Loading...
HomeMy WebLinkAbout2026-04-28 - AGENDA REPORTS - JOHNSON CONTROLS HVAC MAINT EMERGENCY REPAIRO Agenda Item: 9 CITY OF SANTA CLARITA W AGENDA REPORT CONSENT CALENDAR CITY MANAGER APPROVAL: DATE: April 28, 2026 SUBJECT: HEATING AND AIR CONDITIONING MAINTENANCE AND EMERGENCY REPAIR CONTRACT DEPARTMENT: Neighborhood Services PRESENTER: Bryan Peck RECOMMENDED ACTION City Council: Approve the use of a cooperative agreement through Sourcewell contract 9080824-JHN and award a five-year contract to Johnson Controls, Inc., for heating and air conditioning maintenance and emergency repair services for all City -owned facilities for a total contract amount not to exceed $1,986,786. 2. Authorize an ongoing appropriation to the Contractual Services accounts listed on Exhibit A for a total amount of $4,753 in Fiscal Year 2027-28, $4,849 for Fiscal Year 2028-29, $4,946 for Fiscal Year 2029-30, and $5,045 for Fiscal Year 2030-31, contingent upon the appropriation of funds in the annual budget for such fiscal years. 3. Authorize the City Manager or designee to execute all contracts and associated documents, and to modify the awardees in the event of project withdrawal or abandonment, subject to City Attorney review. BACKGROUND The City of Santa Clarita (City) Neighborhood Services Department administers maintenance operations for all City -owned facilities. To ensure timely and responsive service, the City has contracted with Johnson Controls, Inc. (JCI) since 2021 to provide routine preventative maintenance, as well as on -call and emergency response services for heating and air conditioning systems. The current contract is set to expire June 30, 2026. Staff has worked with JCI to develop an in-depth preventive maintenance program to enhance and maintain regular heating and air conditioning maintenance at key facilities such as City Hall, Page 1 Packet Pg. 81 O Public Works Corporate Yard, City Libraries, Transit Maintenance Facilities, Metrolink stations, and the Citrus Building. The goal is to ensure that all HVAC systems remain safe, reliable, and efficient through preventive maintenance. These services include equipment cleaning, temperature control adjustments, filter replacements, lubrication of parts, inspection and calibration of heating controls and thermostats, and checks of safety mechanisms. After conducting extensive research to identify the most competitive pricing and the highest - quality services, the staff recommends using the City's cooperative purchasing option for this procurement. This approach satisfies the City's procurement requirements by leveraging a competitively solicited and publicly awarded cooperative contract, allowing the City to obtain favorable pricing and terms while streamlining the procurement process. The City is using the cooperative purchasing contract with Sourcewell, which allows the City to take advantage of an existing process. This contract, which was awarded on November 26, 2024, was solicited through a competitive request for proposals process and is valid through November 1, 2028, with up to three additional one-year extensions. After performing a cost analysis and reviewing pricing for comparable services from other sources, it has been determined that the Sourcewell cooperative purchasing contract with JCI (9080824-JHN) provides competitive pricing, quality service, and the best value to the City. Using the Sourcewell cooperative purchasing contract results in a total not -to -exceed amount of $1,986,786, inclusive of a 2 percent annual increase during the duration of the contract. ALTERNATIVE ACTION Other action as determined by the City Council. FISCAL IMPACT Upon approval of the recommended actions, adequate funding will be available in the expenditure accounts listed in Exhibit A starting in Fiscal Year 2026-27. The ongoing base budget increase of two percent of contract amount commencing in FY 2027-28 will be contingent upon appropriations of funds by the City Council during the annual budget process. ATTACHMENTS Exhibit A Johnson Controls 5 Years As Needed Repairs (available in the City Clerk's Reading File) Johnson Controls PSA 2026-2027 with 5 Year Renew Proposal (available in the City Clerk's Reading File) Page 2 Packet Pg. 82 9.a Exhibit A City of Santa Clarita Citywide HVAC Maintenance & Repairs 2%Increase Appropriation 2%Increase Appropriation 2%Increase Appropriation 2%Increase Appropriation Location - Account Name Account Number FY 2026-27 FY 2027-28 FY 2027-28 FY 2028-29 FY 2028-29 FY 2029-30 FY 2029-30 FY 2030-31 FY 2030-31 SCVTV- Public Television 1001501-516101 $ 3,022 $ 3,082 $ 60 $ 3,144 $ 62 $ 3,206.97 $ 63 $ 3,271 $ 64 City Hall - City Hall Maintenance 1007404-516101 $ 36,781 $ 37,517 $ 736 $ 38,267 $ 750 $ 39,032.29 $ 765 $ 39,813 $ 781 Newhall Parking Structure - Newhall Parking Stucture Maintenance 1007405-516101 $ 4,870 $ 4,967 $ 97 $ 5,067 $ 99 $ 5,168.08 $ 101 $ 5,271 $ 103 Corporate Yard - Corporate Yard Maintenance 1007410-516101 $ 20,231 $ 20,636 $ 405 $ 21,048 $ 413 $ 21,470 $ 422 $ 21,899 $ 429 The Arts & Events Offcice - Incubator Facility Maintenance 1007415-516101 $ 8,019 $ 8,179 $ 160 $ 8,343 $ 164 $ 8,509.83 $ 167 $ 8,680 $ 170 Citrus Street Building - Citrus Building 1307414-516101 $ 3,942 $ 4,021 $ 79 $ 4,101 $ 80 $ 4,183.28 $ 82 $ 4,267 $ 84 Hart Park - Facilties Adminsitration Hart Park 1407400-516101 $ 19,258 $ 19,643 $ 385 $ 20,036 $ 393 $ 20,436.74 $ 401 $ 20,846 $ 409 Santa Clarita Public Libraries - Public Library Facility Maintenance 3097412-516101 $ 63,302 $ 64,568 $ 1,266 $ 65,860 $ 1,292 $ 67,177.20 $ 1,317 $ 68,521 $ 1,344 Transit Maintenance Facility - Transit Maintenance Facility Maintenance 7003701-516101 $ 73,321 $ 74,787 $ 1,466 $ 76,283 $ 1,496 $ 77,808.83 $ 1,526 $ 79,365 $ 1,556 Metrolink Stations - Transit Facilities 7007407-516101 $ 4,912 $ 5,010 $ 98 $ 5,110 $ 100 $ 5,212.65 $ 102 $ 5,317 $ 104 Facilities Administration - Various Accounts Various Accounts $ 150,000 $ 150,000 $ $ 150,000 $ $ 150,000.00 $ $ 150,000 $ $ 387,658 $ 392,411 $ 4,753 $ 397,260 $ 4,849 $ 402,206 $ 4,946 $ 407,251 $ 5,045 Q ILL W U Z ,W V W 2 W r Q Packet Pg. 83 1T` 11 m.'_ ti CITY OF SANTA CLARITA AS NEEDED REPAIRS 5 YRS Quote Prepared by Natalie Avelar 02/04/2026 Bill To: CITY OF SANTA CLARITA 23920 VALENCIA BLVD, SUITE 300 SANTA CLARITA CA USA 91355 Quote Reference Number: 1-1RONDCHM Project Name: CITY OF SANTA CLARITA AS NEEDED REPAIRS 5 YRS Site: CITY OF SANTA CLARITA CITY HALL 23920 VALENCIA BLVD STE 300 SANTA CLARITA CA 91355-5316 Branch Info: JOHNSON CONTROLS LOS ANGELES CA CB - ONOG Attn: MARCO JIMENEZ Name: MARCO JIMENEZ Johnson Controls This proposal is hereby accepted and Johnson Controls Building Solutions LLC ("JC' or "Johnson Controls") is authorized to proceed with the work, subject to credit approval by Johnson Controls, Milwaukee, WI. We propose to furnish the materials and/or perform the work below for the net price of: $750,000.00. Any additional taxes, duties, tariffs or similar items imposed prior to shipment will be charged. This proposal is valid through: 03/06/2026 CITY OF SANTA CLARITA Johnson Controls Building Solutions LLC. Signature: Signature: Name: Name: Title: Title: Date: Date: PO: CONFIDENTIAL: For customer review. ©2025 Johnson Controls Johnson 000 Controls Page 1 of 6 Overvie Benefits/Scope of Work: Blanket PO per agreed upon Sourcewell rates. 5 YEARS 2026-150K 2027-150K 2028-150K 2029-150K 2030-150K All JCI pricing provided under this agreement will be in accordance with the Johnson Controls Sourcewell contract #080824-JHN All buildings below will pertain to this contract CITY HALL BUSINESS INCUBATOR TRANSIT FACILITY Public Work Corporate Yard Jan Heidt Newhall Metrolink Station Santa Clarita Metrolink Station VIA Princessa Metrolink Station Channel 20 Public Access TV Studios Old Town Newhall Parking Structure VALENCIA LIBRARY JO ANNE DARCY LIBRARY OLD TOWN NEWHALL LIBRARY Old Orchard Park Newhall Park and aquatics Valencia meadows park and aquatics Valencia glen park and aquatics Santa Clarita Park and aquatics North Oaks Park and aquatics Santa Clarita Sports Complex Gym Santa Clarita Sports Complex The Centre Santa Clarita Sports Complex Aquatics Center Santa Clarita Sports Complex Skate Park Canyon Country Park Vista Canyon Park 1 Newhall Community Center Canyon Country community center Central Park The Main Theatre The Cube Tesoro Adobo Park VALENCIA COMMUNITY CENTER CITURS BUILDING William S Hart Park Santa Clarita Sports Complex The Rink CONFIDENTIAL: For customer review. ©2025 Johnson Controls Johnson 010 Controls Page 2 of 6 Exclusions: 1.Labor or material not specifically described above is excluded from this proposal. 2.Unless otherwise stated, any and all overtime labor is excluded from this proposal. 3.Applicable taxes or special freight charges are excluded from this proposal. 4.Any additional taxes, duties, tariffs or similar items imposed prior to shipment will be charged. CUSTOMER ACCEPTANCE: n 9xec4iri: -f s •A.g -ent. '::.-:crre• agrees to the terms and conditic ns cc-ta rC he,eir inslud -a tFcsc n -Fe following pagefs; of this Agreement and an,. aYachments cr •J-rs attache) hest: that c-n-air ecditona' terrrs arc!-ond"icrs t is .n:!e s of tat hose tears an:! cone -icrs shall n° :,iil c:er ar i':a•iaticn in terns art m i-liticns cr an; ones: crcer or -&er dccument the- Custcmcr mar ssic. ,�%ry c.-•anaea rcaues(sd Ly Custoi isr after tn::xscut cm -f his ent she I L•e I:a d fo• i, Mc C: s-erne and' s -n changes shall be autho ized - r:riting. ATTENTION IS DIRECTED TO THE LIMITATION OF LIABILITY, WARRANTY, INDEMNITY AND OTHER CONDITIONS CONTAINED IN THIS AGREEMENT. p•ice is contingent u;:: n'he holIoaing Lilting and pu rarer -tams For most .agreements 0ere the ;:re;: eel am; .rat exceeds $5 000 :USD cr CAC m ail, icala i C: as -erne• agrees -- :a: Johns-n C.c rat c s an ul,:ront de;:,,sit of 3 cr mere due NET 30 -m- :!ate of in: ci-e. Amn-i. el;. fu, ;:reen-an-s ::,ere :f e csal jeice ek.�e-C!s 51 Gusto^ -per ma.; pa;:..chrs,-- in f. NET 10 -ro- date of inci-e r excnarge for ar immec' ate 2: c. Jisco.nt m -he sale -rice J-1"isim �o�t•c s is rc,t require to ccrrme-c:e :cr< An( iI an:: a,_ eeed to ad:an-e oa.;--,ents are eeceieJ I Custunier is u ::iIIin�, tc agree to eitFer-p•-ic- a'-c;e fv -ro--eats exceaec -•36 D' is --r,-se-ted: -lease ac:ise yc. Jonnscn C mteds ep• esen-ati re immec atel: and a e:':. reneice ;:r ,:-sal +;ill need -o le iss.el to "ustc,nier in: mes. II !:e :!e :ered a en -ail and pa.d ria ACEIEF- LorK t onsfer r,itn co..; -gent due NET 30 j.inlesa C as -e nos -ado fall pa -ent %ET 10 r excnarce fc,r a 2°:: c secur-:. Jc,hnKr Combo s EF- Lank transfer deta s v.ill 5e faun :o- ra ul:on contractual agreement - This offer shall be void if not accepted in writing within thirty (30) days from the date first set forth above. To ensure that Seller is compliant with your company's billing requirements, please provide the following information: PO is required to facilitate billing: ❑NO: This signed contract satisfies requirement ❑YES: Please reference this PO Number: AR Invoices are accepted via e-mail: ❑ YES: E-mail address to be used: ❑ NO: Please submit invoices via mail ❑ NO: Please submit via (IMPORTAN7): JC" or 'Johnson Controls' shall mean Johnson Controls Building Solutions, LLC for work performed in the U.S.A. and Johnson Controls Canada LP for work performed in Canada. These terms and conditions are an integral part of JC's offer and form the basis of any agreement (the Agreement) resulting from JC's proposal for the goods and/or services described. All work is to be performed Monday through Friday during normal JC business hours unless otherwise noted, and JC is authorized to proceed with the work; subject however, to credit approval by JC. TERMS AND CONDITIONS (Rev. 10.01.2025) By accepting this proposal, Customer agrees to be bound by the following terms and conditions: 1. SCOPE OF WORK. This proposal is based upon the use of straight time labor only. Plastering, patching, and painting are excluded. Disinfecting of chiller condenser and cooling tower water systems and components for biohazards, such as but not limited to Legionella, are excluded unless otherwise specifically stated in this Agreement. In -line duct and piping devices, including, but not limited to valves, dampers, humidifiers, wells, taps, flow meters, orifices, etc., if required hereunder to be furnished by JC, shall be distributed and installed by others under JC's supervision but at no additional cost to JC. Customer agrees to provide JC with required field utilities (electricity, toilets, drinking water, project hoist, elevator service, etc.) without charge. JC agrees to keep the job site clean of debris arising out of its own operations. Customer shall not back charge JC for any costs or expenses without JC's written consent. Unless specifically noted in the statement of the scope of work or services undertaken by JC under this Agreement, JC's obligations under this Agreement expressly exclude any language or provision of the Agreement elsewhere contained which may authorize or empower the Customer to change, modify, or alter the scope of work or services to be performed by JC and shall not operate to compel JC to perform any work relating to Hazards or Biohazards, such as but not limited to Legionella, without JC's express written consent. CONFIDENTIAL: For customer review. ©2025 Johnson Controls Johnson 000 Controls Page 3 of 6 2. INVOICE AND PAYMENTS. JC may invoice Customer monthly for all materials delivered to the job site or to an off -site storage facility and for all work performed on -site and off -site. Customer shall pay JC an advance payment which shall be credited against the final payment (but not any progress payment) due hereunder. Unless otherwise agreed to by the parties in writing, payments are due Net thirty (30) days from the date of the invoice. Such payment is a condition precedent to JC's obligation to perform any work under this Agreement. If JC consents to payment by credit card in lieu of EFT/ACH, JC may charge additional fees. Invoices shall be paid by Customer via EFT/ACH. Invoicing disputes must be identified in writing by Customer within 21 days of the date of the invoice. Payment of any disputed amounts are due and payable upon resolution. Customer acknowledges and agrees that timely payments of the full amounts listed on invoices is an essential term of this Agreement and Customer's failure to make payment in full when due is a material breach of this Agreement. Customer further acknowledges that if there is any amount outstanding on an invoice; it is material to JC and will give JC, without prejudice to any other right or remedy, the right to, without notice: (i) suspend, discontinue or terminate performing any services and/or withhold further deliveries of equipment and other materials, terminate or suspend any unpaid software licenses, and/or suspend JC's obligations under or terminate this Agreement; (ii) charge Customer interest on the amounts unpaid at a rate equal to the lesser of one and one half (1.5) percent per month or the maximum rate permitted under applicable law, until payment is made in full; and (iii) pay all of JC's costs of collection, including (1) actual out of pocket expenses and (2) charge Customer a collection fee of twenty-five percent (25%) of the past due amount if collected through a collection agency or attorney and thirty-five percent (35%) if litigation is commenced to collect such past due amount. JC's election to continue providing future services does not, in any way diminish JC's right to terminate or suspend services or exercise any or all rights or remedies under this Agreement. JC shall not be liable for any damages, claims, expenses, or liabilities arising from or relating to suspension of services for non-payment. In the event that there are exigent circumstances requiring services or the JC otherwise performs services at the premises following suspension, those services shall be governed by the terms of this Agreement unless a separate contract is executed. If Customer disputes any late payment notice or JC's efforts to collect payment. Customer shall immediately notify JC in writing and explain the basis of the dispute. Customer will pay all of JC's reasonable collection costs (including legal fees and expenses). In the event of Customer's default, the balance of any outstanding amounts will be immediately due and payable. Lien waivers will be furnished upon request, as the work progresses, to the extent payments are received. Customer shall provide financial information requested by JC to verify Customer's ability to pay for goods or services. If Customer fails to provide financial information or if JC, in its reasonable discretion questions Customer's ability or willingness to make payments when due (JC may defer shipments, change payment terms, require cash in advance and/or require other security, without liability and without waiving any other remedies JC may have against Customer. JC shall provide Customer with advance written notice of changes to payment terms. 3. MATERIALS. If the materials or equipment included in this proposal become temporarily or permanently unavailable for reasons beyond the control and without the fault of JC, then in the case of such temporary unavailability, the time for performance of the work shall be extended to the extent thereof, and in the case of permanent unavailability, JC shall (a) be excused from furnishing said materials or equipment, and (b) be reimbursed for the difference between the cost of the materials or equipment permanently unavailable and the cost of a reasonably available substitute therefore. 4. EQUIPMENT WARRANTY. JC warrants that equipment manufactured or labeled by JC shall be free from defects in material and workmanship arising from normal usage for a period of one year. No warranty is provided for third -party products and equipment installed or furnished by JC. Such products and equipment are provided with the third party manufacturer's warranty to the extent available, and JC will transfer the benefits, together with all limitations, of that manufacturer's warranty to Customer. All transportation charges incurred in connection with the warranty for equipment and/or materials not installed by JC shall be borne by Customer. These warranties shall not extend to any equipment that has been abused, altered, misused or repaired by Customer or third parties without the supervision of and prior written approval of JC, or if JC serial numbers or warranty date decals have been removed or altered. Customer must promptly report any failure of the equipment to JC in writing. Unless agreed to in writing by the parties, any technical support, assistance, or advice ("Technical Support") provided by JC, such as suggestions as to design use and suitability of the equipment and products for the Customer's application, is provided in good faith, but Customer acknowledges and agrees that JC is not the designer, engineer, or installer of record. Any Technical Support is provided for informational purposes only and shall not be construed as a representation or warranty, express or implied, concerning the proper selection, use, and/or application of the equipment and products. Customer assumes exclusive responsibility for determining if the equipment and products supplied by JC are suitable for its intended application and all risk and liability, whether based in contract, tort or otherwise, in connection with its application and use of the equipment and products. 5. LIMITED WARRANTY. JC warrants its workmanship or that of its agents (Technicians) in relation to installation of equipment for a period of ninety (90) days from date of installation. Customer shall bear all labor costs associated with replacement of failed equipment still under JC's equipment warranty or the original manufacturer's warranty, but outside the terms of this express labor warranty. All warranty labor shall be executed on normal business days during JC normal business hours. These warranties do not extend to any equipment which has been repaired by others, abused, altered, or misused in any way, or which has not been properly and reasonably maintained. THESE WARRANTIES ARE IN LIEU OF ALL OTHER WARRANTIES, EXPRESSED OR IMPLIED, INCLUDING BUT NOT LIMITED TO THOSE OF MERCHANTABILITY AND FITNESS FOR A SPECIFIC PURPOSE. UNDER NO CIRCUMSTANCES SHALL JC BE LIABLE FOR ANY SPECIAL, INDIRECT, OR CONSEQUENTIAL DAMAGES ARISING FROM OR RELATING TO ANY DEFECT IN MATERIAL OR WORKMANSHIP OF EQUIPMENT OR THE PERFORMANCE OF SERVICES. JC makes no and specifically disclaims all representations or warranties that the services, products, software or third party product or software will be secure from cyber threats, hacking or other similar malicious activity, or will detect the presence of, or eliminate, treat, or mitigate the spread, transmission, or outbreak of any pathogen, disease, virus or other contagion, including but not limited to COVID 19. 6. LIABILITY. To the maximum extent permitted by law, in no event shall JC and its affiliates and their respective personnel, suppliers and vendors ("JC Parties") be liable to you or any third party under any cause of action or theory of liability even if advised of the possibility of such damages, for any: (a) special, incidental, consequential, punitive, or indirect damages; (b) lost profits, revenues, data, customer opportunities, business, anticipated savings, or goodwill; (c) business interruption; or (d) data loss or other losses arising from viruses, ransomware, cyber-attacks or failures or interruptions to network systems. In any case, the entire aggregate liability of the JC Parties under this proposal for all damages, losses, and causes of action (whether in contract, tort (including negligence), or otherwise) shall be limited to the amounts payable to JC hereunder. 7. FAR. JC supplies "commercial items" within the meaning of the Federal Acquisition Regulations (FAR), 48 CFR Parts 1-53. As to any customer order for a U.S. Government contract, JC will comply only with those mandatory flow -downs for commercial item and commercial services subcontracts listed either at FAR 52.244-6, or 52.212-5(e)(1), as applicable. 8. TAXES. Prices do not include taxes, fees, duties, tariffs, false alarm assessments, permits and levies or other charges imposed and/or enacted by a government, however designated or imposed (collectively, 'Taxes"). All Taxes are the responsibility of Customer, unless Customer presents an exemption certificate acceptable to JC and the applicable taxing authorities. If JC is required to pay any such Taxes or other charges, Customer shall reimburse JC on demand. If any such exemption certificate is invalid, then Customer will immediately pay JC the amount of the Taxes, plus penalties and interest. 9. DELAYS. JC shall not be liable for any delay in the performance of the work resulting from or attributed to acts of circumstance beyond JC's control, including but not limited to; acts of God, fire, riots, labor disputes, conditions of the premises, acts or omissions of the Customer, Owner, or other Contractors or delays caused by suppliers or subcontractors of JC, etc. 10. COMPLIANCE WITH LAWS. JC shall comply with all applicable federal, state, and local laws and regulations, and shall obtain all temporary licenses and permits required for the prosecution of the work. Licenses and permits a permanent nature shall be procured and paid for by the Customer. 11. PRICING. JC may increase prices upon notice to the Customer to reflect increases in material and labor costs. Prices may be adjusted by JC prior to shipment CONFIDENTIAL: For customer review. ©2025 Johnson Controls Johnson 010 Controls Page 4 of 6 to take into account increases in the cost of raw materials, component parts, third party products or labor rates or Taxes; Trade Restrictions (as defined below); government actions; or to cover any unforeseen or other extra cost elements. 'Trade Restrictions" means any additional or new tariff/duty, quota, tariff -rate quota, or cost associated with the withdrawal of tariff/duty concessions pursuant to a trade agreement(s). This Agreement is entered into with the understanding that the services to be provided by JC are not subject to any local, state, or federal prevailing wage statute. If it is later determined that local, state, or federal prevailing wage rates apply to the services to be provided by JC, JC reserves the right to issue a modification or change order to adjust the wage rates to the required prevailing wage rate. Customer agrees to pay for the applicable prevailing wage rates. 12. DISPUTES. JC shall have the sole and exclusive right to determine whether any dispute, controversy or claim arising out of or relating to the Agreement, or the breach thereof, shall be submitted to a court of law or arbitrated. For Customers in the United States, the laws of Delaware shall govern the validity, enforceability, and interpretation of this Agreement, without regard to conflicts of law principles thereof, and the exclusive venue for any such litigation or arbitration shall be in Milwaukee, Wisconsin. For Customers located in Canada, the laws of Ontario shall govern the validity, enforceability, and interpretation of this Agreement, without regard to conflicts of law principles thereof, and the exclusive venue for any such litigation or arbitration shall be in Ontario, Canada. The parties waive any objection to the exclusive jurisdiction of the specified forums, including any objection based on forum non conveniens. In the event the matter is submitted to a court, JC and Customer hereby agree to waive their right to trial by jury. In the event the matter is submitted to arbitration by JC, the costs of arbitration shall be borne equally by the parties, and the arbitrator's award may be confirmed and reduced to judgment in any court of competent jurisdiction. If JC prevails in any collection action. Buyer will pay all of JC's reasonable collection costs (including legal fees and expenses). Except as provided below, no claim or cause of action, whether known or unknown, shall be brought by either party against the other more than one year after the claim first arose. Claims not subject to the one-year limitation include claims for unpaid: (1) contract amounts, (2) change order amounts (approved or requested) and (3) delays and/or work inefficiencies. 