Loading...
HomeMy WebLinkAbout2025-05-13 - RESOLUTIONS - RD MAINT REHAB FUNDING CIP.N% .n" RESOLUTION NO.25-18 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA CLARITA, CALIFORNIA, DECLARING THAT IT HAS ADOPTED A LIST OF PROJECTS FOR FISCAL YEAR 2025-26 FUNDED BY SENATE BILL 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017, LOCAL STREETS AND ROADS, ROAD MAINTENANCE AND REHABILITATION FUNDS INTO THE CAPITAL IMPROVEMENT PROGRAM WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April 2017 to address the significant multi -modal transportation funding shortfalls statewide; and WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of our City of Santa Clarita (City) are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; and WHEREAS, the City must adopt by resolution a list of projects proposed to receive fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, which must include a description and the location of each proposed project, a proposed schedule for the project's completion, and the estimated useful life of the improvement; and WHEREAS, the City, will receive an estimated $6,045,690 in RMRA funding in Fiscal Year 2025-26 from SB l; and WHEREAS, this is the ninth year in which the City is receiving SB 1 funding and will enable the City to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB 1; and WHEREAS, the City has undergone a robust public process to ensure public input into our community's transportation priorities/the project list; and WHEREAS, the City used a Pavement Management System to develop the SB 1 project list to ensure revenues are being used on the most high -priority and cost-effective projects that also meet the community's priorities for transportation investment; and Page 1 of 4 WHEREAS, the funding from SB 1 will help the City maintain and rehabilitate numerous streets/roads, bridges, add active transportation infrastructure throughout the City this year and hundreds of similar projects into the future; and WHEREAS, the 2023 California Statewide Local Streets and Roads Needs Assessment found that the City streets and roads are in an "at -risk" condition and this revenue will help us increase the overall quality of our road system and over the next decade will bring our streets and roads into a "good" condition; and WHEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting -edge technology, materials and practices, will have significant positive co -benefits statewide. NOW, THEREFORE by the City Council of the City of Santa Clarita, California, does hereby resolve as as follows: SECTION 1. The foregoing recitals are true and correct. SECTION 2. The following list of newly proposed projects will be funded in -part or solely with Fiscal Year 2025-26 Road Maintenance and Rehabilitation Account revenues: Project Title: 2025-26 Overlay and Slurry Seal Program Design and Construction; Project Description: Generally, the scope of work to be performed includes, but is not limited to, asphalt resurfacing of various streets Citywide; Project Location: Citywide. Specific streets were selected from locations identified through the City's Five -Year Pavement Preservation Program and are identified in the attached Proposed Fiscal Year 2025-26 SB 1 Project List; Estimated Project Schedule: Pre -construction: July 2025 — May 2026, Construction: June 26 — June 2027 based on the component being funded with RMRA funds; and Estimated Project Useful Life: Streets selected for preventative maintenance will have a pavement life expectancy of 3-7 years, and streets selected for rehabilitation will have a life expectancy of 10-15 years. Page 2 of 4 00% SECTION 3. The following previously proposed and adopted projects may also utilize Fiscal Year 2025-26 Road Maintenance and Rehabilitation Account revenues in their delivery. With the relisting of these projects in the adopted fiscal year resolution, the City is reaffirming to the public and the State our intent to fund these projects with Road Maintenance and Rehabilitation Account revenues: Project Title: 2024-25 Overlay and Slurry Seal Program Design and Construction; Project Description: Generally, the scope of work to be performed includes, but is not limited to, asphalt resurfacing of various streets Citywide; Project Location: Citywide. Specific streets were selected from locations identified through the City's Five -Year Pavement Preservation Program and are identified in the attached Proposed Fiscal Year 2025-26 SB 1 Project List; Estimated Project Schedule: Pre -construction: July 2024 — May 2025, Construction: June 25 — June 2026 based on the component being funded with RMRA funds; and Estimated Project Useful Life: Streets selected for preventative maintenance will have a pavement life expectancy of 3-7 years, and streets selected for rehabilitation will have a life expectancy of 10-15 years. SECTION 4. The City Clerk shall certify to the adoption of this resolution. PASSED, APPROVED, AND ADOPTED this 13th day of May 2025. ,�Jj,40 '.. 1,-- MAYOR ATTEST: CITY UERK7- -- _ DATE: Page 3 of 4 STATE OF CALIFORNIA COUNTY OF LOS ANGELES ) ss. CITY OF SANTA CLARITA ) I, Mary Cusick, City Clerk of the City of Santa Clarita, do hereby certify that the foregoing Resolution No. 25-18 was duly adopted by the City Council of the City of Santa Clarita at a regular meeting thereof, held on the 13th day of May 2025, by the following vote: AYES: COUNCILMEMBERS: Ayala, McLean, Weste, Gibbs, Miranda NOES: COUNCILMEMBERS: None ABSENT: COUNCILMEMBERS: None M'4�� 4K., CITY CLERK Page 4 of 4 City of Santa Clarita Proposed Fiscal Year 2025-26 SB 1 Project List Project Road Name (Locations listed are projected estimates and have Pre- Proposed Useful Useful yet to be Project Construction Construction Schedule of Life Life Project Title Project Descri tion finalized) Location I Start Start Completion Min Max 2025-26 Overlay The Annual Overlay Avenue From Rye Jul-25 Jun-26 Jun-27 3 15 and Slurry Seal and Slurry Seal Scott Canyon Program Design Program reflects the Road to and Construction City's commitment McBean to roadway Parkway infrastructure by resurfacing streets in need of attention. 2025-26 Overlay The Annual Overlay McBean From Alegro Jul-25 Jun-26 Jun-27 and Slurry Seal and Slurry Seal Parkway Drive to Ave Program Design Program reflects the Navarre and Construction City's commitment to roadway infrastructure by resurfacing streets in need of attention. 2025-26Overlay The Annual Overlay Rye Canyon From Jul--5 Jun-26 Jun-27 3 1 and Slurry Seal and Slurry Seal Road Avenue Program Design Program reflects the Stanford to and Construction City's commitment Avenue to roadway Scott infrastructure by resurfacing streets in need of attention. 2025-26 Overlay The Annual Overlay Via Sierra Jul-25 Ju11-26 Jun-27 3 15 and Slurry Seal and Slurry Seal Princessa Highway to Program Design Program reflects the Lost Canyon and Construction City's commitment Road to roadway infrastructure by resurfacing streets in need of attention. 2024-25 Overlay The Annual Overlay Copper Hill From Jul-24 Jun-25 Jun-26 3 1 and Slurry Seal and Slurry Seal Drive Newhall Program Design Program reflects the Ranch Road and Construction City's commitment to Avenida to roadway Rancho infrastructure by Tesoro resurfacing streets in need of attention. 2024-25 Overlay The Annual Overlay Sierra From Jul 24 Jun-25 Jun-26 3 15 and Slurry Seal and Slurry Seal Highway Soledad Program Design Program reflects the Canyon and Construction City's commitment Road to to roadway Skyline infrastructure by Ranch Road resurfacing streets in need of attention.