2017-03-14 - AGENDA REPORTS - ORCHARD VILLAGE TURF REMOVAL (2)
Yl Agenda Item• 6 CITY OF SANTA CLARITA Q) AGENDA REPORT CONSENT CALENDAR CITY MANAGER APPROVAL: fAl DATE: March 14, 2017 SUBJECT: ORCHARD VILLAGE ROAD MEDIAN TURF REMOVAL, PROJECT B1015 - AWARD DESIGN CONTRACT DEPARTMENT: Public Works PRESENTER: Damon Letz RECOMMENDED ACTION City Council: 1. Award the design contract to Pacific Coast Land Design, Inc., for the Orchard Village Road Median Turf Removal, Project B1015, in the amount of $163,382, and authorize a contingency in the amount of $24,508, for a total contract amount not to exceed $187,890. 2. Appropriate $91,890 from Landscape Maintenance District Zone 2008-1 fund balance to expenditure account B1015357-5161.001. 3. Authorize the City Manager or designee to execute all documents, subject to City Attorney approval. This proposed Orchard Village Road Median Turf Removal, Project B1015, will remove existing median turf and replace it with plant material that requires significantly less water. Additionally, the project will make provisions to use recycled water when available. This project is part of the multi-year Citywide Major Thoroughfare Median Turf Removal Program and supports the Community Beautification theme in the City of Santa Clarita's (City) five-year strategic plan, Santa Clarita 2020. This project also follows the City's current design standards for median landscaping. This project exemplifies the City's commitment to maintain the high quality of life enjoyed by our residents. Investing in high-quality landscape projects within the public right-of-way helps maintain higher property values and keeps the City on the cutting edge of water management. Page 1 Packet Pg. 26 Yl This project is one facet of an overall program to improve our water management infrastructure, while keeping the City's public areas well -landscaped. Orchard Village Road was constructed in 1970 by the developer of the adjacent master -planned community of Valencia. Maintained by the City's Landscape Maintenance District (LMD) since 1997, the three -acre landscaped median consists primarily of turf, shrubs, and trees with the associated irrigation. The LMD provides a local funding source that is dedicated to the construction and maintenance of landscaped medians within the City. A large portion of the median is located within Southern California Edison (Edison) right-of-way beneath high voltage electric lines, which serve a major portion of Southern California. Each year, the median becomes a prime viewing area for the community's annual Fourth of July parade. The parade route begins in Old Town Newhall, traveling west on Lyons Avenue onto Orchard Village Road and finishing at 16th Street. The parade has been a long-standing tradition in the Santa Clarita Valley since it began in 1932. The design of this median takes this use into consideration by providing an area adjacent to the street that will allow residents to continue viewing the parade from the median. Staff performed extensive outreach during the conceptual design, which has been well received by the community. On June 1, 2016, staff facilitated an open house to engage and discuss potential design options for the Orchard Village Road MedianTurf Removal project with the community. This open house was held at St. Stephen's Episcopal Church, which drew a number of nearby residents. They were able to provide staff with excellent feedback. Upon completion of the conceptual design, staff met with the Fourth of July Parade committee to review the plan and received their approval. On October 18, 2016, a follow-up outreach meeting was held at the Business Incubator with members of the community who attended the initial open house to share the final conceptual plan, which was well received. A Request for Proposal (RFP) for design was issued on December 12, 2016. The RFP asked firms to identify their relevant experience in similar projects and demonstrate their approach for this design project. On January 17, 2017, one firm submitted a proposal to the City. Staff reviewed the proposal and based on their evaluations, scored the firm on a 100 -point scale. Rank Comp anv Score Location Desien Cost 1. Pacific Coast Land Design, Inc. 96 Ventura, CA $163,382 The scoring system heavily emphasized the understanding of the following: required scope of work; key development items; potential issues and resolutions; solutions to drainage issues; understanding of the City's median landscape design guidelines; experience with previous median landscape projects; qualifications of the project team and their resources; and organization of the proposal. Additionally, the consulting firm was asked to provide a detailed schedule and scope of work required for them to prepare the plans, specifications, and an engineer's estimate. Page 2 Packet Pg. 27 Even though Pacific Coast Land Design, Inc., was the only firm to submit a proposal for this project, staff did not see the need to re -advertise the RFP. Pacific Coast Land Design, Inc., has successfully completed many design projects for the City, most recently the design for the Valencia Median Refurbishment project. City staff was able to reach an agreement with Pacific Coast Land Design, Inc., at a fair and reasonable price. Based on their design experience on previous City median projects and the completeness of their proposal for this project, staff recommends the City Council award the concept design contract to Pacific Coast Land Design, Inc., for this project. The requested contingency of $24,508 will cover costs for additional design efforts due to unforeseen conditions or conflicts uncovered during potholing, the design of median modifications, and design coordination with Edison. The requested funding of $91,890 will add to the current budget of $146,500, for a total budget of $238,390, which allows for award of the design contract totaling $187,890. The remaining balance of $50,500 will provide utility fees (for Edison in particular), staff time for environmental support, plan check fees, and project administration costs. California Government Code 4526 prescribes selection of architectural and engineering services to be based on demonstrated competence and professional qualifications necessary for the satisfactory performance of the services required and does not authorize the selection of professional architect and engineering services based on cost. ALTERNATIVE ACTION Other action as determined by the City Council. FISCAL IMPACT Landscape Maintenance District Zone 2008-1(357) funds in the amount of $146,500 are currently appropriated in project expenditure account B 1015357-5161.001. The requested appropriation of $91,890 from the Landscape Maintenance District fund balance (357) creates a project budget of $238,390. This amount will provide for award of the design contract and anticipated project costs. ATTACHMENTS Location Map Proposal from Pacific Coast Land Design (available in the City Clerk's Reading File) Page 3 Packet Pg. 28 I�.a h n.— Fs '®' i a;- '� T ' a JI UI t ��. .t_91�Q 4L8� • �f. R€� a �A Y 11 8 z F iwl+G MITI 7. 4 ,` A K ,fir 1 K •4 �`8' ,f ITIFT a ♦ � ,�� � 4 - F � J Y J�` Y a , _ (p LL ! �V:p � �� �� ,F ♦ .. r `�,, } �� !� ��� � `F �.� 1��*�a�s3') t. x - }'�4 r ''m4 �`•T�� �► �g`p� y r i ,` �IFIF ..97.x, �'. IN ill CIA Fw Ira I Ji ti f .7 � 1. JY •.!{ � � .,F �s "8 > � F _ � ^ a 54 e a e� �j4 , '' � '� x, r r e i III•, �'r a� • Y �, a C - V •4 wpv �"T.,S J®.—.. '..� r^.r�•+bTrr ILL2 9 �m Top .�11r F '{ • oject Loc_ • e I' a `'I`4@G 1 ,w-�� e Yh .. _ e •� r _ TABLE OF CONTENTS PROPOSAL TO PROVIDE PLANS, SPECIFICATIONS & ESTMATES FOR THE ORCHARD VILLAGE ROAD MEDIAN TURF REMOVAL PROJECT For the CITY OF SANTA CLARITA January 17, 2017 INTRODUCTION................................................................................... SECTION 1 QUALIFICATIONS OF FIRM & ASSIGNED STAFF .................................. SECTION 2 WORK STATEMENT............................................................................... SECTION 3 SCHEDULE............................................................................................ SECTION 4 TOTAL COST (SEE SEPARATE ENVELOPE) .......................................... SECTION 5 SUB-CONSULTANTS.............................................................................. SECTION 6 LABOR COMPLIANCE PROGRAM ..................................................... SECTION 7 STATEMENT OF OFFER & SIGNATURE .................................................. SECTION 8 STATEMENTS & AGREEMENT............................................................... SECTION 9 Orchard Village Road Median Turf Removal, City Project B1015 City of Santa Clarifa INTRODUCTION SECTION 1 PROJECT The City intends to obtain the services of a well-qualified Landscape UNDERSTANDING Architectural and Civil Engineering team to develop plans, specifications and estimates (PS&E) for the removal of the existing turf and beautification of the medians along Orchard Village Road. The project aims to refurbish the nine medians located along Orchard Village Road, beginning with the oversized medians near Lyons Avenue that contain SCE transmission towers, and stretching north to McBean Parkway. Coordination with SCE is critical to the success of this project and PCLD has already opened the lines of communication with SCE and is aware of the utility based constraints defining the design within the larger medians. Overall, the existing medians include an irrigated turf ground -plane, mature ornamental trees, and limited shrub planting in key locations. The southern section of the study area serves as the parade route for the annual Fourth of July Parade, and the oversized medians serve as a prime