorge Donapetry shall regularly consult employees required to use respirators to assess the employees' views on program effectiveness and to identify any problems. Any problems that are identified during this assessment shall be corrected. Factors to be assessed include, but are not limited to: • Respirator fit (including the ability to use the respirator without interfering with effective workplace performance); • Appropriate respirator selection for the hazards to which the employee is exposed, • Proper respirator use under the workplace conditions the employee encounters; and • Proper respirator maintenance. Recordkeenine I. Records of medical evaluations must be retained and made available in accordance with section 3204 (8CCR-3204). 2. STAY GREEN INC shall establish a record of the qualitative and quantitative fit tests administered to an employee including: Effwtivc 1/18/16 57 STAY GREEN INC'S Safety Manual and IIPP • The name or identification of the employee tested; • Type of fit test performed; • Specific make, model, style, and size of respirator tested; • Date of lest; and • The pass. fail results for QLFTs or the fit factor and strip chart recording or other recording of the test results for QNFTs. • Fit test records shall be retained for respirator users until the next fit test is administered. 3. Program records shall be made available upon request to affected employees and to the Chief of the Division of Occupational Safety and Health or designee for examination and copying. Procedures for Cleaning Respirators. I. Remove filters, cartridges, or canisters. Disassemble facepieces by removing speaking diaphragms, demand and pressure -demand valve assemblies, hoses, or any components recommended by the manufacturer. Discard and replace any defective pans. 2. Wash components in warn (43 deg. C [I 10 deg. F] maximum) water with a mild detergent or with a cleaner recommended by the manufacturer. A stiff bristle (not wire) brush may be used to facilitate the removal of dirt 3. Rinse components thoroughly in clean, warn (43 deg C [I 10 deg. F] maximum), preferably running water. Drain. 4. When the cleaner used does not contain a disinfecting agent, respirator components should be immersed for two minutes in one of the following: • Hypochlorite solution (50 ppm of chlorine) made by adding approximately one milliliter of laundry bleach to one liter of water at 43 deg. C (I 10 deg. F); or, • Aqueous solution of iodine (50 ppm iodine) made by adding approximately 0.8 milliliters of tincture of iodine (6-8 grams ammonium and/or potassium iodidell00 cc of 45% alcohol) to one liter of water at 43 deg. C (I 10 deg F); or, • Other commercially available cleansers of equivalent disinfectant quality when used as directed, if their use is recommended or approved by the respirator manufacturer. 5. Rinse components thoroughly in clean, warm (43 deg C [I 10 deg F] maximum), preferably running water. Drain. The importance of thorough rinsing cannot be overemphasized. Detergents or disinfectants that dry on facepieces may result in dermatitis. In addition, some disinfectants may cause deterioration of rubber or corrosion of metal parts if not completely removed. 6. Components should be hand -dried with a clean lint -free cloth or air-dried. 7. Reassemble facepiece, replacing filters, cartridges, and canisters where necessary. Effective I IA. 16 58 STAY GREEN INC'S Safety Manual and IIPP 8. Test the respirator to ensure that all components work properly. Elfmtive UI8%16 59 STAY GREEN INC'S Safety Manual and 11PP Appendix D to Section 5144 Mandatory Information for Employees Using Respirators When Not Required Respirators are an effective method of protection against designated hazards when properly selected and wom. Respirator use is encouraged, even when exposures are below the exposure limit, to provide an additional level of comfort and protection for workers. However, if a respirator is used improperly or not kept clean, the respirator itself can become a hazard to the worker. Sometimes, workers may wear respirators to avoid exposures to hazards, even if the amount of hazardous substance does not exceed the limits set by OSHA standards. If your employer provides respirators for your voluntary use, or if you provide your own respirator, you need to take certain precautions to be sure that the respirator itself does not present a hazard. You should do the following: I. Read and heed all instructions provided by the manufacturer on use, maintenance, cleaning and care, and warnings regarding the respirators limitations. 2. Choose respirators certified for use to protect against the contaminant of concern. NIOSH, the National Institute for Occupational Safety and Health of the U.S. Department of Health and Human Services, certifies respirators. A label or statement of certification should appear on the respirator or respirator packaging. It will tell you what the respirator is designed for and how much it will protect you. 3. Do not wear your respirator into atmospheres containing contaminants for which your respirator is not designed to protect against. For example, a respirator designed to filter dust particles will not protect you against gases, vapors, or very small solid particles of fumes or smoke. 4. Keep track of your respirator so that you do not mistakenly use someone else's respirator. Effective 1:1816 N1 STAY GREEN fNC'S Safety Manml -nd UPP Ergonomics Studies have shown over the years that poorly designed and arranged work areas, awkward work postures and repetitive motions can lead to a variety of injuries including carpal tunnel syndrome and tendonitis, which are often referred to as repetitive motion injuries (RMI's). As with cancer, heart disease, and many other ailments, there are risk factors that increase an individual's likelihood of developing RMI's. If the risk factors are reduced, so are the chances of being injured. While some of these risk factors, such as family history, cannot be controlled in the employment setting, many can. Including: • The force used to perform a task, • Posture while performing tasks, • The number of repetitions performed in a given time period, and • Mechanical stresses such as hard surfaces. STAY GREEN INC has developed the following program designed to minimize RMls. The program includes worksite evaluations, control of exposures that have caused RMIs and training of employees. Worksite Evaluation and Exposure Reduction. Each job, process, or operation of identical work activity that has resulted in at least two RMI's or a representative number of such jobs, processes, or operations shall be evaluated for exposures that have caused RMIs. STAY GREEN INC may request assistance from outside consultants for this purpose. Any exposures that have caused RMIs shall, in a timely manner, be corrected or if not capable of being corrected have the exposures minimized to the extent feasible. We shall consider engineering controls, such as workstation redesign, adjustable fixtures or tool redesign, and administrative controls, such as job rotation, work pacing or work breaks. Tminine Affected employees shall be provided training that includes an explanation of: • STAY GREEN INC program; • The exposures which have been associated with RMIs; • The symptoms and consequences of injuries caused by repetitive motion; • The importance of reporting symptoms and injuries to their supervisor; and • Methods used to minimize RMIs • This will include team lifting with heavy objects, such as landscape rocks, shrubs, trees, dirt, sand, gravel, and sod; and the use of material handling aids for assistance when handling large objects, e.g., railroad ties, fencing materials, decorative stone, patio ornamentation, etc. Elfative 1/18/16 61 STAY GREEN INC's Safety Manual and IIPP Garden Tractors, Dump Trucks and Bulldozers Each year about 100 workers are killed and almost 95,000 injured in tractor, truck and bulldozer accidents across the country. To properly protect our employees from such accidents, STAY GREEN INC has adopted the following garden tractor, dump truck and bulldozer Safety Program. General STAY GREEN INC will ensure that each powered truck or tractor operator is competent to operate a powered truck safely, as demonstrated by the successful completion of the training and evaluation specified below. Prior to permitting an employee to operate a powered truck or tractor (except for training purposes), STAY GREEN INC shall ensure that the employee has successfully completed a training program. Training Program Implementation. Trainees may operate a powered truck or tractor only: • under the direct supervision of persons who have the knowledge, training, and experience to train operators and evaluate their competence; and • where such operation does not endanger the trainee or other employees. Training shall consist of a combination of formal instruction (e.g., lecture, discussion, interactive computer learning, video tape, written material), practical training (demonstrations performed by the trainer and practical exercises performed by the trainee), and evaluation of the operator's performance in the workplace. All operator training and evaluation shall be conducted by persons who have the knowledge, training, and experience to train powered truck and tractor operators and evaluate their competence. Note. This section does not require that the training be given by any particular individual or