HomeMy WebLinkAbout2017-03-28 - AGENDA REPORTS - NEWHALL PARKING STRUCTURE (2)Agenda Item• 16 CITY OF SANTA CLARITA AGENDA REPORT MR CONSENT CALENDAR a. CITY MANAGER APPROVAL: fAl DATE: March 28, 2017 SUBJECT: OLD TOWN NEWHALL PARKING STRUCTURE, PROJECT F2010 - AWARD PROFESSIONAL SERVICE CONTRACT FOR MATERIAL TESTING AND SPECIAL INSPECTION DEPARTMENT: Public Works PRESENTER: Damon Letz RECOMMENDED ACTION City Council: 1. Award a professional service contract to Twining, Inc., for the Old Town Newhall Parking Structure, Project F2010, to provide material testing and deputy inspection in the amount of $174,820, and authorize a contingency in the amount of $17,500, for a total contract not to exceed $192,320. 2. Authorize the City Manager or designee to execute all documents, subject to City Attorney approval. BACKGROUND The Old Town Newhall Specific Plan (Specific Plan) was adopted by the City Council in 2005 outlining the vision for the future of Old Town Newhall and created a plan to revitalize the area by encouraging development and redevelopment. Since the adoption of the Specific Plan, the City of Santa Clarita (City) and the Redevelopment Agency of the City of Santa Clarita (Redevelopment Agency) have implemented various components specific to Old Town Newhall's infrastructure, including circulation improvements to create a pedestrian -friendly Main Street area, the extension of Railroad Avenue and Newhall Avenue, the five -block Main Street streetscape enhancement, the Old Town Newhall Public Library, and the roundabout. The next planned infrastructure investment is a parking structure at Railroad Avenue and 9th Street. This project is a component of the "Enhancing Economic Development" theme in Santa Clarita 2020, the City of Santa Clarita's five-year strategic plan. Page 1 Packet Pg. 102 On July 12, 2016, the City Council awarded the design -build contract to Swinerton Builders for the Old Town Newhall Parking Structure, Project F2010. The design portion of the Swinerton Builders contract is complete, and the 12 -month construction phase started on March 13, 2017, with a groundbreaking ceremony held on March 6, 2017. As a part of this project, the City will hire a consultant to perform material testing and special inspections. This third -party firm will verify the construction materials meet the design, strength, and installation requirements shown on the approved construction plans. On November 18, 2016, the Request for Proposals (RFP) for the material testing and special inspection for the Old Town Newhall Parking Structure was sent to four qualified companies. The various proposals were received on January 3, 2017. Staff reviewed the proposals and based on their evaluations, scored the firms on a 100 -point scale. The scoring system emphasized the following: recent experience with similar project, qualification of team and resources, understanding of key items, proposed services in relation to project scope, schedule and availability, and references. The proposals from R.T. Frankian & Associates and MTGL, Inc., did not included sufficient tasks or hours to complete the work required by the project. Based on the above criteria, staff rated the testing companies as shown below: Rank Corm) 1. Twining, hic. 2. Ninyo & Moore 3. R. T. Frankian & Associates 4. MTGL, Inc. Score Location Cost 90 Ventura, CA $174,820 84 Los Angeles, CA $221,650 79 Burbank, CA $145,525 79 Anaheim, CA $99,835 Staff recommends awarding the professional service contract to Twining, Inc., to provide material testing and special inspection for the Old Town Newhall Parking Structure based on their experience with projects of similar size and scope, the completeness of their proposal, and having the ability for in-house staff to perform all of the work. Twining, Inc.'s proposal also included a well thought out scope of work and cost estimate to cover all of the testing and inspection for the 12 months of construction. A total budget of $1,208,944 was identified and previously appropriated for design, staff oversight related to construction and project management, public works inspection, building inspection, encroachment permits, Southern California Edison fees, environmental permitting, entitlements, building and engineering plan check, clerical support, and material and soils testing. The cost for this work was anticipated in that budget. ALTERNATIVE ACTION Other action as determined by the City Council. Page 2 Packet Pg. 103 FISCAL IMPACT Adequate funds have previously been appropriated and are available in expenditure account F2010723-5161.001 (Facilities fund) to provide for all cost associated with this recommended contract. ATTACHMENTS Location Map Bid Proposal for Twining, Inc. (available in the City Clerk's Reading File) Page 3 Packet Pg. 104 H1111I od LOCATION MAP N T J a U LU a 06 t7 z t= LU LU J a LU W H a m r' Q N O Z U O J El Packet Pg. 105 QTWINING OFFICE 805.644.5100 January 3, 2017 Proposal No.: 16-2024 Mr. Harry Corder, Senior Engineer City of Santa Clarita 23920 Valencia Boulevard, Suite 140 Santa Clarita, CA 91355 Subject: Materials Testing and Special Inspection Services, Old Town Newhall Parking Structure Dear Mr. Corder Twining, Inc. is pleased to present this revised proposal to provide materials testing and special inspection services for the Old Town Newhall Parking Structure. Twining has extensive experience providing the services outlined in the scope of this project, and the internal resources to efficiently meet and exceed all of your expectations: FAX Twining's team currently consists of over 150 inspectors throughout California, more 805.644.5179 than eighty percent of whom hold multiple inspection certifications in various aspects WEB of construction. We have the resources to staff every project with experienced and twi¢inginc.com professional inspection personnel. These highly skilled men and women have been selected for their diversity of knowledge and for their ability to work with clients to achieve maximum performance at minimum cost. • Twining has been at the forefront of construction materials testing for over a century. Our network of state-of-the-art laboratories allows us to provide fast, reliable test results that our clients can count on. We subscribe to the most stringent inspection and certification requirements in the industry. Twining delivers our services utilizing a proven project management approach, providing clients with a single point of contact for the entire scope of the project. This project management approach supports our efforts to work closely with the entire design and construction team including the client, structural engineer, construction manager, and general contractor. Our clients benefit from quick access to decision makers, as well as from long-lasting business and industry relationships. We would like to thank you for inviting us to present this proposal. Our comprehensive laboratory capabilities, exceptional technical staff, and commitment to quality project management would make us a valuable member of your project team. We are confident that our firm will provide quality service at the best possible cost to you as we demonstrate our high level of service and commitment to a successful project. Should you have any questions related to this proposal, please contact Michael Molina on his mobile via 951.552.0031 or mmolina@twiningconsulting.com. Sincerely, Michael Molina Edward M. Twining, Jr. Client Services Manager Chairman of the Board 1879 Portola Road, Suite G, Ventura, CA 93003 QTWINING Table of Contents 1. Introduction..............................................................................................................................................1 2. Qualifications of the Firm..........................................................................................................................2 3. Work Statement......................................................................................................................................14 4. Cost Proposal.........................................................................................................................................15 5. Sub-Consultants.....................................................................................................................................22 6. Labor Compliance