2025-03-25 - AGENDA REPORTS - VISTA CYN OPERATIONS MAINT CONTR
O Agenda Item: 4 CITY OF SANTA CLARITA AGENDA REPORT CONSENT CALENDAR CITY MANAGER APPROVAL: Li DATE: March 25, 2025 SUBJECT: VISTA CANYON WATER FACTORY OPERATIONS AND MAINTENANCE CONTRACT DEPARTMENT: Neighborhood Services PRESENTER: Amber Rodriguez RECOMMENDED ACTION City Council: 1. Award a three-year contract to Geosyntec Consultants, Inc., for water testing services in the amount of $482,822 and authorize a contingency in the amount of $48,282, for a total contract amount not to exceed $531,104. 2. Appropriate a one-time expenditure of $112,052 from the Vista Canyon Wastewater Standby fund balance (Fund 368) per attached Exhibit A, effective Fiscal Year 2024-25. 3. Appropriate an ongoing expenditure of $250,000 from the Vista Canyon Wastewater Standby fund balance (Fund 368) per attached Exhibit A, effective Fiscal Year 2025-26. 4. Authorize the City Manager or designee to execute up to two additional, one-year renewal options, plus an adjustment consistent with the appropriate Consumer Price Index for Los Angeles, Riverside, and Orange County adjustments, upon request of the contractor, and contingent upon the appropriation of funds by the City Council in the annual budget for such fiscal year. 5. Authorize the City Manager or designee to execute all contracts and associated documents, subject to City Attorney approval. BACKGROUND As part of the Conditions of Approval for the Vista Canyon project that was approved in April 2011, the City of Santa Clarita (City) required the developer to construct the Vista Canyon Water Factory (Water Factory) and oversee operations until the City assumed full ownership. The Page 1 Packet Pg. 62 O Water Factory was completed in 2020, has a capacity of 392,135 gallons per day (equivalent to 439.2 acre-feet per year) and can produce approximately 371,000 gallons per day (equivalent to 415.5 acre-feet per year) of recycled water. On April 1, 2024, the City officially began overseeing operations and maintenance of the Water Factory. As part of the City's ongoing effort to enhance water resources in our region, as of August 21, 2024, the Water Factory officially began selling recycled water to the Santa Clarita Valley Water Agency. The operations and maintenance expenses associated with the site are funded through the Wastewater Assessment Fund (Fund 368), and revenue generated by the sale of recycled water. To ensure the City remains in compliance with the Los Angeles Regional Water Quality Control Board's (LARWQCB) Waste Discharge Requirements (WDR), Water Reclamation Requirements (WRR), and Monitoring and Reporting Program (MRP) for the Water Factory (Order No. R4-2020-0049, MRP No. C1-10041), adopted on April 16, 2020, the City must monitor and report the potential impacts of landscape irrigation and non -potable recycled water applications using Water Factory effluent. The required monitoring includes continuous, daily, weekly, monthly, quarterly, and annual monitoring of the Water Factory influent, effluent, groundwater, effluent storage tank, and water supply. Quarterly and annual reports are required to describe monitoring actions, summarize monitoring data, analyze trends, and discuss results, compliance, and corrective actions. The City conducted a Request for Proposal (RFP) to solicit proposals from qualified consulting firms to perform water testing services in compliance with the LARWQCB's WDR and WRR for the Water Factory. The RFP was published and circulated via the City's e-procurement system BidNet on December 27, 2024. The City transmitted the solicitation to 1,276 vendors on BidNet, of which 57 vendors downloaded the RFP. Two companies provided proposals for consideration. These proposals were reviewed and evaluated based on each company's ability to meet the specific needs of the City. An evaluation panel comprised of staff from Neighborhood Services, scored the responses using the following categories of weighted criteria: • Contractor Qualifications, Scope of Work, Program Management (15%) • Experience (20%) • Thoroughness of Proposal (20%) • Cost (15%) • Successful Completion of Projects (15%) • Ability to Modify Programming (15%) The evaluation team scored the responses based on a 100-point system, with the results outlined below: Rank Com Location 1 Geosyntec Consultants, Inc. San Diego, CA 2 Rick Engineering Company San Diego, CA Cost Score $482,822 96.34 $353,400 77.34 Page 2 Packet Pg. 63 O In reviewing proposals, the evaluation team awarded the highest score to Geosyntec Consultants, Inc. (Geosyntec). The evaluation team determined that Geosyntec's proposal offered the best overall value to meet the LARWQCB's WDR and WRR for the Water Factory. Additionally, Geosyntec received a higher score based on the comprehensive scope and detailed expense breakdown. City staff completed a due diligence review of Geosyntec's professional references and determined its work history meets the City's standards and performance expectations. Based on the above, staff recommends awarding a three-year contract to Geosyntec. ALTERNATIVE ACTION Other action as determined by the City Council. FISCAL IMPACT Upon City Council approval of the recommended actions, funds will be available in the Vista Canyon Water Factory expenditure account 3687413-514101, 3687413-516101 and 3687413- 518503. ATTACHMENTS Exhibit A-VCWF Budget Geosyntec Vista Canyon (available in the City Clerk's Reading File) Page 3 Packet Pg. 64 4.a Exhibit A Vista Canyon Recycled Water Factory — Operations and Maintenance Account KeyOrg Fiscal Year 2024-25 Ongoing Amount Maintenance and Repairs 3687413-514101 $68,000 $68,000 Licenses and Fees 3687413-518503 $5,000 $5,000 Contractual Services 3687413-516101 $39,052 $177,000 Total. $112,052 $250,000 r Q Packet Pg. 65 m a �z • jam �AV J s / T r ,y s ro: - ♦ Lrt _ 4 Y Am � om roro'A� w+ t= PROPOSAL- RESPONSE FILE For Vista Canyon Water Factory Water Monitoring and Reporting Services Project No. NS-24-25-16 January 27, 2025 Cover Letter Geosyntec consultants Ms. Michele Arima January 27, 2025 Buyer for the City of Santa Clarita Geosyntec Consultants, Inc. 23920 Valencia Blvd., 1031 S Broadway, Suite 300 Santa Clarita, CA 91355 Los Angeles, CA 90015 Subject: Vista Canyon Water Factory Water Monitoring and Reporting Services Dear Ms. Arima, The City of Santa Clarita (City) is seeking a qualified operator to perform water testing services in compliance with the Los Angeles Regional Water Quality Control Board's Water Discharge Requirements (WDRs) and Water Recycling Requirements (WRRs) for the Vista Canyon Water Factory. As local and national leaders in groundwater monitoring, data analysis, and compliance reporting, Geosyntec Consultants, Inc. (Geosyntec) proudly submits this proposal to provide the services requested by the City in the most effective manner. We believe that our seamless continuation managing this project, our extensive experience with the WDR/WRR permit requirements and the historical datasets, and our local monitoring and groundwater expertise will provide the City with the following benefits: • Ability to meet imminent deadlines: Utilizing our strong relationships with PERC Water (the water factory operator) and Santa Clarita Valley Water Agency (SCV Water), we are uniquely positioned to rapidly request, compile, review, and summarize the required datasets and submit the annual monitoring report prior to the March 1, 2025 deadline; • Save the City money: Having already developed eight annual reports and dozens of quarterly reports for the Water Factory, we have streamlined data management and analysis approaches to efficiently generate data summaries, trend figures, and report conclusions aligning with the WDR/WRR requirements. We are also providing a discount to the City, by only including four sampling events in our budget for Year 1, even though we have five events scheduled: and • Confidence in data interpretation and permit negotiations: Leveraging our extensive understanding of the groundwater conditions in the Upper Santa Clara River groundwater basin and our reputation and relationships with Los Angeles Regional Water Quality Control Board staff, we will bring credible adaptive management approaches and monitoring negotiations. With practitioners having worked locally for over 20 years and a proven track record performing high -quality groundwater consulting work for the Vista Canyon Water Factory, the City, SCV Water, and the Newhall Ranch development, we are a local team that the City knows and can trust to provide consistently excellent consulting service. The Geosyntec Team is success -oriented and will provide the City with the responsiveness and technical skillsyou should expectfrom a consultant. You have been and will be, a top client in the Geosyntec organization, and we will treat you as such. Geosyntec accepts the terms and conditions of the City standard consultant agreement. We acknowledge Addendum No. 1 issued January 8, 2025, No. 2 issued January 9, 2025 and No. 3 issued January 23, 2025. If you have any questions, please contact our proposed Project Manager at 805-979-9125. Sincerely, Avery Blackwell, PE, QSD Principal, Project Manager Work: 805.979.9125 Cell: 805.979.9125 Email: ablackwell(1geosyntec.com Brandon Steets, PE, QISP/ToR Senior Principal, Individual Authorized to Bind the Consultant Work: 805.979.9122 Cell: 805.455.9591 Email: bsteets eosyntec.com City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services SECTION 1 Introduction................................................................ 4 SECTION 2 References.................................................................. 5 SECTION 3 License/Certifications...................................................... 13 SECTION 4 Plan of Study/Scope of Work ................................................ 15 SECTION 5 Schedule................................................................... 19 SECTION 6 Program Management...................................................... 20 SECTION 7 Personnel, Equipment, and Facilities ........................................ 22 SECTION 8 Sub-Consultants............................................................ 35 SECTION 9 Optional Special Studies .................................................... 36 City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services 3 SECTION 1: Introduction Introduction Founded in 1983, Geosyntec is a consulting and engineering firm that works with private and public sector clients to address new ventures and complex problems involvingthe environment, natural resources, water and civil infrastructure. With a combined staff exceeding 2,600+ engineers, scientists, and related technical and project support personnel, Geosyntec serves its clients from more than 100 offices in the United States (US), Canada, the United Kingdom, Ireland, Saudi Arabia, Sweden, Spain, the United Arab Emirates (UAE), and Australia. We have 11 offices that services Southern California. Geosyntec has more than 500 engineers and scientists practicing in hydrogeology, geotechnical, water resources, and construction disciplines. These practitioners bring experience and expertise in hydrogeological studies, groundwater investigations, modeling, and treatment; groundwater and surface water supply source investigations; surface water drainage, flood protection and resiliency, sediment remediation and management, coastal engineering and sea level rise, and marine infrastructure; and geotechnical/civil engineering related to the design and construction of specialized subsurface infrastructure. Geosyntec is pleased tosubmitthis proposal in response to the Vista Canyon Water Factory Water Monitoring and Reporting Services Request for Proposal (RFP) dated December 27, 2024. Our understanding of the project's goals and the key services required is based on the detailed scope of work outlined in the RFP and more than 8 years providing these services forthe Vista Canyon Water Factory (Water Factory). The primary objective of this program is to ensure compliance with the WDRs and WRRs in Order No. R4-2020-0049 and the associated Monitoring and Reporting Program (MRP) (No. CI-10041) set by the Los Angeles Regional Water Quality Control Board (LARWQCB) in 2020. We understand that the Water Factory is seeking a qualified operator to provide consulting services for a three-year term starting from February 1, 2025, Geosyntec c" consultants through February 28, 2028, as outlined in the RFP. The City, which manages the operation and maintenance of the Water Factory, requires an operator to perform groundwater testing services and groundwater, influent, effluent, and effluent tank monitoring reporting in compliance with the MRP. Geosyntec is well-equipped to meet these needs since performing monitoring and reporting for the Water Factory in compliance with these WDRs, WRRs, and MRPs since 2016 and we are eager to continue demonstrating our value to the City. Our approach (described in detail in Section 4) involves meticulous collection and analysis of groundwater samples and compliance reporting of groundwater, influent, effluent and recycled water monitoring. This includes close coordination with the City, the Water Factory operator (PERC Water), and the Santa Clarita Valley Water Agency (SCV Water), strict protocols for data collection, USEPA-approved methods for data analysis, comprehensive reporting to the GeoTracker database, and rigorous quality assurance processes. We will prepare four Quarterly Monitoring Reports (QMRs) and one annual monitoring report and one annual wastewater and recycled water volume report per year, ensuring compliance with WDRs, WRRs, MRP, and maintaining the highest standards of data quality and reliability. 