HomeMy WebLinkAbout2026-03-10 - AGENDA REPORTS - ITS HARDWARE CONTR NEW HYDRO BUSESO
Agenda Item: 8
CITY OF SANTA CLARITA
.` AGENDA REPORT
1W
CONSENT CALENDAR
CITY MANAGER APPROVAL:
DATE: March 10, 2026
SUBJECT: CONTRACT FOR INSTALLING ONBOARD INTELLIGENT
TRANSPORTATION SYSTEMS ON SEVEN NEW TRANSIT BUSES
DEPARTMENT: Economic Development
PRESENTER: Adrian Aguilar
RECOMMENDED ACTION
City Council:
Award a contract to Connexionz Limited for Intelligent Transportation System (ITS)
hardware, including the installation, configuration, furnishing, and commissioning of the ITS
system on seven New Flyer Hydrogen Fuel Cell transit buses, for a total amount not to
exceed $74,067.
2. Authorize the City Manager or designee to execute all contracts and associated documents,
subject to City Attorney approval.
BACKGROUND
Santa Clarita Transit is preparing to place seven new Hydrogen Fuel Cell transit buses into
service. As part of standard fleet deployment, each vehicle must be equipped with several
onboard technology systems which allow the bus to operate as part of an active transit fleet.
These hardware systems are collectively referred to as the Intelligent Transportation System
(ITS).
The ITS hardware consists of the onboard computers, communications equipment, and
supporting components that enable essential transit functions. These systems support features
such as automated stop announcements, onboard audio and multimedia displays, vehicle location
and communications, and the exchange of data between the bus and Santa Clarita Transit's
existing operating systems. The ITS hardware also allows the vehicle to interface with other
onboard equipment, including head signs, fare collection systems, passenger counters, and
vehicle diagnostics.
Page 1
Packet Pg. 44
O
This work ensures that the new vehicles are fully integrated with Santa Clarita Transit's existing
technology and are operationally consistent with the active fleet prior to entering revenue
service.
Connexionz Limited is the developer and system integrator of the transit technology environment
currently used by Santa Clarita Transit and, as such, is the only firm able to install, configure,
and commission new vehicles within that system. As a result, and in accordance with the City's
Purchasing Policy, a sole source procurement has been approved for the vendor. Therefore, staff
recommends awarding a contract to Connexionz Limited in an amount not to exceed $74,067.
ALTERNATIVE ACTION
Other action as determined by the City Council.
FISCAL IMPACT
The resources required to implement the recommended action are contained within the City of
Santa Clarita's adopted FY 2025-26 budget, in expenditure account 7003702-520103 (Transit
Capital — Automotive Equipment).
ATTACHMENTS
Connexionz Limited Proposal (available in the City Clerk's Reading File)
Page 2
Packet Pg. 45
Exhibit A
SCOPE OF WORK
Installation, Configuration, and Commissioning of ITS System on Hydrogen Fuel Cell Buses
BACKGROUND
Santa Clarita Transit is preparing to place seven new Hydrogen Fuel Cell Buses into service. As
part of standard fleet deployment, each new vehicle must be equipped with several onboard
technology systems which allow the bus to operate as part of an active transit fleet. These hardware
systems are collectively referred to as Intelligent Transportation Systems (ITS). Completion of this
work ensures new vehicles are fully integrated with Santa Clarita Transit's existing technology
and are operationally consistent with the active fleet prior to entering revenue service.
DESCRIPTION OF WORK
Connexionz Ltd. will supply the labor, tools, parts, mounting brackets, and all equipment needed
to install the ITS hardware identified in Exhibit B, Connexionz Ltd. Quote and Proposal, and
complete the following work on seven City -owned 2026 New Flyer Hydrogen Fuel Cell transit
buses.
• Install, test, and commission on vehicle Automatic Vehicle Location hardware.
• Install, test, and commission audio and visual stop announcement hardware,
including two monitors per vehicle.
• Test and commission on vehicle Automatic Passenger Counter hardware.
• Install, test, and commission farebox interface.
• Install, test, and commission headsign interface.
• Install, test, and commission vehicle health monitoring hardware.
• Install and test Wireless Local Area Network depot download and network
connectivity.
All work must be completed within five calendar days of each vehicle's arrival to the Transit
Maintenance Facility. City staff will notify the Connexionz Ltd. Customer Service Manager of
their arrival date. In the event the work is not completed within five calendar days of the vehicle
arrival date, the City may assess damages of $250 per calendar day for each unfinished vehicle
until the work is completed in its entirety.
Sales Quote SQ000452 Exhibit B
22 September 2025
Page 1 / 3
The City of Santa Clarita Transit
Adrian Aguilar
Suite 292
23920 Valencia Boulevard
Santa Clarita, CA 91355-2196
United States of America
This quote includes the CNX ITS hardware for 7x NFI
vehicles, along with onsite installation at the Santa
Clarita location, system configuration, and full
commissioning.
Your Reference Valid to Salesperson
Hugo Valdovinos
No.
