HomeMy WebLinkAbout2026-01-27 - AGENDA REPORTS - PURCHASE OF THREE HYDROGEN BUSESO Agenda Item: 8 CITY OF SANTA CLARITA .` AGENDA REPORT CONSENT CALENDAR CITY MANAGER APPROVAL: DATE: January 27, 2026 SUBJECT: NEW FLYER OF AMERICA CONTRACT FOR THE PURCHASE AND DELIVERY OF THREE NEW HYDROGEN FUEL CELL TRANSIT BUSES DEPARTMENT: Economic Development PRESENTER: Adrian Aguilar RECOMMENDED ACTION City Council: Approve the "piggyback" purchase of three zero emission hydrogen fuel cell local buses, inclusive of taxes, tariffs, tools, training, and spare parts, from New Flyer of America using the California Association for Coordinated Transportation/Morongo Basin Transit Authority joint procurement contract number 23-01, for a total contract amount not to exceed $5,724,856. 2. Authorize the City Manager or designee to execute all contracts and associated documents and modify the awardees in the event of project withdrawal or abandonment, subject to City Attorney approval. BACKGROUND Santa Clarita Transit has a fleet replacement program that meets the Federal Transit Administration's (FTA) twelve-year life cycle for local transit vehicles. Three of the City of Santa Clarita's (City) local buses have reached the end of their useful life and are scheduled to be replaced. As required by state law, the City Council adopted the City Zero Emissions Transition Plan (Plan) in late 2020. The Plan serves as a road map for the City to comply with the state mandate that requires the City to have a 100 percent zero -emission bus fleet by 2040. Replacing buses at the end of their useful life with zero -emission buses allows the City to continue to improve fleet reliability and reduce emissions; and gives the City access to new vehicle designs and technology that will improve the customer experience. The recommended action would also bring the City in Page 1 Packet Pg. 50 O alignment with the desired capital replacement schedule where approximately one -twelfth of the transit fleet is scheduled for replacement each fiscal year. The use of "piggyback" purchasing allows the City to place orders against a competitively awarded public agency contract. The City intends to purchase three zero emission hydrogen fuel cell buses through the California Association for Coordinated Transportation/Morongo Basin Transit Authority vehicle purchasing cooperative, which allows the City, as a member, to take advantage of an existing process. The use of purchasing cooperatives is common within the transit industry and is a practice accepted by the FTA. Purchasing buses through this method expedites the purchasing process and ensures competitive pricing. Under this cooperative agreement, product specifications were identified and prices were negotiated based on the total projected participation of the cooperative members, rather than just the vehicles scheduled to be purchased by the City. As an added measure, staff conducted a price analysis to ensure the proposed pricing is within industry standards and is the most advantageous to the City. Upon approval by the City Council, the City will be able to take advantage of state incentive programs for the purchase of zero -emission buses, replace a number of aging buses that have reached the end of their useful life, and implement the latest engine technology. These buses are tentatively scheduled for delivery in the Fall of 2027. ALTERNATIVE ACTION Other action as determined by the City Council. FISCAL IMPACT Adequate funds to implement the recommended action are contained within the City of Santa Clarita's adopted Fiscal Year 2025-26 budget, expenditure account 7003702-520103 (Transit Capital/Automotive Equipment). The City has programmed Federal Transit Authority Section 5307 grant funds to cover 80 percent of the total and Municipal Operator Service Improvement Programs funding for the remaining 20 percent. ATTACHMENTS New Flyer of America Proposal (available in the City Clerk's Reading File) Morongo Basin Transit Authority Joint Procurement RFP (available in the City Clerk's Reading File) Combined MBTA NFI Contract (available in the City Clerk's reading file) Page 2 Packet Pg. 51 OF gpNTq pL ol City of .r CFO l6 DEGEMBE�~ SANTA CLARITA TRANSIT Santa Clarita Transit Option Proposal for Three — Forty -Foot Fuel Cell Buses Option off Basin Transit / CalACT Contract # 23-01 NEW FLYER OF AMERICA Santa Clarita Transit Option for Three (3) XHE40 Buses Proposal Table of Contents Tab 1, Letter of Transmittal Tab 2, Bus Price Summary Tab 3, Bus Price Change Detail Tab 4, Tariffs Tab 5, Payment Terms and Milestones Tab 6, Bus Warranty Proposal Tab 7, Bus Training Proposal Tab 8, Bus Publications Proposal Tab 9, Bus Tools and Diagnostics Proposal Tab 10, Bus Contract Spares Proposal Tab 11, Bus Delivery Schedule Tab 12, Bus Technical Summary NEW FLYER OF AMERICA Built to Rely On' Santa Clarita Transit Option for Three (3) XHE40 Buses Tab 1, Letter of Transmittal Solicitation Requirements: N/A New Flyer Response: Please see attached our Tab la, Letter of Transmittal to Santa Clarita Transit. Please indicate your acceptance by providing a Purchase Order to New Flyer, attention: Adrian Graca, Business Segment Director— Municipal Transit Fleets 204.470.5521 Adrian Graca(a-)newflyer.com NEW FLYER OF AMERICA Built to Rely On' • NEW FLYER. December 23, 2025 Adrian Aguilar Transit Manager City of Santa Clarita City of Santa Clarita Transit 28250 Constellation Road Santa Clarita, California 91355 Subject: Quotation for three (3) forty -foot Heavy -Duty Hydrogen Fuel Cell Transit bus Dear Adrian, New Flyer is pleased to submit an option price quotation for the production of three (3) forty -foot Heavy -Duty hydrogen fuel cell Transit buses based on New Flyer's agreement Basin Transit (CaIACT) Contract #23-01. The proposed buses will be technically configured as per the base CaIACT bus with changes to match SR3013. The XHE40 price is $1,639,337.15 USD per bus which includes Warranty, Publications, and Delivery. Tariffs New Flyer's proposed price does not include any additional costs, duties, or price adjustments resulting from regulatory changes, changes or law, or future or recently imposed tariffs as the cost impact is not available. New Flyer's proposed price is based on USMCA agreements and global Tariff values that were in place as of January 20th, 2025. Potential changes to tariffs have been an evolving situation with the full cost impact not yet visible. We expect the cost of Tariffs will increase the price of the bus between 3% and 15% however this is an estimate for your budgeting purposes only. New Flyer may send an updated proposal with an estimate of the Tariff amount once we have better visibility to the final global Tariff values. New Flyer is committed to working collaboratively with Santa Clarita Transit to ensure a transparent and auditable process for assessing and addressing tariff -related costs. Please refer to the Tariff Section within our proposal for more information on tariff impacts associated with this order. Payment Terms and Milestones This contract will include separate invoicing for tariffs and the proposed bus (as defined in the CaIACT agreement). Each will be invoiced separately to ensure clarity and transparency, resulting in separate payment terms. • Tariff payment terms are net 15 days after line entry and when Tariff Price Change and Invoice are submitted. • Basin Transit/CaIACT contract payment terms are net 30 days from acceptance, with bus acceptance required within fifteen (15) days of delivery. We would like to highlight key elements of our proposal: Warranty: New Flyer exceeds the industry standard warranties in many areas such as our 5 year / 300,000 miles axle warranty (standard warranty is 2 years) and our 3 years / 150,000 miles multiplex warranty (standard competitor warranty is 1 year / 50,000 miles). Please refer to our Warranty Section within our proposal for more information. Please note that warranty is included in the bus price. Built to Rely On' Training: New Flyer Training is an organization within the New Flyer Customer Services group, a division of New Flyer Industries. As a part of the leading manufacturer of heavy-duty transit buses in the United States and Canada, we have access to top design, engineering, propulsion technology, and electrical systems professionals. This allows us to offer the service and expertise to maximize the lifetime value of your fleet. Please refer to our Training Section within our proposal for more information. Please note that optional training is not included in the bus price. Publications: The New Flyer Publications team combines extensive, hands-on technical experience with exceptional writing, illustrating, and publishing skills to create the industry's benchmark in maintenance manuals. They supply accurate information in a timely manner, assisting the customer in the performance of proper bus maintenance, which adds to the overall reliability and lifetime value of each New Flyer bus on the road. Please refer to our Publications Section within our proposal for more information. Please note that publications are included in the bus price. Tooling and Diagnostics: Please refer to our Tools and Diagnostics Section within our proposal for more information. Please note that tooling and diagnostics are not included in the bus price. Delivery Proposal: New Flyer is proposing a complete delivery in Q2 of 2027 based on a receipt of a Notice to Proceed within sixty (60) days of this submission. Please note that delivery is included in the bus price. Our negotiated delivery rate with CalACT is listed in the price detail sheet (as found in Bus Price Change Detail in this proposal). This project allows New Flyer the important opportunity to continue our strong relationship with Santa Clarita Transit. It also gives us the opportunity again to delivery some of the most advanced vehicles available in North America. We thank you for your continued interest in New Flyer products and look forward to working with you again in the near future. This quote is open for acceptance for sixty (60) days. Please indicate your acceptance by providing a Purchase Order to New Flyer, attention Adrian Graca, Business Segment Director — Municipal Transit Fleets at Adrian Gracaa-newflyer.com. Sincerely, NEW FLYER OF AMERICA INC. Robby Tokar Technical Sales Manager C 431.294.7568 robby tokar(a)newflyer.com CC: Walter Yang — Regional Sales Manager Adrian Graca — Business Segment Director — Municipal Transit Fleets Hiba Raza — Technical Sales Analyst Built to Rely On' Santa Clarita Transit Option for Three (3) XHE40 Buses Tab 2, Bus Price Summary Solicitation Requirements: N/A New Flyer Response: Please see attached New Flyer's Tab 2a, Price Summary for Three (3) — XHE40 buses for Santa Clarita Transit. NEW FLYER OF AMERICA Built to Rely On' NEW FLYER. Price Change Summary Property Name: Santa Clarita Transit Option Number. 2025-115 Contract Origin: 23-335 SR (if applicable): 3013 Quantity. 3 Bus Type: XHE40 Each Total Items Included in Base Bus Price Original Contract Base Bus Price $ 1,571,895.00 $ 4,715,685.00 Base Bus Price Changes $ 124,641.83 $ 373,925.49 Contract Spares Included With Base Bus $ - $ - Total Revised Base Bus Price $ 1,696,536.83 $ 5,089,610.49 One -Time CalACT Discount $ (57,199.68) $ (171,599.04) Total Projected Bus Price with Discount $ 1,639,337.15 $ 4,918,011.45 Add CALACT Procurement Fee (1 % of bus price to maximum of $40,000 per order) $ 13,333.33 $ 40,000.00 Sales Tax Total Revised Base Bus Price $ 1,696,536.83 $ 5,089,610.49 Remove Non -Taxable Items ADA $ (44,223.35) $ (132,670.04) Delivery $ (23,082.20) $ (69,246.60) Extended Warranty $ (55,678.00) $ (167,034.00) Total Taxable Base Bus Price $ 1,573,553.28 $ 4,720,659.85 Santa Clarita California Sales Tax (9.75 % x Taxable Base Bus Price) $ 153,421.45 $ 460,264.34 Total Revised Base Bus Price with Sales Tax $ 1,849,958.27 $ 5,549,874.82 Items Priced Separately Contract Spares Changes $ $ Miscellaneous Price Changes $ $ Total Items Priced Separately $ $ Estimate of Tariffs Not to Exceed 15% of the Total Projected Bus Price After Discount $ 245,900.57 $ 737, 701.72 Santa Clarita Transit Option for Three (3) XHE40 Buses Tab 3, Bus Price Change Detail Solicitation Requirements: N/A New Flyer Response: Please see attached New Flyer's Tab 3a, Price Detail Sheet. This sheet includes all price changes that are required to go from the base bus to the proposed configuration, as requested. NEW FLYER OF AMERICA Built to Rely On' pr NEW FLYER Price Change Detail Property Name: Santa Clarita Transit Option Number: 2025-115 Contract Origin: 23-335 SR (if applicable): 3013 Quantity: 3 Bus Type: XHE40 Data Price Change Type Ref No. Option No. Option Group D scription Price per coach Extended Total Base Bus Price Change 1 526 Seating BStanchons, Atltl drivers door Arow MV308 $ 9,935.73 $ 29,807.19 2 350 Drivers Control Atltl adjustable driver pedals $ 1,473.54 $ 4,420.62 3 304 Paint 8 Decal atltl Santa CI to s paint scheme Exterior $ 275.85 $ 827.55 4 286 Elect- Instrument B Switch Atltl IRDA wireless COM $ 2,924.29 $ 8,772.87 5 470 Destination Signs Change deatination sign to Hanover Amber $ 22.57 $ 67.71 6 470 Destination Signs Atltl Fleet watch transponder JX Data Recorder Diagnostic Module Type: JX200 and TX200 $ 1,483.14 $ 4,449.43 7 304 Paint 8 Decal Change Interior Decals to be in Spanish, and English 304-OE, 526-2T $ 25.14 $ 75.41 8 600 Customer Options Atltl Bike Rack-S ortswork 3 bike $ 3,871.01 $ 11,613.04 9 450 Flooding A/P Change Flooring change to Altro TFM 27421 Midnight 2.7mm $ 614.32 $ 1,842.95 10 219 Engine change PEM motor 2022 $ 32,438.96 $ 97,316.87 11 470 Destination Signs Atltl Data L er $ 5,164.56 $ 15,493.69 12 600 Customer Options atltl a cameras stem sup lied by IDIS $ 17,621.75 $ 52,865.26 13 286 Elect- Instrument 8 Switch atltl silent alarm switch on vertical face of side console $ 236.34 $ 709.02 14 600 customerO lions Addiniotanmentmontors $ 8,117.75 $ 24,353.26 15 600 Customer O lions Atltl UTA APC s stem $ 7,618.27 $ 22,85C81 16 289 Harness Materials 8 Routing atltl cons Wt with Two ie s of 9shwire from SDS enclosure to destination sin antl from SDS enclosure to farebox edestal. ce are $ 167.66 $ 502.98 17 480 Mirrors Change to Safe vision Mirrors $ 68.83 $ 206.50 18 526 Seatin 8Stanchions Change Passener seating to STER motlel Gemini $ 3,720.49 $ 11,161 AS 19 600 Customer Options Atltl USSC UV air purifier system $ 5,152.52 $ 15,457.55 20 480 Mirrors Chan a Street Sitle mirror to be a high mount instead of low mount $ 111.79 $ 335.38 21 600 Custom erO lions Atltl UTA onsite ins ection/tlebu $ 560.25 $ 1,680.75 22 Delive Deliverable Atltl Delive Cha a CaIACT Optional Item 85 $ 23,082.20 $ 69,246.60 Base Bus Price Change Total $ 124,641.83 $ 373,925.49 Grand Total $ 124,641.83 $ 373,925.49 Santa Clarita Transit Option for Three (3) XHE40 Buses Tab 4, Tariffs Solicitation Requirements: N/A New Flyer Response: New Flyer's proposed price does not include any additional costs, duties, or price adjustments resulting from regulatory changes, changes or law, or future or recently imposed tariffs as the cost impact is not available. New Flyer's proposed price is based on USMCA agreements and global Tariff values that were in place as of January 20th, 2025. Potential changes to tariffs have been an evolving situation with the full cost impact not yet visible. We expect the cost of Tariffs will increase the price of the bus between 3% and 15% however this is an estimate for your budgeting purposes only. New Flyer may send an updated proposal with an estimate of the Tariff amount once we have better visibility to the final global Tariff values. To ensure continued production and delivery of our customers' buses, New Flyer will begin assessing the tariff impact on each bus build at the time of line entry. The amount of the price increase will vary based on the type of bus, Agency selected options, component sourcing, and timing of the order. Per the terms of Basin Transit/CaIACT Contract # 23-01, the following provisions apply: Section GC 9.5, Changes of Law o Changes of Law that become effective after the Proposal Due Date may result in price changes. If a price adjustment is indicated, either upward or downward, it shall be negotiated between the Agency and the Contractor and the final Contract price shall be adjusted upwards or downwards to reflect such changes in Law. Such price adjustment may be audited, where required. For certainty, in the event that a price adjustment is required in respect of changes that are mandatory as a result of legislation or regulations that become effective after the date of the tender submission, such price adjustment shall be negotiated in good faith by the Agency and the successful bidder. Should tariffs or regulatory changes affect the cost of materials, production, or services, or result in a change by Santa Clarita Transit in the number of units to be procured, New Flyer reserves the right to adjust pricing accordingly. The Price Change reflective of actual Tariff costs, will be calculated at the time of line entry and will be provided with auditable backup to Santa Clarita Transit. The amount will be calculated through New Flyer's SRCR (Sales Release Change Request) process and passed through at cost. It will be clearly identified as a Tariff Surcharge on the Price Change. The payment terms for Tariffs are net 15 days from the time of the Price Change, including auditable backup, and invoice are presented to Santa Clarita Transit. The federal government requires that the importer on record pay for Tariffs 2 weeks from the date they are incurred and provide a bond for tariff payments. New Flyer has provided a bond to the Federal Government for Tariff Payments; therefore, the Tariff payment at line entry is not considered an Advanced Payment, and no additional security is required. New Flyer is taking an active advocacy role to educate stakeholders on the impact of tariffs on our industry and the economic impact to Transit Agencies. Unforeseen economic factors and changes in laws and regulations create disruption and added costs. We encourage Santa Clarita Transit to reach out to your government offices to share the impact of Tariffs on your organization and participate in advocacy outreach where and how you deem appropriate. NEW FLYER OF AMERICA Built to Rely On' Santa Clarita Transit Option for Three (3) XHE40 Buses Tab 5, Payment Terms and Milestones Solicitation Requirements: N/A New Flyer Response: This contract will include separate invoicing for tariffs and the proposed bus (as defined in the Basin Transit/CalACT Contract #23-01), which result in separate payment terms. Tariff Payment Terms The payment terms for Tariffs are Net 15 days from the time of the Price Change, including auditable backup, and invoice are presented to Santa Clarita Transit. Contract Payment Terms Basin Transit/CalACT contract payment terms are net 30 days from acceptance, with bus acceptance required within fifteen (15) days of delivery. NEW FLYER OF AMERICA Built to Rely On' Santa Clarita Transit Option for Three (3) XHE40 Buses Tab 6, Bus Warranty Proposal Solicitation Requirements: N/A New Flyer Response: Please see the attached New Flyer Tab 6a, Warranty Proposal. Please note that Warranty Pricing is included as part of the Bus Price. NEW FLYER OF AMERICA Built to Rely On' '"M� NEW FLYER OF AMERICA CONTRACT DELIVERABLES LIST Waimanty CUSTOMER NAME Santa Clarice BID NUMBER 2025-115 Basin Transit 23-335 BUS MODEL XHE40 QUANTITY 3 MAJOR COMPONENTDESCRIPTION BASE AND EXTENDED WARRANTY COMMENTS PROVIDER YEARS MILEAGE Base Bus Warranty New Flyer ofAmerica 2 100,000 Excluding scheduled maintenance items, acts ofnature, or normal consumables Basic Bus Structure New Flyer of America 3 150,000 Body, and body structure shall consist of the components that are bolted or riveted to the structure, such as, exterior panels, interior panels roof ceilin and driver's barrier. Chassis Structure (Integrity) New Flyer ofAmerica 12 500,000 Consists of all components that are weklad together to form the main frame (skeleton) and body construction. The structural integrity guarantee covers against a significant loss of structual integrity of the assembly wits functional performance due to non corrosion related failures. Chassis Structure (Corrosion) New Flyer of America 12 500,000 Consists of all components that are welded together to form the main frame (skeleton) and body construction. The corrosion guarantee s against a significant loss of structural integrity of the assembly or its functional performance, resulting from a pertinent loss of cross section due to corrosion caused by normal environmental elements but excludes corrosion caused by aggressive road de-icers such as Magnesium Chloride or equivalents, unless New Flyer approved preventative measures are taken. The warranty shall be void ifthe Agency fails to conduct corrosion inspections and scheduled preventive maintenance procedures as specified in the Contractor's maintenance nuals The Agency shall maintain documentation, auditable by the Contractor, verifying service activities in conformance with the Contractor's maintenance manuals. Propulsion System (Traction System, ContrdleNlnverteraond Gear Box Siemens/New Flyer of America 6 300,000 First 5 years covered by Siemens and the 6th year covered by New Flyer. All warranty claims to be submitted to New Flyer. Hydrogen Fuel Cell Ballard 6 250,000 Some limitations and exclusions may a - Please see manufacturer's warrantydocument. DC / DC Converter Ballard 6 1 250,000 Some limitations and exclusions may a - Please sea manufacturer's warranty document. Fuel Cell High Voltage Batteries New Flyer Industries America 6 300,000 The Energy Storage System is warranted for 6 years or 300, 000 miles (whichever occurs first) after the date of acceptance of each bus ("Warranty Period"), to be free of defects in design, material and workmanship; (the "Warranty'). The warranty applies to the battery module and internal components, it also includes the Battery Management System (BMS) electronics and Power Distribution Unit (PDU). These components are warranted for proper operation for 6 years/300, 000 miles when the ESS is maintained in the manner described in the Service Manual. All warranty claims to be submitted to New Flyer Axle (Front and Rear) MAN 5 300,000 Excluding maintenance items & items that are not covered by the OEM's warranty. All friction materials are excluded from this limited anty. Wear and third party items supplied with the axle (e.g. slack adjuster, seals and bearings, shocks, air bellows, radius rods, bake chambers) are not included in the 5 year warranty. Please see manufacturer's warranty document. A/C Thermo King 2 Unlimited Some limitations and exclusions may apply - PI ase see manufacturer's warranty document. Al repairs/warranty claims need to be handled through the local authored re it facilit Brake System New Flyer of America 2 100,000 Friction Material Excluded Destination Signs Hanover 12 Unlimited Some limitations and exclusions may apply -Please see manufacturer's warranty document. Al repairs/warranty claims need to be handled throw h the local authored re it fact Door S stems Vapor3 150,000 Excludingmaintenance items & items that are not covered b the OEM's warrant Air Com re VMAC 2 Unlimited Wheelchair Ram New Flyer ofAmerica 2 100,000 Electrical S stem Parker 3 150,000 Excludin intenance items & items that are not covered b the OEM's warrant LED Headlights J.W.S eaker 6 Unlimited Warrant cmaparts only after first year Paint Axalta 5 Unlimited Air D er Haldex 2 200,000 Passen er seats STER Seating5 Unlimited Some limitations and exclusions may a - Please see manufacturer's warrant document. LV Batteries Odyssey 2 1 100,000 New F er Connect New Flyer of America 6 Unlimited Covers subscription and components 6years Radiator Fan Drive EMP 3 150,000 winl w ca 5 3 ,000000 Hand ing 5 300 Road Call A NewFAmrica erofmerica 5 300000 TroubleshootingNew 1 5 1 300000 Santa Clarita Transit Option for Three (3) XHE40 Buses Tab 7, Bus Training Proposal Solicitation Requirements: N/A New Flyer Response: Please see the attached New Flyer Tab 7a, Training Proposal. Please note that this proposal is for recommended training only. Training courses may be selected by Santa Clarita Transit. New Flyer's training team is happy to advise on selecting the correct training for your needs. Corresponding prices are not included in the Bus Price. NEW FLYER OF AMERICA Built to Rely On' CONTRACT DELIVERABLES LIST CUSTOMER TRAINING Note: Line items listed are individual courses. The hours shown are instructor hours for each course. The Transit Agency must select which courses and which quantities are required based on their specific operation and staffing. CUSTOMER NAME Santa Clarita BID/OPTION/SR NUMBER 2025-115 TECHNICAL SUMMARY Rev Draft 1 BUS MODEL XHE40 QUANTITY 3 DESCRIPTION RECOMMENDED MAXIMUM NUMBER OF CITY HRS. TOTAL SELLING REQUIREMENT BILLABLE: YIN STUDENTS PER CLASS PRICE AT BID Operator Orientation (Train -the -Trainer) 6 4 1, 127.25 Recommen e Y Maintenance Orientation 15 4 1,127.25 Recommen e Y First Responder Orientation 25 4 $1,127.25 Recommended Y Preventive Maintenance Inspection 10 4 1,127.25 Recommen e Y Multiplex System 10 32 9,018.00 Recommen e Y Entrance & Exit Doors 10 4 T1,1 77.25 Recommen e Y Wheelchair Ramp 10 4 $1,127.25 Recommended Y Brake Systems and Axles 10 16 4,509.00 Recommended Y Air System and ABS 10 8 2,254.50 Recommen e Y Suspension and Steering 10 8 2,254.50 Recommen e Y Coolant Loop Fill Procedure 10 4 1,127.25 Recommen e Y Towing 10 4 1,1 77.25 Recommen e Y Body anStructure 10 4 1,127.25 Recommended Y Propulsion/Fuel Ce ESS Fami iarization HV Safety 6 40 11,272.50 Recommen e Y Propusion Fue Ce I/ESS Troubleshooting 10 24 6,763.50 Recommen e Y Sub Total - New Flyer Training $46,217.25 Y DESCRIPTION RECOMMENDED MAXIMUM NUMBER OF STUDENTS PER CLASS CITY HRS. TOTAL SELLING PRICE AT BID HVAC Maintenance 8 8 $5,130.00 Recommended Y Fire Suppression Gas Detection 10 8 5,670.00 Recommen e Y Destination Sign 10 8 7,020.00 Recommen e Y Siemens Propulsion Troubleshooting 8 24 18,630.00 Recommen e Y Freudenberg ESS Troubleshooting 8 16 $13,500.00 Recommended Y Ballard Fuel Cell Level 1 & 2 8 24 25,920.00 Recommen e Y Ballard Fuel Cell Level 3 8 24 25,920.00 RecommendedY Sub Total - OEM Vendor Training $101,790.00 Training Total (priced separate from the bus price) $148,007.25 y Santa Clarita Transit Option for Three (3) XHE40 Buses Tab 8, Bus Publications Proposal Solicitation Requirements: N/A New Flyer Response: Please see the attached New Flyer , ab 8a, Publications Proposal. Please note that Publication Pricing is included in the Bus Price. NEW FLYER OF AMERICA Built to Rely On' PROPOSALCONTRACT DELIVERABLES PRIMARYCUSTOMERNAME December Ci of Santa Clama Transit This is for orre XHE40 Optim Build of approx 3 Buses Only UPDATES jjrll'�COMMENTS Emergency information to be on board each 6 bus PUBLICATIONS CUSTOMER NAME I ICityof Santa Clarita Transit BID NUMBER 2025-115 Based on 23-335 BUS MODEL XHE40 QUANTITY New Flyer Standard Bus Publications Emergency Responder Guide 8.5x11 laminated paper) 1 QTY 3 13 CUSTOMER DELIVERY Wth First Bus Delivery Operator's Guide 8.5x11 3-hole) 3 Wth First Bus Delivery 6 Parts Manual 1 20 Business Days After First Production Bus Delivery 12 Service Manual 1 20 Business Days After First Production Bus Delivery 6 Bus System Drawings Manual (11x17 3-hole regular paper includes air, electr, hydraulic, cooling, PLC HVAC layouts and schematics) 1 1 120 Business Days After First Production Bus Delivery 6 TIV USB 1 1 OEM Supplier Publications QTYjP11 Siemens E-Drive Propulsion System OEM Vendor Manual Set (includes only the following) 20 Business Days After First Production Bus Delivery CUSTOMER DELIVERY Wth First Bus Delivery or Soon After Receiving From OEM Supplier 1 6 USB Includes only NF Manuals plus OEM manuals below identified with Option Build of This is for one XHE40 M COMMENTS ELFA3 System User Guide (Safety, Installation, Operation, Maintenance, Diagnostics and Parts information documents 1 N/A Ballard Fuel CeII OEM Manual Set(includes only the following) With First Bus Delivery or Soon After Receiving From OEM Supplier FCMove Fuel Cell System User Guide 1 N/A ESS Battery OEM Manual Set (includes only the following) Wth First Bus Delivery or Soon After Receiving From OEM Supplier System User Guide 1 1.N/A Modine BTMS OEM Manual includes only the followin Wth First Bus Delivery or Soon After Receiving From OEM Supplier BTMS Service Manual 1 N/A Thermo King HVAC OEM Manual (includes only the following) With First Bus Delivery or Soon After Receiving From OEM Supplier RLF Unit Maintenance Manual 1 N/A Intelligaire III Diagnostic Manual 1 N/A Destination Sign OEM Manual (includes only the following) With First Bus Delivery or Soon After Receiving From OEM Supplier Luminator Operation & Maintenance Manual 11.N/A WABCO ABS System OEM Manual (includes only the following) With First Bus Delivery or Soon After Receiving From OEM Supplier ABS Maintenance Manual 1 N/A Fleetwatch AVM System OEM Manual includes only the following) VVith First Bus Delivery or Soon After Receiving From OEM Supplier Fleetwatch Series 55 User Reference Guide 1 N/A EMP Cooling System OEM Manual (includes only the following) Wth First Bus Delivery or Soon After Receiving From OEM Supplier Traction motor and Inverter Cooling System Service Manual 1 N/A Cooling System Troubleshooting Manual 1 N/A Valeo DC200 Cabin Heater OEM Manual Set (includes only the following) Wth First Bus Delivery or Soon After Receiving From OEM Supplier DC200 Workshop Manual 1 N/A Vansco u tiplexing System OEM Manual includes onl the followin Wth First Bus Delivery or Soon After Receiving From OEM Supplier Hardware User Guides 1 N/A Software User Guides 1 Other DESCRIPTION QTY Standard Labour Hours required for NF Bus Manual Set Publishing 450 1,. CUSTOMER DELIVERY N/A N/A UPDATES I r Option approx 3 Buses Only COMMENTS I Not charged to the customer Santa Clarita Transit Option for Three (3) XHE40 Buses Tab 9, Bus Tools and Diagnostics Proposal Solicitation Requirements: N/A New Flyer Response: Please see the attached New Flyer Tab 9a, Tools and Diagnostics Proposal. Please note that this proposal outlines New Flyer's recommended tools and diagnostics package required to maintain the Xcelsior® bus. The package acts as a shopping list for Santa Clarita Transit to select from, as required.. The corresponding Tooling and Diagnostic prices are not included in the Bus Price. NEW FLYER OF AMERICA Built to Rely On' New Flyer Tools Diagnostics Proposal Date 202512-19 Revision Level Rcw Or.1 Customer Name Santa Giants So / Option Number 2025115 Quantity - Bus Mod d Pricing Expiration Date hrew�.® Billing Method Customer Specification Descn-rim NF Pans Description Part Number Type Bitl Duo NF Part Quantity Inowid-I Unit Selling Price USD T-1 Selling Pnce (USD) 1 Billetl Separddy KIT - Panasonic FZ55 Toughbook Laptop Oiagnoslic Equipmenl 6502351 1 $ 3,903 ]1 $ 3.903 ]1 2 Billed Sepamtdy Nee"USB Link-3-WIFIMIudmth Edition Oiagnmtic Equipmenl 6494933 1 $ 1468 ]0 $ 1,46870 3 Billed Separatey Hamess- Adapter Diagnmtic CAN 2 Diagnostic Equipment 07-12-5916 1 $ 14485 $ 14485 4 Bittedep Saratey ZF TeLA dman M Diagnostic Kd Kit Diagnmtic Equipment 6435374 1 $ 4602 55 $ 4,W2 55 5 Billed Separatey Adapter - Gurgle ZF Diagnostic Equipment 6503298 1 $ 36].10 $ W710 6 Billed Separately Intelligaire III Diagnmtic Software & Cables 0iagnmtic Equipment 6393934 1 $ 2,76251 $ 2,76251 1 Billed Separatey Vale. Diagnmtic Software & Cables 0iagnmtic Equipment 6499004 1 $ 74488 $ ]4488 8 Billed Separatey V.1 Adapter -Diagnostic Diagnostic Equipment 6492163 1 $ 12023 $ 12023 9 Billed Separddy Hanover Keys. Programming Device Diagnmtic Equipment 6401761 1 $ 1Do 80 $ 19880 10 Billed Separately Hanover KN. Programming Base Station Diagnostic Equipment 6401760 1 $ 27832 $ 27832 11 Billed Separdely Cable-PVSG Interface 0iagnmtic Equipment 6487019 1 $ 5840 $ 5840 12 Billed Separdely Cable-Transtech VR Interlace Diagnmtic Equipment 6488984 1 $ 32965 $ 32965 13 Billed Separddy Siemens PLAN Interlace Hamess Diagnmtic Equipment ]1144] 2 $ 13D % $ 27912 14 Billed Separddy USB CAN Adapter - Siemens Interlace Diagnmtic Equipmenl 6402046 1 $ 520 W $ 520 W 15 Billed Separdely UDS Software -Vector Indigo Diagnostic Equipment 6487897 1 $ 389867 $ 3,8986] Separdely Vector Keyman USB Gmgl. Diagnostic Equipment 6487899 $ 15904 $ 15964 RBilled ely Billed Separately terface Indigo In- Vector VN 1630 Log Diagnmtic Equipment1 6491163 1 $ 281361 $ 281361 18 Billed Separately CANP"gy 1057GCap-Vector Diagnmtic Equipmenl 6491232 2 $ 30854 $ 61708 19 Billed Separdely CANcable 2y-Vector Intl". Diagnostic Equipment 6412000 2 $ 6362 $ 12723 20 Billed Separddy XALT Interlace Cable-Baft— Diagnmtic Equipment 704950 1 $ 22266 $ 22266 21 Billed Separately Plug -MSD Blank Diagnmtic Equipmenl 869751 1 $ 1193 $ 1193 22 Billed Separdely Cap- 6 PK Bus Bar Prdedive Cvr Diagnmtic Equipment 6483658 1 $ 23864 $ 23864 23 Billed Separdely Key, Cam Ldch *1 (ESS Tnangle Key) Diagn.dic Equipment 6476226 1 $ 5.12 $ 512 24 Billed Separddy Amerex SafdyNet Software & Interlace Diagnmtic Equipment 6355551 1 $ 78324 $ 78324 25 Billed Separately Mobile R . . . r - Fledwatch MR55LT Diagnmtic Equipment 6445849 1 $ 269573 $ 269573 26 Billed Separdely Wabco ABS So.are(Inititial Download) Software/Annual Rmewak/ Subscn bons 6334596 1 $ 44531 $ 44531 27 Billed Separately Annual Maintenance -Vector Indigo Software/Annual Rmewak/ Sub —,tons 6487898 1 $ ]]930 $ 11930 28 Billed Separddy EMP Software N. Charge Software cop: Dr,jers&Downloads em 1 $ $ 29 Billed Separdely Hanover H ELEN Software NO Charge Software kmvers(ahanwerdisplavzcpm 1 $ - $ - m Billed Separddy Van —Software N. Charge Software http://divapp,.p.rker.c.m/divap os/i—A1n.,-VM MS.htm1 1 $ - $ - 31 Billetl Separately Vansco 1210 Chooser NO Charge Software http://d ivapps.oarker.cpm/divap ps/ipanNanscpDlA.html 1 $ $ 32 Billed Separdely PVSG Software N. Charge Software htt //ph.parker.tour/-/1]616 /en/eatewav-module-Darker- 1 $ $ av/#product s 33 Billed Separddy Smadrider Software N. Charge Software htt //pr per arkm/pr ite/parkersm - .n/u,/en/ro e 1 $ - $ - m Billed Separddy Vat-VETC2 Software N. Charge Software —Imann—btec.cpm 1 $ $ 35 Billed Separddy Mobile Starer Software N. Charge Software darrvl om desia rla islmnewflver.c 1 $ - $ - 36 Billed Separddy XALT Service T.1 Sdtwam N. Charge Software darrvl desiarlais�anew8ver.cpm 1 $ - $ - 37 Billed Separdely Modine BTMS Software N. Charge Software Troubleshootin¢&Dmg..,tirs- M.dine 1 $ $ m Billed Separddy DanI Software- Berendsen Pwr Strg N. Charge Software darrvl 1 $ $ 39 Billed Separately Clamp Meter -I"A Fluke 376 Special Tods and PPE 648]900 1 $ 1206.88 $ 12W 88 40 Billed Separately Fluke 2 in 1 M.Iimeter-158]FC Special Tm6 and PPE 6400]46 1 $ 1 83707 $ 1 8310] 41 Billed Separately Cmdurivity Meter Special Tods and PPE 6489997 1 $ ]99.18 $ 199.18 42 Billed Separdely mWulart.t bad led Special Tm6 and PPE 6473267 1 $ 34882 $ 348 82 43 Billed Separddy test probe flat blade Special Tm6 and PPE 6473268 1 $ %62 $ %62 44 Billed Separddy test probe back probe Special Tm6 and PPE 6473269 1 $ 4771 $ 41 ]1 45 Billed Separdely Wabco ABS Sdtware(Renewd) Software/Annul Rmewak/ Subscn Lions 6495817 1 $ 42146 $ 42146 46 Billed Separddy Kd- XALT SPI Tod Universal Diagnostic Equipment 6482554 1 $ 211120 $ 211120 47 Billed Separddy Kd- Lift Tow Universal Special Tm6 and PPE 6396565 1 $ 31825 $ 31825 48 Billed Separddy Kd - Lift Tow Receivers Special Tm6 and PPE 6396567 1 $ 2 W9 84 $ 2 W9 84 49 Billed Separddy Xcelsior Flat Tow adapter (2 pcs. Per sd) Special Tm6 and PPE 6395097 1 $ 260325 $ 260325 50 Billed Separdely Assy- Frame Flat Towing Special Tm6 and PPE 902990 1 $ 6,732.15 $ 6,73215 51 Billed Separdely Jacking Adapters Special Tods and PPE 434434 1 $ 1211 58 $ 121158 52 Billed Separddy Repair Kd -0isc Brakes & Synact Calipers Special Tm6 and PPE 6501865 1 $ 11,0859 $ 11,0859 53 Billed Separdely T."'. M-Iiplier Special Tm6 and PPE 6314711 1 $ 2788.17 $ 278817 54 Billed Separdely Hub Repair Kit -MAN VOK4)8 I'd Axle Special Tm6 and PPE 6408311 1 $ 11806.99 $ 1180699 55 Billed Separdely Optional Hub Removal Hydraulic Tod Kd- MAN VOK4)8 Special Tods and PPE 6458834 1 $ 685867 $ 6185807 % Bitted Separdely King Pin Press Kd -MAN VOK4)8 FIT Axle Special Tods and PPE 6494532 1 $ 22,015 51 $ 22,01551 57 Billed Separately Hub Repair Kd- MAN Hy1350 RR Axle Special Tm6 and PPE 6408306 1 $ 148638 $ 148638 58 Bitted Separdely ABS San—R&R Kit -MAN Hy13W RR Special Tods and PPE 6408307 1 $ 12]1 38 $ 12]1 m 59 Bitted Separdely R— Seal Repair Kit -MAN HV1350 RR Special Tods and PPE 6444302 1 $ 3,181 W $ 3,181 DO 60 Billed Separdely Axfe 01 Repair Kd - MAN Hy1350 RR Special Tods and PPE 6444303 1 $ 1176832 $ 1176832 61 Billed Separately Optimal Tod Kit - MAN Hy1350 RR Axle Special Tods and PPE 6444304 1 $ 4],89132 $ 4],89132 62 Billed Separddy Flow Mder Tester -Strg Gear Box Special Tm6 and PPE 140809 1 $ 1,64 $ 186454 63 Billed Separddy Puller Tod- Pitinan Arm Special Tm6 and PPE 6394270 1 $ 77672 $ 77672 64 Billed Separately TK NC Tod Kit-TE15 R407c Special Tods and PPE 6472762 1 $ M,l3324 $ 34,13324 65 Billed Separddy Amerex Discharge Hme BI—..1 Adapter Special Tm6 and PPE 052132 1 $ 21535 $ 21535 fib Billed Separdely Amerex Fire Alarm/Simulat.r Module Special Tm6 and PPE 6484731 1 $ 42001 $ 42001 67 Billed Separddy Amerex Calibratim Kd- AMGaDS III Special Tm6 and PPE 6459321 1 $ 1,6 41 $ 1566.41 68 Billed Separddy Assy- H2 Tank Pressure Interface Special Tm6 and PPE 970139 1 $ 46727 $ 4672 69 Bitted Separdely Valve MIMI Tod Special Toils and PPE 64]3]80 1 $ 1,800 .33 $ 1,800 33 10 Billed Separdely Tods Kd- FCMwe HD Packaged Special Tods and PPE 650414] 1 $ 12802] $ 12802] 71 Billed Separdely Assy- Magnat—cr Charger Special Tm6 and PPE 842]6] 1 $ 1143280 $ 1143260 72 1 Billed Separddy I Kd-VMAC Service Tm6 Special Tm6 and PPE 6504967 1 1 $ 35580 $ 35580 73 Billed Separddy Kd- Pressure Test T.1 Special Tm6 and PPE 6493641 1 $ 1261 $ 8261 74 Billed Separddy Head Wrench, Dessicant Canister Special Tods and PPE 6485513 1 $ 31903 $ 31063 75 Billed Separddy Kd -ESSC ad Pressure Tester Special Tm6 and PPE 6486719 1 $ 142602 $ 142662 76 Billetl Separddy Kd- ESS Codad Pressure Fill Special To and PPE 6411553 1 $ 10,16,147 $ 10,16447 ]] Bitted Separddy Assy, Lib Beam ESS Rack Special Tods and PPE 6505018 1 $ 865486 $ 865 DO 78 Billed Separddy Boom, Forklift Adapter I Special Tods and PPE 6485514 1 1 $ 424642 $ 424642 New Flyer Tools Diagnostics Proposal 19 Bilbtl Separately Lifting Atlapter Assy- Siemens PEM Special Tools antl PPE 6481413 1 $ 968 81 $ 968 81 80 Bilbtl Separately Lifting Device-XALT XMOD Batr.ry Motlules Special Tools antl PPE 6476635 1 $ 2385W $ 2385W 81 Bilbtl Separately Wha Ins -lath Master Ebctrician's tool kit Special Tools antl PPE 6473M5 1 $ 401925$ 401925 82 Bilbtl Separately wiha 1/4 in ratchet set insulatetl SAE Special Tools antl PPE 6473M7 1 $ 72014 $ 72914 83 Bilbtl Separately wiha 1/4 in ratchet set insulatetl Metric Special Tools antl PPE 6473M8 1 $ 130.15 $ 13015 84 Bilbtl Separately 16 PC 3M d—socket set Special Tools antl PPE 6473M9 1 $ 73111 $ 73111 85 Bilbtl Separately 3/8 Extension set Special Tools antl PPE 6473450 1 $ 8489 $ 8489 86 Bilbtl Separately 3/8 Extension set Special Tools antl PPE 6473451 1 $ 118 39 $ 118 39 81 Bilbtl Separately wiha open entl wrench insulated metric Special Tools antl PPE 6473452 1 $ 1 009.91 $ 10098] 88 Bilbtl Separately wiha open entl wrench insulated sae Special Tools antl PPE 6473453 1 $ 1 56052 $ 1 %052 89 Bilbtl Separately Wha ins -lath S.natetl Tweezers Straigh Special Tools slid PPE 6473454 1 $ 1.326 $ 10326 W Bilbtl Separately Wha ins -lath S.natetl Tweezers Angl.tl Special Tools antl PPE 6473455 1 $ 92.13 $ 92 13 91 Bilbtl Separately Insulatetl Toryue Wrench 1/4" Special Tools antl PPE 6473456 1 $ 982 72 $ 982 ]2 92 Bilbtl Separately Insulatetl Toryoe Wrench 3/8" Special Tools antl PPE 6472024 1 $ 1,17610 $ 1,17610 93 Bilbtl Separately Ins -lath Toryoe Wrench 112" Special Tools antl PPE 6473457 1 $ 129812 $ 1 29812 94 Bilbtl Separately toryue screwtlmer set Special Tools antl PPE 6473458 1 $ 709.32 $ 70932 95 Bilbtl Separately --lath crimper 30-6 Awg 1" Special Tools antl PPE 6473459 1 $ 11464 $ 11464 W Bilbtl Separately re stripper6 -3/8—.11201. 10 Special Tools antl PPE 6473460 1 $ 55 OD $ 5566 91 Bilbtl Separately ns -lath water pump pliers vjaw Special Tools slid PPE 6473461 1 $ 10703$ 10163 98 Bilbtl Separately --lath hex key set 10pc metric Special Tools slid PPE 6473462 1 $ 311 12 $ 311 12 99 Bilbtl Separately Long SAE Natural insulated hex key set 1. Special Tools antl PPE 6473463 1 $ 402 31 $ 402 31 100 BIII.tl Separately 1, tl 1 Special Tools antl PPE 6473464 1 $ 12564 $ 12564 101 BIII.tl Separately Stubby Bit Driver Special Tools antl PPE 6473465 1 $ 44 53 $ 4453 102 BiIletl Separately Wha lns WI di "bi i'lip" Set Special Tools antl PPE 6472034 1 $ 103 SO $ 10338 103 Billetl Separately Mini Screw Omer set Special Tools antl PPE 6473466 1 $ 10762 $ 10762 104 Billetl Separately ARC Flash ProteWbn Clothing Kit -2PC Small Special Tools antl PPE 6471958 1 $ 1,148 54 $ 1,148 54 105 Billetl Separately ARC Flash Pmtectbn Clothing Kit -2PC Metlium Special Tools antl PPE 6473412 1 $ PM 15 $ PM 15 1W Billetl Separately ARC Flash ProteWbn Clothing Kit -2PC Lar e Special Tools antl PPE 6473413 1 $ 1 148 54 $ 1,148 54 107 Billetl Separately RC Flash Protectbn Clothing Kit -2PC X Special Tools slid PPE 6473414 1 $ 1 148 54 $ 1,148 54 108 BIII.tl Separately ARC Flash Pmtectbn Clothing Kit -2PC Special Tools slid PPE 6471962 1 $ 1205 98 $ 120588 109 Billetl Separately ARC 3XL Flash Protectbn Clothing Kit -2PC Special Tools antl PPE 6471963 1 $ 1263 40 $ 1,26340 110 BIIIetl Separately QA'RL Flash Pmtectbn Clothing Kit -2PC Special Tools slid PPE 6471964 1 $ 1,32081 $ 1,32081 III BIIIetl Separately ARC SXL Flash Pmtectbn Clothing Kit -2PC Special Tools slid PPE 6471965 1 $ 1 358.12 $ 1,358 12 112 BIII.tl Separately ARC Flash Pmtectbn Clothing Kit -1PC Sm a1I Special Tools antl PPE 6471966 1 $ P02 44 $ 902 44 113 BIII.tl Separately ARtliumC Flash Pmtectbn Clothing Kit -1PC Me Special Tools slid PPE 6473415 1 $ PM 15 $ PM 15 114 BIII.tl Separately ARC Flash Pmtectbn Clothing Kit -1PC Lar e Special Tools antl PPE 6473416 1 $ PM 15 $ PM 15 115 BIII.tl Separately XRC Flash ProteWbn Clothing Kit -1PC Special Tools slid PPE 6473417 1 $ PM 15 $ PM 15 116 BIII.tl Separately ARC Flash Pmtectbn Clothing Kit -1PC Special Tools slid PPE 6473418 1 $ 9342XL.15 $ 934 15 117 BIII.tl Separately 3XL ARC Flash Pmtectbn Clothing Kit -1PC Special Tools slid PPE 6471971 1 $ 1 08042 $ 1089 42 118 BIIIetl Separately 4A'RL Flash Pmtectbn Clothing Kit -1PC Special Tools slid PPE 6471972 1 $ 1,07521 $ 1,07521 119 BIII.tl Separately ARC SXL Flash Pmtectbn Clothing Kit -1PC Special Tools slid PPE 6471973 1 $ 1 285 W $ 1285 W 120 BIII.tl Separately Balaclava Heatl Cmer one size fits a 11 Special Took antl PPE 6473MO 1 $ 6527$ 6527 121 BIII.tl Separately Hartl Hat antl Face Shbb one —fits a1I Special Tools antl PPE 6368561 1 $ 42183 $ 42183 122 BIII.tl Separately Hamess- Fall Botly Arc Flash(4251bs) Special Tools antl PPE 6700155 1 $ 161426 $ 161426 123 BIII.tl Separately Black ebd—I III— kit, Size 1 Special Tools antl PPE 6471976 1 $ 166.08 $ 16688 124 BIII.tl Separately Black ebd—I III— kit, Size 8 Special Tools antl PPE 6473420 1 $ 17534 $ 175 m 125 BIII.tl Separately Black ebd—I III— kit, Size 8 5 Special Tools antl PPE 6471978 1 $ 161 65 $ 161 65 126 BIII.tl Separately Black abd—I III —kit, s¢e9 Special Tools antl PPE 6471979 1 $ 16141 $ 16747 127 BIII.tl Separately Black electrical III— kit, Size 05 Special Tools antl PPE 6473421 1 $ 161 65 $ 161 65 128 BIII.tl Separately Black electrical III— kit, s 10 Special Tools antl PPE 6473422 1 $ 165.19 $ 165 19 129 BIII.tl Separately Black eectrical glme kit, Size 10 5 Special Tools antl PPE 2471 423 1 $ 231.10 $ 23712 130 BIII.tl Separately Black electrical glme kit, s¢e 11 Special Tools antl PPE 64]3424 1 $ 166.98 $ 16688 131 BIII.tl Separately Black ebctrical III —kit, s¢e 12 Special Tools antl PPE 6473425 1 $ 16165$ 16165 132 BIII.tl Separately HV Blanket 3' x 3' Special Tools antl PPE 6473431 1 $ 48372 $ 48372 133 BIII.tl Separately Blanket Clamp 9-1/2"L,5"Opening Special Tools antl PPE 6473432 1 $ 3082 $ 3982 I BIII.tl Separately Glme Dust 05. Special Tools antl PPE 6473433 1 $ 1783 $ 1783 135 BIII.tl Separately Rescue Hook OFT Special Tools antl PPE 6400745 1 $ 702 40 $ 702 40 I BIII.tl Separately Defibrillator Atluk Special Tools antl PPE 6502239 1 $ 3,14783 $ 3,14783 137 BIII.tl Separately Bratly Persona l Lockout Pooch Kd Special Tools antl PPE 6494427 1 $ 6335 $ 6335 ISO BIII.tl Separately Steel Lock Hasp with Tab Special Took antl PPE 6473M2 1 $ 2012. $ 2012 BIII.tl Separately American bck Al I WRED Special Tools antl PPE 64]3M3 1 $ 2739 $ 2739 139 40 BIII.tl Separately Lock OW Tag (pk of 25) Special Tools antl PPE 6473M4 1 $ 2864 $ 2864 141 BIII.tl Separately W Waming sign Special Tools antl PPE 6473436 1 $ 22.11 $ 22 11 142 BIII.tl Separately Arc Flash Waming sign Special Tools antl PPE 6473437 1 $ 1488 $ 1488 143 BIII.tl Separately steering wheel corers Special Took antl PPE 6473439 1 $ 1093 $ 1983 144 BIII.tl Separately Carl - Safety Ba—d. System (up 1. 