2,600+(J) $600 MILLION + �v 1 1983 C 1 0706 r a o 00 ATE o`~ EMR 0.66 � � so% Industry Average 1.0 City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services SECTION Z: References Project Qualifications and References GeosMtec consultants Many members of the Geosyntec team have extensive experience working with the Water Factory, PERC Water, and SCV Water, as well as managing other projects in the Santa Clarita Valley area. We can leverage our in-depth knowledge and understanding of the Santa Clarita Valley Basin, SCV Water's supply portfolio, and the City's stakeholders and staff/operations to successfully collaborate with the City in developing innovative solutions that advance the Water Factory s short-term and long-term objectives and are approveable the LARWQCB staff. In addition to our eight years of groundwater monitoring and compliance reporting for Water Factory, we have extensive relevant groundwater monitoring and management experience for several municipalities and other entities in the Los Angeles region, including: • Over 15 years of WDR and NPDES permitting, monitoring, and compliance reporting for Newhall Ranch, • Over 15 years of groundwater support for the City, including NPDES permit compliance review, water quality evaluation, analysis of possible alternative use of groundwater, and regulatory and permit support; • Groundwater managementand hydrogeologysupportforSCVWater, including groundwater data management and visualization, groundwater monitoring recommendations, Groundwater Sustainability Plan (GSP) support, and recommendations for well installations; • Extensive groundwater monitoring, reporting, and compliance for nearly 50 wells for confidential clients in compliance with the California Water Code or regulations form the LARWQCB include WDRs. We are eager to continue providing monitoring and reporting services for the Water Factory and have provided brief descriptions of some of our relevant project experience below. We have also identified three references (see References Form uploaded to the portal) from the projects below to provide additional details about the excellent service we provided them. City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services SECTION Z: References GeosMtec consultants Vista Canyon Water Factory Waste Discharge Requirements (WDRs) and Water Reclamation Requirements (WRRs) Support Client: The City of Santa Clarita and JSB Development Scope of Work: Location: Santa Clarita, CA Contact: Jim Backer • Groundwater monitoring • WDR, WRR, and MRP Compliance reporting Phone+ Email: 661.255.3275 + backergsbdev.com • Guidance and coordination to Water Factory Dates of Contract: October 2016 -Current Project Objective For over eight years, Geosyntec Consultants has been engaged by the City (previously by JSB development), to provide comprehensive services related to the WDR, WRR, and MRPforthe Water Factory. Our scope of services includes the monitoring of groundwater quality through a network of six groundwater monitoring wells and three SCV Water - owned production wells. Geosyntec's support encompasses the preparation and submission of QMR and annual reports. Our team reviews monitoring obligations, protocols, and results, providing expert guidance and recommendations for follow-up actions and future strategies based on the monitoring data. Geosyntec's Scope of Services operator • Support for WDR and WRR Permit negotiations The scope of our QMR includes rigorous internal analytical data validation and coordination with laboratories to address any data discrepancies. This scope also encompasses the Water Factory monitoring results, reviewing influent and effluent from PERC Water, and incorporating that into the monitoring reports. The reports detail groundwater quality results, method detection limits, minimum levels, and reporting limits. Baseline groundwater monitoring field observations, where applicable, are also included. Each quarterly monitoring report is accompanied by a cover letter summarizing the monitoring results. All relevant data is submitted to the GeoTracker database in compliance with the MRP. In addition to the quarterly reports, Geosyntec prepares an Annual Monitoring Report that presents the results from the annual sampling event conducted between January 1 and December 31 each year. This comprehensive report includes sampling field observation sheets, analytical laboratory results, and quality assurance/quality control (QA/QC) procedures and certifications. Groundwater quality results, method detection limits, minimum levels, reporting limits, and baseline groundwater monitoring field observations are submitted to the GeoTracker database as part of this annual report. City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services SECTION Z: References GeosMtec consultants Newhall Ranch Water Quality Monitoring, Reporting, Modeling, and NPDES Permitting Client: The Newhall Land and Farming Company Location: Newhall, CA Contact: Matt Carpenter, Five Points Land Vice President, Environmental Resources Phone + Email: 661.255.4259 + matt.carpenter(cl fivepoint.com Dates of Contract: October 2006 - Current Project Objective Geosyntec providesthe Newhall Ranch (owned by FivePoints) with Clean Water Act regulatory and modeling support services related to their planned 12,000-acre Newhall Ranch development in Los Angeles County, California. During our nearly 20 years of support, Geosyntec has provided NPDES permit application support, including review and comment on the draft NPDES permits, Reasonable Potential Analysis (RPA), and work plan development resulting in successfully securing (and renewing) one of the first NDPES permits for a new Water Reclamation Plant in California in more than 30 years. Geosyntec also managed and implemented a comprehensive NPDES surface and groundwater monitoring and reporting program in coordination with the Los Angeles County Sanitation District, including receiving water sampling for chemical and microbiological parameters, toxicity, algae (macroalgae biomass and percent cover, and chlorophyll a), and benthic macroinvertebrates and physical habitat and quarterly compliance reporting. Scope of Work: • NPDES permitting and compliance reporting • 401 c/WDR permitting and compliance reporting • Water quality monitoring (groundwater and receiving waters) • Background stormwater monitoring study design • Draft TMDL and 303(d) review and comment • Watershed and receiving water modeling Geosyntec's Scope of Services Geosyntec developed and implemented a Water Quality Monitoring Plan (WQMP) — including a Sampling and Analysis Plan and Quality Assurance Plan based on SWAMP protocol —to evaluate potential impacts of the overall development on surface water and groundwater quality and to satisfy the storm drain and receiving water quality monitoring requirements of the Clean Water Act Section 401 Certification and Waste Discharge Requirements (WDR) (Order No. R4-2012-0139). The WQMP is consistent with the Los Angeles County MS4 permit monitoring requirements, including outfall monitoring and use of Numeric Action Levels. Geosyntec interfaced and negotiated with LARWQCB staff regarding WQMP requirements and performed semiannual compliance reporting. City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services 7 SECTION Z: References Geosyntec consultants City of Santa Clarita, Special Districts Drainage Benefit Assessment Area Groundwater Client: City of Santa Clarita, Special Districts Location: Santa Clarita, CA Contact: Darin Seegmiller, Environmental Services Manager Phone+ Email: 661.255.4930 + DSEEGMILLERR Santa-clarita.com Dates of Contract: October 2007 - 2025 Project Objective The City of Santa Clarita, incorporated in 1987, inherited several problem drainage areas from prior development. These included rising groundwater during extended periods of flow within the Santa Clara River, which bisects the City, as well as several neighborhoods built on stabilized ancient landslides. These areas, called Drainage Benefit Assessment Areas (DBAAs) require pumping and disposal of groundwater. Permitting of the disposal of groundwater originally occurred through National Pollutant Discharge Elimination System (NPDES) permits regulated by the local Regional Water Quality Control Board. The discharge was subsequently changed from discharge to the Santa Clara River (covered by NPDES permits) to discharge to the sanitary sewer, which is covered by permits with the Los Angeles County Sanitation Districts. Geosyntec's Scope of Services Scope of Work: • Regulatory Review and Support • Groundwater Water Quality Evaluation • Alternative Use Analysis • Permitting and Permit Reporting Support Geosyntec has provided a wide range of services to Special Districts over the nearly 20 years of regulatory support. This includes NPDES permit compliance review, water quality evaluation, analysis of possible alternative use of groundwater, grant proposal preparation, and regulatory and permit support for the switch from NPDES to County Sanitation District discharge. The primary technical support provided to Special Districts over the past 10 years has been review of groundwater water quality, discharge flow calculations, and required permit reporting to the Los Angeles Sanitation Districts. Notable Accomplishments After implementation of the chloride TMDL on the Santa Clara river discharges from permitted outfalls were required to meet strict chloride concentration requirements. The DBAA groundwater is not contaminated but has high total dissolved solids, in particular chloride. Geosyntec assisted the City with navigating compliance for NPDES permits for the DBAA discharges, but ultimately proposed discharge to the sanitary sewer rather than to the river. This eliminated significant fines for out of compliance discharge allowing the DBAAs to better manage meager budgets. In addition, as part of negotiations with regulators to reduce accumulated prior fines, Geosyntec successfully developed work plans to implement a Supplemental Environmental Project (SEP). Geosyntec continues to provide water quality evaluation and Los Angeles Sanitation Districts reporting for several DBAAs. City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services SECTION Z: References GeosMtec consultants City of Santa Clarita DBAA 24 Well Condition Assessment and Planning Client: City of Santa Clarita Location: Santa Clarita, CA Contact: Kelly Kacmar, Project Technician Phone+ Email: 661.286.4058 + kkacmar(gsanta-clarita.gov Dates of Contract: 2022 - Current Project Objective The City of Santa Clarita obtained the Drainage Benefit Assessment Area (DBAA) 24 project from the County of Los Angeles and requested Geosyntec to conduct a document review and well and system condition assessment to plan for operations and maintenance of the DBAA. Geosyntec's Scope of Services Geosyntec reviewed the historical documents related to the DBAA to obtain and summarize the well construction information, groundwater level limits and other relevant information for operation and maintenance of the DBAA. Geosyntec conducted well assessments that included comparison of construction