Program....................................................................................................................23 7. Statement of Offer and Signature............................................................................................................24 8. Statements and Agreement....................................................................................................................25 QTWINING 1 SECTION 1 Introduction It is understood that the purpose of the City's RFP is to obtain the services of a well- qualified consultant, to provide materials testing and special inspection for the Old Town Newhall Parking Structure in accordance with the approved plans and specification. The Old Town Newhall Parking Structure is a relatively straight forward project consisting Of one (1) below ground level and six (6) above ground levels. The structure consists of cast in place columns supported elevated post tension concrete with CMU components. The overall construction schedule is approximately ten (10) months from the start of foundations through TCO. Within that ten (10) month schedule, all structural elements should be completed within the first seven (7) or so months. Twining is a full-service engineering and quality control company with unmatched technical expertise, quality assurance/quality control capabilities, laboratory capabilities, and personnel resources. With laboratories throughout California and nearly 200 inspectors, we are unequaled in our core competencies: • Geotechnical engineering • Materials testing and inspection • Specialty testing • Mobile laboratories • Asphalt pavement quality assurance services • Asphalt pavement design and materials evaluations • Roofing and waterproofing consultation and inspection • Applied engineering and research • Forensic evaluation • Stormwater Services Twining has the daily resources to satisfy the full range of needs required during the project and has demonstrated this during all of our past contracts with the City of Santa Clarita, as well as other local municipal clients, such as the City of Thousand Oaks, City of Agoura Hills, and City of Simi Valley. Our firm proudly offers the City the following: Twining has served your City for years and looks forward to continued opportunities to work on its projects. We also have a long history of working on projects with Swinerton both in their GC group and their CM group. Our history with your agency and Swinerton, our extensive knowledge of the area, and our deep understanding of the community assures a seamless integration between our team and the Design -Build team. ............................................................................................................................................................. Our Laboratory: Recognized Statewide, Available Here... Twining's local laboratory offers the most state-of-the- art testing resources available in California. Widely recognized as California's premier testing resource, our lab is multi -certified and equipped to test in situ density and moisture content, Atterberg limits, sieve analysis, maximum dry density, direct shear, consolidation, expansion index, sand equivalent, cleanness value, soundness, and R -value. We also provide asphalt plant inspection and inspection of soil, epoxies, metals, steel reinforcement, and welds and are able to test concrete, masonry, aggregates, asphalt, diamond bit coring of asphalt, concrete or masonry, and road rating. .............................................................................................4..4..4.......................4 : QTWINING SECTION 2 Qualifications of Firm Inspection Services Twining's inspection staff consists of over 150 inspectors located throughout California. More than 80 percent of these inspectors hold multiple inspection certifications in disciplines including structural steel, high strength bolting, prestressed concrete, reinforced concrete, structural masonry, drilled in anchors, spray applied fireproofing and more. These highly skilled men and women have been selected for their diversity of knowledge and for their ability to work with clients to achieve maximum performance at minimum cost. Twining has the resources to staff every project with experienced and professional inspection personnel. Field Engineering Twining's ability to perform a variety of services in-house makes testing quicker, easier, and more responsive to our clients' needs. We perform standardized tests and services including: • Pull testing of building components • Testing of wedge anchors, epoxied anchors, and wedge anchors • In-place shear testing of masonry walls • Flat -jack load testing of masonry walls • Fireproofing for adhesion and cohesion • Floor flatness and levelness testing Materials Testing Twining has been at the forefront of construction materials testing for over a century. Our network of state-of-the-art laboratories, complimented by our fleet of mobile laboratories, allows us to provide in-house testing for projects throughout the area. Twining provides fast, reliable test results that our clients can count on. We subscribe to the most stringent inspection and certification requirements in the industry. We are recognized by agencies including Caltrans, Division of the State Architect (DSA), American Association of State Highway and Transportation Officials (AASHTO), United States Army Corps of Engineers (USACE), Cement and Concrete Reference Laboratory (CCRL), Federal Aviation Administration (FAA), International Accreditation Service (IAS), and U.S. Army Corps of Engineers along with numerous cities and counties as a certified geotechnical, paving, materials testing and inspection laboratory. Non -Destructive Examination The field of non-destructive examination is undergoing rapid change, bringing technologies that had previously been the subject of research into the arena of practical application. Twining has been at the forefront of these applications; from participating in the post -Northridge SAC committees through being the first firm to fully implement the requirements of FEMA 353 and now AWS D1.8, to the field implementation of the latest technologies such as Phased Array Ultrasonics and Time of Flight Diffraction. Twining is fully compliant not only with ASNT SNT-TC1A, but with the stricter certification standards of CP -189. QTWINING SECTION 2 Twining has provided materials testing and special inspection services on dozens of parking structure projects throughout Southern California. Following is a list of some of the parking structure projects on which we have provided materials testing and special inspection services. • Airport Block Parking Structure, Los Angeles • Alexander Hamilton High School Parking Structure, Los Angeles • California Science Museum Parking Structure, Los Angeles • Charter College Parking Structure • City of Beverly Hills Crescent Drive Parking Structure • City of Oxnard Parking Structure, Oxnard • County of Orange Civic Center Garage, Santa Ana • CSULA Parking Structure #3, Los Angeles • CSUN E6 Brown Center ADA Parking Lot, Northridge • CSUN Parking / Public Safety Building • CSUN Parking Structure B5, Northridge • Encino Gateway Parking Structure/Garage Repair, Encino • Ernst & Young Plaza Parking Structure, Los Angeles • Frontier Toyota Parking Structure and Retaining Wall, Valencia • Howard Hughes Entertainment Complex Parking Structure, Los Angeles • John Wayne Airport 131 Parking Structure • Kaiser Permanente Anaheim Parking Structure, Anaheim • Kaiser Permanente South Bay Medical Center Parking Structure #2, Harbor City • KCIN Parking Structure, Irvine • LACCD, Los Angeles City College Parking Lot 4 Staff Parking Lot, Los Angeles • LAUSD, Beaudry Building Parking Structure Repair • LAX Clarion Hotel Parking Structure • LAX Radisson Parking Structure • LBCCD, LAC Parking Structure • Long Beach Airport Parking Structure, Long Beach • Marvin Braude Parking Structure, Van Nuys • McCarran Terminal 3 Parking Garage • Mickey and Friends Parking Structure, Anaheim • Mission Viejo Mall Parking Structure #1 Northeast and #2 Southwest, Mission Viejo • Plaza Arboretum Apartments Parking Structure, Santa Monica • Pomona College North Campus Residence Hall and Parking Garage • Redondo Beach Pier Parking Structure Repairs, Redondo Beach • Riverpark Parking Structure, Ventura • Riverpark South & North Parking Garages, Ventura • San Bernardino City Hall Parking Structure Seismic Retrofit, San