1511 Special Took antl PPE 6491772 1 $ 1,60535 $ 1 W5 35 145 BIII.tl Separately Tape -Retl HV SafeN Special Took antl PPE 6491845 1 $ 4591 $ 45 Oil $ is $ 1 $ Notes: • Patl numbersare subject to cM1ange. • If mullipk tilsare oNered, lM1e s�bcomponenl quanliles laced will only display 1M1e 1o1a1 quanlmes needetl per kiL • It parts are n?Quiretl to be assembletl in ativance of shipment, phase confrm part number NPe k set to "Assembly'. Customer Signature Oat. Total Amount Id.I.d.d in Bus Pric9� Total Amount Bill.d 8eparatW $ 30069986 'Abovelolakexcludeapptirablelaxes Santa Clarita Transit Option for Three (3) XHE40 Buses Tab 10, Bus Contract Spares Proposal Solicitation Requirements: N/A New Flyer Response: There are no Contract Spares included in New Flyer's proposal. NEW FLYER OF AMERICA Built to Rely On' Santa Clarita Transit Option for Three (3) XHE40 Buses Tab 11, Bus Delivery Schedule Solicitation Requirements: N/A New Flyer Response: New Flyer's schedule for the proposed buses have not been determined, exact dates are not available at this time. Estimated line entry is Q2 2027. A delivery schedule will be forwarded to you when the dates have been determined. NEW FLYER OF AMERICA Built to Rely On' Santa Clarita Transit Option for Three (3) XHE40 Buses Tab 12, Bus Technical Summary Solicitation Requirements: N/A New Flyer Response: Please see the attached New Flyer Tab 12a, Technical Summary for the proposed bus. NEW FLYER OF AMERICA Built to Rely On' Family Family Description Feature Feature Description 100-00 XCELSIOR COACH LENGTH X40 Xcelsior-40'coach. 100-03 STRUCTURAL MATERIAL CAR Carbon steel/ferritic sst. 100-04 FUELTYPE XHE Hydrogen at 350 BAR 100-05 EPACALENDARYEAR 025 2025 100-OK ACCELERA GENERATION EF3 ELFA 3 100-OY BUS MODEL YEAR 027 2027 201-01 FRONT BUMPER NFI Romeo Rim, three piece, front bumper. 201-03 FRONT TOWING PROVISIONS 001 Basic set-up, incorporated in front chassis. Tow adapters are required. 201-05 REAR BUMPER NFI Romeo Rim, three piece, rear bumper with anti -ride feature. 203-01 FRONTAXLE 003 M.A.N. VOK-08, GAWR 18,078 lbs. With disc brakes. Hub mount, Knorr Synact Calipers, with Level N, near zero copper (<0.5%) brake pads. 203-02 SECUREM ENT OF BRAKE LININGS NFI Bonded. 203-06 SHOCKABSORBERS NFI Koni. 203-07 FRONT STABILIZER BAR PVD Required. 203-OA FRT AXLE AND WHEEL SPLASH APRONS 001 Basic, full width, fore of axles and wheels. 203-OB RADIUS ROD BUSHINGS WIN Windowed 204-01 REAR AXLE 004 M.A.N. 5.67:1 HY-1350. GAWR 28,660 lbs. With disc brakes. Hub mount, Knorr Synact Calipers, with Level N, near zero copper (<0.5%) brake pads. 204-03 REAR AXLE GEAR OIL SYN Synthetic. 204-04 REAR STABILIZER BAR PVD Required. 204-09 REARAXLE DRAIN PLUGS EXT Magnetic external hex head. 204-OA REARAXLE MUD FLAP ONE One aft of rear axle. (Requirement is determined by local climate, ice build-up, high ambient temperature.) 204-OC REAR WH EEL MUD FLAP 002 One aft of each rear wheel. 205-01 TIRE SUPPLIER 001 NFIL supplied tires. 205-06 WHEELS LVL Alcoa 22.5" x 8.25" aluminum. Buffed (LVL One) finish. 205-01 STEERING AXLE TI RES 003 305/70R/22.5, Michelin X InCity Z (65 mph). 205-OM REAR AXLE TIRES 003 305/70R/22.5, Michelin X InCityZ (65 mph). 209-01 POWER STEERING PUMP ELC Berendsen electric power steering pump. Mounted at the front streetside. 209-02 POWER STEERING HOSES GAT Gates G2XH 209-03 SER STEERING DIAGNOSTIC POWER REQ At steering box. 209-05 POWER STEERING RESERVOIR REQ Required. 209-06 POWER STEERING FLUID INDICATOR CAB Light required at the Cabin coolant fill door. 209-08 POWER STEERING DRAIN PLUG MAG Magnetic plug. 209-09 POWER STEERING UNIT VTX ZF TAS85, power assisted, frame mounted. POWER STEERING SYSTEM 209-OA DEX Dexron III, mineral based. FLUID 209-OB POWER STEERING SENSOR REQ Hydraulic level sensor required. 219-01 FUEL/PROPULSION SYSTEM XHE Accelera E-Drive, with Ballard fuel cell range extender. VMAC EC20, Liquid cooled rotary screw compressor powered by 219-05 AIR COMPRESSOR Vol 600 VDC motor 219-OD ROAD SPEED 065 Top road speed is governed. Set at 65 MPH (105 KPH). TRANSMISSION/HYBRID Accelera PEM 1CS2022-2FA24 NG, 550 KW, prelim. launch 219-OM 031 DRIVE/TRACTION MOTOR gradeability prediction at GVWR : 20.5% @ 4.56 rear axle ratio. 0-10% driver controlled with accelerator pedal, 30% with 219-ON EBUS REGENERATIVE BRAKING 005 accelerator pedal release, remaining 70% blended with brake application reaching 100% by 15psi. 219-OP TRANSMISSION SHIFTING NFI Foot on brake enables shift when in neutral. 219-1C AIR CLEANER MAH Mahle replaceable cartridge filter. 219-11D AIR RESTRICTION INDICATOR MCH Mechanical gauge mounted directly on air intake tube. 219-1E EXHAUSTSYSTEM FCL SST tailpipe to disperse water vapour. EXHAUSTTAIL PIPE 219-11' 001 Curved pipe set to 45 degrees to streetside. ORIENTATION Propulsion compartment light switch. Located at streetside 219-1U ENGINE SWITCH BOX FCL propulsion compartment strut. 219-30 BALLARD FUEL CELL MODEL FCM Ballard FCMove. RADIATOR,CAC,HYDR FLUID Modine High Voltage 9 fan fuel cell radiator, with predictive 231-02 FHV COOLER cooling capabilities. RADIATOR REVERSE FAN SW & 231-04 PSP Located at propulsion compartment switch panel. DIAG LAMP 231-OC RAID TUBES SST SST 50/50 pre -mixed distilled water with ethylene glycol with anti- 231-OF COOLANT FLUID/ANTIFREEZE 001 corrosion additive and bittering agent. Pink fluid. Propulsion, Fuel Cell, ESS, and cabin heat systems use separate 231-OU XHE COOLANT RESERVOIR REQ SST reservoirs. Propulsion, ESS and cabin heating reservoirs use LEV-R VENT, XH E COOLANT RESERVOI R 231-OV REQ built into tank cap. Pressure is continually vented on fuel cell PRESSURE RELIEF VALVE coolant reservoir. Cabin Heating reservoir uses a graduated sight glass (glass XHE COOLANT RESERVOIR 231-OY REQ material). Propulsion and ESS reservoirs use a glass level SIGHT GLASS indicating ball. Shuts down fuel cell when fuel fill door is open and bus is in XHE LOW COOLANT 231-OZ REQ neutral with park brake applied. Prevents fuel cell restart. CONDITION Programmable timing details are required for Electrical. XH E COOLANT RESERVOI R 231-10 REQ Schrader valve fitting provided on cabin heat reservoir. TEST PORT 234-01 WATER FILTER FCL Fuel cell de -ionized water filter, with 1/4 turn isolation valves. Agility Fuel Solutions Type 4 Composite, 5 tanks, 16.3" OD x 125" long ,roof mounted cylinders with OMB HTV 24V solenoid valve. 241-06 HYDROGEN FUEL TANKS HE5 Total system capacity is 37.5 Kg at 5075 psi (350 bar). For 40' coach. Dual 0.5" SST lines rated for use with hydrogen fuel, with 241-OK HYDROGEN FUEL LINES XHE Swagelok fittings. One remote OMB PRD and one OMB PRD integrated into tank HYDROGEN PRESSURE RELIEF valve (per tank). Operating pressure 0-350 bar (5075 psi). 241-ON OMB DEVICE Operating temperatures: -40 to 85 C (-40 to 185 F), thermal relief (nominal) 110 C (230 F). HYDROGEN FUEL LEVEL 241-OW LTI Low level telltale displayed on instrument panel screen. GAUGE HYDROGEN DEFUEL 241-OY AFS Swagelok AFS valve with locking tabs, with quick connect fitting. PROVISION HYDROGEN FUEL FILL Luxfer WEH TN1 fast fill and TN5 H2 Fill Receptacle, with fuel 241-OZ LUX RECEPTACLES pressure gauge at fill box. Includes tethered dust caps. HYDROGEN FUEL LINE SST lines are labeled with yellow adhesive warning labels at 241-10 NFI IDENTIFICATION every 36". HYDROGEN TANK ISOLATION 241-11 AFS Swagelok AFS ball valves included for each tank. VALVES Shuts down fuel cell when fuel fill door is open and bus is in HYDROGEN FUEL FILL DOOR 241-16 REQ neutral with park brake applied. Prevents fuel cell restart. INTERLOCK Programmable timing details are required for Electrical. AIR COMPRESSOR DISCHARGE 246-01 NFI Teflon 2807 SST braided hose. LINE Combo Tank 1(Wet Tank + Primary Brake Tank), Combo Tank 2 246-02 BASIC AlRTANKS B01 (Front Axle Kneeling Tank+ Accessory Air Tank), Secondary Brake Tank. 246-04 Al R TAN K D RAI N VALVES MNL Manual l/4turn valve. 246-06 WET TANK DRAIN VALVE MAN Manual l/4turn valve. SmartRider electronic leveling system on front axle and 246-09 RIDE HEIGHT SENSORS SP2 Barksdale mechanical leveling valves on center/rear axles. RIDE H EIGHT SETTI NGS, 246-OA SR1 Front ride height is 4.0" axle to bump stop. NORMAL Applied to entrance and exit doors. Foot on brake to release 246-OE DOOR INTERLOCK ENE interlock, applied via multiplex system programming. If the Master Run switch is in the OFF or PARK positions, the 246-OG DRIVER'S PARK BRAKE ALARM 001 kneeling alarm is triggered to alert the driver that the park brake is not set. PARK BRAKE PRESSURE 40 psi auto -apply park brake valve. 60 psi pressure switch for 246-OH NFI SETTING park brake light activation. Haldex "Gemini MDx" Tandem air dryer (includes Multi - 246-OK AIR DRYER 001 Treatment Catridge) and purge tank. 246-OM AIR DRYER LOCATION RST Under the rear step. 246-OT AIR SYSTEM OIL SEPARATOR 12V Single Haldex oil/water separator, with 12V auto drain. 246-OU PARK BRAKE ACTUATION PUL Pull To Apply. PARK/EMERG BRAKE 246-OV PSC Park brake control location - on side console panel. LOCATION 246-13 FRONTTOW CONNECTOR NPT Male 1/4" NPT fitting with Series 20/30 coupler fitting, with tag. FRONT AIR CONNECTOR 246-14 SS1 Located below the bumper, streetside. ARRANGEMENT FRONTAIR CHARGE 246-15 NPT Male 1/4" N PT fitting with Series 20/30 coupler fitting, with tag. CONNECTOR REAR AIR CHARGE FITTING 246-16 CFU At curbside under fusebox. LOCATION REARAIR CHARGE 246-17 NPT Male 1/4" NPT fitting with Series 20/30 coupler fitting, with tag. CONNECTOR TYPE 246-18 REAR Al R CHARGE DUST CAP REQ Required. 246-19 FRONTAIR CHARGE DUST CAP REQ Required. Synflex colour coded. Green: rear service brakes and supplies. Red: front service brakes. Brown: parking brake. Black: 246-113 FLEXIBLE AIR LINES NFI accessories and brake hose. Yellow: compressor and governor. Blue: suspension. 246-1E ABS NFI Wabco. 246-11 FRONT CHARGE AIR ROUTING WET Direct charge to wet tank. 246-1K REAR CHARGE AIR ROUTING AFT Connection after air dryer with direct path into wet tank. AIR SYSTEM TRANSDUCER Transducer Fault Detection - Transducer voltage falls to OV if 246-27 001 FAULT DETECTION transducer failure occurs. Transtech regulatorw/Low Voltage Disconnect, temperature and 260-01 BATTERY MANAGEMENT TRA current sensors to optimize battery life. 260-02 BATTERY VOLTAGE REGULATOR 002 Transtech REG24C w/11939 and data logging BATTERYVOLTAGE REGULATOR 260-03 MCU Mounted on MCU/TCU panel. LOCATION Two Odyssey group 31 Absorbed Glass Mat (AGM) maintenance 260-04 BATTERY TYPE /MFR 003 free batteries. 1150 CCA. Top posts: 3/8" positive, 3/8" negative. Red heat shrink on 24 volt positive cable end and light blue heat 260-05 BATTERY CABLES NFI shrink on 12 volt positive cable end. Slide out battery acid resistant polyethylene enclosure with SST sub frame, SST bearings and rubber isolation mounts. Located 260-09 BATTERY TRAY NFI aft of the curbside rear wheelhouse. Note: battery access door opens to the side. POSITIVE BATTERY Required with quick access through flip -open door. Uses a micro 260-OC 004 DISCON NECT SW switch for propulsion shutdown. 260-OE BATTERY VOLTAGE EQUALIZER V02 Vanner 100 amp. ENERGY STORAGE SYSTEM 260-OK XP2 Freudenberg, High Power, Gen 2. BTRY SUPPLIER/TYPE ENERGY STORAGE SYSTEM 260-OM 135 135 kWh total. CAPACITY 260-OT ESS FIRE DETECTORS NFI Integrated in ALL ESS HV Battery enclosures. Four 11" fan roof mounted EMP radiator with propulsion MOTOR/INVERTER RADIATOR & 260-11 4FA compartment mounted SST Reservoir with sight glass & low level RESERVOIR coolant sensor. MOTOR/INVERTER COOLING 260-12 NFI Rotron. PUMP ROOF FAIRING / SKIRTS 260-15 XHE Fairing with full length skirts for XHE. ENCLOSURE BATTERYVOLTAGE EQUALIZER 260-1B 001 One QUANTITY EMERGENCY HV BATTERY 260-1E HVF Single receptacle mounted at curbside of high voltage fusebox. CHARGE PORT, XHE FUSEBOX HIGH VOLTAGE 260-1M REQ Required. INTERLOCK SWITCH 269-01 P.A. AMPLIFIER MFR /TYPE REI Requires a separate gooseneck or handheld microphone. REI, approximately 30" longfrom base to end of microphone. 269-OC GOOSENECK MICROPHONE REI Black neck and head. GOOSENECK MICROPHONE Inverted, clipped to the A -pillar. Microphone clip is 15.26" from 269-OD API LOCATION bottom of destination sign closeout panel. GOOSENECK MICROPHONE 269-OE BLT Built into microphone. SWITCH 269-OG INTERIOR SPEAKER MFR TCB TCB 269-OH PRIMARY INTERIOR SPEAKERS 006 Six: four to light panels, two above rear bench. EXTERIOR SPEAKERS, 269-OK ENT At basic location above entrance. LOCATION 269-OM EXTERIOR SPEAKER MFR SHE Shekonic 269-OZ PRIMARY PA SYSTEM GSW Gooseneck mic with built-in switch. 269-13 EXTERIOR SPEAKER QUANTITY ES1 One 269-113 AMPLIFIER LOCATION SAW Mounted on front position of sawtooth panel above driver. 269-1E EXTERIOR SPEAKER COIL 1CO Single coil 273-01 HEADLIGHTS NFI NFIL Xcelsior LED low beam and high beam headlights. 273-02 DAY RUN HEADLIGHTS REQ Required. 273-03 FRONTTURN SIGNALS NFI NFIL amber LED. Integrated with headlight assembly. 273-06 TAIL LIGHT ARRANGEMENT 006 Amber, red (stop/tail), red (stop/tail), white. 273-07 TAIL LIGHTS MFR 4DG 4" Dialight LED, grommet mounted. CENTER STOP / DECELERATION 273-08 BSC 18" X 1 " Dialight LIGHT SIZE 273-09 WHITE BACK-UP LIGHT MFR DLG 4" Dialight LED, grommet mounted. STOP LIGHTS ON WITH 273-OA REQ Required. RTRDR/REGEN BRAKE STOP LIGHTS ON WITH PARK 273-OB NFI When park brake or interlock are engaged. BRAKE OR INTERLOCK CENTER STOP / DECELERATION 273-OE 001 One LIGHTS QTY CENTER STOP / DECELERATION 273-OF BSC At lower edge of HVAC door. LIGHTS LOCATION SIDE TURN SIGNALS,TYPE / QTY 273-OH 2DL 2 amber Dialight LED Lamps, 12 volt. PER SIDE SIDE TURN SIGNAL 273-01 BSC Single intensity, Dialight LED lamps. FUNCTIONALITY SD TURN SGNL GUARD BRKT, 273-OK ALU Aluminum, painted per paint scheme. MATERIAL/CTG CURBSIDE TURN SIGNALS 273-OM 001 Lamps are aft of front and fore of rear wheelhouses. LOCATION STREETSIDETURN SIGNALS 273-ON 01F Lamps are fore of all wheelhouses. LOCATION KNEELING/RAMP LIGHTAT 273-OP NFI 2.5" Dialight LED. ENTRANCE 273-OT MARKER / CLEARANCE LIGHTS 001 Dialight LED without guard all around. 273-OV REFLECTORS NFI Self-adhesive decals installed at NFIL basic positions. 273-OW REAR LICENSE PLATE LIGHT SMT Smartrend LED. TIMED SHUT-OFF, ENTR AREA 273-10 BSC The program is set to shut the lights off when the door closes. LIGHTS TIMED SHUT-OFF, EXIT AREA The program is set to shut the lights off five seconds after the 273-12 NFI LIGHTS door closes. CENTER STOP / DECELERATION 273-11' RED Red LIGHTS COLOR MARKER / CLEARANCE LIGHTS New Flyer standard marker/clearance light functionality to meet 273-111 NFI FUNCTIONALITY applicable FMVSS/CMVSS regulations. New Flyer standard marker light locations to meet applicable 273-23 MARKER LIGHTS LOCATION NFI FMVSS/CMVSS regulations Day Run, Night Run, and Night Park modes illuminate the tail 273-25 EXTERIOR LIGHTS DAY lamps, marker/clearance lamps, and license plate lamp. Mandatory for Canadian customers. CENTER STOP/DECELERATION 273-26 STP Basic stop functionality. LIGHT FUNCTIONALITY CENTER STOP/DECELERATION 273-27 12V 12 Volts. LIGHT VOLTAGE INTERIOR PASSENGER 277-02 NFI NFIL LED lights, 24VDC. LIGHTING PASSENGER LIGHTING: 277-04 001 0% 1st bank on each side, 100% for the remaining banks. OUTPUT INTENSITY EXIT BASEPLATE / ELEC PNL 277-07 NFI At each exit door, through removable ad frame. ACCESS TINTED LED PASSENGER LIGHT 277-OB WHT White for all lights. COVERS 277-OC FAREBOX LIGHT SMT One fixed LED light. 277-OF DRIVER'S LIGHT 001 One sealed 2.5" white high output Smartrend LED light. 277-OK SIDS SERVICE LIGHT 1LL One LED lamp, provided at upper front of SIDS enclosure. SIDS SERVICE LIGHT SWITCH 277-OM BSW With switch. CONTROL PROPULSION COMPARTMENT 277-ON 4FC Smartrend, four 1.38" LED lights. For Fuel Cell only. LIGHTS 277-OV REAR DECK STEP LIGHT LED LED. INTERIOR DOOR HEADER 277-OW LIGHTS, ANTI -GLARE SHIELD BLK With black anti -glare shield. COLOR INTERIOR DOOR HEADER 277-OY LIGHTS/ QUANTITY SGL Single strip. (ENTRANCE) INTERIOR DOOR HEADER 277-11 SGL Single strip. LIGHTS/ QUANTITY (EXIT) REAR PLC AND FUSEBOX 277-1A NFI Provided, LED. SERVICE LIGHTS All banks are dimmable. When doors are open, lights turn on to INTERIOR LED LIGHT 277-2D 001 full intensity. When doors are closed, lights reduce to secondary FUNCTIONALITY output intensity. One basic electronic chime above driver. Chime has single tone 280-01 PASSENGER SIGNAL CH IMES BSC which sounds once for regular activation, twice for wheelchair positions. PASSENGER SIGNAL 280-03 YLW Yellow cords are required. PULLCORDS HORIZONTAL PASSENGER 280-07 NFI Set at NFIL designated basic height. All decks. SIGNAL PULLCORDS Four: at the first and second street and curbside pillars forward 280-09 LWR DECK VERT PULLCORDS 004 of the face of the upper deck. SECUREMENT OF VERTICAL 280-OD BSC Looped or clamped to the horizontal depending on the location. PULLCORDS 280-OH STOP REQUEST SIGN TEXT ENG Stop Requested. STOP REQUEST SIGN 280-01 UPP Upper case. LETTERING 280-OK STOP REQUEST SIGN COLOURS WOR White letters on a red background. FRONT STOP REQUEST SIGN Smartrend LED installed overhead between the front 280-OM SMT TYPE/POSITION wheelhouses. PASSENGER SIGNAL TYPE AT 280-OT BSC Basic touchtape. WHEELCHAIR POSITIONS Mounted facing aisle on stanchion fore of exit, low profile 280-OV PUSH BUTTON SIGNAL AT EXIT 001 recessed button. 280-19 PUSH BUTTON SIGNAL TYPE NRQ Not required. ELECTRONIC CONTROL 284-01 NFI Vansco. SYSTEM 284-02 SYSTEM VOLTAGE NFI 24 VDC primary, 12 VDC secondary. 284-03 SWITCHES NFI Water resistant. SPARE INPUT/OUTPUT PORTS Minimum 10% input and 10% output, per electrical panel 284-04 FOR MULTIPLEX SYSTEM NFI location. MODULES 284-06 HAZARD WARNING LIGHTS NFI Front, side and rear lights flash for hazard warning. SIDS ELECTRICAL PANEL 284-OB FSS Facing streetside. ORIENTATION SIDS ELECTRICAL PANEL 284-OD BSR Mounted on backside of SIDS rack. LOCATION ENTRANCE DOOR 284-OF 135P Basic with 5 position settings. CONTROLLER PROPULSION SYSTEM RESET 284-ON NRQ Not required. SWITCH LCD touch display screen. Acrylic material with luminescent 286-01 INSTRUMENT PANEL TCH lighting, with Vansco Instrument Panel Cluster module. 286-02 SHIFT SELECTOR LOCATION NFI located on instrument panel. 286-03 EXTERIOR LAMP TEST NFI simultaneously depress both turn signals. Part of Vansco instrument panel cluster. Set to display miles. 286-04 SPEEDOMETER VMI With odometer (the display can be toggled to show Trip1, Trip 2, engine hours). Remove "engine hours" on battery buses. AUDIBLE SOUN D FOR TURN 286-05 BSC Using click sound for turn signal and for hazard warning. SIGNALS/HAZARDS BRAKE/ACCELERATOR provided by audible alarm and separate red warning lamp on 286-06 INTERLOCK DEACTIVATED RED instrument panel. (Must have in California.) WARNING REGENERATIVE BRAKE DISABLE 286-OC DRV In sawtooth panel above driver. SWITCH LOCATION 286-OD SILENTALARM REQ Required. 286-OF SILENT ALARM SW LOCATION VSC On vertical face of the side console. Two diagnostic plugs under the front dash (left side of the DIAGNOSTICS PLUG 286-OP 004 steering column), at forward face of the SIDS barrier (above LOCATIONS driver) and on rear panel. FUEL CELL FREEZE 286-20 PROTECTION DOP Switch at driver's overhead controls panel. SWITCH/LOCATION 289-01 SECUREMENT OF HARNESSES BSC Hellerman Tyton clamps with Panduit releasable cable ties. WIRING DECAL, REAR PLC AND 296-01 NFI Provided, laminated. FUSEBOX 296-02 WIRING DECAL,SIDE CONSOLE LAM Laminated, shipped loose. SIDE CONSOLE DOOR DECAL 296-07 ENG English LANGUAGE 298-01 WATERTEST DURATION 010 10 minutes. 304-01 EXTERIOR PAINTTYPE NFI Axalta Imron Elite high solids polyurethane. HIGH VOLTAGE SAFETY 304-06 REQ Required. DECALS Grit blasted frame, moisture cure zinc -rich primer (applied for 12 304-07 CORROSION PROTECTION 12Y year protection), anti -chip undercoating, corrosion preventive coating sprayed inside frame tubes up to roof line. 304-09 jEXTERIOR LOGOS,NFIL REQ I NFI logos and Xcelsior logos in standard locations. English / Spanish. Passenger compartment decals are the PASSENGER COMPARTMENT decals within the area of the coach designed for the seating of 304-OE ENS DECAL LANGUAGE passengers and that are intended primarily for passenger viewing. INTERIOR FLEET NUMBER 304-OF REQ Required. DECALS English. Maintenance decals are the decals that will be MAINTENANCE DECAL 304-OG ENG referenced primarily when performing maintenance on the LANGUAGE coach. NFIL basic ramp & kneeling decal (red on white) and an arrow 304-OH KNEELING / RAMP DECALS BSC decal (red and black) provided near the kneeling / ramp deployment lights. 304-OJ AIRTAN K DECALS NFI NFIL basic. EXT FLEET NUMBERS,NON- 304-OM RFL Required (reflective). ROOF 304-OZ INTERIOR LOGOS, NFI REQ NFI logos at standard location. 5 lb ABC class. With gauge, hose and mounting bracket. UL 306-02 FIRE EXTINGUISHERS 5US compliant for US customers. 306-03 FIRE EXTINGUISHER LOCATION 005 Mounted horizontally on the forward face of the driver's barrier. 306-05 SAFETY TRIANGLE LOCATION DRV Behind the driver. Pedals adjustable fore/aft. Brake pedal angle set at 45 degrees DRIVER'S PEDALS, POSITION / 350-01 A45 from pedal to floor. Throttle pedal angle set at 45 degrees from TYPE pedal to floor. 350-04 BRAKE VALVES NFI E6. 350-07 TURN SIGNAL SWITCHES BSC Basic switches, floor mounted. 350-08 DIMMER SWITCH BSC Foot switch located beside side console panel. HAZARD WARNING LIGHT SW 350-OD BSC On side console. LOCATION 350-OG STEERING COLUMN DAT Douglas Autotech with tilt and telescopic features. 350-OH STEERING WHEEL 18B 2 spoke, 18" diameter hard padded. 350-OM DUAL HORN BSC Provided with splash shield. 400-01 JACKING / LIFTING PADS 001 4" diameter round pads at front and rear chassis. 420-02 EXTERIOR SIDE PANELS NFI Fiberglass. 420-03 REAR RF MOUNTED AIR SCOOP SSU Stainless Steel, unpainted (no coating). STREETSIDE PROPULSION 420-04 WVY With wavy screen. COMPT DOOR CURB & STREET ENG,S/CONS Supported by gas struts, side console access door using a short 420-05 SGS DOORS,STRUTS gas strut. CURB & STREET ENG COM PT, Quarter turn chrome plated 5/16" square key latches. Also, used 420-06 CRM BATTERY DOORS,LATCHES for the separate battery access door. Solid door which includes battery disconnect switch access CURBSIDE PROPULSION 420-07 HE1 door (using gas strut). Also includes hydrogen fuel fill access COMPARTM ENT DOOR door. DEFROSTER ACCESS DOOR 420-09 CRM 4 quarter turn chrome plated 5/16" square key latches. LATCHES BATTERY COMPARTMENT Solid door located aft of the curb side rear wheel, separate from 420-OB SOL DOOR the engine compartment. SIDE CONSOLE DOOR 420-OF CHR Quarter turn chrome plated 5/16" square key quad latches. LATCHES 420-OG PROPULSION DOOR SOL Solid door with built-in handle. 420-OH PROPULSION DOOR STRUTS TWO Two, the streetside strut has a locking mechanism. 420-01 PROPULSION DOOR LATCHES CHR Quarter turn chrome plated 5/16" square key quad latches. REAR LICENSE PLATE 420-OM 002 Centered with bottom retainer and two upper inserts. RETENTION 420-OP RAIN GUTTER NFI 0.44" cross section bonded. drain holes and plugs ROOF HATCH INSTRUCTION 420-OR ENS English / Spanish. LANGUAGE 420-15 ROOF HATCH SIZE,REAR X24 24" X 24" 420-16 ROOF HATCH TYPE, REAR BSC Basic hatch/vent. 420-17 ROOF HATCH VENDOR,REAR TRA Transpec Worldwide. Sprague motors 24 volt electric with Sprague wet arm wipers. 420-113 WIPERS 002 Intermittent. 5 US gallon with electric powered pump mounted using 4 weld 420-1E WINDSHIELD WASHER BOTTLE 5US nuts. WINDSHIELD WASHER FILL Accessed via a flip -out door built into the exterior side console 420-11' NFI LOCATION access door. 420-1G LOWER DRIVER'S VENT REQ Provided. 420-1H FENDERS MOL Molded polyurethane. 420-1M EXTERIOR UPPER REAR LOU Louvered style fiberglass door for rear HVAC. 420-1N EXT UPPER REAR DOOR STRUTS 2NL Two, non -locking. EXT UPPER REAR 420-1P CHR Quarter turn chrome plate 5/16" square key latches. DOOR, LATCHES FRONT LICENSE PLATE 420-1T SSB On bumper towards street side. LOCATION FRONT LICENSE PLATE 420-1U RET Retainer on bumper. RETENTION 420-24 WIPERS, MOTORARM LENGTH A01 34"long arm. 420-25 WIPERS, WIPER BLADE LENGTH W01 26" long blade. WIPERS, SPRAY STREAMS PER 420-26 S02 2 streams per arm. ARM 420-2A CABIN COOLANT FILL DOOR BSC Basic hinged door. Drip Edge along the bottom edge of the Rear Crown Panel/HVAC DRIP EDGE FOR REAR CROWN 420-213 REQ door to divert water entering the engine/propulsion PANEL/HVAC DOOR compartment. UPPER CORNER PILLAR DOOR 420-2D BSC Quarter turn chrome plate 5/16" square key latches. LATCHES INSULATION,SI DEWALL AN D 421-01 POL Polyisocyanuratefnam. meets Docket 90 spec. ROOF INSULATION, PROPULSION Noise reduction acoustical foam, retained by perforated 421-03 ACO COMPARTMENT aluminum panels. CEILING PNLS AFT OF FRT 422-02 WHT Antique white plastic, SST trim. W/HS INCL RR PLC CEILING / HVAC COVER 422-03 WHT Antique White fiberglass. PANELS ABOVE FRT W/HS Black. Includes dash, dest sign c/out, ent. mech. box, driver's ENTRANCE /DRIVER'S AREA 422-05 BLK o/head panels. and if used, ent. floor heat duct, frt. RH harness PANELS COLOUR cover is black powder coated alum. DRIVER'S CEILING PANEL 422-06 MEL Melamine. MATERIAL INTERIOR PIER PANEL 422-07 MEL Melamine. MATERIAL 422-08 PIER PANEL COLOUR WHT Antiquewhite INTERIOR LWR SIDEWALL 422-OA MEL Melamine MATERIAL INTERIOR SIDEWALL 422-OC CHA Charcoal Grey Gloss MELAMINE INTERIOR PROPULSION COMPT 422-OD HIN A single hinged panel under the rear seat ACCESS PANEL Bulkhead panel covered with carpet / fabric material. With return 422-OE INTERIOR UPPER REAR PANEL CRG air grille for RR mount HVAC system. CARPET/ FABRIC,UPR REAR INT 422-OF CHA Charcoal Grey carpet with 1/2" plywood backing. PANEL TRIM,CARPET/MELAMINE UPR 422-OH STE Painted steel to match panel. RR INT PANEL C/S,S/S RR BULKHEAD ACCESS 422-OK CPT Carpeted DB plywood. PANELS H RNS/AIR LINE COVERS AT 422-OM PFB Painted flat black. UPPER DECK 422-ON FRT DEST SIGN DOOR LATCHES SQL Short wing quad latches. 422-OP DRIVER'S OVERHEAD PANEL NFI With locker. 422-OR DRIVER'S LOCKER LATCH SQL Short wing quad latch. DRIVER'S COAT HOOK AND Located on the forward face of the harness cover behind the 422-OT FWD STRAP driver. Above street side front wheelhouse. Incorporates driver's With four Take One pockets. Quantity of trays as per 422-OU SECURE DIAGNOSTIC STATION SIDSbarrier. customer and / or as per electronic equipment within compartment. 422-OV SIDS ENCLOSURE COLOUR BLK Flat Black. SIDS ENCLOSURE DOOR 422-OW KEY 5/16" square key quad latch. LATCHES FRONT SUNVISOR / 422-13 B01 Black rollerblind. Scissor type with 20" travel and 44" wide. ROLLERBLINDS 422-14 SIDE SUNVISOR/ROLLERBLIND B02 Black padded sunvisor. 422-15 SQUARE KEY T-HANDLE DRV Located at lower left of driver. ENTRANCE MECHANISM BOX 422-16 2SW Two short wing quad latches. DOOR LATCH C/S,S/S REAR BULKHEAD 422-113 ACCESS PANELS, OPENING REM Removable access panels. METHOD FRONT DASH, ACCESS PANEL Quarter turn, black powder coated 5/16" square key quad 422-111 BSC LATCH latches. INTERIOR UPPER REAR PANEL, 422-1W FLT Flat Trim Design TRIM OPTIONS INTERIOR UPPER REAR PANEL, 422-21 HGS Hinged at top, held open with gas struts. OPENING METHOD INTERIOR UPPER REAR PANEL, 422-22 001 5/16" square key quad latch. LATCHES REAR PLC ENCLOSURE, 422-23 001 5/16" square key quad latch. LATCHES Lower deck uses pressure treated NTACQ plywood. Upper deck 450-02 FLOORING PLY uses composite for step and floor to the rear wheelhouses and NT DB ACQ plywood to the rear. Three panels set in the floor to access the driveshaft, DRIVESHAFT/TRANSMISSION / 450-03 3CC transmission/drive motor and on the composite step to access DRIVE MOTOR ACCESS PANELS air compressor. Midnight TFM 27421(2.7 mm / 0.11" thick), for aisle and 450-06 ALTRO FLOOR COVERING 007 underseats. Yellow anti -slip coating is applied to the edges and vertical faces 450-OA STEPTO UPPER DECK YLW of the step. One yellow flooring safety line provided fore of the hump at the 450-OB FRONT AXLE STAN DEE LINE YLW front axle. 450-OC ENTRANCE NOSING B01 Nosing is 2" wide yellow anti-skid applied to the ramp. 450-OD EXIT NOSING ALT 2.5" yellow nosing for Altro / Tarabus flooring. REAR SEAT RISER COVERING 450-OF B01 Same material and colour as used for the flooring. MATERIAL DRIVER'S PLATFORM 450-01 A07 �Altro, Midnight TFM 27421(2.7 mm / 0.11" thick) FLOORING 450-OK DRIVER'S PLATFORM TRIM SST SST. 450-OM OUTER WHEELHOUSES B01 SST front and rear. INTERIOR FRONT W/HOUSE Matte black, painted stipple. An LED aisle light is provided on the 450-ON B01 (LUGG RACK) COLOURS streetside. Also, SST scuff guards are provided. 450-OT TRIM UPPER DECK ALU Aluminum. INTERIOR FRONT W/HOUSE 450-13 BSC Standard height scuff guard (LUGG RACK), SCUFF GUARDS EXIT DOOR, WHEELHOUSEAND 450-14 ALU Aluminum Trim UPPER DECKTRIM, MATERIAL 72% light transmittance green laminated. With blue shade band 460-01 WINDSHIELDS 72B for street and curb sides. Required for coach delivery beyond a 500 mile radius of Final 460-02 WINDSHIELD PROTECTIVE FILM REQ Assembly. PASS / DRVR'S WINDOWS 460-04 AGN Arow Global frame mounted. MANUFACTURER FRAMED PASSENGER 460-06 BFT Bottom is fixed, top tip -in. WINDOWS Full fixed picture window supported by gas strut. Glazing 460-07 SIDSWINDOW FFG matches passenger window, fully masked on interior side. 460-09 FRAMED WINDOW GLAZING N01 Grey, 44% light transmittance, laminated. 460-OB FRAMED WINDOW LOCKS 001 Locking set -screw. 460-OC WIN DOW FRAM E COLOUR BLK All window frames are black anodized. Minimum quantity based on FMVSS requirements, local, 460-OD WINDOW EMERGENCY EGRESS NFI state/provincial, federal regulations or customer spec whichever is greater. SIDE DESTINATION SIGN Curb side. Fixed clear top and fixed bottom. Bottom matches 460-OE CSN WIN DOWS passenger window glazing. (review 470 for side sign details). WINDOW GLAZING 460-OG RAP Rapid replacement. REPLACEMENT 460-01 PASS WINDOW THICKNESS 6MM 6 mm. With fore and aft sliding sashes. The forward sash has exterior 460-OM DRIVER'S WINDOW,FRAMED DSN and interior handles. Non -egress. AFTSASH,FRAMED DRIVER'S 460-ON H LA With interior handle and latch. WINDOW 460-OP DRIVER'S WINDOW GLAZING LAM Laminated with minimum 70% light transmittance. 470-01 DESTINATION SIGNS MFR H03 Hanover, LED display system, EG4 DEST SIGN CONTROL UNIT Under driver's overhead panel at forward position of sawtooth 470-02 OVR LOCATION panel. 470-06 HANOVER FRT.DEST.SIGNS A01 Amber LED, 17x 160 pixels. FRONT DESTINATION SIGN 470-07 LAM Laminated. GLASS CURB SIDE DESTINATION SIGN 470-OA 2WI At the second window, aft of the entrance door. LOCATION HANOVER CURBSIDE 470-OD A03 Amber LED, 15 X 112 DEST.SIGNS 470-OH REAR ROUTE SIGN, LOCATION H DR At the lower center of the rear HVAC door. 470-OM HANOVER REAR ROUTE SIGNS A01 Amber LED, 15 x 48. AUTO VEHICLE MONITORING 470-11 FLE Fleetwatch SYSTEM (AVM) SECOND AUTO VEHICLE 470-12 VEC Vector Datalogger MONITORING SYSTEM (AVM) NEW FLYER CO N N ECT- 470-16 DIAGNOSTIC & MONITORING WOD Required without driver maneuver awareness system (DMAS). SYSTEM Provisions for future undetermined AVA/GPS system. Installation 470-1V AVA/AVL PROVISIONS PRV of ground plates, conduit and fish wire (No antenna, no cables). NF CONNECTSUBSCRIPTION 470-20 003 3 years. TERM 470-22 GEOFENCE REQUIREMENT NRQ Not required EXTERIOR MIRROR 480-02 HAD Safe Fleet MANUFACTURER EXTERIOR SS MIRROR GLASS 480-03 2PC 2/1(upper portion is flat, lower portion is convex). STYLE EXTERIOR SS MIRROR GLASS 480-04 815 8" x 15" SIZE EXTERIOR SS MIRROR POWER Dual remote control. (The upper and lower portions are remote 480-06 DUR OPTIONS controlled.) EXTERIOR SS MIRROR ARM Spring back. Mirror arm springs back to its previously set 480-08 SPR FUNCTIONALITY position after deflection. 480-09 STREET SIDE MIRROR MOUNT HIG High mount. EXTERIOR CS MIRROR GLASS 480-OE 2PC 2/1(upper portion is flat, lower portion is convex). STYLE EXTERIOR CS MIRROR GLASS 480-OF 815 8" x 15" SIZE CURB SIDE MIRROR POWER Dual remote control. (The upper and lower portions are remote 480-OH DUR OPTIONS controlled.) EXTERIOR CS MIRRORARM Spring back. Mirror arm springs back to its previously set 480-OK SPR FUNCTIONALITY position after deflection. 480-13 DRIVER'S REARVIEW MIRROR BCO 8"x 15", black, convex. 480-14 SPOT M IRROR 6DF 6" diameter flat mirror with short arm, located at curbside front. Convex, 12" diameter, mounted on curved modesty panel 480-15 EXIT DOOR MIRROR 12C stanchion. STREET/ CURB SIDE MIRROR 480-26 CAR Carbon steel ARM MATERIAL 490-01 ENTRANCE DOOR DRIVE SYS ELC Electric 490-02 ENTRANCE DOOR VAP Vapor slide glide. ENTRANCE DOOR LIMIT 490-03 PRX Solid state proximity switch. SWITCH SET-UP ENTRANCE EMERGENCY 490-04 PVD Within mech box. RELEASE VALVE ENTRANCE DOOR MAGNETIC 490-05 REQ required, located at baseplate venting entrance door DUMP VALVE ENTR/EXIT 490-07 ESP English and Spanish. FRANG.COVER,LANGUAGE ENTRANCE DOOR COLOUR, 490-09 BLK Black INTERIOR 490-OB ENTRANCE DOOR HANDLES YLW Yellow powder coated. 490-OK ENTRANCE DOOR GLAZING BSC Full length single piece, 72% green. 490-OV ENTR/EXIT FRANG.COVER PER Perforated cover. ENT AND EXIT DOORS, 490-OW INTERIOR AND EXTERIOR BLK Black Powder Coat PANELCOLOR 491-01 EXIT DOOR DRIVE SYS ELE Electric with pneumatic emergency release. One rear curbside exit door. Medium Ameriview Vapor Slide 491-02 EXIT DOOR MED Glide, 34.8" between panels. 491-03 SLIDE GLIDE EXIT LIMIT SWITCH PRX Solid state proximity switch. 491-04 EXIT DOOR CONTROL DRC Driver controlled at side console. Pneumatic sensitive vertical edge sensor provided at all exit 491-OD EXIT DOOR SENSITIVE EDGE SVE doors. EXIT FRANGIBLE COVER 491-OH MAG Magnetic latch. SECUREMENT 491-OM EXIT DOORASSIST HANDLES 004 Yellow powdercoated, UPA-3 Aluminum 491-OP EXIT DOOR GREEN LIGHT LED LED green light indicates that the exit door is set to open. Buzzer and red 'rear door open' indicator at the instrument panel 491-OT EXIT DOOR ALARM B01 activated when the sensitive edge is triggered. 491-OU EXIT DOOR GLASS SIZE FUL Full length. 491-OV j EXIT DOOR GLAZING I 6MM 16 mm EXIT DOOR GREEN LIGHT 491-12 HOR Exit door green light mounted horizontally on baseplate MOUNTING ORIENTATION 491-15 EXIT DOOR MANUFACTURER VAP Vapor. 491-16 EXIT DOOR OPENING TYPE SGL Slide glide. 491-17 EXIT DOOR WIDTH MED Medium 491-18 EXIT DOOR PANEL MODEL AMV Ameriview. 491-19 CURBSIDE REAR EXIT DOOR REQ Required. STREETSIDE CENTER EXIT 491-22 NRQ Not required. DOOR, 60' 40' PASSENGER SEAT 526-01 040 40 QUANTITY PASSENGER SEAT 526-04 USS STER Seating MANUFACTURER 526-05 STER PASSENGER SEAT MODEL GEM Gemini seats. 526-09 REAR BENCH SEAT NFI 1-3-1 hinged seat. 526-OA PASSENGER SEAT MOUNTING CAN Cantilever 526-OB SEAT MOUNTED GRABRAIL RES Composite resin FIRST SEAT, CURBSIDE UPPER 526-OC FFA Forward facing. REAR FIRSTSEAT, STREETSIDE UPPER 526-OD FFA Forward facing. REAR 526-OF PASSENGER SEATING BARRIER PED Pedestal mounted barrier. SEAT POSITION, FORWARD OF 526-OG FFA Forward facing. REAR EXIT ERGO TRANSIT DRIVER'S SEAT 526-OU B01 Ergo AM80 MODEL 526-OW DRIVER'S SEAT COVER VNL All vinyl. 526-OY DRIVER'S SEAT BELT BSC Lap and shoulder belt with retractor on left hand side. 526-10 DRIVER'S SEAT BELT COLOR BLK Black DRIVER'S SEAT BASE RISER 526-14 BLK Black powdercoated steel. MATERIAL 526-17 DRIVER'S SEAT HEADREST VNL Required, vinyl headrest. WHEELCHAIR Two. At basic locations, one aft of the curbside and one aft of the 526-18 B01 POSITIONS, QUANTITY streetside front wheelhouses. CS WHEELCHAIR RESTRAINT 526-19 VPR Forward facing barrier with V-Pro front restraint. SYSTEM SS WHEELCHAIR RESTRAINT 526-1A VPR Forward facing barrier with V-Pro front restraint. SYSTEM SHOULDER HARNESS,W/CHR Secured to structure (pier panel),one on curbside and one on 526-11) FIX RESTRAINTS streetside. High mount harness location for aisle facing seats. Curved style vertical stanchions. Using cast SST fittings for 526-1F STANCHION /GRABRAIL STYLE CUR vertical and horizontal stanchions. OVERHEAD HORIZONTAL 526-1G SST SST GRABRAILS COLOR - STANCHIONS AT EXITS 526-1K YLW Yellow SST & RR RISER STEP 526-1N VERT AFT OF S/S FRT W/HOUSE VSS To match colour of vertical seat stanchions (see Option 526-1T). VERT FORE OF C/S FRT 526-1P YLW Yellow SST W/HOUSE 526-111 VERT AFT OF C/S FRT W/HOUSE SEA To match colour of vertical seat stanchions (see option 526-1T). COLOR - VERTICAL 526-1T SST SST STANCH IONS AT SEATS FRONT CURBSIDE LUGGAGE 526-22 001 Horizontal tube wrapping around fore, aisle, and aft sides RACK 526-23 FAREBOX GRABRAIL STYLE 002 Wrap around stanchion and basic dash stanchion. 526-25 MODESTY PANEL MATERIAL MEL Melamine. MODESTY PANEL MELAMINE 526-26 CGG Charcoal Grey Gloss. COLOR C/SIDE FORE UPR DECK MOD 526-27 NFI Approximately 2" diagonally. PNL, GAP BARRI ER AT STREET SI DE REAR 526-29 MOD Modesty panel (material and color per 526-25/526-26). RISER One piece, full height Arow Global driver's door with extended 526-21 DRIVER'S DOOR ARE sliding glass top. 526-2M BARRIER FWD OF EXIT(S) UPB Upper panel, 0.5" clear polycarbonate, basic width. 526-2T EMERGENCY INSTRUCTIONS ESP English / Spanish. DRIVER'S SEAT, FORE/AFT SEAT 526-32 FA1 The fore /aft seat travel is 9.45". TRAVEL DRIVER'S DOOR PANEL 526-35 T01 5/16" AS2 Tempered glass. MATERIAL FRONT CURBSIDE LUGGAGE 526-37 SST SST RACK COLOR 526-313 FAREBOX GRABRAIL COLOR YLW Yellow SEAT FWD OF REAR BENCH 526-3V FWD Forward facing. SEAT 549-01 HVAC UNIT 1 TK9 Thermo KingTE15 rear A/C unit. 549-04 HVAC UNIT MOTORTYPE NFI Brushless motor for primary heating & cooling system. 549-05 REFRIGERANT 407 R-407C freon. 549-06 HVAC AIR INTAKE AIR Recirculated air only. 549-07 HVAC RETURN AIR FILTER RPF TK polyester (disposable) filter. 549-OC HVAC SYSTEM VALVES BVB Brass ball valves with basic handles. 549-OD A/C AND HEATER LINE CLAMPS IDE Ideal. 549-OE A/C COMPRESSOR TND Electric driven compressors integrated into the main HVAC unit. Thermo King Intelligaire 3, valid for A/C or heater units. With 549-01 HVAC ELECTRONICS TK1 limited diagnostic capabilities. 549-OK HVAC CONTROL PANELS TKH Thermo King, installed at the HVAC unit. 549-ON A/C PRESSURE READINGS TK1 Obtained via the Thermo King Intelligaire 3 control panel. 549-OY HVAC BOOSTER FAN MCC BCC overhead fan with brushless motor. 549-15 HVAC FAN SPEED SWITCH REQ Required at the side console. 549-16 BOOSTER PUMP ROT Rotron BCC 3 speed brushless SPAL blower, plastic end -caps, 549-1A DEFROSTER 004 electrically controlled damper with on/off interlock. 549-1E AUXILIARY/CABIN HEATER EV1 Valeo Thermo DC 200 (20 kw) @ 690V electric heater. 549-29 AIR/SURFACE PURIFIER AAS USSC Active Air system. Required at each HVAC unit. 580-01 FRONT WHEELCHAIR RAMP NFF NFIL ramp at front door. 32" wide, with 1:7 slope. 580-02 FRONT RAMP CONTROL SWI Ramp switch at driver's instrument panel. Covered with Full Metal Jacket anti-skid treatment. The leading 580-08 WHEELCHAIR RAMP,SURFACE FM1 edge is yellow FM1, the side flanges are painted yellow. KNEELING/RAMP DEPLOYMENT 580-OG MED IP68-rated beeper, medium loud fast beep. WARNING BEEPER FRONT KNEELING/RAMP 580-OH DEPLOYMENTWARNING BSC Curbside under front mask. BEEPER LOCATION 600-05 BACK-UPALARM BSC Basic alarm located on curbside. 600-01 SDS TRAY QUANTITY 002 Two trays total. Stainless Steel Material. Length = 26.56"; Front fore length = 600-OM FAREBOX PEDESTAL BSC 12.36"; Width = 13.96"; Height = 6" 600-ON FAREBOX GF3 41" Genfare FastFare 600-OP FAREBOX,SUPPLIED BY 002 Supplied and installed by customer. 600-OR FAREBOX POSITION / HOLES PVD Provided, only for power and ground. DRIVER'S STORAGE BOX 600-1F PDL Basic box with paddle latch, no key. BEHIND SEAT RADIO,COMMUNICATION Provisions for system. Installation of antenna (s),cabling and 600-26 PRV SYSTEM ground plates, as per customer spec. 600-2G VIDEO SURVEILLANCE SYSTEM CIE Interior and exterior cameras. VIDEO SURVEILLANCE 600-2H IDI IDISAmericas SYSTEM, M FR BICYCLE RACK 600-3V STF Sportworks, Trilogy, front mounted. MANUFACTURER/MODEL 600-3WI BICYCLE RACK MOUNTING BOL Bolted slide -in standoff. 600-3Y I BICYCLE RACK REMOVAL BOL Bolted rack. 600-3Z BICYCLE RACK MATL/COLOR SAT SST, satin anti glare finish. BICYCLE RACK DEPLOY 600-40 REQ Required. INDICATOR LIGHT 600-42 BICYCLE RACK INSTRUCTIONS ESP English / Spanish 600-43 HYDROGEN DETECTION AMS Amerex Safety Net System. Two detectors on the roof, one in the propulsion compartment, HYDROGEN DETECTOR 600-47 AMS one in the A/C compartment and one in the passenger LOCATIONS compartment. 600-4D VIDEO/INFOTAINMENT SYSTEM REI REI VIDEO/INFOTAINMENT DISPLAY 600-4E 002 Two QN AUTOMATIC PASSENGER 600-5A FUL Full system. COUNTER SYSTEM AUTOMATIC PASSENGER 600-513 H09 Hella APS-B (provided by Urban Transportation Associates) COUNTERVENDOR FAREBOX PEDESTAL 600-61' BFM Black fullmetaljacket. TREATMENT 600-81 ANTENNA REQ Required. H2 FILL STATION Communication between bus and fill island done via infrared 600-84 I RD COMMUNICATION (IRDA) transmitter connected to TN1 fast fill receptacle. BICYCLE RACK DEPLOYMENT 600-87 REQ Required. SWITCH 600-813 CAMERA MIRROR SYSTEM PRV Provisions NEW FLYER® Morongo Basin Transit Authority July 10, 2024 Notice of Intent to Award Basin Transit RFP 423-01 Joint Procurement Basin Transit staff has evaluated the offers submitted in response to the subject solicitation. Based on the evaluation criteria contained in the solicitation, the following firms are proposed to be awarded contracts for the Basin Transit Joint Procurement for Heavy Duty Transit Vehicles: 1. Gillig LLC, 451 Discovery Drive, Livermore, Ca 94551: For Gillig low floor 30' buses in diesel and CNG. Gillig low floor battery electric, diesel and CNG 35' and 40' buses. 2. New Flyer of America, 6200 Glen Carson Drive, St. Cloud Minnesota, 56301: For New Flyer Excelsior battery electric, diesel and CNG 35-40' buses, fuel cell 40' buses. 3. Motor Coach Industries, 200 East Oakton Street, Des Plaines, Illinois, 60018: For MCI 45' diesel and battery electric Commuter buses. Orders will only be placed through an Assignment Process that will be managed jointly by Basin Transit and the California Association for Coordinated Transportation. This procurement is a multiple award solicitation and in addition to pricing, Ordering Agencies may consider other criteria such as the past performance or warranty terms, fleet conformity, logistical support and other factors in making their decision of which vehicle/s to select. Basin Transit reviewed the proposals submitted by the aforementioned firms and found them responsive to the solicitation. Additional award details will be specified in the staff report recommending authorization to award to the Basin Transit Board of Directors at its regularly scheduled meeting of July 25, 2024 and in correspondence to the prospective awardees. If there are other questions regarding the recommendation, please contact the undersigned at 760- 285-3479 orjoe@basin-transit.com Sincerely, Joe G. Meer Director of Cooperative Purchasing Programs BASIN TRANSIT Request for Proposal Joint Procurement for Heavy Duty Transit Vehicles (BEB, FC and ICE Buses) On behalf of Participating California Agencies collected by the California Association fo Coordinated Transportation (CalACT) RFP No. 23-01 REV 5 May 2024 Revision (Final) Contents SECTION 1: NOTICE OF REQUEST FOR PROPOSALS....................................................................7 NR 1. Purpose of the Procurement and Period of Performance........................................................ NR 2. Description of the Work to be Done....................................................................................... NR 3. Proposal Due Date and Submittal Requirements.................................................................... NR4. Validity of Proposals............................................................................................................... NR 5. Pre -Proposal Meeting Information.......................................................................................... SECTION 2: INSTRUCTIONS TO PROPOSERS..............................................................................10 IP1. Estimated Quantities.................................................................................................................. IP 2. Proposed Schedule for the Procurement................................................................................... IP 3. Obtaining Proposal Documents................................................................................................. IP 4. Proposal Security Requirements - None................................................................................... IP 5. Pre -Proposal Meeting/Information for Proposers..................................................................... IP 6. Questions, Clarifications and Omissions................................................................................... IP7. Addenda to RFP........................................................................................................................ IP 8. DBE Requirements for Transit Vehicle Manufacturers............................................................ IP 9. Conditions, Exceptions, Reservations or Understandings......................................................... IP10. Protest Procedures................................................................................................................... IP10.1 Address............................................................................................................................ IP 10.2 Pre -Proposal Protests....................................................................................................... IP 10.3 Protests on the Recommended Award............................................................................. IP10.4 FTA Review.................................................................................................................... IP11. Preparation of Proposals.......................................................................................................... IP11.1 Use of Proposal Forms.................................................................................................... IP 11.2 Alternate and Multiple Proposals.................................................................................... IP 11.3 Proposal Format Requirements....................................................................................... IP 11.4 Agency Treatment of Proprietary/Confidential Information ........................................... IP 11.5 Signing of Proposal Forms.............................................................................................. IP 11.6 Modification or Withdrawal of Proposals....................................................................... IP 11.7 Cost of Proposal Development........................................................................................ IP 12. Proposal Evaluation, Negotiation and Selection..................................................................... IP 12.1 Confidentiality of Proposals............................................................................................ IP 12.2 Duration of the Validity of Proposals.............................................................................. IP12.3 Evaluation Committee..................................................................................................... IP 12.4 Proposal Selection Process.............................................................................................. IP12.5 Evaluation Procedures..................................................................................................... IP 12.6 Evaluations of Competitive Proposals............................................................................ IP13. Response to Proposals............................................................................................................. IP 13.1 Single Proposal Response............................................................................................... IP 13.2 Availability of Funds....................................................................................................... IP 13.3 Agency Contract Approval Process................................................................................ IP13.4 Agency Rights................................................................................................................. IP13.5 Execution of Contract...................................................................................................... IP 14. Conflicts of Interests and Gratuities........................................................................................ 2 IP 15. Agency -Specific Provisions.................................................................................................... IP 15.1 Purpose of the Solicitation.............................................................................................. IP 15.2 Roles of the Parties for this Solicitation.......................................................................... SECTION 3: GENERAL CONDITIONS...............................................................................................28 GC1. Definitions............................................................................................................................... GC2. Materials and Workmanship................................................................................................... GC 3. Conformance with Specifications and Drawings.................................................................... GC 4. Inspection, Testing and Acceptance........................................................................................ GC4.1 General............................................................................................................................ GC4.2 Risk of Loss..................................................................................................................... GC5. Title and Warranty of Title...................................................................................................... GC 6. Intellectual Property Warranty................................................................................................ GC7. Data Rights.............................................................................................................................. GC 7.1 Proprietary Rights/Rights in Data................................................................................... GC 7.2 Access to Onboard Operational Data.............................................................................. GC8. Changes................................................................................................................................... GC8.1 Contractor Changes......................................................................................................... GC8.2 Agency Changes.............................................................................................................. GC9. Legal Clauses.......................................................................................................................... GC9.1 Indemnification............................................................................................................... GC9.2 Suspension of Work........................................................................................................ GC 9.3 Excusable Delays/Force Majeure.................................................................................... GC9.4 Termination..................................................................................................................... GC 9.5 Compliance with Laws and Regulations......................................................................... GC9.6 Changes of Law............................................................................................................... GC 9.7 Governing Law and Choice of Forum............................................................................. GC9.8 Disputes........................................................................................................................... GC 9.9 Maintenance of Records; Access by Agency; Right to Audit Records ........................... GC 9.10 Confidential Information............................................................................................... GC 9.11 Conflicts of Interest, Gratuities..................................................................................... GC 9.12 General Nondiscrimination Clause............................................................................... GC9.13 Amendment and Waiver................................................................................................ GC9.14 Remedies not Exclusive................................................................................................ GC9.15 Counterparts.................................................................................................................. GC9.16 Severability.................................................................................................................... GC 9.17 Third -Party Beneficiaries.............................................................................................. GC9.18 Assignment of Contract................................................................................................. GC9.19 Independent Parties....................................................................................................... GC9.20 Survival......................................................................................................................... GC 10. Agency -Specific Provisions - Reserved................................................................................ SECTION 4: SPECIAL PROVISIONS..................................................................................................44 SP 1. Authorization to Use the Procurement..................................................................................... SP2. Assignability............................................................................................................................. SP3. Period of Performance.............................................................................................................. 9 5P4. Procurement Fee....................................................................................................................... SP5. Pricing....................................................................................................................................... SP5.1 Price Protection................................................................................................................ SP 5.2 Price Validity for the Initial Contract Term..................................................................... SP 5.3 Vehicle and Optional Feature Pricing for Option Periods ................................................ SP5.4 Prohibitions....................................................................................................................... SP5.5 Price Adjustments............................................................................................................. SP6. Ordering Procedures................................................................................................................. SP 7. Inspection, Testing, Acceptance and Repairs........................................................................... SP 7.1 First Article Inspection..................................................................................................... SP7.2 Pre -Delivery Tests............................................................................................................ SP 7.3 Service Prior to Delivery.................................................................................................. SP 7.4 Delivery Inspection, Post -Delivery Tests and Acceptance .............................................. SP 7.5 Documentation and Deliverables Per Bus Order.............................................................. SP 7.6 Repairs after Non-Acceptance.......................................................................................... SP 7.7 Orientation with Delivery ................................................................................................. SP8. Registration of Vehicles........................................................................................................... SP9. Payment.................................................................................................................................... SP9.1 Invoices............................................................................................................................. SP9.2 Payment of Taxes............................................................................................................. SP10. Delivery Schedule.................................................................................................................. SP 11. Liquidated Damages for Late Delivery of the Bus................................................................. SP12. Service and Parts.................................................................................................................... SP 12.1 Contractor Service and Parts Support ............................................................................. SP 12.2 Parts Availability Guarantee........................................................................................... SP 13. Federal Motor Vehicle Safety Standards(FMVSS)............................................................... SP 14. Motor Vehicle Pollution Requirements.................................................................................. SP15. Insurance................................................................................................................................. SP 16. Buy America Post -Delivery Audit......................................................................................... SP17. Interchangeability................................................................................................................... SP18. New Technology.................................................................................................................... SECTION 5: FEDERAL REQUIREMENTS........................................................................................ 57 FR1. Access to Records.................................................................................................................... FR1.1 Local Governments.......................................................................................................... FR1.2 State Governments........................................................................................................... FR 2. Federal Funding, Incorporation of FTA Terms and Federal Changes ..................................... FR 3. Federal Energy Conservation Requirements............................................................................ FR 4. Civil Rights Requirements....................................................................................................... FR 5. No Government Obligation to Third Parties............................................................................ FR 6. Program Fraud and False or Fraudulent Statements or Related Acts ...................................... FR7. Suspension and Debarment...................................................................................................... FR 8. Disadvantaged Business Enterprise (DBE).............................................................................. FR9. Clean Water Requirements...................................................................................................... FR 10. Clean Air Requirements......................................................................................................... FR 11. Compliance with Federal Lobbying Policy........................................................................... 4 FR12. Buy America.......................................................................................................................... FR13. Testing of New Bus Models................................................................................................... FR 14. Pre -Award and Post -Delivery Audits.................................................................................... FR15. Cargo Preference.................................................................................................................... FR16. Fly America............................................................................................................................ FR 17. Contract Work Hours and Safety Standards Act................................................................... FR18. ADA Access........................................................................................................................... SECTION 6: TECHNICAL SPECIFICATIONS...................................................................................67 TS1. GENERAL............................................................................................................................... SECTION 7: WARRANTY REQUIREMENTS................................................................................... 68 WR1. Basic Provisions..................................................................................................................... WR1.1 Warranty Requirements.................................................................................................. WR1.2 Voiding of Warranty....................................................................................................... WR 1.3 Exceptions and Additions to Warranty........................................................................... WR1.4 Fleet Defects................................................................................................................... WR2. Repair Procedures................................................................................................................... WR2.1 Repair Performance........................................................................................................ WR2.2 Repairs by the Contractor............................................................................................... WR2.3 Repairs by the Agency.................................................................................................... WR 2.4 Warranty after Replacement/Repairs............................................................................. WR2.5 Forms.............................................................................................................................. WR2.6 Return of Parts................................................................................................................ WR2.7 Timeframe...................................................................................................................... WR2.8 Reimbursements............................................................................................................. SECTION 8: QUALITY ASSURANCE................................................................................................. 75 QA 1. Contractor's In -Plant Quality Assurance Requirements......................................................... QA 1.1 Quality Assurance Organization..................................................................................... QA 1.2 Quality Assurance Organization Functions.................................................................... QA2. Inspection................................................................................................................................ QA2.1 Inspection Stations.......................................................................................................... QA 2.2 Optional Resident Inspectors.......................................................................................... QA3. Acceptance Tests..................................................................................................................... QA3.1 Responsibility.................................................................................................................. QA3.2 Pre -Delivery Tests........................................................................................................... QA 4. Agency -Specific Requirements............................................................................................... QA 4.1 Pre -Delivery Bus Documentation Package (BDP)......................................................... SECTION 9: FORMS AND CERTIFICATIONS................................................................................. 82 CER1. Proposer's Checklist.......................................................................................................... CER 2. Request for Pre -Offer Change or Approved Equal............................................................ CER 3. Acknowledgement of Addenda.......................................................................................... CER 4. Contractor Service and Parts Support Data....................................................................... CER5. Pricing Schedule................................................................................................................ CER 6. Pre -Award Evaluation Data Form..................................................................................... 5 CER 7. Federal Certifications and Other Certifications................................................................. CER 1.1 Buy America Certification............................................................................................ CER 1.2 Debarment and Suspension Certification for Prospective Contractor .......................... CER 1.3 Debarment and Suspension Certification (Lower -Tier Covered Transaction) ............. CER 1.4 Non -Collusion Affidavit............................................................................................... CER 1.5 Lobbying Certification.................................................................................................. CER 1.6 Certificate of Compliance with Bus Testing Requirement ........................................... CER 1.7 DBE Approval Certification......................................................................................... CER 1.8 Federal Motor Vehicle Safety Standards...................................................................... CER1.9 Proposal Form............................................................................................................... CER1.10 Notice of Award.......................................................................................................... CER 1.11 Vehicle Questionnaire....................................................................................................... SECTION 10: CONTRACT................................................................................................................103 Attachment1 - Contract..................................................................................................................... SECTION 11: APPENDIXES.............................................................................................................106 Appendix A-1: H-LF 3 0' -3 5' (ICE)................................................................................................. Appendix A-2 H-LF 35'-40'(ICE)................................................Error! Bookmark not defined. Appendix A-3 — H-OTR (ICE) ......................................................Error! Bookmark not defined. Appendix A-4 — H-BEB/FC 35'40.............................................Error! Bookmark not defined. Appendix A-5 H-OTR BEB .............................. Appendix B: Visual Inspection and Road Test Forms....................................................................... Appendix C, Participants List (Attached).......................................................................................... AppendixD, References.................................................................................................................... AppendixE, Buy America................................................................................................................. AppendixF, References.................................................................................................................... AppendixG, Acronyms........................................................................................ Appendix H, References List................................................................................. Appendix I, Plant and Service Center Inspection Sheets .................................................. Appendix J, Vehicle Questionnaire........................................................................... AppendixK, RFA Form....................................................................................... Request for Proposal RFP 23-01 (HD Transit Vehicles), Final SECTION 1: NOTICE OF REQUEST FOR PROPOSALS NR 1. Purpose of the Procurement and Period of Performance The purpose of this joint procurement is to procure Heavy Duty Transit Vehicles. Basin Transit ("Agency") is the lead agency for the solicitation on behalf of the other participants in the joint procurement. BASIN TRANSIT (formerly Morongo Basin Transit Authority) further reserves the unilateral right to assign vehicles under this procurement to any other public agency, government entity or non-profit organizations performing governmental services under intergovernmental contracting procedures. The agencies that are listed in Appendix C have identified their reasonably expected needs during their respective service planning processes and will have the ability to purchase vehicles for the term of the contract. Following contract award, the California Association for Coordinated Transportation (" CalACT") shall provide contract administration activities related to the joint procurement. BASIN TRANSIT retains the right to self -assignment and administration of its own and its subrecipient acquisitions. The resulting contract may only be modified or amended by written action of BASIN TRANSIT. The initial period of performance shall be one (1) year. Basin Transit shall have the unilateral right to extend the period of performance for four (4) one-year options under the provisions of SP 3. NR 2. Description of the Work to be Done The Agency requests Proposals for the manufacture and delivery of Transit vehicles under the joint procurement in accordance with the terms and conditions set forth in RFP No. 23-01. A single Contract will be executed by BASIN TRANSIT acting on behalf of the all participants. Ordering agencies issue individual purchase orders against the basic contract as funding becomes available to the agencies during the life of the contract. The purchase orders would reflect the basic contract unit prices and reference the basic contract for other terms and conditions. Specifically, the Agency is requesting proposals and pricing for the following types of buses: ICE (CNG and diesel) Zero Emission (Battery electric and Fuel Cell) vehicles. The buses are to be current model year factory production vehicles which are to be titled as new vehicles with less than 3000 miles. All parts used to modify and convert the vehicle for transit use are also to be brand new. Proposal due Date and Submittal Requirements Request for Proposal RFP 23-01 (HD Transit Vehicles), Final Proposals must be received by Due Date/s specified in IP 2 Sealed Proposals shall be submitted to following address: Basin Transit 62405 Verbena Road Joshua Tree, California 92252 2. Envelopes or boxes containing Proposals shall be sealed and clearly labeled with the Agency's Proposal number and the solicitation title: RFP No. 23-01, Joint Procurement for Heavy Duty Transit Vehicles. Proposers are requested to submit to the Agency one hard copy marked "Original," and eight (8) marked and labeled USB thumb drives, each containing an electronic PDF copy of the Proposal and all required Excel files and Buy America documents. Files are to be formatted to include Optical Character Recognition (OCR) so items can be searched. In case of any discrepancies, the hard copy shall be considered by the Agency in evaluating the Proposal, and the electronic version is provided for the Agency's administrative convenience only. Electronic Files are to be organized into subfolders for Technical Package, Price, Qualifications and Confidential Items as more thoroughly described in Section 9. A Proposal is deemed to be late if it is received by the Agency after the deadline stated above. Proposals received after the submission deadline shall be rejected. Firms that intend to propose multiple vehicle manufacturer lines may consolidate their electronic responses into eight (8) single high -capacity drives provided that the media is labeled with Dealer/Manufacturer name, RFP 23-01" and the electronic files are organized into subfolders with file names by manufacturer and type of file. Example: Main Folder named "Acme Bus," containing subfolders for "Acme Class A-C Proposal," "Acme Class A-C Price Worksheet," "Acme A-C Class Buy America Worksheet," "Acme Buy America Cost Documentation," "Acme Vehicle Information Worksheet" etc. In its letter of transmittal, the Proposer is to identify its primary point of contact for follow up inquiries as part of the evaluation process. NR 3. Validity of Proposals Proposals and subsequent offers shall be valid for a period of two hundred ten (210) days. NR 4. Pre -Proposal Meeting Information See IP 5, for meeting details. Request for Proposal RFP 23-01 (HD Transit Vehicles), Final Pre-Cont ract Cont r a c t i ng Of f i c e r ' s Name: Mr. Joe Meer Title: Director of Cooperative Purchasing Programs Address: 62504 Verbena Road, Joshua Tree, CA 92252 Phone number: 760-285-3479 E-mail: joe@basin-transit.com Fax number: 760-366-2445 Contact I n f o i Identification of Source of Funding Financial support of this project is provided through financial assistance grants from the Federal Transit Administration (FTA), and/or the State of California, California Department of Transportation (CalTrans) and other sources of local and state public funding. Signed and Dated for Posting Signature/Title Date 9 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final SECTION 2: INSTRUCTIONS TO PROPOSERS IP 1. Background Information This solicitation is a joint procurement for the manufacture and delivery of Heavy Duty Transit vehicles which may be ordered by public agencies collected by CalACT that have specifically entered into this joint procurement. Individual orders may include and consist of optional features, spare parts, training materials and manuals. The resulting contract will be an Indefinite Delivery Indefinite Quantity (IDIQ) contract, with specific minimum and maximum quantities for the total number of vehicles to be potentially ordered during the contract period. The minimum and maximum quantities established for the contract period are: Total (5 year) Minimum 1100 Total (5 year) Maximum 3957 These figures represent the foreseeable needs of the listed Agencies shown on Appendix C. ONLY these agencies shall be able to be order or assign vehicles from this joint procurement. Neither BASIN TRANSIT, CalACT or any other participant guarantee the purchase of any particular model or configuration of vehicle offered. Because multiple awards are contemplated, no individual vendor receiving an award based on this procurement cannot be guaranteed a minimum number of sales. Orders shall be placed on an as -needed basis. Should a vendor receive no orders for any of its models or configurations under its collective contracts resulting from this solicitation, BASIN TRANSIT shall provide upon request a contract minimum payment of $100. IP 2. Proposed Schedule for the Procurement The following is the solicitation schedule for proposers: • RFP Release: Friday, November 17, 2023. • ZEB Pre -Proposal Zoom Meeting: Monday, December 11, 2023. 0900 PST. Contact Joe(a),Basin-Transit.com for access link and agenda. • Proposer communications and requests: Friday, January 19, 2024 • Responses to Proposer's communications and/or Agency addenda: Friday, February 23, 2024 (Issued February 5, 2024) • Proposals Due Date: Tuesday, April 12, 2024, 5 pm 10 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final ZEB Buy America Post Proposal Zoom Meeting: TBD IP 3. Obtaining Proposal Documents Proposal documents may be obtained from Basin Transit electronically at www. Basin Transitbus.com. Documents requested by mail shall be packaged and sent postage paid. Documents requested by courier shall be packaged and sent only at the Proposers' expense. IP 4. Proposal Security Requirements — None IP 5. Pre -Proposal Meeting/Information for Proposers A Pre -Proposal Meeting shall be held electronically on at the time and date specified in IP2. Prospective Proposers are urged to make every effort to attend this meeting. This is for prospective proposers only; the meeting is not for suppliers or subcontractors. Please contact joe@basin-transit.com for access to the meeting and identify your attendees. The meeting is informational and not a Q&A session. Questions should be sent in writing to BASIN TRANSIT, using the RFA process and form. Prospective Proposers are reminded that any changes to the RFP shall be by written addenda only, and nothing stated at the Pre -Proposal Meeting shall change or qualify in any way any of the provisions in the RFP and shall not be binding on the Agency. IP 6. Questions, Clarifications and Omissions All correspondence, communication and contact in regard to any aspect of this solicitation or offers shall be only with the Contracting Officer identified above. Unless otherwise instructed by the Contracting Officer, proposers and their representatives shall not make any contact with or communicate with any member of the Agency, or its employees and consultants, other than the designated Contracting Officer, in regard to any aspect of this solicitation or offers. At any time during this procurement up to the time specified in "Proposed Schedule for the Procurement," Proposers may request, in writing, a clarification or interpretation of any aspect, a change to any requirement of the RFP, or any addenda to the RFP. Requests may include suggested substitutes for specified items and for any brand names, which whenever used in this solicitation shall mean the brand name or approved equal. Such written requests shall be made to the Contracting Officer. The Proposer making the request shall be responsible for its proper delivery to the Agency as identified on the form Request for Pre -Offer Change or Approved Equal. Any request for a change to any requirement of the Contract documents must be fully supported with technical data, test results or other pertinent information showing evidence that the exception shall result in a condition equal to or better than that required by the RFP, without a substantial increase in cost or time requirements. 11 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final All responses to Request for Pre -Offer Change or Approved Equal shall be provided to all proposers. Any response that is not confirmed by a written addendum shall not be official or binding on the Agency. If it should appear to a prospective Proposer that the performance of the Work under the Contract, or any of the matters relating thereto, is not sufficiently described or explained in the RFP or Contract documents, or that any conflict or discrepancy exists between different parts of the Contract or with any federal, state, local or Agency law, ordinance, rule, regulation or other standard or requirement, then the proposer shall submit a written request for clarification to the Agency within the time period specified above. IP 7. Addenda to RFP The Agency reserves the right to amend the RFP at any time in accordance with "Proposed Schedule for the Procurement." Any amendments to the RFP shall be described in written addenda. Notification of or the addenda also shall be distributed to all such prospective Proposers officially known to have received the RFP. Failure of any prospective proposer to receive the notification or addenda shall not relieve the Proposer from any obligation under the RFP therein. All addenda issued shall become part of the RFP. Prospective Proposers shall acknowledge the receipt of each individual addendum in their Proposals on the form Acknowledgement of Addenda. Failure to acknowledge in the Proposal receipt of addenda may at the Agency's sole option disqualify the Proposal. If the Agency determines that the addenda may require significant changes in the preparation of Proposals, the deadline for submitting the Proposals may be postponed no less than ten (10) days from the date of issuance of addenda or by the number of days that the Agency determines shall allow Proposers sufficient time to revise their Proposals. Any new Due Date shall be included in the addenda. IP 8. DBE Requirements for Transit Vehicle Manufacturers Pursuant to Title 49, Code of Federal Regulations, Part 26.49, the Vehicle Manufacturer, as a condition of being authorized to respond to this solicitation, must certify by completing the form DBE Approval Certification that it has submitted a goal to the Federal Transportation Administration (FTA) and it has not been disapproved. In addition, TVMs are to submit to grantees a copy of their FTA approval letter along with the TVM certifications. Failure to maintain TVM Status through the term of the contract, may result in termination of the contract. IP 9. Conditions, Exceptions, Reservations or Understandings Proposers are cautioned to limit exceptions, conditions and limitations to the provisions of this RFP, as they may be determined to be so fundamental as to cause rejection of the Proposal for not responding to the requirements of the RFP. 12 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final IP 10. Protest Procedures All protests must be in writing, stating the name and address of protestor, a contact person, Contract number and title. Protests shall specify in detail the grounds of the protest and the facts supporting the protest. IP 10.1 Address All protests must be addressed as follows: Agency Contact: Mr. Joe Meer For U.S. Mail, special delivery or hand delivery: Basin Transit 62405 Verbena Road Joshua Tree, CA 92252 Protests not properly addressed to the address shown above may not be considered by the Agency. Copies of the Agency's protest procedures and the protest provisions of FTA Circular 4220.1F or its successor may be obtained from Mr. Joe Meer, Basin Transit, 62405 Verbena Road, Joshua Tree, CA 92252, 760-366-2986. Proposals shall be opened and a Notice of Award shall be issued by the Agency in accordance with the Agency's protest procedures and the protest provisions of FTA Circular 4220.1F or its successor. IP 10.2 Pre -Proposal Protests Pre -Proposal protests are protests based upon the content of the solicitation documents. Three copies of Pre -Proposal protests must be received by the Agency's office no later than ten (10) calendar days after the RFP is first advertised. Protests shall be considered and either denied or sustained in part or in whole, in writing, in a manner that provides verification of receipt, prior to the Due Date for Proposals. A written decision specifying the grounds for sustaining all or part of or denying the protest shall be transmitted to the protestor prior to the Due Date for Proposals in a manner than provides verification of receipt prior to the Due Date for Proposals. If the protest is sustained, the Proposal Due Date may be postponed and an addendum issued to the solicitation documents or, at the sole discretion of the Agency, the solicitation may be canceled. If the protest is denied, Proposals shall be received and opened on the scheduled date unless a protest is filed with FTA. See "FTA Review," below. IP 10.3 Protests on the Recommended Award All proposers shall be notified of the recommended award. This notice shall be transmitted to each proposer at the address contained in its Proposal form in a manner that provides verification of receipt. Any Proposer whose Proposal has not lapsed may protest the recommended award on any ground not specified in "Pre -Proposal Protests," above. Three (3) copies of a full and complete written statement specifying in detail the grounds of the protest and the facts supporting the protest must be received by the Agency at the appropriate address in "Address," 13 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final above, no later than fifteen (15) calendar days after the date such notification is received. Prior to the issuing of the Notice of Award, a written decision stating the grounds for allowing or denying the protest shall be transmitted to the protestor and the proposer recommended for award in a manner that provides verification of receipt. IP 10.4 FTA Review After such administrative remedies have been exhausted, an interested party may file a protest with the Federal Transit Administration of the U.S. Department of Transportation's designee, The California Department of Rail and Mass Transit (CalTrans) pursuant to the procedures provided in the FTA C 4220.1F or its successor. CalTrans/FTA review is limited to the alleged failure of the Agency to have written protest procedures, the alleged failure of the Agency to follow those procedures, the alleged failure of the Agency to review a protest or the alleged violation of federal law or regulation. IP It. Preparation of Proposals IP 11.1 Use of Proposal Forms Proposers are advised that the forms contained in this RFP are required to be used for submission of a Proposal. IP 11.2 Alternate and Multiple Proposals A Proposer may submit multiple proposals. However, each proposal may only contain information for one vehicle. Proposers are expressly prohibited from submitting a single proposal covering multiple vehicles. IP 11.3 Proposal Format Requirements Proposals shall be submitted in four separately sealed packages identified below. In this case, the contents of Package 1, Package 3 and Package 4 may be "combined" into a single package and can be placed in a single binder. 3 ring binders to be used marked with Proposers name, Manufacturer and Line Item bid on cover and spine of folder. Each package shall be marked as specified below and shall contain all of the Proposal documents for which the package is required to be marked and shall include no other documents. Package 2, Price Proposal Requirements, must be submitted separately in a marked sealed package. These same requirements shall apply to any Best and Final Offers (BAFOs) that may be requested. Package 1: Technical Proposal Requirements 1. Letter of Transmittal 2. Acknowledgement of Addenda — CER 3 3. Contractor Service and Parts Support Data — CER 4. In addition, the Proposer should include a detailed description of support resources available for the proposed vehicles. Include an overview of available training, parts locations and availability, help lines and service assistance resources proposed. 14 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final 4. Vehicle Questionnaire — CER 9, Appendix J, Vehicle Questionnaire, Appendix I, Service/Parts Center and Plant Questionnaires, Appendix H, References List, submit Hardcopy and excel sheets. 5. Manufacturing facilities plant layout including a narrative or list of the work being done at each station. 6. Typical delivery schedule from date of order placement 7. Warranty Provisions and Service/Warranty Administration Plan. Each Proposer shall provide the proposed warranty for their vehicle and the major components. This information shall be submitted on the form provided for this purpose. In addition, the Proposer is to be submit a narrative on how warranties shall be handled, the forms, the process, etc. 8. Quality Assurance Procedures Package 2: Price Proposal Requirements Each Price Proposal shall be on the prescribed Proposal form(s) and shall be for the entire Contract, including all Proposal items. I. Letter of Transmittal 2. Price Worksheet (including but not limited to such pricing elements as optional bus features). Note: Subject to the provisions of SP 4, Pricing, the selected Contractors shall agree to sell vehicle(s), including proposed optional equipment, at the same price and under the terms and conditions of this Agreement from the time of contract award to the expiration of the initial contract term. Contractors are prohibited from offering any parts credits, rebates, etc. following Contract award. Pricing is to be proposed on a pre-tax basis. Taxes applicable to the purchaser shall be paid as a pass -through cost, without mark-up or additional fee. The Proposer is required to complete and execute the Agency's Pricing Schedule, contained as part of the Proposal documents, and provide same in the Price Proposal. The Contractor shall be responsible for making tax payments on a timely basis, subject to reimbursement as noted above. The Contractor shall be liable for payment of all local taxes applicable to the complete bus as delivered and should add these amounts to the Proposal price. Package 3: Qualification Package Requirements 1. Pre -Award Evaluation Data Form - CER 6 2. If the Proposer is not the vehicle manufacturer, the Proposal must include a confirmation from the vehicle manufacture that the Proposer is a bona -fide authorized factory dealer for the manufacture of the vehicle. 3. A copy of the three (3) most recent financial statements of the Proposer. Statement of Current Financial Condition. 