Loading...
HomeMy WebLinkAbout2020-11-24 - AGENDA REPORTS - 2020-21 OVERLAY AND SLURRY SEAL PROJ M0137 (2)0 Agenda Item: 11 P CITY OF SANTA CLARITA AGENDA REPORT CONSENT CALENDAR CITY MANAGER APPROVAL:1 DATE: November 24, 2020 SUBJECT: 2020-21 OVERLAY AND SLURRY SEAL PROGRAM, PROJECT M0137 - AWARD DESIGN CONTRACT DEPARTMENT: Public Works PRESENTER: Damon Letz RECOMMENDED ACTION City Council: 1. Award a contract for engineering design services to Pavement Engineering, Inc., for the 2020-21 Overlay and Slurry Seal Program, Project M0137 in the amount of $574,720, and authorize a contingency in the amount of $172,416 (30 percent), which allows the design of additional areas with a pavement condition index less than 30 to support the five-year pavement plan, for a total contract amount not to exceed $747,136. 2. Authorize the City Manager or designee to execute up to three annual renewal options not to exceed the base annual contract, inclusive of contingency, plus any adjustment consistent with the appropriate Consumer Price Index. 3. Authorize the City Manager or designee to execute all contracts and associated documents, modify the awards in the event impossibility of performance arises, and execute all documents subject to City Attorney approval. BACKGROUND The City of Santa Clarita (City) is responsible for maintaining 1,242 lane miles of streets. The Overlay and Slurry Seal Program is an integral part of the City's efforts to maintain our street and roadway system. This program is identified in the City's five-year strategic plan, Santa Clarita 2020, Sustaining Public Infrastructure. The Overlay and Slurry Seal Program improves streets Citywide with various treatments ranging from a full overlay with new asphalt to slurry coating. These treatments enhance the skid -resistant properties of the roadway and increase pavement life. This results in a smoother Page 1 Packet Pg. 67 0 and safer ride for vehicles, an enhanced appearance of the roadway and surrounding areas, and an extended economic life of the roadway. Each year, streets are studied and tested to identify those needing treatment. Accordingly, streets are selected using field evaluations by the engineer, the information contained in the Pavement Management System, and the City's Five - Year Pavement Plan. Staff prepared a Request for Proposal (RFP) for the 2020-21 Overlay and Slurry Seal Program to obtain the services of a civil engineering design firm to develop conceptual design details, prepare complete plans, specifications, estimates, and provide construction support services for the project. The City requested firms submit their proposal specific to the 2020-21 Overlay and Slurry Seal Program. Three firms prepared and submitted a proposal to the City for consideration. Based on the evaluation criteria set forth in the RFP, the following is a summary of the firms' rankings: Rank Company 1. Pavement Engineering, Inc 2. Willdan Engineers 3. Transtech Engineers, Inc. Location Score San Luis Obispo, CA 95.3 Industry, CA 88.3 Chino, CA 82.3 After reviewing the proposals, Pavement Engineering, Inc., (PEI) is the recommended firm. PEI has all the needed pavement evaluation and design resources in-house, which expedites the design process and saves on design costs. PEI has satisfactorily worked with the City on past overlay and slurry seal design projects. The requested approval will give staff the ability to renew up to three annual contracts for engineering design services. Staff is seeking City Council authorization to execute renewal contracts to expedite the design phase of the Overlay and Slurry Seal Program and provide continuity of design from year-to-year. As prescribed in California Government Code 4526, the selection of professional services is to be based on demonstrated competence and professional qualifications necessary for the satisfactory performance of the services required. It does not authorize the selection of professional architectural and engineering services based on cost and does not require the cost proposals to be sealed. Staff evaluated the proposals based on the following criteria: recent experience in similar projects, understanding of key development items, qualification of team and resources, schedule, quality of proposal materials, and references. Based on the City's evaluation process, Pavement Engineering, Inc., (PEI) is the recommended firm. PEI demonstrates the necessary professional qualifications, possesses a full understanding of the project with recent experience on similar projects in the City, and is able to meet an aggressive design timeline. PEI has the necessary resources available to meet the City's plan design needs. Additionally, they are familiar with the City's Pavement Management System and the condition of City streets. The requested contingency will provide funding needed to proactively design plans and specifications for City streets to be used in future construction opportunities. Proactively designing plans and specifications for City streets to create a construction plan inventory is Page 2 Packet Pg. 68 0 fiscally responsible as it will allow staff to maximize construction budgets by adding predesigned plans and specifications to be constructed in the case of projects savings or if additional project funds become available. The contingency will also cover the cost of unforeseen additional engineering studies and/or plans that may be required as the evaluation of each specific location is developed. The contingency may also cover traffic studies and surveys. ALTERNATIVE ACTION Other action as determined by the City Council. FISCAL IMPACT Adequate funds were appropriated as part of the Fiscal Year 2020-21 budget to support approval of the recommended action. Funds are available in expenditure accounts M0137233-5161.001 (TDA Article 8), M0137264-5161.001 (Measure R Local Return), M0137266-5161.001 (Measure M Local Return), and M0137267-5161.001 (SB 1). ATTACHMENTS Bid Proposal for Pavement Engineering, Inc. (available in the City Clerk's Reading File) Page 3 Packet Pg. 69 Pavement ! ! Inc. Cost Proposi City of Santa Clarita Designs Construction Support 2020-2021 Overlay & Slurry Seal Program Project M0137 Pavement Engineering's fee for the work is based on the referenced RFP and our experience with similar projects performed for clients throughout the State of California. Our estimated fee for the total project can be broken down as follows: Task 1 — Visual Inspection of Selected Streets $22,000 Task 2 — Deflection Testing & Coring $94,160 Task 3 — Recommendations and Value Engineering Reports $26,250 Task 4 — Field Measurements Necessary for Design $24,640 Task 5 — Investigate Streets $21,280 Task 6 — Coordinate with Utility Companies $4,520 Task 7 — Assist with Bi-weekly Development Meetings $16,320 Task 8 — Prepare PS&E's $141,280 Task 9 — Bidding Support Services $8,800 Task 10 — Construction Support Services $8,760 Task 11 — Design Support Services $58,210 Task 12 — On -site Construction Support Services ME $148,500 The fees will be invoiced on a time and materials basis. All fees and costs associated with this project are subject to final negotiation with the City of Santa Clarita. The enclosed breakdown shows our estimated