Bernardino • Santa Monica City College Parking Structure Expansion, Santa Monica • Santa Monica Parking Structure #8 Seismic Retrofit, Santa Monica • Sierra Madre Villa Parking and Bus Facility, Pasadena • SMCCD, Chevron Alterations to Parking Structures • Sycamore Parking Structure, Santa Ana • UCLA CHS Parking Structure Seismic Repair • UCLA Parking Structure 8 Bridge Structural Mitigation • Valencia Town Center Inside Ring Road Parking Structure #7, Valencia • West Hollywood Gateway Parking Structure, West Hollywood • Westfield Topanga Parking Structure • Westlake Village Parking Structure, Westlake Village QTWINING LAX, Radisson Parking Structure SECTION 2 The parking structure adjacent to the Raddison LAX is a new, 7 -story structure. Twining worked on the project for the original owner who was forced to file bankruptcy mid -project. Signit Parking at LAX, LLC, picked up the project mid -construction and determined that our team was critical to its successful completion. Signit contracted us to provide materials testing and special inspection services for the duration of the project. Westfield, Del Amo Mall Parking Structure The Del Amo Mall Parking Structure project was a renovation of the existing parking structure. The project involves the extensive structural renovation of the existing structure and the addition of significant structural steel elements throughout the multi -tiered structure. Twining is providing testing and inspection of the structural steel columns and beams, composite metal deck with concrete fill, reinforced masonry, and spray -applied fireproofing. We are also providing special inspection and testing of additional structural components, including site concrete elements, steel canopies, epoxy doweling, anchors and embeds. Westfield, Century City Parking Structure & Connector The Westfield Century City Parking Structure is a new, 5 -story structure adjactent to the existing parking structure. Phase 2 included the addition of a connector between the original structure to the new 5 -story parking structure. Twining provided geotechnical engineering services, soils testing, construction materials testing, and special inspection services for both phases of the project. QTWINING SECTION 2 CSUN Parking Structure II, Lot B3 wowt ?rf.k .0F S rorl �- 10 M7 Owner Name California State University, Northridge Construction Cost $16 million California State University, Northridge built a new, five -level parking structure on its main campus. Twining provided reinforced concrete testing, prestressed concrete testing, structural steel testing, non-destructive testing, and inspection services. 5 QTWINING SECTION 2 CSULA Parking Structure #3 Owner Name California State University, Los Angeles Construction Cost $9.5 million California State University, Los Angeles built a new parking structure on its main campus. Twining performed reinforced concrete testing, prestressed concrete testing, structural steel testing, non-destructive testing, and inspection on this parking structure at California State University, Los Angeles. Ll QTWINING SECTION 2 Disneyland® Mickey and Friends Parking Structure Owner Name Walt Disney Imagineering, Inc. Construction Cost $87.9 million Disneyland's Mickey and Friends parking structure has 10,000 parking spots and is notably the largest parking structure in the Western hemisphere and the second largest in the world. The structure is six levels, 3,750,000 -square -feet, and provides parking for both the Disneyland park and resort. Twining performed reinforced concrete testing, prestressed concrete testing, structural steel testing, non-destructive testing, and inspection services. 7 QTWINING SECTION 2 Jeff Tawakoli, PE ► Project Manager Jeff Tawakoli is a engineer with over 28 years of experience in construction materials engineering. As your Project Manager for this parking structure project, Jeff will will oversee the project team and ensure that our services are provided to the City in a comprehensive and seamless manner. Jeff will also ensure the accuracy and timeliness of all reporting and billing activities. He will review all invoices, inspection reports, and test reports prior to issuance. Jeff will play a critical role in informing the County of budget status, working with the project team to reduce costs, and delivering our services in an efficient manner. In the event of budget deviations, he will ensure that the County is proactively advised and will assist with allocating costs to the actual source of the budget deviations. Education Capabilities Overview Oversees the geotechnical engineering, laboratory and field testing and Bachelors of Science, C.E., inspection operations. University of Utah • Conducts soils engineering investigations which entail subsurface Licenses/Certifications exploration, laboratory testing of soil samples, and engineering analyses. • Oversees production of soils engineering reports which include Civil Engineer, California, recommendations for improvements such as site preparation, grading, No. 51883 foundations, retaining walls, and site drainage. • Designs shallow and deep foundation systems. Civil Engineer, Nevada, No. 0 Performs engineering analyses relating to settlement, slope stability, soil 10869 liquefaction, stabilization, pavement design, and dynamic soil penetration. • Provides consultation and evaluation regarding distressed foundations, Civil Engineer, Utah, No. subterranean structures and pavement materials. 176290 0 Supervises testing and inspection personnel during construction phase of ICC Reinforced Concrete projects. ICC Structural Masonry Project Experience ICC Fireproofing Ventura County Medical Center New, 122 -bed medical center built to OSHPD code standards. Several 4 -5 -story, mixed-use buildings in Ventura and Ojai, California supported on piles or caissons • 72 West Santa Clara Street, Ventura, California. • 40 Chesnut Street, Ventura, California. • 324 and 328 Main Street, Ventura, California. • SWC of Sanjon and Thompson, Ventura, California. • NWC of Palm and Main Street, Ventura, California. DSA Projects with soils reports and materials testing scope: • Buena High School Library, Ventura, California. • Santa Paula High School , Santa Paula, California. • Conejo Valley School District, two elementary schools, Thousand Oaks, California QTWINING SECTION 2 Multi -Certified Inspectors o Abayan, Samuel X X — - X _ X X Abedian, Aris X X X X X Adorjan, Frank X X X Aghayans, Ara X X X X Aguirre, James X X X X X X Aguirre, Manny X X X X Alamilla, Rosa X X X X X Alaverdyan, Razmik X X X X X Anderson, Steve X X X X X Andrade, John X X X X Andrus, Isaac X X X Apaza, Roberto X X X X Arcos, Matt X X X Barron, Jason X X X Basore, Duane X X X X Bauduin, Joe X X X X X Bauduin, Matt X X X X X X X X X X Benson,Scott X X Black, Bonnie X X X Blakley, Truc-chi X X X X X X X X X X Bradford, Joseph (Joe) X X X X X X X X Brittain, Steve X X Busche, Ron X Cameron, Johnny X X X X X Campos, Bertha X X X Case, James X X X X X X X X Castillo, Jose X X X Chaffino, Jesus (Jesse) X X X X X X X Cline, Kyle X X X X X X Cloonan, Steven X X X X X Coey, Wayne X X X X X X X Coldiron, Steve X X X Conarroe, Matthew X X Cooper, Chris X X X X X Corbin, Kelly X X Curatola, Wade X X X X X X X Dadich, Danielle X X X QTWINING SECTION 2 De, Jeffrey (Jeff) cker, 'FDenaker, Rick Diaz, Sergio X X X X X X X Dorado, Carlos Elnabbout, Adib X X X X X X X Estrada, Gerald X Fetcho, Christopher X X X X X X X X X Files, Brian X Francis, Tim X X Franco Cases, Jose X X X Gaicki, Edward X X X Garcia, Vanessa X X Gaytan, Jessie George, Halden X X X X X X X X X X X Gipson, Daniel Gomez, Francisco F. X X X X X X Gomez, Joseph (Jose) X X X Gonzales, Joe X X X X X Gordon, David C. X X X X X Gordon, David M. X X X X X X Graubard, Ben X X X X X Greer, Mike X X X X X Grijalva, Tom X X Grosser, Michael X X X X X Grzybowski, Andy X X Guerrero, Michael X X X X X Guilherme, Michael X X X X X X X Hanna, Youssef X X X X X Harris, William (Bill) X X X X X Hinch, Robert X Hodges,Jack X X X X X Howard, Kelly X X X X X X Johnson, Nathan X X X X X X Johnson, Trayvon X X Jones, Albert X X X 10 QTWINING SECTION 2 11 Inspectors 0 Jones, Tom X X X X X Jong, Yong Rai X X X X Karr, Ryan X X X X X X X Kirby, Brendon X X X X Klink, Clifford X X Kohn, Russell (Russ) X X X Krie, Tyler X X X Langdale, Mike X X X X X Lee, Hyeon Jung X X X X X X X X Leufven, Lorne X X X Lim, Jesus (Jess) X X X X X X X X X Lippincott, Dave X Lorden, Kevin X X X X X X Magan, Mark X X X X Maloney, Troy X Martin, Jarrod X X X X X X X X Martinez, Danny X X X X X Martinez, Jose L. X X X X X X Mathis, Brendan X X X X X McCarthy, Ben X X X X McGrath, Tom X X McMann, Isaac X X X X Melatti, Mike X X Mercado, Jose C. X X X X X X Mikhael, Mikhael X X X X X X X X X Miller, Mike X X X X X X Minghelli, Chris X X X X X X Miranda, Fausto X X X Muehlen, Eric X X X X Murbarger, John X X X Newton, Micheline X X X Nguyen, Quyen X X X Nola, David X X X X X X X X Noriega, Jim X X X X Novodvorsky, Barry X X X X Nowell, David X X X X X X Nunez, Michael X X X 11 QTWINING SECTION 2 O'Donnell, James X X X Odegaard, Oscar X Ornelas, Eddie (Heriberto) X X Oyervides, Ernesto X X X X X Pacheco, David X X X X X X X Pedraza, Salvador (Sal) Peery, Craig X X X X X X X X X X X X X X Perez, Eduardo (Eddie) X X X Petterez, Philip Preciado, Roland X X X X X X X X X X X Prepchuk, Dereck X X X X X X X X Ray, Arjun X X X Reber, Robert X X X X X X X Richardson, Jeffrey (Mike) X Richie, Roque X X X Richie, Xavier X X X X X X Rieger, Walter X X X X X Roberts, Trevor X X Robinson, John X X X X Rodriguez, Pete X X X Rojas, Tomas X X X Roldan, Stewart X X X X X X X X Rowe, Blake X X X X X X X Russell, Robert X X X X Saleh, Samir Sanchez, Oscar X X X X X X X X X Saunders, Gordon X X X X Semanchik, Kevin X X X Shafer, Damian X Smith, Tod X X X X X X Sobay, Mark X X X X X Solis, Andrew X X St. Julien, Jack X X X X X Stacks, Mike X X Striff, Randy X X Suh,Joshua X X X X X X IN QTWINING SECTION 2 13 Summers, Jeff X X X X Tate-Ledgerwood, Sharon X X X X Valentine, Louis X X Van Braam Morris, Bryant X X X Viramontes, Fidencio (Fide) X X X X X X X Wallen, Joe X Wantland, Elizabeth X X X X Ward, Garrett X X X X X X Watson, Raymond (Ray) X X X X Weber, Ronald X X X X Williams, Jay (Matt) X X Williams, Rich X X X X Wright, Chris X X Wright, Edward X X X X X X -Wynn, Steve X X X X X X Yoemans, Jeff X X X Zarlinga, Victor X X X X Zuidema, John X X X X X 13 QTWINING SECTION 3 Work Statement Twining's field staffing plan will be to assign a multi -licensed inspector, approved by the City, capable of performing all inspections, including concrete, rebar, CMU and welding. It is expected that the resident inspector will be on the site when needed continuously and periodically for approximately seven (7) months. The resident inspector will be assisted by additional inspectors as necessary, and where required by the City, generally for concrete placement and when work is being performed where one inspector cannot adequately cover the visual inspections required. We are projecting about 1276 inspection hours over the seven (7) month duration, or about 182 average inspection hours per month. IV Cost Proposal Project Name: Parking Structure Old Town Newhall Proposal No: 16-2024 Rev A Date: 01103/2017 SECTION 4 Twining, Inc - Venture Michael J Molina 0.951.5520031 1 DIVISION 3: CONCRETE Description of Work I Includes preparation 911F Special ins ector- Reinforced Concrete Hours $ 9200 $ 35,32800 Special Ins ector- Prestressed Concrete Hours $ 9200 $ 18,40000 Special Ins ector-Shoterete Hours $ 92.00 $ 4,416.00 Special lnsector- Drilletl In Anchors Hours $ 9200 $ 2,944.00 Field En ineerin Technician - Pull Testin and Tor ue Testin Hours $ 10550 $ 3,376.00 Concrete 0ualit Control ACI Technician Hours $ 9200 $ 8,464.00 Corin Technicain and E u menl 16 Hours $ 195.00 $ 3,120.00 Project Manager 40 Hours $ 14500 $ 5,800.00 Compression Strength: 6" x 12" or 4" x 8" Cylinders 584 Tests $ 25.00 $ 14,600.00 Shotcrele Core Compressive Testing Including Trimming ASTM C42 9 Tests $ 5500 $ 495.00 Grading of Shotcrele Cores 2 Hours $ loom $ 201.00 Standard Sample Pickup 28 Taps $ 6500 $ 1,820.00 Clerical / Report Distribution 3% $ 2,968.92 SUB -TOTAL $ 101,932.92 DIVISION 4: MASONRY Special Inspector/Registered Deputy Inspector 288 Hours $ 92.00 $ 26,498.00 Special Inspector/Registered Deputy Inspector - Drilled In Anchors 56 Hours $ 92.00 $ 5,152.00 Project Manager 20 Hours $ 13500 $ 2,700.00 Compression Test: Composite Masonry Prisms Up To 8' x 16" 14 Tests $ 185.00 $ 2,590.00 Compression: 2" x 4" Mortar Cylinders USC STD 21-16 26 Tests $ 40.00 $ 1,040.00 Compression: 3" x 3" x 6" Grout Prisms, Includes Trimming UBC STD 21-18 26 Tests $ 32.00 $ 832.00 Compression: 20 Cubes ASTM C109 12 Tests $ 3500 $ 420.00 Standard Sample Pickup 18 Taps $ 65.00 $ 1,170.00 Clerical / Report Distribution 1 1 3% 1 1 $ 1,212.00 SUB -TOTAL $ 41,61200 DIVISION 5: METAL Shop Fabrication We are assuming the barometers are local to AWS Certified Welding Inspector the project aIle Nondestructive Testing Technician Project Engineer Field AWS Certified Welding Inspector Nondestructive Testing Technician Project Man ager Clerical / Report Distribution 176 Hours $ 92.00 $ 16,192.00 24 Hours $ 95.00 $ 2,280.00 10 Hours $ 13500 $ 1,350.00 100 Hours $ 92.00 $ 9,200.00 8 Hours $ 9500 $ 760.00 5 Hours $ 135.00 $ 675.00 1 1 3% 1 1 $ 319.05 SUB -TOTAL $ 30,776.05 FINAL AFFIDAVIT 1 Report $ 500.00 $ 500.00 SUB -TOTAL $ 500.00 REMARKS: This proposal is based on the 75% progress set oflums and the preliminary construction schedule provided by the City. See attached schedule of fees for additional terms arm conditions. GRAND TOTAL $ 174,820.97 wj Note: Though we have included a budgetary cost estimate for our services, the estimate is not intended to be lump sum or guarantee of costs, this due to the provided construction documents being preliminary. The final cost will vary according to the actual number of inspection hours and tests performed. The estimate does not take into consideration any re -testing of material and re -inspections of none complainant work as well as any requested overtime. We understand that this project is subjected to the Prevailing Wages Law by the California Department of Labor. 15 SECTION 4 Schedule of Fees 2016 - 2017 NOTE: Rates will be adjusted annually each July tat to reflect increased costs. Personnel Rates: Per Hour Unless Otherwise Noted Task Task Code Engineering and Consulting Personnel Rate Code Non -Destructive Testing Personnel Rate 10026 Senior Principal Advisor/Consultant $ 280.00 10401 NDE Ultrasonic Testing Technician $ 95.00 10001 Principal EngineedGeologist $ 170.00 10403 NDE Magnetic Particle Testing Technician $ 95.00 10017 Metallurgical Engineer $ 165.00 10405 NDE Dye Penetrant Testing Technician $ 95.00 70000 Registered Geotechnical Engineer $ 165.00 10305 Combination NDE Technician/Welding Inspector $ 101.50 10010 Technical Advisor $ 180.00 10409 Radiographic Testing (crew of 2) $ 288.00 10011 Material Scientist, Welding/NDT Consultant $ 190.00 10020 NDE Engineer $ 160.00 70003 Registered GeologistlCertRed $ 150.00 Engineering Geologist 10003 Senior EngineedGeologist $ 150.00 Task Code Equipment Usage (Daily unless Otherwise Noted) Rate 10009 Registered Civil Engineer $ 145.00 95318 Skidmore $ 40.00 60003 Roofing/Waterproofing Consultant $ 185.00 95309 Torque Wrench, Small $ 15.00 10013 Project Engineer/Manager $ 135.00 95312 Torque Wrench, Large $ 25.00 30000 Quality Control Manager $ 120.00 95315 Torque Multiplier $ 40.00 10005 Senior Staff Engineer/Geologist $ 115.00 95321 Air Meter $ 20.00 10007 Staff Engineer/Geologist $ 110.00 95324 Brass Mold $ 20.00 10015 Quality Control Administrator $ 100.00 95343 Nuclear Gauge (Per Hour) $ 6.00 10019 Metallurgical Technician S 90.00 95333 Pull Test Equipment $ 60.00 90001 CADD Operamr/Draftsperson $ 80.00 95348 Concrete/Asphalt Coring Equipment (Per hour) $ 120.00 70107 Field Supervisor $ 115.00 95327 Pachometer $ 55.00 91030 Safety Supervisor S 115.00 95336 Floor Flatness (Dipstick) $ 45.00 20000 Laboratory Manager S 105.00 95330 Schmidt Hammer $ 20.00 98000 laboratory Technician $ 80.00 95341 Vapor Emission Test Kits $ 30.00 90005 Expert Witness Testimony $ 395.00 95342 Relative Humidity Probe $ 45.00 91010 Qualified SWPPP Developer S 130.00 95339 UPV (Ultrasonic Pulse Velocity) Meter $ 280.00 91000 Qualified SW PPP Practitioner $ 120.00 95351 Fireproofing Adhesion/Cohesion (Per Test) $ 20.00 95300 A Scan Ultrasonic Equipment and Consumables $ 65.00 95303 Magnetic Particle Equipment and Consumables $ 30.00 Task 95306 Liquid Penetrant Consumables $ 25.00 Code Field Inspection Personnel Rate 10101 ConeredelReinforced Steel Inspector $ 92.00 95307 Phased Andy Ultrasonic Equipment (Per Hour) $ 50.00 10103 Prestressed/Post