Loading...
HomeMy WebLinkAbout2025-07-08 - AGENDA REPORTS - PROJ P2017 CONTRAgenda Item: 11 CITY OF SANTA CLARITA AGENDA REPORT CONSENT CALENDAR CITY MANAGER APPROVAL: Li ' DATE: July 8, 2025 SUBJECT: NEWHALL PARK IMPROVEMENTS, PROJECT P2017 - DESIGN CONTRACT DEPARTMENT: Public Works PRESENTER: Shannon Pickett RECOMMENDED ACTION City Council: 1. Award a design contract to Pacific Coast Land Design, Inc., for the Newhall Park Improvements Project, Project P2017, in the amount of $599,553 and authorize a contingency in the amount of $59,955 for a total contract amount not to exceed $659,508. 2. Appropriate one-time funds in the amount of $730,000 from the Measure W Safe Clean Water Regional Fund (Fund 274) to the Newhall Park Improvements Project, Project P2017, expenditure account P2017274-516101. 3. Authorize the City Manager or designee to execute all contracts and associated documents, subject to City Attorney approval. BACKGROUND The Upper Santa Clara River Enhanced Watershed Management Program (EWMP) was developed in coordination with Los Angeles County (County) and the County Flood Control District to comply with the state and federal requirements of the Storm Water Permit (Permit) issued by the Los Angeles Regional Water Quality Control Board. The City of Santa Clarita (City) City Council entered into an agreement with the County to develop the EWMP on July 9, 2013. The EWMP identifies certain projects, actions, and milestones necessary to achieve compliance with pollutant reduction standards required by the Permit. One requirement of the EWMP obligates the City to have infiltration capacity for stormwater through regional infiltration facilities. Page 1 Packet Pg. 74 The City identified Newhall Park as an adequate site for a regional stormwater infiltration facility, as shown on the attached Location Map. Newhall Park currently features a basketball court, softball field, playground, soccer fields, picnic areas with a barbeque, public restrooms, public pool, and plenty of natural shade, making it a versatile location for families, students, and visitors to enjoy outdoor activities and events. The site also hosts a multi -purpose room and a Boys and Girls Club facility. This project will complete the concept design for both the installation of the subterranean infiltration facility and park improvements at Newhall Park. This project supports the Building and Creating Community theme of the City's five-year strategic plan, Santa Clarita 2025. The scope of work for this design services contract includes community outreach meetings and architectural, survey, engineering, and landscape design services required to prepare conceptual layouts for the park improvements. These layouts will include preliminary engineer's estimates for completing design and construction. The City conducted a Request for Proposal (RFP) to solicit proposals from qualified consulting firms to provide design services for the Newhall Park Improvements Project. The RFP was published and circulated via the City's e-procurement system, BidNet, on February 24, 2025. The City transmitted the solicitation to 2,706 vendors on BidNet, of which 104 vendors downloaded the RFP. A total of five companies provided proposals for consideration. These proposals were reviewed and evaluated based on each company's ability to meet the specific needs of the City. An evaluation panel, comprised of staff from the Public Works Department and Neighborhood Services Department, scored the responses using the following categories of weighted criteria: • Ability to comply and provide deliverables based on the project schedule developed by the Consultant that meets or exceeds the City's project timeframe (30%) • Consultant qualifications and overall project team experience (25%) • Responsiveness to the RFP including content, format, and completeness of the written proposal (25%) • Ability to present creative ideas and innovative solutions that align with Measure W goals (10%) • References (10%) The evaluation panel scored the responses based on a 100-point scale, with the results outlined below: Rank Company 1. Pacific Coast Land Design, Inc. 2. David Volz Design Landscape Architects, Inc 3. MIG, Inc. 4. SWA Group 5. NUVIS Locati on Ventura, CA Costa Mesa, CA Los Angeles, CA Los Angeles, CA Newport Beach, CA Score 94 88 87 85 80 Page 2 Packet Pg. 75 In reviewing proposals, the evaluation panel awarded the highest score to Pacific Coast Land Design, Inc. (PCLD). The evaluation panel determined that PCLD's proposal offered the best overall value to meet the design needs. PCLD demonstrated an in-depth understanding of the project needs and provided a detailed scope of work and approach to the project. They analyzed the project location and identified key design factors that will need to be addressed in the design. Based on their design experience with similar projects, and the completeness of their proposal for this project, staff recommends awarding the design contract to PCLD. The proposal is available in the City Clerk's Reading File. California Government Code 4526 prescribes the selection of architectural and engineering services to be based on demonstrated competence and professional qualifications necessary for the satisfactory performance of the services required and does not authorize the selection of professional architect and engineering services based on cost. City staff was able to reach an agreement with PCLD at a fair and reasonable price. The requested contingencies will cover the costs of unforeseen design constraints and account for potential design modifications requested by the City, and other permitting agencies, during the design of the project. On January 26, 2021, the City Council approved a transfer agreement for Measure W Safe Clean Water Regional Funds from the County to support design and construction of regional infiltration projects. The requested budget appropriation of $730,000 allocates a portion of these funds to this project, bringing the total project budget to $730,000, representing $659,508 in design contract costs and $70,492 in project administrative costs. Project administrative costs include staff time, project management, permit fees, and all associated technical investigations necessary for cost estimations. ALTERNATIVE ACTION Other action as determined by the City Council. FISCAL IMPACT Upon approval of the recommended action, $730,000 is available in expenditure account P2017274-516101 (Measure W Regional Fund) to support the recommended contract and project administrative costs. ATTACHMENTS Location Map Proposal for Pacific Coast Land Design, Inc. (available in City Clerk's File) Page 3 Packet Pg. 76 4, l u . r�•NEWHALL PARK RFP Number: CIP-24-25-R3008 J U N E 20, 2025 Proposal to Provide LANDSCAPE ARCHITECTURAL SERVICES to THE CITY OF SANTA CLARITA T � SANTA l� M4.. Pacific Coast Land Design, Inc. Landscape Architecture - Urban Design • Environmental Planning with: Encompass Consultant Group (ECG) Thoma Engineering Field Stone Develoment, LLC DiCecco Architecture, Inc. 3C Engineering Thomas Flitsch Archpitects P.C. Aquatic Design Group RG Ei, Inc. Oaktopia Reffiabboal Pacific Coast Land Design, Inc. Landscape Architecture • Urban Design • Environmental Planning 461 East Main Street, Ventura, CA 93001 805.644.9697 www.pc-ld.com City of Santa Clarita Public Works Department, CIP 23920 Valencia Boulevard, Suite 120 Santa Clarita, California, 91355 RE: NEWHALL PARK INFILTRATION PROJECT (RFP NUMBER: CIP-24-25-R3008) Dear Selection Committee Members, Pacific Coast Land Design (PCLD) is pleased to submit our proposal to the City of Santa Clarita for the Newhall Park Infiltration Project. The City has an amazing opportunity through implementation of the Los Angeles County Measure W Safe, Clean Water Program to fund and support the renovation and enhancement of the well -loved park. Having been involved in previous efforts to shape these potential park improvements, PCLD brings a strong understanding of the existing site and key issues that will inform a new and wholly distinct design process. We are excited to hit the ground running with our project knowledge and to engage City decision makers and stakeholders in that renewed dialogue. Growing up in Santa Clarita and attending both Placerita Junior High and Hart High, PCLD project manager Chris Horton is keenly aware of the cherished space Newhall Park has held within the Santa Clarita community for more than half a century. PCLD and our team of expert design consultants look forward to developing a park design to beautify and improve park amenities in coordination with the Measure W supported park infiltration BMP project. PCLD and our consultant team are proud of our recentwork contributing to the development of public -facing projects within the Santa Clarita community, shaping parks, public spaces and streetscapes throughout the city. Our team, with extensive experience collaborating togetherwithin the City of Santa Clarita, is well -positioned to meet the diverse requirements posed by this project. The PCLD design team possesses substantial project experience in working with the City and Los Angeles County agencies and through that experience has established strong working relationships with City staff and local stakeholders. PCLD's expertise and recent experience is in managing multidisciplinary consultant teams for complex park projects with scope and program goals similar to those referenced for Newhall Park. PCLD will serve as the primary design consultant to the City, with the core work produced in partnership with Civil Engineers Encompass Consultant Group and Architect DeCecco Architecture Incorporated. The team is further supported by Aquatic Design Group, Arborisf Dave Muffley, Structural Engineers RGSE, Thoma Electric, Mechanical and Plumbing Engineers 3C Engineering, and CASp reviewer Tom Flifsch. Within the following proposal we have provided our qualifications relating to project management, design, permitting, documentation, and construction oversight, alongside our team's direct and recent experience conducting design and community engagement efforts tied to parks and recreation design. We acknowledge receipt of the released addendums and questions and answers to this RFP. Our knowledge of key project elements and approach is presented in Introduction, followed up with a detailed scope of services and approach as presented in the Work Statement. Keyed to the Work Statement, we've provided the anticipated project timeline and milestone Schedule. You will find more about our project team and our relevant project experience in both the Qualifications of Firm and Staff and Sub -Consultants sections of the proposal. RFP Addenda and Forms are attached to the end of this proposal. As instructed in the RFP, the fee proposal is provided in the separate Cost Proposal envelope. Pacific Coast Land Design values our strong and collaborative relationship with the City of Santa Clarifa and the Newhall Park Infiltration Project is an important opportunity for our firm. We and our consultant team members look forward to the potential of continuing to work closely with City of Santa Clarifa staff on this community defining project. Mike AZielsdo (Authorize Agent) Principal/CEO Pacific Coast Land Design, Inc. mike@pc-Id.com ii I PCLD Newhall Park Infiltration Project Proposal C Is orf00� (Proposal Point -of -Contact) Senior Associate + Project Manager Pacific Coast Land Design, Inc. chris.horfon@pc-Id.com NTRODUCTION GENERAL INTRODUCTION Pacific Coast Land Design, Inc. (PCLD) is eager to continue working with the City of Santa Clarita on the completion of the Newhall Park infiltration Project. As designers of community parks and public spaces in the City of Santa Clarita, PCLD understands the unique history and opportunities presented to City Staff, the community, and the future design team in the design and construction of the park renovations associated with the Newhall Park infiltration BMP project. PROJECT UNDERSTANDING PCLD understands that the City of Santa Clarita is seeking the services of a well -qualified design team to develop multiple iterations of concept designs, 3D models and renderings, construction plans, specifications and estimates (PS&E), provide construction support, and record drawings for the renovation of Newhall Park in coordination with the subgrade infiltration gallery BMP by PACE. PCLD and its consultant team will prepare the required documents necessary to obtain approval and permitting of 100% plans, specifications and estimates, and will work closely with the City Stakeholders to successfully complete the project goals and protect the interest of the City. PLAN APPROVALS AND The PCLD team acknowledges that the proposed project boundaries PERMITTING lie within the permitting jurisdiction of the City of Santa Clarita and Los Angeles County. While the focus of the project is to enhance park amenities at Newhall Park, the design team will also provide the City with the services necessary to secure the needed approvals and permits from City of Santa Clarita Divisions and L.A. County Departments, including storm and sanitation, Health and Fire, CEQA, and SWPPP. PCLD is including Aquatic Design Group in the consultant team specifically to ensure efficient City and County approvals of the splash pad. PCLD has years of experience coordinating with City Stakeholders on park and public facing projects and will ensure that the design reflects the values and needs of the City to ensure a smooth approval process with City Agencies and Divisions. Additionally, the design team will prepare plans, exhibits, and/or documentation for construction access agreements with L.A. County Flood Control District, Placerita Junior High, Hart High School, and property owners as necessary. The team has reviewed all released Addenda, and the solutions and scope of work presented in the proposal are based on the information provided in the RFP and answers to proposer questions given as provided by the City. THE EXISTING SITE Newhall Park is a 14.3-acre park in Santa Clarita flanked by Hart Highschool and Placerita Junior high on Newhall Avenue at Dalby Drive. The park has provided recreational amenities for Santa Clarita families and athletes for over half a century and will be the site of a new subgrade infiltration gallery stormwater BMP as part of the Upper Santa Clara River Enhanced Watershed Management Program. In 2019, PCLD was contracted by the PCLD Newhall Park Infiltration Project Proposal I 1 City of Santa Clarita to assist PACE engineering with conceptual design of park renovations after proposed infiltration gallery installation. Through the design process, the design team and City Stakeholders analyzed a series of potential BMP layouts and park renovation concepts that included major impacts to existing park amenities and vegetation. This design was put on hold in part due to the removal of a considerable number of trees along Dalby Drive. The BMP for the current design effort is much more sensitive to the existing park landscape and amenities. Likewise, existing trees will be protected to the maximum extent possible in PCLD's park renovation designs. DESIGN OPPORTUNITIES The PCLD team is excited to work with the City on the design and construction of park renovations in Newhall Park following the construction of the BMP facility infiltration. Care will be taken to preserve and protect existing trees at every stage of the design and construction process and will be based on an updated Arborist Report for all trees in the park. The following is a list of design opportunities for Newhall Park based on the RFP and PCLD's familiarity with the park: • The existing playground is located under impressive Heritage Oak Tree canopy and renovations to the playground may continue to utilize the existing shade while supplementing new inclusive play features and play equipment with new shade structures. • A perimeter walking path would improve access to all edges of the park and enhance exercise opportunities for walkers and joggers. • Splash Pads have been a top resident request at Santa Clarita Park outreach meetings over the last few years and one could be installed at Newhall Park • The Softball Field could be enhanced with a new outfield fence and renovated field lighting. • The grass fields could be further defined with a Multi -Purpose Field located safely away from the Softball Field and illuminated by the renovated field lighting. • As part of the park enhancements, the existing restrooms could be upgraded to current ADA/CBC standards. • Existing parking and maintenance vehicle access could be improved. • Access will be improved to the existing stone BBQs and gazebo which will be protected in place and integrated into new park features. • Access to the existing BBQs and gazebo could be improved while also protecting these features in place, and a new picnic pavilion could be constructed to compliment the outdoor dining opportunities at the park. • Nature -Based solutions can be used to secure Measure W funding, improve aesthetics and biodiversity in the park, provide educational opportunities, and as a means for conveying offsite stormwater drainage from Hart Highschool. • Similar to PCLD's work in other parks, a Civic Artwork concrete pad could be installed in coordination with the Public Arts Commission. • The existing Multi -Purpose Room and Maintenance Buildings finishes, systems, and internal wall layouts could be assessed and improved. • PCLD and the design team are familiar with City Standards and preferences for park material, quality and cost and can ensure 2 1 PCLD Newhall Park Infiltration Project Proposal that the improvements meet the needs of City and community. In developing designs, standards, and working closely with City CIP, Parks, and LMD on a number of projects, PCLD can provide designs for low a water -use, native and regionally adapted plant palette that will beautify Newhall Park while minimizing maintenance and overall water -use. Low Impact Development (LID) drainage solutions and green streets strategies may be used as key components, developing the site to contain its runoff and runoff from Hart Highschool through Nature -Based systems that will deliver stormwater to the BMP via gentle mounding and swales that will absorb pollutants and increase permeability in the park. DESIGN REQUIREMENTS The work to be performed will be based on the latest pertinent City policies, codes, standard drawings, and ordinances and meet all applicable state and federal guidelines. The design team will work in close coordination with PACE to ensure accurate design and construction. PCLD's previous design work on the Project will help frame initial base drawings and concept design. Development of the park plans will be consistent with City format and approval requirements. The City's Project Manager will direct and coordinate this Project. The Consulting Project Manager, PCLD Senior Associate Chris Horton shall receive, coordinate, and transmit reports and documents to and from the consulting team and function as a liaison with the City team and City Stakeholders. Working in partnership with the consultant team, PCLD will take the lead in developing overall design concepts that will improve the character of the park for all residents of Santa Clarita. PCLD Newhall Park Infiltration Project Proposal 1 3 QUALIFICATIONS OF FIRM & STAFF STATEMENT OF QUALIFICATIONS FIRM PROFILE Pacific Coast Land Design, Inc. (PCLD) has been serving the Southern California region since 1983, providing award -winning landscape architecture, urban planning, and environmental design services. The firm, incorporated as a California C-Corporation in 2011, consists of three principal landscape architects, one senior associate landscape architect, four associate designers, two landscape designers, and an office manager. We understand that no project happens in a vacuum and have spent years developing professional relationships with local agencies, engineers, architects, and other vital consultants, collaborating to deliver the highest quality solutions to our clients and the communities we serve. Our studio, located in downtown Ventura, specializes in regional projects throughout Ventura County, Santa Barbara County, and Northern Los Angeles County. Currently, PCLD consults with the cities of Ventura, Oxnard, Thousand Oaks, Santa Clarita, Santa Maria, Guadalupe and Fillmore, the Counties of Ventura and Santa Barbara, Isla Vista Recreation and Park District, the Santa Paula Unified School District and Ojai Unified School District. PCLD is proud to have contributed to the development of a broad range of public serving projects in our region. In Santa Clarita, our firm has worked closely with the City on a variety of projects for more than 30 years. Currently, PCLD is working on Old Orchard Park and David March Park, both in construction; and Via Princessa Park and the Santa Clarita Sports Complex, both in design; and a host of other public works projects including streetscapes, medians, highway interchanges, and more. In recent years, we have expanded our portfolio of public space and community recreation designs, supplemented by experience in private sector projects. Our experience in working with many local jurisdictions allows us the ability to be a bridge between the municipalities and the agencies we serve, and the community we're designing with. Working within these shared spaces, as both designers and client representatives, we create client -specific strategies by combining our varied knowledge base, keen sense of place, and existing relationships. APPROACH We take pride in our capabilities and always strive to provide services that exceed our clients' expectations. As experts in understanding the topography, natural systems, and uniqueness of different sites, we are committed to crafting meaningful landscapes across a variety of scales and environments. Practicing as artists and technicians, we envision and produce designs that result in beautiful outdoor spaces that connect people with both the natural and built outdoor environment. Since our inception, PCLD has also recognized the importance of a strong public design process to understand and promote the humanity and cultural importance of place. We continue to strengthen our skill set as community engagement specialists, always looking for ways to bolster and improve the means and methods for engaging with communities in these ever -changing times. 