costs for each portion on the project. The individual fees associated with each task will serve as a guideline for progress payments. CITY OF SANTA CLARITA 2020-2021 OVERLAY & SLURRY SEAL PROGRAM, PROJECT M0137 Position Rate Hours Total Senior Principal Engineer $240 40 $9,600 Associate Engineer $165 40 $6,600 Senior Engineering Technician $145 40 $5,800 Senior Principal Engineer $240 24 $5,760 Senior Engineering Technician $145 80 $11,600 Dynaflect Operator $295 56 $16,520 Asst. Dynaflect Operator $165 56 $9,240 Dynaflect & Coring Crew Preparation $165 8 $1,320 Coring Technician $240 72 $17,280 Asst. Coring Technician $145 72 $10,440 R-value (ASTM D2844, CTM 301) $350 24 $8,400 Mobilization $4,100 Traffic Control $9,500 Senior Principal Engineer $240 20 $4,800 Associate Engineer $165 30 $4,950 Senior Engineering Technician $145 60 $8,700 Engineering Technician $130 60 $7,800 Associate Engineer $165 16 $2,640 Senior Engineering Technician $145 80 $11,600 Engineering Technician $130 80 $10,400 Senior Principal Engineer $240 24 $5,760 Associate Engineer $165 80 $13,200 Senior Engineering Technician $145 16 $2,320 CONTINUED CITY OF SANTA CLARITA 2020-2021 OVERLAY & SLURRY SEAL PROGRAM, PROJECT M0137 Associate Engineer $165 8 $1,320 Clerical $80 40 $3,200 Senior Principal Engineer $240 24 $5,760 Associate Engineer $165 64 $10,560 Senior Principal Engineer $240 60 $14,400 Associate Engineer $165 240 $39,600 Assistant Engineer $160 120 $19,200 Senior Engineering Technician $145 240 $34,800 Engineering Technician $130 256 $33,280 Senior Principal Engineer $240 16 $3,840 Associate Engineer $165 16 $2,640 Senior Engineering Technician $145 16 $2,320 Senior Principal Engineer $240 20 $4,800 Associate Engineer $165 24 $3,960 Senior Principal Engineer $240 56 $13,440 Associate Engineer $165 108 $17,820 Senior Engineering Technician $145 98 $14,210 Engineering Technician $130 98 $12,740 Associate Engineer $165 900 $148,500 ILY Pavement EngineeringInc. Fee Schedule Engineering & Landscape Architect Services Senior Principal Engineer..............................................................................................$240/hr PrincipalEngineer.........................................................................................................$205/hr Senior Associate Engineer............................................................................................$180/hr Associate Engineer.......................................................................................................$165/hr AssistantEngineer........................................................................................................ $160/hr Technical Services Project & Construction Managers.................................................................................$160/hr Senior Engineering Technician.....................................................................................$145/hr Engineering Technician.................................................................................................$130/hr CADDrafting.................................................................................................................$130/hr Clerical.......................................................................................................................... $ 80/hr Field Services PW Dynaflect Operator*................................................................................................ $295/hr PW Assistant Dynaflect Operator*................................................................................ $165/hr PW Coring Technician*.................................................................................................$240/hr PW Assistant Coring Technician*................................................................................. $145/hr * Two (2) hour minimum Basis of Charges Miscellaneous Charges Equipment rental, reproductions, testing (other than by PEI), photographic expenses and other outside services: ................................ Cost + 15% Payments Invoices will be submitted either semi-monthly or monthly and are payable upon receipt. Interest of 1-1/2% per month (but not exceeding the maximum rate allowable by law) will be payable on any amounts not paid within 30 days, payment thereafter to be applied first to accrued interest and then to the principal unpaid amount. Attorneys' fees or other costs incurred in collecting any delinquent amount shall be paid by the client. ILY Statement of Offer • Signature PEI's proposal (response file and project fees) is signed by an individual authorized to bind PEI. This proposal is a firm offer for a 120-day period, and the proposed work will be performed at our "not -to -exceed" price listed above. This includes all deliverables and meeting attendance as laid out in the scope of work. Joe Ririe, PE; President V AW October 16, 2020 MP20-511 Ramiro Fuentes Assistant Engineer City of Santa Clarita 23920 Valencia Blvd., Suite 300 Santa Clarita, CA 91355 Subject: City of Santa Clarita — Proposal for Design & Construction Support Services: 2020-2021 Overlay & Slurry Seal Program, Project M0137 Dear Ramiro, Pavement Engineering Inc. (PEI) appreciates the opportunity to respond to the City's RFP to provide pavement design and construction support services for the City's two projects, the 2020- 2021 Annual Overlay Project & 2020-2021 Annual Slurry Seal Project. As the premierpavement engineering company in California, we welcome the opportunity to exceed your goals by providing the highest quality of work. Established in 1987, PEI is a Civil Engineering consultant firm specializing in everything pavement. Whether it is pavement management, evaluation, design, testing, inspection, QC/QA or construction management, it's what we do. It is what we have been doing for 30+ years. Based on our insight, highly trained staff, and hands-on knowledge, we are confident we can continue to deliver superior pavement design and construction support services to the City of Santa Clarita, on time and on budget. PEI brings the following strengths to the City of Santa Clarita: • Familiarity with the City of Santa Clarita streets from our previous work. • Unparalleled expertise in pavement rehabilitation, maintenance, assessment and roadway projects. • Thousands of pavement evaluation studies and recommendations for public agencies throughout California. • Contract documents and contract administration services for many types of pavement roadway projects, including federal aid projects. • Three Caltrans and three AASHTO resource certified testing laboratories in California. • Fully trained, Caltrans-certified inspectors and contract administration staff specializing in pavement maintenance and rehabilitation projects. • Highly experienced and knowledgeable Licensed Civil Engineers. This proposal highlights PEI's experience and qualifications providing design and construction support services on various pavement projects. Based off our prior work for the City of Santa Clarita, we have a strong understanding of the City's previous projects and needs. We are experts in value engineering and our proposed project manager, Sam Ho, has been working closely with the City of Santa Clarita since 2016. Ramiro