Loading...
HomeMy WebLinkAbout2021-06-08 - AGENDA REPORTS - INCORPORATE SB 1 INTO CIP (2)12 of sXNTA C< U � CONSENT CALENDAR CITY OF SANTA CLARITA AGENDA REPORT CITY MANAGER APPROVAL: DATE: June 8, 2021 Ju'll J� �' Agenda Item: 12 SUBJECT: RESOLUTION TO INCORPORATE SENATE BILL 1, ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017, LOCAL STREETS AND ROADS, ROAD MAINTENANCE AND REHABILITATION FUNDS INTO THE CAPITAL IMPROVEMENT PROGRAM DEPARTMENT PRESENTER: Public Works Damon Letz RECOMMENDED ACTION City Council: Adopt a resolution declaring the incorporation of a list of projects proposed to be funded by Senate Bill 1, Road Repair and Accountability Act of 2017, Local Streets and Roads, Road Maintenance and Rehabilitation for Fiscal Year 2021-22 into the Capital Improvement Program. 2. Authorize the City Manager or designee to execute all documents, subject to City Attorney approval. BACKGROUND On April 28, 2017, Governor Brown signed Senate Bill 1 (SB 1) to address basic road maintenance, rehabilitation, and critical safety needs for California state highways, local streets, and road systems. Funds provided by SB 1 will be available to the City of Santa Clarita (City) in the Road Maintenance and Rehabilitation Account (RMRA). The percentage of funds allocated to the City was pre -determined by, and is pursuant to, the Streets and Highways Code Section 2034(a)(1). The estimated allocation of funds for Fiscal Year 2021-22 is $4,262,756. Local Streets and Roads funding is supported by RMRA funding, which includes portions of revenues pursuant to Streets and Highways Code Section 2031 from the following sources: An additional 12 cents per gallon increase to the gasoline excise tax effective November 1, 2017. Page 1 Packet Pg. 73 • An additional 20 cents per gallon increase to the diesel fuel excise tax effective November 1, 2017. • An additional vehicle registration tax called "Transportation Improvement Fee" with rates based on the value of the motor vehicle effective January 1, 2018. • An additional $100 vehicle registration tax on zero emissions (ZEV) vehicles of model year 2020 or later effective July 1, 2020. • Annual rate increases to these taxes beginning on July 1, 2020 (July 1, 2021, for the ZEV fee) and every July 1 thereafter equal to the change in the California Consumer Price Index. SB 1 emphasizes the importance of accountability and transparency. For this reason, California Transportation Commission (CTC) staff, in collaboration with stakeholders, developed Local Streets and Roads Funding Annual Reporting Guidelines. To be eligible for SB 1 and RMRA funding, the guidelines require the City to provide annual project reporting to the CTC, specifically, a list of project(s) proposed to be funded with RMRA funding. All proposed projects must be adopted by a resolution by the City Council at a regular public meeting prior to the submission deadline of July 1, 2021. The 2021-22 Overlay and Slurry Seal Program Design and Construction Project was selected to receive the SB 1 RMRA funds. This project reflects the City's commitment to roadway infrastructure and supports the Santa Clarita 2025 theme of Sustaining Public Infrastructure. The Proposed Fiscal Year (FY) 2021-22 SB 1 Project List is subject to change, as specific roadway segments will be finalized during the design process. Staff anticipates construction will begin in June 2022. The 2020-21 Overlay and Slurry Seal Program Design and Construction Project was previously adopted by the CTC in 2020 and will continue to utilize SB 1 RMRA funds for FY 2021-22. The project is in final design and construction is tentatively scheduled to begin in July 2021. ALTERNATIVE ACTION Other action as determined by the City Council. FISCAL IMPACT Upon approval of the recommended actions, estimated allocations of SB 1 RMRA funds (Fund 267) will be earmarked for the 2021-22 Overlay and Slurry Seal Program. Appropriation of SB 1 RMRA funds will be part of the Fiscal Year 2021-22 budget. ATTACHMENTS Resolution Page 2 Packet Pg. 74 12.a RESOLUTION NO. 21- A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA CLARITA, CALIFORNIA, DECLARING THAT IT HAS ADOPTED A LIST OF PROJECTS FOR FISCAL YEAR 2021-22 FUNDED BY SENATE BILL 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017, LOCAL STREETS AND ROADS, ROAD MAINTENANCE AND REHABILITATION FUNDS INTO THE CAPITAL IMPROVEMENT PROGRAM WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April 2017 to address the significant multi -modal transportation funding shortfalls