4. Letter(s) for insurance, indicating the manufacturer and/or the Contractor's ability to obtain the insurance coverage in accordance with the RFP requirements 5. Proposal Form — CER 2.0 15 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final 6. All Federal certifications: Buy America Certification, Debarment and Suspension Certification for Prospective Contractor, Debarment and Suspension Certification (Lower -Tier Covered Transaction), Non -Collusion Affidavit, Lobbying Certification, Certificate of Compliance with Bus Testing Requirement, DBE Approval Certification, and Federal Motor Vehicle Safety Standards, Tax and Felony Conviction certifications. — CER 1.1 — 1.8 7. Copy of the FTA's letter of the TVM's DBE goal showing either approval of the DBE goal or not disapproval. Package 4: Proprietary/Confidential Information Package Requirements The Proposer is directed to collect and submit any information it deems to be proprietary or confidential in nature in a separate marked and sealed package. If there is no confidential information, then the Proposer should include a statement to that effect. Subject package shall be submitted in accordance with the terms and conditions governing the submittal of proposer's Proposal to this RFP. Blanket -type identification by designating whole pages or sections as containing proprietary information, trade secrets or confidential commercial and financial information shall not ensure confidentiality. The specific proprietary information, trade secrets or confidential commercial and financial information must be clearly identified as such. The Proposer is advised that the Agency is public and as such may be subject to certain state and/or local Public Records Act provisions regarding the release of information concerning this RFP. If a request is received by the Agency for the release of Proposer's propriety/confidential information, subject request shall be referred to the Proposer for review and consideration. If Proposer chooses to declare the information proprietary/confidential and withhold it from release, it shall indemnify, defend, and hold harmless the Agency from any legal action arising from such a declaration. IP 11.4 Agency Treatment of Proprietary/Confidential Information Access to government records is governed by the laws of the State of California. Except as otherwise required to be disclosed by applicable State law, the Agency shall exempt from disclosure proprietary information identified in Package 4. Upon a request for records from a third party regarding this Proposal, the Agency shall notify the Proposer in writing. The Proposer must respond within ten (10) business days with the identification of any and all "proprietary, trade secret, or confidential commercial or financial" information. Failure to respond within the allowed period shall be deemed an approval to release. The proposer shall indemnify the Agency's defense costs associated with its refusal to produce such identified information; otherwise, the requested information may be released. The Agency shall employ sound business practices no less diligent than those used for the Agency's own confidential information to protect the confidence of all licensed technology, software, documentation, drawings, schematics, manuals, data and other information and material provided by Proposers and the Contractor pursuant to the Contract that contain confidential commercial or financial information, trade secrets or proprietary information as 16 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final defined in or pursuant to the California Law against disclosure of such information and material to third parties, except as permitted by the Contract. The Contractor shall be responsible for ensuring that confidential commercial or financial information, trade secrets or proprietary information with such determinations to be made by the Agency in its sole discretion bears appropriate notices relating to its confidential character. IP 11.5 Signing of Proposal Forms Proposals shall include firm name (and, in the event that the Proposer is a joint venture, the names of the individual firms comprising the joint venture); business address; and the name, title and business address of the responsible individual(s) with their telephone, facsimile (fax) numbers and email address who may be contacted during the Proposal evaluation period for scheduling oral presentations and for receiving notices from the Agency. The proposer shall submit with their Proposal a copy of the joint venture agreement. Proposals shall be signed by those individual(s) authorized to bind the proposer. The proposer shall submit evidence of the official's authority to act for and bind the Proposer in all matters relating to the Proposal. (In the event the Proposer is a joint venture or consortium, a representative of each of the members of the joint venture or consortium shall execute the Proposal. Each joint venture or consortium member is jointly and severally liable for the joint venture or consortium.) IP 11.6 Modification or Withdrawal of Proposals A modification of a Proposal already received shall be accepted by the Agency only if the modification is received prior to the Proposal Due Date, is specifically requested by the Agency, or is made with a requested BAFO. All modifications shall be made in writing and executed and submitted in the same form and manner as the original Proposal. A Proposer may withdraw a Proposal already received prior to the Proposal Due Date by submitting to the Agency, in the same manner as the original Proposal, a written request for withdrawal executed by the Proposer's authorized representative. After the Proposal Due Date, a Proposal may be withdrawn only if the Agency fails to award the Contract within the Proposal validity period prescribed in "Duration of the Validity of Proposals," or any agreed -upon extension thereof. The withdrawal of a Proposal does not prejudice the right of a Proposer to submit another Proposal within the time set for receipt of Proposals. IP 11.7 Cost of Proposal Development This RFP does not commit the Agency to enter into a Contract, to pay any costs incurred in the preparation or presentation of a Proposal, nor to procure or contract for the equipment. IP 12. Proposal Evaluation, Negotiation and Selection Proposals shall be evaluated, negotiated, selected and any award made in accordance with the criteria and procedures described below. The approach and procedures are those that are applicable to a competitive negotiated procurement whereby Proposals are evaluated to 17 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final determine which Proposals are within a Competitive Range. Discussions and negotiations may then be carried out with Proposers within the Competitive Range, after which BAFOs may be requested. However, the Agency may select a Proposal or Proposals for award without any discussions or negotiations or request for any BAFOs. Proposers are hereby notified that the selected firms are expressly prohibited from offering any rebates, parts credits and any other price discounts following contract award. Thus, the initial proposal should represent the "best offer." Subject to the Agency's right to reject any or all Proposals, the Proposer or Proposers whose Proposal or Proposals are found to be most advantageous to the Agency shall be selected, based upon consideration of the criteria of "Proposal Selection Process," below. IP 12.1 Confidentiality of Proposals Proposals shall not be publicly opened. All Proposals and evaluations shall be kept strictly confidential throughout the evaluation, negotiation and selection process, except as otherwise required by applicable law. Only the members of the Selection Committee and Evaluation Team and other Agency officials, employees and agents having a legitimate interest shall be provided access to the Proposals and evaluation results during this period. IP 12.2 Duration of the Validity of Proposals Proposals and subsequent offers shall be valid for the period stated in "Section 1: Notice of Request for Proposals." The Agency may request Proposers to extend the period of time specified herein by written agreement between the Agency and the Proposer(s) concerned. IP 12.3 Evaluation Committee An Evaluation Committee, which shall include officers, employees and agents of the Agency and/or other participating agencies, shall be established. The Evaluation Committee shall carry out the detailed evaluations, including establishing the Competitive Range, carrying out negotiations and making the selection of the Proposer, if any, that may be awarded the Contract. The Evaluation Committee may report its recommendations and findings to the appropriate Agency individual or body responsible for awarding the Contract. IP 12.4 Proposal Selection Process The following describes the process by which Proposals shall be evaluated and a selection made for a potential award. Any such selection of a Proposal shall be made by consideration of only the criteria set forth below. "Qualification Requirements" specifies the requirements for determining responsible Proposers, all of which must be met by a Proposer to be found qualified. Final determination of a Proposer's qualification shall be made based upon all information received during the evaluation process and as a condition for award. 18 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final "Proposal Evaluation Criteria" contains all the evaluation criteria, and their relative order of importance, by which a Proposal from a qualified Proposer shall be considered for selection. An award, if made, shall be to responsible Proposer(s) for a Proposal that is found to be in the Agency's best interests, based on price and other evaluation criteria considered. The procedures to be followed for these evaluations are provided in "Evaluation Procedures," below. Qualification Requirements The following are the requirements for qualifying responsible proposers. All of these requirements should be met; therefore, they are not listed by any particular order of importance. Any Proposal that the Evaluation Committee finds not to meet these requirements, and cannot be made to meet these requirements, may be determined by the Evaluation Committee not to be responsible and the Proposal rejected. The requirements are as follows: 1. Sufficient financial strength, resources and capability to finance the Work to be performed and to complete the Contract in a satisfactory manner, as measured by the following: • • Proposer's financial statements (last 3 years) prepared in accordance with generally accepted accounting principles and audited by an independent certified public accountant. The Agency at its discretion may request additional documents to evaluate the financial condition of the manufacturer, suppliers or other documents it needs to determine the financial viability of the proposal. Basin Transit at its sole discretion may and will likely follow up during the evaluation process and require the provision of Financial Statements meeting the above criteria from the manufacturers. electrification modifiers or other key supplier's integral to the proposal. • • Statement of Current Financial Condition. In addition to the financial statements, the Agency requests that the proposer provide a "Statement of Current Financial Position" that updates the financial statements requirement as well as any unidentified subsequent events. Any Going Concern issues are to be disclosed and discussed. The statement is to be prepared by the p r o p o s i n g f i r m' s C e r lIe dafed ne ahrlicV thdn lkhe c A c c release date of this RFP and address the items below. As part of our due diligence, we are focusing on subsequent event(s) related to COVID-19 and resulting supply chain disruptions, inflation and the impact on financial performance and ability to perform on contracts. That process will look at the notes to the financial statements and any relevant information offered by the company's management will be considered. Determination of impact of any subsequent event related to the COVID-19 pandemic on the financial statements involve management judgement. This would include consideration of the date of the financial statements, the facts and circumstances pertaining to the entity and the conditions that existed at, or arose after, that date. 19 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final As the impacts of the COVID-19/Supply chain issues continue to evolve, capturing events that relate specifically to conditions that existed or exist at the date of the financial statements, or after the reporting date, may require assessment. A few examples of events and conditions that may be affected by, or exist and can facilitate identification of subsequent events are given below: -Commitments: New commitments, borrowings or guarantees -Force maj eure: Invocation of force maj eure clause by any party (e.g. supplier or customer) thereby impacting the supply chain/availability of customers for the entity's products -Government stimulus package: Relief or economic stimulus payments provided by the government in the form of loans or grants -Expected Credit Loss (ECL) provisioning: Collectability of trade receivables affected in cases by COVID-19. Status of firm's lines of credit (flooring) in order to support the transactions that may take place doing business with the consortium. •Impairment indicators: Indications of impairment in the value of investments in companies whose businesses have been severely affected by the pandemic -Employee related expenses: Employee termination benefits resulting from a reduction (e.g. because of closure or re -organization of operations that occurred after the reporting date) -Other events: Events that are relevant to the recoverability of assets, ongoing pertinence of business and valuation assumptions Events that will bring into question the appropriateness of accounting policies used in the financial statements. For instance, events call into question the validity of the going concern assumption, ECL model and useful lives of property, plant, and equipment. Events that are relevant to the measurement of estimates or provisions made in the financial statements. For instance, derivative and hedging considerations, insurance claims and rebate arrangements with customers. -Contingencies: Any developments regarding contingencies (for example, new contingent liabilities or circumstances affecting the evaluation of 20 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final existing contingent liabilities, the ability to meet agreed -on performance targets for contingent consideration in business combination arrangements, etc.) -Tax considerations: Tax considerations e.g., impact of reduced flow of goods and services on transfer pricing agreements; recoverability of deferred tax assets. Due to the pandemic, some industries are likely to be more impacted than others. For instance, entities in the aviation sector (and therefore, entities that are feeder industries to entities in the aviation sector), real estate, construction, retail, tourism, hospitality, transportation, financing, infrastructure sectors. Therefore, it is critical for management to assess the impact of events occurring after the balance sheet date on the financial statements already provided and provide this to Basin Transit. • Proposer's ability to obtain required insurance with coverage values that meet minimum requirements evidenced by a letter from an underwriter confirming that the proposer can be insured for the required amount. Letter to be submitted with proposal. Insurance documents provided upon award are to indemnify Basin Transit and the California Association for Coordinated Transportation. 2. Evidence that the human and physical resources are sufficient to perform the Contract as specified and to ensure delivery of all equipment within the time specified in the Contract, to include the following: • • Engineering, management and service organizations with sufficient personnel and requisite disciplines, licenses, skills, experience and equipment to complete the Contract as required and to satisfy any engineering or service problems that may arise during the warranty period. • • Adequate manufacturing facilities sufficient to produce and factory -test equipment on schedule. • • A spare parts procurement and distribution system sufficient to support equipment maintenance without delays and a service organization with skills, experience and equipment sufficient to perform all warranty and on -site Work. •• The proposer is to furnish Basin Transit wi t h a " r e p r e s e n t a t i will be evaluated to ascertain whether the manufacturer and/or converter can build a vehicle according to specification and as proposed to a level of quality and performance acceptable to the consortium participants. See clause SP7. below. Evidence that proposer is qualified in accordance with the provisions of "Section 8: Quality Assurance." 21 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final 4. Evidence of satisfactory performance and integrity on contracts in making deliveries on time, meeting specifications and warranty provisions, parts availability and steps Proposer took to resolve any judgments, liens, Fleet Defects history or warranty claims. Evidence shall be confirmed by client references. Proposers must submit a list of all their deliveries in the last twelve (12) months with contact name, title, agency, phone numbers, email addresses and dates of delivery provided in the Excel sheet provided. Proposal Evaluation Criteria The following are the complete criteria, listed by their relative degree of importance, by which Proposals from responsible Proposers shall be evaluated and ranked for the purposes of determining any Competitive Range and to make any selection of any Proposal for a potential award. Any exceptions, conditions, reservations, or understandings explicitly, fully and separately stated on Form for Proposal Deviation, which do not cause the Agency to consider a Proposal to be outside the Competitive Range, shall be evaluated according to the respective evaluation criteria and sub -criteria that they affect. PASS -FAIL ELEMENTS Category Scoring Method Responsiveness requirements (Certificates and forms) Pass/Fail Vehicle Questionnaire (Products meets specifications) Pass/Fail POINT ALLOCATION Category Scoring Method NON -COST FACTORS (45%) Proposer Qualifications and Requirements: 10 Points References Warranty Provisions and Warranty 10 Points Administration Plan 10 Points Customer Service and Parts Support, Service Plan Proposer and Manufacturer Qualifications and 15 Points Experience 45 Points Total Non -Cost Factor Points COST FACTORS (55%) 22 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final Price Sheet- Base Models (Standard Pricing) 40 Points 15 Points Price Sheet- Optional Features Total Cost Factor Points 55 Points Total Possible Points 100 Points Proposer Price Score = Lowest Price Proposed X Proposer's Price Points Proposer's Cost Under this formula, the proposer with the lowest proposed price for the base model vehicle will receive 40 points. The other proposals will receive a proportionate share of points based on how much higher their proposed price is in relationship to the low proposed price. This score will be based on "Standard Pricing" proposed. "Alternate Pricing" as per SP 10.3 will be evaluated separately for acceptance. Proposed accessories or services will be evaluated for the optional features scores (15 points) using a "basket" of selected options proposed. IP 12.5 Evaluation Procedures Proposals shall be analyzed for conformance with the instructions and requirements of the RFP and Contract documents. Proposals that do not comply with these instructions and do not include the required information may be rejected as insufficient or not be considered for the Competitive Range. The Agency reserves the right to request that a Proposer provide any missing information and make corrections. Proposers are advised that the detailed evaluation forms and procedures shall follow the same Proposal format and organization specified in "Preparation of Proposals." Therefore, Proposers should pay close attention to and strictly follow all instructions. Submittal of a Proposal shall signify that the Proposer has accepted the whole of the Contract documents. Any such conditions, exceptions, reservations or understandings that do not result in the rejection of the Proposal are subject to evaluation under the criteria set forth in "Proposal Selection Process." Evaluations shall be made in strict accordance with all of the evaluation criteria specified in "Proposal Selection Process," above. The Agency shall choose the Proposal that it finds to be most advantageous to the Agency, based upon the evaluation criteria. IP 12.6 Evaluations of Competitive Proposals 1. Qualification of responsible Proposers. Proposals shall be evaluated to determine the responsibility of proposers. A final determination of a Proposer's responsibility 23 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final shall be made upon the basis of initial information submitted in the Proposal, any information submitted upon request by the Agency, information submitted in a BAFO (if required) and information resulting from Agency inquiry of Proposer's references and its own knowledge of the Proposer. 2. Detailed evaluation of Proposals and determination of Competitive Range. The Agency shall carry out and document its evaluations in accordance with the criteria and procedures set forth in "Proposal Selection Process." Any Proposal deficiencies that may render a Proposal unacceptable shall be documented. The Agency shall make specific note of questions, issues, concerns and areas requiring clarification by Proposers and to be discussed in any meetings with Proposers that the Agency finds to be within the Competitive Range. Rankings of the Proposals against the evaluation shall then be made for determining which Proposals are within the Competitive Range, or may reasonably be made to be within the Competitive Range. 3. Proposals not within the Competitive Range. Proposers of any Proposals that have been determined by the Agency as not in the Competitive Range, and that cannot be reasonably made to be within the Competitive Range, shall be notified in accordance with the Agency's policies. 4. Discussions with Proposers in the Competitive Range. The Proposers whose Proposals are found by the Agency to be within the Competitive Range, or that may be reasonably made to be within the Competitive Range, shall be notified and any questions or requests for clarifications provided to them in writing. Each such Proposer may be invited for an interview and discussions with the Agency to discuss answers to written or oral questions, clarifications and any facet of its Proposal. In the event that interviews and discussions are held, these interviews and discussions may be scored. BASIN TRANSIT reserves the right to accept proposals as submitted without conducting discussions. No information, financial or otherwise, shall be provided to any Proposer about any of the Proposals from other Proposers, to the extent permitted by applicable law. Proposers shall not be given a specific price or specific financial requirements they must meet to gain further consideration, except that proposed prices may be considered to be too high with respect to the marketplace or unacceptable. Proposers shall not be told of their rankings among the other Proposers prior to Contract award. Factory and site visits. The Agency reserves the right to conduct factory visits of the Proposer's facilities and/or the facilities of major sub -suppliers included in the Proposal. 24 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final 6. Best and final offers. After all interviews, if any, have been completed, the Proposers in the Competitive Range may be afforded the opportunity to amend their Proposals and make their BAFOs. If BASIN TRANSIT decides to request a BAFO, the Request for BAFOs shall include the following: • • Notice that discussions and negotiations are concluded. • • A complete listing of the conditions, exceptions, reservations or understandings that have been approved. • • A common date and time for submission of written BAFOs, allowing a reasonable opportunity for preparation of the written BAFOs. • • Notice that if any modification to a BAFO is submitted, it must be received by the date and time specified for the receipt of BAFOs. • • Notice to Proposers that do not submit a notice of withdrawal or a BAFO that their immediately previous Proposal shall be construed as their BAFO. Any modification to the initial Proposal made by a Proposer in its BAFO shall be identified in its BAFO. BAFOs shall be evaluated by the Agency according to the same requirements and criteria as the initial Proposals, ("Proposal Selection Process"). The Agency shall make appropriate adjustments to the initial scores for any sub -criteria and criteria that have been affected by any Proposal modifications made by the BAFOs. These final scores and rankings within each criterion shall again be arrayed by the Agency and considered according to the relative degrees of importance of the criteria defined in "Proposal Selection Process." The Agency shall then choose the Proposal(s) that it finds to be most advantageous to the Agency, based upon the evaluation criteria. The results of the evaluations and the selection of a Proposal(s) for any award shall be documented. In this instance, the Agency expects to award to multiple Proposers. Subsequent orders shall be placed following the Ordering Procedures outlined in Section 4, Special Provisions. The Agency reserves the right to make an award to a Proposer(s) whose Proposal(s) it judges to be most advantageous to the Agency based upon the evaluation criteria, without conducting any written or oral discussions with any Proposers or solicitation of any BAFOs. 7. Debriefing. Subsequent to the award, the unsuccessful Proposers shall be notified and may request a debriefing. Proposers shall be debriefed in accordance with Agency policies, including information regarding the shortcomings of their Proposal. 25 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final IP 13. Response to Proposals IP 13.1 Single Proposal Response If only one Proposal for a particular class or vehicle type is received in response to this RFP and it is found by the Agency to be acceptable, a price or cost analysis, or both, possibly including an audit, may be performed by or for the Agency. The Proposer has agreed to such analysis by submitting a Proposal in response to this RFP. IP 13.2 Availability of Funds Orders placed as a result of this procurement are subject to the availability of funding. IP 13.3 Agency Contract Approval Process Following completion of the evaluation process, firms being considered for award shall show compliance with the FTA Pre -Award Buy America requirements. Refusal to provide the required information shall result in the immediate elimination of the specific manufacturer(s) for award consideration. The Agency's mandatory requirements for Buy America auditing and the provision of information in support of such auditing are contained in Appendix E. Once compliance with the Buy America requirements is verified, the Agency shall prepare a written recommendation for contact award(s) to the recommended firm(s). This recommendation shall then be presented to the Agency General Manager and/or Board of Directors for approval. IP 13.4 Agency Rights The Agency reserves the right to cancel the procurement in whole or in part, at its sole discretion, at any time before the Contract is fully executed and approved on behalf of the Agency. The Agency reserves the right to reject any or all Proposals, to undertake discussions with one or more Proposers, and to accept that Proposal or modified Proposal which, in its judgment, shall be most advantageous to the Agency, considering price and other evaluation criteria. The Agency reserves the right to determine any specific Proposal that is conditional or not prepared in accordance with the instructions and requirements of this RFP to be nonresponsive. The Agency reserves the right to waive any Defects, or minor informalities or irregularities in any Proposal which do not materially affect the Proposal or prejudice other Proposers. If there is any evidence indicating that two or more proposers are in collusion to restrict competition or are otherwise engaged in anti -competitive practices, the Proposals of all such Proposers shall be rejected, and such evidence may be a cause for disqualification of the participants in any future solicitations undertaken by the Agency. 26 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final The Agency may reject a Proposal that includes unacceptable Deviations as provided in Form for Proposal Deviation. IP 13.5 Execution of Contract The acceptance of a Proposal for award, if made, shall be evidenced in writing by a notice of award of Contract delivered to those Proposers whose Proposal is accepted. Upon notice of award of the Contract to a Proposer, the Proposer shall commence performance under the Contract by furnishing copies of the certificates of insurance required to be procured by the Contractor pursuant to the Contract documents within thirty (30) calendar days after the date of receipt of the notice of award. Failure to fulfill these requirements within the specified time may be cause for termination of the Contract under "Termination for Default" in Section 3. IP 14. Conflicts of Interests and Gratuities Proposers are prohibited from engaging in any practice that may be considered as a conflict of interests under existing Agency policies and/or state law, and to refrain from participating in any gifts, favors or other forms of compensation that may be viewed as a gratuity in accordance with existing policies and laws. IP 15. Agency -Specific Provisions IP 15.1 Purpose of the Solicitation The purpose of this solicitation is to establish a multi -vendor contract for the purchase of public transportation vehicles. The requirement has been divided into multiple types of vehicles that shall be competed separately and assembled into a listing of vehicles after award. The selected contractors shall accept purchase orders directly from the users. Each purchase order shall incorporate the base contract and all terms and conditions. The intent is to reduce the cost and effort needed to order these vehicles in order to make the funds and equipment available to increase services available to transit organizations. IP 15.2 Roles of the Parties for this Solicitation Basin Transit, a Joint Powers Authority, is the lead agency role for the j oint procurement for Heavy Duty Transit Vehicles. The specific roles and obligations of Basin Transit and CalACT are described in detail in the Cooperative Purchasing Agreement entered into by those parties. For the purposes of this solicitation, the arrangement entered into by Basin Transit and CalACT shall hereinafter be referred to as the "Cooperative." As a general matter, Basin Transit staff, consultants, and counsel shall be responsible for the development of RFP solicitation documents, the technical product specifications and the awarding of vehicle contracts on behalf of the Cooperative. After the vehicle contract is awarded, CalACT shall be responsible for providing ordering agencies with the ordering instructions and forms required to ensure compliant purchasing, solicitation documentation required for the agency's files, collecting fees, and the general administration of the vehicle contract. Ordering Agencies must contact CalACT or Basin Transit to secure formal letters of assignment prior to execution of any orders. 27 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final SECTION 3: GENERAL CONDITIONS GC 1. Definitions The following are definitions of special terms used in this document: Agency: Basin Transit. Any contract modification involving the base contract shall be issued by Basin Transit. The term Ordering Agency shall also refer to any Agency which is a party to the joint procurement and that places a purchase order under the joint procurement. Authorized Signer: The person who is executing this Contract on behalf of the Contractor and who is authorized to bind the Contractor. Best and Final Offer (BAFO): The last Proposal made by a Proposer. If a BAFO is not specifically requested by the Agency, or if the Proposer does not promptly respond to a request for BAFO, then the most recent, current Proposal is the BAFO. Class 1 Failure (physical safety): A failure that could lead directly to passenger or operator injury and represents a severe crash situation. Class 2 Failure (road call): A failure resulting in an en route interruption of revenue service. Service is discontinued until the bus is replaced or repaired at the point of failure. Competitive Range: The range of proposals that are identified as the most highly rated, unless the range is further reduced for purposes of efficiency. Contract: The Proposal and its acceptance by the Agency as manifested by the Contract documents specified in "Section 10: Contract." Contracting Officer: The person who is executing this Contract on behalf of the Agency and who has complete and final authority except as limited herein. For this solicitation, the Contracting Officer prior to Contract award is the authorized representative of Basin Transit. The Contracting Officer for administration of the contract following Contract award is the authorized representative of CalACT. Each order placed shall also designate a Contracting Officer for the Agency placing the order. Contractor: The successful Proposer(s) who is awarded a Contract for providing buses and equipment described in the Contract documents. Cooperative: Term used to describe the relationship between Basin Transit and CalACT for the establishment of the joint procurement. Days: Unless otherwise stated, "days" shall mean calendar days. Defect: Patent or latent malfunction or failure in manufacture, installation or design of any component or subsystem. 28 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final Deviation: Variance from a requirement or specification that does not alter the basis of a contract or adversely affects its performance. Due Date: The date and time by which Proposals must be received by the Agency as specified in "Section 1: Notice of Request for Proposals." Extended Warranty: A warranty available for purchase above the standard warranty. Fatigue Failure (Corrosion Fatigue): The mechanical degradation of a material under the joint action of corrosion and cyclic loading. Joint Procurement: An arrangement between multiple local government entities with multiple vendors to provide specific property or services in the future at established prices. In this case, the specific property includes accessible transit vehicles (Buses). Ordering Agency: Term for the agency that shall be purchasing vehicles from the joint procurement. In this case, an agency must be a listed member of the joint procurement shown in Appendix C. Pass -Through Warranty: A warranty provided by the Contractor but administered directly with the component Supplier. Proposal: A promise, if accepted, to deliver equipment and services according to the underlying solicitation of the Agency documented using the prescribed form in the solicitation, including any Proposal or BAFO. Proposer: A legal entity that makes a Proposal. For this solicitation, the Proposer may be a vehicle manufacturer or a dealer representing a vehicle manufacturer. Related Defect: Damage inflicted on any component or subsystem as a direct result of a separate Defect. Solicitation: Agency's request for proposals. Superior Warranty: A warranty still in effect after all contractually required warranties have expired. The remaining warranty is administered directly between the sub -Supplier and the Agency. Supplier: Any manufacturer, company or Agency providing units, components or subassemblies for inclusion in the bus that is installed by the Contractor. Supplier items shall require qualification by type and acceptance tests in accordance with requirements defined in "Section 8: Quality Assurance." Subcontractor: Any manufacturer, company or Agency providing units, components or subassemblies for inclusion in the bus that is installed by a Subcontractor. Subcontractor 29 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final items shall require qualification by type and acceptance tests in accordance with requirements defined in "Section 8: Quality Assurance." Work: Any and all labor, supervision, services, materials, machinery, equipment, tools, supplies and facilities called for by the Contract and necessary to the completion thereof. GC 2. Materials and Workmanship The Contractor shall be responsible for all materials and workmanship in the construction of the bus and all accessories used, whether the same are manufactured by the Contractor or purchased from a Supplier. This provision excludes any equipment leased or supplied by the Agency, except insofar as such equipment is damaged by the failure of a part or component for which the Contractor is responsible, or except insofar as the damage to such equipment is caused by the Contractor during the manufacture of the buses. GC 3. Conformance with Specifications and Drawings Materials furnished and Work performed by the Contractor shall conform to the requirements of the Technical Specifications and other Contract documents. Notwithstanding the provision of drawings, technical specifications or other data by the Agency, the Contractor shall have the responsibility of supplying all parts and details required to make the bus complete and ready for service even though such details may not be specifically mentioned in the drawings and specifications. Items that are installed by the Agency shall not be the responsibility of the Contractor unless they are included in this Contract. GC 4. Inspection, Testing and Acceptance GC 4.1 General The pre -delivery tests and inspections shall be performed at the Contractor's plant; they shall be performed in accordance with the procedures defined in "Section 8: Quality Assurance"; and they may be witnessed by the resident inspector. When a bus passes these tests and inspections, the resident inspector, if one is present, shall authorize release of the bus. Within fifteen (15) calendar days after arrival at the designated point of delivery, the bus shall undergo the Agency tests defined in "Post -Delivery Tests." If the bus passes these tests or if the Agency does not notify the Contractor of non -acceptance within 15 calendar days after delivery, then acceptance of the bus by the Agency occurs on the 15th day after delivery. If the bus fails these tests, it shall not be accepted until the repair procedures defined in "Repairs After Nonacceptance" have been carried out and the bus retested until it passes. Acceptance occurs earlier if the Agency notifies the Contractor of early acceptance or places the bus in revenue service. GC 4.2 Risk of Loss The Agency shall assume risk of loss of the bus on delivery, as defined in "Bus Delivery." Prior to this delivery, the Contractor shall have risk of loss of the bus, including any damages sustained during the delivery regardless of the status of title or any payments related to the bus. If 30 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final the vehicle is driven to the designated point of delivery, drivers shall keep a maintenance log en route, and it shall be delivered to the Agency with the bus. If the bus is released back to the Contractor for any reason, the Contractor has the risk of loss upon such release. GC 5. Title and Warranty of Title Adequate documents for registering the bus in California shall be provided to the Contractor not less than ten (10) business days before delivery to the Agency. Upon acceptance of each bus, the Contractor registers the vehicle and warrants that the title shall pass to the Agency free and clear of all encumbrances. GC 6. Intellectual Property Warranty The Agency shall advise the Contractor of any pending or threatened patent suit or claim related to this Contract against the Agency and provide all information available. The Contractor shall address any claim and defend any suit or proceeding brought against the Agency based on such a claim that any equipment, or any part thereof, furnished under this Contract constitutes an infringement of any patent, and the Contractor shall pay all damages and costs awarded therein, excluding incidental and consequential damages, against the Agency. In case said equipment, or any part thereof, is in such suit held to constitute infringement and use of said equipment or parts is enjoined, the Contractor shall, at its own expense and at its option, either procure for the Agency the right to continue using said equipment or part, or replace same with non -infringing equipment, or modify it so it becomes non -infringing. The Contractor's obligations under this section are discharged and the Agency shall hold the Contractor harmless with respect to the equipment or part if it was specified by the Agency and all requests for substitutes were rejected, and the Contractor advised the Agency under "Questions, Clarifications and Omissions" of a potential infringement, in which case the Contractor shall be held harmless. The Contractor's obligation to indemnify, defend, and hold harmless the Agency and all affected Ordering Agencies against intellectual property claims and suits shall not extend to materials provided by an Ordering Agency for incorporation into a vehicle purchased under this Contract. GC 7. Data Rights GC 7.1 Proprietary Rights/Rights in Data The term "subject data" used in this clause means recorded information, whether or not copyrighted, that is delivered or specified to be delivered under the Contract. It includes the proprietary rights of the following: • Shop drawings and working drawings • Technical data including manuals or instruction materials, computer or microprocessor software • Patented materials, equipment, devices or processes • License requirements 31 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final The Agency shall protect proprietary information provided by the Contractor to the fullest extent of the law. The Contractor shall grant a royalty -free, perpetual, irrevocable, non-exclusive license to allow the Agency to utilize such information in order to maintain the vehicles. In the event that the Contractor no longer provides the information the Agency has the right to reverse engineer patented parts and software. The Agency reserves a royalty -free, non-exclusive and irrevocable license to reproduce, publish or otherwise use, and to authorize others to use, the following subject data for its purposes: (1) any subject data required to be developed and first produced in the performance of the Contract and specifically paid for as such under the Contract, whether or not a copyright has been obtained; and (2) any rights of copyright to which the Contractor, Subcontractor or Supplier purchases ownership for the purpose of performance of the Contract and specifically paid for as such under the Contract. The Contractor agrees to include the requirements of this clause, modified as necessary to identify the affected parties, in each subcontract and supply order placed under the Contract. GC 7.2 Access to Onboard Operational Data The Agency grants to the Contractor the right to inspect, examine, download, and otherwise obtain any information or data available from components provided by the Contractor, including, but not limited to, any electronic control modules or other data -collection devices, to the extent necessary to enable Contractor to perform reliability maintenance analysis, corrective action and/or other engineering type Work for the bus. This right expressly excludes access to information or data collected on any equipment not provided and installed by the Contractor and information pertaining to transit customers. GC 8. Changes GC 8.1 Contractor Changes Any proposed change in this Contract shall be submitted to the Agency for its prior approval. Oral change orders are not permitted. No change in this Contract shall be made without the prior written approval of the Contracting Officer. The Contractor shall be liable for all costs resulting from, and/or for satisfactorily correcting, any specification change not properly ordered by written modification to the Contract and signed by the Contracting Officer. GC 8.2 Agency Changes The Agency may obtain changes to the Contract by notifying the Contractor in writing. As soon as reasonably possible but no later than thirty (30) calendar days after receipt of the written change order to modify the Contract, the Contractor shall submit to the Contracting Officer a detailed price and schedule Proposal for the Work to be performed. This Proposal shall be accepted or modified by negotiations between the Contractor and the Contracting Officer. At that time, a detailed modification shall be executed in writing by both parties. Disagreements that cannot be resolved within negotiations shall be resolved in accordance with "Disputes," below. Regardless of any disputes, the Contractor shall proceed with the Work ordered. 