HomeMy WebLinkAbout2021-06-08 - AGENDA REPORTS - INCORPORATE SB 1 INTO CIP (2)12
of sXNTA C<
U �
CONSENT CALENDAR
CITY OF SANTA CLARITA
AGENDA REPORT
CITY MANAGER APPROVAL:
DATE: June 8, 2021
Ju'll J� �'
Agenda Item: 12
SUBJECT: RESOLUTION TO INCORPORATE SENATE BILL 1, ROAD REPAIR
AND ACCOUNTABILITY ACT OF 2017, LOCAL STREETS AND
ROADS, ROAD MAINTENANCE AND REHABILITATION FUNDS
INTO THE CAPITAL IMPROVEMENT PROGRAM
DEPARTMENT
PRESENTER:
Public Works
Damon Letz
RECOMMENDED ACTION
City Council:
Adopt a resolution declaring the incorporation of a list of projects proposed to be funded by
Senate Bill 1, Road Repair and Accountability Act of 2017, Local Streets and Roads, Road
Maintenance and Rehabilitation for Fiscal Year 2021-22 into the Capital Improvement
Program.
2. Authorize the City Manager or designee to execute all documents, subject to City Attorney
approval.
BACKGROUND
On April 28, 2017, Governor Brown signed Senate Bill 1 (SB 1) to address basic road
maintenance, rehabilitation, and critical safety needs for California state highways, local streets,
and road systems. Funds provided by SB 1 will be available to the City of Santa Clarita (City) in
the Road Maintenance and Rehabilitation Account (RMRA). The percentage of funds allocated
to the City was pre -determined by, and is pursuant to, the Streets and Highways Code Section
2034(a)(1). The estimated allocation of funds for Fiscal Year 2021-22 is $4,262,756.
Local Streets and Roads funding is supported by RMRA funding, which includes portions of
revenues pursuant to Streets and Highways Code Section 2031 from the following sources:
An additional 12 cents per gallon increase to the gasoline excise tax effective
November 1, 2017.
Page 1
Packet Pg. 73
• An additional 20 cents per gallon increase to the diesel fuel excise tax effective
November 1, 2017.
• An additional vehicle registration tax called "Transportation Improvement Fee" with
rates based on the value of the motor vehicle effective January 1, 2018.
• An additional $100 vehicle registration tax on zero emissions (ZEV) vehicles of model
year 2020 or later effective July 1, 2020.
• Annual rate increases to these taxes beginning on July 1, 2020 (July 1, 2021, for the ZEV
fee) and every July 1 thereafter equal to the change in the California Consumer Price
Index.
SB 1 emphasizes the importance of accountability and transparency. For this reason, California
Transportation Commission (CTC) staff, in collaboration with stakeholders, developed Local
Streets and Roads Funding Annual Reporting Guidelines. To be eligible for SB 1 and RMRA
funding, the guidelines require the City to provide annual project reporting to the CTC,
specifically, a list of project(s) proposed to be funded with RMRA funding. All proposed
projects must be adopted by a resolution by the City Council at a regular public meeting prior to
the submission deadline of July 1, 2021.
The 2021-22 Overlay and Slurry Seal Program Design and Construction Project was selected to
receive the SB 1 RMRA funds. This project reflects the City's commitment to roadway
infrastructure and supports the Santa Clarita 2025 theme of Sustaining Public Infrastructure. The
Proposed Fiscal Year (FY) 2021-22 SB 1 Project List is subject to change, as specific roadway
segments will be finalized during the design process. Staff anticipates construction will begin in
June 2022.
The 2020-21 Overlay and Slurry Seal Program Design and Construction Project was previously
adopted by the CTC in 2020 and will continue to utilize SB 1 RMRA funds for FY 2021-22. The
project is in final design and construction is tentatively scheduled to begin in July 2021.
ALTERNATIVE ACTION
Other action as determined by the City Council.
FISCAL IMPACT
Upon approval of the recommended actions, estimated allocations of SB 1 RMRA funds (Fund
267) will be earmarked for the 2021-22 Overlay and Slurry Seal Program. Appropriation of SB 1
RMRA funds will be part of the Fiscal Year 2021-22 budget.