Tensioned Inspector $ 92.00 95347 Ground Persuading Radar (Per Hour) $ 50.00 10105 Concrete ICC Inspector $ 92.00 95345 Impact Echo $ 280.00 10109 Drilled -In -Anchor Inspector $ 92.00 95359 California Pavement Proiilo imph (Per Hour) $ 115.00 10111 Gunite/Shotemte Inspector S 92.00 95349 Inertial Profiler (Per Hour) $ 250.00 10113 Masonry Inspector S 92.00 95357 Project Dedicated Vehicle $ 100.00 10201 Structural Steekskelding Inspector S 92.00 10203 AWS Certified Welding Inspector $ 92.00 Task Code Specimen Pick -Up Rate 10207 Fireproofing Inspector $ 92.00 20102 Standard Sample: Concrete Cylinders (Each) $ 15.00 10501 Lead Inspector $ 92.00 20101 Standard Sample: Mortar/Grout Cubes and Come, $ 15.00 Fireproofing, Rebar, and Epoxy Prisms (Each) 70109 L.A. Deputy Gretling Inspector 5 100.50 20103/ Oversize Sample: Masonry Prisms, Shotmete Panels, $ 29.00 20104 Flexural Beams (Each) 75001 Asphalt Field and Plant Inspector/Technician $ 98.50 20107 Technician for Specimen Pick -Up Not Listed Above $ 80.00 (Per Hour, 2 -Hour Minimum) 70103 Pile Driving Inspector S 98.50 20109 Technician for Specimen Pick -Up Before 5:00 a.m. $ 92.00 or After 5:00 p.m. Monday thou Friday, or Ali Day Saturday (Per Hour, 2 -Hour Minimum Plus Mileage) 70101 Soils Technician $ 97.50 10107 Concrete Quality Control(ACUCaltrans Technician) 3 98.50 Task Code Jobsite Trailer, Mobile or On-site Laboratory Rate 60001 RoofinglWaterpmofing Inspector 3 112.50 95360 Mobile laboratory for rapid set concrete $ 375.00 (per shift not exceeding 12 hours) 10515 Mechanical Inspector $ 127.50 All others by quotation 10519 Electrical Inspector S 127.50 10521 Plumbing Inspector $ 127.50 10523 Building Inspector $ 127.50 50003 Field Engineering Technician $ 105.50 Task Code Shop Inspection Personnel Rate 10301 Structural Steel Fabrication inspector $ 97.50 10309 Batch Plant Quality Control Techniciaminspector $ 97.50 10325 Glue -Laminated Fabrication Inspector Quotation 10328 Pm -cast concmte/Pipe Fabrication Inspector $ 97.50 W SECTION 4 Task Task Chemical Analysis and Petrographic Code Concrete Tests (Field Made Specimens) Rate Code Examination of Concrete, continued Rate 20201 6' x 12" or 4' x S" Cylinder. Compression Strength $ 25.00 80126 Chemical Analysis for Water Soluble Chlorides $ 130.00 (ASTM C39) (ASTM C1218) (includes sample prep) 20203 Density of Structural Lightweight Concrete $ 75.00 80123 Chemical Analysis for Acid Soluble Chlorides $ 140.00 Equilibrium or Oven Dry Method (ASTM C567) (ASTM C1152) (includes sample prep) 20205 Core Compression including Trimming (ASTM C42) $ 55.00 80193 Chance DiRusion Coefficient of Cementitious $ 2,000.00 Mixtures by Bulk Diffusion (ASTM C1556) 20207 W x 6" x 18' Flexural Beams Not Exceeding $ 70.00 80129 Petrographic Examination of Hardened Quotation Referenced Size (ASTM C78, C293 or CTM 523) Concrete (ASTM 856) 20208 W x 6" x 30" Flexural Beams (CTM 523) $ 85.00 20209 Splitting Tensile Strength (ASTM C496) $ 85.00 Task Code Physical and Chemical Analysis of Cement Rate 20211 Modulus of Elasticity Test (ASTM 0469) $ 140.00 80195 Physical Testing and Chemical Analysis of Portland Cement $ 1,000.00 per Standard Requirements (ASTM C150) 80003 Rapid Chloride Permeability Test: Cylinders or $ 450.00 80100 Chemical Analysis of Portland Cement par $ 550.00 Cores (ASTM C1202) Standard Requirements (ASTM C150) 80006 Density, Absorption, and Votls in Hardened $ 350.00 80103 Physical Testing of Portland Cement per $ 550.00 Concrete (ASTM Cl Standard Requirements (ASTM C150) 40005 Flexural Toughness (ASTM C1609, Formerly $ 700.00 80194 Physical Testing of Type K Cement, Mortar $ 500.00 ASTM C1018) Expansion (ASTM Cl 40009 Coefficient of Thermal Expansion of Concrete $ 500.00 80106 Partial Analysis or Specific; Physical Tests Quotation (CRD 39, AASHTO 7336) 80110 Sulfates Resistance of HyHreulc $ 2,000.00 Cement (ASTM C1012) - 6 Momhs Task 80111 Sulfates Resistance of Hydraulic $ 2,200.00 Code Concrete Specimen Preparation Rate Cement (ASTM C1012) - 12 Months 20151 Sawing of Specimens (Each) $ 25.00 20157 Coring of Specimens in Lab (Each) $ 25.00 Task Code Physical and Chemical Analysis of Fly Ash Rate 80140 Chemical Analysis of Fly Ash per $ 550.00 Standard Requirements (ASTM Cl Task Laboratory Trial Batch: Concrete, Cement and W143 Physical Testing of Fly Ash per Standard Requirements $ 530.00 Code Mortar Rate (ASTM Cl 30217 Compression Test Cylinders Made and Tested in $ 45.00 80146 Partial Analysis or Specific Physical Tests Quotation laboratory (ASTM C192, C35) 30219 6' x 6" x 18" Flexural Beams Made and Tested in $ 85.00 80147 Chemical Analysis and Physical Testing of Fly Ash per $ 1,000.00 Laboratory (ASTM C192, C78) Standard Requirements (ASTM C1618) 30221 6' x 6" x 30" Flexural Beams Made and Tested in $ 95.00 laboratory (ASTM C192, C293) 30223 Splitting Tensile Strength Cylinders Made and Tested in $ 100.00 Task Physical Testing of Chemical Admixtures for laboratory (ASTM C192, C4g6) Code Concrete Rate 30225 Modulus of Elasticity Test Cylinders Made and Tested in $ 156.00 80196 Qualification of Admixture per ASTM C494 Quotation laboratory (ASTM C192, C469) 30227 Density of Structural Lightweight Concrete Made m the $ 86.00 laboratory, Equilibrium or Oven Dry Method (ASTM C567) Task Code Soils and Aggregate Tests Rate 30201 Laboratory Trial Batch (ASTM C192) $ 450.00 30503 Abrasion: LA Rattler (ASTM C131) $ 185.00 30203 Laboratory Trial Batch: Packaged Dry Concrete $ 800.00 30505 Abrasion : LA Rattier (ASTM C535) $ 195.00 Including Verification of Slump, Air Content, Plastic Unit Weight, Six Cylinders for Compressive Strength (ASTM C387 and C192) 30205 Drying Shrinkage Up to 28 Days: Three 3' x 3' or $ 450.00 70301 Atterberg UnnitslPlasticity Index (ASTM D4318. CTM204) $ 150.00 W x 4" Bars, Five Readings up to 28 Dry Days (ASTM C157) 30230 Additional Reading, Per Set of Three Bars $ 45.00 70303 California Bearing Ratio Excluding Maximum Densly $ 550.00 (ASTM D1883): Soil 30231 Storage over Ninety (90) Days, Per Set of $ 30.00 70304 California Bearing Ratio Excluding Maximum Density $ 652.00 Three Bars, Per Month (ASTM D1883): Cement -Treated Soil 30207 Setting Time Up to 7 Hours (ASTM C403) $ 125.00 70344 Cement -Treated SoilTase Mix Design: includes three Wal $ 3,000.00 cement contents with three unconfined compressive strength specimens per cement content 30209 Bleeding (ASTM C232) $ 125.00 70305 Chance and Sulfate Cement (CTM 417, CTM 422) $ 130.00 30229 Concrete Restrained Expansion (ASTM C878) $ 475.00 30403 Clay Lumps and Friable Particles (ASTM C142) $ 175.00 30211 Mix, Make and Test Mortar or Grout Specimens for $ 400.00 30321 Cleanness Value: T' x N4 (CTM 227) $ 175.00 Compressive Strength: Set of 6 (ASTM C109, C942) 20263 Non -Shrink Grout: Height Change after Final $ 450.00 30322 Cleanness Value: LY x.75" (CTM 227) $ 275.00 Set (ASTM C1090) 20265 NonShrink Grout: Height Change at Early $ 700.00 70393 Collapse Potentiadmax (ASTM D5333) $ 175.00 Age (ASTM C82T) 30232 Cracking Resistance, Set of Three Rings, $ 4,000.00 70396 Compressive Strength of Molded Soil -Cement $ 105.00 Laboratory Trial Batching, Test Unfit Cracking or Cylinders (ASTM D1633) up to 28 Days (ASTM 1581) 30233 Evaluation of Pre -Packaged Masonry Mortars $ 1,100.00 70309 Consolidation Test: Full Cycle (ASTM 2435, CTM 219) $ 195.00 (ASTM C270) 70311 Consolidation Test: Time Rate per Load Increment $ 45.00 (ASTM D2435, CTM 219) Task Chemical Analysis and Petrographic 70313 Comeavity, Series: Sulfate, Cl, pH, Resistivity $ 245.00 Code Examination of Concrete Rate (CTM 643, 417, and 422) 80120 Chemical Analysis for Water Soluble Sulfates $ 130.00 70315 CmshedlFrectured Particles (ASTM D5821, CTM 205) $ 175.00 (ASTM C114) (includes sample prep) 70317 Direct Shear Test Remolded and/or Residual $ 245.00 (ASTM D3080) 17 SECTION 4 Task Task Code Solis and Aggregate Tests, continued Rate Code Solis and Aggregate Tests, continued Rate ]0319 Direct Shear Test: Undisturbed - Slow ICD] (ASTM D3080) $ 225.00 30317 Unit Weight Per Cubic Foot (ASTM C29, CTM 212) $ 125.00 70321 Direct Shear Test: Undisturbed - Fast ICU] $ 195.00 30319 Voids in Aggregate with Known Specific Gravity $ 125.00 (ASTM D3080) (ASTM C29, CTM 212) 70378 Durability Index: Per Method -ASC, or $ 210.00 (CTM 229. ASTM D3744) 70325 Expansion Index (ASTM D4829, UBC 18-2) $ 170.00 Task Code Asphalt Concrete Tests Rate 75004 Fine Aggregate Angularity $ 185.00 75031 