HomeMy WebLinkAbout2022-07-12 - AGENDA REPORTS - 2020 21 CIRCULATION IMPROV PGM PROJ C0064 PHASE IVAgenda Item: 13 1. CITY OF SANTA CLARITA AGENDA REPORT CONSENT CALENDAR CITY MANAGER APPROVAL: DATE: July 12, 2022 SUBJECT: 2020-21 CIRCULATION IMPROVEMENT PROGRAM, PROJECT C0064 PHASE IV - DESIGN CONTRACT DEPARTMENT: Public Works PRESENTER: Shannon Pickett RECOMMENDED ACTION City Council: 1. Award a design contract to Dokken Engineering for 2020-21 Circulation Improvement Program Phase IV, Project C0064 in the amount of $349,775 and authorize a contingency in the amount of $34,978, for a total contract amount not to exceed $384,753. 2. Authorize the City Manager or designee to execute all documents, subject to City Attorney approval. BACKGROUND The 2020-21 Circulation Improvement Program, Phase IV project, will focus on traffic circulation improvements for the Valencia Boulevard/McBean Parkway and Valencia Boulevard/Mall Entrance intersections. The improvements will relocate utilities, as needed, to accommodate the proposed improvements and modify medians, curb and gutter, striping, asphalt, landscaping, and irrigation. The project includes enhanced circulation on McBean Parkway (approximately 500 feet in both the north and south directions of the intersection), Valencia Boulevard (from Mall Entrance to approximately 500 feet west of McBean Parkway), and Mall Entrance north of Valencia Boulevard. This action provides for the design of these improvements. The locations are shown on the attached location map. In anticipation of ongoing and future development in and around the City of Santa Clarita (City) and overall traffic increases, circulation improvement projects are needed to maintain traffic flow in the City. The proposed improvements include modifications to raised center medians and the relocation of existing curb and gutter to accommodate additional left -turn pockets on Valencia Boulevard, left -turn lane extensions on McBean Parkway, and a median modification on Mall Page 1 Packet Pg. 117 Entrance. The modifications are based on staff s analysis of traffic volumes and observations of traffic patterns at the selected intersections. This project supports the Sustaining Public Infrastructure theme of the City's five-year strategic plan, Santa Clarita 2025. A Request for Proposal (RFP) for the design of the project was prepared and posted on BidNet on April 13, 2022. The RFP asked firms to identify their relevant experience with similar projects and demonstrate their design approach for this project. On May 13, 2022, two firms submitted proposals. Staff reviewed the proposals and, based on their evaluations, scored the firms on a 100-point scale as follows: Rank Company 1 Dokken Engineering 2 Encompass Consultant Group, Inc Location Score San Diego, CA 92 Santa Clarita, CA 87 The scoring system was based on the following criteria: responsiveness to the RFP based on an understanding of the scope and approach to the required work and key development tasks, the consultant's previous experience with similar projects and experience working with the City, qualifications of the project team and their resources, and schedule for the work. Additionally, each consulting firm was asked to provide a detailed scope of work required to prepare the plans, specifications, and engineer's construction estimate. Dokken Engineering demonstrated an in-depth understanding of the project needs and provided a detailed scope of work and approach to the project. They analyzed the existing streets and identified key design factors that will need to be addressed in the design. Based on their design experience with previous City traffic projects and the completeness of their proposal for this project, staff recommends awarding the design contract to Dokken Engineering. The requested contingency will cover design modifications, field investigations, including potholing for utility locations and foundations, permits required by the County of Los Angeles, and coordination with utility companies and other agencies. While the City maintains a Support of Local Businesses policy that can be utilized by the City Council when warranted, the policy only extends to purchases of supplies, equipment, and services other than Public Works projects and professional services, such as architectural and engineering services. California Government Code 4526 prescribes selection of architectural and engineering services to be based on demonstrated competence and professional qualifications necessary for the satisfactory performance of the services required and does not authorize the selection of professional architect and engineering services based on costs. Staff opened Dokken Engineering's cost proposal and negotiated a final contract at a fair and reasonable price for the services requested in the RFP. ALTERNATIVE ACTION Other action as determined by the City Council. Page 2 Packet Pg. 118 FISCAL IMPACT Adequate funds are available in expenditure account C0064233-516101 (TDA Article 8 Fund) to support the recommended contract and project administrative costs. ATTACHMENTS Location Map Proposal for Dokken Engineering (available in the City Clerk's Reading File) Page 3 Packet Pg. 119 13.a `i`' of SANTA GLARITA `• 2020-21 Capital Improvement Program (Phase IV) • , Aa { McBean Parkway,Valencia Blvd, & Mall Entrance r' ' � x t 1 6 CD a+ „ - �- # Y .r � �� a •R� S r 1 � 4 / _ �r .... CD � 'Y Valencia Boulevard • �. i��o �r 1 e i r . iy ' N Aerial photo is a proprietary dataset provided courtesy of the Los Angeles Region Imagery Consortium (LAR-IAC) and Sanborn Map Company, Inc. 2020 The City of Santa Clarita does not warrant Feet the accuracy of the data and assumes no 0 75 150 300 liability for any errors or omissions. Q:\PROJECTS\PW\220613a1\C0064 N O N v IZ fU t Packet Pg. 120 U fC rculation Improvements for VALENCIA BOULEVARD, MCBEAN PARKWAY, AND MALL ENTRANCE - PHASE IV Proposal # CIP-21-22-CO064 SUBMITTED TO: City of Santa Clarita Purchasing Division ATTN: Danielle Marquez 23920 Valencia Boulevard Suite 120 Valencia, CA 91355 SUBMITTED BY: r R§DOKKEN E N G I N E E R I N G Michael Greer, PE, TE Project Manager 1450 Frazee Road, Suite 100 San Diego, CA 92108 (858) 514-8377 mgreer@dokkenengineering.com PROPOSAL May 17, 2022 ATTN: Danielle Marquez City of Santa Clarita - Purchasing Division 23920 Valencia Boulevard, Suite 120 Valencia, CA 91355 DOKKEN ENGINEERING TEAM Project Manager: Michael Greer, PE, TE • R/W & Utility Coordination Experience • Signal Modification Design Experience • Fiber Optic System Design Experience • City of Santa Clarita Experience Subject: Proposal # ENG-21-22-CO064 — Circulation Improvements for Valencia Boulevard, McBean Parkway, and Mall Entrance — Phase IV Ms. Marquez, For over 36 years, Dokken Engineering has been providing "turn -key" project solutions for our public works clients. Since 1990, we have enjoyed a long history of working with the City of Santa Clarita to successfully deliver multiple projects along local streets and state highways, including intersections of various sizes. Understanding the objectives of our clients while addressing the needs of stakeholders has helped us successfully deliver nearly 3,000 projects. We have extensive experience working on roadway widening and signal modification projects. In the past five years, our proposed Dokken Team has delivered over 50 traffic signal and 100 curb ramp modification designs through construction. Past projects have included modification designs to existing, as well as new, traffic signal systems of various sizes and complexities at single and multi -lane roadway intersections. The Dokken Team's delivery success and long history of completing projects and deliverables on schedule provides assurance to the City that we have the experience and capabilities to deliver this project involving multiple stakeholders and potential utility conflicts. We are uniquely qualified to deliver this project because: Dokken has recent experience delivering roadway widening, curb ramp design, and traffic signal modification projects with similar design challenges. We understand how to efficiently revise roadway and striping geometrics then quickly simulate turning movements for various alternatives to develop the layout that best meets project design and safety objectives. Our team is also adept at creating ADA- compliant curb ramp designs with layouts that protect in place existing utility infrastructure and minimize signal modification work. Dokken has recent experience working with the City on projects that seek to protect in place existing utilities, such as the Sierra Highway Bridge Widening and Replacement Project as well as the newly initiated Bouquet Canyon Trail Project. We have a thorough understanding of City requirements. Dokken has experience working near busy shopping mall intersections, and our staff is experienced in navigating common pitfalls associated with stakeholder and right of way coordination that can delay a project. Our team consists of the same staff that has successfully completed similar projects. Michael Greer, our Project Manager, brings over 15 years of experience with expertise in management, traffic electrical, and civil design for transportation projects. He will be supported by a team he personally selected based on his experience with the individual team members on current projects or those recently completed. Our approach is to develop well thought out strategies at project initiation, which allows projects to move forward without 'surprises' which can derail cost and schedule. Dokken Engineering's mission is to provide superior service to our clients for all their traffic electrical and related civil engineering needs. We strive to be responsive and flexible to our clients, which results in projects being delivered on time and within budget. We appreciate your consideration of our proposal, and we are very excited for this opportunity to be continue our relationship with the City of Santa Clarita. Sincerely, N "chael Greer, PE, TE Project Manager mgreer@dokkenengineering.com 145o Frazee Road, Suite ioo, San Diego, CA 921o8 9 Tele: 858.514.8377 Mark Tarrall, PE Principal in Charge mtarrall@dokkenengineering.com 9 Fax:858.514.86o8 9 www.dokkenengineering.com r NN TA o ti�FO 75 DECEMB��1 N M olmill"lle" - ■ CIRCULATION IMPROVEMENTS FOR VALENCIA BLVD, MCBEAN PKWY, AND MALL ENTRANCE - PHASE IV PROPOSAL #CIP-21-22-00064 1. INTRODUCTION The City of Santa Clarita strives to maintain a circulation plan that has minimal delays by providing adequate capacity and efficient traffic flow for drivers, pedestrians, and other public right of way users. Increased safety is a derived benefit when the above is provided. The project includes two intersections along Valencia Boulevard, at McBean Parkway, and at the Mall Entrance. Valencia is one of the City's major arterials, routing traffic to and from 1-5, located 1 mile to the west, and the areas north of the Santa Clara River. McBean Parkway, another major arterial, is also a route to 1-5. Together these two heavily trafficked roadways provide two of the most direct routes to the freeway and residential areas along with other major traffic attractors, including the Westfield Mall located within the project area. The project seeks to improve capacity, with several modifications to the roadways and intersections, thereby increasing capacity and decreasing delays. The major improvements include adding a third left turn lane from Valencia Avenue to both northbound and southbound McBean Parkway, extending the two left turn lanes from McBean Parkway to Valencia Boulevard in both directions, adding a second left turn lane into the mall entrance from Valencia Boulevard and adding a third entrance lane into the mall. Dokken has thoroughly reviewed the request for proposals and available materials, including performing a site visit to take photos and observe traffic volumes and patterns in the area. We understand the challenges this project will present to design, coordinate, and construct. Our team of traffic electrical, roadway, drainage, and utility coordination specialists have developed an understanding of the key project issues presented herein. Project Approach The City has plans to widen Valencia Boulevard through two of the busier intersections at McBean Parkway and the Mall Entrance. We have developed an approach which addresses stakeholder coordination, maximizes mall access during construction, accounts for property owner coordination, as well as minimizing impacts to the existing drainage and traffic signal systems, mature street trees, and utilities. We have included a Project Overview Exhibit to better understand the project and constraints along this roadway widening, curb ramp, and median reconfiguration project. Dokken's in-house capabilities include civil, traffic, structural, environmental, and drainage services. Having all these capabilities in-house improves uniformity and efficiency of the overall design. Based on our understanding of the project we have developed the following table to identify key project issues, provide our team's recent experience, and describe the unique benefit Dokken brings to the City. Key Project Issue Our Dokken Benefit Stakeholder Coordination of Right of Way and Utility Impacts The project requires coordination Dokken has extensive experience Our team will work to provide required between a large group of working with multiple project documentation, as well as coordinate stakeholders including LA County stakeholders, coordinating design focus with LA County Flood Control District, Flood Control District (LACFCD), meetings, and hosting stakeholder Santa Clarita Traffic Division, and Santa Clarita Traffic Division, and meetings to ensure all expectations are Adjacent Property Owners. We bring Adjacent Property Owners managed and concerns thoroughly our understanding of the process and including Westgate Mall. addressed. project site to the City. Maintaining Roadway Cross -Slopes To Minimize Drainage System Impacts The proposed roadway widening Dokken's in-house water resources Having a team of in-house water and median reconfiguration work team has significant experience resource experts to work together with should be designed to minimize modifying existing storm drain systems roadway and bridge designers provides impacts to two existing storm and relocating catch basins with seamless integration of drainage drain catch basins, maintained by minimal impacts to existing solutions that will work with the project LACFCD. There is a catch basin infrastructure. We understand the constraints. Our drainage structure along the northerly Valencia Blvd calculations needed to develop design construction details have been curb line by the Mall Entrance solutions. Dokken's in-house structures constructed without issue; including and another along the northerly team also has significant experience catch basins, junction structures, debris Valencia Blvd median curb line working side -by -side our water basins, and complex coastal tide gates. towards the project's west end. resources team to provide buildable cost-effective solutions. R§DOKKEN Page 1 2 ENGINEERING - ■ CIRCULATION IMPROVEMENTS FOR VALENCIA BLVD, MCBEAN PKWY, AND MALL ENTRANCE - PHASE IV PROPOSAL #CIP-21-22-00064 Key Project Issue Our Team Experience Dokken Minimizing Traffic Signal System Impacts with Roadway and Curb Ramp Designs The project proposes Dokken has extensive experience We have recent experience designing improvements to five existing designing curb ramps within existing curb ramps for the City of Oxnard for curb ramps for upgrades per built -out environments. Our designers the HSIP Traffic Signal Modification current ADA standards and as are thoroughly trained in the art of project at seven intersections. Our team needed due to curb return avoiding utilities and other valuable performed a thorough inventory of the redesigns. Existing traffic signal infrastructure to minimize project costs. existing curb ramp dimensions and push button accessibility will Our designs seek to protect in place grades to determine ramps that needed need to be re-evaluated to ensure facilities wherever possible and when reconstruction. Photo logs and they are within compliant relocations are needed, we vet the measurements to existing facilities were distances and heights to new proposed locations against current