Loading...
HomeMy WebLinkAbout2021-05-25 - AGENDA REPORTS - C4 PROJ F3020 CONST CONTR (2)O Agenda Item: 6 P CITY OF SANTA CLARITA AGENDA REPORT CONSENT CALENDAR CITY MANAGER APPROVAL:1 DATE: May 25, 2021 SUBJECT: CANYON COUNTRY COMMUNITY CENTER - PHASE 11, PROJECT F3020 - APPROVE CONSTRUCTION SUPPORT CONTRACT AMENDMENTS DEPARTMENT: Public Works PRESENTER: Damon Letz RECOMMENDED ACTION City Council: Extend the current contract and authorize an increased expenditure authority for architectural design and construction support services for Canyon Country Community Center - Phase II, Project F3020, with Gonzalez Goodale Architects in the amount of $110,565 and authorize a contingency in the amount of $11,056, for a total additional contract amount of $121,621. 2. Extend the current contract and authorize an increased expenditure authority for civil engineering, surveying services, and construction support for Canyon Country Community Center - Phase II, Project F3020, with Michael Baker International in the amount of $76,401and authorize a contingency in the amount of $7,640, for a total additional contract amount of $84,041. 3. Extend the current contract and authorize an increased expenditure authority for construction management services for Canyon Country Community Center - Phase II, Project F3020, with Griffin Structures Inc. in the amount of $93,000 and authorize a contingency in the amount of $9,300, for a total additional contract amount of $102,300. 4. Extend the current contract and authorize an increased expenditure authority for LEED Building Envelope Commissioning services for Canyon Country Community Center - Phase II, Project F3020, with P2S Cx in the amount of $11,000 and authorize a contingency in the amount of $1,100, for a total additional contract amount of $12,100. 5. Authorize the City Manager or designee to execute all documents, subject to City Attorney approval. Page 1 Packet Pg. 44 O BACKGROUND On June 28, 2016, following a public engagement process, the City Council approved the Conceptual Master Plan for the Canyon Country Community Center (C4) project. The plan includes the construction of a 25,000-square-foot community center, plaza and courtyards, parking, walkways, landscaping, and street improvements. The plan also includes improvements to the Mint Canyon Channel and storm drains. The total improved area of the project, including channel improvements, is approximately nine acres. This project supports the Building and Creating Community theme of the City of Santa Clarita's (City) five-year strategic plan, Santa Clarita 2025. The City Council awarded architectural design and civil engineering contracts for the project in August and December 2016, respectively. In addition, a Mitigated Negative Declaration was approved and certified at the July 11, 2017, City Council meeting, satisfying the California Environmental Quality Act. The C4 project is divided into three phases: Phase I is complete and included rough grading of the site, improvements to the Mint Canyon Channel and storm drains, and a stormwater infiltration system. Phase II is currently under construction and includes the community center building, parking lots, walkways, courtyards and plazas, play area, outdoor basketball court, landscaping, and the Gateway Plaza at the corner of Sierra Highway and Soledad Canyon Road. • Phase III is complete and included off -site street improvements on Soledad Canyon Road, Sierra Highway, Dolan Way, and Solamint Road. The C4-Phase II project has incurred several design changes during construction, which will result in an improved overall project. These changes include items such as the installation of ultraviolet (UV) lights in the HVAC system to improve air quality to the building and the addition of two flag poles to provide a total of three poles to display the National, State, and City flags. Additionally, upsized trees have been added to screen the high wall on the northern portion of the site, and lights have been added to the open turf area to allow for informal nighttime recreational play. Contracts for several project support firms need to be amended to account for the added design and construction observation services to complete the project. Funding for these recommended support contract increases is available in