SUBJECT: VISTA CANYON DEVELOPMENT PROJECT - CONSTRUCTION
INSPECTION SERVICES
DEPARTMENT: Public Works
PRESENTER: Mike Hennawy
RECOMMENDED ACTION
City Council:
Authorize professional services contract with Tetra Tech, Inc., in the amount of $84,000 and
authorize a 10 -percent contingency in the amount of $8,400 for a total contract amount not to
exceed $92,400.
2. Authorize the City Manager or designee to execute all documents, subject to City Attorney
approval.
3. Appropriate $92,400 to Expenditure Account 14300-5161.001 Development Services
Administration Contractual Services and appropriate $92,400 to Revenue Account 100-
4531.008 General Fund Grading Inspection.
BACKGROUND
Effective September 11, 2012, the Local Agency Formation Commission of the County of Los
Angeles approved the annexation of Vista Canyon through City of Santa Clarita (City)
Annexation No. 2011-20. Consistent with the Vista Canyon Specific Plan and in accordance with
the California Environmental Quality Act, the City is the lead agency for this development and is
required to administer the requirements contained in the Environmental Impact Report. Included
therein are provisions for soil cement bank stabilization on the banks of the river corridor, bulk
grading, and the import of up to 500,000 cubic yards of soil. This is also consistent with the
primary objectives of the Vista Canyon Specific Plan's drainage concept and stormwater
management program.
Due to the unique character of the work being performed on this project, the services of afull-
Page 1
PacketPg. 62
time inspector are necessary to oversee the bulk grading and the dirt hauling associated with bulk
grading and future Lost Canyon Road grading. Additionally, with the anticipated El Nino
weather pattern predicted through April, it is important to have an inspector onsite to ensure
compliance with site-specific Storm Water Pollution Prevention Plan and Best Management
Practices.
California Government Code 4526 prescribes the selection of architectural and engineering
services to be based on demonstrated competence and professional qualifications necessary for
the satisfactory performance of the services required and does not authorize the selection of
professional architect and engineering services based on cost. Therefore, and based on their
previous experience on similar City projects and their illustrated understanding of the needs of
this project, staff recommends the City Council award the contract for inspection services to
Tetra Tech, Inc., for this project. In addition to their professional qualifications, City staff was
able to reach an agreement with Tetra Tech, Inc., at a fair and reasonable price.
This item authorizes a professional services contract in the amount of $84,000 and authorizes a
contingency in the amount of $8,400 for a total contract amount not to exceed $92,400. The
amount of $92,400 will also be reimbursed by the developer.
LINNN' HU4II►ININ114111M621
Other action as determined by City Council.
FISCAL IMPACT
The total amount of this agreement will not exceed $92,400. Upon approval of the recommended
action, the budget will be adjusted accordingly.
ATTACHMENTS
Proposal for Tetra Tech, Inc.
0
Page 2
Packet Pg. 63
7.a
OTETRA TECH
January 28, 2016
Ms. Julia Regan, Project Development Coordinator
City of Santa Clarita
23920 Valencia Boulevard, Suite 300
Santa Clarita, CA 91355
Reference: Proposal for Vista Canyon Development Project Construction Inspection Services
Dear Ms. Regan:
We are pleased to submit a Proposal for the Vista Canyon Development Project Construction Inspection Services.
The City desires a highly skilled individual to assist the ProjectManager with Construction Inspection Services. The project
requires the services of a construction observer who is not only adept in construction methodology, codes and standards,
but possesses superior administrative skills and the unique ability to anticipate problems, recognize and address the needs
of the business community, and represent the agency to the high standards the City expects of its employees and consultants.
We have an outstanding team, which combines the experience, depth, and understanding needed for the successful
delivery of this type of Construction Management Services contract. We are ranked as the #1 WaterFirm by Engineering
News Report (EVR) in a survey of 500 firms. Our firm is a leader in water/wastewater/reclaimed water facility design
and has a long history working in Southern California on challenging civil engineering projects such as those expected
to result from the subject contract. We bring the following distinct advantages to the City of Santa Clarita:
• Commitment of Our Best People to the Contract — We are committing one of our most experienced Construction
Observers/Special Inspectors Brad Therrien, P.E., PLS, to fulfill all of the requirements listed in the scope of services.
He has over 25 years of experience, and has been responsible for the Construction Management of a variety of
water/wastewater projects throughout Southern California. He has a proven track record of managing the construction
contractor and completing a variety of projects on time and within budget with a high degree of client satisfaction.