organization The trainer must only be able to demonstrate that they have appropriate knowledge, training and experience to train others and evaluate Meir competence. Training Program Content. Powered truck and tractor operators shall receive initial training in the following topics. • Operating instructions, warnings, and precautions for the types of truck the operator will be authorized to operate; Etrecti%c 1.18:16 62 STAY GREEN INC'S Safcty Manual and IIPP • Differences between the truck, tractor and the automobile; • Truck controls and instrumentation: where they are located, what they do, and how they work; • Engine or motor operation; • Steering and maneuvering; • Visibility (including restrictions due to loading); • Vehicle capacity; • Vehicle stability; • Any vehicle inspection and maintenance that the operator will be required to perform; • Refueling and/or charging and recharging ofbateries; • Operating limitations; • Any other operating instructions, warnings, or precautions listed in the operator's manual for the types of vehicle that the employee is being trained to operate. • Workplace -related topics: • Surface conditions where the vehicle will be operated; • Composition of loads to be carried and load stability; • Load manipulation, stacking, and unsticking; • Pedestrian traffic in areas where the vehicle will be operated; • Narrow aisles and other restricted places where the vehicle will be operated; • Hazardous locations where the vehicle will be operated; • Ramps and other sloped surfaces that could affect the vehicle's stability; • Closed environments and other areas where insufficient ventilation or poor vehicle maintenance could cause a buildup of carbon monoxide or diesel exhaust; • Other unique or potentially hazardous environmental conditions in the workplace that could affect safe operation; • The requirements of this section. Refresher Traininn and Evaluation. Refresher training, including an evaluation of the effectiveness of that training, shall be conducted to ensure that the operator has the knowledge and skills needed to alienate the powered truck or tractor safely. Refresher training in relevant topics shall be provided to the operator when: • The operator has been observed to operate the vehicle in an unsafe manner; • The operator has been involved in an accident or near -miss incident; • The operator has received an evaluation that reveals that the operator is not operating the truck safely; r • The operator is assigned to drive a different type of truck or tractor; or • A condition in the workplace changes in a manner that could affect safe operation of the truck. Effective 1/18.16 63 STAY GREEN INUS Safety Manual and IIPP An evaluation of each powered truck or tractor operator's performance shall be conducted at least once every three years. Certification. STAY GREEN INC shall certify that each operator has been trained and evaluated as required by this paragraph (1). The certification shall include the name of the operator, the date of the training, the date of the evaluation, and the identity of the person(s) performing the training or evaluation. ElSmtive 1 18;16 @a STAY GREEN 1NUS Safety Manual and 11PP Fire Prevention and Emergency Action Plan STAY GREEN INC has developed the following emergency plan to cover those designated actions that must be taken to ensure employee safety from fire and during other emergencies. Any questions about this plan should be directed to Jorge Donapetry, HR Manager (800) 858- 5508 x-104. Office. Shop & Warehouse Emergency Evacuation and Fire Prevention Supervisors and Managers are responsible for ensuring the following: I. That all required emergency exits are clearly identified in the office, shop, and warehouse and that all required fire fighting and emergency equipment is available and in good condition. The following items will be maintained: • First aid kit • Drinking water • Flashlight • Portable battery powered radio and batteries • Fire extinguishers • Wrench to shut off the main gas valve • Pry bars, axes, saws, tools or similar devices for employee rescue 2. Creating a facility map designating all emergency evacuation routes and the locations of all fire fighting equipment and emergency supplies and equipment.. These maps will be posted in at least two locations in the facility. 3. Training all exposed employees on the procedures to be followed in the event of fire, earthquake or other emergency including how to properly notify other affected employees. 4. Identifying potential fire hazards in the office, shop and warehouse and ensuring that adequate steps are taken to prevent fires. 5. Ensuring that combustible trash and materials are removed promptly from the facility, and that all flammable and combustible liquids are properly stored and handled Dunne an Emergency In the event of an emergency such as earthquake or fire, all employees are expected to evacuate the premises immediately. Jorge Donapetry or Richard Angelo may assign some employees the task of shutting off the gas or electricity, if needed. At no time will any employee be expected to jeopardize their own safety to do this. E1Tative 1:1816 65 STAY GREEN INUS Safety Manual and IIPP Employees will be notified of emergencies through one of the following! • Fire alarm • Intercom • Emergency hom • Direct voice communication After the emergency evacuation has been completed, a head count will be taken to ensure everyone is out of the budding. If necessary, Jorge Donapetry or Richard Angelo may assign some employees to rescue trapped employees. Fire Prevention at Landscatime Sites The following procedures will be used to prevent fires on construction sites I. All accumulated combustible trash and debris will be removed as soon as practical. 2. Flammable liquids will only be stored and dispensed from UL approved safety containers designed for that purpose. 3. All rags soaked with Flammable or combustible liquids will be properly stored in closed metal containers. 4. Appropriate precautions will be taken to prevent fires when torch cutting; welding or soldering. 5. Compressed gas cylinders containing flammable or explosive gasses will be properly stored in the upright position with their caps on and protected from heat or puncture. Fuel gas and oxygen shall be separated at least 20 feet when stored. 6. Smoking or open lights are prohibited within 50 feet of Flammable liquid or gas storage and dispensing areas. 7. Flammable solvents will not be used for cleaning purposes. 8. A fire extinguisher, rated not less than 2A, shall be provided for each 3,000 square feet of the Floor area, or fraction thereof. Where the Floor area is less than 3,000 square feet, at least one extinguisher shall be provided. 9. Travel distance from any point of the protected area to the nearest fire extinguisher shall not exceed 75 feet. Effective 1/18/16 ci• STAY GREEN INC'S Safety Manual and 11PP 10. At least one fire extinguisher, rated not less than 2A, shall be provided on each Floor. In multi -story buildings, at least one fire extinguisher shall be located adjacent to the stairway at each Floor level. 11. A fire extinguisher, rated not less than I OB, shall be provided within 50 feet of wherever more than 5 gallons of Flammable or combustible liquids or 5 pounds of Flammable gas are being used on the job site. This requirement does not apply to the integral fuel tanks of motor vehicles. 12. Portable fire extinguishers shall be inspected monthly, or at more frequent intervals by the employer, and serviced at least annually by a person licensed or registered by the State Fire Marshal. NOTE: Inspection is a "quick check" that an extinguisher is available and will operate. It is intended to give reasonable assurance that the extinguisher is fully charged and operable. This is done by seeing that it is in its designated place, that it has not been actuated or tampered with, and that there is no obvious or physical damage or condition to prevent operation. 13. Suitable fire control devices, such as portable fire extinguishers, shall be available at locations where Flammable or combustible liquids are stored. 14. At least one portable fire extinguisher, having a rating of not less than 20.8 units, shall be located outside of, but not more than 10 feet from, the door opening into any room used for Flammable liquid storage. 15. At least one portable fire extinguisher, having a rating of not less than 20-B units, shall be located not less than 25 feet, nor more than 75 feet, from any Flammable liquid storage area located outside. Effective 1 18.16 67 STAY GREEN INCS Safely Manual and IIPP Office Safety Office accidents can and do happen. To prevent them, STAY GREEN INC has developed the following rules for our office staff. We will also endeavor to include office employees in periodic safety meetings. If at any time, you feel there is a safety hazard, or you have any safety concerns, please do not hesitate to notify Jorge Donapetry, HR Manager. I . Report all accidents and injuries, no matter how minor, to your supervisor immediately. 2. Correct or report any safety hazards that you observe. 3. Clean up any spilled material that may present a slipping hazard. 4. Do not stretch any cords across aisles that may present a tripping hazard. 5. No one is allowed to climb on shelves or stand on chairs; you must use a step stool or ladder. 