Loading...
HomeMy WebLinkAbout2025-08-26 - AGENDA REPORTS - AGMT UPDATE HAZARD MITIGATION PLANO Agenda Item: 8 CITY OF SANTA CLARITA AGENDA REPORT CONSENT CALENDAR CITY MANAGER APPROVAL: Li ' DATE: August 26, 2025 SUBJECT: PROFESSIONAL SERVICES AGREEMENT WITH JACOB GREEN AND ASSOCIATES TO UPDATE THE LOCAL HAZARD MITIGATION PLAN DEPARTMENT: City Manager's Office PRESENTER: Masis Hagobian RECOMMENDED ACTION City Council: 1. Award a contract to Jacob Green and Associates to update the Local Hazard Mitigation Plan for a total contract amount not to exceed $84,900. 2. Appropriate one-time funds in the amount of $84,900 from the General Fund (Fund 100) to Expenditure Account 1001105-516102 and increase the General Fund (Fund 100) FEMA Grant Revenue Account 100-445101 by $63,675. 3. Authorize the City Manager or designee to execute all contracts and associated documents, subject to City Attorney approval. BACKGROUND A Local Hazard Mitigation Plan (LHMP) identifies hazards within a municipality's jurisdictional area and outlines a long-term strategy to reduce or eliminate risk to human life, property, and public infrastructure from future natural or human -caused disasters. To ensure the plan is relevant and effective, the Federal Emergency Management Agency (FEMA) requires the plan to be updated every five years. The City of Santa Clarita's (City) current LHMP is due to expire in November 2026. The City conducted a Request for Proposal (RFP) to solicit proposals from qualified consulting firms to update the City's LHMP, in accordance with federal regulations and to ensure continued eligibility for federal mitigation and recovery funding. As the LHMP update process typically includes multiple assessments, extensive public outreach, and stakeholder engagement, the Page 1 Packet Pg. 146 O process in updating a LHMP must be initiated well in advance to allow adequate time for plan development, public engagement, interagency coordination, and California Office of Emergency Services (CalOES) and FEMA review and approval. The RFP was published and circulated via the City's e-procurement system, BidNet, on December 12, 2024. The City transmitted the solicitation to 1,884 vendors on BidNet, of which 63 vendors downloaded the RFP. Eight companies submitted proposals for consideration. These proposals were reviewed and evaluated based on each company's ability to meet the specific needs of the City. An evaluation panel comprised of City staff from the City Manager's Office, Planning division, and Special Districts division scored the responses using the following categories of weighted criteria: • Contractor Qualifications, Plan of Study/Scope of Work, Program Management (25%); • Experience on similar projects (25%); • Thoroughness of proposal, approach to providing sound services, and ability to provide services to meet objectives and standards (35%); and • Cost of services provided (15%). The evaluation team scored the responses based on a 100-point system and the vendors with the top three scores were invited for interviews with the evaluation team. The evaluation team scored the interviews based on a 25-point system, with the results added to their original scores, outlined below: Rank Company 1 Jacob Green and Associates 2 Witt O'Brien's LLC 3 IEM International, Inc. Location Score Tustin, California 117 Houston, Texas 113 Raleigh, North Carolina 112 Following the interviews, the evaluation panel recommends Jacob Green and Associates (JGA) to update the City's LHMP. JGA demonstrated extensive knowledge for local and regional hazards. Additionally, the firm has robust experience in updating and obtaining federal certification of LHMPs for other Southern California municipalities. The JGA team consists of professionals from local government, public safety, and emergency operations sectors, with significant experience working with CalOES and FEMA. JGA has recently completed hazard mitigation plans for the cities of West Hollywood, Rialto, Lake Forest, and Montebello. Although the three proposals were comparable in total proposed costs, JGA offered the lowest cost among the top three proposals. Partial funding for the project is being provided through FEMA's Hazard Mitigation Grant Program (HMGP) under Disaster DR-4683: California Severe Winter Storms, Flooding, Landslides, and Mudslides, which reimburses 75 percent of eligible costs and requires a 25 percent local match. JGA's proposal includes a total project cost of $84,900. Funding from the FEMA grant will cover 75 percent of the total project cost or $63,675. The remaining total project cost of $21,225 will be funded by the City's General Fund. Page 2 Packet Pg. 147 O ALTERNATIVE ACTION Other action, as directed by the City Council. FISCAL IMPACT Upon approval of the recommended actions, adequate funds will be available in expenditure accounts 1001105-516102 to support the recommended contract and project administrative costs, and will increase FEMA Grant Revenue Account (100-445101) by $63,675. ATTACHMENTS JGA Propsal Page 3 Packet Pg. 148 8.a ACKNOWLEDGEMENT & ACCEPTANCE OF SCOPE OF WORK PROPOSAL # CMO-24-25-15 Local Hazard Mitigation Plan Update Consultant City of Santa Clarito, California By providing the three (3) required signatures below, the Contractor acknowledges full understanding, complete agreement to, and accepts in its entirety, all Scope of Work for the Local Hazard Mitigation Plan Update Consultant. The Contractor will be expected to perform maintenance practices and uphold the standards herein to the established Scope of Work throughout the length of the contract. *Supervisor's Signature: Date: February 6, 2025 *Estimator's Signature: Date: February 6, 2025 *Owner's Signature: Date: February 6, 2025 *All three signatures required Packet Pg. 149 8.a Addendum No. 1 January 9, 2025 Addendum No. 1 PROPOSAL # CMO-24-25-15 Local Hazard Mitigation Plan Update Consultant City of Santa Clarita, California This addendum must be acknowledged via BidNet and should be included with the proposal response. The purpose of this addendum is to address the following for this Request for Proposals (RFP): I. CLARIFICATION REGARDING TIMELINE FOR REVISED LHMP The consultant shall be responsible for delivering a final, revised LHMP suitable for FEMA approval within a twenty-four (24) month period of performance after the contract is awarded, not within three (3) months of the award of contract as stated elsewhere in the RFP. END OF ADDENDUM This addendum must be acknowledged via BidNet and should be included with the response. a 0 L ,Q V February 6, 2025 Co ractor's Representative Date U Q President & CEO Company Name PROPOSAL # CMO-24-25-15 Packet Pg. 150 8.a CITY OF SANTA CLARITA DISCLOSURE STATEMENT PROPOSAL # CMO-24-25-15 Local Hazard Mitigation Plan Update Consultant City of Santa Clarita, California The following information must be disclosed: 1. List the names of all persons having a financial interest in the Request for Proposals. Jacob Green 2. If any person identified pursuant to No. 1 above is a corporation or partnership, list the names of all individuals owning more than ten percent of the shares in the corporation or owning any partnership interest in the partnership. N/A 3. If any person identified pursuant to No. 1 above is a non-profit organization or a trust, list the names of any persons serving as a director of the non-profit organization or as a trustee or beneficiary or trustor of the trust. N/A 4. Has the offeror had more than $250.00 worth of business transacted with any member of the City of Santa Clarita staff, boards, commissions, committees, and Council within the past twelve months? If yes, please indicate the person(s) with whom you have conducted business. NO NOTE: Attach additional pages as necessary. Sign ure of Offeror Jacob Green Print or Type Name of Offeror February 6, 2025 Date Packet Pg. 151 8.a u 2.1 - COST FILE This proposal outlines the total