13. INSURANCE. Insurance coverage in excess of JC's standard limits will be furnished when requested and required. No credit will be given or premium paid by JC for insurance afforded by others. 14. INDEMNITY. The Parties hereto agree to indemnify each other from any and all liabilities, claims, expenses, losses or damages, including attorney's fees which may arise in connection with the execution of the work herein specified and which are caused, by the negligent act or omission of the indemnifying Party. 15. CUSTOMER RESPONSIBILITIES. Customer is solely responsible for the establishment, operation, maintenance, access, security and other aspects of its computer network ("Network") and shall supply JC secure Network access for providing its services. Products networked, connected to the internet, or otherwise connected to computers or other devices must be appropriately protected by Customer and/or end user against unauthorized access. Customer is responsible to take appropriate measures, including performing back-ups, to protect information, including without limit data, software, or files (collectively "Data") prior to receiving the service or products. 16. FORCE MAJUERE. JC shall not be liable, nor in breach or default of its obligations under this Agreement, for delays, interruption, failure to render services, or any other failure by JC to perform an obligation under this Agreement, where such delay, interruption or failure is caused, in whole or in part, directly or indirectly, by a Force Majeure Event. A "Force Majeure Event" is a condition or event that is beyond the reasonable control of JC, whether foreseeable or unforeseeable, including, without limitation, acts of God, severe weather (including but not limited to hurricanes, tornados, severe snowstorms or severe rainstorms), wildfires, floods, earthquakes, seismic disturbances, or other natural disasters, acts or omissions of any governmental authority (including change of any applicable law or regulation), epidemics, pandemics, disease, viruses, quarantines, or other public health risks and/or responses thereto, condemnation, strikes, lock -outs, labor disputes, an increase of 5% or more in tariffs or other excise taxes for materials to be used on the project, fires, explosions or other casualties, thefts, vandalism, civil disturbances, insurrection, mob violence, riots, war or other armed conflict (or the serious threat of same), acts of terrorism, electrical power outages, interruptions or degradations in telecommunications, computer, network, or electronic communications systems, data breach, cyber-attacks, ransomware, unavailability or shortage of parts, materials, supplies, or transportation, or any other cause or casualty beyond the reasonable control of JC. If JC's performance of the work is delayed, impacted, or prevented by a Force Majeure Event or its continued effects, JC shall be excused from performance under the Agreement. Without limiting the generality of the foregoing, if JC is delayed in achieving one or more of the scheduled milestones set forth in the Agreement due to a Force Majeure Event, JC will be entitled to extend the relevant completion date by the amount of time that JC was delayed as a result of the Force Majeure Event, plus such additional time as may be reasonably necessary to overcome the effect of the delay. To the extent that the Force Majeure Event directly or indirectly increases JC's cost to perform the services, Customer is obligated to reimburse JC for such increased costs, including, without limitation, costs incurred by JC for additional labor, inventory storage, expedited shipping fees, trailer and equipment rental fees, subcontractor fees, compliance with vaccination requirements or other costs and expenses incurred by JC in connection with the Force Majeure Event. 17. SAFETY, HEALTH AND HAZARDOUS MATERIALS. The Parties hereto agree to notify each other immediately upon becoming aware of an inspection under, or any alleged violation of the, Occupational Safety and Health Act or similar Canadian laws relating in any way to the project or project site. ACM /Hazardous Materials: Customer shall supply JC with any information in its possession relating to the presence of asbestos -containing materials ("ACM") or hazardous materials at any of its facilities where JC's undertakes any Work or Services that may result in the disturbance of ACM or hazardous materials. JC shall not be responsible for abatement and/or removal and disposal of hazardous materials or ACM. If either Customer or JC becomes aware of or suspects the presence of ACM or hazardous materials that may be disturbed by JC's Work or Services, JC shall immediately stop all work until such ACM or hazardous or unsafe condition is rectified by Owner and Owner so notifies JC in writing that work can safely be resumed, based on test conducted by a licensed testing organization. JC may terminate the Services immediately upon notice to Customer, if JC, in its sole discretion, determines that the Customer's premises are unsafe to be accessed by JC's employees or subcontractors. Timetables for delivery of JC's products or services and the contract price shall be adjusted appropriately for any associated delay. 18. ONE-YEAR CLAIMS LIMITATION. No claim or cause of action, whether known or unknown, shall be brought against JC more than one year after the claim first arose. Except as provided for herein, JC's claims must also be brought within one year. Claims for unpaid contract amounts are not subject to the one-year limitation. 19. DIGITAL ENABLED SERVICES; DATA. If JC provides Digital Enabled Services under this Agreement, these Digital Enabled Services require the collection, transfer and ingestion of building, equipment, system time series, and other data to JC's cloud -hosted software applications. Customer consents to and grants JC right to collect, ingest and use such data to enable JC and its affiliates and agents to provide, maintain, protect, develop and improve the Digital Enabled Services and JC products and services. Customer acknowledges that, while Digital Enabled Services generally improve equipment performance and services, Digital Enabled Services do not prevent all potential malfunction, insure against all loss, or guarantee a certain level of performance. Customer shall be solely responsible for the establishment, operation, maintenance, access, security and other aspects of its computer network ("Network"), shall appropriately protect hardware and products connected to the Network and will supply JC secure Network access for providing its Digital Enabled Services. As used herein, "Digital Enabled Services" mean services provided hereunder that employ JC software and related equipment installed at Customer facilities and JC cloud -hosted software offerings and tools to improve, develop, and enable such services. Digital Enabled Service may include, but are not limited to, (a) remote servicing and inspection, (b) advanced equipment fault detection and diagnostics, and (c) data dashboarding and health reporting. If Customer accesses and uses Software that is used to provide the Digital Enabled Services, the Software Terms (defined below) will govern such access and use. 20. JC DIGTAL SOLUTIONS. Use, implementation, and deployment of the software and hosted software products ("Software") offered under these terms shall CONFIDENTIAL: For customer review. ©2025 Johnson Controls Johnson 010 Controls Page 5 of 6 be subject to, and governed by, JC's standard terms for such Software and Software related professional services in effect from time to time at www. 0ohnsoncontrols.com/techterms (collectively, the "Software Terms"). Specifically, the JC General EUtA set forth at www.johnsoncontrols. com/buildings/legal/digital/generaleula governs access to and use of software installed on Customer's premises or systems and the JC Terms of Service set forth at www.mohnsoncontrols.com/buildings/legal/digital/generaltos govern access to and use of hosted software products. The applicable Software Terms are incorporated herein by this reference. Other than the right to use the Software as set forth in the Software Terms, JC and its licensors reserve all right, title, and interest (including all intellectual property rights) in and to the Software and improvements to the Software. The Software that is licensed hereunder is licensed subject to the Software Terms and not sold. If there is a conflict between the other terms herein and the Software Terms, the Software Terms shall take precedence and govern with respect to rights and responsibilities relating to the Software, its implementation and deployment and any improvements thereto. Notwithstanding any other provisions of this Agreement, unless otherwise agreed, the following terms apply to Software that is provided to Customer on a subscription basis (i.e., a time limited license or use right), (each a "Software Subscription"): Each Software Subscription provided hereunder will commence on the date the initial credentials for the Software are made available (the "Subscription Start Date") and will continue in effect until the expiration of the subscription term noted in the applicable statement of work, order or other applicable ordering document . At the expiration of the Software Subscription, such Software Subscription will automatically renew for consecutive one (1) year terms (each a "Renewal Subscription Term"), unless either party provides the other party with a notice of non -renewal at least ninety (90) days prior to the expiration of the then -current term. To the extent permitted by applicable law, Software Subscriptions purchases are non -cancelable, and the sums paid nonrefundable. Fees for Software Subscriptions shall be paid annually in advance, invoiced on the Subscription Start Date and each subsequent anniversary thereof. Customer shall pay all invoiced amounts within thirty calendar days after the date of invoice. Payments not made within such time period shall be subject to late charges as set forth in the Software Terms. Unless otherwise agreed by the parties in writing, the subscription fee for each Renewal Subscription Term will be priced at JC's then -applicable list price for that Software offering. Any use of Software that exceeds the scope, metrics or volume set forth in this Agreement and applicable SOW will be subject to additional fees based on the date such excess use began. 21. Privacy. JC as Processor. JC as Processor: Where JC factually acts as Processor of Personal Data on behalf of Customer (as such terms are defined in the DPA) the terms at www.mohnsoncontrols.com/dp ("DPA") shall apply. JC as Controller: JC will collect, process and transfer certain personal data of Customer and its personnel related to the business relationship between it and Customer (for example names, email addresses, telephone numbers) as controller and in accordance with JC's Privacy Notice at https://www.mohnsoncontrols.com/privacy. Customer acknowledges JC's Privacy Notice and strictly to the extent consent is mandatorily required under applicable law, Customer consents to such collection, processing and transfer. To the extent consent to such collection, processing and transfer by JC is mandatorily required from Customer's personnel under applicable law, Customer warrants and represents that it has obtained such consent. 22. ASSIGNMENT. This Agreement is not assignable by the Customer except upon written consent of JC first being obtained. JC shall have the right to assign this Agreement, in whole or in part, or to subcontract any of its obligations under this Agreement without notice to Customer. 23. TERMINATION. If either party fails to perform any of its material obligations under this Agreement, the other party shall provide written notice thereof to the party alleged to be in default. Should the party alleged to be in default fail to respond in writing or take action to cure the alleged default within ten (10) days of receiving such written notice, the notifying party may terminate this Agreement by providing written notice of such termination. If JC's performance of its obligations becomes impracticable due to obsolescence or unavailability of systems, equipment, or products (including component parts and/or materials) or because the JC or its supplier(s) has discontinued the manufacture or the sale of the equipment and/or products or is no longer in the business of providing the services, JC may terminate this Agreement, or the affected portions, at its sole discretion upon notice to Customer. JC may terminate this Agreement, or the affected portions, at its sole discretion upon notice to the Customer if JC's performance of its obligations are prohibited because of changes in applicable laws, regulations or codes. 24. ENTIRE AGREEMENT. This proposal, upon acceptance, shall constitute the entire Agreement between the parties and supersedes any prior representations or understandings. Customer acknowledges and agrees that any purchase order issued by Customer in connection with this Agreement is intended only to establish payment authority for Customer's internal accounting purposes and shall not be considered to be a counteroffer, amendment, modification, or other revision to the terms of this Agreement. No term or condition included or referenced in Customer's purchase order will have any force or effect and these terms and conditions shall control. Customer's acceptance of any Services shall constitute an acceptance of these terms and conditions. Any proposal for additional or different terms, whether in Customer's purchase order or any other document, unless expressly accepted in writing by JC, is hereby objected to and rejected. 25. CHANGES. No change or modification of any of the terms and conditions stated herein shall be binding upon JC unless accepted by JC in writing. CONFIDENTIAL: For customer review. ©2025 Johnson Controls Johnson 010 Controls Page 6 of 6 Customer CITY OF SANTA CLARITA CITY HALL Local Johnson Controls Office 7711 CENTER AVE STE 650 HUNTINGTON BEACH, CA 92647-3039 Agreement Start Date: 07/01 /2026 Proposal Date 01 /27/2026 Estimate No: 1-1QMXSDAZ 1 r ti .4r Partnering with you to deliver value -driven solutions Every day, we transform the environments where people live, work, learn and play. From optimizing building performance to improving safety and enhancing comfort, we are here to power your mission. A Planned Service Agreement with Johnson Controls provides you with a customized service strategy designed around the needs of your facility. Our approach features a combination of scheduled, predictive and preventative maintenance services that focus on your goals. As your building technology services partner, Johnson Controls delivers an unmatched service experience delivered by factory -trained, highly skilled technicians who optimize operations of the buildings we work with, creating productive and safe environments for the people within. By integrating our service expertise with innovative processes and technologies, our value -driven planned service solutions deliver sustainable results, minimize equipment downtime and maximize occupant comfort. With more than a century of healthy buildings expertise, Johnson Controls leverages technologies to successfully deliver smart solutions to facilities worldwide. 2020 , I North American Company of thf Johnson Controls was recognized by Frost & Sullivan as the 2020 North American Company of the Year for innovation in the Smart connected Chillers market Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Executive summary Planned service proposal for CITY OF SANTA CLARITA CITY HALL We value and appreciate your interest in Johnson Controls as a service provider for your building systems and are pleased to provide a value -driven maintenance solution for your facility. The enclosed proposal outlines the Planned Service Agreement we have developed on your facility. Details are included in the Planned Service Agreement summary (Schedule A), but highlights are as follows: In this proposal we are offering a service agreement for 5 Years starting 07/01/2026 and ending 06/30/2031. The agreement price for first year is $237,658.00; see Schedule A, Supplemental Price and Payment Terms, for pricing in subsequent years. The equipment options and number of visits being provided for each piece of equipment are described in Schedule A, Equipment list. As a manufacturer of both mechanical and controls systems, Johnson Controls has the expertise and resources to provide proper maintenance and repair services for your facility. Again, thank you for your interest in Johnson Controls and we look forward to becoming your building technology services partner. Please contact me if you have any questions. Sincerely, Natalie Avelar Service Manager (866) 819-0230 The power behind your mission © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 00 Controls Page 2 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Benefits of planned service A Planned Service Agreement with Johnson Controls will allow you to optimize your building's facility performance, providing dependability, sustainability and energy efficiency. You'll get a value -driven solution that fits your specific goals, delivered with the attention of a local service company backed by the resources of a global organization. With this Planned Service Agreement, Johnson Controls can help you achieve the following five objectives: 1. Identify energy savings Opportunities Since HVAC equipment accounts for a major portion of a building's energy usage, keeping your system performing at optimum levels may lead to a significant reduction in energy costs. e The 5 eD benefits =� @ of a PSA 2. Reduce future repair costs Routine maintenance may maximize the life of your equipment and may reduce equipment breakdowns. 3. Extend asset life Through proactive, factory -recommended maintenance, the life of your HVAC assets may be extended, maximizing the return on your investment. 4. Ensure productive environments Whether creating a comfortable place where employees can be productive or controlling a space to meet specialized needs, maintenance can help you achieve an optimal environment for the work that is being accomplished 5. Promote environmental health and safety When proper indoor conditions and plant requirements are maintained, business outcomes may be improved by minimizing sick leave, reducing accidents, minimizing greenhouse gas emissions and managing refrigerant requirements. All of the services we perform on your equipment are aligned with "The 5 Values of Planned Maintenance" and our technicians understand how the work they perform can help you accomplish your business objectives. © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 00 Controls Page 3 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Our partnership Personalized account management A Planned Service Agreement also provides you with the support of an entire team that knows your site and can closely work with you on budget planning and asset management. Your local Johnson Controls account management team can help guide planned replacement, energy retrofits and other building improvement projects. You'll have peace of mind that an entire team of skilled professionals will be looking out for what is best for your facility and budget. A culture of safety Johnson Controls technicians take safety seriously and personally, and integrate it into everything they do. All of our technicians participate in regular and thorough safety training. Because of their personal commitment, we are a leader in the HVAC service industry for workplace safety performance. This means that you do not have to worry about us when we are on your site. Commitment to customer satisfaction Throughout the term of your Planned Service Agreement, we will periodically survey you and use your feedback to continue to make improvements to our service processes and products. Our goal is to deliver the most consistent and complete service experience possible. To meet this goal, we've developed and implemented standards and procedures to ensure you receive the ultimate service experience — every time. Energy & sustainability A more sustainable world one building at a time — Johnson Controls is a company that started more than 125 years ago with a product that reduced energy use in buildings. We've been saving energy for customers ever since. Today, Johnson Controls is a global leader in creating smart environments where people live, work and play, helping to create a more comfortable, safe and sustainable world. The value of integrity Johnson Controls has a long, proud history of integrity. We do what we say we will do and stand behind our commitments. Our good reputation builds trust and loyalty. In recognition for our commitment to ethics across our global operations, we are honored to be named one of the World's Most Ethical Companies by Ethisphere Institute, a leading think tank dedicated to business ethics and corporate social responsibility. In addition, Corporate Responsibility Magazine recognizes Johnson Controls as one of the top companies in its annual "100 Best Corporate Citizens" list. © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 40 Controls Page 4 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Service delivery As part of the delivery of this Planned Service Agreement, Johnson Controls will dedicate a local customer service agent responsible for having a clear understanding of the agreement scope, and your facility procedures and protocols. A high-level overview around our service delivery process is outlined below including scheduling, emergency service, on -site paperwork, communication and performing repairs outside of the agreement scope. Scheduling Preventative maintenance service will be scheduled using our automated service management system. In advance of the scheduled service visit, our technician is sent a notice of service to a smartphone. Once the technician acknowledges the request, your customer service agent will call or e-mail your on -site contact to let you know the start date and type of service scheduled. The technician checks in, wears personal protective equipment, performs the task(s) as assigned, checks out with you and asks for a screen capture signature on the smartphone device. A work order is then e-mailed, faxed or printed for your records. Emergency services Emergency service can be provided 7 days a week, 24 hours a day, 365 days a year. During normal business hours, emergency service will be coordinated by the customer service agent. After hours, weekends and holidays, the emergency service number transfers to the Johnson Controls after-hours call center and on -call technicians are dispatched as needed. Johnson Controls is committed to dispatching a technician within hours of receiving your call through the service line. A work order is e-mailed, faxed or printed for your records. Depending on the terms of your agreement, you may incur charges for after hour services. Communication A detailed communication plan will be provided to you so you know how often we will provide information to you regarding your Planned Service Agreement. The communication plan will also provide you with your main contacts at Johnson Controls. Approval process for non -covered items Johnson Controls will adhere to your procurement process. No work will be performed outside of the agreement scope without prior approval. Johnson Controls will work with you closely to ensure your procurement process is followed before any non -covered item work is started. © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 00 Controls Page 5 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Summary of services and options Comprehensive and operational inspections During comprehensive and operational inspections, Johnson Controls will perform routine checks of the equipment for common issues caused by normal wear and tear on the equipment. Additional tests can be run to confirm the equipment's performance. Routine maintenance, such as lubrication, cleaning and tightening connections, can be performed depending on the type of equipment being serviced. Routine maintenance is one of the keys to the five values of maintenance — it can help identify energy saving opportunities, reduce future repair costs, extend asset life, ensure productive environments, and promote health and safety. Boiler Tube Brushing Boiler heat transfer surfaces must be kept clean to provide for safe and economical boiler operation. During boiler operation deposits such as soot and scale can accumulate on boiler tubes, causing a loss in efficiency due to reduced heat transfer. This includes capacity reduction and high draft losses. Corrosive elements are often present in the scale, increasing the probability of tube failure. Extreme cases of boiler tube blockage can also create a safety or fire hazard. Johnson Controls technicians will brush the tubes, cleaning these surfaces. This improves heat transfer, optimizes efficiency, and reduces potential corrosion and safety issues. This service does not include chemical treatment required to control or eliminate biohazards such as Legionella unless chemical water treatment services have been added as a separate option. Combustion Analysis Combustion analysis and subsequent adjustments are critical to efficient boiler operation. Boiler fuel, whether natural gas or oil, must burn in the proper combination of fuel and air (oxygen). Poor combustion can create soot deposits on the tubes, impairing heat transfer. Incomplete combustion can also lead to the potential formation of CO (carbon monoxide); an odorless gas that can harm occupants in the mechanical room and/or building. Johnson Controls technicians will analyze the flue gas to determine if optimal fuel/air ratios are present. Evanorator Coil Cleanina Dirty evaporator coils impair heat transfer from the circulated air to the cooling medium. This reduces the efficiency of the unit. Extremely dirty coils may impede the airflow across the coil and out into the building, which can cause occupant