ATTACHMENTS
Resolution
Page 2
Packet Pg. 74
12.a
RESOLUTION NO. 21-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA CLARITA,
CALIFORNIA, DECLARING THAT IT HAS ADOPTED A LIST OF PROJECTS FOR
FISCAL YEAR 2021-22 FUNDED BY SENATE BILL 1: THE ROAD REPAIR AND
ACCOUNTABILITY ACT OF 2017, LOCAL STREETS AND ROADS, ROAD
MAINTENANCE AND REHABILITATION FUNDS INTO THE CAPITAL IMPROVEMENT
PROGRAM
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017
(Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor
in April 2017 to address the significant multi -modal transportation funding shortfalls statewide;
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure
the residents of our City of Santa Clarita (City) are aware of the projects proposed for funding in
our community and which projects have been completed each fiscal year;
WHEREAS, the City must adopt by resolution a list of projects proposed to receive fiscal
year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1,
which must include a description and the location of each proposed project, a proposed schedule
for the project's completion, and the estimated useful life of the improvement;
WHEREAS, the City will receive an estimated $4,262,756 in RMRA funding in Fiscal
Year 2021-22 from SB 1;
WHEREAS, this is the fifth year in which the City is receiving SB 1 funding and will
enable the City to continue essential road maintenance and rehabilitation projects, safety
improvements, repairing and replacing aging bridges, and increasing access and mobility options
for the traveling public that would not have otherwise been possible without SB 1;
WHEREAS, the City has undergone a robust public process to ensure public input into
our community's transportation priorities/the project list;
WHEREAS, the City used a Pavement Management System to develop the SB 1 project
list to ensure revenues are being used on the most high -priority and cost-effective projects that
also meet the community's priorities for transportation investment;
WHEREAS, the funding from SB 1 will help the City maintain and rehabilitate numerous
streets/roads, bridges, add active transportation infrastructure throughout the City this year and
hundreds of similar projects into the future;
WHEREAS, the 2018 California Statewide Local Streets and Roads Needs Assessment
found that the City's streets and roads are in an "at -risk" condition, and this revenue will provide
an increase in the overall quality of the City's road system and over the next decade will raise the
City's streets and roads rating to a "good" condition; and
Page 1 of 3
Packet Pg. 75 1
12.a
WHEREAS, the SB 1 project list and overall investment in our local streets and roads
infrastructure with a focus on basic maintenance and safety, investing in complete streets
infrastructure, and using cutting -edge technology, materials and practices, will have significant
positive co -benefits statewide.
NOW, THEREFORE, the City Council of the City of Santa Clarita, California, does
hereby resolve as follows:
SECTION 1. The foregoing recitals are true and correct.
SECTION 2_ The following list of future projects will be funded in -part or solely with
Fiscal Year 2021-22 Road Maintenance and Rehabilitation Account revenues:
Project Title: 2021-22 Overlay and Slurry Seal Program Design and Construction;
Project Description: Generally, the scope of work to be performed includes, but is not limited to,
asphalt resurfacing of various streets Citywide;
Project Location: Citywide, specific streets were selected from locations identified through the
City's Five -Year Pavement Preservation Program and are identified in the attached Proposed
Fiscal Year 2021-22 SB 1 Project List;
Estimated Project Schedule: Start (07/21) — Completion (06/23) based on the component being
funded with RMRA funds; and
Estimated Project Useful Life: Streets selected for preventative maintenance will have a
pavement life expectancy of 3-7 years, and streets selected for rehabilitation will have a life
expectancy of 10-15 years.
SECTION 3. The following projects may also utilize Fiscal Year 2021-22 Road
Maintenance and Rehabilitation Account revenues in their delivery. With the relisting of these
projects in the adopted fiscal year resolution, the City is reaffirming to the public and the State
our intent to fund these projects with Road Maintenance and Rehabilitation Account revenues:
Project Title: 2020-21 Overlay and Slurry Seal Program Design and Construction;
Project Description: Generally, the scope of work to be performed includes, but is not limited to,
asphalt resurfacing of various streets, Citywide;
Project Location: Citywide, specific streets were selected from locations identified through the
City's Five -Year Pavement Preservation Program and are identified in the attached Proposed
Fiscal Year 2021-22 SB 1 Project List;
Estimated Project Schedule: Start (07/21) — Completion (06/22) based on the component being
funded with RMRA funds; and
Page 2 of 3
I Packet Pg. 76 1
12.a I
Estimated Project Useful Life: Streets selected for preventative maintenance will have a
pavement life expectancy of 3-7 years, and streets selected for rehabilitation will have a life
expectancy of 10-15 years.
