Loading...
HomeMy WebLinkAbout2019-09-10 - AGENDA REPORTS - AWARD OF CONTR TO AMERON POLE PRODUCTS FOR THE PUR (2)Agenda Item: 6 DATE: September 10, 2019 SUBJECT: AWARD OF CONTRACT TO AMERON POLE PRODUCTS FOR THE PURCHASE OF ADVANCED REPLACEMENT STREETLIGHT POLES DEPARTMENT: Neighborhood Services PRESENTER: Kevin Tonoian RECOMMENDED ACTION City Council: 1. Award a three-year contract for replacement streetlight poles to Ameron Pole Products for an annual amount of $250,000, for a total contract amount not to exceed $750,000. 2. Appropriate $250,000 to expenditure account 12593-5161.022 for the advanced purchase of replacement streetlight poles, from Landscape Lighting District Streetlight Maintenance Fund 359, to expedite future streetlight knockdowns. 3. Authorize an ongoing base budget appropriation of $250,000 to expenditure account 12593- 5161.022, from Landscape Lighting District Streetlight Maintenance Fund 359, for the ongoing costs associated with the advanced purchase of replacement poles. 4. Authorize the City Manager or designee to execute all contracts and associated documents, subject to City Attorney approval. BACKGROUND On May 10, 2018, the California Public Utilities Commission approved the City of Santa Clarita's (City) purchase of the streetlight system from Southern California Edison (Edison). Staff anticipates that the ongoing acquisition and conversion of the streetlight system to Light Emitting Diode (LED) fixtures will generate operational savings in excess of $30 million during the first 30 years of ownership. Page 1 In addition to transferring ownership of the system, the City is now also responsible for ongoing maintenance, including streetlight knockdowns resulting from vehicle collisions. While the City's knockdown experience during the first six -months of ownership has been limited, with a system encompassing more than 16,500 streetlights, staff forecasts replacing 50 to 100 pole knockdowns each year. To limit financial exposure, the City's insurance carrier provides coverage for the streetlight system. While the City incurs a $1,000 deductible per knockdown occurrence, our insurance carrier will be responsible for reimbursing all remaining expenditures, including the cost of the replacement pole as well as the associated labor. Additionally, our insurance carrier will cover costs associated with the initial emergency response to make the location safe and subsequent services to clear damaged poles. Ameron Pole Products (Ameron), located in Fillmore, California, is the number one manufacturer of concrete streetlight poles in the United States. Ameron provides streetlight poles throughout the country, and is the standardized pole used within the entire Edison service area including Santa Clarita. Pursuant to Section 3.12.270 (B) of the City's Municipal Code (Exceptions to Competitive Bidding Requirements), staff recommends dispensing with bidding procedures as the specific concrete streetlight pole utilized in Santa Clarita may only be obtained from Ameron. While the local sales representative for Ameron, Del Sol Resources, will facilitate this sale, the City will direct all payments to Ameron. The timeline to fabricate and deliver replacement poles to address individual knockdowns requires six to eight weeks of lead-time from placing the order. To expedite the replacement of streetlights damaged by vehicle collisions, staff is recommending the award of a three-year, single -source contract to Ameron in the annual amount of $250,000 for the advanced purchase of replacement poles. This action will provide the City with adequate inventory to access as necessary