Fuentes M P20-511 October 16, 2020 Our highly skilled personnel are experts in pavement projects, specifically overlay and slurry seal projects. In addition to our highlighted experience working with public agencies throughout the state in the last 30+ years, we have provided examples of projects completed within the last few years which demonstrate the asset we would be to the City of Santa Clarita in successfully completing both of their pavement projects. All services are expected to be performed in-house and no sub -consultants will be used. This allows us to be able to control our schedule and be fully available to the City. PEI will be fully committed to and available throughout the term of the contract and for all tasks related to projects for the City. With 85+ employees, we will be able to respond quickly and efficiently to all of the City's requests. Because we take a hands-on, personalized approach with all our clients, assigned staff will remain with all projects from start to finish. This ensures that the City receives consistent services with reliable, accurate results delivered on time and within budget. We value our relationship with the City of Santa Clarita and will continue our commitment to provide our services with honesty, trust and professionalism. As our slogan says, "You can ride on our reputation. " All services for the City will be managed out of our full-time office in Southern California located in Santa Clarita. Our office location will ensure our availability for meetings at City facilities as requested within a reasonable time frame. Joe Ririe will be the main contact person for all related correspondence during the consultant selection process. Very truly yours, Joseph L. Ririe, P.E. President & Senior Principal Engineer Pavement Engineering Inc. 3485 Sacramento Drive, Suite A San Luis Obispo, CA 93401 JoeR@pavementengineering.com Phone: 805.781.2265 Sam Ho, P.E., QSD/QSP Associate Engineer & Project Manager Pavement Engineering Inc. 26007 Huntington Lane, Unit 5 Santa Clarita, CA 91355 SamH@pavementengineering.com Phone: 805.781.2265 /LJ Table of Contents Om Letter of Transmittal................................................................................................... Unnumbered Tableof Contents..........................................................................................................................1 Qualifications of the Firm...........................................................................................................2-9 Individual Experience of Proposed Project Manager and Key Staff......................................10-15 Responseto RFP...................................................................................................................16-19 Schedule..................................................................................................................................... 20 Forms............................................................................................................ Submitted via BidNet ILJ Qualifications of the Firm Ilullc, IS a 6 VHS euclCl11,ull11111Cl 1'uu 11°ln Ih°l)o � � t I ��ll ����mI�� ll l����rh II`IViil.,pIV ��Ii�II ����h,�u hP� .11w � ��e6��� III ;�� 11t, n���Y l�ln���Yll 11 ����',��II I'�ly����� A��11 � h State II II �V�,�jY ,p ��� ll i q q l q @ q q q@ A l q@ we�� ��V III,JW 11h �m IIh III ��@P ��Y m'� IV J�`N �Iy la�lY IIII ���Y 7��. �"�, q II II* �"�, p,^** Years l q q q l@ ! q q ������ �,�t �� �„��Y II o ����rA�. III h,&II II ot6 ti���ly ��.�m��{ Q,u��Y 11 h�` h�W I ,,,)wJwaysw �.'.� HJ I` ww l;a Q � ly e V�V \ e �Y„� � ll �{ h � h � �, �V �Y �� �V �Y ����� Q 1 . Q 6 �V �Y �� �r II �V,� �� Q "� ��btill �II,IdLa� IVY w.'pD1irlclies, o c3, 'ux,',' s r1111airl���.°„ eii oa, air'l t air'H'J Ilti)u ilvate t1mt extei'HJ H'lynx Ilu1:e ,,)a e�a���eirllt, IBecw,,ise we Ih°'mve �,,,)ii t<e�'J Wu'H''ly III Inls thII"oug� foul 6uriles aullmt 13�ciles, We Cahfornb �idu°lllm���tqvn�vuvqvoalhA:ul°gllm�4N��Ir�lyln�yllm�u A u°111�yhlyA���e �Ir�l)ne n�I �ullti�n��xuiln�ull�,Nre°�, t6re°�¢���uumlh.'a,ulligl�tyy, , M�1IIVNnq�oaola 4,u�Y AY llll 1111111�d �11 14,uy1l �r AY 11 All IIOM %u�r AYh mY OM1I�1 11 VIl I R,�M f 11 06�1110�'6 GYM ��a f ll o6�d l �',a N �r AY �u��a%u'ou�� �lo ov�1p �aw� �� Y y w \\ q\ q Nl I` w �V � III ll II II l� I4 I! h','W A Il 11 ll �{ II l) 11 At PEI, we have the latest testing equipment, tools and in-depth oumIlllt IlDropt knowledge to solve the most challenging pavement maintenance problems. During any given year, we evaluate, test, design and inspect tens of millions of square feet of pavement throughout California. urop t coimpbbon Dercenlage We provide the technical knowledge to cost-effectively maintain roadways and parking lots. We have the managerial experience Y p 9 9 p l �,) � to run things smoothly from inception to completion and the proven results that build trust and loyalty. Our number one goal CoimimIlled to is client satisfaction. We manage each dollar our clients spend as exc6bince if it were our own — with common sense and complete honesty. Because we are faced to solve the most challenging pavement maintenance problems, our staff is carefully comprised and highly trained. We have an experienced, licensed and qualified staff of professional engineers, engineering technicians, construction managers, inspectors, laboratory technicians and support personnel. At PEI, we also understand the responsibilities of and constraints on public works departments. They are tasked with maintaining assets in fiscally responsible ways, maximizing services while minimizing costs and always ensuring a quality, long lasting product is delivered. That is no easy task, but it's where we excel. When it comes to assisting our clients, we take a very personal approach to their success to ensure a quality, long-lasting product which maintains assets while keeping down costs. Through our involvement with the development and implementation of the Section 39 of the 2010 & 2015 Caltrans Standard Specifications for Asphalt Concrete (AC), PEI has become a leader in designing and testing the new performance -based AC materials. We literally bring millions of tons of AC experience to the City of Santa Clarita. Stretching the dollars while still meeting the pavement needs requires a thorough understanding of pavements. Not many firms have developed the expertise necessary to say that they understand pavements top to bottom and inside out. Using PEI as a consultant for the overlay and slurry seal projects will allow the City to get the most out of each project. Innovation, expertise and experienceis what we bring to the table. PEI approaches projects differently than other design firms... here's how: Sf,xvrid At PEI, we understand pavements. We understand how they deteriorate, how they are designed, how they are constructed, we understand them down to the aggregate gradation and binder. Our comprehensive understanding has led to unparalleled expertise that causes us to look at, design and manage pavements differently. This unique approach allows us to get the most out of pavements and the design. No ft M i i e ° a� sIhlfOrk. PEI does not approach pavement design based on guesswork. We take a scientific approach