Loading...
HomeMy WebLinkAbout2019-12-10 - AGENDA REPORTS - AWARD CONSTR CONTR FOR NEWHALL RANCH ROAD PARKWAY (2)Agenda Item: 9 DATE: December 10, 2019 SUBJECT: AWARD CONSTRUCTION CONTRACT FOR NEWHALL RANCH ROAD PARKWAY AND SLOPE PLANTING PROJECT DEPARTMENT: Neighborhood Services PRESENTER: Kevin Tonoian RECOMMENDED ACTION City Council: Award the construction contract to STL Landscape, Inc., in the amount of $188,000, and authorize a contingency in the amount of $37,600, for a total contract amount not to exceed $225,600. 2. Appropriate one-time funds in the amount of $225,600 from the Landscape Maintenance District Fund Balance (Fund 357), to expenditure account 12534-5161.013. 3. Authorize the City Manager or designee to execute all contracts and associated documents, subject to City Attorney approval. BACKGROUND The Newhall Ranch Road Parkway and Slope Planting Project consists of renovations on both sides of the newly widened bridge and adjacent trail slope areas, including the installation of parkway plant material and irrigation, to enhance roadway beautification. This project supports the Community Beautification theme identified as part of Santa Clarita 2020 and exemplifies the City of Santa Clarita's (City) commitment to maintaining a high quality of life for residents. Investing in high -quality landscape projects within the public right- of-way helps maintain higher property values and keeps the City on the cutting edge of water management and infiltration practices. Page 1 An Invitation to Bid, LMD-19-20-08, was published and circulated via the PlanetBids system on October 8, 2019. Fifty-three vendors downloaded bid specifications, with eight bids submitted to the City. Company Location Base Bid Amount STL Landscape, Inc. Los Angeles, CA $188,000 Marina Landscape, Inc. Orange, CA $199,067 Oakridge Landscape, Inc. Valencia, CA $203,826 FS Contractors, Inc. Sylmar, CA $233,061 Venco Western, Inc. Oxnard, CA $245,292 KASA Construction, Inc. Chino, CA $247,965 American Landscape, Inc. Canoga Park, CA $249,706 Alfaro Communications Construction, Inc. Compton, CA $270,559 Based on the evaluation of proposals and subsequent due diligence research of professional references, staff recommends award of contract to STL Landscape, Inc. (STL), to cover the completion of this project. STL possesses a valid state contractor's license and is in good standing with the Contractors State License Board. While the Santa Clarita Municipal Code maintains a Support of Local Businesses provision that can be utilized by the City Council when warranted, the City is governed by the California Public Contract Code with regard to public works project procurement. In this type of procurement, the California Public Contract Code does not permit a city to utilize a Support of Local Businesses policy, and instead requires award of contract to the lowest responsible bidder. The project budget encompasses construction, inspection, labor compliance, and project administrative costs. The 20 percent construction contingency will address costs associated with unforeseen site conditions uncovered during the parkway excavation, including potential conflicts with existing utilities, removal of unsuitable soil, or import of plant soil if necessary. ALTERNATIVE ACTION Other action as determined by the City Council. FISCAL IMPACT There is no impact to the General Fund. This action requires a one-time appropriation in the amount of $225,600 from the LMD Fund Balance, Fund 357, to expenditure account 12534- 5161.013. ATTACHMENTS Bioswale-Slope Planting Bid LMD 19-20-08 (available in the City Clerk's Reading File) Page 2 STL Response (available in the City Clerk's Reading File) Page 3 a laar.r a�raurw aouonaasaoo evrwere aroa wawa nr.Wtl ayV.0 eeas...aae �i..u.w CV b 2 w.n Wz <b0 x'<sz� �� l�iuT 9 i F Qp E a t Eu u � z�2z <uuuVV Ww.¢¢LLn FFOcrc. o g VO—t0 futa'-W2���d Z W � z d U Q 0 z w s $a Y u Z s �I o� W [% z y € z v OM i 1 * + + 1 + + 1 ci-. , i o I pp U I 4 R c F i `C°1 a ` Ala 0 o E $ 55 t i r d °. z o g ng 8 �W Z ss —01 wu* A¢— 7 g $ 0 ® Smys E oki �Wo € o fzga -&I m •fie + m o€<< y a{ Rm O pp U i ice' Xig F-rc� zOo $ S 8 t ooW '� 10 �p.P\� i i�� COO R �°�m ig- <i x F Z. oe- I qq o ti� 3��u ** z QQ 6 u 6=''" � &Oz �ci Oo(if� G a i �<z z� o nt - 0560tE84 p+�z19» Wgob0z bps=„=2>>0` Sd>� HA o8FS;o'i.s `mdduwU.� H 10YYMY 1]1YlMO]Mgl]IIILLSNO]�YMYYYd dY0Y X3YW 11YX %Ii 6utugd MO4WdaY V�WV�4Y 3 3 RR � F QQ a R � P s g s I o 'a3 �WZ�r�>>20pp 3 YY J F o 000uS gZ',��FlO np c��F3 9 i <VUU YhUU Z 'a U z Q � � � Z o1 3 O m �<x agc _uMo Mi L $ I, ed S _0p5 I {. � 33gz I 1 I oW� I 1, •; 1 11 (1 1 {I 1 {I s 1 11 ® 1 11 R s I I o Gill � I I u 1 1 1 1: 1 1; $ 1 1 oP3p 1 1" a r 1 II s$ uxrta wp 1 1 E g' 1 I I al 14' 01 x 1 S I ZkYg u� Z �1 ,W3 ax`s a 1 I i op p < o U4 u I 1 1 _�imu fin„ a a g w= sW urRa o4S-2<u otF<oW zi � 5 gg u I i d wW ar vipL i a °.Wpgj;W Z-�j� z 03#<u iiw �yg u C<rcW u�p gift it<'lo4 �.X3nd ooW <b<npF �2{}R7 5� I o a�^i=�A, 4 ° SM 4�O`O z2 -20 SSA 2Fw Mao n0 g< <oW 0w FiS K'ZZ-g22m.2§ rcEgaa 7-jw W=ayd��WO�WR�oaar,dd�nuogioW ooi»�8;e�•�z • E-Sp �Q z�,Qz= uu p U O'<OF�$S22t aauS��ie•o1°Fl m „pus:>`>ou �I THE CITY OF SANTA CLARITA CONTRACT DOCUMENTS AND SPECIAL PROVISIONS For Newhall Ranch Road Parkway and Slope Planting Bid No. LIVID 19-20-08 Prepared By: City of Santa Clarita Neighborhood Services Department 23920 Valencia Blvd. Santa Clarita, CA 91355-2196 Contact: Katie Knybel Project Manager (661) 290-2204 kknybel@santa-clarita.com Bids Due: November 8, 2019 @ 11:00 am TABLE OF CONTENTS Newhall Ranch Road Parkway and Slope Planting Bid No. LIVID 19-20-08 TITLE SECTION NOTICE INVITING BIDS..........................................................................................................A INVITATION FOR BID.............................................................................................................B BIDINSTRUCTIONS......................................................................................................B PROPOSAL..........................................................................................................................0 PROJECT BID SCHEDULE............................................................................................0 DESIGNATION OF COMMISSIONING SUBCONTRACTORS......................................0 DESIGNATION OF SUBCONTRACTORS.....................................................................0 REFERENCES................................................................................................................0 ACKNOWLEDGEMENT & ACCEPTANCE OF BID SPECIFICATION ...........................0 EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION..........................................0 BIDDER'S CERTIFICATION...........................................................................................0 PROPOSLA GUARANTEE (BID BOND)........................................................................0 NON -COLLUSION AFFADAVIT......................................................................................0 BIDDER'S QUESTIONAIRE...........................................................................................0 PROJECT AGREEMENT.........................................................................................................D FAITHFUL PERFORMANCE BOND...............................................................................D LABOR AND MATERIAL BOND.....................................................................................D ADMINISTRATIVE SPECIFICATIONS....................................................................................E GENERAL PROVISIONS - SPECIAL PROVISIONS...............................................................F EXHIBITA................................................................................................................................ CONSTRUCTION DOCUMENTS SECTION A: NOTICE INVITING BIDS Bids must be received electronically before 11:00 AM on Monday, November 8, 2019 by the Purchasing Agent of the City of Santa Clarita. Specifications for this electronic bid may be viewed at: http://www.planetbids.com/portal/portal.cfm?CompanylD=l 6840# Newhall Ranch Road Parkway and Slope Planting Bid No. LIVID 19-20-08 Please refer to specifications for complete details and bid requirements. In accordance with the provisions of California Public Contract Code Section 3300, the successful bidder shall submit proof of a State Contractor's License, C-27 with bid response. Failure to possess the specified license shall render the bid as non -responsive and shall act as a bar to award the contract to any bidder not possessing said license at the time of award. As provided for in Section 22300 of the California Public Contract Code, the Contractor may substitute securities for monies withheld by the City to ensure performance under the contract. DEPARTMENT OF INDUSTRIAL RELATIONS REQUIREMENTS. No BIDDER or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code Section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code Section 1771.1(a)]. No BIDDER or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code Section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. PREVAILING WAGES. This contract is subject to the State prevailing wage requirements of the California Labor Code including, but not limited to, Sections 1770, 1771.5, 1773, 1776 and 1777.5. Contractor shall comply with California prevailing wage laws including, to the extent applicable, Labor Code Section 1720.9. Pursuant to Section 1773 of the Labor Code, the general prevailing wage rates in the county, or counties, in which the work is to be done have been determined by the Director of the California Department of Industrial Relations. These wages are set forth in the General Prevailing Wage Rates for this project, available from the California Department of Industrial Relations' Internet web site at http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm. Future effective general prevailing wage rates which have been predetermined and are on file with the California Department of Industrial Relations are referenced but not printed in the general prevailing wage rates. A copy of the prevailing rate of per diem wages shall be posted at the job site. The Contractor is responsible for obtaining a current edition of all California statutes and regulations, and adhering to the latest editions of such. Specifications for this bid may be downloaded from the City's Purchasing website at http://www.planetbids.com/portal/portal.cfm?CompanylD=16840#. Please refer to specifications for complete details and bid requirements. The specifications in this notice shall be considered a part of any contract made pursuant thereto. Purchasing (661) 255-4918 Bid # LMD 19-20-08 SECTION B: INVITATION FOR BID CITY OF SANTA CLARITA INVITATION FOR BID Newhall Ranch Road Parkway And Slope Planting BID # LMD 19-20-08 Bids must be uploaded via PlanetBids before 11:00 AM on Friday, November 8, 2019 to the Purchasing Agent of the City of Santa Clarita. Specifications for this electronic bid may be viewed at: http://www.planetbids.com/portal/portal.cfm?CompanylD=l 6840# Purchasing: (661) 255-4918 1. Solicitation documents for this bid may be downloaded from the City's Purchasing PlanetBids website at http://www.planetbids.com/portal/portal.cfm?CompanylD=16840#. Please refer to the solicitation documents for complete details and bid requirements. 2. There will be a pre -bid meeting on October 16, 2019 at 2:00 PM at City Hall, 23920 Valencia BI, Santa Clarita, CA 91355 - Century Conference Room, Suite 150. It is strongly encouraged for all interested contractors to attend. Interested parties may RVSP via Planet Bids. Attendees will meet at: City Hall, 23920 Valencia BI, Santa Clarita, CA 91355 - Century Conference Room, Suite 150 on 2:00 PM. This is the one and only meeting that will be scheduled for this bid. 3. Proposer shall honor bid prices for One Hundred Twenty (120) days or for the stated contract period, whichever is longer. 4. Bids must include this invitation for bid form and be signed by the contractor's authorized representative. This signature acknowledges the proposer has read and understands the requirements contained in all bid documents. 5. The last day for questions will be November 1, 2019, 10:00 AM. Questions should be submitted electronically via PlanetBids: http://www.planetbids.com/portal/portal.cfm?CompanylD=l 6840# 6. The vendor is responsible for the accuracy and completeness of any solicitation form not obtained directly from the City. 7. The specifications in this notice shall be considered a part of any contract made pursuant thereto. I have, read, understood, and agree to the terms and conditions on all pages of this invitation for bid. The undersigned agrees to furnish the commodity or service stipulated on this bid as stated above. Company: Address: Name (Print): Company Phone No.: Signature: Title of Person Signing Proposal: SECTION B: BID INSTRUCTIONS Bid # LIVID 19-20-08 Newhall Ranch Road Parkway And Slope Planting ADDENDA. The City will not accept responsibility for incomplete packages or missing addenda. It is the vendors responsibility to monitor PlanetBids for release of the addenda prior to submission of the quote to make certain the package is complete and all required addenda are included. This information will be available via PlanetBids. Vendors are cautioned against relying on verbal information in the preparation of bid responses. All official information and guidance will be provided as part of this solicitation or written addenda. Addenda, if issued by the Agency, will be transmitted via PlanetBids. Addenda must be digitally acknowledged through PlanetBids in addition to a printed and signed version submitted with the bid. If addenda are not signed and submitted with the quote response, the bid may be deemed non -responsive and rejected. 2. AWARDS. 2.1. The City reserves the right waive any informality in any bid. 2.2. The City will award in accordance with S.C.M.C. § 3.12.205 (Support of Santa Clarita Businesses) unless this bid is identified as public works, a professional services, or is federally funded. 2.3. Qualifications of responsibility will be in accordance with the S.C.M.C. Lowest cost is the lowest total cost to the City to acquire the goods and/or services resulting from this solicitation. 2.4. The City may make an award based on partial items unless the bid submitted is marked "All or none." Where detailed specifications and/or standards are provided the City considers them to be material and may accept or reject deviations. The results of the bid will be posted on PlanetBids, normally within 24 hours. 3. BRAND NAMES, ALTERNATIVES, OR EQUIVALENTS. 3.1. In the bid documents, the use of a specific manufacturer, brand or make does not restrict bidders in in their proposed solution wHen brand names are used it indicates the quality and utility of the article desired; thus the bids submittial shall in all cases propose goods equal in quality and utility. to those referred to. 3.2. Materials differing from stated specifications may be considered, provided such differences are clearly noted and described. The Agency shall make the final determination of compliance with the specifications. 3.3. If proposing with an alternative or equivalent product, provide the cut sheet/spec sheet or detailed product description for the proposed product via the PlanetBids Q&A section prior to the last day for questions. For each product proposed documentation provided must include a description reflecting the characteristics and level of quality that will satisfy the salient physical, functional, or performance characteristics of "equal" products specified in the solicitation. The proposal must also clearly identify the item by brand name (if any), and make/model number. In addition, the proposal may include descriptive literature such as illustrations, drawings, or a clear reference to previously furnished descriptive data or information available to the City, and clearly describe any modifications the offeror plans to make in a product to make it conform to the solicitation requirements. 3.4. The City has the option of accepting or rejecting any alternative or equivalent product. Exception is made on those items wherein identical supply has been determined a necessity and the notation NO SUBSTITUTE has been used in the specification section. 4. BONDS. 4.1. When deemed necessary by the City, bid bonds shall be furnished by all bidders in the amount of at least 10% of the total value of the bid OR 10 % of the value of the 1 st year of service for service bids, to guarantee that bidders will enter into contract to furnish goods or services at prices stated. The bonding company must be listed on Treasury Circular 570 and licensed to operate in the state of California. 4.2. Likewise, a Performance Bond and/or Material and Labor bonds shall be required of the successful bidder when stated in the specification (cash deposit, certified or cashier's check or money order may be substituted in lieu of either bond). 4.3. Original Bond or Cashier's Check MUST be received AT CITY HALL, 23920 Valencia Blvd., Santa Clarita, CA 91355, ATTENTION SUITE 120 and marked with the words "BID BOND FOR" and the bid #, "NO LATER THAN the bid due date and time, for the vendor to be considered responsive. 5. COOPERATIVE BIDDING. Other public agencies may be extended the opportunity to purchase off this solicitation with the agreement of the successful vendor(s) and the City of Santa Clarita. The lack of exception to this clause in vendor's response will be considered agreement. However, the City of Santa Clarita is not an agent of, partner to or representative of these outside agencies and is not obligated or liable for any action or debts that may arise out of such independently negotiated "piggy -back" procurements. 6. DELIVERY. Unless otherwise specified, delivery shall be D.D.P., the City of Santa Clarita, site of user division and contract delivery may begin no later than fifteen (15) calendar days from receipt of order. 7. INVOICES. Invoices will be forwarded to: City of Santa Clarita Attention: Katie Knybel NS - Special Districts 23920 Valencia Blvd. Santa Clarita, CA 91355-2196 Invoices will reflect the purchase order # and goods or service delivered in accordance with the terms of the contract. Invoice processing begins on receipt of the material or invoice, whichever is later. 8. STATE PREVAILING WAGE. This contract is subject to the State prevailing wage requirements of the California Labor Code including, but not limited to, Sections 1770, 1771.5, 1773, 1776 and 1777.5. Pursuant to Section 1773 of the Labor Code, the general prevailing wage rates in the county, or counties, in which the work is to be done have been determined by the Director of the California Department of Industrial Relations. These wages are set forth in the General Prevailing Wage Rates for this project, available from the California Department of Industrial Relations' Internet web site at http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm. Future effective general prevailing wage rates which have been predetermined and are on file with the California Department of Industrial Relations are referenced but not printed in the general prevailing wage rates. A copy of the prevailing rate of per diem wages shall be posted at the job site. This bid is subject to SB 854 and SB-96. Contractor shall comply with California prevailing wage laws including, to the extent applicable, Labor Code Section 1720.9. The Contractor is responsible for obtaining a current edition of all California statutes and regulations and adhering to the latest editions of such. 9. PREPARATION. All bids must be submitted via PlanetBids. All forms must be uploaded as laid out in the PlanetBids General Attachments Section. 10. REJECTION. The City reserves the right to reject any or all bids and to waive any informality in any quote. The City may reject the bid of any vendor who has previously failed to perform properly, or complete on time, contracts of a similar nature, or to reject the quote of a vendor who is not in a position to perform such a contract satisfactorily. The City may reject the bid of any vendor who is in default of the payment of taxes, licenses or other monies due to the City of Santa Clarita. 11. RENEWAL AND PRICING ADJUSTMENT. Contracts entered into pursuant to this Invitation to Bid may be renewed annually, up to two times, in accordance with the terms of the contract. If not otherwise stated, the contract may be renewed if the new pricing of the contract does not change more than the Consumer Price Index - All Urban Consumers (not seasonally adjusted), Los Angeles Area -Riverside - Orange county area and prevailing wage rates, if applicable. Price adjustments may be increases or decreases as appropriate and must be requested at least 90 days prior to the expiration/renewal of the contract. The index level for the month preceding the month of solicitation advertisement will become the beginning index. The price adjustment limit will be the percentage change based on the difference between the beginning level or the adjustment level last used and the index level for the period 90 days prior to the expiration of the contract. If not renewed prior to the anniversary date, the contract may continue on a month to month basis until renewed or awarded to a new contractor. 12. STATE CONTRACTOR'S LICENSE. If requested and in accordance with the provisions of California Public Contract Code Section 3300, the successful vendor shall submit proof of a State Contractor's License with bid response. Failure to possess the specified license shall render the bid as non- responsive and shall act as a bar to award the contract to any bidder not possessing said license at the time of award. As provided for in Section 22300 of the California Public Contract Code, the Contractor may substitute securities for monies withheld by the City to ensure performance under the contract. 13. STATE PREVAILING WAGE. This contract is subject to the State prevailing wage requirements of the California Labor Code including Sections 1770, 1771.5, 1773, 1776 and 1777.5. Pursuant to Section 1773 of the Labor Code, the general prevailing wage rates in the county, or counties, in which the work is to be done have been determined by the Director of the California Department of Industrial Relations. These wages are set forth in the General Prevailing Wage Rates for this project, available from the California Department of Industrial Relations' Internet web site at http://www.dir.ca.gov/dlsr/pwd. Future effective general prevailing wage rates which have been predetermined and are on file with the California Department of Industrial Relations are referenced but not printed in the general prevailing wage rates. A copy of the prevailing rate of per diem wages shall be posted at the job site. 14. SUBCONTRACTORS. For all public projects, the vendor must list any subcontractors that will be used, the work to be performed by them, and total number of hours or percentage of time they will spend on the project. 15. SUBMITTING BIDS. 15.1. The bid response must be submitted on this form and include all forms provided or information requested or required by the scope of work or specifications, (uploaded via PlanetBids) 15.2. All documentation of unit pricing or other cost breakdowns as outlined in this quote must be submitted to support the total bid price. 15.3. Bids/corrections received after the closing time will not be accepted. The City will not be responsible for bids not properly or timely, uploaded. Upon award, all submissions become a matter of public record. 16. TERMINATION. The City may terminate any purchase, service or contract with or without cause either verbally or in writing at any time without penalty. The City of Santa Clarita's "Terms and Conditions" is found on a separate attachment in Planet Bids SECTION C: BID SCHEDULE ITEM NO. NEWHALL RANCH ROAD PARKWAYS AND SLOPES UNITS QUANTITY UNIT COST BID PRICE GENERAL 1 Mobilization (Not to Exceed 10% of Total Project Cost) LS 1 2 Water Pollution Control & BMP's, LS 1 3 Traffic Control & Safety LS 1 DRAINAGE MODIFICATIONS 4 Swale Excavation: Remove existing gravel, including Transport and Disposal SF 7,050 5 Swale Excavation: Remove and Stockpile Existing Cobble, Re -install Per Plans, Transport and Disposal of Excess CY 218 6 Open Bottom Desilting Catch Basin EA 4 7 Perforated Pipe LF 300 8 Clean Out Riser EA 4 9 Import of clean planting soil CY 239 10 Geotextile SY 703 11 Vegetated Swale Information Sign EA 1 IRRIGATION 12 Shrub Bubbler on Riser, Including Stream Bubblers EA 168 13 Spray Head on Pop -Up EA 55 14 1" Remote Control Valve, Including Control Wire EA 6 15 Quick Coupler EA 4 16 1 Gate Valve EA 3 17 Pull Box EA 2 18 3/4" SCH 40 PVC Lateral Line EA 2,325 19 1"SCH 40 PVC Lateral Line EA 300 20 2" SCH40 PVC Main Line LF 500 21 1 Directional Boring, New Sleeve LF 40 PLANTING 22 Planting Area Soil Preparation & Amendments SF 17,940 23 Shrubs 1 Gallon - Carex barbarae EA 133 24 Shrubs 5 Gallon - Lomandra longifolia'Breeze' Juncus patens'Elk Blue', Lomandra longifolia, Rhaphiolepsis umbellate' Minor', Acacia redolens'Low Boy' EA 631 25 Planting Area Fine Grading SF 17,940 Organic Mulch (Planting Areas) CY 166 27 First 90 days of Plant Maintenance and Establishment Period (Day 1 to Day 90) SF 17,940 28 Second 90 days of Plant Maintenance and Establishment Period (Day 91 to Day 180) SF 17,940 TOTAL COST IN WORDS: TOTAL COST: $ *If the number entered on this page conflicts with what is entered on Planetbids, the number entered on Planetbids shall govern. S. WURGH\Sd,c9TY20\B&110D 19-20-08\5 LMD 19-20-08 Section G B,d Schetlele Lest P..t.d 101812019 et 5.13 P10 DESIGNATION OF SUBCONTRACTORS Newhall Ranch Road Parkway and Slope Planting Bid No. LIVID 19-20-08 Subcontractor DBE STATUS: Age of firm: Certifying Agency: Dollar Value of Work Annual Gross Receipts: Location and Place of Business Bid Schedule Item Nos: Description of Work License No. Exp. Date: / / Phone( ) Subcontractor DBE STATUS: Age of firm: Certifying Agency: Dollar Value of Work Annual Gross Receipts: Location and Place of Business Bid Schedule Item Nos: Description of Work License No. Exp. Date: / / Phone( ) Subcontractor DBE STATUS: Age of firm: Certifying Agency: Dollar Value of Work Annual Gross Receipts: Location and Place of Business Bid Schedule Item Nos: Description of Work License No. Exp. Date: / / Phone( ) NOTE: A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5 of the Labor Code. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 of the Labor Code at the time the contract is awarded. REFERENCES Newhall Ranch Road Parkway and Slope Planting Bid No. LIVID 19-20-08 The following are the names, addresses, and telephone numbers of three public agencies for which BIDDER has performed work of a similar scope and size within the past 3 years: 2. 3. Name and Address of Owner / Agency Name and Telephone Number of Person Familiar with Project Contract Amount Type of Work Date Completed Name and Address of Owner / Agency Name and Telephone Number of Person Familiar with Project Contract Amount Type of Work Date Completed Name and Address of Owner / Agency Name and Telephone Number of Person Familiar with Project Contract Amount Type of Work Date Completed The following are the names, addresses, and telephone numbers of all brokers and sureties from whom BIDDER intends to procure insurance bonds: ACKNOWLEDGEMENT & ACCEPTANCE OF BID SPECIFICATIONS Newhall Ranch Road Parkway and Slope Planting Bid No. LIVID 19-20-08 By providing the three (3) required signatures below, the Contractor acknowledges full understanding, complete agreement to, and accepts in its entirety, all Bid Specifications for the Newhall Ranch Road Parkway and Slope Planting project. The Contractor will be expected to perform maintenance practices and uphold the standards herein to the established specifications throughout the length of the contract. *Supervisor's Signature:_ Date: *Estimator's Signature: Date: *Owner's Signature: *All three signatures required Date: EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION Newhall Ranch Road Parkway and Slope Planting Bid No. LIVID 19-20-08 This bidder , proposed subcontractor , hereby certifies that he has has not _, participated in a previous contract or subcontract subject to the equal opportunity clause, as required by Executive Orders 10925.11114, or 11246, and that he has , has not , filed with the Joint Reporting Committee, and Director of Office of Federal Contract Compliance, a Federal Government contracting or administering AGENCY, or the former President's Committee on Equal Employment Opportunity, all reports that are under the applicable filing requirements. Company: By: Title: Date: Note: The above certification is required by the Equal Employment Opportunity of the Secretary of Labor (41 CFR 60-1.7(b)(1)), and must be submitted by bidders and proposed subcontractors only in connection with contracts and subcontracts which are subject to the equal opportunity clause as set forth in 41 CFR 60-1.5, (Generally only contracts or subcontracts of $10,000 or under are exempt.) Currently, the Standard Form 100 (EEO-1) is the only report required by the Executive Orders or their implementing regulations. Proposed prime CONTRACTORS and subcontractors who have participated in a previous contract or subcontract subject to the Executive Orders and have not filed the required reports should note that 41 CFR 60-1.7(b)(1) prevents the award of contracts and subcontracts unless such CONTRACTOR submits a report covering the delinquent period or such other period specified by the Federal Highway Administration or by the Director, Office of Federal Contract Compliance, U.S. Department of Labor. BIDDER'S INFORMATION AND CERTIFICATION Bidder certifies that the representations of the bid are true and correct and made under penalty of perjury. EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE Bidder certifies that in all previous contracts or subcontracts, all reports which may have been due under the requirements of any AGENCY, State, or Federal equal employment opportunity orders have been satisfactorily filed, and that no such reports are currently outstanding. AFFIRMATIVE ACTION CERTIFICATION Bidder certifies that affirmative action has been taken to seek out and consider minority business enterprises for those portions of the work to be subcontracted, and that such affirmative actions have been fully documented, that said documentation is open to inspection, and that said affirmative action will remain in effect for the life of any contract awarded hereunder. Furthermore, Bidder certifies that affirmative action will be taken to meet all equal employment opportunity requirements of the contract documents. Bidder's Name: Business Address: Telephone No.: State CONTRACTOR's License No. & Class: Original Date: Expiration Date: The following are the names, titles, addresses, and phone numbers of all individuals, firm members, partners, joint venturers, and/or corporate officers having a principal interest in this proposal: The dates of any voluntary or involuntary bankruptcy judgments against any principal having an interest in this proposal, or any firm, corporation, partnership or joint venture of which any principal having an interest in this proposal was an owner, corporate officer, partner or joint venture are as follows: All current and prior DBAs, alias, and/or fictitious business names for any principal having an interest in this proposal are as follows: IN WITNESS WHEREOF, BIDDER executes and submits this proposal with the names, title, hands, and seals of all aforementioned principals this day of 20_ BIDDER: Signature Name and Title of Signatory Legal Name of Bidder Address Telephone Number Federal Tax I.D. No. SIGNATURES MUST BE MADE AND NOTARY ACKNOWLEDGMENTS OF EXECUTION OF BIDDER MUST BE ATTACHED Subscribed and sworn to this day of , 20_ Notary Public (SEAL) BID SECURITY FORMS FOR CHECK OR BOND TO ACCOMPANY BID Newhall Ranch Road Parkway and Slope Planting Bid No. LIVID 19-20-08 NOTE: The following form shall be used in case check accompanies bid. Accompanying this Proposal is a *certified/cashier's check payable to the order of the City of Santa Clarita for: dollars ($ ), this amount being not less than ten percent (10%) of the total amount of the first contract year (365 days) of this bid. The proceeds of this check shall become the property of said AGENCY provided this Proposal shall be accepted by said AGENCY through action of its legally constituted contracting authorities, and the undersigned shall fail to execute a contract and furnish the required bonds within the stipulated time; otherwise, the check shall be returned to the undersigned. Project Name: Newhall Ranch Road Parkway and Slope Planting Bidder's Signature CONTRACTOR Address City, State, Zip Code * Delete the inapplicable work. NOTE: If the bidder desires to use a bond instead of a check, the following form shall be executed. The sum of this bond shall be not less than ten percent (10%) of the total amount of the bid. PROPOSAL GUARANTEE BID BOND Newhall Ranch Road Parkway and Slope Planting Bid No. LIVID 19-20-08 KNOW ALL MEN BY THESE PRESENTS that as BIDDER, and as SURETY, are held and firmly bound unto the City of Santa Clarita, as AGENCY, in the penal sum of dollars ($ ), which is ten percent (10%) of the total of first contract year (365 days) amount which is bid by BIDDER, to AGENCY for the above -stated project, for the payment of which sum, BIDDER and SURETY agree to be bound, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER is about to submit a bid to AGENCY for the above -stated project, if said bid is rejected, or if said bid is accepted and the contract is awarded and entered into by BIDDER in the manner and time specified, then this obligation shall be null and void, otherwise it shall remain in full force and effect in favor of AGENCY. IN WITNESS WHEREAS, the parties hereto have set their names, titles, hands, and seals, this day of , 20_. BIDDER SURETY* Subscribed and sworn to this NOTARY PUBLIC day of 20_ *Provide BIDDER and SURETY name, address, and telephone number and the name, title, address, and telephone number for authorized representative. IMPORTANT - Surety Companies executing Bonds must appear on the Treasury Department's most current list (Circular 570, as amended) and be authorized to transact business in the State where the project is located. NON -COLLUSION AFFIDAVIT (Title 23 United States Code Section 112 and Public Contract Code Section 7106) Newhall Ranch Road Parkway and Slope Planting Bid No. LIVID 19-20-08 To the CITY OF SANTA CLARITA: In conformance with Title 23 United States Code Section 112 and Public Contract Code 7106, the Bidder declares that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the Bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the Bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the Bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. THE BIDDER'S EXECUTION ON THE SIGNATURE PORTION OF THE "BIDDER'S CERTIFICATION" SHALL ALSO CONSTITUTE AN ENDORSEMENT AND EXECUTION OF THOSE CERTIFICATIONS WHICH FORM A PART OF THE PROPOSAL. BIDDERS ARE CAUTIONED THAT MAKING A FALSE CERTIFICATION MAY SUBJECT THE CERTIFIER TO CRIMINAL PROSECUTION. NON -COLLUSION AFFIDAVIT Newhall Ranch Road Parkway and Slope Planting Bid No. LIVID 19-20-08 TO BE EXECUTED BY EACH BIDDER OF A PRINCIPAL CONTRACT STATE OF CALIFORNIA ) COUNTY OF LOS ANGELES ) being first duly sworn deposes and says that he is the (sole owner, a partner, president, etc.) of the party making the foregoing bid; that such bid is not made in the interest of or behalf of any undisclosed person, partnership, company, association, organization or corporation, that such bid is genuine and not collusive or sham, that said BIDDER has not directly or indirectly induced or solicited any other BIDDER to put in a false or sham bid, or that anyone shall refrain from bidding, that said BIDDER has not in any manner, directly or indirectly sought by agreements, communication or conference with anyone to fix the bid price of said BIDDER or of any other BIDDER, or to fix the overhead, profit, or cost element of such bid price, or of that of any other BIDDER, or to secure any advantage against the public body awarding the Contract or anyone interested in the proposed Contract; that all statements contained in such bid are true, and further, that said BIDDER has not, directly or indirectly, submitted his bid price, or any breakdown thereof, or the contents thereof, or divulged information or date relative thereto, or paid and will not pay any fee in connection, therewith to any corporation, partnership, company, association, organization, bid depository, or to any member or AGENCY thereof, or to any other individual information or date relative thereto, or paid and will not pay any fee in connection, therewith to any corporation, partnership, company association, organization, bid depository, or to any member or AGENCY thereof, or to any other individual, except to such person or persons as have a partnership or other financial interest with said BIDDER in his general business. Signed: Title Subscribed and sworn to and before me this Seal of Notary day of , 20_ BIDDER'S QUESTIONNAIRE Newhall Ranch Road Parkway and Slope Planting Bid No. LIVID 19-20-08 If the bidder has answered the questionnaire within the past year and there are no significant changes in the information requested, then the bidder need not file a new questionnaire. If there are changes, indicate those changes. Should the space provided not be adequate, so indicate and complete information on a separate page(s) and attach hereto. 1. Submitted by: Principal Office Address: 2. Type of Firm: Corporate: Individual: Partnership: 3a. If a Corporation, answer these questions: Date of Incorporation: President's Name: Vice -President's Name: Secretary or Clerk's Name: Treasurer's Name: 3b. If a partnership, answer these questions: Date of organization: Telephone: Other: State of Incorporation: State Organized in: Name of all partners holding more than a 10% interest: 4. Designate which are General or Managing Partners. Name of person holding CONTRACTOR's license: License number: Class: Expiration Date: BIDDER'S QUESTIONNAIRE (cont'd) Newhall Ranch Road Parkway and Slope Planting Bid No. LIVID 19-20-08 5. CONTRACTOR's Representative: Title: Alternate: Title: 6. List the major construction projects your organization has in progress as of this date: Owner: (A) Project Location: Type of Project: (B) SECTION D: SAMPLE CONTRACT MAINTENANCE AGREEMENT BETWEEN THE CITY OF SANTA CLARITA AND FOR THIS MAINTENANCE AGREEMENT ("Agreement") is made by and between the CITY OF SANTA CLARITA, a general law city and municipal corporation ("CITY") and ("CONTRACTOR"). The Parties agree as follows: 1. CONSIDERATION. A. As partial consideration, CONTRACTOR agrees to perform the work listed in the SCOPE OF SERVICES, below; and B. As additional consideration, CONTRACTOR and CITY agree to abide by the terms and conditions contained in this Agreement; and C. As additional consideration, CITY agrees to pay CONTRACTOR an amount as set forth in the attached Exhibit " ," which is incorporated by reference, for CONTRACTOR's services. CITY will pay such amount promptly, but not later than thirty (30) days after receiving CONTRACTOR's invoice. 2. TERM. The term of this Agreement will be from , to The Agreement may be renewed upon mutual consent of the parties. 