Loading...
HomeMy WebLinkAbout2019-04-23 - AGENDA REPORTS - NEWHALL GATEWAY CONCEPTUAL PLAN DISCUSSION (2)O Agenda Item: 5 NEW BUSINESS CITY OF SANTA CLARITA AGENDA REPORT CITY MANAGER APPROVAL: DATE: April 23, 2019 SUBJECT: NEWHALL GATEWAY CONCEPTUAL PLAN DISCUSSION DEPARTMENT: Community Development PRESENTER: Ben Jarvis RECOMMENDED ACTION City Council review the Newhall Gateway conceptual plan and provide direction. BACKGROUND Sierra Crossing Development Proposal On February 27, 2008, SFXS Partners (Applicant) submitted an application to construct the Sierra Crossing commercial center, located on 10.28 acres of vacant land at 23300 Newhall Avenue (formerly known as San Fernando Road). The project was processed under Master Case No. 08-033. The property is on the southeast corner of Newhall Avenue and Sierra Highway, where Sierra Highway is the north/south arterial and Newhall Avenue runs east/west. The project consisted of approximately 99,000 square feet of commercial space in five buildings, including a drive-through restaurant and a hotel (see Exhibit A). No residential uses were proposed. On June 2, 2009, the Planning Commission approved the project with a 4-1 vote. On June 8, 2009, the project was called up for review by the City Council, citing issues with the overall site design, aesthetics, and environmental impacts. A Public Hearing was held at the City Council meeting on August 25, 2009, and, at the request of the Applicant, was continued numerous times over the following year. The project was withdrawn by the Applicant on October 27, 2010. Newhall Gateway Conceptual Plan On January 12, 2010, in the midst of the continued Public Hearing, the City Council received a presentation by City of Santa Clarita (City) staff on the Sierra Crossing commercial project. A resolution of denial was prepared based on site design issues and impacts to the site's riparian habitat; however, no action was taken by the City Council. At that same meeting, the City Council, acting as the Redevelopment Agency board, directed staff to enter into an agreement with Poliquin Kellogg Design Group (PKDG) to conduct a conceptual design and economic Page 1 Packet Pg. 67 O analysis for the entire southeast quadrant at the Newhall Avenue/Sierra Highway intersection. This area became known as the "Newhall Gateway," and included the Sierra Crossing site and parcels owned by the University of Southern California (USC), Rouse and Rouse, LLC, Leon's Transmission Service Inc., and Whitney Canyon Ranch Associates Residential. The analysis area consisted of 18.6 acres and encompassed the triangular area bounded by Newhall Avenue on the north, Sierra Highway on the west, and State Route 14 (SR -14) on the east (see Exhibit B). In response to the Redevelopment Agency's action, the City Council tabled the review of Master Case No. 08-033 for six months to allow PKDG to complete its work on a viable development strategy. On June 22, 2010, staff presented PKDG's conceptual development plans for Newhall Gateway to the City Council/Redevelopment Agency board. Newhall Gateway Site Plan 1 (Site Plan 1) was selected as the preferred option by the City Council (see Exhibit C). Staff was given direction to work with the property owners to implement the conceptual plan. The Newhall Gateway conceptual plan is not an adopted Specific Plan, Master Plan, or legal entitlement; rather, the plan documents the City Council's vision for the kind of development that should be located at this important gateway into the Santa Clarita Valley. Site Plan 1, the most intensive of the concepts explored, proposed 269,000 square feet of commercial space with 10 buildings, including a five -level parking structure, a hotel, restaurant pads, and office buildings. The parking structure was envisioned to have 100 spaces set aside for park-and-ride use. The site plan was situated around Newhall Creek, preserving substantially more riparian area than the Sierra Crossing project. The conceptual plan also highlighted the former US Route 6 right-of-way, a linear strip of historic highway that still exists on the site. When Site Plan 1 was selected as the preferred development concept, the City did not own any of the affected properties in the Newhall Gateway area. The City Council directed staff to work with property owners to implement the plan. If property owners were uninterested or unable to proceed with development projects based on Site Plan 1, then staff was directed to examine other options, including, but not limited to, a Request for Qualifications from prospective developers that may have an interest in developing this quadrant of the