discomfort and complaints. Johnson Controls technicians will clean these coils, improving efficiency and occupant comfort. Filter Replacement Clean air filters help maintain proper airflow throughout your building. Decreased airflow can impair the performance of the cooling coil and may lead to occupant discomfort and inefficient operation of the HVAC system. Johnson Controls will replace the filters on a regular basis to maintain airflow and maximize air quality. Tower/Basin Cleaning During operation, a cooling tower becomes a natural repository for wind-blown debris. This debris has a tendency to collect in the tower's sump/basin. Johnson Controls technicians will clean the tower and basin to prevent blockage and potential damage to critical system components. This service does not include chemical treatment required to control or eliminate biohazards such as Legionella unless chemical water treatment services have been added as a separate option. © 2026 Johnson Controls Johnson 0 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. Page 6 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Vibration Analysis — Fan & Pump Johnson Controls technicians will collect vibration data at various measurement points on the machine. This data is used to assess the condition of bearings, sheaves, belts and rotors. It also detects the presences of imbalance or misalignment. Repairs are followed up with another vibration analysis to ensure root problems have been identified and resolved. Customer vortal / Service information Access The Johnson Controls customer portal is the online gateway to easily access various elements of your service information. This real-time, self-service mechanism is just one more way for you to stay in touch with our service within your facilities. Using the internet, you can view service call history by location, monitor agreements, as well as view asset and invoice information. © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 00 Controls 'age 7 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Summary Thank you for considering Johnson Controls as your building technology services partner. The following agreement document includes all the details surrounding your Planned Service Agreement. With planned service from Johnson Controls, you'll get a value -driven solution that can help optimize your building controls and equipment performance, providing dependability, sustainability and energy efficiency. You'll get a solution that fits your specific goals, delivered with the attention of a local service company backed by the resources of a global organization. The po-,•ver behind your mission © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 40 Controls Page 8 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Planned Service Agreement Customer Name: CITY OF SANTA CLARITA CITY HALL Address: 23920 VALENCIA BLVD STE 300 SANTA CLARITA,CA 91355-5316 Proposal Date: 01/27/2026 Estimate #: 1-1QMXSDAZ Scope of Service Johnson Controls Building Solutions LLC ("JC" or "Johnson Controls") and the Customer (collectively the "Parties") agree Preventative Maintenance Services, as defined in Schedule A ("Services"), will be provided by JC at the Customer's facility. This Planned Service Agreement, the Equipment List, Supplemental Price and Payment Terms, Terms and Conditions, and Schedules attached hereto and incorporated by this reference as if set forth fully herein (collectively the "Agreement"), cover the rights and obligations of both the Customer and JC. Extended Service Options for Premium Coverage If Premium Coverage is selected, on -site repair services to the equipment will be provided as specified in this Agreement for the equipment listed in the attached Equipment List. Basic Coverage means Scheduled Service Visits, plus Scheduled Service Materials (unless excluded from this Agreement). No parts, equipment, Repair Labor or Repair Materials are provided for under Basic Coverage. Premium Coverage means Basic Coverage plus Repair Labor, plus Repair Materials (unless excluded from the Agreement). If Customer has ordered Premium Coverage, JC will inspect the Covered Equipment within forty-five (45) days of the date of this Agreement, or as seasonal or operational conditions permit. JC will then advise Customer if JC finds any Covered Equipment not in working order or in need of repair. With Customer's approval, JC will perform the work necessary to put the Covered Equipment in proper working condition, subject to the terms of this Agreement. Customer will pay for such work at JC's standard rates for parts and labor in effect at the time that the work is performed. If Customer does not want JC to perform the work identified as necessary by JC, any equipment thereby affected will be removed from the list of Covered Equipment, and the Contract Price will be adjusted accordingly. Should Customer not make JC's recommended repairs or proceed with the modified Premium Coverage, JC reserves the right to invoice Customer for the cost of the initial equipment inspection. Extended Service means Services performed outside JC's normal business hours and is available only if Customer has Premium Coverage. Extended Service is available either 24/5 or 24/7, at Customer's election. The price for Extended Service, if chosen by Customer, is part of the total Contract Price. Equipment List Only the equipment listed in the Equipment List will be covered as part of this Agreement. Any changes to the Equipment List must be agreed upon in writing by both Parties. Term / Automatic Renewal This Agreement takes effect on 07/01/2026 and will continue until 06/30/2031 ("Original Term"). The Agreement will automatically renew and extend for successive terms equal to the Original Term unless the Customer or JC gives the other written notice it does not want to renew prior to the end of the © 2026 Johnson Controls Johnson 00 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 9 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL then -current term (each a "Renewal Term"). The notice must be delivered at least (90) days prior to the end of the Original Term or of any Renewal Term. The Original Term and any Renewal Term may be referred to herein as the "Term". Renewal price adjustments are discussed in the Terms and Conditions. Refrigerant Charges Refrigerant is not included under this Agreement and will be billed separately to the Customer by JC. © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 000 Controls 'age 10 of 98 Planned Service Proposal r'Tv )F SANTA CLARITA CITY HALL Price and Payment Terms The total Contract Price for JC's Services during the first year of the Original Term is $237,658.00. This amount will be paid to JC in advance in Monthly installments. Pricing for each subsequent year of a multiyear Original Term is set forth in the Supplemental Price and Payment Terms. Unless otherwise agreed to by the parties, All payments will be due upon receipt. Renewal price adjustments are set forth in the Terms and Conditions. Any additional taxes, duties, tariffs or similar items imposed prior to shipment will be charged. Invoices will be sent to the following location: CITY OF SANTA CLARITA 23920 VALENCIA BLVD, SUITE 300 SANTA CLARITA,CA 91355 To ensure that JC is compliant with your company's billing requirements, please provide the following information: PO is required to facilitate billing: No: This signed contract satisfies requirement YES: Please reference this PO number: AR Invoices are accepted via e-mail: YES: E-mail address to be used : No: Please submit invoices via mail No: Please submit via: This proposal is valid for thirty days from the proposal date. Johnson Controls Building Solutions LLC ("JC" or "Johnson Controls") JC Manager: Customer Manager: JC Manager Signature: Customer Manager Signature: Title: Date: Title: Date: JC Branch: JOHNSON CONTROLS LOS ANGELES CA CB - ONOG Address:7711 CENTER AVE STE 650 HUNTINGTON BEACH,CA 92647-3039 Branch Phone:(866) 819-0230 Branch Email © 2026 Johnson Controls Johnson 000 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 11 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Schedule A - Equipment List CITY OF SANTA CLARITA CITY HALL 23920 VALENCIA BLVD STE 300 SANTA CLARITA, CA 91355-5316 Product: VAV Box, All Quantity: 13 Coverage Level: Basic Customer Tau (13) VAV Boxes Product: Split Systei Quantity: 1 Coverage Level: Basic Customer Tau 2nd Floor server room Product: Split Systei Quantity: 7 Coverage Level: Basic Services Provided 3 Operational 1 Comprehensive Manufacturer Model # Serial # Write -In 1-13MT867F Cooling with Gas Heat, <7.5 Tons Manufacturer Carrier Cooling Only, <7.5 Tons Customer Tag Manufacturer 3rd FL Comms Closet traffic Control Write -In 3rd FI Traffic Room Write -In AV Ground Parking Mitsubishi AV RM Air Handler Write -In Mitsubishi split Mitsubishi Traffic Rm Server Rm Mitsubishi Traffic Room Mitsubishi Product: Packaged, Commercial, Self Contai Quantity: 2 Coverage Level: Basic Services Provided 1 Cooling Comprehensive 4 Return Air Filter Change 2 Operational (Mid Season - Cooling/Heating) 1 Gas Heating Comprehensive Model # Serial # 24ANA76OA300 3106EO9045 Services Provided 4 Return Air Filter Change 3 Operational (Mid Season - Cooling Only) 1 Cooling Comprehensive 1 Condenser Coil Cleaning Model # Serial # 40MUAAQ36XA3 0524V10716 MSYGET18NA 0001617 36AA358MURAQ 3223V13836 S41-34-05-COA AD159740 MUY-GE18NA 0001828T 38MURAQ38AA# 4223V12046 38MURAQ60AA301 3223V13867 <40 Tons Services Provided 3 Operational 4 Return Air Filter Change © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 000 Controls 'age 12 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL 1 Comprehensive 1 Belt Change 1 Evaporator Coil Cleaning Customer Tag Manufacturer Model # Serial # 3rd Floor Wire Room JCI_YORK DlNH036NO5606C NBKM021809 Audio Visual Room Carrier 50VT-K36--- 30-- 38231`49925 Product: Roof Top Unit (RTU), Cooling O Quantity: 6 Coverage Level: Basic Customer Taa AC-1 AC-2 AC-3 AC-4 AC-5 AC-6 Manufacturer Carrier Carrier Carrier Carrier Carrier Carrier with Economizer, 25.5-60 Tons Services Provided 3 Operational (Mid Season - Cooling Only with Economizer) 1 Condenser Coil Cleaning 1 Cooling Comprehensive (with Economizer) 1 Belt Change 4 Standard Filter Change Model # Serial # 50A7-040AQA75420 0624U46720 50A7-040AQA75420 0624U46721 50A7-040AQA75420 0624U46719 50A7-040AQA75420 0624U46722 50A7-040AQA75420 0624U46716 50A7-040AQA75420 0624U46814 Product: Boiler, Gas -Fired, Fire Tube, <50 HP Quantity: 1 Services Provided Coverage Level: Basic 3 Operational 1 Comprehensive 1 Combustion Analysis Customer Tau Manufacturer Model # Serial # Boiler RayPak H9-1802 0303206331 Product: Air Handling Unit (AHU), Return Air, 35-60 HP Quantity: 1 Services Provided Coverage Level: Basic 3 Operational 1 Standard Filter Change 1 Belt Change 1 Comprehensive Customer Taa Manufacturer Model # Serial # City Hall AHU Write -In FIELD UPDATE 1-13MTLRGJ/FIELD NEEDED UPDATE NEEDED © 2026 Johnson Controls Johnson 000 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 13 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Product: Air Handling Unit (AHU), Make -Up Air Unit (MAU), <15 HP Quantity: 1 Services Provided Coverage Level: Basic 3 Operational 4 Standard Filter Change 1 Comprehensive Customer Tau Manufacturer Model # Serial # City Hall MUA Unit Write -In FIELD UPDATE 1-13MT868A/FIELD NEEDED UPDATE NEEDED Product: Block Hours - Tradesman Quantity: 1 Services Provided Coverage Level: Basic 1 Preventive Maintenance Customer Tag Manufacturer Model # Serial # City Hall Water Treatment Write -In CITY HALL WATER CITY HALL WATER TREATMENT TREATMENT SUB PO Product: Fan, Exhaust Fan, Roof Mounted, 0-5 HP Quantity: 2 Services Provided Coverage Level: Basic 4 Operational 1 Belt Change Customer Tag Manufacturer Model # Serial # EF-1 Cook Fans 180 ACE 138SF54211-00/0028105 EF-2 Loren Cook Company 100 ACEB S232683-00 06/88 Product: Expansion Tank Quantity: 2 Services Provided Coverage Level: Basic 4 Operational Customer Tag EXT-2 EXT-3 Manufacturer Model # Serial # Amtrol SX-30V 13127703 Amtrol SX-30V 13127702 © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 40 Controls 'age 14 of 98 Planned Service Proposal `ITV nc SANTA CLARITA CITY HALL Product: Pump, Hot Water, 0-10 HP Quantity: 2 Coverage Level: Basic Customer Tau Manufacturer HWP-1 Weinman Pumps HWP-2 Weinman Pumps Product: Contractor - Water Treatment Quantity: 1 Coverage Level: Basic Services Provided 3 Operational 1 Comprehensive Model # Serial # B028/N06N118R029 6307-2Z-J/C3 B028/N06N118R029F 6307-2Z/C3 Services Provided 1 Contractor - Water Treatment Customer Taa Manufacturer Model # Serial # © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 000 Controls 'age 15 of 98 Planned Service Proposal r'Tv �F SANTA CLARITA CITY HALL VALENCIA LIBRARY 23743 VALENCIA BLVD SANTA CLARITA, CA 91355-2105 Product: VAV Box, All Quantity: 14 Coverage Level: Basic Customer Tau (14) VAV Boxes Services Provided 2 Operational Manufacturer Model # Serial # Write -In FIELD UPDATE 1-13MR4UAZ/FIELD NEEDED UPDATE NEEDED Product: Air Handling Unit (AHU), Mixed Air, 15-30 HP Quantity: 1 Services Provided Coverage Level: Basic 3 Operational 1 Comprehensive 1 Belt Change Customer Taa Manufacturer Model # Serial # A/C-3 Pace B-27 AF DWD1 94-75292-01 Product: Air Compressor/Dryer, Air Compressor, Commercial, <5 HP Quantity: 1 Services Provided Coverage Level: Basic 3 Operational 1 Belt Change 1 Comprehensive Customer Tag Manufacturer Air Compressor Write -In Model # Serial # FIELD UPDATE 1-13MR4UA4/FIELD NEEDED UPDATE NEEDED Product: Air Handling Unit (AHU), Return Air, 15-30 HP Quantity: 1 Services Provided Coverage Level: Basic 3 Operational 1 Comprehensive 4 Standard Filter Change 1 Belt Change Customer Tau Manufacturer Model # Serial # RF-3 Pace B-24 FC DWD1 94-75292-02 000 Johnson © 2026 Johnson Controls Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 16 of 98 Planned Service Proposal `ITV nc SANTA CLARITA CITY HALL VALENCIA LIBRARY 23743 VALENCIA BLVD SANTA CLARITA, CA 91355-2105 Product: Split System, Cooling with Electric Heat, <7.5 Tons Quantity: 1 Services Provided Coverage Level: Basic 1 Cooling Comprehensive 3 Operational (Mid Season - Cooling/Heating) 1 Condenser Coil Cleaning Customer Taa Manufacturer Model # Serial # SPLIT IN SERVER ROOM Samsung FIELD UPDATE NEED SERVER ROOM Product: Air Handling Unit (AHU), Variable Frequency Drive (VFD), <15 HP Quantity: 1 Services Provided Coverage Level: Basic 3 Operational 1 Comprehensive Customer Taa VFD#1 Manufacturer Model # Serial # ABB ACS550-U1-012A-4 2062100469 Product: Air Handling Unit (AHU), Variable Quantity: 1 Coverage Level: Basic Customer Tau VFD#2 ncy Drive (VFD), 15-30 HP Services Provided 3 Operational 1 Comprehensive Manufacturer Model # Serial # ABB ACS550-U1-038A-4 2062101039 © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 000 Controls 'age 17 of 98 Planned Service Proposal C''T`� )F SANTA CLARITA CITY HALL OLD TOWN NEWHALL LIBRARY 22601 LYONS AVE SANTA CLARITA, CA 91321-2854 Product: VAV Box, All Quantity: 29 Coverage Level: Basic Customer Tau (29) VAV Boxes Services Provided 2 Operational Manufacturer Model # Serial # Write -In 1-13MTCI5E Product: Boiler, Gas -Fired, High Efficiency, >10 HP Quantity: 1 Services Provided Coverage Level: Basic 3 Operational 1 Comprehensive 1 Fireside Cleaning (gaskets not included) Customer Taa Manufacturer Model # Serial # Boiler 1 Parker Boiler TC210(L) 23195221902 Product: Cooling Tower, Spray Distribution, <300 Tons Quantity: 1 Services Provided Coverage Level: Basic 3 Operational 1 Tower Cleaning 1 Vibration Analysis (Fan) 1 Comprehensive Customer Taa Manufacturer Model # Serial # CT-1 Evapco Company USS1948 11412631 Product: Fan, Exhaust Fan, Ceiling Mounted, 0 - 5HP Quantity: 6 Services Provided Coverage Level: Basic 4 Operational 1 Belt Change Customer Taa Manufacturer Model # Serial # EF-1 Greenheck Fan Corp SQ-90-D-K 1253400411110 EF-2 Greenheck Fan Corp BSQ-130HP-4-X 126346741110 EF-2 Write -In BSQ-130HP-4-X 126346741110 ,' Johnson J� 0 © 2026 Johnson Controls Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 18 of 98 Planned Service Proposal `ITV nc SANTA CLARITA CITY HALL OLD TOWN NEWHALL LIBRARY 22601 LYONS AVE SANTA CLARITA, CA 91321-2854 EF-6 Greenheck Fan Corp 1-18UIR2FW EF-8 Greenheck Fan Corp SQ-80-D-X 126340041110 EF-8 Greenheck Fan Corp 1-143MF71I Product: Packaged, Commercial, Self Contained, <40 Tons Quantity: 1 Services Provided Coverage Level: Basic 3 Operational Customer Tag Elevator room AC Product: Expansion Tank Quantity: 3 Coverage Level: Basic Customer Tag Expansion Tank #1 Expansion Tank #2 Expansion Tank #3 4 Return Air Filter Change 1 Comprehensive 1 Belt Change Manufacturer Model # Serial # Liebert NOINFO NO INFO Services Provided 4 Operational Manufacturer Model # Serial # Armstrong A4000-L 689077 Wilkins XT-18 12052056104 Lochinvar Corporation SIT080 K11IO0032944 Product: Heat Pump, Water Cooled, >15 Tons Quantity: 1 Services Provided Coverage Level: Basic 4 Standard Filter Change 2 Operational (Mid Season) 1 Heating Comprehensive 1 Cooling Comprehensive 1 Belt Change Customer Tag Manufacturer Model # Serial # Heat Pump #1 Bosch EC120-4VFC 2940-556-000001-7735037 169 Product: Pump, Variable Quantity: 2 Coverage Level: Basic Drive <15 HP Services Provided 3 Operational 1 Comprehensive © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 000 Controls 'age 19 of 98 Planned Service Proposal `ITV nc SANTA CLARITA CITY HALL OLD TOWN NEWHALL LIBRARY 22601 LYONS AVE SANTA CLARITA, CA 91321-2854 Customer Tau Manufacturer Model # Serial # Hot water pump #1 Yaskawa E7BBB007T3 NA Hot water pump #2 Yaskawa E7BBB007T3 4W1192873880002 Product: Heater, Gas Infrared -All Quantity: 1 Coverage Level: Basic Customer Tag IR Heater Services Provided 3 Operational 1 Comprehensive Manufacturer Model # Serial # Write -In 1-13M3UWVD Product: Pump, Hot Water, 0-10 HP Quantity: 2 Services Provided Coverage Level: Basic 3 Operational 1 Comprehensive 1 Vibration Analysis Customer Tag Manufacturer Model # Serial # P-1 Armstrong 4300522-083 1906 P-2 Armstrong 4300522-083 1918 Product: Pump, Condenser, 11-50 HP Quantity: 2 Services Provided Coverage Level: Basic 3 Operational 1 Comprehensive 1 Vibration Analysis Customer Tag Manufacturer Model # Serial # P-3 Armstrong 4300531-083 1547 P4 Armstrong 4300531-083 1549 Product: Split System, Cooling Only, <7.5 Tons Quantity: 2 Services Provided 000 © 2026 Johnson Controls Johnson Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 20 of 98 Planned Service Proposal `ITV nc SANTA CLARITA CITY HALL OLD TOWN NEWHALL LIBRARY 22601 LYONS AVE SANTA CLARITA, CA 91321-2854 Coverage Level: Basic 3 Operational (Mid Season - Cooling Only) 1 Condenser Coil Cleaning 1 Cooling Comprehensive Customer Tag Manufacturer Model # Serial # SCC-1 Mitsubishi MUY-D30NA-1 0001227 SCC-2 Mitsubishi MUT-D30NA-1 0001714 Product: Builtup Unit, Supply -Return Fan, 10-40HP Quantity: 2 Services Provided Coverage Level: Basic 3 Operational 1 Comprehensive 4 Filters, Standard Pleated Customer Tag Manufacturer Model # Serial # SV-1 AaonInc SA-035-3-A-ER09-00 201109-ASCM00122 0 SV-2 AaonInc SA-035-3-A-ER09-00 201110-ASCM00123 0 Product: Cooling Tower, Variable Frequency Drive (VFD), 15-30 HP Quantity: 1 Services Provided Coverage Level: Basic 3 Operational 1 Comprehensive Customer Tau Manufacturer Model # Serial # VFD FOR CT Yaskawa FIELD UPDATE VFD FOR CT 1 NEEDED Product: Block Hours - Tradesman Quantity: 1 Services Provided Coverage Level: Basic 1 Preventive Maintenance Customer Tau Manufacturer Model # Serial # WT SUB PO - NEWHALL LIBRARY Write -In WT SUB PO - WT SUB PO - NEWHALL NEWHALL LIBRARY LIBRARY © 2026 Johnson Controls Johnson 000 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 21 of 98 Planned Service Proposal `ITV nc SANTA CLARITA CITY HALL OLD TOWN NEWHALL LIBRARY 22601 LYONS AVE SANTA CLARITA, CA 91321-2854 Product: Contractor - Water Treatment Quantity: 1 Coverage Level: Basic Customer Taa Services Provided 1 Contractor - Water Treatment Manufacturer Model # Serial # © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 000 Controls 'age 22 of 98 Planned Service Proposal r'Tv �F SANTA CLARITA CITY HALL PUBLIC WORKS CORP YARD 25663 AVENUE STANFORD SANTA CLARITA, CA 91355-1103 Product: Split System, Cooling with Electric Heat, <7.5 Tons Quantity: 2 Services Provided Coverage Level: Basic 1 Condenser Coil Cleaning 3 Operational (Mid Season - Cooling/Heating) 1 Cooling Comprehensive 4 Return Air Filter Change Customer Tau Manufacturer Model # Serial # AC-1 Mitsubishi MUZ-GE18MA 0004077T AC2 Mitsubishi MUZ-GE18NA 2002082 Product: Roof Top Unit (RTU), Cooling/Electric Heating, with Economizer, <8 Tons Quantity: 7 Services Provided Coverage Level: Basic 1 Cooling Comprehensive (with Economizer) 4 Standard Filter Change 1 Condenser Coil Cleaning 3 Operational (Mid Season - Cooling/Heating with Economizer) Customer Taa Manufacturer Model # Serial # AC-1 Carrier 48VGNA3609060 3617C38300 AC-10 JCI_YORK PCG4B600652X2B W21`0911254 AC-2 Carrier 48VGNA4809060 3617C38324 AC-3 Carrier 48VGNA6009060 3617C38327 AC-4 Carrier 48VGNA6009060 3617C38328 AC-7 Carrier 48LCL004AZA6AOAOA 3617C85558 0 Ac-5 Carrier 48LCL006AZA6AOAOA 3517C85524 0 Product: Fan, Exhaust Fan, Roof Mounted, 0-5 HP Quantity: 17 Services Provided Coverage Level: Basic 4 Operational 1 Belt Change Customer Tag Manufacturer Model # Serial # AE 1 Greenheck Fan Corp SWB-36-50X. 93E00724 EF-1 Cook Fans 1-18APUHXU EF-11 Cook Fans 1-18APTBV4 EF-2 Cook Fans 1-18APYL5A EF-4N Greenheck Fan Corp SWB-36-50X 93E00725 EF-5N Greenheck Fan Corp SWB-36-50 93E00726 EF-7N Greenheck Fan Corp SWB-27-20X 93E00723 EF-9 Greenheck Fan Corp SWB-15-7 93E03756 EF-NB Greenheck Fan Corp SWB-15-7 93E03757 EF10 Cook Fans EF10 EF10 © 2026 Johnson Controls Johnson 000 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 23 of 98 Planned Service Proposal `ITV nc SANTA CLARITA CITY HALL PUBLIC WORKS CORP YARD 25663 AVENUE STANFORD SANTA CLARITA, CA 91355-1103 Exhaust Fans Write -In NA Greenheck Fan Corp NA Cook Fans Na Loren Cook Company Na Loren Cook Company Na Loren Cook Company Na Loren Cook Company Product: Heat Pump, Air Cooled, 0-5 Tons 120ACRU/ 120ACRU B 300CPS 300CPS 300CPS 300CPS 1-13MSBHFH 1-18APQHL6 138SE17139-02/0025804 1-18AQ75SI 1-18AQ64DQ 1-18APYLCS 057-1 1/2 - 1725/1140 3-60-230 Quantity: 1 Services Provided Coverage Level: Basic 1 Cooling Comprehensive 1 Condenser Coil Cleaning 1 Heating Comprehensive 1 Belt Change 2 Operational (Mid Season) 4 Standard Filter Change Customer Tau Manufacturer Model # Serial # Ac-12 Thermal Zone TZAA-324-2A757 8342WO81324831 Product: Roof Top Unit (RTU), Cooling/Gas Heating, with Economizer, 15.5-25 Tons Quantity: 2 Coverage Level: Basic Customer Taa Ac-6 Ac-8 Manufacturer Carrier Carrier Services Provided 1 Gas Heating Comprehensive (with Economizer) 1 Condenser Coil Cleaning 1 Cooling Comprehensive (with Economizer) 2 Operational (Mid Season - Cooling/Heating with Economizer) 4 Standard Filter Change 1 Belt Change Model # Serial # 48LCLO04A2A6AOAOA 3617C85559 0 48VGNB240403OTP 3617CO4821 Product: Roof Top Unit (RTU), Cooling/Gas Heating, without Economizer, 25.5-60 Tons Quantity: 1 Services Provided Coverage Level: Basic 2 Operational (Mid Season - Cooling/Heating without Economizer) 1 Condenser Coil Cleaning 1 Gas Heating Comprehensive (without Economizer) 1 Cooling Comprehensive (without Economizer) 1 Belt Change © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 000 Controls 'age 24 of 98 Planned Service Proposal `ITV nc SANTA CLARITA CITY HALL PUBLIC WORKS CORP YARD 25663 AVENUE STANFORD SANTA CLARITA, CA 91355-1103 4 Standard Filter Change Customer Tau Manufacturer Model # Serial # Ac-9 Carrier 48VGNB240403OTP 3417CO3036 Product: Cooling Tower, Evaporative Condenser, <300 Tons Quantity: 9 Services Provided Coverage Level: Basic 3 Operational 1 Vibration Analysis (Fan) 1 Comprehensive Customer Taa EC1 EC10 EC2 EC3 EC4 EC5 EC6 EC7 EC8 Product: Terminal Product Quantity: 2 Coverage Level: Basic Customer Tau FC-11 Server Room unit Manufacturer Model # Serial # Adobe Aire DM120G E04252416 Champion Cooler AD200 AE710003 Company Adobe Aire DM120G D041212600 Adobe Aire DM120G E04252434 Adobe Aire DM120G D0412585 Adobe Aire DM120G D04121586 Champion Cooler AD200 AD7100009 Company Champion Cooler AD200 AD71500010 Company Champion Cooler AD200 AF7150002 Company Fan Coil Unit (FCU), Horizontal Air Flow, 300-1200 CFM Services Provided 3 Operational 4 Air Filter Change 1 Belt Change 1 Comprehensive Manufacturer Model # Serial # Carrier FB4ANA030 2392HO8395 Thermal Zone A18-00 9608134759 © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 000 Controls 'age 25 of 98 Planned Service Proposal r'Tv )F SANTA CLARITA CITY HALL CHANNEL 20 PUBLIC ACCESS TV STUDIOS 22505 14TH ST SANTA CLARITA, CA 91321-1500 Product: Roof Top Unit (RTU), Cooling Only, with Economizer, <8 Tons Quantity: 3 Services Provided Coverage Level: Basic 3 Operational (Mid Season - Cooling Only with Economizer) 4 Standard Filter Change 1 Cooling Comprehensive (with Economizer) 1 Belt Change Customer Tau Manufacturer Model # Serial # AC-1 Rheem NO NAME PLATE NO NAME PLATE INFO INFO AC-2 Rheem RPDC-101CLA 5044G41940457 Ac-3 Rheem RQPL-B024JK F041600925 Product: Heat Pump, Air Cooled, 5.5-10 Tons Quantity: 1 Services Provided Coverage Level: Basic 2 Operational (Mid Season) 1 Condenser Coil Cleaning 1 Heating Comprehensive 1 Cooling Comprehensive 4 Standard Filter Change Customer Taa Manufacturer Model # Serial # AC-4 Bryant 582ANW03606ONBAF 1704G31386 © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 000 Controls 'age 26 of 98 Planned Service Proposal r'Tv �F SANTA CLARITA CITY HALL WILLIAM S. HART PARK 24151 NEWHALL AVE SANTA CLARITA, CA 91321 Product: Roof Top Unit (RTU), Cooling/Gas Heating, with Economizer, <8 Tons Quantity: 1 Services Provided Coverage Level: Basic 1 Gas Heating Comprehensive (with Economizer) 1 Cooling Comprehensive (with Economizer) 4 Return Air Filter Change 1 Condenser Coil Cleaning 2 Operational (Mid Season - Cooling/Heating with Economizer) Customer Tag Manufacturer Model # Serial # AC-1 Frew House JCI YORK D2NZ036N05606NXA NOD7678359 Product: Heat Pump, Air Cooled, 0-5 Tons Quantity: 8 Services Provided Coverage Level: Basic 3 Operational (Mid Season) 1 Cooling Comprehensive 