3. SCOPE OF SERVICES. A. CONTRACTOR will perform services listed in the attached Exhibit " " B. CONTRACTOR will, in a workmanlike manner, furnish all of the labor, technical, administrative, professional and other personnel, all supplies and materials, equipment, printing, vehicles, transportation, office space and facilities, and all tests, testing and analyses, calculation, and all other means whatsoever, except as herein otherwise expressly specified to be furnished by CITY, necessary or proper to perform and complete the work and provide the professional services required of CONTRACTOR by this Agreement. C. CONTRACTOR guarantees each portion of the services as installed against defective materials and workmanship for a period of one (1) year from date of CITY's written acceptance of the work. Promptly upon CITY's request within that one (1) year period, CONTRACTOR agrees to correct by repair or replacement without charge to CITY any defects which may appear in the work or any portion thereof. Notwithstanding the foregoing, all guarantees and warranties obtained by CONTRACTOR from manufacturers and vendors of equipment used in the performance of the services shall be extended to CITY's benefit for the full limit of their terms. 4. PREVAILING WAGES. A. If required by applicable state law including, without limitation Labor Code §§ 1720 (as amended by AB 975 (2001)), 1771, 1774, 1775, and 1776, CONTRACTOR must pay its workers prevailing wages. It is CONTRACTOR's responsibility to interpret and implement any prevailing wage requirements and CONTRACTOR agrees to pay any penalty or civil damages resulting from a violation of the prevailing wage laws and to indemnify, defend, and hold harmless CITY as against any claim, demand, or imposition of penalties, interest, or damages of any kind arising out of Labor Code § 1726, § 1771.6, or any other provision of the California Prevailing Wage Law. In accordance with Labor Code § 1773.2, copies of the prevailing rate of per diem wages are available upon request from CITY's Engineering Division or the website for State of California Prevailing Wage Determination atwww.dir.ca.gov/DLSR/PWD. A copy of the prevailing rate of per diem wages must be posted at the job site. B. If this contract is subject to state prevailing wage requirements of the California Labor Code including Sections 1770 and 1773, then it is also subject to the City's California Department of Industrial Relations (DIR) approved Labor Compliance Program. All covered work classifications required in performance of this contract will be subject to prevailing wage provisions. The Contractors and its subcontractors shall pay not less than the state wage rates and shall further adhere to the requirements contained in the City of Santa Clarita's Labor Compliance Program. A copy of the Labor Compliance Program is available for review upon request at the Office of the City Clerk. All pertinent state statutes and regulations, including, but not limited to those referred to in this contract and in the City's Labor Compliance Program, are incorporated herein as though set forth in their entirety. Additionally, the Contractor is responsible for obtaining a current edition of all applicable state statutes and regulations and adhering to the latest editions of such. This Work is subject to compliance monitoring and enforcement by the Department of Industrial Relations. No prime contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. No prime contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. The Contractor will be required to post job site notices as described in 8 California Code of Regulation section 16451(d). C. Protection of Resident Workers The City of Santa Clarita actively supports the Immigration and Nationality Act (INA), which includes provisions addressing employment eligibility, employment verification, and nondiscrimination. Under the INA, employers may hire only persons who may legally work in the United States (i.e., citizens and nationals of the U.S.) and aliens authorized to work in the U.S. The employer must verify the identity and employment eligibility of anyone to be hired, which includes completing the Employment Eligibility Verification Form (I-9). The Contractor shall establish appropriate procedures and controls so no services or products under the Contract Documents will be performed or manufactured by any worker who is not legally eligible to perform such services or employment. 5. FAMILIARITY WITH WORK. A. By executing this Agreement, CONTRACTOR represents that CONTRACTOR has: Thoroughly investigated and considered the scope of services to be performed; and ii. Carefully considered how the services should be performed; and iii. Understands the facilities, difficulties, and restrictions attending performance of the services under this Agreement. B. If services involve work upon any site, CONTRACTOR warrants that CONTRACTOR has or will investigate the site and is or will be fully acquainted with the conditions there existing, before commencing the services hereunder. Should CONTRACTOR discover any latent or unknown conditions that may materially affect the performance of the services, CONTRACTOR will immediately inform CITY of such fact and will not proceed except at CONTRACTOR's own risk until written instructions are received from CITY. 6. INSURANCE. A. Before commencing performance under this Agreement, and at all other times this Agreement is effective, CONTRACTOR will procure and maintain the following types of insurance with coverage limits complying, at a minimum, with the limits set forth below: Type of Insurance Commercial general liability: Business automobile liability Workers compensation Limits (combined single) $1,000,000 $1,000,000 Statutory requirement B. Commercial general liability insurance will meet or exceed the requirements of ISO-CGL Form No. CG 00 01 11 85 or 88. The amount of insurance set forth above will be a combined single limit per occurrence for bodily injury, personal injury, and property damage for the policy coverage. Liability policies will be endorsed to name City, its officials, and employees as "additional insureds" under said insurance coverage and to state that such insurance will be deemed "primary" such that any other insurance that may be carried by City will be excess thereto. Such insurance will be on an "occurrence," not a "claims made," basis and will not be cancelable or subject to reduction except upon thirty (30) days prior written notice to City. C. Automobile coverage will be written on ISO Business Auto Coverage Form CA 00 01 06 92, including symbol 1 (Any Auto). D. CONTRACTOR will furnish to City duly authenticated Certificates of Insurance evidencing maintenance of the insurance required under this Agreement, endorsements as required herein, and such other evidence of insurance or copies of policies as may be reasonably required by City from time to time. Insurance must be placed with insurers with a current A.M. Best Company Rating equivalent to at least a Rating of "ARIL" Certificate(s) must reflect that the insurer will provide thirty (30) day notice of any cancellation of coverage. CONTRACTOR will require its insurer to modify such certificates to delete any exculpatory wording stating that failure of the insurer to mail written notice of cancellation imposes no obligation, and to delete the word "endeavor" with regard to any notice provisions. E. Should CONTRACTOR, for any reason, fail to obtain and maintain the insurance required by this Agreement, City may obtain such coverage at CONTRACTOR's expense and deduct the cost of such insurance from payments due to CONTRACTOR under this Agreement or terminate. In the alternative, should CONTRACTOR fail to meet any of the insurance requirements under this agreement, City may cancel the Agreement immediately with no penalty. F. Should Contractor's insurance reauired by this Agreement be cancelled at anv point prior to expiration of the policy, CONTRACTOR must notify City within 24 hours of receipt of notice of cancellation. Furthermore, CONTRACTOR must obtain replacement coverage that meets all contractual requirements within 10 days of the prior insurer's issuance of notice of cancellation. CONTRACTOR must ensure that there is no lapse in coverage. 7. TIME FOR PERFORMANCE. CONTRACTOR will not perform any work under this Agreement until: A. CONTRACTOR furnishes proof of insurance as required under Section 6 of this Agreement; and B. CITY gives CONTRACTOR a written Notice to Proceed. C. Should CONTRACTOR begin work in advance of receiving written authorization to proceed, any such professional services are at CONTRACTOR's own risk. 8. TERMINATION. A. CITY may terminate this Agreement at any time with or without cause. B. CONTRACTOR may terminate this Agreement upon providing written notice to CITY at least thirty (30) days before the effective termination date. C. Should the Agreement be terminated pursuant to this Section, CITY may procure on its own terms services similar to those terminated. D. By executing this document, CONTRACTOR waives any and all claims for damages that might otherwise arise from CITY's termination under this Section. 9. INDEMNIFICATION. CONTRACTOR agrees to indemnify and hold CITY harmless from and against any claim, action, damages, costs (including, without limitation, attorney's fees), injuries, or liability, arising out of the performance of this agreement by CONTRACTOR. Should CITY be named in any suit, or should any claim be brought against it by suit or otherwise, arising out of performance by CONTRACTOR of services rendered pursuant to this Agreement, CONTRACTOR will defend CITY (at CITY's request and with counsel satisfactory to CITY) and will indemnify CITY for any judgment rendered against it or any sums paid out in settlement or costs incurred in defense otherwise. 10. INDEPENDENT CONTRACTOR. CITY and CONTRACTOR agree that CONTRACTOR will act as an independent contractor and will have control of all work and the manner in which is it performed. CONTRACTOR will be free to contract for similar service to be performed for other employers while under contract with CITY. CONTRACTOR is not an agent or employee of CITY and is not entitled to participate in any pension plan, insurance, bonus or similar benefits CITY provides for its employees. Any provision in this Agreement that may appear to give CITY the right to direct CONTRACTOR as to the details of doing the work or to exercise a measure of control over the work means that CONTRACTOR will follow the direction of the CITY as to end results of the work only. 11. NOTICES. A. All notices given or required to be given pursuant to this Agreement will be in writing and may be given by personal delivery or by mail. Notice sent by mail will be addressed as follows: To CITY: City of Santa Clarita ATTN: Kenneth W. Striplin, City Manager 23920 Valencia Boulevard, Suite 300 Santa Clarita, CA 91355 To CONTRACTOR: B. When addressed in accordance with this paragraph, notices will be deemed given upon deposit in the United States mail, postage prepaid. In all other instances, notices will be deemed given at the time of actual delivery. C. Changes may be made in the names or addresses of persons to whom notices are to be given by giving notice in the manner prescribed in this paragraph. 12. TAXPAYER IDENTIFICATION NUMBER. CONTRACTOR will provide CITY with a Taxpayer Identification Number. 13. WAIVER. A waiver by CITY of any breach of any term, covenant, or condition contained in this Agreement will not be deemed to be a waiver of any subsequent breach of the same or any other term, covenant, or condition contained in this Agreement, whether of the same or different character, nor will it be deemed to constitute a continuing waiver. 14. CONSTRUCTION. The language of each part of this Agreement will be construed simply and according to its fair meaning, and this Agreement will never be construed either for or against either parry. 15. SEVERABLE. If any portion of this Agreement is declared by a court of competent jurisdiction to be invalid or unenforceable, then such portion will be deemed modified to the extent necessary in the opinion of the court to render such portion enforceable and, as so modified, such portion and the balance of this Agreement will continue in full force and effect. 16. CAPTIONS. The captions of the paragraphs of this Agreement are for convenience of reference only and will not affect the interpretation of this Agreement. 17. INTERPRETATION. This Agreement was drafted in, and will be construed in accordance with the laws of the State of California, and exclusive venue for any action involving this agreement will be in Los Angeles County. 18. AUTHORITY/MODIFICATION. This Agreement may be subject to and conditioned upon approval and ratification by the Santa Clarita City Council. This Agreement is not binding upon CITY until executed by the City Manager. The Parties represent and warrant that all necessary action has been taken by the Parties to authorize the undersigned to execute this Agreement and to engage in the actions described herein. This Agreement may be modified by written agreement. CITY's City Manager may execute any such amendment on behalf of CITY. 19. ACCEPTANCE OF FACSIMILE SIGNATURES. The Parties agree that this Agreement, agreements ancillary to this Agreement, and related documents to be entered into in connection with this Agreement will be considered signed when the signature of a parry is delivered by facsimile transmission. Such facsimile signature will be treated in all respects as having the same effect as an original signature. 20. EFFECT OF CONFLICT. In the event of any conflict, inconsistency, or incongruity between any provision of this Agreement, its attachments, the purchase order, or notice to proceed, the provisions of this Agreement will govern and control. 21. FORCE MAJEURE. Should performance of this Agreement be prevented due to fire, flood, explosion, war, terrorist act, embargo, government action, civil or military authority, the natural elements, or other similar causes beyond the Parties' control, then the Agreement will immediately terminate without obligation of either party to the other. 22. ENTIRE AGREEMENT. This Agreement and its one attachment constitutes the sole agreement between CONTRACTOR and CITY respecting maintenance. To the extent that there are additional terms and conditions contained in Exhibit " " that are not in conflict with this Agreement, those terms are incorporated as if fully set forth above. There are no other understandings, terms or other agreements expressed or implied, oral or written. 23. CONFLICT OF INTEREST. CONSULTANT will comply with all conflict of interest laws and regulations including, without limitation, CITY's conflict of interest regulations. 24. ELECTRONIC TRANSMISSION OF CONTRACT AND SIGNATURE. The Parties agree that this Agreement may be transmitted and signed by electronic mail by either/any or both/all Parties, and that such signatures shall have the same force and effect as original signatures, in accordance with California Government Code section 16.5 and Civil Code section 1633.7. (SIGNATURES ON NEXT PAGE) IN WITNESS WHEREOF, the parties hereto have executed this contract on this date of FOR CONTRACTOR: Print Name & Title Date: FOR CITY OF SANTA CLARITA: KENNETH W. STRIPLIN, CITY MANAGER City Manager Date: APPROVED AS TO FORM: JOSEPH M. MONTES, CITY ATTORNEY City Attorney Date: CORPORATION: By: Print Name & Title Date: IF FAITHFUL PERFORMANCE BOND Newhall Ranch Road Parkway and Slope Planting Bid No. LIVID 19-20-08 City of Santa Clarita, California KNOW ALL MEN BY THESE PRESENTS that , as CONTRACTOR, AND as SURETY, are held and firmly bound unto the City of Santa Clarita, as AGENCY, in the penal sum of dollars ($ ), which is one -hundred (100%) percent of the total amount for the above -stated project, for the payment of which sum, CONTRACTOR and SURETY agree to be bound, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas CONTRACTOR has been awarded and is about to enter into the annexed Contract Agreement with AGENCY for the above -stated project, if CONTRACTOR faithfully performs and fulfills all obligations under the contract documents in the manner and time specified therein, then this obligation shall be null and void, otherwise it shall remain in full force and effect in favor of AGENCY; provided that any alterations in the obligation or time for completion made pursuant to the terms of the contract documents shall not in any way release either CONTRACTOR or SURETY, and notice of such alterations is hereby waived by SURETY. IN WITNESS WHEREOF, the parties hereto have set their names, titles, hands, and seals, this day of ,20 CONTRACTOR* SURETY* Subscribed and sworn to this 20 NOTARY PUBLIC day of * Provide CONTRACTOR/SURETY name, address, and telephone number and the name, title, address, and telephone number of authorized representative. 9M LABOR AND MATERIAL BOND Newhall Ranch Road Parkway and Slope Planting Bid No. LIVID 19-20-08 KNOW ALL MEN BY THESE PRESENTS that , as CONTRACTOR AND as SURETY, are held and firmly bound unto the City of Santa Clarita, as AGENCY, in the penal sum of dollars ($ ) which is one -hundred (100%) percent of the total amount for the above stated project, for the payment of which sum, CONTRACTOR and SURETY agree to be bound, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas CONTRACTOR has been awarded and is about to enter into the annexed Contract Agreement with AGENCY for the above - stated project, if CONTRACTOR or any subcontractor fails to pay for any labor or material of any kind used in the performance of the work to be done under said contract, or fails to submit amounts due under the State Unemployment Insurance Act with respect to said labor, SURETY will pay for the same in an amount not exceeding the sum set forth above, which amount shall insure to the benefit of all persons entitled to file claims under the State Code of Civil Procedures; provided that any alterations in the work to be done, materials to be furnished, or time for completion made pursuant to the terms of the contract documents shall not in any way release either CONTRACTOR or SURETY, and notice of said alterations is hereby waived by SURETY. IN WITNESS WHEREOF, the parties hereto have set their names, titles, hands, and seals, this day of , 20 CONTRACTOR* SURETY* Subscribed and sworn to this 20 NOTARY PUBLIC day of , * Provide CONTRACTOR/SURETY name, address, and telephone number and the name, title, address, and telephone number of authorized representative. XM SECTION E: ADMINISTRATIVE SPECIFICATIONS Newhall Ranch Road Parkway and Slope Planting Bid No. LIVID 19-20-08 INTRODUCTION The City of Santa Clarita, Landscape Maintenance Districts (LIVID) is soliciting sealed bids from qualified companies for the installation of landscape improvements on the parkways and slopes adjacent to the Newhall Ranch Road bridge. SCOPE OF WORK The City requires the contractor to include all labor and equipment for an all-inclusive contract for gravel removal, drainage modifications, boring and installation of irrigation and landscape. The project area includes parkways on south side of Newhall Ranch Road and slope areas adjacent to the San Francisquito Trail. The bid shall be all inclusive for labor hours and equipment, meaning: Contractor shall at his cost provide all the labor and equipment necessary for the removal of existing gravel, boring under trail, installation of drainage system, irrigation and landscape, clean- up, and restoration and repair or replacement of all existing improvements according to scope of work, details, plans, specifications, and contract documents. CONTRACTOR shall provide safe and adequate pedestrian and vehicular movement at and around all construction sites, which shall be maintained at all times. Approved barriers and signs (traffic flagging personnel, if necessary), shall be furnished and utilized by the CONTRACTOR to ensure public safety at all times. This bid is subject to Department of Industrial Relations and Prevailing Wage requirements. See bidder instructions for details. The Contractor shall have a minimum of five years' experience in landscape construction. (See References Sheets). The Contractor will be required to communicate work requests back and forth to LIVID staff through desktop computer, hand held device, or laptop. The Contractor must supply a C-27 license copy or, at minimum, the license number with their bid response. Please refer to the following General Requirement section includes general and special conditions that shall apply to all jobsite locations. Also included in this section are the Scope of Work instructions which more clearly define the services, scheduling, or special circumstances for each location to be serviced. LOCATION OF WORK Newhall Ranch Road between McBean Parkway and Dickason Drive. TIME OF COMPLETION The project shall be completed within forty five (45) working days after the date stated in the Notice to Proceed with Work. Every working day beyond 45 days may incur liquidated damages in the amount of $1000.00 per day. PAYMENT Progress payments will be made on a monthly basis. The payment amount shall be calculated based on the completed quantity or percentage of each bid item. The balance of the contracted amount may be invoiced upon inspection and approval of the completed project. EMERGENCY INFORMATION Fieldwork shall not commence until the Agency's "Contractor Contact Information" sheet is filed with the Agency, the L.A. County Fire Department, and L.A. County Sheriffs Department. The names, addresses, and telephone numbers of the CONTRACTOR and sub- CONTRACTORs shall be filed with the City and the County Sheriffs Department on the day of the pre -construction meeting. RECYCLING PLAN All materials removed from the work area to be disposed offsite unless otherwise specified. Contractor shall dispose of all debris in full compliance with all government regulations having jurisdiction. The Contractor shall keep the project site clean and free from rubbish and debris at all times, as well as any adjacent areas, which are affected by the construction operations. STANDARD SPECIFICATIONS The Standard Specifications set forth above control the general provisions, construction materials, and construction methods for this contract except as amended by the Plans, Special Provisions, or other contract documents. The following Special Provisions are supplementary and in addition to the provisions of the Standard Specifications unless otherwise noted, and the section numbers of the Special Provision coincide with those of the said Standard Specifications. Only those sections requiring elaboration, amendments, specifying of options, or additions are called out. The Standard Specifications of the AGENCY are contained in the 2018 Edition of the Standard Specifications for Public Works Construction, GreenBook, as written and promulgated by the Joint Cooperative Committee of the Southern California Chapter of the American Public Works Association and the Southern California District of the Associated General CONTRACTORs of California. Copies of these Standard Specifications are available from the publisher, Building News, Incorporated, 10801 National Boulevard, Suite 100, Los Angeles, California 90064, telephone (310) 474-7771. SECTION F: GENERAL PROVISIONS Newhall Ranch Road Parkway and Slope Planting Bid No. LIVID 19-20-08 City of Santa Clarita, California The general provisions for this contract shall be in conformance with Part 1 "General Provisions" and Part 4 "Existing Improvements", of the Standard Specifications for Public Works Construction, 2018 Edition, except as amended and or superseded by the following general provisions. PART 1 — GENERAL PROVISONS 1-2 TERMS AND DEFENITIONS.................................................................................................5 1-3 ABBREVIATIONS..................................................................................................................6 1-3.2 Common Usage...........................................................................................................6 1-6 BIDDING AND SUBMISION OF THE BID.............................................................................6 1.6-1 General.........................................................................................................................6 1.6-2 Subcontractor Listing....................................................................................................6 1-7 AWARD AND EXECUTION OF THE CONTRACT................................................................7 1-7.1 General.........................................................................................................................7 1-7.2 Contract Bonds.............................................................................................................7 2-1 WORK TO BE DONE.............................................................................................................8 2-2 PERMITS................................................................................................................................8 2-3 RIGHT OF WAY.....................................................................................................................8 2-5 THE CONTRACTORS EQUIPMENT AND FACILITIES........................................................9 2-5.1 General.........................................................................................................................9 2-7 CHANGES INITIATED BY THE AGENCY.............................................................................9 2-7.1 General.........................................................................................................................9 2-7.2 Balancing Change Order..............................................................................................9 2-7.3 Surety Notification......................................................................................................10 3-2 SELF PERFORMANCE.......................................................................................................10 3-3 SUBCONTRACTORS..........................................................................................................10 3-5 INSPECTION........................................................................................................................10 3-6 THE CONTRACTOR'S REPRESENTATIVE.......................................................................11 3-7 CONTRACT DOCUMENTS.................................................................................................11 3-7.1 General.......................................................................................................................11 3-8 SUBMITTALS.......................................................................................................................11 3-8.1 General.......................................................................................................................11 3-8.7 Pre -Construction Submittals.......................................................................................12 3-8.8 Schedule of Submittal................................................................................................12 3-10 SURVEY.............................................................................................................................12 E-1 3-10.1 General.....................................................................................................................12 3-12 WORK SITE MAINTANENCE............................................................................................13 3-12.2 Air Pollution control..................................................................................................13 3-12.2.1 Dust Control......................................................................................................13 3-12.3 Noise Control............................................................................................................13 3-12.6 Water Pollution Control............................................................................................14 3-12.6.2 Best Management Practices (BMPs)....................................................................14 3-12.6.2.1 General..........................................................................................................14 3-12.6.2.2 BMP Plan Preparation and Submittal............................................................15 3-12.6.2.3 Implementation of the BPM Plan...................................................................16 3-12.6.2.4 Maintenance..................................................................................................17 3-12.6.2.5 Payment.........................................................................................................18 3-12.7 Water........................................................................................................................19 3-14 CONSTRUCTION AND DEMOLITION MATERIALS MANAGEMENT .............................19 3-15 NONCOMPLIANCE WITH THE PLANS AND SPECIFICATIONS....................................20 3-16 CONTRACT RECORD DOCUMENTS...............................................................................20 3-16.1 - As -Built Plans.........................................................................................................20 3-16.2 — Close -Out Submittals and activities.......................................................................21 4-4 TESTING..............................................................................................................................21 4-6 TRADE NAMES...................................................................................................................22 5-3 LABOR.................................................................................................................................23 5-3.1 General.......................................................................................................................23 5-3.2 Prevailing Wages.......................................................................................................23 5-3.6 Work Records.............................................................................................................23 5-4 INSURANCE........................................................................................................................23 5-4.1 General.......................................................................................................................23 5-4.2 — General Liability Insurance......................................................................................24 5-4.3 — Workers Compensation Insurance..........................................................................25 5-4.4 Automobile Liability Insurance....................................................................................25 5-7 SAFETY................................................................................................................................25 5-7.1 Work Site Safety.........................................................................................................25 5-7.1.1 General...............................................................................................................26 5-7.1.2 Work Site Safety Official.....................................................................................26 5-7.1.3 Safety Indemnification.........................................................................................26 5-7.4 Hazardous Substances..............................................................................................26 5-7.10 Temporary Manhole Shaft Covers............................................................................27 5-7.12 Protection of the Public............................................................................................27 5-7.13 Notification to the Agency Departments...................................................................28 5-7.13.1 Payment.............................................................. Error! Bookmark not defined. 5-8 PUBLIC CONVENIENCE AND SAFETY — TRAFFIC CONTROL PLAN ............................28 5-8.1 Access........................................................................................................................28 5-8.2 Work Area Traffic Control...........................................................................................28 5-8.2.1 General...............................................................................................................28 5-8.2.2 Materials and Equipment....................................................................................29 E-2 5-8.2.3 Construction........................................................................................................29 5-8.2.4 Construction Signing...........................................................................................29 5-8.2.5 Channelizers......................................................... Error! Bookmark not defined. 5-8.2.6 Traffic Maintenance............................................................................................29 5-8.2.7 Restriction on Closure of Traffic Lane.................................................................30 5-8.2.8 Weekly Traffic Updated Schedule.......................................................................30 5-8.1.1 Payment..............................................................................................................30 6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF THE WORK ........................30 6-1.1 Construction Schedule...............................................................................................30 6-1.1.1 Terms and Definitions.........................................................................................30 6-1.1.2 General...............................................................................................................31 6-1.1.3 Submittals...........................................................................................................34 6-1.2 Commencement of the Work......................................................................................36 6-1.2.1 General...............................................................................................................36 6-1.2.2 Pre -Construction Meeting...................................................................................37 6-2 PROSECUTION OF THE WORK.........................................................................................38 6-2.1 General.......................................................................................................................38 6-2.2 Work by Others Due to Unsatisfactory Work Prosecution..........................................39 6-3 TIME OF COMPLETION......................................................................................................39 6-3.1 General.......................................................................................................................39 6-4 DELAYS AND EXTENSION OF TIME.................................................................................39 6-4.1 General.......................................................................................................................39 6-5 USE OF IMPROVEMENT DURING CONSTRUCTION........................................................40 6-9 LIQUIDATED DAMAGES....................................................................................................40 6-10 CONSTRUCTION PROGRESS MEETING........................................................................40 7-3 PAYMENT ............................................................................................................................40 7-3.1 General.......................................................................................................................40 7-3.2 Partial and Final Payment..........................................................................................40 7-3.3 Delivered Materials.....................................................................................................41 7-3.4 Mobilization................................................................................................................41 7.3.4.1 Payment..............................................................................................................42 7-3.5 Contract Unit Prices...................................................................................................42 7-3.5.1 General...............................................................................................................42 7-4 PAYMENT FOR EXTRA WORK..........................................................................................43 7-4.2 Basis for Establishing Costs.......................................................................................43 7-4.2.1 Labor...................................................................................................................43 7-4.2.3 Tool and Equipment Rental................................................................................43 7-4.3 Markup.......................................................................................................................43 7-4.3.1 Work by the Contractor.......................................................................................43 7-4.3.2 Work by Subcontractor.......................................................................................44 7-4.3.3 General...............................................................................................................44 7-6 FINAL PAY ITEMS...............................................................................................................44 SECTION 8 FACILITIES FOR AGENCY PERSONNEL............................................................45 SECTION 9 — CONSTRUCTION CLAIMS.................................................................................45 E-3 9-1 GENERAL............................................................................................................................45 9-2 NOTICE OF POTENTIAL CLAIM........................................................................................45 9-3 CLAIMS................................................................................................................................46 401-1 General............................................................................................................................48 401-1.1 Existing Planted areas............................................................................................48 401-1.2 Existing Irrigation Facilities.....................................................................................48 402-1 Location...........................................................................................................................49 402-1.1 General...................................................................................................................49 402-1.2 Payment.................................................................................................................51 402-5 DELAYS DUE TO UTILITY CONFLICT...........................................................................51 402-6 COOPERATON................................................................................................................51 E-4 SECTION 1 —GENERAL (Standard Specification for Public Works Construction, 2018 Edition) 1-2 TERMS AND DEFENITIONS Add the following to the definition in the standard specifications: Agency — The Agency is the City of Santa Clarita. Replace the definition in the standard specifications with the following: Board — The City Council of the City of Santa Clarita. Engineer — The Director of Public Works of the City of Santa Clarita. Add the following definitions: Allowance — An amount established in the Bid by the Agency for the purpose of reimbursing the Contractor for its actual expenses plus the specified markup for an item of work. Balancing Change Order — a Change Order limited to the increase or decrease between the Bid quantity and the actual quantity of each Contract Unit Price. Bid item constructed in conformance with the Contract Documents. Bid Guaranty — The cash, certified check or Bidder's surety bond accompanying the Bid as a guaranty that the Bidder will enter into a Contract with the Board for the performance of the Work. City — the City of Santa Clarita. Contract Time — the time, in Working Days, specified for completion of the Work. County — The County of Los Angeles. Field Order— a change order issued by the Engineer which does not increase the Contract Price. Notice of Completion — a notice filed by the Agency pursuant to Civil Code Section 8180. E-5 Notice of Potential Claim — a written notice addressed to the Agency discussing and describing the contractual basis for its request for additional compensation and/additional Contract Time, and the amount of requested additional compensation and/or Contract Time. Owner — Same as the definition for City. Project — See Work. Quality Assurance — Those standards, systems, processes, procedures and activities exercised by the Agency and the Engineer to ensure that the Work is constructed by the Contractor in accordance with the Contract Documents. Quality Control — Those standards, systems, processes, procedures and activities exercised by the Contractor to ensure that the Work is constructed in accordance with the Contract Documents. 