SECTION 4. The City Clerk shall certify to the adoption of this resolution.
PASSED, APPROVED, AND ADOPTED this 8th day of June 2021.
MAYOR
ATTEST:
CITY CLERK
DATE:
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss.
CITY OF SANTA CLARITA )
I, Mary Cusick, City Clerk of the City of Santa Clarita, do hereby certify that the
foregoing Resolution No. 21- was duly adopted by the City Council of the City of Santa Clarita
at a regular meeting thereof, held on the 8th day of June, 2021, by the following vote:
AYES: COUNCIL,MEMBERS:
NOES: COUNCIL,MEMBERS:
ABSENT: COUNCIL,MEMBERS:
CITY CLERK
Page 3 of 3
I Packet Pg. 77 1
12.a I
City of Santa Clarita
Proposed Fiscal Year 2021-22 SB 1 Project List
Project Road Name
(Locations listed are
projected estimates
Proposed Useful Useful
and have yet to be
Pre-
Schedule of Life Life
Project Title Project Description
finalized)
Project Location
construction
Construction Completion Min Max
2021-22Overlay The Annual Overlay and
Copper Hill Drive
Newhall Ranch
Jul-21
Jun-22 Nov-22 3 15
and Slurry Seal Slurry Seal Program
Road to Smyth
Program reflects the City's
Drive
commitment to
roadway infrastructure
by resurfacing streets in
need of attentinn.
2021-22 Overlay The Annual Overlay and
Magic Mountain
From Railroad
Jul-21
Jun-22 Nov-22 3 15
and Slurry Seal Slurry Seal Program
Parkway
Avenue to
Program reflects the City's
Tourney Road
commitment to
roadway infrastructure
by resurfacing streets in
need of attentinn.
2021-22 Overlay The Annual Overlay and
Whites Canyon Road
From Soledad
Jul-21
Jun-22 Nov-22 3 15
and Slurry Seal Slurry Seal Program
Canyon Road to
Program reflects the City's
Heller Circle
commitment to
roadway infrastructure
by resurfacing streets in
need of attentinn.
2020-21 Overlay The Annual Overlay and
Ashfield PI
Rosemont Ln to
Jun-21
Jul-21 Nov-21 3 15
and Slurry Seal Slurry Seal Program
North End
Program reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of attention.
2020-21 Overlay The Annual Overlay and
Ashland Ct
Sanford Way to
Jun-21
Jul-21 Nov-21 3 15
and Slurry Seal Slurry Seal Program
West End
Program reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of attentinn.
2020-21 Overlay The Annual Overlay and
Beaumont St
Hillsborough Py to
Jun-21
Jul-21 Nov-21 3 15
and Slurry Seal Slurry Seal Program
Bidwell Ln
Program reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of attention.
2020-21 Overlay The Annual Overlay and
Benton Ct
Riversbridge to
Jun-21
Jul-21 Nov-21 3 15
and Slurry Seal Slurry Seal Program
North End
Program reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of attentinn.
2020-21 Overlay The Annual Overlay and
Berwick PI
Littlefield Dr to
Jun-21
Jul-21 Nov-21 3 15
and Slurry Seal Slurry Seal Program
East End
Program reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of attention.
2020-21 Overlay The Annual Overlay and
Bidwell Ln
Decoro Dr to
Jun-21
Jul-21 Nov-21 3 15
and Slurry Seal Slurry Seal Program
South End
Program reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of attentinn.
0
0
w
IL
i—
Z
LU
2
LU
0
IL
2
J
Q
i—
a
Q
U
Z
T-
J
J_
m
LU
I—
Q
Z
LU
co
LU
I-
9
0
a
0
U
Z_
0
i—
Z
0
I—
I
J
0
co
LU
C
O
r
7
O
to
N
r
C
N
E
t
t)
co
r
Q
I Packet Pg. 78 1
12.a I
City of Santa Clarita
Proposed Fiscal Year
2021-22 SB 1 Project List
Project Road Name
(Locations listed are
projected estimates
Proposed Useful Useful
and have yet to be
Pre- Schedule of Life Life
Project Title Project Description
finalized)
Project Location construction Construction Completion Min Max
2020-21Overlay The Annual Overlay and
BranburyCt
Chatfield Way to
Jun-21 Jul-21 Nov-21 3 15
and Slurry Seal Slurry Seal Program
North End
Program reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
nPPd of attention.