statewide; WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of our City of Santa Clarita (City) are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; WHEREAS, the City must adopt by resolution a list of projects proposed to receive fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, which must include a description and the location of each proposed project, a proposed schedule for the project's completion, and the estimated useful life of the improvement; WHEREAS, the City will receive an estimated $4,262,756 in RMRA funding in Fiscal Year 2021-22 from SB 1; WHEREAS, this is the fifth year in which the City is receiving SB 1 funding and will enable the City to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB 1; WHEREAS, the City has undergone a robust public process to ensure public input into our community's transportation priorities/the project list; WHEREAS, the City used a Pavement Management System to develop the SB 1 project list to ensure revenues are being used on the most high -priority and cost-effective projects that also meet the community's priorities for transportation investment; WHEREAS, the funding from SB 1 will help the City maintain and rehabilitate numerous streets/roads, bridges, add active transportation infrastructure throughout the City this year and hundreds of similar projects into the future; WHEREAS, the 2018 California Statewide Local Streets and Roads Needs Assessment found that the City's streets and roads are in an "at -risk" condition, and this revenue will provide an increase in the overall quality of the City's road system and over the next decade will raise the City's streets and roads rating to a "good" condition; and Page 1 of 3 Packet Pg. 75 1 12.a WHEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting -edge technology, materials and practices, will have significant positive co -benefits statewide. NOW, THEREFORE, the City Council of the City of Santa Clarita, California, does hereby resolve as follows: SECTION 1. The foregoing recitals are true and correct. SECTION 2_ The following list of future projects will be funded in -part or solely with Fiscal Year 2021-22 Road Maintenance and Rehabilitation Account revenues: Project Title: 2021-22 Overlay and Slurry Seal Program Design and Construction; Project Description: Generally, the scope of work to be performed includes, but is not limited to, asphalt resurfacing of various streets Citywide; Project Location: Citywide, specific streets were selected from locations identified through the City's Five -Year Pavement Preservation Program and are identified in the attached Proposed Fiscal Year 2021-22 SB 1 Project List; Estimated Project Schedule: Start (07/21) — Completion (06/23) based on the component being funded with RMRA funds; and Estimated Project Useful Life: Streets selected for preventative maintenance will have a pavement life expectancy of 3-7 years, and streets selected for rehabilitation will have a life expectancy of 10-15 years. SECTION 3. The following projects may also utilize Fiscal Year 2021-22 Road Maintenance and Rehabilitation Account revenues in their delivery. With the relisting of these projects in the adopted fiscal year resolution, the City is reaffirming to the public and the State our intent to fund these projects with Road Maintenance and Rehabilitation Account revenues: Project Title: 2020-21 Overlay and Slurry Seal Program Design and Construction; Project Description: Generally, the scope of work to be performed includes, but is not limited to, asphalt resurfacing of various streets, Citywide; Project Location: Citywide, specific streets were selected from locations identified through the City's Five -Year Pavement Preservation Program and are identified in the attached Proposed Fiscal Year 2021-22 SB 1 Project List; Estimated Project Schedule: Start (07/21) — Completion (06/22) based on the component being funded with RMRA funds; and Page 2 of 3 I Packet Pg. 76 1 12.a I Estimated Project Useful Life: Streets selected for preventative maintenance will have a pavement life expectancy of 3-7 years, and streets selected for rehabilitation will have a life expectancy of 10-15 years. SECTION 4. The City Clerk shall certify to the adoption of this resolution. PASSED, APPROVED, AND ADOPTED this 8th day of June 2021. MAYOR ATTEST: CITY CLERK DATE: STATE OF CALIFORNIA ) COUNTY OF LOS ANGELES ) ss. CITY OF SANTA CLARITA ) I, Mary Cusick, City Clerk of the City of Santa Clarita, do hereby certify that the foregoing Resolution