1-3 ABBREVIATIONS 1-3.2 Common Usage —Add the following abbreviations: Abbreviation Word or Words CDMMP ................Construction and Demolition Materials Management Plan LACFCD....................Los Angeles County Flood Control District NTP ...........................Notice to Proceed WPCP .........................Water Pollution Control Program 1-6 BIDDING AND SUBMISION OF THE BID 1.6-1 General — Replace the entire paragraph with the following: Bidding and submission of the Bid shall conform to the requirements specified in the Instructions to Bidders and the Notice Inviting Bids. 1.6-2 Subcontractor Listing — Replace subheading "a)" with the following: E-6 a) The name, the location of the place of business, the California contractor license number, and public works contractor registration number issued pursuant to Section 1725.5 of the Labor Code of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the State of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of 1 percent of the prime contractor's total bid or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one-half of 1 percent of the prime contractor's total bid or ten thousand dollars ($10,000), whichever is greater. 1-7 AWARD AND EXECUTION OF THE CONTRACT 1-7.1 General — Replace the entire paragraph with the following: Award and execution of the Contract shall conform to the requirements and procedures specified in the Instructions to Bidders and the following. Within 10 Days after the date of the AGENCY's Notice of Award, the CONTRACTOR shall execute and return the following to the AGENCY: a) Capital Improvement Project Agreement b) Faithful Performance Bond c) Labor and Material Bond d) Public Liability & Property Damage Insurance Certificate & Endorsements e) Auto Liability Insurance Certificate f) Worker's Compensation Insurance Certificate g) W-9 Form Failure to comply with the above will result in annulment of the award and forfeiture of the BID GUARANTEE. A corporation to which an award is made may be required, before the Contract Agreement is executed by the AGENCY, to furnish evidence of its corporate existence, of its right to enter into contracts in the State of California, and that the officers signing the Contract Agreement and bonds for the corporation have the authority to do so. The Contract Agreement shall not be considered binding upon the AGENCY until executed by the CITY ATTORNEY. 1-7.2 Contract Bonds - Replace the third paragraph with the following: E-7 The Bidder shall provide two good and sufficient surety bonds. The "Payment Bond" (Labor and Material Bond) shall not be less than 100 percent of the Contract Price, to satisfy claims of material suppliers and mechanics and labors employed by it on the Work. The Payment Bond shall be maintained by the CONTRACTOR in full force and effect until 35 Days after the date of recordation of the Notice of Completion, or until all claims for material and labor are paid, whichever is greater. SECTION 2 — SCOPE OF WORK 2-1 WORK TO BE DONE — Add the Following: The estimated quantities of work and materials to be performed, constructed or furnished by the Contractor under this Contract are as shown on the Schedule of Prices in the Bid Proposal. 2-2 PERMITS — Delete section and replace with the following: Prior to the start of work, the CONTRACTOR shall take out all applicable AGENCY permits and make arrangements for AGENCY inspections. AGENCY permits will be issued at no charge to the CONTRACTOR. The CONTRACTOR and all SUBCONTRACTORs shall be licensed in accordance with State Business and Professions Code. The CONTRACTOR shall also obtain, at the CONTRACTOR's cost, any and all other permits, licenses, inspections, certificates or authorizations required by any governing body or entity. The CONTRACTOR shall pay all costs incurred by the permit requirements. The AGENCY will reimburse the CONTRACTOR permit fees associated with the contract. CONTRACTOR shall submit original permit fees for review by AGENCY prior to any reimbursement. No reimbursement to the CONTRACTOR will be made for his time or associated costs incurred in procuring construction permits. 2-3 RIGHT OF WAY — Delete the last sentence and add the following The Contractor shall conduct all of its activities and operations within the rights of way provided by the Agency or within the confines of public thoroughfares. The Contractor shall not allow its employees to use private property for any reason or to use water or electricity from such property without written permission from the owner. If, for any reason, the Contractor elects to encroach upon other lands, it shall first obtain written permission from the owner and provide evidence of such permission in writing to the Engineer prior to entering upon such lands. In performing any work or doing any activity on lands outside of public rights of way, the Contractor shall comply with all applicable Federal, State and local laws, ordinances, and regulations. The Contractor shall indemnify and hold the Agency harmless from all claims or suits for damages occasioned by such work or activity, whether done in compliance with this subsection and with permission from the owner or in violation of this subsection without permission from the owner. E-8 2-5 THE CONTRACTORS EQUIPMENT AND FACILITIES 2-5.1 General — Add the following: The CONTRACTOR and its Subcontractors and suppliers shall not start, operate, move, or idle their equipment prior to the time specified for starting work each Working Day unless otherwise approved by the Engineer. 2-7 CHANGES INITIATED BY THE AGENCY 2-7.1 General — Add the following after the first paragraph: The Engineer may at any time, as the need arises, order changes within the scope of the Work without invalidating the Agreement. If such changes increase or decrease the Contract Price, or the Contract Time, an equitable adjustment will be authorized by issuance of a Change Order. The CONTRACTOR shall not execute such changes pending the receipt of an executed Change Order or further instructions from the Engineer. Each Change Order shall not be considered approved until executed by the AGENCY. The Engineer may, at any time, request changes to the Plans, Specifications, quantities of Contract Unit Price Bid items, and other details of the Work by issuance of a Field Order. The CONTRACTOR shall proceed with the performance of any changes in the Work so ordered by the Engineer unless the CONTRACTOR believes that such Field Order entitles him to a change in Contract Time. Thereafter the CONTRACTOR shall submit the basis for a change in the Contract Time within 5 Days. The Engineer has authority to order changes in the Work, which do not result in a change in the Contract Price or the Contract Time and are not inconsistent with the Contract Documents. The Contractor agrees that such changes are within the scope of the Work and do not constitute the basis for an adjustment of either the Contract Price or the Contract Time. 2-7.2 Balancing Change Order — Add this subsection: Throughout the duration of the Contract, the Contractor shall perform field measurements and associated calculations documenting the quantity of each Contract Unit Price Bid item. The Contractor shall submit the documentation to the Engineer each month prior to the date for request of the progress payment. The Engineer will independently measure and calculate the aforementioned quantities. In the case of a difference in the quantities, the quantity calculated by the Engineer shall prevail. Upon completion of the Work per 6-8.1, the Contractor and the Engineer shall meet to discuss the final quantities of each Contract Unit Price Bid item. If the quantity of each item cannot be agreed upon, the quantity determined by the Engineer shall prevail. E-9 Quantity adjustments in accordance with section 7-3.5.1 shall be tabulated and paid for at the contract unit prices in the Balancing Change Order, except those quantities described in section 7-3.5.2, 7-3.5.3 and 7-3.8. After determination of the final quantities, the Agency will issue a Balancing Change Order for the difference between the Bid quantity and final quantity of each Contract Unit Price Bid item constructed in accordance with the Contract Documents and the associated adjustment in the Contract Price per 7-3.5. 2-7.3 Surety Notification — Add this subsection: The Contractor shall notify its sureties of any Change Orders affecting the scope of the Work or change in the Contract Price, or Contract Time, or a combination thereof. The amount of the applicable Bonds and insurance coverage shall be adjusted accordingly. The CONTRACTOR shall furnish proof of such adjustments to the Engineer. SECTION 3 — CONTROL OF THE WORK 3-2 SELF PERFORMANCE — Replace the entire subsection with the following: The Contractor shall perform, with its own organization, Contract work amounting to at least 50 percent of the Contract Price. Where an entire Bid item is subcontracted, the value of work subcontracted will be based on the Contract Unit Price. When a portion of a Bid item is subcontracted, the value of work subcontracted will be based on the estimated percentage of the Contact Unit Price. This will be determined from information submitted by the Contractor, and subject to approval by the Engineer. 3-3 SUBCONTRACTORS — add the following: Attention is directed to the provisions in Sections 10262 and 10262.5 of the Public Contract Code and Section 7108.5 of the Business and Professions Code concerning prompt payment to subcontractors. The Contractor shall return all moneys withheld in retention from the subcontractor within 30 days after receiving payment for work satisfactorily completed, even if the other contract work is not completed and has not been accepted in conformance with Section 3-13 of the SSPWC. This requirement shall not be construed to limit or impair any contractual, administrative, or judicial remedies otherwise available to the Contractor or subcontractor in the event of a dispute involving late payment or nonpayment by the Contractor or deficient subcontract performance or noncompliance by a subcontractor. 3-5 INSPECTION — Replace the second Sentence with the following: The Contractor shall notify the Engineer 48 hours in advance of the start of the Work. E-10 The following sentence is added to the section: Any work done in unauthorized areas or in a manner unacceptable to the INSPECTOR shall not be accepted or paid for by the CITY. 3-6 THE CONTRACTOR'S REPRESENTATIVE —Add the following: The Contractor's representative shall be accessible by cellular phone at all times. The failure of the designated representative(s) to faithfully prosecute the Work, including, but not limited to, failure to adhere to the Contractor's construction schedule shall be deemed grounds for removal from the Work per 5-3.1. 3-7 CONTRACT DOCUMENTS 3-7.1 General - Replace the last paragraph with the following: The Contractor shall examine and compare the Contract Documents with each other and with the other information made available to the CONTRACTOR by the AGENCY and shall immediately notify the ENGINEER of any errors, inconsistencies, or omissions discovered. If the CONTRACTOR performs any construction activity knowing it involves a recognized error, inconsistency, or omission in the Contract Documents without notice to the ENGINEER, the CONTRACTOR shall assume responsibility for such performance and for the full costs for correction. The CONTRACTOR shall perform field measurements, verify field conditions, and shall carefully compare such field measurements and conditions and other information known to the CONTRACTOR with the Contract Documents before commencing activities. Errors, inconsistencies, or omissions discovered shall be reported to the ENGINEER immediately. Add the following: The Standard Specifications for Public Works Construction and the Standard Plans for Public Works Construction are both promulgated by Public Works Standards, Inc. These publications are available for purchase from BNi Building News, Inc., 1612 South Clementine Street, Anaheim, California 92802, (800) 873- 6397, www.bnibooks.com. These publications are copyrighted and the Agency will not provide copies. Standard Plans of the Los Angeles County Department of Public Works are available for purchase in the Agency's Cashier's Office located at 900 South Fremont Avenue, Alhambra, California 91803-1331, (626) 458-6959, or for downloadingon the internet, www.lqqpE.org/des/Des'ign__Manuals/Standard_Plan .pdf. 3-8 SUBMITTALS 3-8.1 General — Replace the second paragraph with the following: E-11 The Contractor shall allow a minimum of 10 Working Days for each review, unless otherwise approved by the Engineer. Review periods are not cumulative. The aforementioned time frames begin anew upon each submission whether the initial submission or a resubmission after a prior review by the Agency. Each set of submittals shall be accompanied by a letter of transmittal describing exactly what is being transmitted. Submittals shall be submitted to: City of Santa Clarita 23920 Valencia Blvd. Santa Clarita, CA 91355 Phone: 661-290-2204 Fax (661) 290-2212 Attention: Katie Knybel Email: kkn belsanta-clarita.com All submittals shall be submitted and approved prior to issuance of the Part 2 NTP unless otherwise specified herein or approved by the Engineer. 3-8.7 Pre -Construction Submittals —Add this subsection: One week prior to attending the Pre -construction meeting the CONTRACTOR shall submit the following: • Construction Demolition and Materials Management Plan per 3-14 • List of all Subcontractors per 3-3 • Emergency Contact Information • Permits to be obtained by the contractor per 2-2 3-8.8 Schedule of Submittal — add this subsection: The Contractor shall prepare a schedule listing the submittals it has identified as being required and the date upon which each submittal will be made. Each submittal shall be identified on the baseline construction schedule and each update as an individual activity. The agency review time frame specified in 3-8.1 shall be reflected on the submittal schedule and shown as an individual activity. 3-10 SURVEY 3-10.1 General — Replace this section with the following: Construction survey shall be provided by the City and shall not be the responsibility of the contractor. Contractor shall notify the Engineer or City Inspector forty-eight (48) hours in advance of survey request. E-12 3-12 WORK SITE MAINTANENCE 3-12.2 Air Pollution control 3-12.2.1 Dust Control — add this subsection: Dust generated from the CONTRACTOR's work area, or wind are all included in the definition of "dust" and shall be controlled. All activities shall be in compliance with the South Coast Air Quality Management District's (SCAQMD) Rule 403 Fugitive Dust requirements: httD://www.aamd.aov/rules/rea/rea04/r403.odf High wind condition is defined as instantaneous wind speeds exceeding 25 miles per hour (SCAQMD Rule 403, (c), (19), High Wind Conditions). Inactive Disturbed Surface Area means any disturbed surface area upon which active operation have not occurred or are not expected to occur for a period of 20 consecutive days. (SCAQMD Rule 403, (c), (20), Inactive Disturbed Surface Area). Stabilized Surface means any previously disturbed surface area or open storage pile which, through the application of dust suppressants, shows visual or other evidence of surface crusting and is resistant to wind -driven fugitive dust and is demonstrated to be stabilized. Stabilization can be demonstrated by one or more of the applicable test methods contained in the Rule 403 Implementation Handbook. (SCAQMD Rule 403, (c), (31), Stabilized Surface). Equipment shall be removed from the Work site as soon as it is no longer necessary. Within 24 hours of a request from the ENGINEER, theCONTRACTOR must remove equipment from the Work site that is no longer needed. Refusal by the CONTRACTOR to remove the equipment may be cause for withholding progress payments. No separate or additional payment will be made for air pollution control. Payment shall be considered as included in the Contract Unit Prices or lump sum prices for the various Bid items. 3-12.3 Noise Control —Add the following: The project shall follow standard noise abatement regulations as specified by the City of Santa Clarita Municipal Code Section 11.44.080, which restricts construction activities within 300 feet of residentially zoned property to weekdays between 7:00 a.m. and 4:00 p.m. A noise level of 86 db at a distance of 50 feet shall apply to all construction equipment in or related to the job whether owned by the Contractor or not. The use of excessively loud warning signals shall be avoided except in those cases required for the protection of E-13 personnel. The construction CONTRACTOR shall locate equipment and staging areas as far from buildings as possible, and the construction CONTRACTOR shall limit unnecessary idling of equipment. 3-12.6 Water Pollution Control 3-12.6.2 Best Management Practices (BMPs) — Replace the entire subsection with the following: 3-12.6.2.1 General The area of the Work is less than 1 acre and is not part of a larger plan of development, therefore it is not subject to the permitting requirements of the State's General Permit for Storm Water Discharges Associated with Construction and Land Disturbance Activities (Order No. 2010-0014-DWQ, NPDES No. CAS000002). However, the Waste Discharge Requirements for Municipal Separate Storm Sewer System (MS4) Discharges within the Coastal Watersheds of Los Angeles County, except those discharges originating from the City of Long Beach MS4 (Order No. R4-2012-0175, NPDES No. CAS004001) apply and are included herein. Disturbance of areas outside the limits of the Work are not permitted and not included in the BMP consideration The Contractor shall be solely responsible for any arrangements made with a property owner for disturbances outside the limits of the Work. The CONTRACTOR shall be responsible for the costs and liabilities imposed by law as a result of the CONTRACTOR's failure to comply with the requirements specified including, but not limited to, compliance with the applicable provisions of the CASQA Construction BMP Factsheets, and Federal, State, and local regulations. Costs and liabilities include, but are not limited to, fines, penalties, and damages whether assessed against the City of Santa Clarita or the CONTRACTOR, including those levied under the Federal Clean Water Act and the State Porter Cologne Water Quality Act. In addition to the remedies authorized by law, an amount of the money due the CONTRACTOR under the Contract, as determined by the Agency, may be retained by the Agency until disposition has been made of the costs and liabilities. The retention of money due the CONTRACTOR shall be subject to the following: a) The AGENCY will give the CONTRACTOR 30 Days notice of its intention to retain funds from partial payments, which may become due to the CONTRACTOR prior to acceptance of the Contract. Retention of funds from payments made after acceptance of the Contract may be made without prior notice to the CONTRACTOR. b) No retention of additional amounts out of partial payments will be made if the amount to be retained does not exceed the amount being withheld from partial payments pursuant to 7-3.2. E-14 3-12.6.2.2 BMP Plan Preparation and Submittal The Contractor shall prepare and submit for approval a BMP Plan per 3-8.8 and 6-1.2 The BMP Plan shall identify pollution sources that may adversely affect the quality of storm water discharges associated with the Work and shall identify water pollution control measures, hereafter referred to as BMPs, to be constructed, implemented, and maintained in order to reduce to the extent feasible (best available technology and best conventional technology) pollutants in storm water discharges from the Work site during construction performed under this Contract. BMPs shall not contain plastic in any part of their construction when alternative materials are available. The BMP Plan shall incorporate BMPs in the following categories (where applicable to the Project): a) Soil stabilization; b) Sediment control; c) Tracking control; d) Wind erosion control; e) Non -storm water control; f) Waste management and material pollution control; and g) Final stabilization. Specific objectives, implementation details, inspection criteria and minimum requirements for each category of BMP are contained in the CASQA Construction BMP Factsheets. CASQA BMP Fact Sheets are available at: ® https://www.cas a.orq/ ® htt�r://media.ocgov.com/ ov/w/watersheds/documents/bmr/construction activities.asp The CONTRACTOR shall consider the minimum requirements listed for any category, the CONTRACTOR shall incorporate into the BMP Plan and implement on the Project, the listed minimum BMPs required below in order to meet the pollution control objectives for the category. In addition, the CONTRACTOR shall consider other BMPs presented in the CASQA Construction BMP Factsheets and shall incorporate into the BMP Plan and implement on the Project the control measures necessary to meet the objectives. The CONTRACTOR shall document the selection process in conformance with the procedure specified in the CASQA Construction BMP Factsheets. The BMP Plan shall include, but not be limited to, the following BMPs required by the Los Angeles County MS4 Permit, R4-2012-0175 (Table 12), as they apply to the Project: Erosion Control E-15 Scheduling — EC 1 Preservation of Existing Vegetation — EC 2 Sediment Control Silt Fence — SE 1 Sand Bag Barrier — SE 8 Stabilize Construction Site Entrance/Exit — TC 1 Non -Storm Water Management Water Conservation Practices — NS 1 Dewatering Operations — NS 2 Waste Management Material Delivery and Storage — WM 1 Stockpile Management — WM 3 Spill Prevention and Control — WM 4 Solid Waste Management — WM 5 Concrete Waste Management — WM 8 Sanitary/Septic Waste Management — WM 9 The CONTRACTOR shall update the BMP Plan whenever there is a change in construction activities or operations which may affect the discharge of pollutants to surface waters, ground waters, municipal storm drain systems or when deemed necessary by the ENGINEER. The BMP Plan shall be updated if the Plan has not achieved the objective of reducing pollutants in storm water discharges. Updates shall show additional BMPs or revised operations, including those in areas not shown in the initially approved BMP Plan, which are required to control water pollution effectively. Updates to the BMP Plan shall be submitted for review and approval by the ENGINEER. Updates shall be dated and attached to the on -site BMP Plan. The CONTRACTOR shall keep a copy of the BMP Plan, together with updates, revisions and amendments at the Project site or with the Contractor's Representative. 3-12.6.2.3 Implementation of the BPM Plan No work having the potential to cause water pollution or disturb the earth, as determined by the Engineer, shall be performed until the Contractor has implemented the approved BMP Plan and received the approval of the Engineer to proceed. Upon approval of the BMP Plan, the CONTRACTOR shall be responsible throughout the duration of the Project for installing, constructing, inspecting, and maintaining the BMPs described in the BMP Plan and any amendments thereto and for removing and disposing of temporary BMPs when they are no longer needed or have been replaced. Unless otherwise approved by the ENGINEER, the CONTRACTOR's responsibility for BMP Plan implementation shall continue throughout any temporary suspension of the Work ordered accordance with 6-6. Installation, construction, inspection, maintenance, removal, and disposal of BMPs shall conform to the requirements in the CASQA Construction BMP Fact Sheets and these Special Provisions. E-16 Soil stabilization practices and sediment control measures, are applicable throughout the entire year. The CONTRACTOR shall demonstrate the ability and preparedness to fully deploy soil stabilization practices and sediment control measures to protect soil- disturbed areas on the Project site before the onset of precipitation (NOAA forecast of >_ 50 percent). A quantity of soil stabilization and sediment control materials shall be maintained on site equal to 100 percent of that sufficient to protect unprotected, soil -disturbed areas on the Project site. BMPs required to protect unprotected, soil -disturbed areas on the Project site shall be installed and/or implemented no later than 24-hours prior a forecast storm event. Disturbed -soil areas on the Project site shall be considered to be non -active when those areas have been disturbed and are not scheduled to be re -disturbed for at least 7 Days. Effective soil cover shall be provided during this condition which includes; finished slopes, open space, utility backfill and completed lots or building pads. Active disturbed -soil areas of the Project site shall be fully stabilized and receive sediment control. The weather forecast shall be monitored by the CONTRACTOR on a daily basis. The National Weather Service forecast shall be used. The CONTRACTOR shall implement throughout the duration of the Project, BMPs included in the BMP Plan for tracking control, wind erosion control, non- storm water control, and waste management and material pollution control. In accordance with 6-6, the Engineer may order the suspension of the Work in whole or in part if water pollution is being created or if the Contractor fails to implement the approved BMP Plan and/or conform to the requirements in these Special Provisions. 3-12.6.2.4 Maintenance The CONTRACTOR shall regularly inspect and maintain the Work site for the BMPs identified in the BMP Plan. The CONTRACTOR shall identify corrective actions and the time needed to address any deficient measures or reinitiate any BMPs that have been discontinued. All repair and correction shall begin within 72 hours of notice or before the next storm forecasted with a 50 percent or greater probability of precipitation, whichever is sooner. Inspections of the Work site shall be conducted by the CONTRACTOR to evaluate BMPs, as follows: a) Within 48-hours of a NOAA forecasted storm event with a probability of precipitation of 50 percent or more. b) Weekly. c) Every 24-hours during an on -going storm. E-17 Disturbed soil areas within the Project shall be protected in conformance with the requirements in the BMP Plan with an effective combination of soil stabilization and sediment control. Attention shall be focused on prevention of pollution rather on its removal from runoff, as such, soil stabilization BMPs are of the highest priority. If the CONTRACTOR or the ENGINEER identifies a deficiency in the deployment or functioning of an identified BMP, the deficiency shall be corrected immediately. The deficiency may be corrected at a later date and time if requested by the CONTRACTOR and approved by the ENGINEER in writing, but not later than 72 hours after notice or before the next storm forecasted with a probability of precipitation of 50 percent or greater whichever is sooner. Immediately prior to completion of the Work, all disturbed -soil areas, including the construction staging area shall be stabilized with materials approved by the ENGINEER. No stabilization materials may contain plastic. This provision does not apply to the bed, bank, and channel of any streambed or natural drainage. The Work will not be considered as completed in accordance with 3-13.1 until stabilization is performed and approved by the Engineer. 3-12.6.2.5 Payment a) Payment for Preparation of the BMP Plan. Payment for preparation of the BMP Plan shall be considered as included in the lump sum Bid price for "MOBILIZATION/DEMOLIZATION, BONDS & INSURANCE." b) Payment for Implementation of the BMP Plan. Payment for implementation of the BMP Plan, conformance with the requirements in the Special Provisions, and conformance with all other requirements will be made at the lump sum Bid price for "WATER POLLUTION CONTROL & IMPLEMENT BEST PRACTICES". Payments will be amortized over the project duration. The final 10% will be released after the installation certification by the landscape architect of record. No separate or additional payment will be made for the correction of deficiencies. c) Retention and Withholding for Non -Conformance. The AGENCY may retain an amount equal to 25 percent of the estimated value of the Contract work performed during the progress estimate periods in which the CONTRACTOR fails to conform to the specified requirements. The AGENCY will withhold $500 per BMP deficient item from the monthly progress payment if not corrected within 3 Working Days from the issuance date of the deficient item by the Engineer. The Engineer will inspect the Work site on a weekly basis and a deficient item list will be issued if correction is needed. Once E-18 the deficient item is corrected and approved by the Engineer,the withheld money will be released back to the Contractor. Retentions for failure to conform to the specified requirements shall be in addition to the other retentions provided for in the Contract. The amounts retained for failure of the CONTRACTOR to conform to the provisions in this subsection will be released for payment on the next monthly progress estimate following the date that a BMP Plan has been implemented and maintained and water pollution is adequately controlled, as determined by the ENGINEER. 3-12.7 Water — Add this section: The CONTRACTOR shall make arrangements with Santa Clarita Water Company, Valencia Water Company and/or Newhall County Water Company to obtain water from designated fire hydrants at or near the project for use in dust control and soil compaction. It shall be the responsibility of the CONTRACTOR to pay for the water and any deposits required. Water shall not be taken from any residential systems without the express written consent of the homeowner. The cost to furnish and apply water shall be included in the related items of work and no additional compensation shall be made thereof. 3-14 CONSTRUCTION AND DEMOLITION MATERIALS MANAGEMENT —Add this section: The CONTRACTOR shall comply with the City's Construction and Demolition Material Management Ordinance, City of Santa Clarita Municipal Code Section 15.46, parts 1-3 and 5. This ordinance requires that at least 65 percent of all construction and demolition materials and inert wastes from construction, demolition, grading projects be diverted from landfills. The CONTRACTOR shall submit a Construction and Demolition Materials Management Plan (CDMMP) for approval in accordance with 3-8.7. The Part 2 Notice to Proceed will not be issued until the plan has been approved. The CDMMP shall provide all of the information set forth in Section 15.46.300 of the City's Municipal Code. The CDMMP must show that the diversion requirement will be met. The following 3 conditions must be met in order to obtain final payment: 1. Within 10 Days after the completion of the Work per 3-13.1, the CONTRACTOR shall submit documentation that the diversion requirement for the Project has been met. a) Receipts and gate tickets from the vendor or facility which collected or received construction and demolition material showing the actual weight of that material E-19 or, in the case of inert waste, removed from the solid waste stream and not disposed of in a solid waste landfill: b) A copy of the previously approved CDMMP for the Project adding the actual volume or weight of each type of construction and demolition material diverted and transported for disposal in a landfill or transformation facility, or, in the case of inert waste, removed from the solid waste stream and not disposed of in a solid waste landfill; c) Any additional information the CONTRACTOR believes is relevant to determining its efforts to comply in good faith with this requirement. 2. The Agency will review the information submitted and determine whether the CONTRACTOR complied with the approved CDMMP. 3. If the Agency determines that the CONTRACTOR has fully complied with the CDMMP Agency will authorize final payment. 3-15 NONCOMPLIANCE WITH THE PLANS AND SPECIFICATIONS —Add this section: Failure of the Contractor to comply with any requirement of the Plans and Specifications, and to immediately remedy any such noncompliance upon notice from the Engineer, may result in suspension of Contract progress payments on all items of work. Any progress payments so suspended shall remain in suspension until the Contractor's operations are brought into compliance to the satisfaction of the Engineer. Upon determination by the Engineer that the Contractor is in compliance, progress payments will resume for those items of work which have been constructed in conformance with the Plans and the Specifications. No additional compensation shall be due the Contractor as a result of the suspension of progress payments due to noncompliance with the Plans and Specifications. 3-16 CONTRACT RECORD DOCUMENTS —Add this section and following subsections: 3-16.1 - As -Built Plans Prior to the start of the Work, the CONTRACTOR shall identify and maintain for the ENGINEER a complete set of As -Built Plans and Specifications on the Project site at all times. All final locations determined in the field, and any deviations from the Plans and Specifications, shall be marked in red to show the as -built conditions. The CONTRACTOR shall update this set daily, showing every change from the originals, including exact as -built locations, sizes and types of underground piping, valves, equipment, and all other work not visible at surface grade. The As -Built Plans shall graphically show all as -built conditions, locations, configurations, and other details which vary from the details shown on theoriginals including all revisions made necessary by Addenda, Change Orders, and to meet field conditions. E-20 In the case of details shown on the Plans which are superseded by approved Working Drawings or Shop Drawings, the As -Built Plans shall be updated by noting or graphically showing how those details are superseded. Prior to submitting each monthly progress payment request, the CONTRACTOR shall request the ENGINEER'S approval of the current As -Built Plans. The ENGINEER'S approval will be a prerequisite to approval of requests for each progress and final payment The AGENCY will withhold $1,000 for each month that the As -Built Plans are deemed deficient by the ENGINEER. The CONTRACTOR shall deliver the As -Built Plans to the ENGINEER within 10 Days of completion of the Work. Final payment will not be made until this requirement is met. No separate or additional payment will be made for the preparation and maintenance of As - Built Plans and Specifications. Payment shall be considered as included in the Contract Unit Price for the various Bid items. 3-16.2 — Close -Out Submittals and activities Prior to final payment being made, the Contractor shall complete the following list of submittals and activities. 1. Submission of a completed list of deficiencies ("punch list") approved by the Engineer. 2. As -Built Plans / Record Drawings / Irrigation Controller Charts 3. All Labor Compliance Forms and approved CPR's. 4. Final CDMMP and weight delivery tickets. 5. Operations and Maintenance Manuals. 6. Warranties. 7. Removal of all construction area signs. SECTION 4 — CONTROL OF MATERIALS 4-4 TESTING — Delete the last two sentences of the first paragraph. Add the following after the first paragraph: All necessary materials and/or compaction testing will be performed by an AGENCY -approved testing laboratory. Except as elsewhere specified, the testing of materials and/or compaction, which meet or exceed the requirements specified in the Contract Documents will be performed at no expense to the Contractor. If the initial testing determines the material and/or compaction does not conform to the requirements of the Contract Documents, subsequent testing will be E-21 performed by the AGENCY at the Contractor's expense. Additional testing, if deemed necessary by the ENGINEER, of materials and/or compaction, which previously met or exceeded the requirements specified in the Contract, will be performed by the AGENCY at the Contractor's expense. The cost of testing performed at the Contractor's expense will be deducted from a progress payment or the final payment. 4-6 TRADE NAMES — Replace the entire subsection with the following: Pursuant to the Public Contract Code, Section 3400, the Contractor may supply any of the products or materials specified or offer an equivalent. A listing of materials is not intended to be comprehensive, or in order of preference. The Contractor may submit any material or product it considers to be an equivalent to that specified Submission of proposed equivalent materials and products shall be made in conformance with the requirements in the Instructions to Bidders. The Contractor shall have the material tested as required by the Engineer to determine if the quality, strength, physical, chemical, or other characteristics, including durability, finish, efficiency, dimensions, service, and suitability are such that the proposed "equal" will fulfill the intended function. Test methods shall be subject to the approval of the Engineer. Test results shall be reported promptly to the Engineer, who will evaluate the results. If the proposed equivalent product or material is determined by the Agency to not be equivalent to the specified product or material, the Contractor shall furnish and install the specified product or material. Agency -approved equivalent products or materials shall not be installed nor put into usage without the prior approval of the Engineer. The Contract Time of Completion specified in 6-3 shall not be affected by any circumstance arising from the provisions of this subsection. E-22 SECTION 5 — LEGAL RELATIONS AND RESPONSIBILITES 5-3 LABOR 5-3.1 General — Add the following: This Project is subject to compliance monitoring and enforcement by the State of California Department of Industrial Relations. 