all-inclusive not -to -exceed maximum price of $84,900, which encompasses all the necessary tasks, deliverables, and expenses associated with successfully completing the scope of work outlined in the request for proposals. Our cost proposal includes detailed budgets for each significant milestone, providing transparency and ensuring that all aspects of the project are accounted for. Our goal is to provide a comprehensive and competitive cost proposal that reflects our understanding of the project's requirements and our commitment to delivering high - quality results. Task/Milestones Phase 1: Planning Process & Organization of Resources Cost d $7,500 Phase 2: Hazard Identification $9,900 Phase 3: Risk Assessment $18 200 Phase 4: Mitigation Strategy Development $17,300 Phase 5: Plan Preparation & Drafting $14,500 Phase 6: Public Outreach & Engagement $9,500 Phase 7: Plan Approval, Adoption & Integration $8,000 Total Fixed -Fee: $84,900 EXCLUSIONS The following program expenses are not included in consultant fees and are the responsibility of the City, if necessary - • Printing of program materials • Public Meeting Notices • Venue rental fees • Advertisement/marketing expenses • Food and beverages for trainings and/or meetings • Translation Services - In-person/documents INVOICING SCHEDULE: Monthly invoices will be submitted based on a percentage of milestones completed. LATE PAYMENT FEE All invoices are due and payable within 30 days of the invoice date. Any invoice not paid within 30 days will be subject to a late payment fee. A fee of 1.5% per month will be added to the outstanding balance until the invoice is paid in full. The proposal is a firm offer for a 120-day period, and the proposed work will be performed at the "not - to -exceed" price OF $85,000. Jacob Green President & CEO 11 n G F 17 Packet Pg. 152 8.a JGA will not use Subcontractors for this project DESIGNATION OF SUBCONTRACTORS/SUBCONSULTANTS PROPOSAL # CMO-24-25-15 Local Hazard Mitigation Plan Update Consultant City of Santa Clarito, California Listed below are then a mes and locations of the places of business of each subcontractor, supplier, and vendor who will perform work or labor or render service in excess of % of 1 percent, or $10,000 (whichever is greater) ofthe prime contractor's total bid. If no Subcontractors will be used fill out the form with NA. Please add additional sheets if needed. Subcontractor DIR Registration No. Dollar Value of Work Location and Place of Business Bid Schedule Item No's: Description of Work License No. Exp. Date: / / Phone ( ) Subcontractor DIR Registration No. Dollar Value of Work Location and Place of Business Bid Schedule Item No's: Description of Work License No. Exp. Date: / / Phone ( ) Subcontractor DIR Registration No. Dollar Value of Work Location and Place of Business Bid Schedule Item No's: Description of Work License No. Exp. Date: / / Phone ( ) NOTE: A contractor or subcontractor shall not be qualified to propose on, be listed in a proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5 of the Labor Code. It is not a violation of this section for an unregistered contractorto submit a proposal that is authorized by Section 7029.1 ofthe Business and Professions Code or by Section 10164 or 20103.5 ofthe Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 ofthe Labor Code at the time the contract is awarded. Packet Pg. 153 8.a GOVERNMENT -WIDE DEBARMENT AND SUSPENSION (NONPROCURMENT) PROPOSAL # CMO-24-25-15 Local Hazard Mitigation Plan Update Consultant City of Santa Clarito, California Instructions for Certification: By signing and submitting this bid or proposal, the prospective lower tier participant is providing the signed certification set out below. (1) It will comply and facilitate compliance with U.S. DOT regulations, "Nonprocurement Suspension and Debarment," 2 CFR part 1200, which adopts and supplements the U.S. Office of Management and Budget (U.S. OMB) "Guidelines to Agencies on Governmentwide Debarment and Suspension (Nonprocurement)," 2 CFR part 180, (2) To the best of its knowledge and belief, that its Principals and Subrecipients at the first tier: Are eligible to participate in covered transactions of any Federal department or agency and are not presently: (1) Debarred, (2) Suspended, (3) Proposed for debarment, (4) Declared ineligible, (5) Voluntarily excluded, or (6) Disqualified, b. Its management has not within a three-year period preceding its latest application or proposal been convicted of or had a civil judgment rendered against any of them for: (1) Commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State, or local) transaction, or contract under a public transaction, (2) Violation of any Federal or State antitrust statute, or (3) Commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making any false statement, or receiving stolen property, C. It is not presently indicted for, or otherwise criminally or civilly charged by a governmental entity (Federal, State, or local) with commission of any of the offenses listed in the preceding subsection 2.b of this Certification, d. It has not had one or more public transactions (Federal, State, or local) terminated for cause or default within a three-year period preceding this Certification, e. If, at a later time, it receives any information that contradicts the statements of subsections 2.a — 2.d above, it will promptly provide that information to FTA, It will treat each lower tier contract or lower tier subcontract under its Project as a covered lower tier contract for purposes of 2 CFR part 1200 and 2 CFR part 180 if it: (1) Equals or exceeds $25,000, a 0 L a Q C9 a� E U Q Packet Pg. 154 8.a (2) Is for audit services, or (3) Requires the consent of a Federal official, and It will require that each covered lower tier contractor and subcontractor: (1) Comply and facilitate compliance with the Federal requirements of 2 CFR parts 180 and 1200, and (2) Assure that each lower tier participant in its Project is not presently declared by any Federal department or agency to be: a. Debarred from participation in its federally funded Project, b. Suspended from participation in its federally funded Project, c. Proposed for debarment from participation in its federally funded Project, d. Declared ineligible to participate in its federally funded Project, e. Voluntarily excluded from participation in its federally funded Project, or f. Disqualified from participation in its federally funded Project, and (3) It will provide a written explanation as indicated on a page attached in FTA's TEAM -Web or the Signature Page if it or any of its principals, including any of its first tier Subrecipients or its Third Party Participants at a lower tier, is unable to certify compliance with the preceding statements in this Certification Group. Certification Contractor Jacob Green & Associates N CL O Signature of Authorized Official Date 02/06/25 a Q Name and Title of Contractor's Authorized Official Jacob Green, President &CEO r c m E t c� r r Q Packet Pg. 155 8.a EQUAL OPPORTUNITY/AFFIRMATIVE ACTION STATEMENT PROPOSAL # CMO-24-25-15 Local Hazard Mitigation Plan Update Consultant City of Santa Clarito, California The offeror hereafter described will not discriminate against any employee or applicant for employment because of race/color, national origin, sex, sexual preference, religion, age, or handicapped status in employment or the provisions of services. Signature Jacob Green, President & CEO Typed Name and Title Packet Pg. 156 8.a NOTICE TO PROPOSERS REGARDING CONTRACTUAL REQUIREMENTS PROPOSAL # CMO-24-25-15 Local Hazard Mitigation Plan Update Consultant City of Santa Clarita, California 1. SUMMARY OF CONTRACTUAL REQUIRMENTS a. A contract is required for any service performed on behalf of the City of Santa Clarita (City). b. By submitting a proposal, you have reviewed the sample contract documents contained within this request for proposals and agree to be bound