HomeMy WebLinkAbout2026-06-09 - AGENDA REPORTS - CIRCULATION IMPROV PGM COPPER HILL DR AND BOUQUET CYN RD C0080 DESIGN CONTRAgenda Item: 10 CITY OF SANTA CLARITA .` AGENDA REPORT CONSENT CALENDAR CITY MANAGER APPROVAL: DATE: June 9, 2026 SUBJECT: CIRCULATION IMPROVEMENT PROGRAM, COPPER HILL DRIVE AT WEST HILLS DRIVE AND BOUQUET CANYON ROAD AT CENTRAL PARK, PROJECT C0080 - DESIGN CONTRACT DEPARTMENT: Public Works PRESENTER: Carla Callahan RECOMMENDED ACTION City Council: 1. Award the design contract to Kimley-Horn and Associates, Inc., for the Circulation Improvement Program, Copper Hill Drive at West Hills Drive and Bouquet Canyon Road at Central Park, Project C0080, in the amount of $647,162 and authorize a contingency in the amount of $64,716, for a total contract amount not to exceed $711,878. 2. Authorize the City Clerk to accept a dedication and grant of easement for public use and road purposes subject to final review by the City Attorney. 3. Authorize the City Manager or designee to execute an amendment to the Ground Lease Agreement with Santa Clarita Valley Water Agency for the Central Park Sports Facility, expanding the lease boundary subject to City Attorney approval. 4. Authorize the City Manager or designee to execute all contracts and associated documents, subject to City Attorney review. BACKGROUND The City of Santa Clarita (City) completes circulation improvement projects to address traffic congestion and maintain traffic flow in the City. This project includes improvements at the intersections of Copper Hill Drive at West Hills Drive and Bouquet Canyon Road at Central Park. The project will construct a southbound right -turn lane on Copper Hill Drive at West Hills Drive to better accommodate the high volume of motorists traveling to West Creek Academy. Additionally, the project includes construction of a U-turn pocket on eastbound Page 1 Packet Pg. 111 Bouquet Canyon Road at Central Park. The project will also relocate the pedestrian pathway at the Central Park exit from the west side to the east side and remove the existing sidewalk to accommodate roadway widening for an additional left -turn lane for vehicles exiting Central Park onto Bouquet Canyon Road. Construction will include modifications to medians, curb and gutter, striping, landscaping, utilities, and irrigation. The improvements are based on staff s analysis of traffic volumes and observed traffic patterns at the selected intersections. Project locations are shown on the attached Location Map for Copper Hill Drive at West Hills Drive and Location Map for Bouquet Canyon Road at Central Park. The City is currently coordinating with the West Creek West Hills Homeowners Association, managed by PMP Management, to obtain the additional right-of-way necessary at the intersection of Copper Hill Drive and West Hills Drive. The City is also coordinating with Santa Clarita Valley Water Agency (SCVWA) to expand the ground lease area to encompass the proposed improvement areas at Central Park. The required easements and lease line modifications will be secured prior to the commencement of construction. This project supports the Sustainable Public Infrastructure theme of the City's strategic plan, Santa Clarita Pathway Forward. The scope of work for this design contract includes civil engineering design, land surveying, and landscape design services required to prepare construction documents. These documents will consist of complete plans, specifications, and engineer's estimates for construction. Bid assistance will also be provided to support the solicitation for a construction contract. The City conducted a Request for Proposal (RFP) to solicit proposals from qualified consulting firms to provide design services, bid support, construction support, and right-of-way support for the Circulation Improvement Program for Copper Hill Drive at West Hills Drive and Bouquet Canyon Road at Central Park project. The RFP was published and circulated via the City's e- procurement system, BidNet, on March 10, 2026. The City transmitted the solicitation to 4,569 vendors on BidNet, of which 73 vendors downloaded the RFP. A total of four companies provided proposals for consideration. These proposals were reviewed and evaluated based on each company's ability to meet the specific needs of the City. An evaluation panel, comprised of staff from the Public Works department, scored the responses using the following categories of weighted criteria: • Responsiveness to the RFP including content, format, and completeness of the written proposal (40 percent) • Ability to comply and provide deliverables based on the project schedule developed by the Consultant that meets or exceeds the City's project timeframe (30 percent) • Consultant qualifications and overall project team experience (20 percent) • References (10 percent) The evaluation panel scored the responses based on a 100-point scale, with the results outlined below: Page 2 Packet Pg. 112 Rank Company Location Score 1 Kimley-Horn and Associates, Inc. Santa Clarita, CA 93.8 2 Psomas Santa Clarita, CA 93.6 3 Rick Engineering Company Valencia, CA 87.6 4 Sikand Engineering Associates Sherman Oaks, CA 78.8 In reviewing proposals, the evaluation panel awarded the highest score to Kimley-Horn and Associates, Inc. The evaluation panel determined that Kimley-Horn and Associates, Inc.'s proposal offered the best overall value to meet the design service needs. Kimley-Horn and Associates, Inc., demonstrated an in-depth understanding of the project needs and provided a detailed scope of work and approach to the project. They analyzed the project location and identified key design factors that will need to be addressed in the design. Based on their design experience with similar projects, and the completeness of their proposal for this project, staff recommends awarding the design contract to Kimley-Horn and Associates, Inc. The proposal is available in the City Clerk's Reading File. California Government Code 4526 prescribes the selection of architectural and engineering services to be based on demonstrated competence and professional qualifications necessary for the satisfactory performance of the services required and does not authorize the selection of professional architect and engineering services based on cost. City staff was able to reach an agreement with Kimley-Horn and Associates, Inc., at a fair and reasonable price. The requested contingency will cover the cost of unforeseen design constraints and account for potential design modifications requested by the City and other permitting agencies during the design of the project. This includes potential adjustments to the civil and traffic drawings, engineering and landscape drawings, additional field investigations including potholing for utility locations, coordination with utility companies, right-of-way activities and associated fees, and change orders for additional work requested by the City. The City Council appropriated $771,000 for this project upon adoption of the Fiscal Year 2025-26 Mid -Year budget adjustments in December 2025. The project budget is $771,000, representing $711,878 for design and $59,122 for project administration costs. Project administrative costs include staff time, project management, right-of-way and permit fees. ALTERNATIVE ACTION Other action as determined by the City Council. FISCAL IMPACT The amount of $771,000 is available in project expenditure accounts C0080233-516101 (TDA Article 8) and C0080354-516101 (SC Lighting District) to support the recommended action and associated project costs. Page 3 Packet Pg. 113 ATTACHMENTS Location Map for Copper Hill Drive at West Hills Drive Location Map for Bouquet Canyon Road at Central Park Proposal for Kimley-Horn and Associates, Inc. (available in the City Clerk's Reading File) Page 4 Packet Pg. 114 N 10.a SANTA CLARITA x Location Map for Feet Circulation Improvements for 0 50 100 Copper Hill Drive at West Hills Drive Z #C0080 '► w Street centerlines developed & maintained 2 w Legend by City of Santa Clarita GIs > The City of Santa Clarita does not warrant r O Project Footprint the accuracy of the data and assumes no • w liability for any errors or omissions. d Easement Boundary Map prepared by: City of Santa Clarita 2 GIS Division � Z Existing Parcel Boundary O_ O:\PROJECTS\P W\260401 a 1 \77151 \C0080.aprx s a � . — t 3 , 4 k (I b iw -. raTRJ Q HILL OR 0 Z NECORO GR � � 1`'+s S F� P NENMPLL RO en —EM0 J MAcrCMpO kWy E ' �' � C�yONRO �qJS AVE � ��( / CANYOI.I RNA--Irrjjjjl�' IIIfI(� Q V U , 'M1 1 I� r+e E Packet Pg. 115 N SANTA CLARITA A Location Map for Circulation Improvements for Feet o 50 100 Bouquet Canyon Road at Central Park #C0080 I I I Street centerlines developed & maintained Legend by City of Santa Clarita GIs The City of Santa Clarita does not warrant Project Footprint the accuracy of the data and assumes no liability for any errors or omissions. Lease Line Extension Boundary Map prepared by: City of Santa Clarita GIS Division 0 Existing Parcel Boundary Q:\PROJECTS\PW\260401al\77151\CO080.aprx — X _ ,-_ - 10.b w w ,OAO_ W a A_ I4 w g a DECp p cU P NENMPLL R06 SpLEDAOU p MAcr0�0 z kWy N l� e` �qt�y w L a �$ ci 'p,CPypNRO LYgJS AVE I \ �I r � t Packet Pg. 116 PROPOSAL FOR DESIGN SERVICES FOR CIRCULATION IMPROVEMENT PROGRAM PROPOSAL # CIP-25-26-CO080 PREPARED FOR. City of Santa Clarita�, -,N s .. �'�,*'� ;:� f,° {T�; rest c"',rp�,�w�u,�i. ��,�• r f - S 'ri C rvx ♦ ro _. r , - �a i a A� s I `Rl PREPARED BY Kimley>>> Horn Expect More. Experience Better. _1 �_... ..., 1. Introduction.........................................................................................................................................................................................1 2. Qualifications of Firm and Assigned Staff..............................................................................................................................................3 3. Work Statement.................................................................................................................................................................................20 4. Schedule...........................................................................................................................................................................................32 5. Sub-Consultants................................................................................................................................................................................33 6. Statements and Agreement................................................................................................................................................................ 35 For the electronic submission of our proposal, we have uploaded our cost file, executed forms, and signed addenda via BidNet. For the hard copy version of our proposal, we have provided our executed forms and signed addenda in 6. Statements and Agreement, and the cost file in a separate, sealed envelope from our proposal. City of Santa Ciarita TRCASANC074553.2026 0 Kimley A>> Horn April 6, 2026 25152 Springfield Court, Suite 200 Lara Ray Santa Clarita, CA 91355 City of Santa Clarita TEL: 661.347.5627 23920 Valencia Boulevard, Suite 120 Santa Clarita, CA 91355 RE: Proposal for Design Services for Circulation Improvement Program (Proposal # CIP-25-26-00080) Dear Ms. Ray and Members of the Selection Committee: In recent years, the City of Santa Clarita (City) has been diligently upgrading its transportation facilities and infrastructure to keep residents and visitors safe and make traveling more efficient, reliable, and smoother. Kimley-Horn applauds your initiative, and we are excited for your latest endeavor: the Circulation Improvement Program (Project), the latest of which will deliver targeted circulation improvements at the Central Park at Bouquet Canyon Road and the Copper Hill Drive at West Hills DriveMlestcreek Drive intersections to increase roadway capacity, improve traffic flow, and address existing operational challenges. You would be best served by a consultant firm that knows how to serve you effectively, presents innovative solutions to implement the Project improvements, and offers a stable, multidisciplinary team designed to streamline Project delivery. Kimley-Horn is that firm. By partnering with us again, you capitalize on the following benefits: Trusted, Local Partner. Kimley-Horn is proud to have served you since 2005, making us already familiar with your staff standards, and expectations for success, and our Santa Clarita office enables us to provide you with enhanced services. Our work for you includes the Newhall Avenue Railroad Crossing Improvements Project, Left -Turn Median Improvement on Bouquet Canyon Road at Central Park, and Newhall Ranch Road Median Improvement Between Bouquet Canyon Road and Santa Clarita Parkway as well as current as-needed/on-call contracts for civil engineering, traffic engineering, and landscape and irrigation services. Since you can expect no learning curves or growing pains with us, you save valuable time and precious resources. In addition, )ur local office i,, located less than 2 miles away from your offices and less than 5 miles away from the Project sites, so we can mobilize quickly to address yours and the Project's needs. Streamlined Delivery. On this Project, we are committed to lightening your workload and making your experience easy, and our internal organization sets us up to do so. Not only are we a multidisciplinary firm, but our culture is rooted in collaboration; our key disciplines of civil engineering, traffic engineering, and landscape architecture are experienced in delivering multifaceted projects requiring a thoughtful and integrated design process. We promote an in -office culture where we review designs together and really understand the interdisciplinary nature of design decisions. We took great care in assembled our team with key personnel who are committed to this Project and have worked at our firm for an average of 12 years. In fact, most of our key personnel —including project manager Michael Choi, PE, LEED AP, deputy project manager Charis Ahn, PE, principal -in -charge Sri Chakravarthy, PE, TE, quality control/quality assurance (QC/QA) manager Sowmya Chandrasekhar, PE, TE, PTOE, and civil engineering lead Moody Adli, PE —are just doors away from each other, helping us to make sure that we can quickly find solutions to challenges and that the Project is progressing on schedule and within budget. Cutting -Edge and Cost -Saving Solutions. Having worked on projects similar to this one across Southern California, Kimley- - Horn brings innovative solutions that will help the City save money. We are taking a holistic view of the Project constraints by assessing the overall Project goals, existing data / sources of the constraints, and stakeholders and users impacted by the proposed improvements. We understand the need to share the City's vision for the Project in a clear and concise manner that includes both data and graphics. This may include before- and after -images of the corridor to full modeling of the traffic and pedestrian operations to help visualize the improvements for all stakeholders involved. Our team will leverage their experience delivering similar projects, implementing innovative techniques and lessons learned for this Project's successful delivery; this compels us to think several steps anead, identify critical path items, mitigate potential longer lead time tasks, ana aeveiop multiple solutions to challenges. City of Santa Clarita TRCASANC074553.2026 1 Kimiey A>) Horn We are the most uniquely qualified consultant to successfully deliver this Project to you. Should you have any questions, please do not hesitate to reach out to our project manager, Michael Choi, PE, LEED AP, at 213.261.4038, michael.choi@kimley-horn.com, or the address at the top right of the previous page. Sincerely, KIMLEY-HORN AND ASSOCIATES, INC. Michael Choi, PE, LEED AP Project ManagerNice President* Sri Chakravarthy, PE, TE Principal-in-Charge/Senior Vice President* As a senior vice president of Kimley-Horn, Sri is authorized to bind the firm. Kimley-Horn acknowledges the receipt of Addendum No. 1, issued on March 18, 2026, and Addendum No. 2, issued on March 27, 2026. We have provided the signed addenda in 6. Statements and Agreement. Kimley-Horn has reviewed the sample contract provided in the request for proposals (RFP) and takes no exceptions. Kimley-Horn affirms that our proposal, including pricing, is a firm offer for a 120-day period starting on April 6, 2026. Kimley-Horn affirms that we will perform our team's proposed work at a "not -to -exceed" price. City of Santa Ciarita rRCASANC074553.2026 2 Kimiey A>> Horn Statement of Qualifications Kimley-Horn is a full -service planning and engineering consulting firm providing services to both public and private sector clients nationwide. Since our founding in 1967, we have grown from a small group of traffic engineers and transportation planners to a firm with more than 9,900 across 166 offices nationwide, including 17 in California. Today, we are one of the highest -ranked planning and engineering consulting firms in the US. According to Engineering News - Record, we ranked 8th overall among the nation's top 500 design firms in 2025.Our success is a result of our steadfast commitment to providing responsive client service, pursuing continuous quality improvement, and operating as a business - based practice. Our professionals understand that each project brings unique challenges and conditions, and requires solutions unique to each community we serve. Combining national experience with a local sensibility, we provide comprehensive engineering, planning, and environmental consulting services. We work extensively with our internal partners and clients to create the appropriate technical approach for a specific project and provide a clear, concise scope of work. We offer clients the local knowledge and responsiveness of a small organization, backed by the depth of resources only a national firm can offer. Stability and Capacity Kimley-Horn California Office Locations 59 YEARS OSacramento 1 �iL OFFICES Kimley a>HornW ���+ EMPLOYEES Oakland----__0 San Mateo• *Pleasanton I- San Jose 6 Monterey Santa Clarita Pasadena LOS AngelOS Riverside Long