5-3.2 Prevailing Wages - Add the following after the second sentence: The Agency will furnish copies of said wage rates for the Contractor's use Add the following: The CONTRACTOR and all subCONTRACTORs, suppliers, and vendors shall comply with all AGENCY, State, and Federal orders regarding affirmative action to ensure equal employment opportunities and fair employment practices. Failure to file any report due under said orders will result in suspension of periodic progress payments. The CONTRACTOR shall ensure unlimited access to the job site for all equal employment opportunity compliance officers. The General Prevailing Wage Rate Determinations are available at www.dir.ca.gov/DLSR/PWD/index.htm. Copies of the General Prevailing Wage Determinations are on file at the City of Santa Clarita City Hall, 23920 Valencia Blvd. Suite 300, Santa Clarita, CA 91355. Copies will be made available to any interested party upon request. Future effective wage rates will be on file with the Department of Industrial Relations, and are referenced but not printed in said publication. The new wage rates shall become effective on the day following the expiration date of the current determinations and apply to the Contract in the same manner as if they had been included or referenced in the Contract. 5-3.6 Work Records — Add this subsection: Pursuant to Section 1812 of the California Labor Code, the Contractor shall maintain an accurate written record of all employees working on the Project each calendar day. The record shall include each employee's name, Social Security number, job classification and the actual number of hours worked. The Contractor shall submit a signed copy of this record to the Engineer at the end of each week. 5-4 INSURANCE 5-4.1 General — Add the following as the second sentence of the first paragraph: Such insurance shall be primary to and not contributing with any other insurance or self- insurance programs maintained by the Agency. E-23 Add the following to the third paragraph: The Contractor shall provide renewal certificates to the Agency not less than 10 Days prior to the Contractor's policy expiration date(s). The Agency reserves the right to obtain complete, certified copies of any required Contractor and/or Subcontractor policies at any time. All liability insurance policies shall bear an endorsement or shall have attached a rider whereby it is provided that, in the event of an expiration or proposed cancellation of such policies for any reason whatsoever, the AGENCY shall be notified by registered or certified mail, return receipt requested, giving a sufficient time before the date thereof to comply with any applicable law or statute, but in no event less than 30 Days before expiration or cancellation is effective. Payment for insurance shall be considered as included in the lump sum bid price for "MOBILIZATION/DEMOBILIZATION, BONDS & INSURANCE" 5-4.2 — General Liability Insurance Add the following as the second of the first paragraph The policy shall also insure each owner of property upon which the Work is to be performed or which the Contractor acquires for its use. Add the following after the second paragraph A combined single -limit policy with aggregate limits in the amount of $4,000,000 will be considered equivalent to the required minimum limits. Except as provided for in Subsection 6-5, the CONTRACTOR shall save, keep and hold harmless the AGENCY, its officers, employees, and agents from all damages, costs, or expenses in law or equity that may at any time arise or be set up because of damages to property, or of personal injury received by reason of or in the course of performing work, which may be caused by any willful or a negligent act or omission by the CONTRACTOR, any of the CONTRACTOR's employees, or any subCONTRACTOR. The AGENCY will not be liable for any accident, loss or damage to the Work prior to its completion and acceptance, except as provided for in Subsection 6-5 of the SSPWC. Except as provided for in Subsection 6-5, the CONTRACTOR shall save, keep and hold harmless the following: • City of Santa Clarita (Property OWNER) • Additional Property Owners as required to complete the work. A Certificate of Insurance is evidencing the above policy shall be submitted to the AGENCY concurrently with the filing of the Faithful Performance Bond and Payment (Labor and Material) Bond and shall be subject to the approval of the CITY ATTORNEY. E-24 The Contractor shall include all Subcontractors as insureds under the Contractor's own policies, or shall provide the Agency with each Subcontractor's separate evidence of insurance coverage. The Contractor shall be responsible for verifying each Subcontractor complies with the insurance requirements specified in the Specifications and the Agreement and shall require that each Subcontractor name the Agency and each additional insured, and the Contractor as additional insureds on the Subcontractors general liability policy. The Contractor shall obtain the Agency's prior review and approval of any Subcontractor request for modification of the insurance requirements. 5-4.3 — Workers Compensation Insurance — Add the following: Should evidence of the renewal or replacement of the policy not be filed with the Agency prior to the expiration or cancellation date, the Agency will stop all work on the Project and no further work shall be performed until new insurance coverage has been obtained by the Contractor. Such stop order shall not be a cause for a time extension to the Contract Time. Such policy shall be endorsed to waive subrogation against the Agency for injury to the Contractor's employees. If the Contractor's employees will be engaged in maritime employment, the coverage shall provide the benefits required by the U.S. Longshore and Harbor Workers Compensation Act, Jones Act or any other Federal law to which the Contractor is subject. If the Contractor will provide leased employees, coverage shall also include an Alternate Employer Endorsement (providing scope of coverage equivalent to ISO policy form WC 00 03 01 A) naming the Agency as the Alternate Employer and the endorsement form shall be modified to provide that the Agency will receive not less than 30 Days advance written notice of cancellation of this coverage provision. In all cases, the above insurance shall include employer's liability coverage with limits not less than: Each Accident: ....................................................... $1,000,000 5-4.4 Automobile Liability Insurance — Replace the entire paragraph with the following: The Contractor shall provide evidence of and maintain automobile liability insurance. Such insurance shall be written on ISO policy form CA 00 01 or its equivalent with a limit of liability of not less than $1,000,000 for bodily injury and property damage, in combined or equivalent split limits, for each single accident. Such insurance shall cover liability arising out of the Contractor's use of autos in performing the Work, including owned, leased, hired, and/or non -owned autos, as each may be applicable. 5-7 SAFETY 5-7.1 Work Site Safety — Add the following: Contractor shall install, maintain and be responsible for adequate sheeting, shoring, bracing or equivalent protection as required for all excavations in accordance with the requirements E-25 of OSHA and the Construction Safety Orders of the State of California, pursuant to the provisions of Section 6707 of the California. 5-7.1.1 General —Add the following: The Contractor shall be solely responsible for ensuring that all work performed under the Contract is performed in strict compliance with all applicable Federal, State and local occupational safety regulations. The Contractor shall provide at its expense all safeguards, safety devices and protective equipment, and shall take any and all actions appropriate to providing a safe Project site. 5-7.1.2 Work Site Safety Official — Add the following Failure by the Contractor to provide the required Project Safety Official shall be grounds for the Agency to direct the cessation of all work activities and operations at no cost to the Agency until such time as the Contractor is in compliance. 5-7.1.3 Safety Indemnification —Add this subsection: To the extent allowed by law, the Contractor agrees to defend, indemnify and hold harmless the Agency and its officers, employees and agents from and against any and all investigations, complaints, citations, liability, expense (including defense costs and legal fees), claims and/or causes of action for damages of any nature whatsoever, including but not limited to injury or death to employees of the Contractor, its subcontractors or Agency, attributable to any alleged act or omission of the Contractor or its subcontractors which is in violation of any Cal/OSHA regulation. The obligation to defend, indemnify and hold harmless includes all investigations and proceedings associated with purported violations of Section 336.10 of Title 8 of the California Code of Regulations pertaining to multi -employer work sites. The Agency may deduct from any payment otherwise due the Contractor any costs incurred or anticipated to be incurred by the Agency, including legal fees and staff costs, associated with any investigation or enforcement proceeding brought by Cal/OSHA arising out of the Project. 5-7.4 Hazardous Substances — Add the following: Spills along the roadway shall be removed as quickly as practical. Hazardous materials and motor vehicle fluids shall be removed from the site. Contaminated soil shall also be removed or remediate as soon as practical. Cleanup priorities shall include health and safety and protection of streams and other habitats. The CITY shall provide hazardous material testing. Soils on the site shall be sampled and analyzed for pesticides. A groundwater sample shall be collected and analyzed for general screening purposes and for volatile organic compounds. If site sampling detects hazardous materials at levels exceeding regulatory limits, a plan shall be developed, in conjunction with appropriate regulatory agencies, to determine the extent of contamination and to identify methods and procedures for treatment and/or E-26 removal of hazardous materials. The plan shall comply with all local, state, and federal requirements for treatment, removal, transport, and/or disposal of hazardous materials. A contingency plan shall be developed and in place during project construction in the event that unidentified underground storage tanks, hazardous materials, petroleum hydrocarbons, or hazardous or solid wastes are unexpectedly encountered during construction. This contingency plan shall address underground storage tank decommissioning, field screening and materials testing methods, mitigation and contaminant management requirements, and health and safety requirements for construction workers. A contingency plan will be implemented based on an agreement between the CITY and the CONTRACTOR per the "Changes of Work" section herein. 5-7.10 Temporary Manhole Shaft Covers —Add this subsection: The Contractor shall protect the public at all times from accidental entry into manhole or manhole shaft openings. Any such opening shall be covered with an entry proof cover approved by the Engineer. Payment for temporary manhole shaft covers shall be considered as included in the Contract Unit Price for the Bid items for or affecting manholes. 5-7.12 Protection of the Public — Add this subsection: It is part of the service required of the CONTRACTOR shall make whatever provisions are necessary to protect the public. The CONTRACTOR shall use foresight and shall take such steps and precautions as his operations warrant to protect the public from danger, loss of life, or loss of property which would result from interruption or contamination of public water supply, interruption of other public service, or from the failure of partly completed work or partially removed facilities. Unusual conditions may arise on the work which will require that immediate and unusual provisions be made to protect the public from danger or loss, or damage to life and property, due directly or indirectly to prosecution of work under this contract. Whenever, in the opinion of the ENGINEER, an emergency exists against which the CONTRACTOR has not taken sufficient precaution for the public safety, protection of utilities and protection of adjacent structures or property, which may be damaged by the CONTRACTOR's operations and when, in the opinion of the ENGINEER, immediate action shall be considered necessary in order to protect the public or property due to the CONTRACTOR's operations under this contract, the ENGINEER will order the CONTRACTOR to provide a remedy for the unsafe condition. If the CONTRACTOR fails to act on the situation within a reasonable time period, the ENGINEER may provide suitable protection to said interests by causing such work to be done and material to be furnished as, in the opinion of the ENGINEER, may seem reasonable and necessary. E-27 The cost and expense of said labor and material, together with the cost and expense of such repairs as are deemed necessary shall be borne by the CONTRACTOR. All expenses incurred by the AGENCY for emergency repairs will be deducted from the final payment due to the CONTRACTOR. However, if the AGENCY does not take such remedial measures, the CONTRACTOR is not relieved of the full responsibility for public safety. 5-7.13 Notification to the Agency Departments — Add this section and the following subsection: If the closing or opening (either partial or full) of affected streets is approved by the Engineer, the CONTRACTOR shall notify the following City Departments at least twenty-four (24) hours prior to the schedule closing or opening. City of Santa Clarita Public Works Inspection ............. (661) 255-4948 Los Angeles County Sanitation Department ....................(818) 458-5100 Los Angeles County Sheriff Department (Santa Clarita) ... (661) 255-1121 Los Angeles County Fire Department (Santa Clarita) ...... (661) 286-8821 U.S. Post Office, Santa Clarita.................................. (661) 254-3270 5-8 PUBLIC CONVENIENCE AND SAFETY — TRAFFIC CONTROL PLAN — Add this Section and the following subsection: 5-8.1 Access When entering, leaving or operating on roadways carrying public traffic, CONTRACTOR'S equipment, whether empty or loaded, shall in all cases yield to public traffic. Haul trucks shall be covered with tarps and secured prior to entering the traffic lanes. The CONTRACTOR shall submit to the AGENCY for review and approval a truck routing map prior to commencement of construction. Flagmen shall be provided when directed by the AGENCY for the safety of the general public and work personnel. The CONTRACTOR shall be responsible to do a staged construction if necessary to accommodate construction activities required by others. 5-8.2 Work Area Traffic Control 5-8.2.1 General The work shall consist of maintaining and controlling all vehicular traffic through the construction zone and/or detour routes and shall conform to the latest edition of the "California Manual on Uniform Traffic Control Devices" (California MUTCD) published by the State of California, Department of Transportation. The manual prescribes minimum standards for the application of uniform traffic control devices such as traffic surface mounted channellizers, barricades, regulatory signs, warning signs, electronic message board(s), and guide signs. The CONTRACTOR shall have a copy of the manual at the work site and shall comply with its provisions. E-28 The Contractor shall be fully responsible for all traffic and pedestrian safety controls during the construction period. 5-8.2.2 Materials and Equipment The work shall consist of maintaining and controlling all vehicular traffic through the construction zone and/or detour routes and shall conform to the latest edition of the "California Manual on Uniform Traffic Control Devices" (California MUTCD) published by the State of California, Department of Transportation. The manual prescribes minimum standards for the application of uniform traffic control devices such as traffic surface mounted channellizers, barricades, regulatory signs, warning signs, and guide signs. The CONTRACTOR shall have a copy of the manual at the work site and shall comply with its provisions. 5-8.2.3 Construction Traffic control shall include the installation, maintenance, and removal of all necessary traffic control equipment. Damaged or missing equipment shall be replaced upon discovery. Equipment left in place over weekends or during other periods of non -work shall be checked and maintained on a daily basis until the work is complete and all traffic control devices are removed from the project. 5-8.2.4 Construction Signing Construction signing shall consist of furnishing, installing, maintaining, and removing construction signs, cones, delineators, and barricades. All work zoned traffic control devices, materials and equipment shall be in new condition, as determined by the ENGINEER. 5-8.2.6 Traffic Maintenance All traffic lanes and detours shall be continually maintained to prevent the development of potholes and provide smooth, dust -free and mud -free traffic. The CONTRACTOR shall abate dust nuisance on traffic lanes, detours, and work site by cleaning, sweeping, and sprinkling with water or other means, as necessary, during and after the construction hours, including such non -working days as Saturdays, Sundays, and holidays. If a cross street needs to be temporarily closed when work is in progress through the intersection and the anticipated delay is more than 5 minutes, a detour sign shall be installed on the cross street and shall include the installation of advance signing displaying the anticipated delay time. The ENGINEER shall review the signing. The CONTRACTOR's equipment and personal vehicles of the CONTRACTOR's employees shall not be parked on the traveled way or on any street where traffic is restricted at any time. If construction equipment is parked in the parking lanes overnight, then barricades and other suitable warning devices shall be required. E-29 5-8.2.7 Restriction on Closure of Traffic Lane NO MORE THAN ONE LANE may be closed in each direction at any one time during Construction, THERE IS NO EXCEPTION TO THE ABOVE STATED LANE CLOSURE RESTRICTIONS OR CONSTRUCTION HOURS AS STATED IN THE CONTRACT DOCUMENTS. Lane Closure shall be permitted to the hours listed in Section 6-2.1. 5-8.2.8 Weekly Traffic Updated Schedule The CONTRACTOR shall provide a Weekly Traffic Updated Schedule on the Monday of the preceding week throughout the construction period with any modifications to traffic control, pedestrian access, or detour changes. Failure to provide the Weekly Traffic Updated Schedule will be cause to stop the work. 5-8.1.1 Payment Payment for Public Convenience and Safety — Traffic Control Plan shall be considered as included in the lump sum bid price for "TRAFFIC CONTROL, TRAFFIC HANDLING & CONSTRUCTION AREA SIGNS & TWO ELECTRONIC CHANGEABLE MSG SIGNS" Payment shall include full compensation for furnishing all labor, materials, tools, equipment, transportation, and incidentals, and for doing all the work involved in maintaining and controlling the traffic, complete in place, as specified in these General Provisions. Full compensation for additional items and work, not specifically detailed or specified, but essential to the maintaining and controlling of traffic, shall be considered as included and no additional compensation shall therefore be allowed. SECTION 6 — PROSECUTION AND PROGRESS OF THE WORK 6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF THE WORK — Replace the entire section with the following: 6-1.1 Construction Schedule 6-1.1.1 Terms and Definitions The following terms and their respective definitions are in addition to those specified in 1- 2. As -Built Schedule —The final updated Construction Schedule that reflects actual construction progress throughout the entire duration of the Project. E-30 Baseline Schedule — The original Construction Schedule used as the basis for measuring construction progress and Contract performance. Constraint — A requirement that restricts or dictates the Construction Schedule. Construction Schedule — The schedule of construction activities that reflects the means and methods, planned sequencing, duration, and Milestone dates for the completion and acceptance of the Work. Types include the Baseline Schedule, Weekly Schedule Update, Monthly Schedule Update, and the As- Built Schedule. Critical Path — The sequence of activities shown on the Construction Schedule which adds up to the longest overall duration. Data Date — The latest date through which the activities shown on the Construction Schedule have been updated. Milestone — A schedule activity that has zero duration and which graphically represents the start or finish of a portion of the Work. Monthly Schedule Update — An updated Construction Schedule submitted every month that compares actual construction progress versus the progress planned on the Baseline Schedule. Project Float — The difference between the Scheduled Completion Date and Required Completion Date. Float shall be an expiring resource available to both the Contractor and the Agency. Float shall not be for the exclusive use or benefit of either the Agency or the Contractor. Required Completion Date — The required date for completion of the Work as based upon the number of Working Days specified in 6-3.1 and as amended by approved Change Orders. Scheduled Completion Date — The planned date for completion of the Work as shown on the Construction Schedule. Total Float — the maximum amount of time an activity can be delayed from its early start without delaying the completion of the Work. Float shall be an expiring resource available to both the Contractor and the Agency. Float shall not be for the exclusive use or benefit of either the Agency or the Contractor. Weekly Schedule Update —An updated Construction Schedule submitted every week that reflects the status of construction activities from the past week and also includes construction activities scheduled in detail for the following 2 weeks. 6-1.1.2 General Construction schedules shall conform to the following requirements: a) The Construction Schedule shall be prepared using Microsoft Project E-31 b) The Construction Schedule shall be prepared using the Critical Path Method (CPM) illustrating the chronological relationship and sequence of work activities. Activities on the Critical Path shall be clearly delineated. c) Work activities shall be based on the Bid items listed in the Schedule of Prices in the Bid Proposal and the following: 1) Bid Items shall be subdivided into those portions to be constructed during each stage or phase of construction, or portions which do not exceed 20 Working Days, whichever is less. 2) Each submittal, and the corresponding Agency review period, shall be shown as an individual activity. 3) The procurement of construction materials and equipment shall be identified and shown as individual activities. 4) Part 1 NTP requirements shall be shown as individual activities. d) The Construction Schedule shall commence on the Part 1 NTP IssuanceDate and end on the Required Completion Date milestone, or Scheduled Completion Date milestone, required date of the first Working Day whichever date is later. e) Change Orders, including number, description, approval date, and duration shall be shown as individual activities. f) Each activity must have at least one predecessor and one successor with the exception of the Project start and finish milestones. g) Schedule options within the program file shall be as follows: 1) Use retained logic when scheduling progressed activities. 2) Define critical activities as Longest Path. 3) Compute Total Float as the difference between late finish and early finish. 4) Use predecessor activity calendar for scheduling relationship lag. 5) Use of "Must Finish By" date in the project settings shall not be used. h) Calendars, codes, and other information shall be on a project -level basis within the schedule software, as opposed to global, so that any changes to subsequent schedules are independent of past schedule submittals. E-32 i) A level -of -effort type activity shall be included named "Project Float", with the Scheduled Completion Date milestone as a predecessor and the Required Completion Date milestone as a successor. j) Date and time constraints and lags, other than those specified in this subsection, are not allowed unless otherwise accepted by the Engineer. The use of negative lags is not allowed. k) Notification activities shall be milestones linked as predecessors to the related work. These milestones shall contain "As Late As Possible" constraints with lags equal to the notice duration specified. 1) The schedule shall reflect the following Constraints: 1) Utility relocations per 402-4. 2) Schedule impacts due to the protection, removal, or relocation of utilities per 402-5. 3) Temporary traffic control requirements per Section TC of the Special Provisions. 4) The Time of Completion per 6-3. A Baseline Schedule submitted showing completion earlier or later than the time of completion specified will not be accepted. m) The schedule shall include the following Milestones: Activity ID Activity Name Constraint Type NTP1 Part 1 NTP Issuance Date Start On NTP2 Part 2 NTP Issuance Date Start On REQS Required Start Date Start On REQC Required Completion Date Finish On COMP Scheduled Completion Date Finish On or Before n) The Controller shall use the project -specific activity codes loaded in the Project Template provided by the Agency including, but not limited to, the following: 1) Work Type (TYPE): Code Value Description ADM Administrative activities such as contract Milestones, meetings, permits, etc. SUB Submittals by the Contractor REV Submittal Reviews by the Agency PRO Procurement of Materials or Equipment E-33 NOT Notification Activities CON Construction Activities UFE Unforeseen Events OTH Other Activities 2) Responsibility (RESP). Code Value Description PRI Prime Contractor Activities SUB Subcontractor Activities AGE Agency Activities UTI Utility Company Activities OTH Other Entity Activities 3) Item No. (ITEM) - Each activity shall be identified using an activity code with its corresponding Bid item number(s) or Change Order item number(s) listed in the Engineer's Monthly Estimate. 6-1.1.3 Submittals a) General Construction Schedule submittals shall include a portable document file (pdf) accessible using the latest version of Microsoft Project. The submittal shall be emailed to the Engineer or submitted on a compact disc (CD) along with 2 printed color copies on 11-inch x 17-inch sheets. b) Baseline Schedule Within 10 Days after the Agency's issuance of a notice of award of contract, The Contractor shall submit a Baseline Schedule and staging plan for review and acceptance by the Engineer. c) Weekly Schedule Updates The Contractor shall submit Weekly Schedule Updates which will be used to manage, coordinate, and schedule all upcoming Contract activities. These detailed schedules may be submitted in bar chart format and shall reflect the logic and sequence used for the accepted Baseline Schedule. The Weekly Schedule Update shall include the following: 1) Status of the construction activities of the past week, scheduled vs. actual. 2) An explanation for deviations from planned activities, together with actions taken or planned to recover lost time, if applicable. 3) Two -week "look -ahead" Schedule detailing all work activities planned for the next 2 weeks, including all work to be performed by others. Activities E-34 included in the Baseline Schedule shall be further broken down into detailed activities, by specific task, by specific area, at the crew level or lower. d) Monthly Schedules Updates On the first Working Day of each month the Contractor shall submit a Monthly Schedule Update using the same software used to prepare the Baseline Schedule. The Engineer will not submit the Engineer's Monthly Estimate specified in 7-3.2 for processing until the Monthly Schedule Update has been submitted. The schedule may be emailed to the Engineer or submitted on a CD with 2 printed color copies on 11-inch x 17-inch sheets. Should the update not reflect the actual progress of the Work, the update will be returned to the Contractor for inclusion of the changes on the next update. Updates shall conform to 6-1.1.2 and the following: 1) Actual start and completion dates versus the original accepted Baseline Schedule shall be illustrated. 2) Deviations in the progress and sequence of the Work shall be identified and supported by a detailed narrative justification. The updates shall include necessary remedies and revisions to recover delays to the schedule to meet the original Contract milestones. 3) The data date shall be the 28th day of the previous month. 4) Change Order work scheduled after the Data Date that includes an approved time extension shall be shown as a Critical Path activity. Change Order work scheduled after the Data Date without an approved time extension shall be shown as a non -Critical Path activity. Change Order work performed prior to the Data Date shall be shown as an as -built activity. 5) The Required Completion Date milestone constraint date shall be adjusted to account for time extensions approved as of the Data Date. 6) The Scheduled Completion Date milestone constraint date shall be adjusted to match the Required Completion Date as of the Data Date. 7) Schedule updates shall only include changes related to a Time Impact Analysis (TIA) that has been accepted by the Engineer. Schedule updates shall not include changes related to a rejected TIA, or a TIA that is pending. e) As -Built Schedule. Within 7 Days after completion of the Work per 3-13.1, the Contractor shall prepare and submit an As -Built Construction Schedule using the same software used to prepare the Baseline Schedule. The Engineer will not E-35 submit the final monthly progress payment for processing until the schedule has been submitted. The schedule may be emailed to the Engineer or submitted on a CD with 2 printed color copies on 11-inch x 17-inch sheets. The As -Built Schedule shall reflect the actual progress of the Work from the date of issuance of the Part 1 NTP through the date of completion. Should the As -Built Schedule not reflect the actual start and finish dates of all work activities, the schedule will be returned to the Contractor for revision and re submittal. The schedule shall be submitted with a written certificate signed by the Contractor's Authorized Representative stating: "To my knowledge and belief, the enclosed As -Built Schedule reflects the actual start and finish dates of the actual work activities for the Contract contained herein." 6-1.2 Commencement of the Work 6-1.2.1 General — Add this subsection: The Notice to Proceed (NTP) for this Contract will be issued in 2 separate parts. The Agency will issue the Part 1 NTP after the Contractor satisfactorily submits all of the documentation required in the Instructions to Bidders and the Agency has executed the Contract. The Part 1 NTP shall be for the Contractor to perform the following: a) Submit all required pre -construction submittals per 3-8.7 and receive Agency approval for such submittals unless otherwise specified. b) Ensure that all labor, equipment, and materials required for the Contract will be available when required by the Construction Schedule per 6-1. 1. c) Attend preconstruction meetings with the Agency. d) Apply for and obtain all permits and insurance required per 2-2 and 5-4. e) Submit BMP Plan per 3-12.6 and receive Agency approval for such submittals unless otherwise specified. f) Baseline construction Schedule per 6-1.1 and receive Agency approval. The Contractor shall complete all of the above stated -activities within 15 Working Days of the Part 1 NTP. Each additional Working Day in which the Contractor is not in compliance with this requirement will be subtracted from the number of Working Days allowed for the Time of Completion per 6-3. When the number of Working Days specified in 6-3.1 is exhausted, the Contractor will be subject to liquidated damages. The counting of Working Days for the completion of Part 1 NTP activities will stop upon the receipt of E-36 all required Submittals and resume upon the return of any required submittal to the Contractor per 3-8. The Part 2 NTP shall be for the start of the Work. The Part 2 NTP will not be issued until all Part 1 NTP activities have been completed. The ENGINEER and the CONTRACTOR shall agree when the Part 2 NTP will be issued. Payment for compliance with Part 1 and Part 2 NTP requirements shall be considered as included in the lump sum Bid price for "MOBILIZATION/DEMOLOZATION, BONDS & INSURANCE". 6-1.2.2 Pre -Construction Meeting —Add this subsection: A Pre -Construction Conference shall be conducted at the Santa Clarita City Hall, 23920 Valencia Boulevard, Santa Clarita, CA 91355, prior to the start of construction. The Engineer will distribute a notice of this meeting, along with an agenda of the subjects to be addressed at least 5 days prior to the meeting. The job -site foreman or superintendent assigned by the CONTRACTOR for this project shall be present at the Pre -Construction Meeting. The following is a minimum agenda for the Pre Construction Meeting: 1) The ENGINEER will explain and discuss insurance, laws and codes, maintenance of traffic, permits, quality control, inspection and related items. 2) The ENGINEER will discuss procedures for Submittals, and Contract Change Orders. 3) The ENGINEER will discuss monthly progress payment application and establish the estimate cutoff date and discuss partial and final payments. 4) The ENGINEER will discuss the City's Labor Compliance Program. 5) The ENGINEER will discuss the City's Construction & Demolition Materials Management Plan. 6) The ENGINEER will discuss the Notice to Proceed and the Contractor's responsibility to obtain an encroachment permit from the City prior to work. 7) The CONTRACTOR will introduce Contractor's representatives, briefly describe each person's responsibilities. The CONTRACTOR shall designate, in writing, a representative who shall have complete authority to act for the CONTRACTOR, including signature authority limitations. An alternate representative may be designated. The representative or alternate shall be present at the job site whenever work is in progress or whenever actions of the elements necessitate its presence to take measures necessary to protect the project, persons, or property. Any order or communication given to this representative shall be deemed delivered to the CONTRACTOR. In the absence of the CONTRACTOR E-37 or its designated representative, necessary or desirable directions or instructions may be given by the ENGINEER to the superintendent or person having charge of the specific work to which the order applies. Such order shall be complied with promptly and referred to the CONTRACTOR or its representative. 8) The CONTRACTOR will distribute a list of Subcontractors and suppliers and discuss sequence of and coordination of critical work and long lead procurement items. 9) The CONTRACTOR will review the tentative progress schedule. 10) The CONTRACTOR will define and discuss arrangements for Safety, first aid, emergency actions and security. Those attending the meeting shall include, but not be limited to the following: • Contractor • Contractor's Representative • Subcontractors • Subcontractors finance representative or certified Compliance instructions • City of Santa Clarita Project Manager • City Public Works Staff • Design ENGINEER • Affected utility company representatives payroll designee for Labor Any explanations provided by the Engineer at this meeting do not amend, supersede or alter terms or meaning of any Contract Document and the CONTRACTOR shall not claim reliance on such explanations as a defense to any breach or failure by the CONTRACTOR to perform as specified in the Contract. 6-2 PROSECUTION OF THE WORK 6-2.1 General — Add this subsection: The CONTRACTOR's activities shall be confined to the hours between 7:30 AM and 4:30 PM, Monday through Friday. If a one lane closure (eastbound) is required, working hours shall be confined to the hours between 8:30 AM and 3:30 PM. Pedestrian access shall be maintained at all times. In addition, no work shall be performed on Saturday, Sunday, or on the following AGENCY -designated holidays. AGENCY -Designated Holidays New Year's Eve (half day) December 31, 2019 New Year's Day January 1, 2020 Martin Luther King Day January 20, 2019 President's Day February 17, 2019 E-3 8 Memorial Day May 25, 2019 Independence Day July 4, 2019 Deviations from these restrictions will not be permitted without the prior consent of the ENGINEER, except in emergencies involving immediate hazard to persons or property. In the event of either a requested or emergency deviation, inspection service fees will be charged against the CONTRACTOR. Service fees will be calculated at overtime rates including benefits, overhead, and travel time; and will be deducted from the amounts due the CONTRACTOR. Failure of the CONTRACTOR to adhere to these restrictions will result in damages being sustained by the CITY. Such damages are, and will continue to be, impracticable and extremely difficult to determine. For each occurrence of a working day or hours violation, as provided herein, the CONTRACTOR shall pay to the AGENCY, or have withheld from monies due to it, the sum of $1,000, unless otherwise provided in the specifications. 6-2.2 Work by Others Due to Unsatisfactory Work Prosecution —Add this subsection: If, as determined by the Engineer, the Contractor is not prosecuting the Work in a satisfactory manner or is not providing for public safety, traffic and protection of the Work, the Engineer will notify the Contractor of such unsatisfactory conditions and will indicate the date and time when corrective work must be completed. If the Contractor fails to comply, the Agency may elect to do the Work or have the Work performed by others and deduct the cost thereof from any monies due the Contractor. Such action shall not relieve the Contractor from liability. 6-3 TIME OF COMPLETION 6-3.1 General - Replace the first sentence with the following: Time is of the essence in the performance of the work. The CONTRACTOR shall begin work as early as possible and shall prosecute the work to its completion, including the punchlist items, within 45 working days from the Notice to Proceed, exclusive of any extended working hours/days and plant maintenance and establishment period(s). 6-4 DELAYS AND EXTENSION OF TIME 6-4.1 General — Replace the second paragraph with the following: No extension of time will be granted for a delay caused by the inability to obtain materials unless the Contractor obtains from the supplier and furnishes to the Engineer documentary proof that such materials could not be obtained due to war, government regulations, labor disputes, strikes, fires, floods, adverse weather necessitating the cessation of work, or other similar action of the elements. E-39 6-5 USE OF IMPROVEMENT DURING CONSTRUCTION — Add the following after the first paragraph: Action by the Agency to take over and utilize any part of the Project shall become effective only upon issuance of a written notice, signed by the Engineer, setting forth a description of the completed improvements to be taken over, the effective date, location and limits thereof. 