to determining the most cost -effect solutions to addressing the pavement needs. Armed with this information and our expertise, we can quickly develop and evaluate multiple options for preserving and/or rehabilitating pavement. This provides our clients with the assurance that their investment will last. Over the years, we have observed that no other firms have the knowledge and expertise to match what we have at PEI. Our knowledge and expertise cover all aspects of pavement. We excel at pavement management, design, construction and materials. We understand the big picture. This experience and knowledge contribute to efficient designs and lower bids. Deteriorating infrastructure is an important issue, and pavements, because of their visibility, are at the top of the list. Our expertise has given us the privilege to sit in and council with agency decision makers as they struggle to balance budgets and meet the needs of their crumbling infrastructure. We understand the constraints and tough decisions that need to be made as a result of a shortage of proper funds. Therefore, we understand the importance of stretching every dollar and eliminating waste with overdesigns. Simple, effective, and innovative designs that meet our clients' exact needs is our specialty. We like to use the hands-on approach with our clients. We have found that meeting face to face at critical points during the project development stages eliminates wasted time and allows for the project to run more efficiently from start to finish. Many of our clients have commented that even though they know PEi has multiple clients, they feel like they are our only one. With experience spanning more than three decades, we can deliver the following pavement engineering services to the City of Santa Clarita: • Pavement Design PS&E's; • Pavement Evaluation (Coring & Deflection Testing); • Construction Support. We take a scientific approach to protect an agency's pavement investment. Field investigations include deflection testing, coring the pavement structure and evaluating existing pavement drainage. Laboratory testing includes analyzing pavement materials and soil characteristics, which determine structural adequacy. Combining this analysis with observations of pavement performance, our engineers can determine the current condition of pavement and evaluate rehabilitation alternatives. The net result is an optimum design for long-term pavement performance and the lowest annual cost. Our investigation, management and design services conform substantially to the design concepts and generally accepted practices provided by the federal, state, county, and city governments. We have extensive experience working with and can provide services based on recent Caltrans specifications for QC/QA, standard and method processes, Greenbook specifications and Federal agency specifications, including the Federal Highway Administration. We also adhere to ASTM, AASHTO, and CTM standards. PEI understands that well -designed pavement can be the difference between a long-lasting structure and one with a significantly reduced service life. From site plans to public agency documents to pavement rehabilitation documents, we have the experience to assist you through each step of the �design process. Many pavement -related design projects today also require upgrading facilities related to accessibility. PEI is thoroughly knowledgeable and experienced with the multitude of federal and state requirements that apply to exterior accessibility design, including accessible parking, accessible paths or travel, curb ramps, railings, signage, etc. Our design approach ensures a smooth and successful project. Our plans and specifications clearly define the extent and quality of work expected, including all construction details, materials and procedures. We have spent years creating and enhancing specifications for roadways and parking lots that reflect the best industry practices. The combination of site plans, details and specifications ensures that all contractors are bidding on the same work. We are constantly working with contractors all over California to develop engineer's estimates which result in accurate pricing. Detailed contract documents result in lower bids, and complete specifications minimize scheduling, relationship and payment problems. Once test data are gathered and analyzed, PEI visually evaluates the pavement for fatigue characteristics such as raveling, transverse and longitudinal or block cracking, and alligator cracking. The visual investigation focuses not just on pavement condition but also on factors that affect performance, including site drainage, water sources from roof drains and landscaping, tree roots, and loading conditions from trucks, buses, garbage trucks or other heavy wheel loads. Pavement evaluations provide important information about AC performance and service life. They determine an existing pavement's structure, confirm its structural adequacy and endeavor to find the reason why it failed and how it will perform with various maintenance alternatives. Pavement evaluations are invaluable in determining the best and most economical pavement design and rehabilitation approach based on an annual cost analysis. In addition, PEI has found the adequate cores and deflection data are invaluable during both the design and construction phases of the project. Our experience suggests that gathering this additional data helps produce designs that can last longer than average approaches, resulting in additional savings for the agency. Deflection testing is a non-destructive method of evaluating a pavement's flexibility, the resilience of structural layers and how it has been affected by the type and volume of traffic as well as the effects of temperature and moisture. Although there are several different testing devices, the goal is to measure the total deflection from a load applied on the surface of the pavement. Core testing determines how well a foundation distributes repetitive stresses caused by traffic. Coring measures existing pavement thicknesses and determines the type of native soils that form a pavement's subgrade or structural foundation. Dating back to 1997, PEI has completed 60+ various pavement projects for the City of Santa Clarita. The most recent of these projects PEI has performed work on for the City include: • 2019/2020 Annual Federal Resurfacing, Overlay & Slurry Seal Projects & CM Support • 2019/2020 Pavement Management System Update • 2018/2019 Pavement Management System Update • 2018/2019 Wiley Canyon Cross Section • 2018/2019 Annual Overlay & Slurry Seal Projects & CM Support • 2017/2018 Annual Federal Resurfacing, Overlay & Slurry Seal Projects & CM Support • 2017/2018 Pavement Management System Update • 2016/2017 Annual Overlay & Slurry Seal Projects & CM Support • 2016/2017 Pavement Management System Update • 2015 Five -Year Maintenance Plan • 2014/2015 Design Services for the Annual Overlay & Slurry Seal Program Because of these projects, PEI has become very familiar with the City of Santa Clarita's road network and subsequent pavement needs. PEI has worked with hundreds of public agencies throughout California as pavement consultants. At PEI, we are proven and have