32 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final GC 9. Legal Clauses GC 9.1 Indemnification GC 9.1.1 The Contractor shall, to the extent permitted by law: (1) protect, defend, indemnify and save the Agency and its officers, employees and agents, including consultants, harmless from and against any and all liabilities, damages, claims, demands, liens, encumbrances, judgments, awards, losses, costs, expenses and suits or actions or proceedings, including reasonable expenses, costs and attorneys' fees incurred by the Agency and its officers, employees and agents, including consultants, in the defense, settlement or satisfaction thereof, for any injury, death, loss or damage to persons or property of any kind whatsoever, to the extent caused by the intentional misconduct, grossly negligent acts, or negligent acts, errors or omissions of the Contractor in the performance of the Contract, including intentional misconduct, grossly negligent acts, and negligent acts, errors or omissions of its officers, employees, servants, agents, Subcontractors and Suppliers; and (2) upon receipt of notice and if given authority, shall settle at its own expense or undertake at its own expense the defense of any such suit, action or proceeding, including appeals, against the Agency and its officers, employees and agents, including consultants, relating to such injury, death, loss or damage. Each party shall promptly notify the other in writing of the notice or assertion of such claim, demand, lien, encumbrance, judgment, award, suit, action or other proceeding hereunder. The Contractor shall have sole charge and direction of the defense of such suit, action or proceeding. The Agency shall not make any admission that might be materially prejudicial to the Contractor unless the Contractor has failed to take over the conduct of any negotiations or defense within a reasonable time after receipt of the notice and authority above provided. The Agency shall at the request of the Contractor furnish to the Contractor all reasonable assistance that may be necessary for the purpose of defending such suit, action or proceeding, and shall be repaid all reasonable costs incurred in doing so. The Agency shall have the right to be represented therein by advisory council of its own selection at its own expense. GC 9.1.2 The obligations of the Contractor under the above paragraph shall not extend to circumstances where the injury, death or damages are caused solely by the negligent acts, errors or omissions of the Agency, its officers, employees, agents or consultants, including, without limitation, negligence in: (1) the preparation of the Contract documents, or (2) the giving of directions or instructions with respect to the requirements of the Contract by written order. Suspension of Work GC 9.1.1. The Agency may with the agreement of the bus manufacturer issue a written order to the Contractor suspending, delaying or interrupting all or any part of the Work for a specified period of time. GC 9.1.2. The Contractor shall comply immediately with any such written order and take all reasonable steps to minimize costs allocable to the Work covered by the suspension during the period of work stoppage. Contractor shall continue the Work that is not included in the suspension and shall continue such ancillary activities as are not suspended. The Contractor shall 33 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final resume performance of the suspended Work upon expiration of the notice of suspension, or upon direction from the Agency. GC 9.1.3. The Contractor shall be allowed an equitable adjustment in the Contract price (excluding profit) and/or an extension of the Contract time, to the extent that cost or delays are shown by the Contractor to be directly attributable to any suspension. However, no adjustment shall be made under this section for any suspension, delay or interruption due to the fault or negligence of the Contractor, or for which an equitable adjustment is provided for, or excluded under any other term or condition of the Contract. As soon as reasonably possible but no later than forty-five (45) calendar days, or any other period of time agreed to by the parties, after receipt of the written suspension of work notice, the Contractor shall submit to the Contracting Officer a detailed price and schedule Proposal for the suspension, delay or interruption. GC 9.2 Excusable Delays/Force Majeure GC 9.2.1. If the Contractor is delayed at any time during the progress of the Work by the neglect or failure of the Agency or by a cause as described below, then the time for completion and/or affected delivery date(s) shall be extended by the Agency subject to the following cumulative conditions: a. The cause of the delay arises after the Notice of Award and neither was nor could have been anticipated by the Contractor by reasonable investigation before such award. Such cause may also include force majeure events such as any event or circumstance beyond the reasonable control of the Contractor, including but not limited to acts of God; earthquake, flood and any other natural disaster; civil disturbance, strikes and labor disputes; fires and explosions; epidemic, pandemic or terrorism; war and other hostilities; embargo; or failure of third parties, including Suppliers or Subcontractors, to perform their obligations to the Contractor; b. The Contractor demonstrates that the completion of the Work and/or any affected deliveries shall be actually and necessarily delayed; c. The Contractor has taken measures to avoid and/or mitigate the delay by the exercise of all reasonable precautions, efforts and measures, whether before or after the occurrence of the cause of delay; and d. The Contractor makes written request and provides other information to the Agency as described in GC 9.3.4 below. A delay in meeting all of the conditions of this section shall be deemed an excusable delay. Any concurrent delay that does not constitute an excusable delay shall not be the sole basis for denying a request hereunder. GC 9.2.2. None of the above shall relieve the Contractor of any liability for the payment of any liquidated damages owing from a failure to complete the Work by the time for completion that the Contractor is required to pay pursuant to "Liquidated Damages for Late Delivery of the Bus" for delays occurring prior to, or subsequent to the occurrence of an excusable delay. 34 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final GC 9.2.3. The Agency reserves the right to rescind or shorten any extension previously granted, if subsequently the Agency determines that any information provided by Contractor in support of a request for an extension of time was erroneous; provided, however, that such information or facts, if known, would have resulted in a denial of the request for an excusable delay. Notwithstanding the above, the Agency shall not rescind or shorten any extension previously granted if the Contractor acted in reliance upon the granting of such extension and such extension was based on information which, although later found to have been erroneous, was submitted in good faith by the Contractor. GC 9.2.4. No extension or adjustment of time shall be granted unless: (1) written notice of the delay is filed with the Agency within fourteen (14) calendar days after the commencement of the delay and (2) a written application therefore, stating in reasonable detail the causes, the effect to date and the probable future effect on the performance of the Contractor under the Contract, and the portion or portions of the Work affected, is filed by the Contractor with the Agency within thirty (30) calendar days after the commencement of the delay. No such extension or adjustment shall be deemed a waiver of the rights of either party under this Contract. The Agency shall make its determination within thirty (30) calendar days after receipt of the application. GC 9.3 Termination GC 9.3.1. Termination for Convenience The performance of Work under this Contract may be terminated by the Agency in accordance with this clause in whole, or from time to time in part, whenever the contracting officer shall determine that such termination is in the best interest of the Agency. Any such termination shall be effected by delivery to the Contractor of a notice of termination specifying the extent to which performance of Work under the Contract is terminated, and the date upon which such termination becomes effective. After receipt of a notice of termination, and except as otherwise directed by the Contracting Officer, the Contractor shall do the following: • Stop Work under the Contract on the date and to the extent specified in the notice of termination. • Place no further orders or subcontracts for materials, services or facilities, except as may be necessary for completion of such portion of the Work under the Contract as is not terminated. • Terminate all orders and subcontracts to the extent that they relate to the performance of work terminated by the notice of termination; assign to the Agency in the manner, at the times, and to the extent directed by the Contracting Officer, all of the right, title and interest of the Contractor under the orders and subcontracts so terminated, in which case the Agency shall have the right, in its discretion, to settle or pay any or all claims arising out of the termination of such orders and subcontracts. • Settle all outstanding liabilities and all claims arising out of such termination of orders and subcontracts, with the approval or ratification of the Contracting Officer, to the 35 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final extent he or she may require, which approval or ratification shall be final for all the purposes of this clause. • Transfer title to the Agency and deliver in the manner, at the times and to the extent, if any, directed by the Contracting Officer the fabricated or unfabricated parts, Work in process, completed Work, supplies and other material produced as part of, or acquired in connection with the performance of, the Work terminated, and the completed or partially completed plans, drawings, information and other property which, if the Contract had been completed, would have been required to be furnished to the Agency. • Use its best efforts to sell, in the manner, at the times, to the extent, and at the price(s) directed or authorized by the Contracting Officer, any property of the types referred to above, provided, however, that the Contractor shall not be required to extend credit to any purchaser, and may acquire any such property under the conditions prescribed by and at a price(s) approved by the Contracting Officer, and provided further that the proceeds of any such transfer or disposition shall be applied in reduction of any payments to be made by the Agency to the Contractor under this Contract or shall otherwise be credited to the price or cost of the Work covered by this Contract or paid in such other manner as the Contracting Officer may direct. • Complete performance of such part of the Work as shall not have been terminated by the notice of termination. • Take such action as may be necessary, or as the Contracting Officer may direct, for the protection or preservation of the property related to this Contract that is in the possession of the Contractor and in which the Agency has or may acquire an interest. The Contractor shall be paid its costs, including Contract close-out costs, and profit on Work performed up to the time of termination. The Contractor shall promptly submit its termination claim to Agency to be paid the Contractor. Settlement of claims by the Contractor under this termination for convenience clause shall be in accordance with the provisions set forth in Part 49 of the Federal Acquisition Regulations (48 CFR 49) except that wherever the word "Government" appears, it shall be deleted and the word "Agency" shall be substituted in lieu thereof. GC 9.3.2. Termination for Default The Agency may, by written notice of default to the Contractor, terminate the whole or any part of this Contract if the Contractor fails to make delivery of the supplies or to perform the services within the time specified herein or any extension thereof, or if the Contractor fails to perform any of the other material provisions of the Contract, or so fails to make progress as to endanger performance of this Contract in accordance with its terms, and in either of these two circumstances does not cure such failure within a period of ten (10) business days, or such longer period as the Contracting Officer may authorize in writing, after receipt of notice from the Contracting Officer specifying such failure. If the Contract is terminated in whole or in part for default, the Agency may procure, upon such terms and in such manner as the Contracting Officer may deem appropriate, supplies or services 36 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final similar to those so terminated. The Contractor shall be liable to the Agency for any excess costs for such similar supplies or services, and shall continue the performance of this Contract to the extent not terminated under the provisions of this clause. Except with respect to defaults of Subcontractors, the Contractor shall not be liable for any excess costs if the failure to perform the Contract arises out of a cause beyond the control and without the fault or negligence of the Contractor. If the failure to perform is caused by the default of a Subcontractor, and if such default arises out of causes beyond the control of both the Contractor and Subcontractor, and without the fault or negligence of either of them, the Contractor shall not be liable for any excess costs for failure to perform, unless the supplies or services to be furnished by the Subcontractor were obtainable from other sources and in sufficient time to permit the Contractor to meet the required delivery schedule. Payment for completed supplies delivered to and accepted by the Agency shall be at the Contract price. The Agency may withhold from amounts otherwise due the Contractor for such completed supplies such sum as the Contracting Officer determines to be necessary to protect the Agency against loss because of outstanding liens or claims of former lien holders. If, after notice of termination of this Contract under the provisions of this clause, it is determined for any reason that the Contractor was not in default under the provisions of this clause, or that the default was excusable under the provisions of this clause, the rights and obligations of the parties shall be the same as if the notice of termination had been issued pursuant to termination for convenience of the Agency. GC 9.4 Compliance with Laws and Regulations Contractor shall at all times comply with all applicable laws, regulations, policies, procedures and directives (together, the "Law"), including without limitation, FTA regulations, policies, procedures and directives, including those listed directly or by reference in the agreement between the Agency and FTA that funds any part of this Contract, as they may be amended or promulgated from time to time during the term of this Contract. Contractor's failure to so comply shall constitute a material breach of this Contract. GC 9.5 Changes of Law Changes of Law that become effective after the Proposal Due Date may result in price changes. If a price adjustment is indicated, either upward or downward, it shall be negotiated between the Agency and the Contractor and the final Contract price shall be adjusted upwards or downwards to reflect such changes in Law. Such price adjustment may be audited, where required. For certainty, in the event that a price adjustment is required in respect of changes that are mandatory as a result of legislation or regulations that become effective after the date of the tender submission, such price adjustment shall be negotiated in good faith by the Agency and the successful bidder. 37 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final GC 9.6 Governing Law and Choice of Forum This Contract shall be governed by the laws of State of California without regard to conflict of law rules. The Contractor consents to the exclusive jurisdiction of the State and federal courts exercising jurisdiction over the County where any Agency designated as a party to the litigation is located. GC 9.7 Disputes Except as otherwise provided in this Contract, any dispute concerning a question of fact arising under or related to this Contract that is not disposed of by agreement shall be decided in accordance with the following steps. However, by mutual agreement the matter may be taken immediately to any higher step in the dispute resolution process, or mutually agreed to alternative dispute resolution process (which may include structured negotiations, mediation or arbitration) or litigation. Pending final resolution of a dispute hereunder, the Contractor shall proceed diligently with the performance of the Contract and in accordance with the Contracting Officer's or Chief Executive Officer's decision, as the case may be. 1. Notice of dispute. All disputes shall be initiated through a written dispute notice submitted by either party to the other party within 10 (ten) calendar days of the determination of the dispute. 2. Negotiation between contracting officers. The parties shall attempt in good faith to resolve any dispute arising out of or relating to this Contract promptly by negotiation between the designated Contracting Officer of the Agency ordering the vehicles and the Contractor's executives who have authority to settle the controversy. Any party may give the other party written notice of any dispute not resolved in the normal course of business as provided in (1) above. Within 14 (fourteen) calendar days after delivery of the dispute notice, the receiving party shall submit to the other party a written response. The dispute notice and written response shall include: (a) a statement of the party's position and a summary of the arguments supporting that position, (b) any evidence supporting the party's position and (c) the name of the executive who shall represent that party and of any others who shall accompany the executive in negotiations. Within 28 (twenty-eight) calendar days after delivery of the dispute notice, the Contracting Officer of both parties shall meet at a mutually acceptable time and place, and thereafter as they reasonably deem necessary to attempt to resolve the dispute. All reasonable requests for information by one party to the other shall be honored. If the matter has not been resolved by these people within 42 (forty-two) calendar days of the dispute notice, the dispute may be referred to more senior executives of both parties who have authority to settle the dispute and who shall likewise meet to attempt to resolve the dispute. 38 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final GC 9.8 Maintenance of Records; Access by Agency; Right to Audit Records In accordance with 2 CFR § 200.334 and 49 USC § 5325(g), the Contractor agrees to provide the Agency, FTA, the Comptroller General of the United States, the Secretary of the U.S. Department of Transportation, the State of California or any of their duly authorized representatives access to any books, documents, papers and records of the Contractor that are directly pertinent to or relate to this Contract (1) for the purpose of making audits, examinations, excerpts and transcriptions and (2) when conducting an audit and inspection. The Contractor agrees to permit any of the foregoing parties to reproduce by any means whatsoever or to copy excerpts and transcriptions as reasonably needed. For Contract modifications or change orders the Agency, FTA, the Comptroller General of the United States, the Secretary of the U.S. Department of Transportation, the State of California or any of their duly authorized representatives shall have the right to examine all books, records, documents and other cost and pricing data related to a Contract modification, unless such pricing is based on adequate price competition, established catalog or market prices of commercial items sold in substantial quantities to the public, or prices set by law or regulation, or combinations thereof. Data related to the negotiation or performance of the Contract modification or change order shall be made available for the purpose of evaluating the accuracy, completeness and currency of the cost or pricing data. The right of examination shall extend to all documents necessary for adequate evaluation of the cost or pricing data, along with the computations and projections used therein, either before or after execution of the Contract modification or change order for the purpose of conducting a cost analysis. If an examination made after execution of the Contract modification or change order reveals inaccurate, incomplete or out-of-date data, the Contracting Officer may renegotiate the Contract modification or change order price adjustment, and the Agency shall be entitled to any reductions in the price that would result from the application of accurate, complete or up- to-date data. The Contractor agrees to maintain all books, records, accounts and reports required under this contract for a period of not less than three years after the date of termination or expiration of this contract, except in the event of litigation or settlement of claims arising from the performance of this contract, in which case Contractor agrees to maintain same until the Purchaser, the FTA Administrator, the Comptroller General, or any of their duly authorized representatives, have disposed of all such litigation, appeals, claims or exceptions related thereto. The requirements of this section are in addition to any other audit, inspection and record - keeping provisions specified elsewhere in the Contract documents. GC 9.9 Confidential Information Access to government records is governed by the statutes of the State of California. Except as otherwise required by the statutes of the State of California, the Agency shall exempt from 39 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final disclosure proprietary information, trade secrets and confidential commercial and financial information submitted or disclosed during the Contract period. Any such proprietary information, trade secrets or confidential commercial and financial information that a Contractor believes should be exempted from disclosure shall be specifically identified and marked as such. Blanket -type identification by designating whole pages or sections as containing proprietary information, trade secrets or confidential commercial and financial information shall not ensure confidentiality. The specific proprietary information, trade secrets or confidential commercial and financial information must be clearly identified as such. Upon a request for records from a third party regarding the Contract, the Agency shall notify the Contractor in writing. The Contractor must respond within ten (10 ) days with the identification of any and all "proprietary, trade secret or confidential commercial or financial" information. The Contractor shall agree to indemnify, defend, and hold harmless the Agency for all costs associated with the Agency's withholding such identified information; otherwise, the requested information may be released. The Agency shall employ sound business practices no less diligent than those used for the Agency's own confidential information to protect the confidence of all licensed technology, software, documentation, drawings, schematics, manuals, data and other information and material provided by the Contractor pursuant to the Contract that contain confidential commercial or financial information, trade secrets or proprietary information as defined in or pursuant to the statutes of the State of California against disclosure of such information and material to third parties except as permitted by the Contract. The Contractor shall be responsible for ensuring that confidential commercial or financial information, trade secrets or proprietary information, with such determinations to be made by the Agency in its sole discretion, bears appropriate notices relating to its confidential character. During the performance of the Work under the Contract, it may be necessary for either party (the "Discloser") to make confidential information available to the other party (the "Recipient"). The Recipient agrees to use all such information solely for the performance of the Work under the Contract and to hold all such information in confidence and not to disclose same to any third party without the prior written consent of the Discloser or as required by law. Likewise, the Recipient agrees that all information developed in connection with the Work under the Contract shall be used solely for the performance of the Work under the Contract, and shall be held in confidence and not disclosed to any third party without the prior written consent of the Discloser or as required by law. This Confidentiality section shall survive the termination or expiration of the Contract. GC 9.10 Conflicts of Interest, Gratuities No member, officer, or employee of the Agency or of a local public body during his or her tenure, or one year thereafter, shall have any interest, direct or indirect, in this Contract or the proceeds thereof. 40 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final GC 9.11 General Nondiscrimination Clause hi connection with the performance of Work provided for under this Contract, the Contractor agrees that it shall not, on the grounds of race, religious creed, color, national origin, ancestry, physical disability, medical condition, marital status, sex, sexual orientation or age, discriminate or permit discrimination against any person or group of people in any manner prohibited by federal, state or local laws. GC 9.12 Amendment and Waiver GC 9.12.1. Amendment Any modification or amendment of any provisions of any of the Contract documents shall be effective only if in writing, signed by authorized representatives of both the Agency and Contractor, and specifically referencing this Contract. GC 9.12.2. Waiver In the event that either party elects to waive its remedies for any breach by the other party of any covenant, term or condition of this Contract, such waiver shall not limit the waiving party's remedies for any succeeding breach of that or of any other term, covenant or condition of this Contract. GC 9.13 Remedies not Exclusive The rights and remedies of the Agency provided herein shall not be exclusive and are in addition to any other rights and remedies provided by law or under the Contract. GC 9.14 Counterparts This Contract may be executed in any number of counterparts. All such counterparts shall be deemed to constitute one and the same instrument, and each of said counterparts shall be deemed an original thereof. GC 9.15 Severability Whenever possible, each provision of the Contract shall be interpreted in a manner as to be effective and valid under applicable law. However, if any provision, or part of any provision, should be prohibited or invalid under applicable law, such provision, or part of such provision, shall be ineffective to the extent of such prohibition or invalidity without invalidating the remainder of such provision or the remaining provisions of the Contract. GC 9.16 Third -Party Beneficiaries No provisions of the Contract shall in any way inure to the benefit of any third party, including the public at large, so as to constitute such person a third -party beneficiary of the Contract or of any one or more of the terms and conditions of the Contract or otherwise give rise to any cause of action in any person not a party to the Contract, except as expressly provided elsewhere in the Contract. 41 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final GC 9.17 Assignment of Contract Neither party shall assign or subcontract its rights or obligations under the Contract without prior written permission of the other party, and no such assignment or subcontract shall be effective until approved in writing by the other party. Contractor accepts that the right to Purchase may be assigned by the Agency as described in clause NR1, above And clause SP2, below. GC 9.18 Independent Parties The Contractor is an independent contractor with respect to the performance of all Work hereunder, retaining control over the detail of its own operations, and the Contractor shall not be considered the agent, employee, partner, fiduciary or trustee of the Agency. GC 9.19 Survival The following sections shall survive the nominal expiration or discharge of other Contract obligations, and the Agency may obtain any remedy under law, Contract or equity to enforce the obligations of the Contractor that survive the manufacturing, warranty and final payment periods: • "Intellectual Property Warranty" • "Data Rights" • "Indemnification" • "Governing Law and Choice of Forum" • "Disputes" • "Confidential Information" • "Parts Availability Guarantee" • "Access to Records" • "Training" GC 10. Agency -Specific Provisions — Not Used 42 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final SECTION 4: SPECIAL PROVISIONS SP 1. Authorization to Use the Joint Procurement Contract The use of the Joint Procurement contract shall be restricted to the agencies listed in Appendix "C" publicly funded transit agencies, city transit systems, other governmental agencies or non- profit organizations performing governmental services. SP 2. Assignability Basin Transit reserves the right to assign the ability to use the Procurement to any other grantees of FTA funds in accordance with FTA Circular 4220.117 or successor circulars. These grantees shall be CalTrans subrecipients or other Ordering agencies identified in this RFP. A letter of Assignment shall be issued by either BASIN TRANSIT or by CalACT acting for Basin Transit under the terms of their Cooperative Purchasing Agreement. Basin Transit reserves the right to withhold assignments at its unilateral discretion. Each Assignment shall be valid for a one-year period. All buses ordered under that Assignment shall be delivered and accepted in accordance with SP 11. SP 3. Period of Performance The initial period of performance shall be one (1) year. Basin Transit shall have the right to extend the period of performance for four (4) one-year options. The four (4) one-year option periods area unilateral right that shall not be refused by the Contractor. Subject to the Agency's right to order modifications, the Option Vehicles shall have the same specifications as the vehicles purchased under the initial Contract. The Agency may exercise the Options by written notice to the Contractor ("Notice of Exercise of Option") prior to the expiration of the initial period of performance. In the event that these options are exercised, the pricing for each option period shall be established per the provisions of SP 5.3, Price Validity for Option Periods. SP 4. Procurement Fee A procurement fee of 1% of total pre-tax price per vehicle, up to $40,000 per transaction shall be paid by the Contractor(s) to the Cooperative each month based on activity on this contract. This fee shall be shown as a separate line item on the invoice to the Agency ordering the vehicles. It shall be payable to the Cooperative within thirty (30) days of delivery to agencies. Contractors shall also supply monthly activity reports showing all orders and payments to the Cooperative. This activity may be audited. The Cooperative may charge interest for late payment if payment is delayed more than ten (10) days after the payment Due Date set forth above. Interest will be charged at a rate of 10% of the procurement fee that is due. The fee does not apply to direct purchases by Basin Transit or its subrecipients. Basin Transit reserves the right to unilaterally change these fees at any time by giving written notice to the contractor. 43 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final Failure to report shall also be seen as failure to perform the contract and may lead to corrective action up to and including Termination for Default. SP 5. Pricing SP 5.1 Price Protection Contractor agrees all the Prices, terms, warranties, and benefits provided in this Contract are comparable to or better than the terms presently being offered by Contractor to any other governmental entity purchasing the same quantity under similar terms. If during the term of this Contract, Contractor shall enter into contracts with any other governmental entity providing greater benefits or more favorable terms than those provided by this Contract, Contractor shall be obligated to provide the same to Purchaser for subsequent purchases. SP 5.2 Price Validity for the Initial Contract Term Contractor agrees to sell vehicle(s), including proposed optional equipment, at the same price and under the terms and conditions of this Agreement from the time of contract award to the expiration of the initial contract term. By submittal and acceptance of its pricing, the Contractor also agrees to provide any of the listed optional features at the listed pricing for the initial one- year contract term. SP 5.3 Vehicle and Optional Feature Pricing for Option Periods Subject to the provisions of SP 5.5 Price Adjustments, the price of the vehicles and optional equipment ordered after the base period shall be the base period unit price adjusted by multiplying the applicable base period price by the following fraction: Preliminary Index Number on Month Prior to Notice of Exercise of Option Index Number available on Effective Date of the Contract or Prior Option Period The Index shall be the Producer Price Index for Truck and Bus Bodies, Series No. 1413 published by the United States Department of Labor or if such Index is no longer in use, then such replacement which is most comparable to the Index as may be designated by the Bureau of Labor Statistics, or as agreed by the parties. However, in no case shall the annual increase in the cost of a vehicle configuration of separately priced optional equipment item created by the application of the above referenced Index exceed six (6%) unless the Contractor provides written evidence, such as invoices from its suppliers that its net material costs exceed six percent (6%). In that event, the price adjustment shall be six percent (6%) plus one half of the net material costs that exceed six percent (6%). Basin Transit reserves the right to apply the Price Index based escalation without requesting that the contractor provide the above items if there is a preponderance of evidence that the PPI pricing should simply be applied. 44 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final As an example, Should the index value raise by six percent or less, the index value shall be applied to the price of each vehicle configuration and each separately priced optional equipment item; • Should the index value raise by more than six percent, The price of each vehicle configuration and each separately priced optional equipment item shall be increased by three percent; and Individual Contractors may request additional increases for individual vehicle configurations or items of separately priced optional equipment. Properly documented increases in net material costs will be subject to the cost sharing provisions above The net material costs shall be calculated on the full bill of materials for the affected vehicle or separately priced optional equipment. An increase in excess of six percent for a particular system or equipment will not merit a price increase in excess of three percent, should those costs be offset by reduced pricing of other systems or equipment. Pricing considered must include any applicable rebates, credits, or other offsets of any kind. Price adjustments shall be made at the start of each option year, with the six percent (or greater) maximum described above based on the then current pricing. That is, an adjustment at the start of the first option period would be calculated from base pricing. An adjustment at the start of the second option period would be calculated on the first option period pricing. An adjustment at the start of the third option period would be calculated on the second option period pricing. Notwithstanding the above, an increase due to inordinate increases in battery costs (For BEB and FC Buses only) shall be also considered each time a price adjustment is granted for an extension of an option. The Contractor shall provide documentation of the battery component cost increase. The price may be adjusted only in the same amount as the price increase to the Contractor and is net of the price increase granted to the cost of the complete bus. The Contractor shall submit the request and all necessary documentation to the Agency. The documentation of such factors shall be provided by the Contractor. Should the Agency not grant this price increase, the vehicle(s) affected by the BCA price increase may be removed the joint procurement and the contract terminated upon the responsible contractor's request. The agency may only grant the battery cost adjustment (BCA) as a percentage of battery cost vs. total bus cost, excluding this adjustment from the PPI increase. This is because you have already received a PPI increase on the bus body cost. This calculation needs to be reflected in the contractor's request letter per applicable line item. 45 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final A minimum of 60 calendar days advance written notice of price increase from the renewal due date is required which is to be accompanied by sufficient documentation to justify the requested increase. SP 5.4 Prohibitions Contractors are expressly prohibited from offering any rebates, parts credits and any other price discounts following contract award. SP 5.5 Price Adjustments Section GC 9.6, Changes of Law, provides for price adjustments because of changes of law. Section SP 5.3 provides for price adjustments based on increased material costs. The Agency shall consider extraordinary relief when circumstances amounting to a force majeure impact the Contractor's material costs and such increase is not adequately addressed by those provisions. A minimum of 60 calendar days advance written notice of price increase is required which is to be accompanied by sufficient documentation to justify the requested increase. Upon petitioning the agency for Force Majeure relief, the contractor must meet with the Agency or it's representatives on demand and provide substantive documentation within 30 days. The agency will not accept a simple recitation of cost factors, but will expect a submission of past and present costs to demonstrate that a Force Majeure condition has occurred. The contractor may be asked to reimburse up to of $3,000 for expenses in evaluating the Force Majeure request. SP 6. Ordering Procedures Agencies that are members of the joint procurement and that are using federal funds to place orders under this contract shall follow the following procedures: The Agency shall develop a requirements list showing all optional features, if any, that are required. In addition, the Agency shall identify any other evaluation factors that shall be considered in determining which vehicle is to be ordered. (Factors that may also be considered include past performance, special features of the specific vehicle required for effective program performance, warranty considerations, if any, maintenance or inventory considerations, if any and proposed delivery schedule.) 2. The Agency shall issue a request for delivery schedule to Contractors for at least three of vehicles available on the contract. (If there are fewer than three vehicles listed, the Agency shall obtain this information for the maximum number of vehicles available.) The RFQ shall list any other additional information that is required. It shall also note how information shall be evaluated and the deadline for submittal. 46 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final 3. Following receipt of the information, the Agency shall evaluate the submittals according to the evaluation criteria and select the quote that represents the offer that is most advantageous to the Agency when all factors are evaluated. 4. The recommended firm shall receive a written Order Confirmation form from the Ordering Agency. This form shall indicate: a. Itemized list of all vehicles, parts, etc. being ordered and prices b. Designated delivery point c. Delivery due date. 5. The Order Confirmation form does not replace any other required document such as Purchase Orders that may be issued by the agency. 6. All eligible orders must provide a proposal (quote) from the selected Dealer or Manufacturer that provides at a minimum the following information: Vehicle Type -provide description that includes make, model, vehicle class, propulsion type and capacity Full and legal Ordering Agency Name as it will appear on the Assignment Contact at Ordering Agency (including email, title, mailing address, phone number). Provide additional name if your contact is not the person that will receive the Assignment Letter. Sales person Quantity ordered -quote is to reflect entire and complete bus order, and is not per bus Price of all options 7. Orderi ng agency t o i ni t i at e t he t r a n s act program. The agency and Contractor to update all information and changes as needed. Awarded contractors to be briefed by Cooperative staff on use of this program prior to beginning sales activity on the contract. A Cooperative representative will issue a Letter of Assignment only after all the aforementioned steps have taken place. ADA eligible Items identified for sales tax exemption Published and Non -Published Options are to be listed separately Total Price of Bus subject to the procurement fee Document Fee Sales Tax Procurement Fee Delivery fee as quoted on Price Worksheet with expected delivery date -quotes issued without a delivery date are not valid. Date of Order 47 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final All quotes from the contractor must be written using the same format and approved by the Cooperative prior to first order. Any changes to the order by the buyer or seller after receipt need to be sent to the Cooperative. All buses ordered must be compliance with the contract. Questions about buyer eligibility to purchase from the contract need to be sent to the Cooperative for verification. Any change orders made to the initial purchase order are to be communicated as soon as possible to the Cooperative. SP 7. Inspection, Testing, Acceptance and Repairs SP 7.1 Inspections At the sole election of Basin Transit, the Agency may conduct an on -site inspection of the plant and/or first vehicle being manufactured to validate compliance with the specification and to validate the Post -Delivery Buy America and any other audit requirements. This vehicle is being called a First Article bus and it shall serve as a standard for the units that follow as ordered. This shall not relieve the Contractor and manufacturer from an obligation to manufacture all units in compliance with all specifications. The agency will at its discretion conduct on -site or virtual inspections of the manufacturing facility to confirm quality control procedures, technical qualifications and Buy America requirements. Individual purchasing agencies may request a First Article bus to be provided as part of their order. As per IP 12.4, prior to award, Basin Transit will evaluate a Representative Bus, that can be evaluated for performance, quality of manufacture with any variances to be reconciled to the specification and conformance to specifications. As least thirty (30) days prior to completion of the First Article bus, the Contractor is to notify the Agency in writing. The First Article bus is to be available for inspection either at the point of delivery or at the manufacturing facility. Parties that are to be present include representatives from the successful manufacturer, the Contractor and representative(s) from Basin Transit. If the inspection is held at the manufacturing facility, and for inspection of the manufacturing or conversion facilities. the Contractor shall pay travel expenses and $100 per day per diem for up to(two)Basin Transit representatives. /n addition,thelContractor maybe required to pay ap to a total of.70,OOOpervehicleproposecforconsuita4sfees and expensvcaperform facility, Buy Americaand representative orFirst rirst Article bus inspecti,ofrdrsancial reviewsondother necessar_sudits Lobe invoiced by thCooperative Should a change in manufacturing facility or bus design requires another set of inspections post -award, the same schedule of fees shall apply. SP 7.2 Pre -Delivery Tests The Contractor's or manufacturer's pre -delivery tests and inspections of all Vehicles shall be performed at or near the manufacturing plant; they shall be performed in accordance with the procedures defined in Quality Assurance Provisions, and they may be witnessed by the Resident Inspector, if one is assigned to a specific order. The records of this testing shall be provided to the ordering agency in accordance with the Quality Assurance Provisions. 48 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final SP 7.3 Service Prior to Delivery Prior to delivery, each vehicle shall be inspected and serviced by the Contractor or by an authorized dealer of the manufacturer in a service shop located near the Ordering Agency. The service shall include not less than the following: A. Check and fill all fluid levels as necessary. This shall include but not be limited to engine oil, hydraulic oil, transmission fluid, coolant level and mixture, battery levels, brake fluid, differential oil, washer fluid, and any and all other fluid levels. B. Complete wash and detail of the vehicle and removal of all unnecessary dealer stickers prior to delivery and inspection. C. A four-wheel alignment at final point of inspection. Wheel alignment shall take place after delivery to the Contractor's location. Documentation of alignment settings for camber, caster, and toe -in settings shall be furnished for the final inspection, and must accompany delivery documentation to Ordering Agency. D. Full tank of fuel at the Contractor's location. E. Documentation of the alignment of headlights shall be provided to the Ordering Agency at delivery. F. Check to ensure proper operation of all accessories, gauges, lights, mechanical, and hydraulic features. Particular attention shall be given to door alignment, lift operation, weather-stripping, hardware, paint condition, and labeling of the cooling system. G. Copy of the Contractor's pre -delivery inspection and all subsequent inspections by Contractor's inspectors shall be provided to the Ordering Agency upon delivery. H. A certified four -corner weight certificate showing the "as built" weight of the vehicle shall be provided with each vehicle at the time of delivery. The vehicle shall be full of fuel and all fluids and weighed with all equipment installed. The weight certificate shall be included with the bus and available for review at time of inspection. SP 7.4 Delivery Coordination and Pricing of Delivery All vehicle deliveries shall be coordinated with the ordering agency. The Contractor shall contact the ordering agency to agree upon a delivery schedule at least three (3) working days prior to delivery. Delivery shall be made during normal working hours. Delivery terms are Freight on Board (FOB) to be specified by the ordering agency, either at their place of business or at closest dealer location. Delivery charges are to be proposed per zone on the price worksheet and charged accordingly. Said deI i very charges are t o be p r o p o s ed f and point of service and pre -delivery inspection in the State of California to the ordering agency's place of business. (Not from Manufa SP 7.5 Delivery Inspection, Post -Delivery Tests and Acceptance Upon delivery of the Vehicle at a point of delivery, the Agency shall take possession of the Vehicle and shall perform the inspections and tests. For vehicles that are Federally funded, each bus shall be inspected and road tested per Appendix B, Visual Inspection and Road Test Forms. For vehicles funded by or through Caltrans, a postdelivery inspection is required. A sample inspection form is provided in B1ackCat. If the Vehicle passes these inspections and tests, the 49 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final Agency shall Accept the Vehicle no later than the fifteenth day after Contractor delivers the Vehicle to the Agency. The Agency may Accept a Vehicle earlier upon Notice of early Acceptance to the Contractor. If the Agency has not issued a Notice of Acceptance, the Agency shall be deemed to have accepted a Vehicle on the date it places the Vehicle into revenue service. Vehicles that fail to pass the post -delivery tests are subject to non -acceptance. The Agency shall record details of all Defects on the appropriate test forms and shall notify the Contractor of acceptance or non -acceptance of each bus after completion of the tests. The Defects detected during these tests shall be repaired according to procedures defined in "Repairs after Non - Acceptance." SP 7.6 Documentation and Deliverables Per Bus Order The Technical Specification identifies all technical deliverables that must be provided with each bus order. In addition to those items, the Contractor shall provide deliver the following documentation and deliverables with the bus(es). • • Warranty papers — forms, policy, procedures • Post Delivery Buy America documentation. The Contractor also shall exert its best efforts to keep maintenance manuals, operator manuals and parts books up to date for a period of five (5) years. The supplied manuals shall incorporate all equipment ordered on the buses covered by this procurement. In instances where copyright restrictions or other considerations prevent the Contractor from incorporating major components information into the bus parts and service manuals, separate manual sets as published by the subcomponent Supplier shall be provided. SP 7.7 Repairs after Non -Acceptance The Contractor, or its designated representative, shall perform the repairs after non -acceptance. SP 8. The Contractor shall provide a vehicle orientation with each vehicle delivered to an Agency. If an agency orders more than one (1) vehicle of identical specifications, the orientations shall be provided on the first vehicle delivered. The orientation shall be conducted by the Contractor for the maintenance and operations supervisory and training personnel. The orientation shall include but not be limited to: • • Engine type and proper type of fuel • • How to check coolant level and type of coolant required • • Function of all controls on the vehicle. • • Function of all controls on the driver control panel • • Location and function of controls on all add -on equipment, such as the A/C, etc. • • Location and identification of all visible and audible alarms. 