the current project budget previously appropriated by the City Council. There is no increase in the project budget with these items. Architectural Construction Design and Suport Services The City Council amended the architectural and landscape design services contract for a total amount not to exceed $1,524,132 to Gonzalez Goodale Architects (GGA) at its December 10, 2019, meeting. GGA was selected through a Request For Proposal (RFP) process and is the architect of record for the C4 project. Page 2 Packet Pg. 45 O Design changes requested of GGA include revising the location and number of flag poles, which includes electrical modification and landscape adjustments, modifications to the monument sign, adding UVC lights to the HVAC system, and designing the open turf lighting system. To accommodate design changes and provide appropriate construction support throughout the C4-Phase II construction period, it is recommended that the existing contract amount with GGA be increased by $110,565, including a $11,056 contingency, for a total contract increase amount of $121,621. This increase will address design changes and allow GGA to provide construction support through the end of the project. Civil Engineering and Surveying Services The City Council amended the civil design and environmental document services contract for a total amount not to exceed $919,171 to Michael Baker International (MBI) at its July 14, 2020, meeting. MBI was selected through an RFP process and has been the civil engineering firm utilized during the design and construction of the C4-Phase II project. Throughout the construction of the project, several civil engineering design modifications were necessary to complete the project. These include new light pole footings for the open turf area lights, modifying a retaining wall fence near the Mint Canyon Channel, designing a retaining wall on the east property line, modifications to the playground drainage system and reducing the size of the light pole footings near the Mercado parking lot. To allow for added design, survey services, and construction support, it is recommended that the City Council increase the current MBI contract by $76,401 including a $7,640 contingency, for a total contract increase amount of $84,041. This contract increase will allow the civil engineering consultant to remain with the project to provide necessary design, construction support, and surveying services through the end of the project. Construction Management Services The City Council awarded a construction management services contract to Griffin Structures Inc. (Griffin) in the amount of $1,575,200 at its December 11, 2018, meeting. Griffin has provided plan constructability review and construction management services for each of the three phases of the project. The construction schedule for the project has been extended as a result of material procurement and manufacturing delays associated with the pandemic. Staff recommends adding approximately two months to the contract term for construction management services. To maintain project management continuity and to provide on -site quality control inspection through the end of the project, it is recommended that the City Council increase the current contract by $93,000, including a contingency amount of $9,300, for a total contract increase of $102,300. This contract amendment will allow continuous construction management through the end of the project. Page 3 Packet Pg. 46 O LEED Building Commissioning In January 2020, the City entered into a contract with P2S Cx for building envelop commissioning services in the amount of $46,500 to provide submittal review and construction observation reporting to ensure the new community center building meets the Silver Certification level required of the project specifications. To continue P2S Cx services through the end of the project, it is recommended that the City Council increase the current contract amount by $11,000, including a contingency amount of $1,100 for a total contract increase of $12,100. ALTERNATIVE ACTION Other action as determined by the City Council. FISCAL IMPACT Adequate funds are available in expenditure accounts F3020305-5161.001 (Quimby Fund) and F3020723-5161.001 (Facilities Fund) to support the recommended actions. ATTACHMENTS Location Map Additional Services Proposal for GGA (available in the City Clerk's Reading File) Additional Services Proposal for Michael Baker International (available in the City Clerk's Reading File) Additional Services Proposal for Griffin Structures Inc. (available in the City Clerk's Reading File) Additional Services Proposal for P2S Cx (available in the City Clerk's Reading File) Page 4 Packet Pg. 47 \ . \/ �\ � .. � \/\\ \� \� � � � � � \� % { : S� � /\\ \ � � � 1 \` % \.