Loading...
HomeMy WebLinkAbout2026-06-09 - AGENDA REPORTS - SUNRIDGE DEV EIR CONTRAgenda Item• 13 CITY OF SANTA CLARITA .` AGENDA REPORT CONSENT CALENDAR CITY MANAGER APPROVAL: DATE: June 9, 2026 SUBJECT: CONSULTANT PREPARATION OF THE ENVIRONMENTAL IMPACT REPORT FOR THE SUNRIDGE DEVELOPMENT CONTRACT DEPARTMENT: Community Development PRESENTER: David Peterson RECOMMENDED ACTION City Council: Award a contract to Michael Baker International, Inc., for the preparation of the Sunridge Development project Environmental Impact Report (Master Case 24-266) in the amount of $875,102, and authorize a contingency in the amount $370,771, for a total contract amount not to exceed $1,245,873. 2. Authorize the City Manager or designee to execute all documents, subject to City Attorney review. BACKGROUND The Sunridge Development (Project) (Master Case 24-266) is a request by New Urban West, Inc., (Applicant) to develop an approximately 980-acre site located on vacant land (Project site). The Project site is located directly south of the Santa Clara River; west of Golden Valley High School and Santa Clarita Sports Complex; north of Quigley Canyon Open Space and Circle J Ranch, an existing single-family residential neighborhood; northeast of Claibournes Arch, an existing single-family residential neighborhood; and east of various existing industrial uses. The Plan Area is also west of an existing commercial center known as Centre Point Village, located along Soledad Canyon Road and Golden Valley Road. The subject property is within the Porta Bella Specific Plan zone. The Project would replace the existing Porta Bella Specific Plan which was approved by the City Council in 1995. The Applicant has submitted entitlements for the Project, proposing a mixed -use community on approximately 980-acres. Additionally, the Applicant proposes a public park to be developed on Page 1 Packet Pg. 122 a portion of the adjacent 241-acre City -owned property. The Project consists of 5,750 single- family and multi -family residential units, including an amount of affordable units; 2.9 million square feet of nonresidential space; and 330-acres of park and recreational uses, primarily open space. The Project proposes the buildout of one General Plan roadway, Via Princessa, the partial buildout of another, Santa Clarita Parkway, and the elimination of the Magic Mountain Parkway build out. The Project contemplates a total estimate of 29 million cubic yards of grading between the mixed -use community and the adjacent City -owned property. The Applicant has indicated that they are interested in exploring the creation of a community facilities district (CFD) for improvements associated with the development of the project. The Project site is zoned as a Specific Plan (SP) and includes a range of residential, mixed -use, business park, school overlay, and open space subzones intended to support phased development of residential neighborhoods, commercial and employment centers, schools, parks, trails, and recreational amenities. Residential land uses would range from low -density single-family development to higher -density urban village and mixed -use residential neighborhoods. Nonresidential uses would include a wave park, business park, retail, institutional, recreational, and open space uses. Primary access to the Project would be provided via the buildout of Via Princessa and partial buildout of Santa Clarita Parkway, with additional circulation provided through an internal roadway network connecting the various residential, mixed -use, and business park areas throughout the Specific Plan area. The property is located within a Very High Fire Hazard Severity Zone, and portions of the site are located within a Liquefaction Hazard Zone and an Alquist-Priolo Fault Zone. The Project requires approval of the following entitlements: • General Plan Amendment (Class V) 24-001: A General Plan Amendment (GP) is required to replace the existing Porta Bella Specific Plan with the Sunridge Specific Plan, including a change in the Plan Area boundary. Amendments to the City's General Plan Land Use Element and Circulation Element will also be required to replace references to the Porta Bella Specific Plan and to reflect revisions to the roadway network and the land uses established in the Sunridge Specific Plan. • Zone Change (Class VII) 24-001: A Zone Change (ZC) is required. • Oak Tree Permit (Class IV) 24-002: An Oak Tree Permit (Class IV) is required for the removal of four or more oak trees. • Hillside Development Review (Class IV) 24-004: A Hillside Development Review (HDR) is required as development will occur on properties with an average cross slope greater than 15 percent. • Ridgeline Alteration Permit (Class V) 24-001: A Ridgeline Alteration Permit (RAP) is required to regulate development located in the ridgeline preservation (RP) overlay zone. • Tentative Tract Map (ENG25-017): To facilitate development, a Tentative Tract Map (TTM) will create 53 lots and roads for the Plan