Loading...
HomeMy WebLinkAbout2020-01-14 - AGENDA REPORTS - 2019-20 CIRCULATION IMPROV PGM, PROJ C0061- AWARD (2)Agenda Item: 6 DATE: January 14, 2020 SUBJECT: 2019-20 CIRCULATION IMPROVEMENT PROGRAM, PROJECT C0061 - AWARD DESIGN CONTRACT DEPARTMENT: Public Works PRESENTER: Damon Letz RECOMMENDED ACTION City Council: Award the design contract to Psomas for the 2019-20 Circulation Improvement Program, Project C0061 in the amount of $119,045, and authorize a contingency in the amount of $11,941, for a total contract amount not to exceed $130,986. 2. Authorize the City Manager or designee to execute all documents, subject to City Attorney approval. BACKGROUND The 2019-20 Circulation Improvement Program will modify medians, striping, and asphalt to enhance circulation on Lyons Avenue (Wayman Street to Orchard Village Road), Bouquet Canyon Road (Cinema Drive to Valencia Boulevard), Sierra Highway (Stater Bros Driveway to Via Princessa), and Copper Hill Drive (Sycamore Creek Drive to Seco Canyon Road). This action provides for the design of these improvements. In anticipation of future annexations, ongoing development in and around the City of Santa Clarita (City), and overall traffic increases, circulation projects such as this are needed to maintain traffic flow in the City. Intersections with insufficient right-turn/left-turn capacity in all four communities (Canyon Country, Newhall, Saugus, and Valencia) were selected for the 2019- 20 program. The proposed improvements include modifications to raised center medians to accommodate triple left -turn pockets, right -turn lane extensions, and early access to left -turn lanes. The modifications are based on staff s analysis of traffic volumes and observations of traffic patterns at the selected intersections. This project supports the Santa Clarita 2020 theme of Sustaining Public Infrastructure. Page 1 A Request for Proposal (RFP) for the design of the project was posted on September 17, 2019. The RFP asked firms to identify their relevant experience with similar projects and demonstrate their design approach for this project. On October 21, 2019, seven firms submitted proposals. Staff reviewed the proposals and based on their evaluations, scored the firms on a 100-point scale. Rank Company Score Location 1 Psomas 97 Santa Clarita, CA 2 Civil Works Engineers 92 Costa Mesa, CA 3 LIN Consulting, Inc. 91 Diamond Bar, CA 4 Willdan Engineering 87 Industry, CA 5 MNS Engineers, Inc. 86 Westlake Village, CA 6 JMDiaz, Inc. 84 Anaheim, CA 7 W.G. Zimmerman Engineering, Inc. 80 Huntington Beach, CA The scoring system was based on the following criteria: an understanding of the scope and approach to the required work and key development tasks, the consultant's previous experience on similar projects and experience working with the City, qualifications of the project team and their resources, and organization of the proposal. Additionally, each consulting firm was asked to provide a detailed scope of work required to prepare the plans, specifications, and engineer's construction estimate. Psomas demonstrated an in-depth understanding of the project needs and provided a detailed scope of work and approach to the project. Psomas analyzed the existing streets and identified key design factors that will need to be addressed in the design. Based on their design experience on previous City traffic projects and the completeness of their proposal for this project, staff recommends awarding the design contract to Psomas. The requested contingency will cover any additional design modifications, coordination with utilities and other agencies, and any requested changes to the scope of the project. California Government Code 4526 prescribes that the selection of architectural and engineering services be based on demonstrated competence, professional qualifications necessary for the satisfactory performance of the services required, and does not authorize the selection of professional architect and engineering services based on cost. City staff believes they have negotiated a fair and reasonable price with Psomas. ALTERNATIVE ACTION Other action as determined by the City Council. FISCAL IMPACT Adequate funds were appropriated as part of the Fiscal Year 2019-20 budget to expenditure account C0061233-5161.001 to support the recommended contract. Page 2 ATTACHMENTS Location Map Psomas Proposal Page 3 (NOISM aNVM`d - W` NE)O Id 1N3W3AONdWI NOiiv-1 oNio) lesodoad seuaosd :;u9wq:)B;;d p� O to O NVN O O O ,of O Lo O O O O c14 O c14 O O O O O LO r- c7 O llo I D` c7 Il cl ll ll V V cl o; O O p N to N N Lo N O Lo V N r o (/} a a J� sv sv sv sv v� sv sv sv sv sv sv sv sv sv sv sv sv 0 0 0 0 0 U Q O Lo Lo O •� 0 t LO lo O Q O 0 E > D D d N sqr sv O O O O N O V O N O of O 'O O I� O N O N O O V O N Lo V O D N N Lo (7 O � N V m— N D` U � N � tR tR tR ',,� tR tR tR tR tR tR tRto t-,o- I� �O N V O ON O V OOO O lo = N V c'7 V N O o 0 0 l� 2/�I}D1}sIUIU..Ip`p' N N a N a Nbq- a N ` > > > p p a N N N aaubsiaQ Lo O U UlJjpal��VAlo V N N N N M c0 V c0 N Obq- £ N a)o JGGU!bu3 }°afoad 'O v oo v oo v 00 co oo m v v L2 > sq- ]GbouoW oN Z u W pG!Oad 101UGS O 12BDUDW 30 `p'� o N V N o0 (14 V V (14 N ,. 