information to quarterly monitoring information conducted since the 1990s. Following categorization of the 22 wells and piezometer according to likely condition, field investigations were conducted, including downhole video surveys of representative wells. Various conditions were found, including root intrusion, natural fill in the bottoms of wells, and casing wear. Geosyntec prepared a planning -level cost estimate for further investigations, well rehabilitations, and well replacements. Scope of Work: • Well Condition Assessment • Downhole Video Surveys • Document Review • CIP planning • Regulatory and Permitting Guidance Based on the results of these efforts and discussions with City staff, Geosyntec prepared technical specifications for two phases of work with the objective of bringing all of the wells back to working conditions and providing a implementation ready plan to be incorporated into the City's CIP. In 2025, Geosyntec will be supporting the City with implementation of the first phases of the work. City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services 9 SECTION Z: References GeosMtec consultants SCV Groundwater Management Support Client: SCV Water Scope of Work: Location: Santa Clarita, CA • Data Management and Visualization Contact: Stephen Cole, Assistant General Manager • Monitoring Recommendations Phone + Email: 661.705.7915 ext. 115 + • Hydrogeological Evaluation scole(4scvwa.org • Groundwater Sustainability Plan Dates of Contract: 2019 - Current • Graphics Development for Public Outreach Project Objective Groundwater supply within the SCV Water service area is a significant proportion of the total supply, and the aquifer system represents a valuable storage reservoir for SCV Water. In addition, groundwater is also integral to the local ecology through its interaction with surface water flows in the Santa Clara River and support of phreatophytes in the basin. SCV Water, as part of the Santa Clarita Valley GSA, is prepared a GSP for the Santa Clara River Valley East Subbasin, including the development of a groundwater flow numerical model, assessment of groundwater -dependent ecosystems, and development of sustainability criteria and monitoring network. Geosyntec's Scope of Services associated MODFLOW layer schema Geosyntec provided groundwater management and hydrogeology support during the development of the GSP as part of the GSI team and directly to SCV Water. Geosyntec assisted SCV Water in evaluating the results of the groundwater model and assessing the impacts for future groundwater management actions. Work included: • Development of a 3D visualization model to support water resources planning, communication of subsurface conditions to interested parties, and viewing data and analyses from multiple sources, including the groundwater flow model. • Data management, including groundwater levels and quality, surface water quality and flow, and weather and climate. • Development of groundwater pumping scenarios to assess future conditions. • Quantitative evaluation of model outputs, including analysis of zone budget to support water resource planning efforts. • Quantitative evaluation of surface water/groundwater interactions under current and future conditions. • Development of graphics and presentation materials pertaining to water resource planning efforts to facilitate communication and understanding of groundwater evaluations, including modeling results. • Supporting the identification and mapping of the groundwater dependent ecosystems. City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services 10 SECTION Z: References GeosMtec consultants Confidential Southern California Site Assessment, Remediation, WDR Monitoring, and Reporting Client: Confidential Client, Southern California Location: City of Los Angeles, East LA, Valley Blvd. Contact: Confidential Client Phone + Email: Confidential Client Dates of Contract: 10/10/2014 - Current Project Objective The project involves an extensive program consisting of the investigation, characterization, delineation, remediation, monitoring, and WDR reporting of a former electronics manufacturing facility with chlorinated volatile organic compounds (CVOCs) in soil, soil vapor, and groundwater. The remedial strategy for this site is a combined -remedies approach utilizing enhanced in -situ bioremediation (EISB) and dual phase extraction (DPE) to address on site source areas and EISB to address downgradient off -site groundwater impacts. The responsible party is not the current property owner, and onsite remediation is being performed with an additional objective to minimize disruption to the active commercial activities being performed by the site owner. The site is under the LARWQCB regulatory oversight with work performed pursuant to LARWQCB corrective action order requirements along with a WDR and MRP. Scope of Work: • Site Assessment • Permitting • Regulatory Compliance • Groundwater Monitoring • Operation, Maintenance, and Monitoring Geosyntec's Scope of Services Geosyntec was responsible for performing DPE and EISB pilot testing services, and designing and implementing the Remedial Action Plan based on the extent of impacts and the pilot testing results. The remedial design for the site includes 37 DPE wells and on -site and downgradient EISB injections at over 400 injection locations. Geosyntec was responsible for the design, permitting, contractor and equipment procurement, construction, and operations of the DPE system and EISB program at the site. Following successful implementation of EISB, Geosyntec oversees and performs the post-remediation monitoring and reporting program underthe existing LARWQCB WDR. Additional site characterization activities include additional groundwater sampling to refine the extent of groundwater impacts vertically beneath the former source areas and downgradient beyond the EISB treatment area. City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services SECTION Z: References Geosyntec consultants Confidental Water Resources Assessment, Monitoring, Development and Permitting Client: Spring Water Bottling Client Location: Southern California Contact: Ryan Smith, Resource VP, Crystal Geyser Roxane Phone+ Email:805.535.5491 + r.smith(cicgroxane.com Dates of Contract: 2015 - 2025 Project Objective Geosyntec was contracted by a confidential spring water bottling client to assist with development of a spring water site in eastern California. The client proposed to certify spring water bottling operations using production wells hydraulically connected to adjacent springs. Certification of the spring source for bottling purposes was completed through the State of California Department of Public Health (DPH) and the Federal Food and Drug Administration. Geosyntec's Scope of Servicess Geosyntec evaluated spring seeps at the subject property to and installed cutthroat flumes to evaluate approximate spring water flow rates. Test borings were completed to better understand the geohydrology. Geosyntec designed a production well field and supervised installation, development, and aquifer testing of 10-inch diameter production wells. The aquifer testing program included monitoring of 18 wells using data logging transducers and monitoring of spring flow. Water quality samples were collected during aquifer pump testing as part of the "50-state compliance" analytical suite for bottled water. The aquifer pump test data was used to estimate aquifer parameters of hydraulic conductivity, transmissivity, and storage coefficient. The well completion data as well as the aquifer testing results were used in development of a hydrogeological conceptual site model. The conceptual site model and aquifer parameter estimates were used to predict short and long-term yield of the aquifer for the proposed production rates. Groundwater flow was simulated using MODFLOW (USGS) through the graphical user interface Groundwater Modeling System (GMS) 7.0 from Aquaveo. The model simulated the faults identified in the subject property, springs, evapotranspiration, pumping wells, and observation wells. The model was used to predict the potential impacts to groundwater resources and groundwater quality on the property as well as to neighboring groundwater users. sGeosyntec collected data to assist the client with spring water certification with the DPH. Spring water certification is accomplished using production well data to document hydraulic connection between the springs and production wells through evidence of spring flow -reduction during pumping, and hydrogeochemical fingerprinting analyses. Following spring certification, Geosyntec supported the client in obtaining and maintaining waste discharge requirements compliance with their quality assurance project plan. Scope of Work: • Spring Water Site Development • Production Well Design and Installation • Aquifer Testing and Predictive Modeling • Spring Water Certification/Permitting Support Notable Accomplishments The proposed spring site was subject to an extensive Environmental Impact Report (EIR) and California Environmental Quality Act (CEQA) review process. The subsurface hydrogeological model and investigation results included in the EIRwere accepted by the local County Environmental Health Department, without issue. Geosyntec's support on this project through data acquisition and analysis resulted in a successfully completed spring water certification and bottling facility construction. City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services 12 SECTION 3: License/Certifications GeosMtec consultants Geosyntec will provide all applicable license, insurance, and permit requirements of the City, State and Federal governments, as well as any other legal obligations necessary to perform the scope of work outlined in the RFP. Please see the team member license's below: AVERY BLACKWELL, PE, QSD BOARD FOR PROFESSIONAL ENGINEERS. LAND SURVEYORS. AND GEOLOGISTS LICENSING DETAILS FOR: 83866 ZAHRA MALEKI, PHD, PE BOARD FOR PROFESSIONAL ENGINEERS, LAND SURVEYORS, AND GEOLOGISTS li sEPr MaEa roa LICENSING DETAILS FOR: 96369 All TARA ROLFE, PG, CHG City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services SECTION 3: License/Certifications KEVIN COFFMAN, PG, CHG Please see proof of insurance below: AT3I21 I2024 a�izo® CERTIFICATE OF LIABILITY INSURANCE THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the p°Iicy(ies) must have ADDITIONAL INSURED provisions ar he endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such end°rsemeiri Greyhi g Ins. Brokerage/EPIC 3780 Mansell Road, Suite 370 Alpharetta GA 30022 cT Greying COI Spe-h8t ai 770.755.5599 o T70.756.6599 ss. graylingcarts@grayling.com INsuRBR15I A—Rduc covERACE "Ll WsuasRA. National Uni°n Fire ins Co of Pidsbur 19445 MsaREo G— yntec Consultants, Inc. 900 Broken Sound Parkway NW, Suite 200 Boca Raton, FL 33487-0000 Iu..F Re_ Everest National Insurance Gom an 10120 wsuaeRc: Allied Wodd Assurance Oo U.S. In, 15469 WsuasRD: New Ham Bhia Insurance C— ai 23941 WsuRBR c. INsuRER F: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTNATHSTANDING ANY REQUIREMENT. TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. TA LR N141112024 rA4l112a25 X RCIAL CE IUry NM.MA E�o-1R GL5258179 7TWUMIZ , In III R IT APT nMPSUEUAWUTy ° ED Tos oNLv X To= Y I 41202$ _ �nslnGLt_UNITT°L"Fu so°LLY Puurzr(Paraacmacp s x B LALAB x x E aLNMe-Nn°e sTSTNTiN aEx9933e741 1l-24 11-25 sz,BBB.BBo az,III .BBo AN e,cN _.P'ju LL°E°ECIT11E o see Pa)l N 937( —5,93]11rCA) 4111224 41112024 41225 4I1I22 X 5$0 ID 000 L� PralaH inrect�rs Faue�c� tcPL)rz�eta 031 z2T23 41112°24 4fI12o25 0110. $2,999,9°a 1c11— or rtRBRATIONs 1 LocnTl111 ry INT1s (Aeon° 1a1, Aaainonal Rcmarin saaaulc, may I-- SCRIBED POLICIES BE CANCELLED BEFORE S.-UL. ANYEXPIRATION ATE THEREOF, THE EXPIRATION DATE THEREOF, NOTICE MILL BE DELIVERED IN ACCORDANCE Vv1TH THE POLICY PROVISIONS. Sample Cetifcate E°REP T— ©1988-2015 ACORD CORPORATION. All rights re served. ACORD ZS (2016103) The ACORD name and IOg, are registered marks Of ACORD City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services GeosMtec consultants 14 SECTION 4: Plan of Study/Scope of Work The City is seeking groundwater testing services for the Water Factory located at 17365 Humphreys, Santa Clarita, CA 91387. The Water Factory is designed to process up of 392,135 gallons per day and can produce approximately 371,000 gallons per day of recycled water. In August 2024, the City began selling recycled water generated by the facility to the SCV Water, although the production and sale of recycled water has since stopped while the Water Factory is out of compliance with required nutrient concentrations. This work relates to maintaining groundwater monitoring and reporting compliance with the LARWQCB's WDR and WRR for the Water Factory. We recognize that the RFP objectives will be continually updated and prioritized as new information and knowledge are gained, and we are ready and flexible to adapt our analysis and approach to support Water Factory's evolving needs. 