No. 21- was duly adopted by the City Council of the City of Santa Clarita at a regular meeting thereof, held on the 8th day of June, 2021, by the following vote: AYES: COUNCIL,MEMBERS: NOES: COUNCIL,MEMBERS: ABSENT: COUNCIL,MEMBERS: CITY CLERK Page 3 of 3 I Packet Pg. 77 1 12.a I City of Santa Clarita Proposed Fiscal Year 2021-22 SB 1 Project List Project Road Name (Locations listed are projected estimates Proposed Useful Useful and have yet to be Pre- Schedule of Life Life Project Title Project Description finalized) Project Location construction Construction Completion Min Max 2021-22Overlay The Annual Overlay and Copper Hill Drive Newhall Ranch Jul-21 Jun-22 Nov-22 3 15 and Slurry Seal Slurry Seal Program Road to Smyth Program reflects the City's Drive commitment to roadway infrastructure by resurfacing streets in need of attentinn. 2021-22 Overlay The Annual Overlay and Magic Mountain From Railroad Jul-21 Jun-22 Nov-22 3 15 and Slurry Seal Slurry Seal Program Parkway Avenue to Program reflects the City's Tourney Road commitment to roadway infrastructure by resurfacing streets in need of attentinn. 2021-22 Overlay The Annual Overlay and Whites Canyon Road From Soledad Jul-21 Jun-22 Nov-22 3 15 and Slurry Seal Slurry Seal Program Canyon Road to Program reflects the City's Heller Circle commitment to roadway infrastructure by resurfacing streets in need of attentinn. 2020-21 Overlay The Annual Overlay and Ashfield PI Rosemont Ln to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program North End Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attention. 2020-21 Overlay The Annual Overlay and Ashland Ct Sanford Way to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program West End Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attentinn. 2020-21 Overlay The Annual Overlay and Beaumont St Hillsborough Py to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Bidwell Ln Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attention. 2020-21 Overlay The Annual Overlay and Benton Ct Riversbridge to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program North End Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attentinn. 2020-21 Overlay The Annual Overlay and Berwick PI Littlefield Dr to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program East End Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attention. 2020-21 Overlay The Annual Overlay and Bidwell Ln Decoro Dr to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program South End Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attentinn. 0 0 w IL i— Z LU 2 LU 0 IL 2 J Q i— a Q U Z T- J J_ m LU I— Q Z LU co LU I- 9 0 a 0 U Z_ 0 i— Z 0 I— I J 0 co LU C O r 7 O to N r C N E t t) co r Q I Packet Pg. 78 1 12.a I City of Santa Clarita Proposed Fiscal Year 2021-22 SB 1 Project List Project Road Name (Locations listed are projected estimates Proposed Useful Useful and have yet to be Pre- Schedule of Life Life Project Title Project Description finalized) Project Location construction Construction Completion Min Max 2020-21Overlay The Annual Overlay and BranburyCt Chatfield Way to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program North End Program reflects the City's commitment to roadway infrastructure by resurfacing streets in nPPd of attention. 2020-21 Overlay The Annual Overlay and Camford PI West End to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Beaumont St Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attention. 2020-21 Overlay The Annual Overlay and Candington Ct North End to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Beaumont St Program reflects the City's commitment to roadway infrastructure by resurfacing streets in nPPd of attentinn. 2020-21 Overlay The Annual Overlay and Chatfield Way Rosemont Ln to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program East End Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attention. 2020-21 Overlay The Annual Overlay and Chesterfield Dr North End to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program South End Program reflects the City's commitment to roadway infrastructure by resurfacing streets in nPPd of attention. 2020-21Overlay The Annual Overlay and Colebrook PI Hillsborough Py to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program North End Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attention. 2020-21Overlay The Annual Overlay and DunsmoreLn Hillsborough Py to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Sanford Wy Program reflects the City's commitment to roadway infrastructure by resurfacing streets in nPPd of attentinn. 