Agenda Item: 8
CITY OF SANTA CLARITA
.` AGENDA REPORT
CONSENT CALENDAR
CITY MANAGER APPROVAL:
DATE: May 26, 2026
SUBJECT: RESOLUTION TO INCORPORATE SENATE BILL 1, ROAD REPAIR
AND ACCOUNTABILITY ACT OF 2017, LOCAL STREETS AND
ROADS, ROAD MAINTENANCE AND REHABILITATION FUNDS
INTO THE CAPITAL IMPROVEMENT PROGRAM
DEPARTMENT: Public Works
PRESENTER: Shannon Pickett
RECOMMENDED ACTION
City Council:
Adopt a resolution declaring the incorporation of a list of projects proposed to be funded by
Senate Bill 1, Road Repair and Accountability Act of 2017, Local Streets and Roads, Road
Maintenance and Rehabilitation for Fiscal Year 2026-27 into the Capital Improvement
Program.
2. Authorize the City Manager or designee to execute all documents, subject to City Attorney
review.
BACKGROUND
On April 28, 2017, Governor Brown signed Senate Bill 1 (SB 1) to address basic road
maintenance, rehabilitation, and critical safety needs for California state highways, local streets,
and road systems. Funds provided by SB 1 are available to the City of Santa Clarita (City) in the
Road Maintenance and Rehabilitation Account (RMRA). The percentage of funds allocated to
the City are predetermined by Streets and Highways Code Section 2034(a)(1). The estimated
allocation of funds for Fiscal Year (FY) 2026-27 is $6,690,689.
Local Streets and Roads funding is supported by RMRA funding, which includes portions of
revenues pursuant to Streets and Highways Code Section 2031 from the following sources:
An additional 12 cents per gallon increase to the gasoline excise tax effective
November 1, 2017.
Page 1
Packet Pg. 111
O
• An additional 20 cents per gallon increase to the diesel fuel excise tax effective
November 1, 2017.
• An additional vehicle registration tax, called "Transportation Improvement Fee," with
rates based on the value of the motor vehicle effective January 1, 2018.
• An additional $100 vehicle registration tax on zero emissions vehicles (ZEV) of model
year 2020 or later effective July 1, 2020.
• Annual rate increases to these taxes beginning on July 1, 2020, (July 1, 2021, for the
ZEV fee) and every July 1 thereafter equal to the change in the California Consumer
Price Index.
Senate Bill 1 emphasizes the importance of accountability and transparency. For this reason,
California Transportation Commission (CTC) staff, in collaboration with stakeholders,
developed Local Streets and Roads Funding Annual Reporting Guidelines. To be eligible for
SB 1 and RMRA funding, the guidelines require the City to provide annual project reporting to
the CTC, including a list of project(s) proposed to be funded. All proposed projects must be
adopted by a resolution of the City Council at a regular public meeting prior to the July 1, 2026,
submission deadline.
The 2026-27 Overlay and Slurry Seal Program Design and Construction Project was selected to
receive the SB 1 RMRA funds. This project supports the Sustainable Public Infrastructure theme
of the City of Santa Clarita's strategic plan, Santa Clarita Pathway Forward. The Proposed Fiscal
Year 2026-27 SB 1 Project List is subject to change, as specific roadway segments will be
finalized during the design process. Staff anticipates construction will begin in June 2027.
The 2025-26 Overlay and Slurry Seal Program Design and Construction Project list was
previously approved by the CTC in 2025 and will continue to utilize SB 1 RMRA funds for
FY 2026-27. The project will be in construction this summer and is projected to be completed by
the end of 2026.
ALTERNATIVE ACTION
Other action as determined by the City Council.
FISCAL IMPACT
Upon approval of the recommended actions, estimated allocations of SB 1 RMRA funds (Fund
267) will be earmarked for the 2026-27 Overlay and Slurry Seal Program. Appropriation of SB
RMRA funds will be part of the Fiscal Year 2026-27 budget.