4 1 PCLD Newhall Park Infiltration Project Proposal HISTORY OF COMPARABLE WORK PCLD has extensive experience serving public agencies with award winning park design services including both new and park renovations projects. The following list details relevant projects completed or in progress. The park list includes relevant park projects with the City of Santa Clarita are highlighted in LIGHT BLUE and also includes other projects where PCLD worked directly with the City of Santa Clarita, highlighted in GREEN. Projects where PCLD has served as the prime consultant are indicated with a *. Year 2023 - I Project Name Nyeland Acres Park Type of Services Schematic Design through PS&E and construction phase I Location Oxnard, CA Client ME9 Roesling Nakamura Terada resent services Architects 2023 - resent Saticoy Park Park renovation from site investigation to schematic design Ventura, CA Anderson Kulwiec Appleby 2023 - Santa Clarita Maintenance Subconsultant to Civil Engineering Prime consultant for present Yard Schematic Design through PS&E and construction phase Santa Clarita, CA City of Santa Clarita services 2023 - resent Soule Park* Prime consultant for 32-acre existing park tree planting plan Ojai, CA County of Ventura 2022 Prime consultant for 5-acre existing park renovation; present Old Orchard Park* includes public outreach and final PS&E and construction Santa Clarita, CA City of Santa Clarita phase services 2022 Subconsultant to Civil Engineering Prime consultant for present David March Park Schematic Design, PS&E, and construction phase services Santa Clarita, CA City of Santa Clarita for phased park addition 2022 Schematic Design, Community Engagement and PS&E Isla Vista Rec and Park present Pardall Gardens* through Construction Phase Services for Park Renovation Isla Vista, CA District funded through Grant Award managed by PCLD 2022 Subconsultant to Civil Engineering Prime consultant for present SC Sports Complex Phase II Schematic Design and PS&E for selected park Santa Clarita, CA City of Santa Clarita improvements within the 30 acre phased park upgrade 2022 Schematic Design, Community Engagement and PS&E Isla Vista Rec and Park present Isla Vista Children's Park* through Construction Phase Services for Park Renovation Isla Vista, CA District funded through Grant Award managed by PCLD 2022 Newhall Gateway* Schematic Design through PS&E and Construction Phase Newhall, CA City of Santa Clarita present Services for beautification of 10-acre interchange 2022 Greek Park* Grant Strategy, Conceptual Planning, and Community Isla Vista, CA Isla Vista Rec and Park resent Engagement District 2022 Westpark Skatepark Project Management, RFP Development, Community Ventura, CA City of Ventura resent Engagement, Grant Administration 2022 - Guadalupe Central Park* Schematic Design through PS&E and Construction Phase Guadalupe, CA City of Guadalupe resent Services for Park Renovation Master planning, program development, schematic design 2021 - Via Princesses Park through construction documents for 20-acre undeveloped Santa Clarita, CA City of Santa Clarita present park with railroad crossing and immense stormwater manes ement impacts Conceptual plans through final Master Plan. Update 2021 - SC Sports Complex Master Plan existing Master Plan to reflect the conditions associated Santa Clarita, CA City of Santa Clarita present Modification with the proposed Crossroads Development and unbuilt amenities from the phase 1 construction. 2018 - 2022 Arroyo Verde Inclusive Inclusive Playground: Conceptual through final PS&E for Ventura, CA City of Ventura Playground- Thomas Fire new inclusive playground renovation PS&E for 1 median section renovated to increase roadway 2020 - 2021 Santa Clarita Circulation II and intersection capacity, improve traffic flow and Santa Clarita, CA City of Santa Clarita minimize motorist delay. 2020 David March Park I Construction cost study to implement phase 2 park Santa Clarita, CA City of Santa Clarita amenities and design based on schematic park layout 2020 - Santa Clarita Valley Water Schematic design through final PS&E for water district Santa Clarita, CA Santa Clarita Valley Water resent ConservatoryGarden learningand demonstration garden. District 2019 - 2021 Newhall Park Concept Plan* Master planning, program development budget analysis for Santa Clarita, CA City of Santa Clarita existing 16 acre community ark 2019 - Dockweiler Drive Extension Conceptual design, outreach, PS&E for landscape portion Santa Clarita, CA City of Santa Clarita resent of 3/4 mile thoroughfare extension 2018 - 2019 Via Princesses Median Median Improvements. Prelim through construction Santa Clarita, CA City of Santa Clarita administration. 2017 - 2019 Mountain View Park* Schematic design through final PS&E for park Santa Clarita, CA City of Santa Clarita improvements. Community Engagement. 2015 - 2018 Kellogg Park* Conceptual through final PS&E and construction Ventura, CA City of Ventura administration for new park featuring naturals stems PCLD Newhall Park Infiltration Project Proposal 1 5 The above showcases a variety of styles used on project renderings for City of Santa Clarita parks projects. DESIGN VISUALIZATION AND At Pacific Coast Land Design, we have always acknowledged the COMMUNITY ENGAGEMENT importance of strong visual and graphic communications through renderings, plans, vignettes, sections and other media. As landscape architects, this is often the most effective way to communicate our ideas to our clients and end users. We take pride in our ability to meet varied project visualization needs and provide graphic communications that aid in the interface between design, the client, and the public. We offer a diverse catalogue of techniques, styles, aesthetics and media to match the specific demands of each project. From photorealistic renderings that can precisely model environmental conditions to artistic sketchy vignettes, we produce images that communicate the design intent while captivating the audience in the potential. We also offer immersive multi -media experiences including 3-dimensional walkthrough videos, browser based 3-dimensional panorama viewing, and even choreographed virtual reality (VR) experiences. With these capabilities come the responsibilty to produce the right visualization and communication for the right purpose. In particular, the public participation process offers different challenges with regards to visualization and graphic communications. To accomplish successful participation and feedback with design, PCLD has experience facilitating, organizing, leading and promoting meetings, while also designing the graphics and media needed to communicate to the audience. We are well versed in the preparation of interactive exhibits that encourage people to invest their ideas into the process and interact with the design. 6 1 PCLD Newhall Park Infiltration Project Proposal '�. 7 r We-` P p-�J 2 I .�'. � d [CLICK HERE] to watch an sketchy style animated ., y video of the Arroyo Verde Park Inlcusive Playground. i } Multi -media design visualization is crucial for a park pan.or, design project's success as it enhances communication, engagement, and decision -making. PCLD utilizes 3D `. renderings, virtual walkthroughs, and interactive models to convey design decisions and spatial relationships to stakeholders, ensuring alignment with community needs and expectations. - Over the years, PCLD has developed a streamlined linear workflow that allows us to effeciently generate a variety [CLICK HERE] to view an interactive of graphics and media as a design progresses through panorama of the Las Mujeres Park _ development. We understand that design is not a static improvements in Guadalupe, CA. process and have structured our workflow to be the most efficient at incorporating and visualizing design changes. video _ y 4gs r VIA PRINCESSA PARK Santa Clarita, CA BACKGROUND Via Princessa Park is a County of Los Angeles Measure W project that focuses on providing recreation, beautification, and stormwater management. This project, showcases PCLD's master planning, project visualization, construction documentation, and interdisciplinary & inter- agency coordination capabilities. Visitors to Via Princessa Park will cross under the Metro Station via a tunnel DESIGN with decorative walls referencing local geology. On the park side of the station, visitors walk through decorative art archways on the way to the park plaza. The art archways reference the 8' diameter corrugated infiltration gallery pipes in the subgrade BMP. The park plaza includes shaded seating areas, a restroom, wayfinding, civic art and a flowing pavement pattern that references the Santa Clara River. The shaded nature -Chemed formal playground will be located adjacent to the plaza and restroom. The park will include four illuminated multi -purpose fields surrounded by a system of accessible pathways, and a nature based stormwater system that utilizes swales and mounding to convey runoff to the underground BMP West of Honby Channel. The swales and berms will function as informal play opportunities and lead into the Nature Play area on the park peninsula boardered by the Santa Clara River and Honby Channel. Public art, education, native planting, and wayfinding elements satisfy requirements for Measure W funding, and will engage users in both formal and passive moments throughout the park. Lastly, a variety of shaded amenities are strategically placed around the park, inviting users to take part in an assortment of active and passive recreation opportunites. 8 1 PCLD Newhall Park Infiltration Project Proposal Children of all ages can explore and connect mnih nature under the dense free canopy of the Nature P lay Peninsu la Project Duration 2021 - present Project Size �Ii, 20 Acres � Located between the Santa � jF _ -� -, _ c,{' '° .. W, �. ' Clara River and he Via — Value of Design Contract Princeokk ssa Metrolink Station, _ - Value 0 Via Pnncessa Park covers$462,00- - -- _ 20 Acres of and, providing four new sports fields and Walkways, Nature Play Areas, a variety of amenities to s, _ -�i Value of Construction support all types of users. f �� ',_ it and Natural Santa Cs ra River ` $50-60 million budget � -�`-along the Santa Clara River; waterfront edge of the park rS�"t Scope -of -Work Public a r Planning t Outreach Schematic Design o s ' Construction Documentation Consultant Team PSOMAS Engineering (prime/civil) I Rail Pros (railroad engineering) Anil Verma Associates (architecture) Pacific Advanced Civil Engineering (stormwater) The Park plaza is centrally located between the Ninyo & Moore (geoteehnieal) four play felds and welcomes visitors on the park OCMI (cost consultant) side of the railroad station vsth artwork, wayfinding, Elizabeth Sorgman (CASp) shaded seating areas, and a restroom. Pacific Coast Land Design (landscape arch) Owner / Reference -w — r s Leslie Frazier, P.E. Associate Engineer Capital Improvement Projects E 3 �i■ '� ..y ram_ s - _ City of Santa Clarita rat / E 661.286.4172 archors enter sthatthe ferencethe8'ecoration `9y E:Ifrazier@5anta-clarita.com r.^ archways that reference the 8'infliraiion /s gallery pipes in the site's BMP. The Nature-Themed formal playground ► is located near the entrance of the park, - providing play opportunities for a variety'Sri of age ranges. Rim- 1111 - , r n.JE _ - 0 ARROYO VERDE INCLUSIVE PLAYGROUND Ventura, CA BACKGROUND In 2017, the Thomas Fire destroyed one of the playgrounds in Ventura's Arroyo Verde Park. The City decided not to replace it in kind, but instead, to develop the first inclusive playground in the city. PCLD led the design effort from concepts through construction, presenting ideas to the community and gathering ideas and inspiration. PCLD also assisted the City of Ventura in fundraing over $450,000 to construct the $1.08 million playground. Opened in May 2022 to much excitement, the project has since won two "Project of the Year" awards through the American Public Works Association (2022 Ventura County Chapter, 2023 National). DESIGN The approximately 10,000 sf playground incorporates feedback from numerous community outreach meetings and advice gleaned from local professionals specializing in care for children with disabilities to develop the community -specific inclusive goals for this unique playground. The playground contains areas to stimulate physical play, music, balance, swings, a sensory garden with stormwater infiltration basin, and cozy spot with hammocks and a pole fort for moments when it is necessary to seek respite from stimulus. The playground utilizes the topography in the park to access to multiple slides, climbing features, and also provide access to the upper decks of large "fort" play structure that was inpired by the park's original fort play structure. The smaller, 2-5-year-old, structure offers many accessible activities and sensory play opportunities. The two structures are separated by ground level balance components, including log steppers, fallen logs, and balance beams with railings on either side for children of all abilities, as well as, a flush mount merry-go-round and inclusive seesaw. Swings complete the playground with choices for all abilities. 10 1 PCLD Newhall Park Infiltration Project Proposal ,z it A, w The/fully accessible, rubberized play surfacing adds is also a design element.l A progression of balance beams and log steppers offer children variable levels of challenge. h Jilt —1 1; Kor The completely custom, one -of -a -kind sensory wall, fabricated with 3D printed forms for pre -cast i�� ^ - concrete, incorporates donor recognition while \\\\\� creating a fun sensory experience for children. The 2-5 year old "General Store" play structure, music play area, and inclusive carousel are surrounded bythe sensory garden Mich features k' a variety of plants that feature different textures, smells, and colors During the design process, PCLD developed and iterated detai 31) models and animations that provided stakeholders donors a the community a glimpse into the future playground 10. WA-, - ,a g� Cc-Uzu� • I f i I i � � � � _�_ _mil The site plan for the playground illustrates the elements of the inclusive playground, colorcoded based on their respective play value. Elements were chosen through an extensive community engagement process. Project Duration 2018 - 2022 Project Size 10,000 square foot inclusive playground 2,000 square foot stormwater infiltration area Value of Design Contract $106,000 Value of Construction $1.08 million Scope -of -Work Schematic Design Design Development Public Outreach Donor Outreach and Recognition Construction Documentation Permitting Construction Administration PCLD Staff Involved Mike Zielsdorf, Principal in Charge Eric Berg, Project Manager Brooke McDonnell Consultant Team Pacific Coast Land Design (prime) Encompass Consultant Group (civil) Owner / Reference Stacey Zarazua Parks and Recreation Director City of Ventura T: 805.658.4740 E: szarazua@cityofventura.ca.gov 17 y O rn aWorks � CHILDREN'S PARK Isla Vista, « BACKGROUND Children's Park, in the center of Isla Vista, has watched for almost 70 years as the unincorporated, university adjacent community has grown and evolved around it. The Isla Vista Recreation and Park District (IVRPD) set out to update the parks aged amenities and infrastructure, teaming with PCLD to conduct a targeted community engagement campaign and conceptual site design effort for a grant application to the California State Parks Statewide Park Program (SPP). COMMUNITY ENGAGEMENT PCLD worked with IVRPD staff to develop a COVID-19 safe community AND DESIGN DEVELOPMENT engagement plan that not only met, but exceeded the grant guidelines and offered residents several opportunities and venues to engage the potential for Children's Park truncated within 6-week window. PCLD designed engagement activities that could be conducted at hybrid socially distanced in -person events and in virtual sessions to answer three basic questions: what, where, and why Children's Park, and which amenities and programs should be included in the grant application. Qualitative and quantitative data was pulled to answer those questions thoroughly and eventually leading to the 2022 award of $4.2 million in funding for this park. After grant award, IVRPD and PCLD have conducted another 8 public meetings soliticing community feedback, progressing the design development of the park, and solidifying community support for the project. PROJECT DESIGN The project design is centered on the desire to integrate natural systems and elements into the park with hopes of helping neighborhood Children develop a better understanding and sensitivity for the natural world. The park will feature a renovated community building, designed by project architect RNT Architects, a large nature -Chemed, Monarch butterfly inspired playground, large group and small group picnic and BBQ areas, a pollinator meadow, and an open field turf area for passive recreation. The project is currently in construction documents and hopes to start construction in early 2026. 12 1 PCLD Newhall Park Infiltration Project Proposal Community engagement has been central to the design development of Children's Park. PCLD ' designed engagement C O VID-19 safe engagement activities to answer three basic questions: what, , where, and why Children's Park, and which amenities and pro e included iR `} Project Duration 2021 - Present AL -' Project Size e ' 1.0 acre Value of Design Contract $716,721 Grant Program _ Local children provide feedback on their ideas about Statewide Park Development and Community custom nature play park features at a public meeting. _ " -' Revitalization Program + T Value of Grant Award �1iEa $4,205,653 1 EBSITE NDCN, - $t,' . _ s Estimated Project Costs Pre -construction - $1,051,413 Construction - $3,154,240 ' Scope -of -Work ®®Is — -- — ?tFY p X Ye"�l3dS: .— Community Engagement Grant Application Support 111111I r ��, v , tl - - - Conceptual Design I 1 I'i •s,.