Area. • Environmental Impact Report 24-002: A Project Environmental Impact Report (EIR) is required under the California Environmental Quality Act (CEQA) to analyze the Specific Plan's impacts that have the potential for significant environmental impacts. • Community Facilities District (CFD): The Applicant has indicated that they are interested in Page 2 Packet Pg. 123 exploring the formation of a CFD to fund public improvements associated with the Project. • Development Agreement: The MOU contemplates the potential consideration of a development agreement as part of the Project's implementation. The Project is currently under review and requires environmental review under CEQA. Based on anticipated impacts associated with the Project, the appropriate CEQA document required for the Project is an EIR. Since the City of Santa Clarita (City) does not have the in-house expertise or resources available to complete an EIR, an outside environmental consulting firm is required to complete this task. The EIR will analyze a variety of topics including, but not limited to, traffic, geology and soils, biology, wildfire, air quality, noise, aesthetics, and greenhouse gas emissions. The EIR will also analyze how the project would interact with and/or impact cleanup efforts, managed by the Department of Toxic Substances Control (DTSC), of on -site hazardous materials generated by the operation of previous land uses in the project area. The EIR process will help guide coordination between the City and the DTSC regarding this area of study. The City conducted a Request for Proposal (RFP) to solicit proposals from qualified consulting firms to prepare an EIR for the Project. The Memorandum of Understanding approved by the City Council for the project in September 2024, identified preparation of a Program EIR for the project. However, at the request of the project applicant, and with the concurrence of City staff, preparation of a Project EIR was ultimately within the scope of the RFP. The RFP was published and circulated via the City's e-procurement system, BidNet, on March 10, 2026. The City transmitted the solicitation to 4,542 vendors on BidNet, of which 97 vendors downloaded the RFP. Seven firms provided proposals for consideration. An evaluation panel comprised of City staff reviewed and evaluated the proposals based on qualifications, relevant experience, project approach, and the firms' demonstrated ability to successfully prepare and manage complex CEQA documentation. Evaluation criteria included the following: • Contractor qualifications, plan of study/scope of work, program management (40 points) • Experience on similar projects (30 points) • Thoroughness of proposal, approach to providing sound services, and ability to provide services to meet objectives and standards (30 points) • Cost of materials and services provided as well as discounts offered (reviewed separately for completeness and reasonableness and not used as part of the scored ranking process) Consistent with California Government Code Section 4526, the selection of professional architectural, engineering, environmental, and related professional services is based on demonstrated competence and professional qualifications necessary for the satisfactory performance of the services required, rather than price alone. Accordingly, proposals were evaluated and ranked based on qualifications and non -cost criteria. Page 3 Packet Pg. 124 The scoring results are shown below: RANK FIRM LOCATION SCORE 1 Michael Baker International, Inc. Long Beach, CA 92 2 HELIX Environmental Planning, Inc. La Mesa, CA 86 3 Envicom Corporation Westlake Village, CA 81 4 SWCA Incorporated Pasadena, CA 77 5 Impact Sciences Los Angeles, CA 73 6 U1traSystems Environmental Inc. Irvine, CA 72 7 JEcoTierra Consulting Los Angeles, CA 72 In addition to evaluating written proposals, City staff conducted interviews with the three highest -scoring firms: Michael Baker International, Inc., HELIX Environmental Planning, Inc., and Envicom Corporation. The interviews provided an opportunity for the firms to further discuss their project approach, CEQA strategy, experience with complex environmental review processes, project team composition, and overall ability to manage the preparation of the EIR in coordination with City staff and the project applicant. Based on the interviews, City staff determined that Michael Baker International, Inc. (MBI) demonstrated the strongest overall understanding of the Project, the most comprehensive approach to managing the environmental review process, and the greatest depth of relevant experience with comparable CEQA projects. Interview scores were as follows (10 points maximum): RANK FIRM LOCATION SCORE 1 Michael Baker International, Inc. Long Beach, CA 9 2 HELIX Environmental Planning, Inc. La Mesa, CA 6 3 Envicom Corporation Westlake Village, CA 6 Based on the quality of MBI's proposal, qualifications, relevant project experience, and interview performance, City staff recommends