4' a .^ 64 a_ ° > = m U - .... S° o Q) U E U C a s a o° Q) > > z ° o °o 7 O '> CL `6 ~ o od c U ° ° °c °c ° z V y 0 =» ... `c N N iL ° d O C •.LL—.. •.LL—.. C O o O Q a o _ p C 0 O OC y m� W i C U . N 0 O [ N .Q ._� C> 4 N O i N O (� he (' off- a� �a� oa �o •- o ' � T 01 he a Voo� ana 0o��v� c �. cL i Psomas accepts the Scope of Work that has been outlined in the RFP with the following clarifications, additions, and/or edits: 'iS III °1� �iii ���u III lii iir°ui ui iii iii ill i� iiw III iii ����� , III iii a Ill�lii �� iir°ill Based on preliminary research, we will be notifying the following utilities and their respective companies for existing facilities within the four project locations: AT&T — Distribution Phone/Cable Clear Channel Cable County Sanitation District - Desert Sewer, Water Crown Castle Cable/Fiber LA County Public Works — Road Department Storm Drain Level 3 Communications Cable/Fiber Metropolitan Water Sewer, Water Newhall County Water Water Santa Clarita Water Company Water SCE Electricity So Cal Gas Gas Spectrum Cable, Telcom Sprint Cable, Telcom Valencia Water Company Water Topographic survey will be performed to pick-up the following features within limits of the raised median. The following scope is assumed: Survey map at a scale of 1" = 20' for the each of the four medians shown in Exhibit `B".One design survey of each proposed median improvement will be provided for Lyons Avenue at Orchard Village Road, Bouquet Canyon Road at Valencia Boulevard, Sierra Highway at Via Princessa, and Copper Hill at Seco Cayon Road. Boundary lines to be established from available Record Data and/orExisting improvements as located in the field at each of the four locations. Horizontal location, curbs, planters, median improvements, signs, poles, trees over 6-inch diameter, overhead utilities, and other permanent surface visible features. Cross sections of the median will be obtained at twenty -five-foot intervals along each median curb -to -curb. Spot elevations of the existing asphalt will be taken at approximately three feet from the face of curb and spot elevations will be measured between medians projected in towards intersections where applicable. Utilities in medians for location only, not for design purposes. Field measured inverts and elevations on sanitary sewer and storm drain manholes. Topographic survey at intersections is deemed not required and is excluded. Upon conclusion of the topographic survey, Psomas will perform one site visit at each of the location to verify completeness and accuracy of survey for base map use. 7E 0 0 Q 0 0 0 E 0 0 o. m U M Q PSOMAS fl�"M snntncyIl ifln I cyliciifllaiionlliric1 Street Improvement Plans/Profiles (1 "=20') Signing/Striping Plans (1 "=40) Traffic Signal Modification Plans (1 "=20') Temporary Traffic Control Plans (1 "=40) Landscape/Irrigation Plans (1 "=20') Total a,,,,, IIIk We assume that the design process will take a of total six months to complete. Accordingly the following is assumed: One kick-off meeting and a total of two Project Development Team meetings, one of which will be conducted remotely by way of conference call. Utility notification will be performed in cooperation with the City, on the City's cover letter. In the event a utility is impacted, a second utility notice will be issued for relocation/disposition purposes. Quality Control will be performed at Draft, Final Draft and Final submittals. Psomas will furnish the following Plans as part of Draft, Final Draft and Final deliverables to the City: 1 1 1 1 1 1 1 1 N/A 1 2 N/A 2 2 2 2 2 N/A 7 7 6 5 13 11 Engineer's Estimate and Specifications will be furnished and submitted only at the Final Draft and Final project milestones In addition to the above, one title sheet will be prepared covering all of the listed sheets above for deliverable to the City. The Psomas Team will be available to respond to questions/comments during bidding and will assist the City answering them. Construction is also estimated to be complete within a six-month duration. 7E 0 0 Q 0 Y. (. 0 0 0 o. 0 m E U M Q