6. Keep all legs of the chair on the floor. Do not tilt chairs too far back. 7. No one shall be in the possession of, or under the influence of, alcohol or controlled substances while on the premises. 8. No horseplay will be tolerated. 9. Close file drawers when not in use. 10. Do not open more than one file drawer at a time. This could cause the cabinet to tip. 11. Do not store heavy objects above your head which could fall on you in an earthquake. 12. Do not store flammable or combustible materials near heaters or other heat sources. 13. If you are unsure how to do any task safely, ask your supervisor. 14. Do not operate any equipment you are not trained and authorized to use. 15. Always follow safe lifting procedures when lifting any object and get help for heavy loads • Bend your knees, not your back. • Keep the load close to body. • Keep your back straight. • Lift with your legs. • Do not lift and twist. Ef m ive 1/I8/I6 66 STNV GRELN INC'S Safety Manual and IIPP Office Ereonomics Studies have shown over the years that poorly designed and arranged work areas and repetitive motions can lead to a variety of injuries including carpal tunnel syndrome and tendonitis, which arc often referred to as repetitive motion injuries (RMI). As with cancer, heart disease, and many other ailments, there are risk factors that increase an individual's likelihood of developing RMI. If the risk factors are reduced, so are the chances of being injured. While some of these risk factors, such as family history, cannot be controlled in the employment setting, many can, including: • The force used to perforin a task • Posture while performing tasks. • The number of repetitions performed in a given time period. • Mechanical stresses such as hard surfaces. The most significant RMI risk factor in office environments is poor body posture caused by improper workstation design or layout. In many cases employees are required to work in awkward positions for long periods of time. This greatly increases the likelihood of injury. Fortunately, this is often the easiest problem to correct. The goal is to perform work in neutral posture as much as possible. Neutral posture is best described as the most comfortable position and usually involves little or no twisting or deviation of the joints. To apply the principle of neutral posture to the office setting we need to look at the five major components of office workstations. They are: the chair, the computer keyboard, the desk, the computer monitor, and the work product. Chairs are often the most overlooked piece of office equipment, yet they are the single most important item from an ergonomic standpoint. A poor chair that lacks adjustments and support makes it almost impossible to work comfortably and in neutral posture. Good office chairs are fully adjustable including: • Chair height. • Height of the back rest. • The position forward or back of the backrest. • The position forward or back of the seat pan. • The angle (tilt) of the seat pan. • If armrests are provided, they should be height and width adjustable. In many cases, fully adjustable chairs are provided for employees, but they never adjust them. Make sure you understand all of the adjustments your chair has and how to use them. When in doubt, read the owner's manual or ask. A properly adjusted chair should allow the user to rest their feet comfortably on the floor without putting pressure on their lower thighs. Their knees should be approximately the same height as their hips, or slightly higher, and they should be able to sit back against the backrest which is positioned for low back support If your feet don't rest comfortably on the floor the chair is loo high. If the chair cannot be lowered any further, a Effective 1/18/16 69 STAY GREEN INC'S Safety Manual and IIPP footrest should be used. Whether armrests are provided depends on the type of workstation and personal preference. If they are provided, they should be height adjustable to allow the arms to rest comfortably on them without excessive shoulder drop. Armrests should also be well padded to reduce pressure on the lower arms. Once the chair is properly adjusted, the next step is to position the keyboard to minimize bend in your wrists. In order to accomplish this, it is often necessary to have a position and height adjustable keyboard tray attached to the underside of the desk. These should not be confused with keyboard drawers that can not be adjusted for height or position. If you do not use a tray, the only way to adjust the keyboard height is by moving the desk that is difficult at best, and sometimes impossible. Using a tray also frees up workspace on the desk where the keyboard once sat. The height of the keyboard should be set so that there is approximately a 90•degree angle between the upper and lower arms. There should also be a straight line from the elbow out through your fingers. If your fingers hang down too much or bend up, creating a "V" between your hand and forearm, you place extra stress on your wrist. Many people find it comfortable to use padded wrist rests in front of the keyboard. This often helps minimize wrist defection. The keyboard tray should also be adjusted so that you do not have to reach forward too far to type. Your elbows should be close to your side and back by your spine, not out in front of you. Do not extend the small legs on the bottom of the keyboard tray. This increases the wrist angle unnecessarily. Many keyboard trays now also have extensions for your mouse. This places everything you need within easy reach. After you have adjusted the chair and keyboard tray, try using your desk. You should be able to comfortably write and use your other office equipment such as the calculator and phone. Some of these items may need to be moved closer to you. Your legs should also fit easily under the desk. Often, stored items such as boxes block this and should be removed. The standard desk height is fine for most people. If you are exceptionally tall or short, however, adjusting the desk up or down an inch, if possible, may be helpful. Now you are ready to position your monitor. It should be directly in front of you. Monitors that are off to one side cause you to tum your neck that can lead to injury. The top of the screen should be at about eye level. If the screen is too low your neck will ache from constantly looking down. Monitors can easily be raised by putting old phone books or reams of copy paper under them. You may also use a special adjustable monitor holder to free up desk space. Tilt the screen so that the top is closer to you than the bottom. This will reduce glare from overhead lights. If you can't get away from outside Iigh4 use a glare screen to improve contrast and reduce eye strain that can cause headaches. Also know how to adjust the screen contrast and brightness controls and keep the screen clean and free of dust and fingerprints. The work product should be kept within easy reach. Heavy notebooks or binders that you use often should be placed near you. If you use the phone a lot, consider using a headset to reduce neck strain and free up your hands for other tasks. Copy holders can be very helpful if you are Effective 1/18/16 70 STAY GREEN INC'S Sarery Manual and IIPP entering data or typing from paper. Set them up so they are as close to the screen as possible to reduce neck motion. The risk factors of force, repetition, and mechanical stress are also controllable in an office environment. Force can be reduced by using automatic staplers and date stamps. If heavy files, boxes, or other items must be moved, use cans and dollies. When filing, use two hands to hold the larger files and keep heavy items stored between knee and shoulder height to reduce strain on your back and arms. Repetition is controllable through the use of task management. Break up the work as much as possible throughout the day. If possible, do not spend more than two hours at a time typing or entering data. Intersperse other tasks such as filing to use other muscle groups. You should take ten-minute breaks every two hours if you are doing repetitive tasks. Mechanical stress occurs when you rest parts of your body against hard or sharp objects; this cut off blood Flow and presses on nerves, which can lead to numbness and tingling. Sharp edges can be padded or cushioned where needed to reduce this. E1Teetive 1/18/16 STAY GREEN INC'S Safety Manual and 11PP Code of Safe Practices General Safety Rules I. All persons shall follow this Code of Safe Practices and render every possible aid to safe operations. 2. Failure to abide by the Code of Safe Practices may result in disciplinary action up to and including termination. 3. Immediately report any unsafe conditions, accidents, injuries or illness to your supervisor. If you are unsure of the safe method to do your job, STOP and ask your supervisor. Ignorance is no excuse for a safety violation. 4. No one shall be knowingly permitted to work while the employee's ability or alertness is impaired by fatigue, illness, prescription or over the counter drugs. Employees who are suspected of being under the influence of illegal or intoxicating substances, impaired by fatigue or an illness, shall be prohibited from working. 5. Never work while under the influence of an illegal or intoxicating substance, fatigued or ill. 6. Anyone known to be under the influence of any drugs or intoxicating substances which impair the employee's ability to safely perform the assigned duties shall not be allowed on the job. 7. Horseplay, scuttling, fighting and other acts which tend to have an adverse influence on the safety or well-being of the employees are prohibited. 