MBI as the firm most qualified to complete the preparation of the EIR for the Project. The proposed cost for the MBI scope of services is $875,102. The Scope of Work includes preparation of the Project Description; peer review of technical studies; coordination of the Notice of Preparation and Scoping Meeting; preparation of the Draft EIR; responses to comments; preparation of the Final EIR and Mitigation Monitoring and Reporting Program (MMRP); and attendance at public hearings. Michael Baker International, Inc., anticipates an approximate 16-month schedule to complete the EIR once all applicant -prepared technical studies have been submitted. This is consistent with the proposed timelines for other projects Page 4 Packet Pg. 125 including the 12-month proposed timeline for the Belcaro project and the 20-month timeline for the Shadowbox project. Most recently, the City approved an EIR contract for the Belcaro Development Project, which is a smaller -scale project with an anticipated review process of approximately one year. Due to the complexity of the Project and surrounding area, City staff requested that consultants include contingency pricing as part of their proposals. The Request for Proposals (RFP) was released while the Project Description was still being finalized; therefore, consultants were requested to provide a separate schedule of pricing associated with potential revisions to the Project Description and related environmental analysis. The proposed contingency amount is $370,771, bringing the total contract amount to a not -to - exceed amount of $1,245,873. The contingency is intended to address potential recirculation of the Draft EIR and any supplemental environmental analysis that may be required if revisions to the EIR are necessary. The contingency also provides flexibility to address unforeseen issues identified during the environmental review process. The Applicant will be responsible for all costs associated with preparation of the EIR and the related consultant contract. Upon award of the contract, the Applicant will deposit the required funds into a trust account maintained by the City. ALTERNATIVE ACTION Other action as determined by the City Council. FISCAL IMPACT All costs associated with the preparation of the Environmental Impact Report will be the responsibility of the Applicant for the Sunridge Development. There will be no fiscal impact to the General Fund associated with this item. ATTACHMENTS Cost File-Sunridge Project Page 5 Packet Pg. 126 COST FILE SUNRIDGE PROJECT - ENVIRONMENTAL IMPACT REPORT PROPOSAL # CD-25-26-27 N R 10 G E SUBMITTED BY Michael Baker MICHAEL BAKER INTERNATIONAL 376D Kilroy Airport Way • Suite 27D N T E R N A T 1 0 N A L Long Beach, CA 90806 OF SANT9 0 9 ti� bra O 9 DGHOep 16 DECEVA �P �01 0 m A 7 Y I_ Q 0 I� m tm a 1 tea' 5 K" - .NPY1" 4i 0 Y i IM! U- SUBMITTED TO CITY OF SANTA CLARITA COMMUNITY DEVELOPMENT DEPARTMENT, PLANNING DIVISION 2392D Valencia Boulevard Santa Clarita, CA 91355-2196 Packet Pg. 127 1.2.1 BASE BID SCOPE OF WORK As required in the City's RFP, this section includes the costs for all tasks and subtasks described in Section 1.1.3, Plan of Study/Scope of Work, of the Response File. Table 1 below provides this proposal's total costs, and Table 2 provides the billing rates for proposed staff from Years 2026 through 2028. The proposed base bid cost for our scope of work is $875,102.05. A detailed breakdown of costs by task and individual is provided on the attached spreadsheet; however, we understand that costs will be dependent upon the specific services performed under this scope of work. Relative to the cost estimate, it is realized that the proposed costs are in fact an approximation of the labor and reimbursable costs by task. Actual costs per task within the framework of the not -to -exceed task amount will be billed to the City on a time and materials basis. Michael Baker requests flexibility to increase or decrease the level of effort between tasks and among staff within the total not -to - exceed limit of the overall budget. For budgeting purposes, our scope of work assumes the following, consistent with the deliverables identified in the RFP, except where noted: • An electronic copy (Word and pdf format) of a working draft version of the Administrative Draft EIR for City staff review. • Five hard copies and one electronic copy (Word and pdf format) of the preliminary (screencheck) Draft EIR for City staff review. • Five hard copies and one electronic copy (pdf format) of the Appendices for the preliminary Draft EIR for City staff review; for printing budget purposes, Michael Baker assumes that the Appendices will total no more than 1,000 pages. • Ten hard copies and one reproducible master of the Draft EIR for public review and an electronic copy (Word and pdf format) of the Draft EIR. • Ten hard copies of the appendices for the Draft EIR for public review and an electronic copy (pdf format) of the appendices for the Draft EIR; for printing budget