1 Condenser Coil Cleaning 1 Belt Change 4 Standard Filter Change Customer Tau Manufacturer Model # Serial # AH-1 Hart Hall Trane TWE060A300CA P10216K5H AH-2 Hart Hall Trane TWE060A300CA P084PTX5H AH-2 Hart Hall Trane TWA060D300A0 P205EXYlE AH-3 Hart Hall Trane TWE060A300CA P1021-6T5H AH-4 Hart Hall Trane TWE060A300CA P104P7354 CU-1 Hart Hall Trane TWA060D300A0 P2226H41F CU-3 Hart Hall Trane TWA060D300A0 P3056MUlF CU-4 Hart Hall Trane TWA060D300A0 P205KG91F Product: Air Handling Unit (AHU), Return Air, <15 HP Quantity: 1 Coverage Level Customer Tau AHU-1 Manaion Services Provided Basic 3 Operational 4 Standard Pleated Filter Change 1 Belt Change 1 Comprehensive Product: Chiller, Air Manufacturer Trane 10-40 Tons Model # Serial # MCCA012GAVOABC00 K99C71972M OGOECAOOBOA000 © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 000 Controls 'age 27 of 98 Planned Service Proposal `ITV nc SANTA CLARITA CITY HALL WILLIAM S. HART PARK 24151 NEWHALL AVE SANTA CLARITA, CA 91321 Quantity: 2 Services Provided Coverage Level: Basic 3 Operational 1 Comprehensive 1 Condenser Coil Cleaning Customer Tau Chiller 1 The Mansion Chiller 2 The Mansion Product: Furnace, All Quantity: 1 Coverage Level: Basic Customer Tag Furnace-1 The Mansion Manufacturer Model # Serial # Carrier 30RAP0106DA06100 1814Q50486 Carrier 30RAP0106DA06100 1814Q50484 Services Provided 3 Operational 1 Comprehensive Manufacturer Model # Serial # Reznor HX225-8-E AXD6662N12647 Product: Humidifier All Quantity: 1 Services Provided Coverage Level: Basic 2 Operational 2 Comprehensive Customer Tag Manufacturer Model # Serial # Humidifier-1 The Ranch National Environmental SK310M 05431411`1 Product Product: Pump, Chilled Water, 0-10 HP Quantity: 1 Services Provided Coverage Level: Basic 3 Operational 1 Vibration Analysis 1 Comprehensive Customer Tag Manufacturer Model # Serial # Pump-1 Mansion Taco Pump NEED TO GET 1-1QY4SDVV © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 40 Controls 'age 28 of 98 Planned Service Proposal `ITV nc SANTA CLARITA CITY HALL WILLIAM S. HART PARK 24151 NEWHALL AVE SANTA CLARITA, CA 91321 Product: Roof Top Unit (RTU), Cooling/Gas Heating, with Economizer, 8-15 Tons Quantity: 1 Services Provided Coverage Level: Basic 1 Condenser Coil Cleaning 2 Operational (Mid Season - Cooling/Heating with Economizer) 1 Gas Heating Comprehensive (with Economizer) 4 Premium Pleated Filter Change 1 Cooling Comprehensive (with Economizer) 1 Belt Change Customer Tau Manufacturer Model # Serial # RTU-1 The Ranch Lennox Industries TGA120S2BM1Y 5605K12288 Product: Unit Heater, Electric, <300000 BTU Quantity: 1 Services Provided Coverage Level: Basic 3 Operational 1 Comprehensive Customer Tau Manufacturer Model # Serial # Strip Heater-1 The Ranch Neptronic DF-CIOOH 052200037-001 Product: Pump, Variable Quantity: 1 Coverage Level: Basic Customer Tag VFD-1 Mansion Drive (VFD), <15 HP Services Provided 3 Operational 1 Comprehensive Manufacturer Model # Serial # Toshiba International NEED TO GET 1-1QY4WGWC Corp Product: Block Hours - Mechanical Light Quantity: 1 Services Provided Coverage Level: Basic 1 Preventive Maintenance Customer Tag Manufacturer Model # Serial # © 2026 Johnson Controls Johnson 000 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 29 of 98 Planned Service Proposal `ITV nc SANTA CLARITA CITY HALL WILLIAM S. HART PARK 24151 NEWHALL AVE SANTA CLARITA, CA 91321 Product: Contractor - Water Treatment Quantity: 1 Coverage Level: Basic Services Provided 1 Contractor - Water Treatment Customer Taa Manufacturer Model # Serial # © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 40 Controls 'age 30 of 98 Planned Service Proposal r'Tv )F SANTA CLARITA CITY HALL JAN HEIDT NEWHALL METROLINK STATION 24300 RAILROAD AVE SANTA CLARITA, CA 91321 Product: Split System, Cooling Only, <7.5 Tons Quantity: 2 Services Provided Coverage Level: Basic 4 Return Air Filter Change 3 Operational (Mid Season - Cooling Only) 1 Condenser Coil Cleaning 1 Cooling Comprehensive Customer Tau Manufacturer Model # Serial # AC-2 Carrier FB4ANF018000AFAA 2199A16467 Ac-1 Carrier FB4ANF018 2199A16461 © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 000 Controls 'age 31 of 98 Planned Service Proposal r'Tv �F SANTA CLARITA CITY HALL TRANSIT MAINTENANCE FACILITY 28250 CONSTELLATION RD SANTA CLARITA, CA 91355-5000 Product: Heat Pump, Water Cooled, 0-5 Tons Quantity: 13 Services Provided Coverage Level: Basic 1 Belt Change 4 Standard Filter Change 1 Cooling Comprehensive 3 Operational (Mid Season) Customer Tau Manufacturer Model # Serial # ADM-1 Climate Master TSV03VCFBGOURKS 242911354 ADM-1 Climate Master TSV060CFVGOULKS 242911356 AMC-2 Climate Master AMC-2 FIELD UPDATE AMC-2 FIELD UPDATE NEEDED NEEDED CRAC-A-1. Server room AboveAir MCW-018S-4-HGERH 2311672 -EC-00-DFB-1A CRAC-A-2. Server room AboveAir MCW-018S-4-HGERH 2311671 -EC-00-DFB-1A Climate Master 1 Climate Master TLV096AFBGATYTS 243310415 Climate Master 2 Climate Master TSH048CFB6OVRWS 243010922 HP-A-1 SE Quad interior zone Climate Master HP-A-1 FIELD HP-A-1 UPDATE NEEDED UPDATE NEEDED HP-A-11. E quad Hall ways Climate Master GLV100AFC3ECBTS G10630956 HP-A-2 S QUAD EXTERIOR ZONE Climate Master TSV036CFBGOURKS 242911355 LAN Room Climate Master TSH012AGBEOURSS 242911357 RTU (HP-A-10) E Quad Trane GERA06041C0300HP- W05D18426 Dispatch Area A10 RTU (HP-A-9) E Quad Trane GERA12041CO200HP W05D18425 Drivers Break room -A-9 Product: Boiler, Gas-Fi Quantity: 1 Coverage Level: Basic Customer Tau Boiler 1 Product: Pum Quantity: 4 Coverage Level: Water Tube, <50HP Services Provided 3 Operational 1 Comprehensive 1 Fireside Cleaning (gaskets not included) Manufacturer Model # Serial # RayPak H7-0726L V312200228 Chilled Water, 0-10 HP Basic Services Provided 3 Operational 1 Comprehensive © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 000 Controls 'age 32 of 98 Planned Service Proposal ITV nc SANTA CLARITA CITY HALL TRANSIT MAINTENANCE FACILITY 28250 CONSTELLATION RD SANTA CLARITA, CA 91355-5000 Customer Taa CT -pump CWP-1 CWP-2 CWP-3 Manufacturer Baltimore Aircoil Bell & Gossett Bell & Gossett Bell & Gossett Model # Serial # BAC300210 SW03137BS-3/21 1510 BF 7.750 CT3589-01 L40 1510 BF 9.125 CT3586-02 K40 1510 BF 9.125 CT3586-01 K40 Product: Split System, Cooling with Electric Heat, <7.5 Tons Quantity: 11 Services Provided Coverage Level: Basic 4 Return Air Filter Change 1 Cooling Comprehensive 3 Operational (Mid Season - Cooling/Heating) 1 Condenser Coil Cleaning Customer Tau Manufacturer Model # Serial # CU-B-1 JCI_YORK DHP09CSB11S 63229965275 CU-B-11 Training Room Samsung AM036TXMDCH/AA BCZRP3GR400028R CU-B-12 Break Room Samsung AM036TXMDCH/AA BCZRP3GR400024A CU-B-6 LAN Room JCI_YORK TCD48B41SA W21\11775022 CU-B2 JCI_YORK CU-B2 FIELD UPDATE CU-B2 FIELD UPDATE NEEDED NEEDED CU-B3 JCI_YORK DHP09CSB11S CU-B3 FIELD UPDATE NEEDED CU-B4 JCI_YORK DHP09CSB11S CU-B4 FIELD UPDATE NEEDED CU-B5 JCI_YORK DHP09CSB11S CU-B5 FIELD UPDATE NEEDED CU-B7 JCI_YORK DHP09CSB11S CU-B7 FIELD UPDATE NEEDED CU-B8 Samsung AR18TSFABWYKX CU-B8 FIELD UPDATE NEEDED CU-B9 Samsung AR18TSFABWYKXCV OVM9PAFR600602E Product: Corn Quantity: 2 Coverage Level: Services Provided Basic 3 Operational 4 Standard Filter Change 1 Comprehensive Customer Tag Manufacturer Model # Serial # Computer Room Unit #1 Write -In 1-13M9NN3E Computer Room Unit #2 Write -In 1-13M9NN4S Product: Cooling Tower, Variable F Quantity: 2 Coverage Level: Basic Drive (VFD), 15-30 HP Services Provided 3 Operational 1 Comprehensive © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 00 Controls 'age 33 of 98 Planned Service Proposal `ITV nc SANTA CLARITA CITY HALL TRANSIT MAINTENANCE FACILITY 28250 CONSTELLATION RD SANTA CLARITA, CA 91355-5000 Customer Tag Manufacturer Model # Serial # Cooling Tower VFD Write -In 1-13M9NN9Y Cooling Tower VFD 2 Write -In COOLING TOWER VFD 2 - FIELD UPDATE NEEDED Product: Fan, Exhaust Fan, Roof Mounted, 0-5 HP Quantity: 30 Services Provided Coverage Level: Basic 4 Operational 1 Belt Change Customer Tag EF-A-10 EF-A-11 EF-A-12 EF-A-5 EF-A-5 EF-A-6 EF-A-7 EF-A-8 EF-B-1 EF-B-10 EF-B-11 EF-B-12 EF-B-13 EF-B-14 EF-B-16 EF-B-17 EF-B-18 EF-B-19 EF-B-2 EF-B-20 EF-B-21 EF-B-22 EF-B-3 EF-B-4 EF-B-5 EF-B-6 EF-B-7 EF-B-9 HEFA1 PR30 Product: Fan, Exhaust Quantity: 1 Coverage Level: Basic Manufacturer Cook Fans Cook Fans Cook Fans Cook Fans Cook Fans Cook Fans Cook Fans Cook Fans Cook Fans Cook Fans Cook Fans Cook Fans Cook Fans Cook Fans Cook Fans Cook Fans Cook Fans Cook Fans Cook Fans Cook Fans Cook Fans Cook Fans Cook Fans Cook Fans Cook Fans Cook Fans Cook Fans Cook Fans Cook Fans Cook Fans Model # Serial # 70 ACE 1385807079-00/0004601 80 ACE 1385807079-00/0005901 80 ACE 1385807079-00/0005902 135 ACE 1385807079-00/0000701. 135 ACE 1385807079-00/0000701 135 ACE 1385807079-00/0000702 120 ACE 1385807079-00/0002001 100 ACE 1385807079-00/0003301 225CPA 1385807079-01/0000701 380CPA. 1385812701-01/0000701. 210CPA 1385812701-01/0010802 120 CPV 120 CPV 1385812701-01/0008102 120 CPV 120 CPV 1385812701-01/0008103 150 CPV 150 CPV 1385812701-01/0002301 330 CPA 330 CPA 1385812701-01/0003601 270 CPA 270 CPA 1385812701-01/0005101 330 CPA 330 CPA 1385812701-01/0003602 330 CPA 330 CPA 1385812701-01/0003603 330 CPA 330 CPA 1385812701-01/0002101 270 CPA 270 CPA 1385812701-01/0005102 300CPV 1385812701-01/0006701 300 CPV 300 CPV 1385812701-01/0006702 100 ACE 100 C2B 1385812701-01/0000701 70 ACE 70C2B 1385812701-00/0002001 135 ACE 135C4B 1385812701-00/0003401 135 ACE 135C3B 1385812701-00/0004801 120 CPV 0008101 210 KPA 0010801 135 CPA 138580709-01/0003501 300 PR 138581270100/0007306 Roof Mounted, >15 HP Services Provided 4 Operational © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 0111 Controls 'age 34 of 98 Planned Service Proposal ITV nc SANTA CLARITA CITY HALL TRANSIT MAINTENANCE FACILITY 28250 CONSTELLATION RD SANTA CLARITA, CA 91355-5000 Customer Taa Manufacturer Model # Serial # EF-B-8 Cook Fans 245 CPV 0009501 Product: Expansion Tank Quantity: 1 Services Provided Coverage Level: Basic 4 Operational Customer Tag EXT-1 Product: Terminal PI Quantity: 8 Coverage Level: Basic Manufacturer Model # Serial # Bell & Gossett D 20 V 128039 Fan Coil Unit (FCU), Horizontal Air Flow, 300-1200 CFM Services Provided 3 Operational 1 Comprehensive Customer Tau Manufacturer FC-13-3 United Technologies Carrier FC-13-3 Maintenance Manager Office JCI_YORK FC-B-5 Part Manager Office JCI_YORK FC-13-6 LAN Room JCI_YORK FC-B1 - Mech Supply Office JCI_YORK FC-B11 Training Room Samsung FC-B12 Lunch room Samsung FC-B2 Mech Supply office JCI_YORK Product: Cooling Tower, Quantity: 2 Coverage Level: Basic Customer Tau FLC-002 flc-001 Model # Serial # 40QNE009100 3804Y30538 DHP09NWB11S DIB2100049 DHP09NWB11S DIB2100048 AE48CX21G W2A1645775 DHP09NWB11S DIB2100050 FC-B11 FIELD FC-B11 FIELD UPDATE UPDATE NEEDED NEEDED FC-B12 FIELD FC-B12 FIELD UPDATE UPDATE NEEDED NEEDED DHP09NWB11S DIB2100068 Distribution, <300 Tons Services Provided 3 Operational 1 Comprehensive 1 Tower Cleaning 1 Vibration Analysis (Fan) Manufacturer Model # Serial # Marley Cooling Towers LW0321B1 CT-2 FIELD UPDATE NEEDED Marley Cooling Towers LW0321B1 CT-1 FILED UPDATE NEEDED © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 00 Controls 'age 35 of 98 Planned Service Proposal `ITV nc SANTA CLARITA CITY HALL TRANSIT MAINTENANCE FACILITY 28250 CONSTELLATION RD SANTA CLARITA, CA 91355-5000 Product: Heat Pump, Air Cooled, 0-5 Tons Quantity: 1 Services Provided Coverage Level: Basic 4 Standard Filter Change 1 Cooling Comprehensive 1 Heating Comprehensive 1 Condenser Coil Cleaning 2 Operational (Mid Season) Customer Taa Manufacturer Model # Serial # HP-A-13 NE QUAD IDF RM Climate Master GSH015BGC30TL85 G10627073 Product: Air Handling Unit (AHU), Make -Up Air Unit (MAU), <15 HP Quantity: 3 Services Provided Coverage Level: Basic 3 Operational 4 Standard Pleated Filter Change 1 Comprehensive 1 Belt Change Customer Tau Manufacturer Model # Serial # MAU-B-1 Reznor HRPB125-8-5-2 EBDJ66XN007915 SF-A-5 Loren Cook Company 150SQIB 38580707900 SF-A-6 Loren Cook Company 90SQIB 138580707900 Product: Heater, Gas Infrared -All Quantity: 15 Coverage Level: Basic Services Provided 3 Operational 1 Comprehensive Customer Tau Manufacturer Model # Serial # RH-B-1 Reznor VR50 BDF80U2N25958X RH-B-2 Reznor VR50 BDF80U2N2595 RH-B-3 Reznor VR50 BDF80U2N25959X RH-B-4 Reznor VR50 BDF80U2N25961X RH-B-5 Reznor VR50 BDI8OU2N5133OX RH-B-6 Reznor VR50 BD180U2N54041X UH-B-10 Reznor UDAP30 BDH79X7N4045ZX UH-B-11 Reznor UDAP30 BDH79X7N4044ZX UH-B-12 Reznor UDAP30 BDH79X7N40416X UH-B-13 Reznor UDAP30 BDH79X7N40424X UH-B-14 Reznor UDAP30 1-18U8262W UH-B-15 Reznor UDAP30 BDH79X7N4041YX UH-B-7 Reznor UDAP30 BDH79X7N40419X UH-B-8 Reznor UDAP30 BDH79X7N4046ZX UH-B-9 Reznor UDAP30 BDI79X7N49613X © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 00 Controls 'age 36 of 98 Planned Service Proposal `ITV nc SANTA CLARITA CITY HALL TRANSIT MAINTENANCE FACILITY 28250 CONSTELLATION RD SANTA CLARITA, CA 91355-5000 Product: Furnace, All Quantity: 1 Services Provided Coverage Level: Basic 3 Operational 1 Comprehensive Customer Tau Manufacturer Model # Serial # UH-B-5 AaonInc RQ-006-3-H-EB09 202407-AYGF401120 Product: Block Hours - Tradesman Quantity: 1 Services Provided Coverage Level: Basic 1 Preventive Maintenance Customer Tag Manufacturer Model # Serial # WT SUB PO - TRANSIT Write -In WT SUB PO - WT SUB PO - TRANSIT MAINTENANCE TRANSIT MAINTENANCE MAINTENANC Enhanced Tier Product: Controls, Building Automation System, Non -Connected System Quantity: 1 Services Provided Coverage Level: Basic 1 Non -Standard Service Delivery Fee Customer Tag Manufacturer Model # Serial # Product: Contractor - Water Treatment Quantity: 1 Services Provided Coverage Level: Basic 1 Contractor - Water Treatment Customer Tag Manufacturer Model # Serial # © 2026 Johnson Controls Johnson 000 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 37 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 00 Controls Page 38 of 98 Planned Service Proposal r'Tv )F SANTA CLARITA CITY HALL JO ANNE DARCY LIBRARY 18601 SOLEDAD CANYON RD SANTA CLARITA, CA 91351-3726 Product: Heat Pump, Air Quantity: 9 Coverage Level Customer Tau C1 C2 C3 L1 L2 L4 L5 L6 L7 Basic Product: Heat Pump, Air Quantity: 1 Coverage Level: Basic Customer Taa L3 pled, 0-5 Tons Services Provided 4 Standard Filter Change 1 Heating Comprehensive 1 Cooling Comprehensive 1 Condenser Coil Cleaning 2 Operational (Mid Season) Manufacturer Model # Serial # JCI_YORK PHE4B4831B W21\10519753 JCI_YORK PHE4B4831B W2A1519792 JCI_YORK PHE4B4831B W2A1519842 JCI_YORK PHE4B6031B W2A1520304 JCI_YORK PHE4B6034A W2H1340223 JCI_YORK PHE4B6031B W2A1520310 JCI_YORK PHE4B6034A W2H1340220 JCI_YORK PHE4B6031B W2A1520296 JCI_YO RK PHE4A2424A W2E1044470 pled, 5.5-10 Tons Services Provided 1 Heating Comprehensive 2 Operational (Mid Season) 1 Condenser Coil Cleaning 1 Cooling Comprehensive 4 Standard Filter Change Manufacturer Model # Serial # JCI_YORK XXE08A2B3AA1A111 N21\10518895 A2 © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 00 Controls 'age 39 of 98 Planned Service Proposal C''T`� )F SANTA CLARITA CITY HALL OLD TOWN NEWHALL PARKING STRUCTURE 9TH ST SANTA CLARITA, CA 91321 Product: Split System, Cooling Only, <7.5 Tons Quantity: 5 Services Provided Coverage Level: Basic 1 Condenser Coil Cleaning 1 Cooling Comprehensive 3 Operational (Mid Season - Cooling Only) Customer Tau Manufacturer Model # Serial # Cu 1 Carrier 24AHA436A300 117X25238 CU 2 Carrier 24AHA436A300 1917X97446 CU 3 Carrier 24AHA436A300 1117X25214 SFC 1 Cac/Bdp 40MKCB32B-3 0317V00173 SFC 2 Carrier 40MKCB32B-3 0317V00170 Product: Fan, Exhaust Fan, Ceiling Mounted, 0 - 5HP Quantity: 3 Services Provided Coverage Level: Basic 4 Operational 1 Belt Change Customer Tag Manufacturer Model # Serial # EF 1 Cook Fans 330 SQN 138SG96852-00/0000701 EF-2 Cook Fans 70 SQN 138SG96852-00/0002101 SF 1 Cook Fans 19580NB 1388G96852-OOZ0003901 Product: Air Handling Unit (AHU), Variable Frequency Drive (VFD), <15 HP Quantity: 2 Services Provided Coverage Level: Basic 3 Operational 1 Comprehensive Customer Tag Manufacturer Model # Serial # EF 1 VFD Yaskawa CIMR-ZU4AOO11FAA 1W1741501730001 SF 1 VFD Yaskawa CIMR-ZU4A0005FAA 1W1731474540001 Product: Terminal Product, Fan Coil Unit (FCU), Horizontal Air Flow, 300-1200 CFM Quantity: 1 Services Provided Coverage Level: Basic 3 Operational 1 Comprehensive © 2026 Johnson Controls Johnson 00 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 40 of 98 Planned Service Proposal `ITV nc SANTA CLARITA CITY HALL OLD TOWN NEWHALL PARKING STRUCTURE Customer Taa Manufacturer SFC-3 Cac/Bdp 9TH ST SANTA CLARITA, CA 91321 Model # Serial # 1-18UHWBKU © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 40 Controls 'age 41 of 98 Planned Service Proposal r'Tv )F SANTA CLARITA CITY HALL SANTA CLARITA BUSINESS INCUBATOR 22704 9TH ST SANTA CLARITA, CA 91321-2808 Product: Fan, Exhaust Quantity: 3 Coverage Level: Basic Roof Mounted, 0-5 HP Services Provided 4 Operational 1 Belt Change Customer Tau EF-1 EF-2 EF-3 Manufacturer Greenheck Fan Corp Greenheck Fan Corp Jenn-Air Model # GB-101HP-4-X GB-071-6-X 90CRU-JB Serial # 13716785 13716786 1-18S8NS70 Product: Heat Pump, Air Cooled, 0-5 Tons Quantity: 2 Services Provided Coverage Level: Basic 1 Belt Change 4 Standard Filter Change 2 Operational (Mid Season) 1 Heating Comprehensive 1 Cooling Comprehensive 1 Condenser Coil Cleaning Customer Tag Manufacturer Model # Serial # HP-1 Mitsubishi PUZ-A30NHA4 3ZU02021A HP-2 Mitsubishi PUZ-A18NHA4 3ZU03409A Product: Split System, Cooling Only, <7.5 Tons Quantity: 1 Services Provided Coverage Level: Basic 1 Belt Change 1 Cooling Comprehensive 4 Return Air Filter Change 1 Condenser Coil Cleaning 3 Operational (Mid Season - Cooling Only) Customer Tag Manufacturer Model # Serial # Server room unit Mitsubishi MS-A09WA-1 4000160 T Product: Variable Refrigerant Flow (VRF), Change -Over Boxes, 4 Port Change -Over Box Quantity: 1 Services Provided Coverage Level: Basic 4 Operational © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 000 Controls 'age 42 of 98 Planned Service Proposal ITV nc SANTA CLARITA CITY HALL SANTA CLARITA BUSINESS INCUBATOR 22704 9TH ST SANTA CLARITA, CA 91321-2808 Customer Taa Manufacturer Model # Serial # VRF Change -Over Box Write -In VRF CHANGE -OVER VRF CHANGE -OVER BOX BOX FIELD UPDATE NEEDED Product: Variable Refri Flow (VRF), VRF Controllers, Wired Quantity: 4 Services Provided Coverage Level: Basic 4 Operational Customer Taa Manufacturer Model # Serial # VRF Controller 1 Write -In VRF CONTROLLER 1 VRF CONTROLLER 1 FIELD FIELD UPDATE UPDATE NEEDED VRF Controller 2 Write -In VRF CONTROLLER 2 VRF CONTROLLER 2 FIELD FIELD UPDATE UPDATE NEEDED VRF Controller 3 Write -In VRF CONTROLLER 3 VRF CONTROLLER 3 FIELD FIELD UPDATE UPDATE NEEDED VRF Controller 4 Write -In VRF CONTROLLER 4 VRF CONTROLLER 4 FIELD FIELD UPDATE UPDATE NEEDED Product: Variable Refrigerant Flow (VRF), Indoor Unit, Ducted Medium Static Indoor Unit 0.5 - 4.5 Ton Quantity: 4 Services Provided Coverage Level: Basic 3 Operational 4 Return Air Filter Change 1 Comprehensive Customer Taa Manufacturer Model # Serial # VRF Indoor Ducted 1 Write -In VRF INDOOR VRF INDOOR DUCTED 1 DUCTED 1 FIELD UPDATE NEEDED VRF Indoor Ducted 2 Write -In VRF INDOOR VRF INDOOR DUCTED 2 DUCTED 2 FIELD UPDATE NEEDED VRF Indoor Ducted 3 Write -In VRF INDOOR VRF INDOOR DUCTED 3 DUCTED 3 FIELD UPDATE NEEDED VRF Indoor Ducted 4 Write -In VRF INDOOR VRF INDOOR DUCTED 4 DUCTED 4 FIELD FIELD UPDATE NEEDED Product: Variable Refrigerant Flow (VRF), Outdoor Unit, Heat Recovery, 10.0 - 16.0 Ton Quantity: 1 Services Provided Coverage Level: Basic 3 Operational 1 Additional Condenser Coil Cleaning 1 Comprehensive © 2026 Johnson Controls Johnson 00 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 43 of 98 Planned Service Proposal `ITV nc SANTA CLARITA CITY HALL SANTA CLARITA BUSINESS INCUBATOR 22704 9TH ST SANTA CLARITA, CA 91321-2808 Customer Taa Manufacturer Model # Serial # VRF Outdoor Unit Write -In VRF OUTDOOR UNIT VRF OUTDOOR UNIT FILED FIELD UPDATE UPDATE NEEDED © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 40 Controls 'age 44 of 98 Planned Service Proposal r'Tv �F SANTA CLARITA CITY HALL VIA PRINCESSA METROLINK STATION 19201 VIA PRINCESSA SANTA CLARITA, CA 91350 Product: Split System, Cooling with Electric Heat, <7.5 Tons Quantity: 2 Services Provided Coverage Level: Basic 4 Return Air Filter Change 3 Operational (Mid Season - Cooling/Heating) 1 Condenser Coil Cleaning 1 Cooling Comprehensive Customer Tau Manufacturer Model # Serial # Fan Coil -1 Carrier 40MAHBQ12XAl 4021V13194 Spilt-1 Write -In 38MARBQ12AAl 4621V16859 © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 00 Controls 'age 45 of 98 Planned Service Proposal r'Tv )F SANTA CLARITA CITY HALL SANTA CLARITA METROLINK STATION 22122 SOLEDAD CANYON RD SANTA CLARITA, CA 91350-2627 Product: Split System, Cooling with Electric Heat, <7.5 Tons Quantity: 1 Services Provided Coverage Level: Basic 1 Condenser Coil Cleaning 1 Cooling Comprehensive 4 Return Air Filter Change 3 Operational (Mid Season - Cooling/Heating) Customer Tau Manufacturer Model # Serial # Metrolink Station Split System Trane 4A61-160361-11000AD 21484MW64F © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 40 Controls 'age 46 of 98 Planned Service Proposal r'Tv )F SANTA CLARITA CITY HALL 26330 CITRUS STREET 26330 CITRUS ST SANTA CLARITA, CA 91355 Product: Roof Top Unit (RTU), Cooling/HW-Steam Heating, without Economizer, 8-15 Tons Quantity: 4 Services Provided Coverage Level: Basic 1 Belt Change 4 Standard Filter Change 1 Cooling Comprehensive (without Economizer) 2 Operational (Mid Season - Cooling/Heating without Economizer) 1 Heating Comprehensive (without Economizer) 1 Condenser Coil Cleaning Customer Tag Manufacturer Model # Serial # RTU-1 Carrier 50TF0008--- 501GA 0901G30308 RTU-2 Carrier 50TFQ008--- 501GA 0901G30306 RTU-3 Carrier 50TFQ008--- 501GA 0701G30340 RTU-6 Carrier 50TFQ008--- 501GA 1101G30341 © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 000 Controls 'age 47 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Equipment tasking Air Compressor/Dryer, Air Compressor, Commercial, <5 HP Belt Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Perform belt change procedures Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Comprehensive All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Drain condensate from tank and check traps Check safety relief valve Check condition of pulley and belts (if applicable) Inspect air filters and wash or replace as needed Replace oil in compressor and check for proper level Lubricate motor bearings (per manufacturer's recommendations) Check PE switch and starter Check pressure reducing station for proper operation Inspect pressure reducing station filters and clean or replace as required Check for proper operation of air drier Check air drier condenser coil Brush air dryer, condenser and cover grills as required Check for unusual noise and vibration Check overall condition of unit Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Operational All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Drain condensate from tank and check traps Check safety relief valve Check condition of pulley and belts (if applicable) Inspect air filters Check for proper oil level in compressor Lubricate motor bearings (per manufacturer's recommendations) Check PE switch and starter Check pressure reducing station for proper operation Check for proper operation of air drier Check air drier condenser coil Brush air dryer, condenser and cover grills as required Check for unusual noise and vibration Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative Air Handling Unit (AHU), Make -Up Air Unit (MAU), <15 HP Belt Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Perform belt change procedures © 2026 Johnson Controls Johnson 40 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 48 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Standard Filter Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Turn equipment off Remove dirty filters Install new filters Turn equipment on Dispose of dirty filter appropriately Document tasks performed during visit and report any observations to appropriate customer representative Standard Pleated Filter All work must be performed in accordance with Johnson Controls safety policies Change Check with appropriate customer representative for operational deficiencies Turn equipment off Remove dirty filters Install new filters Turn equipment on Dispose of dirty filter appropriately Document tasks performed during visit and report any observations to appropriate customer representative Comprehensive All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Visually inspect damper(s) Check condition of pulleys and belts Check for proper fan operation Check condition of coils Check condition of filters Record temperatures and pressures (if applicable) Check for unusual noise and vibration Check for deterioration of gaskets and seals Check overall condition of unit Visually inspect for fluid leaks of coils and connecting piping Check starter/contactor Check and tighten electrical connections Check damper operation and lubricate as required Visually check control valve(s) Lubricate blower and motor bearings Clean condensate pan and clear drain line Check condition of blower assembly Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Operational All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Inspect motor mounting isolators Check for integrity of cabinet hardware Visually inspect damper(s) Verify damper operation Check condition of pulleys and belts Check for proper fan operation Check condition of coils Check condition of filters Record temperatures and pressures (if applicable) © 2026 Johnson Controls Johnson 40 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 49 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Check condensate drain Visually inspect electrical connections Check for unusual noise and vibration Check overall condition of unit Visually inspect for fluid leaks of coils and connecting piping Document tasks performed during visit and report any observations to appropriate customer representative Air Handling Unit (AHU), Mixed Air, 15-30 HP Belt Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Perform belt change procedures Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Comprehensive