ATTACHMENTS
Resolution
Page 2
Packet Pg. 112
8.a
RESOLUTION NO. 26-
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA CLARITA,
CALIFORNIA, DECLARING THAT IT HAS ADOPTED A LIST OF PROJECTS FOR
FISCAL YEAR 2026-27 FUNDED BY SENATE BILL 1: THE ROAD REPAIR AND
ACCOUNTABILITY ACT OF 2017, LOCAL STREETS AND ROADS, ROAD
MAINTENANCE AND REHABILITATION FUNDS INTO THE CAPITAL IMPROVEMENT
PROGRAM
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017
(Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor
in April 2017 to address the significant multi -modal transportation funding shortfalls statewide;
and
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure
the residents of our City of Santa Clarita (City) are aware of the projects proposed for funding in
our community and which projects have been completed each fiscal year; and
WHEREAS, the City must adopt by resolution a list of projects proposed to receive fiscal
year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1,
which must include a description and the location of each proposed project, a proposed schedule
for the project's completion, and the estimated useful life of the improvement; and
WHEREAS, the City, will receive an estimated $6,690,689 in RMRA funding in Fiscal
Year 2026-27 from SB 1; and
WHEREAS, this is the tenth year in which the City is receiving SB 1 funding and will
enable the City to continue essential road maintenance and rehabilitation projects, safety
improvements, repairing and replacing aging bridges, and increasing access and mobility options
for the traveling public that would not have otherwise been possible without SB 1; and
WHEREAS, the City has undergone a robust public process to ensure public input into
our community's transportation priorities/the project list; and
WHEREAS, the City used a Pavement Management System to develop the SB 1 project
list to ensure revenues are being used on the most high -priority and cost-effective projects that
also meet the community's priorities for transportation investment; and
WHEREAS, the funding from SB 1 will help the City maintain and rehabilitate numerous
streets/roads, bridges, add active transportation infrastructure throughout the City this year and
hundreds of similar projects into the future; and
Page 1 of 4
Packet Pg. 113
8.a
WHEREAS, the 2023 California Statewide Local Streets and Roads Needs Assessment
found that the City streets and roads are in an "at -risk" condition and this revenue will help us
increase the overall quality of our road system and over the next decade will bring our streets and
roads into a "good" condition; and
WHEREAS, the SB 1 project list and overall investment in our local streets and roads
infrastructure with a focus on basic maintenance and safety, investing in complete streets
infrastructure, and using cutting -edge technology, materials and practices, will have significant
positive co -benefits statewide.
NOW, THEREFORE by the City Council of the City of Santa Clarita, California, does
hereby resolve as follows:
SECTION 1. The foregoing recitals are true and correct.
SECTION 2. The following list of newly proposed projects will be funded in -part or
solely with Fiscal Year 2026-27 Road Maintenance and Rehabilitation Account revenues:
Project Title: 2026-27 Overlay and Slurry Seal Program Design and Construction;
Project Description: Generally, the scope of work to be performed includes, but is not limited to,
asphalt resurfacing of various streets Citywide;
Project Location: Citywide. Specific streets were selected from locations identified through the
City's Five -Year Pavement Preservation Program and are identified in the attached Proposed
Fiscal Year 2026-27 SB 1 Project List;
Estimated Project Schedule: Pre -construction: July 2026 — May 2027, Construction: June 2027 —
June 2028 based on the component being funded with RMRA funds; and
Estimated Project Useful Life: Streets selected for preventative maintenance will have a
pavement life expectancy of 3-7 years, and streets selected for rehabilitation will have a life
expectancy of 10-15 years.
SECTION 3. The following previously proposed and adopted projects may also utilize
Fiscal Year 2026-27 Road Maintenance and Rehabilitation Account revenues in their delivery.