50 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final • Location and identification of tire pressure ID plate • Location of batteries and how to service the batteries. SP 9. Registration of Vehicles The Contractor shall all the necessary documentation (MSO, Weight slip, etc.) for the agency to register the buses after delivery. Costs to provide these shall not be billed separately and must be incorporated into the vehicle unit prices. The agency must be able to register the vehicle free and clear of all liens (other than those provided by the Ordering Agency), mortgages and encumbrances, financing statements, security agreements, claims, and demands of any character against the vehicle following the Agency's Acceptance of each bus. SP 10. Payment All payments shall be made as provided herein, less any additional amount withheld as provided below and less any amounts for liquidated damages in accordance with "Liquidated Damages for Late Delivery of the Bus." The Agency shall make payments for buses at the unit prices itemized in the price schedule within thirty (30) calendar days after the delivery and acceptance of each bus and receipt of a proper invoice. The Agency shall make payments for spare parts and/or equipment at the unit prices itemized in the price schedule within thirty (30) calendar days after the delivery and acceptance of said spare parts and/or equipment and receipt of a proper invoice. The Agency shall make a final payment for all withholding within thirty (30) calendar days of receipt of a final proper invoice and the following: Delivery and acceptance of all Contract deliverables, including manuals and other documentation required by the Contract, excluding training. Contractor provision of any certifications as required by law and/or regulations. Completion of post -delivery audits required under the Contract. SP 10.1 Invoices Contractor shall submit invoices for all Vehicles, Spare Parts, and all equipment and other items purchased under this Contract to the Agency thirty (30) calendar days prior to each delivery. Payment shall be within 30 days after Acceptance of each item. Proforma invoices shall be acceptable. SP 10.2 Payment of Taxes Unless otherwise provided in this Contract, the Contractor shall pay all federal, state and local taxes, and duties applicable to and assessable against any Work, goods, services, processes and operations incidental to or involved in the Contract, including but not limited to retail sales and use, transportation, export, import, business and special taxes. The Contractor is responsible for 51 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final ascertaining and paying the taxes when due. The total Contract price shall include compensation for all taxes the Contractor is required to pay by laws in effect on the Proposal Due Date, except sales and use taxes normally applicable to purchasers. These sales and use taxes vary by jurisdiction and shall be billed separately, at cost and without markup of any kind, and subsequently reimbursed by each purchaser in conjunction with payment for the vehicles. The Contractor shall maintain auditable records, subject to the Agency reviews, confirming that tax payments are current at all times. Each invoice for vehicles shall specifically indicate the tax exemption for handicapped equipment (California Revenue and Taxation Code Section 6394.4). SP 10.3 Alternate Payment. (Contingent on FTA Approval) MBTA has proposed and is working with FTA to define adequate security as follows: The Contractor may submit a request for payment upon the Resident Inspector's release of the bus for shipment. Progress payment shall be made not more than thirty calendar days after receipt of an appropriate invoice. As a pre -condition to payment: 1. The purchaser must have completed the relevant Buy America post -delivery audit and have received from the Contractor documentation that would allow the purchaser to secure title to the bus. The Buy America audit is contemplated for completion during the pendency of the thirty -day payment window. Additionally, delivery of title documentation is contemplated is contemplated as occurring during that thirty -day window. Securitization in this manner is contingent on FTA's concurrence that this method represents adequate security to protect their interest in the acquisition. (Alternate Pricing 1 in BAFO sheet) 2. The Contractor must deliver an irrevocable letter of credit covering the full amount of the progress payment. The form of and requirements for letter of credit or other form of security approved by Basin Transit are provided herein. The price for the securitization to be included in the price offered. As the use of progress payments has not been common practice in the industry, Basin Transit reserves the right to renegotiate the price for securitization prior to each option year exercised providing acceptable documentation is submitted by the Contractor to support any adjustment requested. (Alternate Pricing 2 in BAFO sheet). Contractors wanting to utilize this alternative payment plan (92) are to clearly state the method of security they are proposing with the payment terms as well as the method of calculation that will be used for any discounts provided at time of quote/proposal. The costs associated with stated security must be included in the Alternate Payment Price. The Agency shall make progress payments in accordance with the following schedule. No other progress payments are authorized under this Agreement. Advance paw are expressly prohibited. A payment of 75% of the purchase price upon release for shipment as detailed above. 52 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final The Agency shall make payments for spare parts and/or equipment at the unit prices itemized in the price schedule within thirty (30) calendar days after the delivery and acceptance of said spare parts and/or equipment and receipt of a proper invoice. The Agency shall make a final payment for all withholding within thirty (30) calendar days of receipt of a final proper invoice and the following: 1. Delivery and acceptance of all Contract deliverables, including manuals and other documentation required by the Contract, excluding training. 2. Contractor provision of any certifications as required by law and/or regulations. 3. Completion of post -delivery audits required under the Contract. SP 11. Delivery Schedule The Contractor shall deliver all buses on or before the delivery date contained in the Order Confirmation issued by each ordering agency or if not specified, the minimum delivery standards specified in this section. The Order Confirmation shall also indicate the point of delivery as well as days and hours of delivery. " D e f 'hDirlivetw Standard: If a delivery date is not specified by the quote provided, delivery of the vehicles shall be completed within 365 calendar days after issuance of purchase orders by the Purchasing Agencies. If the delivery is delayed because of strike, injunctions, governmental controls, or any cause or circumstances beyond the reasonable control of the manufacturer, supplier or contractor, the time of completion of delivery may be extended upon written request from the proposing firm and approval by Basin Transit and the ordering agency. The request for extension must include detailed justification for the length of the time extension. The Contractor shall propose a delivery date identifying this in its proposal to each participant. Proposals (quotes) not indicating a delivery date to the ordering agency default to the above standard. Liquidated damages to be assessed based on the revised delivery schedule. SP 12. Liquidated Damages for Late Delivery of the Bus It is mutually understood and agreed by and between the parties to the Contract that time is of the essence with respect to the completion of the Work and that in case of any failure on the part of the Contractor to deliver the buses within the time specified in "Delivery Schedule," except for any excusable delays as provided in "Excusable Delays/Force Maj eure" or any extension thereof, the Agency shall be damaged thereby. The amount of said damages, being difficult if not impossible of definite ascertainment and proof, it is hereby agreed that the amount of such damages due to the Agency shall be fixed at $100 per business day per bus. The Contractor hereby agrees to pay the aforementioned amounts as fixed, agreed and liquidated damages, and not by way of penalty, to the Agency and further authorizes the Agency to deduct the amount of the damages from money due the Contractor under the Contract, computed as 53 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final aforesaid. If the money due the Contractor is insufficient or no money is due the Contractor, then the Contractor shall pay the Agency the difference or the entire amount, whichever may be the case, within thirty (30) days after receipt of a written demand by the Contracting Officer. The payment of aforesaid fixed, agreed and liquidated damages shall be in lieu of any damages for any loss of profit, loss of revenue, loss of use, or for any other direct, indirect, special or consequential losses or damages of any kind whatsoever that may be suffered by the Agency arising at any time from the failure of the Contractor to fulfill the obligations referenced in this clause in a timely manner. SP 13. Service and Parts SP 13.1 Contractor Service and Parts Support The Contractor shall state on the form Contractor Service and Parts Support Data the representatives responsible for assisting the Agency, as well as the location of the nearest distribution center, which shall furnish a complete supply of parts and components for the repair and maintenance of the buses to be supplied. The Contractor also shall state in its Proposal its policy on transportation charges for parts other than those covered by warranty. The Contractor must identify in its proposal that it has the resources and experience to service a contract of this scale. Physical service centers with the proximity and the technical capacity to serve the Cooperative's statewide participants are to be identified. Alternatively, if a proposer intends to utilize a subcontractor to provide service and warranty the proposed subcontractor must be identified in the proposal. A letter documenting the manufacturer's approval and authorization of the proposed service provider to perform service and warranty repairs for this contract, along with a letter from the subcontract service provider agreeing to perform the proposed service and warranty requirements, must be submitted with the proposal. The Agency reserves the right to evaluate and approve the subcontractor's technical capacity to adequately serve a contract of the size and scope anticipated for this procurement. SP 13.2 Parts Availability Guarantee The Contractor hereby guarantees to provide, within reasonable periods of time, the spare parts, software and all equipment necessary to maintain and repair the buses supplied under this Contract for a period of at least five (5) years after the date of acceptance. Parts shall be interchangeable with the original equipment and shall be manufactured in accordance with the quality assurance provisions of this Contract. Prices shall not exceed the Contractor's then - current published catalog prices. Where the parts ordered by the Agency are not received within two working days of the agreed - upon time and date and a bus procured under this Contract is out of service due to the lack of said ordered parts, then the Contractor shall provide the Agency, within twenty four (24) hours of the Agency's verbal or written request, the original Suppliers' and/or manufacturers' parts numbers, company names, addresses, telephone numbers and contact persons' names for all of the specific parts not received by the Agency. 54 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final Where the Contractor fails to honor this parts guarantee or parts ordered by the Agency are not received within thirty (30) days of the agreed -upon delivery date, then the Contractor shall provide to Agency, within seven (7) days of the Agency's verbal or written request, the design and manufacturing documentation for those parts manufactured by the Contractor and the original Suppliers' and/or manufacturers' parts numbers, company names, addresses, telephone numbers and contact persons' names for all of the specific parts not received by the Agency. The Contractor's design and manufacturing documentation provided to the Agency shall be for its sole use in regard to the buses procured under this Contract and for no other purpose. SP 14. Federal Motor Vehicle Safety Standards (FMVSS) The Contractor shall submit either a manufacturer's FMVSS self -certification that the vehicle complies with relevant FMVSS or a manufacturer's certified statement that the contracted buses shall not be subject to FMVSS regulations. One copy of the statement shall be provided to each Agency with the delivery of the buses. SP 15. Motor Vehicle Pollution Requirements The Contractor shall furnish to each Agency a certification in writing with each Vehicle delivered that: • • Vehicles shall meet Federal and California pollution requirements. • The horsepower of the Vehicle is adequate for the speed, range, and terrain in which it shall be required to operate and meet the demands of all auxiliary power equipment. SP 16. Insurance The Agency recognizes that the Contractor may be a dealer whose role is warranty and service of the vehicles. In such cases, the Contractor shall maintain in effect during the term of this Contract, including any warranty period, at its own expense, at least the following coverage and limits of insurance: Statutory Workers Compensation and Employers Liability insurance and/or qualified self-insurance program covering Supplier's employees while on Agency property. Commercial General Liability Insurance: • Bodily Injury and Property Damage, including Contractual Liability covering the indemnification contained herein, $1,000,000 combined single limits per occurrence, $5,000,000 aggregate, where applicable. • Product liability: $1,000,000 per occurrence, for a period of five (5) years after acceptance of the last bus delivered under this Contract (Products Liability coverage may be effected through one or more excess liability policies). Automobile Liability Insurance: Bodily Injury and Property Damage, $1,000,000 combined single limits per occurrence. In addition, the vehicle manufacturer whose role is to provide the vehicle shall maintain in effect during the term of this Contract, including any warranty period, at its own expense, at least the following coverage and limits of insurance: 55 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final Commercial General Liability Insurance: • Bodily Injury and Property Damage, including Contractual Liability covering the indemnification contained herein, $1,000,000 combined single limits per occurrence, $5,000,000 aggregate, where applicable. • Product liability: $1,000,000 per occurrence, for a period of five (5) years after acceptance of the last bus delivered under this Contract (Products Liability coverage may be effected through one or more excess liability policies). Contractor shall deliver to the Agency, within thirty (30) days after receiving Notice of Award of this Contract, evidence of the above. Prior to the expiration of any insurance during the time required, the Supplier shall furnish evidence of renewal to the Agency's Contract Administrator. SP 17. Buy America Post -Delivery Audit Prior to delivery of the first vehicle, the Contractor shall demonstrate compliance with Buy America through a Buy America Post -Delivery audit. The audit requirements are further detailed in Appendix E. SP 18. Interchangeability All buses delivered under this Contract, whether provided by a Subcontractor or Supplier, or manufactured by the Contractor, shall be duplicates in design and manufacture, and installed to assure Interchangeability among Buses in each separate order. This Interchangeability shall extend to the components and parts as well as to their locations in the Buses for all buses produced during the first year of the contract. For buses being produced during the second base year of the Contract, Basin Transit shall consider changes such as product improvements on a case -by -case basis. Basin Transit's basic expectation for any such change is that the new product shall perform at least as well if not better than the original. To that end, the Contractor may be required to obtain and provide an extended warranty at no cost for any proposed change in components. If a supplier discontinues a product during the Contract period, Basin Transit shall consider a substitute product on a case -by -case basis. No substitutions are to be made without the express written consent of Basin Transit. Basin Transit's basic expectation for any such change is that the new product shall perform at least as well if not better than the original. To that end, the Contractor may be required to obtain and provide an extended warranty at no cost for any proposed change in components. All such changes shall be processed according to the provisions of GC 8, Changes. The Contractor shall not modify any of the listed items contained on the Technical Submittal which was submitted with the proposal without the express written consent of Basin Transit. 56 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final SP 19. New Technology Basin Transit reserves the right to add or replace new devices to this contract that may evolve through new technology to the resulting contract. Such additions must be for the same purpose as equipment awarded and fall within the original scope. Such equipment shall only be added if it is presented as an ite333ms addition by an awarded Contractor. SP 20. Altoona Testing for New Buses. The Agency values timely delivery of fully compliant vehicles. Requirements for timely delivery are established in SP 11 and 12. Requirements for compliance with 49 CFR Part 655 (Altoona Bus Testing) are established in FR 14. Additionally, Proposers and Contractors offering new bus models as defined in 49 CFR 655.5 are required to make reasonable progress towards successfully completing Altoona testing. In this context, "reasonable progress" is defined as: • fTA authorization (confirmation from FTA or PSU Bus Testing Program) of testing obtained prior to submission of final proposal; and • -Successful completion of required testing within one year of award. (Passed and satisfactory test) The above is to be provided with the proposal and not merely promised by the firm. The agency will consider timely, good faith efforts by Proposers and contractors in enforcing these requirements but retains the authority to reject any proposal related to a new bus model for which the FTA has not authorized testing, and to take any such other actions to ensure new bus model sellers diligently pursue successful testing. SECTION 5: FEDERAL REQUIREMENTS Access to Records The Contractor agrees to maintain all books, records, accounts and reports required under this Contract for a period of not less than three years after the date of termination or expiration of this Contract, except in the event of litigation or settlement of claims arising from the performance of this Contract, in which case Contractor agrees to maintain same until the Agency, the FTA Administrator, the Comptroller General or any of their duly authorized representatives have disposed of all such litigation, appeals, claims or exceptions related thereto. Reference 2 CFR 334. See also clause GC 9.9. The following access to records requirements apply to this Contract: FR 1.1 Local Governments In accordance with 2 CFR 334 the Contractor agrees to provide the Agency, the FTA Administrator, the Comptroller General of the United States or any of their authorized representatives access to any books, documents, papers and records of the Contractor that are 57 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final directly pertinent to this Contract for the purposes of malting audits, examinations, excerpts and transcriptions. The Contractor agrees to permit any of the foregoing parties to reproduce by any means whatsoever or to copy excerpts and transcriptions as reasonably needed. Federal Funding, Incorporation of FTA Terms and Federal Changes The preceding provisions include, in part, certain standard terms and conditions required by the Department of Transportation, whether or not expressly set forth in the preceding Contract provisions. All contractual provisions required by DOT, as set forth in 2 CFR Part 200, and/or FTA Circular 4220.1F or its successors are hereby incorporated by reference. Anything to the contrary herein notwithstanding, all FTA mandated terms shall be deemed to control in the event of a conflict with other provisions contained in this agreement. The Contractor shall not perform any act, fail to perform any act or refuse to comply with any Agency requests that would cause the Agency to be in violation of the FTA terms and conditions. The Contractor shall at all times comply with all applicable FTA regulations, policies, procedures and directives, including without limitation those listed directly or by reference in the Master Agreement between Agency and FTA, as they may be amended or promulgated from time to time during the term of this Contract. Contractor's failure to so comply shall constitute a material breach of this Contract. Federal Energy Conservation Requirements The Contractor agrees to comply with mandatory standards and policies relating to energy efficiency that are contained in the state energy conservation plan issued in compliance with the Energy Policy and Conservation Act. Civil Rights Requirements The following requirements apply to the underlying Contract: Nondiscrimination: In accordance with Title VI of the Civil Rights Act, as amended, 42 USC § 2000d, section 303 of the Age Discrimination Act of 1975, as amended, 42 USC § 6102, section 202 of the Americans with Disabilities Act of 1990, 42 USC § 12132, and Federal transit law at 49 USC § 5332, the Contractor agrees that it shall not discriminate against any employee or applicant for employment because of race, color, creed, national origin, sex, age, or disability. In addition, the Contractor agrees to comply with applicable Federal implementing regulations and other implementing requirements FTA may issue. 2. Equal Employment Opportunity: The following equal employment opportunity requirements apply to the underlying Contract: (a) Race, Color, Creed, National Origin, Sex: In accordance with Title VII of the Civil Rights Act, as amended, 42 USC § 2000e, and Federal transit laws at 58 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final 49 USC § 5332, the Contractor agrees to comply with all applicable equal employment opportunity requirements of U.S. Department of Labor (U.S. DOL) regulations, "Office of Federal Contract Compliance Programs, Equal Employment Opportunity, Department of Labor," 41 CFR Parts 60 e r s e q. (which implement Executive Order No. 11246, "Equal Employment Opportunity," as amended by Executive Order No. 11375, "Amending Executive Order 11246 Relating to Equal Employment Opportunity," 42 USC § 2000e note), and with any applicable Federal statutes, executive orders, regulations, and Federal policies that may in the future affect construction activities undertaken in the course of the Project. The Contractor agrees to take affirmative action to ensure that applicants are employed, and that employees are treated during employment, without regard to their race, color, creed, national origin, sex, or age. Such action shall include, but not be limited to, the following: employment, upgrading, demotion or transfer, recruitment or recruitment advertising, layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. In addition, the Contractor agrees to comply with any implementing requirements FTA may issue. (b) Age: In accordance with section 4 of the Age Discrimination in Employment Act of 1967, as amended, 29 USC §§ 623 and Federal transit law at 49 USC § 5332, the Contractor agrees to refrain from discrimination against present and prospective employees for reason of age. In addition, the Contractor agrees to comply with any implementing requirements FTA may issue. (c) Disabilities: hi accordance with section 102 of the Americans with Disabilities Act, as amended, 42 USC § 12112, the Contractor agrees that it shall comply with the requirements of U.S. Equal Employment Opportunity Commission, "Regulations to Implement the Equal Employment Provisions of the Americans with Disabilities Act," 29 CFR Part 1630, pertaining to employment of persons with disabilities. In addition, the Contractor agrees to comply with any implementing requirements FTA may issue. The Contractor also agrees to include these requirements in each subcontract financed in whole or in part with Federal assistance provided by FTA, modified only if necessary to identify the affected parties. No Government Obligation to Third Parties The Agency and Contractor acknowledge and agree that, notwithstanding any concurrence by the Federal Government in or approval of the Solicitation or award of the underlying Contract, absent the express written consent by the Federal Government, the Federal Government is not a party to this Contract and shall not be subject to any obligations or liabilities to the Agency, Contractor, or any other party (whether or not a party to that Contract) pertaining to any matter resulting from the underlying Contract. 59 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final 2. The Contractor agrees to include the above clause in each subcontract financed in whole or in part with Federal assistance provided by FTA. It is further agreed that the clause shall not be modified, except to identify the Subcontractor who shall be subject to its provisions. Program Fraud and False or Fraudulent Statements or Related Acts The Contractor acknowledges that the provisions of the Program Fraud Civil Remedies Act of 1986, as amended, 31 USC §§ 3801 et s e Band U.S. DOT regulations, "Program Fraud Civil Remedies," 49 CFR Part 31, apply to its actions pertaining to this Project. Upon execution of the underlying Contract, the Contractor certifies or affirms the truthfulness and accuracy of any statement it has made, it makes, it may make, or causes to be made, pertaining to the underlying Contract or the FTA assisted project for which this Contract Work is being performed. In addition to other penalties that may be applicable, the Contractor further acknowledges that if it makes, or causes to be made, a false, fictitious, or fraudulent claim, statement, submission, or certification, the Federal Government reserves the right to impose the penalties of the Program Fraud Civil Remedies Act of 1986 on the Contractor to the extent the Federal Government deems appropriate. 2. The Contractor also acknowledges that if it makes, or causes to be made, a false, fictitious, or fraudulent claim, statement, submission, or certification to the Federal Government under a Contract connected with a project that is financed in whole or in part with Federal assistance originally awarded by FTA under the authority of 49 USC § 5307, the Government reserves the right to impose the penalties of 18 USC § 1001 and 49 USC § 5307(n)(1) on the Contractor, to the extent the Federal Government deems appropriate. The Contractor agrees to include the above two clauses in each subcontract financed in whole or in part with Federal assistance provided by FTA. It is further agreed that the clauses shall not be modified, except to identify the Subcontractor who shall be subject to the provisions. Suspension and Debarment This Contract is a covered transaction for purposes of 2 CFR Parts 180 and 1200. As such, the Contractor is required to verify that none of the Contractor, its principals, as defined at 2 CFR 180.995, or affiliates, as defined at 2 CFR 180.905, are excluded or disqualified as defined at 2 CFR 180.940 and 180.945. The Contractor is required to comply with 2 CFR 180, Subpart C, and must include the requirement to comply with 2 CFR 180, Subpart C, in any lower -tier covered transaction it enters into. 60 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final By signing and submitting its bid or Proposal, the Bidder or Proposer certifies as follows: The certification in this clause is a material representation of fact relied upon by the Agency. If it is later determined that the Bidder or Proposer knowingly rendered an erroneous certification, in addition to remedies available to the Agency, the federal government may pursue available remedies, including but not limited to suspension and/or debarment. The Bidder or Proposer agrees to comply with the requirements of 2 CFR 180, Subpart C, while this Proposal is valid and throughout the period of any Contract that may arise from this Proposal. The Bidder or Proposer further agrees to include a provision requiring such compliance in its lower tier covered transactions. Disadvantaged Business Enterprise (DBE) This Contract is subject to the requirements of Title 49, Code of Federal Regulations, Part 26, Participation by Disadvantaged Business Enterprises in Department of Transportation Financial Assistance Programs. The Contractor shall maintain compliance with "DBE Approval Certification" throughout the period of Contract performance. The Contractor shall not discriminate on the basis of race, color, national origin or sex in the performance of this Contract. The Contractor shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of this DOT -assisted Contract. Failure by the Contractor to carry out these requirements is a material breach of this Contract, which may result in the termination of this Contract or such other remedy as the Agency deems appropriate. Each subcontract the Contractor signs with a Subcontractor must include the assurance in this paragraph (see 49 CFR 26.13(b)). Prompt Payment to Subcontractors Pursuant to 49 Code of Federal Regulations (CFR) Part 26, the Contractor shall pay each Subcontractor under this Contract for satisfactory performance of its Contract no later than thirty days (30) days after receipt of any related Progress Payment received from Agency. The Contractor shall pay to each Subcontractor all amounts it has retained from payments under the Subcontract within thirty (30) days after the Subcontractor's work is satisfactorily completed. Any delay of payment beyond the thirty (30) day time limit shall be only for good cause, and only upon the prior written approval of Agency. Clean Water Requirements 1. The Contractor agrees to comply with all applicable standards, orders or regulations issued pursuant to the Federal Water Pollution Control Act, as amended, 33 USC 1251 e r s e q.The Contractor agrees to report each violation to the Agency and understands and agrees that the Agency shall, in turn, report each violation as required to assure notification to FTA and the appropriate EPA Regional Office. 61 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final 2. The Contractor also agrees to include these requirements in each subcontract exceeding $150,000 financed in whole or in part with Federal assistance provided by FTA. Clean Air Requirements 1. The Contractor agrees to comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act, as amended, 42 USC § § 7401 e r s e q The Contractor agrees to report each violation to the Agency and understands and agrees that the Agency shall, in turn, report each violation as required to assure notification to FTA and the appropriate EPA Regional Office. 2. The Contractor also agrees to include these requirements in each subcontract exceeding $150,000 financed in whole or in part with Federal assistance provided by FTA. Compliance with Federal Lobbying Policy Contractors who apply or bid for an award of $100,000 or more shall file the certification required by 49 CFR Part 20, "New Restrictions on Lobbying." Each tier certifies to the tier above that it shall not and has not used federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any Agency, a member of Congress, an officer or employee of Congress, or an employee of a member of Congress in connection with obtaining any federal Contract, grant or any other award covered by 31 USC 1352. Each tier shall also disclose the name of any registrant under the Lobbying Disclosure Act of 1995 who has made lobbying contacts on its behalf with non-federal funds with respect to that federal Contract, grant or award covered by 31 USC 1352. Such disclosures are forwarded from tier to tier up to the recipient. Buy America The Contractor agrees to comply with 49 USC 53230) and 49 CFR Part 661, which provide that federal fund may not be obligated unless steel, iron and manufactured products used in FTA- funded projects are produced in the United States, unless a waiver has been granted by FTA or the product is subject to a general waiver. General waivers are listed in 49 CFR 661.7. and include a general public interest waiver which applies to microprocessors, computers, microcomputers, software or other such devices, which are used solely for the purpose of processing or storing data. This general waiver does not extend to a product or device that merely contains a microprocessor or microcomputer and is not used solely for the purpose of processing or storing data. Separate requirements for rolling stock are set out at 49 USC 53230)(2)(C) and 49 CFR 661.11. Rolling stock must be assembled in the United States and have a 70 percent domestic content. A Bidder or Proposer must submit to the Agency the appropriate Buy America Certification with all offers on FTA-funded contracts, except those subject to a general waiver. Proposals that are not accompanied by a properly completed Buy America certification are subject to the provisions of 49 CFR 661.13 and may be rejected as nonresponsive. 62 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final Testing of New Bus Models The Contractor agrees to comply with 49 USC 5318 and FTA's implementing regulation at 49 CFR Part 665 and shall perform the following: A manufacturer of a new bus model or a bus produced with a major change in components or configuration shall provide a copy of the final test report to the recipient at a point in the procurement process specified by the recipient, which shall be prior to the recipient's final acceptance of the first vehicle. See SP 20 for additional detail for "new bus models." 2. A manufacturer who releases a report under Paragraph 1 above shall provide notice to the operator of the testing facility that the report is available to the public. If the manufacturer represents that the vehicle was previously tested, the vehicle being sold should have the identical configuration and major components as the vehicle in the test report, which must be provided to the recipient prior to recipient's final acceptance of the first vehicle. If the configuration or components are not identical, the manufacturer shall provide a description of the change and the manufacturer's basis for concluding that it is not a major change requiring additional testing. 4. If the manufacturer represents that the vehicle is "grandfathered" (has been used in mass transit service in the United States before October 1, 1988, and is currently being produced without a major change in configuration or components), the manufacturer shall provide the name and address of the recipient of such a vehicle and the details of that vehicle's configuration and major components. Pre -Award and Post -Delivery Audits The Contractor agrees to comply with 49 USC § 5323(1) and FTA's implementing regulation at 49 CFR Part 663 and to submit the following certifications: 1. Buy America requirements: The Contractor agrees to cooperate with the Buy America requirements, consistent with applicable law, regulations, and FTA guidance, and in the manner detailed in Appendix E. Upon receipt of Notice from Basin Transit, the proposer will be given 60 days to furnish Buy America cost data and verification of domestic origin to BASIN TRANSIT' s d e s i g n sufficiaht taacomHrin t o compliance with the requirement. 2. Solicitation specification requirements: The Contractor shall submit evidence that it shall be capable of meeting the bid specifications. 3. Federal Motor Vehicle Safety Standards (FMVSS): The Contractor shall submit (1) manufacturer's FMVSS self -certification, Federal Motor Vehicle Safety Standards, that the vehicle complies with relevant FMVSS or (2) manufacturer's certified statement that the contracted buses shall not be subject to FMVSS regulations. 63 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final Cargo Preference The Contractor agrees to the following: To use privately owned U.S.-flag commercial vessels to ship at least fifty (50) percent of the gross tonnage (computed separately for dry bulk carriers, dry cargo liners and tankers) involved, whenever shipping any equipment, material or commodities pursuant to the underlying Contract to the extent such vessels are available at fair and reasonable rates for U.S.-flag commercial vessels; To furnish within twenty (20) working days following the date of loading for shipments originating within the United States or within thirty (30) working days following the date of leading for shipments originating outside the United States, a legible copy of a rated, "on -board" commercial ocean bill of lading in English for each shipment of cargo described in the preceding paragraph to the Division of National Cargo, Office of Market Development, Maritime Administration, Washington, DC 20590 and to the FTA recipient (through the Contractor in the case of a Subcontractor's bill -of -lading.) To include these requirements in all subcontracts issued pursuant to this Contract when the subcontract may involve the transport of equipment, material or commodities by ocean vessel. Fly America The Contractor agrees to comply with 49 USC 40118 (the "Fly America" Act) in accordance with the General Services Administration's regulations at 41 CFR Part 301-10, which provide that recipients and sub recipients of federal funds and their contractors are required to use U.S. flag air carriers for U.S. government -financed international air travel and transportation of their personal effects or property, to the extent such service is available, unless travel by foreign air carrier is a matter of necessity, as defined by the Fly America Act. The Contractor shall submit, if a foreign air carrier was used, an appropriate certification or memorandum adequately explaining why service by a U.S. flag air carrier was not available or why it was necessary to use a foreign air carrier and shall, in any event, provide a certificate of compliance with the Fly America requirements. The Contractor agrees to include the requirements of this section in all subcontracts that may involve international air transportation. Contract Work Hours and Safety Standards Act 1. Overtime requirements: No Contractor or Subcontractor contracting for any part of the Contract Work which may require or involve the employment of laborers or mechanics shall require or permit any such laborer or mechanic in any work week in which he or she is employed on such Work to work in excess of 40 hours in such work week unless such laborer or mechanic receives compensation at a rate not less than one and one-half times the basic rate of pay for all hours worked in excess of 40 hours in such workweek. 2. Violation; liability for unpaid wages; liquidated damages: In the event of any violation of the clause set forth in paragraph 1 of this section, the Contractor and any Subcontractor responsible therefore shall be liable for the unpaid wages. In addition, such Contractor and Subcontractor shall be liable to the United States for liquidated damages. 64 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchmen and guards, employed in violation of the clause set forth in paragraph 1 of this section, in the sum of $10 for each calendar day on which such individual was required or permitted to work in excess of the standard work week of 40 hours without payment of the overtime wages required by the clause set forth in paragraph 1 of this section. 3. Withholding for unpaid wages and liquidated damages: Basin Transit shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any monies payable on account of work performed by the Contractor or Subcontractor under any such contract or any other Federal contract with the same Prime Contractor, or any other federally -assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same Prime Contractor, such sums as may be determined to be necessary to satisfy any liabilities of such Contractor or Subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph 2 of this section. 4. Subcontracts: The Contractor or Subcontractor shall insert in any subcontracts the clauses set forth in paragraphs 1 through 4 of this section and also a clause requiring the Subcontractors to include these clauses in any lower tier subcontracts. The Prime Contractor shall be responsible for compliance by any Subcontractor or lower -tier Subcontractor with the clauses set forth in paragraphs 1 through 4 of this section. ADA Access The Contractor and any of its Subsuppliers under this Contract agree to comply with all applicable requirements of the Americans with Disabilities Act of 1990 (ADA), 42 USC §§ 12101 e r Section 504 of the Rehabilitation Act of 1973, as amended, 29 USC § 794; 49 USC § 5301(d); and the following regulations and any amendments thereto: 1. DOT regulations, "Transportation Services for Individuals with Disabilities (ADA)," 49 CFR Part 37; 2. DOT regulations, "Americans With Disabilities Act (ADA) Accessibility Specifications for Transportation Vehicles," 49 CFR Part 38; 3. DOT regulations, "Nondiscrimination on the Basis of Handicap in Programs and Activities Receiving or Benefiting from Federal Financial Assistance," 49 CFR Part 27; 4. U.S. Architectural and Transportation Barriers Compliance Board (U.S. ATBCB) regulations, "American With Disabilities (ADA) Accessibility Specifications for Transportation Vehicles," 36 CFR Part 1192; 5. Department of Justice (DOJ) regulations, "Nondiscrimination on the Basis of Disability in State and Local Government Services," 28 CFR Part 35; 6. DOJ regulations, "Nondiscrimination on the Basis of Disability by Public Accommodations and in Commercial Facilities," 28 CFR Part 36; 7. General Services Administration regulations, "Accommodations for the Physically Handicapped," 41 CFR Subpart 101-19; X11 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final 8. Equal Employment Opportunity Commission, "Regulations to Implement the Equal Employment Provisions of the Americans with Disabilities Act," 29 CFR Part 1630; 9. Federal Communications Commission regulations, "Telecommunications Relay Services and Related Customer Premises Equipment for Persons with Disabilities," 47 CFR Part 64, Subpart F; 10. FTA regulations, "Transportation for Elderly and Handicapped Persons," 49 CFR Part 609; 11. U.S. ATBCB regulations, "Electronic and Information Technology Accessibility Standards," 36 CFR Part 1194; and 12. Any implementing requirements FTA may issue. FR 20. Section 889 NDA Execute CER 1.9 FR 21. ITS Architecture NATIONAL INTELLIGENT TRANSPORTATION SYSTEMS (ITS) ARCHITECTURE AND STANDARDS 23 U.S.C. Sections 502, 517(d) Intelligent transportation system (ITS) property and services must comply with the National ITS Architecture and Standards to the extent required by 23 U.S.C. Section 517(d) and FTA Notice, "FTA National ITS Architecture Policy on Transit Projects," 66 FR 1455 er s e q, January 8, 2001, and later published policies or implementing directives FTA may issue. FR 22. Notification of Legal Matters Vendor acknowledges that if a current or prospective legal matter that may affect the Federal Government interest in the contract emerges, Vendor will promptly inform Basin Transit so that it may notify the Federal Transit Administration and/or it's designee, the California Department of Transportation. The types of legal matters that require notification include, but are not limited to, a major dispute, breach, default, litigation, or naming the Federal Government as a party to litigation or a legal disagreement in any forum for any reason. FR 23. Limitations on Federal Funding. Request for Proposal RFP 23-01 (HD Transit Vehicles), Final Section 5323(u)(1) generally prohibits FTA funding of procurements of rolling stock from any manufacturer that is "owned or controlled by, is a subsidiary of, or is otherwise related legally or financially to a corporation based in" certain foreign countries. Basin Transit may request evidence and information that the proposing manufacturer is not "owned or controlled by, is a subsidiary of, or is otherwise related legally or financially to a corporation based in" a country that meets the statutory criteria, and is not designated as one of the non -market economies by the US International Trade Administration. The information must be presented within 30 days of request. For purposes of this requirement, "otherwise related legally or financially" does not include a minority relationship or investment; it also does not include a relationship with or investment in a subsidiary, joint venture, or other entity based in a covered country that does not export rolling stock or components of rolling stock for use in the United States. The agency reserves the right to solely determine whether the proposer meets the above criteria using principles of general corporate law. FR 24. This Contract is subject to certification requirements related to any "unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability" and certain felony convictions. The Contractor shall submit the required certification and shall require the same certification of all subcontractors and suppliers at any level, regardless of the value of any sub agreement. SECTION 6: TECHNICAL SPECIFICATIONS TS L GENERAL Technical specifications define requirements for the vehicles are contained are found in Section 11. 