His resume is included with this letter.
Dedication to City of Santa Clarita — Tetra Tech is accustomed to serving as a team member for projects similar to Q
yours and has demonstrated our ability to integrate our people with clients' staff. Our approach to this project will F
include a "teamwork and partnering" approach with the City. Our intention is to use this project as another step in to
building a solid, long-term working relationship with you. We will do this by exceeding Your expectations through
hard work, attention to detail, high level of communication and professional presentations. c
N
Our scope of work is detailed in the attached Exhibit B and our fee proposal is attached as Exhibit C.
Our rates are inclusive of mileage, computer, and cell phone charges. Our quote will remain in effect for ninety (90) days.
Tetra Tech has reviewed the sample contract and would be willing to execute the City's Agreement without change, upon
receipt of a notice to proceed. Our signature below of Tetra Tech's authorized representative certifies that to the best of
our knowledge and belief, the information included in this proposal is true and correct. Our proposed work will be
performed at a "not -to -exceed" price as stated within our Cost Proposal for $84,000.
Thank you for giving us the opportunity to submit our proposal. We look forward to your positive response. If you need
additional information or have any questions, please feel free to contact me directly at (949) 809-5157.
Sincerely,
Mark W. Bush, P.E.
Vice President, Water, Environment and Infrastructure
MWB/cg/M:AManagement\W 1RSVDrafts\Bush\SmtaClaritaVO1 cwltr.docx
Attachments
17885 Von Karman Avenue, Suite 500, Irvine. CA °24' 4-42 "
Tel 949.809.5000 Fax 949.809.5010
Packet Pg. 64
7.a
OTETRA TECH
EXHIBIT B
Subject: Vista Canyon Development Project — Construction Inspector Services with
respect to Bulk Grading, Future Lost Canyon Road Grading, Geotechnical
Compliance and Storm Water Compliance
TASK 1: CONSTRUCTION INSPECTOR SERVICES
Subtask 1.1 Attend Weekly Project Construction Meetings
Tetra Tech's representative shall attend weekly project meetings during construction, record
meeting discussion and provide technical assistance to the City.
Output Prepare meeting minutes.
Subtask 1.2 Review and Respond to Contractor RFIs and Change Order Requests
Tetra Tech's representative shall assist the project manager with the review of and response to
contractor RFIs and Change Order requests, review any plan design revision, if necessary.
Track changes on a plan set. Provide assistance to the City Project Manager with change order
requests including cost analysis.
Output 1) Provide RFIs response recommendation.
2) Review plan revisions, if necessary.
3) Track plan changes.
Subtask 1.3 Review and Respond to Contractor Submittals
Tetra Tech's representative shall assist the Project Manager with submittal and shop drawing
review for conformance to the project plans and specifications. Maintain a submittal log and
update and provide update to City as necessary.
Output 1) Respond to submittals and shop drawings.
2) Maintain submittal log updates
Subtask 1.4 Perform Final Job Walk
Tetra Tech's representative shall perform a final job walk with the design team, the City project
manager and contractor. Document issues and develop punch list items.
Output Prepare resulting "punch list."
Subtask 1.5 Review Record Drawings.
Tetra Tech's representative shall perform a review of project record drawings. Compare
contractor's red line set with the change order plan set.
Output Review as -built drawings.
M:\Markefing\Proposals\WMS\EP2016\CM\006_SantaClar ta-VistaCynDev\EXBIBPr B - Bulk Grading Plus.docx Page 1 of 2
Packet Pg. 65
0
N
U
E
t
v
w
F
R
w
F
0
w
R
0
CL
0
a
Y
W
lU
E
t
V
R
Y
Y
Q
7.a
OTETRA TECH
Subtask 1.6 Daily Inspection Services
Tetra Tech's representative shall provide daily construction observation services for the project
and review all work for compliance with the project plans, specification and associated
standards and shall work closely with City staff to address concerns. Primary areas of focus
shall include, but not be limited to:
a) Bulk Grading:
Review geotechnical recommendations relating to the bulk grading process. Observe
construction techniques and equipment utilized in the bulk grading operation for
compliance with standards of the profession. Witness the removal and placement of
material in the "over -excavation" process for adherence to approved project plans,
standard procedures and geotechnical recommendations.
b) Future Lost Canyon Road Grading:
Observe the deep fill operation in the future right-of-way of Lost Canyon Road
abutting the existing bridge over the railroad tracks. Review deep fill recommendations
contained in the geotechnical reports for the project and observe construction process
for compliance with the recommendations, standards and approved plans.
