HomeMy WebLinkAbout2020-11-10 - RESOLUTIONS - MC 18-089 BOUQUET PROJ (2)RESOLUTION NO.20-77
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA CLARITA,
CALIFORNIA, APPROVING MASTER CASE 18-089 (ARCHITECTURAL DESIGN
REVIEW 18-010; CONDITIONAL USE PERMIT 18-004; DEVELOPMENT REVIEW 18-009;
HILLSIDE DEVELOPMENT REVIEW (CLASS 4) 18-001; LANDSCAPE PLAN
REVIEW 19-017; OAK TREE PERMIT (CLASS 4) 19-003; RIDGELINE ALTERATION
PERMIT 18-001; AND TENTATIVE TRACT MAP 82126) FOR THE DEVELOPMENT OF
THE BOUQUET CANYON PROJECT IN THE CITY OF SANTA CLARITA
THE CITY COUNCIL OF THE CITY OF SANTA CLARITA, CALIFORNIA, DOES
HEREBY RESOLVE AS FOLLOWS:
SECTION 1. FINDINGS OF FACT. The City Council does hereby make the following
findings of fact:
a. An application for Master Case 18-089, the Bouquet Canyon Project (Project), was filed by
the project applicant, Bouquet Canyon Project Owner, LLC (applicant), with the City of
Santa Clarita (City) on May 1, 2018, and deemed complete on May 31, 2018. The property
for which this application was filed (hereinafter "Project site") is located east of Bouquet
Canyon Road and south of Copper Hill Drive, in the community of Saugus; Assessor's
Parcel Numbers: 2812-008-003, -008, -013, -021, -022, -031, -900, 2812-038-002, and 2812-
022-031. The entitlement requests (collectively, "Entitlements") include:
1. Architectural Design Review 18-010 for the review of the proposed building design,
styles, and forms.
2. Conditional Use Permit 18-004 to allow for the gating of private roadways, multiple -
family (multifamily) development in the Neighborhood Commercial (CN) zone, and
for Cluster Development.
3. Development Review 18-009 for the review of the proposed physical design and
layout of the Project.
4. Hillside Development Review (Class 4) 18 001 to allow for development on property
with an average cross -slope in excess of 10 percent.
5. Landscape Plan Review 19-017 for the review of the proposed landscape plan.
6. Oak Tree Permit (Class 4) 19-003 to allow for the removal of 26 non -heritage sized
oak trees, the major encroachment of one oak tree, and the minor encroachment of
two oak trees.
7. Ridge line Alteration Permit 18-001 to allow for the development within the Ridgeline
Preservation (RP) Overlay Zone.
8. Tentative Tract Map 82126 to subdivide the 74.66-acre Project site into 19 lots. In
addition, the residential lots, within the subdivision, would have the ability to create
condominium units with a maximum of 375 residential units.
b. The Project site is located in the developed community of Saugus along the northern edge of
the City, on the eastside of Bouquet Canyon Road and south of Copper Hill Drive. The total
development footprint, which includes off -site grading, would cover approximately 74.66
acres. The Project site is designated primarily of the Urban Residential 2 (UR2), Urban
Residential 5 (UR5), and Neighborhood Commercial (CN) zones, in addition to areas within
the Open Space (OS) and Public/Institution (PI) zones with identical corresponding zone
district classifications. The UR2 land use designation is intended for neighborhoods or
communities of single-family homes and other residential uses at a maximum density of five
dwelling units per one acre. The UR5 land use designation provides for medium- to high -
density apartment and condominium complexes in areas easily accessible to transportation,
employment, retail, and other urban services. Allowable uses in this designation include
multifamily dwellings at a minimum density of 18 dwelling units per one acre and a
maximum density of 30 dwelling units per one acre. The CN land use designation provides
for small neighborhood commercial districts that serve the short-term needs of residents in
the immediate area. Multifamily dwellings may be permitted in this zone with a Conditional
Use Permit (CUP). The areas on the Project site, that are designated as OS and PI zones,
would be primarily used for the construction of a new segment of Bouquet Canyon Road, to
follow the general alignment identified in the City's General Plan Circulation Element.
c. The Project site consists of undeveloped land, covered by a mixture of natural and altered
landscapes, prominent hills in the western side, and a stream course flowing from east to
west in the northern part of the site. Steep slopes and a prominent ridgeline define the site
topography in the western portion of the Project site, while lower, relatively flat land is found
in the eastern portion of the Project site. The ridgeline area is identified as a Significant
Ridgeline in the General Plan Conservation Element. Bouquet Creek is an ephemeral stream
that flows east to west through the northern edge of the site. It is mapped as a floodplain and
classified as a 100-year flood hazard zone by the Federal Emergency Management Agency
(FEMA). The Project site contains a total of 64 oak trees, none of which is designated as a
"Heritage" oak tree under the City's Oak Tree Preservation Ordinance. The central portion of
the Project site, zoned UR5, is identified in the General Plan Housing Element as a suitable
site.
d. The surrounding land uses include a mixture of residential uses to the north, west, and south,
vacant open space to the south, commercial uses (Canyon Center and Plum Commerce
Center) to the southwest, and the Los Angeles County Probation Department Camp Joseph
Scott to the east. There is a 2.74-acre parcel that is owned by another party and developed
with a single-family residence near the western site boundary, opposite Fan Court, that is not
part of the Project site.