\ »\� »«i \ : \ \ d \� \ \ \�a� � §� /{ :w,� . 04/28/2021 Wayne Weber Parks Planning Manager City of Santa Clarita via email wweber@santa-clarita.com Subject: A/E Added Scope (Revised) Dear Wayne: This fee proposal includes two added services which totals $110, 565 - Part A and Part B 135 W. Green Street Suite 200 Pasadena, CA 91105 626-568-1428 ggarch.com Additional scopes that had already been performed by the A/E team as of today during the construction phase. Please review scope descriptions for each discipline below: Landscape items: Total Fee $7,064. 1. Flagpole Revisions (Bulletin 12 Delta 17, issue date 10/12/20) 2. Entry Signage Revision (Bulletinl3 Delta 18, issue datel0/22/20) 3. Path Width Increase at Lawn and Restroom Building (RF1303, response date 12/8/20) 4. Coordination/Revisions for County Maintenance Road (as -built differsfrom design, emailsll/4-5/20) 5. Turf Lightings added scope. Architectural items: Total Fee - $23,041. 1. Add Pickleball court. Incorporate painted lines per Bulletin 6 2. Flagpole Study and Revisions per Bulletin 9 and 12 3. Monument Signage Multiple Revisions and finally Issue per Bulletin 13 4. Dedication plaque per Bulletin 13 5. Gym benches - Research product and provide details per RFI 218 6. Wood Benches outside Dance Studio - Research product and provide mfr. details per RFI 269 7. Coordinate and compile all the bulletins (22 bulletins as of today) that had been issued to the contractor 8. Management - Coordination, Meetings, and Quality Control Structural items: Total Fee - $4,812. 1. Evaluate modified hold-down conditions for 12 locations, missing or conflict hold-downs per RFI 213A. Redo calculations for shear walls affected by framing conflicts. Reevaluate shear wall capacities and screw pattern due to shear reduced wall length caused by conflicts. Update drawings and hold-down details. 2. Preparation of calculations and details for new trellis foundations due to utility conflict. GGA III Architecture+ Mechanical items: Total Fee - $1 ,274. 1. Evaluated and coordinated the impacts of changing from low-NOx to Ultra-low-NOx Rooftop units (dimensionally and performance -wise). Ultra-low-NOx units were ultimately not provided due to AQMD extension. 2. Evaluated the implementation of UV-C at the Rooftop units. Advised on design impacts, potential efficacity, and coordinated schedule impacts with Carrier. Electrical items: Total Fee - $12,364. 1. Flagpole location updated to North - Flag lighting provided. Drawings modification added under Bulletin 9 2. Office furniture plans updated - Electrical layout updated. Drawings modification added under Bulletin 11 3. Flagpole location updated, more flag poles added - Flag lighting provided. Drawings modification added under Bulletin 12 4. Signage lighting updated from single point connection to standard lighting. Lighting design provided. - Drawings modification added under Bulletin 13 5. Turf Lighting design - Bulletin 16 o Photometrics and coordination. o Turf lighting cost estimate. o Controls, power, electrical updates, bulletin issuance. o Turf lighting controls submittal. o Turf lighting BIM/backgrounds 6. Security Lighting SUMMARY FEE LANDSCAPE SWA $ 7,064 ARCHITECTURAL GGA $23,041 STRUCTURAL BRANDOW & JOHNSTON $ 4,812 MECHANICAL P2S $ 1,274 ELECTRICAL P2S $12,364 TOTAL FEE $48,555 Page 2 I Letter GGA Architecture+ PART 8 The additional services include site visits for construction observation and assistance in reviewing remaining submittals, requests for clarification, project close out and attendance at additional meetings to assist the City in completion of the project. This proposal is for construction services extended from August through the end of October 2021. The additional services are based on the original contractual hourly rates, will be invoiced hourly, and are not to