Newhall Gateway area. When the State of California Redevelopment Program was discontinued in 2011, the City lost funding and redevelopment options for the site. As a result, the City has not moved forward in purchasing property or assembling parcels. Exhibit D shows the current ownership in the area. Over the past nine years, staff has used Site Plan 1 as a guiding document for the area. Potential applicants who submit conceptual plans for the property, and those who call inquiring about the area, are made aware of the City's vision for Newhall Gateway. Staff comments provided on development proposals and general answers to questions concerning development potential on the site have been consistent with the City Council's 2010 direction. The following matrix provides a development comparison between the Sierra Crossing project and the Newhall Gateway conceptual plan: Page 2 Packet Pg. 68 O DISCUSSION/ANALYSIS Environmental and Site Constraints Newhall Creek runs across the site for approximately 900 linear feet, with approximately 3.3 acres of riparian habitat surrounding the creek bed. The Sierra Crossing project proposed to fill-in and underground 300 linear feet of Newhall Creek, thereby increasing the amount of developable area. Filling in the creek bed was one reason why the project was called up for review in 2009. Several oak trees exist in the vicinity of Newhall Creek, and those trees would be impacted if the creek was to be buried. The Newhall Gateway plan preserved the Newhall Creek bed and used the riparian area as an amenity. The location of the Newhall Creek culvert under Newhall Avenue also presents a development challenge, as it prevents practical access from the project site at the corner of Sierra Highway. Access to Newhall Avenue cannot be provided unless a substantial portion of the creek is undergrounded. The Santa Monica Mountains Conservancy and local environmental groups raised concerns over the proposal to fill a portion of the riparian area and place Newhall Creek in an underground pipe. The site is further constrained by lack of access to the USC parcels located between the riparian area and the SR -14 freeway, the Caltrans slope and drainage easements, and the former US Route 6 right-of-way that contains utilities. Private property ownership and parcel locations likewise present a challenge to implementing Site Plan 1 because the parking structure envisioned in the concept plan, a structure that would provide the bulk of parking for Newhall Gateway, is located on land owned by USC. As envisioned by Site Plan 1, buildings situated on parcels owned by others would need to use the structure on the USC property in order to meet their parking requirement. Chanes Since City Council's 2010 Direction Since staff received direction from the City Council in 2010, substantial changes have occurred that affect the Newhall Gateway area. The State of California eliminated the Redevelopment Program in 2011, and the Redevelopment Agency was subsequently dissolved, eliminating the City's ability to assemble parcels and limiting its options to participate in future projects as a funding partner or lead applicant. In 2011 and 2013, respectively, the City adopted a new General Plan and Zoning Ordinance that increased the site's development potential. Today, this same quadrant of Newhall Gateway could support more than 1.6 million square feet of commercial space and between 334-930 residential units. Given the constraints of the site, the actual amount of commercial space and dwelling units would likely be less than the maximum. Even so, the land now has substantially more development potential than it did in 2010. Page 3 Packet Pg. 69 Sierra Crossing Sierra Crossing portion of Newhall Gateway Newhall Gateway Acres 10.28 10.28 18.6 Hotel (Square Feet) 55,200 75,900 75,900 Office (Square Feet) 15,626 90,400 169,000 Restaurant/Retail (Square Feet) 28,075 0 23,800 Total Square Feet 98,901 166,300 269,300 DISCUSSION/ANALYSIS Environmental and Site Constraints Newhall Creek runs across the site for approximately 900 linear feet, with approximately 3.3 acres of riparian habitat surrounding the creek bed. The Sierra Crossing project proposed to fill-in and underground 300 linear feet of Newhall Creek, thereby increasing the amount of developable area. Filling in the creek bed was one reason why the project was called up for review in 2009. Several oak trees exist in the vicinity of Newhall Creek, and those trees would be impacted if the creek was to be buried. The Newhall Gateway plan preserved the Newhall Creek bed and used the riparian area as an amenity. The location of the