HomeMy WebLinkAbout2021-06-08 - RESOLUTIONS - SB1 PROJ LIST FY 2021 22 (2)RESOLUTION NO.21-27
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA CLARITA,
CALIFORNIA, DECLARING THAT IT HAS ADOPTED A LIST OF PROJECTS FOR
FISCAL YEAR 2021-22 FUNDED BY SENATE BILL 1: THE ROAD REPAIR AND
ACCOUNTABILITY ACT OF 2017, LOCAL STREETS AND ROADS, ROAD
MAINTENANCE AND REHABILITATION FUNDS INTO THE CAPITAL IMPROVEMENT
PROGRAM
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017
(Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor
in April 2017 to address the significant multi -modal transportation funding shortfalls statewide;
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure
the residents of our City of Santa Clarita (City) are aware of the projects proposed for funding in
our community and which projects have been completed each fiscal year;
WHEREAS, the City must adopt by resolution a list of projects proposed to receive fiscal
year funding from the Road Maintenance and: Rehabilitation Account (RMRA), created by SB 1,
which must include a description and the location of each proposed project, a proposed schedule
for the project's completion, and the estimated useful life of the improvement;
WHEREAS, the City will receive an estimated $4,262,756 in RMRA funding in Fiscal
Year 2021-22 from SB 1;
WHEREAS, this is the fifth year in which the City is receiving SB 1 funding and will
enable the City to continue essential road maintenance and rehabilitation projects, safety
improvements, repairing and replacing aging bridges, and increasing access and mobility options
for the traveling public that would not have otherwise been possible without SB 1;
WHEREAS, the City has undergone a robust public process to ensure public input into
our community's transportation priorities/the project list;
WHEREAS, the City used a Pavement Management System to develop the SB 1 project
list to ensure revenues are being used on the most high -priority and cost-effective projects that
also meet the community's priorities for transportation investment;
WHEREAS, the funding from SB 1 will help the City maintain and rehabilitate numerous
streets/roads, bridges, add active transportation infrastructure throughout the City this year and
hundreds of similar projects into the future;
WHEREAS, the 2018 California Statewide Local Streets and Roads Needs Assessment
found that the City's streets and roads are in an "at -risk" condition, and this revenue will provide
an increase in the overall quality of the City's road system and over the next decade will raise the
711,
City's streets and roads rating to a "good" condition; and
Page 1 of 3
WHEREAS, the SB 1 project list and overall investment in our local streets and roads
infrastructure with a focus on basic maintenance and safety, investing in complete streets
infrastructure, and using cutting -edge technology, materials and practices, will have significant
positive co -benefits statewide.
NOW, THEREFORE, the City Council of the City of Santa Clarita, California, does
hereby resolve as follows:
SECTION 1. The foregoing recitals are true and correct.
SECTION 2. The following list of future projects will be funded in -part or solely with
Fiscal Year 2021-22 Road Maintenance and Rehabilitation Account revenues:
Project Title: 2021-22 Overlay and Slurry Seal Program Design and Construction;
Project Description: Generally, the scope of work to be performed includes, but is not limited to,
asphalt resurfacing of various streets Citywide;
Project Location: Citywide, specific streets were selected from locations identified through the
City's Five -Year Pavement Preservation Program and are identified in the attached Proposed
Fiscal Year 2021-22 SB 1 Project List;
Estimated Project Schedule: Start (07/21) — Completion (06/23) based on the component being
funded with RMRA funds; and
7-
Estimated Project Useful Life: Streets selected for preventative maintenance will have a
pavement life expectancy of 3-7 years, and streets selected for rehabilitation will have a life
expectancy of 10-15 years.
. SECTION 3. The following projects may also utilize Fiscal Year 2021-22 Road
Maintenance and Rehabilitation Account revenues in their delivery. With the relisting of these
projects in the adopted fiscal year resolution, the City is reaffirming to the public and the State
our intent to fund these projects with Road Maintenance and Rehabilitation Account revenues:
Project Title: 2020-21 Overlay and Slurry Seal Program Design and Construction;
Project Description: Generally, the scope of work to be performed includes, but is not limited to,
asphalt resurfacing of various streets, Citywide;
Project Location: Citywide, specific streets were selected from locations identified through the
City's Five -Year Pavement Preservation Program and are identified in the attached Proposed
Fiscal Year 2021-22 SB 1 Project List;
Estimated Project Schedule: Start (07/21) — Completion (06/22) based on the component being
funded with RMRA funds; and
Page 2 of 3
Estimated Project Useful Life: Streets selected for preventative maintenance will have a
pavement life expectancy of 3-7 years, and streets selected for rehabilitation will have a life
expectancy of 10-15 years.
SECTION 4. The City Clerk shall certify to the adoption of this resolution.
PASSED, APPROVED, AND ADOPTED this Bch day of June 2021.
ATTEST:
CJ �'\-. u'�
h - -�
CITY CLERK
DATE:
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss.