8. Work shall be well planned and supervised to prevent injuries in the handling of materials and in working together with equipment. 9. Keep your work area clean, free of debris, electrical cords and other hazards. 10. Immediately clean up spilled liquids. 11. Always notify all other individuals in your area who might be endangered by the work you are doing. 12. Do not operate equipment that you are not familiar with. Do not attempt to use such equipment until you are fully trained and authorized. 13. You are responsible for ensuring all safety guards are operable and in place. If they are not, STOP working and tell your supervisor. 14. Never bring firearms, weapons, illegal drugs or alcoholic beverages on company or customer Elkctive 1/18/16 72 STAY GREEN INC' S Safety Manual and IIPP property or thejob site. 15. A red tag system identifies equipment that is NOT to be operated, energized or used. All tag - out or lockout notices and procedures must be observed and obeyed. 16. Do not block exits, fire doors, aisles, fire extinguishers, first aid kits, emergency equipment, electrical panels, or traffic lanes. 17. Do not leave tools, materials, or other objects on the floor that might cause others to trip and fall. 18. Do not ran on the job site or in the shop or office area. 19. Do not distract others while working. If conversation is necessary, make sure eye contact is made prior to communicating. 20. Employees shall ensure that all guards and other protective devices are in proper places and adjusted, and shall report deficiencies promptly to the Supervisor. 21. Tree branches may not be discarded from trees until proper precautions are taken to protect others from the falling objects. 22. Employees shall cleanse thoroughly after handling hazardous substances, including pesticides and insecticides, and follow special instructions from authorized sources. 23. Gasoline or other flammable liquids shall not be used for cleaning purposes. Fall Protection I. Fall protection, such as standard milings or a safety harness and lanyard, shall be used at all times, when working 7 %a feet or more above the level below. 2. Floor and wall openings, unfinished balconies, elevator shafts and similar areas must be railed, covered or barricade to prevent falls. 3. Never remove fall protection mils, covers, or barricades without permission from your supervisor and special precautions. Always replace these items when finished with your task. 4. All safety harnesses shall be the full body type with a shock -absorbing lanyard attached to a substantial anchorage capable of supporting twice the maximum load. Lanyards shall be attached at the wearer's upper back. Body belts are not to be wom as fall protection. 5. Read and obey all manufacturers instructions relating to your fall arrest system (safety harness and lanyard). Effective 1118/16 73 STAY GREEN INC'S Safety Manual and IIPP 6. Inspect all components of your harness and lanyard prior to each use and after a fall. Defective equipment is not to be used. Lanyards must be destroyed after a fall and never reused. 7. Safety harnesses and lanyards should limit free fall distance to less than 4 feet and prevent contact with any level or objects below you. 8. Never use any part of a fall arrest system, such as a harness or lanyard, to hoist materials or for any other purpose. 9. Safety harnesses and shock absorbing lanyards are required to be worn at all times while in boom lifts. Electrical Safetv I. Only trained, qualified, and authorized employees are allowed to make electrical repairs or work on electrical equipment or installations. 2. All electrical equipment and systems shall be treated as energized until tested or otherwise proven to be de -energized. 3. All energized equipment and installations will be de -energized prior to the commencement of any work. If the equipment or installation must be energized for test or other purposes, special precautions will be taken to protect against the hazards of electric shock. 4. All equipment shall be locked out to protect against accidental or inadvertent operation when such operation could cause injury to personnel. Do not attempt to operate any switch, valve, or other energy -isolating device bearing a lock. 5. Safety grounds shall always be used where there is a danger of shock from back feeding or other hazards. 6. Polyester clothing or other flammable types of clothing shall not be worn near electrical circuits. 7. Suitable eye protection must be worn at all times while working on electrical equipment. 8. Always exercise caution when energizing electrical equipment or installations. Take steps to protect yourself and other employees from are blast and exploding equipment in the event of a fault. 9. All power tools will be grounded or double insulated. Tools with defective cords or wiring shall not be used. 10. Metal jewelry should not be wom around energized circuits. Effective 1/18116 74 STAY GREEN INUS Safety Manual and IIPP 11. Extension and temporary power cords must be heavy duty and grounded. Frayed or defective cords shall not be used. 12. Suitable temporary barriers or barricades shall be installed when access to opened enclosures containing exposed energized equipment is not under the control of an authorized person. 13. Electrical installations must be protected from accidental contact by enclosures or tight fitting covers. 14. GFCI's are required on all power outlets. 15. Circuits shall not be overloaded with equipment or extension cords. 16. Metal measuring tapes, fish tapes, ropes or other metal devices are prohibited where they may contact energized parts of equipment or circuits. LockouUTagout I. All machinery and electrical equipment shall be locked out and tagged prior to repair, cleaning, or adjustment unless power is necessary to perform the work. If so, other precautions, specified by your supervisor, will be taken. 2. Use your own lock and key. No one else should have a key for your lock. Destroy all duplicate keys. 3. Maintain control of your key at all times to prevent unauthorized use. 4. Never remove another employee's lock or energize tagged equipment. 5. If multiple employees are working on the same equipment, each employee should install their own lock. 6. Notify all affected employees that a lock-out/tag-out is required and the reasons for it. 7. If the equipment is operating, shut it down by the normal stopping procedure (depress stop button, open toggle switch, etc.). 8. Operate the switch, valve or other energy isolating devices so that the energy source(s) (electrical, mechanical, hydraulic, etc.) is disconnected or isolated from the equipment. 9. Stored energy, such as that in capacitors, springs, elevated machine members, rotating Flywheels, hydraulic systems, and air, gas or water pressure, etc. must also be dissipated or restrained by methods such as grounding, repositioning, blocking, bleeding down, etc. 10. Lock -out all energy isolation devices with an individual lock. Etrmrive 1118116 75 STAY GREEN INCS Safcty Manual and IIPP 11. After ensuring that no employees are exposed and as a check of having disconnected the energy sources, operate the push button or other normal operating controls to make certain the equipment will not operate. Caution: Return operating controls to neutral position after the test. 12. The equipment is now locked -out Install red lock -out tag on operating controls. 13. After repair is complete and the equipment is ready for testing or normal operation, check the equipment to see that all cover plates and safety devices have been reinstalled. 14. When the equipment is clear, remove all locks and tags. The energy isolating devices may be operated to restore energy to the equipment. Comoary Vehicles I. Only authorized employees are permitted to operate company vehicles. Do not let anyone else drive your company vehicle. 2. Company vehicles are to be used for company business only. Personal, off duty and family use is prohibited. 3. Drive defensively and obey all traffic and highway laws. 4. Always wear your seat belt, whether the driver or a passenger. 5. Report all accidents as soon as possible to your supervisor and obtain a police report. 6. Keys must be removed from all unattended vehicles and the vehicles must be locked, unless parking inside the facility. 7. Do notjump from the cab or bed of company vehicles. Always use the stairs or a ladder. 8. Inspect your vehicle and report any defects or operating problems to your supervisor so that repairs can be made. 9. No smoking while refueling. 10. If your drivers license is revoked or expired, immediately notify your supervisor and do not drive. Ladder Safetv I. Inspect the ladder before using it. If it is broken, throw it out. Never repair a broken ladder, get a new one. Keep portable stairways, ladders and step stools in good condition and use Elrative 1/18/16 76 STAY GREEN INCS Safety Manual and IIPP them only in a safe manner. 2. Use the proper ladder for the job. Do not use "A" frame ladders as straight ladders. Make sure the ladder is tall enough to reach the work area. Do not use metal ladders for electrical work. 3. Do not place ladders in passageways, doorways, or any location where they might be hit or jarred, unless protected by barricades or guards. 