by the requirements set forth. c. Questions and requests for modification of these terms must be negotiated and approved prior to proposal submission and are at the full discretion of the City. 2. SUMMARY OF INDEMNITY AND INSURANCE REQUIREMENTS a. These are the Indemnity and Insurance Requirements for Contractors providing services or supplies to City of Santa Clarita (City). By agreeing to perform the work or submitting a proposal, you verify that you comply with and agree to be bound by these requirements. If any additional Contract documents are executed, the actual Indemnity language and Insurance Requirements may include additional provisions as deemed appropriate by City's Purchasing Agent. b. You should check with your Insurance advisors to verify compliance and determine if additional coverage or limits may be needed to adequately insure your obligations under this agreement. These are the minimum required and do not in any way represent or imply that such coverage is sufficient to adequately cover the Contractor's liability under this agreement. The full coverage and limits afforded under Contractor's policies of Insurance shall be available to Buyer and these Insurance Requirements shall not in any way act to reduce coverage that is broader or includes higher limits than those required. The Insurance obligations under this agreement shall be: 1—all the Insurance coverage and limits carried by or available to the Contractor; or 2—the minimum Insurance requirements shown in this agreement, whichever is greater. Any insurance proceeds in excess of the specified minimum limits and coverage required, which are applicable to a given loss, shall be available to City. c. Contractor shall furnish the City with original Certificates of Insurance including all required amendatory endorsements and a copy of the Declarations and Endorsement Page of the CGL policy listing all policy endorsements to City before work begins. City reserves the right to require full -certified copies of all Insurance coverage and endorsements. 3. INDEMNIFICATION a. To the fullest extent permitted by law, CONSULTANT shall defend (with legal counsel reasonably acceptable to CITY), indemnify and hold harmless CITY and its officers, agents, departments, officials, representatives and employees (collectively "Indemnitees") from and against any and all claims, loss, cost, damage, injury (including, without limitation, economic harm, injury to or death of an employee of CONSULTANT or its subconsultants), expense and liability of every kind, nature and description that arise Packet Pg. 157 8.a from or relate to (including, without limitation, incidental and consequential damages, court costs, attorneys' fees, litigation expenses and fees of expert consultants or expert witnesses incurred in connection therewith and costs of investigation) that arise from or relate to, directly or indirectly, in whole or in part, from: (1) CONSULTANT's performance of Services under this Agreement, or any part thereof; (2) any negligent act or omission of CONSULTANT, any subconsultant, anyone directly or indirectly employed by them, or anyone that they control; (3) any actual or alleged infringement of the patent rights, copyright, trade secret, trade name, trademark, service mark or any other intellectual or proprietary right of any person or persons in consequence of the use by CITY, or any other Indemnitee, of articles or Services to be supplied in the performance of this Agreement; or (4) any breach of this Agreement (collectively "Liabilities"). Such obligations to defend, hold harmless and indemnify any Indemnitee shall not apply to the extent such Liabilities are caused by the sole negligence or willful misconduct of such Indemnitee, but shall apply to all other Liabilities. The foregoing shall be subject to the limitations of California Civil Code section 2782.8 as to any design professional services performed by CONSULTANT and in particular the limitation on CONSULTANT's duty to defend whereby such duty only arises for claims relating to the negligence, recklessness or willful misconduct of CONSULTANT as well as the limitation on the cost to defend whereby CONSULTANT will only bear such cost in proportion to CONSULTANT's proportionate percentage of fault (except as otherwise provided in section 2782.8). b. The foregoing indemnification provisions will not reduce or affect other rights or obligations which would otherwise exist in favor of the CITY and other Indemnitees. c. CONSULTANT shall place in its subconsulting agreements and cause its subconsultants to agree to indemnities and insurance obligations in favor of CITY and other Indemnitees in the exact form and substance of those contained in this Agreement. 4. INSURANCE a. Before commencing performance under this Agreement, and at all other times this Agreement is effective, CONSULTANT will procure and maintain the following types of insurance with coverage limits complying, at a minimum, with the limits set forth below: Type of Insurance Limits Commercial general liability: $1,000,000 Professional liability $1,000,000 Business automobile liability $1,000,000 Workers compensation Statutory requirement b. Commercial general liability insurance will meet or exceed the requirements of ISO-CGL Form No. CG 00 01 11 85 or 88. The amount of insurance set forth above will be a combined single limit per occurrence for bodily injury, personal injury, and property damage for the policy coverage. Automobile coverage will be written on ISO Business Auto Coverage Form CA 00 0106 92, including symbol 1 (Any Auto). Liability policies will be endorsed to name CITY, its officials, and employees as "additional insureds" under said insurance coverage and to state that such insurance will be deemed "primary" such that any other insurance that may be carried by CITY will be excess thereto. Such endorsement must be reflected on ISO Form No. CG 20 10 1185 or 88, or equivalent. Such insurance will be on an "occurrence," not a "claims Packet Pg. 158 8.a made," basis and will not be cancelable or subject to reduction except upon thirty (30) days prior written notice to CITY. c. Professional liability coverage will be on an "occurrence basis" if such coverage is available, or on a "claims made" basis if not available. When coverage is provided on a "claims made basis," CONSULTANT will continue to renew the insurance for a period of at least three (3) years after this Agreement expires or is terminated. Such insurance will have the same coverage and limits as the policy that was in effect during the term of this Agreement, and will cover CONSULTANT for all claims made by CITY arising out of any errors or omissions of CONSULTANT, or its officers, employees or agents during the time this Agreement was in effect. d. CONSULTANT will furnish to CITY duly authenticated Certificates of Insurance evidencing maintenance of the insurance required under this Agreement, including endorsements, and such other evidence of insurance or copies of policies as may be reasonably required by CITY from time to time. Insurance must be placed with California -admitted insurers with (other than workers compensation) a current A.M. Best Company Rating of at least "A:VII." e. Waiver of Subrogation: The insurer(s) agree to waive all rights of subrogation against CITY, its elected or appointed officers, officials, agents, volunteers and employees for losses paid under the terms of the workers compensation policy which arise from work performed by CONSULTANT for CITY. f. Should CONSULTANT, for any reason, fail to obtain and maintain the insurance required by this Agreement, CITY may obtain such coverage at CONSULTANT's expense and deduct the cost of such insurance from payments due to CONSULTANT under this Agreement or terminate pursuant to TERMINATION section. In the alternative, should CONSULTANT fail to meet any of the insurance requirements under this Agreement, City