Beach! • Coachella Voley Orange Temecula Irvine • Escondido San Diego •--------------------- Staff stability is an indication of the quality of a company's working environment and the priority it places on its staff. We have ranked on the FORTUNE 100 Best Companies to Work For list for 19 years now, and this is due to our history of retaining staff by holding fast to the philosophy "to provide an environment for our people to flourish." We retain our staff through our "practice builder" philosophy, which our project manager, Michael Choi, PE, LEED AP, and our proposed key personnel, exemplify; in fact, they have worked at our firm for an average of 12 years. Our team, as indicated in this proposal, will be the same team that works on the Project. We strive for personal client service so that you will have our full focus and support to achieve success. This translates into strong relationships between your team and ours, Project stability and success, and outstanding client satisfaction. We understand that the basis of a successful project is founded on responsiveness and adequate staffing. Our single -profit -center structure enables us to share and balance our workload as well as shift personnel to various projects successfully across multiple offices nationwide. This structure means you get the same responsive and timely service you deserve for this Project —no matter which Kimley- Horn office is supporting you. Our team has the capacity to meet yours and the Project's needs. We use a weekly, monthly, and 6-month internal workload forecast system on a firmwide basis to forecast workloads and availability of staff as well as identify key resources required for a project or task order's successful delivery. This "Castahead" system tracks all project commitments/milestones and staff commitments, giving us the ability to manage workload peaks and valleys and allowing us to take proactive steps to keep a project/task order on track. We have effectively used this tool in the delivery of local projects over the past several years, and we can identify overloads and shortfalls many months in advance and develop strategies to overcome them. Based on a review of our Castaheads, we can assure you that our team is available immediately to serve you and are in an excellent position to handle the workload required to deliver the Project. Once the Project is underway, Michael and our discipline leads will meet on a weekly basis to establish task lists for staff and verify that staff resources are properly allocated for the upcoming week and deliverables. In addition, Michael has the authority to mobilize Kimley-Horn's 9,900+ professionals at any given time to meet the City's needs. City of Santa Crarita TRCASANCO74553.2026 Kimley A>> Horn History of Comparable Work Kimley-Horn is well prepared and well positioned to successfully deliver the Project to the City due to our extensive qualifications, which includes comparable and relevant work, done for the City, public agencies in similar environments, and for municipalities across Southern California. As a fully integrated, multidisciplinary firm, we have only one objective: making our clients successful. Citv Exnerience We have proudly served the City for more than 20 years, working on and delivering dozens of projects that encompass roadway design, traffic signal design, landscape architecture, safety analyses/evaluations, intelligent transportation systems (ITS), and more. Our work has taken us across Santa Clarita, making us very familiar with the local environment, the various communities, and the stakeholders that operate here. We have well -established relationships with the City's staff, who can attest to our technical resources, responsiveness, and commitment to the City. At this point, due to the depth of our work, the City's standards come as second nature to work, which means we can hit the ground running on the Project and keep momentum throughout. Our extensive portfolio with the City includes: • Capital Improvement Program As -Needed Contracts (Civil Engineering, Environmental Services & Permitting, Landscape & Irrigation, and Traffic Engineering) • Copper Hill Drive Traffic Signal and Interconnect • Left -Turn Median Improvement on Bouquet Canyon Road at Central Park • Newhall Avenue Railroad Crossing Improvements Project 2 • Newhall Ranch Road Median Improvement Between Bouquet Canyon Road and Santa Clarita Parkway 3 • Santa Clarita Sports Complex Buildout-Design 1 We modified an existing median on the westbound Bouquet Canyon Road at the main Central Park entrance east of the Alamogordo Road intersection by extending the existing left -turn pocket length to 350 linear feet (LF) and installing a protected left - turn phase on the traffic signal. 2 We have completed a comprehensive traffic study to evaluate the traffic operations and safety, and to develop the most suitable lane configuration, storage lengths, and signal phasing for this project. 3 We prepared street improvement plans for the modification of approximately 340 LF of existing median. Santa Clarita Valley WaterAgency (SCV Water) One stakeholder that we are familiar with is SCV Water, which owns Central Park, thus necessitating coordination with them for the Project. We have been on SCV Water's Engineering Services Section On -Call Consultant Services list since 2024, and since then, we have been working on the following task orders and projects: • Yucca Tank Slope Stabilization and Access Road Improvement • Peachland Tanks 4 and 4A Slope Stabilization and Access Road Improvement Project • Pinetree Groundwater Recharge Facility • Bouquet Tank Pipeline Replacement Project • E.G. Jerry Gladbach Water Treatment Plant Mechanical Shop, Access Road, and Drainage Improvements Project We have relationships at SCV Water and know how to work with them effectively, putting us in prime position to coordinate with them and make sure that the Project progresses without any hitches. Civil Enaineerin We offer experienced specialists in roadway, site development, grading, utility engineering, stormwater management, site/retaining walls, and hydraulic/hydrologic modeling, among others. Our engineers have developed plans, specifications, and estimate (PS&E) for more than 4,000 miles of roadway, including urban arterials, neighborhood streets, rural roads, interstate highways, state highways, and highway interchange structures. Our team brings design experience across a wide variety of projects, including intersection geometrics, complete streets, pedestrian and bicycle facilities, pavement rehabilitation, roadway widenings, storm drainage, green infrastructure, and roundabout projects. We are well versed with the American Associate of State Highway and Transportation Officials (AASHTO) Green Book (A Policy on Geometric Design of Highways and Streets), National Association of City Transportation Officials (NACTO), and the Caltrans Highway Design Manual. We have a complete knowledge of Americans with Disabilities Act (ADA) requirements and offer creative solutions to City of Santa Clarita TRCASANC074553.2026 Kimsey A>) Horn designing construction details as related to improvements in the public right- of-way. This includes curb ramps and driveway approaches to fit the existing conditions of each site. Our roadway specialists are committed to designing and delivering high - quality transportation infrastructure that enhances mobility and meets communities' needs. Our work includes: • City of Palmdale, FY 2022-2023 Arterial Overlay Design Project, Palmdale, CA • City of Lancaster, Pedestrian Gap Closure Improvements Project at 36 Locations, Lancaster, CA • City of Ventura, Westside Community -Wide Active Transportation Improvements, Ventura, CA • City of Bakersfield, Monitor Street Corridor Active Transportation Improvements, Bakersfield, CA, • City of Bakersfield, Niles and Monterey Complete Streets, Bakersfield, CA • City of Palm Springs, Racquet Club Road and South Palm Canyon Road Reconfiguration, Palm Springs, CA • City of Irvine, Great Parks Lots 6 and 7 Expansion, Irvine, CA 1 To create a safer corridor along a 3-mile stretch of Monitor Street, we introduced traffic calming measures, more resilient pavement markings, ADA modifications, median modifications, and sidewalk improvements. Traffic Engineering Our firm was built around providing traffic engineering and design services. Our in-house team offers complete traffic engineering services and have completed thousands of traffic engineering and operations projects for local and nationwide clients, ranging from major area -wide signal systems involving hundreds of intersections to single -intersection designs, analyses, and safety audits. Signal system design and implementation is a cornerstone of our professional practice. For nearly six decades, we have developed and implemented signal synchronization timing, developed signal system plans, and built dozens of systems for numerous agencies. From isolated signals to intersection design to ITS, our experienced staff keeps traffic flowing across California and the country. Our systems are based on open -architecture concepts, and each is designed to meet our clients' singular needs. Collectively, our team members have completed as well as traffic signal design for more than 5,000 signals, 550 Closed -Circuit Television (CCTV) design, 30 Changeable Message Signs (CMS) design, and 2,000+ miles of interconnect design plans and integration. We have been responsible for virtually every aspect of traffic systems, including signal timing and coordination; PS&E packages; conceptual designs; operational feasibility; communication architecture; system design; software development; and deployment and implementation plans. In addition to comprehensive master planning for traffic signalization, our engineers have designed numerous plans to standardized traffic control systems and provided comprehensive systems communications and control. Our resume of projects involving traffic signal design, signing and striping, and traffic control extends across Southern California and includes: • City of Oxnard, Citywide Intersection Improvements (Left -Turn Phasing Improvements at 10 Intersections), Oxnard, CA 1 • City of Ventura, Traffic Signal Communication System Upgrade Project Phase I, Ventura, CA • City of Lancaster, Lancaster Health District Improvements (Traffic Signal Improvements), Lancaster, CA • City of Irvine, Protected -Permissive Left -Turn Phasing Project Phase II, Irvine, CA 2 • City of Palm Springs, Traffic Safety Enhancements at Nine Intersections, Palm Springs, CA • City of Anaheim, Protected Left -Turn Signal at Four Intersections, Anaheim, CA 1 We prepared PS&E for traffic signal modifications at 10 signalized intersections, including left -turn phasing upgrades, safety lighting, new signal poles and mast arms, accessible pedestrian signal push buttons, new traffic signal controllers, video detection, conduit and cables, and striping and turn pocket improvements. 2 We are preparing traffic signal improvement, signing and striping, street improvement, stage construction/traffic handling, utility, and landscape irrigation plans to convert existing protected left -turn signal control to protected -permissive left - turns with flashing yellow arrow at five intersections. City of Santa Ciarita FRCASANC074553.2026 5 Kimiey A>) Horn Landscane Architecture From the revitalization of community parks to the design and implementation of downtown streetscapes, we have successfully planned and implemented scores of landscape architecture projects. Our firm has a well-earned reputation for combining creative ideas, technical excellence, and client collaboration, resulting in dynamic projects that blend into their environments and become a part of the area they inhabit. Our landscape architects have a diverse range of experience, from corridor plans and downtown streetscape programs to parks and recreation planning. As metropolitan urban areas continue to grow, urban design, streetscape design, and landscape architecture have become integral components of roadway and transportation system designs and infrastructure improvements in general. Revitalizing commercial districts, controlling traffic flows, and providing recreational areas and pedestrian and bicycle facilities in increasingly congested areas are some of the solutions designed by our landscape architects and planners. We have extensive experience in redevelopment and streetscape projects. These projects include detailed work in fountains, lighting systems, banners, special paving, landscaping, integration of vehicular and pedestrian traffic, and site amenities such as street furniture, recreation facilities, and site graphics. An area is often defined by its physical environment and aesthetic qualities; our landscape architects and urban architects tastefully integrate a project's identity into the surrounding community through aesthetics and repetition of unifying design elements —from structural feature components down to directional signage and pavement treatments. City of Palm Springs, San Rafael Turf Reduction Improvements , 4',�YJF Relevant Services Highlights We bring a host of projects that involved landscaping, irrigation, and hardscape enhancements. These include: 1 We redesigned the existing turf along East • City of El Monte, Ramona Boulevard & Valley Boulevard Intersection San Rafael Drive, between North Mountain Shadow Drive and North Sunrise Way, Improvement Project, El Monte, CA resulting in the reduction of water use for • City of Santa Monica, Lincoln Neighborhood Corridor (LiNC) Streetscape irrigation and thus bringing it in -line with the Project, Santa Monica, CA State's water efficiency ordinance • City of Palm Springs, San Rafael Turf Reduction Improvements, Palm requirements. Springs, CA 1 • City of Santa Ana, Warner Avenue Protected Bike Lanes from Oak Street to Grand Avenue, Santa Ana, CA • City of Oceanside, Mission Avenue Streetscape: A Green/Complete Streets, Oceanside, CA • San Diego Association of Governments (SANDAL), South Bay Bus Rapid Transit (BRT) East Palomar Street Segment Final Design, Chula Vista, CA • City of Imperial Beach, 10th Street Streetscape Improvements, Imperial Beach, CA Similar Services for Other Public Agencies Kimley-Horn is well prepared and well positioned to deliver the Project to the City due to our experience providing similar services for other public agencies in Southern California. On the next page, we have showcased three of our projects. We have also completed and submitted the References form. City of Santa Clarita TRCASANC014553.2026 Kimsey A>) Horn City of Malibu, Pacific Coast Highway (PCH) Pacifico Intersection Improvements, Malibu, Las Flores & Rambla CA Description: The City of Malibu's PCH Safety Study identified the PCH Las Flores & Rambla Pacifica Intersection Improvements, which consists of making various safety and efficiency improvements at the PCH & Las Flores and PCH & Rambla Pacifico intersections. These improvements include the reconfiguring the roadway geometry including turn pockets, modifying traffic signals, and improving driveways at these intersections. The project also includes new traffic striping and signage as well as pedestrian and bicycle improvements. The project's objective is to improve the traffic flow, speed control, and accessibility for pedestrians and cyclists. Kimley-Horn's scope of services included utility coordination, topographic survey, Caltrans coordination, project development and preliminary engineering, environmental clearance and permitting, final design, and bid phase and construction support services. Type of Project: Intersection Improvements Contract Duration: 2025 — Ongoing Names of Staff Involved: Michael Choi, Charis Ahn, Sri Chakravarthy, Moody Adli, Carlos Bobadilla, Matt Stewart Reference: Rob Duboux, Assistant City Manager 1310.456.2489 1 rduboux@malibucity.org City of Rancho Cucamonga, Almona street Extension (Via Verde Street to Carnelian Street), Rancho Cucamonga, CA Description: Almond Street is currently a discontinuous corridor, with the unbuilt segment existing as a dirt pathway adjacent to private properties. The City of Rancho Cucamonga seeks to improve this corridor into a fully accessible public roadway that meets current design standards, thereby improving circulation and accessibility by creating a direct connection between Carnelian Street and Val Verde Street. Kimley-Horn is designing approximately 800 linear feet (LF) of new local roadway, including curb and gutter, sidewalks, equestrian trail, driveways, storm drain infrastructure, and coordination for water and utility upgrades. Our design included regrading portions of properties on the north side of the road to a stabilized slope, converting an existing concrete -lined channel into a box culvert, balancing cut/fill limits and minimizing impacts to adjacent parcels on the south side of the road, and addressing an offset from the existing alignment of the dirt path from the curb return at Carnelian Street, fencing, and landscaping from adjacent parcels at the eastern tie-in. Type of Project: Street Improvements Contract Duration: 2025 — Ongoing (in construction) Names of Staff Involved: Michael Choi, Charis Ahn, Sri Chakravarthy, Moody Adli Reference: Romeo David, Associate Engineer 1909.774.4070 1 romero.david@cityofrc.us City of Agoura Hills, Kanan Road and Agoura Road Intersection Improvements. Agorlra Hills. CA Description: The Kanan Road & Agoura Road intersection serves as the gateway to Agoura Hills and the Santa Monica Mountains, and plays an important role in supporting the mobility of the region. The intersection currently experiences heavy congestion, particularly during the AM/PM peak hours. The City of Agoura Hills retained Kimley-Horn to evaluate the intersection for various alternatives to relieve congestion. We have provided design phase services, including data collection; preparation of a VISSIM microsimulation model for the intersection; and preparation of the intersection design PS&E at 35%, 65%, and 95% stages, which include utility plans, street plans, stormwater and drainage details, landscape plans, signing and striping plans, traffic signal design plan, erosion control, street lighting, and an irrigation plan. Upon our recommendation, the City of Agoura