viewing area for the parade. KEY ISSUES Pacific Coast Land Design recently completed the conceptual design and preliminary costing for this project and we look forward to refining the design. As a follow up to the conceptual design process, we see there is room within the design to maximize the functionality of the large medians at Lyons through the potential inclusion of expanded planter area infiltration treatments. Also, with a detailed survey in hand, the team aims to better define the limits of the expanded paving in ways that fully accommodate the yearly parade traffic while allowing for cost effective paver installation. In addition to our recent work on the Orchard Village Medians Conceptual Plan, Pacific Coast Land Design (PCLD) has had the opportunity to produce several other detailed conceptual designs and construction documents for numerous medians throughout the City of Santa Clarita. Through this experience, PCLD has developed a strong understanding of the existing conditions that will affect the project design. It is anticipated that most of the existing trees will remain and additional trees will be planted. The existing spray irrigation system within the medians will be demolished to allow for construction of a new system that meets the current City LMD design Guidelines, as well as State regulations. The existing water meters, point of connection equipment, mainline, and roadway crossing conduits will be assessed Orchard Village Road Median Turf Removal, City Project 81015 City of Santa Clarita INTRODUCTION SECTION 1 for protection, demolition, or re -use. The planting areas of the medians will be modified, allowing for implementation of the standard median design within the narrower medians. A similar palette will be used in the larger medians to convey continuity through the corridor but the layout of the planting will follow a more organic layout to better make use of the larger planning areas throughout. While the Conceptual Plan calls for median noses to be reduced at Wiley Canyon Road to prevent the obstruction of the crosswalks; the design team understands this effort is already defined on a current set of plans being completed by our Civil design Consultant Kimley-Horn. As such, no median modifications are anticipated within the current scope of work. It is understood per the rfp, that any street improvement plans in addition to the simple detailing of curb and gutter repair will be provided as an additional service at the direction of the City Project Manager. Drawings and specifications will be consistent with City format for Capital Improvement Projects, and will be submitted for City review at 60%, 90% and 100%. Final Bid Documents will be delivered on mylars and include a CD with digital files. The consultant team will collaborate with City staff, utility companies and, if directed, attend public presentations. The design will adhere to the LIVID "Design Standards. Notes & Specifications for Median Landscaping in Santa Clarita," dated June, 2014. THE DESIGN TEAM The "core" team is comprised of the Landscape Architect and Kimley- Horn, the Civil Engineer. In addition, ECG Civil has been brought on to conduct the field survey and produce the project base map. PCLD, Kimley-Horn and ECG Civil are proud to have developed strong relationships with City Staff and are very familiar with the City submittal and review process and the standards and guidelines defining the work. Wallace Labs, the Soils Engineer will be carrying out the coring and testing of the planting area sub -grade early on during the Preliminary Investigation phase and this information will be used to define how the sub -grade in the planted medians will be treated to ensure permeability in the planted section. PCLD understands that time is of the essence. The PCLD team has completed many median construction and renovation projects with the City over the last 9 years. Most recently PCLD has worked in conjunction with City Project Engineer James Tong to complete plans and construction for the Valencia Boulevard Median Refurbishment, a job very similar in length and scope to this project. As on Valencia, key to this project are the existing trees and how they will be protected and accommodated within the design. In modifying the median planter grade, it will be important on this project to protect the raised root crown of the existing trees. Orchard Village Road Median Turf Removal, City Project 81015 City of Santa Clarita QUALIFICATIONS OF FIRM & ASSIGNED STAFF SECTION 2 FIRM Pacific Coast Land Design, Inc. (PCLD) was incorporated in August DESCRIPTION 2011. It was founded by Chris Roberts in 1983 as a sole proprietorship. PCLD operates under Mr. Robert's State of California Landscape Architect's license #2461. The company carries general, professional and automobile liability insurance. Current certificates of insurance are on file with the City of Santa Clarita. We are a certified Small Business Enterprise through the Metropolitan Water District (Certificate #18594). GENERAL PCLD has broad community planning/design and CIP experience over QUALIFICATIONS a span of 30 years. PCLD's strength in leading the development of complex, unique public projects is our most important attribute. Currently, Pacific Coast Land Design consults with the Cities of Goleta, Simi Valley, Camarillo, Thousand Oaks and Santa Clarita. PCLD's understanding of capital improvement infrastructure and maintenance practices are based on years of field experience. We have overseen the management and renovation of hardscape infrastructure, ROW landscaping and hillside plantings for Newhall Land and Farming Company, and now Santa Clarita, since 1990. PCLD has been constantly involved in the planning, design and Capital Improvements management of the City Landscape Maintenance District. Main Street Newhall is our most visible design project. But, it is just as important that we developed a program for evaluating arterials, recommending and costing improvements (or no improvement), and then producing a five year CIP plan for the City that is updated annually. Our involvement with this project, the Orchard Village Road Medians Refurbishment began as a part of that yearly CIP effort a number of years ago. We believe Santa Clarita has one of the most beautiful community landscapes anywhere. KEY In producing the Design Standards for Medians, PCLD has an intimate EXPERIENCE knowledge of LMD maintenance practices and goals for the design of streetscapes throughout the City. PCLD has an unparalleled understanding of the design details and specifications that will be used to define the work for this project. With this understanding, PCLD can provide efficiencies to the project allowing the team to focus energy and time on the development of well thought out design solutions. Orchard Village Road Median Turf Removal, City Project B1015 City of Santa Clarita QUALIFICATIONS OF FIRM & ASSIGNED STAFF SECTION 2 MANAGEMENT PCLD is managed by two principals. Chris Roberts, with over 30 years of experience, guides the long term direction of the firm. Mike Zielsdorf, with more than 16 years of experience, manages office production and construction administration. Mike is also active in all facets of landscape design. Tony Perkins and Brooke McDonnell, project managers, have managed several turf reduction and median refurbishment projects in the City of Santa Clarita. Tony and Brooke have an intimate knowledge of median landscaping and irrigation, and strong writing, drafting, 3D rendering skills. Brooke is a LEED accredited, licensed Landscape Architect. Both will participate in the Orchard Village Road Turf Removal Project. ORGANIZATIONAL Because we have a highly skilled staff, the office structure is horizontal. STRUCTURE All projects are discussed at weekly review meetings, and as interesting junctures in the work arise. Most projects are shaped in some way by all six Landscape Architects, although Chris Roberts and Mike Zielsdorf bear primary responsibility. RELEVANT & RECENT Since 2008 much of PCLD's work has been centered around PROJECT EXPERIENCE circulation corridor planning and design. Our portfolio includes several turf removal and median refurbishment projects, a bike trail with 12 street crossings and four railroad crossings, several Caltrans interchanges, and transformation of Santa Clarita's historic Main Street in Newhall. The streetscape renovation and roundabout which is now complete, is the cornerstone to attracting private development. Main Street's renovation is the first step into the transformation of historic Newhall into a mixed use TOD. It won the APWA's BEST transportation corridor project of the year for So. CA in 2011. Orchard Village Road Median Turf Removal, City Project B1015 City of Santa Clarita QUALIFICATIONS OF FIRM & ASSIGNED STAFF SECTION 2 OLD TOWN NEWHALL Newhall is a historic township in the City of Santa Clarita. The streetscape design is based on a unique City history that Santa Clarita, CA includes the native Tataviam people, a brief gold rush, an oil Newhall's fascinating boom, the railroad, and movie industry westerns. history includes a gold Boardwalk paving, a Western Walk of Fame with star insets, and rush, oil boom, and wild wayfinding stations have shaped the downtown attraction west Railroad town. envisioned by the master plan. Accessibility improvements, PCLD developed themed signage and boulder details, and planters to filter sidewalk storm water serve wayfinding pedestals set to update the streetscape and respect connections to the in boulders to celebrate surrounding natural environment. it s history and alert Scope of Work walkers to the many nearby recreation . Preliminary sidewalk, parking layout & streetscape