HomeMy WebLinkAbout2026-06-23 - AGENDA REPORTS - NEWHALL PARK POOL PUMP ROOM REPL PROJ P2021 PLANS & SPECS CONTRAgenda Item• 21 CITY OF SANTA CLARITA .` AGENDA REPORT CONSENT CALENDAR CITY MANAGER APPROVAL: DATE: June 23, 2026 SUBJECT: NEWHALL PARK POOL PUMP ROOM REPLACEMENT, PROJECT P2021 - PLANS, SPECIFICATIONS, AND CONSTRUCTION CONTRACT DEPARTMENT: Public Works PRESENTER: Carla Callahan RECOMMENDED ACTION City Council: 1. Approve the plans and specifications for the Newhall Park Pool Pump Room Replacement, Project P2021. 2. Find the Newhall Park Pool Pump Room Replacement project exempt from review under the California Environmental Quality Act (CEQA) pursuant to Title 14 of the California Code of Regulations, Article 19, Sections 15302 and 15304. 3. Award the construction contract to Golden Sun Enterprise, Inc., in the amount of $2,800,977 and authorize a contingency in the amount of $280,098, for a total contract amount not to exceed $3,081,075. 4. Award the professional services contract to Pacific Advanced Civil Engineering, Inc., to provide construction support and inspection services in the amount of $91,194 and authorize a contingency in the amount of $9,119, for a total contract amount not to exceed $100,313. 5. Authorize the transfer of project savings in the amount of $220,000 from the General Fund — Capital Projects (Fund 601) in the Corporate Yard Evaporative Cooler Replacement, Project M1047, expenditure account M1047601-516101 to the Newhall Park Pool Pump Room Replacement, Project P2021, expenditure account P2021601-516101. 6. Appropriate one-time funds in the amount of $400,000 from the General Fund — Capital Projects (Fund 601) to the Newhall Park Pool Pump Room Replacement, Project P2021, Page 1 Packet Pg. 146 expenditure account P2021601-516101; increase Transfers In account 601-600100 and Transfers Out account 1009500-710601 in the amount of $400,000. 7. Authorize the City Manager or designee to execute all documents, subject to City Attorney review. BACKGROUND Newhall Park was constructed and operated by the County of Los Angeles (County) until the City of Santa Clarita (City) was incorporated in 1987. The 14.3-acre community park includes a range of amenities, including a pool, multi -purpose room, recreational facilities, and green spaces for visitors to enjoy. This project will replace the pool pump room at Newhall Park, as shown on the attached Location Map. Demolition work includes the removal of the storage building with attached lean- to, chain link fence, temporary storage shed, and portions of concrete as required for the construction of the proposed improvements. The new pool pump room will accommodate reconfigured pump room utilities and require grading of approximately 1,000 square feet for the construction of a new concrete pad, providing dedicated enclosed spaces for chemical storage, the pool heater, chemical controllers, and pool equipment. The exterior area will house the circulation pump, surge pit, sand filters, and associated pool water piping. The project scope includes alternate work consisting of the installation of wrought iron fencing around the pool deck perimeter, replacement of eyewash stations, and installation of a new pool pump. This project supports the Sustainable Public Infrastructure theme of the City's strategic plan, Santa Clarita Pathway Forward. The Newhall Park Pool Pump Room Replacement project is not subject to California Environmental Quality Act (CEQA) review pursuant to Title 14 of the California Code of Regulations, Article 19, Sections 15302 and 15304, which exempts from CEQA review projects that have minor grading and consist of the replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site as the structure being replaced and will have substantially the same purpose and capacity as the structure replaced. In addition, the project will include minor grading associated with the concrete slab improvements to achieve positive site drainage. The Newhall Park Pool Pump Room Replacement project will replace the deteriorated and failing structure and fatigued equipment with a purpose-built, code - compliant accessible facility and modern equipment, within the same location and performing equivalent functions and capacity. An invitation to bid was published and circulated via the City's e-procurement system, BidNet, on April 28, 2026. The City transmitted the solicitation to 2,670 vendors on BidNet, of which 36 vendors downloaded materials. A total of three bids were submitted and opened on May 19, 2026. Each of the bids included a base bid and an alternate bid. The basis of award was the