well -documented to avoid impacts and landing areas. standards. relocations. Vehicle Turns and Signal Placement to Avoid Path Overlap and Maintain Existing Phasing The project seeks to add a third Our team has experience developing With Dokken, the City has an left turn lane to existing dual left signing/striping and signal modification experienced team who understands the turn lanes along Valencia plans at intersections of all sizes. Most importance of developing designs that Boulevard, turning onto McBean notably we are experienced in the fit in built -out areas. We are well -versed Parkway. The project will also add development of turning movements at in the challenges facing drivers as they a second left turn lane to a single large, complex intersections both enter complex intersections, and we left from EB Valencia Boulevard skewed (as is the case at McBean strive to maintain sign visibility and lane to the NB Mall Entrance. Each of Parkway) and non -skewed (as with the clarity in our designs. We understand these turn lane additions will Mall Entrance). We have modified the importance of providing clearly need to be carefully designed to traffic signals to include triple left turn visible and smooth driving paths to ensure no turning vehicle path lanes for projects including Mira Mesa avoid last-minute decisions by drivers overlap to maintain phasing. Boulevard in the City of San Diego. that can result in collisions. Median Reconfigurations to Maximize Left Turn Pocket Storage With Minimal Landscape Impacts A large portion of the work on Dokken has worked with ADL Planning Dokken and ADL Planning understand this project will be along the on many past projects to modify that modification to existing irrigation raised medians where there is existing landscape and irrigation. We systems should be done in a way that existing landscaping, irrigation, are confident that Tony Lawson can protects a majority of the system and large trees throughout. provide cost effective solutions and features to save on project costs. minimize impacts. Stakeholder Coordination of Right of Way and Utility Impacts The project proposes to widen Valencia Boulevard along the southerly limits of the Westgate Mall and reconfigure the existing median and curb ramp at the Mall Entrance driveway. Our team has recent experience coordinating similar modifications to the Fashion Valley Mall Entrance driveway via our Friars Road Widening Project at the SR- 163 Interchange for the City of San Diego. Mall owners added a third entering lane and removed an exit lane from this driveway. The figure to the right depicts the traffic signal and curb ramp modification plan that was ultimately constructed around the mall's holiday moratorium. Impacts to existing utilities, street lights, and meter pedestals along the Valencia Boulevard northerly curb line will be unavoidable due to the roadway widening and curb return reconfigurations. Up to two fire hydrants will need to be relocated because of project improvements. Our team will work closely with the Santa Clarita Valley Water agency and Fire Marshall to obtain concurrence on new fire hydrant locations. Our team will also work with other impacted utilities to accurately map their R§DOKKEN Page 1 3 ENGINEERING - CIRCULATION IMPROVEMENTS FOR VALENCIA BLVD, MCBEAN PKWY, AND MALL ENTRANCE - PHASE IV PROPOSAL #CIP-21-22-00064 facilities and propose relocations that will satisfy all parties. Coordination with multiple stakeholders on public agency projects is one of our strengths since we provide early coordination and solutions to all parties. Maintaining Roadway Cross -Slopes to Minimize Drainage System Impacts The proposed roadwaywidening along the outer curb line does not present as much of a challenge from a drainage and cross -slope maintenance perspective since the existing median reconfigurations to provide additional left turn pocket storage does. Typically, roadway widening is done in the same plane as the adjacent roadway to maintain flow patterns and reduce grade breaks across traveled lanes. However, when widening left turn pockets where raised medians exist, this can sometimes present a problem when the remaining median has significantly differing elevations on either side. For this project we propose utilizing a grade break along the left turn lane stripe to carry the typical roadway crown through the left turn lanes. This creates a situation where the left turn lanes drain towards the median while the through lanes in the same direction drain towards the outer curb line. This is the current configuration along McBean Parkway, to be confirmed with field survey and topography file to perpetuate existing drainage patterns. The addition of a second left turn lane at the Mall Entrance driveway, from eastbound Valencia Boulevard to northbound Mall Entrance, will need to be carefully evaluated for the need of an additional catch basin along the median. The existing raised curb in this area has a steep cross -slope across the top of the median and any modifications to relocate the median will need to account for the elevation differences on either side of the curb. The image to the right, and visible GIS layers, identifies drainage features such as storm drain lines and catch basins (depicted as squares). The blue linework and shapes are maintained by LACFCD. The purple squares are the drainage systems that are maintained by the City. Driving westbound from the Mall Entrance towards the intersection of Valencia Boulevard and McBean Parkway, improvements Exist SD System GIS Layers '-s.tflaltl q MTD 1356 �t"a� ■ ■ [ ■ varer, �ale�" N Isl iiJ� L�r " i f 'v along the segment calls for road widening to provide an additional right turning lane onto McBean Parkway. Currently there is a curb side opening catch basin (Standard Plan 300-2) that would have to be removed and/or relocated along with the pipe network configurations consisting of an 84" diameter RCP (under sidewalk). The location of the 84" diameter pipeline is directly under the adjacent sidewalk which may be impacted by the project improvements. The additional lane conflicts with an existing 34" natural gas line around the area of proposed landscape/irrigation work. Driving southbound from McBean Parkway, improvements include a median modification with the addition of two left turning lanes and irrigation work. Currently, there is a grated catch basin owned by the City that is in conflict to the proposed modification of the median that will be impacted and will need to be relocated. Referring to Exhibit 1 and Figure 1, the median configuration and addition of two left turning lanes onto westbound Valencia Blvd, there are (2) side opening curb catch basins (Standard Plan: 300-2) that are connected to an 18" RCP. The pipework connection may conflict with the median modification and may need to be relocated. R§DOKKEN Page 1 4 ENGINEERING - ® CIRCULATION IMPROVEMENTS FOR VALENCIA BLVD, MCBEAN PKWY, AND MALL ENTRANCE - PHASE IV PROPOSAL #CIP-21-22-00064 Driving eastbound, before the McBean Parkway intersection on Valencia Boulevard, calls for a proposed median modification. A side opening catch basin owned by the City is currently in conflict to the modification of the median and will potentially have to be removed and/or relocated. Alternatively, an option may be to create the new curb line with curb cuts to allow water to flow to this existing drainage inlet, shown along the curb line in the image on the right. Our drainage team will work closely with our roadway, utility, and traffic electrical leads to provide the best possible roadway design that limits impacts to critical drainage facilities. Median with SD Catch Basin 04 SPNTq C� 9 �Y bra O 9 aH ECEMeEP^q¢ Minimizing Traffic Signal System Impacts with Roadway and Curb Ramp Designs Upgrades to existing curb ramps can often snowball into unidentified project and utility impacts if not properly vetted during preliminary design. Our team is adept at taking inventory of existing curb ramps and surrounding areas to better prepare ourselves once CAD activities begin. Our project manager has a traffic engineering background and trains his teams to properly account for traffic signal infrastructure from project initiation. He has also spent valuable time in the field as a roadway and electrical inspector, giving him the insight and forethought required to avoid costly utility impacts during construction. Along with roadway and curb ramp improvements, the existing traffic signals will be impacted. Minor modifications to the Mall Entrance traffic signal will be required. The McBean Parkway intersection will require major modifications including the replacement of the traffic signal poles for the left turn movement from Valencia Parkway. Along with pole replacements, the project will install new detection and controller updates required by the City. Many specialty traffic calming R countermeasures will need to be maintained at this Jim, intersection, including video detection and closed-circuit television cameras, red light compliance and emergency _ vehicle detection, as well as "No Right on Red" blank -out signs. This area also has a major fiber optic communication R., trunk. Any affected fiber optic interconnect through the corridor will be maintained or rerouted and respliced as r Traffic Signal to be Modified necessary. Construction will be staged to ensure that downtime for the fiber will be kept to a minimum. With these improvements, the goal of the project will be met leading to improved capacity through the area and these two intersections. Delays will be lessened and circulation enhanced. The safety of the intersection will be improved leading to less redlight running, and ultimately, less collisions. Vehicle Turns and Signal Placement to Avoid Path Overlap and Maintain Existing Phasing With the addition of a third left turn lane for both the eastbound Valencia Boulevard to northbound McBean Parkway as well as westbound Valencia Boulevard to southbound McBean Parkway turn movements, the City requests to maintain existing traffic signal phasing that allows both left turn movements to go simultaneously. Turn lane modifications will need to be carefully evaluated for path overlap issues, to ensure that vehicles will not meet head-on in the middle of the intersection when making the turn at the same time. Our Project Overview Exhibit included in this section illustrates a draft vehicle turn movement with larger trucks in the outer turn lane and standard passenger cars in the two inner turn lanes. Dokken will evaluate different scenarios during the preliminary design to ensure vehicles of different sizes in various lane configurations will be able to make these turns safely. R§DOKKEN Page 1 5 ENGINEERING - ® CIRCULATION IMPROVEMENTS FOR VALENCIA BLVD, MCBEAN PKWY, AND MALL ENTRANCE - PHASE IV PROPOSAL #CIP-21-22-00064 We understand that these two traffic signals have extremely high volumes for all left turn, through, and right turn vehicle movements and that visibility of the traffic signal heads, and operability of detection equipment helps to maintain a safe environment. Our team will thoroughly evaluate vehicle signal head placements, specifically for the project areas where lanes are being added or shifted from current configurations. We will include in our evaluation a review of vehicle signal head placement during construction and incorporate temporary vehicle head placements on temporary traffic signal plans where needed. We will also ensure that pedestrian and bicycle paths of travel are maintained, or detours provided. Access will need to be maintained to adjacent businesses throughout construction. Thus, staging of the project and the proper development of stage construction plans will be critical to ensuring this goal is reached. Full lane closures are not anticipated to be allowed due to the high traffic volumes in the area, so lane widths and speeds will be proposed to be reduced during construction to create adequate room for safe work areas. Median Reconfigurations to Maximize Left Turn Pocket Storage with Minimal Landscape Impacts The proposed project will shift roadway edges and curbs. This will have an impact on the adjacent landscape areas. While generally smaller in size, some existing landscape areas will increase, while in other locations there will be a reduction in landscape size. To properly address and treat these areas, our team will research existing documents and conditions, confirm the City's landscape goals, and prepare cost effective landscape improvements. We shall gather and review existing landscape irrigation as -built documents to determine the extent of impact on the existing irrigation system, prepare pro -active treatment solutions and review our findings and suggestions with City landscape staff. This will permit us to prepare comprehensive documents that provide proper guidance to contractors in advance, and during site demolition and construction. Additionally, we will determine the best way to expand the existing irrigation, efficiently and effectively in new landscape areas. Generally, projects such as this anticipate a "replace -in -kind" approach to landscape, which assumes a continued use of the currently used irrigation components and systems. However, due to the greater need for water conservation, our team will explore opportunities to upgrade the existing system in ways that would lower water consumption and offer such improvements to the City. Reduction of overhead spray is one common goal however some improvements may be beyond budget limitations at this time but might have options that could anticipate future implementation. Similarly, anticipated plant material would be expected to match existing to the extent reasonable. High water demanding plants should be assessed and alternatives that require less water and maintenance should be given consideration. The continued use of grass is being discouraged in many municipalities throughout the southland to reduce water demand. Our team will offer potential alternatives. In summary, the landscape portion of the project is relatively small, both in scale and costs. However, it will have continued financial impacts to the City regarding maintenance and water costs. We feel it very important to consider best practices and apply good sustainable principles to the proposed landscape improvements. R§DOKKEN ENGINEERING Page 1 6 Circulation Improvements for Valencia ODOKKEN Boulevard, McBean Parkway and Mall Entrance ENGINEERING QUALIFICATIONS OF FIRM AND ASSIGNED STAFF - ® CIRCULATION IMPROVEMENTS FOR VALENCIA BLVD, raft I MCBEAN PKWY, AND MALL ENTRANCE - PHASE IV _ PROPOSAL #CIP-21-22-00064 2. QUALIFICATIONS OF FIRM AND ASSIGNED STAFF DOKKEN STATEMENT OF QUALIFICATIONS Established in 1986, DOKKEN ENGINEERING is a civil, transportation, ENGINEERING and structural engineering firm with environmental and right of way SAN DIEGO OFFICE: services that is headquartered in Folsom, California. Since our 1450 Frazee Road, Suite 100 founding, we have developed an exceptional depth of experience San Diego, CA 92108 and expertise, having successfully completed nearly 3,000 Tel (858) 514-8377 infrastructure projects, including site design, roadways, bikeways, Fax (858) 514-8608 structures, environmental and right of way projects across the state. Dokken employs a multi -disciplinary team of civil engineers, FOLSOM OFFICE— HEADQUARTERS: structural engineers, roadway engineers, traffic engineers, right of 110 Blue Ravine Road, Suite 200 way agents, environmental specialists, hydrologists, and other Folsom, CA 95630 specialists. Our technical experts and their support staff work to provide seamless and cost effective project delivery. Having these REDDING OFFICE: readily available in-house specialists streamlines project 2192 Civic Center Drive coordination by providing easy and effective communication. Our Redding, CA 96001 team is also able to utilize collective experience to plan and troubleshoot projects from various aspects. ORGANIZATIONAL STRUCTURE Business Classification: CA Corporation Dokken's team of experts have established professional working Year of Incorporation: 1986 relationships with federal and state oversight agencies and have a Years Providing Services: 38 thorough understanding of regulatory processes and standards, including Caltrans Local Assistance Procedures Manual (LAPM) PRIMARY