1.1.4.1. TASKS, SUBTASKS, AND OUTPUT Task 1. Project Management, Scheduling and Coordination Geosyntec will coordinate with SCV Water for production well sampling, collaborate with Water Factory operators (PERC Water) on monitoring obligations, protocols, and results, and provide guidance based on results, notify relevant parties of any exceedances, and regularly update the City on project progress, including coordination, budget, and schedule tracking. By implementing the following strategies, we aim to deliver a well -coordinated, on -budget, and on - schedule project, ensuring high -quality outcomes and client satisfaction. Subtask 1.1: Client Updates and Coordination Effective communication and coordination with stakeholders are essential for the success of any project. To ensure all parties are aligned and informed, we will schedule regular meetings with the City representatives, SCV Water, and the Water Factory operators (PERC Water). These meetings will serve as a platform to discuss project progress, address any issues, and plan upcoming activities. Detailed meeting agendas will be prepared and distributed in advance to ensure focused and productive discussions. Following each meeting, minutes will be documented and shared with all participantsto providea clear record of decisions made and actions to be taken. Additionally, concerns GeosMtec consultants or questions from the City will be addressed promptly to maintain a high level of trust and satisfaction. Subtask 1.2: Budget and Schedule Tracking Maintaining control over the project budget and schedule is critical to ensuring timely and cost-effective project delivery. We will closely monitor project expenses and compare them against the approved budget to identify variances early. This proactive approach will enable us to take corrective actions as needed to stay within budget. The project schedule will be updated regularly to reflect progress and changes that may arise. This dynamic scheduling approach will help us manage resources effectively and ensure that project milestones are met. Regular budget and schedule status reports will be provided to the City, offering transparency and keeping all stakeholders informed of the project's financial and temporal status. Subtask 1.3: Internal Project Management and Controls To ensure the project is managed efficiently and effectively, we will implement robust internal project management controls. Project management software will be utilized to track tasks, deadlines, and deliverables, providing a centralized platform for project oversight. Internal team meetings will be conducted regularly to ensure alignment and progress among team members. These meetings will facilitate open communication, allowing team members to share updates, discuss challenges, and collaborate on solutions. Comprehensive project documentation and records will be maintained to ensure project activities are well -documented and easily accessible. This documentation will support project continuity over the long term. Task 1 Output • Documentation of coordination activities and notifications, including meeting agendas, meeting summaries, email communications and follow-up actions; • Regular project updates to the City project manager in the form of written status reports outlining progress, identified challenges and planned actions; and Budget and schedule tracking reports detailing resource allocation and task completion status. City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services 15 SECTION 4: Plan of Study/Scope of Work Task 2. Groundwater Sampling We will complete groundwater monitoring, coordinate and subcontract laboratory analysis, and prepare and submit four QMRs to GeoTracker, incorporating monitoring and operational data from the Water Factory operators. Geosyntec is leveraging its extensive experience and implementing a structured approach to Vista Canyon groundwater sampling, laboratory analysis, and reporting to deliver high - quality outcomes that meet the project's objectives and regulatory standards. The following subtasks will expand more on the details of our approach. Subtask 2.1: Groundwater Monitoring Our extensive experience in monitoring the Vista Canyon site has provided us with valuable insights into the unique challenges and requirements of this project. We will prepare the necessary sampling materials and Chain -of -Custody forms to ensure proper documentation and traceability of the samples. Grab samples will be collected from the accessible wells, and detailed field observation logs will be completed to record the sampling conditions and notable observations. We will coordinate with the SCV Water to access the production wells (i.e., Sand Canyon, Mitchell 5B, Sierra) and the City to access the groundwater monitoring wells (MW-1 to MW-6). Groundwater monitoring well MW-5 has been inaccessible and therefore not sampleable for the past several years and prior to the past two extreme wet seasons (all sampling events prior to 2023) the shallow (25 ft depth) groundwater monitoring wells (MW-4, MW-5, and MW-6) were dry. Subtask 2.2: Subcontracting Laboratory Analyses To ensure the accuracy and reliability of the groundwater analysis, we will continue to subcontract Weck laboratories, Inc., a certified analytical laboratory per the MRP Attachment C Standard Provisions Section 14. Weck will provide sample containers and coolers, which are essential for maintaining the integrity of the samples during transportation. We will coordinate the sample drop-off with the laboratory courier to ensure timely and secure delivery of the samples. The laboratory will conduct the necessary analyses using USEPA-approved methods to meet the MRP requirements. This approach ensures that GeosMtec consultants the analytical data quality objectives are met, and the results are accurate and reliable. Subtask 2.3: Quarterly Reporting As part of our commitment to transparency and regulatory compliance, we will draft and prepare four QMRs per year as per the MRP requirements. These reports will cover the monitoring period and provide detailed information on the groundwater sampling conducted, including the analytical results and any observations made during the sampling process. We will validate the analytical data internally to ensure its accuracy and resolve any discrepancies in coordination with the laboratories. The groundwater quality results, alongwith other required data such as influent, effluent, and effluent tank monitoring and plant operation data provided by the Water Factory operators, will be submitted to the GeoTracker database in the specified electronic format. Our team have been successfully uploading data to GeoTracker since 2017 and have already invested time troubleshooting the workflow and addressing the nuances of uploading formatted EDF data to the system. This comprehensive reporting process ensures that all stakeholders are informed of the monitoring activities and results, and that regulatory requirements are met. All quarterly monitoring reports will contain a separate section discussing compliance requirements or non-compliance occurrence which discusses the compliance records and corrective actions taken or planned that may be needed to bring the reuse into full compliance with water reclamation requirements. Subtask 2 Output • Groundwater sampling data and analysis results, including laboratoryreportswith qualityassurance/ quality control documentation; • Groundwater level elevation measurements with data logs; Four Quarterly Monitoring Reports submitted to GeoTracker per year that include a summary of monitoring activities conducted, analysis of influent, effluent, and effluent tank monitoring data, and identification of any regulatory exceedances and corrective actions taken; and • Documentation proving quarterly electronic data format submissions to GeoTrackerwith all required metadata, detections limits and reporting formats. City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services 16 SECTION 4: Plan of Study/Scope of Work Task 3. Annual Reporting We will prepare and submit an Annual Monitoring Report summarizing monitoring data, compliance, results, trends, and anticipated changes, as well as an Annual Summary Report for wastewater and recycled watervolumes. The annual monitoring report will provide a comprehensive summary of the data collected throughout the year. It will address compliance with regulatory standards, highlight key findings, and identify trends observed during the monitoring period. Additionally, the report will outline any anticipated changes for the upcoming year, ensuring that all stakeholders are informed of potential impacts on operations and compliance. The annual monitoring report must be submitted to the LARWQCB by March 1 of each year. Given Geosyntec's involvement in data collection and quarterly reports for 2024, the firm is well-equipped to submit the 2024 annual report accurately and on time. Subtask 3.1: Summarizing Monitoring Data The annual monitoring report will feature both tabular and graphical summaries of the monitoring data, providing detailed information on the quantity and quality of water sourced from SCV Water and local groundwater. It will also present data on the quality of influent, effluent, and groundwater. Additionally, the report will cover the quantities of influent, effluent directed to the effluent storage tank and sewer, and effluent utilized for recycled water applications. The annual summary report will compile data on wastewater and recycled water volumes, ensuring compliance with the requirements specified in Section III of the MRP. If no wastewater or recycled water is produced during a month, this will be clearly stated. The report will be submitted to the City four weeks before the submission deadline for review. Geosyntec will address one round of comments before the final report submission to the LARWQCB. Subtask 3.2: Discuss Compliance, Results, and Trends The report will include a comparison of laboratory results with the effluent limits, receiving water limitations, and maximum contaminant levels specified in the WDR, WRR, and MRP. Exceedances of these limits or other requirements will be noted and summarized Geosyntec consultants at the beginning of the report. It will also document instances of non-compliance with this Order, including conditions outlined in the Division of Drinking Water's conditional acceptance letter dated February 19, 2020. The list of analytical methods employed for each test and the associated laboratory quality assurance/ quality control procedures. The report will restate the laboratories used to monitor compliance and their certification status and provide a summary of analyses. Additionally, the reportwill include a detailed discussion of the results of final effluent and groundwater monitoring conducted during the monitoring year. This section will cover any changes in receiving groundwater due to effluent discharge application for landscape irrigation, changes in groundwater flow patterns resulting from irrigation, and mass balance for analytes of concern. Geosyntec has developed and established an efficientworkflowfor reporting temporal and spatial trends in water quality data collected from the Vista Canyon project over the years. These tools and workflow will continue to be incorporated into the data analysis process, including comparisons between stations and data collected in previous years. Subtask 3.3: Corrective Actions and Anticipated Changes Based on discussions with the Water Factory operators and the City, the report will describe any corrective or preventive actions taken or planned to ensure full adherence to the WDR, WRR, and MRP. Additionally, changes and anticipated changes, including impacts on the operation of any unit processes or facilities will be noted. By delivering comprehensive annual reports, we ensure