e. The Project includes the development of a residential community consisting of up to 375
attached and detached, two-story, for -sale housing units located within five distinct
neighborhoods (Planning Areas) summarized as follows:
Planning Area 1 (PA-D: Single -Family Detached
PA-1 is located on the western side of the Project site and is divided into two
sections: north and south. The north section consists of nine units with a gated entry
and cul-de-sac that provides access from the existing Bouquet Canyon Road, opposite
Pam Court. The south section consists of 43 units with access from the new segment
of Bouquet Canyon Road. A two-lane street would be located between PA-1,
Planning Area 2 (PA-2), and Planning Area 3 (PA-3), along the new segment of
Page 2of16
Bouquet Canyon Road. Two gated entries would be located at the end of the street
with the west gate granting access to PA-1 and the east gate granting access to PA-2
and PA-3. The homes would be designed as two-story structures, with attached, two -
car garages on lot sizes averaging 2,447 square feet. Three model types are proposed
ranging from three to five bedrooms and three to five baths, with approximately 2,307
to 2,543 square feet of living area.
Planning Area I PA-1A): Single -Family Detached
PA- 1A is located on the southern side of the Project site and directly east of the
Canyon Center commercial center. A gated entry and cul-de-sac are located
immediately north of the northern end of the Canyon Center commercial center to
provide access from the new segment of Bouquet Canyon Road. PA -IA consists of
12 units. The homes would be designed similar to the homes in PA-1.
• Planning Area 2 (PA-2): Single -Family Detached/Eight-Pack Cluster
PA-2 is located in the center of the Project site and would be accessed through a two-
lane street shared between PA-1, PA-2, and PA-3, along the new segment of Bouquet
Canyon Road. Access to PA-2 would be through a gated entry, which is also shared
with PA-3. PA-2 consists of 136 units. The homes would be designed as two-story
structures, generally in clusters of eight units (with varying configurations), with
attached, two -car garages on lot sizes averaging 1,635 square feet. Four model types
are proposed ranging from three to four bedrooms and two to three baths, with
approximately 1,498 to 1,801 square feet of total living area.
• Planning Area 3 (PA-3): Attached Backyard Towns
PA-3 is located on the southern side of the Project site and would be accessed through
the two-lane street shared between PA-1, PA-2, and PA-3, along the new segment of
Bouquet Canyon Road. Access to PA-3 would be through a gated entry, which is also
shared with PA-2. PA-3 consists of 90 units. The homes would be designed as two-
story, townhome structures with attached, two -car garages, in groups of three attached
homes, arranged around a common driveway, and include private backyards. Model
types are proposed ranging from three to four bedrooms and three baths, with
approximately 1,606 to 1,679 square feet of total living area.
Plannine Area 4 (PA-4): Attached Rowtowns with Carriage Units
PA-4 is located on the northern side of the Project site. Two driveways along the
existing Bouquet Canyon Road would provide access to PA-4. Entry gates are not
proposed for PA-4. PA-4 consists of 85 units. The homes would be designed as two-
story, townhome structures, with four to seven attached homes in each "row." Each
home would have its own attached, two -car garage. Four model types are proposed
ranging from 1 to 3 bedrooms and 2.5 baths and approximately 721 to 1,521 square
feet of total living area.
The Project includes amenities such as a recreation center, private and public park areas,
trails, and a public trailhead with a parking lot. It also includes roadway improvements and a
new drainage system. The Project would require alteration of a significant ridgeline for the
construction of a new alignment of Bouquet Canyon Road, in accordance with the City's
Page 3 of 16
Circulation Element objectives. Roadway improvements include the closure of a portion of
Bouquet Canyon Road between Pam Court and Hob Avenue, the closure of a portion of
David Way for the extension of Copper Hill Drive, and removal of the bridge over Bouquet
Creek in order to construct a linear park. The Project includes the construction of a new
drainage channel that runs parallel to Bouquet Creek and the restoration and revegetation of
the existing Bouquet Creek into a low -flow drainage channel. The Project would require
approximately two million cubic yards of earthwork to be balanced across the site. The
Project would require the removal of 26 non -heritage -sized oak trees and the major
encroachment of one oak tree.
f. In accordance with the California Environmental Quality Act (CEQA) Public Resources
Code, §21000 et seq.), the City of Santa Clarita is the lead agency and the City Council is the
decision -making body for the Project. The City's Planning Commission is a recommending
body for the Project.
g. The City determined that an Environmental Impact Report (EIR) must be prepared for the
Project. The City determined that the following areas must be addressed in the EIR for the
Project: aesthetics, air quality, biological resources, cultural resources, energy consumption,
geology and soils, greenhouse gas emissions, hazards and hazardous materials, hydrology
and water quality, noise, public services, transportation/traffic, tribal cultural resources,
utilities and service systems, and wildfire.
h. A Notice of Preparation (NOP) for the Project EIR was circulated to affected agencies,
pursuant to CEQA and the State CEQA Guidelines (Cal. Code Regs., tit. 14, § 15000 et seq.),
for 45 days, beginning on December 4, 2018, and ending on January 18, 2019. Agencies that
received the NOP include, but are not limited to, the County of Los Angeles, Los Angeles
Regional Water Quality Control Board, California Department of Fish and Wildlife, South
Coast Air Quality Management District, law enforcement agencies, school districts, waste
haulers, water agencies, and utility companies serving the Santa Clarita Valley in accordance
with CEQA's consultation requirements. Comments from public agencies, organizations, and
members of the public were received in response to the NOP for the Project.
i. A scoping meeting was held at Santa Clarita City Hall on January 9, 2019, to obtain
information from the public as to issues that should be addressed in the EIR. Notice of the
scoping meeting was published in The Signal newspaper on December 4, 2018. Six people
attended the scoping meeting. The topics of concern that were raised at the meeting included
traffic, noise, dust, air quality, flood and drainage, and a transparent process.