Hills selected a conventional intersection layout due to its operational City of Santa Ciarita TRCASANC074553.2026 Kimsey A>) Horn benefits. We have also assisted the City of Agoura Hills with supplemental environmental impact report (EIR) documentation, right-of-way documentation, and bidding and construction support. Type of Project: Intersection Improvements Contract Duration: 2024 — Ongoing Names of Staff Involved: Michael Choi, Sri Chakravarthy, Sowmya Chandrasekhar, Moody Adli, Michael Madsen, Jean Fares, Matt Stewart, Eden Bouchard Reference: Ramiro Adeva, Assistant City Manager 1818.597.7353 1 radeva@ci.agoura-hills.ca.us Project Team Kimley-Horn knows that when you choose a consulting firm, you are really choosing the people who will bring you technical knowledge, hands-on experience with similar projects, and a commitment to timely, first-rate deliverables and client service. Our team has a history of successfully completing similar projects and has been structured to provide strong support to the City on the Project. Our team consists of individuals who have extensive experience working together to provide professional engineering services to similar agencies, and also have familiarity with the public -sector decision -making process and the required federal, state, and local standards and procedures. We selected our team using two criteria: their experience and locality with a wide range of municipal projects, and their availability to assume major technical responsibilities. The organization chart below identifies our team members and their roles for this Project. Sri Chakravarthy, PE, TE Moody Adli, PE Eugene Huang, PE Drainage Eumir Ruanto, PE, QSD Utilities Brenna Crump, EIT Surveying James Fallon, PLS' Ben Hardin, PLS ^ Jedediah Hawk. PLS " City of Santa Clarita Michael Choi, PE, LEED AP Deputy Charis Ann, PE Traffic Signal Modifications Charis Ahn, PE Jean Fares, PE Signing and Striping/Traffic Control Matt Stewart, PE, TE Carlos Bobadilla, EIT Geotechnical Joe Ririe, PE z Bill Long, PE 2 Sam Ho, PE z Potholing and Utility Verification Abraham Padilla 3 Harrison DeGrote 3 = Key Team Members Subconsultants: 1. Encompass Consultant Group, Inc. 2. Pavement Engineering, Inc. 3. Certerra Subsurface Imaging, Inc. 4. Stay Green, Inc. Sowmya Chandrasekhar, PE, TE, PTOE Michael Madsen, PLA, CLIA, ASLA Landscape and Irrigation Eden Bouchard Irrigation Toning Dave Colburn ° We have provided a table starting on the next page that describes the activities of our designated project manager, discipline leads, and supporting personnel. City of Santa Clarita TRCASANCO14553.2026 Kimley >> Horn Kimley-Horn Serve as key point of contact with the City Scope, budget, and schedule management Michael Choi, PE, LEED AP Project Manager Kimley-Horn team management Maximize Kimley-Horn team's specialties and experience for City's benefit Involvement in all aspects of the Project Day-to-day subconsultant coordination Deputy Project Manager Schedule and action item management Charis Ahn, PE TrafficInvoicing Signal Modifications Lead and progress reports Documentation of decisions, technical deliverables, and comment resolution Lead traffic signal modifications design Provide support to Michael for Project delivery Resource commitment Sri Chakravarthy, PE, TE Principal -in -Charge Strategic direction Risk and challenge resolution Provide independent review for the Project Sowmya Chandrasekhar, PE, TE, PTOE QC/QA Manager Lead quality control efforts Moody Adli, PE Civil Engineering Lead Lead civil engineering efforts Eugene Huang, PE Civil Engineering Act as civil -related technical resource Support civil engineering efforts Eumir Ruanto, PE, QSD Drainage Lead drainage design Brenna Crump, EIT Utilities Lead utility coordination efforts Act as traffic -related technical resource Jean Fares, PE Traffic Signal Modifications Support traffic engineering efforts Matt Stewart, PE, TE Signing and Striping/Traffic Control Lead Lead signing and striping efforts Carlos Bobadilla, EIT Signing and Striping/Traffic Control Provide signing and striping support Michael Madsen, PLA, CLIA, ASLA Landscape Architecture Lead Lead landscape architecture components Eden Bouchard Landscape and Irrigation Provide landscape architecture and irrigation support Encompass Consultant Group, Inc. James Fallon, PLS Surveying Lead Lead surveying efforts Ben Hardin, PLS Surveying Provide surveying support Jedediah Hawk, PLS Surveying Provide surveying support Pavement Engineering Inc. Joe Ririe, PE Geotechnical Lead Lead geotechnical engineering efforts Bill Long, PE Geotechnical Provide geotechnical support Sam Ho, PE Geotechnical Provide geotechnical support Certerra Subsurface Imaging, Inc. Perform vacuum excavation to expose utilities Abraham Padilla Potholing and Utility Verification Record findings Backfill and patch holes City of Santa Crarita TRCASANC074553.2026 Kimsey A>> Horn Harrison DeGrote Potholing and Utility Verification Locate utilities using GPR, electromagnetic locators, ram roads, robotic cameras, and other tools Stay Green, Inc. Dave Colburn Irrigation Toning Trace wires and mark streets We have provided resumes for our key personnel starting on the next page. City of Santa Ciarita TRCASANC074553.2026 10 Kimiey A>> Horn Michael Choi, PE, LEED AP Project Manager Michael has 29 years of experience with roadway, transportation, water resources, utility infrastructure planning, and civil engineering design. He has managed projects that include streetscape improvements, roadway/street design, bike lane improvements and studies, utility infrastructure design and planning, traffic control, and stormwater management. As an experienced civil engineer, Michael oversees design staff coordination with clients/agencies, subconsultants, and contractors from a project's inception through construction. He is adept at coordinating with his project team to arrive at innovative and cost-effective solutions to meet client goals. RELEVANT EXPERIENCE ► City of Santa Clarita, Wiley Canyon Road & Orchard Village Road and Newhall Avenue & Railroad Avenue Intersections Improvement Project, Santa Clarita, CA — Senior Project Engineer EDUCATION Bachelor of Science, Civil Engineering Technology, Old Dominion University CREDENTIALS Professional Engineer in California #67851 Leadership in Energy and Environmental Design Accredited Professional City of Santa Clarita, Left -Turn Median Improvement on Bouquet Canyon Road at Central Park, Santa Clarita — Senior Project Engineer opCity of Santa Clarita, Golden Valley Road Improvements, Santa Clarita, CA — QC/QA opCity of Malibu, PCH Las Flores & Rambla Pacifico Intersection Improvements, Malibu, CA — QC/QA opCity of Rancho Cucamonga, Almond Street Extension, Rancho Cucamonga, CA — QC/QA opCounty of Los Angeles, Department of Parks and Recreation, Hart Park Improvements, Santa Clarita, CA — QC/QA opCity of Lancaster, Lancaster Health District Improvements, Lancaster, CA — Senior Project Engineer/Utilities Lead opCity of Lancaster, Municipal Stadium Project, Lancaster, CA — Project Manager opCity of Thousand Oaks, Thousand Oaks Curbs and Pedestrian Crossing, Thousand Oaks, CA — Senior Project Engineer opCity of Thousand Oaks, Moorpark Road/YMCA Driveway Left -Turn Lane, Thousand Oaks, CA — Project Manager opCity of Burbank, San Fernando Bikeway, Burbank, CA — Project Manager opCity of Burbank, Chandler Bikeway Extension, Burbank, CA — QC/QA opCity of Burbank, Buena Vista Street & Winona Avenue Improvements, Burbank, CA — Project Engineer opCity of Glendale, Proposition 84 Green Streets Best Management Practices (BMP) Demonstration Project, Glendale, CA — Project Manager opCity of Glendale, Colorado Street Active Transportation Project, Glendale, CA — Senior Project Engineer opCity of Glendale, Verdugo Wash Master Plan, Glendale, CA — Project Manager opCity of West Hollywood, Citywide Safety Bollard Improvements Study, West Hollywood, CA — Project Manager opCity of Culver City, Cattaraugus Avenue Improvements, Culver City, CA — QC/QA Reviewer opCity of Culver City, Culver Boulevard Median Stormwater Management Concept Design, Culver City, CA — Project Manager opCity of Malibu, Civic Center Way Realignment Project, Malibu, CA — Project Manager opCity of Whittier, Pio Pico State Park Trail, Whittier, CA — Project Manager opCity of Agoura Hills, Agoura Road Widening Complete Street Project, Agoura Hills, CA — Project Manager opCity of Agoura Hills, Kanan Road & Agoura Road Ultimate Intersection Improvements Project, Agoura Hills, CA — QC/QA Reviewer opCity of Calabasas, Mulholland Highway Scenic Corridor Improvements, Calabasas, CA — Project Manager opCity of Irvine, Great Parks Lots 6 and 7 Expansion, Irvine, CA — Project Engineer City of Santa Clarita TRCASANC074553.2026 Kimsey A>) Horn Charis Ahn, PE Deputy Project Manager; Traffic Signal Modifications Lead Charis is a transportation engineer with experience in traffic engineering and ITS design, planning, and analysis projects. Her experience includes traffic signal design, signal interconnect design, street lighting design, signing and striping design, and planning -level traffic studies. Charis has worked on a variety of projects for which she was involved with traffic intersection modeling, communication block diagrams and fiber-optic splice diagrams, data collection and field review, preparation of design plans using AutoCAD and MicroStation, cost estimation, and technical specifications preparation. RELEVANT EXPERIENCE EDUCATION Bachelor of Science, Civil Engineering, University of California, Los Angeles CREDENTIALS Professional Engineer in California #96083 ► City of Santa Clarita, Newhall Avenue Railroad Crossing Improvements Project, Santa Clarita, CA —Traffic Engineer ► City of Malibu, PCH Las Flores & Rambla Pacifico Intersection Improvements, Malibu, CA — Project Manager ► City of Rancho Cucamonga, Almond Street Extension, Rancho Cucamonga, CA — Traffic Engineer ► City of Irvine, Great Parks Lots 6 and 7 Expansion, Irvine, CA —Traffic Engineer ► City of Irvine, Civic Center Main Parking Lot Improvements, Irvine, CA — Traffic Engineer ► City of Irvine, Protected -Permissive Left -Turn Phasing Project Phase 11, Irvine, CA — Project Manager ► City of Lancaster, Lancaster Health District Improvements, Lancaster, CA — Project Engineer ► City of Lancaster, Section 130 At -Grade Rail Crossing Improvements (Avenues J, K, and M), Lancaster, CA — Traffic Engineer ► City of Lancaster, Safe Routes to School (SRTS) Master Plan, Lancaster, CA — Traffic Engineer ► City of Lancaster, Haul Route/Detours Pavement Impact Fees Analysis, Lancaster, CA — Project Manager ► City of La Canada Flintridge, Foothill Boulevard Traffic Signals Improvements Project, La Canada Flintridge, CA — Traffic Engineer ► City of Los Angeles, Broadway -Manchester Active Transportation Equity Project, Los Angeles, CA — Traffic Engineer ► City of Alhambra, 1.710 North Arterial and 1.10 Interchange Improvements at 1.10 & Fremont Avenue, 1.10 & Atlantic Boulevard, and 1.10 & Garfield Avenue, Alhambra, CA — Traffic Engineer City of Norwalk, Studebaker Road Traffic Signal Synchronization Project and Interconnect Projects, Norwalk, CA — Traffic Engineer ► City of Norwalk, Norwalk Boulevard Traffic Signal and Interconnect Improvements, Norwalk, CA — Traffic Engineer ► City of Norwalk, Alondra Boulevard Traffic Signal Improvements, Norwalk, CA — Designer ► City of Agoura Hills, Signing and Striping Plans for Bicycle Improvements, Agoura Hills, CA — Project Manager ► City of Agoura Hills, Photometric Analysis Study on Reyes Adobe Road, Agoura Hills, CA — Project Manager ► City of Malibu, PCH Signal System Improvements, Malibu, CA — Traffic Engineer ► City of Malibu, Fixed Automated License Plate Recognition Feedback Camera, Malibu, CA — Project Manager ► City of Malibu, Pavement Management System (PMS) Upgrade, Malibu, CA — Project Analyst ► City of Camarillo, Traffic Signal Improvements at Las Posas & Temple Avenue, Camarillo, CA — Traffic Engineer ► City of Camarillo, Central Avenue Bike Lane, Camarillo, CA — Traffic Engineer ► City of Oxnard, Oxnard Boulevard & US 101 Traffic Signal Design, Oxnard, CA — Project Manager ► City of Oxnard, Traffic Signal Modifications, Oxnard, CA — Project Manager ► City of Ventura, Sustainable Transportation Civil Engineering Design Services, Ventura, CA — Traffic Engineer ► City of Ventura, Westside Community -Wide Active Transportation Improvements, Ventura, CA —Traffic Engineer ► City of Ventura, Design of Traffic Signal Communication System Upgrade Project, Ventura, CA — Traffic Engineer ► City of Ventura, The Tides (Telegraph Road & Day Road Intersection) Traffic Signal Design, Ventura, CA — Analyst City of Santa Clarita TRCASANC074553.2026 Kimsey A>) Horn Sri Chakravarthy, PE, TE Principal -in -Charge Sri has more than 22 years of multifaceted transportation engineering and public works experience. Since beginning his career with Los Angeles County prior to joining Kimley-Horn, Sri has participated in a wide variety of public works capital improvement projects involving street improvements, active transportation, drainage/hydrology, and agency permitting. His projects are often multidisciplinary and require coordination with local and regional agencies, Caltrans, and local businesses and residents. RELEVANT EXPERIENCE ► City of Santa Clarita, Newhall Avenue Railroad Crossing Improvements Project, Santa Clarita, CA — Principal -in -Charge City of Santa Clarita, San Fernando Road Improvements, Santa Clarita, CA — Project Engineer City of Lancaster, Lancaster Health District Improvements, Lancaster, CA — Principal -In Charge City of Lancaster, Pedestrian and Bicycle Gap Closure Improvements at 36 Locations, Lancaster, CA — Senior Project Engineer City of La Canada Flintridge, Foothill Boulevard Traffic Signals Improvements Project, La Canada Flintridge, CA — Project Manager EDUCATION Master of Science, Civil Engineering, Louisiana State University Bachelor of Science, Civil Engineering, Kakatiya University, India CREDENTIALS • Professional Engineer in California #73629 • Traffic Engineer in California #2531 AFFILIATIONS Institute of Transportation Engineers (ITE), Member and Past President ► City of Los Angeles, Broadway -Manchester Active Transportation Equity Project, Los Angeles, CA — QC/QA Manager ► City of Los Angeles, Mission Mile Sepulveda Project, Los Angeles, CA — Senior Traffic Engineer ► City of Los Angeles, Griffith Park Safety and Mobility Active Transportation Project, Los Angeles, CA — Principal -in -Charge ► City of Norwalk, Zone 32 Local Streets Rehabilitation Project, Norwalk, CA — Project Manager ► City of Culver City, Ivy Station TOD: Washington Boulevard and National Boulevard Street Off -Site and On -Site Improvements), Culver City, CA — Project Engineer ► City of Agoura Hills, Kanan Road and Agoura Road Intersection Improvements, Agoura Hills, CA — Principal -in -Charge ► City of Malibu, PCH Las Flores & Rambla Pacifico Intersection Improvements, Malibu, CA — Principal -in -Charge ► City of Malibu, PCH Bicycle Route Improvements, Malibu, CA — Project Manager ► City of Malibu, Cliffside Drive Parking, Malibu, CA — Project Manager ► City of Thousand Oaks, Rancho Road Sidewalks and Bike Lanes, Thousand Oaks, CA — Project Engineer ► City of Oxnard, Oxnard Avenue & Saviers Road Traffic Signal Improvements, Oxnard, CA — Project Manager ► City of Ventura, Westside Community -Wide Active Transportation Improvements, Ventura, CA — Principal -in -Charge ► City of Rancho Cucamonga, Almond Street Improvements Project (Via Verde Street to Carnelian Street), Rancho Cucamonga, CA — Project Manager ► City of Fullerton, Nutwood Avenue Bicycle and Pedestrian Mobility Enhancements, Fullerton, CA — Principal -in -Charge ► City of Santa Ana, South Main Street Corridor Improvements, Santa Ana, CA — Traffic Engineer ► City of Irvine, Great Park Lots 6 and 7 Expansion, Irvine, CA — Principal -in -Charge ► City of Irvine, Secure Parking Lot Expansion Design, Irvine, CA — Principal -in -Charge ► City of Irvine, Civic Center Main Parking Lot Improvements, Irvine, CA — Contract Manager ► City of Irvine, Great Park Circulation Analysis, Irvine, CA — Project Engineer ► City of Irvine, Protected Intersections Study and Conceptual Design for Various Locations, Irvine, CA — Project Manager City of Santa Clarita TRCASANC074553.2016 Kimsey A>) Horn Sowmya Chandrasekhar, PE, TE, PTOE QC/QA Manager EDUCATION Sowmya has 17 years of professional experience managing a wide range of engineering projects. She is experienced in public works and capital improvement projects, having worked with local municipalities in Southern California. The range of projects include corridor improvements, park amenities improvements, site civil improvements, operational analysis, feasibility studies, innovative intersection improvements, and active transportation improvements incorporating safety measures for pedestrians and bicyclists. RELEVANT EXPERIENCE ► City of Santa Clarita, Newhall Avenue Railroad Crossing Improvements Project, Santa Clarita, CA — Signing and Striping/Traffic Control Lead City of Lancaster, Pedestrian and Bicycle Gap Closure Improvements at 36 Locations, Lancaster, CA — Senior Engineer City of Lancaster, Avenue USR 14 (SR 138) Interchange Project Approval and Environmental Document (PA&ED), Lancaster, CA — Senior Project Engineer City of Lancaster, Avenue M Interchange Improvements PS&E, Lancaster, CA — Senior Project Engineer City of Lancaster, LRSP, Lancaster, CA — Project Manager City of Lancaster, Paraclete High School SRTS Plan, Lancaster, CA — Senior Traffic Engineer City of Los Angeles, Broadway -Manchester Active Transportation Equity Project, Los Angeles, CA — QC/QA Manager City of Los Angeles, Department of Recreation and Parks, Griffith Park Safety and Mobility Active Transportation Project, Los Angeles, CA — Project Manager Master of Science, Civil Engineering, Missouri University of Science & Technology Bachelor of Science, Civil Engineering, Visvesvaraya National Institute of Technology, India CREDENTIALS Professional Engineer in California #83100 Traffic Engineer in California #2760 Professional Traffic Operations Engineer #3323 AFFILIATIONS ITE, President Orange County Traffic Engineering Council (OCTEC), Member City of Alhambra, 1.710 North Arterial and 1.10 Interchange