HomeMy WebLinkAbout2022-06-14 - AGENDA REPORTS - SB 1 FUNDS CIP PROJ14
Agenda Item:14
CITY OF SANTA CLARITA
AGENDA REPORT
CONSENT CALENDAR
CITY MANAGER APPROVAL:
DATE: June 14, 2022
RESOLUTION TO INCORPORATE SENATE BILL 1, ROAD REPAIR
SUBJECT:
AND ACCOUNTABILITY ACT OF 2017, LOCAL STREETS AND
ROADS, ROAD MAINTENANCE AND REHABILITATION FUNDS
INTO THE CAPITAL IMPROVEMENT PROGRAM
DEPARTMENT: Public Works
PRESENTER: Shannon Pickett
RECOMMENDED ACTION
City Council:
1. Adopt a resolution declaring the incorporation of a list of projects proposed to be funded by
Senate Bill 1, Road Repair and Accountability Act of 2017, Local Streets and Roads, Road
Maintenance and Rehabilitation for Fiscal Year 2022-23 into the Capital Improvement
Program.
2. Authorize the City Manager or designee to execute all documents, subject to City Attorney
approval.
BACKGROUND
On April 28, 2017, Governor Brown signed Senate Bill 1 (SB1) to address basic road
maintenance, rehabilitation, and critical safety needs for California state highways, local streets,
and road systems. Funds provided by SB1 will be available to the City of Santa Clarita (City) in
the Road Maintenance and Rehabilitation Account (RMRA). The percentage of funds allocated
to the City was pre-determined by, and is pursuant to, Streets and Highways Code Section
2034(a)(1). The estimated allocation of funds for Fiscal Year 2022-23 is $5,050,659.
Local Streets and Roads funding is supported by RMRA funding, which includes portions of
revenues pursuant to Streets and Highways Code Section 2031 from the following sources:
An additional 12 cents per gallon increase to the gasoline excise tax effective
November 1, 2017.
Page 1
Packet Pg. 199
14
An additional 20 cents per gallon increase to the diesel fuel excise tax effective
November 1, 2017.
rates based on the value of the motor vehicle effective January 1, 2018.
An additional $100 vehicle registration tax on zero emissions vehicles (ZEV) of model
year 2020 or later effective July 1, 2020.
Annual rate increases to these taxes beginning on July 1, 2020 (July 1, 2021, for the
ZEV fee) and every July 1 thereafter equal to the change in the California Consumer
Price Index.
Senate Bill 1 emphasizes the importance of accountability and transparency. For this reason,
California Transportation Commission (CTC) staff, in collaboration with stakeholders,
developed Local Streets and Roads Funding Annual Reporting Guidelines. To be eligible for
SB1 and RMRA funding, the guidelines require the City to provide annual project reporting to
the CTC, specifically, a list of project(s) proposed to be funded with RMRA. All proposed
projects must be adopted by a resolution by the City Council at a regular public meeting prior to
the submission deadline of July 1, 2022.
The 2022-23 Overlay and Slurry Seal Program Design and Construction Project was selected to
receive the SB1 RMRA funds. This project reflects the City's commitment to roadway
infrastructure and supports the Santa Clarita 2025 theme of Sustaining Public Infrastructure. The
Proposed Fiscal Year (FY) 2022-23 SB1 Project List is subject to change, as specific roadway
segments will be finalized during the design process. Staff anticipates construction will begin in
June 2023.
The 2021-22 Overlay and Slurry Seal Program Design and Construction Project was previously
adopted by the CTC in 2021 and will continue to utilize SB1 RMRA funds for FY 2022-23. The
project is currently in construction and is projected to be completed by the end of 2022.
ALTERNATIVE ACTION
Other action as determined by the City Council.
FISCAL IMPACT
Upon approval of the recommended actions, estimated allocations of SB 1 RMRA funds (Fund
267) will be earmarked for the 2022-23 Overlay and Slurry Seal Program. Appropriation of SB 1
RMRA funds will be part of the Fiscal Year 2022-23 budget.