4. Ladders should only be placed on hard level surfaces. Make sure the ladder feet are not placed on sandy, slippery, or sloping surfaces. Clean or sweep the area where the ladder feet will be and make sure the rubber feet are in good shape. 5. Ladder rungs and steps must be kept free of grease, oil, mud, or other slippery substances. 6. Arrange your work so you are able to face the ladder and use both hands while climbing. Do not carry tools or equipment while climbing a ladder. Climb the ladder, and then hoist the tools or equipment with a line or a hoisting device. 7. Avoid temporary ladders. Always use a commercially made, construction grade ladder of the proper length for the work being performed. 8. Secure portable ladders in place and at a pitch so the leveling indicator is in alignment or the distance from the wall to the base of the ladder is at least P for every 4' of height. 9. Straight ladders shall be tied off the top of the ladder to prevent slipping. 10. Be aware of objects below you, move or cover sharp objects to case you fall. Cap or bend all rebar. 11. Do not stand on or work from the 2nd rung from the top or above. Also do not reach too far from the ladder. Keep your belt buckle between the side rails. 12. Extension ladders shall extend at least 36' above the level being accessed. 13. On all ladders, do not step on cross bmcing that is not intended to be used for climbing. Boom and Scissor Lifts 1. Only trained and authorized employees are allowed to use boom or scissor lifts If you aren't trained, stay off. 2. Read and obey all manufacturers' instructions and safety precautions. 3. Inspect all lifts prior to use. Defective equipment shall not be used. Effective 1 18 16 77 STAY GREEN MCS Safety Manual and IIPP 4. A safety hamess with shock absorbing lanyard must be wom while using boom lifts. Harnesses are not required for scissor lifts, provided you do not leave the work platform. 5. Always stay inside the platform railing. Do not use planks or ladders to extend your reach. 6. Keep the safety chains up on scissor lifts. 7. Always lower the lift before moving. 8. Never use scissor lifts on uneven ground. They are designed for use primarily on concrete Floors. Personal Protective Equipment (PPE) I. Use the correct PPE for each job assignment. If you don't know, ask. 2. PPE shall be maintained in good condition and cleaned regularly. 3. PPE shall be stored properly when not in use to protect it from damage. 4. Damaged or broken PPE must be returned to your supervisor for replacement. 5. ANSI approved safety glasses must be worn when working with power tools, compressed air or gasses, chemicals or any other item that creates an eye injury hazard. 6. Face shields with safety glasses are recommended when grinding or working with hazardous chemicals. 7. Employees must wear industrial work shoes in the shop and on the job site The shoes must have complete leather uppers and skid resistant soles and be in good condition. Steel toe protection is recommended. 8. Athletic style shoes, tennis shoes, open toe shoes, plastic or vinyl shoes or shoes with decorative accessories are not allowed. 9. Hearing protectors must be wom when working with loud equipment such as power lawn mowers, chain saws and leaf blowers. 10. Be sure the protective clothing you wear will not hamper or restrict freedom of movement due to improper fit. 11. Long pants of heavy-duty material must be wom so as to protect against branch cuts and poison ivy or poison oak. No shorts or sweat pants are allowed. Etfcctive 1/18/16 78 STAY GREEN INUS Safety Manual and IIPP 12. Do not wear loose, tom or frayed clothing, dangling ties, finger rings, dangling earrings, jewelry items, or long hair unless contained in a hair net, while operating any machine which could cause entanglement. 13. If required, wear NIOSH approved respirators when applying adhesives, paint, welding, grinding or working with chemicals. Read the MSDS to find out which type of respirators is required. Facial hair may not be permitted in certain circumstances. Hand and Power Tools 1. Proper eye protection must be wom when using hand and power tools. 2. Know your hand and power tool applications and limitations. Always use the proper tool for thejob. 3. Inspect cords and tools prior to use. Do not use tools that are faulty in any way. Exchange them for safe tools immediately. 4. Power tools must be grounded or double insulated. All power tools are to be plugged into a grounded GFCI outlet. 5. Do not use power tools in damp, wet or explosive atmospheres. 6. Do not lift, lower or carry portable electrical tools by the power cord. 7. Keep all safety guards in place and in proper working order. 8. Use clamps or vises to secure work pieces. 9. Do not force hand power tools. Apply only enough pressure to keep the unit operating smoothly. 10. Return all tools and other equipment to their proper place after use. 11. Unplug all power tools before conducting maintenance. 12. Before using sledges, axes or hammers be sure the handles are securely fastened with a wedge made of sound material. Trenching and Excavation 1. All excavations and trenches 5 feet deep or greater most be shored sloped, or benched to protect workers from the hazards of moving earth. All trenching must be done in accordance with Cal/OSHA regulations. Effective 1 18 16 79 STAY GREEN INC'S SaferyManual and IIPP 2. Always locate underground utilities before digging. Also contact regional notification centers in advanm. 3. Do not work under loads handled by lifting or digging equipment 4. ladders shall be provided for access to trenches and excavations 4' deep or greater. Use them. 5. Keep all spoils 2' from the edge. 6. Barricade trenches or use caution tape to warn others of their presence. 7. Inspect all trenches and excavations daily, before work, to look for signs of shifting earth. 8. Do not jump over trenches, use wood planks or sheeting. Hazardous Materials and Chemicals I . Read all warning labels and Material Safety Data Sheets (MSDS) before using any chemicals. MSDS contain personal protective equipment and safety information and are available from your supervisor. 2. Hazardous materials shall be handled in accordance with the MSDS and label. If prolective equipment is required, use it. 3. Eye protection must be worn when working with restricted use pesticides and or hazardous materials or chemicals. 4. Mixing of chemicals is prohibited at all times unless required by the label. Before you mix - review all MSDS. 5. Always wash your hands thoroughly after handling chemicals and before eating or smoking, even if you were wearing protective gloves. 6. Never use solvents for hand cleaning. Use the non-toxic hand cleaners provided. 7. Store all hazardous materials properly in suitable containers that are properly labeled. 8. Use chemicals only in well -ventilated areas. 9. When using secondary containers, ensure that they are labeled as to their contents and hazards. Fire Prevention and Housekeeping Elrmlive 1118116 E:. STAY GREEN INC'S Safcty Manual and IIPP I. Always take precautions to prevent fires which may be started, particularly from oily waste, rags, gasoline, trash, pesticides, insecticides, and other flammable liquids. 2. Fire fighting equipment is to be inspected on a regular basis. All discharged, damaged or missing equipment is to be immediately reported to a supervisor. Tampering with fire equipment is prohibited. 3. Access to fire extinguishers must be kept clear at all times. Make note of the location of fire fighting equipment in your work area. 4. Never use gasoline or flammable solvents for cleaning purposes. 5. Smoking is prohibited within 20 feet of where flammable substances are present. 6. In case of fire, employees shall consider the safety of themselves and other individuals before saving property. 7. Keep your work areas free of debris. Remove useless material from the work area as fast as required to help reduce tripping hazards. 8. Maintain awareness of potential hazards when walking about the job site. 9. Keep tools, materials and equipment out of walkways and stairways at all times. 10. Sharp wires or protruding nails must be kept bent. 11. Place tools and equipment so they will not slide off the roof 12. Tie material down at day's end so the wind will not blow it off the roof. Traffic Safety I. All employees exposed to traffic hazards are required to wear neon yellow or orange flagging garments (shirts, vests, jackets) at all times. 2. When possible, construction vehicles are to be placed between the employees and traffic to prevent vehicles from entering the work area and hitting members of the crew. 3. All traffic controls will be established in accordance with the State of California Manual of Truffle Controls for Construction and Maintenance Work Zones. 4. Traffic controls are to be properly maintained throughout the workday. Signs and cones must be kept upright, visible and in their proper position at all times. Cranes and Rigging E1ltcove 1 18.16 STAY GREEN IMUS Sxfcty Manual and 11PP I. No employee is permitted to ride on loads, honks, or slings of any cranc, hoist or derrick. 2. Do not work or stand under any suspended load. Crane operators shall avoid swinging loads over people. 