HMA Mixing and Preparation $ 125.00 (AASHTO T304, ASTM C1252, CTM 234) 30507 Flat and Elongated Particle (ASTM D4791) $ 225.00 75032 HMA Mixing and Preparation with Aggregate Treatment $ 175.00 30508 Flat or Elongated Particle (ASTM D4791) $ 195.00 75033 Bulk Specific Gravity of Compacted Sample or $ 50.00 Core: SSD (CTM 308C and ASTM D2726) 70331 Maximum Density: Methods A/B/C $ 190.00 75036 Bulk Specific Gravity of Compacted Sample or $ 75.00 (ASTM D1557, 0698, CTM 216) Core: Pamfin Corded (CTM 308A and ASTM Di 188) 70333 Maximum Density: Check Point $ 65.00 75040 Emulsion Residue, Evaporation (ASTM 3244) $ 150.00 (ASTM D1557, D698) 70335 Maximum Density: AASHTO C [Modified] $ 195.00 75024 Extraction % Bitumen (CTM 382, ASTM D6307) $ 160.00 (AASHTO T-180) 70337 Moisture Content (ASTM D2216,CTM 226) $ 25.00 75027 Extraction: % Bitumen and Gradation (CTM 382, $ 205.00 CTM 202, ASTM D6307, ASTM D5444) 70339 Moisture and Density. Ring Sample (ASTM D2937) $ 30.00 75028 Extraction: % Bitumen, Correction Factor $ 325.00 (CTM 382, ASTM D6307) 70341 Moisture and Density: Shelby Tube Sample $ 40.00 75030 Chemical Extraction: %Bitumen and Sieve Analysis $ 245.00 (ASTM D2937) (ASTM D2172 Method A or B, ASTM D5444) 70340 Moisture -Density Relations of Soil -Cement $ 275.00 75042 Lab Tested Maximum Density. Hveem, 3 briquettes $ 205.00 Mixtures Premixed In the Field (ASTM D558) (CTM 304, CTM 308, ASTM D1561, ASTM Dot 188) 70342 Moisture -Density Relations of Soil -Cement Mixtures $ 350.00 75057 Hveem Stabilometer Test, Premixed, 3 briquettes $ 205.00 Mixed in the Lab (ASTM D558) (CTM 304, CTM 366, ASTM D1560, ASTM D1561) 30401 Organic Impurities (ASTM C40, CTM 213) $ 90.00 75048 Lab Tested Maximum Density. Marshall, $ 205.00 3 briquettes (ASTM D6926,ASTM D2726) 70343 Permeability (ASTM D5084) Quotation 75049 Lab Tested Maximum Density. Marshall $ 215.00 6" Specimen, 3 briquettes (ASTM D5581, ASTM D2726) 80001 Potential Reactivity: Chemical Method (ASTM C289) $ 475.00 75050 Lab Tested Maximum Density. Superpave Gyratory $ 75.00 Compacted Briquette, SSD, 1 briquette (ASTM D6925, ASTM D2726) 70394 Potential Reactivity: Moder Bar Expansion Method, $ 750.00 75052 Lab Tested Maximum Density: Superpave Gyratory $ 85.00 14 -Day Exposure (ASTM C1260) Compacted Briquette, Parafin, 1 briquette (ASTM 06925, ASTM D1188) 70391 Potential Reactivity: Mortar Bar Expansion Method, $ 800.00 75051 Maximum Theoretical Specific Gravity (RICE] $ 155.00 28 -Day Exposure (ASTM C1260) (CTM 309, ASTM D2041) 70398 Potential Reactivity: Concrete Bar Expansion, $ 2,400.00 75066 Marshall Stability and Flow, Cored Sample, each $ 75.00 Method (ASTM C1293),12 month (ASTM D6927) 70399 Potential Reactivity: Concrete Bar Expansion, $ 2,600.00 75069 Marshall Stability and Flow, Pramixed, 3 briquettes $ 205.00 Method (ASTM C1293), 24 month (ASTM D6926, ASTM D6927) 70397 Potential Reactivity of Aggregate Combination, $ 900.00 75106 Marshall Stability and Flow, Gyratory Compacted $ 225.00 14 -Day Exposure, Mortar (ASTM C1567) Specimen Pre -Mixed, 3 briquettes (ASTM D6925, ASTM D5581) 70392 Potential Reactivity of Aggregate Combination, $ 950.00 75107 Marshall Stability and Flow 6" Specimen, Premixed, $ 215.00 28 -Day Exposure, Mortar (ASTM C1567) 3 briquettes (ASTM D5581) 70345 R -Value: Soil (ASTM 2844, CTM 301) $ 375.00 75063 Moisture Content (CTM 370) $ 85.00 70347 R -Value: Aggregate Base (ASTM D2844, CTM 301) $ 410.00 75005 Wet Track Abrasion Test (ASTM 03910) $ 15DA0 70349 Sand Equivalent (ASTM D2419, CTM 217) $ 125.00 75093 Hveem Mix Design (Excluding Aggregate Quality Tests) $ 3,000.00 70351 Sieve #200 Wash Only (ASTM D1140, CTM 202) $ 90.00 750% Hveem Mix Design, with RAP (Excluding Aggregate $ 3,300.00 Quality Tests, RAP QualRcabon) 70353 Sieve with Hydrometer: 3/4" Gravel to Clay $ 250.00 75099 Hveem Mix Design, with Lime (Excluding Aggregate $ 3,550.00 (ASTM D422, CTM 203) Quality Tests) 70355 Sieve with Hydrometer: Sand to Clay $ 240.00 75094 Hveem Mix Design Caltrans Untreated Mix $ 4,200.00 (ASTM D422, CTM 203) (Including Aggregate Quality Tests) 70357 Sieve Analysis Including Wash $ 150.00 75095 Hveem Mix Design Caltrans Lime Treated Mix $ 4,300.00 (ASTM C136, CTM 202) (including Aggregate Quality Tests) 70359 Sieve Analysis Without Wash (ASTM C136, CTM 202) $ 120.00 75084 Marshall Mix Design (Excluding Aggregate Quality Tests) $ 3,000.00 70360 Sieve Analysis: Split Sieve (ASTM C136, CTM 202) $ 240.00 75087 Marshall Mix Design with RAP (Excluding Aggregate $ 3,30DA0 Quality Tests) 70361 Sieve Analysis Without Wash: With Cobbles $ 235.00 75090 Marshall Mix Design with Lime (Excluding Aggregate $ 3,550.00 (ASTM C136, CTM 202) Quality Tests) 70363 Soundness: Sodium or Magnesium Sulfate, $ 450.00 75083 Open Grade Asphalt Concrete Mix Design $ 1,350.00 5 Cycles (ASTM C88) (CTM 368, ASTM D7064) 70365 Specific Gravity and Absorption: Coarse $ 100.00 75109 Superpave Mix Design (Excluding Aggregate Quality Tests) $ 4,770.00 (ASTM C127, CTM 206) 70367 Specific Gravity and Absorption: Fine $ 165.00 75113 Superpave Mix Design, with RAP $ 6,090.00 (ASTM C128, CTM 207) (Excluding Aggregate Quality Tests) 70369 SwelbSettlement Potential: One Dimensional $ 105.00 75114 Superpave Mix Design, with Rubber $ 6,200.00 (ASTM 04546) (Excluding Aggregate Quality Tests) 70371 Triaxial Quotation 70373 Unconfined Compression (ASTM 02166, CTM 221) $ 135.00 W SECTION 4 Task Task Concrete Roof Fill: Gypsum, Vermiculite, Fertile, Code Asphalt Concrete Tests, continued Rate Code Lightweight Insulating Concrete, Etc. Rate 75115 Supereave Mix Design, with Additives $ 5,590.00 20371 Compression Test (ASTM C495 and C472) $ 4000 (Excluding Aggregate Quality Tests) 75075 Effect of Moisture on Asphalt Paving Mixtures, Pre -Mixed $ 900.00 20373 Air Dry Density (ASTM C472) $ 30.00 (AASHTO T283, ASTM D4867) 75111 Hamburg Wheel Track Test, 20,000 passes, 4 briquettes $ 1,000.00 20379 Oven Dry Density (ASTM C495) $ 55.00 (AASHTO T324) 75116 Hamburg Wheel Track Test, 25,000 passes, 4 briquettes $ 200.00 Task (AASHTO T324) Code Reinforcing Steel, ASTM A615, A706 Rate 75039 Raveling Test of Cold Mixed Emulsified Asphalt $ 325.00 20501 Tensile Test: If 11 or Smaller $ 45.00 (ASTM D7196) 75067 Marshall Stability, wet set, 3 replicates (AASHTO T $ 275.00 20503 Bend Test: # 11 or Smaller $ 40.00 245) 75068 Marshall Stability, dry set, 3 replicates (AASHTO T $ 9,500.00 20504 Bend Test #14 or #18 $ 300.00 245) 75070 Cold Recycled Asphalt Mix Design: 2 gradings each, 3 20505 Tensile Test: # 14 $ 200.00 emulsion content (Caltrans LP -8) 20507 Tensile Test # 18 $ 300.00 Task Code Brick Masonry Tests, ASTM C67 Rate 20301 Modulus of Rupture: Flexural (5 Required Per ASTM) $ 45.00 Task Code Reinforcing Steel - Welded or Coupled Specimens Rate 20303 Compression Strength (3 Required Per ASTM) $ 45.00 20521 Tensile Test Welded/Coupled #11 and Smaller $ 65.00 20305 Absorption: 5 Hour or 24 Hour (5 Required) $ 50.00 20523 Tensile Test Welded/Coupled #14 $ 225.00 20307 Absorption (Boil): 1, 2 or 5 Hours (5 Required) $ 60.00 20525 Tensile Test: Welded/Coupled #18 $ 325.00 20309 Initial Rate of Absorption (5 Required) $ 40.00 20529 Weld: Macroetch $ 70.00 20311 Efflorescence IS Required) $ 60.00 20531 Slippage Test- Caltrans (CTM 670) $ 180.00 20313 Cores: Compression $ 55.00 20315 Shear Test on Brick Cores: 2 Faces $ 80.00 Task Code Metal and Steel Testing Rate 20601 Tensile Strength: Up to 100K Pounds (Each) $ 55.00 Task 20603 Tensile Strength: Up to 200K Pounds (Each) $ 65.00 Code Concrete Block, ASTM C140 Rate 20321 Compression (3 Required Per ASTM) $ 60.00 20605 Tensile Strength: Up to 300K Pounds (Each) $ 75.00 20323 Absorption/Moisture ContenVOven Dry Density $ 80.00 20607 Tensile Strength: Up to 400K Pounds (Each) $ 125.00 (3 Required Per ASTM) 20327 Linear Shrinkage (ASTM 0426) $ 200.00 20609 Tensile Strength: 400K to 600K Pounds (Each) $ 300.00 20335 Web and Face Shell Measurements $ 40.00 20611 Tensile Strength: Stress -Strain Percent Offset $ 150.00 20329 Tension Test $ 150.00 20545 Weld: Macroetch $ 70.00 20331 Core Compression $ 55.00 20547 Weld: Fracture $ 30.00 20333 Shear Test of Masonry Cores: 2 Faces $ 75.00 20615 Bend Test $ 46.00 20339 Efflorescence Tests (3 Required) $ 40.00 20617 Flattening Test $ 55.00 20619 gunnel and Rockwell Hardness Test $ 75.00 (ASTM E18) (Per Test) Task 20630 Bolt Axial Tensile Test (Up to 7/8" diameter) $ 40.00 Code Masonry Prisms, ASTM C1314 Rate 