ATTACHMENTS
Resolution
Page 2
Packet Pg. 200
14.a
RESOLUTION NO. 22-____
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA CLARITA,
CALIFORNIA, DECLARING THAT IT HAS ADOPTED A LIST OF PROJECTS FOR
FISCAL YEAR 2022-23 FUNDED BY SENATE BILL 1: THE ROAD REPAIR AND
ACCOUNTABILITY ACT OF 2017, LOCAL STREETS AND ROADS, ROAD
MAINTENANCE AND REHABILITATION FUNDS INTO THE CAPITAL IMPROVEMENT
PROGRAM
WHEREAS, Senate Bill 1 (SB1), the Road Repair and Accountability Act of 2017
(Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor
in April 2017 to address the significant multi-modal transportation funding shortfalls statewide;
and
WHEREAS, SB1 includes accountability and transparency provisions that will ensure
the residents of our City of Santa Clarita (City) are aware of the projects proposed for funding in
our community and which projects have been completed each fiscal year; and
WHEREAS, the City must adopt by resolution a list of projects proposed to receive fiscal
year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB1,
which must include a description and the location of each proposed project, a proposed schedule
for the project’s completion, and the estimated useful life of the improvement; and
WHEREAS, the City, will receive an estimated $5,050,659 in RMRA funding in Fiscal
Year 2022-23 from SB1; and
WHEREAS, this is the sixth year in which the City is receiving SB1 funding and will
enable the City to continue essential road maintenance and rehabilitation projects, safety
improvements, repairing and replacing aging bridges, and increasing access and mobility options
for the traveling public that would not have otherwise been possible without SB1; and
WHEREAS, the City has undergone a robust public process to ensure public input into
our community’s transportation priorities/the project list; and
WHEREAS, the City used a Pavement Management System to develop the SB1 project
list to ensure revenues are being used on the most high-priority and cost-effective projects that
also meet the community’s priorities for transportation investment; and
WHEREAS, the funding from SB1 will help the City maintain and rehabilitate numerous
streets/roads, bridges, add active transportation infrastructure throughout the City this year and
hundreds of similar projects into the future; and
WHEREAS, the 2018 California Statewide Local Streets and Roads Needs Assessment
found that the City streets and roads are in an “at-risk” condition and this revenue will help us
increase the overall quality of our road system and over the next decade will bring our streets and
roads into a “good” condition; and
Attachment: Resolution \[Revision 1\] (RESOLUTION TO INCORPORATE SENATE BILL 1 IN CAPITAL IMPROVEMENT PROGRAM)
Page 1 of 3
Packet Pg. 201
14.a
WHEREAS, the SB1project list and overall investment in our local streets and roads
infrastructure with a focus on basic maintenance and safety, investing in complete streets
infrastructure, and using cutting-edge technology, materials and practices, will have significant
positive co-benefits statewide.
NOW THEREFORE the City Council of the City of Santa Clarita, State of California,
does hereby resolve as follows:
SECTION 1. The foregoing recitals are true and correct.
SECTION 2. The following list of newly proposed projects will be funded in-part or
solely with Fiscal Year 2022-23 Road Maintenance and Rehabilitation Account (RMRA)
revenues:
Project Title: 2022-23 Overlay and Slurry Seal Program Design and Construction;
Project Description: Generally, the scope of work to be performed includes, but is not limited to,
asphalt resurfacing of various streets Citywide;
Project Location: Citywide, specific streets were selected from locations identified through the
City’s Five-Year Pavement Preservation Program and are identified in the attached Proposed
Fiscal Year 2022-23 SB1 Project List;
Estimated Project Schedule: Start (07/22) –Completion (06/24) based on the component being
funded with RMRA funds; and
Estimated Project Useful Life: Streets selected for preventative maintenance will have a
pavement life expectancy of 3-7years, and streets selected for rehabilitation will have a life
expectancy of 10-15 years.
SECTION 3. The following projects may also utilize Fiscal Year 2022-23 Road Maintenance
and Rehabilitation Account revenues in their delivery. With the relisting of these projects in the
adopted fiscal year resolution, the City is reaffirming to the public and the State our intent to
fund these projects with RMRA revenues:
Project Title: 2021-22 Overlay and Slurry Seal Program Design and Construction;
Project Description: Generally, the scope of work to be performed includes, but is not limited to,
asphalt resurfacing of various streets, Citywide;
Project Location: Citywide, specific streets were selected from locations identified through the
City’s Five-Year Pavement Preservation Program and are identified in the attached Proposed
Fiscal Year 2022-23 SB1 Project List;
Attachment: Resolution \[Revision 1\] (RESOLUTION TO INCORPORATE SENATE BILL 1 IN CAPITAL IMPROVEMENT PROGRAM)
Page 2 of 3
Packet Pg. 202
14.a
Estimated Project Schedule: Start (07/22) –Completion (06/23) based on the component being
funded with RMRA funds; and
Estimated Project UsefulLife: Streets selected for preventative maintenance will have a
pavement life expectancy of 3-7 years, and streets selected for rehabilitation will have a life
expectancy of 10-15 years.
SECTION 4. The City Clerk shall certify to the adoption of this resolution.
th
PASSED, APPROVED, AND ADOPTED this __ day of ________ 2022.