Improvements at 1.10 & Fremont Avenue, 1.10 & Atlantic Boulevard, and 1.10 & Garfield Avenue, Alhambra, CA — Traffic Engineer ► City of Norwalk, Norwalk Boulevard Traffic Signal and Interconnect Improvements, Norwalk, CA — QC/QA Reviewer ► City of Simi Valley, LRSP, Simi Valley, CA — Project Engineer ► City of Diamond Bar, Neighborhood Traffic Management Plan on North Del Sol Lane and Highland Valley Road, Diamond Bar, CA — Project Manager City of Bakersfield, Monitor Street School Corridor Active Transportation Improvements Project, Bakersfield, CA — Project Manager ► City of Bakersfield, Niles and Monterey Complete Streets, Bakersfield, CA — Senior Engineer ► City of Buena Park, SRTS Plan, Buena Park, CA — Project Manager ► City of Buena Park, Orangethorpe Avenue Complete Streets Planning Study, Buena Park, CA — Project Manager ► City of Santa Ana, South Main Street Corridor Improvements, Santa Ana, CA — QC/QA ► City of Irvine, Great Park Parking Lots 6 and 7 Expansion, Irvine, CA — Project Manager ► City of Irvine, Civic Center Main Parking Lot Improvements, Irvine, CA — Senior Project Engineer ► City of Irvine, Secure Parking Lot Expansion Design, Irvine, CA — Senior Project Engineer ► City of Irvine, Great Park Circulation Analysis, Irvine, CA — Project Manager ► City of Laguna Niguel, Rancho Niguel Road and Rancho Azul Corridor Operations and Safety Study, Laguna Niguel, CA — Senior Project Engineer ► Caltrans, Complete Intersections: A Guide to Reconstructing Intersections and Interchanges for Bicyclists and Pedestrians, Statewide, CA — Project Manager City of Santa Clarita TRCASANC074553.2026 Kimsey A>) Horn en Moody Adli, PE Civil Engineering Lead -_ EDUCATION Moody is a civil engineer with diverse experience delivering • Bachelor of Science, Civil infrastructure projects across both the public and private sectors. His Engineering, California State background includes design and coordination of roadway improvements, University, Northridge subsurface utilities, drainage and grading, ADA compliance upgrades, active transportation facilities, and sidewalk and curb ramp design. He is well versed in preparing construction CREDENTIALS documents, cost estimates, and project specifications. He has software experience with . Professional Engineer in AutoCAD Civil 3D, Microsoft Office, and Bluebeam. California #98938 RELEVANT EXPERIENCE ► City of Rancho Cucamonga, Almond Street Improvements Project (Via Verde Street to Carnelian Street), Rancho Cucamonga, CA — Project Engineer City of Malibu, Land Development On -Call Plan Review and Plan Check Services, Malibu, CA — Project Engineer ► City of Malibu, On -Call Traffic Engineering, Malibu, CA — Project Engineer ► City of Artesia, On -Call Engineering Services, Artesia, CA — Project Engineer ► City of Agoura Hills, On -Call Engineering Services, Agoura Hills, CA — Project Engineer ► City of Burbank, San Fernando Bikeway, Burbank, CA — Analyst ► City of Los Angeles, Broadway -Manchester Active Transportation Equity Project, Los Angeles, CA — Analyst ► City of Lancaster, Haul Route/Detours Pavement Impact Fees Analysis, Lancaster, CA — Analyst ► City of Norwalk, Local Street Rehabilitation Program: Zones 2, 9, and 29, Norwalk, CA — Analyst ► City of Norwalk, Norwalk Boulevard Traffic Signal and Interconnect Improvements, Norwalk, CA —Analyst ► City of Norwalk, Studebaker Road Traffic Signal Synchronization Program (TSSP) and Interconnect Projects, Norwalk, CA —Analyst ► City of Agoura Hills, Kanan Road and Agoura Road Intersection Improvements, Agoura Hills, CA —Analyst ► City of Agoura Hills, Recreation Center Trail Project, Agoura Hills, CA — Analyst ► City of Agoura Hills, Chumash Park Restroom Rehabilitation and ADA Improvements, City of Agoura Hills, CA —Analyst ► City of Malibu, PCH Las Flores & Rambla Pacifico Intersection Improvements, Malibu, CA —Anal ► City of Malibu, Bluffs Park Pedestrian Walkway Improvements, Malibu, CA — Analyst ► City of Malibu, Kanan Dume Biofilters, Malibu, CA — Analyst ► Los Angeles County Metropolitan Transportation Authority (LA Metro), Rail to Rail Segment A Active Transportation Corridor, Los Angeles, CA — Analyst ► City of Simi Valley, Traffic Signal Condition Assessment, Simi Valley, CA —Analyst ► City of Simi Valley, First Street Rehabilitation Project, Simi Valley, CA — Analyst ► City of Simi Valley, Madera Road Rehabilitation Project, Simi Valley, CA — Analyst ► City of Oxnard, Traffic Signal Modifications, Oxnard, CA — Analyst ► City of Oxnard, Oxnard Boulevard & US 101 Traffic Signal Design, Oxnard, CA —Analyst ► City of Ventura, Sustainable Transportation Civil Engineering Design Services, Ventura, CA — Analyst ► City of Irvine, Great Park Parking Lots 6 and 7 Expansion, Irvine, CA — Analyst ► City of Irvine, Civic Center Main Parking Lot Improvements, Irvine, CA — Analyst ► City of Irvine, Protected -Permissive Left -Turn Phasing Project Phase II, Irvine, CA — Analyst City of Santa Ciarita TRCASANC074553.2026 Kimsey A>) Horn Michael Madsen, PLA, CLIA, ASLA Landscape Architecture Lead EDUCATION J Michael brings more than 22 years of landscape architectural • Master of pe experience supporting roadway, streetscape, and site improvement re, University Architecture, University of projects. His background includes corridor planning, roadway Florida enhancements, and the design of parkway, median, and sidewalk environments that improve Bachelor of Science, circulation, safety, and overall functionality. He works closely with multidisciplinary teams to Business Administration, integrate landscape architecture into transportation solutions —coordinating curb, gutter, and Florida State University sidewalk modifications, and making sure that site elements align with traffic operations and engineering requirements. Michael applies a data -driven approach to inform design decisions, CREDENTIALS helping to address operational challenges while enhancing user experience. His work . Professional Landscape emphasizes clear, maintainable, and context -sensitive design, incorporating durable materials Architect in California #5798 and water -efficient planting strategies that complement infrastructure improvements. By balancing performance, safety, and aesthetics, Michael helps deliver projects that improve • Certified Landscape traffic flow while creating cohesive and visually appealing public environments. Irrigation Auditor #92638 RELEVANT EXPERIENCE Council of Landscape Architectural Registration ► City of Burbank, Burbank Channel Bikeway Project, Burbank, CA — Boards #21623 Landscape Architect AFFILIATIONS City of Monterey Park, Monterey Pass Road Complete Streets, Monterey Park, CA — Landscape Architect • American Society of opCity of Agoura Hills, Kanan Road and Agoura Road Intersection Improvements, Landscape Architects Agoura Hills, CA — Landscape Architect (ASLA), Member opCity of Thousand Oaks, Rancho Road Sidewalks and Bike Lanes, Thousand Oaks, CA — Landscape Architect opCity of Banning, Lions Park Irrigation Conversion Project, Banning, CA — Project Manager/Landscape Architect opCity of Desert Hot Springs, Hacienda Avenue Improvement Project, Desert Hot Springs, CA — Landscape Architect opCity of Palm Springs, San Rafael Turf Reduction, Palm Springs, CA — Project Manager/Landscape Architect opCity of Palm Springs, Demuth Park Pickleball Expansion Project, Palm Springs, CA — Project Manager/Landscape Architect opCity of Palm Springs, Demuth Park Dog Park Renovation, Palm Springs, CA — Landscape Architect opPalm Springs Unified School District, Palm Springs High School Renovations, Palm Springs, CA — Landscape Architect opCity of Anaheim, Gene Autry Way Improvements From 1.5 to State College Boulevard and State College Boulevard Improvements (West Side) from Artisan Court to Gateway Office, Anaheim, CA — Landscape Architect opCity of Santa Ana, Santa Ana Boulevard and 5th Street Protected Bike Lane, Santa Ana, CA — Landscape Architect opCity of San Diego, Crown Point Park Renovations, San Diego, CA — Landscape Architect opCity of National City, Euclid Avenue Pedestrian and Bike Enhancements, National City, CA — Landscape Architect opCity of National City, Paradise Creek Educational Park, National City, CA — Project Manager opCity of Chula Vista and Meridian Development, Millenia Park, Chula Vista, CA — Project Manager/Landscape Architect opSANDAG, Uptown Bikeways: 4th and 5th Avenues, San Diego, CA — Landscape Architect opSANDAG, North Park and Mid -City Bikeways: Landis and Georgia -Meade, San Diego, CA — Landscape Architect opSANDAG, Imperial Avenue Bikeway, San Diego, CA — Landscape Architect opCity of Brawley, Alyce Gereaux Park Renovations, Brawley, CA — Landscape Architect opCity of El Centro, Engineering Design and Architectural Design Services for Plank Park, El Centro, CA — Landscape Architect City of Santa Ciarita TRCASANC074553.2026 Kimsey A>) Horn James Fallon, PLS Surveying James is a principal surveyor with more than 25 years of professional experience delivering land surveying services for a wide range of public and private sector projects throughout Southern California. While his background is well-rounded, his work has leaned heavily toward supporting public agencies on infrastructure -focused assignments, including transportation corridors, flood control improvements, pipelines, and utility system upgrades. James has led survey efforts for cities, counties, and water agencies under both task -specific and on -call contracts, bringing strong familiarity with agency standards, regulatory processes, and multi -disciplinary coordination. His technical expertise includes topographic and boundary surveys, right-of-way and easement mapping, ALTA surveys, legal descriptions, and construction staking. He is also experienced in the use of geodetic control networks, aerial mapping control, and terrestrial LiDAR technologies. With a practical understanding of field operations and a commitment to accuracy and responsiveness, James consistently delivers dependable, high -quality survey support across all phases of public works project development. RELEVANT EXPERIENCE ► City of Santa Clarita, Orchard Village Road Median Turf Removal, Santa Clarita, CA — Project Manager City of Ventura, Montalvo SRTS Cypress Point Gap Closure and Complete Streets Active Transportation Project, Ventura, CA — Project Manager City of Ventura, Johnson Drive Street Improvements: Bristol Road to US 101, Ventura, CA — Principal Surveyor City of Ventura, 2020-2022 Citywide Street Improvements, Ventura, CA — Principal Surveyor EDUCATION Bachelor of Science, Surveying Engineering, California State University, Fresno CREDENTIALS Professional Land Surveyor in California #7807 AFFILIATIONS California Land Surveyors Association (CLSA), Member, Past Officer, and Past Joint Professional Practices Committee Member American Council of Engineering Companies (ACEC), Channel Coast Chapter, Member and Past President International Right of Way Association (IRWA), Member City of Santa Barbara, Modoc Road Multi -Use Path Improvements, Santa Barbara, CA —Project Manager City of Santa Barbara, Eastside Community Paseos, Santa Barbara, CA — Project Manager City of Santa Barbara, Westside and Lower West Active Transportation Project, Santa Barbara, 'I�FCG CA — Project Manager ► City of Santa Barbara, Eastside Active Transportation Improvements, Santa Barbara, CA — Project Manager ► City of Santa Barbara, Westside Community Pasos Monument Preservation, Santa Barbara, CA — Principal Surveyor ► City of Oxnard, Oxnard Alleys Reconstruction Project, Oxnard, CA — Project Manager ► City of Oxnard, Oxnard Green Alleys, Oxnard, CA — Principal Surveyor ► City of Oxnard, Yucca Street Storm Drain, Oxnard, CA — Principal Surveyor ► City of Oxnard, Multiple Traffic Signal Modifications (PW 23-115), Oxnard, CA — Project Manager ► City of Oxnard, Ventura Road Street and Safety Improvements, Oxnard, CA — Project Manager ► City of Oxnard, Citywide Neighborhood Resurfacings, Oxnard, CA — Project Manager ► City of Oxnard, Gonzales Road Median Improvements, Oxnard, CA— Project Manager ► City of Oxnard, La Colonia Alleys Reconstruction Project, Oxnard, CA — Project Manager City of Santa Clarita TRCASANC074553.2026 17 Kimiey A>) Horn Three Recent Projects Managed by the Project Manager Our project manager, Michael Choi, PE, LEED AP, has managed three projects that share the same elements as the Project, which we detail below and in the following pages. We affirm that there will be no change in project manager without the City's written authorization. City ur ourvanK, San rernanau omeway, buroanK, uA Before The San Fernando Bikeway project is a 3-mile Class I bike path that runs parallel to the Union Pacific Railroad (UPRR/Metrolink Valley rail line owned by LA Metro). This will be constructed primarily as a separate Class I bicycle path, with a small portion (0.15 miles) consisting of a Class III bike route. Most of the path will be constructed in the LA Metro -owned rail ROW adjacent to the current UPRR/Metrolink railroad ROW in addition to a half -mile stretch along the Los Angeles County Flood Control Channel. The portion adjacent to the flood control channel will require review and coordination with Los Angeles County Flood Control District (LACFCD), US Army Corps of Engineers (USACE), and City of Burbank Water and Power (BWP). The project also includes a key segment between the County of Los Angeles flood channel and Downtown Burbank Metrolink Station along North Varney Street that requires sidewalk and driveway improvements while considering vehicular traffic and truck turning movements for various industrial facilities and businesses. Kimley-Horn prepared PS&E for civil, traffic, landscape, and structural; coordinated with regulatory agencies (LACFCD, USACE, LA Metro, and Caltrans) for permitting and shared use agreements; coordinated with various utility companies for adjustment of conflicting utility vaults; provided environmental revalidation; coordinated with City of Burbank staff and departments in the preparation of the PS&E package; and provided bid support services. Our design of the proposed Class I bike path along the flood control channel required assessment of maintenance access for LACFCD and BWP, connection to adjacent improvements with proposed bike path boardwalk and structural improvements, bike path lighting, perimeter fencing for safety and security, local and draught tolerant landscape improvements to address corridor beatification and ease of maintenance, and stormwater treatment for the proposed improvements prior to discharging to the existing channel. Reference: David Kriske, Assistant Community Development Director 1818.238.5269 1 driske@burbankca.gov City of Malibu, Civic Center Way Improvements, Malibu, CA Kimley-Horn provided the City of Malibu with multiple services to improve mobility and safety on Civic Center Way, including roadway widening, sidewalk improvements, traffic synchronization, and the addition of bicycle lanes. We provided site analysis, preliminary design, and PS&E for roadway improvements along Civic Center Way between Malibu Canyon Road and Webb Way, and Webb Way between Civic Center Way and PCH. For Webb Way & PCH, an additional second left -turn lane for eastbound PCH traffic was added as well as new traffic signals. For Webb Way & Civic Center Way, an additional northbound left turn lane onto Civic Center Way as well as a new sidewalk on the west side of Webb Way were installed. A traffic signal was installed at the intersections of Civic Center Way and Webb Way & Stuart Ranch Road, which was synchronized with the Webb Way & PCH signals to enhance vehicular flow. In addition, we provided improvements along Civic Center Way to enhance pedestrian and bicycle safety through minor road alignment modifications, incl uding City of Santa Ciarita TRCASANC074553.2026 Kimsey A>) Horn traffic lane striping and a new bike lane as well as new pedestrian walkways and driveway transitions. New landscaping was added along both sides of the road. We also completed hydrology, hydraulic analysis, and engineering plans for drainage and stormwater quality .. improvements of Malibu Canyon Road and Civic Center Drive. The project involved modification of three County of Los Angeles and two City of Malibu storm drain'' systems. The H&H analysis evaluated a 25-acre study area. Clear and "burned" peak flows were evaluated .� using the Los Angeles County Modified Rational;- Method. We performed a hydraulic analysis of street: flow capacity using Bentley FlowMaster, while we evaluated existing and proposed pipe improvements using Civil Design Water Surface Pressure Gradient (WSPG) software. Project improvement plans and bid specifications included 18" and 24" reinforced concrete pipe (RCP) drainage laterals, curb inlets, and a 24" RCP main. We improved existing water quality through thel design and construction of Filterra structures, a bioswale, and two biofiltration areas. 