purposes, Michael Baker assumes that the Appendices will total no more than 1,000 pages. • An electronic copy (Word and pdf format) of a working draft version of the Administrative Final EIR for City staff review. • An electronic copy (Word and pdf format) of the preliminary (screencheck) Final EIR for City staff review. • Fifteen copies and one reproducible master of the Final EIR for public review and an electronic copy (Word and pdf format) the Final EIR. In addition, a new California law requires CEQA documents submitted to the State Clearinghouse (SCH), as a state agency, be compliant with the requirements of the Web Content Accessibility Guidelines (WCAG). Because creating WCAG-compliant documents is a very time -intensive exercise, our cost only includes staff time to produce WCAG-compliant Draft and Final EIRs but not the EIR Appendices. Due to the unknown length of these appendices at this time, our proposed cost does not include producing WCAG-compliant EIR Appendices as the cost will vary based on length and complexity of the documents. Michael Baker will provide the City within an estimate for these costs once the number of appendices has been determined. Our proposed scope of services provided in Section 1.1.3, Plan of Study/Scope of Work, of the Response File, also includes a kickoff meeting, a scoping meeting, and a community meeting during the 45-day review of the Draft EIR, and regular staff meetings throughout the CEQA process. Furthermore, the cost identified in the table below includes time for the Michael Baker project management team to assist with the preparation of presentations and attendance at one Planning Commission hearing and one City Council hearing. I N T E R N A T I O N A L CITY OF SANTA CLARITA • SUNRIDGEPROJECT -ENVIRONMENTALIMPACTREPORT • Packet Pg. 128 13.a 1.2.2 ADDITIONAL ANALYSIS PRICING Consistent with requirements Sections 1.2.2.1 through 1.2.2.5 of the RFP, Table 1 also presents our estimated cost for work that may be required due to changes in the project description and associated environmental analyses. Separate optional costs associated with recirculation of the Draft EIR (Section 1.2.2.4) or preparation of a Supplemental EIR or Revised EIR (Section 1.2.2.5) are shown at the bottom of the table. These optional costs are our best estimation at this point. However, accurate costs for recirculation of the Draft EIR or a Supplemental/Revised EIR cannot be provided until the nature and extent of the Project changes are identified. In addition, the estimated cost of attendance at additional public meeting or hearings or extended coordination with reviewing agencies (Section 1.2.2.6) will vary and depend on which members of the Project team the City requests to participate; the cost per public meeting or hearing may range from $2,300 (attendance by our Principal -in -Charge, Project Manager, and Deputy Project Manager) to $5,000 (additional staff attendance, such as our senior biologists, transportation engineers, and/or technical specialists), and virtual one -hour coordination meetings with reviewing agencies may start at $800 per meeting. Regarding responses to unusually high volumes of public or agency comments (Section 1.2.2.7), we estimate that, on average, responding to an individual comment in a comment letter will typically require 1 to 2 hours of staff time; however, responding to certain individual comments may take up to 5 to 6 hours of staff time, depending on the complexity of the comment, whether subject matter experts are needed to weigh in on the comment, and whether the comment is attorney -written. Therefore, we would assume that addressing 100 additional comments may require between $10,000 to $50,000 more, with the assumption that a number of these comments are similar in nature to ones already addressed during the initial batch of responses to comments. Hourly billing rates by staff are presented in Table 2. As required in the City's RFP, this proposal is a firm offer for a 120-day period, and work will be performed at the "not -to -exceed" price shown in Table 1. This cost proposal is signed by Fareeha Kibriya, who is the authorized representative to make legally binding commitments for Michael Baker. Z' _� 6P areeha Kibriy Vice President/Office Executive 9, 2026 Date I N T E R N A T I O N A L CITY 0 F SANTA CLARITA • SUNRIDGEPROJECT- ENVIRONMENTALIMPACTREPORT • Packet Pg. 129 riujeLt ue—iptiuni Vdl I dull I ty dIIU —Itillyelit DIVI-1111eiRd I Mildly— —pe Ul VVUIK RK d neU I LUldteU Mall Lin \uase — , iaSK Y. 11 Project Description Variability and Contingent Environmental Analysis Scope of Work for a Supplemental EIR or Revised EIR (Base Bid Task 9.2) 1=1 ­­= ­­­nd. �.2 I em In. _..' An— 2 2. 1. T­ I— H! in H H H 1111MM��Z�31 T,11­1� IIII. 16 1 11 "1 "1 1 11 lg� 3111111 11 61 1 1 1 16 FM..h..l Baker Table 2 Sunridge Project Environmental Impact Report Hourly Rate Sheet for Years 2026 through 2028 (;11YOfSAN1ACLAR11A - SUNRIDGE PROJECT -ENVIRONMENTAL IMPACT REPOR �