Description
HARDWARE
002467
Medius G2-DB4, Multimedia, WiFi, TTS
001164
Medius INPUT Power Pigtail 300mm
002684
Pepwave MAX BR1 Mini with Cat 7 LTE Advanced
(HW4), 1yr Primecare
001759
Medius OUTPUT Power 12V for Router
(Cradlepoint/Pepwave), 500mm
001925
Tracker Antenna - Ant 829MHZ/1.59GHZ Dome
Panel, Cable - 10ft (3m)
001103
GPS Cover Dome
002061
SMA/Female to SMA/Male Extension Cable, 6ft
002060
Adapter SMA Jack, Female Socket To RP-SMA
Plug, Female Socket
002080
Network Switch (5-Port Ethernet)
002125
USB Power for Switch A Male to DC Barrel -
1.35mm ID, 3.5mm OD, 3ft
002109
Ethernet Patch Lead, 3ft
002073
Ethernet Patch Lead, 20ft
connexionz
SMARTER TRANSIT SOLU TiONS
Connexionz Limited
PO Box 9001
Tower Junction
Christchurch, 8149
New Zealand
Payment Terms Shipment Method
20th of the
following month
Unit Price Line Amount
Quantity Excl. VAT Excl. VAT
7
Each
2,950.00
20,650.00
7
Each
30.00
210.00
7
Each
500.00
3,500.00
7
Each
40.00
280.00
7
Each
115.00
805.00
7
Each
50.00
350.00
35
Each
10.00
350.00
14
Each
5.00
70.00
7
Each
35.00
245.00
7
Each
10.00
70.00
7
Each
5.00
35.00
7
Each
20.00
140.00
VAT Registration No. Home Page Phone No. Email
068-635-861 www.connexionz.com +64 3 339 4536 accounts@connexionz.com
Sales Quote SQ000452
22 September
2025
Page 2 / 3
001365
J1708 Multi -Vendor Headsign Cable, DB9, 16.5ft
001359
OEM J1708 Farebox, Odyssey, 20ft
001166
Speaker Pigtail, 1ft
002161
G2 Mic Audio In Screened (Molex), 13ft
001362
Vehicle Diagnostic J 1939 (3-pin), 4.5ft
001181
General Purpose INPUT Pigtail 250mm
002076
UTA OEM RS232 Passenger Count Cable, 5ft
001642
Monoprice Blackbird 4K 1x2 HDMI Amplifier
Splitter
002487
HDMI Splitter Cover
001683
USB Power for HDMI Splitter A to 2.1mm Plug
5V/2A), 1m
001156
High Speed 4K HDMI Cable 3ft
001158
High Speed 4K HDMI Cable 10ft
002162
Active High Speed 4K HDMI Cable 30ft
HARDWARE FREIGHT
Item Freight
PROJECT SERVICES
7 Vehicle -
Deployment Services — Installation, Configuration,
Travel & Expenses
7 Vehicle -
System Licensing & Vehicle Integration Setup
SALES TAX
Santa Clarita
Sales Tax on hardware only (33,495.00) at
9.750%
7
Each
225.00
1,575.00
7
Each
90.00
630.00
7
Each
20.00
140.00
7
Each
70.00
490.00
7
Each
130.00
910.00
14
Each
20.00
280.00
7
Each
220.00
1,540.00
7
Each
35.00
245.00
7
Each
25.00
175.00
7
Each
5.00
35.00
7
Each
15.00
105.00
7
Each
25.00
175.00
7
Each
70.00
490.00
1 799.97 799.97
1 29,155.35 29,155.35
1 7,350.00 7,350.00
1 3,265.76 3,265.76
Total USD 74,066.08
Sales Quote SQOOO452
22 September 2025
Page 3 / 3
Quote Acceptance
Name: Signature: Date:
50% After Hardware Delivery and Final 50% after Vehicle Commissioning
Leadtime can vary, especially for systems containing solutions from third parties. Please allow up to 12 weeks lead time
Assumptions:
Hardware & Installation
1. CNX ITS hardware is provided only for the 7x NFI vehicles listed in this quote.
2. Onsite installation will take place at the Santa Clarita location during standard business hours unless otherwise agreed
3. Vehicle availability and access for installation will be provided by the customer.
4. It is assumed that NFI/MCI will provide the necessary inputs, outputs, and wiring harnesses to the ITS cabinet, so that
CNX will only need to connect to the wiring from the ITS cabinet.
5. All hardware installed will include a one (1) year warranty from the date of installation.
Configuration & Licensing
6. Configuration, commissioning, and licensing are limited to the features and hardware described in this quote, with
licensing purchased through the agreed SMA contract.
7. One (1) year of Pepwave PrimeCare is included under this quote. Following this period, it will be the responsibility of
Santa Clarita Transit to purchase and maintain any additional PrimeCare licenses if desired.
8. SIM cards required for system operation will be provided by Santa Clarita Transit.
Vehicle Scope & Fees
9. It is assumed that the 7 vehicles identified in this quote are replacements of existing vehicles. In the event that these
vehicles are additions to the fleet rather than replacements, an additional fee per vehicle will be applied to maintain
coverage through the end of the SMA period.
Taxes
10. Sales tax for hardware has been included in quote.
Estimated Arrival of Hardware
11. Hardware is estimated to be delivered within 5 days of receipt of PO from The City of Santa Clarita Transit.