may terminate this Agreement immediately with no penalty. g. Should CONSULTANT'S insurance required by this Agreement be cancelled at any point prior to expiration of the policy, CONSULTANT must notify City within 24 hours of receipt of notice of cancellation. Furthermore, CONSULTANT must obtain replacement coverage that meets all contractual requirements within 10 days of the prior insurer's issuance of notice of cancellation. CONSULTANT must ensure that there is no lapse in coverage. h. The CITY shall be entitled to any coverage in excess of the minimums required herein. I have read and understand the above requirements and agree to be bound by them for any work performed for the City. Authorized Signature: Date: February 6, 2025 Printed Name: Jacob Green Packet Pg. 159 JACOB GREEN &ASSOCIATES 13217 Jamboree Road #248 Jacob GreenAndAssociates.com Q A I Packet Pg. 160 m Cover r Letter LETTER FROM CEO JACOB GREEN Page 1 c !a a Section c o 1.1.1 INTRODUCTION Page 2 L Section 1.1.2 REFERENCES = rt Page 3 p J Section �a 1.1.3 PLAN OF STUDY/SCOPE OF WORK c L Pages 4 - 10 d Q Section r 1.1.4 SCHEDULE E Page 11 V !a r Section r Q 1.1.5 PROGRAM MANAGEMENT Page 12 Section 1.1.6 PERSONNEL, EQUIPMENT, AND FACILITIES Pages 13 -16 Section 2.1 COST FILE Pages 17 Packet Pg. 161 8.a 1.888.4.JGA.IST I INFO@JACOBGRFENANDASSOCIAT February 6, 2025 Jaclyn Abston City of Santa Clarita 23920 Valencia Blvd. Santa Clarita, CA 91355 Dear Ms. Abston, Jacob Green & Associates (JGA) is pleased to submit our proposal in response to the Request for Proposals (RFP) No.CMO-24-25-15 for the City of Santa Clarita Local Hazard Mitigation Plan (LHMP). We value the opportunity to work alongside the City. With our extensive local government experience in Southern California emergency management and LHMP development, we are well-equipped to deliver a comprehensive and actionable LHMP that addresses Santa Clarita's unique hazards and vulnerabilities. Our team of dedicated professionals brings a wealth of knowledge and expertise to this project. Through collaboration, stakeholder engagement, and the utilization of cutting -edge methodologies and technologies, we are committed to developing an LHMP that reflects Santa Clarita's distinct characteristics and meets the requirements of relevant regulations, including the Disaster Mitigation Act of 2000 and applicable state legislation. Patrick Marchman, AICP, will be JGA's project manager for the City of Santa Clarita. Patrick has 20 years of experience in the hazard mitigation, environmental, and climate adaptation fields. Patrick served as a Project Manager for hazard mitigation and disaster risk reduction planning while working with the U.S. Federal Emergency Management Agency, writing and reviewing over a dozen hazard mitigation plans. Additionally, Patrick led several projects at local and state levels, as well as for private sector clients, and worked with FEMA Region VII on direct community engagement to operationalize hazard mitigation plans across a four -state area. Effective collaboration and open communication are central to our approach. Thank you for considering Jacob Green & Associates as your trusted partner for the LHMP project. We are excited about the opportunity to contribute to the safety and resilience of the City of Santa Clarita. Sincerely, Jacob Green President & CEO PAGE I HE ACOB GREEN Packet Pg. 162 8.a 1.1.1 - INTRODUCTION JGA is an Orange County -based corporation comprised of 30 veteran local government leaders with over 600 years of combined municipal experience; it includes former City Managers, Emergency Managers, Police Chiefs, Fire Chiefs, and other municipal experts. We help our clients prepare for and respond to challenges in Emergency Management, Organizational Development, Crisis Communications, and Public Safety. We provide tailored services by developing a deep understanding of client needs, fostering authentic and trusted relationships, and focusing on solutions and outcomes that consistently exceed expectations. What sets JGA apart? Hazard Mitigation Planning In 2023, FEMA implemented changes to the Hazard Mitigation Plan (HMP) process that have radically; tightened the requirements for what will pass CalOES and FEMA review, and has resulted in a backlog of Q over 120 plans in the queue for review and approval by CalOES and FEMA. These changes include: c 0 • Much deeper examination of the impacts of climate change. r_ 0 r • Requirements to substantively address social equity and disadvantaged populations, a, r • More thorough stakeholder and public involvement processes, encouraging the public to not only comment on the final product, but to have stakeholder and public input be an integral part of the N process. _ c� JGA has developed a deep understanding of FEMA's new requirements through our close collaboration 0 with Cal OES. We've refined our methodologies to align precisely with current FEMA expectations, ensuring our hazard mitigation plans meet and exceed the latest standards. Our ability to ) deliver plans that satisfy today's rigorous criteria, not outdated benchmarks, positions JGA as the 0 optimal partner for Santa Clarita's HMP project. a. Beyond hazard mitigation, JGA has built a broader planning practice focusing on climate action and r adaptation planning, economic development, and comprehensive planning. We are currently delivering E these services to City governments throughout California, allowing us to bring a holistic perspective to your LHMP update. r a JGA has completed a wide range of resilience and emergency management -related projects, including the following hazard mitigation plans: • City of West Hollywood Local Hazard Mitigation Plan Update • City of Rialto Local Hazard Mitigation Plan Update • Rincon Band of Luiseno Indians Local Hazard Mitigation Plan Update • City of Lake Forest Local Hazard Mitigation Plan Update • City of Montebello Local Hazard Mitigation Plan Update In addition to these plans, we are currently engaged in developing the following plans: • City of Santa Fe Springs Local Hazard Mitigation Plan Update • City of Seaside Climate Action and Adaptation Plan �coB GREEN PAGE 2 Packet Pg. 163 8.a 1.1.2 - REFERENCES CITY OF WEST HOLLYWOOD Margarita Kustanovich, Emergency Management Coordinator mkustanovich@weho.org 323.848.6419 Local Hazard Mitigation Plan CITY OF RIALTO Brian Park, Fire Chief bpark@confire.org 909.820.2501 Emergency Management Support Services and Local Hazard Mitigation Plan Oa�a ofLQ�o RINCON BAND OF LUISENO INDIANS a Chip Duncan, Fire Chief cduncan@rincon-nsn.gov 760.297.2300 Ext. 533 Tribal Hazard Mitigation Plan CITY OF SAN JUAN CAPISTRANO �9 Ben Siegel, City Manager U �96im bsiegel@sanjuancapistrano.org �'9LIFl�AN 949.234.4563 Emergency Management Support Services: Gap Analysis and Workplan; Emergency Operations Plan, Disaster Recovery Plan, Continuity of Operations Plan, Local Hazard Mitigation Plan, Training & Exercise Support J�PL'N CITY OF LAKE FOREST 9� JM z Sharlyn De La Paz, Administrative Manager sdelapaz@lakeforestca.gov 949.282.5215 local Hazard Mitigation Plan and Comprehensive Emergency Management Services PAGE 3 Packet Pg. 164 8.a 1.1.3 - PLAN OF STUDY/SCOPE OF WORK The proposed Scope of Work outlines the structured and collaborative approach that Jacob Green and Associates (JGA) will implement in partnership with City of Santa Clarita staff, the Planning and Steering Committees, and key community stakeholders to develop an updated Local Hazard Mitigation Plan (LHMP). The updated LHMP will meet FEMA's latest mitigation planning standards, comply with State of California regulatory mandates, and align with the City's goal of integrating the plan into the Safety Element of the General Plan. The LHMP will be developed in full compliance with federal, state, and local requirements, including: • Disaster Mitigation Act of 2000 (DMA 2000) - Establishing the requirement for local hazard mitigation