Loading...
HomeMy WebLinkAbout2020-01-28 - AGENDA REPORTS - SC AQUATIC CNTER ACTIVITY POOL DECK CONCRETE REPAI (2)Agenda Item: 5 DATE: January 28, 2020 SUBJECT: SANTA CLARITA AQUATIC CENTER ACTIVITY POOL DECK CONCRETE REPAIRS, PROJECT M3035 - APPROVE PLANS AND SPECIFICATIONS AND AWARD CONSTRUCTION CONTRACT DEPARTMENT: Public Works PRESENTER: Damon Letz RECOMMENDED ACTION City Council: 1. Approve the plans and specifications for the Santa Clarita Aquatic Center Activity Pool Deck Concrete Repairs, Project M3035. 2. Approve the use of a "piggyback" contract for repair services with Sol Construction through the Sourcewell (formerly NJPA) cooperative purchasing contract (contract 4062117-DAC) in the amount of $199,460, plus a contingency of $39,892, for a total contract amount not to exceed $239,352. 3. Authorize the City Manager or designee to execute all contracts and associated documents, subject to City Attorney approval. BACKGROUND Since the Santa Clarita Aquatic Center (Aquatic Center) opened in 2003, it has been heavily used by the community. The Aquatic Center's activity pool alone attracts approximately 30,000 patrons annually. As a result, the original surface of the activity pool's concrete deck is showing signs of wear and is in need of repair to address sections that are cracked or spalled. On February 21, 2019, staff met with a Los Angeles County Health Department inspector to review the condition of the concrete surfaces surrounding all the pools at the Aquatic Center. It was recommended that staff work with a design consultant to draft plans and specifications for the needed repairs. Based on the heavy usage at the activity pool, staff recommends repair work to include the removal and replacement of affected sections of the deck around the perimeter of Page 1 the activity pool. Additional concrete repairs will be performed on the remaining pools in the future. This project supports the Sustaining Public Infrastructure theme of the City of Santa Clarita's (City) five-year strategic plan, Santa Clarita 2020. Construction is anticipated to commence in February and conclude before April 2020, allowing the pool deck areas to be in operation for recreational programming. On July 11, 1995, the City Council approved the use of "piggyback" purchasing. This process permits the City to place orders against a competitively awarded, existing public agency contract. The City is using the cooperative purchasing contract with Sourcewell (formerly NJPA) for this project. This contract, which was awarded on August 17, 2017, was competitively solicited through a nationwide bid process and is valid through 2021. Staff recommends awarding the contract to Sol Construction, which is contracted with the Sourcewell Cooperative purchasing agreement, in the amount of $199,460, plus a contingency of $39,892, for a total contract amount not to exceed $239,352. The requested contingency will cover unforeseen conditions during construction. ALTERNATIVE ACTION Other action as determined by the City Council. FISCAL IMPACT Adequate funds were appropriated as part of the Fiscal Year 2019-20 budget to expenditure account M3035367-5161.001 to support the recommended contract. ATTACHMENTS Location Map Sol Construction Proposal (available in the City Clerk's Reading File) Page 2 103roNd `SNI`dd3N 313NONOO NO3a -100d .UTAIIOV N31N30 oiiv t)V) dew uoi;eoo-j:;uewLjoe;;d L O •Q. M N M C� CD O Z � V aa� �.. Q V 0 a 1 O LL Vol N � L � a Cl)0 iz1j,1QCi" Work Order Signature Document EZIQC Contract No.: CA08-SCI-GEP02-080719-SOL FINew Work Order F-1 Modify an Existing Work Order Work Order Number.: 072999.00 Work Order Date: 11/12/2019 Work Order Title: Santa Clarita- SCSC Aquatics Pool Deck Concrete Repair Owner Name: CALIFORNIA - City of Santa Clarita Contractor Name: Sol