1. Approve an extension of the existing temporary construction easement with the Santa Clarita
Valley Water Agency on City -owned Assessor's Parcel Numbers 2811-063-904, 2811-063-
905, 2811-063-906, and 2811-063-907 (Rye Canyon Industrial area).
2. Authorize the City Manager or designee, to execute all documents, subject to City Attorney
approval.
BACKGROUND
The Santa Clarita Valley Water Agency (SCVWA) requested an extension of a temporary
construction easement that was approved by the City Council on June 28, 2022. The temporary
construction easement is set to expire on December 31, 2025, and the SCVWA is requesting an
extension until December 31, 2032. The easement allows for the construction of a pipeline across
a portion of Assessor Parcel Numbers (APNs) 2811-063-904, 2811-063-905, 2811-063-906, and
2811-063-907, located parallel to San Francisquito Creek (Creek) in the Rye Canyon industrial
area. The parcels were dedicated to the City by Newhall Land and Farming Company in 2001.
The temporary construction easement supports the SCVWA Castaic Conduit Bypass Pipeline
Project (Project), which will create a more secure and flexible water supply throughout the Santa
Clarita Valley.
Construction of this Project has not begun, as SCVWA has experienced significant delays due to
permitting issues and executing necessary easements with property owners within the Project's
proximity. Construction will have a minimal impact on the trails on both sides of the Creek. It is
the responsibility of SCVWA to manage all construction and associated impacts related to
Page 1
Packet Pg. 315
O
barricades, detours, signs, public safety, and restoration of the trails upon completion of the
project to the satisfaction of the City Engineer.
ALTERNATIVE ACTION
Other action as determined by the City Council.
FISCAL IMPACT
There is no fiscal impact.
ATTACHMENTS
Easement Map
Easement Exhibit
Page 2
Packet Pg. 316
Easement Map
9.a
Q
1:4,514
City Property Street Centerlines 0 0.04 0.09 0.18 mi
=Parcel Outlines Primary 0 0.07 0.15 0.3 krr
Easement Area Minor
Bureau of Land Management, Esri, HERE, Garmin,
INCREMENT P, NGA, USGS
City Park
Packet Pg. 317
Data layers that appear on this map mayor may not be accurate, current, or otherwise reliable. The City of Santa Clarita does not warrant the accuracy of the data and assumes no liability for any
9.b
EXHIBIT "B"
TEMPORARY CONSTRUCTION EASEMENT
\ APN 2811-063-904 THRU 907
ti \
a \
4 �� 6
�\ 1� ,=02°27'51"
\ as R=2577. 21 '
\ L=110.84'
.� �9
00
;
61
Oyu \ q \
LOT 2 0 Vol \
TRACT NO. 51931-02 h°
M. B. 1238130-61
APV 2811-063-904 O /
OWNER:
THE CITY OF
SANTA CL AR I TA �c�o
�O
BASIS OF BEARINGS: v
THIS MAP IS BASED ON THE //"v
�b
CALIFORNIA COORDINATE SYSTEM
OF 1983, ZONE 5, 1983 NORTH
AMERICAN DATUM, 2008.0 EPOCH P
ADJUSTMENT. DIVIDE DISTANCES
BY 0.99988886 TO OBTAIN GROUND DISTANCES.
INDICATES TEMPORARY CONSTRUCTION EASEMENT
AREA = 64,121 SO. FT.
7
PARAGON
PARTNERS
LTD
CASTAIC CONDUIT BYPASS PIPELINE
CITY OF SANTA CLARITA
COUNTY OF LOS ANGELES
STATE OF CAIIFORNIA
-LOT 54
APN
2811-063-906
TER' o
KAHLEN z
No.8746
SHEET: 1 OF 1
DATE: 05/04/15
DRAWN BY: TLK
SCALE: 1 "= 100'
r
Q
Packet Pg. 318