exceed:. Rate Hours/week 13 weeks fee GGA Additional Meetings, Site Visits • Project Manager $ 180.00 14 182 hours $ 32,760 • Project Captain $ 150.00 15 195 hours $ 29,250 TOTAL PROPOSED ADDED SERVICES $ 62,010 The above total fee from Part A $48,555 and Part B $62,010 is $110,565. We look forward to receiving the approval of this proposal and to continuing to work with the City and the Construction Manager in completing this project. Thank you. Sincerely, Harry 7Drake, AIA Principal hrdrake@ggarch.com Page 3 I Letter GGA Architecture+ I N T E R N AT 1 0 N A L April 29, 2021 Mr. Wayne Weber CITY OF SANTA CLARITA Parks Planning Manager 23920 Valencia Boulevard, Suite 140 Santa Clarita, CA 91355 Via e-mail WWEBER@santa-clarita.com We Make a Difference Subject: Canyon Country Community Center — Additional work for phases 2 and 3. Dear Mr. Weber: JN 167409 Enclosed herewith is the Additional Work Request No. 10, Revision 1 (AWR No. 10, Rev 1) for additional services required for the subject project. This proposal includes additional work required per construction changes and it was not included in the scope of work per the current contracts on file. If the proceeding meets with your approval, please sign and return to our office for processing. If you have any questions or require any additional information, please do not hesitate to call me at (951) 506-2073. Respectfully Submitted, Miguel V. Gonzalez Project Manager John Tanner Office Manager 40810 County Center Drive, Suite 200 1 Temecula, CA 92591 MBAKERINTL.COM Office: 951-676-804z 1 Fax:951-676-7z40 BakerJN: 167409 Request No.: AWR10, Rev 1 Date: April 29, 2021 ADDITIONAL WORK REQUEST SUMMARY Client: City of Santa Clarita Work Requested By: Wayne Weber Project Name: Canyon Country Community Center (C4) — Additional Work for Phase 2 and 3 TASK 1.0: I ADDITIONAL DESING WORK FOR PHASE 2 Michael Baker shall provide the following additional work requested for Phase 2: 1. Design of slender foundation for Mercado parking lights (Bulletin 9) 2. Relocate Mercado Parking Lot and walkway lights and coordinate impact with installed utilities (Bulletin 14). 3. Coordinate and provide additional details for sewer connection on Sierra Highway. 4. Foundation design for lights in the turf area (Bulletin 16). 5. Revision for drainage of playground area (Bulletin 20). 6. Design of actional drains under trellis 3 and lawn area north of it (Bulletin 10) TASK 2.0: 1 ADDITIONAL CONSTRUCTION SUPPORT FOR PHASE 2 Michael Baker shall provide additional construction support as required for civil improvements associated with Phase 2 this project. Consultant shall visit the jobsite if required to observe progress and compliance with approved construction document. Consultant shall also provide recommendations regarding any request for information (RFI), civil plans construction issues or change order request submitted by the contractor for civil improvements. Consultant shall review and make recommendation for approval or denial of: • Contractor Submittals • Request for Information (RFIs) • Verification of Quantities and payment requests submitted by the construction contractor for civil improvements. Scope includes 80 hours budgeted time as follows: Meetings and Conference calls 20 hours RFI Reviews 20 hours Submittal Reviews 10 hours Site Visits 10 hours Consulting as required 20 hours MBAKERINTL.COM 40810 County Center Drive, Suite 200 1 Temecula, CA 92591 Office: 951-676-80421 Fax: 951-676-7240 Additional construction support services will be performed, if required, on an hourly basis for an additional fee. TASK 3.0: ADDITIONAL DESIGN FOR PHASE 3 Michael Baker shall provide the following additional work requested for Phase 3: 1. Prepare detail for sidewalk widening and fence on top of culvert on Solemint Road (Bulletin 2) 2. Revise plans for additional chain link fence on Flood Control property (Bulletin 2). 