plan • Construction documents & construction administration . Participate in workshops to Council & community 2008-2072 Client Community Development & Public Works Departments City of Santa Clarita VISUALIZATION Honest Communication The wall is a photo The rest is a PCLD 3D rendering Photo Rendering Overlay Staff Mike Zielsdorf. Chris Roberts, Brooke McDonnell, Eric J.H. Berg Orchard Village Road Median Turf Removal, City Project B1015 City of Santa Clarita QUALIFICATIONS OF FIRM & ASSIGNED STAFF SECTION 2 THE SANTA PAULA RAIL The Santa Paula Trail is the central 3 mile section of a proposed 31 TRAIL & MILL PLAZA mile rail trail that will connect Ventura to LA County in Santa Clarita. Santa Paula, CA Construction exceeded $4,000,000. PCLD, as prime consultant 2004-2012 coordinated with the PUC, CALTANS and municipal agencies for 13 street and 4 railroad crossings . The trail extends lengthwise through the middle of town. It includes Client rest stops, staging areas, safety elements & adapted landscaping Public Works with low flow irrigation. The trail also includes a PCLD designed Department City of Santa Paula `^'ayfinding system. Contact: The bicycle plaza features a Sycamore lined grass creek bed that is Brian Yanez embedded with cooling misters & boulders for seating. The tourist 805.933.4212 plaza maps and signs invite downtown visitation and regional bike excursions. Completion was on time & on budget. Staff PCLD Scope of Work Chris Roberts, • Evaluate and revise Master Planned trail alignment Mike Zielsdorf • Preliminary design, CD's, multi agency processing, construction administration • Stakeholder workshops • Street, & sidewalk construction, grading & utility realignment Special issues Master planned trail needed to be revised. PCLD facilitated state funding in absence of City staff. Detailed safety analysis and street calming at pedestrian & train crossings. Clockwise: Mill Plaza grand opening, rail historical signage, concept rendering, misters at night Orchard Village Road Median Turf Removal, City Project B1015 City of Santa Clarita QUALIFICATIONS OF FIRM & ASSIGNED STAFF SECTION 2 LANDSCAPE IMPROVEMENT PCLD carried out the City-wide inventory of arterial roadway PLAN, MEDIAN DESIGN landscapes resulting in the development of city-wide landscape GUIDELINES &CIP FACILTIES design guidelines and standardized construction details and PLANNING specifications for the arterial medians. Santa Clarita, CA PCLD also produced and updated annually the CIP Travel 2010 -Current Corridor Landscape Improvements Plan for the City of Santa Clarita. The booklet recommends specific landscape improvements, with cost estimates, for all City arterials over a five year projection. Median Design Guidelines with Construction Standard Details & Specifications I N wide coldred assured earned me hardens tel Unreal andart plant orA.tShia stwho sho,bm.armed Dphrases STANDARD MEDIAN DESIGN PUN VIEW STANDARD MEDIAN DESIGN SECTION DESIGN STANDARDS Compience MN these abneaeeia mind"Mem they as* Al&maMes mer IN erpoveexlxre BTree Nell raw,, W ketole amnce from street greee at second face of median cubo sea <Dnarnas dome alle ilve denser shadi Nelllrcmg tithe Most Not dismarderals; bwertllmbetptenling tlme. into the Burns'. D. Duel purpose be reasons bartln/mot Dan be statl be lnaelkd In carbon planters commul surd uu specor ONO of smmpea pavly. L A onman meeien are dbaleg elwg Me bfM1 N tie median. 10. WM1em media n planta expands lT in w[Mh b NI5INS than 18in wIEN, Mppmurn NGh 2 A rest M amauer aaxnureze stns be wedged at mat, end N long named.Cul .1 to be Bond to III the new B. Use asingle spenas a areae equally spaced along Me madmn senNr. pass lw Yauem It uaPo on each io a. Drugs alower shot shrub In egnally 5pe5M nulls almg daub Swe Of mree, emm�m bwM duwithmb WWperos'wbncmx'. rueaenbmyGo Me ansanmr. Proud, ul acwnlplandng at meehnmaubMghligDtlumlanea annsseMs of thing 15.CNomecmarl aMbe SReero SONFby fi mail... ewar 14 (scureardid, sub M Bmenam. bild eatmmnre LMeagawea MtlwabelntM wneam Mmlai min egneetawn trnapmeaen tmibeanalmloxersan lq'ani tree®wpeawll oaiu^ON bN tieeight Berne. Graduate to Me ameNmrquiemeM of the mvieuirgagmdee. 18.Witl'in apM1theiNadncehanded. all ueeeatnll beeleMeNa(no muMlhunlu. Scope of Work IS City-wide inventory of arterial landscapes. . Analysis of existing landscape conditions and costed facilities improvements plan. IS Updates to City-wide median design standards. New standards define use of low water and adapted ornamental plant material. Irrigation to point source and subsurface with Weather adjusted smart controllers. Landscape areas of medians are graded to retain and infiltrate irrigation and surface water. Client Special Districts -Landscape Maintenance City of Santa Clarita Staff: Chris Roberts, Mike Zielsdorf, Brooke McDonnell, Eric J.H. Berg, Tony Perkins Orchard Village Road Median Turf Removal, City Project B1015 City of Santa Clarita QUALIFICATIONS OF FIRM & ASSIGNED STAFF SECTION 2 LYONS AVE. AT PCLD completed preliminary & construction documents for this free - 15 INTERCHANGE way intersection along the US Interstate 5. The design features native Santa Clarita, CA planting consistent with the undeveloped hills adjacent to the project. 2010-2012 The edge planting is of non -irrigated grasses that will turn brown during the dormant season. LID/BMP features include bioswales, permeable maintenance paths and water detention facilities that will cleanse water and increase infil- tration. This project employs point irrigated bubblers for the container plants and rotators where the grasses are watered. PCLD was prime consultant on a team that included a civil engineer. Construction cost was $875,000. Client Special Districts, LMD City of Santa Clarita PCLD Scope of Work Identify local native context and gateway concept Develop gateway hardscape Design through construction documents, landscape architect drew grading plans Develop bioswale system • Oversee construction Orchard Village Road Median Turf Removal, City Project 81015 City of Santa Clarita QUALIFICATIONS OF FIRM & ASSIGNED STAFF SECTION 2 THOUSAND OAKS US -101 The Thousand Oaks Freeway Corridor Study was conducted for a 6 FREEWAY CORRIDOR & mile section of the 101 and resulted in two simple but important INTERCHANGES findings. PCLD altered previous ramp design strategies by selecting Thousand Oaks, CA sandstone cobble and adding boulders that matched the color of 1997-2001 the exposed rocks in the coastal range. ..„ AJ "did, ^+." .. ..,. . a. �.., ..., WiKk i� &Ila3 y VJ4fiI VIII.. did 11AMP,kiii Will J4111,11 1'.\M yv.n ' Thousand Oaks US -101 Corridor Study (Analysis and Schematic Design Exhibit) The design preserved mountain view corridors and framed the with oak tree masses. Borchard Road is almost entirely native chaparral species growing on the adjacent north facing hills. Client: City of Thousand Oaks Public Works Department Max Maximous, Sr. Engineer (Retired) (805)368-5591 sammax75@aol.com Staff: Chris Roberts, Mike Zielsdorf Following completion of the Corridor Study, three interchanges along the 101 corridor were identified for design. US 101 /Hampshire Road Interchanae, The scope included ramps, street medians and parkways. Existing and new planting was combined in the medians, along with stamped paving and a City monument. Orchard Village Road Median Turf Removal, City Project B1015 City of Santa Clarita J ...:.Y If T Ifi W'1 .. Liffid"Iff" Id, did— Liz x.. �' I T. ... ..,L, 1 , GaJ ICY HYIL If YG ILLIVIVIIII .11 F—���� . Thousand Oaks US -101 Corridor Study (Analysis and Schematic Design Exhibit) The design preserved mountain view corridors and framed the with oak tree masses. Borchard Road is almost entirely native chaparral species growing on the adjacent north facing hills. Client: City of Thousand Oaks Public Works Department Max Maximous, Sr. Engineer (Retired) (805)368-5591 sammax75@aol.com Staff: Chris Roberts, Mike Zielsdorf Following completion of the Corridor Study, three interchanges along the 101 corridor were identified for design. US 101 /Hampshire Road Interchanae, The scope included ramps, street medians and parkways. Existing and new planting was combined in the medians, along with stamped paving and a City monument. Orchard Village Road Median Turf Removal, City Project B1015 City of Santa Clarita J ...:.Y If T Ifi W'1 .. .. Liz x.. �' I T. ... ..,L, 1 , GaJ ICY HYIL YG Thousand Oaks US -101 Corridor Study (Analysis and Schematic Design Exhibit) The design preserved mountain view corridors and framed the with oak tree masses. Borchard Road is almost entirely native chaparral species growing on the adjacent north facing hills. Client: City of Thousand Oaks Public Works Department Max Maximous, Sr. Engineer (Retired) (805)368-5591 sammax75@aol.com Staff: Chris Roberts, Mike Zielsdorf Following completion of the Corridor Study, three interchanges along the 101 corridor were identified for design. US 101 /Hampshire Road Interchanae, The scope included ramps, street medians and parkways. Existing and new planting was combined in the medians, along with stamped paving and a City monument. Orchard Village Road Median Turf Removal, City Project B1015 City of Santa Clarita QUALIFICATIONS OF FIRM & ASSIGNED STAFF SECTION 2 THOUSAND OAKS US -101 US 101/Moorpark Road Interchange Landscape; PCLD was FREEWAY CORRIDOR & retained to design the landscape for an unusual triangle of INTERCHANGES property at the Moorpark Rd. northbound off -ramp. The property continued was dirt and weeds, the City had not established any criteria for the design. PCLD designed a gateway to the downtown that was within the context of the hills and drainages that define the Conelo Valley. Undulating mounds with native