REPRESENTATIVE policies and procedures, FHWA requirements, and regulatory Michael Greer, PE, TE agency requirements. ■ mgreer@dokkenengineering.com Dokken works almost exclusively with public agencies and many of ■ California Licensed Professional our staff have substantial experience working for local agencies, Engineer, #C79080 Caltrans, and/or resource agencies. This allows us to better ■ California Licensed Traffic Engineer, understand and meet the needs of our clients and develop the best #TR 2845 approach to achieving project delivery. As a result, project management is streamlined, saving valuable time and money. FIRM EXPERTISE Project Management Signal/Lighting Design I Dokken Engineering has many in-house Traffic Signals & Lighting Design 1 specialties including Electrical and Traffic Signal Design for Bridge & Road Design 1 r public projects. Dokken Engineering's internal team has Environmental Engineering &Planning 1 r provided traffic signals and street lighting plans for a CEQA/ NEPA multitude of intersections and streets including lighting design for Stakeholder Coordination & freeways, bridges, parking lots, and streetscape projects. Services Public/Community Outreach include layout, design, and estimate of signal modifications, new Utility Coordination & Design signals, street lighting plans, ITS and TMS design, striping and signing Funding Assistance plans, and aesthetic lighting for bridges and streetscapes. Our staff Right of Way Acquisition & Relocation is well versed with signal, lighting, and electrical design Hydrology & Hydraulics Engineering requirements, and the California MUTCD. We have designed or Site Design modified over 200 traffic signals in various jurisdictions across California. www.dokkenengineering.com R§DOKKEN Page 1 8 ENGINEERING - CIRCULATION IMPROVEMENTS FOR VALENCIA BLVD, MCBEAN PKWY, AND MALL ENTRANCE - PHASE IV _ PROPOSAL #CIP-21-22-00064 Traffic Control/Signing & Striping Plans I Dokken Engineering has prepared hundreds of traffic control plans for various projects and agencies. We are familiar with the traffic control requirements, standards, and permitting process. We develop traffic control plans with a focus on safety, while minimizing impacts to the traveling public. Our team develops traffic striping and signing plans per the latest CA MUTCD and agency design standards to support our projects. Road and Bikeway Design Services I Roadway projects are an integral component of Dokken Engineering's services. Our engineers design simple and complex roadway widening/extension projects, as well as �. the required improvements to the surrounding area, such as sidewalks, bike and pedestrian pathways, .; bus stop/pullouts and intersection signalizations. Our roadway projects are supported by engineering staff from our specialty groups. Structures Design I Dokken has successfully completed hundreds of structure designs, from rural two-lane HBP bridges, to complex multi -level freeway -to -freeway interchanges. Additional structure designs include pedestrian overcrossings, bicycle bridges, viaducts, and retaining/sound walls. Dokken has also ;, m"' provided seismic stability evaluations, retrofit plans, specifications, and estimates. Our structures team has innovative and cost-effective design solutions which save our clients millions of dollars. Paying careful attention to the details of a project's setting, along with client and community feedback, our designs meet the unique conditions of each project. Environmental Services I Dokken has an experienced in-house Environmental Services Group that works on our roadway, bridge, and infrastructure projects throughout California. We have established professional working relationships with federal and state regulatory agencies based on technical excellence and a thorough understanding of regulatory processes, including: Environmental Document Preparation (NEPA/ CEQA Analysis and Compliance); Technical Studies & Reports; and Environmental Regulatory Permitting & Compliance. Dokken's hands on approach and technical experience have accelerated schedules for all regulatory requirements of the Federal Clean Water Act (CWA), Sections 401, 402, and 404; the National Environmental Policy Act (NEPA); the National Historic Preservations Act (NHPA), Sections 106 and 110; the Federal Endangered Species Act (ESA), Sections 7 and 10; the California Environmental Quality Act (CEQA); the California Endangered Species Act (CESA); and 1600-16116 California Fish and Game Codes. Drainage Studies and Water Quality Engineering I Dokken Engineering has staff dedicated to hydrology, hydraulics, and drainage design. These staff members are experts in assessing drainage issues, Nit conducting analyses, and coordinating with other disciplines to develop balanced, cost-effective •solutions. Our group concurrently reviews the project improvements to determine the storm water quality management requirements. Each project includes Site Design and Source Control BMPs and may include Treatment Control BMPs. We engage the City early to develop proposed drainage and water quality concepts that accommodate roadway improvements and correct any existing drainage deficiencies. Utilities I Our team identifies potential conflicts in collaboration with the utility owner representatives and the local agency and develop a comprehensive plan to ensure that all potential conflicts are verified. We understand the importance of accurate utility mapping, positive verification of utility conflicts through potholing, and developing conflict resolutions early in the design process. We work side -by -side with the local agency and utility owner representatives, creating exhibits as needed to highlight potential conflicts and resolutions for accurate designs that are compatible with the proposed project improvements and construction sequencing. R§DOKKEN Page 1 9 ENGINEERING M■ CIRCULATION IMPROVEMENTS FOR VALENCIA BLVD, MCBEAN PKWY, AND MALL ENTRANCE - PHASE IV _ PROPOSAL #CIP-21-22-00064 HISTORY OF COMPARABLE WORK Since our founding, we have developed an exceptional depth of experience and expertise, having successfully completed nearly 3,000 infrastructure projects, including site design, roadways, structures, environmental and right of way projects across the state. Our qualified staff has the knowledge and experience to provide cost- efficient engineering for the City of Santa Clarita for this project. Dokken Engineering has worked extensively with the City and is very familiar with City standards and procedures. In addition, we are well -versed in design procedures, Standard Plans and Specifications, and Caltrans design standards. Projects Dokken Engineering has completed for the City of Santa Clarita include: • Sierra Highway Improvements and Pedestrian Bridge • McBean Parkway Bridge over the Santa Clara River • Golden Valley Road Bridge over the Santa Clara River • Bouquet Canyon Rd Bridge Widening over the Santa Clara River • Wiley Canyon Road Bridge over the Santa Clara River • Soledad Canyon Road Bridge over the Santa Clara River • 1-5/Magic Mountain Parkway Interchange Drainage • Paseo Overcrossing Valencia Boulevard • Paseo Overcrossing Magic Mountain Parkway MANAGEMENT APPROACH Our management approach is to be an extension of the City staff and provide the City an experienced team. Our team will provide the resources and tools necessary to deliver this project with minimal oversight from the City staff. LINES OF COMMUNICATION It's critical that the project team receives confirmation of the scope, budget and schedule from the City' Project Manager. This review allows all parties to understand the project scope and schedule and the submittal milestones. In addition to monthly project team meetings, Dokken Engineering will keep the City Project Manager aware of progress through weekly emails and team conference calls. This approach allows the City Project Manager to provide any required input throughout the project development process. SCHEDULE AND BUDGET CONTROL In order to manage the three interdependent elements found in every project — scope, schedule, and budget — it is necessary to implement a sustainable project control methodology. Michael, our Project Manager, will develop and implement the project controls plan. The plan outlines the procedures for conducting work, managing project resources, and reporting project status and progress. The project management tools identified on the right assures on time and within budget project deliverables. These tools will enable Michael to provide a systematic approach to deliver any project. All project participants, including the City and Dokken Engineering Team, will be aware of the project status in order to make informed management decisions. Our tools and system are designed to respond to these requirements. Dokken Engineering prepares and maintains project schedules for every project. The schedules are monitored and staffing adjusted to meet milestones. Performance is monitored through R§DOKKEN Page 1 to ENGINEERING - ® CIRCULATION IMPROVEMENTS FOR VALENCIA BLVD, MCBEAN PKWY, AND MALL ENTRANCE - PHASE IV _ PROPOSAL #CIP-21-22-00064 quality control checks, review of actual versus planned progress, completion of action items prepared after meetings, monthly invoicing, and progress reporting. Dokken Engineering will use the City standards and formats, making invoice review streamlined and familiar to the City. For our team, quality is not just a priority, it is a core value. Dokken Engineering has found that the best way to control budget is to ensure the project schedule is followed. This method avoids costly over -runs and extended production times. The key to preserving budgets is to start on time, get it right, and submit the deliverable on time. Utilizing the same design working group from the beginning of the project to the end ensures consistent thought and engineering practice, while eliminating wasteful hours spent "getting familiar" with a project. The MS Project Schedule will be supplemented with a deliverables schedule that identifies all project deliverables and submittal dates. The deliverables schedule is a critical project management tool because it specifies what is being delivered to the client and when it is to be submitted. The deliverables schedule will be updated monthly and submitted as part of the monthly invoice to report on the status of completed, in -progress and upcoming deliverables. The combination of the budget and schedule showing task durations and sequencing will enable us to produce a time -phased budget. With a time -phased budget and a work -based method of measuring progress, a reliable comparison on planned versus actual can be made. PROJECT COMMUNICATION As an extension of the City staff, Michael and his team will use a suite of communication mechanisms to keep the City informed and to maintain the project schedule. The following diagram identifies the key communication methods to deliver this project. Weekly Internal Team Meeting Monthly Project I Development Team Meeting (PDT) 3 Focus Meetings to Resolve Issues Weekly Email Update to City Agency Meetings Dokken Engineering has long-standing history of delivering projects with multiple team members and stakeholders, and we have established communication protocols that all team members understand. We host weekly internal team conference calls to track progress and keep everyone current on project status and recent decisions that affect their awareness and productivity. Our number one goal when working with our clients is successful project delivery. We identify risks early in the process and develop ways to mitigate these risks. We work closely with our clients to keep them informed on the status of their project and any pending decisions, and we are extremely responsive to their needs. QUALITY CONTROL/QUALITY ASSURANCE Dokken Engineering and our Team members are committed to the City of Santa Clarita in delivering project documents whose quality exceeds the industry standards. Quality is not just a priority; it is one of our core values. From the project outset, QA/QC procedures will be implemented in accordance with the project Scope of Work. Our procedures incorporate continuous product review cycles during plan development, as well as a series of formal review procedures completed for major project deliverables. The review of deliverables needed to satisfy the QA/QC procedure is built into our proposed schedule. The following flow chart outlines our process: R§DOKKEN Page 1 11 ENGINEERING - ® CIRCULATION IMPROVEMENTS FOR VALENCIA BLVD, MCBEAN PKWY, AND MALL ENTRANCE - PHASE IV PROPOSAL #CIP-21-22-00064 O4 SANTq C� 9 U 9 s� 4E �60[cEMCEP,e�^ We take quality very seriously, as a quality plan set provides the most competitive bidding opportunities for projects and helps keep projects within their overall budgets, ultimately resulting in a high -quality project being built, on time, and with minimal or no change orders. PROJECT EXPERIENCE The Dokken Engineering team offers outstanding experience and technical competence and has successfully delivered projects similar in nature to the Circulation Improvements — Phase IV project. Together, with the technical specialties of our subconsultants, the Dokken Engineering team assures the City that our proven management and quality services will continue to be provided. The following highlighted projects detail our experience with projects of similar scopes to the that of the Circulation Improvements Project. OXNARD SIGNAL MODIFICATIONS I Oxnard, CA CLIENT: Dokken Engineering provided services to develop the z CITY OF OXNARD PS&E for the modification of seven existing traffic 300 West Third Street signals throughout the City of Oxnard. The project Oxnard, CA 93030 improves safety through signal improvements CONTACT: Debbie O'Leary (805) 200.5283 debbie.oleary@oxnard.org Year Completed: ■ 2021 SCOPE OF SERVICES: ■ HSIP Funded Project ■ Traffic Signal Modifications ■ Signing and Striping ■ ADA Improvements ■ Utility Coordination ■ Right of Way Coordination Key Staff: ■ Michael Greer, PE, TE ■ Joe Ostdiek, PE, TE ■ Eduardo Simonsen, PE including protected left -turn phasing, removal of existing signals in median islands, ADA improvements, video detection and equipment upgrades to current" City, State, and Federal standards. The improvements are funded in part with a federal HSIP grant from the California Department of Transportation, coordinated through the Office of Local Assistance. Dokken completed a thorough evaluation of existing conditions at each intersection which included identification of existing detection systems, measuring the grades of existing curb ramps and ADA clearances around existing signal equipment, evaluating the condition of existing signal equipment, and determining the available space to install new signal poles. The plans included upgrades to existing signal controllers with video and loop detection upgrades provided as needed for each intersection, traffic signal pole location optimization, layouts for pavement grind and overlay, construction details for curb ramps, as well as signing and striping. In addition, a lighting analysis using AGi32 software was completed for each intersection to ensure the design provides adequate lighting levels that meet current standards. I§DOKKEN Page 1 12 ENGINEERING ME" CIRCULATION IMPROVEMENTS FOR VALENCIA BLVD, MCBEAN PKWY, AND MALL ENTRANCE - PHASE IV PROPOSAL #CIP-21-22-00064 CUYAMACA RIGHT TURN POCKET I Santee, CA CLIENT: CITY OF SANTEE 10604 Magnolia Avenue Santee, CA 92071 CONTACT: Carl Schmitz, PE (619) 257-4100 x175 cschmitz@ci.santee.ca.us Year Completed: ■ On -going SCOPE OF SERVICES: ■ Traffic/Electrical ■ Utility Coordination ■ Right of Way Coordination Key Staff: ■ Mark Tarrall, PE ■ Charles Tornaci, PE ■ Eduardo Simonsen, PE Dokken Engineering is providing plans, specifications and estimate for the proposed right turn pocket on Cuyamaca Street from existing taper at Raising Canes driveway to Mission Gorge Road. Project components include installation of a signal interconnect across Cuyamaca Street and the addition of a signalized pedestrian crossing at the MTS Green Line. Dokken established the geometrics for the roadway widening, curb and gutter, sidewalk, driveway, upgrades for pedestrian at -grade railroad crossing, curb ramps, and installtion of a signal interconnect across Cuyamaca Street. A Utility Pothole Exhibit was prepared for review by stakeholders to ensure that potholing efforts were fully encompassing of all project considerations while minimizeing traffic control efforts. Coordination with the City, utility owners, property owners, and MTS was required. Key components included jacking and boring of conduit for the signal interconnect, at -grade railroad crossing, and preparation of plat maps with legal descriptions for the right of way acquisition needed to install the right turn pocket. A combination of open trench and jack and bore are being used to install the signal interconnect conduit. FRIARS ROAD/SR-163 INTERCHANGE I San Diego, CA CLIENT: Dokken Engineering prepared the Project - - CITY OF SAN DIEGO Report and coordinated preparation of r 525 B Street, Suite 750 the Environmental Document for the San Diego, CA 92101 interchange project. Due to funding constraints, the project will be designed CONTACT: and constructed in three phases. Dokken Alejandra Gonzalez Engineering completed Final Design PS&E r (619) 533-5155 for Phase 1 in 2016 and construction was completed in November 2019. AGonzalezNav@sandiego.gov Phase 1 of the project includes local road improvements such as widening Friars Road and the overcrossing, adding bike lanes and 10-foot wide Year Completed: sidewalks, improving Frazee Road and Ulric Street, coordinating signal ■ 2019 timing, constructing retaining walls, improving freeway ramp SCOPE OF SERVICES: connections, and providing additional pedestrian and bicycle facilities. 