The original Project application, received on May 1, 2018, included a subdivision of 70 lots
and the development of 461 residential units located in five planning areas. The architectural
designs of the units included two- and three-story homes. After receiving input from the
surrounding residents and comments throughout the Development Review Committee (DRC)
review process, the applicant decided to decrease the proposed number of units from 461 to
375 and lower the heights of the homes to two stories.
k. A site tour of the Project site with the Planning Commission was originally scheduled for
April 8, 2020; however, due to COVID-19 measures, the site tour was cancelled. A
Page 4 of 16
memorandum, dated April 29, 2020, was sent to the Planning Commission, which included a
project description, area maps, site maps, and photo simulations for review.
1. The City prepared a Draft EIR for the Bouquet Canyon Project that addressed all issues
raised in comments received on the NOP. The Draft EIR was circulated for review and
comment by affected governmental agencies and the public, in compliance with CEQA.
Specifically, the Notice of Availability/Notice of Completion for the Draft EIR was
advertised on April 4, 2020, filed and posted on April 6, 2020, and the 60-day public review
period ended on June 5, 2020, at 5:00 p.m., in accordance with CEQA regulations. Staff
received written comments throughout the comment period, as well as oral testimony at the
June 2, 2020, July 7, 2020, and August 18, 2020, Planning Commission meetings for the
Project.
m. The Planning Commission public hearings for the Project were duly noticed in accordance
with the noticing requirements for each of the Entitlements. The Project was advertised in
The Signal, through on -site posting prior to the hearing, and by direct first-class mailing to
property owners within 1,000 feet of the Project site. In addition, the date and time of each
public hearing was posted on the two signs posted at the Project site.
n. The Planning Commission held a duly -noticed public meeting on the Project on June 2, 2020.
The Planning Commission meeting, along with the subsequent meetings, were conducted
remotely, consistent with public health orders issued by the State of California and the
County of Los Angeles. These meetings were held at Santa Clarita City Hall, 23920 Valencia
Boulevard, Santa Clarita, at or after 6:00 p.m. The meetings were conducted via Zoom,
livestreamed through the City's website, and broadcast on SCVTV Channel 20.
o. On June 2, 2020, the Planning Commission opened the public hearing for the Project and
received a presentation from staff on the project setting, requested entitlements, and project
description. Staff also made a detailed presentation on the Draft EIR Sections (Aesthetics,
Air Quality, Biological Resources, Cultural Resources, Energy Consumption, Geology and
Soils, Greenhouse Gas Emissions, Hazards and Hazardous Materials, Hydrology and Water
Quality, Noise, Public Services, Transportation/Traffic, Tribal Cultural Resources, Utilities
and Service Systems, Wildfire, and Project Alternatives). In addition, the Planning
Commission received a presentation from the applicant and public testimony regarding the
Project. The Planning Commission provided staff direction to bring the Bouquet Canyon
Project back to the Planning Commission at the July 7, 2020, meeting with the following: 1)
additional information regarding various discussion topics, including traffic, drainage, the
proposed row -house designs, emergency egress, recreational facilities, and bicycle parking,
and 2) a draft resolution and Conditions of Approval for the Planning Commission to
consider. In addition to the applicant, there were three speakers in favor of the Project and
one public speaker who was opposed to the Project. There were seven written comments
opposed to and nine written comments in favor of the Project submitted to the Commission at
the meeting. The Planning Commission closed the public hearing and continued the item to
the July 7, 2020, Planning Commission meeting.
p. On July 7, 2020, the Planning Commission continued the public meeting to the August 18,
2020, meeting to allow for additional time for staff and the applicant to respond to the Project
comments and the comments received during the EIR comment period. One speaker
Page 5 of 16
provided comment on the Project expressing concerns over various technical aspects of the
Project, as well as expressing concerns over the June 2, 2020, meeting being conducted
remotely via Zoom.
q. On August 18, 2020, the Planning Commission continued the public meeting to a date
uncertain, per the request of the applicant, to allow for additional time to finalize Project
details. One speaker provided comment on the Project expressing concerns over riparian
habitat, ridgeline alteration, groundwater recharge, and traffic.
r. On October 6, 2020, the Planning Commission received a presentation from staff on the
follow-up items from the June 2, 2020, July 7, 2020, and August 18, 2020 meetings, along
with the applicant's presentation and public testimony. In addition to the applicant, there
were a total of 13 speakers (6 in favor of the Project, 1 neutral, and 6 who were opposed to
the Project). There was a total of 32 written comments (30 in favor of the Project, 1 neutral,
and 1 who was opposed to the Project). The Planning Commission considered the Draft EIR
(April 2020) and Draft Final EIR (September 2020) prepared for the Project, as well as
information in staff reports, public testimony, and letters submitted to the Planning
Commission prior to recommending approval of the Project.
s. At the conclusion of October 6, 2020, public meeting, the Planning Commission voted 5-0 to
recommend that the City Council certify the Draft Final EIR (Resolution P20-08) and
approve the Project (Resolution P20-09). The Planning Commission also recommended that
the City Council adopt the Mitigation and Monitoring and Reporting Plan (MMRP).
t. Following the October 6, 2020, public meeting, the City prepared the Final EIR (October
2020). The Final EIR contained copies of all comment letters, responses to oral and written
comments received on the Draft EIR, Errata Section, and MMRP. Notice of the Final EIR's
availability was provided on October 30, 2020, to commenting agencies, organizations, and
persons.
u. The City Council held a duly -noticed public hearing on the Project on November 10, 2020.