c) Geotechnical Compliance
Review all plans, geotechnical reports and field memos for the project. Observe
activities of geotechnical staff in the field for compliance with standard procedures and
project specific directives relating to soils work. Communicate concerns and any need
for corrective measures with the geotechnical staff. Assess all "daily reports" prepared
by the field geotechnical staff. Review all modifications proposed by the Geotechnical
Engineer. Issue corrective notices to the contractor when necessary.
d) Storm Water Compliance
Review all erosion control plans, storm water reports and recommendations for the
project. Observe all construction activities for compliance with mandated and
recommended erosion control/pollution prevention measures. Work closely with the
storm water pollution prevention specialist employed by the developer. Issue
corrective notices to the contractor when necessary.
Output 1) A daily field report will be issued with results of observations and relative compaction test
results (tests performed by others) and other field information encountered each day. This
daily report shall be in a format acceptable to the City and include but not be limited to the
following data: weather, working hours, summary of the work completed in accordance
with project schedule, safety concerns, workmanship issues, manpower and equipment
utilized, and measured quantities for bid schedule items.
2) Obtain all necessary information (i.e. certificate of compliance, chain of custody, etc.)from
the prime contractor and all subcontractors to ensure all materials are in conformance with
the project's specifications and plans and match all approved submittals.
3) Provide daily project photograph documentation as necessary.
M:\Markefing\Proposals\WMS\EP2016\CM\006_SantaClar ta-VistaCynDev\EXMBTT B - Bulk Grading Plus.docx Page 2 of 2
Packet Pg. 66
Z
O
Z
Z
Q
U
F
N
7.a
OTETRA TECH
*A011 - MM
M
FEE PROPOSAL
Tetra Tech will assign Mr. Brad Therrien, P.E., PLS to this project. Our rates utilizing Mr. Therrien for this
project are as follows:
*Our rates are inclusive of mileage, computer, and cell phone charges. Our quote will remain in effect for ninety (90)
days. Below is Tetra Tech's hourly rate schedule, which is a part of Tetra Tech's Proposal:
*Overtime is defined as over 8 hours in one working day or the first 8 hours worked on the 7' consecutive day. Double
time is over 12 hours in one working day or over 8 hours on the 7a' consecutive day.
HOURLY CHARGE RATE AND
EXPENSE REIMBURSEMENT SCHEDULE
Professional
Engineering Intern/Technician/Assistant... $ 65.00
Project Administrator ................................
$ 107.00
Designer/CAD Operator/Engineer I ..........
$ 117.00
Engineer II and III/Senior Designer .........
$ 127.00
Biologist....................................................$
127.00
Planner.......................................................
$ 127.00
Senior Engineer/Landscape Architect .......
$ 140.00
Project Engineer/Project Coordinator........
$ 165.00
Senior Planner ...........................................
$ 180.00
Senior Scientist ..........................................
$ 180.00
Senior Project Engineer .............................
$ 180.00
Project Manager/Sr. Project Coordinator..
$ 200.00
Senior Project Manager .............................
$ 260.00
Program Director/Project Director ............
$ 275.00
Administrative
Administrative Clerk ..................................$ 59.00
Word Processor/Admin. Support ................$ 87.00
Graphic Designer ........................................$ 117.00
Survev/Mannin
Survey Technician I ...................................$
109.00
Survey Technician II/Field Supervisor .......
$ 125.00
Senior Surveyor ..........................................$
141.00
Project Surveyor .........................................$
163.00
Two -Person Survey Party ...........................$
230.00
Two -Person Survey Party with GPS ..........
$ 275.00
Three -Person Survey Party .........................$
320.00
Survey Travel Time (Two -person) .............$
109.00
Survey Travel Time (Three-person) ...........
$ 153.00
Construction Management
Construction Observer I .............................
$ 100.00*
Construction Observer II ............................
$ 112.00
Senior Construction Observer ....................
$ 135.00
Resident Engineer ......................................
$ 145.00
Construction Manager ................................
$ 180.00
All charges for printing, mileage, telephone, mailing, subcontracted services and other expenses incidental to the
performance of the main items of the Observation Services are included within our hourly rate schedule.
Subconsultants will be billed at their cost plus a 10% markup.
M:\Markefing\Proposals\WMS\FP2016\CM\006_SantaClanta-VistaCynDev\EXBIBFF C - Fee Proposal.doex Page 1 of 1