and facilitate pole knockdown replacements within approximately two weeks, as opposed to eight to ten weeks when ordering replacements as each knockdown occurs. Staff recommends placing an initial order for 50 replacement poles. The cost associated with securing these poles is $114,680, inclusive of transportation and delivery. Upon fabrication, the City's Transit Maintenance Facility will serve as the storage location for replacement poles. ALTERNATIVE ACTION Other actions as determined by the City Council. FISCAL IMPACT There is no impact to the General Fund. This action requires an appropriation from the Streetlight Maintenance District (Fund 359) of $250,000 for Fiscal Year 2019-20, and is contingent upon Council appropriation of funds as part of the annual budget in future years. The Streetlight Maintenance operation budget will be responsible for funding all advanced costs for each streetlight knockdown. The City's insurance carrier will reimburse all expenses for each knockdown, with the exception of a $1,000 deductible per occurrence. Page 2 ATTACHMENTS Del Sol Resources Quote Page 3 Date: Aug 21, 2019 anng" IF IIL.....S 0 �..I I1 C IIIIIIIC Quote: DSR - LA19-10304-3 Project CITY OF SANTA CLARITA - Location SANTA CLARITA CA Quote DSR - LA19-10304-3 6.a Quo �, Page Del Sol Resources 249 S Hwy 101 PMB 532 Solana Beach CA 92075 Phone: (760) 407-1410 Fax: (760) 407-1575 From: KELLY SPERBECK Quoter Ph: email: To: KEVIN TONOIAN For CITY OF SANTA CLARITA Bid Date Jul 22, 2019 SANTA CLARITA CA Expires Aug 21, 2019 Phone: (661) 290-2210 EMail: KTONOIAN@SANTA-CLARITA. TY T e MFG Part Price UQ ExtPrice 5 AMERON 1 C1 25 BASEPLATED OCTAGONAL POLE 25'-6" $1,714.00 8 570.00 ABOVE GRADE HEIGHT 373N BLACK & WHITE LA EXPOSED AGGREGATE FINISH NO COATING 1AP6A SINGLE 6 ALUMINUM ARM ASSEMBLY PER DRAWING #1905- 012. WITH ANCHOR BOLTS AND DELIVERY & STOCKPILING OF POLE PER POLE. LOADING: 1 LUMINAIRE 2.5 SQ. FT. EPA 50 LBS LUMINAIRE BY OTHERS. 45 AMERON 1 C1 29 BASEPLATED OCTAGONAL POLE 29'-0" $2,358.00 106 110.00 ABOVE GRADE HEIGHT 373N BLACK & WHITE LA EXPOSED AGGREGATE FINISH NO COATING 1AP6A SINGLE 6 ALUMINUM ARM ASSEMBLY PER DRAWING #1812- 008. WITH ANCHOR BOLTS AND DELIVERY & STOCKPILING OF POLE PER POLE. LOADING: 1 LUMINAIRE 2.5 SQ. FT. EPA 50 LBS LUMINAIRE BY OTHERS. Total: Notes: QUOTE IS SUBJECT TO APPROVAL. FREIGHT/ANCHOR BOLTS/DELIVERY AND STOCKPILING ARE INCLUDED IN THIS QUOTE. NO SALES TAX INCLUDED. 1 WEEK LEAD TIME FOR DRAWINGS. 8 WEEK LEAD TIME AFTER THE RECEIPT OF SIGNED APPROVALS. Terms and conditions of sale: NOTES: PRICES NOT GUARANTEED AFTER 30 DAYS. STANDARD FREIGHT TERMS APPLY. ADD FREIGHT FOR PRE -SHIPMENT OF ANCHOR BOLTS. STANDARD MANUFACTURE'S COLORS ARE QUOTED. STANDARD MANUFACTURE'S WARRANTEES APPLY. SPARES NOT INCLUDED UNLESS LISTED ABOVE. $114,680.00 0 ) E Q 0 U 0 0 tJ 0 L Q m 0 0 d 0 m U 0 0 m 0 co m d 0 m E U M Q KELLY SPERBECK Date: Aug 21, 2019 anng" IF IIL.....S 0 �..I I1 C IIIIIIIC Quote: DSR - LA19-10304-3 Project CITY OF SANTA CLARITA - Location SANTA CLARITA CA Quote DSR - LA19-10304-3 6.a ' Quo �' Page Del Sol Resources 249 S Hwy 101 PMB 532 Solana Beach CA 92075 Phone: (760) 407-1410 Fax: (760) 407-1575 From: KELLY SPERBECK Quoter Ph: email: QUOTATION IS VOID IF CHANGED. COMPLETE QUOTE MUST BE USED, NO PARTIALS. FREIGHT/DELIVERY: UNLESS OTHERWISE NEGOTIATED, BUYER SHALL PAY FREIGHT/DELIVEREY CHANGE ON GOODS IN TRANSIT AND FILE ANY NECESSARY RESULTING CLAIMS. MANUFACTURE SHALL NOT BE RESPONSIBLE FOR DAMAGE THAT OCCURES TO ANY PRODUCTS SINCE THE PRODUCTS HAVE BEEN TRANSFERRED TO AN ATHORIZED SHIPPING & DELIVERY PROVIDER. S 0 m E Q 0 U L 0 tJ O L 3 Q KELLY SPERBECK