This hearing was held at City Hall, 23920 Valencia Boulevard, Santa Clarita, at 6:00 p.m.
v. The City Council received public testimony, closed the public hearing, certified the Final
EIR, and adopted all necessary approval documents (e.g., resolutions) for approval of the
Project. The Draft EIR (April 2020), Draft Final EIR (September 2020), and Final EIR
(October 2020) have been prepared and circulated in compliance with CEQA.
w. Based upon the Draft EIR (April 2020), Draft Final EIR (September 2020), and Final EIR
(October 2020), staff and consultant presentations, staff reports, applicant presentations, and
public comments and testimony, the City Council finds that the Project will not adversely
affect the health, peace, comfort, or welfare of persons residing in the area; nor will the
Project be materially detrimental to the use, enjoyment, or valuation of property in the
vicinity of the Project site; nor will the Project jeopardize, endanger or otherwise constitute a
menace to the public health, safety, or general welfare since the Project conforms with the
Zoning Ordinance and is compatible with surrounding land uses.
Page 6of16
x. Additionally, the City Council finds that all public hearings pertaining to the Project were
duly noticed in accordance with noticing requirements for each of the entitlements. The
Project was advertised in The Signal, through on -site posting 14 days prior to each hearing,
and by direct first-class mailing to property owners within 1,000 feet of the Project site.
y. The location of the documents and other materials for the Master Case 18-089 project file
that constitute the record of proceedings upon which the decision of the City Council is based
is found in with the Community Development Department, specifically in the custody of the
Director of Community Development.
SECTION 2. GENERAL FINDINGS FOR MASTER CASE 18-089. Based on the above
findings of fact and recitals and the entire record, including, without limitation, the entire
Bouquet Canyon Project EIR, oral and written testimony, and other evidence received at the
public hearings, reports and other transmittals from City staff to the Planning Commission and
the City Council, and upon studies and investigations made by the Planning Commission and
City Council, the City Council finds as follows:
a. The proposal is consistent with the General Plan;
The Bouquet Canyon Project is consistent with the Goals and Policies of the General Plan of
the City of Santa Clarita. The General Plan designates the Project site as UR2, UR5, and CN
zones, in addition to areas within the OS and PI zones. The UR2 zone is intended for single-
family homes and other residential uses at a maximum density of five dwelling units per one
acre. The UR5 zone provides for medium- to high -density apartment and condominium
complexes. Multifamily dwellings are allowable at a minimum density of 18 dwelling units
per one acre and a maximum density of 30 dwelling units per one acre. The CN zone allows
multifamily dwellings with a CUP. With consideration of the average cross slope calculation,
the Project site may have a maximum of approximately 944 units. However, with the
physical constraints of the site and the necessity of the realignment of Bouquet Canyon Road,
the Project includes a request for a maximum of 375 units located in five planning areas.
The State of California required that the General Plan Housing Element includes an
inventory of land suitable for residential development, including vacant sites and sites having
the potential for redevelopment, and an analysis of the zoning and infrastructure available to
serve these sites. This inventory is used to identify sites that can be feasibly developed for
housing within the planning period in order to meet the Regional Housing Needs Allocation
(RHNA). This section of the Housing Element contains the required inventory of adequate
sites for new housing that can be developed to meet the City's housing needs within the
planning period.
The vacant, approximately 32-acre central portion of the Project site, zoned UR5, is
identified in the General Plan Housing Element as a suitable site, Housing Site 2. A UR5
designation allows 18 to 30 units per acre. In general, this classification, along with the
density bonus allowances, would allow for up to 1,360 units. However, based on the site's
topography, floodway, and other constraints, an estimated 300 units may be reasonably
accommodated on the property. This central portion, in addition to other areas of the Project
site, would accommodate the development of 375 residential units, amenities, and necessary
drainage systems to be consistent with the General Plan, specifically, Mixed Land Uses Goal
Page 7 of 16
LU 2: A mix of land uses to accommodate growth, supported by adequate resources and
maintaining community assets. In addition, the realignment of Bouquet Canyon Road,
extension of Copper Hill Drive, and other roadway improvements is consistent with the
Circulation Element.
b. The proposal is allowed within the applicable underlying zone and complies with all other
applicable provisions of this code;
The Project requires the approval of entitlements consisting of an Architectural Design
Review, Conditional Use Permit, Development Review, Hillside Development Review,
Landscape Plan Review, Oak Tree Permit, Ridgeline Alteration Permit, and Tentative Tract
Map in accordance with the City's Unified Development Code (UDC). With the granting of
these entitlements, the Project, with its mix of units, recreation area, trails, density, and
parking, would be allowed within the applicable underlying zones and compliant with all
other application provisions of the UDC.