6-9 LIQUIDATED DAMAGES — Replace the third sentence of the first paragraph with the following: For each Day in excess of the time specified for the completion of the Work in 6-3.1, as adjusted in accordance with 6-4, the Contractor shall pay to the Agency, or have withheld from monies due it, the sum of $1000. Replace the first sentence of the second paragraph with the following: Execution of the Contract shall constitute agreement by the Agency and the Contractor that $1,000 per Day is the minimum value of the costs and actual damage caused by the failure of the Contractor to complete the Work within the allotted time. 6-10 CONSTRUCTION PROGRESS MEETING —Add this section: Progress meetings will be scheduled between the ENGINEER and CONTRACTOR. Meetings will be scheduled weekly and more often as necessary for the competent and timely execution of the work under the Contract. These meetings will be conducted by the ENGINEER. The CONTRACTOR shall supply, as requested by the ENGINEER, an updated schedule for work to be performed in the next two weeks. SECTION 7 — PAYMENT 7-3 PAYMENT 7-3.1 General — Add the following: No payment will be made for work which is not in conformance with the requirements of the Contract Documents nor for work performed outside the limits of the Work as shown on the Plans or otherwise approved by the Engineer. 7-3.2 Partial and Final Payment — Add the following: The closure date for the purpose of making partial progress payments will be the last day of each month. Prior to the end of each month and preparation of the progress payment estimate, the CONTRACTOR shall meet with the ENGINEER to review and discuss the quantity of each unit price Bid item and percentage of each lump sum Bid item completed to the closure date. The Engineer will furnish the Contractor with a statement of the approximate measurement of the Work performed to the closure date. The Contractor shall submit an E-40 invoice identical in itemization, quantity, and cost to that shown on the statement. The monthly progress payment will not be submitted for processing until an invoice has been received. When the Work is complete in accordance with 3-13.1, the ENGINEER will determine the final quantities of each unit price Bid item and prepare the final progress payment report. Payments are authorized and made within 45 Days after date of receipt of an invoice. However, payments will be withheld pending receipt of any outstanding submittals, reports, or other documentation required by the Contract Documents. In addition, the final progress payment will not be released until the CONTRACTOR conforms to the requirements of 3-16. A full 5 percent will be retained from all progress amounts due. The retained amounts will be authorized for final payment 35 Days after the date of recordation of the Notice of Completion. The CONTRACTOR, however, may receive interest on the retained amount or receive the retained amount itself so long as securities equivalent to the retained amounts are substituted with an escrow holder approved by the AGENCY At the request and expense of the CONTRACTOR, retained amounts or securities equivalent to the retained amounts may be deposited with the State Treasurer or a state or federally chartered bank as the escrow agent, who shall return such monies or securities to the CONTRACTOR upon acceptance of the Contract. Securities eligible for investment shall include those listed in Section 16430 of the State Government Code, bank or savings and loan certificates of deposit, interest bearing demand deposit accounts and stand-by letters of credit. Any escrow agreement entered into shall contain the following provisions and be substantially similar to the form "Escrow Agreement for Security Deposits in Lieu of Retention as contained in Section 4590 of Chapter 13 of Division 5 of Title 1 of the Government Code." 7-3.3 Delivered Materials — Replace the entire subsection with the following: Delivered materials shall be stored at a location or facility approved by the Engineer. The Contractor shall be solely responsible for theft, vandalism, damage, or any other event or circumstance affecting the quality or suitability of the delivered materials for incorporation into the Work. Materials and equipment delivered, but not incorporated into the work, will not be included in the estimate for progress partial payment. The CITY will not pay for storage costs. 7-3.4 Mobilization - Replace the Entire subsection with the following: Mobilization shall consist of preparatory work and operations, including, but not limited to, those necessary for the movement of personnel, equipment, supplies and incidentals to the E-41 Project site and for all other work and operations which must be performed or costs incurred prior to beginning work on the various Contract items on the Project site and the movement of personnel, equipment, supplies and incidentals off of the Project site (Demobilzation). 7.3.4.1 Payment When a Bid item is included in the Bid for "MOBILIZATION/DEMOBILZATION & INSURANCE", the costs of work in advance of construction operations and not directly attributable to any specific Bid item will be included in the progress estimate. Payment for Mobilization shall be considered as included in the lump sum Bid price for "MOBILIZATION/DEMOLIZATION, BONDS & INSURANCE." Payments for mobilization will be made as follows: a) When the monthly progress payment estimate of the amount earned, not including the amount earned for mobilization, is 5 percent or more of the Contract Price, the total amount earned for mobilization shall be 50 percent of the Contract Unit Price for mobilization or 5 percent of the Contract Price, whichever is less, and said amount will be included in said estimate for payment. b) When the monthly progress payment estimate of the amount earned, not including the amount earned for mobilization, is 10 percent or more of the Contract Price, the total amount earned for mobilization shall be 75 percent of the Contract Unit Price for mobilization or 7.5 percent of the Contract Price, whichever is less, and said amount will be included in said estimate for payment. c) When the monthly progress payment estimate of the amount earned, not including the amount earned for mobilization, is 20 percent or more of the Contract Price, the total amount earned for mobilization shall be 95 percent of the Contract Unit Price for mobilization or 9.5 percent of the Contract Price, whichever is less, and said amount will be included in said estimate for payment. d) When the monthly progress payment estimate of the amount earned, not including the amount earned for mobilization, is 50 percent or more of the Contract Price, the total amount earned for mobilization shall be 100 percent of the Contract Unit Price for mobilization or 10 percent of the Contract Price, whichever is less, and said amount will be included in said estimate for payment. e) After completion of the Contract Work, the amount, if any, of the Contract Unit Price for mobilization in excess of 10 percent of the Contract Price will be included in the final progress payment. 7-3.5 Contract Unit Prices 7-3.5.1 General - Add the following: E-42 The AGENCY reserves the right to increase or decrease the amount of any or all of the approximate quantity shown in the Bid Schedule, and to add or delete the locations, type, and extent, of each Bid item. Increases or decreases in the quantities within the limits specified shall in no way invalidate the Contract Unit Price. No claim shall be made by the Contractor for any loss of anticipated profits because of any such alteration or due to any variation between the approximate quantities and the actual quantities of each Bid item. 7-4 PAYMENT FOR EXTRA WORK 7-4.2 Basis for Establishing Costs 7-4.2.1 Labor — Replace the first paragraph with the following: The cost of labor shall be the cost of wages (basic hourly rate) plus the cost of employer payments (health and welfare, pension, vacation/holiday, training, and other payments for assessments or benefits required by lawful collective bargaining agreements) as listed on the General Prevailing Wage Determination made by the Director of Industrial Relations in effect at the time the Extra Work is performed. To the total of these costs, a labor surcharge of 12 percent shall be applied for statutory payroll items stipulated by various governmental agencies. The items included are worker's compensation insurance, Social Security, Medicare, Federal unemployment insurance, State unemployment insurance, and State training taxes. The markup for labor specified in 7-4.3.1 includes the labor surcharge. 7-4.2.3 Tool and Equipment Rental — Replace the second paragraph with the following: Regardless of ownership, the rates to be used in determining equipment rental costs shall not exceed those listed in the current edition of the "Labor Surcharge and Equipment Rental Rates" of the State of California Department of Transportation (Caltrans) (www.dot.ca.g2yjg/construc/egui�tml) at the time the work is performed. Standby rates shall be 50 percent of the hourly rate. Payment for standby shall not exceed 8 hours per day, 40 hours per week and 176 hours per month. If the equipment is not listed, the rate allowed shall be that calculated for a comparable item. 7-4.3 Markup 7-4.3.1 Work by the Contractor — Replace the entire paragraph with the following: The following percentages shall be added to the Contractor's costs and shall constitute the markup for overhead and profit, and all other costs not specifically provided for on work performed by the Contractor: Labor (including Labor Surcharge) .............20% Materials......................................................15% Equipment Rental........................................15% Other Items and Expenditures .....................15% E-43 To the sum of the costs and markups provided for in this subsection, 1 percent shall be added as compensation for bonding. 7-4.3.2 Work by Subcontractor - Replace the entire paragraph with the following: When all or any part of the Extra Work is performed by a Subcontractor, the markup established in 7-4.3.1 shall be applied to the Subcontractor's actual cost of such work. A markup of 10 percent on the first $2,000 of the subcontracted portion of the Extra Work may be added by the Contractor. A markup of 5 percent may be added to the remaining subcontracted portion. This markup shall constitute the Contractor's markup for overhead and profit on work performed by the Subcontractor. 7-4.3.3 General — Add this subsection: The markups specified in 7-4.3.1 and 7-4.3.2 above shall be considered as including, but not be limited to, the Contractor's labor costs for personnel not working directly on the Extra Work, including the cost of any tools and equipment which they may use. Such costs shall not be reported as labor or equipment costs elsewhere except when they are actually used in the performance of the Extra Work. Labor costs shall in that case be reported for the labor classification corresponding to the type and nature of Extra Work performed. 7-6 FINAL PAY ITEMS — Add this Subsection: When an item of work is designated as a Final Pay Item in the Schedule of Prices, the estimated quantity for that item of work shall be the final pay quantity, unless the dimensions of any portion of that item are revised by the Engineer, or the item or any portion of the item is eliminated. If the dimensions of any portion of the item are revised, and the revisions result in an increase or decrease in the estimated quantity of that item of work, the final pay quantity for the item will be revised in the amount represented by the changes in the dimensions. If a final pay item is eliminated, the estimated quantity for the item will be eliminated. If a portion of a final pay item is eliminated, the final pay quantity will be revised in the amount represented by the eliminated portion of the item of work. The estimated quantity for each item of work designated as a Final Pay Item shall be considered as approximate only, and no guarantee is made that the quantity which can be determined by computations, based on the details and dimensions shown on the Plans, will equal the estimated quantity. No allowance will be made in the event that the quantity based on computations does not equal the estimated quantity. In the case of a discrepancy between the quantity shown in the Schedule of Prices for a Final Pay Item and the quantity or summation of quantities for the same item shown on the Plans, payment will be based on the quantity shown in the Schedule of Prices. E-44 SECTION 8 — FACILITIES FOR AGENCY PERSONNEL SECTION 8 FACILITIES FOR AGENCY PERSONNEL No field offices for AGENCY personnel shall be required, however, AGENCY personnel shall have the right to enter upon the project at all times and shall be admitted to the offices of the CONTRACTOR if so provided by the CONTRACTOR for his own personnel. SECTION 9 — CONSTRUCTION CLAIMS SECTION 9 — CONSTRUCTION CLAIMS — Add Section and following Subsections 9-1 GENERAL In addition to notices and reports required by the contract documents, the Contractor shall comply with the provisions of this Section. 9-2 NOTICE OF POTENTIAL CLAIM The CONTRACTOR shall not be entitled to the payment of any additional compensation for any act, failure to act, by the ENGINEER, including failure or refusal to issue a Change Order, or for the happening of any event, thing, occurrence, or other cause, unless the Contractor has submitted to the ENGINEER a due written Notice of Potential Claim as hereinafter specified. The written Notice of Potential Claim shall set forth the reasons for which the CONTRACTOR believes additional compensation will or may be due, the nature of the costs involved, and, insofar as possible, the amount of the potential claim. The said notice as above required must have been given to the ENGINEER prior to the time that the CONTRACTOR shall have performed the work giving rise to the potential claim for additional compensation, if based on an act or failure to act by the ENGINEER, or in all other cases within 15 Days after the happening of the event, thing, occurrence, or other cause, giving rise to the potential claim. It is the intention of this subsection that differences between the parties arising under and by virtue of the Contract be brought to the attention of the ENGINEER at the earliest possible time in order that such matters may be settled, if possible, or other appropriate action promptly taken. The CONTRACTOR hereby agrees that it shall have no right to additional compensation for any claim that may be based on any such act, failure to act, event, thing, or occurrence for which no written notice of potential claim as herein required was filed. E-45 9-3 CLAIMS Claims shall be resolved in accordance with Part 3, Chapter 1, Article 1.5 (commencing with Section 20104) of the Public Contract Code. All claims shall be in writing and shall include the documents necessary to substantiate the claims. Claims must be filed on or before the date of final payment. For claims of less than $50,000, the AGENCY will respond in writing to any written claim within 45 Days of receipt of the claim, or may request, in writing, within 30 Days of receipt of the claim, any additional documentation supporting the claim or relating to defenses or to the claim the AGENCY may have against the CONTRACTOR. If additional information is thereafter required, it shall be requested and provided pursuant to mutual agreement of the AGENCY and the CONTRACTOR. The AGENCY's written response to the claim, as further documented, will be submitted to the CONTRACTOR within 15 Days after receipt of the further documentation or within a period of time no greater than that taken by the CONTRACTOR in producing the additional information, whichever isgreater. For claims of over $50,000 and less than or equal to $375,000, the AGENCY will respond in writing to all written claims within 60 Days of receipt of the claim, any additional documentation supporting the claim or relating to defenses to the claim the AGENCY may have against the CONTRACTOR. If additional information is thereafter required, it shall be requested and provided pursuant to mutual agreement of the AGENCY and the CONTRACTOR. The AGENCY's written response to the claim, as further documented, will be submitted to the CONTRACTOR within 30 Days after receipt of the further documentation, or within a period of time no greater than that taken by the CONTRACTOR in producing the additional information or requested documentation, whichever is greater. If the CONTRACTOR disputes the AGENCY's written response, or the AGENCY fails to respond within the time prescribed, the CONTRACTOR may so notify the AGENCY, in writing, either within 15 Days of receipt of the AGENCY's response or within 15 Days of the AGENCY's failure to respond within the time prescribed, respectively, and demand an informal conference to meet and confer for settlement of the issues in dispute. Upon a demand, the AGENCY will schedule a meet and confer conference within 30 Days for settlement of the dispute. Following the meet and confer conference, if the claim or any portion remains in dispute, the CONTRACTOR may file a claim as provided in Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code. For purposes of those provisions, the running of the period of time within which a claim must be filed shall be tolled from the time the CONTRACTOR first submits his or her written claim until the time that claim is denied as a result of the meet and confer process, including any period of time utilized by the meet and confer process. This Section does not apply to tort claims and nothing in this Section is intended nor shall be construed to change the time periods for filing tort or actions specified by Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code. E-46 The following procedures are established for all civil actions filed to resolve claims subject to this Section: Within 60 Days, but no earlier than 30 Days, following the filing or responsive pleadings, the court will submit the matter to non -binding mediation unless waived by mutual stipulation of both parties. The mediation process shall provide for the selection within 15 Days by both parties of a disinterested third person as mediator, shall be commenced within 30 Days of the submittal, and shall be concluded within 15 Days from the commencement of the mediation unless a time requirement is extended upon a good cause showing to the court or by stipulation of both parties. If the parties fail to select a mediator within the 15-Day period, any party may petition the court to appoint the mediator. 2. (1) If the matter remains in dispute, the case shall be submitted to judicial arbitration pursuant to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, notwithstanding Section 1141.11 of that code. The Civil Discovery Act of 1986 (Article 3 (commencing with Section 2016) of Chapter 3 of Title 3 of Part 4 of the Code of Civil Procedure) shall apply to any proceeding brought under this Subsection consistent with the rules pertaining to judicial arbitration. (2) Notwithstanding any other provision of law, upon stipulation of the parties, arbitrators appointed for purposes of this Section shall be experienced in construction law, and upon stipulation of the parties, mediators and arbitrators shall be paid necessary and reasonable hourly rates of pay not to exceed their customary rate, and such fees and expenses shall be paid equally by the parties, except in the case of arbitration where the arbitrator, for good cause, determines a different division. In no event shall these fees or expenses be paid by state or county funds. a) In addition to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, any party who after receiving an arbitration award requests a trial de novo but does not obtain a more favorable judgment shall, in addition to payment of costs and fees under that chapter, pay the attorney's fees of the other party arising out of trial de novo. 3. The court may, upon request by any party, order any witnesses to participate in the mediation or arbitration process. E-47 PART 4 — EXISTING IMPROVEMENTS SECTION 400 — PROTECTION AND RESTORATION 401-1 General The third paragraph is hereby deleted and replaced with the following: Protect and maintain street lights, utility poles and services, traffic signal control boxes, curb boxes, valves and other services, except items designated for removal. Provide for temporary relocation when required to maintain facilities and services in operation during construction work. Add the following: All costs to the CONTRACTOR for protecting, removing, restoring, relocating, repairing, replacing or reestablishing existing improvements for which no specified bid item is listed shall be included in related items of work and no additional compensation will be allowed 401-1.1 Existing Planted areas —Add this subsection: Existing planted areas including trees, designated on the plans to be maintained, shall be protected in place in conformance with these special provisions and section 400 of the SSPWC. Tree roots encountered during the excavation for the removal of existing items and construction of the new foundations that are less than 4" in diameter may be removed as necessary. The Contractor shall coordinate with the City Arborist prior to removal of any roots in excess of 2" in diameter that are within 12' of any tree that is to be protected in place. All costs to the Contractor for protecting planted areas shall be considered included in the bid for the various work items involved. 401-1.2 Existing Irrigation Facilities —Add this subsection: The Contractor is advised of existing irrigation facilities on the project site. The Contractor shall coordinate with the City's Landscape Maintenance District inspector to ascertain the location of existing irrigation facilities, and shall protect existing irrigation facilities, in their entirety. The Contractor shall coordinate with the City's Landscape Maintenance District inspector to cap irrigation facilities that will interfere with the work. The City's Landscape Maintenance District will be responsible for reestablishing irrigation and vegetation within the Contractor's work area. The Engineer may make or cause to be made those temporary repairs that are necessary to restore the facilities to service. The cost of the repairs shall be borne by the Contractor and may be deducted from any moneys due or to become due to the Contractor under the contract. Full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in protecting or repairing the existing irrigation facilities as F-48 specified in these special provisions and in Section 400 of the SSPWC shall be considered as included in the prices paid for the various contract items of work and no additional compensation will be allowed therefor. SECTION 402 — UTILITIES 402-1 Location 402-1.1 General Replace the last sentence of the third paragraph with the following: The Contractor shall provide the subsurface installation location data to the Engineer prior to issuance of the Notice to Proceed. Add the following: "Subsurface installation" shall include service connections. Location of subsurface installations shall be shown as an individual activity on the Baseline Schedule. Refer to 6- 1.1. Where water lines exist, at each angle point, cross connection and "T" connection, the Contractor shall assume the existence of a concrete thrust block located such as to resolve thrust loads. The Agency may arrange for and conduct a preconstruction meeting between the Contractor, the Engineer, and the utility owners to discuss scheduling, coordination of any required utility relocations, and the protection of existing utilities. The Contractor shall attend any preconstruction meeting scheduled by the Agency and shall cooperate with all utility owners performing utility relocation or installation work on the Project site. The California Public Utilities Commission mandates that, in the interest of public safety, main line gas valves be maintained in a manner to be readily accessible and in good operating condition. The contractor shall notify Southern California Gas Company, Headquarters Planning Office at least 2 working days prior to the start of construction. All existing City -owned utilities located in sidewalk, driveway approach, access ramp, or any area requiring grade adjustment due to the proposed improvements shall be considered appurtenant to the bid item for which the adjustment is required. The CONTRACTOR shall verify the location, size, and type of all existing utilities prior to construction. The utilities which have facilities located within the limits of the Project are as follows: 1) County Sanitation Districts: County Sanitation Districts of Los Angeles County 1955 S. Workman Mills Road F-49 Whittier, CA 90670-4990 Attention: Tim Hancuff (562) 699-7411 2) Southern California Gas Company: SOUTHERN CALIFORNIA GAS COMPANY 9400 Oakdale Ave. Chatsworth, CA 91313 Attention: Transmission Planning Office (818) 701-3228 3) Telephone Contact: AT&T 26971 Furnivall Ave, Room D102 Santa Clarita, CA 91351 For: Newhall & Valencia Attention: Craig London (661) 251-9979 For: Canyon Country and Saugus Attention: John Castro (661) 252-0107 4) Water Districts: SANTA CLARITA WATER DIVISION 22722 W. Soledad Canyon Road Santa Clarita, CA 91351 Attention: Rodger Hitchen (661) 259-2737 NEWHALL COUNTY WATER DISTRICT P.O. Box 220970 Santa Clarita, CA 91321 Attention: Josh Jenkins (661) 259-3610 x25 VALENCIA WATER COMPANY 24631 W. Avenue Rockefeller Santa Clarita, CA 91355 Attention: Gino Garcia (661) 295-6508 5) Southern California Edison: SOUTHERN CALIFORNIA EDISON 25625 W. Rye Canyon Road Valencia, CA 91355 F-50 Attention: Scott M. Walker (661) 257-8247 6) Cable Contact: Time Warner Cable/North Division 22620 Market Street Newhall, CA 91321 Attention: Cesar Senda (310) 629-8143 The CONTRACTOR shall obtain all necessary permits and notify the affected agencies at least 72 hours in advance of excavating around any of their structures. The utility companies listed above can be contacted as indicated. It shall be the responsibility of the CONTRACTOR to coordinate all phases of construction with the various utility companies involved. The location and existence of utilities and improvements shown on the plans are approximate and taken from available records. The CONTRACTOR shall pothole to verify the location of existing improvements and shall take all precautions to protect them whether shown or not. The CONTRACTOR shall notify Underground Service Alert at 1-800-422-4133 at least 48 hours prior to any excavation. The CONTRACTOR is advised of the existence of the utility notification service provided by Underground Service Alert (USA). USA member utilities will provide the CONTRACTOR with the precise locations of their substructures in the construction area when the CONTRACTOR gives at least 48 hour notice to Underground Service Alert by calling 1-800-422-4133. The exact location and identification of all existing utilities shall be determined by the CONTRACTOR prior to the start of any work. The CONTRACTOR shall protect -in -place all utilities otherwise noted on the plans 402-1.2 Payment — Replace the entire subsection with the following: No separate payment will be made for the location of utilities pursuant to Government Code Sections 4215 and 4216, and 402-1.1, or for attendance at the preconstruction meeting. Payment shall be considered as included in the Contract Unit Price for the various Bid items. 402-5 DELAYS DUE TO UTILITY CONFLICT Payment to the Contractor for actual loss due to a protracted utility delay shall be calculated based on wage increases, price increases of material and equipment, additional insurance costs and actual direct costs of maintaining the Project site incurred as a result of such utility delay. 402-6 COOPERATON The Agency expects to have one or more separate utility owners/contractors working in the same area at the same time. The CONTRACTOR shall coordinate and cooperate with any and F-51 all separate utility owners/contractors. Such coordination may include, but will not be limited to, participating in regularly scheduled or special meetings with the Agency, residents, and/or other contractors; sharing work and materials storage areas; scheduling work to coincide with work of a utility owner/contractor and to minimize disruption to the construction schedule; and similar tasks requested by the Engineer. It is anticipated that all concurrent utility activities will require coordination between the CONTRACTOR and each respective utility owner/contractor. Further requirements of the CONTRACTOR are listed below. No separate or additional payment will be made for cooperation with utility owners/contractor. F-52 SECTION G - SPECIAL PROVISIONS For Newhall Ranch Road Parkways and Slope Planting From Ave. Tibbitts to Baywood Lane Trail Access City Project No. LMD 19-20-08 City of Santa Clarita, California Except as modified by the drawings and plan notes, the Standard Specifications for Public Works Construction (SSPWC), 2018 edition, and its supplements prepared and promulgated by the Southern California Chapters of the American Public Works Association, constitute the Standard Specifications for this project. However, City of Santa Clarita standards or construction plates shall take precedence over the Standard Specifications. TABLE OF CONTENTS PAGE GENERAL ITEMS — (SEE GENERAL PROVISIONS)......................................................2 BID ITEM 1 — MOBILIZATION/DEMOBILIZATION, BONDS & INSURANCE ..................2 BID ITEM 2 — WATER POLLUTION CONTROL AND IMPLEMENT BEST MANAGEMENT PRACTICES...................................................................2 BID ITEM 3 —TRAFFIC CONTROL, TRAFFIC HANDLING, CONSTRUCTION AREA SIGNS.......................................................................................................2 DRAINAGE MODIFICATIONS..........................................................................................2 BID ITEM 4 — SWALE EXCAVATION: REMOVE EXISTING GRAVEL, INCLUDING TRANSPORT & DISPOSAL......................................................................3 BID ITEM 5 — SWALE EXCAVATION: REMOVE & STOCKPILE EXISTING COBBLE, RE -INSTALL PER PROJECT PLANS, TRANSPORT & DISPOSAL OF EXCESSCOBBLE.................................................................................... 3 BID ITEM 6 — OPEN -BOTTOM DESILTING CATCH BASIN............................................4 BID ITEM 7 — PERFORATED PIPE FOR DISPERSAL LINE...........................................4 BID ITEM 8 — CLEAN OUT RISER...................................................................................5 BID ITEM 9 — IMPORT OF CLEAN PLANTING SOIL ...................................................... 5 BID ITEM 10 — GEOTEXTILE FABRIC............................................................................. 5 BID ITEM 11 — VEGETATED SWALE SIGN.................................................................... 5 IRRIGATION ITEMS.........................................................................................................9 BID ITEM 12 — SHRUB BUBBLER ON RISER................................................................. 9 BID ITEM 13 — SPRAY HEAD ON POP-UP..................................................................... 9 BID ITEM 14 — 1" REMOTE CONTROL VALVE...............................................................9 BID ITEM 15 —QUICK COUPLER.................................................................................... 9 BID ITEM 16 — GATE VALVE........................................................................................... 9 BID ITEM 17 — PULL BOX................................................................................................9 BID ITEM 18 — %" SCH 40 PVC LATERAL LINE............................................................. 9 BID ITEM 19 — 1" SCH 40 PVC LATERAL LINE.............................................................. 9 BID ITEM 20 — 2" SCH 40 PVC MAIN LINE.....................................................................9 BID ITEM 21 — DIRECTIONAL BORING..........................................................................9 PLANTING ITEMS..........................................................................................................19 BID ITEM 22 — PLANTING AREA SOIL PREP. & AMENDMENTS ................................ 19 BID ITEM 23 — SHRUBS 1 GALLON..............................................................................19 Newhall Ranch Road Parkway and Slope Planting Project No. LIVID 19-20-08 October 2019 G-1 BID ITEM 24 — SHRUBS 5 GALLON.............................................................. BID ITEM 25 — PLANTING AREA FINE GRADING ........................................ BID ITEM 26 — 2" ORGANIC MULCH............................................................. BID ITEM 27 — 1ST90 DAY PLANT MAINTENANCE & ESTABLISHMENT.... BID ITEM 28-2ND90 DAY PLANT MAINTENANCE & ESTABLISHMENT... SPECIAL PROVISIONS - TECHNICAL This project consists of the following plans: Sheet 1 CS-13-0.00 COVER SHEET Sheet 2 LC-B-1.01 BIOSWALE PLANTING PLAN Sheet 3 LC-B-1.02 SLOPE PLANTING PLAN Sheet 4 LC-B-1.03 CONSTRUCTION & PLANTING DETAILS Sheet 5 LI-B-2.01 IRRIGATION PLAN Sheet 6 LI-B-2.02 IRRIGATION PLAN Sheet 7 LI-B-2.03 IRRIGATION CALCULATIONS Sheet 8 LI-B-2.04 IRRIGATION DETAILS Sheet 9 C-1.00 BIOSWALE PLAN BID ITEM MEASUREMENT AND PAYMENT SCHEDULE The Newhall Ranch Road Parkways and Slope Planting measurement and payment is generally organized according to lump sum or unit prices. If an appurtenant facility, specific piece of equipment, or any other improvement is listed in the bid schedule, all units are to be included as part of that line item. Items that do not appear as line item improvements are included as part of other applicable bid items and no additional payment will be made therefore. GENERAL ITEMS — (SEE GENERAL PROVISIONS) See GENERAL PROVISIONS for DESCRIPTION and MEASUREMENT AND PAYMENT of these BID ITEMS. BID ITEM 1 — MOBILIZATION/DEMOBILIZATION, BONDS & INSURANCE BID ITEM 2 — WATER POLLUTION CONTROL AND IMPLEMENT BEST MANAGEMENT PRACTICES BID ITEM 3 — TRAFFIC CONTROL, TRAFFIC HANDLING, CONSTRUCTION AREA SIGNS DRAINAGE MODIFICATIONS Newhall Ranch Road Parkway and Slope Planting Project No. LIVID 19-20-08 October 2019 G-2 A. SCOPE The scope of work comprises of the modifications to the Best Management Practices (BMPs) currently implemented for the Newhall Ranch Road Bridge Widening project, designed in the Standard Urban Stormwater Mitigation Plan (SUSMP) prepared by T.Y. Lin International (dated May 02, 2016). This section includes all work appurtenant to drainage, subsurface drainage, biofiltration soil mix, aggregate materials, fabrics, wells, liners and a Best Management Practices (BMPs) sign related with the construction of vegetated swale and adjacent drainage improvements including, but not limited to, modification of existing gravel and cobble swale section, excavation and compaction of existing earthwork, furnishing, installing, placing and compacting vegetated swale materials as required per the approved Plans, establishing flowlines and finish grade elevations. All work shall be completed as described in Sections 300 and 306 of the SSPWC. The CITY references the Low Impact Development Standards Manual (dated February 2014), established by the County of Los Angeles Department of Public Works, to mitigate the potential water quality impacts associated with development projects through the implementation of BMPs. Designated in the LID Manual as VEG-4: Vegetated Swales, this BMP specified for construction provides pollutant removal through settling and filtration in the vegetation lining the channel, provide the opportunity for stormwater volume reduction through infiltration and evapotranspiration, reduce the flow velocity. The pre -cast drop inlets located at the ends of the swales capture the treated runoff and conveyed through the perforated pipes for dispersal through the existing infiltration trench. B. MATERIALS & METHOD The CONTRACTOR shall accept or confirm existing topographic information, shall review the site and make their own interpretations and conclusions with respect thereto, and shall perform an independent earthwork estimate on which to base the bid. BID ITEM 4 — SWALE EXCAVATION: REMOVE EXISTING GRAVEL, INCLUDING TRANSPORT & DISPOSAL BID ITEM 5 — SWALE EXCAVATION: REMOVE & STOCKPILE EXISTING COBBLE, RE -INSTALL PER PROJECT PLANS, TRANSPORT & DISPOSAL OF EXCESS COBBLE CONTRACTOR shall prepare the swale section by removing the existing gravel completely from the swale surface. The excess gravel shall be removed from the site and disposed of. Following removal of the gravel, the CONTRACTOR shall remove existing cobble to allow for installation of the perforated pipe and catch basins as defined in the following sections. Cobble will be re -installed to match the project details. The swale surface area shall match existing channel grade and side slopes can be no steeper than listed per the approved Plans. In order to not compact the soil, ensure that heavy equipment works from the sides to excavate Newhall Ranch Road Parkway and Slope Planting Project No. LIVID 19-20-08 October 2019 G-3 the vegetated swale to the depth and dimensions specified in the design. CONTRACTOR shall conform to SSPWC Section 306-3 Trench Excavation. The bottom of the excavation should be as deep as necessary to account for the component layers included in the design. Working downward from the top, these include mulch, soil filter bed, cobble as necessary. The CONTRACTOR shall uniformly grade all areas to a smooth surface, free from irregular surface changes. The CONTRACTOR shall comply with compaction requirements and grade to the cross sections, lines, and elevations indicated on the approved Plans. CONTRACTOR shall confirm the flow of water into the swale, checking the areas that are to contribute runoff. This may require using a survey level or hand level and a survey rod to check spot elevations and confirm flow paths. Contact DigAlert (811) and mark utilities before excavating. BID ITEM 6 — OPEN -BOTTOM DESILTING CATCH BASIN CONTRACTOR shall furnish and install pre -cast catch basins, with bolt -down parkway frame and grate, as manufactured by Precon or approved equal. Form bottom of excavation clean and smooth to correct elevation. Level top surface of clean crushed rock base ('/2-inch to 1-inch rock size) to receive shaft sections. Clean crushed rock base shall be wrapped in geotextile fabric, all sides. Establish elevations and pipe inverts for inlets and outlets as indicated on drawings. Compact top 12" of native materials below the bottom of catch basins to minimum 95 percent of relative density. BID ITEM 7 — PERFORATED PIPE FOR DISPERSAL LINE CONTRACTOR shall furnish and install dispersal line diameter of six (6) inches using slotted PVC SDR 26 or PVC C9000 per Section 207-17 of the SSPWC. The slotted pipe should have two to four rows of slots cut perpendicular to the axis of the pipe or at right angles to the pitch of corrugations. Slots should be 0.04 to 0.1 inches wide with a length of 1 to 1.25 inches. Slots should be longitudinally -spaced such that the pipe has a minimum of one square inch opening per lineal foot and should face down. Hand trim excavations to required elevations. Dispersal line shall be placed in a clean stone envelope that measures 18 inches wide and elevated six inches above the existing sand filter layer. The top and sides of the underdrain pipe shall be covered with clean stone, with a minimum envelope depth of 15 inches. The underdrain and clean stone envelope shall be covered with geotextile fabric to prevent clogging. Re -use of the existing 2-inch to 6-inch diameter stone, removed from existing infiltration trench, is acceptable provided that the stones are cleaned prior to placement. The compaction of the backfill material along the sides and one foot above the pipe shall be done with hand tampers, or equal, to protect the pipe. Request inspection prior to and immediately after placing backfill cover over pipe. Newhall Ranch Road Parkway and Slope Planting Project No. LIVID 19-20-08 October 2019 G-4 BID ITEM 8 — CLEAN OUT RISER CONTRACTOR shall furnish and install lockable, clean -out riser placed at