compliance with all regulatory standards and keep stakeholders fully informed about the project's progress, compliance status, and any anticipated changes. Based on the historical results, Geosyntec plans to assist the City in adaptively managing the groundwater monitoring requirements for the project by proposing to the Executive Officer a list of parameters to drop as allowed for in the MRP Section Vill. A large portion of analytes included in the quarterly and annual groundwater monitoring suite have consistently had non -detects or concentrations below water quality objectives, including metals, organic compounds, and radionuclides. If this trend continues for a year after the Water Factory recycled water has been used for City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services 17 Geosyntec SECTION 4: Plan of Study/Scope of Work consultants landscape irrigation, then we recommend requesting they be removed from the current list. We anticipate if this request is approved, the annual costs of sampling could be reduced by almost $20,000. Our team has successfully implemented adaptive management approaches in several projects to 1) address trends in the water quality conditions that providean evidence -based rationaleto requestchanges to a monitoring program that eliminates redundancy and focuses on monitoring points and constituents that best represent the objectives of the permit requirements and 2) address evolving regulations and policies from the LARWQCB and the State Water Resources Control Board. One notable example is the Newhall Ranch development project, where Geosyntec was able to support permit negotiations with the LARWQCB staff resulting in reduced monitoring requirements. Another significant project is the Santa Clarita Valley GSP, where analyses of the data collected for this project provided for a dynamic project that captures variations in the hydrology of the groundwater basin through changes in water use and water year types. These projects demonstrate our commitment to adaptive management, allowing us to navigate regulatory changes while maintaining compliance and achieving project goals. Task 3 Output • Draft and final Annual Monitoring Report submission to GeoTracker, which shall include summarized monitoring data and compliance trends, analysis of operational performance and regulatory compliance, and recommendations for future actions or modifications; and Annual Summary Report submitted to GeoTracker that details wastewater and recycled water volumes, and summary of operations activities and compliance adherence. City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services 18 SECTION 5: Schedule Geosyntec consultants Our team has carefully thought through the project sequencing and critical path items based on our extensive experience with the timing of the moni- toring periods, the length lab analyses take, and the availability of data from the Water Factory operators. A detailed annual project schedule is included below, showing the work periods and completion dates, as well as the anticipated meeting dates to meet the MRP compliance deadlines. Since the 2025 first quarter groundwater monitoring has not been completed, the Year 1 schedule show five monitoring events. However, in future years, groundwater monitoring will only be conducted four times (during January, April, July, and October). Vista Canyon Water Factory Monitoring gend and Reporting Task 2.3 Quarterly Reporting utv',soma Marta Hnnual Schedule February 1,2025 N February 28, 2028) - - `- Work Tasks 1. Project Management Feb Mar Apr May lun -- lul Hug = Sep = rvov - oec lan Project Management ■ Annual �■■■IMEME : ■■■■■■:■ quarterly 11 Dnlyduring Ye 1 NONE quarterly 00000001 �MENNEN MEN MEMO ■■■■■■� SamplingTask Task 2. Groundwater Groundwater coordination and monitoring Deliveryof tothe CityCheck-in ■■■■■■■■��■■■■■■■■■■��■■■■■■■■■■��■■■■■■■■■■��■ Meeting with the City QMR Upload to G-Tracker Monitoring Data Annual Report Wastewater/Recycled Water Volume Annual Report Delivery of Annual Reports to the City Check -in Meeting with the City Annual Reports Upload to GeoTracker City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services 19 SECTION 6: Program Management Geosyntec's Project Manager, Avery Blackwell, will continue, as he has for the past eight years, to be responsible for overall program management, oversight of work quality, adherence to budget and schedule for the project, and communication with the City and the Water Factory operators. Geosyntec's approach to program management is formed around the core concept that effective client communication is paramount to project success. The Project Manager will continually build and reinforce team awareness, so that there is a strong focus on cost and schedule management integrated in the planning and execution of each task and deliverable. To facilitate better communication and coordination, Geosyntec utilizes various project management software tools. Our team is highly proficient in several programs such as Microsoft Project, SharePoint, an internal Project Management Portal, QA/QC systems, and collaboration software tools. Internally, we developed dashboards and customized reporting tools that allow our project managers to assess and review earned value and status of budgets, schedules, and scopes of work. We use these tools regularly with very complex projects involving multiple parties. We will use a project SharePoint site to compile, organize, and communicate all project information with Geosyntec personnel. A secured project website will also be developed to function as a comprehensive repository of project information that can be accessed by the project team and the City representatives. GeosMtec consultants Communication Plan: In the kick-off meeting, the Project Manager, in discussion with the City's Project Manager, will develop a communication plan. This will cover items including defining the frequency of updates (i.e., weekly, bi-weekly, monthly, etc.), medium for updates (i.e., email, conference calls, in -person meetings, etc.), and coordination channels within our team and with the City. Geosyntec is committed to providing a project management experience that will provide relevant communication with the City without excessive demand on the City's project manager. Quality Management and Deliverables: All reports and deliverables are peer and senior --reviewed in accordance with Geosyntec's Quality Management Plan (QMP). In addition to reviewing draft and final deliverables, peer reviewers or appropriate technical specialists are consulted at critical stages of the project to provide valuable feedback. We pride ourselves in producing clear and concise reports that make use of appropriate graphics and visual aids as needed to best convey concepts. Key elements of the project team's QMP include detailed Planning Point Lists (PPLs) and Standard Operating Guidance (SOG) for each step and stage of project development. The technical Peer and Senior Review processes are designed to ensure that the client and the project requirements are met and documented. The Project Manager will guide the peer review process to ensure consistency with internal review procedures. Specifically, they will implement the following peer review activities: City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services 20 SECTION 6: Program Management • Review project deliverable requirements, personnel structure, and budget/schedule for each task, • Confirm that a technical professional has been assigned to review deliverables by Geosyntec and subconsultants; • Confirm that the technical professional performs duties in accordance with applicable engineering procedures (i.e., calculations, specifications, or drawing preparation and constructability review); and • Perform quality assurance reviews to ensure adherence to applicable procedures. Schedule Tracking: Maintaining project schedules is critical to project success and client satisfaction. Geosyntec uses project scheduling tools such as Microsoft Projectand maintains regularcommunication internally and with City staff and the Water Factory operators regarding the status of key milestones and deliverables. Geosyntec has demonstrated their ability to be responsive and meet or exceed established schedules for this project repeatedly over the past years. This tradition of collaboration, responsiveness, Geosyntec consultants and transparency will continue under this contract. Geosyntec considers scheduling and budget control critical measures of project success for our clients and our project managers. During each phase of a project, we apply our project management and technical skills to control costs and meet schedule milestones. To facilitate effective scheduling and cost control, Geosyntec has an internal project managementtraining program led by a registered project management professional to ensure project managers have the specialized training required to effectively manage projects, control costs, meet schedule milestones, and ultimately ensure customer satisfaction. During the project life cycle, project calls with the City will be scheduled to provide status updates, discuss alternatives, and discuss project questions. City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services 9 SECTION 7: Personnel, Equipment, and Facilities Geosyntec° consultants Organizational Chart Our project team is spearheaded by an experienced multi -disciplinary group of professionals under the leadership of the Project Manager, Avery Blackwell, PE, bringing the best -in -class project organization and continuity of leadership and valuable insight gained from our ongoing experience working for the City and the Water Factory. Below is an organizational chart identifying the key staff who will support the City in the delivery of this Project and short bios describing their relevant subject specialization details, qualifications, and experience. Our organization chart below shows the structure of the key project personnel. City of SANTA GLARITA Key Project Personnel Our key project personnel are provided below. 13 Years EXPERIENCE Geosyntec° consultants MONITORING AND REPORTING SUPPORT Tara Rolfe, PG, CHG Kevin Coffman, PG, CHG AVERY BLACKWELL, PE I PROJECT MANAGER Mr. Blackwell has developed and conducted cutting -edge water quality investigation and monitoring programs in relation to compliance with Waste Discharge Requirements, Water Recycling Requirements, MS4 Permits, and TMDLs, including drafting monitoring plans and quality assurance project plans, training and leading field sample collection and SIPP recommended Microbial Source Tracking investigation approaches, laboratory coordination, field and laboratory results data processing and analysis, drafting compliance reports, and developing recommendations based on program findings. For the past 13 years, he has led groundwater and surface water monitoring projects throughout the Upper Santa Clara River groundwater basin. This work includes the Vista Canyon Water Factory, Santa Clarita Valley Water Agency, and the Newhall Ranch Development. City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services 22 SECTION 7: Personnel, Equipment, and Facilities Geosyntec° consultants 3 Years EXPERIENCE Geosyntec° consultants � w #uv pf 25 Years EXPERIENCE Geosyntec° consultants 20 Years EXPERIENCE Geosyntec° consultants ZAHRA MALEKI, PHD, PE I LEAD MONITORING COORDINATOR Dr. Zahra Maleki is a water resources engineer with consulting experience in environmental data analysis, data visualization, statistical analysis, and modeling techniques in order to evaluate the water quality parameters and their compliance with regulatory requirements. Dr. Maleki has extensive experience in quantitative assessment of pollution loading to water bodies, environmental data interpretation, and biogeochemical processes and transformations to design preventive measures to preserve water quality and comply with regulatory needs. In addition, she has hands on experience with the Vista Canyon Water Factory project for over 2 years, encompassing both fieldwork in groundwater sampling collection and supporting reporting requirements and data analysis. DAVID PARKINSON, PHD, PG I SENIOR TECHNICAL EXPERT Dr. Parkinson is a Principal Scientist at Geosyntec with more than 25 years of experience providing geological and hydrogeological consulting services. He has worked on a number of surface