All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Visually inspect damper(s) Check condition of pulleys and belts Check for proper fan operation Check condition of coils Check condition of filters Record temperatures and pressures (if applicable) Check for unusual noise and vibration Check for deterioration of gaskets and seals Check overall condition of unit Visually inspect for fluid leaks of coils and connecting piping Check starter/contactor Check and tighten electrical connections Check damper operation and lubricate as required Visually check control valve(s) Lubricate blower and motor bearings Clean condensate pan and clear drain line Check condition of blower assembly Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Operational All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Inspect motor mounting isolators Check for integrity of cabinet hardware Visually inspect damper(s) Verify damper operation Check condition of pulleys and belts Check for proper fan operation Check condition of coils Check condition of filters Record temperatures and pressures (if applicable) Check condensate drain Visually inspect electrical connections Check for unusual noise and vibration Check overall condition of unit Visually inspect for fluid leaks of coils and connecting piping Document tasks performed during visit and report any observations to © 2026 Johnson Controls Johnson 000 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 50 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL appropriate customer representative Air Handling Unit (AHU), Return Air, 15-30 HP Belt Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Perform belt change procedures Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Standard Filter Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Turn equipment off Remove dirty filters Install new filters Turn equipment on Dispose of dirty filter appropriately Document tasks performed during visit and report any observations to appropriate customer representative Comprehensive All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Visually inspect damper(s) Check condition of pulleys and belts Check for proper fan operation Check condition of coils Check condition of filters Record temperatures and pressures (if applicable) Check for unusual noise and vibration Check for deterioration of gaskets and seals Check overall condition of unit Visually inspect for fluid leaks of coils and connecting piping Check starter/contactor Check and tighten electrical connections Check damper operation and lubricate as required Visually check control valve(s) Lubricate blower and motor bearings Clean condensate pan and clear drain line Check condition of blower assembly Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Operational All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Inspect motor mounting isolators Check for integrity of cabinet hardware Visually inspect damper(s) Verify damper operation Check condition of pulleys and belts Check for proper fan operation Check condition of coils Check condition of filters Record temperatures and pressures (if applicable) Check condensate drain Visually inspect electrical connections 000 © 2026 Johnson Controls Johnson Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 51 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Check for unusual noise and vibration Check overall condition of unit Visually inspect for fluid leaks of coils and connecting piping Document tasks performed during visit and report any observations to appropriate customer representative Air Handling Unit (AHU), Return Air, 35-60 HP Belt Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Perform belt change procedures Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Standard Filter Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Turn equipment off Remove dirty filters Install new filters Turn equipment on Dispose of dirty filter appropriately Document tasks performed during visit and report any observations to appropriate customer representative Comprehensive All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Visually inspect damper(s) Check condition of pulleys and belts Check for proper fan operation Check condition of coils Check condition of filters Record temperatures and pressures (if applicable) Check for unusual noise and vibration Check for deterioration of gaskets and seals Check overall condition of unit Visually inspect for fluid leaks of coils and connecting piping Check starter/contactor Check and tighten electrical connections Check damper operation and lubricate as required Visually check control valve(s) Lubricate blower and motor bearings Clean condensate pan and clear drain line Check condition of blower assembly Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Operational All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Inspect motor mounting isolators Check for integrity of cabinet hardware Visually inspect damper(s) Verify damper operation Check condition of pulleys and belts Check for proper fan operation Check condition of coils © 2026 Johnson Controls Johnson 000 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 52 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Check condition of filters Record temperatures and pressures (if applicable) Check condensate drain Visually inspect electrical connections Check for unusual noise and vibration Check overall condition of unit Visually inspect for fluid leaks of coils and connecting piping Document tasks performed during visit and report any observations to appropriate customer representative Air Handling Unit (AHU), Return Air, <15 HP Belt Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Perform belt change procedures Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Standard Pleated Filter All work must be performed in accordance with Johnson Controls safety policies Change Check with appropriate customer representative for operational deficiencies Turn equipment off Remove dirty filters Install new filters Turn equipment on Dispose of dirty filter appropriately Document tasks performed during visit and report any observations to appropriate customer representative Comprehensive All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Visually inspect damper(s) Check condition of pulleys and belts Check for proper fan operation Check condition of coils Check condition of filters Record temperatures and pressures (if applicable) Check for unusual noise and vibration Check for deterioration of gaskets and seals Check overall condition of unit Visually inspect for fluid leaks of coils and connecting piping Check starter/contactor Check and tighten electrical connections Check damper operation and lubricate as required Visually check control valve(s) Lubricate blower and motor bearings Clean condensate pan and clear drain line Check condition of blower assembly Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Operational All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Inspect motor mounting isolators Check for integrity of cabinet hardware Visually inspect damper(s) 000 © 2026 Johnson Controls Johnson Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 53 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Verify damper operation Check condition of pulleys and belts Check for proper fan operation Check condition of coils Check condition of filters Record temperatures and pressures (if applicable) Check condensate drain Visually inspect electrical connections Check for unusual noise and vibration Check overall condition of unit Visually inspect for fluid leaks of coils and connecting piping Document tasks performed during visit and report any observations to appropriate customer representative Air Handling Unit (AHU), Variable Frequency Drive (VFD), 15-30 HP Comprehensive All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Check and tighten electrical connections Check for heat damage Review event log (if applicable) Ramp drive up and down, and check for proper operation (if possible) Check condition of air filter and clean or replace as needed Verify proper operation of cooling fans and clean as needed Check for unusual noise or vibration Check overall condition of unit Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Operational All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Check drive for proper operation Review event log (if applicable) Check for unusual noise and vibration Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative Air Handling Unit (AHU), Variable Frequency Drive (VFD), <15 HP Comprehensive All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Check and tighten electrical connections Check for heat damage Review event log (if applicable) Ramp drive up and down, and check for proper operation (if possible) Check condition of air filter and clean or replace as needed Verify proper operation of cooling fans and clean as needed Check for unusual noise or vibration Check overall condition of unit Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative © 2026 Johnson Controls Johnson 40 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 54 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Operational All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Check drive for proper operation Review event log (if applicable) Check for unusual noise and vibration Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative Block Hours - Mechanical Light Preventive Maintenance Check with appropriate customer representative for operational deficiencies Perform scheduled block hour tasks Complete any required maintenance checklists, report observations to appropriate customer representative Block Hours - Tradesman Preventive Maintenance Check with appropriate customer representative for operational deficiencies Perform scheduled block hour tasks Complete any required maintenance checklists, report observations to appropriate customer representative Boiler, Gas -Fired, Fire Tube, <50 HP Combustion Analysis All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Perform combustion analysis procedures Document tasks performed during visit and report any observations to appropriate customer representative Operational All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Blow down boiler Check for proper operation of low and high gas pressure cut-out switches Check factory supplied gas piping and components for leakage Check burner for proper sequence of operation Check flame quality Visually inspect combustion chamber, draft diverter and flue for accumulation of soot Check boiler relief valves for leakage Verify proper operation of low water cut-out control Check combustion blower motor operation Check hot water/steam temperature and pressure Check proper operation of make-up water valv Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative Comprehensive All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Inspect burner contactors for wear Check and tighten electrical connections Check for proper gas supply pressure 000 © 2026 Johnson Controls Johnson Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 55 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Check and clean pilot assembly Clean combustion fan wheel Visually inspect combustion chamber, draft diverter and flue for accumulation of soot - clean as needed Check burner for proper sequence of operation Check operating controls Check all safety controls Lift relief valve to ensure proper operation Check boiler relief valves for leakage Check combustion blower motor operation and lubricate as needed Check factory supplied gas piping and components for leakage Drain boiler, open hand hole covers and clean as needed (if applicable) Disassemble and clean low water cut-out Fill boiler and check for proper operation of make-up water valve Verify proper operation of low water cut-out control Check overall condition of unit Record and log all operating parameters (including pressures and temperatures) Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Boiler, Gas -Fired, High Efficiency, >10 HP Operational All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Blow down boiler Inspect condensate piping , trap and drain Check for proper operation of low and high gas pressure cut-out switches Check factory supplied gas piping and components for leakage Check burner for proper sequence of operation Check flame quality Visually inspect combustion chamber, draft diverter and flue for accumulation of soot Check boiler relief valves for leakage Verify proper operation of low water cut-out control Check combustion blower motor operation Check hot water/steam temperature and pressure Check proper operation of make-up water valv Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative Comprehensive All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Inspect burner contactors for wear Check and tighten electrical connections Check for proper gas supply pressure Check and clean pilot assembly Clean combustion fan wheel Visually inspect combustion chamber, draft diverter and flue for accumulation of soot - clean as needed Check burner for proper sequence of operation Check operating controls Check all safety controls Inspect condensate piping , trap and drain Lift relief valve to ensure proper operation Check boiler relief valves for leakage Check combustion blower motor operation and lubricate as needed © 2026 Johnson Controls Johnson 40 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 56 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Check factory supplied gas piping and components for leakage Drain boiler, open hand hole covers and clean as needed (if applicable) Disassemble and clean low water cut-out Fill boiler and check for proper operation of make-up water valve Verify proper operation of low water cut-out control Check overall condition of unit Record and log all operating parameters (including pressures and temperatures) Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Fireside Cleaning All work must be performed in accordance with Johnson Controls safety policies (gaskets not included) Check with appropriate customer representative for operational deficiencies Remove access panels Brush fireside surfaces Reinstall access panels Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Boiler, Gas -Fired, Water Tube, <50HP Operational All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Blow down boiler Check for proper operation of low and high gas pressure cut-out switches Check factory supplied gas piping and components for leakage Check burner for proper sequence of operation Check flame quality Visually inspect combustion chamber, draft diverter and flue for accumulation of soot Check boiler relief valves for leakage Verify proper operation of low water cut-out control Check combustion blower motor operation Check hot water/steam temperature and pressure Check proper operation of make-up water valv Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative Comprehensive All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Inspect burner contactors for wear Check and tighten electrical connections Check for proper gas supply pressure Check and clean pilot assembly Clean combustion fan wheel Visually inspect combustion chamber, draft diverter and flue for accumulation of soot - clean as needed Check burner for proper sequence of operation Check operating controls Check all safety controls Lift relief valve to ensure proper operation Check boiler relief valves for leakage Check combustion blower motor operation and lubricate as needed Check factory supplied gas piping and components for leakage Drain boiler, open hand hole covers and clean as needed (if applicable) © 2026 Johnson Controls Johnson 000 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 57 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Disassemble and clean low water cut-out Fill boiler and check for proper operation of make-up water valve Verify proper operation of low water cut-out control Check overall condition of unit Record and log all operating parameters (including pressures and temperatures) Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Fireside Cleaning All work must be performed in accordance with Johnson Controls safety policies (gaskets not included) Check with appropriate customer representative for operational deficiencies Remove access panels Brush fireside surfaces Reinstall access panels Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Builtup Unit, Supply -Return Fan, 10-40HP Comprehensive Check with appropriate customer representative for operational deficiencies Check operation of control system and dampers Check safeties Check sheaves and pulleys for wear and alignment Check step controller (as applicable) Check and tighten bolts, set screws and collars Check supply and control air pressures Check thermal cutout on electric heaters (as applicable) Clean area around equipment Clean starter and cabinet Check and tighten electrical connections Inspect fan wheel and shaft for wear Log operating conditions system stabilizer Lube fan shaft and motor bearings Motor lead megohm test Test high static pressure Check belt guard Test low static pressure Test low temperature safety devices Check belts and adjust tension Perform Annual Comprehensive maintenance tasks in addition to inspection and testing procedures Check condition of contacts Check contactors for free and smooth operation Check damper wear, security and linkage Check fan blades Check fan and motor bearings Complete any required maintenance checklists, report observations to appropriate customer representative Filters, Standard Check with appropriate customer representative for operational deficiencies Pleated Replace air filters per agreement Turn equipment off Remove dirty filters Install new filters Turn equipment on Dispose of dirty filter appropriately © 2026 Johnson Controls Johnson 40 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 58 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Complete any required maintenance checklists, report observations to appropriate customer representative Operational Check with appropriate customer representative for operational deficiencies Check sheaves and pulleys for wear and alignment Check supply and control air pressures Clean area around equipment Check and tighten electrical connections Inspect fan wheel and shaft for wear Test high static pressure Check belt guard Test low static pressure Test low temperature safety devices Check belts and adjust tension Check condition of contacts Check contactors for free and smooth operation Check fan blades Check fan and motor bearings Complete any required maintenance checklists, report observations to appropriate customer representative Chiller, Air Cooled, Scroll, 10-40 Tons Condenser Coil All work must be performed in accordance with Johnson Controls safety policies Cleaning Check with appropriate customer representative for operational deficiencies Spray coil(s) with chemical solution Rinse coil(s) thoroughly with water Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Operational All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Review control panel for proper operation and recorded fault histories Check for proper chilled water flow Check system pressures and temperatures Check refrigerant charge (sight glass) Check for proper capacity control operation Check for proper crank case heater operation (if applicable) Check for visual signs of refrigerant/oil leak(s) Check for unusual noise and vibration Check for proper condenser fan operation For YK, YMC2, YZ, YD, YVAA, YMAA, and YS - Review the Proactive Parts Replacement Tool for components that may be in need of or recommended for proactive replacement. Check overall condition of unit Record and log all operating parameters Document tasks performed during visit and report any observations to appropriate customer representative Comprehensive All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Review control panel for proper operation and recorded fault histories Check for visual signs of refrigerant/oil leak(s) Conduct refrigerant leak check Check for proper crank case heater operation (if applicable) Perform lock -out and tag -out procedure /' © 2026 Johnson Controls Johnson i 0 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 59 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Inspect condenser fan and compressor contactors for wear Check and tighten electrical connections Perform preventative procedures to flow proving devices Check for unusual noise and vibration For YK, YMC2, YZ, YD, YVAA, YMAA, and YS - Review the Proactive Parts Replacement Tool for components that may be in need of or recommended for proactive replacement. Check overall condition of unit Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Computer Room Unit, with Water Cooled Condenser, <5 Tons Standard Filter Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Turn equipment off Remove dirty filters Install new filters Turn equipment on Dispose of dirty filter appropriately Document tasks performed during visit and report any observations to appropriate customer representative Operational All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Review control panel for proper operation and recorded fault histories Check for proper humidifier operation Check humidifier pan for signs of debris Check water make-up valve for leaks Check blower motor operation Check condition of pulley and belts Check dry cooler fan motors and blades (if applicable) Check the dry cooler coil for debris (if applicable) Visually check for glycol leaks (if applicable) Check condition of evaporator coil Check condition of filters Check condensate drain Check for visual signs of refrigerant/oil leak(s) Visually inspect electrical components for signs of over heating Check for unusual noise and vibration Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative Comprehensive All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Check for proper humidifier operation Check humidifier pan for signs of debris Clean humidifier pan (if applicable) Replace humidifier canister or quartz bulbs (customer provided) Conduct refrigerant leak check Lubricate blower and motor bearings Check and tighten electrical connections Check contactor(s) Check operating controls Check water make-up valve for leaks © 2026 Johnson Controls Johnson 00 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 60 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Check blower motor operation Check condition and alignment of pulley and belts Check condition of evaporator coil Check condition of dry cooler coil (applicable) Check condition of filters Clean condensate pan and clear drain line Check operation of reheat function Visually check for glycol leaks (if applicable) Check for unusual noise and vibration Check overall condition of unit Record and log all operating parameters Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Controls, Building Automation System, Non -Connected System Non -Standard Service All work must be performed in accordance with Johnson Controls safety policies Delivery Fee Cooling Tower, Evaporative Condenser, <300 Tons Vibration Analysis (Fan) All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Record equipment specific information for reference Install pads and labels (if applicable) Install sensors in proper location. Start equipment and run at normal operating conditions. Record readings and remove sensors. Submit readings for report generation and deliver to customer with recommendations. Document tasks performed during visit and report any observations to appropriate customer representative Comprehensive All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Check condition of sump and basin Check for proper operation of make up water controller and adjust as needed Disassemble and clean sump level sensor (if applicable) Check for proper condenser water temperature control (if applicable) Check operation of bypass valve (if applicable) Check for spray nozzle blockage Check fan mechanical drive system and lubricate per manufacturer's recommendation Check belt(s) (if applicable) Check and tighten electrical connections Check operation of basin heater (if applicable) Check tower sump screens Check for proper sump pump operation Check for unusual noise and vibration Check overall condition of unit Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative © 2026 Johnson Controls Johnson 000 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 61 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Operational All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Check condition of sump and basin Check for proper operation of make up water controller Check for proper condenser water temperature control (if applicable) Check operation of bypass valve (if applicable) Check condition of heat transfer section Check for spray nozzle blockage Check fan mechanical drive system Check belt(s) (if applicable) Check operation of basin heater (if applicable) Check for proper sump pump operation Check for unusual noise and vibration Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative Cooling Tower, Spray Distribution, <300 Tons Vibration Analysis (Fan) All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Record equipment specific information for reference Install pads and labels (if applicable) Install sensors in proper location. Start equipment and run at normal operating conditions. Record readings and remove sensors. Submit readings for report generation and deliver to customer with recommendations. Document tasks performed during visit and report any observations to appropriate customer representative Comprehensive All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Check condition of sump and basin Check for proper operation of make up water controller and adjust as needed Disassemble and clean sump level sensor (if applicable) Check for proper condenser water temperature control (if applicable) Check operation of bypass valve (if applicable) Check condition of tower fill Check for spray nozzle blockage Check fan mechanical drive system and lubricate per manufacturer's recommendation Check belt(s) (if applicable) Check and