vegetation and a sandstone dry creek and waterfall are the primary components of the constructed landscape. This was a relatively inexpensive solution that befits its location at the primary gateway to downtown Thousand Oaks. US 101 / Borchard Road Interchange and commuter parkina lot; included City Street medians & parkways, existing landscape renovation, new landscaping including existing planting, new planting and gateway signage and paving. The Borchard Road Interchange, competed in 2003, was the last of three interchanges designed according to the criteria developed during the Thousand Oaks corridor study. Pacific Coast Land Design held prime consultant responsibility for all facets of freeway interchange landscape architecture. Orchard Village Road Median Turf Removal, City Project B1015 City of Santa Clarita OLD TOW NEWHALL w ,= ---__�ft a FIN, %w< �a 5 'Mi h LI ._jaljaq-'r V ��P i QUALIFICATIONS OF FIRM & ASSIGNED STAFF SECTION 2 PROJECT ORGANIZATION Pacific Coast Land Design is responsible for all facets of the project. PCLD will be the sole communication source to the City unless special circumstances arise. Sub -consultants will visit the site and attend meetings only if required by the City. PCLD will maintain regular and consistent contact with City Staff and will only contact stakeholders as directed by City Staff. Mike Zielsdorf will be the Project Manager and the main point of contact for City Staff, Consultants and effected utility companies and regulating agencies. Pacific Coast Land Design, Inc. Landscape Architecture Project Manager Mike Zielsdorf Principal Chris Roberts Project documentation Time/Projection Project Design Record keeping QA—QC Budget management Project Design Landscape Landscape Office Manager Technician Technician Karen Anctil Tony Perkins Brooke McDonnell Project documentation CAD operator CAD operator Time/Projection record Project design Project design keeping Budget management Consultants ECG Civil Kimley-Horn Wallace Labs SAL CONTRERAS, P.E. ADAM CHASE, Garn Wallace, Survey P.E., T.E. Sr. Soils Engineer Traffic Engineering Orchard Village Road Median Turf Removal, City Project 81015 City of Santa Clarita QUALIFICATIONS OF FIRM & ASSIGNED STAFF SECTION 2 MIKE ZIELSDORF • Principal, Project Manager (CA L. Arch. Lic #6044) EDUCATION Bachelor of Landscape Architecture, California Polytechnic State RELEVANT University, San Luis Obispo, 2001 QUALIFICATIONS Transportation Corridor Landscape Architecture • Soledad Canyon Road Medians Refurbishment, 2014-2015 • Main Street Newhall Revitalization: Design Documents & Construction Administration for 9 block redevelopment district, City of Santa Clarita, 2007- Current • Santa Paula Rail Trail: Design Documents & Construction Administration for 2 mile rail trail, City of Santa Paula, 2007-2012 • Creekside Road: Design Documents & Construction Administration for Traffic calming/pedestrian safety treatments for retail district, City of Santa Clarita, 2010 • South River Trail: Recreation trail and riverbank restoration & stabilization, Newhall Land & Farm / City of Santa Clarita • County of Ventura Bike Trail Master Plan: Sub -consultant to Alta Planning and Design, 2006 Public Outreach • Old Town Newhall & Roundabout: Directed community workshop & presentations to Downtown Business Association, Planning Commission and City Council • Santa Paula Rail Trail: Directed community workshops & presentations to City, CALTRANS & State PUC. TONY PERKINS EDUCATION Landscape Technician Bachelor of Science in Landscape Architecture, University of RELEVANT California Davis, Davis, CA 2013 QUALIFICATIONS Project Experience • Orchard Village Median Conceptual Design, Santa Clarita, CA, 2016 • Valencia Boulevard Median Refurbishment, Santa Clarita, CA, 2014-2016 • LMD Non -Median Turf Assessment, Santa Clarita, CA, 2015-2016 • Old Orchard Park Construction Documents, Santa Clarita, CA, 2015-2016 • Golden Valley Road Bridge Widening, Santa Clarita, CA, 2016 Professional Presentations: • Using Technology for Inclusive Greenway Planning California Trails & Greenways Conference, 2015 Public Outreach • Orchard Village Medians Conceptual Design: Presented concepts at community workshop with participation from City staff and community members. • North Davis Riparian Greenbelt Urban Greening Project: Directed community workshops & presentations to City, Orchard Village Road Median Turf Removal, City Project B1015 City of Santa Clarita QUALIFICATIONS OF FIRM & ASSIGNED STAFF SECTION 2 CHRIS ROBERTS Principal in Charge, Landscape Architect EDUCATION Master of Landscape Architecture & Environmental Planning, Utah State University, 1983 Teaching Credential, California Lutheran University, Thousand Oaks, CA, 1971 BA Business, San Diego State University, CA, 1969 RELEVANT Planning, Reports & Design Guidelines QUALIFICATIONS • Ventura harbor Landscape Improvement Plan (2010-2011) • City of Oxnard Central Business Redevelopment Master Plan • City of Santa Clarita CIP five year Median Improvements Report, annually updated • City of Santa Clarita LMD Median Design Guidelines, water use and construction standards Transportation Corridor Landscape Architecture • Isla Vista ROW Outdoor Standards (2008) • Embarcadero Loop & EI Embarcadero Opportunities & Constraints Analysis and Concept Plan (2010) • Lyons 1-5 Freeway Ramp landscape installation (2012) • Santa Paula Trail & Mill Plaza, Santa Paula (2003-2011) • Old Town Newhall, Main Street Redevelopment Design Registration • CA Landscape Architect Lic #2461 Public Outreach • Santa Barbara County BAR,2002-2008, Chair 2008 • Ventura Vision: 1999-2001 Community Workshops, chaired City Planning & Design Goals & Objectives Action Team • Lillie Ave, Summerland Community outreach workshops, 2005 Publications: Planting and Irrigation Hillslopes for Stability along the Southern California Coast and Coastal Valleys, 1981 Landscape Architecture Magazine - Two articles on planting and irrigation hillsides. BROOKE Project Landscape Architect, LEED CERTIFIED McDONNELL Bachelor of Landscape Architecture, California Polytechnic State University, EDUCATION San Luis Obispo, CA 2004 Reaistration & Certifications • Landscape Architect, State of California #5668 RELEVANT • LEED Accredited Professional QUALIFICATIONS Proiect Experience • Soledad Canyon Road Medians Refurbishment, 2014-2015 • Wrote original CIP plan for Santa Clarita, provided annual update • Iron Horse Trailhead in Santa Clarita, Newhall Land • Las Piedras Community Park, City of Santa Paula • Promontory Point Park, City of Ventura • Newhall Roundabout, City of Santa Clarita Orchard Village Road Median Turf Removal, City Project 81015 City of Santa Clarita WORK STATEMENT SECTION 3 TASK 1 PRELIMINARY INVESTIGATION SUB -TASK 1.1 SITE INVESTIGATION After reviewing City provided GIS mapping and background data, Pacific Coast Land Design and Kimley-Horn will walk the site with the City Project Manager and/or a representative from the City's Traffic Division. The team will note existing conditions at this time. Particular attention will be paid to the SCE facilities and the required access points. Existing trees will be eval- uated to recommend whether they should be removed or protected in place. Irrigation facilities will be catalogued to assist with the production of a comprehensive Irrigation Crossing Plan to be developed following com- pletion of the field survey and digital base map by ECG Civil. PCLD and Kimley-Horn will also identify damaged median & curb concrete with the City Project Manager. Pictures will be taken and filed. We will identify the items to be catalogued through field surveying (e.g. utilities, existing irrigation facilities, traffic signs, trees, as well as any other conditions that may require team coordination and/or other agencies.) OUTPUT 1. Map of existing conditions for development of design base map. 2. Determine limits of field survey and features to be catalogued. SUB -TASK 1.2 EXISTING UTILITY RESEARCH AND MAPPING Use Kimley tasks - Along with the initial site investigation and the supple- mental survey, Kimley-Horn will contact dry and wet utility companies and agencies to obtain record drawing information to document existing utili- ties within the work area. Record utility maps will be compiled onto an ex- isting utility base map used for design. Dig Alert will be contacted to obtain a list of providers and utility owners for the project area. A letter and map will be sent to each entity on the list with a request for maps or a clear- ance statement. Kimley-Horn will compute alignments of subsurface utilities and provide potholing recommendations on the plans to avoid conflict with proposed improvements. Subsurface alignments will be oriented and adjusted to the digital base map using the surveyed locations of surface features where possible. OUTPUT 1. Existing Utility Base Map. SUB -TASK 1.3 FIELD SURVEY ECG Civil will perform a field survey within the limits of the existing medians. The field survey will locate all existing utilities such as SCE facilities and ac- cess ways, manholes, valves, vaults, paint marks, poles, boxes, meters, sign- age, and other visible utility features. The extents of damaged curb and gutter to be repaired will also be surveyed for accurate delineation on the project plans. Existing tree trunk locations with elevation data will also be surveyed. Orchard Village Road Median Turf Removal, City Project B1015 City of Santa Clarita WORK STATEMENT SECTION 3 For trees within 8' of the adjacent curb, curb elevations will also be gathered to facilitate new hardscape detailing and tree protections within the protected root zone. The engineer will download and compute field survey data. Surveyed features will