water and groundwater projects throughout the Upper Santa Clara River groundwater basin over the past 20 years. This work includes projects for Newhall County Water District, City of Santa Clarita Special Districts, and several confidential clients. This work includes investigation of augmenting water supply in Castaic Valley, groundwater and surface water quality evaluation, NPDES permitting of groundwater discharge to surface water, mitigation of elevated groundwater levels on developed properties, and review of a number of TMDL related surface and groundwater models. TARA ROLFE, PG, CHG I MONITORING AND REPORTING SUPPORT Ms. Rolfe is a hydrogeologist with over 20 years of experience in the water resources industry consulting for both public and private clients. Her technical expertise includes the development and implementation of adaptive management plans, design, and implementation of groundwater and surface water monitoring programs for recharge and resource management, production and monitoring well design and aquifer testing in both bedrock and alluvial environments, groundwater well condition assessments, and regulatory compliance. She has extensive experience in monitoring and analysis of basin -wide and regional groundwater resources. City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services 23 SECTION 7: Personnel, Equipment, and Facilities Geosyntec° consultants 20 Years EXPERIENCE Geosyntec° consultants KEVIN COFFMAN, PG, CHG I MONITORING AND REPORTING SUPPORT Mr. Coffman has over 20 years of experience in the environmental investigation and remediation industry. His expertise includes soil, soil vapor, and groundwater investigation methodologies, site characterization, hydrostratigraphic characterization, and implementation of current remedial technologies. As project manager, he has managed numeroussoiland groundwaterassessments, aquifertesting characterizations, remedial development and implementation, and work scope/proposal development. Through his remedial groundwater work, Mr. Coffman has developed Waste Discharge Requirement monitoring programs and managed compliance with their quality assurance project plans. He has worked on projects in several states and southern California counties and managed projects under the oversight of the U.S. EPA, the Department of Toxic Substances Control (DTSC), Regional Water Quality Control Board (RWQCB), the State of California Petroleum Underground Storage Tank Cleanup Program, and local regulatory agencies. City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services 24 SECTION 7: Personnel, Equipment, and Facilities Geosyntec° consultants AVERY BLACKWELL, PE Principal 0 Specialties Water Quality Monitoring and Reporting Data Collection, Analysis, and Management Integrated Water Planning ® Education MS, Civil Engineering (Water Resources), Colorado State University, Fort Collins, CO, 2015 BS, Civil Engineering, California State Polytechnic University, San Luis Obispo, CA, 2002 ORegistrations & Certifications Registered Professional Engineer, Civil, State of California, No. 83866 Career Summary Avery Blackwell, PE, is water resource engineer and project manager with pioneering experience in California's public and private sectors, including planning, monitoring, analysis, modeling, design, compliance reporting, and funding of water supply, stormwater, and recycled water projects. Mr. Blackwell has developed and conducted cutting -edge water quality investigation and monitoring programs in relation to Waste Discharge Requirements, Water Recycling Requirements, MS4 Permit, and TMDL compliance, including drafting monitoring plans and quality assurance project plans, training and leading field sample collection and SIPP recommended Microbial Source Tracking investigation approaches, laboratory coordination, field and laboratory results data processing and analysis, drafting compliance reports, and developing BMP recommendations based on program findings. In all his projects, Mr. Blackwell strives to create innovative and comprehensive approaches that simply address his client's complex water problems and anticipate their future needs. Relevant Project Experience Vista Canyon MRP Support, Vista Canyon, CA. Project Manager (2016-Present). Groundwater and potable water sampling and reporting to comply with the Vista Canyon Water Factory Waste Discharge Requirements and Water Reclamation Requirements. Coordination with subcontract laboratory to ensure analysis of all required constituents. Preparation, trends analysis, and submission of monitoring data via Geotracker. Newhall Ranch WDR and NPDES Water Quality Monitoring and Reporting, Newhall Land and Farming Company, CA. Assistant Project Manager (2011-2020). Development and implementation of a receiving water and stormdrain outfall Water Quality Monitoring Plan to comply with the Newhall Ranch Specific Plan and Waste Discharge Requirements (WDR) Order/401 Certification. Also monitoring and reporting for the Newhall Ranch Wastewater Reclamation Plant (WRP) NPDES permit, which includes groundwater and receiving surface water monitoring, quarterly compliance reporting, and coordination with Regional Board NPDES permit writing staff. Preparation and submission of monitoring data to the California Integrated Water Quality System (CIWQS). Conducted receiving water Reasonable Potential Analysis for monitoring data from 2008 to 2011 in order to renew NPDES Permit. City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services 25 SECTION 7: Personnel, Equipment, and Facilities Geosyntec° consultants Avery Blackwell, PE CONTINUED Palos Verdes Peninsula Coordinated Integrated Monitoring Plan Implementation, City of Rancho Palos Verdes, CA. Project Manager (2021-Present). Provide CIMP monitoring and reporting support for the Palos Verdes Peninsula Watershed Management Group, including wet and dry weather outfall, receiving water, and TMDL water quality and flow monitoring, monthly progress reporting, monitoring data management and visualization, Los Angeles MS4 permit complaint annual reporting, CIMP revisions to align with new Los Angeles Permit requirements and monitoring and reporting negogations with the LA Regional Water Quality Control Board. Confidential Litigation Monitoring Support, Los Angeles County, CA. Assistant Project Manager (2013-2019). Development and implementation of a Water Quality Monitoring Plan capable of detecting project site influence on water quality between 22 upstream and downstream monitoring locations. Tasks include wet weather event planning, equipment preparation, storm tracking, staff and lab coordination, health and safety oversight, and in -field training and guidance of up to fourteen field staff per event. Monitoring reporting including statistical analysis, trends visualization, and data summary. Santa Clarita Valley Water Agency Resiliency Planning Support, Santa Clarita, CA. Project Manager (2022). Developed recommendations, study plans, and scopes of work for technical studies to support and advance the SCV Water Resilience Initiative. Led Water Resilience Initiative planning meetings and consultant coordination in developing specific priorities for further evaluation and investigation of environmental and water resources projects, including monitoring, data collection, modeling, and data management needs. Santa Barbara Urban Stormwater Monitoring, Santa Barbara County and the Cities of Carpinteria, Goleta, Solvang, and Buellton, CA. Project Manager (2018). Development of an Urban Stormwater Monitoring Report that describes and summarizes the implementation of the Urban Stormwater Monitoring Program. Data analyses were conducted including comparison of results to water quality objectives, correlations between acute toxicity levels and pyrethroid pesticides, metals, and nutrients, and statistically analyzing the sample results to determine whether sufficient samples had been collected to accurately characterize the average land use -specific pollutant concentrations. Recommendations were provided to improve safety, provide better quality results, save analysis costs, and expand the applicability of monitoring results. City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services 26 SECTION 7: Personnel, Equipment, and Facilities Geosyntec° consultants Zahra Maleki, PhD, PE Senior Staff Professional 0 Specialties Compliance Planning and Reporting Biogeochemical Processes and Remediation Water Quality Monitoring and Reporting Water Quality Data Analysis and Statistics ® Education PhD, Civil/Environmental Engineering, Stony Brook University, NY, USA. 2022 MS, Civil/Environmental Engineering, Sharif University of Technology, Tehran, Iran. 2015 BS, Civil Engineering, Sharif University of Technology, Tehran, Iran. 2013. ORegistrations & Certifications Registered Professional Engineer, Civil, State of California, No. 96369 Career Summary Dr. Zahra Maleki is a water resources engineer with consulting experience in environmental data analysis, data visualization, statistical analysis, and modeling techniques in order to evaluate the water quality parameters and their compliance with regulatory requirements. Dr. Maleki has extensive experience in quantitative assessment of pollution loading to water bodies, environmental data interpretation, and biogeochemical processes and transformations to design preventive measures to preserve water quality and comply with regulatory needs. Relevant Project Experience Vista Canyon Water Factory waste discharge (WDR), water reclamation (WRR), and monitoring and reporting program (MRP), Santa Clarita, CA. Coordination and management of quarterly and annually groundwater sampling efforts. Support for data analysis and final report preparation. Palos Verdes Peninsula Watershed Management Group, Los Angeles County Department of Public Works and Los Angeles County Flood Control District, Los Angeles, CA. Support for annual monitoring report summarizing the receiving water, outfall, and TMDL monitoring performed by the Palos Verdes Peninsula Watershed Management Group. Data analysis to assess the chemical, physical, and biological impacts of discharges from the municipal separate storm sewer system (MS4) on receiving waters, assessment of compliance with receiving water limitations and water quality -based effluent limitations (WQBELs) established to implement Total Maximum Daily Loads (TMDLs) during wet weather and dry weather. Tajiguas Sanitary Landfill, Gaviota, CA. Support for the Compost Management Unit report of the ReSource Center at the Tajiguas Landfill to obtain coverage for the ReSource Center under the California State Water Resources Control Board General Waste Discharge Requirements for Composting Operations. Water balance calculations and organizing wet weather sampling efforts. Diestel Turkey Ranch and Triple J Farms, Sonora, CA. Report preparation for complying reports of the Central Valley Regional Water Quality Control Board's (Regional Board) Waste Discharge Requirements for Diestel Turkey Ranch and Timothy J. and Joan C. Diestel in addition to assisting Triple J Farms in complying with the State Water Resources Control Board General Waste Discharge Requirements for Composting Operations (Permit) at the Triple J Farms composting site. City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services 27 SECTION 7: Personnel, Equipment, and Facilities Geosyntec° consultants Zahra Maleki, PhD, PE CONTINUED Pacific Gas and Electric best management practice (BPM) Design and Consent Decree Reporting, California. Support for PG&E annual BMP report including stormwater dioxin and PCP water quality data analysis for consent decree between Pacific Gas and Electric (PG&E) and the Ecological Rights Foundation (ERF). 