10- ■ Complete Streets Design foot wide sidewalks and Class II bike lanes are provided on each side of ■ Traffic Signal Design Friars Road. At the ramp termini, shaded "pedestrian nodes" were ■ Drainage/Hydrology constructed and over 30 curb ramps were upgraded to meet ADA design ■ Utility Coordination standards. Key Staff: ■ Michael Greer, PE, TE ■ Charles Tornaci, PE ■ Joe Ostdiek, PE, TE ■ Eduardo Simonsen, PE ■ Ashley Orsaba-Finders, PE Due to the annual holiday construction moratorium, construction staging plans were prepared to minimize impacts to local businesses during the holiday season. The complex staging plan involved constructing temporary ramps, installing pedestrian detours, and managing aerially deposited lead removal. Temporary signals plans were prepared for ramp intersections. In addition, lane closure charts were developed in conjunction with Caltrans for freeway and ramp closures. R§DOKKEN Page 1 13 ENGINEERING CIRCULATION IMPROVEMENTS FOR VALENCIA BLVD, ME" MCBEAN PKWY, AND MALL ENTRANCE - PHASE IV PROPOSAL #CIP-21-22-00064 PLAZA BOULEVARD WIDENING I National City, CA CLIENT: CITY OF NATIONAL CITY 1243 National City Boulevard National City, CA 91950 CONTACT: Jose Lopez, PE (619) 336-4312 jlopez@nationalcityca.gov Year Completed: ■ 2017 SCOPE OF SERVICES: ■ Traffic Signals & Lighting ■ Green Street Design ■ Roadway Design ■ Utility Undergrounding Key Staff: ■ Michael Greer, PE, TE ■ Mark Tarrall, PE ■ Joe Ostdiek, PE, TE ■ Eduardo Simonsen, PE Dokken Engineering completed preliminary a engineering, environmental documents, and the PS&E for the widening of 1.3 miles of Plaza Boulevard which is one of National. City's busiest corridors. Plaza Boulevard is a multi -lane roadway of varying width, various lane geometry and private s improvement setbacks. Dokken Engineering's preliminary engineering established the ultimate roadway alignment, cross-section, curb, gutter and. sidewalk locations, layout of medians and turn lanes, driveway/parking lot reconfigurations, modification of 6 traffic signals and ultimate locations of thirteen MTS bus stops, nine of which are located within the Phase 1 and Phase 2 project limits. Dokken designed and studied 3 alternatives to widen the roadway to a six lane prime arterial, analyzing impacts to existing utilities and traffic signals with each alternative. Coordination with the City, utility owners, Caltrans, and MITTS was required. Key project components included identification of right-of-way and easements for acquisition of both roadway and public transportation loading zones, coordination of required utility relocations and Rule 20A conversion and undergrounding, and full roadway PS&E inclusive of signing and striping plans, traffic signal modification design, street lighting, intersection grading, and drainage improvements. 1-805/CARROLL CANYON ROAD DIRECT ACCESS RAMP I ,an Diego, CA CLIENT: CALTRANS DISTRICT 11 4050 Taylor Street San Diego, CA 92110 CONTACT: Dale Wilson, PE (619) 688-3248 Year Completed: ■ 2009 SCOPE OF SERVICES: ■ Project Management ■ Signal/Lighting/Electrical ■ Signing & Striping Design ■ Multi -Agency Coordination Key Staff: ■ Michael Greer, PE, TE ■ Joe Ostdiek, PE, TE Carroll Canyon Road was extended from its terminus at Scranton Road to Sorrento Valley Road under-neath 1-805. 1-805 was widened to the inside from Carrol Canyon Road to just south of the 1-5 separation with one HOV lane in each of the northbound and southbound directions provided. Carroll Canyon Road was built on a structure for much of the alignment in order to avoid impacts to a utility corridor and so as not to prevent future widening of the 1-805 Carrol Canyon overhead structures. Dokken Engineering completed design for the traffic signal at the direct access ramp to 1-805 from the newly constructed bridge in addition to other signals, high mast lighting along 1-805, and lighting along Carroll Canyon Road. An in depth lighting analysis was conducted to ensure the design provided adequate illumination levels along Carroll Canyon Road while simultaneously avoiding light trespass in to an environmentally sensative area below. I§DOKKEN ENGINEERING Page 1 14 - ® CIRCULATION IMPROVEMENTS FOR VALENCIA BLVD, MCBEAN PKWY, AND MALL ENTRANCE - PHASE IV _ PROPOSAL #CIP-21-22-00064 ASSIGNED STAFF The Dokken Engineering team will be led by Project Manager, Michael Greer, PE, TE, who has 15 years of providing civil engineering expertise during planning, design, and construction phases. Michael is experienced in the layout, design, and estimating of modifications to existing and new signals, street lighting plans, striping plans, and signing plans. He is well versed in the Caltrans Signal, Lighting & Electrical Systems Design Guide and signing and striping requirements as outlined in the CAMUTCD. He also has extensive knowledge in the design of roadways and complete streets in accordance with City, County, Caltrans, and AASHTO standards. He will be supported by a qualified team of professionals providing all the services required to successfully deliver this project. x MICHAEL GREER, PE, TE I Project Manager Mark Tarrall, PE Principal in Charge Justin Thornber, PET Charles Tornaci, PE Joe Ostdiek, PE, TE i Matt Bruno Eduardo Simonsen, PE Joe Ostdiek, PE, TE Eduardo Simonsen, PE Anthony Lawson, RLA (ADL) 7 Jamie Formico, SR/WA Jena Addenbrooke, PE Mike Lopez, P LS (VSJ} Ashley Orsaba-Finders, PE, QSD/P V Alan Rasplicka, PE, GE (RTFA) SUBCONSULTANTS ADL RanningAssobates{ADL} R.T. Frankian & Associates, Inc. {RTFA} Vertex Surveying, Inc. (VSI) R§DOKKEN Page 1 15 ENGINEERING - ® CIRCULATION IMPROVEMENTS FOR VALENCIA BLVD, MCBEAN PKWY, AND MALL ENTRANCE - PHASE IV PROPOSAL #CIP-21-22-00064 RESUMES MICHAEL GREER, PE, TE DOKKE N PROJECT MANAGER ENGINEERING EDUCATION Mr. Greer designs roadways and complete streets in accordance with City, 2008, BS Civil Engineering County, Caltrans, and AASHTO standards. He also works on traffic signals, San Diego State University lighting design, and electrical infrastructure giving him the unique ability to foresee various potential issues related to design. He has also worked in the field as a roadway inspector, allowing him the opportunity to gain valuable REGISTRATION knowledge about construction equipment, practices, and techniques. California Professional Civil PROJECT EXPERIENCE Engineer, #79080 Oxnard Signal Modifications, Oxnard, CA I Project Manager for the PS&E for California Professional Traffic PM Reference:OOOR the modification of seven existing traffic Debbie O'Leary 1 (805) 200.5283 signals throughout the City of Oxnard. Engineer, #2845 debbie.oleary@oxnard.org � The project improves safety through signal improvements including protected left -turn phasing, removal of existing signals in median islands, ADA improvements, video detection and EXPERIENCE equipment upgrades to current City, State, and Federal standards. The 15 Years (with Dokken since proposed improvements are funded in part with a federal HSIP grant from 2008) Caltrans, coordinated through the Office of Local Assistance. Traffic Striping and Signing Plans Associated with County of San Diego Road AFFILIATIONS Maintenance Projects, San Diego County, CA I Task Order Manager American Society of Civil PM Reference: responsible for the traffic striping and Engineers (ASCE) Keith Kezer 1 (858) 495.5752 signing plans to support and assist the keith.kezer@sdcounty.ca.gov = Department of Public Works County of Institute of Transportation San Diego Road Maintenance Projects for the past three fiscal years (FY Engineers (ITE) 17/18, FY 18/19, and FY 19/20). In total, over the last three years we have prepared traffic striping and signing plans for nearly 57 miles of roadway, adding approximately 20 miles of Class II bike lanes and 15 miles of Class III AREAS OF EXPERTISE bike routes to County roads during the contracted fiscal years. / Project Management Paseo Santa Fe Streetscape Improvements Phase II & III, Vista, CA I Project / Roadway Design P M Reference: � Engineer/Project Manager for the PS&Eof / Green Streets Skip Hammann 1 (760) 802.5605 the South Santa Fe Streetscape / Roundabout Design Skip.hammann@gmail.com Improvements, Phases II and III. Design / Traffic Signals improvements include roundabouts, utility undergrounding, enhanced / Lighting (State and City) landscaping and hardscaping, pedestrian oriented streetscape furnishings, / Overhead Sign Illumination and water quality design features that qualify this roadway as a Green Street. / Ramp Metering Systems / Traffic Monitoring, County San Pablo Streetscape Improvements, Phase 1 and 2, Palm Desert, CA and Vehicle Class Stations PE Reference: Project Engineer responsible for the / Interconnection and Fiber Randy Bowman 1 (760) 776.6493 design and preparation of plans for the Optic Networks rbowman@cityofpalmdesert.org roadway (including pedestrian and / Transit Station Amenities roundabout), traffic electrical (including lighting and signal modifications), / Utility Coordination and traffic control (including signing and striping) improvements portions of this road -diet project. Roundabout Validation Reports, City Council Study Session on Roundabouts, and Position Paper on the Use of Roundabouts versus Stop Control at Intersections were specifically prepared. R§DOKKEN Page 1 16 ENGINEERING - ® CIRCULATION IMPROVEMENTS FOR VALENCIA BLVD, MCBEAN PKWY, AND MALL ENTRANCE - PHASE IV _ PROPOSAL #CIP-21-22-00064 MARK TARRALL, PE D O K K E N PRINCIPAL IN CHARGE E N G I N E E R I N G EDUCATION Mr. Tarrall has over 23 years of experience and specializes in the 1997, MS Civil Engineering management, permitting and design of transportation related projects Georgia Tech including local roadway, interchange, bike path, highway widening, and transit projects. Mr. Tarrall has led both local agency and Caltrans projects 1996, BS Civil Engineering through the concept planning, preliminary engineering, Environmental Virginia Tech Document approval, right of way acquisition, and preparation of Final Plans, Specifications and Estimate (PS&E). REGISTRATION PROJECT EXPERIENCE California Professional Civil Prospect Avenue Corridor Enhancement, Santee, CA I Project Manager for Engineer, #C71953 the Plans, Specifications and Estimate of this $23 million corridor enhancement road widening. The project relied heavily on right of way EXPERIENCE coordination with property owners, utility companies and the County of San 23 Years (with Dokken since Diego. A significant component was the Rule 20B undergrounding of 2009) overhead electric and communications utilities. AFFILIATIONS Plaza Boulevard Widening, City of National City, CA I Project Manager American Public Works responsible for the final design of a local roadway widening project including Association (APWA) the roadway design, utility coordination, plan preparation, spec writing, and estimates. The project constructed the widening of Plaza Boulevard from a American Society of Civil four lane major road to a six lane arterial for approximately 1/4 mile. Also Engineers (ASCE) included in the project is the SDG&E underground conversion throughout the corridor. JUSTIN THORNBER, PE RMDOKKEN ROADWAY/ADA ENGINEERING EDUCATION Mr. Thornber has a demonstrated history of civil design excellence 2010, BS Civil Engineering specifically on -site development plans, construction plans, restoration plans, San Diego State University and grading and erosion control plans. Mr. Thornber is proficient using AutoCAD Civil 3D, Microstation Inroads, Hydro CAD, ArcMAP, Flowmaster, REGISTRATION Bluebeam, and Projectwise. California Professional Civil Engineer, #C88901 EXPERIENCE 11 Years (with Dokken since 2018) AFFILIATIONS American Public Works Association (APWA) American Society of Civil Engineers (ASCE) R§DOKKEN ENGINEERING PROJECT EXPERIENCE San Pablo Avenue Streetscape Phases I & II, Palm Desert, CA I Mr. Thornber was responsible for preparing the ATP cycle 4 grant application for San Pablo Avenue. He designed the driveways and curb ramps along the San Pablo corridor from Highway 111 to Fred Waring Drive. He developed the cost estimate separated by funding source to aid with funding decisions and reduced construction cost by recommending grind and overlay work, instead of full depth removal, between Royal Palm Drive and Fred Waring Drive. Paseo Santa Fe Streetscape Phases II & III, Vista, CA I Design Engineer for the PS&E of the South Santa Fe Streetscape Improvements, Phases II and III. Design improvements include roundabouts, utility undergrounding, enhanced landscaping and hardscaping, pedestrian oriented streetscape furnishings, and water quality design features that qualify this roadway as a Green Street. Page 1 17 - ® CIRCULATION IMPROVEMENTS FOR VALENCIA BLVD, MCBEAN PKWY, AND MALL ENTRANCE - PHASE IV _ PROPOSAL #CIP-21-22-00064 CHARLES TORNACI, PE D O K K E N STRUCTURES 99ENGINEERING EDUCATION Mr. Tornaci is Dokken's San Diego structures team leader, both overseeing 1999, BS Mechanical and performing the structural analysis and design efforts for bridge projects Engineering in Southern California. With over 20 years of experience on structural Cal Poly, San Luis Obispo transportation projects spanning over Caltrans, Railroad, and Army Corp facilities, he is very familiar with Caltrans Local Assistance and Division of REGISTRATION Structures standards and practices, specializing in innovative and cost - California Professional Civil effective design solutions. He has been involved in a wide range of projects Engineer, #C66058 involving planning, design, construction, and seismic retrofits of vehicular and pedestrian bridges, retaining walls, and bike trails. EXPERIENCE PROJECT EXPERIENCE 21 Years (with Dokken since Sierra Highway Improvements, Santa Clarita, CA I Project Manager and 2000) Structures Lead Designer responsible for the design of a pedestrian bridge crossing over the Sierra Highway (SR-14U). Close coordination and iteration AFFILIATIONS with project Geotechnical engineers allowed for the utilization of cost -saving American Society of Civil shallow foundations to support this bridge founded on a mitigated landslide Engineers (ASCE) complex in a high seismic region. Nichi Tunnel, City, CA, Davis, CA I Lead Structures Engineer responsible for the planning studies and cost estimates for a proposed pedestrian railroad crossing. Studies were performed for alignments spanning over (grade separation structure), as well as below (tunnel) existing UPRR tracks. JOE OSTDIEK, PE, TE R§DOKKEN TRAFFIC/ELECTRICAL & SIGNING AND STRIPING ENGINEERING EDUCATION Mr. Ostdiek is a Senior Signal and Lighting Design Engineer with twenty years 1999, BS Civil Engineering of experience in the layout, design, and estimating of modifications to San Jose State University existing and new signals, street plighting plans, striping plans, and signing plans. Mr. Ostdiek is well versed in the California