shown that we can respond to our clients' requests in a tirri hr mat -met arid ^a���� ���,����^a��a�t�'t��ttt� � �����°��t�tm��tm�� tt����� i��i�h°°���sk. to ftreet our c ti'erits ' Including PEI's prior work for the City of Santa Clarita, PEI has worked with the following 100+ public agencies: Arroyo Grande Hercules Orinda Santa Clarita Atascadero Hollister Oxnard Santa Cruz Co. Buellton Lake Co. Pacifica Santa Maria Calabasas Lakeport Palo Alto Santa Monica Calistoga Lancaster Paso Robles Seaside Camarillo Larkspur Petaluma Sebastopol Carpinteria Lathrop Pismo Beach Shasta Lake Citrus Heights Lincoln Pittsburg Sierra Co. Concord Lompoc Pleasant Hill Solano Co. Contra Costa Co. Los Altos Port Hueneme Sonoma Co. Cupertino Los Altos Hills Reedley St. Helena Daly City Los Gatos Rocklin Stanislaus Co. Danville Marin Co. Roseville Stockton Dublin Mill Valley Ross Sunnyvale El Cerrito Millbrae Sacramento Susanville Escalon Milpitas San Anselmo Tehama Fort Bragg Monte Sereno San Bruno Tehama Co. Galt Monterey San Carlos Thousand Oaks Gilroy Moorpark San Jose Tiburon Goleta Moraga San Leandro Tracy Gonzales Morgan Hill San Luis Obispo Vacaville Grover Beach Napa San Mateo Walnut Creek Guadalupe Novato San Mateo Co. Windsor Hayward Oakdale San Ramon Woodland Hemet Oakley Santa Barbara Yountville Ojai Santa Barbara Co. Yreka City of 1 2020 Annual• 1M0131 (°:Xeprat 23920 Valencia Blvd., Suite 300 Santa Clarita, CA 91355 Ramiro Fuentes Assistant Engineer 661.286.4134 rfuentes@santa-clarita.com Pr(,,),1e(:,t Dates, November 2019 — On -going Scope of services: Pavement Engineering Inc, has worked with the City of Santa Clarita for over a decade in their Pavement Management Program. For the FY 2019-2020, PEI has worked with the City on the design for the Overlay, Slurry Seal and Federal Resurfacing Projects. This includes performing the initial visual review to help with finalizing the street list, field deflection testing and coring, design recommendations, generating the design package (PS&E), assisting in the bidding process and supporting the City during the construction phase with a licensed engineer working at the City hand -in -hand. The asphalt binder used for the TMO that PEI has developed with the City of Santa Clarita has discontinued. PEI was able to come up with an alternative rubberized asphalt that would work just as well and still meet the Cal Grant requirements. Additionally, PEI provided on -call designed requests as necessary. City of • • Oaks 2020 Pavement Overlay *, 1 4" 2100 Thousand Oaks Blvd. Thousand Oaks, CA 91362 Michelle McCarty Engineering Assistant 805.449.2477 mmccarty@toaks.org Pr(,,),1e(,1„t Dates, September 2019 — August 2020 ('iey o ' 1 " ...,I Scope of Services: PEI provided design support for the City's Pavement Overlay and Slurry Programs. These programs included a measurement of field quantities, and a pavement evaluation comprised deflection testing and coring. The purpose of our evaluation was to determine the feasibility of using TMO as a maintenance treatment option as well as other possible rehabilitation options. PEI developed neat exhibits for each work area showing the repair locations, treatment and general limits of work along with itemized quantities for those repairs. PEI also provided construction support services for the City including marking repair items, reviewing submittals and responding to any questions that arose. City of • • • Measure Q Pavement Repair Projects 3, 4, 5, 6, 7 & 8 (°:Xeprat 1950 Parkside Drive, MS 40 Concord, CA 94519 Aldrich R. Bautista, P.E. Project Manager 925.671.3028 Aldrich. Bautista@cityofconcord.org Pr(,,),1e(t Dates, December 2015 — On -going Scope of Services: PEI provided a PS&E package for the City's Measure Q Pavement Repair Projects 3, 4, 5, 6, 7 & 8. These projects included a measurement of field quantities, and a pavement evaluation comprised of deflection testing and coring. The purpose of our evaluation was to determine the feasibility of using TMO as a maintenance treatment option as well as other possible rehabilitation options. PEI also compiled a PS&E package and provided construction support services for the City. Additionally, PEI evaluated curb ramps and sidewalks for accessibility complacency issues and field designed necessary repairs. PEI also provided pavement evaluation services and localized sanitary sewer repairs within the project streets. City of '. • Robles Spring Street Pavement ., (°:Xe:,i.` 1000 Spring Street Paso Robles, CA 93446 Mercedes (Ditas) Esperanza Capital Projects Engineer 805.237.3861 Desperanza@prcity.com Pr(,,),1e(,1„t dates, March 2014 — On -going Scope of services: For the City's multi -year pavement project, PEI provided various design, quality assurance and testing services. These included a pavement evaluation which consisted of coring analyses and deflection testing for pavement design, field surveys, specifications quantity takeoff and construction bidding support services. PEI also performed inspection, construction administration, and construction support services for the project. City of 2020 Pavement ManagementProgram (°:Xegrit 44933 Fern Avenue Lancaster, CA 93534 Marissa Diaz, PE Capital Program Manager lancaster ca 661.945.6864 mdiaz@cityoflancasterca.org tt Dit, I e I'r Anna Leonard Civil Engineer 661.723.5881 aleonard@cityoflancasterca.org :,, °(")le(,1„r (. ��a�A,"���s, March 2020 — On -going Scope of services: PEI provided pavement evaluation services for the City's Pavement Management Programs. These programs included a pavement evaluation comprised of deflection testing and coring. The purpose of our evaluation was to determine the feasibility of using creative approaches for rehabilitation treatment options. PEI will provide construction support services for the City. Individual ExperienceProposed ILY Project Manager• Key Staff With 85+ employees, PEI has the staff resources to perform all of the proposed design and construction support services for both City projects. Our team focuses specifically on evaluating, designing, managing, maintaining and rehabilitating pavements and roadways, including concrete and soils, and will be fully committed to and available throughout the term of both projects for the City of Santa Clarita. Our staff is comprised of registered engineers, associate engineers, assistant engineers, engineering technicians, laboratory managers and construction managers, all of whom have technical skills which encompass a complete range of pavement engineering disciplines. Because we take a hands-on, personalized approach with all our clients and assigned staff will remain with a project from start to finish. This ensures that the City receives consistent services with reliable, accurate results delivered on time and within budget. PEI has five offices which serve public and private entities throughout California located in: • Concord Luis Obispo (corporate) Redding• lri (managed) • Sacramento We are a company in five different locations with shared services, working together to achieve superior results for our clients with the cost-effectiveness, efficiency, quality and reliability expected in today's competitive and budget -conscious environment. In addition, our offices are connected through