� �I��III z. jIN Consultant Team Mature tree canopy is to be largely c a 6-1Pacific Coast Land Design (prime) replacement strategy for those removed An sh " ck Wall is Encompass Consultant Group (survey + civil) 1 the basis fora deckto be used forcommunity eventsand teaming. active RNT Architects (architecture) The back park area remains an open space for dedicated n ..., (structural) play vnih the addition of two accessible parking stalls. Buehler (Stru ct I) Alan Noelle Engineering (electrical) 3C (plumbing) ling natural systere msis� Children's nTi"Ham` ° „Ir!_� "` nl ' a, - ee �Ilce rmerges sea eeNvsih �nwate Rincon Consultants (environmental) r1..77 �) Owner Reference ^I " Kimberley Kiefer General Manager (' a I n n r<i * - Isla Vista Recreation and Park District Li7�f e S The rendered site plan illustrates the parks primary design C -1 _ �. "�� / r T: 805.680.4300 features vsih the neighboring context. N� 4 : 1 `y� r� �'^ ��_ . � _ r r �,,, ft� E: kkiefer@ivparks.org The park's existing building will be renovated to cater to the f*s) v 3• District's children focused programing initiatives.- _ t r�� r e c cbutteNrnyi:ay .�.t� ' � •,.. II to ature Monarch KELLOGG PARK Ventura,« BACKGROUND Plans to develop Kellogg Park as a neighborhood park for the Westside Ventura community began in 2013, as a dream for a vacant lot along Ventura Ave. The City of Ventura was able to partner with the Trust for Public Land to purchase the 2.4-acre property, beginning an active partnership with members of the community to develop a conceptual plan that could meet the varied demands. PCLD was chosen to move the design of the park from concept through construction documents, present ideas to the community, and eventually see the park through construction. The park opened in April of 2018 to much local fanfare. DESIGN The park is structured around a '/-mile looped walking trail, a natural "river" stormwater swale, and a playground. The forms within the park are derived from the geologic and hydrologic formations of the nearby Ventura River watershed, all with the intent of providing children and other visitors an educational backdrop for the ecology of the region. The park also features a multi -generational community gathering area with an amphitheater, varied seating, beanbag toss games, and game tables. The playground divides 2-5 and 5-12 year -old play areas with a ridge feature. This ridge feature provides climbing features and access to several raised playground structures, including a "Jack -and -Jill" artificial - turf slide hill. The stormwater swale "river" feature is designed to detain and infiltrate runoff from large storm events by containing both on -site water and also by pulling in runoff from neighboring streets to alleviate local flooding problems and mitigate runoff quality. In addition to the stormwater benefits, which only occur during California's seasonal rains, the swale also serves as a use amenity with play facilities scattered along its course. The feature terminates in the center of a "stormwater amphitheater," using a variety of native plantings as the centerpiece to a community amenity. 14 1 PCLD Newhall Park Infiltration Project Proposal - 7 �- -- Project Duration 12015 - 2018 - ,• =y r Project Size �, �I. 4'�_ 2.5 acres Value of Design Contract $250, o� 00 Value of Construction �$3.0 million i Scope -of -Work T Schematic Design i Design Development • Public Outreach Construction Documentation -,f Bid Administration Assistance 4'r t Permitting C tion Administration PCLD Staff Involved Mike Zielsdorf, Principal in Charge -Manager ,<�a=AM 11—.`i � 0 Eric Berg, Project ll �� •- Brooke McDonnell Consultant Team Kellogg Park nestles into the existing Pacific Coast Land Design (prime) neighborhood fabric, a stone's ECG Staff - Formerly with STANTEC (civil) throw from the Ventura River and - -. RGSE, Inc. (structural) the ocean. - "' s - . - i Alan Noelle Engineering (electrical) Earth Systems at CamCASp (CASp Compliance) General Contractor CS Legacy Construction, Inc. MMp- ���Owner / Reference 7-1 StaceyInundation of water Zarazua infrastructure ta any occurs briefly A Parks and Recreation Director W-P^ _ - ' II ry ,"�'- {' during storm events and then offers City of Ventura -*ems ` j _,.7�+f +yam --- +x`r�l �� �R s§" '"� usersa vane of ssive and active ` f b pa T: 805.658.4740 uses during to rest of the year.E: szarazua@cityofventura.ca.gov try -` �a" • f ; , E_ PCLD KEY PERSONNEL We are proud of our internal collaboration at PCLD and rely on the 6 diversity of people and skills within the office to deliver the best project Pacific Coast Land Design, Inc. possible. We also understand the importance of a single point of contact Landscape Architecture •Urban Design• Environmental Planning and communication within our team to work directly with city project staff throughout the entirety of the project. Chris Horton will be PCLD's project manager and point of contact for the project. PCLD's team for the Newhall Park Infiltration Project includes the following key personnel: • Mike Zielsdorf - Managing Principal • Chris Horton - Senior Associate + Project Manager • Torrey Slininger - Associate • Nicole Nomura - Landscape Designer MIKE 7' - LS D O R F PLA I ASLA MANAGING PRINCIPAL As Principal Landscape Architect, Mike is the center of Pacific Coast Land Design's daily operations and responsible for design oversight and technical QA/QC. Mike is a Ventura County native, with more than 25 years dedicated to the design of context sensitive outdoor environments that showcase the definitive cultural and natural resources of the region. That experience includes the planning, design and construction oversight of urban streetscapes, city parks and open space, public works infrastructure and infill residential at a variety of scales and income levels. Mike brings his sound technical knowledge backed by a strong understanding of local plant communities and how best to integrate low impact strategies that maximize water savings and reduce site infrastructure impacts. As Principal in Charge, Mike is currently involved in the oversight and management of each of PCLD's public serving projects. For the Newhall Park Infiltration Project, Mike will serve as Principal Landscape Architect, helping shape project design aswell as managing the day-to-day contract and technical oversight with a keen eye on meeting client deliverable deadlines and quality control. Mike will also be actively engaged in the public outreach effort and stakeholder and agency coordination. RELEVANT PROJECT EXPERIENCE • David March Park PH II, City of Santa Clarita, Santa Clarita, CA • Via Princessa Park, City of Santa Clarita, Santa Clarita, CA • Newhall Park Renovation, City of Santa Clarita, Santa Clarita, CA • Children's Park, Isla Vista Recreation and Park District, Isla Vista, CA • Arroyo Verde Inclusive Playground, City of Ventura, Ventura, CA • Conservatory Learning Garden, Santa Clarita Valley Water Agency, Santa Clarita, CA • Old Orchard Park, City of Santa Clarita, Santa Clarita, CA • Kellogg Park, City of Ventura, Ventura, CA • Old Town Newhall and Roundabout, City of Santa Clarita, City of Santa Clarita, Santa Clarita, CA 16 1 PCLD Newhall Park Infiltration Project Proposal CHRIS HORTON SENIOR ASSOCIATE + PROJECT MANAGER Chris grew up in Santa Clarita and practices landscape architecture with an artistic point of view, striving to create imaginative, intuitive, and grounded places. He has a passion for utilizing public outreach and design team collaboration to develop unique and compelling outdoor spaces that engage a wide range of visitors. His experience in the profession of landscape architecture includes conceptual design, public outreach, project coordination, landscape construction documentation, client and stakeholder presentation, and field observation. Chris excels at project management for parks and public -facing projects. With a pragmatic and thoughtful approach to all projects, he successfully consolidates varying stakeholder and agency views in close coordination with design teams to ensure high -quality solutions and deliverables. Additionally, Chris's history of effective leadership and dependability on many Santa Clarita recreation projects have led to a fruitful relationship of ongoing project work with the City. Currently, Chris is the project manager for several of PCLD's active projects with the City of Santa Clarita, including David March Park (currently under construction), Via Princessa Park, Dockweiler Drive Extension. Chris was also project manager for past completed parks and public works projects in the City, including Moutain View Park, Newhall Ranch Road Fire Revegetation, and the Orchard Village Medians projects. Utilizing all these skills and experiences, Chris is a successful Project Manager and will serve as the kay point of contact with the City for the Newhall Park Infiltration Project. RELEVANT PROJECT EXPERIENCE • David March Park PH II, City of Santa Clarita, Santa Clarita, CA • Via Princessa Park, City of Santa Clarita, Santa Clarita, CA • Newhall Park Renovation, City of Santa Clarita, Santa Clarita, CA • Conservatory Learning Garden, Santa Clarita Valley Water Agency, Santa Clarita, CA • Mountain View Park Renovation, City of Santa Clarita, Santa Clarita, CA • Dockweiler Drive Extension, City of Santa Clarita, Santa Clarita, CA • Newhall Ranch Road Fire Revegetation, City of Santa Clarita, Santa Clarita, CA • Via Princessa Medians, City of Santa Clarita, Santa Clarita, CA • Orchard Village Medians, City of Santa Clarita, Santa Clarita, CA PCLD Newhall Park Infiltration Project Proposal 1 17 TORREY SLININGER ASSOCIATE Torrey has design experience in a variety of fields including landscape architecture, planning and graphic design. She obtained her bachelor's degree In Environmental Design from the University of Colorado Boulder with an emphasis in Urban Planning. She has over 6 years of experience in creating vibrant, resilient, drought - tolerant landscapes throughout Ventura County and Southern California. Her passion lies in creating accessible and dynamic outdoor spaces for underserved communities, and the general public, so that they may have more opportunities to enjoy the outdoor environment and benefit from revitalized landscapes thanks to added shade, pervious surfaces and carbon sequestration. Born in Ventura, her local knowledge, in addition to her experience with drought tolerant plantings, irrigation design, outreach efforts and placemaking are important assets for creating community -driven spaces. RELEVANT PROJECT EXPERIENCE • Via Princessa Park, City of Santa Clarita, Santa Clarita, CA • Santa Clarita Valley Water Conservatory Garden, Santa Clarita, CA • Las Mujeres Park, Guadalupe, CA • Ventura River Trail Improvement Project, City of Ventura, Ventura CA NICOLE NOMURA LANDSCAPE DESIGNER A Ventura native, Nicole received her most recent design and technical training through the double master's program for landscape architecture and regional planning at Cornell University. She approaches projects equipped with a holistic understanding of ecological, social, and municipal systems and regulations. She continues to develop her diverse skillset at PCLD by supporting a variety of projects and tasks. Her experience includes preparing municipal landscaping guidelines and best practices, feasibility studies, GIS mapping/processing, conceptual design & planning, community engagement, landscape construction documentation, construction administration, and grant and RFP applications. In her two years with PCLD, Nicole has lent her support in many Santa Clarita projects. With her sharp attention to detail and consistency in delivering high -quality work, she will be an important part of Pacific Coast Land Design's team for the City's as -needed projects. RELEVANT PROJECT EXPERIENCE • Old Orchard Park Construction Documents, City of Santa Clarita, Santa Clarita, CA • Santa Clarita Sports Complex Phase II, City of Santa Clarita, Santa Clarita, CA • David March Park Phase II, City of Santa Clarita, Santa Clarita, CA • Via Princessa Park, City of Santa Clarita, Santa Clarita, CA • LMD Median Guidelines, LMD, Santa Clarita, CA 18 1 PCLD Newhall Park Infiltration Project Proposal V Ir ;K STATEMENT SUB -CONSULTANT SCOPE PCLD has assembled an outstanding group of sub -consultant firms to INVOLVEMENT provide the variety of services identified in the RFP for the Newhall Park Infiltration Project. As prime consultant and the landscape architect of record for the project, PCLD will coordinate closely with the sub - consultants throughout the project. The following table illustrates which consultants are involved in the tasks listed in the work plan and which consultants will have Primary Responsibility or will be secondary on specific tasks. •= PRIMARY RESPONSIBILITY 0= SECONDARY RESPONSIBILITY TASK ID DESCRIPTION •� Task Project Management 1.0 Project Kickoff Meeting • O O O O O O O O O 1.1 Monthly PDT Meetings • O O O O O O O O O 1.2 Monthly Progress Reports • 1.3 Measure W Technical Support • O 1.4 Schedule • 1.5 Quality Control • 1.6 Public Engagement • O O 1.7 Public Art Support • Task Preliminary Investigation 2.1 Field Reconnaissance • O O O O O O 2.2 Document Research and Review • O O O O O O O O 2.3 Survey O • 2.4 Existing utility Research O • 2.5 CASp Accessibility Report O O • 2.6 Existing Tree Survey and Oak Tree Report O • Task 3 Design 3.1 Initial Conceptual Design Study Aternatives • O O O O 3.2 2nd Conceptual Design Aternatives • O O O O 3.3 3rd Conceptual Design Aternatives • O O O O O O O 3.4 Final Conceptual Design Aternatives • O O O O O O O O 3.5 30%PS&E • O O O O O O O 3.6 60%PS&E • O O O O O O O O 3.7 90%PS&E • O O O O O O O O 3.8 100%PS&E • O O O O O O O 3.9 Issue Final PSBE for Bidding (following 100% re New • O O O O O O O Task 4 Plan Approvals and Permits 4.1 Permits and Approvals • O O O O O O O 4.2 Bid Support • O O O O O O O Task Constuctan Support (Optional) 5.1 Construction Meetings and Support to O O O O O O O 5.2 As -Built Plans • O O O O O O PCLD Newhall Park Infiltration Project Proposal 1 19 SCOPE OF The services proposed by Pacific Coast Land Design and our team of sub -consultants WORK include necessary tasks to implement the Newhall Park Infiltration Project as listed in the RFP and discussed in the Project Understanding section of this proposal. Project implementation will rely on close collaboration between the Design team and the City with key input from stakeholders and the community. The PCLD Team will provide all professional and support services required to manage, control, track, and report on the progress of work and expenditures provided under this scope of work. 1_0 Project Kick-off Meeting (see Scope of Work Subtask 2.1 per the RFP) • Develop a Project Development Team (PDT) consisting of Consultants, City Staff, and other agency representatives and stakeholders as necessary. • City to transfer existing site information, as -built drawings, design guidelines, and 2020 Conceptual Plan documents to the consultant team. • Set PDT meeting schedules and review overall project timeline. • Discuss project overview including known opportunities and constraints. • Discuss communication and documentation format between City, consultants and stakeholders, and identify any needed information. OUTPUT - Meeting notes with updated project schedule. 1_1 Monthly PDT Meetings • PCLD and key sub -consultants will attend and prepare for monthly PDT meetings to review project schedules, coordinate design progress, and present major submittals to City Stakeholders. Meetings may be held in -person, on -site, and virtually at the discretion of the City. OUTPUT - All agendas, meeting minutes, action items, and exhibits will be included. 1_2 Monthly Progress Reports • PCLD will prepare monthly progress reports, schedule updates, and supporting data. These reports will accompany monthly invoices throughout the project and will include accomplished tasks for the month, anticipated progress for the next month, pending issues, action items, and schedule completion target dates. OUTPUT -Monthly Progress Reports 1_3 Measure W Technical Support • Provide any necessary data or documentation to submit a project modification request form to Safe Clean Water (SCW) after concept design plan is finalized and selected. • Prepare quarterly and annual reports, and provide technical information as needed. OUTPUT - Exhibits and documentation as needed and requested by the City 1_4 Project Schedule • Within two weeks of the Notice to Proceed (NTP), PCLD will provide a detailed project schedule that will include Measure W project funding deadlines. PCLD will update the schedule as needed throughout the project. OUTPUT - Project Schedule with Key Dates, Milestones, and Deadlines 1_5 Quality Control • PCLD will be the primary Quality Assurance/Quality Control (QA/QC) lead with 20 1 PCLD Newhall Park Infiltration Project Proposal project submittals and will complete internal documentation reviews with the consultant team prior to formal submittals to the City. OUTPUT - PCLD will format and provide a matrix documenting all comments and correction items. This matrix will be provided to the City and all sub -consultants to ensure proper coordination, task tracking, and comment responses. 1_6 Public Engagement • PCLD and key design consultants will prepare exhibits for, attend, and present at public engagement meetings. This task includes: • Attendance at one meeting with City staff to strategize outreach methods, materials, and engagement opportunities. • Preparation of materials for the City's Public Outreach process. • Presentation at two Public Engagement meetings. • Attendance at one additional public hearing as determined by the City. OUTPUT - Outreach materials, attendance, presentation, and report 1_7 Public Art Support • PCLD will meet and coordinate with the Civic Arts department at up to three meetings to determine appropriate location and size of Civic Art pad. OUTPUT - Meetings and Civic Art concrete base layout, detail, and specifications PCLD's previous work on the project and familiarity with Newhall Park will streamline this task. The Design Team will acquire existing data, reports, and drawings relative to the Newhall Park Infiltration project from the City and will supplementwith site reconnaissance and survey to establish the base plan. Information gathered and analyzed during this phase will be presented to City Staff and stakeholders in the form of Opportunities and Constraints exhibits that will be the basis for the Conceptual Design effort listed in Task 3 - Design. 