c. The proposal will not endanger, jeopardize, or otherwise constitute a hazard to the public
convenience, health, interest, safety, or general welfare, or be materially detrimental or
injurious to the improvements, persons, property, or uses in the vicinity and zone in which
the property is located;
The Project has been evaluated in accordance with the UDC and the General Plan. The
Project has been designed to be in keeping with the provisions of the UDC, as well as the
goals and policies of the General Plan. The Project will not endanger, jeopardize, or
otherwise constitute a hazard to the public convenience, health, interest, safety, or general
welfare, or be materially detrimental or injurious to the improvements, persons, property, or
uses in the vicinity. The Project is designed to be compatible with the surrounding land uses
and is in keeping with the development in the vicinity. The proposal was fully evaluated by
regulatory agencies through the development review process to ensure compliance with all
applicable codes and regulations. The Project was also subject to a public hearing process in
which interested citizens in the vicinity voiced their opinions before the Planning
Commission. Through the application of the Conditions of Approval, the Project will not be
detrimental to the public health, safety, or welfare and will not be materially injurious to the
properties in the vicinity. Furthermore, the Project would complete the Bouquet Canyon
Road, Copper Hill Drive, and other circulation improvements.
d. The proposal is physically suitable for the site. The factors related to the proposal's physical
suitabilityfor the site shall include, but are not limited to, the following:
1. The design, location, shape, size, and operating characteristics are suitable for the
proposed use;
The Project has been designed to be consistent with the UDC, including the required
provisions for hillside development, cluster development, and residential code
requirements. The Project site consists of residential development primarily within the
UR2, UR5, and CN zones, and trailhead, park areas, and road improvements located
within the OS and PI zones. The zones have identical corresponding General Plan
designations. The Project was designed under the constraints of a ridgeline and floodplain
Page 8 of 16
and the necessity of constructing a realignment of Bouquet Canyon Road. The Project
utilized the topography of the Project site to concentrate uses on the flat areas, where
possible, utilized cluster development within five planning areas, and altering a portion of
the ridgeline for the road realignment. The new segments of Bouquet Canyon Road and
Copper Hill Drive are developed within the remaining portions of the site. With the
Conditions of Approval, the Project will be suitable for the site and the uses entitled with
the Project.
2. The highways or streets that provide access to the site are of sufficient width and are
improved as necessary to carry the kind and quantity of traffic such proposal would
generate;
The Project included a detailed traffic analysis to evaluate the improvements required for
the Project. The Project includes the construction of a new segment of Bouquet Canyon
Road and the connection of Copper Hill Drive to the new segment of Bouquet Canyon
Road to follow the general alignment identified in the City's General Plan Circulation
Element. The traffic analysis identified multiple areas of roadway improvement
requirements to mitigate the traffic impacts of the Project. The applicant is required to
construct improvements at the following intersections: David Way and existing segments
of Bouquet Canyon Road, Benz Road and Copper Hill Drive, and the eastern location of
the new segment of Bouquet Canyon Road and the existing segment of Bouquet Canyon
Road. In addition, the applicant is required pay the Project's fair share contribution to a
collective set of improvements around the Project site that would alter and improve
traffic flow within the immediate area of the Project site, which includes Benz Road,
Copper Hill Drive, Kathleen Avenue, David Way, and Bouquet Canyon Road, among
others. The completion of the roadway improvements would ensure the Project will have
the necessary traffic infrastructure to service the site and uses in the vicinity of the
Project site. The Project will have access from the new segment of Bouquet Canyon
Road, the existing Bouquet Canyon Road, and Copper Hill Drive. The Project is
conditioned to require the completion of the new segment of Bouquet Canyon Road,
subject to the infrastructure phasing plan, to be submitted to the satisfaction of the City
Engineer and construction timing as approved by the City Engineer.
3. Public protection services (e.g., Fire protection, Sheriff protection, etc.) are readily
available; and
The Project site is located in an established, urban environment that is serviced by
existing Sheriff and fire protection services. The applicant will pay applicable fees to the
Sheriff and Fire Departments to assist in offsetting any impacts to the services necessary
to properly service the Project. No new or expanded Los Angeles County Sheriff s
Department or Los Angeles County Fire Station facilities would be required to provide
public safety and law enforcement services to the Project site. In addition, a detailed
wildfire access and emergency analysis was completed and found the Project is designed
accordingly to provide safe access.
4. The provision of utilities (e.g., potable water, schools, solid waste collection and
disposal, storm drainage, wastewater collection, treatment, and disposal, etc.) is
adequate to serve the site.
Page 9 of 16
The Project is in a portion of the City that is developed with access to the necessary utilities
to service the Project site. Santa Clarita Valley Water would have sufficient water supplies to
meet the Project's water demand. The payment of mandatory development impact fees to
each affected school district would sufficiently mitigate the Project's impacts. A sewer area
study was conducted for the Project. Los Angeles County Sanitation District would have
sufficient wastewater capacity to convey and treat the flows generated by the fully developed
Project. The stormwater drainage facilities developed on -site are designed to hold a greater
capacity and infiltration than the water quality volume required by the County of Los
Angeles Public Works.
SECTION 3. SPECIFIC FINDINGS FOR TENTATIVE TRACT MAP 82126. Based on the
above findings of fact and recitals and the entire record, including, without limitation, the entire
Bouquet Canyon Project EIR, oral and written testimony and other evidence received at the
public hearings, reports and other transmittals from City staff to the Planning Commission and
City Council, and upon studies and investigations made by the Planning Commission and City
Council, the City Council finds as follows:
a. The design of the subdivision or type of improvements will not conflict with easements,
acquired by the public at large, for access through or use of, property within the proposed
subdivision.
The Project will not obstruct any public access as a result of the proposed subdivision. The
Project includes the construction of a new segment of Bouquet Canyon Road, which includes
the connection and continuation of the City's Class II Bike Lane, to follow the general
alignment identified in the City's General Plan Circulation Element. In addition, an
interconnected public walking trail network is to be constructed within the interior and along
the perimeter of the Pr?ject site to integrate the site with the City's existing trail system. A
trailhead with a public parking lot and park areas within the eastern portion of the Project site
would allow access to the on -site trail network. As part of the Project, three new bus stops
will be constructed for the City to integrate the site with the City's existing transit system.