planning. • 44 CFR Part 201.6 - FEMA's Local Mitigation Plan Requirements.CL AB 2140 (2006) -Facilitating the integration of hazard mitigation into general plans. • SB 379 (2015) & SB 1000 (2016) -Addressing climate change vulnerability and a. environmental justice in hazard mitigation. o • SB 1241 (2012) -Enhancing wildfire risk reduction within local planning efforts. • Government Code Sections 65302(g)(4) and 65302.15 -Ensuring alignment between hazard mitigation planning and local safety elements. L N M The plan will also incorporate FEMA's 2022 Local Mitigation Planning Policy Guide and April 2023 updates, which emphasize: c J • Robust public and stakeholder engagement N • Climate change considerations in hazard identification, risk assessment, and c mitigation strategy development. a` • Equity -focused planning, ensuring that vulnerable and historically underserved populations are included in risk reduction efforts per Cal OES and FEMA guidance r • Integration with regional and local planning efforts, ensuring compliance with Cal OES and FEMA guidelines. r r JGA brings extensive experience in developing FEMA-compliant hazard mitigation plans, ensuring a that Santa Clarita's LHMP is data -driven, strategic, and actionable. 8.a PHASE 1: PLANNING PROCESS AND ORGANIZATION OF RESOURCES Project Kickoff Meeting & Initial Coordination Jacob Green & Associates (JGA) will initiate the City of Santa Clarita's Local Hazard Mitigation Plan (LHMP) Update by facilitating a project kickoff meeting with City staff. This meeting will establish the foundation for a FEMA-compliant, climate -informed, and equity -focused hazard mitigation planning process, aligning with the FEMA Local Mitigation Planning Handbook, the 2022 Local Mitigation Planning Policy Guide, and 44 CFR Part 201. The kickoff meeting will confirm project objectives and deliverables, ensuring that the hazard identification, risk assessment, and mitigation strategy fully incorporate the current and future effects of climate change, as required under SB 379 and SB 1000. JGA will work with City staff to establish key milestones and deadlines within the 24-month period of performance and outline an engagement strategy that fosters robust participation from internal and external stakeholders, including historically underserved populations. Q. To ensure compliance with FEMA, Cal OES, and state requirements, bi-weekly check -in meetings will be r_ scheduled between JGA and City staff. These meetings will serve to: a • Track progress and adjust timelines as needed to meet Cal OES and FEMA review requirements. c • Clarify deliverables and maintain alignment with federal and state hazard mitigation standards. • Address issues in real time to keep the project on schedule. r L By implementing a structured project management approach, JGA will facilitate an efficient, transparent, and federally compliant LHMP update that enhances Santa Clarita's eligibility for FEMA x hazard mitigation funding. 0 J Formation of Planning CommitteeCL JGA will facilitate the formation of a Planning Committee to guide the LHMP update. This committee o will be structured to ensure compliance with FEMA's Local Mitigation Planning Handbook and to meet a SB 379 and SB 1000 requirements by integrating climate adaptation and environmental justice considerations into the planning process. We will reach out to all relevant City departments and work r with them to maximize opportunities for participation. To ensure an inclusive and actionable LHMP, E JGA will define committee roles and responsibilities, guiding members in: JGA will coordinate outreach efforts to ensure diverse participation, extending invitations to: r a • Providing localized risk data and past hazard impact insights to inform the risk assessment. • Assisting in public engagement efforts to ensure broad community participation. • Identifying new mitigation projects that align with the City's hazard mitigation and climate resilience goals. • Reviewing draft LHMP sections to ensure a comprehensive, data -driven, and equity -focused plan. Formation of Steering Committee JGA will also facilitate the formation of a Steering Committee to be made up of interested stakeholders who will provide input at important stages in the LHMP development process. As required by recent FEMA guidance, invitations will be extended to organizations in the following sectors; Local government (neighboring cities, Los Angeles County, the Southern California Association of Governments), the local business community, local schools and academia, community organizations and other non -profits, and Organizations working with vulnerable populations IACOB GREEN PAGE 5 Packet Pg. 166 8.a PHASE 2: HAZARD IDENTIFICATION JGA will conduct a comprehensive hazard identification process that aligns with FEMA's Local Mitigation Planning Handbook (Tasks 1, 4, and 5) and the 2023 Local Mitigation Planning Policy Guide to ensure the City of Santa Clarita's LHMP meets federal and state requirements. This process will define the planning area, establish the methodology and resources, and conduct a thorough risk assessment incorporating historical hazard occurrences and future projections. The assessment will begin by reviewing and expanding upon the City's existing hazard mitigation framework, integrating FEMA's National Risk Index, California -specific hazard data, and local insights provided by City staff and the Planning Committee. This collaborative approach will ensure that the most relevant hazards —including climate -driven risks such as extreme heat, drought, and flooding —are identified and prioritized based on historical impacts, evolving climate conditions, and projected future vulnerabilities. Each selected hazard will be meticulously profiled to provide a comprehensive understanding of its characteristics, frequency, and potential consequences. The profiling process will include an in-depth analysis of historical hazard occurrences, using local records, state databases, and FEMA disaster declarations to assess past impacts on Santa Clarita's population, infrastructure, economy, and environment. Advanced modeling tools and predictive analytics will be utilized to forecast future hazard occurrences, incorporating climate adaptation considerations in line with FEMA and SB 379 requirements. To ensure an equity -focused approach to mitigation planning, JGA will evaluate hazard -specific vulnerabilities in historically underserved communities, critical facilities, and essential services. This assessment will highlight disproportionate risks, informing the development of targeted mitigation actions that address Santa Clarita's most at -risk populations. PHASE 3: RISK ASSESSMENT A comprehensive risk assessment will be conducted to evaluate the probability, severity, and potential impacts of natural, man-made, and technological hazards on Santa Clarita's population, economy, infrastructure, and environment. This assessment will align with FEMA's 2022 Local Mitigation Planning Policy Guide, California state requirements, and Santa Clarita's LHMP RFP, ensuring compliance with federal, state, and local mitigation standards. The risk assessment will specifically identify and rank the City's top 10 hazards in order of greatest risk, integrating historical data, scientific modeling, and future climate projections. Climate change factors will be addressed throughout the assessment, ensuring an understanding of how hazards are evolving and their long-term impacts across Santa Clarita's diverse communities. The findings will provide a data - driven foundation for prioritizing mitigation actions that enhance resilience. PAGE G IACOB GREEN Packet Pg. 167 8.a Comprehensive Risk Analysis The assessment will analyze historical hazard occurrences and future climate conditions to determine hazard likelihood, frequency, and severity. Special attention will be given to climate -driven changes, such as