30% design support for implemented BMPs at various PG&E sites using AutoCAD. Support for watershed delineation and outfall mapping. City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services 28 SECTION 7: Personnel, Equipment, and Facilities Geosyntec° consultants Career Summary Dr. Parkinson is a Principal Scientist at Geosyntec with more than w 25 years of experience providing geological and hydrogeological consulting services. He has worked on a number of surface water and groundwater projects throughout the Upper Santa 41,01 Clara River groundwater basin over the past 20 years. r This work includes projects for Newhall County Water District, City of Santa Clarita Special Districts, and several confidential clients. This work includes investigation of augmenting water supply in Castaic Valley, groundwater and surface water quality DAVE PARKINSON, PHD, evaluation, NPDES permitting of groundwater discharge to PG surface water, mitigation of elevated groundwater levels on Principal developed properties, and review of a number of TMDL related surface and groundwater models. Specialties Relevant Project Experience Newhall County Water District, Artificial Recharge Hydrogeology Feasibility Study, Los Angeles, CA. The Newhall County Water Water Quality District, providing water supply to its district in northern Los Geochemistry Angeles County, together with development partners, requested a feasibility study for artificial recharge of up to 5,000 acre feet Education per year of recycled water. A combination of field investigations ® of infiltration, aquifer pumping tests and MODFLOW modeling PhD, Geological Sciences, evaluated the capacity of the alluvial aquifer for artificial recharge. University of a California t Santa Barbara, California, 1992 at Stormwater Infiltration Hydrogeologic Site Assessments, CityofSanta Clarita, CA. As partof ateamwith PACE Engineering, MSc., Geological Sciences, Geosyntec performed a desktop hydrogeologic analysis to University of British Columbia at understand capabilities of several identified projects site for British Colombia, Canada, 1985 infiltration of stormwater. The analysis involved developing BA, Geological Sciences, calculations for groundwater mounding, understanding nearby University of California at Santa environmental impacts, and assessing aquifer capability to Barbara, California, 1981 infiltrate available stormwater volumes. Water Resource and Water Quality Consulting, City of Registrations & O Santa Clarita, California. Ongoing water resource and water Certifications quality consulting including review of groundwater quality and Washington Licensed Geologist preparation of permit required monitoring reports, development No. 2740 and review of mitigation plans, review and compliance monitoring for NPDES permits, preparation and review of grant proposals, water quality evaluation and alternative measures for City of Santa Clarita Drainage Benefit Assessment Areas. Geochemical Modeling of Aquifer Storage Recovery, Goleta Water District, CA. With excess water credits in a nearby surface water reservoir, the Goleta Water District desired to inject water into its groundwater basin for multi -year storage in anticipation City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services 29 SECTION 7: Personnel, Equipment, and Facilities Geosyntec° consultants Dave Parkinson, PhD, PG CONTINUED of future dry years. Geochemical modeling of mixing of surface water with the native groundwater in the basin was performed using PHREEQC to determine if any deleterious effects, such as encrustation or precipitation, would occur. Modeling indicated minor iron oxidation/reduction reactions, but overall little impact. The project proceeded and resulted in successfully allowing the Water District to maximize its water storage capabilities. Constructed aquifer recharge systems. As part of a regional investigation by Central Arizona Project, the Aqua Fria River, Arizona, was analyzed for hydrogeological compatibility for in -river, and off -river, natural and constructed recharge of excess Colorado River water. Following hydrogeologic analysis, conceptual designs for off -river artificial recharge were developed. City of Fillmore, Hydrogeological analysis. Performed an analysis of hydrogeologic setting and impacts to groundwater supply wells. The evaluation included geochemical impacts through modeling of stormwater and surface water infiltration to groundwater supply wells. Performed a review of MODFLOW input and results for cooperative groundwater modeling of groundwater basins by United Water Conservation District. Revenue Requirements Study, City of Los Angeles, CA. Review of City of Los Angeles Department of Water and Power water quality regulatory requirements. As part of a rate increase assessment, the City of Los Angeles required an audit of Department of Water and Power to determine the need for requested rate increases. Specific to this charge, an analysis of existing and pending water quality regulations and their impact on LADWP operations was conducted. This included analysis of proposed capital projects and their effectiveness to meet pending water quality regulations. Grant Funding and Implementation SWWRCB, Santa Monica Bay City, CA. Assisted Santa Monica Bay City with successfully obtaining $3.1 M State Water Resources Control Board grants for stormwater mitigation projects. Implementation of this stormwater retrofit project occurred adjacent to an Area of Special Biological Significance (ASBS) to reduce runoff and treat remaining runoff to the ASBS. Regional Bedrock Hydrogeo/ogic Study. Developed and instituted GIS based protocol for quantifying regional recharge to bedrock aquifers in Northern Nevada for large land holding client. This project covered the northern third of Nevada, incorporating land use, geology, hydrology, precipitation, evapotranspiration, and discharge into a GIS to allow for rigorous calculations of regional natural bedrock groundwater recharge. City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services 10 SECTION 7: Personnel, Equipment, and Facilities Geosyntec° consultants TARA ROLFE, PG, CHG Principal 0 Specialties Hydrogeology Groundwater Resource Management Well Field Assessments Groundwater Quality Investigations Groundwater Wells ® Education BA, Geology and Environmental Studies, Occidental College, Los Angeles, California, 2002 O_ Registrations & Certifications Professional Geologist, California, No. 8546 Certified Hydrogeologist, California, No. 992 Career Summary Ms. Rolfe is a hydrogeologist with over 20 years of experience in the water resources industry consulting for both public and private clients. Her technical expertise includes the development and implementation of adaptive management plans, design, and implementation of groundwater and surface water monitoring programs for recharge and resource management, production and monitoring well design and aquifertesting in both bedrock and alluvial environments, groundwater well condition assessments, and regulatory compliance. She has extensive experience in monitoring and analysis of basin -wide and regional groundwater resources. Relevant Project Experience Prado Basin Habitat Sustainability Program, Chino Basin Watermaster, Chino Basin, CA. Ms. Rolfe served as the Project Manager for the development and implementation of the 2016 Adaptive Management Plan (AMP) for the Prado Basin Habitat Sustainability Program (PBHSP) convened by the Inland Empire Utilities Agency and the Chino Basin Watermaster. The AMP was developed to satisfy a mitigation measure for the EIR by monitoring the potential impactsofcontrolled overdraftofthe Chino Groundwater Basin on the riparian habitat in the Prado Basin. The AMP included a comprehensive monitoring program, annual data analysis and reporting to stakeholders, and mechanisms to update the monitoring program and to implement potential future mitigation activities. AMP implementation included coordination with stakeholders to collect existing data, the installation of 16 piezometers at nine locations, and ongoing collection of data for the monitoring program. Ms. Rolfe coordinated with the Prado Basin Habitat Sustainability Committee stakeholders to review and approve the adaptive management plan. Ground -Level Monitoring Program, Chino Basin Watermaster, Chino Basin, CA. Ms. Rolfe served as Project Manager for the on -going Ground -Level Monitoring Program. The project included a comprehensive monitoring program for aquifer system stressors and the resulting strain that contributed to elastic and inelastic land subsidence, data analysis and annual reporting to stakeholders, as -needed updates to the monitoring program, and implementation of focused investigations and mitigation activities. The monitoring program included InSAR data; collection of data from six vertical extensometers; groundwater levels by pressure transducers at over 70 wells; well production; basin recharge and ground -level surveys within the designated Managed Area and four additionally identified City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services 11 SECTION 7: Personnel, Equipment, and Facilities Geosyntec° consultants TARA ROLFE, PG, CHG CONTINUED Areas of Subsidence Concern. The data were analyzed and summarized in annual reports for the stakeholder group. Ms. Rolfe also prepared annual budgets and presented results and recommendations. When ground -level measurements showed an increase in land subsidence rates in one area, Ms. Rolfe was the Project Manager for the development of a five-year work plan to investigate the mechanism(s) contributing to the land subsidence and develop an adaptive management plan. Groundwater Monitoring Program, Rancho Mission Viejo, CA. Ms. Rolfe managed the groundwater level and production monitoring and reporting program which included monthly recording of production, hour, and power meter readings at over 50 sites and measurement of groundwater levels at eight wells. Ms. Rolfe provided monthly production reports to the client for water accounting purposes and prepared annual reports for basin management. When the client's needs changed, Ms. Rolfe replaced a monthly groundwater level measurement program with pressure transducers that record groundwater levels at 15-minute intervals and training the Ranch staff to record meter readings. The pressure transducers provide higher temporal resolution data which allows for a greater understanding of causal relationships between climate, groundwater production and recharge, and groundwater storage changes. Chino Basin Recycled Water Groundwater Recharge Program: Title 22 Engineering Report, Chino Basin Watermaster, Chino Basin, CA. Ms. Rolfe served as the Project Geologist and oversaw the drilling contractor's activities for the installation of eight dual -nested piezometers, two triple -nested piezometers, and four lysimeter clusters of six lysimeters each in the Chino Basin to monitor the impacts of recycled water recharge on down -gradient groundwater and to determine regional groundwater levels in the three - aquifer system. She oversaw installation of the wells from mobilization to completion and continued to manage data collected during a groundwater infiltration tracer study. City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services 12 SECTION 7: Personnel, Equipment, and Facilities Geosyntec° consultants W KEVIN COFFMAN, PG, CHG Principal 0 Specialties Hydrogeologic Investigations and Remediation Soil Vapor and Vapor Intrusion Investigations and Remediation ® Education University of California, Santa Barbara: BS, Environmental Sciences; Hydrology emphasis in Geology, 2000 ORegistrations & Certifications Professional Geologist, California, No. 8387 Certified Hydrogeologist, California, No. 1068 Career Summary Mr. Coffman has over 20 years of experience in the environmental investigation and remediation industry. His expertise includes soil, soil vapor, and groundwater investigation methodologies, site characterization, hydrostratigraphic characterization, and implementation of current remedial technologies. As project manager, he has managed numerous soil and groundwater assessments, aquifer testing characterizations, remedial development and implementation, and work scope/proposal development. In addition, Mr. Coffman is a technical lead for the Geosyntec vapor intrusion practice team, knowledgeable on sampling protocols, investigation strategy, laboratory methods, data analysis, guidance, and state of the industry. Through his remedial groundwater work, Mr. Coffman has developed Waste Discharge Requirement monitoring programs and managed compliance with their quality assurance project plans. He has worked on projects in several states and southern California counties and managed projects under the oversight of the U.S. EPA, the Department of Toxic Substances Control (DTSC), Regional Water Quality Control Board (RWQCB), the State of California Petroleum Underground Storage Tank Cleanup Program, and local regulatory agencies. Relevant Project Experience Northrop Grumman, Woodland Hills, CA. Mr. Coffman has performed and managed soil and groundwater investigations