be added to the City GIS aerial based digital base map on identifiable layers. (Optional - Survey to be provided as additional service at the direction of City project manager if medians are to be modified in addition to what is defined on the approved conceptual plans. Horizontal and vertical data will be recorded to assist with the production of street improvement plans in those areas. At this time if is understood no median modifications are planned) OUTPUT AutoCAD drawing file of the surveyed features. Surveyor's notes, legend, and a control point listing with descriptions and coordinates will be added to the project design cover sheet. SUB -TASK 1.4 DIGITAL PROJECT BASE MAP Following completion of the Site Investigation, Field Survey, and Utility Research & Maopina, the team will produce a digital project base map from a combination of sources including the City provided median plans, Georeferenced City GIS aerial, acquired utility information and the gathered field survey data. OUTPUT 1. Digital project base map in AutoCAD format at 1" = 20' resulting in (9) 24" x 36" 'D' size sheets to be used for design purposes. SUB -TASK 1.5 EXISTING IRRIGATION FACILITIES PLAN/IRRIGATION STREET CROSSING PLAN With base map in hand, PCLD will inventory the existing irrigation facilities to assess the viability of reusing existing POC equipment, sleeves, mainline and controller wire. PCLD anticipates visiting the site with the LMD maintenance contractor to observe the operation of the existing Point of Connection (P.O.C.) equipment including water meter, backflow with associated valves and the automatic controllers. The equipment will be reviewed to determine if it meets the specifications of the current LIVID standards. Areas currently being irrigated will be noted to determine if the P.O.C. equipment and in-place pipe, wire and sleeving can accommodate the increase in the number of stations that will be required based on the use of bubbler and localized irrigation. Irrigation equipment to be removed or abandoned will be noted. Based on the analysis of the existing systems, recommendations will be made for irrigation street crossings, new sleeve locations, or modification to the existing points of connection should it be required. Orchard Village Road Median Turf Removal, City Project B1015 City of Santa Clarita WORK STATEMENT SECTION 3 This exhibit will be provided as part of the construction plan set in Task 3 Design and serve as the basis for the development of the irrigation plans for construction. OUTPUT 1. Exiting Irrigation Facilities Plan Exhibit - (2) 24x36 plan sheets at 1" = 40'. SUB -TASK 1.6 SOIL CORING AND TESTING WITHIN MEDIANS Wallace Labs will perform exploration within the existing medians at 12 lo- cations determined by the City PM and PCLD during the initial Site Investi- aa tion. Prior to starting exploration, test locations will be marked, and Un- derground Service Alert will be notified with at least 48 hours notice before excavation will start. In addition, traffic control if needed will be coordinat- ed with the Surveyor. The team anticipates that one 3.5 -inch diameter hand auger boring will be advanced within the existing planter areas without the need to core through concrete. All borings will be advanced to depths of approximately 5 feet, and logged by the soil scientist. Core samples of the soils that are encountered will be obtained from each boring at depths of 24 and 60 inches below existing grade.. Borings will be backfilled with cuttings gener- ated during the excavation process. Samples will be returned to Wallace Labs offices for testing. Testing will in- clude approximately 24 (i.e. 2 per boring) measurements of in-situ density and moisture content (to help determine whether soils are native or previ- ously compacted fill materials), and approximately 12 (i.e. one per boring) short hydrometer tests (to determine clay contents for correlation with per- meability characteristics). 12 samples will be processed for nutrient analy- sis agronomic testing. The scope of the median planter area coring is based on the City request- ed data to be gathered on the soil subgrade. It is anticipated that this scope item will be reviewed with the City PM at the Project Kick-off meet- ing and assessed during the initial site visit to determine if the number of testing locations can be reduced. OUTPUT 1. Soils Report containing test results for all core samples with permeability interpretations, and recommendations to facilitate adequate permea- bility within the planted section. 2. Agronomic soils report with recommended actions to amend the soils for planting and irrigation. Orchard Village Road Median Turf Removal, City Project B1015 City of Santa Clarita WORK STATEMENT SECTION 3 TASK 2 PROJECT MANAGEMENT SUB -TASK 2.1 KICK OFF MEETING WITH WRITTEN SUMMARY Review and possibly adjust proposal scope of work and schedule. Discuss communication & documentation format between City, consultants, utility companies and reviewing agencies. The list of Project Development Team (PDT) members will be established including the City PM and necessary City Staff, PCLD, ECG Civil, Kimley-Horn, and affected utility companies and Reviewing Agencies deemed appropriate by the City. City to transfer site information to Consultant. Consultant/Staff meeting schedules and date of 60% submittal will also be discussed. Team will discuss project overview including known site issues and needed information. OUTPUT 1. Kick-off Meeting Agenda 2. Meeting Minutes including any revised scope or schedule changes. 3. PDT contact list. SUB -TASK 2.2 DETAILED PROJECT SCHEDULE Produce project schedule. Define submittal dates and periods for City review, update schedule as needed through the course of the project. OUTPUT 1. Up to date project schedule for review at City review meetings. SUB -TASK 2.3 CONDUCT MONTHLY PROJECT DEVELOPMENT TEAM (PDT) MEETINGS Pacific Coast Land Design will conduct monthly meetings to review the progress of the project, discuss resolution of any issues such as utility coordination that may affect the scheduled completion of the project. The meetings will include affected utility agencies as appropriate at the direction of the City PM. PDT meetings shall be scheduled at every City review period to discuss City comments. (6) total meetings anticipated. OUTPUT 1. Meeting Agendas 2. Meeting minutes 3. Schedule Updates with revised submittal dates SUB -TASK 2.4 PREPARE MONTHLY PROGRESS REPORTS Project progress reports shall be prepared and submitted to the City on a monthly basis to monitor scope, anticipated work and tasks for the upcoming month, indicate accomplished tasks, schedule and budget. Format shall be approved by the City. OUTPUT 1) Summary report of project progress. Orchard Village Road Median Turf Removal, City Project B1015 City of Santa Clarita WORK STATEMENT SECTION 3 SUB -TASK 2.5 QUALITY ASSURANCE/QUALITY CONTROL PLAN Quality Assurance and Quality Control are two critical steps applied to all Pacific Coast Land Design projects. PCLD will implement an internal QA/ QC plan through the entire duration of the project. Submittals of both plans and specifications will be compiled prior to scheduled delivery dates to the City and internally reviewed and checked by the Managing Princi- pal. Review comments are distributed to the project team for correction prior to final submittal to the City for review. OUTPUT 1) Quality Control Plan and Check list. SUB -TASK 2.6 FIELD WALK WITH CITY PM TO REVIEW 90% PLANS & SPECIFICATIONS Pacific Coast Land Design will visit the site with the City PM to identify po- tential issues during construction and note any remaining design comple- tion tasks prior to submittal of the 100% Plans and Specifications. OUTPUT 1. Meeting notes with action items for completion of the 100% plans. TASK 3 DESIGN SUB -TASK 3.1 PRELIMINARY DESIGN PLANS (60% CONSTRUCTION DOCUMENT SUBMITTAL) Prepared with the digital mapping and the studies conducted during Site Investigation, PCLD and its consultants shall develop preliminary design plans defining the proposed refurbishment of the planted medians. Due to the fact that the conceptual plan has been completed as part of a separate project, this submittal will provide the City with the opportunity to review the proposed design prior to production of full construction doc- uments and technical specifications. This set of plans will include a draft copy of all plan sheets. Draft technical specification sections will be in- cluded with headings tied to an itemized Bid Schedule with costs. The intent is to give the City the opportunity to review proposed solutions for making use of the existing irrigation facilities, the planting concept showing the existing trees and the proposed layout of the new trees and shrubs as well as the limits of demolition and proposed concept for subsur- face drainage to facilitate permeability in the planted section. Plans will include street improvement plan details for median curb and gutter re- pairs, separate construction phasing/project limit, traffic control, and de- tour plans, and preliminary landscape plans and associated irrigation cal- culations. Orchard Village Road Median Turf Removal, City Project B1015 City of Santa Clarita WORK STATEMENT SECTION 3 OUTPUT The following products will be produced for the 60% Submittal: 1. Project Cover sheet - (1 sheet) Includes sheet index, consultant & utility design contact info & General notes. 