2020-21 Overlay The Annual Overlay and
Camford PI
West End to
Jun-21 Jul-21 Nov-21 3 15
and Slurry Seal Slurry Seal Program
Beaumont St
Program reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of attention.
2020-21 Overlay The Annual Overlay and
Candington Ct
North End to
Jun-21 Jul-21 Nov-21 3 15
and Slurry Seal Slurry Seal Program
Beaumont St
Program reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
nPPd of attentinn.
2020-21 Overlay The Annual Overlay and
Chatfield Way
Rosemont Ln to
Jun-21 Jul-21 Nov-21 3 15
and Slurry Seal Slurry Seal Program
East End
Program reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of attention.
2020-21 Overlay The Annual Overlay and
Chesterfield Dr
North End to
Jun-21 Jul-21 Nov-21 3 15
and Slurry Seal Slurry Seal Program
South End
Program reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
nPPd of attention.
2020-21Overlay The Annual Overlay and
Colebrook PI
Hillsborough Py to
Jun-21 Jul-21 Nov-21 3 15
and Slurry Seal Slurry Seal Program
North End
Program reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of attention.
2020-21Overlay The Annual Overlay and
DunsmoreLn
Hillsborough Py to
Jun-21 Jul-21 Nov-21 3 15
and Slurry Seal Slurry Seal Program
Sanford Wy
Program reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
nPPd of attentinn.
2020-21Overlay The Annual Overlay and
DunsmoreLn
Sanford Wyto
Jun-21 Jul-21 Nov-21 3 15
and Slurry Seal Slurry Seal Program
West End
Program reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of attention.
2020-21Overlay The Annual Overlay and
Ellison Way
Beaumont St to
Jun-21 Jul-21 Nov-21 3 15
and Slurry Seal Slurry Seal Program
Preston Way
Program reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
nPPd of attentinn.
Q
Q'
C9
O
w
d
H
Z
W
2
W
O
W
d
2
J
Q
H
d
Q
U
Z
7
J
J_
m
W
H
Q
Z
W
W
H
Q
O
d
O
U
Z_
O
H
Z
O
H
J
O
W
C
O
r
O
O
N
d
C
d
L
v
cC
r
r
Q
I Packet Pg. 79 1
12.a I
City of Santa Clarita
Proposed Fiscal Year 2021-22 SB 1 Project List
Project Road Name
(Locations listed are
projected estimates
Proposed Useful Useful
and have yet to be
Pre-
Schedule of Life Life
Project Title Project Description
finalized)
Project Location construction
Construction Completion Min Max
2020-21 Overlay The Annual Overlay and
Ingram Ct
West End to
Jun-21
Jul-21 Nov-21 3 15
and Slurry Seal Slurry Seal Program
Bidwell Ln
Program reflects theCity's
commitment to
roadway infrastructure
by resurfacing streets in
need of attentinn.
2020-21 Overlay The Annual Overlay and
Lamberton PI
Pelham PI to
Jun-21
Jul-21 Nov-21 3 15
and Slurry Seal Slurry Seal Program
North End
Program reflects theCity's
commitment to
roadway infrastructure
by resurfacing streets in
need of attention.
2020-21 Overlay The Annual Overlay and
Lane Ct
Littlefield Dr to
Jun-21
Jul-21 Nov-21 3 15
and Slurry Seal Slurry Seal Program
East End
Program reflects theCity's
commitment to
roadway infrastructure
by resurfacing streets in
need of attentinn.
2020-21 Overlay The Annual Overlay and
Littlefield Dr
Riversbridge Wy
Jun-21
Jul-21 Nov-21 3 15
and Slurry Seal Slurry Seal Program
to Lane Ct
Program reflects theCity's
commitment to
roadway infrastructure
by resurfacing streets in
need of attention.
2020-21 Overlay The Annual Overlay and
Littlefield Dr
Lane Ct to
Jun-21
Jul-21 Nov-21 3 15
and Slurry Seal Slurry Seal Program
Fairview Dr
Program reflects theCity's
commitment to
roadway infrastructure
by resurfacing streets in
need of attentinn.