67 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final SECTION 7: WARRANTY REQUIREMENTS WR 1. Basic Provisions WR 1.1 Warranty Requirements WR 1.1.1 Contractor Warranty/Minimums Warranties in this document are in addition to any statutory remedies or warranties imposed on the Contractor. Consistent with this requirement, the Contractor warrants and guarantees to the original Agency each complete bus and specific subsystems and components as follows. Performance requirements based on design criteria shall not be deemed a warranty item. Minimum Standards: The complete bus body and body structure, exterior, wiring, and paint shall be warranted to be free from defects, related defects, and to maintain structural integrity for a period of thirty-six (36) months or 60,000 miles. This warranty includes any failure as a result of frame alterations to lengthen the chassis for a Type C. This would include but not limited to frame, drive lines, brake lines and fuel lines that are altered as a result of the chassis stretch. Contractor to provided standard OEM and supplier warranties for chassis, engine, wheelchair lifts or ramps and climate control systems, CNG conversions and electric powertrains describing these on the vehicle information sheets and as submissions on the proposal. WR 1.1.2 Complete Bus The complete bus, propulsion system, components, major subsystems and body and chassis structure are warranted to be free from Defects and Related Defects for years or miles, whichever comes first, beginning on the date of revenue service but not longer than 15 days after acceptance under "Inspection, Testing, Acceptance and Repairs." The warranty is based on regular operation of the bus under the operating conditions prevailing in the Agency's locale. [Information from the selected firm(s) will be inserted at time of Contract award.] WR 1.1.3 Body and Chassis Structure Body, body structure, structural elements of the suspension and engine cradle are warranted to be free from Defects and Related Defects for X years or XXX miles, whichever comes first. [Information from the selected firm(s) will be inserted at time of Contract award.] Primary load -carrying members of the bus structure, including structural elements of the suspension, are warranted against corrosion failure and/or Fatigue Failure sufficient to cause a Class 1 or Class 2 Failure for a period of X years or XXX miles, whichever comes first. [Information from the selected firm(s) will be inserted at time of Contract award.] Request for Proposal RFP 23-01 (HD Transit Vehicles), Final WR 1.1.4 Propulsion and Energy components, specifically the engine, transmission or drive motors, (For ICE) and generators, drive and non -drive axles and energy storage systems shall be warranted to be free from Defects and Related Defects for the standard X years or XXX miles, w h i c h e v e r comes f i rs t . The propul s i o warranty, delineating items excluded from the Extended Warranty, submitted in accordance with the Request for Pre -Offer Change. [Information from the selected firm(s) will be inserted at time of Contract award.] WR 1.1.5 Emission Control System (ECS) The Contractor warrants the emission control system for five years or 100,000 miles, whichever comes first. The ECS shall include, but is not limited to, the following components: • complete exhaust system, including catalytic converter (if required) • after -treatment device • components identified as emission control devices Note if Not Applicable in submission. WR 1.1.6 Warranty Summary including Subsystems Other subsystems shall be warranted to be free from Defects and Related Defects for the period shown below: [Information from the selected firm(s) will be inserted at time of Contract award.] Item Years Mileage Body Structure Chassis Engine Transmission Air Conditioner Lift/Ram Battery Electric and Fuel Cell Components Other Optional Features WR 1.1.7 Extension of Warranty If, during the warranty period, repairs or modifications on any bus are made necessary by defective design, materials or workmanship but are not completed due to lack of material or inability to provide the proper repair for thirty (30) calendar days, the applicable warranty period shall be extended by the number of days equal to the delay period. 69 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final WR 1.2 Voiding of Warranty The warranty shall not apply to the failure of any part or component of the bus that directly results from misuse, negligence, accident or repairs not conducted in accordance with the Contractor -provided maintenance manuals and with workmanship performed by adequately trained personnel in accordance with recognized standards of the industry. The warranty also shall be void if the Agency fails to conduct normal inspections and scheduled preventive maintenance procedures as recommended in the Contractor's maintenance manuals and if that omission caused the part or component failure. The Agency shall maintain documentation, auditable by the Contractor, verifying service activities in conformance with the Contractor's maintenance manuals. WR 1.3 Exceptions and Additions to Warranty The warranty shall not apply to the following items: • scheduled maintenance items • normal wear -out items • items furnished by the Agency Should the Agency require the use of a specific product and has rejected the Contractor's request for an alternate product, then the standard Supplier warranty for that product shall be the only warranty provided to the Agency. This product shall not be eligible under "Fleet Defects," below. The Contractor shall not be required to provide warranty information for any warranty that is less than or equal to the warranty periods listed. WR 1.3.1 Pass -Through Warranty Should the Contractor elect to not administer warranty claims on certain components and wish to transfer this responsibility to the sub -Suppliers, or to others, the Contractor shall request this waiver. Contractor shall state in writing that the Agency's warranty reimbursements shall not be impacted. The Contractor also shall state in writing any exceptions and reimbursement including all costs incurred in transport of vehicles and/or components. At any time during the warranty period, the Contractor may request approval from the Agency to assign its warranty obligations to others, but only on a case -by -case basis approved in writing by the Agency. Otherwise, the Contractor shall be solely responsible for the administration of the warranty as specified. Warranty administration by others does not eliminate the warranty liability and responsibility of the Contractor. WR 1.3.2 Superior Warranty The Contractor shall pass on to the Agency any warranty offered by a component Supplier that is superior to that required herein. The Contractor shall provide a list to the Agency noting the 70 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final conditions and limitations of the Superior Warranty not later than the start of production. The Superior Warranty shall not be administered by the Contractor. WR 1.4 Fleet Defects WR 1.4.1 Occurrence and Remedy TS 1.1 A Fleet Defect is defined as cumulative failures of three (3) of the same components in the same or similar application where the fleet size is fewer than twelve (12) buses where such items are covered by warranty. Where the fleet size is twelve (12) or more buses, a Fleet Defect is defined as twenty (20) percent of the same components in the same or similar application where such items are covered by warranty. Basin Transit reserves the right to declare a Fleet Defect applicable to all purchasers if cumulative reported defects exceed 10% of all model or bus type purchases. A Fleet Defect shall apply only to the base warranty p e r i o d i n s e c t i o n s e n t i t i e d " Co mp l e t a Bu s" When a Fleet Defect is declared, the remaining warranty on that item/component stops. The warranty period does not restart until the Fleet Defect is corrected. For the purpose of Fleet Defects, each order placed through the joint procurement shall be treated as a separate bus fleet. The Contractor shall correct a Fleet Defect under the warranty provisions defined in "Repair Procedures." After correcting the Defect, the Agency and the Contractor shall mutually agree to and the Contractor shall promptly undertake and complete a work program reasonably designed to prevent the occurrence of the same Defect in all other buses and spare parts purchased under this Contract. Where the specific Defect can be solely attributed to particular identifiable part(s), the work program shall include redesign and/or replacement of only the defectively designed and/or manufactured part(s). In all other cases, the work program shall include inspection and/or correction of all of the buses in the fleet via a mutually agreed -to arrangement. The Contractor shall update, as necessary, technical support information (parts, service and operator's manuals) due to changes resulting from warranty repairs. The Agency may immediately declare a Defect in design resulting in a safety hazard to be a Fleet Defect. The Contractor shall be responsible to furnish, install and replace all defective units. WR 1.4.2 Exceptions to Fleet Defect Provisions The Fleet Defect warranty provisions shall not apply to Agency -supplied items, such as radios, fare collection equipment, communication systems and tires. In addition, Fleet Defects shall not apply to interior and exterior finishes, hoses, fittings and fabric. Fleet defect rule does not apply to normal wear -and -tear items or the following major components: engine, transmission, and HVAC. However, if the fleet defect percentage is reached in a major component, it is expected that the manufacturer will fully support and assist the purchasing agencies with obtaining the appropriate remedy from the major component supplier. The fleet defect provision remains in force for all other components and structural elements proposed 71 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final WR 2. Repair Procedures WR 2.1 Repair Performance The Contractor is responsible for all warranty -covered repair Work. To the extent practicable, the Agency shall allow the Contractor or its designated representative to perform such Work. At its discretion, the Agency may perform such Work if it determines it needs to do so based on transit service or other requirements. Such Work shall be reimbursed by the Contractor. WR 2.2 Repairs by the Contractor If the Agency detects a Defect within the warranty periods defined in this section, it shall, within thirty (30) days, notify the Contractor's designated representative. The Contractor or its designated representative shall, if requested, begin Work on warranty -covered repairs within five calendar days after receiving notification of a Defect from the Agency. The Agency shall make the bus available to complete repairs timely with the Contractor's repair schedule. The Contractor shall provide at its own expense all spare parts, tools and space required to complete repairs. At the Agency's option, the Contractor may be required to remove the bus from the Agency's property while repairs are being affected. If the bus is removed from the Agency's property, repair procedures must be diligently pursued by the Contractor's representative. WR 2.3 Repairs by the Agency WR 2.3.1 Parts Used If the Agency performs the warranty -covered repairs, it shall correct or repair the Defect and any Related Defects utilizing parts supplied by the Contractor specifically for this repair. At its discretion, the Agency may use Contractor -specified parts available from its own stock if deemed in its best interests. WR 2.3.2 Contractor -Supplied Parts The Agency may require that the Contractor supply parts for warranty -covered repairs being performed by the Agency. Those parts may be remanufactured but shall have the same form, fit and function, and warranty. The parts shall be shipped prepaid to the Agency from any source selected by the Contractor within fourteen (14) days of receipt of the request for said parts and shall not be subject to an Agency handling charge. WR 2.3.3 Defective Component Return The Contractor may request that parts covered by the warranty be returned to the manufacturing plant. The freight costs for this action shall be paid by the Contractor. Materials should be returned in accordance with the procedures outlined in "Warranty Processing Procedures." 72 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final WR 2.3.4 Failure Analysis The Contractor shall, upon specific request of the Agency, provide a failure analysis of Fleet Defect or safety -related parts, or major components, removed from buses under the terms of the warranty that could affect fleet operation. Such reports shall be delivered within 60 days of the receipt of failed parts. WR 2.3.5 Reimbursement for Labor and Other Related Costs The Agency shall be reimbursed by the Contractor for labor. The amount shall be determined by the Agency for a qualified mechanic at a straight time wage rate per hour, which shall include fringe benefits and overhead adjusted for the Agency's most recently published rate in effect at the time the Work is performed. These wage and fringe benefit rates shall not exceed the rates in effect in the Agency's service garage at the time the Defect correction is made. WR 2.3.6 Reimbursement for Parts The Agency shall be reimbursed by the Contractor for defective parts and for parts that must be replaced to correct the Defect. The reimbursement shall be at the current price at the time of repair and shall include taxes where applicable, plus fifteen (15) percent handling costs. Handling costs shall not be paid if part is supplied by Contractor and shipped to Agency. WR 2.3.7 Reimbursement Requirements The Contractor shall respond to the warranty claim with an accept/reject decision including necessary failure analysis no later than sixty (60) days after the Agency submits the claim and defective part(s), when requested. Reimbursement for all accepted claims shall occur no later than sixty (60) days from the date of acceptance of a valid claim. The Agency may dispute rejected claims or claims for which the Contractor did not reimburse the full amount. The parties agree to review disputed warranty claims during the following quarter to reach an equitable decision to permit the disputed claim to be resolved and closed. The parties also agree to review all claims at least once per quarter throughout the entire warranty period to ensure that open claims are being tracked and properly dispositioned. WR 2.4 Warranty after Replacement/Repairs If any component, unit or subsystem is repaired, rebuilt or replaced by the Contractor or by the Agency with the concurrence of the Contractor, the component, unit or subsystem shall have the unexpired warranty period of the original. Repairs shall not be warranted if the Contractor - provided or authorized parts are not used for the repair, unless the Contractor has failed to respond within five days, in accordance with "Repairs by the Contractor." If an item is declared to be a Fleet Defect, the warranty stops with the declaration of the Fleet Defect. Once the Fleet Defect is corrected, the item(s) shall have three (3) months or remaining time and/or miles of the original warranty, whichever is greater. This remaining warranty period shall begin on the repair/replacement date for corrected items on each bus if the repairs are completed by the Contractor or on the date the Contractor provides all parts to the Agency. 73 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final WR 2.4.1 Warranty Processing Procedures The following list represents requirements by the Contractor to the Agency for processing warranty claims. One failure per bus per claim is allowed. • bus number and VIN • total vehicle life mileage at time of repair • date of failure/repair • acceptance/in-service date • Contractor part number and description • description of failure • all costs associated with each failure/repair (invoices may be required for third -party costs): • towing • road calls • labor • materials • parts • handling • troubleshooting time WR 2.5 Forms The Contractor shall supply warranty forms to each Ordering Agency. The completed forms shall be accepted by the Contractor if all of the above information is included. Electronic submittal may be used if available between the Contractor and Agency. WR 2.6 Return of Parts When returning defective parts to the Contractor, the Agency shall tag each part with the following: • bus number and VIN • claim number • part number WR 2.7 Timeframe Each claim must be submitted no more than thirty (30) days from the date of failure and/or repair, whichever is later. All defective parts must be returned to the Contractor, when requested, no more than forty-five (45) days from date of repair. WR 2.8 Reimbursements Reimbursements are to be transmitted to the address provided by the Agency. 74 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final SECTION 8: QUALITY ASSURANCE QA 1. C o n t r a c-Plsni- Quality Assurance Requirements QA 1.1 Quality Assurance Organization QA 1.1.1 Organization Establishment The Contractor shall establish and maintain an effective in -plant quality assurance organization. It shall be a specifically defined organization and should be directly responsible to the Contractor's top management. QA 1.1.2 Control The quality assurance organization shall exercise quality control over all phases of production, from initiation of design through manufacture and preparation for delivery. The organization shall also control the quality of supplied articles. QA 1.1.3 Authority and Responsibility The quality assurance organization shall have the authority and responsibility for reliability, quality control, inspection planning, establishment of the quality control system, and acceptance/rejection of materials and manufactured articles in the production of the transit buses. QA 1.2 Quality Assurance Organization Functions QA 1.2.1 Minimum Functions The quality assurance organization shall include the following minimum functions: Work instructions: The quality assurance organization shall verify inspection operation instructions to ascertain that the manufactured product meets all prescribed requirements. Records maintenance: The quality assurance organization shall maintain and use records and data essential to the effective operation of its program. These records and data shall be available for review by the resident inspectors. Inspection and test records for this procurement shall be available for a minimum of one year after inspections and tests are completed. Corrective action: The quality assurance organization shall detect and promptly ensure correction of any conditions that may result in the production of defective transit buses. These conditions may occur in designs, purchases, manufacture, tests or operations that culminate in defective supplies, services, facilities, technical data or standards. QA 1.2.2 Basic Standards and Facilities The following standards and facilities shall be basic in the quality assurance process: • Configuration control: The Contractor shall maintain drawings, assembly procedures, and other documentation that completely describe a qualified bus that meets all of the options and special requirements of this procurement. The quality assurance organization shall 75 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final verify that each transit bus is manufactured in accordance with these controlled drawings, procedures, and documentation. Measuring and testing facilities: The Contractor shall provide and maintain the necessary gauges and other measuring and testing devices for use by the quality assurance organization to verify that the buses conform to all specification requirements. These devices shall be calibrated at established periods against certified measurement standards that have known, valid relationships to national standards. Production tooling as media of inspection: When production jigs, fixtures, tooling masters, templates, patterns, and other devices are used as media of inspection, they shall be proved for accuracy at formally established intervals and adjusted, replaced, or repaired as required to maintain quality. Equipment use by resident inspectors: The Contractor's gauges and other measuring and testing devices shall be made available for use by the resident inspectors to verify that the buses conform to all specification requirements. If necessary, the Contractor's personnel shall be made available to operate the devices and to verify their condition and accuracy. QA 1.2.3 Maintenance of Control The Contractor shall maintain quality control of purchases: Supplier control: The Contractor shall require that each Supplier maintains a quality control program for the services and supplies that it provides. The Contractor's quality assurance organization shall inspect and test materials provided by Suppliers for conformance to specification requirements. Materials that have been inspected, tested, and approved shall be identified as acceptable to the point of use in the manufacturing or assembly processes. Controls shall be established to prevent inadvertent use of nonconforming materials. Purchasing data: The Contractor shall verify that all applicable specification requirements are properly included or referenced in purchase orders of articles to be used on transit buses. QA 1.2.4 Manufacturing Control • Controlled conditions: The Contractor shall ensure that all basic production operations, as well as all other processing and fabricating, are performed under controlled conditions. Establishment of these controlled conditions shall be based on the documented Work instructions, adequate production equipment and special working environments if necessary. • Completed items: A system for final inspection and test of completed transit buses shall be provided by the quality assurance organization. It shall measure the overall quality of each completed bus. • Nonconforming materials: The quality assurance organization shall monitor the Contractor's system for controlling nonconforming materials. The system shall include procedures for identification, segregation and disposition. 76 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final Statistical techniques: Statistical analysis, tests and other quality control procedures may be used when appropriate in the quality assurance processes. Inspection status: A system shall be maintained by the quality assurance organization for identifying the inspection status of components and completed transit buses. Identification may include cards, tags or other normal quality control devices. QA 1.2.5 Inspection System The quality assurance organization shall establish, maintain and periodically audit a fully documented inspection system. The system shall prescribe inspection and test of materials, Work in process and completed articles. As a minimum, it shall include the following controls: Inspection personnel: Sufficient trained inspectors shall be used to ensure that all materials, components and assemblies are inspected for conformance with the qualified bus design. Inspection records: Acceptance, rework or rejection identification shall be attached to inspected articles. Articles that have been accepted as a result of approved materials review actions shall be identified. Articles that have been reworked to specified drawing configurations shall not require special identification. Articles rejected as unsuitable or scrap shall be plainly marked and controlled to prevent installation on the bus. Articles that become obsolete as a result of engineering changes or other actions shall be controlled to prevent unauthorized assembly or installation. Unusable articles shall be isolated and then scrapped. Discrepancies noted by the Contractor or resident inspectors during assembly shall be entered by the inspection personnel on a record that accompanies the major component, subassembly, assembly, or bus from start of assembly through final inspection. Actions shall be taken to correct discrepancies or deficiencies in the manufacturing processes, procedures or other conditions that cause articles to be in nonconformity with the requirements of the Contract specifications. The inspection personnel shall verify the corrective actions and mark the discrepancy record. If discrepancies cannot be corrected by replacing the nonconforming materials, then the Agency shall approve the modification, repair or method of correction to the extent that the Contract specifications are affected. Quality assurance audits: The quality assurance organization shall establish and maintain a quality control audit program. Records of this program shall be subject to review by the Agency. QA 2. Inspection QA 2.1 Inspection Stations Inspection stations shall be at the best locations to provide for the Work content and characteristics to be inspected. Stations shall provide the facilities and equipment to inspect structural, electrical, hydraulic and other components and assemblies for compliance with the design requirements. 77 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final Stations shall also be at the best locations to inspect or test characteristics before they are concealed by subsequent fabrication or assembly operations. These locations shall minimally include underbody structure completion, body framing completion, body prior to paint preparation, water test, engine installation completion, underbody dress -up and completion, bus prior to final paint touchup, bus prior to road test and bus final road test completion. QA 2.2 Optional Resident Inspectors For orders greater than ten (10) buses, the Ordering Agency shall determine if a Resident Inspector is required under 49 CFR Part 663.37, In the event that the agency decides to have a Resident Inspector either full time or part-time, the following sections apply. QA2.2.1Re s i dent I n s p e c t o r' s Ro l e The Agency may be represented at the Contractor's plant by resident inspectors, as may be required by FTA. Resident inspectors may be Agency employees or outside contractors. The Agency shall provide the identity of each inspector and shall also identify their level of authority in writing. They shall monitor, in the Contractor's plant, the manufacture of transit buses built under the procurement. The presence of these resident inspectors in the plant shall not relieve the Contractor of its responsibility to meet all of the requirements of this procurement. The Agency shall designate a primary resident inspector, whose duties and responsibilities are delineated in "Pre -Production Meetings," "Authority" and "Pre -Delivery Tests," below. Contractor and resident inspector relations shall be governed by the guidelines included as Attachment A to this "Section 8: Quality Assurance." QA 2.2.2 Pre -Production Meetings If there are Pre -Production Meetings scheduled, the primary resident inspector may participate in design review and pre -production meetings with the Agency. At these meetings, the configuration of the buses and the manufacturing processes shall be finalized, and all Contract documentation provided to the inspector. No less than thirty (30) days prior to the beginning of bus manufacture, the primary resident inspector may meet with the Contractor's quality assurance manager and may conduct a pre- production audit meeting. They shall review the inspection procedures and finalize inspection checklists. The resident inspectors may begin monitoring bus construction activities two weeks prior to the start of bus fabrication. QA 2.2.3 Authority Records and data maintained by the quality assurance organization shall be available for review by the resident inspectors. Inspection and test records for this procurement shall be available for a minimum of one year after inspections and tests are completed. The Contractor's gauges and other measuring and testing devices shall be made available for use by the resident inspectors to verify that the buses conform to all specification requirements. If 78 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final necessary, the Contractor's personnel shall be made available to operate the devices and to verify their condition and accuracy. Discrepancies noted by the resident inspector during assembly shall be entered by the Contractor's inspection personnel on a record that accompanies the major component, subassembly, assembly or bus from start of assembly through final inspection. Actions shall be taken to correct discrepancies or deficiencies in the manufacturing processes, procedures or other conditions that cause articles to be in nonconformity with the requirements of the Contract specifications. The inspection personnel shall verify the corrective actions and mark the discrepancy record. If discrepancies cannot be corrected by replacing the nonconforming materials, the Agency shall approve the modification, repair or method of correction to the extent that the Contract specifications are affected. If applicable, the primary resident inspector shall remain in the Contractor's plant for the duration of bus assembly Work under this Contract. Only the primary resident inspector or designee shall be authorized to release the buses for delivery. The resident inspectors shall be authorized to approve the pre -delivery acceptance tests. Upon request to the quality assurance supervisors, the resident inspectors shall have access to the Contractor's quality assurance files related to this procurement. These files shall include drawings, assembly procedures, material standards, parts lists, inspection processing and reports, and records of Defects. QA 2.2.4 Support Provisions The Contractor shall provide office space for the resident inspectors in close proximity to the final assembly area. This office space shall be equipped with desks, outside and interplant telephones, Internet access, file cabinet and chairs. QA 2.2.5 Compliance with Safety Requirements At the time of the Pre -Production meeting, the Contractor shall provide all safety and other operational restrictions that govern the Contractor's facilities. These issues shall be discussed and the parties shall agree which rules/restrictions shall govern the Agency's inspector(s) and any other Agency representatives during the course of the Contract. QA 3. Acceptance Tests QA 3.1 Responsibility Fully documented tests shall be conducted on each production bus following manufacture to determine its acceptance to the Agency. These acceptance tests shall include pre -delivery inspections and testing by the Contractor and inspections and testing by the Agency after the buses have been delivered. QA 3.2 Pre -Delivery Tests The Contractor shall conduct acceptance tests at its plant on each bus following completion of manufacture and before delivery to the Agency. These pre -delivery tests shall include visual and 79 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final measured inspections, as well as testing the total bus operation. The tests shall be conducted and documented in accordance with written test plans approved by the Agency. Additional tests may be conducted at the Contractor's discretion to ensure that the completed buses have attained the required quality and have met the requirements in Section 6: Technical Specifications. The Agency may, prior to commencement of production, demand that the Contractor demonstrate compliance with any requirement in that section if there is evidence that prior tests have been invalidated by the Contractor's change of Supplier or change in manufacturing process. Such demonstration shall be by actual test, or by supplying a report of a previously performed test on similar or like components and configuration. Any additional testing shall be recorded on appropriate test forms provided by the Contractor and shall be conducted before acceptance of the bus. The pre -delivery tests shall be scheduled and conducted with thirty (30) days notice so that they may be witnessed by the resident inspectors, who may accept or reject the results of the tests. The results of pre -delivery tests, and any other tests, shall be filed with the assembly inspection records for each bus. The underfloor equipment shall be available for inspection by the resident inspectors, using a pit or bus hoist provided by the Contractor. A hoist, scaffold or elevated platform shall be provided by the Contractor to easily and safely inspect bus roofs. If there is an on -site inspector, delivery of each bus shall require written authorization of the primary resident inspector. Authorization forms for the release of each bus for delivery shall be provided by the Contractor. An executed copy of the authorization shall accompany the delivery of each bus. QA 3.2.1 Visual and Measured Inspections Visual and measured inspections shall be conducted with the bus in a static condition. The purpose of the inspection testing includes verification of overall dimension and weight requirements, that required components are included and are ready for operation, and that components and subsystems designed to operate with the bus in a static condition do function as designed. QA 3.2.2 Total Bus Operation Total bus operation shall be evaluated during road tests. The purpose of the road tests is to observe and verify the operation of the bus as a system and to verify the functional operation of the subsystems that can be operated only while the bus is in motion. Each bus shall be driven for a minimum of fifteen (15) miles during the road tests. If requested, computerized diagnostic printouts showing the performance of each bus shall be produced and provided to the Agency. Observed Defects shall be recorded on the test forms. The bus shall be retested when Defects are corrected and adjustments are made. This process shall continue until Defects or required adjustments are no longer detected. 80 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final QA 4. Agency -Specific Requirements QA 4.1 Pre -Delivery Bus Documentation Package (BDP) The Contractor's quality assurance organization shall be responsible for preparing a documentation package for each Bus. The BDP shall be inserted into a manila envelope which shall be labeled with the Agency name and the bus number on the front of the envelope. This envelope shall be placed into the Bus and shall be presented to the Agency upon delivery. At a minimum, each BDP shall contain the following items: • • BDP Check -off Sheet listing the following: • • QA Certificate of Completion (signed by Contractor QC representative). • • CNG pressure test certification — if applicable • • Water test Certification. • • Alignment and Steering Stop Adjustment Certification. • • Smoke Opacity Test (Exhaust Emissions), if applicable. • • "Completed Bus" Inspection document. • • Copy of defects noted during any Agency on -site inspection. • • List of "Open Items"- if any • • VIN number (copy of bus data plate) • • Certificate of Origin • • Weight slip (curb weight) • • Certificate of compliance for high voltage/energy storage protective devices, if applicable. • • Copy of FMVSS plate • • Component Serial Number List - List of serialized components installed on each Bus to include, but not limited to: Engine, Electric Motor. Transmission Alternator Starter A/C Compressor Drive Axle Power Steering Unit Air Compressor Electric Powertrain components if applicable. Other serialized components for which the Contractor shall require serial numbers for the processing of warranty claims. 81 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final SECTION 9: FORMS AND CERTIFICATIONS P r o p o s e r' s Ch e c k l i s t RFP No. 23-01, Joint Procurement For Heavy Duty Transit Vehicles Package 1: Technical Proposal (Note: Package 1, 3 and 4 may be combined into one submittal. ❑ 1. Letter of Transmittal ❑ 2. Acknowledgement of Addenda ❑ 3. Contractor Service and Support Data, Written Service Plan describing how buses are to be supported ❑ 4. Vehicle Questionnaires, Service Questionnaire, Plant Questionnaire, Reference Lists Above are Excel sheets submitted with requested documents embedded in the form ❑ 5. Manufacturing facility plant layout including description of work by station ❑ 6. Typical Delivery Schedule 7. Warranty Provisions and Warranty Administration Plan. Written Service Plan. ❑ 8. Quality Assurance Program Package 2: Price Proposal (Package 2 must be a separate sealed submittal. ❑ 1. Letter of Transmittal ❑ 2. Pricing Schedule(including option bus features Package 3: Qualifications Package ❑ 1. Pre -Award Evaluation Data Form ❑ 2. Authorized Factory Dealer Confirmation from manufacturer and converter, Dealer's License If applicable) ❑ 3. A copy of the three (3) most recent audited financial statements, Statement of current financial condition ❑ 4. Letter for insurance ❑ 5. Proposal Form ❑ 1 6. Required Certifications ❑ 7. FTA- Approval letter required for TVMs, Altoona Test Result or Status Information from FTA Package 4: Proprietary/Confidential Information Packa el ❑ 1 1. Proprietary/Confidential Information 82 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final 1. There may be items in the first three packages that are included in Package 4 because they are considered to be proprietary/confidential information. When this occurs, the Proposer must note that fact in Packages 1 through 3. Proposers are not to submit any items considered Confidential electronically. 83 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final Request for Pre -Offer Change or Approved Equal This form must be used for requested clarifications, changes, substitutes or approval of items equal to items specified with a brand name and must be submitted as far in advance of the Due Date, as specified in "Questions, Clarifications and Omissions." Please submit the document electronically to the contract officer with separate files for clarifications on the contract and each bus type. File names should describe the category of request made and identify the proposing firm. See Appendix K for form. 84 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final Acknowledgement of Addenda Failure to acknowledge receipt of all addenda may cause the Proposal to be considered nonresponsive to the Solicitation. Acknowledged receipt of each addendum must be clearly established and included with the Proposal. The undersigned acknowledges receipt of the following addenda to the documents: Addendum No.: — Dated: Addendum No.: — Dated: Addendum No.: — Dated: Addendum No.: — Dated: Proposer: Name: Title: Phone: Street address: City, state, ZIP: Authorized signature Date Request for Proposal RFP 23-01 (HD Transit Vehicles), Final Contractor Service and Parts Support Data Location of nearest Technical Service Representative to Agency Name: Address: Telephone: Describe technical services readily available from said representative: Location of nearest Parts Distribution Center to Agency: Name: Address: Telephone: Describe the extent of parts available at said center: Policy for delivery of parts and components to be purchased for service and maintenance: Regular method of shipment: Cost to Agency: e. Request for Proposal RFP 23-01 (HD Transit Vehicles), Final Price Worksheet REV 2 The Price Worksheet is contained in a separate document that is an Excel Spreadsheet. Each Proposer is to complete the appropriate spreadsheet tabs, print and return an original with a "wet signature" with the required proposal forms. Proposers are to also provide the other copies as required in NR 3, Proposal Date and Submittal Requirements. 10� RFP 23-01 Price Worksheet REV 2.xlsx 87 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final Pre -Award Evaluation Data Form Instructions: This form is to be completed and included in the Qualification Package. Attach additional pages if required. Morongo Basin Transit Authority RFP No. 23-01 for a Joint Procurement for Heavy Duty Transit Vehicles 1. Name of firm: 2. Address: 3. ❑ Individual ❑ Partnership ❑ Corporation ❑ Joint Venture 4. Date organized: State in which incorporated: 5. Names of officers or partners: a. b. C. d. 6. How long has your firm been in business under its present name? 7. Have you been terminated or defaulted in the past five years, on any Contract you were awarded? Have you been barred by Federal process or any Western State? ❑ Yes ❑ No If yes, then attach as SCHEDULE ONE the full particulars regarding each occurrence. 8. Attach as SCHEDULE TWO Proposer's last three (3) financial statements prepared in accordance with generally accepted accounting principles of the jurisdiction in which the Proposer is located, and audited by an independent certified public accountant [This may require execution of an acceptable non -disclosure agreement between the Agency and the Proposer.] And Statement of Current Financial Condition. 9. Attach as SCHEDULE THREE a list of all principal Subcontractors (if applicable) and the percentage and character of Work (Contract amount) that each shall perform on this Contract. Note: A subcontractor is one that physically works on manufacturing the bus. 10. If the Contractor or Subcontractor is a joint venture, submit PRE -AWARD EVALUATION DATA forms for each member of the joint venture. The above information is confidential and shall not be divulged to any unauthorized personnel. The undersigned certifies to the accuracy of all information: Name and title: Company: 88 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final Authorized signature Date 89 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final Federal Certifications and Other Certifications CER 1.1 Buy America Certification This form is to be submitted with an offer exceeding $150,000. NOTE: If Proposer is a bus dealer, submit forms executed by both the Dealer and Manufacturer represented. (Separate Form Each if Proposer is Dealer) Certificate of Compliance The Proposer hereby certifies that it shall comply with the requirements of 49 USC Section 53230)(2)(C), Section 165(b)(3) of the Surface Transportation Assistance Act of 1982, as amended, and the regulations of 49 CFR 661.11: Name and title: Company: Authorized signature Date Certificate of Non -Compliance The Proposer hereby certifies that it cannot comply with the requirements of 49 USC Section 53230)(2)(C) and Section 165(b)(3) of the Surface Transportation Assistance Act of 1982, as amended, but may qualify for an exception to the requirements consistent with 49 USC Sections 53230)(2)(B) or 0)(2)(D), Sections 165(b)(2) or (b)(4) of the Surface Transportation Assistance Act, as amended, and regulations in 49 CFR 661.7. Name and title: Company: Authorized signature Date 90 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final CER 1.2 Debarment and Suspension Certification for Prospective Contractor Primary covered transactions must be completed by proposer for contract value over $25,000. Choose one alternative: — The Proposer, [insert name], certifies to the best of its knowledge and belief that it and its principals: 1. Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any federal department or agency; 2. Have not within a three-year period preceding this Proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (federal, state or local) transaction or Contract under a public transaction; violation of federal or state antitrust statutes or commission or embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property; 3. Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (federal, state, or local) with commission of any of the offenses enumerated in Paragraph 2 of this certification; and 4. Have not within a three-year period preceding this Proposal had one or more public transactions (federal, state or local) terminated for cause or default. ,I ' — The Proposer is unable to certify to all of the statements in this certification, and attaches its explanation to this certification. (In explanation, certify to those statements that can be certified to and explain those that cannot.) The Proposer certifies or affirms the truthfulness and accuracy of the contents of the statements submitted on or with this certification and understands that the provisions of Title 31 USC § Sections 3801 are applicable thereto. — Executed in [insert city and state]. Name: Authorized signature Date 91 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final 92 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final CER 1.3 Debarment and Suspension Certification (Lower -Tier Covered Transaction) This form is to be submitted by each Subcontractor receiving an amount exceeding $25,000. The prospective lower -tier participant (Proposer) certifies, by submission of this Proposal, that neither it nor its "principals" as defined at 49 CFR § 29.105(p) is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or Agency. If the prospective Proposer is unable to certify to the statement above, it shall attach an explanation, and indicate that it has done so by placing an "X" in the following space: _ THE PROPOSER, , CERTIFIES OR AFFIRMS THE TRUTHFULNESS AND ACCURACY OF EACH STATEMENT OF ITS CERTIFICATION AND EXPLANATION, IF ANY. IN ADDITION, THE PROPOSER UNDERSTANDS AND AGREES THAT THE PROVISIONS OF 31 USC §§ 3801 ET SEQ APPLY TO THIS CERTIFICATION AND EXPLANATION, IF ANY. Name and t i tl a of t he proposer' s a u t ho Authorized signature Date 93 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final CER 1.4 Non -Collusion Affidavit This affidavit is to be filled out and executed by the Proposer; if a corporation makes the bid, then by its properly executed agent. The name of the individual swearing to the affidavit should appear on the line marked "Name of Affiant." The affiant's capacity, when a partner or officer of a corporation, should be inserted on the line marked "Capacity." The representative of the Proposer should sign his or her individual name at the end, not a partnership or corporation name, and swear to this affidavit before a notary public, who must attach his or her seal. State of , County of I, , being first duly sworn, do hereby state that (Name of Affiant) I am of (Capacity) (Name of Firm, Partnership or Corporation) whose business is and who resides at and that (Give names of all persons, firms, or corporations interested in the bid) is/are the only person(s) with me in the profits of the herein contained Contract; that the Contract is made without any connection or interest in the profits thereof with any persons making any bid or Proposal for said Work; that the said Contract is on my part, in all respects, fair and without collusion or fraud, and also that no members of the Board of Trustees, head of any department or bureau, or employee therein, or any employee of the Authority, is directly or indirectly interested therein. 94 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final Signature of Affiant Date Sworn to before me this day of 20 Seal Notary public My commission expires 95 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final CER 1.5 Lobbying Certification This form is to be submitted with an offer exceeding $100,000. The Proposer certifies, to the best its knowledge and belief, that: No federal appropriated funds have been paid or shall be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of a federal department or agency, a member of the U.S. Congress, an officer or employee of the U.S. Congress, or an employee of a member of the U.S. Congress in connection with the awarding of any federal Contract, the making of any federal grant, the making of any federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment or modification thereof. 2. If any funds other than federal appropriated funds have been paid or shall be paid to any person for making lobbying contacts to an officer or employee of any agency, a member of Congress, an officer or employee of Congress, or an employee of a member of Congress in connection with this federal Contract, grant, loan or cooperative agreement, the undersigned shall complete and submit Standard Form LLL, "Disclosure Form to Report Lobbying," in accordance with its instruction, as amended by "Government -wide Guidance for New Restrictions on Lobbying," 61 Fed. Reg. 1413 (1/19/96). The undersigned shall require that the language of this certification be included in the award documents for all subawards at all tiers (including subcontracts, subgrants and contracts under grants, loans and cooperative agreements) and that all subrecipients shall certify and disclose accordingly. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by 31, USC § 1352 (as amended by the Lobbying Disclosure Act of 1995). Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. THE PROPOSER, , CERTIFIES OR AFFIRMS THE TRUTHFULNESS AND ACCURACY OF EACH STATEMENT OF ITS CERTIFICATION AND DISCLOSURE, IF ANY. IN ADDITION, THE PROPOSER UNDERSTANDS AND AGREES THAT THE PROVISIONS OF 31 USC §§ 3801 ET SEQ. APPLY TO THIS CERTIFICATION AND DISCLOSURE, IF ANY. Name of the bidder or Proposer's authorized official: Title Signature Date 96 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final Per paragraph 2 of the included form Lobbying Certification, add Standard Form—LLL, "Disclosure Form to Report Lobbying," if applicable. 97 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final CER 1.6 Certificate of Compliance with Bus Testing Requirement The undersigned certifies that the vehicle offered in this procurement complies and shall, when delivered, comply with 49 USC § 5324(c) and FTA's implementing regulation at 49 CFR Part 665 according to the indicated one of the following three alternatives. Mark one and only one of the three blank spaces with an "X." 1. The buses offered herewith have been tested in accordance with 49 CFR Part 665 on (date). If multiple buses are being proposed, provide additional bus testing information below or on attached sheet. The vehicles being sold should have the identical configuration and major components as the vehicle in the test report, which must be submitted with this Proposal. If the configuration or components are not identical, then the manufacturer shall provide with its Proposal a description of the change and the manufacturer's basis for concluding that it is not a major change requiring additional testing. If multiple buses are being proposed, testing data on additional buses shall be listed on the bottom of this page. 2. The manufacturer represents that the vehicle is "grandfathered" (has been used in mass transit service in the United States before October 1, 1988, and is currently being produced without a major change in configuration or components), and submits with this Proposal the name and address of the recipient of such a vehicle and the details of that vehicle's configuration and major components. 3. The vehicle is a new moldp3oposed as per JP 20 whiElhaii be tested and the results shalibe submitted to the Agency prior to acceptance ofthe first bus. The undersigned understands that misrepresenting the testing status of a vehicle acquired with federal financial assistance may subject the undersigned to civil penalties as outlined in the Department of Transportation's regulation on Program Fraud Civil Remedies, 49 CFR Part 31. In addition, the undersigned understands that FTA may suspend or debar a manufacturer under the procedures in 49 CFR Part 29. Company name: Name and t i tl a of t he Authorized signature p r o p o s e r' s a u t h o r i z e d Date 98 0 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final CER 1.7 DBE Approval Certification I hereby certify that the Proposer has complied with the requirements of 49 CFR 26, Participation by Disadvantaged Business Enterprises in DOT Programs, and it has submitted a goal to Federal Transit Administration and it has not been disapproved. Name and t i tl a of t he proposer' s a u t h o r i zed o Authorized signature Date In addition, TVMs are to submit a copy of their FTA approval letter along with the above TVM certification. 99 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final CER 1.8 Federal Motor Vehicle Safety Standards The Proposer and (if selected) Contractor shall submit (1) manufacturer's FMVSS self - certification sticker information that the vehicle complies with relevant FMVSS or (2) manufacturer's certified statement that the contracted buses shall not be subject to FMVSS regulations. Company name: Name of signer: Title: Authorized signature Date 100 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final CER 1.9 The undersigned hereby certifies that the offeror, (company name) VENDOR hereby acknowledges that the -John S. McCain National Defense A,tho,;zar;on Ater for F; s o a l Year 207, Pub. L. 115232, § 889 (Aug. 13, 2018) (the Act) prohibits the Agency from procuring certain "covered telecommunications equipment or services," as defined in the Act, in federally assisted procurements and that the instant procurement is a federally assisted procurement subject to that prohibition. VENDOR represents and warrants that it has performed a due diligence review of its supply chain and that no such "covered telecommunications equipment or services" shall be provided to the Agency that would cause the Agency to be in violation of the prohibition contained in the Act. (A) Does not have any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability; and (B) Was not convicted of the felony criminal violation under any Federal law within the preceding 24 months. Additionally, the Contractor acknowledges that if it cannot so certify, the Agency must refer the matter to FTA and not to enter into any agreement with the Contractor without FTA's written approval. Moreover, the Contractor acknowledges that it may not enter into any sub agreement related to this Contract without first obtaining a like certification from its subcontractor or supplier and will require its subcontractors and suppliers at every level to obtain like certifications in lower level transactions (signature, typed or printed name, and date) 101 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final 102 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final CER 2.0 Proposal Form NOTE: The following is an example of a proposal form to be modified as appropriate by the Agency and included in the RFP. Proposer shall complete the following form and include it in the price Proposal. PROPOSAL By execution below by a duly authorized representative(s) of the Proposer, the Proposer hereby offers to furnish equipment and services as specified in its Proposal submitted to BASIN TRANSIT in response to Request for Proposal No. 23-01: Joint Procurement for HEAVY Duty Transit Vehicles in its entirety. Proposer: Street address: City, state, ZIP: Name and title of Authorized Signer(s): Name and title of Authorized Signer(s): Phone: Authorized signature Date Authorized signature Date 103 Notice of Award By execution below, Basin Transit accepts Proposal as indicated above. Contracting officer: Authorized signature Request for Proposal RFP 23-01 (HD Transit Vehicles), Final Date 104 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final CER 2.1 Federal Tax Liability and Felony criminal violations The undersigned hereby certifies that the offeror, (company name) (A) Does not have any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability; and (B) Was not convicted of the felony criminal violation under any Federal law within the preceding 24 months. Additionally, the Contractor acknowledges that if it cannot so certify, the Agency must refer the matter to FTA and not to enter into any agreement with the Contractor without FTA's written approval. Moreover, the Contractor acknowledges that it may not enter into any sub agreement related to this Contract without first obtaining a like certification from its subcontractor or supplier and will require its subcontractors and suppliers at every level to obtain like certifications in lower level transactions (signature, typed or printed name, and date) Vehicle Questionnaire The Vehicle Questionnaire is attached as an Excel Spreadsheet in Appendix J. Each Proposer is to complete the appropriate spreadsheet tabs, print and return an original with a "wet signature" with the required proposal forms. Proposers shall also provide the required Warranty Provisions. Proposers are to also provide the other copies as required in NR 3, Proposal Date and Submittal Requirements. This form must be completed and included in the Technical Proposal. To be submitted in hardcopy and electronically (in native Excel form). 105 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final 106 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final SECTION 10: CONTRACT 1. Contract Documents and Order of Precedence The Contract consists of the documents listed below. In case of any conflict among these documents, the order of precedence shall be: 1. Form of Contract 2. "Section 4: Special Conditions" 3. "Section 3: General Conditions," and "Section 5: Federal Requirements" 4. "Section 6: Technical Specifications," "Section 7: Warranty Requirements," and "Section 8: Quality Assurance" 5. Contractor's Best and Final Offer (including Contractor Proposal) 6. Addenda 7. RFP No. 23-01 A modification or change to any Contract document shall take its precedence from the term it amends. All other documents and terms and conditions shall remain unchanged. 2. Compensation The Price Worksheet is Attachment 1 to this Contract. Each ordering Agency shall pay the Contractor the amount shown on the Ordering Confirmation Form as full compensation for all costs and expenses of completing the Work in accordance with the Contract, including but not limited to all labor and material required, overhead, storage and shipping, risks and obligations, taxes (as applicable), fees and profit, and any unforeseen costs. 3. Contract Term and Period of Performance The effective date of this Contract shall be the effective date set forth in the Notice to Proceed (NTP). The Contractor shall provide vehicles under the Schedule for a period of two (2) years after the effective date of the Contract, upon receipt of the NTP. 4. Contract Type This is an Indefinite Delivery/Indefinite Quantity (ID/IQ) contract. The minimum and maximum quantities established for the contract period are in Section IP 1: These figures represent the foreseeable needs of the listed Agencies shown on Appendix "C". . Neither BASIN TRANSIT, CalACT nor any other participant guarantee any purchase beyond the minimum quantity for the base contract period. Orders shall be placed on an as -needed basis. 107 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final 5. Notices Any Notice legally required to be given by one parry to another under the Contract shall be in writing, dated and signed by the party giving such Notice or by a duly authorized representative of such party. Notices shall not be effective unless transmitted by any method that provides confirmation of transmission and delivery, such as fax, certified mail or registered mail and addressed to: To Agency: Mr. Joe Meer, Director of Procurement Basin Transit 62405 Verbena Road Joshua Tree, CA 92252 [Insert Contractor name, address and point of contact] 6. Entire Agreement This Contract constitutes the complete and entire agreement between the Agency and Contractor and supersedes any prior representations, understandings, communications, commitments, agreements or Proposals, oral or written, that are not incorporated as a part of the Contract. Contractor name Signature of authorized official (Print or type name and title) Date Tax ID number Agency name Signature of authorized official (Print or type name and title) Date Approved as to form by: Insert name and title 108 Attachment 1 - Pricing Worksheet (Signed) [INSERT PRICING SCHEDULE] Request for Proposal RFP 23-01 (HD Transit Vehicles), Final 109 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final SECTION It: APPENDIXES Vehicle Specifications (Embedded) W Att A-3 (H-OTR-) RFP #23-02.doc WE Att A-4 (H-BEB FC 35-40') RFP #23-01 Ac W W W Att A-2 (H-LF 35-40') Att A-1 (H-LF 30-35') Att A-5 OTR BEB RFP #23-02 Add 1.do<RFP #23-01 Add 1.do< 45'.docx Appendix B: Visual Inspection and Road Test Forms Guide for Inspection: Coach Manufacturer The Following Items Should Be Inspected Coach Number on Every Coach of Each Order Test Location ITEM REQUIREMEN INSPECTION RESUL INSPECTOR REMARKS/NOTE T INSTRUCTIO T / S N DATE Curb Maximum curb Measure on Weight Weight weight of lb. certified scale FMVSS Affixed to vehicle Locate sticker Pass/Fail Stickers Finish and Smooth body Visually inspect Pass/Fail Color surfaces and paint all surfaces for flaws 110 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final Interior Absence of rough Visually inspect Pass/Fail Panel edges or surfaces for proper Fastening installation Towing Provision of Verify presence Pass/Fail Devices towing eyes of towing eyes (front/rear) Door Opening time of Verify door Pass/Fail Control sec. opening time frame Interior Lighting operable Switch on all Pass/Fail Lighting without engine interior lights Exterior All vehicle lights Switch on and Pass/Fail Lighting operable verify lamps are on Fuel Tank Fill rate and filler Inspect filler for Pass/Fail location easy access and check fill rate Chassis Welds, axles, Inspect for leaks, Pass/Fail suspension, and interference. steering, wheels, Check fluid and brakes levels, welds, undercoating, air lines, brake slack, and lug nuts Electrical Wiring and Inspect for loose Pass/Fail 'unction boxes or stretched wires Batteries Secured and Inspect Pass/Fail polarized wiring compartment access for jump and jumper start cable access HVAC Capacity and Operate AC, Pass/Fail performance check compressor, condenser, flow, and temperature Wheelchai Clear lift or ramp Operate lift or Pass/Fail r Access access, and ramp, inspect securement area operation, measure areas 111 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final Power Mounting and Check for loose Pass/Fail Plant arrangement lines, leaks, and noises. Check fluid levels, belt alignment, and L-J cap fit LJ I SAMPLE ROAD TEST SHEET Guide for Inspection: Coach Manufacturer The Following Items Should Be Inspected Coach Number on Every Coach of Each Order Test Location ITEM REQUIREMENT INSPECTION RESULT INSPECTOR REMARKS/ INSTRUCTION /DATE NOTES Engine N/A Record low idle, Low fast idle, and Fast high idle speeds High 112 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final Service Stopping distance Verify function Pass/Fail Brakes and indicator, check for pulling to either side Parking N/A Verify indicator, Pass/Fail Brake and no movement Turning Steering wheel Check effort with Pass/Fail Effort torque coach stopped Turning Not to exceed at Verify turning Pass/Fail Radius corner of body radius in both directions Acceleration rate from 0 to Verify Pass/Fail mph acceleration on smooth road Resonance Absence of Operate coach at Pass/Fail audible and/or various speeds, visible vibrations check for vibrations and rattles Windshield Evenly deposited Operate coach at Pass/Fail Wipers wash fluid safe speed over 40 mph, check coverage, parking position, and wiper frequency Power Plant N/A Check for leaks Pass/Fail under coach and in engine compartment, check for abnormal noises HVAC Interior Operate system, Int. temperature check internal and ambient Amb. temp. Door Accelerator and At speeds less Pass/Fail Control brake interlocks than 10 mph, verify accelerator and brake 113 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final interlocks with dooropen General N/A During testing, Pass/Fail observe any abnormalities in ride and handling of coach Signature of Inspector Date 114 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final Appendix C Participants List (Agency Master List PDF) 23-01 Participants List 02012024.pdf 115 RESERVED Request for Proposal RFP 23-01 (HD Transit Vehicles), Final 116 RESERVED Request for Proposal RFP 23-01 (HD Transit Vehicles), Final 117 Appendix E, Buy America Procedures (Attached) LLI RFP 20-01, App E, Buy America Procedur Appendix F, References Request for Proposal RFP 23-01 (HD Transit Vehicles), Final 118 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final SAE # Title Date Published J10 — Methods of Test for Paints - Part J10: Determination of Deposition — Sep 15, Efficiency of Coating Powders 1998 — J211 — Instrumentation for Impact Test —Part 2: Photographic — May 1, Instrumentation 2001 — J287 — Driver Hand Control Reach — Feb 1, 2007 — J366 — Exterior Sound Level for Heavy Trucks and Buses — Feb 1, 1987 — J382 — Windshield Defrosting Systems Performance Requirements - — Jan 1, Trucks, Buses, and Multipurpose Vehicles. 1994 — J534 — Lubrication Fittings — May 1, 2008 — J537 — Storage Batteries — Sep 1, 2000 — J541 — Voltage Drop for Starting Motor Circuits — Oct 1, 1996 — J587 — License Plate Illumination Devices (Rear Registration Plate — Sep 1, Illumination Devices) 2003 — J593 — Backup Lamps (Reversing Lamps) — Sep 1, 2005 — J673 — Automotive Safety Glasses — Oct 1, 2005 — J680 — Location and Operation of Instruments and Controls in Motor Truck — Sep 1, Cabs, Recommended Practice 1988 — J686 — Motor Vehicle License Plates — Oct 1, 1999 — J689 — Curbstone Clearance, Approach, Departure, and Ramp Breakover — Aug 1, Angles —Passenger Car and Light Truck 2009 — J833 — Human Physical Dimensions — May 1, 2003 — J844 — Nonmetallic Air Brake System Tubing — Nov 1, 2004 — J941 — Motor Vehicle Drivers' Eye Locations — Mar 1, 2010 — J994 — Alarm —Backup —Electric Laboratory Performance Testing — Mar 1, 2009 119 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final — J1050 — Describing and Measuring the Driver's Field of View — Jan 1, 2003 — J1113 — Electromagnetic Compatibility Component Test Procedure Part 42, — Oct 1, Conducted Transient Emissions 2006 — J1127 — Low Voltage Battery Cable — Mar 1, 2010 — J1128 — Low Voltage Primary Cable — Dec 1, 2005 — J1149 — Metallic Air Brake System Tubing and Pipe — Aug 1, 2007 — J1292 — Automobile and Motor Coach Wiring — Jan 1, 2008 — J1455 — Recommended Environmental Practices for Electronic Equipment — Jun 1, Design in Heavy -Duty Vehicle Applications 2006 — J1587 — Joint SAE/TMC Electronic Data Interchange between — Jan 1, Microcomputer Systems in Heavy -Duty Vehicle Applications, 1996 Recommended Practice — J1708 — Serial Data Communications Between Microcomputer Systems in — Oct 1, Heavy -Duty Vehicle Applications 2008 — J1986 — Balance Weight and Rim Flange Design Specifications, Test — Jan 1, Procedures, and Performance Recommendations 2006 — J1939 — Data Link Layer — Dec 1, 2006 — J1995 — Engine Power Test Code - Spark Ignition and Compression Ignition — Jun 1, - Gross Power Rating, Standard; 1990 — J2402 — Road Vehicles —Symbols for Controls, Indicators, and Tell -tales — Jan 1, 2010 — J2711 — Recommended Practice for Measuring Fuel Economy and — Sept 1, Emissions of Hybrid -Electric and Conventional Heavy -Duty 2002 Vehicles 120 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final Appendix G, Abbreviation and Acronyms A/C air conditioning ABS anti -lock braking system AC alternating current ACQ alkaline copper quaternary ADA Americans with Disabilities Act Ah amp hour ALR auto -locking retractor APA The Engineered Wood Association, formerly the American Plywood Association APC automatic passenger counter APTA American Public Transportation Association ASTM ASTM International, formerly the American Society for Testing and Materials ATC automatic traction control AVL automatic vehicle location AWG American Wire Gauge BAFO Best and Final Offer BMS Battery Management System BRT bus rapid transit CARB California Air Resources Board CCS climate control system CCTV closed-circuit television cfm cubic feet per minute CGA Compressed Gas Association CNG compressed natural gas dB decibel DBE disadvantaged business enterprise DC direct current DDU driver display unit DEF diesel exhaust fluid DOT Department of Transportation DPF diesel particulate filter ECM Engine Control and Monitoring ECS emission control system ELR emergency locking retractor EMI electromagnetic interference EPA Environmental Protection Agency ESS energy storage system FEA Finite Element Analysis FEMA failure mode effects analysis FMCSA Federal Motor Carrier Safety Administration FMCSR Federal Motor Carrier Safety Regulations 121 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final FMVSS Federal Motor Vehicle Safety Standards FTA Federal Transit Administration GAWR gross axle weight rated GPS global positioning system GVW gross vehicle weight GVWR gross vehicle weight rated H-point hip -point HDS hybrid drive system HMI human -machine interface HSC hybrid system controller HV high voltage HVAC heating, ventilation and air conditioning ICE internal combustion engine I/O input/output IEEE Institute of Electrical and Electronics Engineers ISO International Standards Organization LEL LED emergency light LV low voltage mA milliampere MDT mobile data terminal MPa mega -Pascal NC normally closed NFPA National Fire Protection Association NGV natural gas vehicle NOx nitrogen oxide NO normally open NTP notice to proceed OEM original equipment manufacturer OSI Open Systems Interconnect PA public address PMO project management oversight PPU primary propulsion unit PPU prime power init PPV price per vehicle PRD pressure relief device psi pounds per square inch RF radio frequency RFI radio frequency interference RTC real-time clock SAE SAE International, formerly the Society of Automotive Engineers scf standard cubic feet SLW seated load weight 122 Request for Proposal RFP 23-01 (HD Transit Vehicles), Final SOC state of change UL Underwriters Laboratories UNECE United Nations Economic Commission for Europe VDC volts of direct current Wh watt-hours VIN vehicle information number ZEB Zero Emission Bus Appendix H, References List Worksheet (Attached) Appendix I, Plant and Service Center/s Worksheets (Attached) Appendix J, Vehicle Questionnaire Sheet (Attached) Appendix K, RFA Form (Attached) Appendix H, References List Form (Submit all applicable to proposal, provide in Excel Format and Hardcopy) 10� RFP 23-01 REFERENCES FORM.xI Appendix I, Mfrs. Plant and Service Ctr Audit Checklist (Embed requested Does in Excel Sheet, submit electronic copy in Excel format and a hardcopy) For ZEB Buses, fii out both ZEB Bus and MFRS Preaward audit sheets, mark NA when necessary. 123 10� RFP 23-01 MFRS Pre -Award Audit Shee 10� 0� RFP 23-01 ZEB BUS RFP 23-01 SERVICE MFR FORM.xlsb CENTER FORM.xlsb Request for Proposal RFP 23-01 (HD Transit Vehicles), Final Appendix J, Vehicle Questionnaire (Submit in Electronic Excel Format and Hardcopy, Embed Does in Form as needed) 10� RFP 23-01 VEHICLE QUESTION NAIRE.xlsx Appendix K, RFA (Use only this form f o r 10� RFP 23-01 RFA FORM.As t o request A E ' s) 124 MBTA CONTRACT # 23-01 NEW FLYER AGREEMENT REGARDING PURCHASE OF TRANSIT VEHICLES. THIS AGREEMENT is made and entered into on July 31, 2024 between and among New Flyer of America Inc., with its principal place of business located at 6200 Glen Carson Drive, St. Cloud Minnesota, 56301 ("SELLER"), and BASIN TRANSIT ("Morongo Basin Transit Authority/MBTA"). SELLER and Basin Transit may be referred to herein individually as "Party" or collectively as "Parties." RECITALS WHEREAS, MBTA, by its Request for Proposals #23-01, duly advertised for written proposals to be submitted for the purchase of Heavy Duty Transit ("BUSES") on behalf of itself and Consortium members ("Consortium") identified in the Participating Agencies List in the RFP collected by the California Association of Coordinated Transportation ("CalACT") and, WHEREAS, the MBTA's RFP is attached hereto as Exhibit "A", and is incorporated herein by reference as if set forth in full, and WHEREAS, SELLER submitted a sealed proposal in response to BASIN TRANSIT's Notice Inviting Proposals, and WHEREAS, after it was determined that SELLER was a successful responsive and responsible proposer for battery electric, compressed natural gas, diesel, diesel hybrid and hydrogen fuel cell powered buses; and WHEREAS, SELLER's proposal in response to BASIN TRANSIT's Notice Inviting Proposals is attached hereto as Exhibit "B," and is incorporated herein by reference as if set forth in full; and WHEREAS, the BASIN TRANSIT Board of Directors has authorized the staff via Resolution and board action to award contracts and accept SELLER'S proposal through agreement by and between SELLER and BASIN TRANSIT upon the terms and conditions set forth herein; and WHEREAS, BASIN TRANSIT has fully complied with all federal, state, and local laws governing public procurement process for the purchase of the BUSES; NOW, THEREFORE, incorporating the foregoing recitals herein, for and in consideration of the promises and of the mutual covenants and agreements herein contained, SELLER and BASIN TRANSIT hereby agree as follows: 1. CONTRACT DOCUMENTS. This Agreement, along with all Exhibits referenced herein, and including without limitation, all documents referenced in said Exhibits shall hereinafter be referred to as the "Contract Documents." In the event of any conflict, the Contract Documents, including specifically RFP #23-01 and any addendums thereto, shall take priority in interpreting the respective rights and obligations of the Parties created by this Agreement. Any contract, agreement, or other document subsequently created by any Party in connection with a purchase order issued pursuant to this Agreement and which changes or otherwise modifies the terms and conditions set forth in the Contract Documents shall not be valid without the prior written approval of both of the Parties to this Agreement. 2. DESCRIPTION OF BUSES PURCHASED. SELLER hereby agrees that it shall sell the BUSES as more particularly described in RFP #23-01 (attached hereto as Exhibit "B") to any and all participants named in the RFP who desire to purchase such BUSES from SELLER. BUSES are to be vehicles with less than 4000 miles and that have never been previously registered. 3. CONTRACT PRICING. SELLER hereby agrees to sell such BUSES as more particularly described in RFP #23-01 (attached hereto as Exhibit "B") under the terms and conditions set forth in RFP #23-01. 4. DELIVERY. SELLER shall deliver F.O.B. per terms and conditions of BASIN TRANSIT RFP #23-01 Section SP 7.4, 11 and 12 and as proposed. 5. PAYMENT BY CONSORTIUM PARTICIPANTS. SELLER shall collect payment from Consortium participants within thirty (30) days after the delivery and acceptance of the BUSES by the participant, and a receipt of an invoice thereof, per RFP #23-01, Section SP 10. 6. NO ASSIGNMENT. Neither this Agreement, nor any interest in it, may be assigned or transferred by any Party without the prior written consent of all of the Parties to this Agreement. 7. NO ATTORNEYS' FEES. If litigation is required to enforce or interpret the provisions of this Agreement, neither SELLER nor the Cooperative shall be entitled to an award of attorneys' fees or costs, but shall be entitled to any other relief to which it may be entitled by law. 6. MODIFICATION. This Agreement may be modified only in a writing approved by the BASIN TRANSIT Board and signed by all Parties. 9. GOVERNING LAW. The laws of the State of California will govern the validity of this Agreement, its interpretation and performance. Any litigation arising in any way from this Agreement shall be brought in San Bernardino County, California. 10. NO WAIVER OF DEFAULT. The failure of any Party to enforce against another party any provision of this Agreement shall not constitute a waiver of that party's right to enforce such a provision at a later time, and shall not serve to vary the terms of this Agreement. 11. FURTHER ASSURANCES. Each Party shall execute and deliver such papers, documents, and instruments, and perform such acts as are necessary or appropriate, to implement the terms of this Agreement and the intent of the parties to this Agreement. 12. BINDING EFFECT; CONTEXT; COUNTERPARTS. Subject to Paragraph 6, the rights and obligations of this Agreement shall inure to the benefit of, and be binding upon, the parties to the contract and their heirs, administrators, executors, personal representatives, successors and assigns. Whenever the context so requires, the masculine gender and includes the feminine and neuter, and the singular number includes the plural. This Agreement may be executed in any number of counterparts, each of which shall be considered as an original and be effective as such. 13. NON -INTEREST. No officer or employee of BASIN TRANSIT shall hold any interest in this Agreement (California Government Code section 1090). 14. CORPORATE AUTHORITY. Each individual signing this Agreement on behalf of an entity represents and warrants that he or she is respectively, duly authorized to sign on behalf of the entity and to bind the entity fully to each and all of the obligations set forth in this Agreement. 15. INDEMNIFICATION. Indemnification will be as per the terms and conditions specified in RFP #23-01, GC 9.1. 16. WARRANTY. The BUSES are warranted by SELLER to be new and to be free from defects in material and workmanship pursuant to and in accordance with those certain manufacturer's warranties collectively attached hereto as Exhibit "B", and as submitted in response to RFP #23-01 by SELLER and incorporated herein by reference as if set forth in full. During said warranty periods, the BUSES shall maintain structural and functional integrity. The warranty is based on regular operation under operating conditions prevailing in the purchaser's operating area. 17. WARRANTY OF FITNESS. SELLER hereby warrants that the BUSES and all materials furnished shall meet the requirements and conditions of the Contract Documents and shall be fit for the purposes intended. Acceptance of this warranty and acceptance the BUSES and materials to be manufactured or assembled pursuant to the specifications in these Contract Documents shall not waive any warranty, either express or implied 18. NOTICE. All notices relative to this Agreement shall be given in writing and shall be personally served or sent by certified or registered mail and be effective upon depositing in the United States mail. The Parties shall be addressed as follows, or at any other address designated by proper notice: BASIN TRANSIT: Joe Meer Director of Cooperative Purchasing Programs Morongo Basin Transit Authority 62405 Verbena Road Joshua Tree, California 92252 SELLER: Jennifer McNeil Vice President of Sales and Marketing New Flyer of America, Inc. 6200 Glen Carson Drive, St. Cloud Minnesota, 56301 19. EXECUTION. This Agreement is effective upon execution by both Parties. It is the product of negotiation and all parties are equally responsible for authorship of this Agreement. Section 1654 of the California Civil Code shall not apply to the interpretation of this Agreement. IN WITNESS WHEREOF, the Parties have executed this Agreement as of the date first above written. New Flyer of America, Inc. Morongo Basin Transit Authority By By Jennifer McNeil, Vice President of Sales and Marketing Jo eer, Director of Purchasing 07/08/24 BASIN TRANSIT ADDENDUM NO. 6 Vehicle RFP #23-01 Date Issued: July 24, 2024 The following clarifications, amendments, additions, deletions, revisions and/or modifications form a part of the documents, and change original or previously issued documents only in the manner and to the extent stated. The contract price shall reflect all addendum changes and each proposer submit with the proposal, a copy of this Addendum. Items requested by proposers in the RFP's approved equal and request for comment period that are not addressed by addendum or included by reference are to be considered denied. Basin Transit revises and reissues RFP #23-01 adding clauses as follows: VIOLATION AND BREACH OF CONTRACT Rights and Remedies of the AGENCY The AGENCY shall have the following rights in the event that the AGENCY deems the Contractor guilty of a breach of any term under the Contract. 1. The right to take over and complete the work or any part thereof as agency for and at the expense of the Contractor, either directly or through other contractors; 2. The right to cancel this Contract as to any or all of the work yet to be performed; 3. The right to specific performance, an injunction or any other appropriate equitable remedy; and 4. The right to money damages. Rights and Remedies of Contractor Inasmuch as the Contractor can be adequately compensated by money damages for any breach of this Contract, which may be committed by the AGENCY, the Contractor expressly agrees that no default, act or omission of the AGENCY shall constitute a material breach of this Contract, entitling Contractor to cancel or rescind the Contract or to suspend or abandon performance. Remedies Substantial failure of the Contractor to complete the Project in accordance with the terms of this Agreement will be a default of this Agreement. In the event of a default, the AGENCY will have all remedies in law and equity, including the right to specific performance, without further assistance, and the rights to termination or suspension as provided herein. The Contractor recognizes that in the event of a breach of this Agreement by the Contractor before the AGENCY takes action contemplated herein, the AGENCY will provide the Contractor with sixty (60) days written notice that the AGENCY considers that such a breach has occurred and will provide the Contractor a reasonable period of time to respond and to take necessary corrective action. Disputes Disputes arising in the performance of this Contract that are not resolved by agreement of the parties shall be decided in writing by the authorized representative of AGENCY's Administrator. This decision shall be final and conclusive unless within [10] days from the date of receipt of its copy, the Contractor mails or otherwise furnishes a written appeal to the Administrator. In connection with any such appeal, the Contractor shall be afforded an opportunity to be heard and to offer evidence in support of its position. The decision of the Administrator shall be binding upon the Contractor and the Contractor shall abide be the decision. Performance during Dispute Unless otherwise directed by AGENCY, Contractor shall continue performance under this Contract while matters in dispute are being resolved. Rights and Remedies The duties and obligations imposed by the Contract documents and the rights and remedies available thereunder shall be in addition to and not a limitation of any duties, obligations, rights and remedies otherwise imposed or available by law. No action or failure to act by the AGENCY or Contractor shall constitute a waiver of any right or duty afforded any of them under the Contract, nor shall any such action or failure to act constitute an approval of or acquiescence in any breach thereunder, except as may be specifically agreed in writing. SAFE OPERATION OF MOTOR VEHICLES Seat Belts Use The Contractor is encouraged to adopt and promote on-the-job seat belt use policies and programs for its employees and other personnel that operate company -owned vehicles, company -rented vehicles, or personally operated vehicles. The terms "company -owned" and "company -leased" refer to vehicles owned or leased either by the Contractor or Agency. Distracted Driving The Contractor agrees to adopt and enforce workplace safety policies to decrease crashes caused by distracted drivers, including policies to ban text messaging while using an electronic device supplied by an employer, and driving a vehicle the driver owns or rents, a vehicle Contractor owns, leases, or rents, or a privately -owned vehicle when on official business in connection with the work performed under this agreement. New Flyer of America Inc. DATE 07/08/24 Byil Jennifer McNeill Vice President, Sales & Marketing Addendum 46 IRFP 23-01 MF"'A Final Audit Report 2024-08-07 Created: 2024-08-01 By: Luciana Marques (luciana_marques@newflyer.com) Status: Signed Transaction ID: CBJCHBCAABAAxWLA06qugxundMlkBmJRAOSHaOTem1uR "Addendum #6 RFP 23-01 MBTA" History Document created by Luciana Marques (luciana_marques@newflyer.com) 2024-08-01 - 1:18:56 PM GMT Document emailed to Jennifer McNeill Qennifer_mcneill@newflyer.com) for signature 2024-08-01 - 1:19:00 PM GMT Ali Email viewed by Jennifer McNeill Qennifer_mcneill@newflyer.com) 2024-08-07 - 2:54:29 PM GMT Document e-signed by Jennifer McNeill Qennifer_mcneill@newflyer.com) Signature Date: 2024-08-07 - 3:00:25 PM GMT - Time Source: server Agreement completed. 2024-08-07 - 3:00:25 PM GMT V Adobe Acrobat Sign AMENDMEAT BASIN TRANSIT CONTRACT NO. 23-01 —NEW FLYER THIS AMENDMENT is made and entered into on JULY 31, 2025 between and among New Flyer of America Inc., with its principal place of business located at 6200 Glen Carson Drive, St. Cloud Minnesota, 56301 ("SELLER"), and the Morongo Basin Transit Authority ("Basin Transit/MBTA"). SELLER and The Morongo Basin Transit Authority may be referred to herein individually as "Party" or collectively as "Parties." RECITALS WHEREAS, Basin Transit, by its Requestfor Proposals# 23-01, duly advertised for written proposals to be submitted for the purchase of Transit Vehicles ("BUSES") on behalf of the California Association for Coordinated Transportation ("CALACT") membership by Basin Transit; and WHEREAS the parties entered into an AGREEMENT, BASIN TRANSIT Contract No.23-01-NEW FLYER on July 31, 2024; and WHEREAS the AGREEMENT was for a one-year base period with four one-year options; and WHEREAS MBTA Board of Directors has provided authorization to staff to exercise options; NOW THEREFORE BE IT RESOLVED incorporating the foregoing recitals herein, for and in consideration of the promises and of the mutual covenants and agreements herein contained, SELLER and Basin Transit hereby agree as follows: 1. Per Section SP-3, Period of Performance, the period of contract performance is extended to exercise the first one-year option. The new Period of Performance is extended through July 30, 2026. 2. Per Section SP-5.3, Vehicle and Optional Feature Pricing, the price of the vehicles and of the optional features for each option period shall be the unit price established in the initial Schedule adjusted by PPI 1413 as stipulated in the Contract. For the first one-year period, the price increase is 4.8% from the base price. The new pricing is attached to this Amendment and shall become effective for orders placed on or after July 31, 2025. 3. Price calculation method, incorporation of additional tariff costs, and support of FTA grantee cost analysis. Pricing — for Purchase Orders placed on or after the date of this Amendment 1, SELLER shall, in cooperation with the individual purchasing agency, establish a Not to Exceed (NTE) price for each bus. That NTE price will be based on the then -current price schedule, plus an amount expressed in dollars, for which the individual purchasing agency assumes the risk of cost increases. SELLER shall assume the risk of cost increases beyond the NTE price. The final price for each bus shall be calculated at the time of production by adding to the price at the time the Purchase Order was issued: a. Any intervening increases formally recognized by Basin Transit pursuant to Section SP-5.3 and based on PPI 1413 and b. The net change in SELLER and supplier tariff costs as documented below. The net change in SELLER and supplier tariff costs shall be the net difference between tariffs payable on the date of the last price increase formally recognized by Basin Transit pursuant to Section SP-5.3 and based on PPI 1413 and tariffs payable at the time of production. In no case shall the final price exceed the NTE price established in the Purchase Order. Changes in tariff costs experienced directly by SELLER shall be established through documented proof of tariffs existing on the date of the last price increase formally recognized by Basin Transit pursuant to Section SP-5.3 and based on PPI 1413 and those existing at the time of production. Changes in tariff costs experienced by SELLER's suppliers shall be established through certifications from affected suppliers detailing the tariffs payable, in dollars, on the date of the last price increase formally recognized by Basin Transit pursuant to Section SP- 5.3 and based on PPI 1413 and tariffs payable at the time their products were delivered to SELLER for incorporation into the buses. In every case, SELLER shall certify that the tariffs claimed were actually charged to and payable by SELLER, that the tariffs claimed directly relate to the vehicles to be delivered, and that no countervailing reduction in tariffs affecting the delivery are known to the SELLER. SELLER shall supply such proof as a condition precedent to receiving any tariff relief. For purposes of determining final prices, the time of production shall be deemed 45 days prior to the date on which SELLER expects production to begin and all necessary documentation shall be delivered to the individual purchasing agency not later than 30 days before the SELLER expects production to begin. IN WITNESS WHEREOF, the Parties have executed this Agreement as of the date first above written. NEW FLYER OF AMERICA, INC. MORONGO BASIN TRANSIT AUTHORITY Jennifer McNeill- Vice President, Sales & Marketing J07Vleer, Director of Purchasing