CITY OF SANTA CLARITA )
I, Mary Cusick, City Clerk of the City of Santa Clarita, do hereby certify that the
foregoing Resolution No. 21-27 was duly adopted by the City Council of the City of Santa
Clarita at a regular meeting thereof, held on the Bch day of June, 2021, by the following vote:
AYES: COUNCILMEMBERS: McLean, Gibbs, Weste, Miranda
NOES: COUNCILMEMBERS: None
ABSENT: COUNCILMEMBERS: Smyth
Page 3 of 3 1
City of Santa Clarita
Proposed Fiscal Year 2021-22 SB 1 Project List
Project Road Name
(locations listed are
projected estimates
Proposed
Useful
Useful
and.have yet to be
Pre-
Schedule of
Life
Life
Project Title
Project Description
finalized)
Project Location
construction
Construction
Completion
Min
Max
2021-22 Overlay
The Annual Overlay and
Copper Hill Drive
Newhall Ranch
Jul-21
Jun-22
Nov-22
3
15
and Slurry Seal
Slurry Seal Program
Road to Smyth
Program
reflects the City's
Drive
commitment to
roadway infrastructure
by resurfacing streets in
2021-22 Overlay
The Annual Overlay and
Magic Mountain
From Railroad
Jul-21
Jun-22
Nov-22
3
15
and Slurry Seal
Slurry Seal Program
Parkway
Avenue to
Program
reflects the City's
Tourney Road
commitment to
roadway infrastructure
by resurfacing streets in
2021-22 Overlay
The Annual Overlay and
Whites Canyon Road
From Soledad
Jul-21
Jun-22
Nov-22
3
15
and Slurry Seal
Slurry Seal Program
Canyon Road to
Program
reflects the City's
Heller Circle
commitment to
roadway infrastructure
by resurfacing streets in
2020-21 Overlay
The Annual Overlay and
Ashfield PI
Rosemont Ln to
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
North End
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of attpn
2020-21 Overlay
The Annual Overlay and
Ashland Ct
Sanford Way to
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
West End
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of attpntIon,
2020-21Overlay
The Annual Overlay and
Beaumont St
Hillsborough Py to
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
Bidwell Ln
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of attention,
2020-21 overlay
The Annual Overlay and
Benton Ct
Riversbridge to
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
North End
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
2020-21 Overlay
The Annual Overlay and
Berwick PI
Littlefield Dr to
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
East End
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
2020-21Overlay
The Annual Overlay and
Bidwell Ln
Decoro Dr to
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
South End
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of attpntion,
Page 1 of 6
City of Santa Clarita
Proposed Fiscal Year 2021-22 SB
1 Project List
Project Road Name
(Locations listed are
projected estimates
Proposed
Useful
Useful
and have yet to be
Pre-
Schedule of
Life
Life
Project Title
Project Description
finalized)
Project Location
construction
Construction
Completion
Min
Max
2020-21 Overlay
The Annual Overlay and
Branbury Ct
Chatfield Way to
Jun-21
Jul-21
Nov-21
3
SS
and Slurry Seal
Slurry Seal Program
North End
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of attention,
2020-21 Overlay
The Annual Overlay and
Camford PI
West End to
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
Beaumont St
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of atte flon.
2020-21 Overlay
The Annual Overlay and
Candington Ct
North End to _
_ Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
Beaumont St
Program
reflects the City's
commitment to
roadway Infrastructure
by resurfacing streets in
need of attentinn
2020-21 Overlay
The Annual Overlay and
Chatfield Way
Rosemont Ln to
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
East End
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need nfattPritIon.
2020-21 Overlay
The Annual Overlay and
Chesterfield Dr
North End to
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
South End
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of attpntwon.
2020-21 Overlay
The Annual Overlay and
Colebrook PI
Hillsborough Py to
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
North End
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of atte toon.
2020-21 Overlay
The Annual Overlay and
Dunsmore Ln
Hillsborough.Py to
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
Sanford Wy
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of attention.
2020-21 Overlay
The Annual Overlay and
Dunsmore Ln
Sanford Wy to
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
West End
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need nf attention,
2020-21Overlay
The Annual Overlay and
Ellison Way
Beaumont St to
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
Preston Way
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of ;ittpnt*on,
17
Page 2 of 6
7i
City of Santa Clarita
Proposed Fiscal Year 2021-22 SB
1 Project List
Project Road Name
(Locations listed are
projected estimates
Proposed
Useful
Useful
and have yet to be
Pre-
Schedule of
Life
Life
Project Title
Project Description
finalized)
Project Location
construction
Construction
Completion
'Min
Max
2020-210verlay
The Annual Overlay and
Ingram Ct
West End to
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
Bidwell Ln
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of attention,
2020-21 Overlay
The Annual Overlay and
Lamberton PI
Pelham PI to
Jun-21
Jul-21
Nov-21
3
is
and Slurry Seal
Slurry Seal Program
North End
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets In
need of attention,
2020-21 Overlay
The Annual Overlay and
Lane Ct
Littlefield Dr to
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
East End
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
I need of attpntion-
2020-21 Overlay
The Annual Overlay and
Littlefield Dr
Riversbridge Wy
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
to Lane Ct
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
2020-21 Overlay
The Annual Overlay and
Littlefield Dr
Lane Ct to
Jun-21
Jul-21
Nov-21
3
is
and Slurry Seal
Slurry Seal Program
Fairview Dr
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of attpn 0
2020-21 Overlay
The Annual Overlay and
Littleton Way
Shelbourne Dr to
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
Hillsborough Py
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
2020-21 Overlay
The Annual Overlay and
Meriden PI
Waterford Dr to
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
East End
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of attention.