Newhall Creek culvert under Newhall Avenue also presents a development challenge, as it prevents practical access from the project site at the corner of Sierra Highway. Access to Newhall Avenue cannot be provided unless a substantial portion of the creek is undergrounded. The Santa Monica Mountains Conservancy and local environmental groups raised concerns over the proposal to fill a portion of the riparian area and place Newhall Creek in an underground pipe. The site is further constrained by lack of access to the USC parcels located between the riparian area and the SR -14 freeway, the Caltrans slope and drainage easements, and the former US Route 6 right-of-way that contains utilities. Private property ownership and parcel locations likewise present a challenge to implementing Site Plan 1 because the parking structure envisioned in the concept plan, a structure that would provide the bulk of parking for Newhall Gateway, is located on land owned by USC. As envisioned by Site Plan 1, buildings situated on parcels owned by others would need to use the structure on the USC property in order to meet their parking requirement. Chanes Since City Council's 2010 Direction Since staff received direction from the City Council in 2010, substantial changes have occurred that affect the Newhall Gateway area. The State of California eliminated the Redevelopment Program in 2011, and the Redevelopment Agency was subsequently dissolved, eliminating the City's ability to assemble parcels and limiting its options to participate in future projects as a funding partner or lead applicant. In 2011 and 2013, respectively, the City adopted a new General Plan and Zoning Ordinance that increased the site's development potential. Today, this same quadrant of Newhall Gateway could support more than 1.6 million square feet of commercial space and between 334-930 residential units. Given the constraints of the site, the actual amount of commercial space and dwelling units would likely be less than the maximum. Even so, the land now has substantially more development potential than it did in 2010. Page 3 Packet Pg. 69 O Needham Ranch is another factor, as that development is under construction. A Condition of Approval for Needham Ranch required a new right -turn lane on northbound Sierra Highway at Newhall Avenue. The new lane requires an additional 12 feet of right-of-way that further constrains the corner parcel at Sierra Highway and Newhall Avenue. In 2017, the Sierra Crossing applicant submitted for a Lot Line Adjustment to create a one -acre lot at the corner of Sierra Highway and Newhall Avenue. The Lot Line Adjustment was recorded in September 2017. Also in 2017, USC submitted for a lot merger to combine its properties in the Newhall Gateway area adjacent to SR -14. The lot merger was recorded in 2018. Consolidating the lots provided frontage on Newhall Avenue for the entire USC property, though physical access may not be feasible due to the property's proximity to the southbound SR -14 on- ramp. The most practical access for the USC property continues to be through adjoining parcels that front Sierra Highway. Access is one reason why the City Council supported the concept of a master planned development for the area; taking a larger view of issues, such as access, drainage, and infrastructure, could potentially allow more efficient use of the site than developing the site in an uncoordinated manner. One Stop Reviews Since 2010, when Site Plan 1 was selected as the preferred development plan by the City Council, staff has processed three One Stop Reviews for the Newhall Gateway area. Some proposals encompassed the entire quadrant, others looked at sub -areas of the larger site. A One Stop Review is a general look at a conceptual project and is not a formal development request. The One Stop Reviews are summarized below: • Master Case 17-015 For 258 residential units and 40,700 square feet of commercial space, including two restaurants with drive-through lanes • Master Case 18-017 For a gas station at the corner of Newhall Avenue and Sierra Highway • Master Case 18-018 For a Tentative Parcel Map for the subdivision of land In each case listed above, staff provided comments that referenced the Newhall Gateway conceptual plan. An example of typical written comments includes the following: The project is located in an area known as the Newhall Gateway. This area serves as a major entry point into the City of Santa Clarita. Given the prominence of the corner, its proximity to the Antelope Valley Freeway, and its role as a gateway into Old Town Newhall, the City Council has stated the entire quadrant should