HomeMy WebLinkAbout2026-05-26 - RESOLUTIONS - FY2026-27 SB1 FUNDED PROJECTS CIPRESOLUTION NO.26-24
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA CLARITA,
CALIFORNIA, DECLARING THAT IT HAS ADOPTED A LIST OF PROJECTS FOR
FISCAL YEAR 2026-27 FUNDED BY SENATE BILL 1: THE ROAD REPAIR AND
ACCOUNTABILITY ACT OF 2017, LOCAL STREETS AND ROADS, ROAD
MAINTENANCE AND REHABILITATION FUNDS INTO THE CAPITAL IMPROVEMENT
PROGRAM
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017
(Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor
in April 2017 to address the significant multi -modal transportation funding shortfalls statewide;
and
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure
the residents of our City of Santa Clarita (City) are aware of the projects proposed for funding in
our community and which projects have been completed each fiscal year; and
WHEREAS, the City must adopt by resolution a list of projects proposed to receive fiscal
year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1,
which must include a description and the location of each proposed project, a proposed schedule
for the project's completion, and the estimated useful life of the improvement, and
WHEREAS, the City, will receive an estimated $6,690,689 in RMRA funding in Fiscal
Year 2026-27 from SB 1; and
WHEREAS, this is the tenth year in which the City is receiving SB 1 funding and will
enable the City to continue essential road maintenance and rehabilitation projects, safety
improvements, repairing and replacing aging bridges, and increasing access and mobility options
for the traveling public that would not have otherwise been possible without SB 1; and
WHEREAS, the City has undergone a robust public process to ensure public input into
our community's transportation priorities/the project list; and
WHEREAS, the City used a Pavement Management System to develop the SB 1 project
list to ensure revenues are being used on the most high -priority and cost-effective projects that
also meet the community's priorities for transportation investment; and
WHEREAS, the funding from SB I will help the City maintain and rehabilitate numerous
streets/roads, bridges, add active transportation infrastructure throughout the City this year and
hundreds of similar projects into the future; and
Page 1 of 4
WHEREAS, the 2023 California Statewide Local Streets and Roads Needs Assessment
found that the City streets and roads are in an "at -risk" condition and this revenue will help us
increase the overall quality of our road system and over the next decade will bring our streets and
roads into a "good" condition; and
WHEREAS, the SB 1 project list and overall investment in our local streets and roads
infrastructure with a focus on basic maintenance and safety, investing in complete streets
infrastructure, and using cutting -edge technology, materials and practices, will have significant
positive co -benefits statewide.
NOW, THEREFORE by the City Council of the City of Santa Clarita, California, does
hereby resolve as follows:
SECTION 1. The foregoing recitals are true and correct.
SECTION 2. The following list of newly proposed projects will be funded in -part or
solely with Fiscal Year 2026-27 Road Maintenance and Rehabilitation Account revenues:
Project Title: 2026-27 Overlay and Slurry Seal Program Design and Construction; n
Project Description: Generally, the scope of work to be performed includes, but is not limited to,
asphalt resurfacing of various streets Citywide;
Project Location: Citywide. Specific streets were selected from locations identified through the
City's Five -Year Pavement Preservation Program and are identified in the attached Proposed
Fiscal Year 2026-27 SB 1 Project List;
Estimated Project Schedule: Pre -construction: July 2026 — May 2027, Construction: June 2027 —
June 2028 based on the component being funded with RMRA fonds; and
Estimated Project Useful Life: Streets selected for preventative maintenance will have a
pavement life expectancy of 3-7 years, and streets selected for rehabilitation will have a life
expectancy of 10-15 years.
SECTION 3. The following previously proposed and adopted projects may also utilize
Fiscal Year 2026-27 Road Maintenance and Rehabilitation Account revenues in their delivery.