20341 Compression Test Composite Masonry $ 185.00 20631 Bolt: Wedge Tensile Test (Up to 718" diameter) $ 55.00 Prisms Up To 8" x 16" 20343 Compression Test Composite Masonry $ 245.00 20632 Bolt: Axial Tensile Test (Greater than 7/8" up to 1" diameter) $ 60.00 20346 Prism Cord Modulus of Elasticity $ 525.00 20633 Bolt: Wedge Tensile Test (Greater than 7/8" $ 75.00 up to 1- diameter) 20347 Prism Cord Modulus of Elasticity with Transverse $ 630.00 20634 Bolt: Axial Tensile Test (Greaterthan T' diameter) Quotation Strain (for double-wythe specimen) 20635 Bolt: Wedge Tensile Test (Greater than 1 -diameter) Quotation Task 20636 Bolt: Proof Load Test (Up to 7/8') $ 65.00 Code Mortar and Grout Rate 20351 Compression: 2" x W Mortar Cylinders (ASTM C780) $ 40.00 20637 Bolt: Proof Load Test (Greater than 718" up to V diameter) $ 85.00 20353 Compression: 3" x 3" x 6" Grout Prisms, $ 32.00 20638 Bolt Proof Load Test (Greater than 1") Quotation Includes Trimming (ASTM C119) 20355 Compression: 2" Cubes (ASTM C109) $ 35.00 20639 Nut: Proof Load Test (Up to 718") $ 45.00 20357 Compression: Cores (ASTM C42) $ 55.00 20640 Nut: Proof Load Test (Greater than 718" up to V diameter) $ 65.00 20641 Nut: Proof Load Test (Greater than 1") Quotation Task Task Code Masonry Specimen Preparation Rate Code Chemical Testing of Metal and Steel Rate 20155 Cutting of Cubes or Prisms $ 50.00 80170 Steel Chemical Analysis $ 135.00 80173 Weight of Galvanized Coating (ASTM A90) $ 75.00 Task Code Fireproofing Tests Rate 20401 Oven Dry Density (Per Sample) (ASTM E605) $ 65.00 Task Code Spell and Shotcrete Tests Rate 20361 Core Compression Including Trimming (ASTM C42) $ 55.00 20363 Compression: 6" x 12" Cylinders $ 25.00 20365 Compression: Cubes (Includes Saw Cutting) $ 74.00 IG SECTION 4 Task Machining and Preparation of Tensile and Bend Task Code Sample: Carbon Steel Rate Code Polymer Matrix Composite Materials (Fiberwrap) Rate 20751 Machinist: Initial Preparation from Mock-up, Etc. $ 90.00 20706 Tensile Strength— Set of 5 Specimenslbatch/direction $ 1,350.00 (Per Hour) (ASTM D3039) 20753 Sawcut to Overall Will (Per 0.5 Thickness or $ 45.00 20707 Tensile Strength —Additional Specimens $ 250.00 Fraction Thereof) (ASTM D3039) 20755 Machine to Test Configuration: Milled Specimens $ 60.00 20708 Heating Chamber Time — Per 24 hr period $ 85.00 (Per 0.5' Thickness or Faction Thereof) (ASTM D3039) 20757 Machine to Test Configuration: Turned Specimens $ 120.00 (Per 0.5' Thickness or Faction Thereof) 20759 Prepare Subsize Specimens (Per 0.5' Thickness $ 75.00 Task Calibration Services and Universal Machine Usage Rate 20801 Calibration/Verification Services Quotation I ask 20803 Universal Test Machine Usage (Per Hour) $ 250.00 Coda Charpy Impact Rate 20621 Charity Impact Ambient Temperature, per sample $ 85.00 (Average of 3 Samples Typically Required) Ceramic Tile Testing Division 20623 Charpy Impact Reduced Temperature, per sample $ 105.00 I ask Code Machining of Charley Samples: Carbon Steel Rate 20780 Cutting and Milling (Per 0.5' or Fraction Thereafter) $ 75.00 (Average of 3 Samples Typically Required) 20783 Final Machining to Sample Configuration $ 85.00 (Average of 3 Samples Typically Required) Task Code Prestressing Wires and Tendons, ASTM A416 Rate 20701 Sham"train Analysis: Wire or Strands $ 130.00 (Including Chart and Percent Offset) 20703 Tensile Test Only $ 105.00 20705 Tendons Quotation General Conditions The Ceramic Tile Institute of America (CTIOA) and Twining worked together to advance and develop technology designed to enhance the quality of materials and workmanship in the ceramic No industry. A separate schedule of fees for these services is available upon request. Cyclic and Fatigue Testing Programs on Special Products/Pads Quotation Engineering and Technical supports/Design of Prototypes and Special Quotation Test Set -Up FastenedCoupling Full Testing Program Per New Regulations: Tension, Quotation Fiberglass/Composke Materials Field Testing Program (ASTM D4065, Quotation Of 143, D4923, D2584, D4476, D1242, D7901, D7921, and D732) Field Testing of Structures and Structural Elements Quotation In -Pace Shear Testing Quotation Materials and/or Product Evaluation Per Specifications Quotation Structural Dynamic Testing and Durability Analysis Quotation NOTE: Field inspection work conditions are established by contract with Operating Engineers, Local 12. NOTE: A minimum of 24 hours notice is required for testing and inspection services. Administrative Fees All administrative costs including report distribution and Twining Consi mctionHive system are billed at the following percentage of the monthly invoice total: 0% Note that hard copies of reports will be sent only to governing jurisdictions that mandate them. All other parties will receive reports electronically. The administrative fee above will be increased by 1% if additional hard copies of reports are requested. Minimum Charges (Inspection and Technician Personnel Only - Other Personnel Charged on Portal to Portal Basis) 2 -Hour Minimum: Inspector arrives at jobsite, no work to perform. 4Hour Minimum: 1 to 4 hours of inspection 8 -Hour Minimum: Over 4 to 8 hours of inspection Regular Time The first 8 hours worked Monday through Friday between 5:00 a.m. and 5:00 p.m. Time and One -Half (All Types of Inspection) All shifts will be billed based on the time and date of their start. Any increment past 8 hours through 12 hours worked Monday through Friday and the first 12 hours on Saturday. Time and one-half will also be charged for any time before 5:00 a.m. and after 5:00 p.m. Double Time (All Types of inspection) All shifts will be billed based on the time and date of their start. After the first 12 hours worked Monday through Saturday, all day Sunday, holidays, and the first Saturday following the first Friday in June and December. Holidays are New year's Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, the day after Thanksgiving, and Christmas Day. Meal Period When personnel am required by their duties to work more than five consecutive hours without a one-half hour uninterrupted meat period,one half hour at double time rate will be charged in addition to any applicable overtime for actual hours worked. Shift Differential (Applies to Regularly Scheduled Shifts Only) A $1.00 par hour shift dllferential premium will be charged for all inspection hours that fall outside of the 5:00 a.m. to 5:00 p.m. tlme period. Twining will require 48-hour notice prior to beginning a shift that will include hours falling outside this time period. Should this notice not be provided, all work performed on that shift will be billed at the overtime rate. if three shifts per day are required, the first shift will be billed at the standard rate. The second shift shall he billed in accordance with the previous paragraph. The third shift shall be billed at 8 hours for the first 6 1/2 hours worked and overtime for all hours thereafter. P SECTION 4 General Conditions, continued Travel Time and Mileage For projects outside a 50 -mile radius from the nearest Twining facility, $ 0]0 per excess mile to and from the project will be charged for inspectors and technicians. Other than small tools, whenever project related equipment is required to be transported to and from the project site, time and mileage for inspectors and field technicians will be For work locations located 100 miles or more from Twining, travel time will be charged at the relevant rate for inspectors and technicians in addition to a subsistence allowance Saturday Sample Pick -Ups In order to be in strict conformance with testing standards, it may be required that Saturday pick-ups be performed (e.g. concrete specimens cast on Friday must be picked up on Saturday in older to be in conformance with ASTM C31 requiring specimens to be moved to their final curing location within 48 hours of casting.) Applicable charges for Saturday work will apply when this is required. Should these charges not be authorized then Twining will not be responsible for any negative consequences. Reimbursable Expenses Parking, air fare, car rental, food and lodging, etc. will be charged at cost plus 15% per processed invoice, unless provided by client. Project Specific Documents Costs presented assume that client will provide project specific documents (plans, specifications, submittals, RFIs, etc.) for all inspection personnel. Should project specific documents be provided electronically through a for fee service, the client will be responsible for providing access and paying any fees for the service. Project Site Facilities Prices quoted assume that initial curing facilities for test samples that comply with relevant test standards and project requirements and desk space for inspection staff are provided by others. Additional costs will apply should Twining be required to provide such facilities. Subsistence Subsistence on remote jobs will be charged per quotation. Laboratory Testing Hours Please note that laboratory testing will be billed on an hourly basis for non-standard tests. If testing is required to be performed on Saturdays, Sundays, holidays, or before 5:30 a.m. or after 4:00 p.m. on weekdays, an additional hourly charge with a minimum of one hour will be applied for the laboratory technician. 