Loading...
HomeMy WebLinkAbout2026-05-26 - RESOLUTIONS - FY2026-27 SB1 FUNDED PROJECTS CIPRESOLUTION NO.26-24 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA CLARITA, CALIFORNIA, DECLARING THAT IT HAS ADOPTED A LIST OF PROJECTS FOR FISCAL YEAR 2026-27 FUNDED BY SENATE BILL 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017, LOCAL STREETS AND ROADS, ROAD MAINTENANCE AND REHABILITATION FUNDS INTO THE CAPITAL IMPROVEMENT PROGRAM WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April 2017 to address the significant multi -modal transportation funding shortfalls statewide; and WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of our City of Santa Clarita (City) are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; and WHEREAS, the City must adopt by resolution a list of projects proposed to receive fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, which must include a description and the location of each proposed project, a proposed schedule for the project's completion, and the estimated useful life of the improvement, and WHEREAS, the City, will receive an estimated $6,690,689 in RMRA funding in Fiscal Year 2026-27 from SB 1; and WHEREAS, this is the tenth year in which the City is receiving SB 1 funding and will enable the City to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB 1; and WHEREAS, the City has undergone a robust public process to ensure public input into our community's transportation priorities/the project list; and WHEREAS, the City used a Pavement Management System to develop the SB 1 project list to ensure revenues are being used on the most high -priority and cost-effective projects that also meet the community's priorities for transportation investment; and WHEREAS, the funding from SB I will help the City maintain and rehabilitate numerous streets/roads, bridges, add active transportation infrastructure throughout the City this year and hundreds of similar projects into the future; and Page 1 of 4 WHEREAS, the 2023 California Statewide Local Streets and Roads Needs Assessment found that the City streets and roads are in an "at -risk" condition and this revenue will help us increase the overall quality of our road system and over the next decade will bring our streets and roads into a "good" condition; and WHEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting -edge technology, materials and practices, will have significant positive co -benefits statewide. NOW, THEREFORE by the City Council of the City of Santa Clarita, California, does hereby resolve as follows: SECTION 1. The foregoing recitals are true and correct. SECTION 2. The following list of newly proposed projects will be funded in -part or solely with Fiscal Year 2026-27 Road Maintenance and Rehabilitation Account revenues: Project Title: 2026-27 Overlay and Slurry Seal Program Design and Construction; n Project Description: Generally, the scope of work to be performed includes, but is not limited to, asphalt resurfacing of various streets Citywide; Project Location: Citywide. Specific streets were selected from locations identified through the City's Five -Year Pavement Preservation Program and are identified in the attached Proposed Fiscal Year 2026-27 SB 1 Project List; Estimated Project Schedule: Pre -construction: July 2026 — May 2027, Construction: June 2027 — June 2028 based on the component being funded with RMRA fonds; and Estimated Project Useful Life: Streets selected for preventative maintenance will have a pavement life expectancy of 3-7 years, and streets selected for rehabilitation will have a life expectancy of 10-15 years. SECTION 3. The following previously proposed and adopted projects may also utilize Fiscal Year 2026-27 Road Maintenance and Rehabilitation Account revenues in their delivery. With the relisting of these projects in the adopted fiscal year resolution, the City is reaffirming to the public and the State our intent to fund these projects with Road Maintenance and Rehabilitation Account revenues: Page 2 of 4 Project Tide: 2025-26 Overlay and Slurry Seal Program Design and Construction; Project Description: Generally, the scope of work to be performed includes, but is not limited to, asphalt resurfacing of various streets Citywide; Project Location: Citywide. Specific streets were selected from locations identified through the City's Five -Year Pavement Preservation Program and are identified in the attached Proposed Fiscal Year 2026-27 SB 1 Project List; Estimated Project Schedule: Pre -construction: July 2025 — May 2026, Construction: June 2026 — June 2027 based on the component being funded with RMRA funds: and Estimated Project Useful Life: Streets selected for preventative maintenance will have a pavement life expectancy of 3-7 years, and streets selected for rehabilitation will have a life expectancy of 10-15 years. SECTION 4. The City Clerk shall certify to the adoption of this resolution. PASSED, APPROVED, AND ADOPTED this 26" day of May 2026. MAYOR ATTEST: CITY CRK/ DATE:_ Page 3 of 4 STATE OF CALIFORNIA ) COUNTY OF LOS ANGELES ) ss. CITY OF SANTA CLARITA ) L Melody Bartlette, City Clerk of the City of Santa Clarita, do hereby certify that the foregoing Resolution No. 26-24 was duly adopted by the City Council of the City of Santa Clarita at a regular meeting thereof, held on the 26e' day of May 2026, by the following vote: AYES: COUNCILMEMBERS: Ayala, Gibbs, McLean, Miranda, Weste NOES: COUNCILMEMBERS: None ABSENT: COUNCILMEMBERS: None Il..aR.'A� Page 4 of 4 I n City of Santa Clarita Proposed Fiscal Year 2026-27 SB 1 Project List Projed RwdMame (lorHbnslittM arc prolestedestimstes Prc- Propmed Useful useful and haw yet b be Conswtbn Con-ru . MM1eduleof A life projnot Tale Pro]est Oescdptlon flnalimdl Protest lootbn Mart Start Completion Min Mu 2016-270Veday The Annual Overlay and Oecoro Drw From Copper Hill Ju4M Jun-27 Jun-M 3 15 and Slurry Seal Slurry Seal Program Dnre to MCBean Program Design reflect Me CM's Parkway and CorotmRion commitment to roadway infrastructure by resurfacing Streets in need of attention. 202627 Ovrrlay The Annual Overlay and Avenue Scott From McBean lukM Jun-27 Jun-M 3 15 and Slurry Seal Slurry Seal Program Parkway to Rye Program Design mfle¢s the City's Canyon Road and Commusbw commitment to roadway Infrastrottureby resurfacing street in need of attention. 2026270wrlay The Annual Overlay and Rye Canyon Rwtl From Avenue Jul-M Jun-27 Jun-M 3 15 and Slurry seal Slurry Seal Program Stnfordto P.,.mDesign reflects the City's Avenue Scott and Combustion commdmemto roadway infrastructure by resur(xing sneer in need of Abandon. 2025-260veAay The Annual Overby and Via Prin. From Sierra Jul-25 Jun-M Jun-P 3 1S and Slurry Seal Slurry Seal Pogrom Highwnytot t Program Design reflect the City's Canyon Road and Conaoattion commdmerd to roadway infisson cdure by resuRacing street In need of attentio 2025-26OVed, The Annual Overby and! MLBean Parkway From Alegro Drive Jul-M J.x Jun-27 3 15 and Slur, Seal Slurry Seal Program to Avenida Program Design reflects the City's Hawme and Consnuttion commitment to roadway infrastructure by resurf.mg streets In need of mention.