tighten electrical connections Check operation of basin heater (if applicable) Check tower sump screens Check for unusual noise and vibration Check overall condition of unit Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Operational All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Check condition of sump and basin Check for proper operation of make up water controller Check for proper condenser water temperature control (if applicable) 000 © 2026 Johnson Controls Johnson Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 62 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Check operation of bypass valve (if applicable) Check condition of tower fill Check for spray nozzle blockage Check fan mechanical drive system Check belt(s) (if applicable) Check operation of basin heater (if applicable) Check for unusual noise and vibration Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative Tower Cleaning All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Drain tower and basin Remove soot and debris Clean basin Fill tower and basin Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Cooling Tower, Variable Frequency Drive (VFD), 15-30 HP Comprehensive All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Check and tighten electrical connections Check for heat damage Review event log (if applicable) Ramp drive up and down, and check for proper operation (if possible) Check condition of air filter and clean or replace as needed Verify proper operation of cooling fans and clean as needed Check for unusual noise or vibration Check overall condition of unit Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Operational All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Check drive for proper operation Review event log (if applicable) Check for unusual noise and vibration Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative Expansion Tank Operational Check with appropriate customer representative for operational deficiencies Check for leaks Check for proper air cushion Clean area around equipment Complete any required maintenance checklists, report observations to appropriate customer representative © 2026 Johnson Controls Johnson 00 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 63 of 98 Planned Service Proposal "I-rY OF SANTA CLARITA CITY HALL Fan, Exhaust Fan, Ceiling Mounted, 0 - 5HP Belt Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Perform belt change procedures Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Operational Check with appropriate customer representative for operational deficiencies Check rain guard Check and tighten electrical connections Clean area around equipment Inspect starter Lubricate as required Motor operating amps Check belt guard Check belt(s) (if applicable) Check drive condition Check electrical contacts Check fan blades Check for proper rotation Complete any required maintenance checklists, report observations to appropriate customer representative Fan, Exhaust Fan, Roof Mounted, 0-5 HP Belt Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Perform belt change procedures Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Operational Check with appropriate customer representative for operational deficiencies Check rain guard Check and tighten electrical connections Clean area around equipment Inspect starter Lubricate as required Motor operating amps Check belt guard Check belt(s) (if applicable) Check drive condition Check electrical contacts Check fan blades Check for proper rotation Complete any required maintenance checklists, report observations to appropriate customer representative Fan, Exhaust Fan, Roof Mounted, >15 HP Operational Check with appropriate customer representative for operational deficiencies Check rain guard 010 © 2026 Johnson Controls Johnson Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 64 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Check and tighten electrical connections Clean area around equipment Inspect starter Lubricate as required Motor operating amps Check belt guard Check belt(s) (if applicable) Check drive condition Check electrical contacts Check fan blades Check for proper rotation Complete any required maintenance checklists, report observations to appropriate customer representative Furnace, All Comprehensive Check with appropriate customer representative for operational deficiencies Cycle thermostat and check for proper operation Check fan operation Check for unusual noise or vibration Check condition and operation of electric heat coil (if applicable) Check condition of heat exchanger and flue (if applicable) Check operation of gas power vents (if applicable) Inspect, clean and test operation of gas train valves, pilot/igniter assemblies and burner (if applicable) Check gas piping for leaks (if applicable) Clean area around equipment Complete any required maintenance checklists, report observations to appropriate customer representative Operational Check with appropriate customer representative for operational deficiencies Cycle thermostat and check for proper operation Check fan operation Check for unusual noise or vibration Clean area around equipment Complete any required maintenance checklists, report observations to appropriate customer representative Heat Pump, Air Cooled, 0-5 Tons Belt Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Perform belt change procedures Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Standard Filter Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Turn equipment off Remove dirty filters Install new filters Turn equipment on Dispose of dirty filter appropriately Document tasks performed during visit and report any observations to © 2026 Johnson Controls Johnson 00 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 65 of 98 Planned Service Proposal r"TY OF SANTA CLARITA CITY HALL appropriate customer representative Operational (Mid All work must be performed in accordance with Johnson Controls safety policies Season) Check with appropriate customer representative for operational deficiencies Review control panel for proper operation and recorded fault histories (if applicable) Check condition of condenser coil Check condition of evaporator coil Check condenser fan motors and blades Check blower motor operation Check condition of pulley and belts Check heating operation (when applicable) Check condition of filters Check condensate drain Check for visual signs of refrigerant/oil leak(s) Visually inspect electrical connections Check for unusual noise and vibration Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative Condenser Coil All work must be performed in accordance with Johnson Controls safety policies Cleaning Check with appropriate customer representative for operational deficiencies Spray coil(s) with chemical solution Rinse coil(s) thoroughly with water Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Cooling Comprehensive All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Review control panel for proper operation and recorded fault histories (if applicable) Check and tighten electrical connections Check contactor(s) Check condition of condenser coil Check condition of evaporator coil Check condenser fan motors and blades Check blower motor operation Lubricate blower and motor bearings Check condition and alignment of pulley and belts Check condition of filters Clean condensate pan and clear drain line Check for visual signs of refrigerant/oil leak(s) Check for unusual noise and vibration Record and log all operating parameters Check overall condition of unit Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Heating Comprehensive All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Review control panel for proper operation and recorded fault histories (if applicable) Check operation of heating mode Check and tighten electrical connections Check contactor(s) © 2026 Johnson Controls Johnson 40 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 66 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Check condition of condenser coil Check condition of evaporator coil Check condenser fan motors and blades Check blower motor operation Lubricate blower and motor bearings Check condition and alignment of pulley and belts Check condition of filters Check for visual signs of refrigerant/oil leak(s) Check for unusual noise and vibration Record and log all operating parameters Check overall condition of unit Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Heat Pump, Air Cooled, 5.5-10 Tons Standard Filter Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Turn equipment off Remove dirty filters Install new filters Turn equipment on Dispose of dirty filter appropriately Document tasks performed during visit and report any observations to appropriate customer representative Operational (Mid All work must be performed in accordance with Johnson Controls safety policies Season) Check with appropriate customer representative for operational deficiencies Review control panel for proper operation and recorded fault histories (if applicable) Check condition of condenser coil Check condition of evaporator coil Check condenser fan motors and blades Check blower motor operation Check condition of pulley and belts Check heating operation (when applicable) Check condition of filters Check condensate drain Check for visual signs of refrigerant/oil leak(s) Visually inspect electrical connections Check for unusual noise and vibration Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative Condenser Coil All work must be performed in accordance with Johnson Controls safety policies Cleaning Check with appropriate customer representative for operational deficiencies Spray coil(s) with chemical solution Rinse coil(s) thoroughly with water Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Cooling Comprehensive All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Review control panel for proper operation and recorded fault histories (if 000 © 2026 Johnson Controls Johnson Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 67 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL applicable) Check and tighten electrical connections Check contactor(s) Check condition of condenser coil Check condition of evaporator coil Check condenser fan motors and blades Check blower motor operation Lubricate blower and motor bearings Check condition and alignment of pulley and belts Check condition of filters Clean condensate pan and clear drain line Check for visual signs of refrigerant/oil leak(s) Check for unusual noise and vibration Record and log all operating parameters Check overall condition of unit Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Heating Comprehensive All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Review control panel for proper operation and recorded fault histories (if applicable) Check operation of heating mode Check and tighten electrical connections Check contactor(s) Check condition of condenser coil Check condition of evaporator coil Check condenser fan motors and blades Check blower motor operation Lubricate blower and motor bearings Check condition and alignment of pulley and belts Check condition of filters Check for visual signs of refrigerant/oil leak(s) Check for unusual noise and vibration Record and log all operating parameters Check overall condition of unit Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Heat Pump, Water Cooled, 0-5 Tons Belt Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Perform belt change procedures Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Standard Filter Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Turn equipment off Remove dirty filters Install new filters Turn equipment on Dispose of dirty filter appropriately © 2026 Johnson Controls Johnson 40 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 68 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Document tasks performed during visit and report any observations to appropriate customer representative Operational (Mid All work must be performed in accordance with Johnson Controls safety policies Season) Check with appropriate customer representative for operational deficiencies Review control panel for proper operation and recorded fault histories (if applicable) Check condition of evaporator coil Check for proper condenser water flow Check blower motor operation Check condition of pulley and belts Check heating operation (when applicable) Check condition of filters Check condensate drain Check for visual signs of refrigerant/oil leak(s) Visually inspect electrical connections Check for unusual noise and vibration Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative Cooling Comprehensive All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Review control panel for proper operation and recorded fault histories (if applicable) Check and tighten electrical connections Check contactor(s) Check condition of evaporator coil Check for proper condenser water flow Check blower motor operation Lubricate blower and motor bearings Check condition and alignment of pulley and belts Check condition of filters Clean condensate pan and clear drain line Check for visual signs of refrigerant/oil leak(s) Check for unusual noise and vibration Record and log all operating parameters Check overall condition of unit Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Heat Pump, Water Cooled, >15 Tons Belt Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Perform belt change procedures Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Standard Filter Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Turn equipment off Remove dirty filters Install new filters Turn equipment on /' © 2026 Johnson Controls Johnson i 0 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 69 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Dispose of dirty filter appropriately Document tasks performed during visit and report any observations to appropriate customer representative Operational (Mid All work must be performed in accordance with Johnson Controls safety policies Season) Check with appropriate customer representative for operational deficiencies Review control panel for proper operation and recorded fault histories (if applicable) Check condition of evaporator coil Check for proper condenser water flow Check blower motor operation Check condition of pulley and belts Check heating operation (when applicable) Check condition of filters Check condensate drain Check for visual signs of refrigerant/oil leak(s) Visually inspect electrical connections Check for unusual noise and vibration Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative Cooling Comprehensive All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Review control panel for proper operation and recorded fault histories (if applicable) Check and tighten electrical connections Check contactor(s) Check condition of evaporator coil Check for proper condenser water flow Check blower motor operation Lubricate blower and motor bearings Check condition and alignment of pulley and belts Check condition of filters Clean condensate pan and clear drain line Check for visual signs of refrigerant/oil leak(s) Check for unusual noise and vibration Record and log all operating parameters Check overall condition of unit Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Heating Comprehensive All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Review control panel for proper operation and recorded fault histories (if applicable) Check operation of heating mode Check for proper condenser water flow Check and tighten electrical connections Check contactor(s) Check condition of evaporator coil Check blower motor operation Lubricate blower and motor bearings Check condition and alignment of pulley and belts Check condition of filters Check for visual signs of refrigerant/oil leak(s) Check for unusual noise and vibration © 2026 Johnson Controls Johnson 000 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 70 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Record and log all operating parameters Check overall condition of unit Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Heater, Gas Infrared -All Comprehensive Check with appropriate customer representative for operational deficiencies Check operating and safety controls, adjust as needed Clean pilot assembly, including electrode spark gap, orifice, and ignition wire Check and tighten electrical connections Inspect for leaks and report Check alignment of thermo-sensor bulb Check and clean pilot sight glass Clean area around equipment Complete any required maintenance checklists, report observations to appropriate customer representative Operational Check with appropriate customer representative for operational deficiencies Check operating and safety controls, adjust as needed Clean pilot assembly, including electrode spark gap, orifice, and ignition wire Check and tighten electrical connections Inspect for leaks and report Check alignment of thermo-sensor bulb Check and clean pilot sight glass Clean area around equipment Complete any required maintenance checklists, report observations to appropriate customer representative Humidifier All Comprehensive Check with appropriate customer representative for operational deficiencies Check control valve(s) Check manifold Check strainer Check trap Clean area around equipment Complete any required maintenance checklists, report observations to appropriate customer representative Operational Check with appropriate customer representative for operational deficiencies Check control valve(s) Check manifold Check strainer Check trap Clean area around equipment Complete any required maintenance checklists, report observations to appropriate customer representative Packaged, Commercial, Self Contained, <40 Tons Belt Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies 0011 © 2026 Johnson Controls Johnson Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 71 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Perform belt change procedures Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Return Air Filter Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Turn equipment off Remove dirty filters Install new filters Turn equipment on Dispose of dirty filter appropriately Document tasks performed during visit and report any observations to appropriate customer representative Evaporator Coil All work must be performed in accordance with Johnson Controls safety policies Cleaning Check with appropriate customer representative for operational deficiencies Clean condensate drain (if necessary) Spray coil(s) with chemical solution Rinse coil(s) thoroughly with water Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Operational All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Check for proper condenser water flow Check condition of evaporator coil Check blower motor operation Check condition of pulley and belts Check condition of filters Check condensate drain Check for visual signs of refrigerant/oil leak(s) Visually inspect electrical connections Check for unusual noise and vibration Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative Comprehensive All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Check and tighten electrical connections Check VFD operation and clean cooling fan intake (if applicable) Check contactor(s) Check for proper condenser water flow Check condition of evaporator coil Check blower motor operation Lubricate blower and motor bearings Check condition and alignment of pulley and belts Check condition of filters Clean condensate pan and clear drain line Check for visual signs of refrigerant/oil leak(s) Check for unusual noise and vibration Record and log all operating parameters Check overall condition of unit Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative © 2026 Johnson Controls Johnson 000 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 72 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Pump, Chilled Water, 0-10 HP Vibration Analysis All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Record equipment specific information for reference Install pads and labels (if applicable) Install sensors in proper location. Start equipment and run at normal operating conditions. Record readings and remove sensors. Submit readings for report generation and deliver to customer with recommendations. Document tasks performed during visit and report any observations to appropriate customer representative Comprehensive All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Check for leaks Check coupling Lubricate pump and motor bearing(s) per manufacturer's recommendation Record and log all operating parameters Check for unusual noise and vibration Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative Operational All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Check for leaks Check pressures Visually inspect coupling Check for unusual noise and vibration Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative Pump, Condenser, 11-50 HP Vibration Analysis All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Record equipment specific information for reference Install pads and labels (if applicable) Install sensors in proper location. Start equipment and run at normal operating conditions. Record readings and remove sensors. Submit readings for report generation and deliver to customer with recommendations. Document tasks performed during visit and report any observations to appropriate customer representative Comprehensive All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Check for leaks Check coupling Lubricate pump and motor bearing(s) per manufacturer's recommendation 000 © 2026 Johnson Controls Johnson Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 73 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Record and log all operating parameters Check for unusual noise and vibration Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative Operational All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Check for leaks Check pressures Visually inspect coupling Check for unusual noise and vibration Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative Pump, Hot Water, 0-10 HP Vibration Analysis All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Record equipment specific information for reference Install pads and labels (if applicable) Install sensors in proper location. Start equipment and run at normal operating conditions. Record readings and remove sensors. Submit readings for report generation and deliver to customer with recommendations. Document tasks performed during visit and report any observations to appropriate customer representative Comprehensive All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Check for leaks Check coupling Lubricate pump and motor bearing(s) per manufacturer's recommendation Record and log all operating parameters Check for unusual noise and vibration Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative Operational All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Check for leaks Check pressures Visually inspect coupling Check for unusual noise and vibration Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative Pump, Variable Frequency Drive (VFD), <15 HP Comprehensive All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies 000 © 2026 Johnson Controls Johnson Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 74 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Check and tighten electrical connections Check for heat damage Review event log (if applicable) Ramp drive up and down, and check for proper operation (if possible) Check condition of air filter and clean or replace as needed Verify proper operation of cooling fans and clean as needed Check for unusual noise or vibration Check overall condition of unit Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Operational All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Check drive for proper operation Review event log (if applicable) Check for unusual noise and vibration Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative Roof Top Unit (RTU), Cooling Only, with Economizer, 25.5-60 Tons Belt Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Perform belt change procedures Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Standard Filter Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Turn equipment off Remove dirty filters Install new filters Turn equipment on Dispose of dirty filter appropriately Document tasks performed during visit and report any observations to appropriate customer representative Condenser Coil All work must be performed in accordance with Johnson Controls safety policies Cleaning Check with appropriate customer representative for operational deficiencies Rinse coil(s) thoroughly with water Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Cooling Comprehensive All work must be performed in accordance with Johnson Controls safety policies (with Economizer) Check with appropriate customer representative for operational deficiencies Review control panel for proper operation and recorded fault histories (if applicable) Check and tighten electrical connections Check VFD operation and clean cooling fan intake (if applicable) Check contactor(s) Check condition of condenser coil Check condition of evaporator coil © 2026 Johnson Controls Johnson 000 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 75 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Check condenser fan motors and blades Check blower motor operation Lubricate blower and motor bearings Check economizer operation Lubricate and adjust economizer damper linkages Verify proper operation of exhaust motor (if applicable) Check condition and alignment of pulley and belts Check condition of filters Clean condensate pan and clear drain line Check for visual signs of refrigerant/oil leak(s) Check for unusual noise and vibration Record and log all operating parameters Check overall condition of unit Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Operational (Mid All work must be performed in accordance with Johnson Controls safety policies Season - Cooling Only Check with appropriate customer representative for operational deficiencies with Economizer) Review control panel for proper operation and recorded fault