With the relisting of these projects in the adopted fiscal year resolution, the City is reaffirming to
the public and the State our intent to fund these projects with Road Maintenance and
Rehabilitation Account revenues:
Page 2 of 4
Packet Pg. 114
8.a
Project Title: 2025-26 Overlay and Slurry Seal Program Design and Construction;
Project Description: Generally, the scope of work to be performed includes, but is not limited to,
asphalt resurfacing of various streets Citywide;
Project Location: Citywide. Specific streets were selected from locations identified through the
City's Five -Year Pavement Preservation Program and are identified in the attached Proposed
Fiscal Year 2026-27 SB 1 Project List;
Estimated Project Schedule: Pre -construction: July 2025 — May 2026, Construction: June 2026 —
June 2027 based on the component being funded with RMRA funds: and
Estimated Project Useful Life: Streets selected for preventative maintenance will have a
pavement life expectancy of 3-7 years, and streets selected for rehabilitation will have a life
expectancy of 10-15 years.
SECTION 4. The City Clerk shall certify to the adoption of this resolution.
PASSED, APPROVED, AND ADOPTED this _ day of 2026.
ATTEST:
CITY CLERK
DATE:
Page 3 of 4
MAYOR
Packet Pg. 115
8.a
STATE OF CALIFORNIA
COUNTY OF LOS ANGELES
ss. CITY OF SANTA CLARITA
I, Melody Bartlette, City Clerk of the City of Santa Clarita, do hereby certify that the
foregoing Resolution No. 26- _was duly adopted by the City Council of the City of Santa Clarita
at a regular meeting thereof, held on the _ day of _ 2026, by the following vote:
AYES: COUNCILMEMBERS:
NOES: COUNCILMEMBERS:
ABSENT: COUNCILMEMBERS:
Page 4 of 4
CITY CLERK
Packet Pg. 116
8.a
City of Santa Clarita
Proposed Fiscal Year 2026-27 SB 1 Project List
Project Road Name
(Locations listed are
projected estimates
Pre-
Proposed
Useful
Useful
and have yet to be
Construction
Construction
Schedule of
Life
Life
Project Title
Project Description
finalized)
Project Location
Start
Start
Completion
Min
Max
2026-27 Overlay
The Annual Overlay and
Decoro Drive
From Copper Hill
Jul-26
Jun-27
Jun-28
3
15
and Slurry Seal
Slurry Seal Program
Drive to McBean
Program Design
reflects the City's
Parkway
and Construction
commitment to roadway
infrastructure by
resurfacing streets in
2026-27Overlay
The Annual Overlay and
Avenue Scott
From McBean
Jul-26
Jun-27
Jun-28
3
15
and Slurry Seal
Slurry Seal Program
Parkway to Rye
Program Design
reflects the City's
Canyon Road
and Construction
commitment to roadway
infrastructure by
resurfacing streets in
2026-27 Overlay
The Annual Overlay and
Rye Canyon Road
From Avenue
Jul-26
Jun-27
Jun-28
3
15
and Slurry Seal
Slurry Seal Program
Stanford to
Program Design
reflects the City's
Avenue Scott
and Construction
commitment to roadway
infrastructure by
resurfacing streets in
need of attention-
2025-26 Overlay
The Annual Overlay and
Via Princessa
From Sierra
Jul-25
Jun-26
Jun-27
3
15
and Slurry Seal
Slurry Seal Program
Highway to Lost
Program Design
reflects the City's
Canyon Road
and Construction
commitment to roadway
infrastructure by
resurfacing streets in
2025-26Overlay
The Annual Overlay and
McBean Parkway
From Alegro Drive
Jul-25
Jun-26
Jun-27
3
15
and Slurry Seal
Slurry Seal Program
to Avenida
Program Design
reflects the City's
Navarre
and Construction
commitment to roadway
infrastructure by
resurfacing streets in
need of atte toon.
O
W
d
H
Z
W
E
W
O
W
d
E
J
Q
H
d
Q
U
Z
T-
J
J_
m
W
H
Q
Z
W
W
H
Q
O
d
O
U
Z_
O
H
Z
O
H
J
O
W
C
O
r
O
W
N
r
C
N
sr
t
v
!E
r
r
Q
Packet Pg. 117