3. Design wall next to planter and provide details to retrofit tubular steel fence (Bulletin 2). TASK 4.0: RECORD DRAWINGS / AS -BUILT PLANS Consultant shall prepare As -Built Plans for all civil plans for this project. The As -Built effort consists of visual inspection and verification of all surface improvements for the project, for consistency with the approved plans. In addition, Consultant will use RFI's, contractor's mark-up plans and field notes for this task. Contractor for this project is responsible of providing mark-up plans to consultant. A total of 60 hours has been budgeted for this task. MBAKERINTL.COM 40810 County Center Drive, Suite 2001 Temecula, CA 92591 Office:951-676-80421 Fax:951-676-7240 City of Santa Clarita Canyon Country Community Center AWR 10 Rev1 April 29, 2021 Page 4 Fee for Additional Work: Task 1.0: Additional Design Work for Phase 2: $19,707 Task 2.0: Additional Construction Support for Phase 2: $18,080 Meetings and Conference calls * 4,520 RFI Reviews * 4,520 Submittal Reviews * 2,260 Site Visits * 2,260 Consulting as required * 4,520 Task 3.0: Additional Design for Phase 3: $3,164 Task 4.0: Record Drawings / As Built Plans: $11,580 TOTAL: $52,531.00 Change order #13 for monument preservation services $15,650.00 Change order #15 for additional surveying services $8,220.00 $76,401.00 *The budget amount shown is for authorization purposes only. Should the total of the monthly billings reach eighty percent (8001.) of the budget amount, Owner and Baker will review the status of the work to determine the need for an increase in the budget amount, and whether additional budget authorization to complete the project is appropriate. If additional tasks not included in this scope of work are required, the scope and corresponding fee may be adjusted accordingly based on direction from the Client. All services outlined herein this scope of work will be performed not -to -exceed $76,401.00 plus the direct cost of reimbursable expenses, to be billed monthly on a time and materials basis. Prepared By: Authorized By: Manager (Date) (Client) (Date) \\Temecalfsl\hroot\pdata\156721\Admin\contract\167409\AWR 10 Ph2\AWR 10_C4_Rev1_2021-04-29.docx ADD SERVICE RLIQUES"YO I OS �I C IP41iirCll'4 COtfl'4"l"'IIRY C0IICIIClflP4III lulu 0I111111114l III CIII' 0II1"')il CIII'�CC 14"'l"'A CIIlCIIP III"'l°' 04/27/21 Griffin Structures' Fee Proposal is based on all reasonable costs necessary to perform additional Construction Management services for the City of Santa Clarita's Canyon Country Community Center (C4) Project For these requisite services, Griffin Structures proposes the following Not to Exceed Fee: Construction Management $ 92,638 Reimbursable Costs: $ 362 Total $ 93,000 All proposed hourly rates are fully burdened and include overhead, profit, tuxes, and benefits. The hours identified for each individual employee and task are estimates only and are not to be construed as not to exceed hours for any indi«dual task, phase, or tilne-period. We reserve the right to reallocate hours between staff members and tasks to accomplish the overall objectives and requirements of the project. Services are based on the attached Fee Analysis, which provides detail on the allocation of hours. Any extension of the schedule or services may result in additional fee, in good faith negotiation with the City. II°II°II�I° ICI°°I°'°" AND II°II�I°' llU Ilk°i'' I The C4 project has encountered extensive delays to the schedule due to a number of events and/or conditions unforeseen at the time of contact execution. These delays have resulted in a total project extension of 3 months beyond the original contact duration, resulting in additional Constriction Management services. 2. As a result, Griffin Strictures has endeavored to modify its staffing allocation to absorb a significant portion of these delays in a good faith effort to mitigate imposing additional cost to the City. These mitigation efforts resulted in Griffin successfully absorbing 3.5 months of schedule extension. 3. This ASR seeks to capture costs associated with the remaining 3.5 months of additional service. 4. To achieve an equitable staffing allocation that does not over -burden the City, this proposal assumes the Project Coordinator will reduce their role to 3 days per week beginning in July 2021. 5. This will allow the Construction Manager to remain on the project through October, with closeout services in November, should the Contactor continue to experience schedule delays. 2 TET.hrology Dr.,SWtc: 150 �rvlriE:, GA 92618 P 949.497.9000 www.griffiristruc;turc:s.CN.Orn'ro 11P12SC"'X uuuimi��ioi�uuuuuuouuuuuuuuuuiuuuuurl������iooioiuiouuuuuuuiuul��,���„��uuuuuuuui ouuuuuuuuuuuuuuuuuuuo C����o'.