HomeMy WebLinkAbout2022-06-14 - RESOLUTIONS - SB 1 PROJ LISTRESOLUTION NO. 22-33
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA CLARITA,
CALIFORNIA, DECLARING THAT IT HAS ADOPTED A LIST OF PROJECTS FOR
FISCAL YEAR 2022-23 FUNDED BY SENATE BILL 1: THE ROAD REPAIR AND
ACCOUNTABILITY ACT OF 2017, LOCAL STREETS AND ROADS, ROAD
MAINTENANCE AND REHABILITATION FUNDS INTO THE CAPITAL IMPROVEMENT
PROGRAM
WHEREAS, Senate Bill 1 (S131), the Road Repair and Accountability Act of 2017
(Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor
in April 2017 to address the significant multi -modal transportation funding shortfalls statewide;
and
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure
the residents of our City of Santa Clarita (City) are aware of the projects proposed for funding in
our community and which projects have been completed each fiscal year; and
WHEREAS, the City must adopt by resolution a list of projects proposed to receive fiscal
year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1,
which must include a description and the location of each proposed project, a proposed schedule
for the project's completion, and the estimated useful life of the improvement; and
WHEREAS, the City, will receive an estimated $5,050,659 in RMRA funding in Fiscal
Year 2022-23 from SB 1; and
WHEREAS, this is the sixth year in which the City is receiving SB 1 funding and will
enable the City to continue essential road maintenance and rehabilitation projects, safety
improvements, repairing and replacing aging bridges, and increasing access and mobility options
for the traveling public that would not have otherwise been possible without SB 1; and
WHEREAS, the City has undergone a robust public process to ensure public input into
our community's transportation priorities/the project list; and
WHEREAS, the City used a Pavement Management System to develop the SB 1 project
list to ensure revenues are being used on the most high -priority and cost-effective projects that
also meet the community's priorities for transportation investment; and
WHEREAS, the funding from SB 1 will help the City maintain and rehabilitate numerous
streets/roads, bridges, add active transportation infrastructure throughout the City this year and
hundreds of similar projects into the future; and
WHEREAS, the 2018 California Statewide Local Streets and Roads Needs Assessment
found that the City streets and roads are in an "at -risk" condition and this revenue will help us
increase the overall quality of our road system and over the next decade will bring our streets and
roads into a "good" condition; and
Page 1 of 3
WHEREAS, the SB 1 project list and overall investment in our local streets and roads
infrastructure with a focus on basic maintenance and safety, investing in complete streets
infrastructure, and using cutting -edge technology, materials and practices, will have significant
positive co -benefits statewide.
NOW THEREFORE the City Council of the City of Santa Clarita, State of California,
does hereby resolve as follows:
SECTION 1. The foregoing recitals are true and correct.
SECTION 2. The following list of newly proposed projects will be funded in -part or
solely with Fiscal Year 2022-23 Road Maintenance and Rehabilitation Account (RMRA)
revenues:
Project Title: 2022-23 Overlay and Slurry Seal Program Design and Construction;
Project Description: Generally, the scope of work to be performed includes, but is not limited to,
asphalt resurfacing of various streets Citywide;
Project Location: Citywide, specific streets were selected from locations identified through the
City's Five -Year Pavement Preservation Program and are identified in the attached Proposed
Fiscal Year 2022-23 SB 1 Project List;
Estimated Project Schedule: Start (07/22) — Completion (06/24) based on the component being
funded with RMRA funds; and
Estimated Project Useful Life: Streets selected for preventative maintenance will have a
pavement life expectancy of 3-7 years, and streets selected for rehabilitation will have a life
expectancy of 10-15 years.
SECTION 3. The following projects may also utilize Fiscal Year 2022-23 Road Maintenance
and Rehabilitation Account revenues in their delivery. With the relisting of these projects in the
adopted fiscal year resolution, the City is reaffirming to the public and the State our intent to
fund these projects with RMRA revenues:
Project Title: 2021-22 Overlay and Slurry Seal Program Design and Construction;
Project Description: Generally, the scope of work to be performed includes, but is not limited to,
asphalt resurfacing of various streets, Citywide;
Project Location: Citywide, specific streets were selected from locations identified through the
City's Five -Year Pavement Preservation Program and are identified in the attached Proposed
Fiscal Year 2022-23 SB1 Project List;
Page 2 of 3
Estimated Project Schedule: Start (07/22) — Completion (06/23) based on the component being
funded with RMRA funds; and
Estimated Project Useful Life: Streets selected for preventative maintenance will have a
pavement life expectancy of 3-7 years, and streets selected for rehabilitation will have a life
expectancy of 10-15 years.