2020-21 Overlay
The Annual Overlay and
Millston Ct
West End to
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
Littlefield Dr
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of attention
2020-21 Overlay
The Annual Overlay and
Northfield Ct
Waterford Dr to
Jun-21
Jul-21
Nov-21
3
is
and Slurry Seal
Slurry Seal Program
East End
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of;;ttpnt*on,
Page 3 of 6
City of Santa Clarita
Proposed Fiscal Year 2021-22 SB
1_ Project List
Project Road Name
(Locations listed are
projected estimates
Proposed
Useful
Useful
and have yet to be
Pre-
Schedule of
Life
Life
Project Title
Project Description
finalized)
Project Location
construction
Construction
Completion
Min
Max
2020-21 Overlay
The Annual Overlay and
Norwood Ct
Rosemont Ln to N
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
End
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
2020-21 Overlay
The Annual Overlay and
Preston Way
West End to
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
Bidwell Ln
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of attention.
2020-21 Overlay
The Annual Overlay and
Riversbridge Wy
West End to
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
Wilton Way
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
2020-21 Overlay
The Annual Overlay and
Riversbridge Wy
Wilton Way to
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
North End
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of attention.
2020-21Overlay
The Annual Overlay and
Rosemont Ln
South End to
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
Hillsborough Py
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of atte flon.
2020-21Overlay
The Annual Overlay and
Roswell Ct
Pelham PI to
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
North End
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of attention,
2020-21 Overlay
The Annual Overlay and
Sanford Way
South End to
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
North End
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
2020-21 Overlay
The Annual Overlay and
Shadwell Ct
West End to
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
Ellison Wy
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets In
need of attentmon.
2020-21 Overlay
The Annual Overlay and
Shelbourne Dr
North End to
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
South End
Program
reflects the City's
commitment to
roadway Infrastructure
by resurfacing streets in
need of attention,
Page 4 of 6
City of Santa Clarita
Proposed Fiscal Year 2021-22 SB
1 Project List
Project Road Name
(Locations listed are
projected estimates
Proposed
Useful
Useful
and have yet to be
Pre-
Schedule of
Life
Life
Project Title
Project Description
finalized)
Project Location
construction
Construction
Completion
Min
Max
2020-21 Overlay
The Annual Overlay and
Sherwood PI
West End to East
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
End
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of attpn ion.
2020-21 Overlay
The Annual Overlay and
Staten PI
South End to
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
Preston Wy
Program
reflects the City's
commitment to
roadway Infrastructure
by resurfacing streets in
need of attention,
2020-21 Overlay
The Annual Overlay and
Trinidad Ct
West End to
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
Beaumont St
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of attention-
2020-21Overlay
The Annual Overlay and
Trenton PI
North End to
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
Bidwell Ln
Program
reflects the City's
commitment to
roadway Infrastructure
by resurfacing streets in
2020-21 Overlay
The Annual Overlay and
Waterford Dr
Fairview Dr to
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
North End
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of attention
2020-21 Overlay
The Annual Overlay and
Wilton Way
Hillsborough Py to
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
Riversbridge Wy
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of attention,
2020-21 Overlay
The Annual Overlay and
Woodbury Way
Sherwood PI to
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
Pelham PI
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
2020-21 Overlay
The Annual Overlay and
Newhall Ranch Road
Copper Hill Drive
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
to Dickason Drive
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of attention.
Page 5 of 6
City of Santa Clarita
Proposed Fiscal Year 2021-22 SB
1 Project List
Project Road Name
(Locations listed are
projected estimates
Proposed
Useful
Useful
and have yet to be
Pre-
Schedule of
Life
Life
Project Title
Project Description
finalized)
Project Location
construction
Construction
Completion
Min
Max
RELISTED
2020-21Overlay
The Annual Overlay and
McBean Parkway
1-5 Freeway to
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
Alegro Drive
Program
reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
2020-21 Overlay
The Annual Overlay and
Soledad Canyon Road
Valley Center
Jun-21
Jul-21
Nov-21
3
15
and Slurry Seal
Slurry Seal Program
Drive to Langside
Program
reflects the City's
Avenue
commitment to
roadway infrastructure
by resurfacing streets in
need of attention.
Page 6 of 6