2.1 Field Reconnaissance PCLD and the design team will conduct field reconnaissance over several site visits in coordination with City Staff to assess existing conditions of the project site and surrounding areas, with a focus on identifying "nature -based" opportunities that can be incorporated into the project design. The design team will also create UAV (drone) video of the project area for use during design and project meetings. OUTPUT - Opportunities and Constraints Analysis, UAV (drone) site video 2.2 Document Research and Review • Obtain and review available reports, maps, data, as -built plans, and applicable previous studies of the project site. • Locate all existing underground and overhead utilities withing the project area and include them in the project base map. • Agency and utility company coordination to identify design constraints. • Review and analyze findings with the PDT to determine design controls and considerations necessary for plan preparation and approvals. OUTPUT - Project base map and summary of findings for PDT PCLD Newhall Park Infiltration Project Proposal 1 21 2_3 Survey PCLD and the design team understand that previous survey data can be provided, but that it may need to be updated/supplemented. As such, the survey subconsultant (ECG) will perform and coordinate all survey and mapping necessary to establish existing property boundaries for the project. Mapping of existing easements and restricted areas will be included within this scope of work. Additionally, we will perform and coordinate all required topographic survey to complete the construction documents. Research, compile, and verify all existing control data, including research of all affected utility companies within the project area. Sufficient mapping of adjacent parcels will need to be performed to adequately study all potential grading and drainage impacts. We understand that special notice should be taken to the drainage near the adjacent high school. All survey work will be coordinated with all project consultants to ensure the control for the project is consistent. Due to the coarse nature and limitations of the existing 2018 aerial survey, ECG recommends a new base map that will be prepared to meet current design expectations and project needs. ECG will provide a new topographic base map for the project site using a combination of aerial mapping and targeted supplemental field surveys. Aerial imagery will be captured and processed to produce 1" = 20' mapping with 1-foot contour intervals. Supplemental field surveys will identify visible site features not captured by aerial methods, critical design constraints, and all park tree locations (greater than 4" in diameter). Boundary compilation will be based on current assessor data and a current Title Report, with easements of record included in the final base map. Boundary monuments sufficient in number will be recovered and tied to project control to orient the boundary to the topographic base mapping. Final deliverables will include AutoCAD and PDF files, with the survey signed and sealed by a California Licensed Land Surveyor. OUTPUT - Topographical Survey AutoCAD and PDF files, with the survey signed and sealed by a California Licensed Land Surveyor with hardcopies available 2_4 Existing Utility Research • Key team subconsultant Encompass Consultant Group ( ECG) will research existing underground/overhead utilities within the project area and will coordinate with the existing utility providers to determine and identify locations of all existing underground and overhead utilities within the project area.. ECG will obtain available utility data from record drawings and provide the information as part of the site base map for the project and will Confer and coordinate with affected agencies and utility companies to identify design controls and considerations necessary for plan preparation and approvals. • In addition to desktop research, ECG will perform nondestructive utility investigations using geophysical techniques such as ground -penetrating radar (GPR), electromagnetic (EM) locating, or equivalent technologies. These methods will supplement record research and provide improved accuracy in identifying subsurface utility locations, particularly in areas where records are unclear or incomplete. These methods do not guarantee that all utilities will be located. We assume 5 days of fieldwork to complete this task. Utilities will be flagged and marked. ECG survey will immediately follow to locate the marking and update the survey basemap. • This task also includes submitting a ticket to Underground Service Alert (USA) for field marking of known utilities. Additionally, selective potholing will be performed at targeted locations where utilities are suspected to be in conflict with proposed design features. Potholing will be limited to critical locations where vertical and 22 1 PCLD Newhall Park Infiltration Project Proposal horizontal confirmation is necessary to mitigate risk during design and construction. We assume 3 days of on -site potholing. No traffic control will be necessary. ECG will use professional judgment to prepare utility mapping based on the best available data and investigation tools. However, due to inherent limitations in utility records and field detection technologies, utility information provided shall be considered approximate and for design reference only. Final utility locations shall be verified by the contractor in the field during construction OUTPUT - Existing Utility Documentation, Pothole Mapping 2_5 CASp Field Inspection Report • As a Certified Access Specialist (CASp), TJ F Architects, will visit the site and conduct an accessibility assessment of existing park features to remain, including, but not limited, any existing buildings to remain that require accessibility upgrades, existing parking facilities, existing paths -of -travel to remain, and existing BBQs and gazebo area to remain. This report will serve as the basis for key decision making regarding renovations to existing structures or park amenities, particularly in terms of enhancements to existing restrooms, multi -purpose rooms, and maintenance building as identified in the RFP. OUTPUT - CASp Field Inspection Report, Concept and PS&E CASp review 2_6 Existing Tree Survey (including Oak Tree Report) and Tree Recommendations • Based on the 2020 Conceptual Site Plan provided with the RFP, and PCLD's previous work on the project, there are nearly 200 existing trees on the Newhall Park site, many of which are Heritage Oaks. We understand the value that the City and the community place in preserving these existing trees. The team's arborist, Dave Muffly, will create an Existing Tree Report that will assign tree values based on size, health, appearance and potential conflicts for all of the trees in the park. Additionally, the arborist will create a list of recommended proposed trees for the park based on existing tree species and site conditions. OUTPUT - Existing Tree Report (including Oak Tree Report), Existing Tree Protection Recommendations/Specifications, Tree Planting Recommendations PCLD and the design team understand that project scope -of -work will be solidified through a series of conceptual design submittals and reviews. This phase of work will begin with the development of initial conceptual design alternatives that will be vetted by city staff and also presented to the public (see Task 1.6 Public Engagement) to ultimately deliver a refined conceptual site design for the project. PCLD will coordinate with the PDT after concept submittal to review, respond to comments, and provide recommendations to City staff. The conceptual design tasks herein will be completed prior to the Measure W Project Modification Request submittal. Per RFP Subtask 3.1, PCLD has divided conceptual design into tasks 3.1 - 3.4 to provide 4 submittals of conceptual plans with several layout options or alternate design options included in each submittal. Alternatives through the conceptual design process will balance the expected project budget, goals, requirements, and environmental constraints. These tasks also include meetings/presentations of the alternatives to City Staff and the alternatives and deliverables crafted during this task may be presented to the public to gain feedback from residents and key stakeholders (see Task 1.6 - Public Engagement). OUTPUT - Outputs for these tasks include: Illustrative Conceptual Site Plans - The team will coordinate to present illustrative site plans for each of the alternatives presented. The site plans will PCLD Newhall Park Infiltration Project Proposal 1 23 be at an early conceptual level of detail and will contain enough information to convey the design intent in presentations and meetings. Conceptual Design 3-D Renderings - The team will prepare conceptual 3-dimensional renderings of the various alternatives for graphic communication. Supplementary Visual Presentation Materials - The team will include visual presentation graphics, diagrams, etc. for graphic communication. Conceptual Cost Estimates - Estimates will be provided for each alternative presented. Estimates at this early stage will be rough -order -of -magnitude (ROM) and will include contingencies, soft costs, design costs, and CPI. 3_1 Initial Conceptual Design Study Alternatives • The PCLD team expects to develop as many as 4 conceptual design study alternatives for the park as part of the initial conceptual design task. • Additionally, the PCLD team will provide two alternative floor plans for each of the following: • Multipurpose room updates (access upgrades, minor finishes) • B&G City attached restrooms (access upgrades) • Concession building (access upgrades) • Maintenance building (access upgrades) • Multipurpose replacement building 3_2 2nd Conceptual Design Alternatives • Following the submittal and review of initial conceptual design alternatives, the PCLD team will incorporate feedback received from the PDT to incorporate into revised conceptual design alternatives. It is anticipated that the number of alternatives prepared will be reduced after City Stakeholder review, and the consultant team will continue development of viable alternatives as directed. • Additionally, the PCLD team will finalize conceptual design alternatives for access upgrades to the existing buildings and will provide two revised plan/massing studies integrated into the site plan for the new multipurpose building. 3_3 3rd Conceptual Design Alternatives • The PCLD team will continue Concept Design development of select designs after City Stakeholder review of the 2nd Conceptual Design Alternatives. • Additionally, the PCLD team will provide two revised plan/massing studies integrated into the site plan for the new multipurpose building. 3_4 Final Conceptual Design • The consultant team will continue design development of the selected alternative after City Stakeholder review of the 3rd Conceptual Design Alternatives and any public engagement. This final Concept Design will coincide with the City's Measure W Project Modification Request submittal. • Additionally, the PCLD team will provide one revised plan/model for the new multipurpose building including perspective renderings with the building and site design. Upon City approval and acceptance of a single concept plan alternative and project budget estimate, the design team will refine the design and provide submittals of Plans, Specifications and Estimates (PS&E) at the following intervals: 30%, 60%, 90%, 100% and Final Issue for Bid, included as Tasks 3.5 - 3.9 below. 24 1 PCLD Newhall Park Infiltration Project Proposal OUTPUT Plans - Plans will be prepared and submitted for plan review at 30% (Task 3.5), 60% (Task 3.6), 90% (Task 3.7), and 100% (Task 3.8), and Final Issue for Bid (Task 3.9). PCLD and the design team will provide all items required for submittal by the reviewing agencies. The submitted plans and specifications shall be issued in a condition such that the documents are complete, fully coordinated between disciplines, and ready to be issued for plan checking. Anticipated plans will include, but not be limited to: 0 Project Cover Sheet 0 Vehicle Maintenance and Pedestrian Access Plan 0 Demolition Plans 0 Existing Tree Protection Plans 0 Grading and Drainage Plans * Storm Drain Plan to be provided by others * Drainage report and infiltration BMP design provided by others. * Identify potential haul routes and stockpile locations. 0 Wet Utility Plan 0 Utility Composite Plan 0 Horizontal Control Plan 0 Site Lighting and Power 0 Sports Field Lighting 0 Landscape Site Construction Plans and Details 0 Irrigation Plans and Details 0 Splash Pad Plans and Details (including M.E.P., etc.) 0 Architectural/Building Enhancement Plans and Details 0 Structural Plans and Details • PCLD and the design team will provide electronic copies of all documents developed during the contracted period with the City. Drawings will be developed on AutoCAD Version 2022 or equivalent and documents will be prepared utilizing Microsoft Office Suite and submitted to the City via email or City -approved software. • Specifications - PCLD and the design team will prepare specifications in a format consistent with the 2021 or latest edition of the Standard Specifications for Public Works Construction (SSPWC). For work items not adequately covered in the SSPWC, project specific specifications will be developed to include technical specifications for any materials, finished, and/or structures to be used as needed. Specifications for specialized sports field design based on previous City parks will also be included. Specifications will be submitted at 90% (Task 3.7), 100% (Task 3.8), and final milestones (Task 3.9). When complete, PCLD will provide a digital file for specification package in Microsoft Word format. • Estimates - PCLD will work closely with cost estimating sub -consultant Field Stone Development to provide cost estimate at 30% (Task 3.5), 60% (Task 3.6), 90% (Task 3.7), 100% (Task 3.8), and final plans (Task 3.9). The estimate will include a breakdown of costs for each item of work and match the bid schedule, item by item, included in the specifications. The unit costs will be based upon the most current cost information for recent similar projects in the area, compiled by the Consultant and approved by the City. The estimate will include detailed takeoff of the plans to account for all engineer - estimated bid item quantities. • Estimated Construction Schedule - PCLD, in coordination with the design team, will submit updated design and estimated construction schedule at 60% (Task 3.6), 90% (Task 3.7), 100% (Task 3.8), and Final submittals (Task 3.9). The construction schedule will consider adjacent school schedules, any large programming that occurs at Newhall Park throughout the year, and PCLD Newhall Park Infiltration Project Proposal 1 25 any scope items with long lead times. 3-11) Renderings -The team will prepare conceptual 3-dimensional renderings of the detailed design for use and display in meetings at 90% (Task 3.7), 100% (Task 3.8), and Final PS&E (Task 3.9) submittals. 3_5 307o PS&E • As the first PS&E submittal, the 30% milestone will be the first to incorporate all feedback received during the previous conceptual design phase, narrowing the scope -of -work to the single alternative selected and approved by the City. This milestone serves as a basis -of -design for the scope -of -work and will create the PS&E framework from which subsequent submittals will be built and reviewed. 3_6 607o PS&E • The 60% PS&E Submittal will incorporate any feedback received from previous submittal(s) and plan check comments received from the City. 3_7 907o PS&E • The 90% PS&E Submittal will incorporate any feedback received from the previous submittal(s) and plan checks to the City. This submittal will serve as the first formal permit submittal to the City and other agencies, as required, including, but not limited to L.A County Public Heath Department and Flood Control District. 3_8 100% PS&E • The 100% PS&E submittal will incorporate any plan check comments received by the City and all additional permit agencies and resubmitted once corrected. 3_9 Issue Final PS&E for Bidding (following 100% review) • The Final PS&E will incorporate any remaining comments from the City and/or permitting agencies prior to bidding. The PCLD team will include and coordinate any other plan submittals, reviews or clearances required from City and County agencies to provide complete plans and specifications for permit issuance. The PCLD team will format the 90% PS&E documents as necessary to begin the permit application and review process with City and County Agencies, including revisions per comments received incorporated into resubmittals at 100% PS&E. 4_1 Permits and Approvals • PCLD and the design team will receive plan check approvals from all design consultants, affected agencies, and all applicable City divisions including but not limited to CIP, Environmental Services, Parks, Facilities Maintenance, Engineering Services, Building and Safety, Traffic, Urban Forestry, Landscape Maintenance Division, Recreation and Community Services, and Arts and Events. This task also includes: • Coordination with all utility companies throughout the design of the project as well as other public agencies such as L.A. County Flood Control District as needed. • Obtain L.A. County approvals for associated storm drain and sanitation permits. • Obtain any necessary Health Department and/or Fire Department permits and/or approvals as needed. Splash pad design shall adhere to any applicable City and County requirements as required. • Provision of technical information or documentation as needed for CEQA 26 1 PCLD Newhall Park Infiltration Project Proposal and the SWPPP permit and account for any time impacts from these environmental submittals in the scheduling. • Preparation of plans, exhibits, and/or documentation necessary for construction access agreement on neighboring property (L.A. County Flood Control District, Placerita Junior High, Hart High School) or discussions with property owners, as necessary. • Provision of all necessary plan check copies required by the affected Agencies and utilities. • Provision to the City of original and/or updated complete set of approved PS&E. OUTPUT - Complete set of approved PS&E documents 4_2 Bid Support • PCLD will provide technical support during the bid phase of the project and assist the City's Project Manager in responding to questions related to the plans and technical specifications during the bid phase. If necessary, PCLD and the design team will update the plans and technical specifications based on questions during the bid phase and write addendums in response to these changes. This tasks includes: • Attend Pre -Bid meeting. • Assist in analyzing the bids to identify lowest responsible bidder. • Assist in City's RFP preparation for Materials Testing and Special Inspections. OUTPUT - RFI Responses, Addenda, Bid Analysis This task is included as an optional scope to the work plan. If awarded, PCLD and the design team will assist the City with construction administration services during construction phase through project close-out. This phase shall include but not be limited to the following tasks. Construction Meetings and Support • The design team will provide construction administration for the duration of the construction project including the preparation, review, and recommendation of all construction related documents. This task includes: • Attend weekly jobsite meetings and job inspection visits. This assumes a total of 36 weekly meetings based on a 180 day construction schedule. • Respond to RFI's and review submittals and shop drawings. • Prepare construction bulletins as needed. • Prepare construction correction notices as needed. • Assist with reviewing, analyzing, and advising the City on Contract Change Order requests. • Perform Qualified SWPPP Practitioner (QSP) services, including all required inspections, field sampling, sample analysis forTurbidity and pH, REAP preparation, and reports. • Meet with the City approximately once a month to report on the progress of the work. A brief written summary of these meetings shall be prepared by the Consultant and submitted to the Project Manager. • Complete Sustainability Certification documentation and submittal package, if needed. • Perform final review and contribute to the punch list with the contractor. • Procure and maintain construction management software for coordination and filing of construction documents (ProCore or similar). As -Built Plans • PCLD and the design team will prepare As -Built Drawings upon completion of the project and acquire the Contractor's daily red lined plans from the Contractor and their subcontractors. • Final Record Drawings in electronic (CAD and PDF) and hard copy format. PCLD Newhall Park Infiltration Project Proposal 1 27 Proposal and Design Consultant Selection 37 days Mon 2/24/25 Tue 4/15/25 Contract Award 1 day Tue 5/13/25 Tue 5/13/25 5/13/25 7/22/25 •••� 1.0 Project Kickoff Meeting 1day Tue7/22/25 Tue7/22/25 1.1 Monthly PDT Meetings 354 days Wed 8/6/25 Fri 1/15/27 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1.2 Monthly Project Reports days Wed 8/23/2 1.3 Measure W Technical Support 5 m T 3/19/7 8 mons Wed 7/23/25 Thu 3/19/26 SCHEDUL 1.4 Schedule 380days Wed 7/23/25 Mon2/8/27 Quality Control 380 days Wed 7/23/25 Mon 2/8/27 lL5 .6 Public Engagement 286 days Thu 10/16/25 Fri 12/11/26 1.7 Public Art Support 251 days Fr 11/7/25 Thu 11/12/26 • rr .. 2.1 Field Reconnaissance 20 Wks Wed 7/23/25 Fri 12/12/25 2.2 Document Research and Review 6Wks Wed 7/23/25 Wed 9/3/25 2.3 Survey 6Wks Wed 7/23/25 Wed9/3/25 2.4 Existing Utility Research 16wks Wed 7/23/25 Wed 11/12/2 2.5 CASp Accessibility Report 6Wks Wed 7/23/25 Wed9/3/25 2.6 Existing Tree Survey and Oak Tree Report 6Wks Wed 7/23/25 Wed9/3/25 - - - - MEMO ON:• 2}.7Geotechnicol Investigations 6Wks Wed 7/23/25 Wed9/3/25 • - - - �ii�•��•s•�,1,... - -... Ji in YELLOW. 