1.5 x regular test rate will be charged for rush testing. Charges for Subcontracted Services Material sent to outside laboratory for testing: Cost plus 20% Material sent to outside fabricator or machine shop: Cost plus 20% Glu -Lam beam inspection: Cost plus 20% Other subcontractors: Cost plus 20% Project exclusive equipment purchase: Cost plus 20% Limit of Liability Client agrees to limit Twining's aggregate liability to all entities for alleged or actual effors and omissions in the performance of its professional sevices under this agreement to $50,000.00 or the fees actually paid to Twining, whichever amount is greater. Higher limits may be available by quotation. Certified Payroll Certified payroll will be provided, upon request, at an additional charge of $100.00 month. Final Reports Required by Jurisdiction If a final report or affidavit is required, we must first review all inspection and testing reports and clear up any unresolved issues on these reports. These issues will typically require approval by the engineer or architect of record. This process can take several weeks or just a day, depending on the number and complexity of the issues. Cost for final reports will be billed hourly. Terms of Payment Fees charged are for professional and technical services and are due upon presentation. If not paid within 30 days from date of invoice, they are considered past due and a finance charge of 11/2% per month will be added to the unpaid balance (APR 18%). All invoice errors or necessary corrections shall be brought to the attention of Twining with 15 days of receipt of Invoice. Thereafter, customer acknowledges invoices are correct and valid. Twining reserves the right to terminate its services to a customer without notice if all invoices are not current. Upon such termination of services, the entire amount accrued for all services performed shall immediately become due and payable. Customer waives any and all claims against Twining, its subsidiaries, affiliates, servants and agents for termination of work on account of these terms. In the event of any litigation arising from or related to any agreement to provide services whether verbal or written, the prevailing party shall be entitled to recover from the non - prevailing party all reasonable costs incurred, including staff time, court costs, attorney's fees and all other related expenses in such litigation. Additionally, in the event of a non - adjudicative settlement of litigation between the parties or a resolution of dispute by arbitration, that same process shall determine the prevailing party. Specimen Disposal Specimens will be discarded after testing unless Twining has been notified prior to testing that the customer wishes to retrieve the specimens or storage arrangements are made. Oversize Specimens An extra charge will be made when test specimens require more than one person to handle due to size or weight. 01 QTWINING SECTION 5 Sub -Consultants Twining is a full-service testing and inspection firm, and based on our review of the scope of work, we do not anticipate the need for subconsultants on this project. WA: QTWINING SECTION 6 Labor Compliance Program Twining understands that this is a prevailing wage project, and we will fully comply with the City's labor compliance program. 0191 QTWINING SECTION 7 Statement of Offer and Signature This proposal is submitted to the City, and signed by Edward M. Twining, Jr., Chairman of the Board. This proposal is a firm offer for a 90 -day period and all work will be performed on a not -to -exceed basis without prior authorization. Twining has reviewed the City's standard contract, included in the subject RFP as Attachment A, and finds it acceptable. We do not request any deviations or modifications to the City's standard contract. Edward M. Twining, Jr., Chairman of the Board +z! QTWINING Statements and Agreement We have included the required forms in the following pages. SECTION 8 25 QTWINING SECTION 8 ATTACHMENT A CITY OF SANTA CLARITA DISCLOSURE STATEMENT The following information must be disclosed: 1. List the names of all persons having a financial interest in the Request for Qualifications. 2. If any person identified pursuant to No. 1 above is a corporation or partnership, list the names of all individuals owning more than ten percent of the shares in the corporation or owning any partnership interest in the partnership. 3. If any person identified pursuant to No. 1 above is a non-profit organization or a trust, list the names of any persons serving as a director of the non-profit organization or as a trustee or beneficiary or trustor of the trust. 4. Has the offeror had more than $250.00 worth of business transacted with any member of the City of Santa Clarita staff, boards, commissions, committees, and Council within the past twelve months? If yes, please indicate the person(s) with whom you have conducted business. NOTE: Attach additional pages as necessary. Signature of Offeror Edward M. Twining, Jr. Print or Type Name of Offeror December 2, 2016 Date ATTACHMENT B W: QTWINING SECTION 8 EQUAL OPPORTUNITY/AFFIRMATIVE ACTION STATEMENT The offeror hereafter described will not discriminate against any employee or applicant for employment because of race/color, national origin, sex, sexual preference, religion, age, or handicapped status in employment or the provisions of services. Signature Edward M. Twining, Jr. Typed Name and Title `IA QTWINING ATTACHMENT C HOLD HARMLESS AGREEMENT SECTION 8 Offeror agrees to indemnify and hold harmless the City of Santa Clarita against and from any and all damages to property or injuries to or death of any person or persons, including employees or agents of the City, and shall defend, indemnify and hold harmless the City, its officers, agents and employees, from any and all claims, demands, suits, actions or proceedings of any kind or nature, of or by anyone whomsoever, in any way resulting from or arising out of the negligent or intention all acts, errors, or omissions of the offeror or any of its officers, agents, or employees. Signature Edward M. Twining, Jr. Typed Name and Title M, QTWINING Not applicable. ATTACHMENT D SECTION 8 DESIGNATION OF SUB -CONTRACTORS, SUPPLIER AND VENDOR Listed below are the names and locations of the places of business of each sub -contractor, supplier, and vendor who will perform work or labor or render service in excess of % of 1 percent, or $10,000 (whichever is greater) of the prime CONTRACTOR'S total bid. DBE status, age of fern and annual gross receipts are required if sub -contractor is participating as a DBE. See Appendix E for additional requirements. Photocopy additional sheets if needed. 29 Sub -contractor: Age of Firm: Portion of Work & Dollar Value: Annual Gross Receipts: < $500,000_ , $500,000<_<$lmillion DBE certified? Yes/No: Agency Certifying: >$lmillion ; $1-$2million $2-$5million ; >$5million Location and Place of Business (include business address) LICENSE NO, EXP. DATE: / / PHONE ( ) Sub -contractor: Age of Firm: Portion of Work & Dollar Value: Annual Gross Receipts: < $500,000_ , $500,000<_<$lmillion DBE certified? Yes/No Agency Certifying: >$lmillion ; $142million $2-$5million ; >$5million Location and Place of Business: (include business address) LICENSE NO. EXP. DATE: / / PHONE ( ) Sub -contractor: Age of Firm: Portion of Work & Dollar Value: Annual Gross Receipts: < $500,000_ , $500,000<_<$ lmillion ; DBE certified: Yes/No >$lmillion_; $142million $2-$5million_; Agency Certifying: >$5million Location and Place of Business: (include business address) 29