2020-21 Overlay The Annual Overlay and
Littleton Way
Shelbourne Dr to
Jun-21
Jul-21 Nov-21 3 15
and Slurry Seal Slurry Seal Program
Hillsborough Py
Program reflects theCity's
commitment to
roadway infrastructure
by resurfacing streets in
need of attention.
2020-21 Overlay The Annual Overlay and
Meriden PI
Waterford Dr to
Jun-21
Jul-21 Nov-21 3 15
and Slurry Seal Slurry Seal Program
East End
Program reflects theCity's
commitment to
roadway infrastructure
by resurfacing streets in
need of attentinn.
2020-21 Overlay The Annual Overlay and
Millston Ct
West End to
Jun-21
Jul-21 Nov-21 3 15
and Slurry Seal Slurry Seal Program
Littlefield Dr
Program reflects theCity's
commitment to
roadway infrastructure
by resurfacing streets in
need of attention.
2020-21 Overlay The Annual Overlay and
Northfield Ct
Waterford Dr to
Jun-21
Jul-21 Nov-21 3 15
and Slurry Seal Slurry Seal Program
East End
Program reflects theCity's
commitment to
roadway infrastructure
by resurfacing streets in
need of attentinn.
0
0
w
IL
i—
Z
LU
2
LU
0
w
IL
2
J
Q
i—
a
Q
U
Z
T-
J
J_
m
LU
I—
Q
Z
LU
co
LU
I-
9
0
a
0
U
Z_
0
i—
Z
0
I—
I
J
0
co
LU
C
O
r
7
O
to
N
r
C
N
E
t
t)
co
r
Q
I Packet Pg. 80 1
12.a I
City of Santa Clarita
Proposed Fiscal Year 2021-22 SB 1 Project List
Project Road Name
(Locations listed are
projected estimates
Proposed Useful Useful
and have yet to be
Pre- Schedule of Life Life
Project Title Project Description
finalized)
Project Location construction Construction Completion Min Max
2020-21 Overlay The Annual Overlay and
Norwood Ct
Rosemont Ln to N
Jun-21 Jul-21 Nov-21 3 15
and Slurry Seal Slurry Seal Program
End
Program reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
nPPd of attention.
2020-21 Overlay The Annual Overlay and
Preston Way
West End to
Jun-21 Jul-21 Nov-21 3 15
and Slurry Seal Slurry Seal Program
Bidwell Ln
Program reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of attention.
2020-21 Overlay The Annual Overlay and
Riversbridge Wy
West End to
Jun-21 Jul-21 Nov-21 3 15
and Slurry Seal Slurry Seal Program
Wilton Way
Program reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
nPPd of attentinn.
2020-21Overlay The Annual Overlay and
RiversbridgeWy
Wilton Way to
Jun-21 Jul-21 Nov-21 3 15
and Slurry Seal Slurry Seal Program
North End
Program reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of attention.
2020-21 Overlay The Annual Overlay and
Rosemont Ln
South End to
Jun-21 Jul-21 Nov-21 3 15
and Slurry Seal Slurry Seal Program
Hillsborough Py
Program reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
nPPd of attention.
2020-21 Overlay The Annual Overlay and
Roswell Ct
Pelham PI to
Jun-21 Jul-21 Nov-21 3 15
and Slurry Seal Slurry Seal Program
North End
Program reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of attention.
2020-21 Overlay The Annual Overlay and
Sanford Way
South End to
Jun-21 Jul-21 Nov-21 3 15
and Slurry Seal Slurry Seal Program
North End
Program reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
nPPd of attentinn.
2020-21 Overlay The Annual Overlay and
Shadwell Ct
West End to
Jun-21 Jul-21 Nov-21 3 15
and Slurry Seal Slurry Seal Program
Ellison Wy
Program reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
need of attention.
2020-21 Overlay The Annual Overlay and
Shelbourne Dr
North End to
Jun-21 Jul-21 Nov-21 3 15
and Slurry Seal Slurry Seal Program
South End
Program reflects the City's
commitment to
roadway infrastructure
by resurfacing streets in
nPPd of attentinn.