across the site assessing chlorinated solvents associated with site activities and gasoline additives associated with off -site activities. He manages the groundwater monitoring program for the site under RWQCB oversight. Former Litton Data Systems, Northrop Grumman, Van Nuys, CA. Mr. Coffman manages extensive groundwater delineation efforts surrounding the former aerospace industry site. Various drilling techniques are implemented (including sonic, hollow - stem, air rotary, and mud -rotary) to evaluate the complex contaminant pathway with multiple aquifer zones affected down to 420 feet below ground surface. He also manages the groundwater monitoring program for the site under RWQCB oversight. Santa Barbara County, Tajiguas Landfill, CA. Mr. Coffman prepared the Hydrogeologic and Water Supply Impact Analysis Report detailing the impact to water resources from the proposed Tajiguas Resource Recovery Project. A detailed safe yield evaluation was performed for sub -surface bedrock aquifers beneath and adjacent to the Landfill. Based on the safe yield City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services 13 SECTION 7: Personnel, Equipment, and Facilities Geosyntec° consultants KEVIN COFFMAN, PG, CHG CONTINUED evaluation, an impact analysis on the increased water demand was evaluated in relation to neighboring wells, surface water, and springs. The evaluation included the successful siting, construction, and testing of two additional production wells for the site. Education for Change, Oakland, CA. Mr. Coffman oversaw the investigation and remedial measures for cleanup of California Department of Transportation (Caltrans) facility. Corrective measure activities included the delineation of soil, soil vapor, and groundwater impacts followed by remedial activities including excavation, in -situ groundwater treatment, and sub -floor venting. The successful corrective actions resulting in the conversion of the Caltrans property into a charter high school within the City of Oakland. Confidential Client, Eastern Sierra Nevada Region, CA. Mr. Coffman manages extensive groundwater investigation efforts surrounding a former arsenic discharge pond for a spring water bottling facility. In addition to investigation efforts, an analysis of naturally occurring arsenic concentrations and regional arsenic information has been prepared to illustrate the distribution of regional arsenic in groundwater within the area. Mr. Coffman also manages implementation of the quality assurance plan in complying with the site's waste discharge requirements permit. Former Tecknit and Tube Holding Company, Santa Barbara, CA. Mr. Coffman managed and performed an extensive field investigation related to chlorinated solvents in groundwater. Investigation techniques include membrane interface probe (MIP) testing coupled with standard penetration cone or direct push drilling. The site is actively being remediated with in -situ chemical oxidation (ISCO) via sodium permanganate injections and Mr. Coffman has overseen assessment of the effectiveness of the ISCO system. ASCON Landfill, Huntington Beach, CA. Mr. Coffman manages the groundwater monitoring program at the ASCON Landfill which accepted drilling mud and oil field wastes over nearly 50 years. As part of the groundwater monitoring program, Mr. Coffman oversees the implementation of the field work, Level II data validation of the laboratory results, and preparation of monitoring reports for submittal to the DTSC. Boeing Co., Woodland Hills, CA. Mr. Coffman developed an ISCO injection program for the treatment of chlorinated solvents in shallow groundwater. Implementation along with soil remediation resulted in a No -Further -Action being granted from the Regional Water Quality Control Board. GeneralAtomics, San Diego, CA. Mr. Coffman managed the routine groundwater monitoring and reporting program for an aerospace client where chlorinated solvents and 1,4-dioxane impact groundwater. He currently manages the waste discharge requirements reporting for the site's in -situ chemical oxidation program for treatment of the groundwater contaminant plume. General Atomics, San Diego, CA. Mr. Coffman managed the investigation and removal of soil impacted by vegetable -based hydrocarbons used in capacitor manufacturing. The removal was performed in accordance with the San Diego Site Assessment and Mitigation (SAM) manual guidance for the purposes of meeting lease termination agreements. AMPAC, Henderson, NV. Mr. Coffman oversaw field operations of installing, by means of air rotary and sonic drilling, extraction and re -injection wells for treatment of perchlorate contaminated groundwater. Through performance of aquifer step tests and re -injection tests, Mr. Coffman provided the data for remedial design. City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services 14 SECTION 8: Sub -Consultants Geosyntec will use the following Subconsultants: GeosMtec consultants WECK LABORATORIES, INC. 1 14859 CLARK AVENUE, INDUSTRY, CA 91745 W L Weck Laboratories, Inc. (Weck) was established in 1964 in the City of Industry, California, as a consulting firm and contract laboratory. Through the WECK LABORATORIES, INC. years, the company has grown significantly, expanding facilities, personnel, and equipment, becoming a full -service analytical laboratory dedicated predominately to environmental testing. With more than 59 years of industry expertise, Weck strives to provide the best possible value for their clients by delivering high quality data, comprehensive analytical services, and excellent customer service. They work hand in hand with their staff, clients, government agencies, and vendors to solve complex analytical issues using cutting edge instrumentation, leading the industry in methods development for emerging environmental contaminants and investigative chemistry. Weck Laboratories, Inc. is organized as a privately held California corporation and offers a full range of analytical services to industrial, engineering, utilities, and government clients, operating from its facility in the Los Angeles area. Weck is a certified small (SBE), minority (MBE) and County of Los Angeles local (LBE) business enterprise. The laboratory employs over 75 chemists, technicians, and support personnel. Testing services available include analysis of drinking water, wastewater, groundwater surface water, desalination, water re -use, hazardous waste, and soil. Sampling services and consultation with chemists and environmental professionals are also provided. CONFLUENCE ENVIRONMENTAL, INC. 1 353 W PACIFIC COAST HIGHWAY LONG BEACH, CA 90806 Confluence Environmental, Inc. is a trusted partner for premium environmental sampling and technical field services. With a rich background in the field, top -tier equipment, and specialized expertise, they guarantee the seamless and safe execution of projects, even in the most challenging environments. Their focus on intricate sites with demanding protocols sets them apart, making them the preferred choice for clients seeking excellence in environmental services. Key Service Highlights: • Expert Sampling Solutions: From groundwater, soil and soil -vapor to ponds and leachate fields they excel in collecting precise data by following industry specific methodologies, ensuring the accuracy and reliability of results. • Flexible Collaboration: Whether you require additional field staff to enhance your team or prefer their independent operation, they tailor their services to meet your specific project needs seamlessly. • Certified and Compliant: Confluence Environmental holds CPUC certification as a Women Business Enterprise (WBE) and California State certification as a Small Business. They boast C-8, C-12, and C-57 licenses, coupled with Hazardous Substance Removal Certification (HAZ), demonstrating their adherence to industry standards. Moreover, their ISNetworldO and AVETTA certifications underscore their unwavering commitment to safety and regulatory compliance. Their services span across California and the broader Western States, catering to diverse environmental requirements with efficiency and professionalism. City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services 15 SECTION 9: Optional Special Studies Geosyntec is not recommending optional special studies. City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services GeosMtec consultants 16 Geosyntec �' consultants engineers I scientists I innovators Offices in Principal Cities of the United States and Select International Locations geosyntec.com 02025 PROPOSAL - COST FILE For Vista Canyon Water Factory Water Monitoring and Reporting Services Project No. NS-24-25-16 January 27, 2025 Cover Letter Ms. Michele Arima Buyer for the City of Santa Clarita 23920 Valencia Blvd., Santa Clarita, CA 91355 GeosMtec consultants January 27, 2025 Geosyntec Consultants, Inc. 1031 S Broadway, Suite 300 Los Angeles, CA 90015 Subject: Vista Canyon Water Factory Water Monitoring and Reporting Services - Cost File Dear Ms. Arima, Please find the Cost Proposal for Geosyntec Consultants, Inc. on the following pages. This proposal is a firm offer for a 120-day period. The proposed work will be performed at the "not -to -exceed" price with the hours breakdown byTaskfor each Member. This will includes all deliverables and meeting attendance as laid out in the scope ofwork. Avery Blackwell, PE, QSD Principal, Project Manager Work: 805.979.9125 Cell: 805.979.9125 Email: ablackwell(dgeosyntec.com Brandon Steets, PE, QISP/ToR Senior Principal, Individual Authorized to Bind the Consultant Work: 805.979.9122 Cell: 805.455.9591 Email: bsteetsogeosyntec.com City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services SECTION 1 Project Cost Breakdown...................................................... 4 SECTION 2 Rate Schedule............................................................... 5 City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services Geosyntec �' SECTION 1: Project Cost Breakdown consultants y •K •k F w q Q C U R C W q L q V] F F F A Task ITask Description a O w i, M $350 $330 $215 15% 3% 1 Project Management 2 18 24 $12,430 $0 $0 $373 $373 $12,803 $13,187 $13,583 $39,572 2.1&2 Groundwater Sampling*** 0 20 126 $33,690 $54,794 $8,219 $1.011 $64,024 $97,714 $100,645 $103,665 $302,024 2.3 Quarterly Reporting 4 36 72 $28,760 $0 $0 $863 $863 $29,623 $301511 $31,427 $91,561 3 Annual Reporting 5 12 46 $15,600 $0 $0 $468 $468 $16,068 $161550 $17,047 $49,665 TOTAL 11 1 86 268 $90,480 $54,794 $8,219 $2,714 $65,728 $156,208 $160,894 $165,721 S482,S22 Notes: * Estimates of hours provided for budgeting purposes; actual staff allocations within the predefined budgets may change. ** Price includes annual adjustment to match the change in the Consumer Price index as described in the RFP (assumed at 3%) ***As shown in our project schedule, five groundwater sampling events are scheduled for Year 1, since the 2025 1 st quarter sampling event has not been conducted. As a discount to the City, we have excluded one of the 2025 quarterly sampling events from our project cost estimate, although it is included in our scope of work. City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services SECTION Z: Rate Schedule GEOSYNTEC CONSULTANTS 2025 A RATE SCHEDULE GeosMtec consultants Eniineer/Scientist Rate/Hour Staff Professional $185 Senior Staff Professional $215 Professional $245 Project Professional $275 Senior Professional $ 3 0 5 Principal $330 Senior Principal $350 Construction Services Engineering Technician I $105 Engineering Technician TT $1 15 Senior Engineering Technician I $125 Senior Engineering Technician TT $140 Site Manager T $147 Site Manager II $167 Construction Manager $185 Design, Graphical, and Administrative Services Designer $195 Senior Drafter/Senior CADD Operator $175 Drafter/CADD Operator/Artist $160 Project Administrator $105 Clerical $85 General Direct Expenses Cost plus 12% Subcontract Services Cost plus 15% Communications Fee 3% of Professional Fees Specialized Computer Applications (per hour) $24 Personal Automobile (per mile) Current Gov't Rate Photocopies (per page) $0.10 Rates are provided on a confidential basis and are client and project specific. City of Santa Clarita I Vista Canyon Water Factory Water Monitoring and Reporting Services 5 Geosyntec �' consultants engineers I scientists I innovators Offices in Principal Cities of the United States and Select International Locations geosyntec.com 02025