______________________________
MAYOR
ATTEST:
_______________________________
CITY CLERK
DATE:__________________________
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss.
CITY OF SANTA CLARITA )
I, Mary Cusick, City Clerk of the City of Santa Clarita, do hereby certify that the
foregoing Resolution No. 22- was duly adopted by the City Council of the City of Santa Clarita
th
at a regular meeting thereof, held on the __ day of ________ 2022, by the following vote:
AYES: COUNCILMEMBERS:
NOES: COUNCILMEMBERS:
ABSENT: COUNCILMEMBERS:
______________________________
CITY CLERK
Attachment: Resolution \[Revision 1\] (RESOLUTION TO INCORPORATE SENATE BILL 1 IN CAPITAL IMPROVEMENT PROGRAM)
Page 3 of 3
Packet Pg. 203
14.a
City of Santa Clarita
Proposed Fiscal Year 2022-23 SB 1 Project List
Project Road Name
(Locations listed are
projected estimates
Proposed
Useful
Useful
and have yet to be
Pre-
Schedule of
Life
Life
Project Title
Project Description
finalized)
Project Location
construction
Construction
Completion
Min
Max
2022-23 Overlay
The Annual Overlay and
Avenue Scott
From McBean
Jul-22
Jun-23
Nov-23
3
15
and Slurry Seal
Slurry Seal Program
Parkway to Avenue
Program
reflects the City's
Tibbitts
commitment to roadway
infrastructure by
resurfacing streets in
need of attention.
2022-23 Overlay
The Annual Overlay and
Bouquet Canyon Road
From Newhall
Jul-22
Jun-23
Nov-23
3
15
and Slurry Seal
Slurry Seal Program
Ranch Road to
Program
reflects the City's
Concrete Bridge
commitment to roadway
North of Seco
infrastructure by
Canyon Road
resurfacing streets in
need of attention.
2022-23 Overlay
The Annual Overlay and
Copper Hill Drive
From Haskell
Jul-22
Jun-23
Nov-23
3
15
and Slurry Seal
Slurry Seal Program
Canyon Road to
Program
reflects the City's
David Way
commitment to roadway
infrastructure by
resurfacing streets in
need of attention.
2022-23 Overlay
The Annual Overlay and
Lyons Avenue
From Walnut
Jul-22
Jun-23
Nov-23
3
15
and Slurry Seal
Slurry Seal Program
Street to Railroad
Program
reflects the City's
Avenue
commitment to roadway
infrastructure by
resurfacing streets in
need of attention.
2022-23 Overlay
The Annual Overlay and
Newhall Avenue
From Railroad to
Jul-22
Jun-23
Nov-23
3
15
and Slurry Seal
Slurry Seal Program
Roundabout
Program
reflects the City's
commitment to roadway
infrastructure by
resurfacing streets in
need of attention.
2022-23 Overlay
The Annual Overlay and
Sierra Highway
From Newhall
Jul-22
Jun-23
Nov-23
3
15
and Slurry Seal
Slurry Seal Program
Avenue to City
Program
reflects the City's
Limit (South)
commitment to roadway
infrastructure by
resurfacing streets in
need of attention.
2021-22 Overlay
The Annual Overlay and
Copper Hill Drive
Newhall Ranch
Jul-21
Jun-22
Nov-22
3
15
and Slurry Seal
Slurry Seal Program
Road to Smyth
Program
reflects the City's
Drive
commitment to roadway
infrastructure by
resurfacing streets in
need of attention.
2021-22 Overlay
The Annual Overlay and
Magic Mountain
From Railroad
Jul-21
Jun-22
Nov-22
3
15
and Slurry Seal
Slurry Seal Program
Parkway
Avenue to Tourney
Program
reflects the City's
Road
commitment to roadway
infrastructure by
resurfacing streets in
need of attention.
2021-22 Overlay
The Annual Overlay and
Whites Canyon Road
From Soledad
Jul-22
Jun-23
Nov-23
3
15
and Slurry Seal
Slurry Seal Program
Canyon Road to
Program
reflects the City's
Heller Circle
commitment to roadway
infrastructure by
resurfacing streets in
need of attention.
Q
0
O
w
a
H
Z
W
2
W
O
w
a
2
J
Q
H
(L
Q
U
Z
J
J_
m
W
H
Q
Z
W
W
H
Q
O
(L
W
O
L)
Z_
O
H
Z
O
H
D
J
O
U)
W
0.'
C
O
N
N
C
O
7
O
N
N
S=
d
E
L
U
Q
Packet Pg. 204