9 C r Reference: Rob Duboux, Assistant City Manager 1310.456.2489 1 rduboux@malibucity.org City of Agoura Hills, Agoura Road Widening Complete Street Project, Agoura Hills, CA Kimley-Horn provided road widening, streetscape design, and traffic engineering services for this project, which was designed to facilitate increased traffic from the new developments, improve traffic flow and safety, and implement improvements consistent with the Agoura Village Specific Plan and the guidelines of the 2007 California Complete Street Act (Assembly Bill 1358). The 2.2-mile project included the widening of Agoura Road from two to four lanes; construction of landscape medians, sidewalks, multiple driveway modifications, and dedicated bike lanes in both directions; a pedestrian -only bridge; and undergrounding of electrical power lines. The scope of work included the preservation of native oak trees; use of benches, accent paving, and lighting over the length of the roadway to provide continuity and unity; and modifications to storm drains and debris basins to promote green standards such as sub- surface bio-retention and infiltration. Reference: Charmaine Yambao, Director of Public Works/City Engineer 1818.597.9360 1 cyambao@agourahillscity.gov City of Santa Ciarita FRCASANC074553.2026 19 Kimiey A>) Horn Project Understanding/Approach The City seeks a qualified engineering firm to provide professional engineering design services to increase roadway and intersection capacity, enhance traffic flow, and support efficient circulation at the following two Project intersections: • Central Park at Bouquet Canyon Road • Copper Hill Drive at West Hills Drive/Westcreek Drive Kimley-Horn has prepared initial design recommendations for each location, as illustrated in Exhibit 1 (on page 22) and Exhibit 2 (on page 23). These proposed improvements are designed to address current traffic demands, reduce congestion, and lead to smooth transitions through each intersection to better serve Santa Clarita residents' needs. Our approach will also include review of the City's traffic studies and data that resulted in the Project recommendations and understanding of outreach or input received from stakeholders. Central Park at Bouquet Canyon Road The existing east driveway of Central Park includes one dedicated left -turn lane and one shared left/right-turn lane. To enhance traffic flow and minimize congestion, this Project proposes widening the driveway's western side by approximately 8 feet to accommodate three egress lanes: two dedicated left -turn lanes, and one dedicated right -turn lane. The widening will necessitate an evaluation of existing tree canopy and roots at the driveways' southwest corner. Additionally, the existing park monument sign will be protected in place to preserve its location and integrity. To facilitate this improvement, the following are anticipated: • Sidewalk Relocation: The sidewalk on the driveway's west side will be removed, and pedestrian circulation will be redirected to the east side to maintain ADA compliance and accommodate the driveway expansion. Further review of sidewalk relocation and layout will need to be assessed for optimal and safe circulation for both pedestrians and vehicular traffic. • Enhanced Pedestrian Connectivity: A new concrete pedestrian pathway and ADA-compliant curb ramp will be constructed, connecting to the crosswalk and integrating with the park's existing pathway network. This will provide an opportunity for coordination with SCV Water for the new pedestrian pathway alignment and any future landscape enhancement to Park entry. To facilitate U-turn movements for northbound vehicles on Bouquet Canyon Road intending to head southbound, the median on the south leg of Bouquet Canyon Road will be modified to add a U-turn lane with sufficient pocket length. With a southbound receiving width of 36 feet, there appears to be sufficient space for U- turn movements. Median modifications will require adjustments to planting and irrigation, as the existing irrigation pull box within the median nose will need to be relocated. The existing median features established vegetation and shrubs. Based on the median modification to accommodate the U-turn lane, shrubs along the south edge of the median will be removed, with new landscaping integrated into the updated design. A complete hard pipe and bubbler irrigation system will be installed, using existing sleeves and controller wire, with toning performed to confirm wiring locations. All new paving in the median will match the existing stamped concrete in both color and pattern for aesthetic continuity. Upgrades to traffic signal infrastructure will be essential for the design of the proposed U-turn lane: • Southeast Signal Pole Replacement: The existing 19A-2-80 pole with a 20-foot mast arm will be replaced with a longer mast arm to extend over the new U-turn lane. A new traffic signal pole will be installed at the southeast corner with a 40-foot mast arm, U-turn signal head indications, and updated signage to support the lane modifications. L City of Santa Ciarita TRCASANC074553.2026 Kimsey A>) Horn Kimley-Horn's team will collaborate with the City's Traffic Division for clear and efficient traffic signal design and operations. Since Central Park is owned by SCV Water, adjustments to the City's existing lease line agreement will be required to implement the proposed improvements. Our survey task will obtain a title report for the Park to delineate the existing lease line to be adjusted for the proposed improvements. Our long history of successful projects with both the City and SCV Water will support seamless collaboration as well as efficient project coordination with SCV Water. Copper Hill Drive at West Hills DriveMestcreek Drive The existing southbound approach on Copper Hill Drive at West Hills Drive/Westcreek Drive consists of three through lanes and one left - turn lane. To address traffic congestion and enhance safety, this Project proposes widening the west side of Copper Hill Drive's north leg by approximately 8 feet to accommodate a new dedicated southbound right -turn lane onto West Hills Drive. This improvement will provide better access to West Creek Academy and reduce southbound delays during peak hours. The roadway widening will necessitate the adjustments to both existing utilities and sidewalk along the west side of Copper Hill Drive. To facilitate this improvement, the following are anticipated: • Landscaping and Sidewalk Removal: Portions of existing landscaping, trees, and the sidewalk along the west side of Copper Hill Drive will be removed to provide space for the new dedicated southbound right -turn lane. Drainage analysis will be performed to estimate the increased stormwater runoff flowrate due to the increase in impervious surface and to document no major impact to the existing storm drain system. • Utility Relocations: Cabinets, utilities, pull boxes, and streetlights will be relocated to the back of the sidewalk to accommodate the widened roadway. Identification of existing subsurface utility locations and depth will be confirmed by performing selective potholing in additional to utility information from record plans. The existing catch basin at the northwest corner will be protected in place. Kimley-Horn will work closely with City staff to coordinate required storm drain updates and achieve compliance with County of Los Angeles (County) standards to avoid Project delays. If the Project improvements require modification to the existing catch basin, Kimley-Horn has processed County storm drain permits for similar modification to existing catch basin and laterals. Revisions at the northwest curb return will include several improvements to accommodate the new turn lane and achieve compliance with accessibility standards: • Northwest Traffic Signal Equipment Relocation: The existing Type 15 traffic signal pole, traffic signal controller cabinet, service pedestal, and multiple pull boxes will be relocated to the back of walk. • Curb Ramp Reconstruction: The existing curb ramp at this corner will be reconstructed to meet ADA accessibility requirements and provide safe pedestrian access. Detailed survey and review of City right-of-way versus easements that needs to be updated will be completed for the improvements. To further optimize traffic movement and reduce vehicle wait times for the southbound right -turn lane: • Pedestrian Crosswalk Relocation: The east -west pedestrian crossing is proposed to be relocated from the north leg of Copper Hill Drive to the south leg of the intersection. A yellow continental crosswalk with an updated limit line will be installed across the south leg to improve visibility and accessibility. • Enhanced Signal Timing: Relocating the crosswalk allows for better traffic signal phasing, reducing potential conflicts between southbound-traveling vehicles and pedestrians crossing Copper Hill Drive, and optimizes signal timing for improved traffic flow. City of Santa Clarita TRCASANC074553.2026 Kimsey A>) Horn Update existing 19A-2-80 traffic signal pole to new pole with longer mast arm to accommodate U-turns. City of Sable Clarits , TRCWN0014553.2026 22 Kim ley>o Horn City of Sable Clarita • TRCWN0014553.2026 23 Kim ley>o Horn Scope of Services TASK 1: PROJECT MANAGtivicry i Kimley-Horn will provide project management for each task detailed in this scope of services, which is assumed to be 12 months from NTP to the Construction Authorization. Management activities consist of attending meetings; creating and updating the Project schedule; tracking budget; coordinating with the City, Diagnostic Team, and third -party agencies; developing and maintaining Project information, agendas, meeting notes, and task lists; QC/QA; and Project administration. Task 1.1: Kick -Off and Monthly Project Development Team (PDT) Meetings The Kimley-Horn team will assist the City in developing the PDT, which is subject to final approval by the City. The PDT will include the necessary agency representatives entitled to advance the Project design elements and gain approvals. The Kimley-Horn team will schedule and conduct a kick-off meeting and monthly PDT meetings (virtual) for 12 months —from NTP to Construction Authorization —between the Kimley-Horn team and the City to coordinate Project details and develop next steps. These meetings will provide opportunities for Kimley-Horn to report upon the Project's status, coordinate activities, and review the schedule. The Kimley-Horn team will create and distribute meeting notes with action items to attendees after each meeting. • Preparation of Monthly PDT Meeting Agendas and Notes (12 PDT Meetings) Task 1.2: Schedule The Kimley-Horn team will prepare the Critical Path Method (CPM) schedule. The schedule will include tasks, Project milestone dates, critical path, and deliverables and agency review periods and approvals as well as utility and stakeholders' coordination for Project submittals. The Kimley-Horn team will split the CPM schedule between the two (2) Project locations in case one (1) location design is required to lag behind the other and be monitored during Project performance. If schedule delays occur or appear likely, the Kimley-Horn team will advise the City of the situation and recommend corrective actions, as appropriate. The Kimley-Horn team will update the schedule monthly, or as required, to reflect changes and progress on major milestones throughout the Project's duration, and review them at each PDT meeting. • CPM Schedule Split Between Two (2) Project Locations and CPM Schedule Updates Task 1.3: Quality Control Kimley-Horn will implement its QC/QA program, which includes a senior -level review of Project deliverables. The QC/QA program will identify the major Project deliverables at the Project's beginning, and Kimley-Horn will send out notifications to the Kimley-Horn team ahead of deliverables to schedule QC reviews. The Kimley-Horn team's project manager will schedule reviews and make sure they are completed. Upon completion of QC reviews, the technical manager and task leaders will review the comments and determine appropriate revisions and responses to comments. The technical manager will then conduct a follow-up meeting to "close the loop" with the QC reviewer and obtain approval of comment resolutions. The Kimley-Horn team's project manager will oversee the QC/QA process and will resolve any conflicting comments between the QC reviewer, technical manager, and independent reviewers performing the work. Task 1.4: Public Meetings Kimley-Horn will provide public meeting support to the City. In support of this effort, the Kimley-Horn team will attend and prepare exhibits for presentation for up to five (5) public meetings. TASK 2: PRELIMINARY INVESTIGATION Task 2.1: Field Reconnaissance The Kimley-Horn team will visit the site to review and record visible, above -ground existing conditions with plans in hand. During the initial site visit, the Kimley-Horn team will evaluate all pertinent Project components against City of Santa Clarita Standards, California Manual on Uniform Traffic Control Devices (CA-MUTCD) standards, Caltrans Standard Specifications, and Standard Specifications and Plans for Public Works Construction (Green Book). The Kimley-Horn team will identify elements that could impact the Project, including existing utilities, drainage facilities, traffic signal, signing and striping, sidewalk, and pavement. The Kimley-Horn team will note and compare these City of Santa Ciarita TRCASANC074553.2026 Klmley ">> Horn components against the topographic mapping and utility base mapping prepared in Tasks 1.2 and 1.3. The Kimley-Horn team will record existing site conditions in photographs and/or video. • Site Photos and/or Video Task 2.2: Document Research and Utilitv Maaain The Kimley-Horn team will perform utility investigations and coordination with utility owners throughout the Project development process. The Kimley-Horn team will start the utility information request process by preparing a Project limits map and requesting utility information from each utility owner within the area of work. The Kimley-Horn team will obtain a list of utility providers from the City and cross-reference lists with the DigAlert database so there is comprehensive coverage. The City will provide copies of available pertinent City records —such as street plans, traffic signal plans, and signing and striping plans. The Kimley-Horn team will begin the utility coordination process upon receiving the Notice to Proceed (NTP), prepare utility "A" letters on City letterhead, and submit them to the City for review and approval. Once the utility "A" letters are approved, the Kimley-Horn team will send them, along with the Project limits map, to all utility owners within the Project limits. The Kimley-Horn team will prepare and maintain a utility matrix to track discussions and information received from the various utility owners. The Kimley-Horn team will transfer utility information received from the utility owners based on the utility "A" letters to base maps in plan and profile view, as applicable. The Kimley- Horn team will save all original information obtained from the utility owners in the Kimley-Horn team's Project files, providing the City with a copy. The Kimley-Horn team will prepare utility "B" letters during the 60% PS&E development and submit them to the City for review and approval. Once the utility "B" letters are approved and after submittal of 60% PS&E, the Kimley-Horn team will send the utility "B" letters and the 60% design plans to the utility owners for review, indicating where there are conflicts with their utilities (both existing and future plans for their utilities). The Kimley-Horn team will use additional information on existing utilities obtained from the utility "B" letters to determine potential utility conflicts and to resolve the conflicts identified. As with the utility "A" letters, the Kimley-Horn team will save all original information obtained from the utility owners in the Kimley-Horn team's Project files, providing the City with a copy. The Kimley-Horn team will prepare utility "C" letters at the 100% design stage and submit them to the City for review and approval prior to sending to the affected utility owners. Once the utility "C" letters are approved, we will send them, along with the 100% design plans, to each utility owner, indicating whether any changes have been made to the Project plans since the utility "B" letters were transmitted. The Kimley-Horn team will request written confirmation of utility relocations and the utility relocation schedule. The Kimley-Horn team will save all original information received from the utility owners in the Kimley-Horn team's Project files, providing the City with a copy. The Kimley-Horn team will use the data and base maps to develop a utility base map identifying potential utility conflicts. The utility base map will help support environmental clearance, PS&E approval, and utility/right-of-way certification. The Kimley-Horn team will incorporate existing utilities received from utility companies into the utility base map, including underground and overhead utilities based on utility data collected from document research and surveyed surface utilities. • Distribution of Utility "A" Letters • Distribution of Utility "B" Letters • Distribution of Utility "C" Letters • Utility Conflict Matrix in Excel/PDF (updated throughout the utilities coordination process) • Utility Base Map (AutoCAD, PDF) Task 2.3: Topographic Survey and Record Right -of -Way Kimley-Horn's subconsultant, Encompass Consultant Group, Inc. (ECG), will create an aerial image and topographic map covering the two Project intersections' right-of-way. The Kimley-Horn team will provide ground control for the aerial imagery using global positioning systems (GPS). The Kimley-Horn team will provide a detailed topographic survey for the following: • Central Park at Bouquet Canyon Road • Copper Hill Drive at West Hills DriveM/estcreek Drive The survey will include visible existing street improvements, including surface drainage structures and utilities, striping, back of walk, landscaping, markings, signs, streetlights, and other appurtenant improvements. The survey will take cross sections at 50' intervals and will include top of curb, flowline, edge of gutter, edge of pavement, lane lines, centerline, curb and medians, angle points and curb retu ms. At Central Park, the survey limits will encompass the Project intersection as well as approximately 150 feet of the west and south legs. At City of Santa Crarita TRCASANC074553.2026 Klmley ">> Horn Copper Hill Drive, the survey limits will include the Project intersection along with approximately 600 feet of the west side of Copper Hill Drive's north leg. ECG will also perform right-of-way engineering and obtain street centerline and tie monuments surveys for the Project extents along Bouquet Canyon Road. ECG will establish the street right-of-way lines from found monuments based on City and County record maps, centerline tie -sheets, and other documents. ECG will use the topographic survey and record right-of-way mapping from preliminary design to approved construction documents. The design surveys will conform to the Caltrans Survey manual and locate centerline, vertical, and horizontal controls. The topographic survey will include existing easements on adjacent properties. • Aerial Topographic Map and Orthophotography • Field Topographic Survey [AutoCAD Civil3D (.dwg) format] Task 2.4: Utility Potholin Kimley-Horn's subconsultant, Certerra Subsurface Imaging, Inc. (Certerra), will conduct potholing to positively identify underground utility conflicts. The Kimley-Horn