3.1 Initial Conceptua l Design Study Alternatives 10wks Wed8/6/25 Wed TO/ 15/2 P Inih Fpl,, vi ew Meeting 1 day Thu 10/16/25 Thu 10/16/25 � 10/16/25 City Reviewlnlh'al ConcepiDeslgn 3wkr Fr110/17/25 ihu 11/6/25 3.2 End Conceptual Design Alternatives 6Wks Fri 11/7/25 Mon 12/22/2certainith —together. And Concephlal Design Review Meeting 1 day Tue 12/23/25 Tue 12/23/25 12/23/25 — City Revlew2,d(D eptual Deslgn Ag—ewes 3wkr Mon 115126 Fr11123126 3.3 3rd Conceptual Design Alternatives 4 Wks Mon 1/26/26 Mon 2/23/26 3rd Conceptual Design Review Meeting 1day Tue 2/24/26 Tue 2/24/26 ♦2/24/26 City Rev1ew3bl Do— ptual Deslgn Altema fives 2wkr Wed 2125126 rue 3110126 ® — — 3.4 Final Conceptual Design Alternatives 4Wks Wed3/11/26 Tue POSER — - Final ConcephralflesirJnRr-View Meeting 1day Wed 4/8/26 Wed 4/8/26 ♦4/8/26 City Review Final Conce pt Deslgn Alternatives 2wks rhu 419126 Wed 4122126 ® __ PS Sf Conhact Negoh'ah'on 8wks rhu 419126 rhu 614126 from kick-off to bidding, this schedule - - - - 3.5 30% PS&E 4 Wks Fri 6/5/26 Thu 7/2/26 30% Submittal Milestone 1day Mon]/6/26 Mon]/6/26 7/6/26 — — — — ClbRevlew 4wks Tue 717126 Mon 8/3/26 3.6 60% PS&E 4 Wks Tue 8/4/26 Mon 8/31/26 _ _ IN 60% Submittal Milestone 1day Tue Al/26 Tue Al/26 I ♦9/1/26 City Review 4wks Wed 9/2/26 Wed 9/30/26- 3.7 90%PS&E 6Wks Thu 10/1/26 Wed 11/11126 follows: 90% Submittal Milestone 1day Thu 11/12/26 Thu 11/12/26 ♦11/12/26 ConceptPhaseCity ReSAew City Revlew(CIP,Envlronmental Servlces,Parla',Faclllfier Maintenance, Englneenng S—s—, BOdmg antl Sateb, Traffic, 6wks Fri 11/13/26 Wed 1/6/27 ® , working day.i Urban Forestry, LMD, Recreation antl Communlb S-1—s) weeks) 3.8 100W PS&E 4 Wks Thu 1/7/27 Wed 2/3/27 Phase City _ _ B. B. • 1 700% Submittal Milestone 1day Thu2/4/27 Thu 2/4/27 2/4/27 City Review 4wks Fri 2/5/27 Fri Bees and00% 0 working days (4 week 3.9 Issue Final PS&E for Bidding (following 100% review) 4 Wks Mon 3/8/27 Fri 0' /27 11 4.1 Permits and Approvals 91 days Fri 11/13/26 Fri 4/2/27 4.2 Bid Support 2 mons Mon 4/5/27 Fri 5/28/27 CONSTRUCTION SUPPORT•• • r. 5.1 Construction Meetings and Support 36 Wks Mon 8/16/2/ Thu S/4/28 5.2 As -Built Plans 6 Wks 5/5/28 6/15/28 - FFFri �Thu • • �WlJ1i7If/LL Project Bidding 83 days Mon 4/19/27 Fri 8/13/27 Anno-cementtoBidders 1day Mon 4/19/27 Mon 4/19/27 *4/19/27 Bid Period 1mon Tue 4/20/27 Mon 5/17127 Bid Opening 1day Tue 5/18/27 Tue 5/18/27 ♦5/18/27 Bid Negotiation 3mons Wed 5/19/27 Thu 8/12/27 Notice to Pro—ol 1 day Fin 8/13/27 Fin 8/13/27 8/13/27 Construction 180 days Mon 8/16/27 Thu 5/4/28 Construction 180 days Mon8/16/27 Thu 5/4/28 END OF CONSTRUCTION 1 day Fri 5/5/28 Fri 5/5/28 5/5/28 90- Day Maintenance Period 90 days Sat5/6/28 Thu 8/3/28 GRAND OPENING 1 day Fri 8/4/28 Fri 8/4/28 * 8/4/28 PCLD Newhall Park Infiltration Project Proposal 1 28 0 "r' T CL O q OLti 19�.c OFD 75 DECEMBV� PRIME CONSULTANT ROJECT MANAGEMENT Mike Tielsdorf, Managing Principal Chris Horton, Project Manager LANDSCAPE ARCHITECTURE, COMMUNITY ENGAGEMENT, AND RELATED SERVICES Torrey Slininger, Landscape Design Nicole Nomura, Landscape Design SUB -CONSULTANTS ENCOMPASS CONSULTANT GROUP (Survey + Civil Engineering) Josiah Jenison THOMA ENGINEERING Sal Contreras (Electrical Engineering) Jose Ascencio Jeff Thoma DICECCO ARCHITECTURE (Archtecture) Mark Dicecco AQUATIC DESIGN GROUP (Splash Pad Design) Justin Caron FIELD STONE DEVELOPMENT (Cost Estimating) Katie MacFarlane 3C ENGINEERING THOMAS JACOB FLITSCH ARCHITECTS (Mechanical + Plumbing) (CASp) Brian Starrett Thomas Flitsch RGSE, INC. OAKTOPIA (Structural Engineering) (Arborist) Ramon Garcia Dave Muffly ECG CIVIL ENGINEERING AND HYDROLOGY CONTACT INFO Josiah Jenison, PE 25115 Avenue Stanford, Suite B-130 Santa Clarita, CA 91355 T 661.600.9367 F 805.445.7522 W www.ECGcivil.com COMPANY PROFILE Encompass Consultant Group (ECG) is a local, employee -owned Civil Engineering and Land Surveying firm established in 2016. Our team of engineers, surveyors, and technical specialists brings decades of experience in delivering innovative and cost-effective solutions for public infrastructure projects and vested interest in participating in successful improvements for the communities we live in and serve. With a local Santa Clarita office, our firm is structured to provide personalized attention, ensuring that every project benefits from senior - level oversight and direct involvement from our leadership team. Our team brings extensive parks experience with work ranging from upgrading existing facilities and renovating park areas to developing entirely new parks. With an increasing focus on sustainable design and LEED Certification, ECG emphasizes green design elements throughout our projects. Our team has extensive expertise in hydrologic studies and stormwater quality mitigation, ensuring compliance with local and regional stormwater quality permits. SAL CONTRERAS PE MANAGING PRINCIPAL Sal Contreras is a Principal Engineer with over 25 years of civil engineering design experience involving project master planning, public improvement projects and private land developments. With his broad knowledge and expertise in civil engineering, he provides quality control and design consultation to internal staff for projects of all types. Mr. Contreras is well versed in the management and preparation of feasibility studies, due diligences, master plans, construction plans, specifications, and estimates, and providing construction administration services. He has extensive experience with potable and recycled water infrastructure, water storage tank design, hydrologic and hydraulic studies, grading and drainage design. Sal has a long history of work with the City of Santa Clarita, including on -call service contracts. He has developed and maintains a working knowledge of local City policy standards, as well as County and State engineering and environmental regulations. RELEVANT PROJECT EXPERIENCE • Campus Park, City of Oxnard, Oxnard, CA • Del Sol Park, City of Oxnard, Oxnard ,CA • Guadalupe Central Park, City of Guadalupe, Guadalupe, CA • La Colonia Green Alleys, City of Oxnard, Oxnard, CA • On -Call Civil Engineering and Survey Services, City of Santa Clarita, Santa Clarita, CA PCLD Newhall Park Infiltration Project Proposal 1 30 ICG CAMPUS PARK PROJECT MANAGER Sal Contreras, PE CIVIL DESIGN/HYDROLOGY Jose Ascencio, PE,QSD SURVEY AND MAPPING James Fallon, PLS JOSIAH JENISON PE I QSD I LEED PROJECT MANAGER Josiah is a Principal Engineer with over 15 years of experience in civil engineering design across residential, educational, and public infrastructure projects. His extensive design knowledge ensures efficient project execution and successful outcomes. Josiah is highly skilled in designing a variety of development and infrastructure systems, including grading, drainage, storm drains, sewer, domestic and recycled water systems. He has a strong background in preparing construction plans, estimates, specifications, hydrologic and hydraulic studies, and stormwater pollution prevention plans (SWPPP). Josiah has developed drainage systems to meet LID/WQMP requirements across multiple jurisdictions. RELEVANT PROJECT EXPERIENCE • Circulation Improvement Plan, PH I and II, City of Santa Clarita, Santa Clarita, CA • Center Pointe Parkway Improvements, City of Santa Clarita, Santa Clarita, CA • Golden Valley Road Sidewalks, City of Santa Clarita, Santa Clarita, CA • Avenue Scott Trail Connection,City of Santa Clarita, Santa Clarita, CA Oxnard, CA This new 25-acre city park featuresa pelota Mixteca court, community garden, playground, pump track, pavilion, amphitheater, and restrooms. ECG services included, topographic survey, grading and drainage, paving, utility infrastructure, ADA accessibility, and hydrology. A key grant requirement was the inclusion of a dry creek bed, which plays an integral role in the park's stormwater management strategy. ECG designed the grading to ensure the dry creek bed serves as the primary stormwater conveyance system. Adjacent to the creek, biofiltration BMPs were designed to meet the stormwater quality requirements, collecting and filtering stormwater before it overflows into the creek. Additionally, the dry creek bed functions as an above -grade detention basin during smaller storm events, reducing the size of the required underground detention system. Together, the dry creek and biofiltration BMPs highlight the park's natural stormwater management features. 31 1 PCLD Newhall Park Infiltration Project Proposal ARCHITECTURE CONTACT INFO DiCecco Architecture, Incorporated (dai) 887 Patriot Drive, Suite C Moorpark, CA 93021 T 805.552.0088 W www.diceccoarch.com COMPANY PROFILE Di Cecco Architecture, Inc (DAI) is a full -service architecture, land planning, and consulting firm founded in 1988 located in Ventura County, California. We are a dedicated team of professionals with backgrounds in the architecture, planning, and construction fields. We are committed to timely, responsive, quality work on behalf of the Client and project. We utilize computerized time management, scheduling, and communication tools for all aspects of our practice. Our team has experience with multiple project types, from gaining project approvals through construction and eventual occupancy. We have experience with complex entitlements, including GPAs, Specific Plans and Amendments, and Special Use Permits. A successful project for us is one that allows the Client to succeed, financially, operationally, and via reputation. To achieve this, we concentrate on Client and occupant need and constructability within the given budget and time frame. We believe that the built environment is not specifically isolated to individual buildings, and that the buildings we design must relate to the broader context of the community and site in which they are located. MARK DI CECCO AIA I D.ARCH I NCARB I LEED AP PRESIDENT Mark is founder and principal of Moorpark, California based DiCecco Architecture, Inc. (DAI). A native of Los Angeles, he comes from a family of successful contractors in the housing industry. He is a licensed architect in four states, NCARB certified, and a LEED Accredited Professional. He has taught architecture at Woodbury University and UCLA Extension. He has been a featured speaker at local housing conferences. His design experience ranges from playhouses auctioned off for a cause to 700 acre master planned mixed use developments. He thrives where the needs of the Client, the Jurisdiction, and the Community meet, where the environments between the buildings and the communities they fit in are more important than the buildings themselves. This experience represents over forty five years in the design and construction industry and thirty seven years of continuous practice at DAI. PCLD Newhall Park Infiltration Project Proposal 1 32 VILLAGE AT THE PARK Camarillo, CA DAI provided a collection of common buildings for this master planned community in Ventura County. A master community center and pool was located within the residences and kept the suburban scale of the neighborhood. All of the facilities for the regional sports park, including restrooms and snack bar, community gathering spaces and maintenance facilities were designed by DAI for heavy use, long term durability and to withstand the occasional foul ball. BOYS AND GIRLS CLUB Oxnard, CA The Boys and Girls Club started life as a 1920s gym with a substantial addition in the 1950s. The facility had been insensitively modified over the years to the point it was unsafe for the children that it served. DAI removed all of the unsafe internal conditions, reconfigured the spaces for the new services to be offered, and created a playful facade to welcome the children. REIDY CREEK GOLF CLUBHOUSE Escondido, CA A public/private partnership between a developer and the City of Escondido, a new community was created that included a new public golf course. DAI was selected to design the clubhouse, cart barn and gate house entrance to the community. We were inspired by buildings anchored to the landscape in the tradition of Craftsman era bungalows. 33 1 PCLD Newhall Park Infiltration Project Proposal AQUATIC DES I G N G R O UP SPLASH PAD DESIGN AND ENGINEERING CONTACT INFO Justin Caron 2226 Faraday Avenue Carlsbad, CA 92008 T 760.438.8400 F 760.438.5251 W aquaticdesigngroup.com COMPANY PROFILE Since 1984, Aquatic Design Group has worked with clients from around the globe to help bring their dreams to reality. This experience has resulted in quality, efficient design solutions that lead to projects delivered on time and on budget. Aquatic Design Group sets the standard for quality splash pad, swimming pool, mechanical, and electrical design and consulting services within the aquatics industry. We are dedicated and committed to providing the highest possible level of customer satisfaction. We are a highly trained group of talented designers, project managers, technicians, and administrative staff, all guided by a passion for aquatic facilities and those who experience them. Our drive to be innovative combined with our commitment to work with the entire team helps deliver projects that are unique, special, sustainable, and stand the test of time. SANTA CLARITA EXPERIENCE Aquatic Design Group first worked with the City of Santa Clarita in 2000 with the design of the Santa Clarita Aquatics Center. Since then, Aquatic Design Group has worked with the City on improvements to the swimming pools, mechancial systems and swimming pool decks and deck drainage at the agautic facility. JUSTIN CARON MBA, AFO PRINCIPAL Justin has spent his entire life around aquatics; he developed a passion for water early and translated that passion to success as a swimmer and a coach. In 2005 Justin transitioned into the world of aquatics consulting working his way up from business development to being named CEO of Aquatic Design Group, a globally recognized expert in aquatic design, in 2019. Since 2005 he has personally managed over 800 projects, spoken at over 100 industry events, and written or been featured in over 75 publications and podcasts. Justin is a member of several industry committees and boards and strives to improve lives through equitable access to water for everyone. RELEVANT PROJECT EXPERIENCE • Santa Clarita Sports Complex Pools Improvements, City of Santa Clarita, Santa Clarita, CA • Obregon Park Pool, County of Los Angeles, Los Angeles, CA • Diversity Fountain / Wet Play, City of Walnut, Walnut, CA • Eucalyptus Park Interactive Water Feature / Splash Pad, City of Chula Vista, Chula Vista, CA • Balboa Sports Complex, City of Los Angeles, Los Angeles, CA • Mar Vista Pool and Bathhouse Replacement, City of Los Angeles, Los Angeles, CA PCLD Newhall Park Infiltration Project Proposal 1 34 MILLER PARK AMPHITHEATER WATER PLAY FEATURE Fontana, CA PRINCIPAL IN CHARGE Aquatic Design Group provided planning, design and engineering, and Justin Caron, MBA, AFO construction observation services for the circular water feature that is PROJECT PRINCIPAL part of a new amphitheater for the City of Fontana. The water feature Dennis Berkshire, AFO, CPO includes colored, interactive sprayers that vary in height and frequency. PRINCIPAL ARCHITECT Greg Ferrell, AIA NORTH VALLEYS WATER SPLASH PARK Reno, NV PRINCIPAL IN CHARGE Aquatic Design Group provided programming, planning, construction Dennis Berkshire, AFO, CPO documents and construction observation for a splash pad with PROJECT PRINCIPAL recirculation system. This aviation Chemed water splash park includes a Justin Caron, MBA, AFO Rare Bear model resembling the restored F8F 1940s military aircraft, and PRINCIPAL ARCHITECT features more than 20 different water features and over 60 spray heads. Greg Ferrell, AIA 35 1 PCLD Newhall Park Infiltration Project Proposal Arms—w— ENGINEERING CONTACT INFO Jeffrey Thoma, President 3562 Empleo St., Suite C, San Luis Obispo, CA 93401 T 805.543.3850 F 805.543.3829 W thomaelectric.com ELECTRICAL ENGINEERING COMPANY PROFILE The Electrical Engineering Division of Thoma Electric, Inc. provides electrical design and consulting services in all facets of the Electrical Construction and Communications Industry throughout California. The Electrical Engineering Division of Thoma Electric, Inc. is unique in its ability to maintain a closeness to the construction community because of the association with its sister Construction Division. This allows the Engineering group to consider the cost, quality, success and failure of systems with which the Construction Division has had experience. This tool is of benefit to an owner as it provides quality planning and "value engineering" during design, ratherthan afterdesign is complete. Practical solutions to solving problems have always been our strength. Communications Systems have become increasingly sophisticated, and the integration of voice, data and power system controls will continue to play a major role in modern design. Our staff is actively involved in reviewing and implementing the emerging government and industry standards for communications systems design. RELEVANT FIRM EXPERIENCE • Santa Clarita Sports Field Site Preparation and Electrical Infrastructure, Santa Clarita, CA • Santa Clarita Community Center, Santa Clarita, CA • Baseball Field Scoreboard Replacement, Hart High School, William S. Hart School District, Santa Clarita JEFF THOMA ELECTRICAL ENGINEER As Electrical Engineering Division Manager, President and CEO, and Professional Electrical Engineer, Jeff will provide critical technical and managerial oversight of the project and team staff for Thoma Electric, Inc. Jeff will work closely with the in-house Project Manager to provide technical oversight in preparing construction documents. Jeff's responsibilities include reviewing single line diagrams, schedules, details, etc. as well as calculations, panel schedules, circuiting and Title 24 lighting compliance forms. Jeff will have on -going coordination with the design team Principals, and will be present for key Owner meetings through each phase of project. Jeff will be involved in all phases of the project including construction administration and project close-out as necessary. PCLD Newhall Park Infiltration Project Proposal 1 36 3C ENGINEERING MECHANICAL AND PLUMBING ENGINEER CONTACT INFO Brian Starrett 1500 Palm St San Luis Obispo, CA 93401 T 805.540.5358 W httrps://www.3ceng.com COMPANY PROFILE 3CE is a full -service professional engineering firm specializing in mechanical and plumbing engineering, and troubleshooting systems to optimize building operations and efficiency. Our clients include architects, developers, municipalities, contractors, and building owners. 