the terminal ends of the dispersal line without a pre -cast catch basin. The riser shall be per Standard Plan 204-2 of the SPPWC. Key's shall be fabricated and provided to the CITY. Install pipe, fittings, and accessories in accordance with manufacturer's instructions. The riser pipe shall be PVC pipe or equal with a diameter of 6 inches. Access cover shall have "CO" raised letters, modified from "S" on the Standard Plan. BID ITEM 9 — IMPORT OF CLEAN PLANTING SOIL CONTRACTOR shall furnish and install well -draining soil for vegetated swale per the approved Plans, amended with two inches of compost, unless the organic content is already greater than ten (10) percent. The compost must be mixed into the native soils to a depth of eight (8) inches to prevent soil layering and washout of compost. On -site, (native) excavated materials may be used if it meets these specifications and Section 300-4 of the SSPWC for said materials. The compost must contain no sawdust, green or under -composted material, or any other toxic or harmful substance. It should contain no unsterilized manure, which can result in high levels of pathogen indicators (coliform bacteria) in stormwater runoff. Erosion Control: Newly graded areas are to be protected from traffic and erosion. Where completed compacted areas are disturbed by subsequent construction operations or adverse weather, the CONTRACTOR shall re -shape the surface, and compact to required density prior to further construction at no additional cost to the CITY. If additional import is required, it shall be included in this bid item and no additional compensation will be made. Consistent with the GENERAL PROVISIONS, CONTRACTOR shall provide an Erosion Control Plan (ECP) for the project. Excavate the vegetated swale when the weather is expected to be dry for several days. Install erosion control devices as required within the construction site in case of rain. Cover stockpiles of soil temporarily with a tarp to prevent the material washing away. Implement all construction BMPs per the approved ECP. BID ITEM 10 — GEOTEXTILE FABRIC CONTRACTOR shall conform to the SSPWC 213-5 Geotextiles and Geogrids. Fabric shall be non -woven polypropylene geotextile, Mirafi 180-N or approved equal. CONTRACTOR shall adequately overlap fabric as required to remain in place for placement of vegetated swale materials. BID ITEM 11 —VEGETATED SWALE SIGN Newhall Ranch Road Parkway and Slope Planting Project No. LIVID 19-20-08 October 2019 G-5 Vegetated swale sign shall be made of high -quality materials per Caltrans Standard Specifications Section 82 "Signs and Markers". Sign panel shall be an aluminum nonreflective sheeting sign with a protective overlay film. Sign shall be submitted for layout and overall dimensions before fabrication. Sign shall be mounted on one 4 by 4, decay resistant wood post (pressure treated or equal), securely anchored to bottom of vegetated swale trench, elevated min 2 feet above top of finished surface. At a minimum, one sign shall be placed within each vegetated swale segment directed toward the closest adjacent street. Locations shall be confirmed by a City representative before installation. C. MEASUREMENT & PAYMENT Measurement and payment for the following SWALE EXCAVATION: REMOVAL OF GRAVEL shall be based on the SQUARE FOOT price. The CONTRACTOR shall be responsible for furnishing all labor, materials, tools, testing, equipment for doing all the work involved in SWALE EXCAVATION: REMOVAL OF GRAVEL, complete in place, as shown on the Plans, as specified in the SSPWC and these Special Provisions, and as directed by the City Representative. Measurement and payment for the following SWALE EXCAVATION: REMOVAL & RE -INSTALLATION OF COBBLE shall be based on the CUBIC YARD price. The CONTRACTOR shall be responsible for furnishing all labor, materials, tools, testing, equipment for doing all the work involved in SWALE EXCAVATION: REMOVAL & RE -INSTALLATION OF COBBLE, complete in place, as shown on the Plans, as specified in the SSPWC and these Special Provisions, and as directed by the City Representative. Measurement and payment for the following OPEN -BOTTOM DESILTING CATCH BASIN shall be based on the EACH price. The CONTRACTOR shall be responsible for furnishing all labor, materials, tools, testing, equipment for doing all the work involved in OPEN -BOTTOM DESILTING CATCH BASIN, complete in place, as shown on the Plans, as specified in the SSPWC and these Special Provisions, and as directed by the City Representative. Measurement and payment for the following PERFORATED PIPE FOR DISPERSAL LINE shall be based on the PER LINEAR FOOT price. The CONTRACTOR shall be responsible for furnishing all labor, materials, tools, testing, equipment for doing all the work involved in PERFORATED PIPE FOR DISPERSAL LINE, complete in place, as shown on the Plans, as specified in the SSPWC and these Special Provisions, and as directed by the City Representative Measurement and payment for the following CLEAN -OUT RISER, shall be based on the EACH price. Newhall Ranch Road Parkway and Slope Planting Project No. LIVID 19-20-08 October 2019 G-6 The CONTRACTOR shall be responsible for furnishing all labor, materials, tools, testing, equipment for doing all the work involved in CLEAN -OUT RISER, complete in place, as shown on the Plans, as specified in the SSPWC and these Special Provisions, and as directed by the City Representative. Measurement and payment for the following IMPORT OF CLEAN PLANTING SOIL, shall be based on the CUBIC YARD price. The CONTRACTOR shall be responsible for furnishing all labor, materials, tools, testing, equipment for doing all the work involved in IMPORT OF CLEAN PLANTING SOIL, complete in place, as shown on the Plans, as specified in the SSPWC and these Special Provisions, and as directed by the City Representative. Measurement and payment for the following GEOTEXTILE FABRIC, shall be based on the SQUARE YARD price. The CONTRACTOR shall be responsible for furnishing all labor, materials, tools, testing, equipment for doing all the work involved in GEOTEXTILE FABRIC, complete in place, as shown on the Plans, as specified in the SSPWC and these Special Provisions, and as directed by the City Representative. Measurement and payment for the following VEGETATED SWALE INFORMATIONAL SIGN, shall be based on the EACH price. The CONTRACTOR shall be responsible for furnishing all labor, materials, tools, testing, equipment for doing all the work involved in VEGETATED SWALE INFORMATIONAL SIGN, complete in place, as shown on the Plans, as specified in the SSPWC and these Special Provisions, and as directed by the City Representative. D. SUBMITTALS Submit under provisions of Section 2-5.3, Submittals, of the General Provisions, the following information: • CONTRACTOR shall provide a shop drawing for the Perforated Pipe for Dispersal Lines and the Clean -Out Risers. • CONTRACTOR shall provide a shop drawing for Vegetated Swale Signs. Vegetated Swale Materials: • A sample of mixed vegetated swale soil. Certification from the soil supplier or an accredited laboratory that the vegetated swale soil meets the requirements of this specification. Organic content test results of mixed vegetated swale soil. Organic content test shall be performed in accordance with by Testing Methods for the Examination of Compost and Composting (TMECC) 05.07A, "Loss -On -Ignition Organic Matter Method". Organic Grain size analysis results of mixed vegetated swale soil performed in Newhall Ranch Road Parkway and Slope Planting Project No. LIVID 19-20-08 October 2019 G-7 accordance with ASTM D 422, Standard Test Method for Particle Size Analysis of Soils. A description of the equipment and methods used to mix the compost to produce the vegetated swale soil. The name of the testing laboratory(s) and the following information: o Contact person(s) o Address(s) o Phone contact(s) o email address(s) o Qualifications of laboratory(s), and personnel including date of current o Certification by STA, ASTM, or approved equal. o Vegetated swale soils shall be analyzed by an accredited lab (ASTM D 422 or as approved by municipality). Vegetated swale soils shall be analyzed by an accredited geotechnical lab for the following tests: o Moisture — density relationships (compaction tests) shall be conducted on vegetated swale soil. Vegetated swale soil for the permeability test shall be compacted to 85 to 90 percent of the maximum dry density (ASTM D1557). o Constant head permeability testing in accordance with ASTM D2434 shall be conducted on a minimum of two samples with a 6-inch mold and vacuum saturation. Newhall Ranch Road Parkway and Slope Planting Project No. LIVID 19-20-08 October 2019 G-8 IRRIGATION ITEMS BID ITEM 12 — SHRUB BUBBLER ON RISER BID ITEM 13 — SPRAY HEAD ON POP-UP BID ITEM 14 — 1" REMOTE CONTROL VALVE BID ITEM 15 — QUICK COUPLER BID ITEM 16 — GATE VALVE BID ITEM 17 — PULL BOX BID ITEM 18 — %" SCH 40 PVC LATERAL LINE BID ITEM 19 — 1" SCH 40 PVC LATERAL LINE BID ITEM 20 — 2" SCH 40 PVC MAIN LINE BID ITEM 21 — DIRECTIONAL BORING A. SCOPE, MATERIALS AND METHODS 1.0 GENERAL This section sets forth the requirements for Irrigation System Improvements. Perform the work in accordance with Sections 800 — Landscape and Irrigation Materials and 801 — Landscape and Irrigation Installation of the SSPWC, latest edition, as modified and supplemented below. 1.1 Work Included — 1. Furnish and install sleeving, boring, piping, fittings, sprinkler heads, valves and accessories. 2. Furnish and install all electrical connections and wiring. 3. Excavate and backfill trenches. Place lateral and main irrigation lines as depths detailed on the plans within +/-1 ". 4. Testing as indicated in the notes and specifications and as required by the governing agency. 5. Installation and end of maintenance walk and corrections. 6. Ninety -day maintenance period. (2 Total) 7. One year guarantee of Irrigation work and materials. 1.2 Related Work Specified Elsewhere A. Landscape Planting and Maintenance B. Weekly attendance by superintendent C. Repair of irrigation system until project is accepted. Newhall Ranch Road Parkway and Slope Planting Project No. LIVID 19-20-08 October 2019 G-9 1.3 Protection of Work The CONTRACTOR shall adequately protect the work, adjacent property and the public, and shall be responsible for any damage, injury and/or loss due to the construction of the irrigation system. Damaged facilities shall be repaired within a reasonable amount of time at no additional cost to the CITY. All existing irrigation systems shall be kept in operation at all times. If the CONTRACTOR damages an existing system, it shall be repaired immediately, at no additional cost to the CITY. If damaged by the public, the CITY shall compensate the CONTRACTOR for the cost of the repair. After each repair, all heads of the repaired lateral(s) shall be removed and flushed so the lines can be clear of all dirt and foreign matter. 1.4 Submittals Submittals shall be in accordance with Section 2-5.3 Submittals and as specified herein. A. Materials List. Within fifteen (15) calendar days from the award of contract, the CONTRACTOR shall provide a materials list of all irrigation equipment as specified in the drawings, manufacturer's brochures, maintenance manuals, guarantees and operating instructions. B. Shop Drawings. Within fifteen (15) calendar days from the award of contract, the CONTRACTOR shall provide shop drawings as required or necessary to complete the work. C. Schedule of Work. Within fifteen (15) calendar days from the award of contract, the CONTRACTOR shall provide a proposed Schedule of Work. D. Record Drawings. The CONTRACTOR shall provide and keep up-to-date "As - Built" drawings on the job site at all times. The CONTRACTOR shall record accurately on one set of "As -Built" drawings all changes in the work constituting departures from the original approved drawings. The changes and dimensions shall be recorded in a legible and workmanlike manner. All dimensions shall have two (2) permanent points of reference, such as the roadway station points or measures along median center lines. Prior to the landscape architect of record construction certification, the CONTRACTOR shall provide corrected and completed sepia mylars of the Record Drawings. Delivery of the sepias will not relieve the CONTRACTOR of the responsibility of furnishing information that may have been omitted from the prints. The following items shall be shown on the Record Drawings. 1. Connection of existing water lines. 2. Water meter(s). 3. Electrical power connection. 4. Electrical meter(s). 5. Controller(s). 6. Routing of mainlines. 7. Sleeves. 8. Gate Valves. 9. Ball Valves. 10. Remote Control Valves. 11. Quick Coupling Valves. 12. Other Related Equipment. Newhall Ranch Road Parkway and Slope Planting Project No. LIVID 19-20-08 October 2019 G-10 13. The area watered by each Remote Control Valve E. Controller Charts. Prior to final acceptance, the CONTRACTOR shall provide to the City Representative two (2) hermetically sealed, controller charts illustrating valve numbers, gpm's and permanently colored locations of the area covered by each valve.. The controller charts shall be of a size that will fit inside the door of the controller cabinet. Controller charts will identify to the nearest foot the locations of mainlines, sleeves valves, controllers and point of connection appurtenances. The controller charts shall reflect any changes made during construction. A copy of each controller chart shall be provided to the CITY prior to installation certification by the CITY. F. Operation and Maintenance Manuals. Prior to final acceptance, the CONTRACTOR shall deliver two (2) hard cover, three-ring binders containing: 1. Index sheet stating the CONTRACTOR's address and telephone number, list of equipment and addresses of local manufacturer's representatives. 2. Catalog and parts sheets on every material and all equipment installed under this contract. 3. Guarantee statement. 4. Complete operating and maintenance instruction on all major equipment. G. Equipment to be Furnished. Prior to final acceptance, the CONTRACTOR shall provide the following equipment as part of this contract: 1. Two sets of keys for all controllers and enclosures. 2. Two wrenches for each type of sprinkler head. 3. Two quick coupler keys with hose swivels. H. Substitutions. Substitutions may be permitted under the provisions of Section 4-1.6 Trade Names or Equals. Submittals presenting "equal" products will be considered for approval if the City's Representative determines that the product is equal in all features, product material and performance. No substitutions shall be allowed without prior written approval from the City's Representative. The CONTRACTOR shall be responsible for the performance of any substituted material or product. If the CITY determines that the substituted material or component is unsatisfactory or if there has not been prior approval, it shall be removed and replaced at the CONTRACTOR's expense with the specified material or component 1.5 Quality Assurance and Requirements A. Permits and Fees. See General Provisions, Section 7-5 for payment of permits and fees for Capital Improvement Projects. B. Manufacturer's Instructions. Manufacturer's instruction and detailed drawings shall be followed in all cases where the manufacturers of materials used in the contract furnish directions covering points not shown in the drawings and specifications. C. Ordinances and Regulations. CONTRACTOR shall abide by all applicable local, state and federal rules and regulations relating to the Work Included. All work and materials shall be in full accordance with the latest rules and regulations of the National Electric Code, Uniform Plumbing Code. D. Explanation of Drawings. Due to the scale of drawings, it is not possible to indicate all offsets, fittings, sleeves, etc. The CONTRACTOR shall be fully acquainted with the site prior to construction. Drawings are diagrammatic and are generally indicative of the work to be completed. The work shall be installed in such a manner as to avoid conflicts between irrigation systems, planting and Newhall Ranch Road Parkway and Slope Planting Project No. LIVID 19-20-08 October 2019 G-11 architectural features. Any discrepancies in the plans or with existing field conditions shall be brought to the attention of the Landscape Architect immediately. The CONTRACTOR shall not willfully install the irrigation system as shown on the drawings when it is obvious in the field that obstructions, grade differences or discrepancies in area dimensions exist that might not have been considered in the Landscape Design. In the event that notification is not performed, the CONTRACTOR shall assume full responsibility for any revision necessary. E. Correction of Work. Any and all discrepancies or unsatisfactory work shall be corrected by the CONTRACTOR at no additional cost to the CITY. The correction of work shall be finished within a reasonable period of time mutually agreed upon between the CITY and the CONTRACTOR. 1.6 Delivery and Storage All materials shall be new, first quality, commercial quality and in the original shipping cartons or boxes. The CONTRACTOR is responsible for all materials until final acceptance of the work. Store materials in enclosures. Plastic pipe and other materials which can be damaged by weather shall be stored in such a manner as to protect them from sunlight, wind, rain, etc. Do not store materials directly on the ground. Materials which are damaged in transit or become damaged during storage or progress of the work shall be rejected and replaced at no additional cost to the CITY. Handle and carry materials in a manner to ensure delivery and placement on the site in sound and undamaged condition. Keep pipes and fittings free from dirt or debris. Do not drag pipe. 1.7 Guarantee and Replacement Written Guarantee. The CONTRACTOR shall furnish a written guarantee of materials and workmanship for a period of one (1) year from the date of final acceptance. The CONTRACTOR shall repair or replace defective items within a reasonable time, but not more than 14 calendar days, from notification by the CITY at no addition cost to the CITY. 2.0 MATERIALS Add the following to Section 800-2.1.1 General. All new equipment shall meet the requirements for recycled/reclaimed water use and be purple in color or include tags and marking consistent with County of Los Angeles Health Department requirements for use of reclaimed and /or recycled water. Piping shall be as follows: 1. The service line from the metered Point of Connection (P.O.C) through the backflow prevention device shall be: Type K copper or red brass. 2. All pressurized mainlines 2" and smaller shall be: SCH 40 solvent -weld P.V.C. 3. All pressurized mainlines 2 1/2" to 3" shall be: CL 315 solvent -weld P.V.C. 4. Pressurized mainlines greater in diameter than 3" shall be: CL 315 bell and gasket P.V.C. 5. Lateral lines up to 2" shall be: SCH 40 solvent -weld P.V.C. 6. Lateral lines greater than 2" shall be /cl 315 solvent -weld P.V.C. 7. All fittings shall be SCH 40 P.V.C. and conform to the latest ASTM standards. Newhall Ranch Road Parkway and Slope Planting Project No. LIVID 19-20-08 October 2019 G-12 8. All threaded nipples shall be SCH 80 P.V.C. with molded threads. 9. All male threaded fittings shall receive %" Teflon tape during installation. 10. All reclaimed piping shall conform to all State, Federal, and Local codes and regulations and shall be marked accordingly. 11. All piping shall be installed subsurface. Pipe on grade shall not be allowed unless written preauthorization has been given by the CITY. Modify Section 800-2.1.3 Plastic Pipe for Use with Solvent Weld Socket or Threaded Fittings to delete any reference to Schedule 80 pipe for pressurized pipe. Add the following after paragraph 3: "Thrust blocks shall be placed at each change or direction in the mainline sized 3" and larger and shall be per manufacturer's recommendation. All fittings shall be Schedule 40 PVC connected with primer and solvent per manufacturer's recommendations. Plastic pipe shall bear the following markings: manufacturer's name, nominal pipe size, schedule or class, type of material, pressure rating, NSF seal of approval, and the date of extrusion. All fittings shall bear the manufacturer's name or trademark, materials, designation, size, applicable schedule and NSF seal of approval." Add the following at the end of Section 800-2.2.1 General: "Provide and install one valve box for each Master Valve, Ball Valve, Gate Valve, Remote Control Valve, or Quick Coupler." Delete Section 800-2.2.7 Valve Boxes in its entirety and replace it with: "Valve Boxes. Valve boxes shall be made from a durable plastic material resistant to weather, sunlight and chemical action of soils. They shall be purple in color to denote use of recycled water. The cover shall be secured with a stainless steel bolt down mechanism and shall be able to sustain a load of 1,500 psi. Valve box extensions shall be by the same manufacturer as the valve box. All valve boxes shall be manufactured by Ametek, Carson, or approved equal." Add the following at the end of Section 800-2.3 Backflow Preventer Assembly: "All Backflow Preventer Assemblies shall be plumbed with copper, brass, or bronze pipe and fittings. A bronze or brass union shall be provided on the downstream side. Backflow shall be installed in a vandal resistant, locking enclosure as specified on the plans and approved by the City Representative for each project. The enclosure shall be installed on a concrete slab per manufacturer's recommendations." Add "Section 800-2.3.1 Master Valve and Flow Meter Assembly: Each Point of Connection shall include a Master Valve and Flow Meter Assembly. The Master valve shall be as recommended by the controller manufacturer. The master valve shall be wired back to the Controller and have the ability to shut down the irrigation system in case of a high flow occurrence such as a mainline break." Add: "Section 800-2.6 Check Valves: Check valves shall be installed on all heads or on laterals which have a differential in elevation or 3' or more or as needed to prevent laterals from draining after the system has been shut down. Spring -loaded check valves shall be of plastic construction with soft composition disks. Spring tension shall be adjustable from 4 Newhall Ranch Road Parkway and Slope Planting Project No. LIVID 19-20-08 October 2019 G-13 psi to 15 psi. They shall be located in the swing assembly or be integrated into the sprinkler body. Check valves shall be Valcon ADV, Rain Bird, Hunter, Toro, or approved equal." Add: "Section 800-2.7 Sleeves All piping which is located under hardscape surfaces shall be placed in CL 315 sleeves a minimum of 2 times the line size. Control wires shall be placed in a separate conduit adjacent to the pipe sleeving." All fittings and valves shall be brass and/or stainless steel. All piping shall be copper. A pressure gauge shall be installed with a capacity to read up to at least 150 psi. Booster pumps shall be installed in a lockable, stainless steel pump enclosure with venting. The CONTRACTOR shall be responsible for connecting the new booster pump to the electrical system and to the irrigation controller. Booster pumps shall be installed per all applicable State, Federal, and Local codes and regulations and the manufacturer's specifications. Booster pumps shall be properly grounded. The CONTRACTOR shall provide submittals of pump specifications, pump curves, and shop drawings for approval by the CITY, prior to ordering materials." Modify Section 800-3.2.1 Conduit. Conduit shall be SCH 40 PVC plastic, gray in color. Add the following at the end of Section 800-3.2.2 Conductors. "Control wires shall be a different color for each controller valve. Common wires shall be white. Each controller shall have an independent common wire. Wiring shall occupy the same trench and shall be installed along the same route as the pressurized mainline where possible with the exception of road and sidewalk crossings. Control wires shall be separately sleeved in Schedule 40 conduit under all paved surfaces. Where wire is placed in the mainline trench, the wiring shall be taped together at interval of ten (10) feet. A two (2) foot expansion curl shall be provided within three (3) feet of each wire connection. Wire connections shall be grease type connectors, 3M DBY Direct Bury Splice Kit PN-09053, or approved equal. Use one kit per connection. Three continuous spare control wires, blue in color, shall be installed with all pressurized Mainline(s) from the controller enclosure to the ends of the Mainline." Add the following at the end of Section 800-3.3 Controller Unit: "All controller components shall be fused and have a chassis ground. All controllers shall be equipped with a 4" x 4" electrical junction box, with an on/off switch, and a grounded receptacle mounted inside the enclosure. The controller enclosure shall be vandal -resistant and stainless steel manufactured as indicated on the irrigation legend and approved by the City Representative in writing. The enclosure shall be installed per the manufacturer's recommendations and as approved by the City Representative. The Controller Unit shall be compatible with the CITY's irrigation controller standards. The Controller shall include communication capabilities, complete and operational, all other incidental equipment required to meet City controller standards." 3.0 EXECUTION Newhall Ranch Road Parkway and Slope Planting Project No. LIVID 19-20-08 October 2019 G-14 Add the following to the end of Section 801-5.1 General: "CONTRACTOR shall use extreme caution in working near utilities. The CONTRACTOR shall be responsible to call Underground Service Alert of Southern California, a.k.a. Dig Alert for location of utilities. The CONTRACTOR shall be responsible for damages to utilities that are caused by his/her operations or neglect. The CONTRACTOR shall verify all grades and installation conditions. No work shall begin until unsatisfactory conditions are corrected." Modify Section 801-5.3.1 General, second paragraph: Pipe shall be bedded in 3" of sand above and below the pipe rather than 2". Add the following at the end of Section 801-5.3.1 General: A. Staking of Lines. Prior to installation, the CONTRACTOR shall stake out all pressure supply lines, routing, and location of water distribution heads. The CITY shall approve the location of all equipment and Point(s) and Connection prior to installation. B. Water Supply. The irrigation system shall be connected at the approximate location shown on the plans and approved in the field by the City Representative. C. Electrical Supply. Electrical connections for the controller shall be made as indicated at the approximate location on the plans and approved in the field by the City Representative. The CONTRACTOR shall be responsible for connecting the irrigation controller to the nearest power source. CONTRACTOR shall coordinate with the electrical provider and the CITY. D. Observation Schedule. The CONTRACTOR is responsible for notifying the Inspector in advance for the following meetings/inspections: 1. Pre -construction meeting — 7 days 2. Mainline pressure test — 48 hours 3. Lateral line & head installation — 48 hours 4. Coverage test — 48 hours 5. Final turn over — 7 days E. Installation. 1. Trenching. a. Trenches shall be straight, on an even grade, and in the approximate location shown on the plans. b. Where it is necessary to excavate adjacent to existing trees, the CONTRACTOR shall take every precaution to avoid injury to the trees or their roots. No backhoe or trenchers shall be used within the tree dripline, unless City Representative is on site. Hand digging is required within tree driplines. All roots 2" and larger shall be tunneled under and shall be heavily wrapped with burlap to prevent scarring or excessive drying. When the roots are smaller than 2" in diameter, the wall of the trench adjacent to the root shall be hand trimmed, making clean cuts through the roots. Trenches adjacent to the root shall be closed within twenty-four (24) hours. Where this is not possible, the side of the trench adjacent to the tree shall be kept moist and shaded with burlap or canvas. c. Provide a minimum cover of 24" over all pressurized mainlines. d. Provide a minimum cover of 18" over all non -pressurized lateral lines. e. Provide a minimum cover of 24" for all control wire. f. Provide a minimum of 30" cover under AC paving and roadways. 2. Backfilling. Newhall Ranch Road Parkway and Slope Planting Project No. LIVID 19-20-08 October 2019 G-15 Trenches shall not be backfilled until all required tests and inspection have been performed and the conditions have been approved by the City Representative. Trenches shall be filled with 3" sand above and below mainline pipes. No material larger than inch shall be permitted in the initial backfill. Backfill shall be tamped in 4-inch layers under all piping and mechanically compacted to a dry density equal to adjacent undisturbed soil in landscape areas and shall conform to adjacent grade. Truck wheels shall not be used to compact soil. If settlement occurs and subsequent adjustments in pipe, valves, valve boxes, sprinkler heads, lawn, planting, or other construction is necessary, the CONTRACTOR shall make all required adjustments at no additional cost to the CITY. 3. Trenching and Backfilling under Paved Surfaces. a. The CONTRACTOR shall install and cap all piping under paved surfaces prior to paving work whenever possible. b. Sleeves under existing pavement may be installed by directional boring. No hydraulic driving is permitted under AC pavement at depths less than 36". No hydraulic driving shall be permitted under concrete roadways. The CONTRACTOR shall repair any and all damage to existing facilities including paved surfaces with like materials in accordance with CITY standards and details. c. Any cutting or breaking of sidewalks and/or concrete that is necessary shall be completed and replaced in kind by the CONTRACTOR as a part of the contract cost. Permission to cut or break sidewalks and/or concrete shall be obtained from the CITY prior to start of work. d. Sleeves shall be installed a minimum of 6" beneath the bottom of the pavement subgrade or 36" from finish surface, whichever is greater. e. Mainline sleeving shall be a minimum of 2 times the line size diameter. The sleeve shall have a minimum of 1 inch clearance from the mainline and shall extend a minimum of 18" beyond such pavement unless physically impossible. In -line fittings or couplings shall not be permitted under paved surfaces except when the length of the line is greater than 20 feet. The ends of sleeves shall be capped until piping is laid. 4. Line Clearance. All lines shall have a minimum clearance of six (6) inches from each other and from lines of other trades. Parallel lines shall not be installed directly over on another. 5. Assemblies. a. Routing of lateral lines is diagrammatic. Install lines and assemblies in such a manner as to conform with the intent of the drawings, comply with the irrigation details, and provide and complete an operable irrigation system. The CONTRACTOR shall not willfully install a system, which will not fulfill the intent of adequate coverage. The CONTRACTOR shall be responsible for adjustments to system to achieve adequate coverage at no additional cost to the CITY. b. No manifolds shall be allowed in the irrigation system. Each assembly shall have its own outlet. c. Install all assemblies in accordance with its respective detail. In the absence of a detail or specifications, complete the work in accordance with best standard practice with prior approval of the Landscape Architect of Record or the City Representative. d. Carefully inspect all PVC pipes and fittings to insure that they are cleaned of dirt, dust, and moisture prior to installation. Solvent welding methods shall be as recommended by the pipe, fitting, and solvent manufacturers. Newhall Ranch Road Parkway and Slope Planting Project No. LIVID 19-20-08 October 2019 G-16 e. On PVC to metal connections, the CONTRACTOR shall work the metal connections first. Teflon tape or approved equal shall be used on all threaded PVC to PVC connections and on threaded PVC to metal joints. Where threaded PVC connections are required, use threaded hardening pipe dope on all threaded plastic -to -metal connections, except where noted otherwise. f. The CONTRACTOR shall construct concrete thrust blocks at all changes in direction on mainlines 3" or larger. Pipe restraints may be used in lieu of thrust blocks on bell and gasket piping. Delete the first sentence of paragraph two (2) of Section 801-5.5.3 Riser and Nozzle Line Installation which states "Risers for oscillation sprinklers and nozzle lines shall be galvanized steel pipe. All other risers may be galvanized steel or Schedule 80 PVC." Replace with "All risers shall be threaded Schedule 80 PVC pipe." Delete reference to single -swing joint assemblies in paragraph six (6). All riser assemblies shall be a minimum of double -swing joints. Add the following paragraph after paragraph two (2) of Section 801-5.5.4 Sprinkler Head Adjustment. "The CONTRACTOR shall adjust all irrigation components for optimum performance. There shall be no irrigation water onto walks, or roadways. If it is determined that adjustments in the irrigation equipment will provide proper and more adequate coverage, then adjustments shall be made at no additional cost to the CITY. Adjustments may also include, but are not limited to: changes in nozzle size, adding heads, or changing the riser locations." Add the following after the first paragraph of Section 801-5.6 Automatic Control System Installation. "The location of the controller shall be as shown on the plans and shall be approved by the City Representative before installation. The CONTRACTOR shall be responsible for coordinating the electrical service connection and connecting the controller to the power source. Remote control valves shall be connected to the controller in numerical sequence as shown on the plans." Add the following to Section 801-5.6.2.1 Pipeline Pressure Test. General. "Pressure mains shall be tested prior to the installation of control valves. Lines shall be capped at the control valve connections. Mainlines shall be tested at a pressure of 150 psi for not less than four hours. Lateral lines shall be tested at a pressure of 100 psi for not less than two hours." Add the following to the end of Section 801-5.7.4 Operational Test. "Any items deemed not acceptable by the City Representative shall be reworked to the complete satisfaction of the City Representative. The CONTRACTOR shall have turned over all accessories, charts, record drawings, and equipment as required before the project can be accepted. The CONTRACTOR shall provide certification testing for all backflow preventers by a certified backflow prevention technician. Certification shall be conducted in accordance with all State, Federal, and local codes and regulations. The original written certification shall be submitted to the CITY prior to acceptance of the project. The CONTRACTOR shall arrange and pay for all testing and certification. The CONTRACTOR shall complete an Newhall Ranch Road Parkway and Slope Planting Project No. LIVID 19-20-08 October 2019 G-17 irrigation coverage test and have written acceptance of the same prior to beginning any planting work with the exception of planting specimen trees and palms." Add the following section: "Section 801-5.7.5 Temporary Repairs. The CITY reserves the right to make temporary repairs as necessary to keep the irrigation in operating condition. The exercise of this right by the CITY shall not relieve the CONTRACTOR of his/her responsibility under the terms of the guarantee." Add the following section: "Section 801-9 Guarantee. The CONTRACTOR shall repair or replace defective items within a reasonable time frame at no additional cost to the CITY. Damage to plant materials or adjacent facilities due to defective items or workmanship shall be repaired or replaced at no additional charge to the CITY." B. MEASUREMENT AND PAYMENT The contract price paid for IRRIGATION system components as listed in BID ITEMS 11-12 shall be paid at the Unit Prices as indicated in the BID SCHEDULE and as listed below shall include full compensation for installation of a functioning irrigation system, including connection to existing water meter and coordination with the water purveyor, complete in place as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the City Representative and no additional compensation will be allowed therefore. Newhall Ranch Road Parkway and Slope Planting Project No. LIVID 19-20-08 October 2019 G-18 PLANTING ITEMS BID ITEM 22 — PLANTING AREA SOIL PREP. & AMENDMENTS BID ITEM 23 — SHRUBS 1 GALLON BID ITEM 24 — SHRUBS 5 GALLON BID ITEM 25 — PLANTING AREA FINE GRADING BID ITEM 26 — 2" ORGANIC MULCH BID ITEM 27 — 1ST90 DAY PLANT MAINTENANCE & ESTABLISHMENT BID ITEM 28 — 2ND 90 DAY PLANT MAINTENANCE & ESTABLISHMENT 1.0 GENERAL This section sets forth the requirements for Landscape Improvements. Perform the work in accordance with Sections 800 — Landscape and Irrigation Materials and 801 — Landscape and Irrigation Installation of the SSPWC, latest edition, as modified and supplemented below. 1.1 Work Included — 1. Gather soil samples and coordinate soil testing of import soils. 2. Complete finish grading, furnish and install all import soil necessary to replace over excavated material and for backfill required to complete the planting shown on the plans and details. 3. Furnish and install all required backfill material, soil amendments, fertilizers, and herbicides. 4. Furnish all labor, material, equipment and services necessary to provide all landscape planting, complete, in place, as shown and specified. 5. Furnish and install all planting accessories, tree stakes, ties, and guys. 6. Provide a plant establishment period of not less than thirty (30) continuous calendar days after all plant material has been installed and is in a healthy condition. 7. Provide maintenance to a period of not less than sixty (60) continuous calendar days after completion of the plant establishment period and acceptance of construction. 7. Provide second maintenance period of not less than ninety (90) continuous calendar days after completion of the plant establishment and acceptance of the first maintenance period. 8. Guarantee and provide replacement as necessary, in accordance with Section 1.7 of these Landscape Planting and Maintenance provisions. 1.2 Related Work Specified Elsewhere A. Irrigation System 1.3 Protection of Work Newhall Ranch Road Parkway and Slope Planting Project No. LIVID 19-20-08 October 2019 G-19 The CONTRACTOR shall adequately protect the work, adjacent property and the public, and shall be responsible for any damage, injury and/or loss due to the construction of the landscape improvements. Damaged facilities shall be repaired within three working days at no additional cost to the CITY. 1.4 Submittals Submittals shall be made in accordance with Section 2-5.3 Submittals A. Agronomic Soils Report. After completion of rough grading and prior to soil preparation, the CONTRACTOR shall provide the testing of import soils for approval by the City Representative, and composted materials by an independent agronomic soils testing laboratory at least 2 weeks in advance prior to actual work (member of the California Association of Agricultural Labs). No less than two (2) samples within the median planter areas shall be taken. Representative soil samples shall be taken in the field and a written report shall be prepared by the soil scientist and shall include tests for texture, fertility, toxicity along with recommendations for soil amendments as measured in cubic yards per 1,000 square feet to a depth of 6 inches, excavation pit fertilization and post maintenance fertilization. Soils test shall be performed after soil preparation to confirm that amended soil is in compliance with the pre -plant soils report and specifications. Deviation from the control mix shall not exceed twenty percent (20%). B. Materials List. Within two weeks (14) calendar days after award of Contract, the CONTRACTOR shall submit to the City's representative, documentation that all materials are available for approval. Materials shall not be ordered until materials submittals have been approved. Submit the following: 1. Plant Materials (include pictures of plant(s) with a scaling object such as a ruler or person). City Representative shall tag all trees at the nursery and has the option of tagging all project plant material at the nursery. 