Department of REGISTRATION Transportation Signal, Lighting and Striping design and requirements. Mr. California Professional Civil Ostdiek also has extensive knowledge and experience with the Americans Engineer, #65334 with Disabilities Act and California Accessibility Standards. California Professional Traffic Engineer, #TR 2508 FXPFPii:mrF 22 Years (with Dokken since 2002) OFFII IDTI(11UC Institute of Transportation Engineers (ITE) PROJECT EXPERIENCE San Pablo Avenue, Phases 1 and 2, Palm Desert, CA I As senior engineer Mr. Ostdiek made recommendations for traffic signal modifications and lighting improvements including intersection, roundabout, decorative, and in - pavement roadway lighting. Mr. Ostdiek was responsible for oversight of the PS&E development, as well as the selection of fixtures and writing of electrical specifications for this project. SR 67 at Poway Road Traffic Signal Modification, Poway, CAI Traffic Signal Design Engineer for the modification of the existing traffic signal at the popular Iron Mountain Trailhead near the intersection of SR 67 at Poway Road. Coordination with the City staff to prepare the park and ride plans was needed to ensure signing, striping, and traffic signal improvements did not impede on any adjacent park and ride improvements. R§DOKKEN ENGINEERING = - ® CIRCULATION IMPROVEMENTS FOR VALENCIA BLVD, MCBEAN PKWY, AND MALL ENTRANCE - PHASE IV _ PROPOSAL #CIP-21-22-00064 EDUARDO SIMONSEN, PE R§DOKKEN TRAFFIC/ELECTRICAL & SIGNING AND STRIPING ENGINEERING EDUCATION Mr. Simonsen has extensive experience in traffic electrical design, drafting, 2008, BS Civil Engineering and analysis. Mr. Simonsen has provided PS&E services in all aspects of traffic San Diego State University electrical design and modification including traffic signals, ramp metering, lighting, and ITS. Mr. Simonsen is knowledgeable in California Department of REGISTRATION Transportation Signal, Lighting, Signing, and Striping design procedures as California Professional Civil outlined in the MUTCD 2014 California Edition, as well as electrical design Engineer, #C82608 requirements defined by the National Electrical Code. FXDFRIriurr 14 Years (with Dokken since 2013) AFFILIATIONS Institute of Transportation Engineers (ITE) PROJECT EXPERIENCE San Pablo Avenue, Phases 1 and 2, Palm Desert, CA I Mr. Simonsen was responsible for lighting analysis performed to determine the optimal layout for new safety and decorative lighting along San Pablo Ave. One project challenge involved working closely with the landscape architect to carefully locate lighting between trees to establish a pattern of consistency and uniformity. He carefully balanced the electrical circuits to minimize maintenance and service points while maximizing flexibility in design. Miramar Street and Athena Circle Improvements, UCSD, San Diego, CA Mr. Simonsen was responsible for street lighting along Miramar Street and Athena Circle and the traffic signal modification at Miramar Street and Regents Road. The traffic signal was modified to accommodate the widening of existing Miramar Street, video detection was introduced to the west leg of the signal. JENA ADDENBROOKE, PE UTILITY COORDINATION EDUCATION 2008, BS Civil Engineering San Diego State University REGISTRATION California Professional Civil Engineer, #C82544 EXPERIENCE 14 Years (with Dokken since 2008) AFFILIATIONS Women's Transportation Seminar (WTS) DOKKE N ENGINEERING Ms. Addenbrooke has 14 years of roadway design experience, specializing in the area of utility coordination. She has an extensive understanding and complies with the FHWA's regulations and requirements under CFR governing utility relocations to ensure proper and complete utility clearance prior to Right of Way certification. She communicates clearly and efficiently with utility companies, municipal utility departments, clients, Caltrans, and subconsultants to ensure the completion of this critical project function PROJECT EXPERIENCE Mid -Coast Corridor Transit Project, San Diego, CA I Associate Utility Coordinator who assisted with coordination of dry utility relocations. She was responsible for coordinating all utility designs with the respective companies, ensuring relocations were compatible with the combined project plans, processing traffic control and right of way permits for the utility owners, and providing construction support during relocations. E Palomar St Transit Station, Park & Ride and DAR at 1-805, Chula Vista, CA Utility Engineer who assisted in utility coordination during the design phase of the 1-805 Palomar DAR project. Ms. Addenbrooke identified potential conflicts, prepared pothole plans, monitored all activity in the field, and verified utility conflicts for the project. She also prepared recycled water project utility sheets in accordance with Otay Water District design standards. R§DOKKEN ENGINEERING Page 1 19 - CIRCULATION IMPROVEMENTS FOR VALENCIA BLVD, MCBEAN PKWY, AND MALL ENTRANCE - PHASE IV _ PROPOSAL #CIP-21-22-00064 ASHLEY ORSABA-FINDERS, PE, QSD/P R§DOKKEN STORM DRAIN/WATER QUALITY ENGINEERING EDUCATION 2012, Master of Business Administration, Drexel University 2007, BS Civil Engineering, California State University, Sacramento REGISTRATION California Professional Civil Engineer, #C77894 LEED AP I ENV SP Qualified SWPPP Developer/ Practitioner I California Drinking Water Operator D1 EXPERIENCE 14 Years (with Dokken since 2017) Ms. Orsaba-Finders has over 14 years of experience in project management, civil engineering, site development, environmental engineering, municipal engineering, planning, and GIS analysis. She is experienced in design, hydraulic modeling, planning, drafting and design of civil engineering projects including drainage, utility design, site design, and pump stations. PROJECT EXPERIENCE Citrus Heights Storm Drain Improvements — Locations 6, 10, and 11, Citrus Heights, CA I Ms. Orsaba-Finders is the design lead for this storm drainage improvement projects which is comprised of three separate subprojects within the City's Neighborhoods 8, 9, and 10. Her duties include design alternatives development, extended period simulation storm water modeling, and design engineering needed to prevent the neighborhood homes from being flooded in a 100-yr storm event. SANDAG South Bay BRT East Palomar Street Improvements, Chula Vista, CA This project constructed several miles of transit guideway in the Chula Vista area including extensive LID drainage features include bioswales, underground detention vaults, and stormwater treatment BMPs. Ms. Orsaba-Finders performed engineering design, report writing, and drafting. JAMIE FORMICO, SR/WA, R/W-NAC, R/W-RAC RIGHT OF WAY SUPPORT DOKKE N ENGINEERING EDUCATION Ms. Formico has 20 years of right of way project management, real property 2001, BS Criminal Justice acquisition and relocation experience. She specializes in right of way project CSU Sacramento management, property acquisition, relocation assistance services, public REGISTRATION project management, and agreement preparation. California Licensed Real Estate PROJECT EXPERIENCE Broker, #01445531 Green Tree Boulevard Extension, Victorville, CA I Ms. Formico managed all right of way aspects of the project, including right of way determination, California License Notary ordering preliminary title reports, title research, plat maps and legal Relocation Certification, IRWA descriptions, property owner exhibits, document preparation, right of way (R/W-RAC) negotiations, railroad coordination, escrow coordination, and right of way certification. The project is a roadway gap closure that provides Negotiations Certification approximately 1.5 miles of new roadway and a 600 feet long bridge over the IRWA (R/W-NAC) BNSF Railroad. EXPERIENCE Yucca Loma Bridge and Roadway Widening, Town of Apple Valley, CA I Ms. 20 Years (with Dokken since Formico managed all right of way aspects of the project, including right of 2014) way determination, ordering preliminary title reports, title research, plat AFFILIATIONS maps and legal descriptions, property owner exhibits, document preparation, International Right of Way right of way negotiations, railroad coordination, escrow coordination, and Associations (SR/WA) right of way certification. The project improvements include widening Yucca Loma Road from a two-lane roadway with roadside ditches to a four -lane arterial with curb, gutter, sidewalks and paved multi -use trail. R§DOKKEN Page 1 20 ENGINEERING - ® CIRCULATION IMPROVEMENTS FOR VALENCIA BLVD, MCBEAN PKWY, AND MALL ENTRANCE - PHASE IV _ PROPOSAL #CIP-21-22-00064 MATTHEW BRUNO R§DOKKEN ROADWAY/ADA ENGINEERING EDUCATION Mr. Bruno is an Assistant Engineer with four years of experience. Work 2018, Civil Engineering assignments consists of designing roadways & pedestrian travel, road San Diego State University rehabilitation, pavement design, site surveying, and mitigating for utility conflicts. He began his career in San Diego in 2016 with Dokken and has EXPERIENCE continued to progress his engineering skills to this date. Furthermore, he has 4 Years (with Dokken since a well-rounded background in plan production as well as working with a 2018) multitude of public agencies at the federal, state, and local levels. PROJECT EXPERIENCE Traffic Signal Modifications, Oxnard, CA I Mr. Bruno was the Assistant Engineer responsible for the ADA curb ramps and road rehabilitation pavement improvements. This project improved seven 4-way intersections, updating traffic signals and loops, along with pedestrian curb ramps. Initial project tasks included development of multiple conceptual designs alternatives that considered both traffic control and pedestrian accessibility. Paseo Santa Fe Streetscape Improvements, Phase II & III, Vista, CA I Mr. Bruno participated in the design and plan production of this road reconstruction project in Vista, CA. This project transformed a typical main street into a modern boulevard with multiple roundabouts and updated parking stalls with more suitable ADA pedestrian ramps and features. Tasks included multiple site investigations, extensive photo logging, utilizing best design practices, navigating utility conflicts, multiple construction changes, and coordinating with the contractor. ANTHONY LAWSON, RLA LANDSCAPE EDUCATION BS Landscape Architecture Cal Poly, San Luis Obispo REGISTRATION California Landscape Architect, #2348 EXPERIENCE 40 Years AFFILIATIONS American Society of Landscape Architects (ASLA) ADL J Planning _JJ Associates J -1111)-i Mr. Lawson founded ADL Planning Associates, Inc. in 1986 with the mission of providing high quality planning, design and landscape architectural services to developers, builders and public agencies. With more than 40 years in the industry, Mr. Lawson has obtained valuable experience in the planning, design, permitting and construction support of all project types, including: large scale master planned communities, site specific feasibility studies, parks and recreational facilities, commercial, educational, streetscapes and other civic development. He has served on numerous Commissions, Boards and Committees for the City of Carlsbad and is currently teaching landscape architecture at Mesa Community College in San Diego. PROJECT EXPERIENCE • McFadden Avenue Bike Improvements, Santa Ana, CA • San Pablo Avenue Street & Bike Improvements, Palm Desert, CA • Paseo Santa Fe Streetscape, Vista, CA • Pioneer Boulevard Streetscape, Artesia, CA • El Camino Real Street & Bike Improvements, Carlsbad, CA • College Boulevard Street & Bike Improvements, Carlsbad, CA R§DOKKEN Page 1 21 ENGINEERING - ® CIRCULATION IMPROVEMENTS FOR VALENCIA BLVD, MCBEAN PKWY, AND MALL ENTRANCE - PHASE IV _ PROPOSAL #CIP-21-22-00064 ALAN RASPLICKA, PE, GE LRTFA GEOTEC H N ICAL GEOTECIAN,CAL ENGINEERING & ENGINEERING GEDLoG. EDUCATION BS Civil Engineering Cal Poly, Pomona RFr.ICTRATIn1U California Professional Civil Engineer, #C53575 California Geotechnical Engineer, #GE 2558 FXPFPii:mrF 28 Years MIKE LOPEZ, PLS SURVEYING EDUCATION Ventura Community College REGISTRATION California Professional Land Surveyor, #8995 Certified Party Chief, JAC Local 12 EXPERIENCE 32 Years AFFILIATIONS California Land Surveyors Association (CLSA) Mr. Rasplicka has over twenty-eight years of experience in the field of geotechnical and environmental engineering. His experience includes field and laboratory work, field supervision, and environmental and geotechnical investigations. Mr. Rasplicka has performed geotechnical investigations and provided grading and foundation recommendations for many projects, including shopping centers, industrial centers, residences, apartments, office buildings, bridges, aqueducts, and critical facilities, including medical buildings, schools, and fire stations. He has also investigated several distressed residences, apartment buildings, condominiums, slopes, and shopping centers. He has provided expert witness services for distressed residences, expansive soils, retaining walls, gross slope stability, and surficial stability. PROJECT EXPERIENCE • Performed peer review of geotechnical reports performed by other geotechnical consultants and also regulatory review of geotechnical reports for the City of Santa Clarita • Performed geotechnical safety hazard evaluations for several single- family residences for the City of Santa Clarita from conditions resulting from the 2005 rainy season Mr. Lopez has an extensive background in both field and office procedures relative to boundary and cadastral surveys, topographic mapping, construction stakeout, engineering design, GPS control, GIS and CADD mapping. He is also familiar with survey supervision coordination, calculations, and analysis in support of survey crews. PROJECT EXPERIENCE AMLI Spanish Hills, CA I Technical Manager responsible for project surveying. Michael Baker provided stormwater support to AMLI Residential that included developing a stormwater pollution prevention plan (SWPPP) and filing permit registration documents in SMARTS. On -Call Survey and Mapping, Ventura County, CA I Survey Manager responsible for project surveying. Michael Baker provided on -call surveying and mapping services to the County Surveyors Office, Engineering Services Department and Watershed Protection District. Services included: topographic mapping, ground control for aerial mapping, and technical map checking of Subdivision and Record of Survey maps, legal descriptions, corner records and lot line adjustment documents. R§DOKKEN ENGINEERING Page 1 22 r NN TA %i.