Construction, Inc. Contact: Peter Henne Contact: Robert Mooneyhan Phone: (661) 284-1427 Phone: 323-358-7929 Work to be Performed Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of Sourcewell EZIQC Contract No CA08-SCI-GEP02-080719-SOL. Brief Work Order Description: Remove and repair damaged areas specified by the City. Redo areas of need around aquatic play pool. Time of Performance Estimated Start Date: Estimated Completion Date: Liquidated Damages Will apply: 11 Will not a I : Work Order Firm Fixed Price: $199,459.82 Owner Purchase Order Number: Approvals CALIFORNIA - City of Santa Clarita Date Contractor Date Work Order Signature Document Page 1 of 1 11 /12/2019 'Dourcewell; Detailed Scope of Work To: Robert Mooneyhan CALIFORNIA - City of Santa Clarita 25663 Avenue Stanford Santa Clarita, CA 91355 323-358-7929 Date Printed: Work Order Number: Work Order Title: Brief Scope: From: Peter Henne CALIFORNIA - City of Santa Clarita 25663 Avenue Stanford Santa Clarita, CA 91355 (661) 284-1427 November 12, 2019 072999.00 Santa Clarita- SCSC Aquatics Pool Deck Concrete Repair Remove and repair damaged areas specified by the City. Redo areas of need around aquatic play pool. Preliminary Revised �X Final The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the items set forth below shall be considered part of this scope of work. Activity Pool 1. R & R damaged/cracked/worn concrete panels per as -built conditions 2. R & R failed joint caulking adjacent to replaced panels in kind 3. Maintain proper drainage to area drains at replaced panels 4. Create better drainage at water feature concrete to ensure no leakage into adjacent area Overall Site 1. Mobilization 2. Existing surfaces and pool(s) protection 3. House keeping Subject to the terms and conditions of JOC Contract CA08-SCI-GEP02-080719-SOL Contractor CALIFORNIA - City of Santa Clarita uaie uaie Scope of Work Page 1 of 1 11 /12/2019 Contractor's Price Proposal - Summary Date: November 12, 2019 Re: IQC Master Contract #: CA08-SCI-GEP02-080719-SOL Work Order #: 072999.00 Owner PO #: Title: Santa Clarita- SCSC Aquatics Pool Deck Concrete Repair Contractor: Sol Construction, Inc. Proposal Value: $199,459.82 Section - 01 $33,326.83 Section - 02 $28,907.06 Section - 03 $132,791.80 Section - 31 $4,434.13 Proposal Total $199,459.82 Thisl total represents the correct total for the proposal. Any discrepancy between line totals, sub -totals and the proposal total is due to rounding. The Percentage of NPP on this Proposal: % Contractor's Price Proposal - Summary Page 1 of 1 11 /12/2019 Contractor's Price Proposal - Detail Date: November 12, 2019 Re: IQC Master Contract #: CA08-SCI-GEP02-080719-SOL Work Order #: 072999.00 Owner PO #: Title: Santa Clarita- SCSC Aquatics Pool Deck Concrete Repair Contractor: Sol Construction, Inc. Proposal Value: $199,459.82 Sect. Item Mod. UOM Description Line Total Labor Equip. Material (Excludes) Section - 01 1 01 22 23 00 1373 DAY 13 CY Rear Dump Truck With Full -Time Truck Driver $18,065.95 Quantity Unit Price Factor Total Installation 800 x 1,770.20 x 1.2757 = 18,065.95 Dump truck to haul demolished concrete. 2 trucks 4 days 2 01 22 23 00 1408 WK 2,000 Gallon Water Truck With Full -Time Driver $5,195.19 Quantity Unit Price Factor Total Installation 1.00 x 4,072.42 x 1.2757 — 5,195.19 compaction water, dust control 3 01 71 13 00 0004 EA First 25 Miles, Equipment Delivery, Pickup, Mobilization And Demobilization $2,802.28 Using A Tractor Trailer With Up To 53' Bedlncludes loading, tie -down of equipment, delivery of equipment, off loading on site, rigging, dismantling, loading for return and transporting away. For equipment such as bulldozers, motor scrapers, hydraulic excavators, gradalls, road graders, loader-backhoes, heavy duty construction loaders, tractors, pavers, rollers, bridge finishers, straight mast construction forklifts, telescoping boom rough terrain construction forklifts, telescoping and articulating boom manlifts with >40' boom lengths, etc. Quantity Unit Price Factor Total Installation 3.00 x 732.22 x 1.2757 2,802.28 equipment delivery. 