increasing flooding, extreme heat, and drought frequency. Each identified hazard will be examined in detail, with probability assessments, damage potential, and mitigation opportunities documented to support decision -making. Man-made and technological hazards, including infrastructure failures and hazardous materials incidents, will also be assessed to ensure a holistic understanding of Santa Clarita's risks. Vulnerability Assessment To quantify hazard impacts, a vulnerability analysis will assess the exposure of critical assets, infrastructure, and populations. The City's residential, commercial, public, and transportation assets will be cataloged and cross-referenced with FEMA's Repetitive Loss and Severe Repetitive Loss property data, incorporating information from the Los Angeles County Assessor's Office to identify high -risk locations. Social vulnerability factors —including low-income populations, seniors, and non- English -speaking residents —will be examined to ensure equitable mitigation planning and targeted resource allocation. Capability Assessment The City's existing hazard mitigation capacity will be reviewed to identify strengths, gaps, and areas for enhancement. Santa Clarita's building codes, zoning ordinances, and floodplain management strategies will be analyzed to determine their effectiveness in reducing hazard risks. The assessment will also review National Flood Insurance Program (NFIP) participation and Community Rating System (CRS) compliance, ensuring alignment with FEMA regulations and identifying opportunities to improve flood resilience. Financial, technical, and human resources available for hazard mitigation will be examined, with funding opportunities identified through FEMA programs such as Hazard Mitigation Assistance (HMA), Building Resilient Infrastructure and Communities (BRIC), and Flood Mitigation Assistance (FMA). Strategic recommendations will be provided to enhance the City's resilience -building capacity, ensuring that mitigation strategies are both feasible and effective. PHASE 4: MITIGATION STRATEGY DEVELOPMENT The Mitigation Strategy for Santa Clarita's Local Hazard Mitigation Plan (LHMP) Update will establish a framework for reducing risk, protecting lives and property, and ensuring community resilience. This strategy will align with FEMA's requirements, including the three main components: Goals, Actions, and an Action Plan, as outlined in the Local Mitigation Planning Policy Guide (2022). The Planning Committee, consisting of internal City divisions, and the Steering Committee, composed of external agencies and public representatives, will collaborate to shape the strategy, incorporating insights from the risk assessment to guide mitigation priorities. PAGE 7 IACOB GREEN Packet Pg. 168 8.a Mitigation Goals The goals of the mitigation strategy will be developed based on findings from the risk assessment and vulnerability analysis. These goals will focus on addressing the City's top hazards, integrating mitigation efforts into Santa Clarita's Safety Element of the General Plan, and ensuring life safety, property protection, and continuity of essential services. The objectives supporting these goals will include measurable benchmarks to track progress, incorporation of public input from engagement efforts, and equity -driven approaches that prioritize vulnerable populations. Mitigation Actions A comprehensive set of mitigation actions will be identified and prioritized to address Santa Clarita's highest -risk hazards. Actions will include both existing efforts already underway and new strategies developed through input from the Planning and Steering Committees. Each action will be evaluated based on risk reduction potential, cost-effectiveness, feasibility, equity impacts, and environmental co- r benefits. Q. To support successful implementation, each mitigation action will be categorized by: c a • Implementation timeline (short-term, medium -term, long-term). c • Funding sources, such as FEMA's BRIC program, Hazard Mitigation Grant Program (HMGP), and Flood Mitigation Assistance (FMA). °1 r • Lead agencies and key partners responsible for execution. L Action Plan & Implementation N x The Action Plan will outline the process for prioritizing, funding, and implementing mitigation measures. Actions will be ranked based on risk reduction potential and cost -benefit analysis, ensuring _OJ alignment with FEMA funding eligibility. The plan will also establish monitoring mechanisms to track progress, measure effectiveness, and adjust strategies over time. c L PHASE FIVE: PLAN PREPARATION a The City of Santa Clarita and JGA will follow the City's established process for developing policy documents to ensure a well -structured, FEMA-compliant Local Hazard Mitigation Plan (LHMP). This phased approach will facilitate internal review, stakeholder engagement, and regulatory compliance r while integrating key findings from the risk assessment, vulnerability analysis, and mitigation strategy a development. JGA will prepare a First Draft Plan, incorporating inputs from the Planning Committee and aligning with 44 CFR Part 201, FEMA's 2022 Local Mitigation Planning Policy Guide, and Cal OES requirements. This draft will include: • A comprehensive hazard identification and historical data analysis to document past hazard occurrences and their impacts. • A detailed risk and vulnerability assessment identifying high -risk areas and populations. • A mitigation strategy outlining prioritized actions to enhance resilience. • A capability assessment to align hazard mitigation efforts with existing City policies and planning frameworks. Upon completion, the First Draft will be internally reviewed by the Planning Committee, who will recommend necessary revisions before advancing to the next phase. IACOB GREEN PAGE 8 Packet Pg. 169 8.a Stakeholder Review and Plan Refinement Following internal revisions, a Second Draft Plan will be shared with the Steering Committee, which consists of representatives from external agencies and the general public. This phase will allow for broad input on mitigation priorities, feasibility, and alignment with community needs. Based on Steering Committee feedback, JGA will prepare a Third Draft Plan, incorporating additional refinements as needed. The finalized draft will then be submitted to Cal OES and FEMA for regulatory review to ensure full compliance with federal and state hazard mitigation standards. Enhanced Clarity, Accessibility, and Engagement JGA will ensure the LHMP is accessible and visually engaging, incorporating: • High -quality illustrations to illustrate risk areas and mitigation priorities. • Data -driven charts and tables to present hazard profiles and potential loss estimates. • Clear, structured language and call -out sections to highlight key findings and action steps. CL c Throughout the plan development process, JGA will maintain continuous collaboration with the Planning a Committee, City staff, and key stakeholders, ensuring the LHMP is well-informed, actionable, and aligned c with Santa Clarita's long-term resilience goals. PHASE SIX: PUBLIC OUTREACH & ENGAGEMENT L JGA is committed to ensuring that the Local Hazard Mitigation Plan (LHMP) update is a community- N driven process, with direct input from residents, businesses, and organizations shaping the City's = resilience strategies. Our public engagement approach will emphasize inclusivity, accessibility, and c transparency, with a specific focus on vulnerable communities that may be disproportionately affected 0_ by natural and man-made hazards. Feedback from these communities will be documented and ,j integrated into the hazard identification, risk assessment, and mitigation strategy components of the c LHMP, a` a Community Meetings & Stakeholder Engagement r At the earliest stages of the project, JGA will work with the City to decide upon the most appropriate mix of in -person and virtual