2020-21Overlay The Annual Overlay and DunsmoreLn Sanford Wyto Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program West End Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attention. 2020-21Overlay The Annual Overlay and Ellison Way Beaumont St to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Preston Way Program reflects the City's commitment to roadway infrastructure by resurfacing streets in nPPd of attentinn. Q Q' C9 O w d H Z W 2 W O W d 2 J Q H d Q U Z 7 J J_ m W H Q Z W W H Q O d O U Z_ O H Z O H J O W C O r O O N d C d L v cC r r Q I Packet Pg. 79 1 12.a I City of Santa Clarita Proposed Fiscal Year 2021-22 SB 1 Project List Project Road Name (Locations listed are projected estimates Proposed Useful Useful and have yet to be Pre- Schedule of Life Life Project Title Project Description finalized) Project Location construction Construction Completion Min Max 2020-21 Overlay The Annual Overlay and Ingram Ct West End to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Bidwell Ln Program reflects theCity's commitment to roadway infrastructure by resurfacing streets in need of attentinn. 2020-21 Overlay The Annual Overlay and Lamberton PI Pelham PI to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program North End Program reflects theCity's commitment to roadway infrastructure by resurfacing streets in need of attention. 2020-21 Overlay The Annual Overlay and Lane Ct Littlefield Dr to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program East End Program reflects theCity's commitment to roadway infrastructure by resurfacing streets in need of attentinn. 2020-21 Overlay The Annual Overlay and Littlefield Dr Riversbridge Wy Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program to Lane Ct Program reflects theCity's commitment to roadway infrastructure by resurfacing streets in need of attention. 2020-21 Overlay The Annual Overlay and Littlefield Dr Lane Ct to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Fairview Dr Program reflects theCity's commitment to roadway infrastructure by resurfacing streets in need of attentinn. 2020-21 Overlay The Annual Overlay and Littleton Way Shelbourne Dr to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Hillsborough Py Program reflects theCity's commitment to roadway infrastructure by resurfacing streets in need of attention. 2020-21 Overlay The Annual Overlay and Meriden PI Waterford Dr to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program East End Program reflects theCity's commitment to roadway infrastructure by resurfacing streets in need of attentinn. 2020-21 Overlay The Annual Overlay and Millston Ct West End to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Littlefield Dr Program reflects theCity's commitment to roadway infrastructure by resurfacing streets in need of attention. 2020-21 Overlay The Annual Overlay and Northfield Ct Waterford Dr to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program East End Program reflects theCity's commitment to roadway infrastructure by resurfacing streets in need of attentinn. 0 0 w IL i— Z LU 2 LU 0 w IL 2 J Q i— a Q U Z T- J J_ m LU I— Q Z LU co LU I- 9 0 a 0 U Z_ 0 i— Z 0 I— I J 0 co LU C O r 7 O to N r C N E t t) co r Q I Packet Pg. 80 1 12.a I City of Santa Clarita Proposed Fiscal Year 2021-22 SB 1 Project List Project Road Name (Locations listed are projected estimates Proposed Useful Useful and have yet to be Pre- Schedule of Life Life Project Title Project Description finalized) Project Location construction Construction Completion Min Max 2020-21 Overlay The Annual Overlay and Norwood Ct Rosemont Ln to N Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program End Program reflects the City's commitment to roadway infrastructure by resurfacing streets in nPPd of attention. 2020-21 Overlay The Annual Overlay and Preston Way West End to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Bidwell Ln Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attention. 2020-21 Overlay The Annual Overlay and Riversbridge Wy West End to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Wilton Way Program reflects the City's commitment to roadway infrastructure by resurfacing streets in nPPd of attentinn. 2020-21Overlay The Annual Overlay and RiversbridgeWy Wilton Way to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program North End Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attention. 