team will complete potholing after the distribution of utility "B" letters and follow-up meetings with utility companies. The Kimley-Horn team will identify potholing locations to confirm underground utility conflicts that would require changes to design. The Kimley-Horn team will identify pothole information on the plans. The Kimley-Horn team has assumed up to four (4) locations for potholing as part of this scope of services. The Kimley-Horn team will coordinate all field work with the City prior to performing the work. The Kimley-Horn team will contact and arrange for USA DigAlert markings prior to the pothole exploration. Kimley-Horn's subconsultant, Stay Green, Inc. (Stay Green) will perform toning to identify existing wiring locations within the Project limits. • Potholing Report Task 2.5: Corina and Pavement Assessment Pavement Engineering, Inc. (PEI) will perform coring and deflection testing to evaluate the existing asphalt concrete (AC) pavement's structural capacity and performance. PEI will perform deflection tests at 100- foot maximum intervals in each lane. PEI will perform coring once at each lane, including turn lanes. PEI will perform the deflection analysis in general accordance with CTM. PEI will record existing AC, base, and gutter thicknesses. PEI will take representative cores to determine whether any areas are unsuitable for saw cutting and pouring against the existing asphalt. ECG shall visually evaluate the condition of the existing surface. If the City would li ke a thorough pavement treatment option and evaluation, PEI will perform evaluations in a separate proposal. • Coring Data • Deflection Testing Results • Pavement Assessment TASK J: LOCATION 1 DESIGN - CENTRAL PARK AND BOUQUET CANYON ROAD The completed PS&E documents will include the designs for improvements, including demolition, paving and grading, sidewalk, curb and gutter, signing and striping, medians, drainage, traffic control, and modification of existing traffic signals. Kimley-Horn will include a detailed layout plan in the 60%, 90%, Draft 100%, and Final 100% PS&E submittals to show the improvements within the Project limits. The completed designs will conform to applicable laws, ordinances, and codes, including the latest ADA Title II regulations, City of Santa Clarita Standards, the latest Caltrans Standard Specifications and Standard Plans, and the latest CA-MUTCD. Task 3.1: PS&E Kimley Horn will prepare the PS&E Documents at the following five (5) submittal stages: 30%, 60%, 90%, Draft 100%, and Final 100%. Kimley-Horn will prepare up to two (2) AutoTurn concepts to demonstrate that vehicle movements will work with the proposed design. Kimley-Horn will include the following plans for Central Park at Bouquet Canyon Road with each submittal, unless otherwise specified on below: City of Santa Ciarita TRCASANC074553.2026 Klmley ">> Horn Title Sheet 1 sheet General Notes 1 sheet Survey Control Sheet 1 sheet Typical Sections 1 sheet Demolition Plans Up to 2 sheets at 1" = 40' Street Improvement Plans Up to 2 sheets at 1" = 40' Curb Ramp Details 1 sheet at 1" = 10' Erosion Control Plan 1 sheet at 1" = 60' Construction Details Up to 2 sheets Utility Relocation Plans Up to 2 sheets at 1" = 40' Signing and Striping Plans 1 sheet at 1" = 40' Traffic Signal Modification Plans 1 sheet at 1" = 20' (60% PS&E and beyond) Traffic Control Plans and Pedestrian Detour Plans 1 sheet at 1" = 40' (60% PS&E and beyond) Irrigation and Landscape Plans Up to 2 sheets at 1" = 40' (60% PS&E and beyond) Total Up to 19 sheets Task 3.1.1: 30% Plans and Estimate The 30% Plans will include conceptual layout, scope of improvements, and framework of the bid set. This includes the assessment of the potential issues, including right-of-way constraints, any changes in existing site conditions observed during the initial site visit, vehicular and pedestrian accessibility, and feasibility of all improvements. The purpose of the 30% Plans will be to capture proposed design improvements, updated existing conditions from the initial site visit, topographic mapping, right-of-way boundaries, and existing utilities from the utility "A" letter responses. The 30% Plans will also include typical sections, proposed alignments, and construction notes. The 30% Plans will include a cost estimate. Task 3.1.2: 60% PS&L- Kimley-Horn will review the City's comments on the 30% Plans and incorporate non -conflicting comments into the 60% PS&E submittal. Kimley-Horn will prepare a comments -response matrix, with responses to each of the comments along with their disposition. Kimley-Horn will facilitate up to one (1) 30% comments resolution meeting with the City to clarify comments. Kimley-Horn will incorporate comments received on the 30% Plans into the 60% PS&E submittal based on concurrence from the City. The 60% design will be a more detailed version of the 30% design, identifying potential utility conflicts and construction details required for pavement, curb ramps, maintenance access, pedestrian crossings, and medians with warning devices. The 60% PS&E submittal will also include traffic signal modification plans, traffic control plans and phasing, and irrigation and landscape plans. The 60% PS&E submittal will include an itemized engineer's estimate that will include pertinent construction costs for items of work, and will be in the same format as the schedule of bid items. Kimley- Horn will prepare the Special Provisions using the latest City Technical Specifications, with modifications to include this Project's elements, in particular the bid item list and descriptions. Kimley-Horn will submit the specifications in Microsoft Word and PDF formats. Task 3.1.3: 90% PS&E Kimley-Horn will review the City's comments on the 60% PS&E submittal and incorporate non -conflicting into the 90% PS&E submittal. Kimley-Horn will prepare a comments -response matrix, with responses to each of the comments along with their disposition. Kimley-Horn will facilitate up to one (1) 60% comments resolution meeting with the City to clarify comments. Kimley-Horn will incorporate comments received on the 60% PS&E submittal into the 90% PS&E submittal based on concurrence from the City. The 90% PS&E submittal will include an itemized engineer's estimate that will include pertinent construction costs for items of work, and will be in the same format as the schedule of bid items. Kimley-Horn will prepare the Special Provisions using the latest City Technical Specifications, with modifications to include this Project's elements, in particular the bid item list and descriptions. Kimley-Horn will submit the specifications in Microsoft Word and PDF formats. Task 3.1.4: Draft 100% PS&E Kimley-Horn will review the City's comments on the 90% PS&E submittal and incorporate non -conflicting into the Draft 100% PS&E submittal. Kimley-Horn will prepare a comments -response matrix, with responses to each of the comments along with their disposition. Kimley-Horn will facilitate up to one (1) 90% comments resolution meeting with the City to clarify comments. Kimley-Horn will incorporate City of Santa Ciarita TRCASANC074553.2026 Klmley ">> Horn comments received on the 90% PS&E submittal into the Draft 100% PS&E submittal based on concurrence from the City. The Draft 100% PS&E submittal will include an itemized engineer's estimate that will include pertinent construction costs for items of work, and will be in the same format as the schedule of bid items. Kimley-Horn will prepare the Special Provisions using the latest City Technical Specifications, with modifications to include this Project's elements, in particular the bid item list and descriptions. Kimley-Horn will submit the specifications in Microsoft Word and PDF formats. Task 3.1.5: Final 100% PS&E Kimley-Horn will review the City's comments on the Draft 100% PS&E submittal and incorporate non -conflicting into the Final 100% PS&E submittal. Kimley-Horn will prepare a comments -response matrix, with responses to each of the comments along with their disposition. Kimley-Horn will facilitate up to one (1) Draft 100% comments resolution meeting with the City to clarify comments. Kimely-Horn will incorporate comments received on the Draft 100% PS&E submittal into the Final 100% PS&E submittal based on concurrence from the City. The Final 100% PS&E submittal will include an itemized engineer's estimate that will include pertinent construction costs for items of work, and will be in the same format as the schedule of bid items. Kimley-Horn will prepare the Special Provisions using the latest City Technical Specifications with modifications to include this Project's elements, in particular the bid item list and descriptions. Kimley-Horn will submit the specifications in Microsoft Word and PDF formats. • 30% Plans and Estimate (PDF) • 60% Design Plans (PDF), Draft Specifications (Word and PDF), Draft Engineer's Estimate (PDF), 30% Response to Comments (PDF) • 90% Design Plans (PDF), Draft Specifications (Word and PDF), Draft Engineer's Estimate (PDF60% Response to Comments (PDF) • Draft 100% Design Plans (PDF), Draft Specifications (Word and PDF), Draft Engineer's Estimate (PDF), 90% Response to Comments (PDF) • Final 100% Design Plans (PDF), Final Specifications (Word and PDF), Final Engineer's Estimate (PDF), Draft 100% Response to Comments (PDF) Task 3.2: Easement Preparation and Support Kimley-Horn will collaborate with the City to prepare supporting documents and exhibits necessary to amend the City's existing lease line agreement with SCV Water. This task assumes up to 40 hours of effort. TASK 4: LOCATION 2 DESIGN - COPPER HILL DRIVE AT WEST HILLS DR/WESTCREEK DR The completed PS&E documents will include the designs for improvements including demolition, paving and grading, sidewalk, curb and gutter, signing and striping, drainage, traffic control, and modification of existing traffic signals. Kimley-Horn will include a detailed layout plan in the 60%, 90%, Draft 100%, and Final 100% PS&E submittals to show the improvements within the Project limits. The completed designs will conform to applicable laws, ordinances, and codes, including the latest ADA Title II regulations, City of Santa Clarita Standards, the latest Caltrans Standard Specifications and Standard Plans, and the latest CA-MUTCD. Task 4.1: PS&E Kimley Horn will prepare the PS&E Documents at the following five (5) submittal stages: 30%, 60%, 90%, Draft 100%, and Final 100%. Kimley-Horn will prepare up to two (2) AutoTurn concepts to demonstrate that vehicle movements will work with the proposed design. The Kimley-Horn will split out the PS&E submittals into two (2) packages for each location. City of Santa Ciarita FRCASANC074553.2026 Kimley ">> Horn Kimley-Horn will include the following plans for Copper Hill Drive at West Hills DriveMlestcreek Drive with each submittal, unless otherwise specified below: Title Sheet 1 sheet General Notes 1 sheet Survey Control Sheet 1 sheet Typical Sections 1 sheet Demolition Plans 3 sheets at 1" = 40' Street Improvement Plans 3 sheets at 1" = 40' Curb Ramp Details 1 sheet at 1" = 10' Erosion Control Plan 1 sheet at 1" = 60' Construction Details 2 sheets Utility Relocation Plans 3 sheets at 1" = 40' Signing and Striping Plans 1 sheet at 1" = 40' Traffic Signal Modification Plans 1 sheet at 1" = 20' (60% PS&E and beyond) Traffic Control Plans and Pedestrian Detour Plans 2 sheets at 1" = 40' (60% PS&E and beyond) Irrigation and Landscape Plans 3 sheets at 1" = 40' (60% PS&E and beyond) Street Light Modification Plans 2 sheets at 1" = 40' Total 26 sheets Task 4.1.1: 30% Plans and Estimate The 30% Plans will include conceptual layout, scope of improvements, and framework of the bid set. This includes the assessment of the potential issues, including right-of-way constraints, any changes in existing site conditions observed during the initial site visit, vehicular and pedestrian accessibility, and feasibility of all improvements. The purpose of the 30% Plans will be to capture proposed design improvements, updated existing conditions from the initial site visit, topographic mapping, right-of-way boundaries, and existing utilities from the utility "A" letter responses. The 30% Plans will also include typical sections, proposed alignments, and construction notes. The 30% Plans will include a cost estimate. Task 4.1.2: 60% PS&E Kimley-Horn will review the City's comments on the 30% Plans and incorporate non -conflicting comments into the 60% PS&E submittal. Kimley-Horn will prepare a comments -response matrix, with responses to each of the comments along with their disposition. Kimley-Horn will facilitate up to one (1) 30% comments resolution meeting with the City to clarify comments. Kimley-Horn will incorporate comments received on the 30% Plans into the 60% PS&E submittal based on concurrence from the City. The 60% design will be a more detailed version of the 30% design, identifying potential utility conflicts and construction details required for pavement, curb ramps, maintenance access, pedestrian crossings, and medians with warning devices. The 60% PS&E submittal will also include traffic signal modification plans, traffic control plans and phasing, and irrigation and landscape plans. The 60% PS&E submittal will include an itemized engineer's estimate that will include pertinent construction costs for items of work, and will be in the same format as the schedule of bid items. Kimley- Horn will prepare the Special Provisions using the latest City Technical Specifications, with modifications to include this Project's elements, in particular the bid item list and descriptions. Kimley-Horn will submit the specifications in Microsoft Word and PDF formats. Task 4.1.3: 90% PS&E Kimley-Horn will review the City's comments on the 60% PS&E submittal and incorporate non -conflicting into the 90% PS&E submittal. Kimley-Horn will prepare a comments -response matrix, with responses to each of the comments along with their disposition. Kimley-Horn will facilitate up to one (1) 60% comments resolution meeting with the City to clarify comments. Kimley-Horn will incorporate comments received on the 60% PS&E submittal into the 90% PS&E submittal based on concurrence from the City. The 90% PS&E submittal will include an itemized engineer's estimate that will include pertinent construction costs for items of work, and will be in the same format as the schedule of bid items. Kimley-Horn will prepare the Special Provisions using the latest City Technical Specifications, with modifications to include this Project's elements, in particular the bid item list and descriptions. Kimley-Horn will submit the specifications in Microsoft Word and PDF formats. City of Santa Crarita TRCASANC074553.2026 Klmley ">> Horn Task 4.1.4: Draft 100% PS&E Kimley-Horn will review the City's comments on the 90% PS&E submittal and incorporate non -conflicting into the Draft 100% PS&E submittal. Kimley-Horn will prepare a comments -response matrix, with responses to each of the comments along with their disposition. Kimley-Horn will facilitate up to one (1) 90% comments resolution meeting with the City to clarify comments. Kimley-Horn will incorporate comments received on the 90% PS&E submittal into the Draft 100% PS&E submittal based on concurrence from the City. The Draft 100% PS&E submittal will include an itemized engineer's estimate that will include pertinent construction costs for items of work, and will be in the same format as the schedule of bid items. Kimley-Horn will prepare the Special Provisions using the latest City Technical Specifications, with modifications to include this Project's elements, in particular the bid item list and descriptions. Kimley-Horn will submit the specifications in Microsoft Word and PDF formats. Task 4.1.5: Final 100% PS&E Kimley-Horn will review the City's comments on the Draft 100% PS&E submittal and incorporate non -conflicting into the Final 100% PS&E submittal. Kimley-Horn will prepare a comments -response matrix, with responses to each of the comments along with their disposition. Kimley-Horn will facilitate up to one (1) Draft 100% comments resolution meeting with the City to clarify comments. Kimley-Horn will incorporate comments received on the Draft 100% PS&E submittal into the Final 100% PS&E submittal based on concurrence from the City. The Final 100% PS&E submittal will include an itemized engineer's estimate that will include pertinent construction costs for items of work, and will be in the same format as the schedule of bid items. Kimley-Horn will prepare the Special Provisions using the latest City Technical Specifications with modifications to include this Project's elements, in particular the bid item list and descriptions. Kimley-Horn will submit the specifications in Microsoft Word and PDF formats. • 30% Plans and Estimate (PDF) • 60% Design Plans (PDF), Draft Specifications (Word and PDF), Draft Engineer's Estimate (PDF), 30% Response to Comments (PDF) • 90% Design Plans (PDF), Draft Specifications (Word and PDF), Draft Engineer's Estimate (PDF), 60% Response to Comments (PDF) • Draft 100% Design Plans (PDF), Draft Specifications (Word and PDF), Draft Engineer's Estimate (PDF), 90% Response to Comments (PDF) • Final 100% Design Plans (PDF), Final Specifications (Word and PDF), Final Engineer's Estimate (PDF), Draft 100% Response to Comments (PDF) Task 4.2: Easement Preparation and Support Kimley-Horn will collaborate with the City to prepare supporting documents and exhibits necessary for homeowners association (HOA) easement, as the sidewalks are currently under HOA jurisdiction. This task assumes up to 40 hours of effort. i ASK a: PERMITS AND PLAN APPROVALS Task 5.1: Permits Coordination Kimley-Horn will coordinate the processing of PS&E submittals at the specified design milestones. Kimley-Horn will collaborate closely with all relevant City divisions to secure plan approvals, including Capital Improvement Projects, Traffic, Engineering Services, Transit, Urban Forestry, Street Light Maintenance Division (SMD), and Landscape Maintenance Division (LIVID). Kimley-Horn will provide support in processing and obtaining approvals for all necessary permits associated with the agency's facilities to ensure construction readiness. Task 5.2: Utility Coordination Kimley-Horn will follow-up with utility companies after the utility "A" letters have been distributed to obtain utility maps and confirm ownership of existing utilities. After distribution of the utility "B" letters, Kimley-Horn will follow up and schedule meetings with utility companies to obtain latest utility maps and confirm potential utility conflicts. Kimley-Horn will meet with utility owners as needed should utility conflicts be identified. These meetings will serve to identify where additional investigations, including potholing, will be necessary. Kimley-Horn will coordinate with utility companies to sign the utility "B" letters stating that the utility owners will adjust/relocate their facilities and coordinate with contractor prior/during construction to provide the City with documentation for utility certification. City of Santa Ciarita TRCASANC074553.2026 Klmley ">> Horn TASK 6: BID SUPPORT Task 6.1: Bid Phase Technical Support Kimley-Horn will provide bid support services on a time -and -materials basis for up to 40 hours. The support services will include the following: • Attend the pre -proposal meeting • Provide engineering assistance related to finalizing bid items, special provisions, and responses to contractor bid questions • Prepare and coordinate up to one (1) addendum TASK 7: ADDITIONAL SUPPORT — OWNERS' ALLOWANG, Task 7.1: Additional Support — Owners' Allowance Kimley-Horn will provide supplemental services, at the City's discretion, to address evolving Project needs. This flexible allowance is intended to accommodate miscellaneous efforts, which may include, but are not limited to: • Additional utility investigation (e.g., potholing) • Pavement evaluation activities (e.g., core sampling) • Enhanced or expanded traffic control plans • Wire toning or coordination support for traffic signal systems • Additional irrigation and landscape documentation (demolition and/or improvement plans) • Other tasks deemed necessary by the City to support Project development Kimley-Horn will perform these services on an as -needed basis, up to the budget allocated in the fee proposal for Task 7.1, and only upon the City's direction. 