3. Inspect all slings and chains prior to use. Do not use defective slings, chains, or rigging. Effective VI&16 €'_ STAY GREEN INC'S Safety Manual and IIPP Code of Safe Practices Receipt This is to certify that I have received a copy of the STAY GREEN INC Code of Safe Practices. I have read these instructions, understand them, and will comply with them while working for the company. I understand that failure to abide by these rules may result in disciplinary action and possible termination of my employment with STAY GREEN INC. 1 also understand that 1 am to report any injury to my supervisor immediately and report all safety hazards. 1 further understand that 1 have the following rights. • 1 am not required to work in any area 1 feel is not safe. • 1 am entitled to information on any hazardous material or chemical I am exposed to while working. • 1 am entitled to see a copy of the STAY GREEN INC Safety Manual and Injury and Illness Prevention Program. • 1 will not be discriminated against for reporting safety concerns. Pnnt Name Sign Name Date Copy: Employee File Elfative 1!18/16 STAY GREEN INC'S Safety Manual and IIPP Hazard Communication Employee Training Handbook It is important that all of our employees understand the information given about hazardous materials. If you have any questions regarding this, please ask your supervisor or contact Jorge Donapetry at (800) 858-5508 x-104. This material has been prepared to assist our employees in better understanding the hazardous materials which they commonly work with. Chemicals can enter the body in a number of ways, including inhalation, skin contact or ingestion. The hazard of any substance is dependent on other variables such as age, sex and health of the employee as well as the concentration and duration of exposure. In other words, the same amount of a chemical may produce very different effects on two different people Chemicals are controlled in the workplace in such a manner so as to keep exposures below a level that may produce a reaction in very sensitive people. These levels are set by the government in the interest of minimizing harmful health effects of chemicals in the workplace. The Occupational Safety and Health Administration (OSHA) has established specific legally enforced permissible exposure limits (PEL) for hazardous substances in the workplace. The PEL indicates the concentration of airborne contaminants to which nearly all workers may be exposed to for eight hours a day, forty hours a week, over a working lifetime of 30 years, without adverse health effects. Additional information on the materials you may be exposed to can be found in the product's Material Safety Data Sheets (MSDS). A complete folder of MSDS is available to you at all times in the office. Your supervisor also has copies of data sheets on commonly used items. At any time, an employee has the right to • Access the MSDS folder, and the Hazard Communication Program. • Receive a copy of any chemical sampling data collected in the workplace. • See their employment medical records upon request. Personal protective equipment acts as a barrier to the routes of entry that a chemical may take into your body. As a barrier to chemicals that can be inhaled, there are a variety of respirators that may be used. The respirators either filter out particles, react with chemicals to neutralize them, or provide fresh, filtered air. There are two important things to remember about using respirators. The first is that a respirator only works when you wear it and use it properly. Second, and equally important, is that you must use the proper respirator for the specific hazard. Respirators designed for one type of chemical will not work for another. One last note about respirators is that no one is allowed to use any respirator without proper training. It is against the law to use a respirator without formal training in its proper use. Effective Ir18:16 iI STAY GREEN INC'S Safety Manual and 11PP As a barrier to skin, we have gloves, facemasks, protective clothing, and head protection. A combination of these items may be necessary to provide the proper level of protection in your area. As a barrier to the eyes, a variety of eye protection may be used. Goggles are recommended when pouring or handling chemicals which may splash the eyes. They are also recommended while spraying adhesives and paints. Protect your eyes; your vision is priceless and irreplaceable. There is no real protection against swallowing materials except good work practices. Always label any container to prevent accidental drinking. Always thoroughly wash your hands with soap and water before eating, drinking or smoking. Keep any food and cigarettes away from the work area. Breads, fruits, and cigarettes can actually absorb chemicals from the air, to be inhaled or ingested later. Prolonged exposure to excessive noise can cause permanent hearing damage. For those employees working in areas where excessive noise is generated, it is recommended that earplugs or ear muffs be used on a regular basis. General first aid practices should be followed in the event of exposure to insecticides, pesticides, or other hazardous materials. EYES: Flush eyes for at least 15 minutes with water. SKIN: Wash the affected area with soap and water. If clothing is involved, remove and launder before putting back on. If caustic materials are spilled, remove clothing immediately and wash off of the body. INGESTION: Do Not Induce Vomiting Unless the Label Indicates - transport the affected person to the medical clinic immediately for treatment or call 911. They will take the appropriate action. INHALATION: Generally, removing the person to fresh air is adequate after short-term exposure to most vapors. If breathing difficulty develops, dial 911 and be prepared to administer CPR. The provisions set forth by the Federal Hazard Communication Program dictate that all containers of hazardous materials must be properly labeled. All containers of hazardous materials used must have, at a minimum, the original label provided by the manufacturer or a locally prepared label describing its contents and hazards involved. Effmtiw 118:16 STAY GREEN tNC'S Safety Manual and IIPP Garden Tractor Safety Rules I. Securely fasten your seat belt, if available. 2. Where possible, avoid operating the tractor near ditches, embankments, and holes. 3. Reduce speed when fuming, crossing slopes, and on rough, slick, or muddy surfaces. 4. Stay off slopes too steep for safe operation. 5. Watch where you are going, especially at row ends, on roads, and around trees. 6. Do not permit others to ride. 7. Operate the tractor smoothly— no jerky turns, starts, or stops. 8. Hitch only to the drawbar and hitch points recommended by tractor manufacturers. 9. When the tractor is slopped, set brakes securely and use the park lock, if available. Effective VI8 16 as STAY GREEN INC's Safcty Manual and IIPP Driving Safety Rules Motor vehicle accidents continue to be the leading cause of workplace death in the nation In 1995 alone, 1,329 workers were killed on the job, in auto accidents. That's one employee death every 7 hours of every day. Motor vehicle accidents arc:* • The leading cause of death at work. • The leading cause of death for people age 15 to 24. • The second most common cause of death for people age 25 to 44. • The third most common cause of death for people age 45 to 64. • The fifth most common cause of death for all ages behind heart disease, cancer, stroke, and lung disease. *Source: 1995 statistics from the National Institute of Occupational Safety and Health (NIOSH) and the Bureau of Labor Statistics (BLS). Fortunately, auto accidents are often preventable. By driving defensively and using good judgment, you can significantly reduce your chances of being hurt or killed in a motor vehicle. The following defensive driving tips are designed to help you avoid accidents and injuries from your Fleet operations. These rules are mandatory for all employees driving STAY GREEN INC vehicles. I. Personal and off duty use of STAY GREEN INC vehicles is prohibited. 2. Only authorized employees may drive STAY GREEN INC vehicles. No other family members may drive company vehicles. 3. Non-employee passengers are not permitted in STAY GREEN INC vehicles at any time unless they are business related. 4. Seat belts must be wom in STAY GREEN INC vehicles at all times. 5. No employee is permitted to drive STAY GREEN INC vehicles while impaired by alcohol, illegal or prescription drugs, or over the counter medications. 6. All accidents involving STAY GREEN INC vehicles must be reported to the office immediately. 7. Employees with two or more preventable accidents in a three year period, or that obtain three points on their driving record, will be subject to a loss of their driving privileges or have their driving privileges restricted. Effective 1/18/16 87 STAY GREEN INC'S Safety Manual and 11PP 8. The single biggest thing you can do to save your life is wear your seat belt. Hundreds of studies over the years have proven, without a doubt, that seat belts save lives. This is true even in crashes involving fire and water submersion. Properly worn seat belts actually absorb crash forces that, otherwise, would be transferred to your body. If the seat bells in your vehicle are inoperative or defective, have them repaired or replaced immediately. You should wear the lap belt low across your hips and have the shoulder strap directly across your chest. You also need to keep the belt tight. There should not be more than an inch between your body and the belt at any point 9. Get the big picture while driving. Keep your eyes aimed high and try to anticipate hazards and other drivers' mistakes. You should be looking well ahead of where you are. You should also always leave yourself an out in case the other driver does the unexpected. 