2. Amendments 3. Topsoil- Class A 4. Commercial Fertilizer 5. Mulch C. Substitutions. Any and all substitutions due to unavailability must be requested in writing prior to confirmation of ordering. CONTRACTOR shall provide a list of nurseries and suppliers contacted for verification of unavailability. Substitutions shall not be permitted after the Material List has been reviewed and accepted. No substitutions will be allowed without prior written approval by the City Representative. Equipment or materials installed or furnished without prior written approval may be rejected and the CONTRACTOR required to remove and replace such materials from the site at the CONTRACTOR's own expense. The CONTRACTOR shall not request a plant substitution based solely on the CONTRACTOR's failure to verify the cost of plant material prior to bidding. The CONTRACTOR shall bear the responsibility of providing the material as shown on the plans. Delivery to the site may begin upon approval of samples by the City's Representative. Newhall Ranch Road Parkway and Slope Planting Project No. LIVID 19-20-08 October 2019 G-20 D. Certificates of Delivery. Prior to installation, the CONTRACTOR shall submit to the City's Representative all manufacturer's literature, receipts of sale, and laboratory analytical data, bearing the manufacturer's or supplier's guaranteed analysis. The CONTRACTOR shall provide certificates of delivery with each shipment of materials. Certificates shall state source, quantity or weight, type and analysis, and date of delivery. All certificates shall be delivered to the City's Representative. Written certifications required to be submitted include: 1. Size and quantity of plant materials 2. Quantity of all soil amendments. 3. Quantity and quality of topsoil. 4. Quantity of commercial fertilizer. 5. Quantity of other additives such as sulfur, iron sulfate, gypsum, etc. 6. Quantity and composition of organic mulch. 1.5 Quality Assurance and Requirements A. Permits and Fees. See General Provisions, Section `E' 7-5 for payment of permits and fees for Capital Improvement Projects. B. Ordinances and Regulations. CONTRACTOR shall abide by all applicable local, state and federal rules and regulations relating to the Scope of Work. C. Explanation of Drawings. The CONTRACTOR shall be fully acquainted with the site prior to construction. Drawings are diagrammatic and are generally indicative of the work to be completed. The work shall be installed in such a manner as to avoid conflicts between irrigation systems, planting and architectural features. Any discrepancies in the plans or with existing field conditions shall be brought to the attention of the City's Representative immediately. The CONTRACTOR shall not willfully install the planting as shown on the drawings when it is obvious in the field that obstructions, grade differences or discrepancies in area dimensions exist that might not have been considered in the landscape design. In the event that notification is not performed, the CONTRACTOR shall assume full responsibility for any revision necessary. D. Manufacturer's Recommendations. Manufacturer's recommendations shall apply when no other direction is given or when it is a more stringent requirement than these Specifications. E. Correction of Work. The CONTRACTOR, at no additional cost to the CITY, shall correct any and all discrepancies or unsatisfactory work. The correction of work shall be finished within a reasonable period of time mutually agreed upon between the CITY and the CONTRACTOR. 1.6 Delivery, Storage, and Handling A. Plant Material. The CONTRACTOR shall notify the City's Representative seven (7) days in advance of delivery of all plant materials and shall submit an itemized list of the plants in each delivery. Maintain and protect plant material in a healthy condition prior to planting. Plant material which has been rejected or damaged after acceptance shall be removed from the site and replaced with acceptable materials. Newhall Ranch Road Parkway and Slope Planting Project No. LIVID 19-20-08 October 2019 G-21 1.7 Guarantee and Replacement A. Written Guarantee. The CONTRACTOR shall furnish a written guarantee of materials and workmanship for a period of one (1) year from the date of final acceptance. The CONTRACTOR shall repair or replace defective items within a reasonable time, but not more than 14 calendar days, from notification by the CITY at no addition cost to the CITY. All shrubs, groundcover, and lawn shall be guaranteed for a period of ninety (90) days from final acceptance. All trees shall be guaranteed for a period of one (1) year from final acceptance. All guarantee periods shall begin from the time of final written acceptance by the CITY. This acceptance shall be after the Installation Maintenance period which consists of a 30-day Plant Establishment Period and the 60-day Maintenance Period have been accepted and approved in writing by the CITY. 1.8 Order of the Work A. The irrigation shall be complete and operational prior to the start of any planting installation. The CONTRACTOR shall have completed an irrigation test in the presence of the City's Representative and have written approval for the installation. An exception may be made in the case of the installation of specimen trees 24" and larger and palms. The CONTRACTOR shall be responsible to provide adequate water to the specimen trees by whatever means necessary until the irrigation is complete and operational. 2.0 MATERIALS Add the following to Section 800-1 Landscape Materials: "Use only materials of the brands, type or species noted on the drawings or approved equal. Materials shall be new; plants shall be of the type and size specified, standard approved and first grade quality free from diseases or insects. All plants shall be tagged with botanical name (including variety) and size in accordance with the standards of practice recommended by the American Association of Nurserymen. Any rejected material shall be promptly removed from the site." Add the following to Section 800-1 Topsoil: "Topsoil shall be Class "A" as specified in Section 800-1.1. Topsoil to be used as planting medium shall be fertile, well -drained, of uniform quality, free from stones over 1-inch in diameter, sticks, oils, chemicals, plaster, concrete and other deleterious materials." Add the following to the topsoil requirements at the end of Section 800-1.1.2: "d) Boron and Sodium Content. Boron content shall not exceed 1 PPM as measured by the saturation extract. Sodium absorption ratio (SAR) shall not exceed 6 and the electrical conductivity of the saturation extract shall not exceed 3.0 milliohms per centimeter at 25 C." Add the following at the end of Section 800-1.2.1 General: "Soil Amendment. The following organic soil amendments are for bid purposes only: 1. After soils test and at the direction of the soils lab, provide stable humus with a carbon/nitrogen ratio of less than 25. See attached soils report. Newhall Ranch Road Parkway and Slope Planting Project No. LIVID 19-20-08 October 2019 G-22 2. Iron sulfate, 20% iron (expressed as metallic iron), derived from ferric and ferrous sulfate, 10% (expressed as elemental). Ten pounds per 1,000 square feet." The CONTRACTOR is directed to fertilize, amend or otherwise treat the soil as recommended and specified by the soils laboratory report." Add the Following at the end of Section 800-1.2.3 Commercial Fertilizer: "Fertilizer pellets or granules shall be slow -release, 12-8-8 by Gro Power (15065 Telephone Avenue, Chino, CA (909) 393-3744) , Best Fertilizers or approved equal and shall be mixed by the commercial fertilizer supplier. It shall be applied at the rate recommended by the manufacturer and the soils report. Fertilizer shall be applied every 45 days through -out the maintenance period at a rate agreed upon by the Soils testing consultant A minimum of two applications shall be completed. The CONTRACTOR shall provide the City's Representative with materials receipt for the fertilizers used. The CONTRACTOR shall provide the CITY with 48-hour notice prior to fertilization. Should the CONTRACTOR fail to provide said notice or materials receipt, the CONTRACTOR may be subject to reapplication of the materials in the presence of the City's Representative. Plant tablets shall be slow -release, 21-gram tablets as manufactured by Scott's Agriform, Best, or approved equal. They shall be applied at a rate of one tablet per 1 gallon plant, three tablets per 5 gallon plant, nine tablets per 15 gallon plant, twenty tablets per 24" box tree, and per manufacturer's recommendations for larger box sizes. Add the following to Section 800-1.2.4 Organic Soil Amendment: "Organic Soil Amendment shall be Type 1, and shall not include Pine or Eucalyptus." Add the following to Section 800-1.2.5 Mulch: "Mulch shall be Type 1 only (ground wood product). Mulch shall be recycled chippings from an approved source which do not contain Pine, Eucalyptus, trash or debris. If recycled materials are not available, a premium grade shredded cedar bark shall be used.. The CONTRACTOR shall apply a 2" depth of mulch to all planter areas having a grade of 1:6 or less. Mulch shall be a typical "Forest Floor Blend" with particles having a size between 2" and 4". CONTRACTOR shall submit a sample of the proposed mulch to the City's Representative for approval prior to delivery to the site." Add the following Section: "800-1.2.6 Pesticides and Herbicides. All chemicals used for pest control shall be registered by the State of California Department of Food and Agriculture and the Environmental protection Agency with registration identification on the label. All chemicals shall be applied as per the registered label instruction and manufacturer's recommendations. Restricted chemicals shall be applied in a manner consistent with State and Federal Law by a licensed applicator possessing the appropriate classification. No chemicals may be used on site without prior written approval of the City's Representative." Add the following to Section 800-1.4 Plants: "Trees and shrubs provided shall be of equal or better quality to that available at Norman's Nursery, Brightview Tree Company or Boething Treeland Farms. A. Additional plants may be necessary to fill all areas at the on center spacing or not illustrated on the plan. B. All plant material shall be No. 1 grade healthy, disease, and pest free, without visible damage, abrasions, or disfigurement. Newhall Ranch Road Parkway and Slope Planting Project No. LIVID 19-20-08 October 2019 G-23 C. Plants specified shall be delivered in the containers specified and true to industry standard size for the container specified. Plants shall have been growing with the specified container a minimum of six months and no longer than one (1) year and shall be properly rooted without being rootbound. Plants with cracked or broken root balls shall be rejected." Delete the last sentence of Section 800-1.4.1 General which states, "Other than normal side pruning during the growth period, no pruning shall be done prior to inspection at the nursery." And replace it with: "Trees which have be topped, headed back, or otherwise damaged by pruning, shall be rejected. Side pruning of lower branches is discouraged and may be grounds for rejecting trees. Trees shall not be pruned after selection and delivery to the site without prior written approval of the Landscape Architect of record or City's Arborist. Trees which have been pruned without authorization may be subject to removal and replacement at no additional cost to the CITY." Add the following to Section 800-1.4.2 Trees: "A. All trees shall be true to type or name as ordered or shown on the plans and shall be individually tagged or tagged in groups by species and cultivar (variety). B. All trees shall be healthy, have a form typical for the species or cultivar, be well -rooted, strong in branching pattern and properly trained. Trees which are deemed by the City Representative not to have these qualities will be rejected and replaced without additional charge to the CITY. C. All trees shall comply with Federal and State laws requiring inspection for plant diseases and pest infestations. Inspection certificates required by law shall accompany each shipment of plants. Clearance from the County Agricultural Commissioner as required by law, shall be obtained before planting trees delivered from outside the County in which they are to be planted. D. The rootball of all trees shall be moist throughout and the crown shall show no signs of moisture stress. E. The tree crown of broad-leaved, decurrent trees shall have a single straight trunk that has not been headed or topped. Potential lateral scaffolds (height of lowest scaffold depends on landscape use) for small -growing trees such as Crape Myrtle shall be at least 2" apart vertically, which could be trained in the landscape to 3 to 7 branches 4" or more apart vertically. Large -growing trees such as Oak shall have lateral scaffolds at least 6" apart vertically, which could be trained in the landscape to 5 to 9 branches 18" apart or more vertically. Branches shall be radially distributed around the trunk, be not more than 2/3 the diameter of the trunk measured 1" above the branch, and be free of included bark in attachments (bark embedded between the trunk and a lateral). No laterals below the lowest potential scaffold should be larger than'/4 the trunk diameter at point of attachment. F. Small temporary branches (less than'/4 diameter of trunk) below the scaffold branches should not be removed. G. Broad-leaved or coniferous, excurrent (central trunked) trees shall have a single, straight trunk with no double leaders (co -dominant stems) or vigorous, upright branches competing with the leader. Radial and vertical distribution of branches shall form a symmetrical crown. H. Each tree shall comply with the above criteria without having or having had to remove, now or within the previous growing season (at least six months), more than 25 percent of the branches of a size similar to or larger than those of the potential scaffold branches. I. The tree shall be free of roots visibly circling the trunk, and free of "knees" (roots) or kinks protruding above the soil. Newhall Ranch Road Parkway and Slope Planting Project No. LIVID 19-20-08 October 2019 G-24 J. If in a tapered container, the rootball periphery shall be free of circling roots larger than '/4" in diameter and a bottom mat of roots'/4" or larger (the acceptable diameter of circling peripheral roots depends on species and size of the rootball). K. When untied from the nursery stake, the tree shall not bend to touch the top rim of the container. L. The trunk and main roots shall be free of circling roots and kinks within 2" of the trunk to a depth of 2-1/2". Inspect the roots by tipping the rootball or container on its side and with a small jet of water expose the roots within 2" of the trunk to a depth of 2-1/2" below the topmost root attached to the trunk. After inspection, replace soil washed from around the trunk with a similar soil mix (less than ten percent of the total rootball volume should be added). If circling of roots is suspected, a representative sampling of approximately two trees or two percent of the total for each species whichever is greater may be removed from their containers and cleaned of soil. The trunk and main roots shall be free of circling and kinked roots. Circling roots at the periphery of the rootball shall not be reason for rejecting a tree unless the circling roots are large for the species and shoot growth is not acceptable for the species. M. In case the sample trees inspected are found to be defective, the CITY reserves the right to reject the entire lot or lots of trees represented by the defective samples. Any plants rendered unsuitable for planting because of this inspection will be considered as samples and will not be paid for. N. Trees shall be of sufficient height and caliper for the container size and plant type specified. Typically, 15-Gallon trees shall be 6'-8', 24" box trees shall be 8'-10', 36" box trees shall be 10' —12'. O. Tree pits shall be tested for adequate drainage prior to planting trees. 12 inch diameter by 72" depth augered pits (locations per plan) shall be dug and filled with water in the presence of the City Representative. After 24 hours, the City Representative shall observe all holes to determine if water has drained completely. Relocate tree(s) or install augured sumps in holes which fail to drain properly, as directed by the City Representative." Add the following at the end to Section 800-1.4.4 Flatted Plants: "All material from flats shall be well rooted, not cuttings. Flat grown plants shall remain in the flats until transplanting." Modify Section 800-1.5.3 Tree Stakes as follows: Delete the first sentence "The type of tree stake shall be as specified in the Special Provisions." And replace with the following: "Tree stakes shall be straight Lodge Pole Pine free from knots, splits, checks or disfigurement. Stakes shall be 2-inch nominal size and 10 feet in length. Stakes shall have a tapered drive point and chamfered top and shall be treated with an approved wood preservative. Supports for staking shall be rubber cinch ties manufactured by V.I.T. Company, Phone: (949) 891-8338, or approved equal, attached in a figure eight position, and secured with a nail at the stake. All wood preservatives shall be in accordance with the latest State, Federal, and local codes and regulations. Stakes shall not rub the lower branches in such a way the injury is caused to the tree. In some cases, the stake may need to be cut so they do not cause damage to the scaffold branches." 3.0 EXECUTION Add the following at the end of Section 801-1 General: Newhall Ranch Road Parkway and Slope Planting Project No. LIVID 19-20-08 October 2019 G-25 "Perform actual planting only during periods when weather and soil conditions are suitable and in accordance with locally accepted practice." Modify Section 801-2.1 to delete the reference to Class B Topsoil. Only Class A Topsoil will be utilized on the project. Add the following after the last sentence: "A. Clearing and Grubbing. 1. All existing planting within the limits of work shall be removed, with the exception of the plants specifically called out in the drawings to remain, or as specified by the City's Representative in the field. Protect in place plants to remain. All vegetation to be removed shall be grubbed, raked, and cleared from the site. The CONTRACTOR shall remove from the site and dispose of in a lawful manner, all materials grubbed from the site at no additional cost to the CITY. 2. All subsurface rocks over 2" in diameter and other underground obstructions which may hinder proper fine grading, tilling, or planting shall be removed to a minimum depth of 12". All abandoned utility lines uncovered or severed shall be cut below grade and capped or plugged with concrete. Explosives shall not be used for removal. Damage to utility lines shown on the plans shall be repaired at the CONTRACTOR's expense. 3. The soil within the planting pits shall be over -excavated to the specific depths as defined per median on the project plans. The over -excavated pits shall be backfilled with native soil and re -compacted to 80% prior to setting new trees or shrubs in plant pit and backfilling with amended backfill. B. Perennial Weed Abatement. If live perennial weeds exist on site at the beginning of work, a non -selective herbicide shall be sprayed per manufacturer's recommendations. CONTRACTOR shall mix dye with the herbicide to insure adequate coverage. The sprayed plants shall be left intact for a minimum of 15 days. The plants shall then be mowed and grubbed to a depth of at least 4"below the finished surface. C. Weed Abatement and Removed Tree Root Sprouting. Upon completion of soil preparation and installation of all specimen trees, begin the weed abatement program Spray a non -selective, translocative herbicide to eradicate any germinated weeds or newly sprouted roots from trees that have been removed. Translocation shall be 7-10 days or an approved alternate time period. If weeds or grasses exist, re -water four times daily for fourteen consecutive days, until new growth appears. Reapply herbicide. Remove weeds after herbicide has had sufficient time to kill the weeds. Repeat as necessary to eradicate weeds. Maintain the site weed free until final acceptance by the CITY utilizing mechanical, manual, and/or chemical treatment. After all plant material has been installed and a 30 day plant establishment period has passed an approved pre -emergent shall be applied before installation of organic wood mulch. Herbicide must be approved by the City Representative. D. Soil Amendment. All planting areas with slopes flatter than 2:1 shall receive soil amendments. The amendments specified in the included agronomic soils report shall be uniformly spread and cultivated thoroughly by means of a mechanical tiller into the top 6" of soil." Add the following at the end of Section 801-2.4 Finish Grading: "All rocks, clods, sticks or other debris shall be removed from the site and disposed of in a lawful manner at the CONTRACTOR's expense." Delete from Section 801-4.5 reference to the use of Type 2 or 3 soil amendment. Only Type 1 shall be used. Delete any reference to Type 2 through 6 mulches. Only Type 1 mulch shall be used. Newhall Ranch Road Parkway and Slope Planting Project No. LIVID 19-20-08 October 2019 G-26 Item c) shall be modified from "c) Prepared soil mix shall be deposited in the remainder of the hole to finish grade." to "c) Prepared soil mix and planting tablets per Section 800-1.2.3 shall be deposited in the remainder of the hole to finish grade." Add the following to the end of the section: "A. Planting Layouts. Locations for all trees, specimen shrubs (5 gallon and larger), and outlines of areas to be planted shall be marked on the ground by the CONTRACTOR before any plant pits are dug. All locations shall be approved by the Landscape Architect and City's Representative. Layout shall be accomplished with flagged grade stakes indicating plant names and specified container size on each stake. It shall be the CONTRACTOR's responsibility to confirm with the CITY and governing agency, the location and depth of all underground utilities and obstructions. No planting shall take place until an irrigation coverage test has been completed and the irrigation system has been approved, in writing by the CITY, as complete and in place. (See Section 1.8 of these specifications.") Section 801-4.6 Plant Staking and Guying, including Sections 801-4.6.1 Method "A" Tree Staking, 801-4.6.2 Method "B" Tree Staking and 801-4.6.3 Guying shall be deleted in its entirety, and replaced with: "Tree Staking. Trees shall be staked as shown on the Plans. Trees 36" and larger may not need to be staked. The CONTRACTOR shall not stake trees if they are able to stand straight without added support. The CONTRACTOR shall be responsible for determining the necessity of staking. Staking and guying shall be done immediately after planting using the materials specified in Section 800-1.5.3 (modified by these specifications). After staking, all plant material shall be removed within 18" of the tree trunk. This area shall be covered with Type 1 mulch to meet finish grade." Delete from Section 801-4.7 Ground Cover and Vine Planting, the following sentence from paragraph four (4): "A 1 inch layer of Type 1,2,3, or 4 mulch shall be spread over the planted areas.." and replace with "A minimum 2" layer of Type 1 mulch shall be spread over all planted areas." Refer to Section 801-6 MAINTENANCE AND PLANT ESTABLISHMENT of these specifications for more information. Add: "Section 801-4.9.6 Clean Up. The CONTRACTOR shall maintain the site in a tidy manner at all times. Remove all trash, excess soil, empty plant containers, and debris from the site on a daily basis during the course of the work. All trash shall be placed in a proper container or dumpster which shall be emptied as needed. The CONTRACTOR shall leave the site broom -clean and shall wash down all paved areas within the Contract area on a weekly basis or as needed to maintain a safe work area." Add: "Section 801-4.9.7 Observation Schedule. The CONTRACTOR shall be responsible for notifying the City Representative and the landscape architect of record 48 hours in advance for the following site visits: 1. Job start conference. 2. Acceptance of finish grade. 3. Acceptance of plant material. 4. Acceptance of planting layout. 5. Acceptance of tree pits, prior to planting. 6. Acceptance of soils preparation and planting. Newhall Ranch Road Parkway and Slope Planting Project No. LIVID 19-20-08 October 2019 G-27 7. Completion of planting and acceptance into the plant establishment period. 8. Completion of 30-day plant establishment period, acceptance of pre -emergent and acceptance into the maintenance period. 9. Final acceptance of the project and turnover items." Delete Section 801-6 MAINTENANCE AND PLANT ESTABLISHMENT in its entirety and replace it with the following: "801-6 PLANT ESTABLISHMENT AND MAINTENANCE. The CONTRACTOR shall furnish all labor, material, equipment, and services required to maintain the landscape in pleasing manner. Watering, mowing, rolling, edging, trimming, fertilizing, weeding, spraying, and pest control shall be included in the plant establishment and maintenance periods. All hardscape surfaces shall be kept clean and all gutters, drains and drain pipes shall be free of silt and debris. The CONTRACTOR shall be responsible for maintaining adequate protection of the area. Damaged areas including, but not limited to, plant death, vandalism, and theft, shall be repaired at the CONTRACTOR's expense until such time as the CONTRACTOR receives written acceptance of the project by the CITY. The project will have two (1) 90-day maintenance and plant establishment periods. Maintenance and plant establishment shall adhere to the following guidelines: A. Plant Establishment. It is the responsibility of the CONTRACTOR to inform the CITY of completion of the project and request an inspection or order to begin the Plant Establishment period. The project will not be accepted into the Plant Establishment period until the following items have been completed and accepted by the CITY: 1. All work required in the plans has been completed and accepted. 2. All punch list and correction items have been completed and accepted. 3. An irrigation coverage test has been completed and accepted. 4. Permanent power has been established and is continuous to the automatic controller(s). The Plant Establishment Period shall be a minimum of 30 days during which time all plant materials shall thrive. All plants shall thrive without disease, pest infestation, stress, die -back, broken branches, or poor pruning. All planting areas shall be weed free. Any plants or seeded areas that are not thriving at the end of the 30 days shall be replaced at the CONTRACTOR's expense. It shall be the CONTRACTOR's responsibility to request an inspection at the end of the 30-day period. If the CONTRACTOR fails to do so, or if the plant materials are not in a satisfactory condition, the Plant Establishment period will be extended until all areas are acceptable to the CITY. The project shall not be segmented into maintenance phases unless specifically authorized in writing by the CITY. B. Maintenance Period. Once the project has been accepted into the first Maintenance Period of 90 days, the CONTRACTOR shall inspect the site weekly performing all, fertilizing, edging, trimming, weeding, trash removal, plant replacement, or other maintenance duties as needed to maintain an attractive environment at no additional cost to the CITY. 1. The irrigation shall be checked weekly and adjusted as needed to maintain plant health without run-off, overwatering, or overspray. 2. During the maintenance period, a balanced fertilizer shall be applied at the rate recommended by the approved agronomic soils report. In the event that ground cover, trees or shrubs, exhibit nutrient deficiencies, necessary action shall be taken by the CONTRACTOR at no additional cost to the CITY. Newhall Ranch Road Parkway and Slope Planting Project No. LIVID 19-20-08 October 2019 G-28 3. No pruning shall be done without approval of the CITY and shall be in strict accordance with the International Society of Arboriculture Standards and Practices. A Certified Arborist and/or Certified Tree Worker shall perform pruning. 4. Shrubs shall not be clipped into balls or boxed forms. Trees and shrubs shall be pruned back to the lateral branches or buds. Stubbing will not be permitted. 5. Old, wilted flowers and foliage shall be pinched or cut off and removed. 6. No supplemental daytime irrigation shall be allowed during the post - establishment maintenance period without prior approval. 7. The site shall be kept free of all clippings, debris and trash. Drains shall be kept free of trash, silt or debris. 8. Paved areas shall be kept clean. 9. The CONTRACTOR shall be responsible for pest management, including insect, disease, invertebrate or vertebrate. Pest management shall be performed in accordance with all Federal, State and local codes and regulations. The CONTRACTOR shall be responsible for notifying the CITY, the local agency, the landscape architect of record and all other necessary parties 10 days prior to the completion of the first 90 day maintenance period (includes the 30 day plant establishment period). All parties shall walk the site and create a punch list of outstanding items to be corrected prior to the commencement of the second 90 day maintenance period. C. Final Acceptance. The CONTRACTOR shall be responsible for notifying the CITY, the local agency, the landscape architect of record and all other necessary parties 10 days prior to the completion of the final maintenance period. Deficiencies noted during the final inspection shall extend the maintenance period until all deficiencies are corrected. All irrigation shall be adjusted to required height in relation to finish grade. All planters shall be maintained in a weed -free condition throughout the establishment and maintenance periods. Plant material not showing vigor or that has been damaged or is missing shall be replaced. If substantial amounts of plant material has failed or is missing, the maintenance period shall be extended until the health of the plants has been established for not less than 30 days. All turn over items, including the turn over sheet, maintenance manuals, equipment items, "As -built" plans, irrigation controller charts and written guarantee shall be received and accepted by the CITY prior to final acceptance. The end of maintenance shall occur only upon written acceptance by the CITY." MEASUREMENT AND PAYMENT The contract price paid for PLANTING, (III°; II.' I'TIR..;:II S 13,, 9) as listed below) will be measured at the Unit Prices as indicated in the BID SCHEDULE and shall include full compensation for each item complete and in place. The BID SCHEDULE unit prices shall include full compensation for all finish grading, over -excavation of plant pits (see Detail B of sheet LC-2.02), soil preparation, planting, planting accessories and all appurtenances required for a complete functioning planted system and no additional compensation will be allowed therefore. Newhall Ranch Road Parkway and Slope Planting Project No. LIVID 19-20-08 October 2019 G-29 Ab64 gX11 A 04 a 4 Y . e City of Santa Clarita ►' TM LANDSCAPE MAINTENANCE DISTRICT TURNOVER SHEET • CONTRACTOR is to provide:1 Set Blue `As -Built' prints of plans 1 Set Keys to the Controllers 1 Sets Laminated copies of controller `As Built' charts Irrigation & Plant Legends listing all materials used in project 1, 3 ring binder Maintenance Manual ZONENO. Water Meter ID No. Water Meter Location: Zone Name Meter Address Electric Meter ID No. Meter Address Electric Meter Location: Controller Location, Serial #, Controller station numbers, Type of Controller; Tract No.: Installed.: SQUARE FOOTAGE Turf square footage Shrub quantity Tree quantity in planting area: Concrete square feet Total area in the LIVID District Acceptance Date Developer/Owner. Signature of WeatherTrak Color Square footage: Benches, trash rec., _ Doggie scoop dispensers Date: Date: Signature approved backflow Date: Date: Signature by the LIVID Representative indicates acceptance of the District areas: Newhall Ranch Road Parkway and Slope Planting Project No. LIVID 19-20-08 October 2019 Date: CONTRACTOR G-30 END OF SPECIAL PROVISIONS G-31 o " o" o ° LO o�___ F z Lo Q Q Z � o z �C9 U o w J w wdz Vz ¢ p N Q J Q N o Up300z dzd ° R p w J m U w0 0< - ���,¢wo �" u, z O �- zz�a o U U o 4 HO zdz55¢wz > p _ u u e ���°,� ,r,S00 Uos I- x Q U N s —0000"' U 3 W J Z/ Z U G �o OmwOVVVVm U LU Q W O- O�>U r U- J J 0 ° >�000H� \<\ Q w o " 81 LL - U, 3zzz� W / o........ Q p Q -��000m 0 m ° g N_ z N UUU° mo i V o N Z OQ WagQ��°�� oxo os ~ i Wo �,°-� �� wNw��u3°a LU W o0 0000 N U N V) a 5d 3 �ooaF s H s r � �RwT �/ Q A W Q C Ix od.Y p 3° F. o° w CL 0� Q �! oW oop °o ��zo°m Q = Wz. tii C%V} z�z 'w ooa �o�pz lVF� - 0 O C O ' �o pro Q i �3g moo¢ p�gwOz 61v L r z Z J 0 oy o0ow 0 z? pm 000p ae Z3 E"+ ca wm U�- >o z 0 N V } ' /W� is r Q &°3 0�° Q O W Q `! ww Oa�z = H.- go UwxwwZg U 0 r w0 Vy�p bx Z Z 0 0 (jl oQ ?o?o y °w� °ovg ..s Q Q '` d Q ��zoi� ypO oEq u N Z = >- U �(} r � 3 Ozw zo ayp �O <,O x" yo ", OQ m i S� c7¢Q°� o��x Qyo iOQ3o� W �z� �� wp O Z V �pw w3wp �� G,aolo ao ¢�w3poO •!� W =Op QwwO OwW Wz�S aWy ZOFOOQ °U Q i ,nUj wQZQQ QW Grp wUi rpdoa Q �r� >wwU Z� >�FE w UUO j��ZFg m yQ0 w O QU ¢ayw m ¢�O? - m� �ar W MP z LL a 000p zzoa Qo6- s o wo '23zp �p ° - F p0 3 ¢ap0 U U p ap p z m mU �QzZm� I III O� �QQOSi8 Q Q „' oQO� OO R� Ow _ Mc Pn a z0 YwQQ�� ww ��pw>pQ O N QO a ywa0 OOQw oUr r p O 0wzp0 iizw Qp Om??a�p� a zz o r°LLp OwOz ww Oz�Owzz ,� O�: i ONop No 3-z p 6. r ° .-oz gffi °n„p Uz p wp 00 LU uJ _ �zoZ°Oo az < a x 3 ozo- ts�6 'O ~ '�. 5 o� a o =3 y o wo N 5Y °°,���� °w o a 30 y wzy� poo? d iJ w<°z 8LL�p$ o� z a 25 a 5 M<a 2u <o 6 Uu�1aoo cwo pp _ Qzd;zp�op-� D�¢pLLSpUouoUw oQ> >6 26 5<�Q �n ° -- �u a=ao?tiF-< „vag�OWo�°oz 16< i,5 y° ooQ�o o azQoaa<awo¢mop y°> 1 °z° �z J-a F�z � >QwU UUwMaFla�zSr,°oL oi �w-n U�r �wOuG opzO Wzpoyn w Q CL ' I Om0 =°a�mZUU °Up ? z (� a O p w ,n�00yOg� QU Q w �> _ y oQpyO „'ZZLLO OYp 1i a OQ �ypp UzpZO3 ¢ 0r5-0 �Or� 000�3ozO-Qa.0.��a�0 Op�¢�Ya�Fzo¢ Z 06o UU Ua6Nz U �¢O� W Z \: \\\\}\\\\\\\\)\}° \:z: } /-:_zo } }( o-(§ o zz (:\ ) - - } ( Tu - - \\} ( j } o § } \}/}}}(} }}) } 7 \ ):\}}{})\ }i} ) } - Z\< > r �o \\\} 600 ° : ;§} }:>r j}} \\\\\\ \\:\)\j)(\: \>::::: ((}(°°>t:::/§\}°:(r`:Z{\) })\}}}} ) \j}(}j)}( Z \: \\\\}\\\\\\\\)\}° / \} } /-:_ } }( -(§ (:\ ) - - } ( - - \\} ( j { =:}§ {): \( j �— oo 7}) } 7 \ )\- ) \} > r - znu �� \\ \} L2 < § - \j(}:::i : ( \ - \\\\\{}}§ \\�}} :4(-u,o E)\j)(\: :: }::\>: :\::\:((}(°°>t::\(Z{\) }(()\j)))\}}}} ) \j}(}j)}( 4 0 ° w�W �Of "�� ffiw a� x ¢wwz aFOi oaf — > °� f;a -Oz ¢ �,z�oy a _ i F OzoQ (7 oxz6o6 -bo W Q �h r i r i a` pzQrc o Q zp�zcj a 'iU wUe� LLWV U Q w ° HH w moo a°owu apz IR- o 00 0 sees � z a z o p z Q Kopz IIIII�I Al il I mom» ti U e� I w II LLoo w -- z ' �Illlli llI]lli I o °oho o u u w ulli-nil u I ae�� loo li,d z a �o°o a o� - 111111.-8 a saoa a IIIIII OJ z's z�waao ao -zo it aj � z II III ° ?�0000 z.zsoo u l tL IIIIIIII�TIF c � ?'oy°a HE w1= Z w � x III III IIWI�- a� b oo�°mw Ialliall�� M m s ��F A A Z r�V�p /=d �oP C- g OUgj . = co oz a �� wp SJ Nz ° I � U Zz w 0 Z Z , z z0 ppUa O z �azz�zz��xa�,y 0 Z. wz O�zx zQzOY 7 oww000ax�az aUUUUUowu�wLLLLLLa�iO�ag Qz a� ��3 m mm, ¢Q¢�uOOow�S z o m odd U m �TLLaaa�soa���3 O Z m=' w > 0 3 m UU 0 r �3 za O Q 0 p a > w4 o 4 a N O o a O z O O Q .; w 0o Z NOJ wmr O< OY am 0 wZ Ozz Ow VOF>� z aQ z �ry pm OZ z_OFZ O�O� w wiz o w ui JaFww p 000 U0O"- 'o oy �3 00 Ow apOZ"ma �z Giw Zgu��w 00 u U wzJgz „p0. yam 6 y=� p 0z �O a a¢O~ � ou Q p QOWpw O �O w�nw �0 ww yDUJ - Om 3- oUoa3a0o0U�3 (ajm 00z00 .<0 ���+O ��G10 a¢� 0 OwQO�QOww3�gw brz -OZOEZ3:�� ;azz�� BiU>�r�i w Ozow�3 O>a zO-Wz,Uzrn O z0 o� ��U>� �" OYOZUw�ai w Q&3¢Pw¢a - a¢00_Fzzz�,„O�yo z _ p O U�g�wF ZmoW6 �zw>µ�m4zg w0<�Uzzw N a > ¢zm�¢z'�-2z3 oozy zoG�Q6poQ4� � a > y ioby�oo�o a5 °z°��w�zSao¢o¢c9�„ 0�a,0nwoa OOw0�00a0�p�Va �w00wQ s c�a�U¢��¢oU¢r,_¢�.,,z �G1 Z a U U > U p40 T ea 3Q� O�z 3 aUa U y<z U z�U Q 'O Q�U ? Ufa 0 ° a zpm QUQ�pW aOw w� �0z=y0 3 y3yw �aop?O w� a3� 3 oo0 Uw(aj z z'p" a c4 c4 � z � E3 a 8 'o a 3 O F F g O o o OO U 3 O O 3 U 8 3 O Q u� u u O U a Q p Q p Q d Q p z0 o m > z w z > ° p z z Q 0> U w z F 3 O O�> a ca9 z i m �O Z a U U > U p40 T ea 3Q� O�z 3 aUa U y<z U z�U Q 'O Q�U ? Ufa 0 ° a zpm QUQ�pW aOw w� �0z=y0 3 y3yw �aop?O w� a3� 3 oo0 Uw(aj z z'p" a c4 c4 � z � E3 a 8 'o a 3 O F F g O o o OO U 3 O O 3 U 8 3 O Q u� u u O U a Q p Q p Q d Q p z0 o m > z w z > ° p z z Q 0> U w z F 3 O O�> a ca9 z i m �O m �O 0 0 0 ZNzz O Ow Qy ���0?o UM-'='UZ UU Q ¢UU0000w��LL LLLLg�i w z u pm a<o—bdul6o W Y C� Q z 3 Q U o d z& o o> ¢ 3 3 O¢ < < ® ---- g i ti '° ° d z LL z y m O U O �3a v a� c c !� [ [ .�.���� � p p J 0 OU <Q Yg Oz 6 0 �xuzw o O� Oa Sr a U° U Z = wOi w 0 Qm O� w O� o �� Qxzm� (' O O w "+O<� �x 3d (9 nO�wp z oO U �z mrz� o �j;i Q< wf - w xOy �Op wa Qw �ry pm pz �>0z i f LL �aw Up 'i OLLO� O a w � r WFz zOF w O npx ow - 9 G � >Z a° ZQpoy.�3 Qo c m Z->z r �To°� �Om j z`E 0 Giw o p woaQ a�o�z o�owyw _ wo oz E(90 i1 Gi ¢O a¢U Si O 0 of ' z 01 0-.1. Em-zZz0 OZ wp O . > ppOzU 00o��- wz a3yxo3 O o�.,mw(7D��OO YOz 5LL Eo �o�� a ��Q D<zww O oo Q�piO _ §��� pzozz3owma J LL ? zOYx�w O a0�o 0 ..� wmw a� F� ®_ = a\ 'J U> pmoQa �zw>zm¢zg°j°UZzw Qmo Q�Oz�3 Oozi�xyzo G�Q0�0oo� z O pz QO Q�OQw 0?zO 0wp p Jp?U Q h�pwQ I- ma Ua�U a�r¢�U¢rn=¢�.-1 N w an w do U ' z � � Q p40 G' /,Cg N y 6 4 - r 0 7f p x o Jg Dig le oZ arw o� U - " z rw3 yUr z ° no U LL O w z15. p � U 4 rc _ OmFui Q°p zNi�w u�< 9 fa pw_Q ° - SyuSS Qzar ,nw aQ Ozz Oro�o r 030 a�.Ow w� - `¢s a p v� CC - - pam U_ �OZwiO ¢ � o2 3 3wz �a� z� ao� d 0 i° ¢ - O QUZa�U 3U� w e vxi z�w�zzw g�mZoe <� > u as 10 �w _ U >w °°z z Q i N 1, \\\ f I O K U Q rc a 2 a w 3 - � 0 g E3 'o a I m�? Q o oU ¢ a p a p a d a 7 7 � o m o y > o z y w Q m M � O o o Q Q U- 3 d g o O O Q a o F h W ° m U 2a . - z � oUz 4� p J 3 a a- p oij = U U 3 ST z I ° -o o o o ° a 3 p w 3 a E o o a Q o 4 - _ -? m E _o u U g 6 F m Q p i 44 4oE U m 2€ s o £ E c c � .E v i E vE m E5RF QA 6 o * n����- 2 c .E m Q �n O U a Co � - - - n 2 1� E E E Ogd as S S S S S uz 00 2Q ° 3 z °m Eo o a G- --o o°° 0o as wp 14 z o YU °J E= - :lE _ a E m 5 t c E o F 3 E c o 0 Q a o > E a 4 n 2 s 2 2 2 2 2 E E° o E v E n I - - - ZQ o E€ a 22 pip U v i w P U S°. o � `� � 3°`o3 a i 0 - O - E_- 5 E w __ a 4 0 w p U o $ 00 -s E ii _ Q z _ _ ------------------------------------------- In IMMU"I too, 91 min m = IRI n>Tm illP" ro III Hi go Till r —q' a HE co a 8 U op 00 01 0 I H 1 HI 21 R 1 1 11 1 qjj 1 Boss ssssso w! A 1 0' U al wi u (Des a 8 8 s (D e vi z< 01 w AQ �ww =wa — Ka� z -Ef - w _o o w pN �w Om m � o a w� W io z 2 O � F r , B � O a � eo zci o 3no 4 4 w 1 N m 2 a =o .w >w = o Q 1 Tna 3w `o cJ0 a a IZ X I w yo U ¢ — I n pi Q ° a pp <d w Qo m ¢,�� ! m � o .a _ J Y (xaw)'aazatl m ;— o yaa aaa iaaru W x _ ¢ x U RanchNewhall The following are the names, addresses, and telephone numbers of three pi.,iblic agencies for which BIDDER ER has performed work of a similar scope and size within the past 3 years: 1. City of Buena Park lame and Address of Owner / Agency Annie Singhai (714) 562-369"1 Name and Telephone Number of Person Familiar with Protect 26 ,000 Median Landscapes 10/1 Contract Amount _Type of Worm_____________[Date oaiplet d_.. Z City of Lena Beach ..m.................. __ _m.... ____.m...._._.._....._._._._.n._._.