1ASK is (ut-i iVIYAL): c.UNS 1 HuL i IVIY Juf- vvK l Task 8.1 Design Support During Construction (DSDC) Our team will provide DSDC services on a time -and -materials basis. The support services will include but are not limited to the following: • Attend Pre -Construction Meeting • Attend in -person construction meetings, as requested by City • Review and respond to contractors' Requests for Information (RFIs) • Create and maintain file directory to keep records of construction submittals and RFI correspondence • Prepare construction bulletins and correction notices • Prepare punch list for contractor • Prepare record drawings City of Santa Ciarita FRCASANC074553.2026 8 Kimiey A>) Horn PROPOSAL FOR THE DESIGN SERVICES FOR CIRCULATION IMPROVEMENT PROGRAM PROPOSAL # CIP-25-26-GODBO 4.SCHEDULE k To provide you with the full depth of proven experience necessary to seamlessly deliver services for the Project, Kimley-Horn has teamed with three skilled and experienced subconsultants to complement our in-house resources. Not only is this firm talented from a technical standpoint, but they also understand the local environment. We have provided our subconsultants' information in the Designation of Subcontractors/Subconsultants form. ECG I Surveying ECG's team includes licensed surveyors and skilled professionals with significant experience in public works and roadway improvements. They have a long history of experience in similar projects across Santa Clarita and Northern Los Angeles County, with a thorough understanding of local survey requirements and I C public agency procedures. With extensive experience in the latest surveying technologies, including Encompass Consultant Group advanced global positioning systems (GPS), LiDAR, and aerial imagery, they leverage cutting -edge tools to deliver highly accurate data and enhance efficiency in the field. ECG's team is equally adept in both fieldwork and technical data processing, making sure that they not only capture precise measurements, but also meticulously analyze and interpret the data to produce reliable results. ECG has worked on a host of projects for the City, with their recent experience including: • Magic Mountain Beautification Project • Valencia Industrial Center Bicycle and Pedestrian Improvements • Sierra Highway Sidewalks Design Project • Centre Pointe Parkway Sidewalk Project • Golden Valley Road Curb and Gutter Project PEI I Geotechnical • Plum Canyon and Golden Valley Road Median Improvements • 2020-2021 Circulation Improvement Program (CIP) Phase II • 2020-2021 CIP Phase III • Newhall Gateway Beautification Project PEI is a civil engineering firm specializing in pavement management and rehabilitation. Since they were incorporated in California in 1987, they have assessed, tested, and designated tens of millions of SF of asphalt concrete roadways and parking lots each year, completing more than 10,000 projects for more than 300 clients. PEI's experienced, licensed, and qualified staff includes professional engineers, engineering technicians, construction managers, inspectors, laboratory technicians, and support personnel. Through their involvement with the development and implementation of the Caltrans Standard Specifications for Hot Mix Asphalt (HMA), PEI has become a leader in designing and testing the new performance -based HMA materials. pavemprt«,ya,epr" Inc PEI's experience with the City dates back to 1997, and in that time, they have delivered more than 65 various pavement projects. Their experience makes them very familiar with the City's road network and subsequent pavement needs. Their City projects include: • 2025/2026 Annual Overlay and Slurry Seal Program • 2024/2025 Annual Overlay and Slurry Seal Program • 2024 Pavement Management Program (PMP) Update • 2023/2024 Annual Overlay and Slurry Seal Program • 2022/2023 Annual Overlay and Slurry Seal Program • 2021/2022 Annual Overlay and Slurry Seal Program • 2020 PMS Update • 2020/2021 Annual Overlay and Slurry Seal Program • 2019/2020 Annual Federal Resurfacing, Overlay and Slurry Seal Projects, and Construction Management Support • 2019/2020 PMS Update City of Santa Ciarita FRCASANC074553.2026 Kimsey A>) Horn Certerra I Potholing and Utility Verification Certerra has been in the utility locating business for 16 years. They employ more than 80 staff members, 1 CERTERRA including 66 technicians, project engineer, surveyors, and a CAD drafting department. Certerra's highly 1 SUBSURFACE - C BELOW experienced technicians use the most advanced equipment in the industry. They locate horizontal and vertical locations of underground utilities, including gas, power, waste, communications, and cable/television. They use many different methods to locate these utilities, including ground penetrating radar (GPR), closed-circuit television (CCTV), utility locators, electromagnetic locators, and potholing. They can provide information in the form of pull box or electrical reports, potholing reports, underground mapping, 3D modeling, CAD drawings or simply marking surfaces. Stay Green I Irrigation Toning Founded in 1970, Stay Green has extensive experience providing professional, comprehensive landscape STAYG R E E f maintenance services throughout Southern California, designed to maintain City -owned properties in THE NATURAL CHOICE healthy, safe, and visually appealing conditions. Their core services include irrigation inspection and repair. They perform services with a focus on safety, water efficiency, and environmental responsibility, using the industry's best practices and modern equipment to achieve consistent results. Since 2010, they have proudly served the City, maintaining both municipal and commercial properties. City of Santa Ciarita TRCASANC074553.2026 34 Kimiey A>) Horn Per the City's instructions in the RFP, we have provided the following executed forms in this section, starting on the next page. • Notice to Proposers Regarding Contractual Requirements • Designation of Subcontractors/Subconsultants • References • Acknowledgement and Acceptance of Scope of Work • City of Santa Clarita Disclosure Statement • Equal Opportunity/Affirmative Action Statement • Signed Addendum No. 1 • Signed Addendum No. 2 For our proposal's electronic submission, we have uploaded these executed forms via BidNet. City of Santa Ciarita TRCASANC074553.2026 35 Kimiey A>> Horn re r, CONTACT MICHAEL CHOI, PE, LEED AP michael.choi@kimley-horn.com 213.261.4038 25152 Springfield Court, Suite 200, Santa Clarita, CA 91355 www.kimley-hom.com The entirety of this proposal, including text and images, is the property of Kimley- Horn and Associates, Inc., protected under US copyright law. Copyright © 2026 Kimley-Horn and Associates, Inc. Kimley>>> Horn Expect More. Experience Better. NOTICE TO PROPOSERS REGARDING CONTRACTUAL REQUIREMENTS PROPOSAL # CIP-25-26-00080 Design Services for Circulation Improvement Program City Project No. C0080 City of Santa Clarita, California SUMMARY OF CONTRACTUAL REQUIRMENTS 1. A contract is required for any service performed on behalf of the City of Santa Clarita (City). 2. By submitting a proposal, you have reviewed the sample contract documents contained within this request for proposals and agree to be bound by the requirements set forth. 3. Questions and requests for modification of these terms must be negotiated and approved prior to proposal submission and are at the full discretion of the City. SUMMARY OF INDEMNITY AND INSURANCE REQUIREMENTS 1. These are the Indemnity and Insurance Requirements for Contractors providing services or supplies to City of Santa Clarita (City). By agreeing to perform the work or submitting a proposal, you verify that you comply with and agree to be bound by these requirements. If any additional Contract documents are executed, the actual Indemnity language and Insurance Requirements may include additional provisions as deemed appropriate by City's Purchasing Agent. 2. You should check with your Insurance advisors to verify compliance and determine if additional coverage or limits may be needed to adequately insure your obligations under this agreement. These are the minimum required and do not in any way represent or imply that such coverage is sufficient to adequately cover the Contractor's liability under this agreement. The full coverage and limits afforded under Contractor's policies of Insurance shall be available to Buyer and these Insurance Requirements shall not in any way act to reduce coverage that is broader or includes higher limits than those required. The Insurance obligations under this agreement shall be: 1—all the Insurance coverage and limits carried by or available to the Contractor; or 2—the minimum Insurance requirements shown in this agreement, whichever is greater. Any insurance proceeds in excess of the specified minimum limits and coverage required, which are applicable to a given loss, shall be available to City. 3. Contractor shall furnish the City with original Certificates of Insurance including all required amendatory endorsements and a copy of the Declarations and Endorsement Page of the CGL policy listing all policy endorsements to City before work begins. City reserves the right to require full -certified copies of all Insurance coverage and endorsements. I. INDEMNIFICATION: To the fullest extent permitted by law, including without limitation Civil Code sections 2782 and 2782.8, CONSULTANT shall defend (with legal counsel reasonably acceptable to CITY), indemnify and hold harmless CITY and its officers, agents, departments, officials, representatives and employees (collectively "Indemnitees") from and against any and all claims, loss, cost, damage, injury (including, without limitation, economic harm, injury to or death of an employee of CONSULTANT or its subconsultants), expense and liability of every kind, nature and description that arise from or relate to (including, without limitation, incidental and consequential damages, court costs, attorneys' fees, litigation expenses and fees of expert consultants or expert witnesses incurred in connection therewith and costs of investigation) that arise from or relate to, directly or indirectly, in whole or in part, from: (1) any negligent act or omission of CONSULTANT, any subconsultant, anyone directly or indirectly employed by them, or anyone that they control; (2) any actual or alleged infringement of the patent rights, copyright, trade secret, trade name, trademark, service mark or any other intellectual or proprietary right of any person or persons in consequence of the use by CITY, or any other Indemnitee, of articles or Services to be supplied in the performance of this Agreement; or (3) any breach of this Agreement (collectively "Liabilities"). Such obligations to defend, hold harmless and indemnify any Indemnitee shall not apply to the extent such Liabilities are caused by the sole or active negligence or willful misconduct of such Indemnitee, but shall apply to all other Liabilities. The foregoing indemnification provisions will not reduce or affect other rights or obligations which would otherwise exist in favor of the CITY and other Indemnitees. CONSULTANT shall place in its subconsulting agreements and cause its subconsultants to agree to indemnities and insurance obligations in favor of CITY and other Indemnitees in the exact form and substance of those contained in this Agreement. II. INSURANCE (A) Before commencing performance under this Agreement, and at all other times this Agreement is effective, CONSULTANT will procure and maintain the following types of insurance with coverage limits complying, at a minimum, with the limits set forth below: Type of Insurance Limits Commercial general liability: $1,000,000 Professional liability $1,000,000 Business automobile liability $1,000,000 Workers compensation Statutory requirement (i) Commercial general liability insurance will meet or exceed the requirements of ISO-CGL Form No. CG 00 01 11 85 or 88. The amount of insurance set forth above will be a combined single limit per occurrence for bodily injury, personal injury, and property damage for the policy coverage. Automobile coverage will be written on ISO Business Auto Coverage Form CA 00 01 06 92, including symbol 1 (Any Auto). Liability policies will be endorsed to name CITY, its officials, and employees as "additional insureds" under said insurance coverage and to state that such insurance will be deemed "primary" such that any other insurance that may be carried by CITY will be excess thereto. Such endorsement must be reflected on ISO Form No. CG 20 10 1185 or 88, or equivalent. Such insurance will be on an "occurrence," not a "claims made," basis and will not be cancelable or subject to reduction except upon thirty (30) days prior written notice to CITY. (ii) Professional liability coverage will be on an "occurrence basis" if such coverage is available, or on a "claims made" basis if not available. When coverage is provided on a "claims made basis," CONSULTANT will continue to renew the insurance for a period of at least three (3) years after this Agreement expires or is terminated. Such insurance will have the same coverage and limits as the policy that was in effect during the term of this Agreement, and will cover CONSULTANT for all claims made by CITY arising out of any errors or omissions of CONSULTANT, or its officers, employees or agents during the time this Agreement was in effect. CONSULTANT will furnish to CITY duly authenticated Certificates of Insurance evidencing maintenance of the insurance required under this Agreement, including endorsements, and such other evidence of insurance or copies of policies as may be reasonably required by CITY from time to time. Insurance must be placed with California -admitted insurers with (other than workers compensation) a current A.M. Best Company Rating of at least "A:VII." Waiver of Subrogation: The insurer(s) agree to waive all rights of subrogation against CITY, its elected or appointed officers, officials, agents, volunteers and employees for losses paid under the terms of the workers compensation policy which arise from work performed by CONSULTANT for CITY. Should CONSULTANT, for any reason, fail to obtain and maintain the insurance required by this Agreement, CITY may obtain such coverage at CONSULTANT's expense and deduct the cost of such insurance from payments due to CONSULTANT under this Agreement or terminate pursuant to TERMINATION section. In the alternative, should CONSULTANT fail to meet any of the insurance requirements under this Agreement, City may terminate this Agreement immediately with no penalty. Should CONSULTANT'S insurance required by this Agreement be cancelled at any point prior to expiration of the policy, CONSULTANT must notify City within 24 hours of receipt of notice of cancellation. Furthermore, CONSULTANT must obtain replacement coverage that meets all contractual requirements within 10 days of the prior insurer's issuance of notice of cancellation. CONSULTANT must ensure that there is no lapse in coverage. The CITY shall be entitled to any coverage in excess of the minimums required herein. I have read and understand the -above requirements and agree to be bound by them for any work performed for the City. I - Authorized Signature: �_ Date: April 6, 2026 Srikanth Chakravarthy, PE, TE, Sr. VP, Printed Name: Kimley-Horn and Associates, Inc. DESIGNATION OF SUBCONTRACTORS/SUBCONSULTANTS PROPOSAL # CIP-25-26-CO080 Design Services for Circulation Improvement Program City Project No. C0080 City of Santa Clarita, California Listed below are the names and locations of the places of business of each subcontractor, supplier, and vendor who will perform work or labor or render service in excess of/: of 1 percent, or $10,000 (whichever is greater) of the prime contractor's total bid. If no Subcontractors will be used fill out the form with NA. Please add additional sheets if needed. Subcontractor DIR Registration No. Dollar Value of Work Certerra Subsurface Imaging 100070292 $34,322.00 Location and Place of Business 12130 Santa Margarita Court, Suite 100 Rancho Cucamonga, CA Bid Schedule Item No's: Description of Work Task 1.4 Utility Investigation License No. Exp. Date: / / Phone ( ) 1077106 6/30/2027 888.902.3569 Subcontractor DIR Registration No. Dollar Value of Work Encompass Consultant Group, Inc. (ECG) 1000037899 $53,300.00 Location and Place of Business 333 N. Lantana Street, Suite 287, Camarillo,CA 93010 Bid Schedule Item No's: Description of Work Tasks 1.3, 3.2, and 4.2 Land Surveying License No. Exp. Date: / / Phone ( ) PLS 7808,CA 12/31/2027 805.416.8706 Subcontractor DIR Registration No. Dollar Value of Work Pavement Engineering, Inc. �1000010484 $30,870.00 Location and Place of Business 26007 Huntington Lane, Unit 5. Santa Clarita, CA 91355 Bid Schedule Item No's: Description of Work Tasks 1.5 and 2.1 Pavement Deflection Testing and Coring, Pavement Analysis License No. Exp. Date: / / Phone ( ) N/A 805.781.2265 Subcontractor DIR Registration No. Dollar Value of Work Stay Green Inc. 1000015596 $440.00 Location and Place of Business 26415 Summit Cir, Santa Clarita, CA 91350 Bid Schedule Item No's: Description of Work Task 1.4 Irrigation Toning License No. Exp. Date: / / Phone ( ) 346620 12/31 /2026 800.858.5508 NOTE: A contractor or subcontractor shall not be qualified to propose on, be listed in a proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5 of the Labor Code. It is not a violation of this section for an unregistered contractor to submit a proposal that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 of the Labor Code at the time the contract is awarded. REFERENCES PROPOSAL # CIP-25-26-00080 Design Services for Circulation Improvement Program City Project No. C0080 City of Santa Clarita, California The following are the names, addresses, and telephone numbers of three public agencies for which proposer has performed work of a similar scope and size within the past 3 years. If the instructions on this form conflict with the references requested in the scope of work, the scope of work shall govern. Complete this form out accordingly. Fill out this form completely and upload it with your proposal. 