10. Maintain a safe following distance at all times. Approximately 1/3 of all auto accidents are rear end collisions. You should be at least two seconds behind the vehicle in front of you to allow yourself sufficient time to stop. Do not tailgate. Following distances should be increased for larger vehicles or if in slippery or rainy conditions. 11. Avoid passing on two lane roads. Head on collisions are the most common cause of fatalities. You should also mm on your headlights while driving on two lane roads. This helps oncoming traffic see and avoid you. Never pass another vehicle on blind turns or hills. 12. You must be sober and alert at all times while driving. The use of drugs or alcohol while driving, or prior to driving, significantly increases your chances of having an accident It should be at least eight hours from the time you take a drink until operating a vehicle. You should also avoid the use of prescription or over the counter medicines that make you drowsy. 13. Inspect the vehicle for mechanical defects prior to each trip. Test your brakes as soon as you start out to insure they are properly operating. Wom tires can make your vehicle difficult to control or slop. 14. Avoid dialing the phone, reading maps or other distracting activities while driving. These actions take your eyes off the road and often cause you to swerve. Pull over into a safe parking area before making that call. 15. Never drive faster than road conditions warrant Slow down when road conditions are poor (min, fog, night) and never exceed posted speed limits. 16. Always signal when changing lanes or turning. 17. Use caution when passing any stopped vehicle. especially near intersections or cross walks. 18. Aggressive driving has become a significant problem in the past few years. Just don't do it. Avoid tailgating, rapid lane changes, speeding, and hand gestures to bad drivers. You never Elfative 1:19.16 88 STAY GREEN INC'S Safety Manual and 11PP know, they may be armed. If you we being tailgated, change lanes and let them pass. It's really not worth getting killed over. 19. Intersection collisions are also a significant problem. These are often caused by someone running the red light. You should always be under control when approaching an intersection and be prepared to stop if the light changes. 20. Slow down and look for trains at all railroad crossings. Even with modem signals and gates, hundreds of cars are hit by trains each year at grade crossings. 21. Use your low beams while driving in fog and slow down. If you can't see, pull over into a safe parking area and wait for better visibility. Do not stop in the traffic lanes. You will almost certainly be hit by another vehicle if you do. 22. Always walk behind the vehicle before backing. This will insure that there are no people or objects behind you that you cannot see from the drivers seat. You should also make sure that all loads are properly secured to prevent them from moving. Numerous accidents are caused by objects that have fallen off company vehicles. 23. Always signal well in advance when changing lanes or turning, and make sure to check your blind spot for other vehicles. Also, avoid driving in someone else's blind Spot If they can't see you, they don't know you are there. 24. Yield the right of way until you are sure the other driver is going to stop. Just because you have the legal right of way doesn't mean you should always take it. Always yield the right of way to emergency vehicles. Defensive drivers. • Expect the unexpected • Anticipate bad driving by others • Look ahead for hazards • Always leave themselves an out • Always drive under control • Obey the rules of the road Effective 1/18/16 99 STAY GREEN INC's Safety Manual and IIPP Driving Safety Rules Company Vehicle Policy Receipt This is to certify that I have received a copy of the STAY GREEN INC Driving Safety Rules and Company Vehicle Policy. I have read these instructions, understand them, and will comply with them while driving company vehicles. 1 understand that failure to abide by these rules will result in disciplinary action and possible suspension of my driving privileges. 1 also understand that I am to report any accident to the office immediately. Print Name Sign Name Date Effm ive 1.18=16 qg STAY GREEN INC'S Safety Manual and IIPP Heat and Illness Prevention Program The elements reflected within this Heat Illness Prevention Program am those contained in Title 8 of the California Code of Regulations, Section 3395 (TB CCR 3395) and consist of the follomng. • provision of Water • Access to Shade • High -Heat Procedures • Training PROVISION OF WATER Water Is a key preventive mensure to minimiu the risk of heat related Illnesses 3395 (c) Employees shall have access to potable drinking water meeting the requirements of Section 1534, 3363, and 3457, as applicable. Where the supply of water is not plumbed or otherwise continuously supplied, water shall be provided in sufficient amntiry at the bminninu of the work shift to provide one nun per employee per hour for drinkine for the entim shift. Employers may begin the shift with smaller quantities of water if they have effective procedures for replenishment during the shift at needed to allow employees to drink one quart or more per hour 1ha frmumtdrinkinenfw,rer. ns descrihed in snhcremno l0lllfCl dnilMn,,.o„m•..1 To ensure access to sufficient quantities of potable drinking water, the following steps will be taken • Bring at lmst2 quarts per employee at the sun of the shill, and • Crew Leader will'monitor water containers every hour, and employees am encouraged to report to Crew Leader low levels or dirty water. • All trucks most have water coolers and vehicle most be located as close as possible to the workers, not away from them. • Crew Leader will replenish the water coolers before water levels fall below the point that will allow for adequate water during the time necessary to effect replenishment To encourage frequent drinking of potable water, the following steps will be taken: • Every morning there will be short milgaw meetings in remind workers about the importance of frequent consumption of water throughout the shill. This will be implemented by Crew Leaders • All Woks most have water coolers and vehicle must be located as close as possible to the workers, not away from them. • Provisions will be made to issue employees their own cups each day Effective 1/18.16 51 STAY GREEN INCS Safety Manual and IIPP ACCESS TO SHADE Access to rest and shade or other cooling measures are Important preventive steps to minimize the risk of bent related illnesses. 3395 (d) (1) Shade required to be present when the temperature exceeds 85 degrees Fahrenheit When the outdoor temperature in the work area exceeds 85 degrees Fahrenheit, the employer shall have and maintain one or more with shade at all times while employees am present that am either open to the air or provided with ventilation or c:x:ling The amount ofshade present shall be at least enough to accommodate 25.9 of the employees on the shift at any time, so that they can sit in a normal pasture fully in the shade without having to be in physical contact with each other The shaded area shall be located as close as practicable to the areas where employees are working. (2) Shade required to be available when the temperature does not exceed 85 degrees Fahrenheit. When the outdoor temperature in the work area does not exceed 85 degrees Fahrenheit employers shall either provide shade as per subsection (d)(1) or provide timely access to shade upon an employee's request. (3) Employees shall be allowed and encouraged to take a cool -clown rest in the shade for a period of no less than five minutes at a time when they feel the need to do so to protect themselves fium overheating. Such seems to shade shall be permitted at all times. Exceptions to subsection (d): (1) Where the employer can demonstrate that it is infeasible or unsafe to have a shade structure, or otherwise to have shade present on a continuous basis, the employer may utilize alternative procedures for providing access to shade if the alternative procedures provide equivalent protection. (2) Except for employers in the agricultural industry, cooling measures other than shade (e.g., use of misting machines) may be provided in lieu of shade if the =player can demonstrate that these measures are at least as effective as shade in allowing employees to cool. To ensure access to shade at all time, the fallowing steps will be taken: 9 For eachjob, the Crew Leaders will show employees the location of designated shade. a Employees have access to trucks with air conditioning; as well as, offices, bailers, or other buildings. Employees have access to tees and cease vines. This can provide shade that is superior to anificially provided shade and ase accepted as compliant sources of shade if the canopy of the tees or vines is sufficiently dense to provide substantially complete blockage of direct sunlight. Flecks of sunlight are acceptable as long as, overall, the shade provides substantially complete blockage of sunlight. Where bas or other vegetation are used to provide shade, the thickness and shape of the canopy must, given the changing angles