3CE provides quality services for a wide range of structures, including hospitals, mixed -use buildings and educational facilities. We strive to design systems that are functionally innovative, aesthetically pleasing, and environmentally responsible. We offer comprehensive mechanical, plumbing, and energy engineering consulting services across California. Our vision was formed when a group of professional engineers and energy management experts, with decades of experience, came together to focus on sustainable building design and energy conservation. Notably, we are the on -call mechanical engineer for the California State Parks, where we have worked on projects providing construction documents (plans, specifications, construction estimates), construction administration, HVAC or A/C replacements and upgrades, accessibility upgrades, and entire building replacements. BRIAR STARRETT PE PRINCIPAL Brian has led numerous design teams for projects across the entire built environment spectrum. His passion for energy -efficient building design coupled with his pragmatic approach to problem -solving results in high caliber, cost-effective designs that are delivered on time and on budget. Brian is the director of the consulting engineering department and is involved in all projects from the initial proposal to the final punch walk. He weighs in on all HVAC and plumbing equipment and system selections. He is also tasked with performing quality control reviews for all project deliverables. RELEVANT PROJECT EXPERIENCE • CA State Parks Twin Lakes, Sacramento, CA • Conejo Community Center, Thousand Oaks, CA • CA State Parks China Camp Restroom Upgrades, San Rafael, CA • Irish Hills Community Center, San Luis Obispo, CA • Isla Vista Childrens Park Renovation, Isla Vista, CA 37 1 PCLD Newhall Park Infiltration Project Proposal R G S E Inc. CONTACT INFO 2720 Cochran St. Suite 8B Simi Valley, CA 93065 T 805.522.3379 W www.raseinc.com COST ESTIMATING STRUCTURAL ENGINEERING RAMON GARCIA SE PRINCIPAL Ramon Garcia has been practicing structural engineering since 1994 and established RGSE Inc. in 2005. With an extensive working relationship with architects, developers, city officials and others, combined with his knowledge and attention to detail, Mr. Garcia has distinguished himself as a highly valuable and well-rounded structural engineer. His experience includes commercial, industrial, public, DSA, essential facilities, high -end custom homes, senior housing, multi family housing, mixed use, seismic retrofits, due diligence reports, fatal flaw analysis, and peer reviews. As the Principal and Partner of RGSE, Inc. he is responsible for overseeing project completion and client satisfaction at each phase of design development, construction administration and client interface. RELEVANT PROJECT EXPERIENCE • Old Orchard Park, City of Santa Clarita, Santa Clarita, CA • Tierra Rejada Park, Moorpark, CA • Dominguez Park, Redondo Beach, CA • Boys and Girls Club of Ventura, Ventura, CA • Kellogg Park, Ventura, CA KATIE MACFARLANE ASPE s"�ield Stone Dx�evelopment, LLC Over25 years providing cost estimating services fora wide variety of public and private clients. Specializing in early concept estimating for capital funding of projects ranging from $1 m-$2b including new construction, renovations and historic restorations. Provides project estimating leadership, partnering with the design and delivery teams to ensure a successful project within program and budget constraints. A proven track record of successful projects and history of repeat clients in the private sector and satisfied clients in the public sector. RELEVANT PROJECT EXPERIENCE • Chief Cost Estimator September 2020-to Present, Architect of the Capitol, Washinton DC • Curtis School, Innovation Center Los Angeles, CA • Florida State University, Ben Hill Griffin Stadium, Gainesville, FL • St. Bede's Parish Hall, La Canada/Flintridge, CA • Holy Family Glendale Parish Center, Glendale, CA • Star Wars Galaxy's Edge, Anaheim, CA and Orlando, FL • Los Angeles Zoo, Various Projects, Los Angeles, CA • Universal Studios Orlando, EPIC Theme Park, • Santee Town Center Development, Santee, CA • Getty Center for the Arts, Site Development, Brentwood, CA CONTACT INFO 4171 Yucca Street, Bullhead City, AZ 86429 T 1 818.943.4334 E I katiemacf@amail.com PCLD Newhall Park Infiltration Project Proposal 1 38 THOMAS JACOB FLITSCH ARCHITECTS P.C. CERTIFIED ACCESS SPECIALIST (CASp) CONTACT INFO 860 D Hampshire Road Westlake Village CA 91361 T 805.338.2883 W www.tifarchitects.com ARBORIST SERVICES THOMAS J. FLITSCH AIA I CASp Thomas Jacob Flitsch Architects P.C. is dedicated to serving your project goals through strategic design, deliberate documentation, and detailed attention. TJF has over 35 years of experience supporting renovation, redevelopment, and new construction projects. TJF is AIA and NCARB Certified firm, and provide professional services in most of the US and Canada. The lead Architect, Tom Flitsch, is a Certified Access Specialist under the Division of the State Architect, Department of General Services. RELEVANT CASp EXPERIENCE • Architect for Multifamily Redevelopment Projects including 13 Equity Residential, 8 Irvine Company, 5 UDR, 5 LivCorp, 6 Structure Property Management Group, 4 Far West Management and E&S Ring among others • Architect and Devleopment Consultant to Atria Senior Living - 1 1 Redevelopment Projects • Certified Access Specialist, (CASp) Consultant - including Irvine Company, E&S Ring, DiCecco Architects, RRM Architects, Van Tilberg Architects, among others. • NCARB & AIA DAVE MUFFLY ISA CERTIFIED ARBORIST Dave Muffly is a Board -Certified Master Arborist with the International Society of Arboriculture. He is a tree researcher, educator, consultant and is the sole proprietor of Oaktopia. Dave specializes in oaks, street trees, climate change adaptation, urban-wildland interface plantings, and strategic tree planning. Dave's most important work is introducing new climate adapted trees to the California nursery industry. He currently lives in Santa Barbara, but his work ranges throughout California and the American Southwest learning, teaching, and growing cool trees! RELEVANT PROJECT EXPERIENCE • Senior Arborist, Apple, Inc. - Oversaw growing and installation of 9,000 trees on the Apple Park campus in Cupertino • Consulting Arborist, Street Tree Management Prioritization Survey for City of Menlo Park, 2008 - ranking removal, pruning and retention levels for roughly 10,000 street trees, including individual analyses of more than 2,700 trees. • Co-authored Street Tree Management Plan for the City of Menlo Park • Consulting Arborist, Hazard Tree Analysis for the City of East Palo Alto, 2008 - prioritizing removal of dozens of highrisk trees, and directing City resources for maximum tree risk reduction. • Consulting Arborist, East Palo Alto Tree Initiative, 2007 - designed and oversaw installation of innovative and highly successful 1,000- tree planting in East Palo Alto, 2007. All trees selected for drought - adaptation, and low long-term maintenance. p31%60v a CONTACT INFO 836 Cheltenham Road Santa Barbara, CA 93105 T 1 805.705.2602 website I www.oaktopia.orq 39 1 PCLD Newhall Park Infiltration Project Proposal PCLID Newhall Park Infiltration Project Proposal 1 40 FAFA'AA&3 b] DI A I I D7A'&Ilk Pacific Coast Land Design acknowledges receipt of all addenda and have provided signed receipts, included as follows: • Addendum 1, dated March 18, 2025 • Addendum 2, dated March 19, 2025 • Addendum 3, dated March 27, 2025 • Addendum 4, dated March 28, 2025 PCLD Newhall Park Infiltration Project Proposal I AJ 04 8r'NT+4 O Addendum No. 1 PROPOSAL # CIP-24-25-113008 Newhall Park Infiltration Project City of Santa Clarita, California Addendum No. 1 March 18, 2025 This addendum must be acknowledged via BidNet and should be included with the proposal response. I. Pre-Proaosal meeti There was a non -mandatory, pre -proposal meeting on March 17, 2025 beginning at 11:00 AM (PT). The meeting was held via Zoom. Attending Staff: • Connor H a h m — Engineer, Public Works • Dan Duncan — Environmental Administrator, Public Works • Michele Arima - Buyer, Administrative Services • Kathy Alfaro — PTS Office Clerk, Administrative Services Attending Vendors: • Elizabeth Benbrooks, SWA Group • Wendy Chan, MIG Inc. • Alicia Taylor, NUVIS • Eric Berg, Pacific Coast Land Design, Inc. • Chris Horton, Pacific Coast Land Design, Inc. • Torrey Slininger, Pacific Coast Land Design, Inc. • Lynna Buitron, Psomas • Jeremey Johnson, Psomas • Paul Diamond, NDS • Jennifer Chan, NDS • Onah Power — NDS • Chris Chadwick, Rain for Rent • Angela Gonzalez, C.S. Legacy Construction, Inc. • Jason Fussel The following questions were asked and answered: Q1) Are you accepting any alternate vendors to the Newhall Avenue BMP? Al) No, we are going to have PACE continue with their 95% design. Q2) Has the City completed an Arborist Evaluation Report for the park? A2) No, however an arborist evaluation report shall be included as an additional item under subtask 2.1. Additionally, please include procurement of an arborist as an additional optional item under subtask 5.1. PROPOSAL # CIP-24-25-R3008 A.ii I PCLD Newhall Park Infiltration Project Proposal Addendum No. 1 March 18, 2025 Q3) For coordination relative to Public Outreach social media, web page etc. Will the park consultant provide information and the City manage the upload to City social media? A3) Yes, that is correct. The Park consultant will provide information and the City will manage social media uploads. Q4) Please clarify DIR requirements? A4) Consultants are still required to be registered with the DIR but many DIR requirements are not applicable for this project since it is a design services contract. Any contractor that bids or works on a City project is required to be registered with the DIR, pay prevailing wage, keep and submit certified payroll records, and comply with apprenticeship standards. Refer to the response to question 16 in Q&A for further details on the types of field work requiring prevailing wage. Q5) When is the project set to be completed by? A5) This project is anticipating to complete the concept design phase and 30% plans by the end of this calendar year, and the full 100% PS&E is estimated to be completed within 18 months from the start of the project. II. Revision to answer for Q4 in Q&A: Q4) Question: Brand Names, Alternatives, or Equivalents Proposal Instructions, Item 6 mentions Brand Names, Alternatives, or Equivalents. Can you please clarify how this relates to the as -needed design services proposal? A4) During design of the park improvements, certain products included in the design such as playground equipment will have specific manufacturer or brand names. Item 6.2 describes how the City shall make the final determination of compliance for all of the considered goods/materials and has the option of accepting or rejecting any alternative or equivalent product. The following was reviewed: • Project scope of work • Bidding Guidelines END OF ADDENDUM This addendum must be acknowledged via BidNet and should be included with the response. A. � � �" vl_� March 28, 2025 Contractor'. epresent tive Date Mike Zielsdorf, Principal/CEO Pacific Coast Land Design, Inc. Company Name PROPOSAL # CIP-24-25-R3008 PCLD Newhall Park Infiltration Project Proposal I AJH gpNTA CL O a oG~RFD l8 DECEM�eEP es Addendum No. 2 PROPOSAL # CIP-24-25-113008 Newhall Park Infiltration Project City of Santa Clarita, California Addendum No. 2 March 19, 2025 This addendum must be acknowledged via BidNet and should be included with the proposal response. The purpose of this addendum is to address the following for this Request for Proposals (RFP): I. ADDITIONS TO SUBTASKS 2.1 AND 5.1 IN SCOPE OF WORK The following is clarifying answer to Q2 on Addendum No.1: Under Subtask 2.1: Kickoff Meeting and Field Reconnaissance • Provide an Arborist Evaluation Report that documents tree species, size, health condition, structural integrity, and any visible signs of disease, decay, or pest infestation. Assessment shall include photographic documentation of the findings and a list of recommended actions for tree preservation, mitigation, or removal if applicable. Under Subtask 5.1: Construction Meetings and Support • [Optional Task] Identify and procure the services of an ISA Certified Arborist or equivalent professional with experience in oak tree preservation during construction. o Arborist shall monitor construction activities to prevent damage to trees including soil compaction, trenching, and grading near root zones and be familiar with the City's Oak Tree Preservation Guidelines. o Arborist shall visit the site frequently to assess tree health and provide mitigation measures if necessary. o Arborist shall ensure protective fencing and root zone barriers are installed and maintained per the project plans and specifications. o Arborist shall produce and deliver a tree protection plan, monitoring reports summarizing site inspections and findings, and a final Tree Health Report documenting construction impacts and ongoing care recommendations. PROPOSAL # CIP-24-25-R3008 A.iv I PCLD Newhall Park Infiltration Project Proposal Addendum No. 2 March 19, 2025 END OF ADDENDUM This addendum must be acknowledged via BidNet and should be included with the response. March 28,2 025 Contractor's Aepresentati4 Date Mike Zielsdorf, Principal/CEO Pacific Coast Land Design, Inc. Company Name PROPOSAL # CIP-24-25-R3008 PCLD Newhall Park Infiltration Project Proposal I Ax gpNTA CL O a oG~RFD l8 DECEM�eEP es Addendum No. 3 PROPOSAL # CIP-24-25-113008 Newhall Park Infiltration Project City of Santa Clarita, California Addendum No. 3 March 27, 2025 This addendum must be acknowledged via BidNet and should be included with the proposal response. The purpose of this addendum is to address the following for this Request for Proposals (RFP): I. ATTACHMENT referencing Answers to Q19 and Q27 in Q&A. Please see attached exhibit. PROPOSAL # CIP-24-25-R3008 AM I PCLD Newhall Park Infiltration Project Proposal n W r ry 01 a 'f .0A q Irk 1 X4, , i pgry� PCLD Newhall Park Infiltration Project Proposal I A.vii Addendum No. 3 March 27, 2025 END OF ADDENDUM This addendum must be acknowledged via BidNet and should be included with the response. _ March 28, 2025 Contractor's a presentati e Date Mike Ziel dorf, Principal/CEO Pacific Coast Land Design, Inc. Company Name PROPOSAL # CIP-24-25-R3008 A.viii I PCLD Newhall Park Infiltration Project Proposal of SANrA CL 9 C7 'dam Ofp �s oEceMs�'�, Addendum No. 4 PROPOSAL # CIP-24-25-113008 Newhall Park Infiltration Project City of Santa Clarita, California Addendum No. 4 March 28, 2025 This addendum must be acknowledged via BidNet and should be included with the proposal response. The purpose of this addendum is to address the following for this Request for Proposals (RFP): I. UPDATE TO PROPOSAL CLOSING DATE Please note the close date for this proposal has been updated to April 3, 2025, at 11:00 AM PT. END OF ADDENDUM This addendum must be acknowledged via BidNet and should be included with the response. �a- March 28, 2025 Contractor's R resentative Date Mike Zielsdorf, Principal/CEO Pacific Coast Land Design, Inc. Company Name PROPOSAL # CIP-24-25-R3008 PCLD Newhall Park Infiltration Project Proposal I A.ix FORMS Pacific Coast Land Design has included the following forms, as referenced in the RFP. • Notice to Proposers Regarding Contractual Requirements • Designation of Subcontractors/Subconsultants • References • Acknowledgement & Acceptance of Scope of Work • City of Santa Clarita Disclosure Statement • Equal Opportunity / Affirmative Action Statement PCLD Newhall Park Infiltration Project Proposal I BA NOTICE TO PROPOSERS REGARDING CONTRACTUAL REQUIREMENTS PROPOSAL # CIP-24-25-R3008 Newhall Park Infiltration Project City Project No. R3008 City of Santa Clarita, California 1. SUMMARY OF CONTRACTUAL REQUIRMENTS a. A contract is required for any service performed on behalf of the City of Santa Clarita (City). b. By submitting a proposal, you have reviewed the sample contract documents contained within this request for proposals and agree to be bound by the requirements set forth. c. Questions and requests for modification of these terms must be negotiated and approved prior to proposal submission and are at the full discretion of the City. Requests should be submitted via the Q&A portal on BidNet prior to the deadline for questions and answers. 2. SUMMARY OF INDEMNITY AND INSURANCE REQUIREMENTS a. These are the Indemnity and Insurance Requirements for Contractors providing services or supplies to City of Santa Clarita (City). By agreeing to perform the work or submitting a proposal, you verify that you comply with and agree to be bound by these requirements. If any additional Contract documents are executed, the actual Indemnity language and Insurance Requirements may include additional provisions as deemed appropriate by City's Purchasing Agent. b. You should check with your Insurance advisors to verify compliance and determine if additional coverage or limits may be needed to adequately insure your obligations under this agreement. These are the minimum required and do not in any way represent or imply that such coverage is sufficient to adequately cover the Contractor's liability under this agreement. The full coverage and limits afforded under Contractor's policies of Insurance shall be available to Buyer and these Insurance Requirements shall not in any way act to reduce coverage that is broader or includes higher limits than those required. The Insurance obligations under this agreement shall be: 1—all the Insurance coverage and limits carried by or available to the Contractor; or 2—the minimum Insurance requirements shown in this agreement, whichever is greater. Any insurance proceeds in excess of the specified minimum limits and coverage required, which are applicable to a given loss, shall be available to City. c. Contractor shall furnish the City with original Certificates of Insurance including all required amendatory endorsements and a copy of the Declarations and Endorsement Page of the CGL policy listing all policy endorsements to City before work begins. City reserves the right to require full -certified copies of all Insurance coverage and endorsements. 3. INDEMNIFICATION a. To the fullest extent permitted by law, CONSULTANT shall defend (with legal counsel reasonably acceptable to CITY), indemnify and hold harmless CITY and its officers, agents, departments, officials, representatives and employees (collectively "Indemnitees") from and against any and all claims, loss, cost, damage, injury (including, without limitation, economic harm, injury to or death of an employee of B.ii I PCLD Newhall Park Infiltration Project Proposal CONSULTANT or its subconsultants), expense and liability of every kind, nature and description that arise from or relate to (including, without limitation, incidental and consequential damages, court costs, attorneys' fees, litigation expenses and fees of expert consultants or expert witnesses incurred in connection therewith and costs of investigation) that arise from or relate to, directly or indirectly, in whole or in part, from: (1) CONSULTANT's performance of Services under this Agreement, or any part thereof; (2) any negligent act or omission of CONSULTANT, any subconsultant, anyone directly or indirectly employed by them, or anyone that they control; (3) any actual or alleged infringement of the patent rights, copyright, trade secret, trade name, trademark, service mark or any other intellectual or proprietary right of any person or persons in consequence of the use by CITY, or any other Indemnitee, of articles or Services to be supplied in the performance of this Agreement; or (4) any breach of this Agreement (collectively "Liabilities"). Such obligations to defend, hold harmless and indemnify any Indemnitee shall not apply to the extent such Liabilities are caused by the sole negligence or willful misconduct of such Indemnitee, but shall apply to all other Liabilities. The foregoing shall be subject to the limitations of California Civil Code section 2782.8 as to any design professional services performed by CONSULTANT and in particular the limitation on CONSULTANT's duty to defend whereby such duty only arises for claims relating to the negligence, recklessness or willful misconduct of CONSULTANT as well as the limitation on the cost to defend whereby CONSULTANT will only bear such cost in proportion to CONSULTANT's proportionate percentage of fault (except as otherwise provided in section 2782.8). b. The foregoing indemnification provisions will not reduce or affect other rights or obligations which would otherwise exist in favor of the CITY and other Indemnitees. c. CONSULTANT shall place in its subconsulting agreements and cause its subconsultants to agree to indemnities and insurance obligations in favor of CITY and other Indemnitees in the exact form and substance of those contained in this Agreement. 