cloud services, allowing us to readily share files and resources, review documents, schedule employees and resolve issues of varying complexities. This makes PEI extraordinarily flexible, collaborative and responsive. All of our proposed services for the City, including the location of our proposed project manager, will be managed and assigned out of PEI's Southern California Office located in Santa Clarita, with any needed support coming from the rest of the company. Pavement Engineering Inc. 26007 Huntington Lane, Unit 5 Santa Clarita, CA 91355 805.781.2265 Bill Long, PE Peer Review/Pavement Eva) Senior Principal Engineer Joe Ririe, PE Principal -in -Charge Senior Principal Engineer Sam Ho, PE Project Manager Associate Engineer PEI Support Staff Assistant Engineers Senior Engineering Techs Engineering Techs Lab Managers Lab Technicians Clerical Joseph L. Ririe,P.E. President, Senior Principal Engineer & Principal -in -charge Summary of Experience Joe's recent project experience includes the following public agencies Atascadero Goleta Lompoc Oxnard San Bruno Seaside Camarillo Grover Beach Los Altos Hills Pacifica San Carlos Sonoma Carpinteria Guadalupe Milpitas Paso Robles San Luis Obispo Sunnyvale Concord Hayward Napa Petaluma Santa Maria Thousand Daly City Hollister Oakley Pismo Beach San Ramon Oaks Danville Lancaster Ojai Pittsburg Santa Barbara Vacaville Dublin Larkspur Orinda San Benito Santa Clarita Woodland Galt Lathrop Yountville William J. Long, P.E. CEO, Senior Principal Engineer & Peer Review Summary of Experience Bill's recent project experience includes the following public agencies Atascadero Fort Bragg Los Altos Ojai San Carlos Stanislaus Buellton Galt Los Altos Hills Oxnard San Luis Obispo St. Helena Calabasas Gilroy Los Gatos Pacifica San Mateo Stockton Calistoga Goleta Marin Palo Alto San Ramon Tehama Camarillo Grover Beach Mill Valley Paso Robles Santa Barbara Thousand Carpinteria Guadalupe Millbrae Petaluma Santa Cruz Oaks Citrus Hayward Milpitas Pismo Beach Santa Maria Tiburon Heights Hemet Monterey Pittsburg Seaside Vacaville Concord Hercules Moorpark Rocklin Sebastopol Walnut Creek Cupertino Lakeport Morgan Hill Port Hueneme Shasta Lake Windsor Daly City Larkspur Napa Roseville Sierra Woodland Danville Lathrop Novato Sacramento Solano Yountville El Cerrito Lincoln Oakdale San Anselmo Sonoma Yreka Escalon Lompoc Oakley San Benito Sam , Associate Engineer & Project Manager Summary of Experience Sam's recent project experience includes the following public agencies Arroyo Grande Daly City Los Gatos San Bruno Atascadero Goleta Millbrae San Luis Obispo Belmont Grover Beach Mill Valley Santa Clarita Berkeley Guadalupe Oxnard Santa Maria Calabasas Hayward Paso Robles Seaside Carpinteria Lancaster Pismo Beach Thousand Oaks Concord Larkspur Reedley Yountville Joseph L. Ririe,P.E. President• Principal Pavement Engineering Inc. 3485 Sacramento Drive, Suite A San Luis Obispo, CA 93401 805.781.2265 JoeR@pavementengineering.com Summary Joe has 27+ years of wide-ranging experience in engineering and project management and in developing practical, cost-effective and quality pavement solutions for clients throughout California, including 21+ specifically focused on pavement design. Joe has worked on pavement projects for more than 100 public agencies throughout California over the past five years, including with the City of Santa Clarita. He specializes in pavement management systems (PMS), pavement rehabilitation design and construction administration. As PEI's President, Joe is responsible for PEI's reputation as California's premier pavement engineering specialists and has set the standard for delivering quality projects on time, on budget and with unparalleled customer service that builds trust and loyalty. Joe has enhanced his pavement expertise by serving as a chairman on the Soil and Rock Sub -committee for the American Society for Testing and Materials (ASTM) and was industry co-chair for Caltrans' Pavement Preservation Task Group (PPTG). Joe's responsibilities include: Responsibility for overall planning and development of PS&E's, overseeing contractor performance and quality control standards, overseeing associate and assistant engineers, as well as engineering technicians, inspectors and laboratory testing. Bachelor of Science in Civil Engineering Education California Polytechnic State University — San Luis Obispo, CA Professional i r i California Civil Engineering 52735 Professional ric 1998 - present President and Sr. Principal Engineer, Pavement Engineering Inc. Joe was promoted to PEI's president in 2013. In that role, he is responsible for overall planning and project generation for Pavement Engineering Inc. He develops pavement rehabilitation PS&Es, oversees contractor performance and quality control standards, trains and mentors associate and assistant engineers in project management and design, trains inspectors and technicians and manages a diverse client base. William J. A • Pavement Engineering Inc. 20260 Skypark Drive Redding, CA 96002 530.224.4535 f' BillL@pavementengineering.com Summary Bill has 31+ years of engineering and construction experience in asphalt concrete pavements and associated paving materials. He focuses on the engineering, construction and inspection of pavements, including numerous deflection studies and failure analyses, overlay and alternate rehabilitation designs. He is an expert in long -life pavements, CIR, warm mix asphalt, cold foam and epoxy asphalt. Bill also has extensive experience assisting contractors in obtaining quality asphalt concrete pavements by performing thousands of quality control tests each year using Caltrans, ASTM and AASHTO standards. Bill is the Redding Office Branch Manager in charge of the engineering and construction activities of asphalt concrete pavement projects. He is responsible for quality control/quality assurance of the firm's deflection testing and also manages PEI's Caltrans testing and inspection work, including overseeing laboratory testing. Bill has worked on pavement projects for more than 100 public agencies throughout California in the past five years. Education Bachelor of Science in Civil Engineering California State University, Chico — Chico, CA Professional California Civil Engineering 47552 Registration Professional ric 1987- present CEO and Sr. Principal Engineer, Pavement Engineering Inc. Bill is the manager of PEI's Redding Office and oversees the engineering and construction activities of asphalt concrete pavement projects. He is responsible for QA/QC of PEI's deflection testing and manages PEI's Caltrans testing and inspection work, including overseeing laboratory testing. Caltrans No. 04-4AO104 - Route 80 Vacaville Caltrans No. 03-1A4644 - Routes 99/113 Tudor Caltrans No. 04-012OF4 - SFOBB SAS Bridge Caltrans No. 04-OA1854 - Route 101 Petaluma Caltrans No. 10-OA8724 - Routes 219/108 Caltrans No. 02-347604 - Route 5 Anderson Caltrans No. 04-1A3204 - Route 580 Richmond Caltrans No. 02-4E9504 - Route 44 Palo Cedro Caltrans No. 03-2F35U4 - Route 20 Nevada Co Caltrans No. 03-406604 - Route 99 Sutter Co Caltrans No. 04-3A23U4 - Route 101 Windsor Route 4 in Antioch Caltrans No. 04-3E4304 - Route 680 Walnut Creek Caltrans No. 02-4F1704 - Route 3 