Loading...
HomeMy WebLinkAbout2021-06-08 - RESOLUTIONS - SB1 PROJ LIST FY 2021 22 (2)RESOLUTION NO.21-27 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA CLARITA, CALIFORNIA, DECLARING THAT IT HAS ADOPTED A LIST OF PROJECTS FOR FISCAL YEAR 2021-22 FUNDED BY SENATE BILL 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017, LOCAL STREETS AND ROADS, ROAD MAINTENANCE AND REHABILITATION FUNDS INTO THE CAPITAL IMPROVEMENT PROGRAM WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April 2017 to address the significant multi -modal transportation funding shortfalls statewide; WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of our City of Santa Clarita (City) are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; WHEREAS, the City must adopt by resolution a list of projects proposed to receive fiscal year funding from the Road Maintenance and: Rehabilitation Account (RMRA), created by SB 1, which must include a description and the location of each proposed project, a proposed schedule for the project's completion, and the estimated useful life of the improvement; WHEREAS, the City will receive an estimated $4,262,756 in RMRA funding in Fiscal Year 2021-22 from SB 1; WHEREAS, this is the fifth year in which the City is receiving SB 1 funding and will enable the City to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB 1; WHEREAS, the City has undergone a robust public process to ensure public input into our community's transportation priorities/the project list; WHEREAS, the City used a Pavement Management System to develop the SB 1 project list to ensure revenues are being used on the most high -priority and cost-effective projects that also meet the community's priorities for transportation investment; WHEREAS, the funding from SB 1 will help the City maintain and rehabilitate numerous streets/roads, bridges, add active transportation infrastructure throughout the City this year and hundreds of similar projects into the future; WHEREAS, the 2018 California Statewide Local Streets and Roads Needs Assessment found that the City's streets and roads are in an "at -risk" condition, and this revenue will provide an increase in the overall quality of the City's road system and over the next decade will raise the 711, City's streets and roads rating to a "good" condition; and Page 1 of 3 WHEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting -edge technology, materials and practices, will have significant positive co -benefits statewide. NOW, THEREFORE, the City Council of the City of Santa Clarita, California, does hereby resolve as follows: SECTION 1. The foregoing recitals are true and correct. SECTION 2. The following list of future projects will be funded in -part or solely with Fiscal Year 2021-22 Road Maintenance and Rehabilitation Account revenues: Project Title: 2021-22 Overlay and Slurry Seal Program Design and Construction; Project Description: Generally, the scope of work to be performed includes, but is not limited to, asphalt resurfacing of various streets Citywide; Project Location: Citywide, specific streets were selected from locations identified through the City's Five -Year Pavement Preservation Program and are identified in the attached Proposed Fiscal Year 2021-22 SB 1 Project List; Estimated Project Schedule: Start (07/21) — Completion (06/23) based on the component being funded with RMRA funds; and 7- Estimated Project Useful Life: Streets selected for preventative maintenance will have a pavement life expectancy of 3-7 years, and streets selected for rehabilitation will have a life expectancy of 10-15 years. . SECTION 3. The following projects may also utilize Fiscal Year 2021-22 Road Maintenance and Rehabilitation Account revenues in their delivery. With the relisting of these projects in the adopted fiscal year resolution, the City is reaffirming to the public and the State our intent to fund these projects with Road Maintenance and Rehabilitation Account revenues: Project Title: 2020-21 Overlay and Slurry Seal Program Design and Construction; Project Description: Generally, the scope of work to be performed includes, but is not limited to, asphalt resurfacing of various streets, Citywide; Project Location: Citywide, specific streets were selected from locations identified through the City's Five -Year Pavement Preservation Program and are identified in the attached Proposed Fiscal Year 2021-22 SB 1 Project List; Estimated Project Schedule: Start (07/21) — Completion (06/22) based on the component being funded with RMRA funds; and Page 2 of 3 Estimated Project Useful Life: Streets selected for preventative maintenance will have a pavement life expectancy of 3-7 years, and streets selected for rehabilitation will have a life expectancy of 10-15 years. SECTION 4. The City Clerk shall certify to the adoption of this resolution. PASSED, APPROVED, AND ADOPTED this Bch day of June 2021. ATTEST: CJ �'\-. u'� h - -� CITY CLERK DATE: STATE OF CALIFORNIA ) COUNTY OF LOS ANGELES ) ss. CITY OF SANTA CLARITA ) I, Mary Cusick, City Clerk of the City of Santa Clarita, do hereby certify that the foregoing Resolution No. 21-27 was duly adopted by the City Council of the City of Santa Clarita at a regular meeting thereof, held on the Bch day of June, 2021, by the following vote: AYES: COUNCILMEMBERS: McLean, Gibbs, Weste, Miranda NOES: COUNCILMEMBERS: None ABSENT: COUNCILMEMBERS: Smyth Page 3 of 3 1 City of Santa Clarita Proposed Fiscal Year 2021-22 SB 1 Project List Project Road Name (locations listed are projected estimates Proposed Useful Useful and.have yet to be Pre- Schedule of Life Life Project Title Project Description finalized) Project Location construction Construction Completion Min Max 