4. INSURANCE a. Before commencing performance under this Agreement, and at all other times this Agreement is effective, CONSULTANT will procure and maintain the following types of insurance with coverage limits complying, at a minimum, with the limits set forth below: Type of Insurance Limits Commercial general liability: $1,000,000 Professional liability $1,000,000 Business automobile liability $1,000,000 Workers compensation Statutory requirement b. Commercial general liability insurance will meet or exceed the requirements of ISO-CGL Form No. CG 00 011185 or 88. The amount of insurance set forth above will be a combined single limit per occurrence for bodily injury, personal injury, and property damage for the policy coverage. Automobile coverage will be written on ISO Business Auto Coverage Form CA 00 0106 92, including symbol 1 (Any Auto). Liability policies will be endorsed to name CITY, its officials, and employees as "additional insureds" under said insurance coverage and to state that such insurance will be deemed "primary" such that any other insurance that may be carried by CITY will be excess thereto. Such endorsement must be reflected on ISO PCLD Newhall Park Infiltration Project Proposal I B.iii Form No. CG 20 10 1185 or 88, or equivalent. Such insurance will be on an "occurrence," not a "claims made," basis and will not be cancelable or subject to reduction except upon thirty (30) days prior written notice to CITY. c. Professional liability coverage will be on an "occurrence basis" if such coverage is available, or on a "claims made" basis if not available. When coverage is provided on a "claims made basis," CONSULTANT will continue to renew the insurance for a period of at least three (3) years after this Agreement expires or is terminated. Such insurance will have the same coverage and limits as the policy that was in effect during the term of this Agreement, and will cover CONSULTANT for all claims made by CITY arising out of any errors or omissions of CONSULTANT, or its officers, employees or agents during the time this Agreement was in effect. d. CONSULTANT will furnish to CITY duly authenticated Certificates of Insurance evidencing maintenance of the insurance required under this Agreement, including endorsements, and such other evidence of insurance or copies of policies as may be reasonably required by CITY from time to time. Insurance must be placed with California -admitted insurers with (other than workers compensation) a current A.M. Best Company Rating of at least "A:VII." e. Waiver of Subrogation: The insurer(s) agree to waive all rights of subrogation against CITY, its elected or appointed officers, officials, agents, volunteers and employees for losses paid under the terms of the workers compensation policy which arise from work performed by CONSULTANT for CITY. f. Should CONSULTANT, for any reason, fail to obtain and maintain the insurance required by this Agreement, CITY may obtain such coverage at CONSULTANT's expense and deduct the cost of such insurance from payments due to CONSULTANT under this Agreement or terminate pursuant to TERMINATION section. In the alternative, should CONSULTANT fail to meet any of the insurance requirements under this Agreement, City may terminate this Agreement immediately with no penalty. g. Should CONSULTANT'S insurance required by this Agreement be cancelled at any point prior to expiration of the policy, CONSULTANT must notify City within 24 hours of receipt of notice of cancellation. Furthermore, CONSULTANT must obtain replacement coverage that meets all contractual requirements within 10 days of the prior insurer's issuance of notice of cancellation. CONSULTANT must ensure that there is no lapse in coverage. h. The CITY shall be entitled to any coverage in excess of the minimums required herein. I have read and understand the above requirements and agree to be bound by them for any work performed for the City. 5 Authorized Signature: _Date: March 28, 202_ Printed Name: Mike Zielsdorf, Principal/CEO BJv I PCLD Newhall Park Infiltration Project Proposal DESIGNATION OF SUBCONTRACTORS/SUBCONSULTANTS PROPOSAL # CIP-24-25-R3008 Newhall Park Infiltration Project City Project No. R3008 City of Santa Clarita, California Listed below are the names and locations of the places of business of each subcontractor, supplier, and vendor who will perform work or labor or render service in excess of %: of 1 percent, or $10,000 (whichever is greater) of the prime contractor's total bid. If no Subcontractors will be used fill out the form with NA. Please add additional sheets if needed. Subcontractor DIR Registration No. Dollar Value of Work Encompass Consultant Group 1000037899 See cost proposal Location and Place of Business 333 N Lantana St #287, Camarillo, CA 93010 Bid Schedule Item No's: Description of Work N/A Survey and Civil Engineering Design Services License No. 7807 (Survey) Exp. Date: / 12/31/2 25 (Survey) Phone ( ) 66720 (Civil) 805.322.4443 Subcontractor DIR Registration No. Dollar Value of Work DiCecco Architecture, Inc. Will provide at time of contract See cost proposal Location and Place of Business 887 Patriot Dr Suite C, Moorpark, CA 93021 Bid Schedule Item No's: Description of Work N/A Architectural Design Services License No. Exp. Date: / / Phone ( ) C 19697 4/30/2027 805.552.0088 Subcontractor DIR Registration No. Dollar Value of Work Aquatic Design Group 1000054878 See cost proposal Location and Place of Business 2226 Faraday Ave. Carlsbad, CA 92008 Bid Schedule Item No's: Description of Work N/A Splash Pad Design Services License No. Exp. Date: / / Phone ( ) C-35802 7/31 /2025 760.438.8400 NOTE: A contractor or subcontractor shall not be qualified to propose on, be listed in a proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5 of the Labor Code. It is not a violation of this section for an unregistered contractor to submit a proposal that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 of the Labor Code at the time the contract is awarded. PCLD Newhall Park Infiltration Project Proposal I B.v DESIGNATION OF SUBCONTRACTORS/SUBCONSULTANTS PROPOSAL # CIP-24-25-R3008 Newhall Park Infiltration Project City Project No. R3008 City of Santa Clarita, California Listed below are the names and locations of the places of business of each subcontractor, supplier, and vendor who will perform work or labor or render service in excess of M of 1 percent, or $10,000 (whichever is greater) of the prime contractor's total bid. If no Subcontractors will be used fill out the form with NA. Please add additional sheets if needed. Subcontractor DIR Registration No. Dollar Value of Work RGSE, Inc. will provide at time See cost proposal of contract Location and Place of Business 2720 Cochran Street, Suite 813, Simi Valley, CA 93065 Bid Schedule Item No's: Description of Work N/A Structural Engineering Services License No. Exp. Date: / / Phone ( ) SE-4595 6/30/2025 805.522.3379 Subcontractor DIR Registration No. Dollar Value of Work Thoma Electric 1000000812 See cost proposal Location and Place of Business 3562 Empleo Street, San Luis Obispo, CA 93401 Bid Schedule Item No's: Description of Work N/A Electrical Engineering Services License No. Exp. Date: / / Phone ( ) 20823 9/30/2026 805.543.3850 Subcontractor DIR Registration No. Dollar Value of Work 3C Engineering 1000002239 See cost proposal Location and Place of Business 1500 Palm St. San Luis Obispo, CA 93401 Bid Schedule Item No's: Description of Work N/A Mechanical and Plumbing Engineering Services License No. Exp. Date: / / Phone ( ) #M34068 6/30/2026 805.540.5358 NOTE: A contractor or subcontractor shall not be qualified to propose on, be listed in a proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5 of the Labor Code. It is not a violation of this section for an unregistered contractor to submit a proposal that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 of the Labor Code at the time the contract is awarded. BM I PCLD Newhall Park Infiltration Project Proposal DESIGNATION OF SUBCONTRACTORS/SUBCONSULTANTS PROPOSAL # CIP-24-25-R3008 Newhall Park Infiltration Project City Project No. R3008 City of Santa Clarita, California Listed below are the names and locations of the places of business of each subcontractor, supplier, and vendor who will perform work or labor or render service in excess of M of 1 percent, or $10,000 (whichever is greater) of the prime contractor's total bid. If no Subcontractors will be used fill out the form with NA. Please add additional sheets if needed. Subcontractor DIR Registration No. Dollar Value of Work Field Stone Development Will provide at time See cost of contract proposal Location and Place of Business 4171 Yucca Street, Bullhead City, AZ 86429 Bid Schedule Item No's: Description of Work NA Project Costing and Estimating License No. NA Exp. Date: / / Phone ( ) Member American Association for Cost NA (818) 943-4334 Estimating International (AACEi) Subcontractor DIR Registration No. Dollar Value of Work Thomas Jacob Flitsch will provide at time ro See cost proposal p p Architects P.C. of contract Location and Place of Business 860 D Hampshire Road, Westlake Village CA 91361 Bid Schedule Item No's: Description of Work N/A Certified Access Specialist (CASp) Services License No. Exp. Date: / / Phone ( ) CASp-637 8/31/2027 805.338.2883 Subcontractor DIR Registration No. Dollar Value of Work Oaktopia (Dave Muffly) will provide at time of contract See cost proposal p p Location and Place of Business 836 Cheltenham Road, Santa Barbara, CA 93105 Bid Schedule Item No's: Description of Work N/A Arborist Services License No. Exp. Date: / / Phone ( ) I SA WE-4279A 12/31 /2028 805.705.2602 NOTE: A contractor or subcontractor shall not be qualified to propose on, be listed in a proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5 of the Labor Code. It is not a violation of this section for an unregistered contractor to submit a proposal that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 of the Labor Code at the time the contract is awarded. PCLD Newhall Park Infiltration Project Proposal I B.vii RFFFRFNrFG PROPOSAL # CIP-24-25-R3008 Newhall Park Infiltration Project City Project No. R3008 City of Santa Clarita, California The following are the names, addresses, and telephone numbers of three public agencies for which proposer has performed work of a similar scope and size within the past 3 years. If the instructions on this form conflict with the references requested in the scope of work, the scope of work shall govern. Complete this form out accordingly. Fill out this form completely and upload it with your proposal. 1 City of Ventura Name and Address of Owner / Agency Stacey Zarazua / Parks and Recreation Director / 805.658.4740 Name and Telephone Number of Person Familiar with Project Marina Park Playground - $54,835 Arroyo Verde Park Playground - $106,000 Parks and Recreation 2015 - present Contract Amount Type of Work Date Completed 2. Isla Vista Recreation and Park District Name and Address of Owner / Agency Kimberly Kiefer / General Manager / 805.680.4300 Name and Telephone Number of Person Familiar with Project Pardall Gardens - $132,155 Children's Park - $716,721 Parks and Recreation 2021 - present Contract Amount Type of Work Date Completed 3 Ventura County Parks Name and Address of Owner / Agency Jeri Cooper / Parks Manager / 805.654.3968 Name and Telephone Number of Person Familiar with Project Soule Park - $50,000 Lewis Road Park - $50,000 Parks and Recreation 2020 - present Contract Amount Type of Work Date Completed B.viii I PCLD Newhall Park Infiltration Project Proposal ACKNOWLEDGEMENT & ACCEPTANCE OF SCOPE OF WORK PROPOSAL # CIP-24-25-R3008 Newhall Park Infiltration Project City Project No. R3008 City of Santa Clarita, California By providing the three (3) required signatures below, the Contractor acknowledges full understanding, complete agreement to, and accepts in its entirety, all Scope of Work for the Newhall Park Infiltration Project. The Contractor will be expected to perform maintenance practices and uphold the standards herein to the established Scope of Work throughout the length of the contract. *Supervisor's Signature: Date: March 28, 2025 Mike Ziel _orf, Prin ipal/CEO *Estimator's Signature: _ Date: March 28, 2025 . Eric J. Berg, Principal *Owner's Signature: Date: March 28, 2025 Mike Ziel orf, Pri cipal/CEO *All three signatures required PCLD Newhall Park Infiltration Project Proposal I Ux CITY OF SANTA CLARITA DISCLOSURE STATEMENT PROPOSAL # CIP-24-25-R3008 Newhall Park Infiltration Project City Project No. R3008 City of Santa Clarita, California The following information must be disclosed: 1. List the names of all persons having a financial interest in the Request for Proposals. Mike Zielsdorf, Principal/CEO 2. If any person identified pursuant to No. 1 above is a corporation or partnership, list the names of all individuals owning more than ten percent of the shares in the corporation or owning any partnership interest in the partnership. Mike Zielsdorf, Principal/CEO (Sole Owner - 100% of Shares) 3. If any person identified pursuant to No. 1 above is a non-profit organization or a trust, list the names of any persons serving as a director of the non-profit organization or as a trustee or beneficiary or trustor of the trust. NA 4. Has the offeror had more than $250.00 worth of business transacted with any member of the City of Santa Clarita staff, boards, commissions, committees, and Council within the past twelve months? If yes, please indicate the person(s) with whom you have conducted business. NA NOTE: Attach additional pages as necessary. Signature Afferor Mike Zielsdorf, Principal/CEO Print or Type Name of Offeror March 28, 2025 Date B.x I PCLD Newhall Park Infiltration Project Proposal CITY OF SANTA CLARITA DISCLOSURE STATEMENT PROPOSAL # CIP-24-25-R3008 Newhall Park Infiltration Project City Project No. R3008 City of Santa Clarita, California The following information must be disclosed: 1. List the names of all persons having a financial interest in the Request for Proposals. None 2. If any person identified pursuant to No. 1 above is a corporation or partnership, list the names of all individuals owning more than ten percent of the shares in the corporation or owning any partnership interest in the partnership. N/A 3. If any person identified pursuant to No. 1 above is a non-profit organization or a trust, list the names of any persons serving as a director of the non-profit organization or as a trustee or beneficiary or trustor of the trust. N/A 4. Has the offeror had more than $250.00 worth of business transacted with any member of the City of Santa Clarita staff, boards, commissions, committees, and Council within the past twelve months? If yes, please indicate the person(s) with whom you have conducted business. No NOTE: Attach additional pages as necessary. Signature of Offeror r Sal Contreras P.E., Vice President Print or Type Name of Offeror 03/19/2025 Date PCLD Newhall Park Infiltration Project Proposal I BA CITY OF SANTA CLARITA DISCLOSURE STATEMENT PROPOSAL # CIP-24-25-R3008 Newhall Park Infiltration Project City Project No. R3008 City of Santa Clarita, California The following information must be disclosed: List the names of all persons having a financial interest in the Request for Proposals. Mark DiCecco, president, DiCecco Architecture Inc. If any person identified pursuant to No. 1 above is a corporation or partnership, list the names of all individuals owning more than ten percent of the shares in the corporation or owning any partnership interest in the partnership. DiCecco Architecture, Inc. is an S Corporation. 100% of the stock is owned by Mark DiCecco If any person identified pursuant to No. 1 above is a non-profit organization or a trust, list the names of any persons serving as a director of the non-profit organization or as a trustee or beneficiary or trustor of the trust. Has the offeror had more than $250.00 worth of business transacted with any member of the City of Santa Clarita staff, boards, commissions, committees, and Council within the past twelve months? If yes, please indicate the person(s) with whom you have conducted business. NO NOTE: Attach additional pages as necessary. Signature of Offeror Mark DiCecco Print or Type Name of Offeror March 23, 2025 Date B.xii I PCLD Newhall Park Infiltration Project Proposal CITY OF SANTA CLARITA DISCLOSURE STATEMENT PROPOSAL # CIP-24-25-R3008 Newhall Park Infiltration Project City Project No. R3008 City of Santa Clarita, California The following information must be disclosed: 1. List the names of all persons having a financial interest in the Request for Proposals. N/A 2. If any person identified pursuant to No. 1 above is a corporation or partnership, list the names of all individuals owning more than ten percent of the shares in the corporation or owning any partnership interest in the partnership. N/A 3. If any person identified pursuant to No. 1 above is a non-profit organization or a trust, list the names of any persons serving as a director of the non-profit organization or as a trustee or beneficiary or trustor of the trust. N/A 4. Has the offeror had more than $250.00 worth of business transacted with any member of the City of Santa Clarita staff, boards, commissions, committees, and Council within the past twelve months? If yes, please indicate the person(s) with whom you have conducted business. N/A NOTE: Attach additional pages as necessary. Signature of Of or Scott Palmer, Director of Marketing Print or Type Name of Offeror 3/17/2025 Date PCLD Newhall Park Infiltration Project Proposal I B.xiii CITY OF SANTA CLARITA DISCLOSURE STATEMENT PROPOSAL # CIP-24-25-R3008 Newhall Park Infiltration Project City Project No. R3008 City of Santa Clarita, California The following information must be disclosed: 1. List the names of all persons having a financial interest in the Request for Proposals. Jeffrey Thoma, P.E., President 2. If any person identified pursuant to No. 1 above is a corporation or partnership, list the names of all individuals owning more than ten percent of the shares in the corporation or owning any partnership interest in the partnership. Jeffrey Thoma, P.E., President 3. If any person identified pursuant to No. 1 above is a non-profit organization or a trust, list the names of any persons serving as a director of the non-profit organization or as a trustee or beneficiary or trustor of the trust. 4. Has the offeror had more than $250.00 worth of business transacted with any member of the City of Santa Clarita staff, boards, commissions, committees, and Council within the past twelve months? If yes, please indicate the person(s) with whom you have conducted business. no NOTE: Attach additional pages as necessary. Signature Jf"eror JEFFREY THOMA, P.E., PRESIDENT Print or Type Name of Offeror MARCH 25. 2025 Date B.xiv I PCLD Newhall Park Infiltration Project Proposal CITY OF SANTA CLARITA DISCLOSURE STATEMENT PROPOSAL # CIP-24-25-R3008 Newhall Park Infiltration Project City Project No. R3008 City of Santa Clarita, California The following information must be disclosed: 1. List the names of all persons having a financial interest in the Request for Proposals. Brian Starrett, Jason Haendler, Kelly Robinson, Chris Lewis 2. If any person identified pursuant to No. 1 above is a corporation or partnership, list the names of all individuals owning more than ten percent of the shares in the corporation or owning any partnership interest in the partnership. N/A 3. If any person identified pursuant to No. 1 above is a non-profit organization or a trust, list the names of any persons serving as a director of the non-profit organization or as a trustee or beneficiary or trustor of the trust. N/A 4. Has the offeror had more than $250.00 worth of business transacted with any member of the City of Santa Clarita staff, boards, commissions, committees, and Council within the past twelve months? If yes, please indicate the person(s) with whom you have conducted business. N/A NOTE: Attach additional pages as necessary. Signature of Offeror Brian Starrett Print or Type Name of Offeror 03/21 /2025 Date PCLD Newhall Park Infiltration Project Proposal I B.xv CITY OF SANTA CLARITA DISCLOSURE STATEMENT PROPOSAL # CIP-24-25-R3008 Newhall Park Infiltration Project City Project No. R3008 City of Santa Clarita, California The following information must be disclosed: 1. List the names of all persons having a financial interest in the Request for Proposals. Ramon Garcia SE President of RGSE Inc Structural Engineers 2. If any person identified pursuant to No. 1 above is a corporation or partnership, list the names of all individuals owning more than ten percent of the shares in the corporation or owning any partnership interest in the partnership. Ramon Garcia 3. If any person identified pursuant to No. 1 above is a non-profit organization or a trust, list the names of any persons serving as a director of the non-profit organization or as a trustee or beneficiary or trustor of the trust. n/a 4. Has the offeror had more than $250.00 worth of business transacted with any member of the City of Santa Clarita staff, boards, commissions, committees, and Council within the past twelve months? If yes, please indicate the person(s) with whom you have conducted business. NO NOTE: Attach additional pages as necessary. Signature of Offeror Ramon Garcia Print or Type Name of Offeror 3/25/2025 Date B.xvi I PCLD Newhall Park Infiltration Project Proposal CITY OF SANTA CLARITA DISCLOSURE STATEMENT PROPOSAL # CIP-24-25-R3008 Newhall Park Infiltration Project City Project No. R3008 City of Santa Clarita, California The following information must be disclosed: 1. List the names of all persons having a financial interest in the Request for Proposals. 