2. Construction Staging/Traffic Control Plans - (4 sheets, 1" = 40') 3. Street Improvement Plan Details for median curb and gutter repair (2 sheets, scale varies) 4. Street Improvement Plans for Median Modifications (Optional- As directed by City PM) 5. Demolition, Removals & Protection Plans (9 sheets, 1"= 201 6. Preliminary Hardscape Layout & Planting Plans (9 sheets, 1" = 20') 7. Hardscape, Subsurface Drainage & Planting Details (3 sheets) 8. Preliminary Irrigation Plans (9 sheets, 1" = 20') 9. Update Existing Irrigation Sleeving Plan (2 Sheets, 1" = 40') 10. Irrigation Details & AB 1881 Water Use Calculations (3 sheets) 11. Stormwater Pollution Prevention Plan and erosion control (3 sheets) 12. Bid Schedule to match City format—will include itemized costs and function as the detailed overall project cost for base bid to assist with design analysis and construction budgeting. 13. Technical specifications in draft form Following review of the 60% Plans and Specifications, the Design Team will meet with the City Project manager to review the City comments and corrections before moving to production of the 90% Construction Documents. SUB -TASK 3.2 All City review comments will be processed by PCLD and distributed to the design team and all affected agencies. CONSTRUCTION DOCUMENTS (90% SUBMITTAL) Following the review of the 60% plans, the design team will move to produce the 90% plans and specifications. The ultimate goal of this submittal is to produce a final plan set for review by all required City departments. The team will make corrections and revisions to the plans per the City 60% comments and will result in nearly complete versions of the OUTPUT listed products below. Kimley-Horn will provide sight trianales for all uncontrolled left turn pockets. This plan set will be used to review the design solutions on-site with the City PM. The following products will be produced for the 90% Submittal: 1. Project Cover sheet - (1 sheet) Includes sheet index, consultant & utility contact info & General notes. 2. Construction Staging/Traffic Control Plans - (4 sheets, 1" = 40') 3. Street Improvement Plan Details for median curb and gutter repair (2 sheets, scale varies) 4. Street Improvement Plans for Median Modifications (Optional- As directed by City PM) 5. Demolition, Removals & Protection Plans (9 sheets, 1"= 201 6. Hardscape Layout & Planting Plans (9 sheets, V = 20') 7. Hardscape, Subsurface Drainage & Planting Details (3 sheets) 8. Irrigation Plans (9 sheets, 1" = 20') Orchard Village Road Median Turf Removal, City Project B1015 City of Santa Clarita WORK STATEMENT SECTION 3 9. Update Existing Irrigation Sleeving Plan (2 Sheets, 1" = 40') 10. Irrigation Details & AB 1881 Water Use Calculations (3 sheets) 11. Stormwater Pollution Prevention Plan and erosion control (3 sheets) 12. Bid Schedule to match City format—will include itemized costs and function as the detailed overall project cost for base bid to assist with design analysis and construction budgeting. 13. Technical specifications in draft form SUB -TASK 3.3 Following review of the 90% Plans and Specifications, the Design Team will meet with the City Project manager to review the City comments and cor- rections before moving to production of the 100% plans. All City review comments will be processed by PCLD and distributed to the design team. CONSTRUCTION DOCUMENTS (10076 SUBMITTAL) Following the review of the 90% plans, the design team will move to pro- duce the 100% plans and specifications. These documents will be com- pleted and submitted to the City for final review of the project by affected City departments and will undergo a constructability review by City Construction Inspector Staff OUTPUT 1. 100% completed Plans, specifications and estimates for final City re- view and comment. SUB -TASK 3.4 ISSUE PLANS AND SPECIFICATIONS FOR BID PCLD understands that final, minor comments will be issued following City review of the 100% plans and specifications. These corrections will be made to the project documents and the bid set will be published on Mylar with stamp and signature. OUTPUT 1. Completed project plans, printed on Mylar with stamp and signature. 2. Completed project specifications with itemized bid schedule including project quantities. 3. Project quantity breakdown with back-up for City records during con- struction. Orchard Village Road Median Turf Removal, City Project B1015 City of Santa Clarita I 0 Y T W. Task Descirlpfion oo©o©0000mmmmmmmmmmmmmmm � ..-.. �mmmm�mm�mmmmmmmmmmmmmmm © 11mmorr K IOU It ®�... �mmmmmmm�mmmmmmmmmmmmmm� m ��������������©���■������ 9 CONSTRUCTION MANAGEMENT SUPPORT I Task 4 wa Hems to he completed in line with ConMcflon Schedule. e ftojmf MYem TOTAL COST SECTION 5 TASK 1: PRELIMINARY INVESTIGATION 1 Principal 1 Proi Mgr 1 Designer 1 Admin i Fee SUB -TASK TASK DESCRIPTION 1$ 1501 130 $ 901 75 1.1 Site Invesfi alion LLI Initial Yield visit w/Civil Engineer & City PM: include follow-up documentation and meeting notes 6 6 $ 1,320 1.L2 Civil Engineer initial field visit Tetra Tech: Civil LUMPSUM $ 1,153 Sub -Task 1.1: Site Invesfi afion $ 2,473 1.2 Esisfing Utility Research & Mapping Tetra Tech: Civil (LUMP SUM) $ 4,597 SUB -TASK 1.2: Utility Research & Mal 4,597 1.3 Field Survey Tetra Tech: Survey (LUMP SUM) $ 4,101 SUB -TASK 1.3: Field SuTveYI $ 4,101 1.4 Di ilal Pro'ect Base Ma 1.4.2 Civil Engineer- link City georeferenced aerial to field survey & utility info, Trace City provided georeferenced aerial photo for median Tetra Tech: Civil (LUMP SUM) $ 3,699 1.4.1 JAdd landscape site data and develop landscape base sheet 1 2 1 $ 980 SUB -TASK 1.4: Di ital Protect Base Ma $ 4,679 1.5 1 Existing Iai afion Facilfiies Plan 2 - 2436 sheets 2 1 8 1 24 $ 3,500 Sub -Task 1.5: Existing Irrigation Sheet Crossing Plani $ 3,500 1.6Siam ed Concrete/As hall & Soil Corin 1.6.1 Corin &Field Exploration Activities 12 Locations total R.T. Frankton: Geofech (LUMP SUM) $ 6,720 1.6.2 A ronomic Soils Testing 24 moisture density tests, 12 permeabilit R.T. Frankian: Geofech LUMP SUM $ 5,250 1.6.3 1 Geotechnical Report with recommendations I R.T. Frankian: Geotech (LUMP SUM) 1 $ 1,75 - SUB -TASK 1.6: Stamped Concrete & Soil Corin $ 13365 1.7a Pavement coring in 2locations, excavation in planter areas (2 per median) & evaluation of existing sleeves - 2 days of labor, jack hammer and demo, Extra day of labor and potholing at curb noses for additional sleeving in street isoptional C.F.Engineering: Coring, Sleeve excavation $ 4,183 1.7b Pavement Potholing at Median noses - Extra day of labor and potholing at curb noses for additional sleeving in street is optional if necessary C.F,En ineerin : Coring, Sleeve excavation $ 1,208 SUB -TASK 1.7: Potholing $ 5,391 TASK 1: Total PCLD Hours 1 2 1 14 1 30 1 0 144 SUBTOTALTASK1 PRELIMINARY INVESTIGATION 38,706 TASK 2: PROJECT MANAGEMENT Princi al Pro' M r Designer Admin Fee SUB -TASK TASK DESCRIPTION $ 150 $ 130 $ 90 1 75 2.1 1 Kick-off Meeting with Written Summary 2.1.1 Develop meeting agenda, attendance at meeting, meeting notes, PDT contact list 6 4 2 $ 1,290 2.12 1 Civil Engineer - attendance at proiecf Kick-off meeting Tetra Tech: Civil (LUMP SUM) 1 $ 769 Sub -Task 3.1: Kick-off Meeting wilh Wrkien Summaryl $ 2,059 2.2 1 Detailed Protect Schedule 1 1 4 $ 670 Sub -Task 3.2: Detailed Protect Schedulel $ 670 2.3 Conduct Monthly Project Development Team Meetings 2.3.1 Develop meeting agenda, attendance at meeting, meeting notes, contact re uired agencies/utilities 6 meetings total 28 6 $ 4,180 2.3.2 Civil Engineer- attendance at PDT and plan review mtg (4 total) Tetra Tech: Civil (LUMPSUM) $ 3,073 Sub -Task 3.3: Monthly Protect Develo menl Team Meetings $ 7,253 2.4 lPrepare Monthly Pro ress Report 1 8 1 $ 1,040 Sub -Task 3.4: Pre are Mo MY FrogrOUReporil $ 1,040 2.5 lQualfil Assurance/Quality Control Plan 8 1 2 1 1 1 $ 1,460 Sub -Task 3.5: Quality Assurance Qualify Control Plan 1 $ 1,460 Orchard Village Road Median Turf Removal, City Project B1015 City of Santa Clarita TOTAL COST SECTION 5 2.6 Affend Public Meefina at Direction of Ci No Charge) $ Sub -Task 3.6: Attend Public Me ling at Direction of Cityl $ 2.7 Field Walk with City PM to Review 9076 Plans & Specifications 2.7.1 Field Walk with follow-up documentation 6 4$ 1.140 2.7.2 Civil Engineer - Field Walk Tetra Tech: Civil (LUMP SUM) $ 769 Sub -Task 3.7: Field Walk with City PM to Review 907a Plans & Specifications 1 1,909 TASK 3: Total PCLD Hours 9 54 14 12 70 SUBTOTAL TASK 3: PROJECT MANAGEMENT $ 14,391 TASK 3: DESIGN Principal Proj Mgr 1 Designer 1 Admin 1 Fee SUB -TASK TASK DESCRIPTION S 150 1 $ 130 1 $ 90 1$ 75 3.1 PRELIMINARY DESIGN PLANS (60% SUBMITTAL) 3.1.1 Project Cover sheet including sheet index, consultant & utility contact info and General notes 1 3 $ 400 3.1.2a Traffic Control Plan F4sheets, l"=40' Tetra Tech: Civil LUMP SUM $ 5,416 3.1.2b Calhans Encroachment Permit Coordination Tetra Tech: Civil (LUMP SUM) $ 965 3.1.3 Street Improvement Plans - Median Modifications in 4locations 2 sheets, l"=20' Tetra Tech: Civil (LUMP SUM) $ 4,158 3.1.4 Demolition. Removals & Protection Plans 7 sheets, F = 20' 2 4 1 24 1 $ 2,980 3.1.5 Hardsca a Layout & Planting Plans 7 sheets, 1" = 20' 1 1 4 1 38 1 $ 4,090 3.1.6a Hardsca e, Subsurface Drainage & Planting Details F3 sheets 2 1 6 1 $ 800 3.1.6b Civil - development of subsurface drains - e details Tetra Tech: Civil (LUMP SUM) $ 1750 3.1.70 Irrigation Plans (7 sheets, l"=20' 1 2 32 1 $ 300 3.1.7b Ini ation Plans - Update Existing Irrigation Facilities Plan 3 1 $ 270 3.1.8 Irrigation Details & AB 1881 Water Use Calculations (3 sheets) 2 8 1 $ 980 3.1.9 Stormwater Pollution Prevention Plan & erosion control (3 sheets) Tetra Tech: Civil (LUMP SUM) $ 5,320 3.1.10 Costed Bid Schedule to match City forma} Prelim. Cost Estimate) 1 4 4 $ 1,030 3.1.I1a Draft Technicalspecifications 1 6 $ 930 3.1.11 to Civil - Technicalspecifications sections. Tetra Tech: Civil (LUMP SUM) $ 1,300 Meet with City to review City comments on 60% plans Included above in TASK 