The onsite roadways necessary for the Project will be installed and accessible for the future
residents, as well as any law enforcement and emergency services. Therefore, the Bouquet
Canyon Project will not obstruct any public access with the subdivision of the site.
SECTION 4. SPECIFIC FINDINGS FOR HILLSIDE DEVELOPMENT REVIEW (CLASS
4 1) 8-001. As documented in the Project and based on the above findings of fact and recitals and
the entire record, including, without limitation, the entire Bouquet Canyon Project EIR, oral and
written testimony and other evidence received at the public hearings, reports, and other
transmittals from City staff to the Planning Commission and City Council, and upon studies and
investigations made by the Planning Commission and City Council, the City Council finds as
follows:
a. That the natural topographic features and appearances are conserved by means of landform
grading to blend any manufactured slopes or required drainage benches into the natural
topography;
b. That natural, topographic prominent features are retained to the maximum extent possible;
Page 10 of 16
The grading plan would involve an estimated cut of 2,069,664 cubic yards and a fill of
2,052,237 cubic yards. The total development footprint, including off -site grading, would
cover approximately 74.66 acres. All earthwork would be balanced on site with the
difference between cut and fill due to shrinkage upon compaction. No import or export of
earth will be required. The Project includes grading within the Ridgeline Preservation (RP)
overlay zone and the alteration of a portion of the ridgeline to build the General Plan -
designated roadway. The Project site contains hillsides in excess of 10 percent average cross -
slope requiring the approval of a Hillside Development Review in accordance with the UDC.
The grading will blend into the neighboring hillsides, utilize appropriate contour grading
techniques to soften the impacts associated with the grading, and will comply with Hillside
Development standards of the UDC.
c. That clustered sites and buildings are utilized where such techniques can be demonstrated to
substantially reduce grading alterations of the terrain and to contribute to the preservation
of trees, other natural vegetation and prominent landmark features and are compatible with
existing neighborhood;
The requested entitlements include a CUP to allow for Cluster Development subject to the
requirements of the UDC. This would allow for a concentration of residential units and
reductions in minimum lot size in order to preserve the ridgeline and Bouquet Creek to the
fullest extent feasible. Over three acres of land is dedicated for the construction of the new
segment of Bouquet Canyon Road and over eight acres of land is dedicated for a drainage
channel and Bouquet Creek restoration area. The Project's density is calculated on a project -
level rather than a parcel -by -parcel basis, and would allow the development of smaller lots
than are customarily permitted in the zones, which would retain or preserve the remaining
areas as permanent open space, as in the case of the ridgeline and creek. The north section of
PA-1 and the entirety of PA-2, PA-3, and PA-4 are all located in relatively flat areas of the
Project site.
d. That building setbacks, building heights and compatible structures and building forms that
would serve to blend buildings and structures with the terrain are utilized;
The Project complies with the applicable setback requirements of the UDC. To ensure
construction of each planning area is compliant with the provisions of the UDC, a Condition
of Approval (attached as Exhibit A) has been incorporated into the Project requiring the
approval of a Development Review application by the Director of Community Development.
e. That plant materials are conserved and introduced so as to protect slopes from slippage and
soil erosion and to minimize visual effects ofgrading and construction on hillside areas,
including the consideration of the preservation of prominent trees and, to the extent possible,
while meeting the standards of the Fire Department;
The Project includes the grading of the Project site to accommodate the development of the
residential uses and roadway improvements. The new slopes will use landform and contour
grading techniques to further blend into the existing slopes on the Project site. Planting of the
graded slopes will be consistent with the City's landscape ordinance which requires standards
relating to the quality, quantity, and functional aspects of landscaping and landscape
screening. In addition, the Project shall be compliant with the requirements of the Los
Page 11 of 16
Angeles County Fuel Modification Unit for development within a Very High Fire Hazard
Severity Zone. Planting will generally consist of the use of native vegetation and plant
material that is compatible with the climate of the Santa Clarita Valley. Furthermore, a
condition has been added to the Project that requires a disclosure of the planting requirements
in the Covenants, Conditions, and Restrictions (CC&Rs). The Project site contains a total of
64 oak trees, varying in size, species, and health. No heritage oak trees were identified on the
Project site. As part of the Project, 15 non -heritage -sized oak trees would be removed and
would either replaced on -site or required to pay an in -lieu fee into the City's Oak Tree Fund
as required by the UDC. The remaining 49 oak trees would be saved. Therefore, planting the
graded slopes will be conducted in a manner consistent with the City's landscape, hillside,
and oak tree ordinances, as well as the requirements of the Los Angeles County Fire
Department.
f. That street design and improvements that serve to minimize grading alterations and emulate
the natural contours and character of the hillsides are utilized;
One of the Project Objectives listed in the Project's EIR states to "minimize grading of a
significant ridgeline, while providing the necessary amount of grading to construct the new
segment of Bouquet Canyon Road in the preferred alignment." In order to facilitate the
construction of the new segment of Bouquet Canyon Road, an alteration of a portion of the
significant ridgeline is required. The City's design criteria for arterial roadways limit both the
steepness and curve radii of the new segment of Bouquet Canyon Road. As a result, there is a
cut depth of over 100 feet required in order to construct the alignment. The combination of
depth of cut, width of the roadway (four lanes plus parkways), and 2:1 slopes adjacent to the
roadway would result in a major alteration to the existing ridgeline. This will allow the slope
to be planted with drought tolerant landscaping and soften views to the public. The east side
of the existing Bouquet Canyon Road (adjacent to the south section of PA-1) and the south
side of the new segment of Bouquet Canyon Road will be integrated into the hillside grading
to take advantage of the natural grades to the extent possible. The clustering of units would
further minimize impacts.
g. That grading designs that serve to avoid disruption to adjacent properties are utilized; and
h. That site design and grading that provide the minimum disruption of view corridors and
scenic vistas from and around any proposed development are utilized.