be planned with a coordinated, long-term, economically viable strategy. • As proposed, it is unclear whether or not the proposed subdivision is consistent with Site Plan I of the Newhall Gateway development concept (Newhall Gateway Plan). On June 22, 2010, the City Council directed staff to work to implement the Newhall Gateway Plan. Staff will review any proposed project as it relates to the development strategy identified in the Newhall Gateway Plan. Page 4 Packet Pg. 70 The Newhall Gateway conceptual plan did not contemplate gas stations, drive-through restaurants, or housing; therefore, staff has consistently provided input that discourages these uses in favor of the hotel, restaurant, and office uses envisioned by Site Plan 1. ALTERNATIVE ACTION Other action as determined by Council. FISCAL IMPACT The discussion would have no fiscal impact. ATTACHMENTS Exhibit A: Sierra Crossing Site Plan Exhibit B: Newhall Gateway Vicinity Map Exhibit C: Newhall Gateway Site Plan 1 Exhibit D: Newhall Gateway Ownership O Page 5 Packet Pg. 71 w FFilI I� •.,I I I 1 u Ueld len;deouo:D Aeme;eE) peLlmON) ueld GM 6uissoa:D eJJOIg :V;lglyx3 :;uauayoe;;V cup `n r m 1 � S ���$� FLLi �oaeeaeNw d Nr11N �•ll iv �iSa � n- a LLYR 1L �j � ] O0. 4rj C iC LU • 1 � oo Is�,o 99 29 d I �AVT;4 Murrym nnn miry NNA M Lr) (uoissnosla ueld len}deouoa Aeme4e!D IlegmON) dew A;luloln AMOWD IlegmeN :8 4Iq!gx3 :4uauay3e44V m X Q W N Ro N U d U to a U w W Z 2 W • z NROAD CAM 02 Z • _r' ti ° �6 Cf N r i I__1 ob y Z OLDEN V a f4 �- r M Cl a v cc a U p k W (uolssnosla ueld len;daouoa (ema;eE) llegmaN) L ueld a;lg (ema;eE) llegmaN :D;lglgx3 :;uawgoe;;y ar nem arwro� arram�� u: a�um.>� acwro W m aS a$ 0 0 g� _ o f-.= � N No Z W = O LL LLl LL. IL w c 2 O r 0 coo �o On � o n 'i Z� Z� Z� N 0 c p b W oar 0 p z 0 O o z O m a YWo S O W S2 w H~ m m ¢LL QLL aaa m mNw �� �a 1w �= 4N z cc m o� _ :a a o aE sS a LL LL LL LLLL N N W N N N N Nf11 am u:d ":dLL o W LL. li I: IL LCL{ .j< NQ In VI t� f/J 'd N In In J N �F $ �* m w°*m (- 0 m Off. lJ.l O g U) o g 0 z o I z U} w ¢ 0 a m Z_ < da w 0 0 w w w Zvi ~� /n �o m w 0 U U U =g aaz'Q m Q Q N LLW UY_ Z)W wli FO o 9 m �� go coo to m X�m W. z Zw z� z� zrm ycn co W w� 9O m 9> �o �� OJo ,O (nm{n 65 (p� m u: mO mm mm mN =vi u: N 0 W m fJ! Q t� Q (!i V1 to 0 0 _ m U U U Z W = O LL LLl LL. IL w c 2 O r 0 coo �o On � 3m Z� Z� Z� m 0 a. Q ��z m oN 2 O, 2 �o =0 mm mN mN 6 Q m a a OO W m u:d ":dLL o W LL. li I: IL LCL{ .j< NQ In VI t� f/J 'd N In In J N �F $ �* m w°*m (- 0 m Off. lJ.l O g U) o g 0 z o I z U} w ¢ 0 a m Z_ < da w 0 0 w w w Zvi ~� /n �o m w 0 U U U =g aaz'Q m Q Q N LLW UY_ Z)W wli FO o 9 m �� go coo to m X�m W. z Zw z� z� zrm ycn co W w� 9O m 9> �o �� OJo ,O (nm{n 65 (p� m u: mO mm mm mN =vi u: u: Li W m fJ! Q t� Q (!i V1 to N fA * W = N W b m N M am N * Q U' N M1 N w O, 2 Q z � x wz 0 xm a Q Q } wd' Q ¢ O wrc w 0 0 w w w �= 4N a= a �¢i ¢LL mLLvLL _ O h -Z U' m 00 Uo Z O C7o ¢ x g z 19 Zz a K� z�: a ] w� d ow no 90 no Lu Won H CO w N°a m LL mO mN mN mm u:d ":dLL o W LL. li I: IL LCL{ .j< NQ In VI t� f/J 'd N In In J N �F $ �* m w°*m (- 0 m Off. lJ.l O g U) o g 0 z o I z U} w ¢ 0 a m Z_ < da w 0 0 w w w Zvi ~� /n �o m w 0 U U U =g aaz'Q m Q Q N LLW UY_ Z)W wli FO o 9 m �� go coo to m X�m W. z Zw z� z� zrm ycn co W w� 9O m 9> �o �� OJo ,O (nm{n 65 (p� m u: mO mm mm mN =vi W m H W = am N U' O, 2 � � OY N m o Q d S o N N y Q t�J O ii g N NW �N Oar Cf Won w WW 00 m OO z Zm< Y LL "M aw wt �� ~ as a WN a¢z z zz z LLp Wf-ttYYY Y YY Orn H a as a u:d ":dLL o W LL. li I: IL LCL{ .j< NQ In VI t� f/J 'd N In In J N �F $ �* m w°*m (- 0 m Off. lJ.l O g U) o g 0 z o I z U} w ¢ 0 a m Z_ < da w 0 0 w w w Zvi ~� /n �o m w 0 U U U =g aaz'Q m Q Q N LLW UY_ Z)W wli FO o 9 m �� go coo to m X�m W. z Zw z� z� zrm ycn co W w� 9O m 9> �o �� OJo ,O (nm{n 65 (p� m u: mO mm mm mN =vi 0.00 All 111 ill BJORKMANrMI(C TR'ET�AL�&�M�ANDJL Lei FINANCIAL,COMPANY9X'XV IVERSITY� OF, SOUTHERN;'' ..tl CALIFORNIA �T,rMCAND,L FINANCL z`1, OMPANYXXV�&IA REDMOND JOHN�L f N I r - t ,-ROUSE�AND �l =ROUSE LLC `LEONS TRANSMISSION% SERVICE INC. .F W,-iff /IRA 5 WHITNEANYON ,ANCWASSOCIATES RESIDENTIAL I 5.d I 0 c a Newhall Gateway Area Parcel Ownership The City of Santa Clarita does not warrant the accuracy ofthe data and assumes no liability for any errors or omissions. Map prepared by: City of Santa Clarita - GIS Q:\PROJECTS\CD\190322bl\newhall—gatoway.aprx Packet Pg. 75 U fC z Newhall Gateway Area Parcel Ownership The City of Santa Clarita does not warrant the accuracy ofthe data and assumes no liability for any errors or omissions. Map prepared by: City of Santa Clarita - GIS Q:\PROJECTS\CD\190322bl\newhall—gatoway.aprx Packet Pg. 75