2. If any person identified pursuant to No. 1 above is a corporation or partnership, list the names of all individuals owning more than ten percent of the shares in the corporation or owning any partnership interest in the partnership. "�' a AC► -e- �k, �, l&,A 3. If any person identified pursuant to No. 1 above is a non-profit organization or a trust, list the names of any persons serving as a director of the non-profit organization or as a trustee or beneficiary or trustor of the trust. 4, Has the offeror had more than $250,00 worth of business transacted with any member of the City of Santa Clarita staff, boards, commissions, committees, and Council within the past twelve months? If yes, please indicate the person(s) with whom you have conducted business, "0 NOTE: Attach additional pages as necessary. L.�~r ignatu�AO Print or Type Name of Offeror I AZ� Z Date PCLD Newhall Park Infiltration Project Proposal I B.xvii CITY OF SANTA CLARITA DISCLOSURE STATEMENT PROPOSAL # CIP-24-25-113008 Newhall Park Infiltration Project City Project No. R3008 City of Santa Clarita, California The following information must be disclosed: 1. List the names of all persons having a financial interest in the Request for Proposals. Thomas Flitsch, Principal Architect Thomas Jacob Flitsch Architects P.C. CASp Consultant 2. If any person identified pursuant to No. 1 above is a corporation or partnership, list the names of all individuals owning more than ten percent of the shares in the corporation or owning any partnership interest in the partnership. Sole shareholder 3. If any person identified pursuant to No. 1 above is a non-profit organization or a trust, list the names of any persons serving as a director of the non-profit organization or as a trustee or beneficiary or trustor of the trust. for -profit• 4. Has the offeror had more than $250.00 worth of business transacted with any member of the City of Santa Clarita staff, boards, commissions, committees, and Council within the past twelve months? If yes, please indicate the person(s) with whom you have conducted business. No NOTE: At additional pages as necessary. S. ature of Offeror Thomas Flitsch AIA/CASp Print or Type Name of Offeror 3/20/25 Date B.xviii I PCLD Newhall Park Infiltration Project Proposal CITY OF SANTA CLARITA DISCLOSURE STATEMENT PROPOSAL # CI P-24-25-R3008 Newhall Park Infiltration Project City Project No. R3008 City of Santa Clarita, California The following information must be disclosed: List the names of all persons having a financial interest in the Request for Proposals. David J. Muffly If any person identified pursuant to No. 1 above is a corporation or partnership, list the names of all individuals owning more than ten percent of the shares in the corporation or owning any partnership interest in the partnership. If any person identified pursuant to No. 1 above is a non-profit organization or a trust, list the names of any persons serving as a director of the non-profit organization or as a trustee or beneficiary or trustor of the trust. 4. Has the offeror had more than $250.00 worth of business transacted with any member of the City of Santa Clarita staff, boards, commissions, committees, and Council within the past twelve months? If yes, please indicate the person(s) with whom you have conducted business. No NOTE: Attach additional pages as necessary. i� ku Signature of Offeror David J. Muffly Print or Type Name of Offeror 28 March 2025 Date PCLD Newhall Park Infiltration Project Proposal I B.xix AL OPPORTUNITY/AFFIRMATIVE ACTION STATEMENT PROPOSAL # CIP-24-25-R3008 Newhall Park Infiltration Project City Project No. R3008 City of Santa Clarita, California The offeror hereafter described will not discriminate against any employee or applicant for employment because of race/color, national origin, sex, sexual preference, religion, age, or handicapped status in employment or the provisions of services. Signature Mike Zielsdorf, Principal/CEO Typed Name and Title B.xx I PCLD Newhall Park Infiltration Project Proposal L OPPORTUNITY/AFFIRMATIVE ACTION STATEMENT PROPOSAL # CIP-24-25-R3008 Newhall Park Infiltration Project City Project No. R3008 City of Santa Clarita, California The offeror hereafter described will not discriminate against any employee or applicant for employment because of race/color, national origin, sex, sexual preference, religion, age, or handicapped status in employment or the provisions of services. Signature Sal Contreras P.E., Vice President Typed Name and Title PCLD Newhall Park Infiltration Project Proposal I B.xxi L OPPORTUNITY/AFFIRMATIVE ACTION STATEMENT PROPOSAL # CIP-24-25-R3008 Newhall Park Infiltration Project City Project No. R3008 City of Santa Clarita, California The offeror hereafter described will not discriminate against any employee or applicant for employment because of race/color, national origin, sex, sexual preference, religion, age, or handicapped status in employment or the provisions of services. Signature Mark DiCecco, president Typed Name and Title B.xxii I PCLD Newhall Park Infiltration Project Proposal L OPPORTUNITY/AFFIRMATIVE ACTION STATEMENT PROPOSAL # CIP-24-25-R3008 Newhall Park Infiltration Project City Project No. R3008 City of Santa Clarita, California The offeror hereafter described will not discriminate against any employee or applicant for employment because of race/color, national origin, sex, sexual preference, religion, age, or handicapped status in employment or the provisions of services. Signature Scott Palmer, Director of Marketing Typed Name and Title PCLD Newhall Park Infiltration Project Proposal I B.xxiii L OPPORTUNITY/AFFIRMATIVE ACTION STATEMENT PROPOSAL # CIP-24-25-R3008 Newhall Park Infiltration Project City Project No. R3008 City of Santa Clarita, California The offeror hereafter described will not discriminate against any employee or applicant for employment because of race/color, national origin, sex, sexual preference, religion, age, or handicapped status in employment or the provisions of services. Signature JEFFREY THOMA, P.E., PRESIDENT Typed Name and Title B.xxiv I PCLD Newhall Park Infiltration Project Proposal L OPPORTUNITY/AFFIRMATIVE ACTION STATEMENT PROPOSAL # CIP-24-25-R3008 Newhall Park Infiltration Project City Project No. R3008 City of Santa Clarita, California The offeror hereafter described will not discriminate against any employee or applicant for employment because of race/color, national origin, sex, sexual preference, religion, age, or handicapped status in employment or the provisions of services. Signature Brian Starrett, Principal Typed Name and Title PCLD Newhall Park Infiltration Project Proposal I B.xxv EQUAL OPPORTUNITY/AFFIRMATIVE ACTION STATEMENT PROPOSAL # CIP-24-25-R3008 Newhall Park Infiltration Project City Project No. R3008 City of Santa Clarita, California The offeror hereafter described will not discriminate against any employee or applicant for employment because of race/color, national origin, sex, sexual preference, religion, age, or handicapped status in employment or the provisions of services. I0�� to�� Signature Ramon Garcia SE, President of RGSE inc Typed Name and Title B.xxvi I PCLD Newhall Park Infiltration Project Proposal EQUAL OPPORTUNITY/AFFIRMATIVE ACTION STATEMENT PROPOSAL # CIP-24-25-1113008 Newhall Park Infiltration project City Project No, R3008 City of Santa Clarita, California The offeror hereafter described will not discriminate against any employee or applicant for employment because of race/color, national origin, sex, sexual preference, religion, age, or handicapped status in employment or the provisions of services, �Ignatu�re���� 'e "2 fcY 1'� c �j�i✓/u; a - Typed Name and Title PCLD Newhall Park Infiltration Project Proposal I B.xxvii EQUAL OPPORTUNITY/AFFIRMATIVE ACTION STATEMENT PROPOSAL # CIP-24-25-113008 Newhall Park Infiltration Project City Project No. R3008 City of Santa C/arita, California The offeror hereafter described will not discriminate against any employee or applicant for employment because of race/color, national origin, sex, sexual preference, religion, age, or handicapped status in employment or the provisions of services. Si ture Tom Flitsch AIA/CASp Principal Architect Thomas Jacob Flitsch Architects P.C. Typed Name and Title B.xxviii I PCLD Newhall Park Infiltration Project Proposal EQUAL OPPORTUNITY/AFFIRMATIVE ACTION STATEMENT PROPOSAL # CI P-24-25-R3008 Newhall Park Infiltration Project City Project No. R3008 City of Santa Clarita, California The offeror hereafter described will not discriminate against any employee or applicant for employment because of race/color, national origin, sex, sexual preference, religion, age, or handicapped status in employment or the provisions of services. Signature David J. Muffly, Senior Arborist Typed Name and Title PCLD Newhall Park Infiltration Project Proposal I B.xxix 4, l u . r�•NEWHALL PARK _ y $NNTA - , 0, � 4 Pacific Coast Land Design, Inc. Landscape Architecture' Urban Design' Environmental Planning with: Encompass Consultant Group (ECG) DiCecco Architecture, Inc. Aquatic Design Group RFP Number: CIP-24-25-113008 J U N E 20, 2025 Proposal to Provide LANDSCAPE ARCHITECTURAL SERVICES to THE CITY OF SANTA CLARITA COST PROPOSA Thoma Engineering Field Stone Develoment, LLC 3C Engineering Thomas Flitsch Archpitects P.C. RG Ei, Inc. Oaktopia COST PROPOSAL INTRODUCTION On the following pages the team has defined the effort and associated costs to the City in relation to the scope of work as outlined in the Work Statement. In developing a comprehensive project approach, we are providing a scope and fee breakdown that addresses all known costs of charges to the City as part of this project. Costs illustrated in this proposal are based on inclusive blended rates, encompassing known project - related or supported expenses, including travel expenses. Pacific Coast Land Design has defined the expected hours per task by Staff Level for the work to be carried out by the prime consultant. Sub -Consultant costs are reflected as a lump -sum effort per task and include a 10% administration and management mark-up fee. Along with the detailed task -related fees, the team has provided a list of anticipated reimbursable expenses. The team welcomes a dialogue on scope and overall fee refinement based on best meeting the City's programming and budgeting parameters. While we understand from City Q & A responses that the architectural improvements are secondary to the BMP and park improvements, we have included comprehensive architectural and relate subconsultant fees to cover the full extent of the stated potential improvements in the RFP. Refinement of those design services and fees may best be adjusted following the confirmation of project programming and completion of the conceptual design tasks. ASSUMPTIONS Contracted services are through Conceptual Design Task 3.4, Services following Task 3.4 will be negotiated and awarded under separate contract. Based on the scope of work outlined within the RFP, PCLD and the design team have included the following list of assumptions regarding the services proposed: • The design team assumes the infiltration BMP design by others is adequate to structurally support the proposed park features structurally and that the hydrology analysis includes the developed stormwater volumes for the new park design. Coordination with the Infiltration design team is included. • Architectural and related structural services provided for enhancements of existing buildings are limited to internal spatial reconfigurations only. It is assumed that no building lateral force systems will be substantially affected by architectural renovations and therefore require additional structural engineering. • It will be the responsibility of the Owner, and/or their Contractor, to obtain utility designs prior to construction. Construction of utility company improvements must be obtained directly from the serving utility company for their construction documents, specifications, drawings, details and notes. • All improvements are assumed to be on City property with right-of- way improvements limited to the park adjacent conditions along Dalbey Drive and Newhall Avenue (i.e. sidewalk, curb and/or gutter along park edges.) No work on adjacent parcels (Hart High PCLD Newhall Park Infiltration Project Cost Proposal I H School, School District properties, private residential properties). • Traffic Control Plans are excluded. • Environmental or Biological Studies are excluded. • Hazardous material evaluation and removal is excluded. • Sustainability certification is limited to the Institute for Sustainable Infrastructure (ISI) verification (Envision). • Additional Meetings, Agency presentations and Public Meetings separate from those listed in the Workplan will be billed at the regular office rates. • Plan check and permit fees shall be paid by the City. • Utility mapping shall be based on the best available data and investigation tools. However, due to inherent limitations in utility records and field detection technologies, utility information provided shall be considered approximate and for design reference only. Final utility locations shall be verified by the contractor in the field during construction. • Splash Pad/spray ground is assumed to be approximately 2,000 SF, which is larger than average. If increases in size require additional supportive equipment, additional services shall be requested. • Mechanical and Plumbing assumes 3 restroom remodels and drinking fountain replacement. Plumbing and HVAC design beyond the 3 restroom remodels in multi -purpose and boys & girls club can be provided as additional services. • Civil and structural designs will utilize the previous Geotechnical Investigation recommendations. No new geotechnical investigates are included. • Electrical assumes that adequate physical space and electrical capacity exist within existing electrical distribution system to accommodate added loads contemplated in this scope of work for the existing restrooms, multi -purpose room, etc. Excludes upgrade of existing serving electric utility to accommodate added load to buildings scoped under this project. Assumes new electrical services will be required for sports lighting and EV charging systems added under this project. • Electrical excludes design within existing buildings for new large/ major equipment or systems replacement (i.e. replacement of HVAC, addition of Audio/Video, replacement of Fire Alarm system, etc.). Assumes that all electrical design for existing buildings shall utilize existing power/lighting/fire alarm/communications infrastructure and will not require upgrade or replacement. • Assumes that both lighted play -fields will be lighted to IES RP-6- 24 (current) "Recreational Level of Play" with LED sources ("Class IV" level of play, which is defined as "limited or no provisions for spectators"). • The time of performance for the design services prior to project bidding is eighteen months. • Construction Phase Support is anticipated to span the City stated 180 working days and is based on the understanding that Construction Management services, City Construction Observation and Materials and Site Testing are to be by others and not a part of our team's contracted services. Please see the following pages for the itemized tasks and fees based on the assumptions listed above and the PCLD team's scope of work as defined in Work Statement. PCLD Newhall Park Infiltration Project Cost Proposal I iii FEE TABLE TASK ID TASK DESCRIPTION PROJECT MANAGEMENT PCLD Services PCLD TOTAL Encompass Co nsultant Group (Survey + Civil) Lum Sum DICecco Architecture Inc. (Arch) Lum Sum Aquatic Design Group (Splash Pad) Lum Sum Thoma Engineering (Electrical) Lum Sum 3C Engineering (Mech+Plumb) Lum Sum RGSE, Inc. (Structural) Lum Sum Sub-Consuflants (*Include 109 Administration 8 Managemerd Mark-up) Thomas Jacob Field Stone Flitsc h Architects Development P.C. Oaktopla (Cost Estimating) [CASp) (Arbodst) TOTAL Lum Sum Lum Sum Lum Sum 1.0 Project Kickoff Meeting $ 2,680 $ 1,958.00 $ 2,167.00 $ 539.00 $ 979.00 $ 1,716.00 $ 792.00 $ 137.50 $ 550.00 $ ],I Coco $ 12,618.50 1.1 Monthly PDT Meetings $ 15,210 $ A54500 $ 10,527.00 $ 3,349.50 $ 2,937.00 $ 6,215.00 $ 4,752.00 $ 55ace $ 550.00 $ 1,76i0.00 $ 52,395.50 1.2 Monthly Progress Reports (assume 9) $ 2,480 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 2,480.00 1.3 Measure W Technical Support $ 6,420 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 6,427.00 1.4 Schedule $ 2,140 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 2,140.00 1.5 Quality Control $ 9,630 $ 1,056.00 $ 2,684.00 $ - $ - $ - $ - $ - $ - $ - $ 13,370.00 1.6 LbEngagement $ 27,565 $ 3,091.00 $ 7,012.50 $ 990.00 $ - $ - $ - $ - $ - $ - $ 38,658.50 1.7 Public Art Support $ AUFU - $ - $ - $ - $ - $ - $ - $ $ 4,050.00 TASK TASK I PROJECT MANAGEMENT SUBTOTAL PRELIMINARY INVESTIGATIONS - - $ 132,132.50 2.1 Field Reconnaissance $ 3,760 $ 6,628.60 $ 3,935.00 $ 269.50 $ 1,830.40 $ 2,310.00 $ 1,408.00 $ - $ - $ $ 20,144.50 2.2 Document Research and Review $ 5,600 $ 1,430.00 $ 1,705.00 $ 539.00 $ 3,007.40 $ 2,857.50 $ 1,408.00 $ - $ 1,1pace $ 220.00 $ 17,896.90 2.3 Survey $ 3,590 $ 35,769.50 $ - $ - $ - $ - $ - $ - $ - $ $ 42,359.50 2.4 Existing Utility Research $ 2,830 $ 23,185.00 $ - $ - $ - $ - $ - $ - $ - $ $ 26,018.00 2.5 CASp Accessibility Report $ 1,610 $ - $ 1,441.00 $ - $ - $ - $ - $ - $ 7,700.00 $ $ 10,751.00 2.6 Existing Tree Survey and Oak Tree Report $ 2,530 - $ - $ - $ - $ - $ - $ 15,400.00 $ 17,930.00 TASK 3A TASK 2 PRELIMINARY INVESTIGATIONS SUBTOTAL- ICONCEPTUAL DESIGN - $ - $ 135,099.90 3.1 Initial Conceptual Design Study Alternatives $ 43,460 $ 5,280.00 $ 11,319.00 $ 1,419.00 $ - $ - $ - $ 3,300.00 $ - $ - $ 64,778.00 3.2 2,J Conceptual Design Alternatives $ 35,070 $ 16,808.00 $ 11,319.00 $ 1,419.00 $ - $ - $ - $ 2,750.00 $ - $ 3.3 ED Conceptual Design Alternatives $ 30,3C0 $ 14,102.00 $ 13,332.00 $ 1,41Ace $ 3,663.00 $ 2,684.00 $ 1,056.00 $ 2,200.00 $ - $ 3.4 Final Conceptual Design Alternatives is 24,510 i $ 7,447.00 $ 14,003.00 $ 1,419.00 $ 2,549.80 $ 2,684.00 $ 1,056.00 $ ],I Coco $ 4,950.00 $ TASK 3A CONCEPTUAL DESIGN SUBTOTAL - $ - $ 263,618.80 OWNER'S ALLOWANCE Services may include but are not limited to: -Additional inspections and utility research, -Design forMulti-PurposeRoom and Maintenance Building Enhancements (beyond original scope) -Additional public engagem ent with other stakeholders -Traffic studies $ 63,701.80 OWNER'S ALLOWANCE SUBTOTAL11 63,701.80 REIMBURSABLE EXPENSES Workshop Materials- Foam core, color printing, scanning, pens and commenting materials $ 5,000.00 REIMBURSABLE EXPENSES SUBTOTAL $ 5,000.00 TOTAL• • oo PCLD Newhall Park Infiltration Project Cost Proposal I iv FEE TABLE TASK 3B PS&E DESIGN (OPTIONAL -NOT INCLUDED AT TIME OF CONTRACT) 3.5 30%PS&E 36190 $ 47,234.W $ 15,378.W $ 3,564.W $ 14,922.60 $ 3,261.50 $ 1,254.00 $ 6,6LW.00 - - 128,404.10 3.6 60%PS&E $ 42860 $ SL194.W $ 76049.W $ 4,477.W $ 20, 756.40 $ 3,267.50 $ 1,254.0G $ S,SW.00 $ 5,5L0.W $ - 75Q 785.90 3.7 `%0%PS&E $ SQ9W $ SQ644.W $ 75, 378.W $ 4, 807.50 $ 25,39020 $ 4,224.W $ 1,254.0G $ 4,4W.00 $ 2,750.00 - 759747.70 3.8 100%PS&E 42860 $ 26664.W $ 72782W $ 3, 806.W $ 7,455.80 $ 2, 706.50 $ 1,254.0G $ 3,3W.00 - $ - 1OQ228.30 3.9 Issue Final PS&E for Bidding (following 100%review; S 25,7W $ 17,468.W $ 6765.W $ 7, 765.50 $ 7,89420 $ L29250 $ 946.OG $ 7,650.00i $ - $ - 57,481.20 SUBTOTAL $ - $ 596,041.20 TASK 4 PLAN APPROVALS AND PERMITS (OPTIONAL - NOT INCLUDED ATTIME OF CONTRACT) 'ermits and Approvals 13,400 $ 5,808.00 $ - $ - $ - 19,208.00 31d Support 6,720 $ 1,210.00 $ - $ - $ - 7,930.00 SUBTOTAL - $ - $ - $ - $ - $ 27,138.00 jig• •' • �� �� �� : �� gel = -- �� j PCLD Newhall Park Infiltration Project Cost Proposal I v RATE TABLE Principal Senior Associate Landscape - Associate Designer $ 195 $ 170 $ 135 $ 115 2-Man I Clerical _ Principal II Principal I Senior II Associate I Assistant II Assistant Survey Support $ 240 $ 220 $ 205 $ 175 $ 165 $ 155 $ 335 $ 95 Aquatics Aquatics Aquatics - Project Principal Project Aquatics PM Aquatics Aquatics • • • • • Aquatics PIC Principal Architect Architect (CA) Designer Admin $ 245 $ 245 $ 245 $ 225 $ 205 $ 165 $ 110 •• Design - • • • • • Principal Engineer DraRer Admin $ 215 $ 175 $ 105 $ 85 PCLD Newhall Park Infiltration Project Cost Proposal I vi