�� `75 DECEMB� - ® CIRCULATION IMPROVEMENTS FOR VALENCIA BLVD, MCBEAN PKWY, AND MALL ENTRANCE - PHASE IV PROPOSAL #CIP-21-22-00064 3. WORK STATEMENT The Dokken Engineering Team, referred to as "Dokken" throughout this Scope of Work, will perform professional and technical engineering services to prepare the construction documents and bid package for authorization to award. This Scope of Work includes a review of the hydraulic and hydrologic designs, civil design, construction cost estimates, specifications, topographical survey, utility research and coordination, preparation of contract documents, and other related support services pursuant to the 2020-21 Circulation Improvement Program, Phase IV (City Project No. C0064). SCOPE OF WORK We have reviewed the work statement and draft scope of work provided with the RFP and evaluated the need for additional or Optional Tasks as identified below. The following is a detailed scope of services, roughly based on the City's outline, required to successfully deliver this project with Tasks, Subtasks, and Deliverables (a.k.a. Outputs): TASK 1: PRELIMINARY INVESTIGATION Subtask 1.1: Field Reconnaissance Dokken will obtain and review all available data developed as part of this project such as as-builts, available geotechnical and hydraulic studies, infrastructure improvement plans, topographic survey, survey ties, City benchmarks, existing right-of-way documents, City standards, aerial photographs, and any applicable previous studies that have been conducted in the vicinity of the project site. Dokken will perform site visits and take photos and videos to identify and record design issues. Dokken will maintain a project file to log all documents obtained for the project. Subtask 1.2: Document Research and Utility Mapping Dokken will obtain existing underground and overhead utility base mapping, as-builts, and aerial photographs to accurately map via a thorough review of available materials. This review will be supplemented by a field inventory completed via site visits to aid in the creation of a Utility Conflict Matrix that identifies all above and below ground utility features within the project limits to track any potential utility conflicts within the limits of work. Existing base mapping will be requested from utility companies and confirmed via field site inventory. Subtask 1.3: Topographic Survey and Record Right of Way Dokken will coordinate with our Surveying Services subconsultant, Vertex Surveyors, to collect City control points, run a traverse and level loop, and search and locate centerline and right of way monumentation. Proposal includes site orthophoto drone flight. Utilities identified in the field review will be shot to supplement existing topographic survey information, this includes surveying of existing curb ramps (8), traffic signal, storm drain, and utility features within the project area. Driveways have been excluded from this survey proposal. Impacted trees will be accurately located with diameters of each provided to ensure proper removal, disposal, and replacement per City and environmental requirements. Right of way and property lines will be researched from record documentation and compared to existing drawings to plot and field search positions to compile a record base file. Costs for traffic control have been included as an "Other Direct Cost" (ODC). Subtask 1.4a: Subsurface Utility Investigations via Potholing Dokken will identify any potential utility conflicts or areas where additional facility information is needed and coordinate up to ten (10) utility potholes throughout the project limits. Dokken will prepare a Pothole Location Exhibit, identifying proposed pothole locations with anticipated facilities to be encountered, requiring approval by the City's Project Manager prior to scheduling any pothole work. Prior to the start of field work, the locations of the proposed utility potholes would be field marked and submitted to Underground Service Alert Southern California, DigAlert, for utility locating, as required. A Utility Pothole Report, with photo logs and field measurements, will be prepared by Dokken Engineering based on the work completed by the utility investigation subcontractor (Taft Electric; to be contracted with as an ODC for simplicity in billing purposes). We will survey each pothole location (ten potholes are anticipated at deep excavations for pole foundations) and update the R§DOKKEN Page 1 23 ENGINEERING - ® CIRCULATION IMPROVEMENTS FOR VALENCIA BLVD, MCBEAN PKWY, AND MALL ENTRANCE - PHASE IV PROPOSAL #CIP-21-22-00064 utility base map and affected plan sheets to reflect positively identified locations. We will then revisit the previously identified conflicts to update information and resolve conflicts through redesign as needed. Subtask 1.4b: Subsurface Investigations via Ground Penetrating Radar (GPR) (Optional Task) Dokken will coordinate with a subcontractor with GPR capabilities to investigate potential conflicts with the more shallow utilities, such as telecommunication, electrical service, and fiber optic that have average depths of less than three feet. Due to traffic control required within these heavily congested intersections, we estimate two days of field work utilizing GPR for markouts and depths. Subtask 1.5: Geotechnical Coring Investigations and Optional Geotechnical Report (Optional Task) Dokken will coordinate with the geotechnical subconsultant, RTF&A, to develop a plan for project geotechnical investigations to account for requested pavement corings to establish existing structural section and curb/gutter thickness at six (6) locations. Prior to the start of field work, the locations of the proposed pavement and curb/gutter corings would be field marked and submitted to Underground Service Alert Southern California, DigAlert, for utility locating, as required. It may be determined that existing geotechnical data and structural section documentation already exists, or potholing efforts may identify thicknesses sufficiently, thus we have made this an optional task to account for estimated half -day of field sampling, required laboratory tests, and report. If requested by the City the results of geotechnical field investigation and laboratory testing can be summarized within a formal report that would include recommendations for paving associated with the roadway widening and median reconstruction that is suitable for submittal to reviewing agencies. Additional sampling for laboratory corrosion testing and R-value testing is not within this scope of work but can be provided as an optional service for additional fee. Task 1 Deliverables: Documentation Logs; Field Review Notes; Topographic Survey Data and Base Map; Right of Way Base Map; Utility Pothole Report; Existing Utility Base Map; Utility GPR Report (Optional); Geotechnical Coring Investigations; Geotechnical Design Report (Optional) TASK 2: PROJECT MANAGEMENT Project management includes project setup, regular meetings, deliveries, presentation of work products, development and monitoring of action items, monthly progress reports, work progress monitoring, budget monitoring, extensive communication, and coordination. Upon project kickoff a Project Development Team (PDT) will be established to include City of Santa Clarita staff, Dokken staff, and any other agency representative as deemed necessary to collaborate with stakeholders on the project. Dokken will maintain the same PDT throughout the life of the project to ensure continuity. Subtask 2.1: Kick-off and Monthly PDT Meetings Dokken Engineering will coordinate meetings with the City to facilitate decision making. For each meeting, Dokken will prepare the meeting agenda in consultation with the City Project Manager, provide meeting notices one week prior to the meeting, arrange for appropriate participants to attend, prepare meeting materials (including exhibits, task lists, and agenda), facilitate the meeting, and prepare/distribute meeting minutes within five business days of the meeting. Dokken will consult with the City's project manager prior to each meeting to review upcoming meeting items. The following meetings are anticipated for this project: • Kick-off Meeting (1): To start, Dokken will organize a kick-off meeting with key personnel, design team members, and stakeholder representatives. The purpose of this meeting is to review the goals and objectives of the project, discuss each team member's roles and responsibilities, and identify critical project issues. • PDT Progress Meetings (12): The PDT meetings will be scheduled monthly and will serve as the primary forum for reviewing the status of the project and identifying and resolving project issues. A Project Schedule and Action Items List will be prepared and updated for each PDT meeting. The schedule and list R§DOKKEN Page 1 24 ENGINEERING - ® CIRCULATION IMPROVEMENTS FOR VALENCIA BLVD, MCBEAN PKWY, AND MALL ENTRANCE - PHASE IV __ PROPOSAL #CIP-21-22-00064 shows the work items (tasks and subtasks), the dates they are due, who is responsible for the task, critical path, review timelines for City and outside sources, and the date completed. Subtask 2.2: Schedule and Administration Dokken will schedule all work necessary to complete the project while administering, monitoring, and controlling the effort and progress of the proposed services as follows: • Set up an internal project accounting, reporting, and invoicing system • Prepare, monitor, and adjust the Schedule using MS Project; updated monthly • Prepare monthly Progress Reports indicating work accomplished the previous month, anticipated work to be completed the next month, issues requiring resolution, milestones achieved, meetings held, actions taken, approval actions required, coordination issues and design schedule impacts to accompany invoices. • Coordinate with the City and Stakeholders to obtain and provide all relevant information needed to complete the bid package and prepare documents for Construction and obtain final approval. Subtask 2.3: Quality Control Dokken will prepare a Quality Control Plan (QCP) to be utilized throughout the life of the project. The QCP will be utilized as a tracking and monitoring tool to assure submittal completeness and formally assign team review responsibilities. Task 2 Deliverables: Attend and Facilitate 1 Kickoff Meeting & up to 12 PDT Meetings; Meeting Agendas; Meeting Minutes, Project Schedule with Updates, Progress Reports with Invoices, and Quality Control Plan TASK 3: DESIGN Following the kick-off meeting, Dokken will collect and analyze existing available plans in the area to develop a database of existing facilities and improvements to be protected in place. Dokken will utilize one of the early PDT meetings to consult and advise the City on required aspects of the PS&E package prior to making any final development decisions. Subtask 3.1: Plans, Specifications, and Estimate (PS&E) Following the review and discussion of the entire PS&E package Dokken will prepare and submit a final design schedule for the 30% Plans & Estimate (P&E), 60% P&E, 90% Plans, Specifications, & Estimate (PS&E), 100% PS&E, and Final PS&E Submittal Packages to the City for input. A draft design schedule has been included herein. Sub-Subtask 3.1.1: 30% Plans & Estimate (P&E) Dokken will begin preparation of the project plans and estimate by developing draft typical section, roadway plan/profile, signing/striping, traffic signal modification, and utility sheets to the 30% level of design with quantities and engineer's estimate developed based on those plans. We will also prepare Project Overview Exhibits to better illustrate the proposed improvements to any non -engineer audiences that will be reviewing the project details. We will utilize AutoCAD for all drafting needs and preparation of plans, and we will provide Autoturn analyses to the City's Traffic Division for concurrence with designs. Our quality control process will be followed to ensure that all deliverables are properly checked prior to submitting to the City. Sub-Subtask 3.1.2: 60% Plans & Estimate (P&E) Dokken will continue preparation of the project plans and estimate by further developing all plan sheets to the 60% level of design with quantities and engineer's estimate developed based on those plans. The construction staging/phasing plans will identify a lay down yard location and will include detour plans to maintain access to the mall entrance. Our quality control process will be followed to ensure that all deliverables are properly checked prior to submitting to the City. The following is a list of sheets proposed to be submitted with the 60% P&E Package: • Title Sheet, General Notes, Index of Plans (1) • Survey Control Sheet (1) • Drainage Plans/Profiles, Details, & Q's (4) • Signing/Striping Plans, Details, & Q's (4) R§DOKKEN ENGINEERING Page 1 25 M■ CIRCULATION IMPROVEMENTS FOR VALENCIA BLVD, MCBEAN PKWY, AND MALL ENTRANCE - PHASE IV PROPOSAL #CIP-21-22-00064 • Typical Cross Sections (2) • Demolition Plans (4 @ 1"=40' Scale) • Roadway Imp. Plans (4 @ 1"=40' Scale) • Construction Details with 5 Curb Ramps (4) • Stage Construction/Traffic Handling (6) Sub-Subtask 3.1.3: 90% PS&E • Signal Modification Plans & Schedules (4) • Fiber Optic Plans & Details (2) • Street Lighting Plans & Details (2) • Landscape & Irrigation Demo Plans (6) • Landscape & Irrigation Improvement Plans (6) TOTAL Plan Sheets = 50 Upon receipt of the 60% review comments from the City and other stakeholders, Dokken will revise the 60% drawings and will develop the additional plan sheets required to reach 90% level of detail. Development of a draft specifications will occur at this design level to ensure all aspects of the project are properly accounted for. During this phase of the project the draft geotechnical report and hydrology study with draft drainage report will be submitted to the City for review. Dokken will revise the construction cost estimate and prepare the technical special provisions (a.k.a. construction specifications) to reflect the revisions to the 90% plan set. Construction specifications will be prepared using Microsoft Word in a format consistent with the latest edition of the Standard Specifications for Public Works Construction (SSPWC); or specifications will be created for any non -covered items. An itemized construction bid schedule and cost estimate with item numbers, item descriptions, units of pay, quantities derived from a detailed takeoff, and estimated unit costs will be prepared in Microsoft Excel spreadsheet format. A preliminary construction schedule will be provided to reflect the project plans including anticipated utility relocation work. Sub-Subtask 3.1.4: 100% PS&E Dokken will review and respond to any City comments from the 90% PS&E submittal. Once all comments are addressed, we will continue with the design effort to reach 100% PS&E. Dokken will prepare a revised, 100% design level set of plans, construction specifications, and construction cost estimate with bid schedule. Any changed unit items or cost from the 90% submittal will be identified to the City for clarity. Dokken will review and respond to the comments on the geotechnical and drainage reports and will prepare or coordinate preparation of final reports, studies, and calculations. Sub-Subtask 3.1.5: Final PS&E Dokken will review and respond to any City comments from the 100% PS&E submittal. Once all comments are addressed, we will continue with the design effort to reach Final PS&E. Dokken will prepare a revised, final set of plans, construction specifications, and construction cost estimate with bid schedule. Any changed unit items or cost from the 100% submittal will be identified to the City for clarity. When the project is complete, Dokken will provide AutoCAD files for all plan sheets via file share (MS-OneDrive) link. Subtask 3.2: Easement Preparation (Optional Task) Dokken will coordinate with Vertex Surveyors, to prepare Plat Maps with Legal Descriptions for project easement needs to be stamped and signed by a licensed land surveyor. Preliminary easement needs provided by the City have identified two Temporary Construction Easements (TCEs) and four Permanent Easements to be coordinated during the design phase. As the final easement needs will be determined during the design phase we have opted to make this task optional until the exact number of Plat Maps with Legal Descriptions is better understood. Property Appraisals and Offer Packages are not included with this cost proposal, although our team can assist with those right of way acquisition processes as an optional service if needed and requested by the City. Subtask 3.3a: Drainage Analysis and Reports (Inlets Modifications) As the Project will impact several City and LACFCD inlet facilities drainage analysis of the affected systems will be required. For impacted LACFCD facilities, Dokken will prepare a LACFCD Catch Basin Modification Plan and coordinate the design modifications with LACFCD. For City drainage features that are impacted, Dokken will prepare a Drainage Report evaluating and analyzing proposed modifications. Both reports will be prepared to document the hydrology and hydraulic analysis based on City and County of LA criteria and will provide a detailed discussion of the existing conditions, post -project drainage patterns and conditions, results of the on -site hydraulic R§DOKKEN Page 1 26 ENGINEERING - ® CIRCULATION IMPROVEMENTS FOR VALENCIA BLVD, MCBEAN PKWY, AND MALL ENTRANCE - PHASE IV PROPOSAL #CIP-21-22-00064 Moor analyses and any issues of special concern or significance. The analysis will reuse any applicable previously prepared studies and design. A draft report will be submitted for review by the City for comments at the and will be finalized upon completion of the Final PS&E milestone submittal. Subtask 3.3b: Drainage Analysis and Reports (84" RCP Modifications) (Optional Task) As the Project may impact an 84" diameter LACFCD storm drain in the proposed widened area along Valencia Blvd., drainage analysis of the affected system may be required. Dokken will prepare and coordinate the design modifications with LACFCD. A report will be prepared to document the hydrology and hydraulic analysis based on County of LA criteria and will provide a detailed discussion of the existing conditions, post -project