Peanut Caltrans No. 02-4F1504 - Routes 3/97 Siskiyou Co Caltrans No. 02-4C9604 - Route 3 Hayfork Caltrans No. 04-3A7764 - Rte 80 Carquinez Bridge Caltrans No. 04-4G3904 - Route 80 Hercules Caltrans No. 04-153504 - Rte 80 Vallejo/Fairfield / Vacaville Caltrans No. 05-1A4304 - Route 1 Marin Co Caltrans No. 03-4M1604 - Route 32 Chico Caltrans No. 05-1A7104 -Route 17 Scotts Valley Caltrans No. 04-3E2904 - Route 82 Sunnyvale / Mountain View Yolo County WO No. 4521 - County Road 98 CTM 105 - Calculations CTM 375N - AC density (nuclear) LP4-Lab procedure CTM 106 - Specific gravity CTM 526 - Profilograph LP5-Lab procedure CTM 125AC — Sampling of materials LP1-Lab procedure LP6-Lab procedure CTM 125AGG — Sampling of materials LP2-Lab procedure LP7-Lab procedure CTM 125GEN — Sampling of materials LP3-Lab procedure LP9-Lab procedure r + P.E. Associate Engineer & Project Pavement Engineering Inc. ? f r 26007 Huntington Lane, Unit 5 Santa Clarita, CA 91355�"�� 415.307.4550 SamH avementen ineerin .come° ��p......................g..... .........g.................................... ,�b�r:...................................................... Summary Sam has over a decade of experience in the Engineering and Construction industry. He specializes in developing plans / specifications / estimates, handling submittals / RFIs, and performing quality control / quality assurance. In his time at PEI, Sam has honed his project management and design capabilities with pavement rehabilitation projects for dozens of public agencies and school districts. Sam is a registered Civil Engineer and QSD / QSP in the State of California, and LEED AP. Since joining PEI in 2016, Sam has honed his project management and design skills with pavement design, inspection and assessment projects. After working in the San Luis Obispo Office for over a year, Sam now heads the office in Santa Clarita. Sam's responsibilities include: field design, site assessments, developing plans, specifications and estimates, coordinating pre -bid meeting, reviewing RFIs, submittals and specifications, and overseeing the project from start to finish. Sam will also coordinate pre -construction and status update meetings. Education Bachelor of Science in Civil Engineering California Polytechnic State University — San Luis Obispo, CA 2008 Professional California Civil Engineering 79939 Registration Certification Qualified SWPPP Developer & Practitioner Number 23285 Professional ric (with I) 2016 - present Associate Engineer, Pavement Engineering Inc. Sam is the manager of PEI's Santa Clarita Office and works as a Civil Engineer who specializes in pavement maintenance and rehabilitation projects. He provides pavement assessment, design, and construction support for cities, counties and school districts throughout the State of California. Responsibilities include: field design, development of plans, specifications and estimates, coordinating pre -bid and pre -construction meetings, review RFI and submittals and overseeing the project from start to finish. WA Offas-11[m This year, the City of Santa Clarita will use its Five -Year Pavement Maintenance (StreetSaver®) Plan to select project streets throughout Valencia, Newhall, Saugus and Canyon Country for overlay or slurry treatments. For Fiscal 2020-2021, the City has budgeted approximately $11 M for overlays and slurry seals, 45% of which will be applied to arterial streets, 45% to collector and residential streets, and 10% on contingency streets. The City envisions two construction projects: 1) Annual Overlay Project and 2) Annual Slurry Seal Project. Pavement Engineering Inc. (PEI) will provide the following services to complete the two construction projects: detailed construction plans, specifications and cost estimates; street quantity sheets; and materials testing and inspection logs, for each projects in accordance with the latest edition of Standard Plans and Specification for Public Works Construction. TASK 1: PERFORM ., AREAS PEI will perform a visual evaluation of the condition of streets, selected from the City's Five -Year Pavement Maintenance Plan, StreetSaver®, and the City's input. The evaluation will aid in identifying the next maintenance treatment for each street and the treatment timing and associated costs. PEI will also include a review of streets that are within the same geographic vicinity as the City's plan listed streets, with the purpose to fill out the budget and treat a neighborhood at the same time. Once the visual evaluations are performed, PEI will then perform deflection testing, coring and analysis, as necessary, on all streets within the City's selected areas. This type of analysis eliminates guesswork and ensures the best rehabilitation approach. Adequate cores and deflection data on all streets are invaluable during both the design and construction phases of the project. Our experience shows that gathering this additional data helps produce designs that can last longer than average approaches, resulting in additional savings to the City. PEI will perform the deflection analysis in general accordance with California Test Method 356 (CTM 356) at 100-foot maximum intervals in each lane (minimum 10 tests per lane). We will core at 500-foot maximum intervals over the street segment (minimum two cores per street segment). Traffic control on arterial streets will be provided using a follow vehicle. Flagging will be provided as needed on all streets. The City will provide traffic index information. PEI will use this information to assist in the value engineering process. We will explore all possible rehabilitation options, including pulverization and resurfacing, milling and filling, conventional AC overlay and ARHM overlays, as well as recycling options such as FDR and CIR. PEI will also identify whether or not a less expensive maintenance treatment should be considered as an option. Deflection testing and coring data will be summarized for each street and will be included in project development binders. To conserve design funds, no formal deflection testing report will be prepared. The pavement evaluation summary sheets will be compiled into binders and reviewed with the City throughout the design process. PROVIDETASK 3. I RECOMMENDATIONS, TREATMENT RECOMMENDATIONSI ING REPORTS, TO CITY FOR REVIEW Because we are familiar with and have evaluated most of the streets in Santa Clarita, PEI can provide expert guidance on the streets that will benefit from inclusion in the 2020-2021 overlay and slurry seal projects. After performing street evaluations by deflection testing and coring, we will recommend the best maintenance methods and prepare preliminary engineer's estimates for various street segments. We will work with City staff and StreetSaver® to prioritize and refine project street lists, as well as the City's five-year plan list, that best fit the City's budget and maintenance goal of $11 M. Its � � - • - � � :��'�'�i�'� • - •alb PEI's staff will physically walk each rehabilitation project street to measure and record all pertinent field quantities within the right-of-way and adjoining streets that will be pertinent or may conflict with the proposed design. Physically measuring the quantities provides confidence that bid quantities