Agenda Item: 2
CITY OF SANTA CLARITA
AGENDA REPORT
CONSENT CALENDAR
CITY MANAGER APPROVAL:
DATE: March 13, 2018
SUBJECT: BUS STOP IMPROVEMENT PROJECT
DEPARTMENT: Neighborhood Services
PRESENTER: Adrian Aguilar
RECOMMENDED ACTION
City Council:
1. Award a contract to E.C. Construction Company for the purchase and installation of bus stop
furniture, in an amount not to exceed $211,280.
2. Appropriate funds in the amount of $211,280 to expenditure account 12400-5201.002 and
increase Miscellaneous Federal Grants revenue account 700.4424.009 by $169,024 and
Municipal Operator Service Improvement Program (MOSIP) revenue account 700.4424.007
by $42,256.
3. Authorize the City Manager or designee to execute all contract documents, or modify the
award in the event that issues of impossibility of performance arise, subject to City Attorney
approval.
BACKGROUND
The City of Santa Clarita (City) strives to provide safety and accessibility for our patrons. Over
bus stops have included improved access and
sideways, real-time bus arrival information, new passenger amenities, and in-street concrete pads
to extend the life of our roadways.
The bus stop improvements project is a federally funded grant project from the Federal Transit
Administration that provides transit enhancement funding to eligible transit operators.
If approved by Council, this project will improve 29 existing bus stops citywide by replacing
damaged and worn bus shelters, benches and trash receptacles. It will also improve safety with
the installation of brighter solar powered LED lighting.
Page 1
Packet Pg. 17
2
An Invitation to Bid was published three times in 2018 on January 9, 13, and 16, for the Bus
Stop Improvements Project (Bid No. TMF-17-18-37). Notifications were sent to 1052 vendors.
As a result, seven
vendors submitted a bid. The results of the bids are as follows:
Company Location Bid Amount
E.C. Construction Company S. El Monte, CA $211,280
Deken Construction Corp. Valencia, CA $216,618
F.S. Contractors, Inc. Sylmar, CA $259,750
Cody & Noah Construction, Inc. dba Foster Construction Saugus, CA $270,000
PTM General Engineering Services, Inc. Riverside, CA $279,969
Cybertech Construction Company Encino, CA $353,320
Y. KO. Construction Co., Inc, Woodland Hills, CA $440,080
Federally funded projects are prohibited from specifying in-state or local geographical
preferences, or evaluating bids or proposals in light of in-state or geographic preferences, even if
those preferences are imposed by state or local laws or regulations.
Of the seven bids received, staff recommends that E.C. Construction Company be awarded the
contract to provide improvements to various bus stops City-wide. This contract is for one year
with no renewal options.
ALTERNATIVE ACTION
Other action as determined by the City Council.
FISCAL IMPACT
There is no fiscal impact to the General Fund. The appropriation of $211,280 in federal and local
transit grant funds will cover the total contract amount.
ATTACHMENTS
2018 Bus Stop Location Map
Page 2
Packet Pg. 18
Attachment: 2018 Bus Stop Location Map (Bus Stop Improvement Project)
2.a
Packet Pg. 19
Y
N
S
N
L
GO
NACL
U
C
OT
IU
QS
ICN
P
O