drainage patterns and conditions, results of the on -site hydraulic analyses and any issues of special concern or significance. The analysis will reuse any applicable previously prepared studies and design. Boundary conditions for proposed drainage system outfalls for connections to existing systems will be taken from existing FEMA studies, LA County Flood Control District, or the City will provide or agree to assumed boundary conditions for use in the hydraulic analysis. A draft report will be submitted for review by the City for comments at the and will be finalized upon completion of the Final PS&E milestone submittal. Task 3 Deliverables: 30% P&E, 60% P&E, 90% PS&E, 100% PS&E, and Finol PS&E Submittals (PDF and Hord Copies os needed); Project Design Auto CAD and Other Electronic Files As Requested, Plot Mops with Legol Descriptions (6 Totol Easements Anticipated; 2 TCEs and 4 Permanent Easements); Draft and Finol Drainage Reports TASK 4: PROCESSING AND PLAN APPROVALS Subtask 4.1: Utility Coordination and Relocation Plans Dokken will create a Utility Coordination Matrix to identify all utility agencies and facilities within the area, then systematically contact and meet with each one to engage planners and request as-builts via a I" Utility Notice prepared on City letterhead. Dokken will research and document via site visits, all utilities within the project limits and update the utility base map. Second Utility Notices will be prepared for all utilities within the project area to notify each of the identification of potential conflicts and request confirmation along with a check of rights of ownership (i.e. cost liabilities). Meetings will be arranged as needed to gain concurrence of the proposed approach to each potential conflict, and once in agreement, the need for utility relocation plans and utility agreements will be identified. Third Utility Notices will then be prepared and sent as a Notice to Relocate to each utility with an identified conflict. When agreements are in place and final plans are ready for bid a 41" Utility Notice will be sent to each as a Final Notice to Relocate Immediately, or as needed before or during construction. Dokken will coordinate with impacted utilities to resolve any constructability requirements and coordinate preparation of utility relocation plans by outside agencies as required. Dokken will coordinate with the affected utility companies to ensure agency requirements and specifications conform with the bid documents for this project. Where necessary to expedite processes, we will provide draft utility relocation exhibits to illustrate proposed relocation strategies. Subtask 4.2: Agency Reviews and Approvals Dokken will prepare and process PS&E submittals at specified design milestones to receive approvals from all City Divisions including, but not limited to Capital Improvement Projects (CIP), Traffic, Engineering Services, Building & Safety, Transit, Urban Forestry, Environmental Services, Street Light Maintenance Division (SMD), and Landscape Maintenance Division (LIVID). We will create Comment Response Matrices for each review completed, to track comment resolutions and coordinate with each reviewer. We will also coordinate, and track timelines required for all plan checks from City Divisions as well as any outside agencies needed for construction permits. Subtask 4.3: LACFCD Flood Permit Dokken will prepare and obtain approval for the LACFCD Flood Permit associated with LACFCD facility relocations. As coordination with LACFCD can be a lengthy process, Dokken proposes to begin this process following submission of the project 60% P&E. R§DOKKEN Page 1 27 ENGINEERING - ■ CIRCULATION IMPROVEMENTS FOR VALENCIA BLVD, MCBEAN PKWY, AND MALL ENTRANCE - PHASE IV _ PROPOSAL #CIP-21-22-00064 Task 4 Deliverables: Utility Coordination Matrix, Utility Conflict Matrix, 1st Utility Notice (Preliminary Project Notice and Request As -built Maps); 2nd Utility Notice (Review and Identify Potential Conflict and Need to Relocate); 3rd Utility Notice (Notice to Relocate); and 4th Utility Notice (Final Notice to Relocate Immediately); Proposed Utility Base Map, Agency Permits/Approvals; LACFCD permit approval. TASK 5: BID SUPPORT Dokken will provide services for engineering support during the bidding phase to address any design concerns on an as -needed basis. This will ensure our team is readily available to help answer questions, develop alternative design solutions, and resolve issues during the bidding phase as they arise. Subtask 5.1: Bidding Support Dokken will assist the City in answering written questions during the biding process, attend the Pre -Bid conference, and respond to technical questions from the prospective bidders. Dokken will assist with an addendum to the PS&E package (as needed) resulting from the comments and questions from the Pre -Bid conference. Dokken will assist the City in analyzing the contractor's bids for competency and completeness and will recommend the lowest responsible bidder. Dokken will assist the City's RFP preparation for Material Testing and Special Inspection. Task 5 Deliverables: Attend Preconstruction Meeting; Respond to Bidder Inquiries, Prepare Project Addendum; Bid Analysis, and Responsible Bidder Recommendation TASK 6: OWNER'S ALLOWANCE The City/Owner has included this task for additional project -related items to be requested as needed. Allowance to be utilized as directed by the City's Project Manager for items such as private property owner coordination, easement preparation assistance, and construction engineering support. City/Owner to provide Title Reports. Construction Support Dokken will attend contractor progress meetings as requested by the City, attend regular jobsite meetings and inspection visits, respond to request for information, review shop drawing submittals, revise the construction documents (as needed), analyze the City on contractor change order requests, prepare construction correction notices as needed, and prepare the punch list for the contractor. As -Built Plans Dokken will acquire the daily red lined plans from the contractor and the subcontractors and will prepare the As - built drawings upon completion of the project. We will coordinate with the Construction Management Team to review updated plan sheets. Final record drawings will be submitted in electronic (CAD/PDF) and hard copies. Property Owner Exhibits We can prepare Property Owner Exhibits, that focus on impacts to existing private property features, to communicate private property impacts to non -engineering audiences as needed. Task 6 Deliverables: Property Owner Exhibits, Construction Support Deliverables (RFI's, CCO's, Contractor Submittal Reviews, Etc.); As -Built Drawings to include both CAD and PDF copies with hard copies as needed R§DOKKEN Page 1 28 ENGINEERING r NN TA o ti�FO 75 DECEMB��1 City of Santa Ch- Proposal# EN6-21-22-00066 FY2021 CIRCULATION IMPROVEMENTS -PHASE IV February 28, 2022 ID Task Name Demtion Start Finish 2 1 Jen'22 l01'22 221291511211912613 10 1 Aeg'22 I 1J 24 31 J Al21 28 Sep'22 1 O1'22 1 Nov'22 I Dec'22 Jan'23 4 11 18 25 2 9 1612313016 13 20 2J 4 11 18 25 1 8 15 22 29 Feb'23 Mar'23 Apr'23 May'23 5 12 19 26 511211912612 911612313017 Jen'23 Ju1'23 Aeg'23 Sep'23 11'23 14 21 28 4 11 18 25 2 9 16 23 30 6 13 20 2J 3 10 1J 24 1 8 15 22 N11'23 Dec'23 Jan'I Feb'24 29 5 12 19 26 3 10 17 24 31 J 14 21 28 4 11 18 25 1 FYZD21 Circulation Improvement, - Phase IV 431 days Mon Mon fi/20 FY2021 Circulation Improvements -Phase IV Notice t0 Proceed D days 6/2D/22 2/12/24 Mon 6/2D/22 Mon 6/2D/22 2/12 2 TASK 1: SITE AND UTILITY INVESTIGATION 91) days Mon Fri 1D/21/22 fi/20 TASK1: SITEANDUTILITYINVESTIGATION 3 1.1: Field Reconnaissance 5 days 6/2D/22 Mon 6/2D/22 Fri 6/24/22 6/20 Ov 10/21 4 5 1.2: Document Research and Utlity Mapping 45 days Mon 6/2D/22 Fri 8/19/22 1.2: Do u ent Research and Utlity Mapping 1.3: Topographic Survey and Record Right Of Way 45 days Mon 6/2D/22 Fri 8/19/22 6/20 1.3: Topo ra hic Sorveyand ...:.::. :.... B/19 Record Rig t of Way 6 6/20 8/19 J 1.4: Utility Potholing 45 days Mon 8/22/22 Fri 1D/21/22 1.4: Utility Potholing 1.5: Coring and Geotechnical Report 3D days Mon Fri 9/3D/22 8/22 1.5: Co ng and Geotechnical Report 10/21 8 TASK 2: PROJECT MANAGEMENT 24D days 8/22/22 Mon Fri 5/19/23 B/22 9/30 TASK2: PROJECTMANAGEMENT 13 2.1: Project Kick-off and PDT Meetings 24D days 6/2D/22 Mon 6/2D/22 Fri 5/19/23 6/20 2.1: Project Kick-off and PDT Meetings 5/19 14 22: Scheduleand Administration 24D days Mon 6/2D/22 Fri 5/19/23 2.2: Scheduleand Administration 5/19 6/20 15 2.3 Quality Control 24D days Mon 6/2D/22 Fri 5/19/23 2.3 quality Control 5/19 6/20 R6 16 TASK 3: DESIGN 235 days Mon Fri 5/19/23 TASK3: DESIGN 5/19 6/20 17 3.1: Plans, Specifications, and E.imate (PS&E) 235 days 6/27/22 Mon Fri 5/19/23 6/27 6 5/19 18 3.1.1: 3D%P&E 4D days 6/27/22 Mon 6/27/22 Fri 8/19/22 3.1.1: 30Y P&E 19 Agency Review 2D days Mon 8/22/22 Fri 9/16/22 6/2) B/19 A gency Review 20 3.1.2: 6D%P&E 45 days Mon 9/19/22 Fri 11/18/22 B/22 9/lfi 3.1.2:fi0 aP&E 21 Agency Review 2D days Mon Fri 12/16/22 9/19 8 enry Review 22 3.1.3: 9D%PS&E 45 days 11/21/22 Mon Fri 2/17/23 11/21 12/lfi 3.1.3: 901.PS&E 23 Agency Review 2D days 12/19/22 Mon 2/2D/23 Fri 3/17/23 12/19 gency Review 24 3.1.4: 1DD%PS&E 3Ddays Mon 3/2D/23 Fri 4/28/23 2/20 3/1) 3A.4: SOB%PS&E 25 Agency Review 1D days Mon 5/1/23 Fri 5/12/23 3/20 4/28 Age cyReview 26 3.1.5: Final PS&E 5 days Mon 5/15/23 Fri 5/19/23 5/1 3.1.5: 5/12 final PS&E 27 3.3: Drainage Analysis&Report 12D days Mon 8/22/22 Fri 2/3/23 3.3: rainage Analysis&Report 5/15 28 3.4: SUSMPfor MS4/Water Quality Permit Compliance 12D days Mon 8/22/22 Fri 2/3/23 8/22 S4fw.terQuality Permit Compliance 2/3 29 TASK 4: PROCESSING AND PLAN APPROVALS 15D days Mon Fri 5/19/23 8/22 TASK4: PROCESSING 2/3 AND PLAN APPROVALS 30 4.1: Utility Coordination and Relocation Plans 6D days 1D/24/22 Mon Fri 1/13/23 W. 4.: Utility Coordination and Relocation Plans 5/19 31 4.2: Agency Reviews and Approvals 9D days 1D/24/22 Mon 1/16/23 Fri 5/19/23 1B/24 1/13 4.2: Agency Reviews and Approvals 32 4.3: IACFCD FIOOd Permit 9D days Mon 1/16/23 Fri 5/19/23 fi 4.3: LACFCD Flood Permit 5/19 33 TASK 5: BIDDING AND CONSTRUCTION MANAGEMENT 176 days Fri 6/9/23 Mon 1/lfi 5/19 TASKS: BIDDING AND CONSTRUCTION MANAGEMENT SUPPORT 34 SUPPORT 5.1: Bidding Support 25 days 2/12/24 Fri 6/9/23 Fri)/14/23 6/9 .1: BiddingSupport 2/12 35 5.2: C-P.ction Support 12D days Fri 8/11/23 Fri 1/26/24 6/9 5.2: Construction Support 40 5.3: A,B.W Plans 11 days Mon Mon 8/11 1/2fi 5.3; s-Built Plans 47 1/29/24 2/12/24 1/29 1/12 Critial Task Manual Task D-tionanly Baseline Vilertone 0 Summary Extemal Tasks Inactive Milestone _ NA Critial Split ..... .......... Split ... ............ Startanly C Baseline Milestone ♦ Manual Summary External Milestone ♦ Inactive Summary 6 Critial Progress TaskProgreSs I'mishanly 3 Baseline Split ................ Summary Progress Project Summary W ...... . . Inactive Task Deadline Page 29 r NN TA %i.�� `75 DECEM�' Y - ® CIRCULATION IMPROVEMENTS FOR VALENCIA BLVD, MCBEAN PKWY, AND MALL ENTRANCE - PHASE IV _ PROPOSAL #CIP-21-22-00064 6. SUBCONSULTANTS Dokken Engineering has utilized many valuable sub -consultants to complete past projects and has compiled an outstanding team for this project. The team has the capabilities to deliver all services outlined in the RFP. The following identifies one proposed subconsultant on the Dokken Engineering Team, their role, a brief description of the firm and relevant experience. ROLE: LANDSCAPE ARCHITECTURE ADL _J Planning _J_J_J ASSOcIClt@$ J_JJJ ADL PLANNING ASSOCIATES 2979 State Street Suite C Carlsbad, CA 92008 (760) 729.8637 ROLE: GEOTECHNICAL LRTFA R.T. FRANKIAN & ASSOCIATES, INC. 26027 Huntington Lane Suite A Santa Clarita, CA 91355 (661) 257.5800 ADL Planning Associates is a full -service planning and landscape architectural firm providing comprehensive consulting, design and construction support services since 1986. With a focus on municipal and public sector, or CIP improvements, the firm has designed and oversaw the installation of many successful Roadway Projects, Streetscapes, Bike Lanes and Trails throughout the southland. Key factors of experience attributable to ADL for this proposed project include: • Significant Public Street Landscape Improvement projects addressing: • Multi -Modal Improvements • Green Street, Urban Forest & Low Impact Development (LID) Projects • Road Diet & Traffic Calming • Pedestrian and Bike Trail experience • Public Street Plazas Improvements • Significant experience collaborating with Dokken Engineering throughout southern California ADL is presently working with Dokken Engineering on numerous public works projects in the communities of Carlsbad, Vista, San Diego, Palm Desert, Newport Beach, and Santa Ana. Experience working directly with the public agencies, coupled with bike and trail experience will position ADL to execute this design assignment effectively, efficiently, and successfully. :......................................................................................................................... R. T. Frankian & Associates, Inc., is one of the longest established geotechnical consulting firms in Southern California. We specialize in geotechnical engineering, environmental engineering, engineering geology, storm water infiltration/environmental compliance, and geotechnical services, which include materials testing and inspection. Our main office and laboratory are located within the County of Los Angeles in the City of Santa Clarita. We operate a small corporate and administrative office in Burbank, California. The firm is a California corporation and was founded in 1963. The projects we have worked on include geotechnical investigation, analysis, inspection and testing of over 150 miles of new roads and highways, 85 miles of public storm drains, 90 miles of sanitary sewer, 250 miles of utility lines, 35 miles of soil cement and the placement of nearly 250 million cubic yards of compacted fill, nearly 35 bridges, and over 45 schools and 15 hospitals. Relevant project experience includes: • City of Santa Clarita Paved Trail and Paseo System • Vista Canyon Open Space Trail System R§DOKKEN ENGINEERING Page 1 30 - ® CIRCULATION IMPROVEMENTS FOR VALENCIA BLVD, MCBEAN PKWY, AND MALL ENTRANCE - PHASE IV _ PROPOSAL #CIP-21-22-00064 ROLE: SURVEYING VERTEX SURVEYING, INC. 28348 Constellation Road Suite 800 Santa Clarita, CA 91355 (661) 254.1928 Since 2001 Vertex Survey, Inc. (formerly Pinnacle Land Surveying) has provided land surveying services to municipalities, counties, planners, design professionals, contractors, developers, and private parties. Our services range from boundary and topographic surveys, construction staking, mapping, aerial topographic surveys, monumentation, ALTA preparation, as well as legal descriptions. Field surveying projects have contributed to planning, design and construction of water treatment plants, wastewater treatment plants, pumping stations and pipelines, reservoirs, residential developments, roads, bridges, landfills, commercial buildings, parks, fire stations, as well as infrastructure. Vertex Survey, Inc. is and has recently provided various surveying and mapping services to several Cities in accordance with Chapter 10 of the Caltrans Local Assistance Procedure Manual as well as to Caltrans Survey Standards. These projects have included bridge widening, grade separations, and street improvements. Our team understands the important aspects of construction staking that will be required for this project. Relevant project experience includes: • Williams S. Hart School District/ Survey at Golden Valley HS and West Ranch HS • Multiple Improvements for College of the Canyons with multiple contractors • Vista Canyon Ranch, Santa Clarita/Contracted by: JSB Development • Runkle Canyon, Simi Valley Contracted by: KB Home • Deerlake, Chatsworth Contracted by: Foremost Communities • Santa Clarita Valley Water Agency/Plat to Accompany Legal Description / State Board of Equalization :....................................................................................................................... R§DOKKEN ENGINEERING Page 1 31 r NN TA LABOR DMPLIAP PROGRA Y o ti�FO 75 DECEMQ'��� M■ CIRCULATION IMPROVEMENTS FOR VALENCIA BLVD, MCBEAN PKWY, AND MALL ENTRANCE - PHASE IV _ PROPOSAL #CIP-21-22-00064 7. LABOR COMPLIANCE PROGRAM While Dokken Engineering does not typically have employees performing work subject to the payment of prevailing wages, as the prime consultant on large public works projects we have ample experience complying with both California and Federal labor compliance requirements related to the payment of prevailing wages. Dokken Engineering is registered with Department of Industrial Relations (DIR) as a Public Works Contractor and every subconsultant we utilize is also registered with the DIR. We coordinate closely with subconsultants who perform work subject to prevailing wages to ensure that all LCP requirements are met, including the submittal of weekly certified payroll records to the DIR, as well as all other required notices and forms. R§DOKKEN Page 1 32 ENGINEERING r NN TA o LOLIO 75 DECEM8��1 wMaimil 0 11 zf Y - ® CIRCULATION IMPROVEMENTS FOR VALENCIA BLVD, MCBEAN PKWY, AND MALL ENTRANCE - PHASE IV PROPOSAL #CIP-21-22-00064 8. STATEMENT OF OFFER AND SIGNATURE Dokken Engineering's Proposal for Circulation Improvements for Valencia Boulevard, McBean Parkway, and Mall Entrance — Phase IV is a firm offer valid for a 90-day period from the date of this submittal. The proposed work will be performed at a "not -to -exceed" price. Please reference Section 5, Total Cost, for detailed information regarding our proposed cost. Dokken Engineering has reviewed the City of Santa Clarita's Standard Contract for Professional Services and is prepared to execute this contract without modification or deviation for this project. Dokken Engineering's executed Notice to Proposers Regarding Indemnity and Insurance Requirements, Designation of Subcontractors/Subconsultants, References, Acknowledgement and Acceptance of Scope of Work, City of Santa Clarita Disclosure Statement, Equal Opportunity/Affirmative Action Statement, and addendums are attached. John Klemunes, PE, ENV S , President May 17, 2022 Date R§DOKKEN ENGINEERING Page 1 33 9. zf Y r NN TA %i.