2021-22 Overlay The Annual Overlay and Copper Hill Drive Newhall Ranch Jul-21 Jun-22 Nov-22 3 15 and Slurry Seal Slurry Seal Program Road to Smyth Program reflects the City's Drive commitment to roadway infrastructure by resurfacing streets in 2021-22 Overlay The Annual Overlay and Magic Mountain From Railroad Jul-21 Jun-22 Nov-22 3 15 and Slurry Seal Slurry Seal Program Parkway Avenue to Program reflects the City's Tourney Road commitment to roadway infrastructure by resurfacing streets in 2021-22 Overlay The Annual Overlay and Whites Canyon Road From Soledad Jul-21 Jun-22 Nov-22 3 15 and Slurry Seal Slurry Seal Program Canyon Road to Program reflects the City's Heller Circle commitment to roadway infrastructure by resurfacing streets in 2020-21 Overlay The Annual Overlay and Ashfield PI Rosemont Ln to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program North End Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attpn 2020-21 Overlay The Annual Overlay and Ashland Ct Sanford Way to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program West End Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attpntIon, 2020-21Overlay The Annual Overlay and Beaumont St Hillsborough Py to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Bidwell Ln Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attention, 2020-21 overlay The Annual Overlay and Benton Ct Riversbridge to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program North End Program reflects the City's commitment to roadway infrastructure by resurfacing streets in 2020-21 Overlay The Annual Overlay and Berwick PI Littlefield Dr to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program East End Program reflects the City's commitment to roadway infrastructure by resurfacing streets in 2020-21Overlay The Annual Overlay and Bidwell Ln Decoro Dr to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program South End Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attpntion, Page 1 of 6 City of Santa Clarita Proposed Fiscal Year 2021-22 SB 1 Project List Project Road Name (Locations listed are projected estimates Proposed Useful Useful and have yet to be Pre- Schedule of Life Life Project Title Project Description finalized) Project Location construction Construction Completion Min Max 2020-21 Overlay The Annual Overlay and Branbury Ct Chatfield Way to Jun-21 Jul-21 Nov-21 3 SS and Slurry Seal Slurry Seal Program North End Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attention, 2020-21 Overlay The Annual Overlay and Camford PI West End to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Beaumont St Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of atte flon. 2020-21 Overlay The Annual Overlay and Candington Ct North End to _ _ Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Beaumont St Program reflects the City's commitment to roadway Infrastructure by resurfacing streets in need of attentinn 2020-21 Overlay The Annual Overlay and Chatfield Way Rosemont Ln to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program East End Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need nfattPritIon. 2020-21 Overlay The Annual Overlay and Chesterfield Dr North End to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program South End Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attpntwon. 2020-21 Overlay The Annual Overlay and Colebrook PI Hillsborough Py to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program North End Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of atte toon. 2020-21 Overlay The Annual Overlay and Dunsmore Ln Hillsborough.Py to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Sanford Wy Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attention. 2020-21 Overlay The Annual Overlay and Dunsmore Ln Sanford Wy to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program West End Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need nf attention, 2020-21Overlay The Annual Overlay and Ellison Way Beaumont St to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Preston Way Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of ;ittpnt*on, 17 Page 2 of 6 7i City of Santa Clarita Proposed Fiscal Year 2021-22 SB 1 Project List Project Road Name (Locations listed are projected estimates Proposed Useful Useful and have yet to be Pre- Schedule of Life Life Project Title Project Description finalized) Project Location construction Construction Completion 'Min Max 2020-210verlay The Annual Overlay and Ingram Ct West End to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Bidwell Ln Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attention, 2020-21 Overlay The Annual Overlay and Lamberton PI Pelham PI to Jun-21 Jul-21 Nov-21 3 is and Slurry Seal Slurry Seal Program North End Program reflects the City's commitment to roadway infrastructure by resurfacing streets In need of attention, 2020-21 Overlay The Annual Overlay and Lane Ct Littlefield Dr to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program East End Program reflects the City's commitment to roadway infrastructure by resurfacing streets in I need of attpntion- 2020-21 Overlay The Annual Overlay and Littlefield Dr Riversbridge Wy Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program to Lane Ct Program reflects the City's commitment to roadway infrastructure by resurfacing streets in 2020-21 Overlay The Annual Overlay and Littlefield Dr Lane Ct to Jun-21 Jul-21 Nov-21 3 is and Slurry Seal Slurry Seal Program Fairview Dr Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attpn 0 2020-21 Overlay The Annual Overlay and Littleton Way Shelbourne Dr to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Hillsborough Py Program reflects the City's commitment to roadway infrastructure by resurfacing streets in 2020-21 Overlay The Annual Overlay and Meriden PI Waterford Dr to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program East End Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attention. 