____.w____m......_ ._..__._.._ Name .and Address of Owner l Agency 1, 60,000 Median Landscape 6/19 Contract Arnor.xnt Type of hark t ate f,onipleted 3. City of Santa Ana Name and Address of Owner l Agency Hobert Aguirre 14-29-9621 Name and Telephone Number of Person Familiar °ww4h Projecat. $329,000 Park Improvements ' 0/19 Contract Amount Type of Work Date Completed The following are the names, addresses, and telephone nu ribers of all brokers and sureties froi whom BIDDER intends to procure insurance bonds: Alliant Insurance Services 735 Carnegie, San Bernardino ,.Pay `reernag DocuSign Envelope ID: 1579ABA7-3438-48EB-B9B8-B382FC973ABC ATTACHMENT 5 MV TRANSPORTATION RESPONSE TO RFP# TMF-17-18-20 Included by reference 73 Tfi� �Ilf Bids must be uploaded via P&anefflids before 11 :00 AM on Friday, November 8, 2019 to the Purchasinc', Agent of the City of Santa Clarita Specifications for this electronic bid may be vi(,,�wed at' 1 L Itta P.1�".an-!L)A 'I Q 8 4 0 # _gyjQ, Purchasing- (661) 255-4918 1. Solicitation documents for this bid may be downloaded frorn the City's Purchasing PlarietBids website at ht /ww 0, !_ Piease rEJer to the _ I . .... ... .. . .. solicitation documents for complete details and bid requirements 2. There will be a pre -bid meeting on October 16, 2019 at 2:00 PM at City Idali, 23920 Valerl(.Ja D, Santa Clarita, CA 91355 - Century Conference Room, Suite 150 It is strongly enCOUr'aged for all interested contractors to attend. Interested parties r-nay RVSP via Planet Bids. Attendees will rneet at: City Hall, 23920 Valencia BI, Santa Clahta, CA 91355 - Centc..iry Conference Roorn, Suite 150 on Z00 PM. This is the one and only meeting that will be scheduled for this bid 3. Proposer shall honor bid prices for One Hur'6'ed 'Twenty (120) days or for the stated contract period, whichever is longer. 4. Bids must include this invitation for bid form arid be signed by the contractof's authorized representative. This signature acknowledges the proposer has reaJ arid unrJerstands lhe requirements, contained in all bid documents. 5. The last day for questions will be November 1, 2019, 1000 AM QUestions shouk.1 be subri-Oted electronically via PlanetBids-, =16240# 6. The vendor is responsible for the accuracy and completeness of any solicitation form not obtained directly frorn the City, 7, The specifications in this notice shall be considered a part of any (.,ontract rnade I)Jjr<;uant thereto. I have, read, understood, and agree to the terms and conditions on allpages of this invitation for bid I"r he undersigned agrees to furnish the commodity or service stipulated on this bid as s,tated above STIL Landscape, Inc, Name (Print) Signature, Title of Person Signing Proposal __Z Secreta AddresO122 Compton Ave Los Angeles CA 90001 Cornpany Phone No. Newhall Ranch Road Parkway and Slope Planting Bid No. LIVID 19-20!-08, By providing the three (3) required signatures below, the C.ontractor ackrlowlledges full understanding, complete agreement to, and accepts in its entirety, all Bid Specifications for the Newhall Ranch Road Parkway and Slope Planting project, The Contractor will be expected to perform maintenance practices and uphold the standards herein to the established specifications throughout the length of the contract. MI M M *A11 lhtee sigmatures iequired Date: ADDENDUM #1 For City of Santa Clarita Invitation to Bid LM D-19-20-08 Newhall Ranch Road Parkway and Slope Planting October 16, 2019 This addendum must be acknowledged via Planet Bids and should be included with the bid response. There was a non -mandatory, pre -bid meeting on October 16, 2019 beginning at 2:00 PM. The meeting was located at City Hall, 23920 Valencia BI, Santa Clarita, CA 91355 - Century Conference Room, Suite 150. Attending staff: • Katie Knybel - Project Development Coordinator, Neighborhood Services • Melody Bartlette - Buyer, Administrative Services The following vendors were in attendance: • Jeremy Dervaes—Terra Form, Inc. The following was reviewed: Project Overview The City requires the contractor to include all labor and equipment for an all-inclusive contract for gravel removal, drainage modifications, boring and installation of irrigation and landscape. The project area includes parkways on south side of Newhall Ranch Road and slope areas adjacent to the San Francisquito Trail. The bid shall be all inclusive for labor hours and equipment, meaning: Contractor shall at his cost provide all the labor and equipment necessary for the removal of existing gravel, boring under trail, installation of drainage system, irrigation and landscape, clean- up, and restoration and repair or replacement of all existing improvements according to scope of work, details, plans, specifications, and contract documents. CONTRACTOR shall provide safe and adequate pedestrian and vehicular movement at and around all construction sites, which shall be maintained at all times. Approved barriers and signs (traffic flagging personnel, if necessary), shall be furnished and utilized by the CONTRACTOR to ensure public safety at all times. This bid is subject to Department of Industrial Relations and Prevailing Wage requirements. See bidder instructions for details. The Contractor shall have a minimum of five years' experience in landscape construction. (See References Sheets). The Contractor will be required to communicate work requests back and Bid # LMD-19-20-08 forth to LIVID staff through desktop computer, hand held device, or laptop. The Contractor must supply a C-27 license copy or, at minimum, the license number with their bid response. Please refer to the following General Requirement section includes general and special conditions that shall apply to all jobsite locations. Also included in this section are the Scope of Work instructions which more clearly define the services, scheduling, or special circumstances for each location to be serviced. Project Schedule Construction Begins: TBD — early 2020 Construction Completion: 45 working days Liquidated damages: $100.00/day Labor Compliance Program Mary Alice Boxall, Labor Compliance Specialist General Construction Topics • Pre -mobilization requirements o Barricades/signage on trail with advance notice of work o City to provide signage upon receipt of schedule o Coordination of schedule with City Parks Maintenance Division • Mobilization plan o Designated materials & equipment storage area o Perimeter cones/traffic control plan • Construction Schedule o Overall construction schedule o Two week look ahead construction schedule at weekly construction meeting • Order of work — to be determined by the CONTRACTOR o Barricades/signage o Underground utilities o Demolition o Installation • Working hours stated in the project specs (7:30 am to 4:30 pm Monday — Friday) • Lane closures (eastbound) shall be confined to the hours of 8:30 am to 3:30 pm • Maintain 24-hour vehicular and pedestrian access to all adjacent trails, businesses & residences • Work coordination with LIVID staff, Parks Maintenance staff, monitor and maintenance contractor • Weekly Construction Meetings will be held at time and location to be determined. • Communication with team • Pre -Con Walk to evaluate existing conditions Inspections • Landscape inspection —tbd • As -needed inspection — Katie Knybel Bid # LMD-19-20-08 2 Required Documents • Material warranty and certifications Drawing Log/As-Built Plans Contractor to maintain an updated drawing log onsite and provide as -built redlines and irrigation controller charts to Project Manager at the completion of construction. The following questions were asked and answered: Q1) What is the engineer's estimate? a. The engineer's estimate is $200,000. Contrac s pr ative Date UWI (M,-O /W --r Company Name Bid # LMD-19-20-08 ADDENDUM #2 For City of Santa Clarita Invitation to Bid LM D-19-20-08 Newhall Ranch Road Parkway and Slope Planting November 5, 2019 This addendum must be acknowledged via Planet Bids and should be included with the bid response. 1. The following section has been updated. Please remove and replace the page in the original bid document with the last page provided in this addendum. Section C. BID SCHEDULE Line item change: Bid Item #8 Clean Out Riser has been removed. 2. The bid due date has been changed: Bids must be uploaded via Planet8ids before 11:00 AM on Tuesday, November 12, 2019 to the Purchasing Agent of the City of Santa Clarita. 3. Please see Newhall Ranch Road drawing for clarification on question from Q&A: Q: There is no discernible difference between existing and proposed mainlines on plans; please distinguish between existing mainlines and proposed. If mainline shown crossing Newhall Ranch Road is existing; confirm that the only location requiring directional boring will be the lateral line crossing under the existing asphalt trail. A. The only location requiring directional boring and sleeving is the lateral line crossing the existing asphalt trail. NEWHALL RANCH ROAD IFIG FJ e ) TI b',I,FF J, —,7Ftj :`'d iI EI,E _ PJIN f ._IIIIF II A F f Al 4 =F �FII NFF I' CF W , "]N Ik F.�" I II '.� "'.I IF II HZ2 . I ��6�I11II U/It111Illi St'1 �* l <zz SHEET U-9-1.01 Bid # LMD-19-20-08 1 NEWHALL RANCH ROAD PARKWAY AND SLOPE PLANTING Project # LMD 19-20-08 City of 15onto Cladta, California Collfed 610 SCHEDULE ITEM NO- NEWHALL RANCH ROAD PARKWAYS AND SLOPES UNITS QUANTITY MNjT CPTi 41D PRICE GENERAL I Mobilizotion (Not to Exceed 10% of Total Project Cost) LS !;- 2 3 Waler Pollution Control & BMP's, Traffic Control & Safety Loot-) 000 DRAINAGE MODIFICATIONS 4 Swale Excavation: Remove existing gravel, including Transport and Disposal SF 7,050 5 Swale Excavation: Remove and Stockpile Existing Cohble-, Re install Pei r Plans, Transport and Disposal of Excess CY 218 Z(q0O 6 Open Bottom Desilfing Catch Basun EA 4 /0000 7 Perforated Pipe I F: 300 7 8 Clean Out Riser - LINE ITEM OMITTED - DO NOT ENTER PRICING EA 1) t7 0 9 import of clear; planting soil Cy 239 /1 9 50 M Geotextile Sy 703 57 I I Vegetated Swale information Sign EA I 1 00 IRRIGATION 12 ,Shrub Buluhler on Riser, Irrcluding Stream Bubblers FA 168 35- 13 Spray Head an Pop -Up 55 14 1" Remote Control Valve, including Control Wire -EA FA 6 gg d 1) 1) p 0 6 15 Quick Couples r EA 4 56 16 Gate Valve EA 3 AV 60 17 Pull Box EA 2 2570 18 19 20 3/4" SCH 40 PVC Laleral Line 1' SCH 40 PVC Laterall Line 2" SCH40 PVC Main Unc, EA EA LF 2,325 300 500 -- 21 Directional Boring, New Sleeve LF 40 -�7 cf, PLANTING 22 Planting Area Soil Preparation & Arriendments SF 17,940 75' 131 If 23 Shrubs I Gallon - Carex borborcre EA 133 = IZ-7— 24 Shrubs' 5 Gallon - Lomandra ongifoI1ci'Bree7e'Juncus patens Elk Blue', Lamandra lonqfolia, Rhaphiciepsis umbellata'Minor', Acacia redolens'Low Boy' EA 631 30 25 Planting Area Fine Grading SF 17940—o,so 9A 7 o 26 2" Organic Mulch (Planting Areas) Cy 166 'S N , C14 0 27 First 90 (Joys of Plant Maintenance and EstablishMnt Pernod (D'ay I to Day 90) SF 17,940 61 z 5, , Y- Efs- 28 Second 90 days of Plant Maintenance and Establishment Period ((Nay 91 to Day 180) SF 17,9 M) 0, -?< 46, gy 5 IOTAL COU $ TOTAL COS'1" IN W ORDS: If the number entered on this page Conflicts with what is entered on Planetbids, the number entered on Planetbids shall govern. 3 19 20M5 IMO 1. X'N 5—i- C" ffid Jr,,,," 111111,20 11 i, 4 1 1 M1 I I Contr for r tative Date Company Name Bid # LMD-19-20-08 ADDENDUM #3 For City of Santa Clarita Invitation to Bid LM D-19-20-08 Newhall Ranch Road Parkway and Slope Planting November 12, 2019 This addendum must be acknowledged via Planet Bids and should be included with the bid response. 1. The following section has been updated. Please remove and replace the pages in the original bid document with the pages provided in this addendum. Section F. GENERAL PROVISIONS 2. The bid due date has been changed: Bids must be uploaded via PlanetBids before 11:00 AM on Friday, November 15, 2019 to the Purchasing Agent of the City of Santa Clarita. 5 %`1/ /v4IJ 3�- Company Name SECTION C: BID SCHEDULE NEWHALL RANCH ROAD PARKWAY AND SLOPE PLANTING Project # LMD T 9.20.08 City of Santa Clarita, California ITEM NO. NEWHALL RANCH ROAD PARKWAYS AND SLOPES UNITS QUANTITY UNIT COST BID PRICE GENERAI 1 Mobilization (Not to Exceed 10% of Total Project Cost) LS 1 2 Water Pollution Control & BMP's, LS 1 3 Traffic Control & Safety LS 1 DRAINAGE MODIFICATIONS 4 Swale Excavation: Remove existing gravel, including Transport and Disposal SF 7,050 5 Swale Excavation: Remove and Stockpile Existing Cobble, Re -install Per Plans, Transport and Disposal of Excess CY 218 6 Open Bottom Desilting Catch Basin EA 4 7 Perforated Pipe LF 300 8 IClean Out Riser - LINE ITEM OMITTED - DO NOT ENTER PRICING EA 1 0 0 0 9 Import of clean planting soil CY 239 10 Geotextile SY 703 11 Vegetated Swale Information Sign EA 1 IRRIGATION 12 Shrub Bubbler on Riser, Including Stream Bubblers EA 168 13 Spray Head on Pop -Up EA 55 14 1" Remote Control Valve, Including Control Wire EA 6 15 Quick Coupler EA 4 16 Gate Valve EA 3 17 Pull Box EA 1 2 18 3/4" SCH 40 PVC Lateral Line EA 2,325 19 1" SCH 40 PVC Lateral Line EA 300 20 2' SCH40 PVC Main Line LF 500 21 1 Directional Boring, New Sleeve LF 40 PLANTING 22 Planting Area Soil Preparation & Amendments SF 17,940 23 Shrubs 1 Gallon - Carex barbarae EA 133 24 Shrubs 5 Gallon - Lomandra longifolia'Breeze' Juncus patens'Elk Blue', Lomandra longifolia, Rhaphiolepsis umbellato'Minor', Acacia redolens'Low Boy' EA 631 25 Planting Area Fine Grading SF 17,940 26 2" Organic Mulch (Planting Areas) CY 166 27 1 First 90 days of Plant Maintenance and Establishment Period (Day 1 to Day 90) SF 17,940 28 Second 90 days of Plant Maintenance and Establishment Period (Day 91 to Day 180) SF 17,940 TOTAL COST IN WORDS: TOTAL COST: $ If the number entered on this page conflicts with what is entered on Planetbids, the number entered on Planetbids shall govern. S,NURCH\Solicit 20S,ds11013 19-20-08\5 LMD 19-20-08 Sm im C Bid S,hWule Lasl Printed 10/8,2019 at 515 PM Bidder certifies that the representations of the bid are true and correct and made under penalty of perjury. Bidder certifies that in all previous contracts or subcontracts. ail reports which may have been due under the requirements of any AGENCY, State, or Federal equal employrnent oppoftun4y orders have been satisfactorily filed, and that no such reports are currently outstanding. Bidder certifies that affirmative action has been taken to seek out and conssder minority business enterprises for those portions of the work to be subcontracted, and that such affirmahve actions have been fully documented, that said documentation is open to inspection, and that said affirmative action will remain in effect for the life of any contract awarde(I hereunder. Furlhermore, Bidder certifies that affirmative action will be taken to meet all equal en-iploynient opportUllity requirements of the contract documents, STL Landscape, Inc. IM's Business Address: 8122 Compton Ave Los Angeles, Ca 90001 Telephone No.-. 323 581 8200 State CONTRACTOR's License No & Class: 956281 A/C27 Original Date- 1/4/11 Expiration Dat-,e1/31/21 The following are the names., titles, addresses, and phone numbers of all individuals, firm members, partners, joint venturers, and/or corporate officers having a principal rnterest in this proposal; STL Landscape, Inc 81122 Compton Avenue, Los Angeles, Ca 90001, 323-581-8200 .... . . ...... . ... .. Feliciano Loera, President[Treasurer Sergio Lopez Vice PresidentManager than Patterson, Secretary The dates of any vduntary or involuntary bankruptcy judgments against any prrndpal having an interest in this proposal, or any firm, corporation, partnership or joint venture of which any principal having an interest in this proposal was an owner, corporate officer, partner or joint venh,rre are as follows: NIA All current and prior DBAs, alias, and/or fictitious bUSiness names for any princIipal having an interest in this proposal are as follows: NA IN WITNESS WHEREOF, BIDDER executes and submits this proposal with the names, title, hands, and seals of all aforementioned principals this 12th day of _NC)V 20 19, ­­­­ . . ... . . ....... Dan Pattersori--Secretary Name and Title of Signatory STL Landscape, Inc. Legal Name of Bidder 8122 Compton Ave Address Les ------- Telephone Number Federal Tax I.D.No IMMIMMA z."I III, III III ij�I III � 111 '11111 111111, 1 111 1 , I 1, I!wn 01 Pj R EIIIIIIIIIIIII E-01 WTV Is 111MI M Subscribed and sworn to this day of 20­­Irr Notary . . .... (SEA1 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfuilness, accuracy, or validity of that document. State of California County of Los Angeles Subscribed and sworn to (or affirmed) before me on this 11th day of November _, 20 19 , by Dan Patterson proved to me on the basis of satisfactory evidence to be the person(a) who appeared before me. 1 2 0 (Seal) Signatu rIza" If the bidder, has answered the questionnaire within the past year and there are no significaM changes in the information requested, then the bidder need not file a new questionnaire. If there are changes, indicate those changes. Should the space provided not be adequate, so indicate and complete information on a separate page(s) and attach hereto. 1, Submitted by: _ STIL Lancl,��cap -t, Inc F0hone323-581 -8200 ep,-.-,­....­-,,, j­ _ Principal Office Address: 8122 Cor ,4�i�iton Ave Tos 2. Type of Firm: S Corporation . ..... Corporate: Other� NMEMM 3a. If a Corporation, answer these questions: Date of Incorporation: 11 /10/10 __State of Incorporation: CA President's Name: Feliciano Loera Vice- President's dame: SergioLp cZ, Secretary or Clerk's Name: -- Dan Patterson Treasurer's Name: Feliciano Loera 3b, If a partnership, answer, these questions: Date of organization: ........ _State Organized in. Name of all partners holding more than a 10% interest: M Name of person holding CONTRACTOR's Hcense,- License number-. Class: Date: Newhall Ranch Road Parkway and Slope planting Bid No. LIVID 19-20-08 a.CONTRACTOR's Representative: � [),an Patterson Title: Alternate: Sergio Lopez List the major construction projects your organization has in progress as of this date: Owneri (A) • Project Corona Type of Project; Al 2 ' pity gat L .o ri. h. Long Beach A/ 2 PROPOSAL. GUARANTEE BID BOND Newhall Ranch Road Partway and Slope Planting Bid No. LIVID 19-20-08 KNOW ALL MEN BY THESE PRESENTS that STL Landscape, Inc. ,as BIDDER, and Western Surety Company as SURETY, are held and firmly bound unto the City of Santa Clarita, as AGENCY, in the penal sum of Ten percent of amount bid dollars ($ 10% 1 which is ten percent (10%) of the total of first contract year (365 days) amount which is bid by BIDDER, to AGENCY for the above -stated project, for the payment of which sum, BIDDER and SURETY agree to be bound, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER is about to submit a bid to AGENCY for the above -stated project, if said bid is rejected, or if said bid is accepted and the contract is awarded and entered into by BIDDER in the manner and time specified, then this obligation shall be null and void, otherwise it shall remain in full force and effect in favor of AGENCY. IN WITNESS WHEREAS, the parties hereto have set their names, titles, hands, and seals, this 12th day BIDD STL Landsi Surety Company 2019, _Laurie B. Druck, Attorney -in -Fact A'lIiant Insurance Services InC. 685 East Carnegie Dr. Ste, 265, San Bernardino, CA 92408 909-886-9861 Subs :f hed and sworn to this day of 20_, NOTARY PUBLIC *Provide BIDDER and SURETY name, address, and telephone number and the name, title, address, and telephone number for authorized representative. Western Surety Company PCB Box 5077 Sioux Falls SD 57117 1-800-331-6053 IMPORTANT- Surety Companies executing Bonds must appear on the Treasury Department's most current list (Circular 570, as amended) and be authorized to transact business in the State where the project is located, cry ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or document. validit o that ..... www_ITITIT� State of California County of Los Angeles On November 12, 2019 before me, Ivonne Loera-Khatib (insert name and title of the officer) personally appeared Dan Patterson who proved to me on the basis of satisfactory evidence to be the person(&) whose name(4) is/a;a subscribed to the within instrument and acknowledged to me that he/ate/texecuted the same in his/he , it authorized capacity(+eej, and that by his/h rAeir signatureEs) on the instrument the person(; or the entity upon behalf of which the person(s-} acted, executed the instrument. certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature Ait` ., IVON.NE�LOERA-KHAFIB �y Notary Public -California ..,� Los Angeles County L / Commission # 2'197353 MY Comm. Expires Jun 11, 2021 (Seal) Western Surety Company POWER OF ATTORNEY APPOINTING INDIVIDUAL ATTORNEY -IN -FACT Know All Men By These Presents, That WESTERN SURETY COMPANY, a South Dakota corporation, is a duly organized and existing corporation having its principal office in the City of Sioux Falls, and State of South Dakota, and that it does by virtue of the signature and seal herein affixed hereby make, constitute and appoint Jay P. Freeman, Pamela Mc Carthy, Cynthia J Young, Laurie B Druck, Individually of San Bernardino, CA, its true and lawful Attomey(s)-in-Fact with full power and authority hereby conferred to sign, seal and execute for and on its behalf bonds, undertakings and other obligatory instruments of similar nature - In Unlimited Amounts - and to bind it thereby as fully and to the same extent as if such instruments were signed by a duly authorized officer of the corporation and all the acts of said Attorney, pursuant to the authority hereby given, are hereby ratified and confirmed. This Power of Attorney is made and executed pursuant to and by authority of the By-law printed on the reverse hereof, duly adopted, as indicated, by the shareholders of the corporation. In Witness Whereof, WESTERN SURETY COMPANY has caused these presents to be signed by its Vice President and its corporate seal to be hereto affixed on this 16th day of June, 2015. �Nddtry WESTERN SURETY COMPANY 0 W� VOA `.of i aul T. Bnrflat, Vice President State of South Dakota 1 1? County of Minnehaha ss On this 16th day of June, 2015, before me personally came Paul T. Bruflat, to me known, who, being by me duly sworn, did depose and say: that he resides in the City of Sioux Falls, State of South Dakota; that he is the Vice President of WESTERN SURETY COMPANY described in and which executed the above instrument; that he knows the seal of said corporation; that the seal affixed to the said instrument is such corporate seal; that it was so affixed pursuant to authority given by the Board of Directors of said corporation and that he signed his name thereto pursuant to like authority, and acknowledges same to be the act and deed of said corporation. My commission expires ""*"*�"'"""� S. 'EACH February 12 2021 !HOM Sam I S. Eich, Notary Public CERTIFICATE 1, L. Nelson, Assistant Secretary of WESTERN SURETY COMPANY do hereby certify that the Power of Attorney hereinabove set forth is still in force, and further certify that the By -Law of the corporation printed on the reverse hereof is still in force. hi testimony wh f I have hereunto subscribed G' my name and affixed the seal of mi-d corporation this day of m V" " pad �" ?j7. z Form F4280-7-2012 WESTERN SURETY COfvl PA'!JY L. Nelson, Assistant Secretary Authorizing By -Law ADOPTED BY THE SHAREHOLDERS OF WESTERN SURETY COMPANY This Power of Attorney is made and executed pursuant to and by authority of the following By -Law duly adopted by the shareholders of the Company. Section 7. All bonds, policies, undertakings, Powers of Attorney, or other obligations of the corporation shall be executed in the corporate name of the Company by the President, Secretary, and Assistant Secretary, Treasurer, or any Vice President, or by such other officers as the Board of Directors may authorize. The President, any Vice President, Secretary, any Assistant Secretary, or the Treasurer may appoint Attorneys in Fact or agents who shall have authority to issue bonds, policies, or undertakings in the name of the Company. The corporate seal is not necessary for the validity of any bonds, policies, undertakings, Powers of Attorney or other obligations of the corporation. The signature of any such officer and the corporate seal may be printed by facsimile. 667 CALIFORNIA; ALL-PURPOSE ACKNOWLEDGEMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California ss. County of San Bernardino ) On November 12, 2019 before me, Cynthia J. Young,- Notary Public Name and Title of Officer (e.g., "Jane Doe, Notary Public") personally appeared Laurie B. Druck ��"� uuu�du�i �'✓�m�lAr �� � �m�NNw i�iu w.w�" �+�wnuutl�w u�� + Name(s) of Signer(s) who proved to me on the basis of satisfactory evidence to be the person whose name is subscribed to the within instrument and acknowledged to me that she executed the same in her authorized capacity, and that by her signature on the instrument the person, or the entity upon behalf of which the person acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITN S my hand and official seal SignAture ' ary Public „ I OPTIONAL Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. >61 Description of Attached Document Title or Type of Document: Document Date: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: O Individual O Corporate Officer Title O Partner -- O Limited O General O Attorney -in -Fact O Trustee O Guardian or Conservator Other: Signer is Representing: Number of Pages: Top of thumb here 7 AMENDED Certificate of Authoritv THIS Is To CxRTapy, That, pursuant to the insurance Code of the State of California, of SIOUX FALLS, SOUTH DAKOTA , organized under the laws of SOUTH DAKOTA , subject to its Articles of Incorporation or other fundamental organizational documents, is hereby authorized to transaa within this State, subject to all provisions of this Certificate, the following dame ofinsurance: as such classes are now or may hereafter be defined in the Insurance Laws of the State of Califotriia. Tms CER-nr ciTx is expressly conditioned upon the holder hereof now and hereafter being in full compliance with all, and not in violation of any, of the applicable laws and lawful requirements made under authority of the laws of the State of California as long as such laws or requirements are in effect and applicable, and as such laws and requirements now are, or may hereafter be changed or amended. IN WrrN= WknwF, effective as of the-.-_ ST.- _.__day of.,_-_-_ _S , 1,915 , I have hereunto set my hand and caused my offlafal seat to be afixed this_21ST--- day of__ MARCH I9 75 . Fee WESLEY J. KINDER COMMbliow Rec. No. :^ ,�W...k Filed By NOTICE: Qualification with the Secretary of State must be accomplished as required by the California Corporations Code promptly after issuance of this Certificate of Authority. Failure to do so will be a violation of Ins. Code Sec. 701 and will be grounds for revoldng this Certificate of Authority pursuant to the covenants made in the application therefor and the conditions contained herein. FORM CO-3 tons-m 7.7s ro ou, ® oar NON -COLLUSION AFFID"IT (Title 23 United States Code • 112 and • • Code Section 7106) • • LIVID 19-20-08 In conformance with Title 23 United States Code Section 112 and Public Contract Code 7106, the Bidder declares that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the Bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the Bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the Bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. NON -COLLUSION AFFIDAVIT 7M, T1.1111*1M M11911:741M !III Will . . . . ... ................................. . ......... STATE OF CALIFORNIA COUNTY OF LOS ANGELES Dan Patterosn being first duly sworn deposes and says that he is the. Secretary(sole owner, a partner, president, etc.) of the party making the foregoing bid; that —that sTcbid _Ts_n&t5made in the interest of or behalf of any undisclosed person, partnership, company, association, organization or corporation, that such bid is genuine and not collusive or sham, that said BIDDER has not directly or indirectly induced or solicited any other BIDDER to put in a false or sham bid, or that anyone shall refrain from bidding, that said BIDDER has not in any manner, directly or indirectly sought by agreements, communication or conference with anyone to fix the bid price of said BIDDER or of any other BIDDER, or to fix the overhead, profit, or cost element of such bid price, or of that of any other BIDDER. or to secure any advantage against the public body awarding the Contract or anyone interested in the proposed Contract; that all statements contained in such bid are true, and further, that said BIDDER has not, directly or indirectly, submitted his bid price, or any breakdown thereof, or the contents thereof, or divulged information or date relative thereto, or paid and will not pay any fee in connection, therewith to any corporation, partnership, company, association, organization, bid depository, or to any member or AGENCY thereof, or to any other individual information or date relative thereto, or paid and will not pay any fee in connection, therewith to any corporation, partnership, company association, organization, bid depository, or to any member or AGENCY thereof, or to any other individual, except to such person or persons as have a partnership or other financial interest with said BIDDER in his general, bus,1' Iss.. Signed: cl: Title S/ecretay Subscribed and sworn to and before me this Seal of Notary mtotary publk or other offer carripleflng this docuprir , certificate veripes onIIhe Identitof the IrdividuaI who s19o,dItho ont a which the certificate is attached,,d'or the trot n, u.O"t. State of California. County of 1. SubKribod W swarn to �*r affirmed) befor-e-ne on d0s day of 20_, by proved to me on the basis of satisfactory evidence to be the per"Ifil' appeared before me. Sowturt: day of 20—, I I I I D 7 71 0 Big I 1" " I I I I � L Newhall Ranch Road Parkway and Slope Planting Bid No. LMD 19-20-08 Ag'Q ol., 611-111: C .................. - I'Yrw;'� R('� - ------- -- ......... . . Location and Place O1'BW1II'ICSS ....... . ............. .. .... . .. ..... Bid Schedule Item No,', . � I C.'ClIption ol Work License No l4k6 .. .. . . ........ . ..... . . ........ .. ..... .. .......... . - ----- -- . . . . ..... . 1.1 bcol 1 t I'a d or DIO: `ETA] t ls�! ........... . Doll,lr Value ol Work rya 7£ I —fri r 1 n: Ccrlik'rim.' A2011c�: - - - - - -------- Annmd Or(�',"R�ccj . ...... Location and 11kice ol, dick Ile iton Nos: .. .............. . �r"I T-r ]AW, S I l-1 IS: V�du�.� oI[' Wol k A-e offiirrn� ('-'ort i I v i i i L, A - c� c Amltr'�l 610["eccipt": Location and Place ofusine'.'s Bid tic hedt de hein Nos: T i —c e I —is -e N—o k, P, Dato: Ic NOTE: A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, SUbjeCt to the requirements of Section 4104 of the Public Contract Code, or engage in the perfort-nance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5 of the Labor Gode, It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section, 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 of the Labor Code at the time the contract is awarded, �#* " 11,2111MAK'A"M Newhall Ranch Road Parkway and Slope Planting Bid No. LIVID 19-20-08 This bidder STL Landscape, Inc, , proposed Subcontractor ­" — --- - ­­ - ----------- - -------------- ---------- ------- , hereby certifies that he has -_, has not _)C_, participated in a previous contract or subcontract subject to the equal opportunity clause, as required by Executive Orders 10925.11114, or 11246, and that , he has has not x , filed with the Joint Reporting Committee, arid Director of Office of Federal Contract Compliance, a Federal Government contracting or administering AGENCY, or the former President's Committee on Equal Employqn3,ent Opportunity, all reports that are under the applicable filing requiremQnts. In TL an so SLc c Company.- 0 Title: Sec Date-. 11/12/1 Dan Patterson Note: The above certification is required by the Equal Employrnent Opportunity of the Secretary of Labor (41 CFR 60-1.7(b)(1)), and must be submitted: by bidders and 1r)roposed subcontractors only in connection with contracts and Subcontracts which are Subject to the equal opportunity clause as set forth in 41 CFR 60-1.5, (Generally only contracts or Subcontracts of $10,000 or under are exempt.) Currently, the Standard Form 100 (EEO-1) is the only report required by the Executive Orders or their implementing regulations Proposed prime CONTRACTORS and subcontractors who have participated in a previous contract or subcontract subject to the Executive Orders and have not filed the required reports should note that 41 CFR 60-1.7(b)(1) prevents the award of contracts and subcontracts, unless such CONTRACTOR submits a report covering the delinquent period or such other period specified by the Federal Highway Administration or by the Director, Office of Federal Contract Compliance, US. Department of Labor. Home -T`E LICENSE BOARD CONTRACTORS STA DISCLAIMER: A license status check provides information taken from the MB licome, ditabase. Before relying on this information, you should be aware of the following limitations. 1 6: 1 r 1 S I [ iANDS(Allf ih� ,.'0114''9(4AV! NUF Q', A NK& I L, ', , A I 00r� I Ru'Ttop,s Phonp Nmri- :0 1 Yj "r!0 Entity Col pot ik o,, Nsue Date OiW/ ;Q, � Expire Date AI , 1100 N. 1 H5, Ur-mro k rurynnt and mfive. All Information below should be re,6owe9. * ,, oO NRM ( UN * ("'.1 qkK I U!,. iW,[ iPli [ K fOWMICJL Th,s Wed,, Bond Nurnber: �UM 81, Bond Amount: 1, 15,0N) Effective Date: v" fiond Bond of Qualifyinig, individual 0 Thr, rOvAd,,fl UM POFOO Yd v,,O,d lhl� 9"'/,Jhe o. rr , )4 H, ,Wirw inforestof this corilmny, rwr,f e Effective DaW GA '0W,11H 4 Thh� 5wm, ,Mo of t h =.i u o, n mr%,; thwreior 6', II " i, I, d (,I Q; , if, mf� I I iv, 0— t t L. d Effective Oatex 0 1 I TNskonw Policy Number:S] WC0321(1 Effective Date, iWJ20H Expire Date: 040 7,);M7; 0 1,.,pT1JM M 11"N' City of Santa Clarita Newhall Ranch Road Parkway and Slope Planting (LMD 19-20-08), bidding on November 15, 2019 11:00 AM (Pacific) Bid Results Bidder Details Vendor Name STL Landscape, Inc. Address 8122 Compton Avenue Los Angeles, CA 90001 United States Respondee Dan Patterson Respondee Title Estimator Phone 323-581-8200 Ext. Email dan@stllandscapeinc.com Vendor Type License # CA DIR Bid Detail Bid Format Electronic Submitted November 15, 2019 10:47:30 AM (Pacific) Delivery Method Bid Responsive Bid Status Submitted Confirmation # 195747 Ranking 0 Respondee Comment Buyer Comment Attachments File Title ifbd license subs references sched a&a eeo info questionaire addendas Line Items Type Item Code GENERAL File Name img-191114151752.pdf img-191114151818.pdf img-191114151840.pdf img-191114151907.pdf Scan HP_2019111423135000.pdf img-191114151955.pdf img-191 114152203.pdf img-191114152229. pdf img-191114152523.pdf Scan HP_2019111423130700.pdf UOM Qty Unit Price II'"ul aline tll3wd, incIl Page 1 Printed 11/18/2019 File Type INVITATION FOR BID FORM Required certificates/qual ifications/I ice nses DESIGNATION OF SUBCONTRACTORS References Bid Schedule ACKNOWLEDGEMENT & ACCEPTANCE OF BID SPECIFICATIONS EQUALEMPLOYMENT OPPORTUNITY CERTIFICATION BIDDER'S INFORMATION AND CERTIFICATION BIDDER'S QUESTIONNAIRE Addenda Line Total Comment City of Santa Clarita Page 2 Newhall Ranch Road Parkway and Slope Planting (LMD 19-20-08), bidding on November 15, 2019 11:00 AM (Pacific) Printed 11/18/2019 Bid Results Type Item Code UOM Qty Unit Price Line Total Comment 1 Mobilization (Not to Exceed 10% of Total Project Cost) LS 1 $15,000.00 $15,000.00 2 Water Pollution Control & BMP's LS 1 $1,000.00 $1,000.00 3 Traffic Control & Safety LS 1 $1,000.00 $1,000.00 Subtotal $17,000.00 DRAINAGE MODIFICATIONS 4 Swale Excavation: Remove existing gravel, including Transport and Disposal SF 7050 $1.00 $7,050.00 5 Swale Excavation: Remove and Stockpile Existing Cobble, Re -install Per Plans, Transport and Disposal of Excess CY 218 $100.00 $21,800.00 6 Open Bottom Desilting Catch Basin EA 4 $2,500.00 $10,000.00 7 Perforated Pipe LF 300 $36.25 $10,875.00 8 Clean Out Riser- LINE ITEM OMITTED - DO NOT ENTER PRICING EA 0 0 0 9 Import of clean planting soil CY 239 $50.00 $11,950.00 10 Geotextile SY 703 $5.00 $3,515.00 11 Vegetated Swale Information Sign EA 1 $1,500.00 $1,500.00 Subtotal $66,690.00 IRRIGATION 12 Shrub Bubbler on Riser, Including Stream Bubblers EA 13 Spray Head on Pop -Up EA 14 1" Remote Control Valve, Including Control Wire EA 15 Quick Coupler EA 168 $35.00 $5,880.00 55 $75.00 $4,125.00 6 $1,000.00 $6,000.00 4 $500.00 $2,000.00 II'"ul aline fi3ld, incIl City of Santa Clarita Page 3 Newhall Ranch Road Parkway and Slope Planting (LMD 19-20-08), bidding on November 15, 2019 11:00 AM (Pacific) Printed 11/18/2019 Bid Results Type Item Code UOM Qty Unit Price Line Total Comment 16 Gate Valve EA 3 $500.00 $1,500.00 17 Pull Box EA 2 $250.00 $500.00 18 3/4" SCH 40 PVC Lateral Line EA 2325 $5.00 $11,625.00 19 1" SCH 40 PVC Lateral Line EA 300 $5.25 $1,575.00 20 2" SCH40 PVC Main Line LF 500 $5.75 $2,875.00 21 Directional Boring, New Sleeve LF 40 $123.00 $4,920.00 Subtotal $41,000.00 PLANTING 22 Planting Area Soil Preparation & Amendments SF 17940 $0.75 $13,455.00 23 Shrubs 1 Gallon - Carex barbarae EA 133 $19.00 $2,527.00 24 Shrubs 5 Gallon - Lomandra long ifol ia 'Breeze' Juncus patens'Elk Blue', Lomandra longifolia, Rhaphiolepsis umbellata'Minor', Acacia redolens'Low Boy' EA 631 $30.00 $18,930.00 25 Planting Area Fine Grading SF 17940 $0.50 $8,970.00 26 2" Organic Mulch (Planting Areas) CY 166 $63.00 $10,458.00 27 First 90 days of Plant Maintenance and Establishment Period (Day 1 to Day 90) SF 17940 $0.25 $4,485.00 28 Second 90 days of Plant Maintenance and Establishment Period (Day 91 to Day 180) SF 17940 $0.25 $4,485.00 Subtotal $63,310.00 Total $188,000.00 II'"ul aline fi3l d, incIl Newhall Ranch Road Parkway and Slope Planting Bid No. LIVID 19-20-08 DOCUMENTS CHECKLIST The following documents are required to be completed and submitted by the Contractor at the times specified by an X opposite each title. If no column is marked, document will not be required. DO NOT send more information than is requested. DO send the REQUESTED information. With Bid Proposal (All Bidders) With Agreement (Awardee only) Prior to Starting Work (Awardee only) X Proposal — electronic X Proof of Contractor's License - license number will suffice X Bidder's Bond (MUST be received at City Hall prior to bid due date) X List of Commissioning Subcontractors — if none, write "n/a';-Do NOT leave blank X List of Subcontractors — if none, write "n/a ;-Do NOT leave blank X References X Bid Schedule — Use the City supplied pricing page only X Pricing pages that require initials X Required certificates/qualifications (as identified in solicitation including but not limited to, License C27 and CLIA certification) X Contract Agreement X Insurance Requirements — Return only ifAwarded X Bond for Faithful Performance X Payment Bond (for Labor and Material) X Certification of Public Liability and Property Damage Insurance X Certification of Worker's Compensation Insurance X Certification of Fire and Extended Coverage Insurance X Maintenance Meeting X Emergency Contact Information