2 skid steer and 1 excavator 4 01 74 19 00 0016 EA 40 CY Dumpster (5 Ton) "Construction Debris" Includes delivery of dumpster, $854.68 rental cost, pick-up cost, hauling, and disposal fee. Non -hazardous material. Quantity Unit Price Factor Total Installation 1.00 x 669.97 x 1.2757 = 854.68 general construction debris 5 01 74 19 00 0022 MO Ramped Concrete Washout Binlncludes delivery. $704.82 Quantity Unit Price Factor Total Installation 1.00 x 552.50 x 1.2757 — 704.82 concrete washout 6 01 74 19 00 0029 CY Drop -Off Reinforced Concrete At Recycling Center $3,196.39 Quantity Unit Price Factor Total Installation 90.00 x 27.84 x 12757 = 3,196.39 concrete recycling 7 01 74 19 00 0041 CYM Hauling On Paved Roads, First 15 Miles $1,239.98 Quantity Unit Price Factor Total Installation 1,350.00 x 0.72 x 1.2757 = 1,239.98 hauling of demolished concrete. 90cy x 15 = 1350 cym 8 01 74 19 00 0042 CYM Hauling On Paved Roads, Miles Over Initial 15 Miles $1,267.54 Quantity Unit Price Factor Total Installation 2,070.00 x 0.48 x 1.2757 — 1,267.54 hauling of demolished concrete. 90cy x 23 = 2070 cym Subtotal for Section - 01 $33,326.83 Contractor's Price Proposal - Detail Page 1 of 4 11 /12/2019 Contractor's Price Proposal - Detail Continues.. Work Order Number: 072999.00 Work Order Title: Santa Clarita- SCSC Aquatics Pool Deck Concrete Repair Section - 02 9 02 41 13 13 0031 SY >3" To 6" By Machine, Break-up And Remove Rod Reinforced Concrete $16,627.45 Paving Quantity Unit Price Factor Total Installation 555.11 x 23.48 x 1.2757 = 16,627.45 Concrete demolition 10 02 41 13 13 0042 SF >6" To 8" By Hand, Break-up And Remove Concrete Paving $4,315.90 Quantity Unit Price Factor Total Installation 466.00 x 7.26 x 1.2757 - 4,315.90 hand work near pool and drains. pool edge is thickened 11 02 41 19 13 0063 LF Saw Cut Rod Reinforced Concrete Slab Up To 4" Depth $7,963.71 Quantity Unit Price Factor Total Installation 1,366.00 x 4.57 x 1.2757 - 7,963.71 saw cut panels from pool deck Subtotal for Section - 02 $28,907.06 Section - 03 12 03 11 13 00 0009 LF Up To 6" High Slab Edge and Block -Out Wood Formwork $5,690.03 Quantity Unit Price Factor Total Installation 914.00 x 4.88 x 1.2757 - 5,690.03 concrete forms for multi pours and forming for slots and drains 13 03 15 16 00 0025 LF 1/2" x 6" Asphalt Saturated Fiber, Premolded Expansion Joint $3,541.01 Quantity Unit Price Factor Total Installation 814.00 x 2.42 x 1.2757 = 2,512.98 Demolition 814.00 x 0.99 x 1.2757 1,028.04 expansion molding 14 03 15 16 00 0095 LF 1-1/2" Thermaflex TM Expansion Joint Systemincludes seal, adhesive, $26,539.79 polyurethane elastomeric concrete and all components required for installation. Excludes surface preparation. Quantity Unit Price Factor Total Installation 310.00 x 61.97 x 1.2757 = 24,507.09 Demolition 310.00 x 5.14 x 1.2757 = 2,032.70 joint seal system for pool decks 15 03 21 11 00 0251 EA Dowels Or Hairpin, 1/2" x 30" Length, Drilled And Epoxy In Concrete, 6" $7,709.08 Embedment Quantity Unit Price Factor Total Installation 302.00 x 20.01 x 1.2757 = 7,709.08 dowels 16 03 31 13 00 0005 SF 6" 3,000 PSI Slab On Grade Concrete Slabs Assembly $44,865.17 Quantity Unit Price Factor Total Installation 4,358.00 x 8.07 x 1.2757 = 44,865.17 Concrete panels 17 03 31 13 00 0005 0147 MOD For 3,500 PSI Concrete, Add $444.76 Quantity Unit Price Factor Total Installation 4,358.00 x 0.08 x 1.2757 = 444.76 18 03 31 13 00 0005 0154 MOD For >2,000 To 5,000, Add $3,280.11 Quantity Unit Price Factor Total Installation 4,358.00 x 0.59 x 1.2757 = 3,280.11 Contractor's Price Proposal - Detail Page 2 of 4 11 /12/2019 Contractor's Price Proposal - Detail Continues.. Work Order Number: 072999.00 Work Order Title: Santa Clarita- SCSC Aquatics Pool Deck Concrete Repair Section - 03 19 03 31 13 00 0008 SF 10" 3,000 PSI Slab On Grade Concrete Slabs Assembly $7,419.88 Quantity Unit Price Factor Total Installation 512.00 x 11.36 x 1.2757 - 7,419.88 concrete panels/thickened edges 20 03 31 13 00 0008 0147 MOD For 3,500 PSI Concrete, Add $84.91 Quantity Unit Price Factor Total Installation 512.00 x 0.13 x 1.2757 = 84.91 21 03 31 13 00 0008 0151 MOD For Up To 500, Add $2,599.57 Quantity Unit Price Factor Total Installation 512.00 x 3.98 x 1.2757 = 2,599.57 22 03 35 13 00 0004 SF Broom, Concrete Floor Finish $6,771.80 Quantity Unit Price Factor Total Installation 4,870.00 x 1.09 x 1.2757 - 6,771.80 finish concrete for health department requirements 23 03 35 13 00 0005 SF Final Float, Concrete Floor Finish $7,890.08 Quantity Unit Price Factor Total Installation 4,870.00 x 1.27 x 1.2757 = 7,890.08 proper slope for proper drainage to area and slot drains health department requirement 24 03 37 16 00 0009 HR 170' To 175' Boom Truck For Concrete Placement (182 CY Per Hour Rating) $14,402.45 Quantity Unit Price Factor Total Installation 24.00 x 470.41 x 1.2757 = 14,402.45 3 pours 25 03 39 13 00 0002 SF Water Based Curing, Sealing, Hardening And Dustproofing $1,553.16 CompoundCoverage rates: rough finish = 300 SF/GAL, broom finish = 300 to 400 SF/GAL, steel troweled = 500 to 600 SF/GAL, and vertical surface = 400 - 500 SF/GAL. Quantity Unit Price Factor Total Installation 4,870.00 x 0.25 x 1.2757 1,553.16 concrete cure Subtotal for Section - 03 $132,791.80 Section - 31 26 31 23 16 13 0013 CY Compaction of Fill or Subbase for Trenches by Vibratory Plate, Air Tamper, $1,374.36 Etcetera Quantity Unit Price Factor Total Installation 166.00 x 6.49 x 1.2757 = 1,374.36 compaction of subgrade 27 31 23 16 33 0012 CY Relocating On Site Excavated Material From Bulk Excavation >300' to 500' $761.21 Quantity Unit Price Factor Total Installation 90.00 x 6.63 x 1.2757 - 761.21 moving demolished concrete to loading area 28 31 23 16 36 0006 CY Excavation For Building Foundations And Other Structures By Hydraulic $630.32 Excavator, Backhoe, Loader in Soil Quantity Unit Price Factor Total Installation 90.00 x 5.49 x 1.2757 = 630.32 over ex for compaction Contractor's Price Proposal - Detail Page 3 of 4 11 /12/2019 Contractor's Price Proposal - Detail Continues.. Work Order Number: 072999.00 Work Order Title: Santa Clarita- SCSC Aquatics Pool Deck Concrete Repair Section - 31 29 31 23 16 36 0018 CY Backfilling Around Building Foundations And Other Structures By Hydraulic $487.96 Excavator, Backhoe, Loader Quantity Unit Price Factor Total Installation 90.00 x 4.25 x 1.2757 — 487.96 backfill after over ex 30 31 23 16 36 0021 CY Compaction Of Fill Or Subbase For Building Foundations and Other Structures $1,180.28 by Vibratory Plate, Air Tamper, Etcetera Quantity Unit Price Factor Total Installation 90.00 x 10.28 x 1.2757 — 1,180.28 compaction of subgrade Subtotal for Section - 31 $4,434.13 Proposal Total $199,459.82 This total represents the correct total for the proposal. Any discrepancy between line totals, sub -totals and the proposal total is due to rounding. The Percentage of NPP on this Proposal: % Contractor's Price Proposal - Detail Page 4 of 4 11 /12/2019 Subcontractor Listing Date: November 12, 2019 Re: IQC Master Contract #: CA08-SCI-GEP02-080719-SOL Work Order #: 072999.00 Owner PO #: Title: Santa Clarita- SCSC Aquatics Pool Deck Concrete Repair Contractor: Sol Construction, Inc. Proposal Value: $199,459.82 No Subcontractors have been $0.00 0.00 selected for this Work Order Subcontractor Listing Page 1 of 1 11 /12/2019