histories (if applicable) Check condition of condenser coil Check condition of evaporator coil Check condenser fan motors and blades Check blower motor operation Check economizer operation Check condition of pulley and belts Check condition of filters Check condensate drain Check for visual signs of refrigerant/oil leak(s) Visually inspect electrical connections Check for unusual noise and vibration Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative Roof Top Unit (RTU), Cooling Only, with Economizer, <8 Tons Belt Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Perform belt change procedures Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Standard Filter Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Turn equipment off Remove dirty filters Install new filters Turn equipment on Dispose of dirty filter appropriately Document tasks performed during visit and report any observations to appropriate customer representative Cooling Comprehensive All work must be performed in accordance with Johnson Controls safety policies (with Economizer) Check with appropriate customer representative for operational deficiencies 000 © 2026 Johnson Controls Johnson Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 76 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Review control panel for proper operation and recorded fault histories (if applicable) Check and tighten electrical connections Check VFD operation and clean cooling fan intake (if applicable) Check contactor(s) Check condition of condenser coil Check condition of evaporator coil Check condenser fan motors and blades Check blower motor operation Lubricate blower and motor bearings Check economizer operation Lubricate and adjust economizer damper linkages Verify proper operation of exhaust motor (if applicable) Check condition and alignment of pulley and belts Check condition of filters Clean condensate pan and clear drain line Check for visual signs of refrigerant/oil leak(s) Check for unusual noise and vibration Record and log all operating parameters Check overall condition of unit Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Operational (Mid All work must be performed in accordance with Johnson Controls safety policies Season - Cooling Only Check with appropriate customer representative for operational deficiencies with Economizer) Review control panel for proper operation and recorded fault histories (if applicable) Check condition of condenser coil Check condition of evaporator coil Check condenser fan motors and blades Check blower motor operation Check economizer operation Check condition of pulley and belts Check condition of filters Check condensate drain Check for visual signs of refrigerant/oil leak(s) Visually inspect electrical connections Check for unusual noise and vibration Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative Roof Top Unit (RTU), Cooling/Electric Heating, with Economizer, <8 Tons Standard Filter Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Turn equipment off Remove dirty filters Install new filters Turn equipment on Dispose of dirty filter appropriately Document tasks performed during visit and report any observations to appropriate customer representative Condenser Coil All work must be performed in accordance with Johnson Controls safety policies Cleaning Check with appropriate customer representative for operational deficiencies 000 © 2026 Johnson Controls Johnson Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 77 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Rinse coil(s) thoroughly with water Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Cooling Comprehensive All work must be performed in accordance with Johnson Controls safety policies (with Economizer) Check with appropriate customer representative for operational deficiencies Review control panel for proper operation and recorded fault histories (if applicable) Check and tighten electrical connections Check VFD operation and clean cooling fan intake (if applicable) Check contactor(s) Check condition of condenser coil Check condition of evaporator coil Check condenser fan motors and blades Check blower motor operation Lubricate blower and motor bearings Check economizer operation Lubricate and adjust economizer damper linkages Verify proper operation of exhaust motor (if applicable) Check condition and alignment of pulley and belts Check condition of filters Clean condensate pan and clear drain line Check for visual signs of refrigerant/oil leak(s) Check for unusual noise and vibration Record and log all operating parameters Check overall condition of unit Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Operational (Mid All work must be performed in accordance with Johnson Controls safety policies Season- Check with appropriate customer representative for operational deficiencies Cooling/Heating with Review control panel for proper operation and recorded fault histories (if Economizer) applicable) Check condition of condenser coil Check condition of evaporator coil Check condenser fan motors and blades Check blower motor operation Check economizer operation Check heating operation (when applicable) Check condition of pulley and belts Check condition of filters Check condensate drain Check for visual signs of refrigerant/oil leak(s) Visually inspect electrical connections Check for unusual noise and vibration Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative Roof Top Unit (RTU), Cooling/Gas Heating, with Economizer, 15.5-25 Tons Belt Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Perform belt change procedures Remove and dispose any debris from any maintenance activity © 2026 Johnson Controls Johnson 01k; Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 78 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Document tasks performed during visit and report any observations to appropriate customer representative Standard Filter Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Turn equipment off Remove dirty filters Install new filters Turn equipment on Dispose of dirty filter appropriately Document tasks performed during visit and report any observations to appropriate customer representative Condenser Coil All work must be performed in accordance with Johnson Controls safety policies Cleaning Check with appropriate customer representative for operational deficiencies Rinse coil(s) thoroughly with water Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Cooling Comprehensive All work must be performed in accordance with Johnson Controls safety policies (with Economizer) Check with appropriate customer representative for operational deficiencies Review control panel for proper operation and recorded fault histories (if applicable) Check and tighten electrical connections Check VFD operation and clean cooling fan intake (if applicable) Check contactor(s) Check condition of condenser coil Check condition of evaporator coil Check condenser fan motors and blades Check blower motor operation Lubricate blower and motor bearings Check economizer operation Lubricate and adjust economizer damper linkages Verify proper operation of exhaust motor (if applicable) Check condition and alignment of pulley and belts Check condition of filters Clean condensate pan and clear drain line Check for visual signs of refrigerant/oil leak(s) Check for unusual noise and vibration Record and log all operating parameters Check overall condition of unit Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Gas Heating All work must be performed in accordance with Johnson Controls safety policies Comprehensive (with Check with appropriate customer representative for operational deficiencies Economizer) Check and tighten electrical connections Check contactor(s) Check combustion blower motor operation Check igniter and pilot operation Check condition of heat exchanger Check condition of burners and clean as required in place Check for proper venting Check for leaks on gas line (within cabinet) Check condition of pulley and belts Check economizer operation © 2026 Johnson Controls Johnson 000 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 79 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Lubricate and adjust economizer damper linkages Verify proper operation of exhaust motor (if applicable) Check condition of filters Check for unusual noise and vibration Check overall condition of unit Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Operational (Mid All work must be performed in accordance with Johnson Controls safety policies Season- Check with appropriate customer representative for operational deficiencies Cooling/Heating with Review control panel for proper operation and recorded fault histories (if Economizer) applicable) Check condition of condenser coil Check condition of evaporator coil Check condenser fan motors and blades Check blower motor operation Check economizer operation Check heating operation (when applicable) Check condition of pulley and belts Check condition of filters Check condensate drain Check for visual signs of refrigerant/oil leak(s) Visually inspect electrical connections Check for unusual noise and vibration Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative Roof Top Unit (RTU), Cooling/Gas Heating, with Economizer, 8-15 Tons Premium Pleated Filter All work must be performed in accordance with Johnson Controls safety policies Change Check with appropriate customer representative for operational deficiencies Turn equipment off Remove dirty filters Install new filters Turn equipment on Dispose of dirty filter appropriately Document tasks performed during visit and report any observations to appropriate customer representative Belt Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Perform belt change procedures Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Condenser Coil All work must be performed in accordance with Johnson Controls safety policies Cleaning Check with appropriate customer representative for operational deficiencies Rinse coil(s) thoroughly with water Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Cooling Comprehensive All work must be performed in accordance with Johnson Controls safety policies /' © 2026 Johnson Controls Johnson J�0 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 80 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL (with Economizer) Check with appropriate customer representative for operational deficiencies Review control panel for proper operation and recorded fault histories (if applicable) Check and tighten electrical connections Check VFD operation and clean cooling fan intake (if applicable) Check contactor(s) Check condition of condenser coil Check condition of evaporator coil Check condenser fan motors and blades Check blower motor operation Lubricate blower and motor bearings Check economizer operation Lubricate and adjust economizer damper linkages Verify proper operation of exhaust motor (if applicable) Check condition and alignment of pulley and belts Check condition of filters Clean condensate pan and clear drain line Check for visual signs of refrigerant/oil leak(s) Check for unusual noise and vibration Record and log all operating parameters Check overall condition of unit Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Gas Heating All work must be performed in accordance with Johnson Controls safety policies Comprehensive (with Check with appropriate customer representative for operational deficiencies Economizer) Check and tighten electrical connections Check contactor(s) Check combustion blower motor operation Check igniter and pilot operation Check condition of heat exchanger Check condition of burners and clean as required in place Check for proper venting Check for leaks on gas line (within cabinet) Check condition of pulley and belts Check economizer operation Lubricate and adjust economizer damper linkages Verify proper operation of exhaust motor (if applicable) Check condition of filters Check for unusual noise and vibration Check overall condition of unit Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Operational (Mid All work must be performed in accordance with Johnson Controls safety policies Season- Check with appropriate customer representative for operational deficiencies Cooling/Heating with Review control panel for proper operation and recorded fault histories (if Economizer) applicable) Check condition of condenser coil Check condition of evaporator coil Check condenser fan motors and blades Check blower motor operation Check economizer operation Check heating operation (when applicable) Check condition of pulley and belts Check condition of filters Check condensate drain © 2026 Johnson Controls Johnson 40 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 81 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Check for visual signs of refrigerant/oil leak(s) Visually inspect electrical connections Check for unusual noise and vibration Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative Roof Top Unit (RTU), Cooling/Gas Heating, with Economizer, <8 Tons Return Air Filter Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Turn equipment off Remove dirty filters Install new filters Turn equipment on Dispose of dirty filter appropriately Document tasks performed during visit and report any observations to appropriate customer representative Condenser Coil All work must be performed in accordance with Johnson Controls safety policies Cleaning Check with appropriate customer representative for operational deficiencies Rinse coil(s) thoroughly with water Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Cooling Comprehensive All work must be performed in accordance with Johnson Controls safety policies (with Economizer) Check with appropriate customer representative for operational deficiencies Review control panel for proper operation and recorded fault histories (if applicable) Check and tighten electrical connections Check VFD operation and clean cooling fan intake (if applicable) Check contactor(s) Check condition of condenser coil Check condition of evaporator coil Check condenser fan motors and blades Check blower motor operation Lubricate blower and motor bearings Check economizer operation Lubricate and adjust economizer damper linkages Verify proper operation of exhaust motor (if applicable) Check condition and alignment of pulley and belts Check condition of filters Clean condensate pan and clear drain line Check for visual signs of refrigerant/oil leak(s) Check for unusual noise and vibration Record and log all operating parameters Check overall condition of unit Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Gas Heating All work must be performed in accordance with Johnson Controls safety policies Comprehensive (with Check with appropriate customer representative for operational deficiencies Economizer) Check and tighten electrical connections Check contactor(s) Check combustion blower motor operation /' © 2026 Johnson Controls Johnson J� 0 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 82 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Check igniter and pilot operation Check condition of heat exchanger Check condition of burners and clean as required in place Check for proper venting Check for leaks on gas line (within cabinet) Check condition of pulley and belts Check economizer operation Lubricate and adjust economizer damper linkages Verify proper operation of exhaust motor (if applicable) Check condition of filters Check for unusual noise and vibration Check overall condition of unit Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Operational (Mid All work must be performed in accordance with Johnson Controls safety policies Season- Check with appropriate customer representative for operational deficiencies Cooling/Heating with Review control panel for proper operation and recorded fault histories (if Economizer) applicable) Check condition of condenser coil Check condition of evaporator coil Check condenser fan motors and blades Check blower motor operation Check economizer operation Check heating operation (when applicable) Check condition of pulley and belts Check condition of filters Check condensate drain Check for visual signs of refrigerant/oil leak(s) Visually inspect electrical connections Check for unusual noise and vibration Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative Roof Top Unit (RTU), Cooling/Gas Heating, without Economizer, 25.5-60 Tons Belt Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Perform belt change procedures Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Standard Filter Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Turn equipment off Remove dirty filters Install new filters Turn equipment on Dispose of dirty filter appropriately Document tasks performed during visit and report any observations to appropriate customer representative Condenser Coil All work must be performed in accordance with Johnson Controls safety policies /' © 2026 Johnson Controls Johnson J� 0 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 83 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Cleaning Check with appropriate customer representative for operational deficiencies Rinse coil(s) thoroughly with water Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Cooling Comprehensive All work must be performed in accordance with Johnson Controls safety policies (without Economizer) Check with appropriate customer representative for operational deficiencies Review control panel for proper operation and recorded fault histories (if applicable) Check and tighten electrical connections Check VFD operation and clean cooling fan intake (if applicable) Check contactor(s) Check condition of condenser coil Check condition of evaporator coil Check condenser fan motors and blades Check blower motor operation Lubricate blower and motor bearings Check condition and alignment of pulley and belts Check condition of filters Clean condensate pan and clear drain line Check for visual signs of refrigerant/oil leak(s) Check for unusual noise and vibration Record and log all operating parameters Check overall condition of unit Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Gas Heating All work must be performed in accordance with Johnson Controls safety policies Comprehensive (without Check with appropriate customer representative for operational deficiencies Economizer) Check and tighten electrical connections Check contactor(s) Check combustion blower motor operation Check igniter and pilot operation Check condition of heat exchanger Check condition of burners and clean as required in place Check for proper venting Check for leaks on gas line (within cabinet) Check condition of pulley and belts Check condition of filters Check for unusual noise and vibration Check overall condition of unit Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Operational (Mid All work must be performed in accordance with Johnson Controls safety policies Season- Check with appropriate customer representative for operational deficiencies Cooling/Heating without Review control panel for proper operation and recorded fault histories (if Economizer) applicable) Check condition of condenser coil Check condition of evaporator coil Check condenser fan motors and blades Check blower motor operation Check heating operation (when applicable) Check condition of pulley and belts Check condition of filters © 2026 Johnson Controls Johnson 40 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 84 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Check condensate drain Check for visual signs of refrigerant/oil leak(s) Visually inspect electrical connections Check for unusual noise and vibration Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative Roof Top Unit (RTU), Cooling/HW-Steam Heating, without Economizer, 8-15 Tons Belt Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Perform belt change procedures Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Standard Filter Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Turn equipment off Remove dirty filters Install new filters Turn equipment on Dispose of dirty filter appropriately Document tasks performed during visit and report any observations to appropriate customer representative Condenser Coil All work must be performed in accordance with Johnson Controls safety policies Cleaning Check with appropriate customer representative for operational deficiencies Rinse coil(s) thoroughly with water Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Cooling Comprehensive All work must be performed in accordance with Johnson Controls safety policies (without Economizer) Check with appropriate customer representative for operational deficiencies Review control panel for proper operation and recorded fault histories (if applicable) Check and tighten electrical connections Check VFD operation and clean cooling fan intake (if applicable) Check contactor(s) Check condition of condenser coil Check condition of evaporator coil Check condenser fan motors and blades Check blower motor operation Lubricate blower and motor bearings Check condition and alignment of pulley and belts Check condition of filters Clean condensate pan and clear drain line Check for visual signs of refrigerant/oil leak(s) Check for unusual noise and vibration Record and log all operating parameters Check overall condition of unit Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative © 2026 Johnson Controls Johnson 00 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 85 of 98 Planned Service Proposal r'Tv )F SANTA CLARITA CITY HALL Heating Comprehensive All work must be performed in accordance with Johnson Controls safety policies (without Economizer) Check with appropriate customer representative for operational deficiencies Check and tighten electrical connections Check contactor(s) Check blower motor operation Check condition of pulley and belts Check for proper operation of steam or hot water valve Check condition of filters Check for unusual noise and vibration Check overall condition of unit Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Operational (Mid All work must be performed in accordance with Johnson Controls safety policies Season- Check with appropriate customer representative for operational deficiencies Cooling/Heating without Review control panel for proper operation and recorded fault histories (if Economizer) applicable) Check condition of condenser coil Check condition of evaporator coil Check condenser fan motors and blades Check blower motor operation Check heating operation (when applicable) Check condition of pulley and belts Check condition of filters Check condensate drain Check for visual signs of refrigerant/oil leak(s) Visually inspect electrical connections Check for unusual noise and vibration Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative Split System, Cooling Only, <7.5 Tons Belt Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Perform belt change procedures Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Return Air Filter Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Turn equipment off Remove dirty filters Install new filters Turn equipment on Dispose of dirty filter appropriately Document tasks performed during visit and report any observations to appropriate customer representative Condenser Coil All work must be performed in accordance with Johnson Controls safety policies Cleaning Check with appropriate customer representative for operational deficiencies Spray coil(s) with chemical solution /' © 2026 Johnson Controls Johnson i 0 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 86 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Rinse coil(s) thoroughly with water Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Cooling Comprehensive All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Check and tighten electrical connections Check contactor(s) Check condition of condenser coil Check condenser fan motors and blades Check blower motor operation Lubricate blower and motor bearings (if applicable) Check condition and alignment of pulley and belts (if applicable) Check condition of filters Clean condensate pan and clear drain line (if readily accessible) Check for visual signs of refrigerant/oil leak(s) Check for unusual noise and vibration Record and log all operating parameters Check overall condition of unit Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Operational (Mid All work must be performed in accordance with Johnson Controls safety policies Season - Cooling Only) Check with appropriate customer representative for operational deficiencies Check condition of condenser coil Check condenser fan motors and blades Check condensing unit electrical connections and contactor(s) Check blower motor operation Check condition of filters Check condition of pulley and belts (if applicable) Check condensate system Check for visual signs of refrigerant/oil leak(s) Check for unusual noise and vibration Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative Split System, Cooling with Electric Heat, <7.5 Tons Return Air Filter Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Turn equipment off Remove dirty filters Install new filters Turn equipment on Dispose of dirty filter appropriately Document tasks performed during visit and report any observations to appropriate customer representative Condenser Coil All work must be performed in accordance with Johnson Controls safety policies Cleaning Check with appropriate customer representative for operational deficiencies Spray coil(s) with chemical solution Rinse coil(s) thoroughly with water Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to ,' © 2026 Johnson Controls Johnson J� 0 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 87 of 98 Planned Service Proposal r"TY OF SANTA CLARITA CITY HALL appropriate customer representative Cooling Comprehensive All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Check and tighten electrical connections Check contactor(s) Check condition of condenser coil Check condenser fan motors and blades Check blower motor operation Lubricate blower and motor bearings (if applicable) Check condition and alignment of pulley and belts (if applicable) Check condition of filters Clean condensate pan and clear drain line (if