1 City of Malibu 123825 Stuart Ranch Road, Malibu, CA 90265 Name and Address of Owner / Agency Rob Duboux 1310.456.2489 1 PCH Las Flores & Rambla Pacifico Intersection Improvements Name and Telephone Number of Person Familiar with Project $654,544 Intersection Improvements Ongoing Contract Amount Type of Work Date Completed 2 City of Agoura Hills 130001 Ladyface Court, Agoura Hills, CA 91301 Name and Address of Owner / Agency Ramiro Adeva, 818.597.7353 Kanan Road and Agoura Road Intersection Improvements Name and Telephone Number of Person Familiar with Project $1,437,209 Intersection Improvements Ongoing Contract Amount Type of Work Date Completed 3 City of Rancho Cucamonga 1 10500 Civic Center Drive, Rancho Cucamonga, CA 91730 Name and Address of Owner / Agency Romeo David 1909.744.4070 1 Almond Street Extension (Via Verde Street to Carnelian Street) Name and Telephone Number of Person Familiar with Project $251,180 Street Improvements Ongoing (in construction) Contract Amount Type of Work Date Completed ACKNOWLEDGEMENT & ACCEPTANCE OF SCOPE OF WORK PROPOSAL # CIP-25-26-CO080 Design Services for Circulation Improvement Program City Project No. C0080 City of Santa Clarita, California By providing the three (3) required signatures below, the Contractor acknowledges full understanding, complete agreement to, and accepts in its entirety, all Scope of Work for the Design Services for Circulation Improvement Program. The Contractor will be expected to perform maintenance practices and uphold the standards herein to the established Scope of Work throughout the length of the contract. *Supervisor's Signature: *Estimator's Signatu *Owner's Signature: Srikanth Cakravarthy, PE, TE. Sr. VP Kimley-Horn and Associates, Inc. D /� Srikanth Cakravarthy, PE, TE. Sr. VP 1 / Kimley-Horn and Associates, Ina p *All three signatures required April 6, 2026 April 6, 2026 _- Srikanth Cakravarthy, PE, TE. Sr. VP - Kimley-Horn and Associates, Ina pate: April 6, 2026 CITY OF SANTA CLARITA DISCLOSURE STATEMENT PROPOSAL # CIP-25-26-CO080 Design Services for Circulation Improvement Program City Project No. C0080 City of Santa Clarita, California The following information must be disclosed: 1. List the names of all persons having a financial interest in the Request for Proposals. 2. If any person identified pursuant to No. 1 above is a corporation or partnership, list the names of all individuals owning more than ten percent of the shares in the corporation or owning any partnership interest in the partnership. N/A 3. If any person identified pursuant to No. 1 above is a non-profit organization or a trust, list the names of any persons serving as a director of the non-profit organization or as a trustee or beneficiary or trustor of the trust. N/A 4. Has the offeror had more than $250.00 worth of business transacted with any member of the City of Santa Clarita staff, boards, commissions, committees, and Council within the past twelve months? If yes, please indicate the person(s) with whom you have conducted business. NO NOTE: Attach additional pages as necessary. Signature of Offeror Srikanth Chakravarthy, PE, TE Sr. Vice President Kimley-Horn and Associates, Inc. Print or Type Name of Offeror April 6, 2026 Date CITY OF SANTA CLARITA DISCLOSURE STATEMENT PROPOSAL # CIP-25-26-CO080 Design Services for Circulation Improvement Program City Project No. C0080 City of Santa Clarita, California The following information must be disclosed: List the names of all persons having a financial interest in the Request for Proposals. Certerra Subsurface Imaging If any person identified pursuant to No. 1 above is a corporation or partnership, list the names of all individuals owning more than ten percent of the shares in the corporation or owning any partnership interest in the partnership. No individual owns more than 10% of the shares in the corporation. If any person identified pursuant to No. 1 above is a non-profit organization or a trust, list the names of any persons serving as a director of the non-profit organization or as a trustee or beneficiary or trustor of the trust. N/A 4. Has the offeror had more than $250.00 worth of business transacted with any member of the City of Santa Clarita staff, boards, commissions, committees, and Council within the past twelve months? If yes, please indicate the person(s) with whom you have conducted business. N/A NOTE: Attach additional pages as necessary. eroC� Signaturee of Offero(/ Hector Vargas Print or Type Name of Offeror 4/2/26 Date CITY OF SANTA CLARITA DISCLOSURE STATEMENT PROPOSAL # CIP-25-26-CO080 Design Services for Circulation Improvement Program City Project No. C0080 City of Santa Clarita, California The following information must be disclosed: 1. List the names of all persons having a financial interest in the Request for Proposals. N/A 2. If any person identified pursuant to No. 1 above is a corporation or partnership, list the names of all individuals owning more than ten percent of the shares in the corporation or owning any partnership interest in the partnership. N/A 3. If any person identified pursuant to No. 1 above is a non-profit organization or a trust, list the names of any persons serving as a director of the non-profit organization or as a trustee or beneficiary or trustor of the trust. N/A 4. Has the offeror had more than $250.00 worth of business transacted with any member of the City of Santa Clarita staff, boards, commissions, committees, and Council within the past twelve months? If yes, please indicate the person(s) with whom you have conducted business. N/A NOTE: Attach additional pages as necessary. Signature of Offeror James Fallon, P.L.S Print or Type Name of Offeror 03/31 /2026 Date CITY OF SANTA CLARITA DISCLOSURE STATEMENT PROPOSAL # CIP-25-26-CO080 Design Services for Circulation Improvement Program City Project No. C0080 City of Santa Clarita, California The following information must be disclosed: 1. List the names of all persons having a financial interest in the Request for Proposals. Bill Long, Joe Ririe, Troy Sisneros, Don Trotter, Eric Wells 2. If any person identified pursuant to No. 1 above is a corporation or partnership, list the names of all individuals owning more than ten percent of the shares in the corporation or owning any partnership interest in the partnership. Bill Long, Joe Ririe, Troy Sisneros, Don Trotter, Eric Wells 3. If any person identified pursuant to No. 1 above is a non-profit organization or a trust, list the names of any persons serving as a director of the non-profit organization or as a trustee or beneficiary or trustor of the trust. N/A 4. Has the offeror had more than $250.00 worth of business transacted with any member of the City of Santa Clarita staff, boards, commissions, committees, and Council within the past twelve months? If yes, please indicate the person(s) with whom you have conducted business. No NOTE: Attach additional pages as necessary. C�— Signature of Offeror Joe Ririe, PE Print or Type Name of Offeror 3/27/2026 Date CITY OF SANTA CLARITA DISCLOSURE STATEMENT PROPOSAL # CIP-25-26-CO080 Design Services for Circulation Improvement Program City Project No. C0080 City of Santa Clarita, California The following information must be disclosed: 1. List the names of all persons having a financial interest in the Request for Proposals. Chris Angelo 2. If any person identified pursuant to No. 1 above is a corporation or partnership, list the names of all individuals owning more than ten percent of the shares in the corporation or owning any partnership interest in the partnership. 3. If any person identified pursuant to No. 1 above is a non-profit organization or a trust, list the names of any persons serving as a director of the non-profit organization or as a trustee or beneficiary or trustor of the trust. N/A 4. Has the offeror had more than $250.00 worth of business transacted with any member of the City of Santa Clarita staff, boards, commissions, committees, and Council within the past twelve months? If yes, please indicate the person(s) with whom you have conducted business. N/A NOTE: Attach additional pages as necessary. '!t� Signature of Offeror Steve Seely Print or Type Name of Offeror 4/1 /2026 Date EQUAL OPPORTUNITY/AFFIRMATIVE ACTION STATEMENT PROPOSAL # CIP-25-26-CO080 Design Services for Circulation Improvement Program City Project No. C0080 City of Santa Clarita, California The offeror hereafter described will not discriminate against any employee or applicant for employment because of race/color, national origin, sex, sexual preference, religion, age, or handicapped status in employment or the provisions of services. April 6, 2026 Signature Srikanth Chakravarthy, PE, TE, Sr. Vice President Kimley-Horn and Associates, Inc. Typed Name and Title 0 �7T Addendum No. 1 RFP # CIP-25-26-CO080 Design Services for Circulation Improvement Program City of Santa Clarita, California Addendum No. 1 March 18, 2026 This addendum must be acknowledged via BidNet and should be included with the proposal response. There was a non -mandatory, pre -proposal meeting on March 17, 2026, beginning at 2:00 PM (PT). The meeting was conducted via Zoom. Attending Staff: • Lara Ray — Project Development Coordinator, Public Works • Connor Hahm — Engineer, Public Works • Cesar Romo — Traffic Signal System Administrator, Public Works • Jennifer De Avila —Assistant Engineer, Public Works • Brandon Ansari —Assistant Engineer, Public Works • May Soe Moe — Project Development Coordinator • Jaclyn Abston — Buyer, Administrative Services • Dyana Gutierrez — PTS Office /Administrative Support, Administrative Services Attending Vendors: • Christine Gallis, Psomas • Jeremey Johnson, Psomas • Mari Contreras, ECG • Josiah Jenison, ECG • Raman Gaur, Sikand Engineering • Mark Sikand, Sikand Engineering • Jun Im, Kimley-Horn • Sri Chakravarthy, Kimley-Horn • Charis Ahn, Kimley-Horn • JChess — Name not provided • Arief Naftali — Name not provided No questions were asked during this Pre -Proposal Meeting. The following was reviewed: • Project scope of work • Bidding Guidelines RFP # CIP-25-26-00080 of SANrA CL 9 C7 'dam Ofp �s oEceMs�'�, END OF ADDENDUM Addendum No. 1 March 18, 2026 This addendum must be acknowledged via BidNet and should be included with the response. Srikanth Chakravarthy, PE, TE Aril 6, 2026 Sr. Vice President p Contractor's Representative Date Kimley-Horn and Associates, Inc. Company Name RFP # CIP-25-26-00080 Docusign Envelope ID: 233EDF90-6AF4-4D8A-97E2-B60CEEA9A761 Addendum No. 2 March 27, 2026 Addendum No. 2 PROPOSAL # CIP-25-26-CO080 Design Services for Circulation Improvement Program City of Santa Clarita, California This addendum must be acknowledged via BidNet and should be included with the proposal response. The purpose of this addendum is to address the following for this Request for Proposals (RFP): I. TASK 3: DESIGN — CENTRAL PARK AND BOUQUET CANYON ROAD Subtask 3.1: Plans, Specifications, and Estimates (PS&E) The list of required plan sheets is hereby revised to include the following additional sheets: • Pedestrian Detour Plans o Plans shall identify temporary pedestrian and bicycle circulation routes during construction. Detours shall maintain safe, ADA -compliant access at all times. Plans shall include signage, striping, and traffic control measures consistent with City standards. Civil Improvement Plans Improvements shall include a new sidewalk connection along the south side of the roadway to provide continuous pedestrian access to Central Park. Plans shall incorporate associated landscape, irrigation, and aesthetic enhancements within the modified sidewalk and parkway areas. These sheets shall be prepared in accordance with City standards and included as separate sheets within the PS&E submittals at all required design milestones. II. TASK 4: DESIGN — WEST HILLS DRIVE AND COPPER HILL DRIVE Subtask 4.1: Plans, Specifications, and Estimates (PS&E) The list of required plan sheets is hereby revised to include the following additional sheet: PROPOSAL # CIP-25-26-CO080 Docusign Envelope ID: 233EDF90-6AF4-4D8A-97E2-B60CEEA9A761 U4o� gANTq pl .p�� 4 • Pedestrian Detour Plans Addendum No. 2 March 27, 2026 o Plans shall identify temporary pedestrian and bicycle circulation routes during construction. Detours shall maintain safe. ADA -compliant access at all times. Plans shall include signage, striping, and traffic control measures consistent with City standards. This sheet shall be prepared in accordance with City standards and included as a separate sheet within the PS&E submittals at all required design milestones. A r$g Damon Letz City Engineer END OF ADDENDUM This addendum must be acknowledged via BidNet and should be included with the response. Srikanth Chakravarthy, PE, TE Sr. Vice President April 6, 2026 Contractor's Representative Date Kimley-Horn and Associates, Inc. Company Name 9:ti] li�y_1 �E�y I b�.�►�:��IiI�I:�i; CITY OF SANTA CLARITA Design Services for Circulation Improvement Program Sr. Sr. Sr. professional Analyst ll Analyst ll Professional 11 ProfessionalI Professional) Billing Rate $375 1 $345 $280 $250 1 $220 M. Support Horn Kimley-Horn Certerra ECG PEl Stay Green Staff Total Total Cost Cost Total Cost Total Cost Total Cost $160 Hours Task 1 Project Management 48 12 4 54 52 12 182 $ 48,560 $ 1,300 187 $ 49,860 1 A Kick -Off and Monthly PDT Meetings 16 26 36 8 86 $ 20,620 $ 1,300 91 $ 21,920 1.2 Schedule 4 8 8 20 $ 5,020 20 $ 5,020 1.3 Quality Control 16 12 4 8 8 48 $ 14,780 48 $ 14,780 1.4 Public Meetings 12 12 4 28 $ 8,140 28 $ 8,140 Direct Expenses Task 2 Preliminary Investigation 8 42 68 10 128 $ 28,020 $ 34,322 $ 28,080 $ 29,570 $ 440 295 $ 120,432 2.1 Field Reconnaissance 4 1 8 1 8 2 22 $ 5,340 22 $ 5,340 2.2 Document Research and Utility Mapping 2 24 40 2 68 $ 14,670 $ 1,865 68 $ 16,535 2.3 Topographic Survey and Record Right of Way 2 2 8 2 14 $ 3,090 $ 28,080 132 $ 31,170 2.4 Utility Potholing 4 6 2 12 $ 2,460 $ 32,457 $ 440 12 $ 35,357 2.5 Coring and Pavement Assessment 4 6 2 12 $ 2,460 $ 29,570 61 $ 32,030 Direct Expenses $ 2,200 $ 2,200 Task 3 Design - Central Park and Bouquet Canyon Road 42 150 240 390 1 12 834 $ 182,070 $ 11,510 892 $ 193,580 3.1.1 30% Plans and Estimate 4 20 20 48 2 94 $ 20,340 94 $ 20,340 3.1.2 60% Plans, Specifications, and Estimates 8 1 40 80 140 2 270 $ 57,520 1 270 $ 57,520 3.1.3 90% Plans, Specifications, and Estimates 12 40 80 100 2 234 $ 51,420 234 $ 51,420 3.1.4 Draft 100 % Plans, Specifications, and Estimates 8 28 40 60 2 138 $ 30,520 138 $ 30,520 3.1.5 Final 100 % Plans, Specifications, and Estimates 8 16 20 36 2 82 $ 18,560 82 $ 18,560 3.2 Easement Preparation and Support 2 6 6 2 16 $ 3,710 $ 11,510 74 $ 15,220 Direct Expenses Task 4 Design - West Hills Drive and Copper Hill Drive 38 206 308 454 12 1 1,018 $ 221,690 $ 11,510 1,076 $ 233,200 4.1.1 30% Plans and Estimate 4 20 1 40 60 2 126 $ 27,020 126 $ 27,020 4.1.2 60% Plans, Specifications, and Estimates 8 1 60 112 160 2 342 $ 73,360 1 342 $ 73,360 4.1.3 90% Plans, Specifications, and Estimates 8 60 80 108 2 258 $ 56,440 258 $ 56,440 4.1.4 Draft 100 % Plans, Specifications, and Estimates 8 40 60 80 2 190 $ 41,720 190 $ 41,720 4.1.5 Final 100 % Plans, Specifications, and Estimates 8 20 16 40 2 86 $ 19,440 86 $ 19,440 4.2 Easement Preparation and Support 2 6 6 2 16 $ 3,710 $ 11,510 74 $ 15,220 Direct Expenses Task 5 Permits and Plan Approvals 4 8 24 1 4 40 $ 8,700 40 $ 8,700 5.1 Permits Coordination 2 2 4 2 10 $ 2,330 10 $ 2,330 5.2 Utility Coordination 2 1 6 1 20 2 30 $ 6,370 30 $ 6,370 Direct Expenses Task 6 Bid Support 6 8 26 40 9,190 40 $ 9,190 6A Bid Phase Technical Support 6 8 26 40 $ 9,190 40 $ 9, 190 Task 7 Addiitional Support - Owners Allowance 8 44 40 92 $ 21,600 $ 8,000 $ 400 92 $ 30,000 7.1 Additional Support - Owners Allowance 8 44 40 92 $ 21,600 $ 8,000 $ 400 92 $ 30,000 Direct Expenses TOTAL HOURS Subtotal Labor: 148 $55,500 12 $4,140 4 $1,120 504 $126,000 548 $120,560 1,028 $195,320 50 $8,000 2,294 $ 519,830 $ 42,322 $ 51,100 $ 30,870 $ 840 $ 644,962 TOTAL OTHER DIRECT COSTS $ 2,2001 $ 2,200 TOTAL COST: 1 1 $ 519,8301 $ 42,322 1 $ 53,300 1 $ 30,870 $ 840 BROOPUSTD. A CAI Task 8 Construction Support 20 40 40 100 $ 25,100 100 $ 25,100.00 8.1 Design Support During Construction 20 40 40 100 $ 25,100 100 $ 25,100.00 Expenses by Task OPTIONAL TASKS TOTAL HOURS 20 40 40 100 100 Optional Tasks Subtotal Labor: $7,500 $10,000 $7,600 $ 25,100 $ 25,100 TOTAL OTHER DIRECT COSTS OPTIONAL TASKS TOTAL COST: $ 25,100 $ 25,100