public meetings in order to provide the broadest practical range of opportunities for public participation. These meetings will serve to educate the public, collect r community input, and foster meaningful discussions on hazard mitigation priorities and strategies. a Community members —especially those from historically underserved and vulnerable populations —will be encouraged to share their experiences, concerns, and ideas for mitigation actions. This approach will help ensure that the LHMP reflects the needs of all Santa Clarita residents, including renters, seniors, non-English speakers, and low-income households. PAGE 9 IACOB GREEN Packet Pg. 170 Public Information & Digital Outreach To complement in -person engagement, JGA will support the City in expanding digital outreach efforts through the City's website, social media platforms, and partner organizations. The outreach strategy will include: Regular updates on the LHMP process through the City's communication channels. Fact sheets, infographics, and FAQ documents summarizing hazard risks and proposed mitigation actions. • Bilingual outreach materials to ensure equitable access to information. By leveraging digital platforms and community networks, Santa Clarita will broaden public participation, ensuring that diverse voices contribute to the LHMP update. Integration of Public Feedback r All public input will be systematically documented and incorporated into the LHMP, ensuring that community priorities are reflected in the hazard identification, risk assessment, and mitigation strategy a sections. Feedback will be collected through: a. c • Public meeting records and summaries. c r • Online survey responses and digital engagement metrics. a, • Stakeholder interviews and outreach to community partners. g This feedback will be analyzed and used to refine mitigation strategies, ensuring that they address the concerns of Santa Clarita's residents. Sensitive infrastructure data will be redacted from publicly shared NM documents in accordance with FEMA and federal guidelines, while maintaining an open and rt participatory planning process. 0 PHASE SEVEN: PLAN APPROVAL, ADOPTION & INTEGRATION N 0 The updated Local Hazard Mitigation Plan (LHMP) will be submitted to Cal OES for initial review and a` approval, followed by submission to FEMA for final approval no later than six months before the grant closeout deadline. Upon approval, the LHMP will be formally adopted by the Santa Clarita City Council and integrated into the Safety Element of the City's General Plan, in compliance with AB 2140. E State and Federal Review Process 0 r r Following public review, the LHMP will be submitted for formal regulatory approval through the Cal OES a and FEMA review processes: Step 1: Cal OES Review - The draft plan will be submitted to Cal OES, which has 45 days to complete its review. Any required revisions will be addressed through direct coordination with Cal OES staff to ensure full compliance. Once approved, the plan will be forwarded to FEMA Region IX. Step 2: FEMA Review - FEMA will complete its review within 45 days of receiving the plan from Cal OES. If modifications are needed, JGA will work closely with FEMA staff to make the necessary adjustments and secure final approval. Although approval timelines are subject to Cal OES and FEMA capacity and internal considerations and may result in delays out of the control of either the City or JGA, JGA will ensure prompt responses to revision requests, facilitating an efficient review and approval process, and commits to working with the City through the entire process until formal adoption of the LHMP by the City and acknowledgement by FEMA. EE IACOB GREEN PAGE 10 Packet Pg. 171 8.a City Council Adoption and General Plan Integration Once FEMA grants final approval, JGA will assist the City in preparing the final LHMP for adoption by the Santa Clarita City Council, a critical step in securing FEMA compliance and AB 2140 eligibility. JGA will: Finalize the document by incorporating any remaining Cal OES and FEMA-required modifications. Provide briefings and presentation materials for City Council review to ensure decision -makers understand the plan's objectives, mitigation actions, and long-term benefits. Support the City in seamlessly integrating the LHMP into the General Plan's Safety Element, ensuring hazard mitigation remains a core component of Santa Clarita's long-term planning framework. 1.1.4 - SCHEDULE Phase 1: Planning Process & Organization of Resources „ , 4 weeks Phase 2: Hazard Identification 8 weeks Phase 3: Risk Assessment 6 weeks Phase 4: Mitigation Strategy Development 6 weeks Phase 5: Plan Preparation & Drafting 8 weeks Phase 6: Public Outreach & Engagement Ongoing Phase 7: Plan Approval, Adoption & Integration" 6 weeks Duration: 42 weeks **Phase 7 Time for Completion refers to direct work between JGA and the City and does not include the Cal OES and FEMA review periods detailed in Phase 7 above. Cal OES and FEMA review timelines are subject to issues outside of the control of the City or JGA, including internal capacity and overall workloads. JGA will not be held responsible for delays caused by Cal OES or FEMA. PAGE 11 IACOB GREEN Packet Pg. 172 8.a 1.1.5 P RO G RAM MANAG E M E N T For a more flexible and iterative approach to managing the LHMP Project, we can use an Adaptive Management Framework. This method allows for continuous learning, stakeholder feedback integration, and iterative updates throughout the project lifecycle. 8.a 1.1.6 - PERSONNEL, FACILITIES LEADERSHIP TEAM EQUIPMENT, AND JACOB GREEN, MPA President & CEO Jacob is a nationally recognized local government expert in organization and leadership development. As an Assistant City Manager for the City of San Juan Capistrano and the City of Ontario, he has managed hundreds of employees and managed numerous government departments. As a trainer, keynote speaker, facilitator, and coach, Jacob has worked with municipal clients, as well as commercial clients such as Mattel, FedEx, Hyundai Capital, ADP, and many others. In 2019, Jacob distilled his personal and professional experiences into an Amazon Best -Selling book: "See Change Clearly: Leveraging Adversity to Sharpen Your Vision and Build Resilient Teams." Jacob has received numerous awards for his leadership, including the National Caring Award, the Orange County Human Relations Award, and Most Inspiring Student at UC Irvine, and is the youngest recipient of the Gene Lentzner Humanitarian Award. Jacob has his Bachelor of Arts in Social Sciences with a Minor in Management from the University of California, Irvine, his Master of Public Administration (MPA) degree from California State University, Long Beach, and was recently awarded an honorary doctorate degree from Western University School of Health Sciences. DAVE BROWN Director of Client Success Chief Dave Brown (ret.) is passionate about helping public sector executives and organizations succeed in a dynamic and challenging environment, especially when facing leadership, political, or personnel challenges. Chief Brown has held command positions in every division of law enforcement, including many years as a Chief of Police. He has also served as Director of Public Safety, Assistant City Manager, and had several stints as Interim City Manager. In 2017, Chief Brown was recruited by the City of Menifee, California, to spearhead the creation of the Menifee Police Department. Over the next three years, Brown created and implemented a robust, data -driven strategy, successfully launching the new Menifee Police Department on July 1, 2020. More recently, Dave served as the Executive Director of the Riverside Sheriffs' Association (RSA), one of the largest law enforcement labor organizations in the country. m r Q. c 2 a c 0 to N c� x 0 J Q. 0 a Q m E r r Q PAGE 13 L "AC RCUFFMI Packet Pg. 174 8.a NICOLE BEACH Director of Strategic Initiatives Nicole Beach is a