2020-21 Overlay The Annual Overlay and Rosemont Ln South End to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Hillsborough Py Program reflects the City's commitment to roadway infrastructure by resurfacing streets in nPPd of attention. 2020-21 Overlay The Annual Overlay and Roswell Ct Pelham PI to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program North End Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attention. 2020-21 Overlay The Annual Overlay and Sanford Way South End to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program North End Program reflects the City's commitment to roadway infrastructure by resurfacing streets in nPPd of attentinn. 2020-21 Overlay The Annual Overlay and Shadwell Ct West End to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Ellison Wy Program reflects the City's commitment to roadway infrastructure by resurfacing streets in need of attention. 2020-21 Overlay The Annual Overlay and Shelbourne Dr North End to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program South End Program reflects the City's commitment to roadway infrastructure by resurfacing streets in nPPd of attentinn. Q Q' C9 O d H Z W 2 W O d 2 J Q H d Q U Z 7 J J_ m W H Q Z W W H Q O d O U Z_ O H Z O H J O W C O r O O N d C d L v cC r r Q I Packet Pg. 81 1 12.a I City of Santa Clarita Proposed Fiscal Year 2021-22 SB 1 Project List Project Road Name (Locations listed are projected estimates Proposed Useful Useful and have yet to be Pre- Schedule of Life Life Project Title Project Description finalized) Project Location construction Construction Completion Min Max 2020-21 Overlay The Annual Overlay and Sherwood PI West End to East Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program End Program reflects theCity's commitment to roadway infrastructure by resurfacing streets in need of attentinn. 2020-21 Overlay The Annual Overlay and Staten PI South End to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Preston Wy Program reflects theCity's commitment to roadway infrastructure by resurfacing streets in need of attention. 2020-21 Overlay The Annual Overlay and Trinidad Ct West End to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Beaumont St Program reflects theCity's commitment to roadway infrastructure by resurfacing streets in need of attentinn. 2020-21 Overlay The Annual Overlay and Trenton PI North End to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Bidwell Ln Program reflects theCity's commitment to roadway infrastructure by resurfacing streets in need of attention. 2020-21 Overlay The Annual Overlay and Waterford Dr Fairview Dr to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program North End Program reflects theCity's commitment to roadway infrastructure by resurfacing streets in need of attentinn. 2020-21Overlay The Annual Overlay and Wilton Way HillsboroughPyto Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Riversbridge Wy Program reflects theCity's commitment to roadway infrastructure by resurfacing streets in need of attention. 2020-21 Overlay The Annual Overlay and Woodbury Way Sherwood PI to Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program Pelham PI Program reflects theCity's commitment to roadway infrastructure by resurfacing streets in need of attentinn. 2020-21 Overlay The Annual Overlay and Newhall Ranch Road Copper Hill Drive Jun-21 Jul-21 Nov-21 3 15 and Slurry Seal Slurry Seal Program to Dickason Drive Program reflects theCity's commitment to roadway infrastructure by resurfacing streets in need of attention. 0 0 w IL i— Z LU 2 LU 0 IL 2 J Q i— a Q U Z T- J J_ m LU I— Q Z LU LU I- 9 0 a 0 U Z_ 0 i— Z 0 I— I J 0 co LU C O r 7 O to N r C N E t t) co r Q I Packet Pg. 82 1 12.a City of Santa Clarita Proposed Fiscal Year 2021-22 SB 1 Project List Project Road Name (Locations listed are projected estimates Proposed Useful Useful and have yet to be Pre- Schedule of Life Life Project Title Project Description finalized) Project Location construction Construction Completion Min Max 2020-21 Overlay The Annual Overlay and McBean Parkway and Slurry Seal Slurry Seal Program Program reflects theCity's commitment to roadway infrastructure by resurfacing streets in need of attention. 2020-21 Overlay The Annual Overlay and Soledad Canyon Road and Slurry Seal Slurry Seal Program Program reflects theCity's commitment to roadway infrastructure by resurfacing streets in need of attention. ZELISTED I-5Freeway to Jun-21 Jul-21 Nov-21 3 15 Alegro Drive Valley Center Jun-21 Jul-21 Nov-21 3 15 Drive to Langside Avenue Packet Pg. 83