2020-21 Overlay The Annual Overlay and Millston Ct West End to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Littlefield Dr Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attention 2020-21 Overlay The Annual Overlay and Northfield Ct Waterford Dr to Jun-21 Jul-21 Nov-21 3 is and Slurry Seal Slurry Seal Program East End Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of;;ttpnt*on, Page 3 of 6 City of Santa Clarita Proposed Fiscal Year 2021-22 SB 1_ Project List Project Road Name (Locations listed are projected estimates Proposed Useful Useful and have yet to be Pre- Schedule of Life Life Project Title Project Description finalized) Project Location construction Construction Completion Min Max 2020-21 Overlay The Annual Overlay and Norwood Ct Rosemont Ln to N Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program End Program reflects the City's commitment to roadway infrastructure by resurfacing streets in 2020-21 Overlay The Annual Overlay and Preston Way West End to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Bidwell Ln Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attention. 2020-21 Overlay The Annual Overlay and Riversbridge Wy West End to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Wilton Way Program reflects the City's commitment to roadway infrastructure by resurfacing streets in 2020-21 Overlay The Annual Overlay and Riversbridge Wy Wilton Way to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program North End Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attention. 2020-21Overlay The Annual Overlay and Rosemont Ln South End to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Hillsborough Py Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of atte flon. 2020-21Overlay The Annual Overlay and Roswell Ct Pelham PI to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program North End Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attention, 2020-21 Overlay The Annual Overlay and Sanford Way South End to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program North End Program reflects the City's commitment to roadway infrastructure by resurfacing streets in 2020-21 Overlay The Annual Overlay and Shadwell Ct West End to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Ellison Wy Program reflects the City's commitment to roadway infrastructure by resurfacing streets In need of attentmon. 2020-21 Overlay The Annual Overlay and Shelbourne Dr North End to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program South End Program reflects the City's commitment to roadway Infrastructure by resurfacing streets in need of attention, Page 4 of 6 City of Santa Clarita Proposed Fiscal Year 2021-22 SB 1 Project List Project Road Name (Locations listed are projected estimates Proposed Useful Useful and have yet to be Pre- Schedule of Life Life Project Title Project Description finalized) Project Location construction Construction Completion Min Max 2020-21 Overlay The Annual Overlay and Sherwood PI West End to East Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program End Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attpn ion. 2020-21 Overlay The Annual Overlay and Staten PI South End to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Preston Wy Program reflects the City's commitment to roadway Infrastructure by resurfacing streets in need of attention, 2020-21 Overlay The Annual Overlay and Trinidad Ct West End to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Beaumont St Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attention- 2020-21Overlay The Annual Overlay and Trenton PI North End to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Bidwell Ln Program reflects the City's commitment to roadway Infrastructure by resurfacing streets in 2020-21 Overlay The Annual Overlay and Waterford Dr Fairview Dr to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program North End Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attention 2020-21 Overlay The Annual Overlay and Wilton Way Hillsborough Py to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Riversbridge Wy Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attention, 2020-21 Overlay The Annual Overlay and Woodbury Way Sherwood PI to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Pelham PI Program reflects the City's commitment to roadway infrastructure by resurfacing streets in 2020-21 Overlay The Annual Overlay and Newhall Ranch Road Copper Hill Drive Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program to Dickason Drive Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attention. Page 5 of 6 City of Santa Clarita Proposed Fiscal Year 2021-22 SB 1 Project List Project Road Name (Locations listed are projected estimates Proposed Useful Useful and have yet to be Pre- Schedule of Life Life Project Title Project Description finalized) Project Location construction Construction Completion Min Max RELISTED 2020-21Overlay The Annual Overlay and McBean Parkway 1-5 Freeway to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Alegro Drive Program reflects the City's commitment to roadway infrastructure by resurfacing streets in 2020-21 Overlay The Annual Overlay and Soledad Canyon Road Valley Center Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Drive to Langside Program reflects the City's Avenue commitment to roadway infrastructure by resurfacing streets in need of attention. Page 6 of 6