�� `75 DECEMB� NOTICE TO PROPOSERS REGARDING INDEMNITY AND INSURANCE REQUIREMENTS PROFESSIONAL SERVICES AGREEMENT — DESIGN PROPOSAL # CIP-21-22-00064 2020-21 Circulation Improvement Program, Phase IV City Project No. C0064 City of Santa Clarita, California SUMMARY OF CONTRACTUAL REQUIRMENTS 1. A contract is required for any service performed on behalf of the City of Santa Clarita (City). 2. By submitting a proposal, you have reviewed the sample contract documents contained within this request for proposals and agree to be bound by the requirements set forth. 3. Questions and requests for modification of these terms must be negotiated and approved prior to proposal submission and are at the full discretion of the City. SUMMARY OF INDEMNITY AND INSURANCE REQUIREMENTS 1. These are the Indemnity and Insurance Requirements for Contractors providing services or supplies to City of Santa Clarita (City). By agreeing to perform the work or submitting a proposal, you verify that you comply with and agree to be bound by these requirements. If any additional Contract documents are executed, the actual Indemnity language and Insurance Requirements may include additional provisions as deemed appropriate by City's Risk Manager. 2. You should check with your Insurance advisors to verify compliance and determine if additional coverage or limits may be needed to adequately insure your obligations under this agreement. These are the minimum required and do not in any way represent or imply that such coverage is sufficient to adequately cover the Contractor's liability under this agreement. The full coverage and limits afforded under Contractor's policies of Insurance shall be available to Buyer and these Insurance Requirements shall not in any way act to reduce coverage that is broader or includes higher limits than those required. The Insurance obligations under this agreement shall be: 1—all the Insurance coverage and limits carried by or available to the Contractor; or 2—the minimum Insurance requirements shown in this agreement, whichever is greater. Any insurance proceeds in excess of the specified minimum limits and coverage required, which are applicable to a given loss, shall be available to City. 3. Contractor shall furnish the City with original Certificates of Insurance including all required amendatory endorsements and a copy of the Declarations and Endorsement Page of the CGL policy listing all policy endorsements to City before work begins. City reserves the right to require full -certified copies of all Insurance coverage and endorsements. I. INDEMNIFICATION: To the fullest extent permitted by law, including without limitation Civil Code sections 2782 and 2782.8, CONSULTANT shall defend (with legal counsel reasonably acceptable to CITY), indemnify and hold harmless CITY and its officers, agents, departments, officials, representatives and employees (collectively "Indemnitees") from and against any and all claims, loss, cost, damage, injury (including, without limitation, economic harm, injury to or death of an employee of CONSULTANT or its subconsultants), expense and liability of every kind, nature and description that arise from or relate to (including, without limitation, incidental and consequential damages, court costs, attorneys' fees, litigation expenses and fees of expert consultants or expert witnesses incurred in connection therewith and costs of investigation) that arise from or relate to, directly or indirectly, in whole or in part, from: (1) any negligent act or omission of CONSULTANT, any subconsultant, anyone directly or indirectly employed by them, or anyone that they control; (2) any actual or alleged infringement of the patent rights, copyright, trade secret, trade name, trademark, service mark or any other intellectual or proprietary right of any person or persons in consequence of the use by CITY, or any other Indemnitee, of articles or Services to be supplied in the performance of this Agreement; or (3) any breach of this Agreement (collectively "Liabilities"). Such obligations to defend, hold harmless and indemnify any Indemnitee shall not apply to the extent such Liabilities are caused by the sole or active negligence or willful misconduct of such Indemnitee, but shall apply to all other Liabilities. The foregoing indemnification provisions will not reduce or affect other rights or obligations which would otherwise exist in favor of the CITY and other Indemnitees. CONSULTANT shall place in its subconsulting agreements and cause its subconsultants to agree to indemnities and insurance obligations in favor of CITY and other Indemnitees in the exact form and substance of those contained in this Agreement. II. INSURANCE (A) Before commencing performance under this Agreement, and at all other times this Agreement is effective, CONSULTANT will procure and maintain the following types of insurance with coverage limits complying, at a minimum, with the limits set forth below: Type of Insurance Limits Commercial general liability: $1,000,000 Professional liability $1,000,000 Business automobile liability $1,000,000 Workers compensation Statutory requirement (i) Commercial general liability insurance will meet or exceed the requirements of ISO-CGL Form No. CG 00 01 11 85 or 88. The amount of insurance set forth above will be a combined single limit per occurrence for bodily injury, personal injury, and property damage for the policy coverage. Automobile coverage will be written on ISO Business Auto Coverage Form CA 00 01 06 92, including symbol 1 (Any Auto). Liability policies will be endorsed to name CITY, its officials, and employees as "additional insureds" under said insurance coverage and to state that such insurance will be deemed "primary" such that any other insurance that may be carried by CITY will be excess thereto. Such endorsement must be reflected on ISO Form No. CG 20 10 1185 or 88, or equivalent. Such insurance will be on an "occurrence," not a "claims made," basis and will not be cancelable or subject to reduction except upon thirty (30) days prior written notice to CITY. (ii) Professional liability coverage will be on an "occurrence basis" if such coverage is available, or on a "claims made" basis if not available. When coverage is provided on a "claims made basis," CONSULTANT will continue to renew the insurance for a period of at least three (3) years after this Agreement expires or is terminated. Such insurance will have the same coverage and limits as the policy that was in effect during the term of this Agreement, and will cover CONSULTANT for all claims made by CITY arising out of any errors or omissions of CONSULTANT, or its officers, employees or agents during the time this Agreement was in effect. CONSULTANT will furnish to CITY duly authenticated Certificates of Insurance evidencing maintenance of the insurance required under this Agreement, including endorsements, and such other evidence of insurance or copies of policies as may be reasonably required by CITY from time to time. Insurance must be placed with California -admitted insurers with (other than workers compensation) a current A.M. Best Company Rating of at least "A:VII." Waiver of Subrogation: The insurer(s) agree to waive all rights of subrogation against CITY, its elected or appointed officers, officials, agents, volunteers and employees for losses paid under the terms of the workers compensation policy which arise from work performed by CONSULTANT for CITY. Should CONSULTANT, for any reason, fail to obtain and maintain the insurance required by this Agreement, CITY may obtain such coverage at CONSULTANT's expense and deduct the cost of such insurance from payments due to CONSULTANT under this Agreement or terminate pursuant to TERMINATION section. In the alternative, should CONSULTANT fail to meet any of the insurance requirements under this Agreement, City may terminate this Agreement immediately with no penalty. Should CONSULTANT'S insurance required by this Agreement be cancelled at any point prior to expiration of the policy, CONSULTANT must notify City within 24 hours of receipt of notice of cancellation. Furthermore, CONSULTANT must obtain replacement coverage that meets all contractual requirements within 10 days of the prior insurer's issuance of notice of cancellation. CONSULTANT must ensure that there is no lapse in coverage. The CITY shall be entitled to any coverage in excess of the minimums required herein. I have read and understand the above requirements and agree to be bound by them for any work performed for the City. Authorized Signature: Date: 5/17/2022 Printed Name: John Klemunes, PE DESIGNATION OF SUBCONTRACTORS/SUBCONSULTANTS PROPOSAL # CIP-21-22-CO064 2020-21 Circulation Improvement Program, Phase IV City Project No. C0064 City of Santa Clarita, California Listed below are the names and locations of the places of business of each subcontractor, supplier, and vendor who will perform work or labor or render service in excess of % of 1 percent, or $10,000 (whichever is greater) of the prime contractor's total bid. If no Subcontractors will be used fill out the form with NA. Please add additional sheets if needed. Subcontractor DIR Registration No. Dollar Value of Work ADL Planning Associates 1000061511 $34,540 Location and Place of Business 2979 State Street, Suite C, Carlsbad, CA 92008 Bid Schedule Item No's: Description of Work Tasks 1, 2, 3, 5 Landscape License No. Exp. Date: / / Phone( ) PLA #2348 3/31/2023 (760)729-8637 Subcontractor DIR Registration No. Dollar Value of Work R.T. Frankian & Associates, Inc. 1000027078 $10,000 Location and Place of Business 26027 Huntington Lane, Suite A, Santa Clarita, CA 91355 Bid Schedule Item No's: Description of Work Task 1 Geotechnical Engineering License No. Exp. Date: / / Phone( ) CE 53575 6/30/2023 (661) 257-5800 Subcontractor DIR Registration No. Dollar Value of Work Vertex Survey, Inc. 1000023128 $61,535 Location and Place of Business 28348 Constellation Road, Suite 800, Santa Clarita, CA 91355 Bid Schedule Item No's: Description of Work Task 1, 3 Surveying License No. Exp. Date: / / Phone( ) PLS 8995 9/30/2023 (661)254-1928 NOTE: A contractor or subcontractor shall not be qualified to propose on, be listed in a proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5 of the Labor Code. It is not a violation of this section for an unregistered contractor to submit a proposal that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 of the Labor Code at the time the contract is awarded. REFERENCES PROPOSAL # CIP-21-22-00064 2020-21 Circulation Improvement Program, Phase IV City Project No. C0064 City of Santa Clarita, California The following are the names, addresses, and telephone numbers of three public agencies for which proposer has performed work of a similar scope and size within the past 3 years. If the instructions on this form conflict with the references requested in the scope of work, the scope of work shall govern. Complete this form out accordingly. Fill out this form completely and upload it with your proposal. 1. City of Oxnard, 300 West Third Street, Oxnard, CA 93030 Name and Address of Owner / Agency Debbie O'Leary, (805) 200-5283 Name and Telephone Number of Person Familiar with Project Contract Amount PS&E Type of Work 2. City of Palm Desert, 76510 Fred Waring Drive, Palm Desert, CA 92260 Name and Address of Owner / Agency Randy Bowman, (760) 776-6493 Name and Telephone Number of Person Familiar with Project $1.6 Million Contract Amount 2021 Date Completed PS&E, Construction Support 2021 Type of Work Date Completed 3. City of Vista, 200 Civic Center Drive, Vista, CA 92084 Name and Address of Owner / Agency Conrad "Skip" Hammann, (760) 802-5605 Name and Telephone Number of Person Familiar with Project $1.9 Million Contract Amount PS&E, Construction Support 2021 Type of Work Date Completed The following are the names, addresses, and telephone numbers of all brokers and sureties from whom Proposer intends to procure insurance bonds: Dealv. Renton & Associates. P.O. Box 12675, Oakland, CA 94604, (510) 654-3090 ACKNOWLEDGEMENT & ACCEPTANCE OF SCOPE OF WORK PROPOSAL # CIP-21-22-CO064 2020-21 Circulation Improvement Program, Phase IV City Project No. C0064 City of Santa Clarita, California By providing the three (3) required signatures below, the Contractor acknowledges full understanding, complete agreement to, and accepts in its entirety, all Scope of Work for the C2020-21 Circulation Improvement Program, Phase IV. The Contractor will be expected to perform maintenance practices and uphold the standards herein to the established Scope of Work throughout the length of the contract. *Supervisor's Signature: Date: 5/17/2022 C *Estimator's Signature: Date: 5/17/2022 *Owner's 2022 Signature: 'v / Date: 5 17 g / / *Ail three signatures required CITY OF SANTA CLARITA DISCLOSURE STATEMENT PROPOSAL # CIP-21-22-00064 2020-21 Circulation Improvement Program, Phase IV City Project No. C0064 City of Santa Clarita, California The following information must be disclosed: 1. List the names of all persons having a financial interest in the Request for Qualifications. N/A 2. If any person identified pursuant to No. 1 above is a corporation or partnership, list the names of all individuals owning more than ten percent of the shares in the corporation or owning any partnership interest in the partnership. N/A 3. If any person identified pursuant to No. 1 above is a non-profit organization or a trust, list the names of any persons serving as a director of the non-profit organization or as a trustee or beneficiary or trustor of the trust. N/A 4. Has the offeror had more than $250.00 worth of business transacted with any member of the City of Santa Clarita staff, boards, commissions, committees, and Council within the past twelve months? If yes, please indicate the person(s) with whom you have conducted business. N/A NOTE: Attach additional pages as necessary. �_Zd, 4��_ / - ignature of Offeror John Klemunes, PE Print or Type Name of Offeror 5/17/2022 Date EQUAL OPPORTUNITY/AFFIRMATIVE ACTION STATEMENT PROPOSAL # CIP-21-22-00064 2020-21 Circulation Improvement Program, Phase IV City Project No. C0064 City of Santa Clarita, California The offeror hereafter described will not discriminate against any employee or applicant for employment because of race/color, national origin, sex, sexual preference, religion, age, or handicapped status in employment or the provisions of services. 94A���- gignature John Klemunes. PE. President Typed Name and Title