3- PROJECT MANAGEMENT $ - Sub -Task 3.1: PRELIMINARY DESIGN PLANS 60%Submiffal $ 33,379 3.2 CONSTRUCTION DOCUMENTS (707. SUBMITTAL) 3.2.1 Project Cover sheet including sheet index, consultant & utility contact info and General notes 1 2 $ 180 3.2.2a Final Traffic Control Plan 14sheets, l"=40' Tetra Tech: Civil (LUMP SUM) $ 2,500 3.2.2b Caltrans Encroachment Permit Coordination Tetra Tech: Civil (LUMP SUM) $ 613 3.1.3 Final Street Improvement Plans - Median Modifications in 4locations (2 sheets, Y=20') Tetra Tech: Civil (LUMP SUM) $ 1,450 3.2.4 Final Demolition, Removals & Protection Plans 7 sheets, 1" = 20' 1 4 18 $ 2,290 3.2.5 Final Horoscope Layout & Planting Plans (7 sheets, I' = 20') 1 6 32 $ 3,810 3.2.6a Final Hardscape, Subsurface Drainage & Planting Details (3 sheets) 3 3 $ 660 3.2.6b Civil - development of subsurface drainage details Tetra Tech: Civil (LUMP SUM) $ 813 3.2.7a Final Irrigation Plans (7 sheets, 1"= 20') 1 6 1 42 $ 4,710 3.2.7b Irri aticn Plans - Existing Irrigation Facilities Plan 1 I 1 $ 220 3.2.8 Final lin ation Details & AB 1881 Water Use Calculations 3 sheets 1 1 6 1 $ 670 3.2.9 Stormwater Pollution Prevention Plan & erosion control )3 sheets) Tetra Tech: Civil (LUMP SUM) $ 1,395 3.2.10 Costed Bid Schedule to match City format (Updated Cost Est. 1 2 4 $ 770 3.2.11a Final Technicalspecifications w/ measurement & payment i 1 12 $ 1,560 3.2.11 b Civil - Final Technicalspecifications sections Tetra Tech: Civil (LUMP SUM) $ 650 Meetwith City to review City comments on 90% plans. Walk site with la ns Included above in TASK 3 - PROJECT MANAGEM 1 1 $ Sub -Task 3.2: CONSTRUCTION DOCUMENTS 90%SubmiHal $ 22,291 Orchard Village Road Median Turf Removal, City Project B1015 City of Santa Clarita TOTAL COST SECTION 5 3.3 CONSTRUCTION DOCUMENTS 100%SUBMITTAL 3.3.1 100% Project Cover sheet including sheet index, consultant & utility 1 $ 90 3.3.2a 100% Traffic Control Plan 14 sheets, 1"= 40' Tetra Tech: Civil (LUMP SUM) $ 1.,221 3.3.2b Caltrans Encroachment Permit Coordination Tetra Tech: Civil (LUMP SUM) $ 384 3.3.3 100% Street Improvement Plans - Median Modifications in 4locations (2 sheets, l"=20') Tetra Tech: Civil LUMP SUM $ 821 3.3.4 100% Demolition, Removals & Protection Plans 7 sheets, 1"= 20 1 4 is $ 2,290 3.3.5 100% Horoscope Loyout & Planting Plans f7 sheets, 1"= 20' 1 2 16 $ 1,850 3.3.6 100% Horoscope, Subsurface Drainage & Planting Details (3 sheets) 3 3 $ 660 3.3.7a 100% Irrigation Plans p sheets, 1"= 201 1 4 48 $ 4,990 3.2.7b Il Plans - Existing Irri ation Facil ies Plan $ 3.3.8 100%Irrigalion Details & AB 1881 Water Use Calculations (3 sheets) 4 $ 360 3.3.9 Stormwater Pollution Prevention Plan & erosion control (3 sheets) Tetra Tech: Civil (LUMP SUM) $ 460 3.3.10 Costed Bid Schedule to match City format Final Cost Estimate 2 4 $ 620 3.3.IIa 100%Technical Spec ificationsw measurement& payment 4 1 2 $ 670 3.3.11 to Civil - 100% Technical specifications sections I Tetra Tech: Civil (LUMP SUM) $ 192 Meet with City to review City comments on 100% plans. Included above in TASK 3 - PROJECT MANAGEMENT $ Sub -Task 3.3: CONSTRUCTION DOCUMENTS (100% Submittal) $ 14,609 3.4 ISSUE PLANS 8 SPECIFICATIONS FOR BID 3.4. 1 a Final revisions to plans and specifications per City review of the 100% submittal. Print & sign m lar Bid Set 4 6 $ 1,060 3.4.16 I Civil - revisions per 100% review, issue signed M lar bid old ns Tetra Tech: Civil (LUMP SUM) $ 821 3.4.2 Bid assistance to City at request of PM 4 6 $ 1.060 Sub -Task 3.3: CONSTRUCTION DOCUMENTS IF00%Submittal) $ 2,941 TASK 3: Total PCLD Hours 8 67 230 2 299 SUBTOTALDESIGN $ 73,220 TASK 4: CONSTRUCTION MANAGEMENT SUPPORT ADD -ALTERNATE Principal Pral Mgr Designer Admin Fee TASK TASK DESCRIPTION $ 150 $ 130 $ 90 $ 75 5.1 Attend Pre -construction Meeting includes documentation 5 $ 650 5.2 Attend weekly Project Construction Meetings 95 $ 12,350 5.3 Review and Respond to Contractor RFI•a and Change Order Requests 40 $ 5,200 5.4 Review and respond to Contractor Submittals 40 $ 5,200 5.5 Review design change request and prepare new design plans as needed 40 $ 5,200 5.6 Maintain a log of all changes to approved plan set 10 $ 1,300 5.7 Assist City PM in reviewing and making recommendations to Contract Chan a Order 10 $ 1,300 5.8 Perform Final Job Walk with punchlist and documentation 10 $ 1,300 5.9 Prepare As -built Record Drawings 8$ 1,040 TASK S. Total PCLD Hours I 0 0 1258 SUBTOTAL TASK 4 CONSTRUCTION MANAGEMENT SUPPORT (ADD -ALTERNATE) $ 33,540 REIMBURSABLE EXPENSES Draft Plan Sets 1 per submittal - 34 plan sheets x $6.00/sheet x 4 City reviews (3 formal, 1 informal) 1 $ 1,020 Final signed Mylars for completed bid set - 34 plan sheets x $21.00/sheet 1 $ 714 Total Relinnibursables $ 1,734 TOTAL PROJECT FEES (NOT INCLUDING ADD -ALTERNATE) $ 128,051 TOTAL PROJECT FEES (INCLUDING•DD TOTAL FEES - NOT INCLUDING ADD ALTERNATE (PACIFIC COAST LAND DESIGN) $ 60,604 TOTAL SUB -CONSULTANT FEES (TETRA TECH - CIVIL/SURVEY) $ 48,091 TOTAL SUB -CONSULTANT FEES (R.T. FRANKIAN - GEOTECH) $ 13,965 TOTAL SUB -CONSULTANT FEES (C.F. ENGINEERING -FIELD POTHOLING) $ 5,391 ' Sub -Consultant fees include 5% administration charge for processing Reimbursable Expenses: Reproduction of all documents and postage and shipping charges requested by the City in addition to those listed above shall be paid shall be paid for at cost plus 15% for handling. Orchard Village Road Median Turf Removal, City Project B1015 City of Santa Clarita QUALIFICATIONS (SUB -CONSULTANTS) SECTION b KIMLEY-HORN (CIVIL, TRAFFIC & SURVEY) COMPANY At Kimley-Horn we provide our clients with the local knowledge and BACKGROUND & responsiveness of a small organization, backed by the depth of resources only QUALIFICATIONS a national firm can offer. Throughout our history, Kimley-Horn has built a reputation for providing innovative, high-quality consulting services. Today we are one of the largest engineering, planning, and environmental consulting firms in the U.S. According to Engineering News -Record, our firm now ranks 28th overall among the nation's top 500 design firms. Our proposed team possesses a wealth of technical and design expertise and is made up of highly qualified civil engineers who have broad experience in the disciplines relevant to the City of Santa Clarita's specific needs. These include, but are not limited to, the following: • Civil engineering/roadway design • Complete streets • Drainage • Traffic signal phasing and timing • Electrical engineering • Intelligent Transportation Systems (ITS) • Multimodal analysis • Utility design and coordination • Surveying and right-of-way engineering • Construction staging/traffic control • Landscape Architecture • Environmental permitting & CEQA RELEVANT WILEY CANYON ROAD AT ORCHARD VILLAGE ROAD & NEWHALL AVENUE AT EXPERIENCE RAILROAD AVENUE INTERSECTION IMPROVEMENT PROJECT, Santa Clarita, CA Kimley-Horn prepared construction documents including street improvements, median improvements, signal modification, and signing and striping plans for these two intersections in the City of Santa Clarita. We assisted the City in extending the existing turn -pocket length and installing a protected left phase at Wiley Canyon Road and Orchard Village Road. Kimley-Horn also assisted in design of a bulb -out and new medians at Newhall Avenue and Railroad Avenue to provide more refuge to pedestrians at the very busy intersection. NEWHALL AVENUE ROUNDABOUT AT MAIN STREET, Santa Clarita, CA Mr. Adam Chase served as the Project Manager for this $2.2M roundabout design project which created a main gateway to the historic Newhall commercial district and optimized traffic calming and pedestrian safety measures at the busy intersection. In 2005, the Santa Clarita City Council adopted the Downtown Newhall Specific Plan (DNSP), which outlined a future vision for the Old Town Newhall and created a plan to revitalize the area. The DNSP's primary objective for improving traffic flow through Newhall Avenue, 5th Street, and Main Street was achieved by removing the existing traffic signal components and constructing a single lane modem roundabout, which produced smoother traffic flow, less delays, and a friendly environment to promote pedestrian activity to the William S. Hart Park and DNSP businesses. Orchard village Road Median Turf Removal, City Project B1015 City of Santa Clarita QUALIFICATIONS (SUB -CONSULTANTS) SECTION b KIMLEY-HORN PROJECT STAFF Adam Chase, P.E., T.E. REGISTRATIONS & Professional Civil Engineer in California #74043 CERTIFICATIONS Professional Traffic Engineer in California #2594 American Public Works Association (APWA), Member American Society of Civil Engineers (ASCE), Member Institute of Transportation Engineers (ITE), Member EDUCATION Bachelor of Science, Civil and Environmental Engineering, University of Massachusetts QUALIFICATIONS Adam's experience includes more than 17 years of developing diverse client relationships (both private and public), project management, mentoring of staff, intricate problem solving, and technical experience within the field of traffic and transportation engineering. He is an award -winning project manager with broad experience in transportation infrastructure related to the planning, permitting, design, and construction of roadway projects. Adam has direct experience with several state and local agency owners and has worked in over 20 cities. Every one of his projects includes at least one element of the multimodal complete street design including planning, funding, design, approval, and implementation processes for new construction, reconstruction, and retrofits. He has advanced knowledge from regional agencies and national organizations such as the National Association of City Transportation Officials (NACTO) Urban Street