readily accessible) Check for visual signs of refrigerant/oil leak(s) Check for unusual noise and vibration Record and log all operating parameters Check overall condition of unit Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Operational (Mid All work must be performed in accordance with Johnson Controls safety policies Season- Check with appropriate customer representative for operational deficiencies Cooling/Heating) Check condition of condenser coil Check condenser fan motors and blades Check condensing unit electrical connections and contactor(s) Check blower motor operation Check heating operation (when applicable) Check condition of filters Check condition of pulley and belts (if applicable) Check condensate system Check for visual signs of refrigerant/oil leak(s) Check for unusual noise and vibration Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative Split System, Cooling with Gas Heat, <7.5 Tons Return Air Filter Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Turn equipment off Remove dirty filters Install new filters Turn equipment on Dispose of dirty filter appropriately Document tasks performed during visit and report any observations to appropriate customer representative Gas Heating All work must be performed in accordance with Johnson Controls safety policies Comprehensive Check with appropriate customer representative for operational deficiencies Check and tighten electrical connections Check contactor(s) Check combustion blower motor operation Check igniter and pilot operation Check condition of heat exchanger Check condition of burners and clean as required in place /' © 2026 Johnson Controls Johnson i 0 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 88 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Check for proper venting Check for leaks on gas line (within cabinet) Check condition of pulley and belts (if applicable) Check condition of filters Check for unusual noise and vibration Check overall condition of unit Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Cooling Comprehensive All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Check and tighten electrical connections Check contactor(s) Check condition of condenser coil Check condenser fan motors and blades Check blower motor operation Lubricate blower and motor bearings (if applicable) Check condition and alignment of pulley and belts (if applicable) Check condition of filters Clean condensate pan and clear drain line (if readily accessible) Check for visual signs of refrigerant/oil leak(s) Check for unusual noise and vibration Record and log all operating parameters Check overall condition of unit Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Operational (Mid All work must be performed in accordance with Johnson Controls safety policies Season- Check with appropriate customer representative for operational deficiencies Cooling/Heating) Check condition of condenser coil Check condenser fan motors and blades Check condensing unit electrical connections and contactor(s) Check blower motor operation Check heating operation (when applicable) Check condition of filters Check condition of pulley and belts (if applicable) Check condensate system Check for visual signs of refrigerant/oil leak(s) Check for unusual noise and vibration Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative Terminal Product, Fan Coil Unit (FCU), Horizontal Air Flow, 300-1200 CFM Air Filter Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Turn equipment off Remove dirty filters Install new filters Turn equipment on Dispose of dirty filter appropriately Document tasks performed during visit and report any observations to appropriate customer representative © 2026 Johnson Controls Johnson 40 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 89 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Belt Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Perform belt change procedures Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Comprehensive All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Check for proper fan operation Check condition of coils Check condition of filters Record temperatures Check fan contactor/relay Check and tighten electrical connections Clean condensate pan and clear drain line Check condition of pulley and belts (if applicable) Visually check control valve(s) Lubricate blower and motor bearings (if applicable) Check condition of blower assembly Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Operational All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Check condition of pulley and belts (if applicable) Check condition of coils Check condition of filters Check condensate drain Check for unusual noise and vibration Check unit for proper operation Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative Unit Heater, Electric, <300000 BTU Comprehensive All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Check integrity of unit heater supports Check and tighten electrical connections Measure operating amperage of heater elements Check condition of pulley and belts (if applicable) Cycle thermostat and check for proper operation Check for unusual noise and vibration Check overall condition of unit Remove and dispose any debris from any maintenance activity Document tasks performed during visit and report any observations to appropriate customer representative Operational All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Check integrity of unit heater supports Check condition of pulley and belts (if applicable) Check for proper fan operation Cycle thermostat and check for proper operation ,' © 2026 Johnson Controls Johnson J� 0 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 90 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Check for unusual noise and vibration Check overall condition of unit Document tasks performed during visit and report any observations to appropriate customer representative VAV Box, All Types Comprehensive Check with appropriate customer representative for operational deficiencies Check and tighten electrical connections Check damper and linkage Cycle thermostat and check for proper operation Check for leaks in air supply (if applicable) Clean area around equipment Complete any required maintenance checklists, report observations to appropriate customer representative Operational Check with appropriate customer representative for operational deficiencies Check temperature Check damper and linkage Cycle thermostat and check for proper operation Check for leaks in air supply (if applicable) Check fan operation Clean area around equipment Complete any required maintenance checklists, report observations to appropriate customer representative Variable Refrigerant Flow (VRF), Change -Over Boxes, 4 Port Change -Over Box Operational All work must be performed in accordance with Johnson Controls safety policies Visually inspect for refrigerant leaks Inspect wiring connection integrity Inspect for abnormal sounds of change -over solenoids Variable Refrigerant Flow (VRF), Indoor Unit, Ducted Medium Static Indoor Unit, 0.5 - 4.5 Ton Comprehensive All work must be performed in accordance with Johnson Controls safety policies Check that the fan rotates counterclockwise and inspect the rotating speed Check for unusual noise and vibration Inspect for activation of float switch (if applicable) Inspect for activation of drain -up mechanism if applicable Check condition of air filter and clean or replace as needed Check condition of evaporator coil Inspect for electrical insulation resistance Clean air inlet grille Visually inspect for refrigerant leaks Clean condensate pan and clear drain line Operational All work must be performed in accordance with Johnson Controls safety policies Check that the fan rotates counterclockwise and inspect the rotating speed Check for unusual noise and vibration Inspect for activation of float switch (if applicable) Inspect for activation of drain -up mechanism if applicable 000 © 2026 Johnson Controls Johnson Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 91 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Check condition of air filter and clean or replace as needed Check condition of evaporator coil Inspect for electrical insulation resistance Clean air inlet grille Visually inspect for refrigerant leaks Return Air Filter Change All work must be performed in accordance with Johnson Controls safety policies Check with appropriate customer representative for operational deficiencies Turn equipment off Remove dirty filters Install new filters Turn equipment on Dispose of dirty filter appropriately Document tasks performed during visit and report any observations to appropriate customer representative Variable Refrigerant Flow (VRF), Outdoor Unit, Heat Recovery, 10.0 - 16.0 Ton Additional Condenser All work must be performed in accordance with Johnson Controls safety policies Coil Cleaning Spray coil(s) with chemical solution Rinse coil(s) thoroughly with water Clean area around equipment Comprehensive All work must be performed in accordance with Johnson Controls safety policies Check that the fan rotates counterclockwise and inspect the rotating speed Check for unusual noise and vibration Inspect condenser coil for any accumulated dirt and dust Inspect for loose or missing screws and secure or replace as required Inspect for peeling thermal insulation material on the cabinet and repair it Inspect for abnormal activation of the magnetic contactor, auxiliary relay, or printed circuit board (PCB) Inspect for faulty contact caused by loosened terminal connections, oxidized contacts, foreign matter, and other items Inspect for abnormal sounds or vibration of compressor Inspect for any abnormal activating sound of reversing valve Check that there is no temperature difference between the ends of strainer Check crankcase heater Inspect for electrical insulation resistance Spray coil(s) with chemical solution Rinse coil(s) thoroughly with water Clean area around equipment Operational All work must be performed in accordance with Johnson Controls safety policies Check that the fan rotates counterclockwise and inspect the rotating speed Check for unusual noise and vibration Inspect condenser coil for any accumulated dirt and dust Inspect for loose or missing screws and secure or replace as required Inspect for peeling thermal insulation material on the cabinet and repair it Inspect for abnormal activation of the magnetic contactor, auxiliary relay, or printed circuit board (PCB) Inspect for faulty contact caused by loosened terminal connections, oxidized contacts, foreign matter, and other items Inspect for abnormal sounds or vibration of compressor Inspect for any abnormal activating sound of reversing valve Check that there is no temperature difference between the ends of strainer Check crankcase heater © 2026 Johnson Controls Johnson 000 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 92 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Inspect for electrical insulation resistance Variable Refrigerant Flow (VRF), VRF Controllers, Wired Operational All work must be performed in accordance with Johnson Controls safety policies Inspect that the controller is communicating Inspect wiring connection integrity Reset filter clean timer (if applicable) Supplemental Price & Payment Terms (Applies to Multi -Year Contracts Only) Year Total Annual Dollar Amount Payment Frequency Year1 $237,658.00 Monthly Year2 $242,411.00 Monthly Year3 $247,260.00 Monthly Year4 $252,206.00 Monthly Year5 $257,251.00 Monthly Site CHANNEL 20 PUBLIC ACCESS TV STUDIOS CITY OF SANTA CLARITA CITY HALL JAN HEIDT NEWHALL METROLI N K STATION JO ANNE DARCY LIBRARY OLD TOWN NEWHALL LIBRARY OLD TOWN NEWHALL PARKING STRUCTURE PUBLIC WORKS CORP YARD SANTA CLARITA BUSINESS INCUBATOR SANTA CLARITA METROLINK STATION TRANSIT MAINTENANCE FACILITY VALENCIA LIBRARY VIA PRINCESSA METROLINK STATION SANTA CLARITA CITRUS BUILDING WILLIAM S. HART PARK TOTAL 2026/27 Yearly Price $ 3,022.60 �$ 36,780.84 �$ 2,182.67 �$ 10,141.39 $ 43,843.92 �$ 4,869.62 $ 20,230.31 �$ 8,018.80 �$ 1,375.24 �$ 73,321.25 �$ 9,316.97 $ 1,354.27 �$ 3,942.12 $ 19, 258.00 $ 237,658.00 12026/27 Monthly Price $ 251.88 $ 3,065.07 $ 181.89 $ 845.12 $ 3,653.66 $ 405.80 $ 1,685.86 $ 668.23 $ 114.60 $ 6,110.10 $ 776.41 $ 112.86 $ 328.51 $ 1,604.83 $ 19,804.83 © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 00 Controls 'age 93 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Special Additions and Exceptions "This proposal is in accordance with the Johnson Controls Sourcewell Contract #080824-JHN" © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 40 Controls 'age 94 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Johnson Controls Standard Service Terms: One PSA Terms These terms cover the services and equipment provided by Johnson Controls. This Agreement includes the proposal, these terms and any referenced links. Conflicts are resolved in that order. Scope of Work We will provide the services or equipment described in the proposal. If the services include planned maintenance of equipment, only the equipment set forth in our proposal is covered by our services ("Covered Equipment"). Unless otherwise agreed in the proposal, services are performed during our normal working hours, excluding holidays. We reserve the right to modify or substitute materials. Payment Terms Services fees are paid annually in advance due 30 days from the invoice date via EFT/ACH, unless stated otherwise. Payment is required before services are performed or equipment is ordered or installed. Failure to pay on time is a breach that permits us to suspend or delay services until full payment is received, without liability, or to terminate this Agreement. Interest may also be charged on unpaid amounts at the lesser of 1.5% per month (19.56% annually) or the highest rate permitted by law. If you require a purchase order to process payments, you must send it to us at least 30 days before the end of a term but you must pay invoices even without a purchase order. No purchase order is required for any emergency services you request. Prices Prices do not cover taxes, fees, duties, tariffs, permits and levies or other charges imposed and/or enacted by a government. You are responsible for these items unless you provide an acceptable exemption certificate. If we need to pay any of these items or the exemption certificate is invalid or only covers some of these items, you must reimburse us on demand for the amounts owing. Prices may be adjusted at any time to reflect changes in costs, labor or market conditions. We will try to notify you of any changes in pricing in advance. Additional charges will be required for: (i) changes to these services or the Covered Equipment; (ii) additional services or equipment; (iii) unexpected site conditions or issues with the Covered Equipment; (iv) appointments that are cancelled less than 24 hours beforehand or for service, warranty or alarm calls caused by your error; (v) changes required to comply with laws, codes and regulations ("Laws"), including prevailing wage laws; and (vi) costs to notify and dispatch emergency personnel. We may change prices on equipment or parts prior to shipment or installation to reflect increases in costs from raw materials, third party products, any new or additional tariffs, duties, quotas, taxes, the withdrawal of trade agreement concessions or any unforeseen or other extra cost elements. Limited Warranty We warrant that services will be performed in a good and workmanlike manner for 90 days from the date of performance. Equipment we provide is also warranted to be free from defect in materials and workmanship for 90 days from installation. No warranty is provided for third -party equipment we install or furnish. Third -party HVAC and controls equipment is provided with the third -party manufacturer's warranty to the extent available. This limited warranty does not cover failures, defects, or damages caused in whole or in part by: (i) misuse, neglect, accident, Force Majeure, changes to your premises, or installation, maintenance or repairs not performed by us; (ii) environmental, electrical or other causes beyond our control; (iii) normal wear and tear or corrosion; (iv) use of unauthorized replacement parts or products or using the equipment for purposes not intended by the manufacturer; or (vi) issues arising from your failure to comply with this Agreement or your obligations. To qualify for warranty consideration, you must notify us in writing of your warranty claim prior to the end of the warranty period, complete all instructions on warranty procedures and provide us with reasonable site access to inspect the equipment and/or perform any © 2026 Johnson Controls Johnson 00 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 95 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL necessary warranty work. Your sole remedy is to have defective services re -performed or equipment repaired or replaced at our election. THESE WARRANTIES ARE EXCLUSIVE AND ARE IN LIEU OF ALL OTHER WARRANTIES, EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO THOSE OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. You need to determine if our equipment are suitable for your use. You assume all risk and liability from their application and your use. Warranty service does not cover: (i) system upgrades and replacing obsolete systems, equipment, or consumable parts and components ; (ii) reloading, updating, or maintaining software; (iii) additional costs for access, deinstallation, re -installation and transportation; and (iv) the exclusions set out in the Supplemental Terms. If you call us for warranty service and the problem is due to any of these reasons, we may charge you for the service call even if we do not work on the equipment. We may offer these services at an extra cost. Customer Obligations You must provide all relevant information about the equipment and premises, follow all applicable Laws and ensure us safe access. You must operate, test, maintain, and repair the equipment according to manufacturer and our recommendations and notify us immediately of any issues. In addition, you agree to, (i) obtain necessary licenses and permits and pay related fees and taxes; (ii) provide a suitable environment for the equipment as recommended by us or the manufacturer including heat to avoid freezing; (iii) supply the necessary electrical service, power, heat, heat tracing, water and schematics ; (iv) provide proper water treatment for condensers, cooling towers, and boilers, and protect against environmental issues; (v) set and test alarm systems as recommended by us or the manufacturer; (vi) avoid causing false alarms and reimburse us for any fines or fees; (vii) notify all necessary parties, such as local authorities and monitoring providers, about system testing or repairs; (viii) keep accurate and up-to-date work logs for the equipment; and (ix) take precautions for Covered Equipment failure to prevent injury or property damage. If you do not meet any of these obligations, we are not responsible for equipment breakdowns, repairs, or replacements. We can suspend services until these issues are fixed and charge for any corrective work needed. For equipment connected to your computer network, we provide and install the software to run the equipment and connect to it based on the network settings you provide. You must provide us with secure access to your computer network as required in our specifications. If we cannot connect to the network or need extra equipment for connectivity, additional charges may apply. Our services do not include changes to the network, security, or firewall settings. You are solely responsible to protect your data, computer network, and products networked or connected to the Internet; and we are not responsible for any loss or damage, as allowed by Law. You should back up data and software before services are performed. You must promptly remove any devices that interfere with the operation of the Covered Equipment. Insurance We do not guarantee that services or equipment will prevent risk of loss at your premises or detect all events. You are responsible for any losses and need to rely on your own insurance. You release and waive for yourself and your insurer all subrogation and other rights to recover from us. Limitations on Liability Neither we or our suppliers or vendors ("JCI Parties') are liable for special, incidental, consequential, punitive or indirect damages, or for lost profits, revenue, data or business interruption. The total liability of the JCI Parties is limited to $250,000 or 12 months of fees paid to Johnson Controls under this Agreement, whichever is less. Claims Limitation; Forum; Choice of Law Disputes may be resolved in court or through arbitration, as determined exclusively by us. Delaware law governs any agreement performed in the U.S., with disputes resolved in Milwaukee, Wisconsin. Ontario law governs any agreement performed in Canada, with disputes resolved in Ontario. Any claims by you must be brought within one year. The parties waive their right to a jury trial. © 2026 Johnson Controls Johnson 40 Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 96 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL Term and Termination The term of this Agreement is set out in the proposal and renews automatically for successive terms equal to the length of the original term unless either party gives 60 days' prior written notice of termination to the other party before the end of a term or the parties agree in writing on a different length of renewal term. Either party can terminate for cause with 10 days' notice, but only after written notice the defaulting party has 30 days to cure any alleged default. We can terminate immediately if we can no longer service the Covered Equipment for whatever reason including if we stop selling the Covered Equipment, providing the services or if we cannot obtain equipment, parts or support the technologies. We can terminate this Agreement without cause with 60 days' written notice. Upon termination, you must pay all amounts owed and provide access for us to remove any of our property at your premises and reprogram systems. You are responsible for our costs to enforce this. If you end this Agreement early for any reason, you must also pay us 50% of the service charges for the remaining term of this Agreement. You are responsible for our costs to enforce this. Access and Hazardous Materials You must provide us with reasonable and safe access to the Covered Equipment. We will follow our health and safety policies and applicable Laws. You must inform us of any hazardous conditions or materials (e.g., mold, asbestos containing materials, biohazards) and you are responsible for resolving, removing and disposal. If we encounter hazardous conditions or materials, we may stop work without liability and you are required to provide us reasonable evidence of abatement before we will restart work. Additional charges will apply if access to a confined space is required. Force Majeure We are not in breach or liable for any delays or failures caused, in whole or in part, by any events beyond our control, such as natural disasters, severe weather, public health risks, government actions, cyberattacks, civil disturbances, labor disputes, strikes or shortages of parts or materials ("Force Majeure"). You must allow us additional time to perform the services and reimburse us for increased costs due to such events. Data and Intellectual Property; Digitally Enabled Services You own your data, but we may use it to perform services and you grant us a perpetual, worldwide, irrevocable, royalty free license to use your building data on a de -identified basis. We retain rights to any intellectual property created. Digital enabled services mean services provided under this Agreement that employ our software and cloud -hosted software offerings and tools. They may include, but are not limited to, (i) remote inspection, (ii) advanced equipment fault detection and diagnostics, and (iii) data dashboarding and health reporting. Digital enabled services may require data collection, and you consent to this. Software -Digital Solutions Use of our software, including software to provide digital enabled services and solutions, is governed by our standard terms at https://www.johnsoncontrols.com/techterms. These terms apply to the software you are allowed to use, but we retain ownership and rights to the software, including improvements. If provided as part of our services, third -party software is subject to its own terms. Privacy If provided to us, we will process personal data according to our Data Processing Agreement at www.johnsoncontrols.com/dna and adhere to our privacy notice at https://www.johnsoncontrols.com/privacy. You consent to this processing and will ensure all necessary consents are obtained. Miscellaneous Notices must be in writing. This Agreement cannot be assigned without our consent; any assignment without our consent is void. We can assign this Agreement, in whole or in part, or subcontract the work, without notice. Invalid, illegal or unenforceable provisions do not affect the rest of this Agreement. This Agreement is subject to specific supplemental terms located at www.johnsoncontrols.com/legal/one-psa-supplemental-terms. In addition, if you 000 © 2026 Johnson Controls Johnson Customer Confidential Controls Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls. 'age 97 of 98 Planned Service Proposal CITY OF SANTA CLARITA CITY HALL request us to perform any work outside the scope of this Agreement, you consent to it being performed subject to our standard customer terms then in effect at www.johnsoncontrols.com/customerterms. This Agreement is the entire contract and supersedes prior written or oral communications and documents, and terms in any purchase order or other documents you later provide are rejected. We may convert this Agreement to an electronic format. [END OF DOCUMENT] Johnson Controls Standard Service Terms: One PSA, version 6.12.2025 © 2026 Johnson Controls Customer Confidential Do not copy (physically, electronically, or in any other media) without the express written permission of Johnson Controls Johnson 40 Controls 'age 98 of 98