of the sun, result in a sufficient shadow being cut to protest employers from the son during the entice shift. Elf rtive 1118:16 Y'_ STAY GREEN INC'S Safety Manual and TIFF To ensure that employees have access to a preventative recovery period, the following steps will he taken: • Every morning that the temperature is at least $50 degrees Fahrenheit there will be short tailgate meetings (in the employees' lanbmege) to remind workers about the importance of rest breaks. • The Crew Leader will remind employees thmughout the work shift to drink plenty of water. • For each job, the Ctew Leaders will show employees the location of designated shade. MONITORING THE WEATHER All 54nn,'i50f$ Alld Lrcw Icudcn will be truncd and iosCtus'jyi' 1g_F1+Cf k1R.eGs lncc_71t� rx[�_: _yrl3 wca[hcr lierL:_ag[..... Wei±Slh{f_ far:cacK iu-'i bL chyti$e u'ilh [ht r -Id nl {�{1p-1lw u"a.rr+'s.maaa.crnl or by cr.I1+nr1h G_1>a0Qnal_LYycd:e1 5yniyc phony ns^byn or by ILIL' lh': WV:nl'yrS hip• -J -L Nlwt+rk.'l he work schdUl.y will :t' i'lannct Irl ud•x._c, Ly15jllg Inn coacr�yrg{Igp_w;:r; hif. 11 Ill [QmPur olurc� yr a kcal wart rs cx pry l0 1'LI__ tylr,-. g 1. i Ok'4111•!1' p1pWn will take plmcc a41 summer 3rrr-g, HIGH -HEAT PROCEDURES 3395 (e) The employer shall implement high -heat procedures when the temperature equals or exceeds 95 degrees Fahrenheit. These procedures shall include the following to the extent practicable (1) Ensuring that effective communication by voice, observation, or electronic menus is maintained so that employees at the work site can contact a supervisor when necessary. An electronic device, such as a cell phone or text messaging device, may be used for this purpose only if reception in the area is reliable. (2) Observing employees for alertness and signs or symptoms of heat illness. (3) Reminding employees throughout the work shift to drink plenty of water - (4) Close supervision of a new employee by a supervisor or designee for the first 14 days of the employee's employment by the employer, unless the employee indicates at the time of hire that he or she has been doing similar outdoor work for at least 10 of the past 30 days for 4 or more hours per day. To ensure that employees receive the high -heat procedures, the following steps will be taken: • Manager needs to advise Crew Leaders that the temperature will reach 95• Fahrenheit and that the "High -Heat Procedures' will be taking place. • All crews will have at least one mdio/cellular phone each. • Crew Leader will encourage employees to drink plenty of water tluaugh+im the day and observe employees for signs of heal illness. Effective IM/16 Y3 STAY GREEN INC'S Safety Manual and IIPP All new hires will be closely supervised by Crew Leaders for the first 14 days ofemploymrnt. •8 I rim. he :m:IN irmrl nil i1; I.•:f:' LpL',y=ry aJ:!nrts tl+ncyf's_8C411PY,:.p'I'0'I is IFq I[s•l7Cfn rV anri �rl�fii nhr_iu!t,_'r.i- ti:c boJr in:.I cwrurs x!Ien rh�c�. irpr_4'md17 19d'.0 c*1 hcal IviB-Sn "'h::h IIIc tKJ� iyy�.: !,�,yr�j� 'tIe" irc.•.I'114 and sudden'y c.c ud b. ,.IJV!gr.ca?1 r4'!IIM06la t:'9anyxs: I.^._^lpg rggu�: r twy to idirl elwn Irn twin: rn nw suddcnk LirL[.pa emxavy ee als 3e]I i;:.n,%s b7 X03 tTkdli:l easy mt%n AhC;j u.V p{IlikeS OI when •':•rt:rL, x<tc aub thjjt3D the emS1 ZV] SIP hl^I t2 bWj b:•r'I g-i� usgyJ_. Effective 1+19;16 94 Formatted: List Paragraph Leh No bullets or numbering, Tab stops: Not at 0.75" Formatted: Ndent Lek 0.5", Tab stops. 0.750, List tab . Not at 0.5" STAY GREEN INC'S Safety Manual and IIPP TRAINING Training Is critical to help reduce the risk of heat related Illnesses and to assist with obtaining emergency assistance without delay. 3395 (f) (1) Employee training: Training in the following topics shall be provided to each supervisory and non. supervisory employee before the employee begins work that should reasonably be anticipated to result in exposure to the risk of heat illness: (A) The environmental and personal risk factors for heat illness, as well as the added burden of heat load on the body caused by exertion, clothing, and personal protective equipment. (B) The employer's procedures for complying with the requirements ofthis standard. (C) The importance of frequent consumption of small quantities of water, up to 4 cups per hour, when the work environment is hot and employees are likely to be sweating more than usual in the performance of their duties. (D) The importance of acclimatization. (E) The different types of heat illness and the common signs and symptoms of heat illness. (F) The importance to employees of immediately reporting to the employer, directly or through the employee's Supervisor, symptoms or signs of heat illness in themselves, or in co-workers. (G) The employer's procedures for responding to symptoms of possible heat illness, including how emergency medical services will be provided should they become necessary. (H) The employer's procedures for contacting emergency medical services, and if necessary, for transponing employees to a point where they can be reached by an emergency medical service provider. (1) The employer's procedures for ensuring that, in the event of an emergency, clear and praise directions to the work site can and will be provided as needed to emergency respandera. These procedures shall include designating a person to be mailable to casure that emergency procedures are invoked when appropriate. Note: T8 CCR 3303 (a) (3) requires that communication for employees shall be in a form readily understandable by all affected employees. Effective 1 15.16 93 STAY GREEN 1NC'S Safety Manual and IIPP 3395 (1) (2) Supervisor Training: Prior to supervising employees performing work that should masmubly be anticipated to result in exposum to the risk of heat illness effective training on the following topics shall be provided to the supervisor (A) The information required to be provided by section (f) (1) above (B) The procedures the Supervisor is to follow to implement the applicable provisions in this section. (C) The procedures the supervisor is to follow when an employee cahi6its symptoms comistent with possible heat illness, including emergency response procedures. (D) How to monitor weather reports and how to respond to hot weather advisories. 3395 (1) (3) Written Procedures: The employer's procedures for complying with each requirenrnt of this standard required by subsections (1)(1) (D), (G), (H), and (1) shall be in wridng and shall be made available to employees and to representatives of the Division upon request. To ensure employees are trained, the following steps will be taken: • All Employes will receive heat illness prevention training, especially all newly hired employees. • On hot days, and during a hilt wave, Crew Leaders will hold short tailgate meetings to review this important information with all workers. To ensure Supervisors are provided training, the following steps will be taken: • Supervisors and Crew Leaders will be trained prior to being assigned to supervise outdoor workers. To reduce the risk of heat -related Illness (Hp and respond to possible symptoms of 111, the following steps will betaken: • All employees will be trained. • As much water and test breaks will be provided. • Crew Leaders will continuously check all employees, and stay alta to the presence of heat related symptoms. • Crew Leaders and co-workers ate encouraged neve to discount any signs or symptoms they are experiencing, and will immediately report them. • Crew Lenders will carry cell phores or other means of communication, to ensure that emergency services can be called, and check that these ate functional at the worksite prior to each shift • Every mining, Crew Leaders will remind workers about emergency procedures. Effective 1:18:16 96 STAY GREEN INC'S Safety Manual and IIPP To ensure that emergency medical services are provided without delay, the following steps will betaken; Stay Green's procedures for responding to .rynrptoma of possible heat illness, including how emergency medical services will be provided should they become necessary are • Immediately take employee to designated shaded arca • Remove the person's unnecessary clothing to help cool him down. • Fan warm air over the person while wetting the skin with lukewarm water to help cool down the employee. • Provide employee with water. • Take employee to closest designated clinic. • Crew Leader needs to call Supervisor to inform of sita ition.. • If emergency medical services arc necessary. Crew Leader needs to read and follow the emergency medical posting located in every track Crew Leader needs to call 911 and then call Supervisor to inform of situation. Stay Green's procedurer for contacting emergency mediral servicer, and ifnecessary. for transporting employees to a point where they can be reached by an emergency medical service provider are • Crew Leader needs to refer to emergency medical posting located in every track Crew Leader needs to use company cell phone to call 911. • Do not move an employee from the designated shaded area until emergency medical service provider arrives. Stay Green's procedures for ensuring that, in the event of emergency, clear and precise directions to the work site can and will be provided as needed to emergency responders are • Crew Leaders have job -sheets with the address of thejobsit. • Supervisor will train Crew I=dcr on how to give clear and precise direction to the work site Effective 1/18/16 97