and Urban Bikeway Design guides. RELEVANT • Orchard Village Road at Wiley Canyon Road, City of Santa Clarita, EXPERIENCE CA -Quality Control/Quality Assurance Engineer • Orchard Village Road Median Modification Conceptual Study, City of Santa Clarita, CA - Project Manager • Newhall Avenue Highway Safety Improvement Program, City of Santa Clarita, CA - Project Manager • Newhall Avenue Roundabout at Main Street, City of Santa Clarita, CA - Project Manager/Engineer • Median Modification Program, City of Santa Clarita, CA- Project Manager • Colorado Esplanade, Complete Streets Constructability Review, City of Santa Monica, CA -Quality Control/Qualify Assurance Engineer • Ekv4I Street and Fowler Road Extensions and Roundabouts, City of Goleta, CA- Senior Project Engineer • Donlon Road at State Route 118, Roadway Improvements, County of Ventura, CA - Quality Control/Quality Assurance Engineer • Street at Hueneme Road, Feasibility Study, County of Ventura, CA - Senior Project Engineer • Union Valley Parkway Extension, City of Santa Maria, CA -Senior Project Engineer • Ash Avenue Streetscape Improvements, City of Carpinteria, CA - Project Manager • Mission Street Undercrossing, City of Santa Barbara, CA - Project Engineer Orchard Village Road Median Turf Removal, City Project 31015 City of Santa Clarita QUALIFICATIONS (SUB -CONSULTANTS) SECTION 6 ECG CIVIL (SURVEY) COMPANY Encompass Consultant Group, Inc. (ECG) is an employee -owned private BACKGROUND & consulting firm specialized in providing quality civil engineering, land QUALIFICATIONS surveying, site planning, SWPPP preparation, and MS4 compliance services. The ECG team is comprised entirely of former Penfield & Smith (now Stantec) employees. The group is made up of highly respected engineers, land surveyors, and designers who, combined, have nearly 100 years of experience providing consulting engineering and surveying services throughout Ventura County, Los Angeles County, and Santa Barbara County. At ECG, we utilize our staff's extensive diverse experience to provide comprehensive civil engineering and land surveying services ranging from due diligence and entitlement engineering to the preparation of construction documents for a wide range of projects. We have the familiarity with local codes and regulations to effectively and efficiently obtain necessary approvals to ensure projects move forward to completion. We provide our clients with professional services that meet their expectations and needs. We encourage sustainable design practices and good stewardship of our built environment. We are committed to continuous improvement of our organization and our employees' skill levels. ECG has developed and maintains a working knowledge of local City, RELEVANT County, and State engineering and environmental regulations and has EXPERIENCE extensive experience with grading, street, sewer and storm drainage design, along with right of way mapping and utility plans. Sal Contreras is a Principal Engineer with nearly 20 years of civil engineering design experience involving project master planning, public improvement projects and private land developments, many in the City of Santa Clarita. A partial list of those projects would include the following: • Soledad Canyon Rd & Reuther Ave Median Modification (Recently authorized) • Construction Cost Escalation Analysis Study • Creekside Road Improvements Project* • Bouquet Canyon Median Modification Project* • Soledad Canyon Median Modification Project* • Railroad Avenue Median Modification Project* • Newhall Avenue Median Modification Project* • Citywide Median Project* *While at Penfield & Smith, now Stantec Orchard village Road Median Turf Removal, City Project 81015 City of Santa Clarita QUALIFICATIONS (SUB -CONSULTANTS) SECTION 6 ECG CIVIL PROJECT STAFF SAL CONTRERAS, Principal Engineer REGISTRATIONS & Professional Engineer No. 66720, California CERTIFICATIONS EDUCATION Bachelor of Science Degree, Civil Engineering, California Polytechnic State University, 1997 KEY Project manager for multiple City of Santa Clarita CIP Projects including QUALIFICATIONS the Newhall Avenue Median Modification Project. Over 19 years of CIP and public works projects experience. With his broad knowledge and expertise in civil engineering, he provides qualify control and design consultation to internal staff for projects of all types. Mr. Contreras is well versed in the management and preparation of feasibility studies, due diligences, master plans, construction plans, specifications, and estimates, and providing construction administration services. He has extensive experience in hydrologic and hydraulic studies, grading and drainage design, and utilities infrastructure design. JAMES FALLON, Principal Surveyor REGISTRATIONS & Professional Land Surveyor No. 7807, California CERTIFICATIONS EDUCATION B.S. Surveying Engineering, California State University Fresno, 1999 PROFESSIONAL • Past Officer, California Land Surveyors Association, State & Channel AFFILIATIONS Islands Chapter • Past President, ACEC, Channel Coast Chapter • Past Committee Member, Channel Islands CLSA Chapter - Joint Professional Practices Committee • Member, International Right of Way Association (IRWA) KEY Lead Project surveyor for multiple median projects for the City of Santa QUALIFICATIONS Clarita including the Citywide Medians Project. Over 18 years of experience with Geodetic Control Surveys and Geographic Information Systems Over 10 years of school and institutional project experience. Work performed includes topographic mapping, monument preservation, public agency map and document review, geodetic control networks, boundary surveys, easement and legal description preparation, subdivision mapping, lot line adjustments, ALTA land title surveys, condominium plans, right of way acquisition surveys, construction staking, and data acquisition for Geographic Information Systems (GIS). His work includes numerous public infrastructure projects, encompassing many miles of corridor surveys for design improvements in Ventura, Los Angeles and Santa Barbara Counties. Orchard village Road Median Turf Removal, City Project 81015 City of Santa Clarita QUALIFICATIONS (SUB -CONSULTANTS) SECTION 6 DESIGNATION OF SUBCONTRACTORS ORCHARD VILLAGE ROAD MEDIAN — Project B1015 City of Santa Clarifa, California Listed below are the names and locations of the places of business of each subcontractor, supplier, and vendor who will perform work or labor or render service in excess of %, of 1 percent of the prime contractor's total bid: DBE status, age of firm, certifying agency and annual gross receipts are required if sub contractor is participating as a DBE. The form MUST be returned with bid, filled in or annotated with "No Subcontractors" if none will be used. Subcontractor Kimley-Horn DBE STATUS: Not DBE Dollar Value of Work $61,821.26 Age of firm: 49 Years Certifying Agency: N/A Annual Gross Receipts: $626,300,000 Location and Place of Business 21820 Burbank Blvd., Suite 230, Woodland Hills, CA 91367 Bid Schedule Item Nos: Description of Work Civil Design and Traffic Engineering License No.Exp. Date: ! I Phone ( )747-900-8400 California P.E. # 66720 Description of Work Subcontractor ECG Civil DBE STATUS: Not DBE Dollar Value of Work $12,107.64 Age of firm: 1 Year Certifying Agency: N/A Annual Gross Receipts: $675,000 Location and Place of Business Description of Work 333 N. Lantana St. Ste. 130, Camarillo, CA 93010 Exp. Date: I ! Bid Scheduie Item Nos: Description of Work Description of Work Soils Testing Survey Exp. Date: I / License No. Exp. Date: f I Phone ( ) 805-322-4443 California P.E. # 74043 Subcontractor CF Engineering DBE STATUS: Not DBE Dollar Value of Work $14,145.40 Age of firm: Certifying Agency: N/A Annual Gross Receipts: $ Location and Place of Business 21907 Placentas Blvd, Newhall, CA 91312 Bid Schedule Item Nos: Description of Work Field Exploration License No. Exp. Date: I ! Phone ( ) 661-702-9408 Subcontractor Wallace Labs DBE STATUS: Not DBE Dollar Value of Work $7,350.90 Age of fume: Certifying Agency: N/A Annual Gross Receipts: $ Location and Place of Business Phone ( ) 365 Coral Cir. EI Segundo, CA 90245 Bid Schedule Item Nos: Description of Work Soils Testing License No. Exp. Date: I / Phone ( ) 310-615-0116 Subcontractor DBE STATUS: Age of firm: Certifying Agency: Dollar Value of Work Annual Gross Receipts: Location and Place of Business Bid Schedule Item Nos: Description of Work License No. Exp. Date: I 1 Phone ( ) Orchard village Road Median Turf Removal, City Project 81015 City of Santa Clarita LABOR COMPLIANCE PROGRAM SECTION 7 STATEMENT OF COMPLIANCE Contained within our proposal, Pacific Coast Land Design, Inc. has demonstrated our under- standing, acclimation and application of pertinent Labor Compliance Program requirements and objectives necessary to ensure effective program compliance. Sub -consultants performing field work will be paid at the State of California prevailing wage rate per the City of Santa Clarita's Labor Compliance Policy. Pacific Coast Land Design, Inc. will submit certified payroll documentation and worker forms as needed. STATEMENT OF OFFER & SIGNATURE SECTION 8 • This proposal is a firm offer for a ninety (90) day period. • The proposed work will be performed at a "not -to -exceed" price of including the Add -Alternate. • The City's Standard Contract is acceptable without changes. A ?/_� January 17, 2017 Mike Zielsdorf,ci al Date STATEMENT & AGREEMENT SECTION 9 As requested in Section "V, Subsection 9" of the RFP, the following form and disclosure state- ment has been completed and attached. o Attachment A: Designation of Sub -consultants Orchard Village Road Median Turf Removal, City Project B1015 City of Santa Clarita