are accurate, ensures smoother contract administration and reduces the potential for change orders. This information includes the location of existing striping; locations of utility lids; limits of paving transitions, digouts and other pavement repairs; and the total area of pavement to be resurfaced. If concrete repairs or tree root damage are identified during field reviews, we will bring these items to the City's attention to determine if the repairs should be added to the contract. Based on the project street lists developed in Task 3, PEI will investigate and identify any preparatory work required before applying the specified treatments. We will identify the location of work, quantities of work and any limitations to the work, including locations, limits and quantities of traffic stripes and raised pavement marker removals. Following the investigation, PEI will provide the City with a detailed street -by -street accounting of the estimated costs. Our detailed accounting will include the locations, limits and quantities of traffic striping and raised pavement marker removals identified in Task 4. Additionally, PEI will provide a summary of quantities and street evaluation reports which will verify treatment recommendations. We will consider the conclusion of Task 5 as the 60% submittal phase. Underground utilities may be impacted depending on the selected pavement rehabilitation treatment. To minimize utility impact, PEI will work with the City to notify local utility companies of the projects and will provide a project street list to allow them to coordinate and make needed repairs prior to the start of the paving project. PEI will incorporate all necessary utility information received through this coordination effort that will conflict with the design into the contract documents. We will need to obtain a current listing of utility companies and contact information from the City for this task. Throughout the project, PEI will meet with City staff bi-weekly to coordinate and review specific project progress, evaluate value engineering options, address schedules, budgets and other items of business to ensure the work performed meets performance goals. Our objective is to deliver a quality project on time and on budget and make sure the City understands where we are at all times throughout the project. Most of the work will be performed from PEI's Santa Clarita Office located in the City's industrial area. The Project Manager is available to meet with the City to provide the updates and support, as necessary. TASK 8: PREPARE PLANS, SPECIFICATIONS,• • DOCUMENTS & COSM ESTIMATE PEI will prepare two sets of street improvement plans (24" x 36" sheets), construction documents (specifications) and construction cost estimates. The approximate budget of $11 M will be divided into an overlay project and a slurry seal project. Documents will be consistent with the City's format and plan sets PEI has previously provided. PEI will draft specifications and prepare details for typical sections, transitions, keycuts, digouts and any necessary additional pavement work. Any portion of the work that requires clarification will be submitted in the form of drafted plan views, details and elevations or cross sections, as necessary. The plans will include existing signs, lane stripes with dimensions, pavement legends and traffic signal loops affected by and within the proposed pavement maintenance and rehabilitation treatment limits PEI will incorporate any new striping and signage plans provided by the City. We will also incorporate any comments and revisions into the plan set. After the final submittal, PEI staff will be available to answer questions from the City concerning the design. We will prepare addenda as required. In addition, we also will be available to answer questions from contract administration personnel or contractors during the bidding process. We will prepare bid tabulation sheets for each project from bidding information provided by the City. During the construction phase, PEI will be available to the City construction staff to answer contractor's questions during construction regarding design. During the construction phase of the projects, PEI will provide design support services to the City. These services can include (but are not limited to) answering RFI's, reviewing submittals, and preparing change order street improvement plans, traffic control plans, construction specifications, and construction cost estimate consistent with the City's format as well, as preparing traffic signage/striping plans, if required, which include the existing and proposed signs, lane stripes with dimensions, pavement legends and traffic signal loops affected by the overlay and slurry seal projects. PEI understands the City of Santa Clarita is requesting a person familiar with the construction management process who will assist in the pavement projects. This person will work from an office at the City Hall for approximately five days a week, as needed from the City, after the contract is awarded. The employee PEI will select to fill this role will be Sam Ho, P.E. We have chosen Sam because of his familiarity with the City of Santa Clarita. Sam will be the project manager on the design services for City's M0137 Annual Overlay and Slurry Seal Projects and supported in construction management for the M0131 Annual Overlay & Slurry Seal Projects, and the M0128 Overlay & Slurry Seal Projects. He worked closely with the City's Project Manager during the design and construction phases of the projects. PEI also understands the person who will provide construction management support will also work closely with the City's Project Manager and staff to successfully complete the projects and protect the interest of the City. Given the complexity of the projects, Sam's availability will ensure the projects run smoothly from start to finish and are completed on -time and within budget. Tasks to be perform by Sam Ho include, but are not limited to, tracking construction quantities, project budget, preparation of construction documents, respond to construction related questions from the contractor and City staff, answer technical design questions, attend weekly construction status meetings, and be on call to provide support on any project related questions or tasks. ILJ Estimated Project Schedule Based on the recommended time frame for completion as stated in the RFP (Project M0137) and from past experience working with the City of Santa Clarita, PEI anticipates that the entire project will take approximately fourteen (14) weeks to complete, from the `Notice to Proceed.' PEI will schedule the work after receiving a Notice to Proceed and contracts have been executed. We will make every effort to complete tasks on time; however, inclement weather may result in delays. 1 Preliminary Evaluation 2 Street Evaluation 3 Value Engineering 4 Field Measurements 5 Project Street Investigations Utility Company 6 Coordination 7 Bi-weekly Project Meetings 8 PS&Es 9 Bidder Support Services 10 Contractor Support Services 11 Design Support Services 12 On -Site Construction Support During bidding phase During construction phase During construction phase During construction phase 95 1111111111 100