With the relisting of these projects in the adopted fiscal year resolution, the City is reaffirming to
the public and the State our intent to fund these projects with Road Maintenance and
Rehabilitation Account revenues:
Page 2 of 4
Project Tide: 2025-26 Overlay and Slurry Seal Program Design and Construction;
Project Description: Generally, the scope of work to be performed includes, but is not limited to,
asphalt resurfacing of various streets Citywide;
Project Location: Citywide. Specific streets were selected from locations identified through the
City's Five -Year Pavement Preservation Program and are identified in the attached Proposed
Fiscal Year 2026-27 SB 1 Project List;
Estimated Project Schedule: Pre -construction: July 2025 — May 2026, Construction: June 2026 —
June 2027 based on the component being funded with RMRA funds: and
Estimated Project Useful Life: Streets selected for preventative maintenance will have a
pavement life expectancy of 3-7 years, and streets selected for rehabilitation will have a life
expectancy of 10-15 years.
SECTION 4. The City Clerk shall certify to the adoption of this resolution.
PASSED, APPROVED, AND ADOPTED this 26" day of May 2026.
MAYOR
ATTEST:
CITY CRK/
DATE:_
Page 3 of 4
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss.
CITY OF SANTA CLARITA )
L Melody Bartlette, City Clerk of the City of Santa Clarita, do hereby certify that the
foregoing Resolution No. 26-24 was duly adopted by the City Council of the City of Santa Clarita
at a regular meeting thereof, held on the 26e' day of May 2026, by the following vote:
AYES: COUNCILMEMBERS: Ayala, Gibbs, McLean, Miranda, Weste
NOES: COUNCILMEMBERS: None
ABSENT: COUNCILMEMBERS: None
Il..aR.'A�
Page 4 of 4
I
n
City of Santa Clarita
Proposed Fiscal Year 2026-27 SB 1 Project List
Projed RwdMame
(lorHbnslittM arc
prolestedestimstes
Prc-
Propmed
Useful
useful
and haw yet b be
Conswtbn
Con-ru .
MM1eduleof
A
life
projnot Tale
Pro]est Oescdptlon
flnalimdl
Protest lootbn
Mart
Start
Completion
Min
Mu
2016-270Veday
The Annual Overlay and
Oecoro Drw
From Copper Hill
Ju4M
Jun-27
Jun-M
3
15
and Slurry Seal
Slurry Seal Program
Dnre to MCBean
Program Design
reflect Me CM's
Parkway
and CorotmRion
commitment to roadway
infrastructure by
resurfacing Streets in
need of attention.
202627 Ovrrlay
The Annual Overlay and
Avenue Scott
From McBean
lukM
Jun-27
Jun-M
3
15
and Slurry Seal
Slurry Seal Program
Parkway to Rye
Program Design
mfle¢s the City's
Canyon Road
and Commusbw
commitment to roadway
Infrastrottureby
resurfacing street in
need of attention.
2026270wrlay
The Annual Overlay and
Rye Canyon Rwtl
From Avenue
Jul-M
Jun-27
Jun-M
3
15
and Slurry seal
Slurry Seal Program
Stnfordto
P.,.mDesign
reflects the City's
Avenue Scott
and Combustion
commdmemto roadway
infrastructure by
resur(xing sneer in
need of Abandon.
2025-260veAay
The Annual Overby and
Via Prin.
From Sierra
Jul-25
Jun-M
Jun-P
3
1S
and Slurry Seal
Slurry Seal Pogrom
Highwnytot t
Program Design
reflect the City's
Canyon Road
and Conaoattion
commdmerd to roadway
infisson cdure by
resuRacing street In
need of attentio
2025-26OVed,
The Annual Overby and!
MLBean Parkway
From Alegro Drive
Jul-M
J.x
Jun-27
3
15
and Slur, Seal
Slurry Seal Program
to Avenida
Program Design
reflects the City's
Hawme
and Consnuttion
commitment to roadway
infrastructure by
resurf.mg streets In
need of mention.