�'�m 2/23/2021 SUBJECT: SANTA CLARITA CANYON COUNTY COMMUNITY CENTER, LEED V4 BUILDING ENVELOPE COMMISSIONING ADDED SERVICE — SANTA City of Santa Clarita CLARITA, CA Wayne Weber Parks Planning Manager Dear Mr. Weber: Thank you for considering P2S Commissioning for the above -referenced project. We are pleased to provide the following proposal that outlines our statement of understanding, scope of services and fees. STATEMENT OF UNDERSTANDING P2S commissioning (P2S Cx) currently has a scope of completing LEED Monitored Based Commissioning and Building Envelope Commissioning (BECx) services for the new 24,000 square foot SF Community Center in Santa Clarita Canyon County. This proposal is a request for additional services compensation in the construction and operational phase for additional hours expended to date and for additional anticipated services. Our BECx construction phase work to date has included reviewing product data and shop drawing submittals, reviewing RFIs, and attending three construction phase meetings and site visits (Commissioning kickoff meeting on 26 June 2020 and site visits on 9 December 2020 and 8 January 2021). Through 29 January 2021, we have exceeded our BECx budget for submittal and shop drawing reviews mainly due to: (1) having fragmented rather than consolidated issued for construction drawings and specifications, (2) receiving incomplete shop drawings during initial submittal, resulting in multiple re -reviews, and (3) reviewing submittals concurrent with Architect review instead of after Architect initial review. Our scope of work includes thirty-six technical staff hours to review select building enclosure system submittals and shop drawings; the above -noted circumstances have resulted in us expending at least forty-five hours beyond our budget to date. Moving forward, beyond the work already performed at your direction as outlined above, we anticipate the following additional construction and operational phase services: Submittal and Shop Drawing Review: Perform additional submittal reviews after architect initial review. We will review and comment on select shop drawings and review select submittals by comparing them to the contract documents. Review and approval of all submittals remains the sole responsibility of the Architect of Record. We include approximately ten additional technical staff -hours for additional submittal and shop drawing reviews in our additional fee budget estimate. ` 000 E: Spring ,t., Suite 800 �m�� 562, 97299J Iful�o�� i 2 IINC—C,`C.. M .ong Beach, CA 90815 Commissioning Services Proposal to: Wayne Weber, City of Santa Clarita 2/23/2021 Commissioning Construction Observations: Conduct construction site observations during construction of the building enclosure. Site visits may also be used to witness enclosure field performance testing. We will perform three additional site visits (two performed to date). Our focus of the observations will be to verify that systems being installed comply with the construction documents and can be successfully installed, function, and be maintained. This work typically includes the preparation and distribution of a written and illustrated field report summarizing our observations and recommendations based on the site visits. Our budget assumes no more than ten hours will be required for each site visit, including on -site time, writing and editing field reports, supplemental detailing, answering contractor questions, etc. PROPOSED FEE FOR BUILDING ENVELOPE COMMISSIONING P2S Cx proposes to provide the additional commissioning services for a fixed fee of ELEVEN THOUSAND HUNDRED DOLLARS ($11,000.00). Invoicing will be monthly based on percentage of completion. _.007, Ii Building Envelope Commissioning Management - P2S: $ 1,500.00 Submittal and Shop Drawing Review - Simpson Gumpertz & Heger: $ 2,500.00 Commissioning Construction Observations - Simpson Gumpertz & Heger: $ 7,000.00 If additional site visits are required, our fee per visit will be $2,300 including expenses and the preparation of field reports. We look forward to working with you on completing this project successfully. Should you have any questions or need clarifications, please contact us. Sincerely, a Bryant Mercado, PE, CxA, CEM Senior Commissioning Agent Cell# 310-977-5715 Bryant.Mercado@p2sinc.com