The Project is not located within any scenic vistas and is not anticipated to have a significant
impact to the visual character of the site. The Project includes development on a ridgeline
identified as a Significant Ridgeline in the City's General Plan Conservation Element. A
portion of the designated ridgeline on the west side of the Project site would be graded in
order to build a General Plan -identified alignment for Bouquet Canyon Road. While grading
would occur on this ridgeline, the Project would still be consistent with Conservation and
Open Space Element Policies because the Project would only alter a portion of the ridgeline
and the ridgeline is not the most substantial ridgeline in the community. Based on the
evaluations of existing conditions, including the fact that the ridgeline on the Project site is
not a character -defining feature of the Saugus community, the Project would not result in a
substantial adverse effect on a scenic vista.
Page 12 of 16
SECTION 5. SPECIFIC FINDINGS FOR RIDGELIKE ALTERATION PERMIT 18-001.
Based on the above findings of fact and recitals and the entire record, including, without
limitation, the entire Bouquet Canyon Project EIR, oral and written testimony and other evidence
received at the public hearings, reports and other transmittals from City staff to the Planning
Commission and City Council, and upon studies and investigations made by the Planning
Commission and City Council, the City Council finds as follows:
a. The use or development will not be materially detrimental to the visual character of the
neighborhood or community, nor will it endanger the public health, safety, or general
welfare;
b. The appearance of the use or development will not be substantially different than the
appearance of adjoining ridgeline areas so as to cause depreciation of the ridgeline
appearance in the vicinity;
The Project would not be materially detrimental to the visual character of the site, as the
residential use would be appropriate in relation to adjacent uses and the development of the
community, as is evidenced by the surrounding residential developments. The proposed
buildings would utilize materials and design elements consistent with the Community
Character and Design Guidelines for the Saugus community. No new homes or other
structures would exceed two stories or 35 feet in height, and the built -environment of all
proposed planning areas would be consistent in scale and massing with surrounding
residential neighborhoods. Furthermore, the Project provides visual buffers to soften the
extent of building massing and maintains views of the site's prominent ridgeline for travelers
along Bouquet Canyon Road. Mitigation measures recommended in the EIR and compliance
with all local codes ensure that the Project would not endanger the public health, safety, or
general welfare.
c. The establishment of the proposed use or development will not impede the normal and
orderly development and improvement of surrounding properties, nor encourage
inappropriate encroachments to the ridgeline area;
Implementation of the Project would not impede the normal and orderly development and
improvement of surrounding property, nor encourage inappropriate future encroachments
into the ridgeline areas. Overall, the Project would not violate the visual integrity of the
ridgeline, as the ridgeline on the Project site is indistinguishable from other hills in the
surrounding area and the Project would not restrict and views of other ridgelines located off
the Project site.
d. The proposed use or development demonstrates creative site design resulting in a project
that will complement the community character and provide a direct benefit to current and
future community residents of not only the proposed use or development, but the residents of
the City as a whole;
One of the Project Objectives listed in the Project's EIR states to "construct site
improvements that achieve a desirable community character which will be compatible with,
and enhance the residential character of, surrounding neighborhoods." The Project was
designed under the constraints of a ridgeline and floodplain and the necessity of constructing
a realignment of Bouquet Canyon Road. The Project utilized the Cluster Development
Page 13 of 16
provisions of the UDC for the concentration of residential units primarily on the flat areas
and the reductions in minimum lot size in order to preserve the ridgeline and Bouquet Creek
to the fullest extent feasible. Through the review process, the proposed number of units of the
Project was reduced from 461 units to 375 units and lowered the heights of the homes from
two- and three-story homes to only two-story homes in all five planning areas, thereby
lowering the potential visual impacts. The General Plan Circulation Element was developed
based on analysis of existing conditions in the Santa Clarita Valley, future development in
both City and County areas, and anticipated growth. Roadway infrastructure improvements
are made as growth occurs in the Santa Clarita Valley and needs are assessed continually by
the City. The Project includes the realignment of Bouquet Canyon Road, as designated in the
Circulation Element as a secondary highway, which is designed to service both through
traffic and to collect traffic from collector and local streets. As conditioned, the Project is
required to build the roadway prior to the occupancy of any units. Furthermore, the Project
includes other features that would provide a direct benefit to current and future community
residents of both the development and City as a whole, including bus stops, public trailhead,
trail network, park areas, and amenities.
e. The use or development minimizes the effects of grading to the extent practicable to ensure
that the natural character of the ridgeline is preserved;
f. The proposed use or development is designed to mimic the existing topography to the
greatest extent possible through the use of landform contour grading; and
One of the Project Objectives listed in the Project's EIR states to "minimize grading of a
significant ridgeline, while providing the necessary amount of grading to construct the new
segment of Bouquet Canyon Road in the preferred alignment." A portion of the designated
ridgeline on the west side of the Project site would be graded in order to build the General
Plan -identified alignment for Bouquet Canyon Road. The northern portion of the ridgeline
would be preserved in its current form, and the middle portion of the ridgeline would be
modified to accommodate for a trail and park area, thereby preserving the northern portion of
the ridgeline. While grading would occur on this ridgeline, the Project would still be
consistent with Conservation and Open Space Element Policies. The Project would conserve
natural topographic features and appearances by means of landform grading, so as to blend
any manufactured slopes or required drainage benches into the natural topography. The east
side of the existing Bouquet Canyon Road and the south side of the new segment of Bouquet
Canyon Road will be integrated into the hillside grading to take advantage of the natural
grades to the extent possible.
g. The proposed use or development does not alter natural landmarks and prominent natural
features of the ridgelines.