project management and strategy delivery leader who specializes in helping organizations realize value by aligning strategy with execution. Nicole collaborates closely with our clients to develop work plans that ensure their success in executing strategic goals and provides project management oversight across all projects. Before joining JGA, Nicole amassed a wealth of experience leading complex technology, organizational, and strategic projects, including M&A integrations, ERP implementations, and process improvement initiatives. Most recently, she oversaw Project Management Offices and Strategic Portfolio Management for SAFEbuilt, Citrix, and Sport Clips. Nicole holds r certifications as a Project Management Professional (PMP) and Lean Six Q Sigma Green Belt. She also earned an MBA with a concentration in c Process Improvement from Nova Southeastern University. KEY PERSONNEL !E V O PAT RI C K MARC H MAN, Al C P Project Manager // Hazard Mitigation, Climate and Resilience Advisor Q O Patrick Marchman has 20 years of experience as a planner with a` experience in multiple components of comprehensive planning, including zoning, transportation, resilience and sustainability, environmental and economic development. His work initially focused on developing and managing the NEPA process for multi -billion -dollar infrastructure projects. Patrick then moved into hazard mitigation and disaster risk reduction planning while working with the U.S. Federal Emergency a Management Agency, writing and reviewing over a dozen hazard mitigation plans. After a four-year stint managing the environment and real estate programs and working closely with Metropolitan Planning Organizations supporting local and regional transportation planning, for the U.S. Federal Highway Administration's Michigan Division, he shifted to the private sector, supporting climate adaptation and sustainability strategy for a wide range of public and private sector clients. Since 2011, Patrick has been a member of the American Institute of Certified Planners, and has delivered presentations at national planning conferences as well as many planning -related publications. He also holds a certification in Sustainability and Climate Risk from the Global Association of Risk Professionals. Patrick has served in leadership roles in several professional organizations as well as on his City's Zoning Board of Appeals, and has a commitment to leading the development of new PAGE 14 practice areas within the planning profession. Packet Pg. 175 8.a TONY E. COLETTA JR , MPA, CEM, MPM Senior Advisor // Emergency- i....I..I Tony's focus is on assisting clients solve local challenges through innovative, cooperative, and sustainable public safety solutions. As a proven leader, he excels in problem -solving, alliance building, and organizational communication, and delivering results -driven solutions for today's municipal challenges. Tony has built highly effective emergency management teams, led multi -million -dollar regional homeland security programs, coordinated statewide public safety initiatives, authored best practice emergency plans, and leveraged federal agencies and funding to solve local homeland security and emergency management challenges. Tony Coletta brings 35 years of public safety experience, with 25 years dedicated to emergency management and homeland security administration. His expertise spans emergency planning, training and exercises, hazard and risk mitigation, organizational assessments, and strategic planning. Tony's extensive background includes state, federal, and international disaster deployments. He has made notable achievements in instructing and course design, emergency operations center design, recruitment, succession planning, and grant and performance management. Tony is an internationally Certified Emergency Manager and holds degrees in Emergency Medical Services Administration, Police Service Administration, Fire Service Administration, and Public Administration. RAYMOND CHEUNG, CEM Senior Advisor // Emergency Management Raymond Cheung has served for over 20 years in the public sector ranging from military service to leadership roles in local government. His local government emergency management tenure includes positions as a city emergency manager as well as Assistant Emergency Manager for Orange County, California for the Orange County Sheriff's Department. He is also a graduate of FEMA's National Emergency Management Advanced Academy and the Harvard Kennedy School of Government's Leadership in Crises executive program. As an International Association of Emergency Management Certified Emergency Manager (CEM), Raymond has led and managed teams at both the county and city level in Southern California. He has responded to and worked dozens of disasters and Emergency Operations Center activations, including Presidentially declared disasters. A veteran of the United States Marine Corps, he deployed to Iraq during Operation Iraqi Freedom in a Civil Affairs capacity to restore civil governance, local infrastructure, and basic humanitarian needs during and after the 2003 invasion. m Q. c 2 a c r to L N V O Q. 0 a a c m E U to r r a PAGE 15 Packet Pg. 176 8.a MEGHAN MURRAY Project Specialis' Meghan Murray has over 24 years of experience in Operations Management, Program Management, Personnel Management, Executive Communication, and Continuous Process Improvement. Meghan served in the Air Force for 22 years and has extensive background in Organizational Development. Meghan excelled in overseeing operations, professional development, and personnel programs for organizations and has directed multiple programs valued at $113 while managing risk, safety, and compliance. Meghan holds a Masters of Science degree with a specialty in Human Resource Management bringing to the team an extensive knowledge in team leadership, strategic planning, and data driven decision making. One of Meghan's most notable projects was being a strategic team lead of the Organization of the Future that led to the building of the latest branch of the military, the United States Space Force. As a Project Specialist with IGA, Meghan supports the Organizational Development and Emergency Management Departments by coordinating projects, managing timelines, and ensuring the successful execution of department initiatives. Packet Pg. 177 8.a REFERENCES PROPOSAL # CMO-24-25-15 Local Hazard Mitigation Plan Update Consultant City of Santa Clarito, California The following are the names, addresses, and telephone numbers of three public agencies for which proposer has performed work of a similar scope and size within the past 3 years. If the instructions on this form conflict with the references requested in the scope of work, the scope of work shall govern. Complete this form out accordingly. Fill out this form completely and upload it with your proposal. 1 CITY OF WEST HOLLYWOOD, 8300 Santa Monica Blvd, West Hollywood, CA 90069 Name and Address of Owner / Agency Margarita Kustanovich, Emergency Management Coordinator, mkustanovich@weho.org 323.848.6419 Name and Telephone Number of Person Familiar with Project $74,800 LHMP Oct 2024 Contract Amount Type of Work Date Completed 2. CITY OF RIALTO,150 S. Palm Avenue. Rialto, CA 92376. Name and Address of Owner / Agency Brian Park, Fire Chief, bpark@confire.org, 909.820.2501 Name and Telephone Number of Person Familiar with Project $72,800 LHMP Apr 2023 Contract Amount Type of Work Date Completed 3 CITY OF LAKE FOREST, 100 Civic Center Dr. Lake Forest, CA 92630. Name and Address of Owner / Agency Sharlyn De La Paz, Administrative Manager, sdelapaz@lakeforestca.gov, 949.282.5215 Name and Telephone Number of Person Familiar with Project $74,800 LHMP Jan 2024 Contract Amount Type of Work Date Completed The following are the names, addresses, and telephone numbers of all brokers and sureties from whom Proposer intends to procure insurance bonds: Packet Pg. 178