Loading...
HomeMy WebLinkAbout2020-03-10 - AGENDA REPORTS - PLANS, SPECIFICATIONS, AND CONST CONTR FOR THE 201 (2)O Agenda Item: 8 P CITY OF SANTA CLARITA AGENDA REPORT CONSENT CALENDAR CITY MANAGER APPROVAL:1 DATE: March 10, 2020 SUBJECT: PLANS, SPECIFICATIONS, AND CONSTRUCTION CONTRACT FOR THE 2019-20 ANNUAL CONCRETE REHABILITATION PROGRAM, PROJECTS M0133 AND D0002 DEPARTMENT: Public Works PRESENTER: Cruz Caldera RECOMMENDED ACTION City Council: 1. Approve the plans and specifications for the 2019-20 Concrete Rehabilitation Program, projects M0133 and D0002. 2. Award the construction contract to R.C. Becker and Son, Inc., in the amount of $416,404, and authorize a contingency in the amount of $15,778, for a total contract amount not to exceed $432,182. 3. Authorize the City Manager or designee to execute all contracts and associated documents, subject to City Attorney approval. BACKGROUND The annual Concrete Rehabilitation Program consists of two projects awarded under one contract to make the most efficient use of available funding. Project M0133 will replace existing sidewalks and drive approaches damaged by tree roots and pavement settlement, and Project D0002 will construct new access ramps at various locations Citywide. This will meet the requirements outlined in Title 21 of the Americans with Disabilities Act. These projects support the Sustaining Public Infrastructure theme of the City of Santa Clarita's (City) five-year strategic plan, Santa Clarita 2020. Attached is a list of construction locations that were identified through resident requests and by staff during their annual Citywide sidewalk inspection. Page 1 Packet Pg. 189 O Substantial constraints and controls were established in the construction contract to reduce potential impacts to traffic and homeowners during construction. Construction is scheduled to begin in April 2020 and is anticipated to be completed within 55 working days following the Notice to Proceed. Staff will appoint inspectors to ensure proper work performance by the contractor and to handle daily field issues should they arise. An invitation to bid was published on January 9, 2020, and was posted on the City's website. Plans and specifications were also posted on PlanetBids. Five responsive bids were submitted electronically to the City and opened by Purchasing on February 10, 2020. The results are shown below: Company Name R.C. Becker and Son, Inc. FS Contractors, Inc. TORO Enterprises, Inc. Onyx Paving Company, Inc. Hardy & Harper, Inc. Location Santa Clarita, CA Sylmar, CA Oxnard, CA Anaheim, CA Santa Ana, CA Base Bid Amount $416,403.73 $418,908.40 $464,448.00 $484,000.00 $670,060.00 Staff recommends the contract be awarded to R.C. Becker and Son, Inc., the lowest responsive bidder. This contractor possesses a valid state contractor's license and is in good standing with the Contractors State License Board. The contractor's bid was reviewed for accuracy and conformance to the contract documents and found to be complete. The current budget for the Annual Concrete Rehabilitation Program is $495,562. This provides for the construction contract and contingency contract in an amount not to exceed $432,182. The requested construction contingency of $15,778 will cover the costs of unforeseen site conditions, change order requests made by the contractor, and change orders for additional work ordered by the City. The remaining funds in the amount of $63,380 will provide for construction support such as surveying, tree maintenance, project management, inspections, labor compliance, and miscellaneous administrative costs. ALTERNATIVE ACTION Other action as determined by the City Council. FISCAL IMPACT Adequate funds were appropriated as part of the Fiscal Year 2019-20 budget to expenditure account M0133264-5161.001 (Measure R Local), M0133601 (General Fund - Capital), and D0002233-5161.001 (TDA Article 8) to support the recommended construction contract, construction support and related administrative costs. ATTACHMENTS List of Locations Page 2 Packet Pg. 190 H (--fi-d--lM164e4O8 OW3Unp lenuuV 6i-6L62) suoBsuol Jo lsil ln8W43vUV O 6 s Y w 6 W a u, �3 h v� m e� a 3 �N s a a q 'Sr N a p p p p e Q 8 a w z o a 3 a a 3 L �, C O T a Iwel6wd uoile1111Ve49N elw3uo0lenuutl OZ-6L00 suaileaol to lsil :luow43egV 0 F el (w6wd uayellll4eyatl alanuop IenuuV OZ MZ) suolleool P lsil aaawOeNV 0 6 O Y V 4 � ICI■ 9■9 D (wu6wd uoijn,Veyay naiouoo lenuutl OZ-61OZ) suolleaol lo)sll:luaw4aeyV m g m Y Y q 6 O N OI NI�IgI-,I—IEI-I-I IzsINI—INI�I—IRIfl -INI -I I-INIRlfl31'1*1 1 1 R 1 INM� ININI°tl�IN101'21-ILA" 1-1-INI-I-1-1-1-lglN i 191 l I .a NINI NI�IINI w^I�I O^I^I NINIoI�ININI�IQI�I�I^ININININI�I NIN 1-6 J(..6-d --11911Ii ... U-aOl 40 1911 :IUGW43MV ti N N N N O O� Q Q_ n Q N V) N h� N T� O O O OO � O r R� I ul 9 12 U u H (wwewd uopeW!4eyay aanuop lenuutl OZ-61OZ) suopeool to lsil:luow4oepV S Y u w 6 i i I�� ma (welBmduope11114eVa8 alai, uoplenuutl OZ-610Z) suolleoollolell:luaw WeAV 1 MIIIIIIIIIIIIIIIIIIIIIIIIIIIII HIIIIIIIIIIIIIIIIIIIIIIIIIIIII HIIIIIIIIIIIIIIIIIIIIIIIIIIII MIIIIIIIIIIIIIIIIIIIIIIIIIIIII MIIIIIIIIIIIIIIIIIIIIIIIIIIIII MIIIIIIIIIIIIIIIIIIIIIIIIIIII )wel6ald uo4e111!ge4ay alai ouoo lenuutl OL'6W) suaileaol /o Isll :luaw4aRUV b 9 � b 5 Y u t 1 9 It a (wn6ad..!jm!!!4e4aa alwauoo l,nuuv 0L-6IoZ) suogeaol/o ISllauaw40MV o 6 5 Y V 4 n 111111 HIM 0 0 .I milli �I H(wei6md uoiRIDlQe9ea alanuop jenuutl 6i'610i) suoileool to lsil :luowg3mV MIIIIIIIIIIIIIIIIIIIIIIIIIIIIIHIIIIMIIIIIIIIIIIIIIIIIIIIIIIIIIIII II■9 (weAwduop"mmepa�l alwauoo Jun uuVOZ-6loz) suopeaoltolsil:luawgaepltl m R 6 5 V 6 it III O N O 9