By incorporating Cluster Development, this allows for a concentration of residential units
and reductions to development standards in order to preserve the ridgeline and Bouquet
Creek to the fullest extent feasible. There are no public scenic overlooks on or adjacent to,
the Project site; however, the steep terrain on the Project site could make the site part of a
scenic vista when viewed from a distant location. There are other General Plan -designated
significant ridgelines in the immediate vicinity of the Project site, all of which are taller than
the significant ridgeline on the Project site. While grading would occur on this ridgeline, the
Project would still be consistent with Conservation and Open Space Element, because the
Page 14 of 16
Project would only alter a portion of the ridgeline, and because the ridgeline on the Project
site is not the most substantial ridgeline in the community.
SECTION 6. SPECIFIC FINDINGS FOR OAK TREE PERMIT (CLASS 4) 19-003 Based
on the above findings of fact and recitals and the entire record, including, without limitation, the
entire Bouquet Canyon Project EIR, oral and written testimony and other evidence received at
the public hearings, reports, and other transmittals from City staff to the Planning Commission
and City Council, and upon studies and investigations made by the Planning Commission and
City Council, the City Council finds as follows:
a. The approving authority shall make one(]) or more of the following findings before granting
an oak tree permit:
i. The condition or location of the oak trees) requires cutting to maintain or aid its health,
balance, or structure;
ii. The condition of the tree(s) with respect to disease, danger offalling, proximity to
existing lots, pedestrian walkways or interference with utility services cannot be
controlled or remedied through reasonable preservation andlor preventative procedures
and practices;
iii. It is necessary to remove, relocate, prune, cut, or encroach &nto the protected zone of an
oak tree to enable reasonable use of the subject property which is otherwise prevented by
the presence of the tree and no reasonable alternative can be accommodated due to the
unique physical development constraints of the property; or
iv. The approval of the request will not be contrary to or in conflict with the general purpose
and intent of the code.
The Project site contains 64 oak trees that are protected by the City's Oak Tree Preservation
Ordinance. The Project consists of the removal of 15 non -heritage sized oak trees and the
encroachment of four oak trees, thereby saving 49 oak trees. The City would require
replacement oak trees to be planted in the landscaped areas of the Project site to offset the
loss the removed of oak trees. If planting on site is not possible, the applicant may donate the
replacement oak trees to the City or provide the equivalent monetary value of the
replacement trees to the City's Oak Tree Fund. In addition, the Project site contains two Blue
Oaks that are uncommon and rare in the community. Therefore, the Project will include
Conditions of Approval to provide additional justification, which includes grading plan
details, cross -sections, reappraisals, and a transplant study, prior to any proposed removal to
be reviewed and approved by the City. The compliance with the City's Oak Tree
Preservation Ordinance, including the Standards for Performance of Permitted Work of the
Oak Tree Preservation Guidelines, would ensure that the Project would not conflict with any
local policies or ordinances protecting biological resources and impacts.
b. No heritage oak tree shall be removed unless one (1) or more of the above findings are made
and the review authority also finds that the heritage oak tree's continued existence would
prevent any reasonable development of the property and that no reasonable alternative can
be accommodated due to the unique physical constraints of the property. It shall further be
found that the removal of such heritage oak tree will not be unreasonably detrimental to the
community and surrounding area.
No heritage oak trees were identified on the Project site.
Page 15 of 16
SECTION 7. The City Council approves Master Case 18-089; Architectural Design Review
18-010; Conditional Use Permit 18-004, Development Review 18-009, Hillside Development
Review (Class 4) 18-001, Landscape Plan Review 19-017, Oak Tree Permit (Class 4) 19-003,
Ridgeline Alteration Permit 18-001, and Tentative Tract Map 82126 for the development of the
Bouquet Canyon Project, in the City of Santa Clarita, subject to the Conditions of Approval
(Exhibit A).
SECTION 8. The City Clerk shall certify to the adoption of this resolution and certify this record
to be a full, complete, and correct copy of the action taken.
PASSED, APPROVED, AND ADOPTED this 1 Oth day of November, 2020.
ATTEST:
CITY CLERK
DATE
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss
CITY OF SANTA CLARITA )
I, Mary Cusick, City Clerk, of the City of Santa Clarita, do hereby certify that the foregoing
Resolution No. 20-77 was duly adopted by the City Council of the City of Santa Clarita at a
regular meeting thereof, held on the 1 Oth day of November, 2020, by the following vote of the
City Council:
AYES: COUNCILMEMBERS: Weste, Miranda, McLean, Smyth
NOES: COUNCILMEMBERS: None
ABSENT: COUNCILMEMBERS: None
RECUSED: COUNCILMEMBERS: Kellar
CITY CLERK