Q
Q'
C9
O
d
H
Z
W
2
W
O
d
2
J
Q
H
d
Q
U
Z
7
J
J_
m
W
H
Q
Z
W
W
H
Q
O
d
O
U
Z_
O
H
Z
O
H
J
O
W
C
O
r
O
O
N
d
C
d
L
v
cC
r
r
Q
I Packet Pg. 81 1
12.a I
City of Santa Clarita
Proposed Fiscal Year 2021-22 SB 1 Project List
Project Road Name
(Locations listed are
projected estimates
Proposed Useful Useful
and have yet to be
Pre-
Schedule of Life Life
Project Title Project Description
finalized)
Project Location
construction
Construction Completion Min Max
2020-21 Overlay The Annual Overlay and
Sherwood PI
West End to East
Jun-21
Jul-21
Nov-21 3 15
and Slurry Seal Slurry Seal Program
End
Program reflects theCity's
commitment to
roadway infrastructure
by resurfacing streets in
need of attentinn.
2020-21 Overlay The Annual Overlay and
Staten PI
South End to
Jun-21
Jul-21
Nov-21 3 15
and Slurry Seal Slurry Seal Program
Preston Wy
Program reflects theCity's
commitment to
roadway infrastructure
by resurfacing streets in
need of attention.
2020-21 Overlay The Annual Overlay and
Trinidad Ct
West End to
Jun-21
Jul-21
Nov-21 3 15
and Slurry Seal Slurry Seal Program
Beaumont St
Program reflects theCity's
commitment to
roadway infrastructure
by resurfacing streets in
need of attentinn.
2020-21 Overlay The Annual Overlay and
Trenton PI
North End to
Jun-21
Jul-21
Nov-21 3 15
and Slurry Seal Slurry Seal Program
Bidwell Ln
Program reflects theCity's
commitment to
roadway infrastructure
by resurfacing streets in
need of attention.
2020-21 Overlay The Annual Overlay and
Waterford Dr
Fairview Dr to
Jun-21
Jul-21
Nov-21 3 15
and Slurry Seal Slurry Seal Program
North End
Program reflects theCity's
commitment to
roadway infrastructure
by resurfacing streets in
need of attentinn.
2020-21Overlay The Annual Overlay and
Wilton Way
HillsboroughPyto
Jun-21
Jul-21
Nov-21 3 15
and Slurry Seal Slurry Seal Program
Riversbridge Wy
Program reflects theCity's
commitment to
roadway infrastructure
by resurfacing streets in
need of attention.
2020-21 Overlay The Annual Overlay and
Woodbury Way
Sherwood PI to
Jun-21
Jul-21
Nov-21 3 15
and Slurry Seal Slurry Seal Program
Pelham PI
Program reflects theCity's
commitment to
roadway infrastructure
by resurfacing streets in
need of attentinn.
2020-21 Overlay The Annual Overlay and
Newhall Ranch Road
Copper Hill Drive
Jun-21
Jul-21
Nov-21 3 15
and Slurry Seal Slurry Seal Program
to Dickason Drive
Program reflects theCity's
commitment to
roadway infrastructure
by resurfacing streets in
need of attention.
0
0
w
IL
i—
Z
LU
2
LU
0
IL
2
J
Q
i—
a
Q
U
Z
T-
J
J_
m
LU
I—
Q
Z
LU
LU
I-
9
0
a
0
U
Z_
0
i—
Z
0
I—
I
J
0
co
LU
C
O
r
7
O
to
N
r
C
N
E
t
t)
co
r
Q
I Packet Pg. 82 1
12.a
City of Santa Clarita
Proposed Fiscal Year 2021-22 SB 1 Project List
Project Road Name
(Locations listed are
projected estimates Proposed Useful Useful
and have yet to be Pre- Schedule of Life Life
Project Title Project Description finalized) Project Location construction Construction Completion Min Max
2020-21 Overlay The Annual Overlay and McBean Parkway
and Slurry Seal Slurry Seal Program
Program reflects theCity's
commitment to
roadway infrastructure
by resurfacing streets in
need of attention.
2020-21 Overlay The Annual Overlay and Soledad Canyon Road
and Slurry Seal Slurry Seal Program
Program reflects theCity's
commitment to
roadway infrastructure
by resurfacing streets in
need of attention.
ZELISTED
I-5Freeway to Jun-21 Jul-21 Nov-21 3 15
Alegro Drive
Valley Center Jun-21 Jul-21 Nov-21 3 15
Drive to Langside
Avenue
Packet Pg. 83