SECTION 4. The City Clerk shall certify to the adoption of this resolution.
PASSED, APPROVED, AND ADOPTED this 141h day of June, 2022.
MAYOR
ATTEST:
CITY CLERK d
DATE:
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss.
CITY OF SANTA CLARITA )
I. Mary Cusick, City Clerk of the City of Santa Clarita, do hereby certify that the
foregoing Resolution No. 22-33 was duly adopted by the City Council of the City of Santa
Clarita at a regular meeting thereof, held on the 141h day of June, 2022, by the following vote:
AYES: COUNCILMEMBERS: Smyth, McLean, Miranda, Gibbs, Weste
NOES: COUNCILMEMBERS: None
ABSENT: COUNCILMEMBERS: None
CITY CLERIC
Page 3 of 3
City of Santa Clarita
Proposed Fiscal Year 2022-23 SB 1 Project List
Project Road Name
(Locations listed are
projected estimates
Proposed
Useful
Useful
and have yet to be
Pre-
Schedule of
Life
Life
Project Title
Project Description
finalized)
Project Location
construction
Construction
Completion
Min
Max
2022-23 Overlay
The Annual Overlay and
Avenue Scott
From McBean
Jul-22
Jun-23
Nov-23
3
15
and Slurry Seal
Slurry Seal Program
Parkway to Avenue
Program
reflects the City's
Tibbitts
commitment to roadway
infrastructure by
resurfacing streets in
need of attention.
2022-23 Overlay
The Annual Overlay and
Bouquet Canyon Road
From Newhall
Jul-22
Jun-23
Nov-23
3
15
and Slurry Seal
Slurry Seal Program
Ranch Road to
Program
reflects the City's
Concrete Bridge
commitment to roadway
North of Seco
infrastructure by
Canyon Road
resurfacing streets in
need of attention.
2022-23 Overlay
The Annual Overlay and
Copper Hill Drive
From Haskell
Jul-22
Jun-23
Nov-23
3
15
and Slurry Seal
Slurry Seal Program
Canyon Road to
Program
reflects the City's
David Way
commitment to roadway
infrastructure by
resurfacing streets in
need of attention.
2022-23 Overlay
The Annual Overlay and
Lyons Avenue
From Walnut
Jul-22
Jun-23
Nov-23
3
15
and Slurry Seal
Slurry Seal Program
Street to Railroad
Program
reflects the City's
Avenue
commitment to roadway
infrastructure by
resurfacing streets in
need of attention.
2022-23 Overlay
The Annual Overlay and
Newhall Avenue
From Railroad to
Jul-22
Jun-23
Nov-23
3
15
and Slurry Seal
Slurry Seal Program
Roundabout
Program
reflects the City's
commitment to roadway
infrastructure by
resurfacing streets in
need of attention.
2022-23 Overlay
The Annual Overlay and
Sierra Highway
From Newhall
Jul-22
Jun-23
Nov-23
3
15
and Slurry Seal
Slurry Seal Program
Avenue to City
Program
reflects the City's
Limit (South)
commitment to roadway
infrastructure by
resurfacing streets in
need of attention.
2021-22 Overlay
The Annual Overlay and
Copper Hill Drive
Newhall Ranch
Jul-21
Jun-22
Nov-22
3
15
and Slurry Seal
Slurry Seal Program
Road to Smyth
Program
reflects the City's
Drive
commitment to roadway
infrastructure by
resurfacing streets in
need of attention.
2021-22 Overlay
The Annual Overlay and
Magic Mountain
From Railroad
Jul-21
Jun-22
Nov-22
3
15
and Slurry Seal
Slurry Seal Program
Parkway
Avenue to Tourney
Program
reflects the City's
Road
commitment to roadway
infrastructure by
resurfacing streets in
need of attention.
2021-22 Overlay
The Annual Overlay and
Whites Canyon Road
From Soledad
Jul-22
Jun-23
Nov-23
3
15
and Slurry Seal
Slurry Seal Program
Canyon Road to
Program
reflects the City's
Heller Circle
commitment to roadway
infrastructure by
resurfacing streets in
need of attention.