base bid only. The results of the base bids are shown below. Company Location Bid Amount USA Construction, LLC Los Angeles, CA $1,980,860 Golden Sun Enterprise, Inc. Van Nuys, CA $2,424,777 Page 2 Packet Pg. 147 AMG & Associates, Inc. Santa Clarita, CA $3,676,622 Upon reviewing the bids, staff determined the apparent low bidder, USA Construction, LLC, was non -responsive due to its failure to provide an original notarized bid bond. This project has been advertised and bid on three separate occasions and, in each instance, USA Construction, LLC did not submit the required bid bond documentation necessary for the bid to be considered responsive. Staff recommends awarding the construction contract to Golden Sun Enterprise, Inc., the second -lowest responsive and responsible bidder, in the amount of $2,800,977, which includes $2,424,777 for the base bid and $376,200 for the bid alternate, and authorizing a contingency in the amount of $280,098, for a total contract amount not to exceed $3,081,075. The base bid includes the replacement of the pool pump room, and the alternate includes the installation of wrought iron fencing around the pool perimeter, replacement of eyewash stations, and installation of a new pool pump. This contractor possesses a valid contractor's license and is in good standing with the Contractors State License Board. The contractor's bid was reviewed for accuracy and conformance to the contract documents and was found to be complete. The bid proposal adheres to the project's plans and specifications and is available in the City Clerk's Reading File. While the City maintains a Support of Local Businesses policy that can be utilized by the City Council, when warranted, the City is governed by the California Public Contract Code with regard to public works project procurement. In this type of procurement, the California Public Contract Code does not permit a city to utilize a Support of Local Businesses policy, and instead requires the contract be awarded to the lowest responsive and responsible bidder. Construction Support Services The City conducted a Request for Proposal (RFP) to solicit proposals from qualified firms to provide design, construction support, and inspection services for the Newhall Park Pool Pump Room Replacement project. The RFP was published and circulated via the City's e-procurement system, BidNet, on October 31, 2023. Thirty-three companies downloaded bid specifications, and the RFP closed on November 30, 2023, with no proposals submitted. As a result, consistent with the City purchasing policy, staff identified three qualified vendors and requested proposals through an informal process. One vendor opted not to submit, while another failed to respond to staff inquiries regarding the project. However, Pacific Advanced Civil Engineering, Inc. (PACE) submitted a proposal that met the project's needs. The City Council awarded a professional services contract for design services for a total amount not to exceed $206,570 to PACE at the March 12, 2024, City Council meeting. PACE is the Engineer of Record for the Newhall Park Pool Pump Room Replacement project Since PACE was originally evaluated and selected based on its qualifications to perform the entire scope of services outlined in the RFP, it is recommended that PACE be awarded a contract for a total of $100,313, including contingency, to provide appropriate construction support and inspection services throughout construction. This will allow PACE to provide construction support for meetings, site observations and inspections, requests for information responses, and submittals as the project is constructed. The proposal is available in the City Clerk's Reading File. Page 3 Packet Pg. 148 The requested contingencies will cover the cost of unforeseen design constraints, design modifications requested by the City or other permitting agencies, and field investigations. This includes potential adjustments to the engineering and landscape drawings, architectural drawings, engineered grades, and change orders for additional work requested by the City. The City Council appropriated $2,710,000 for construction of the project upon adoption of the Fiscal Year 2025-26 budget. The requested transfer of project savings in the amount of $220,000 and budget appropriation in the amount of $400,000 bring the total project budget to $3,330,000, representing $3,081,075 in construction contract costs, $100,313 in construction support services, and $148,612 in project administrative costs. Project administrative costs include staff time, project management, public works inspections, environmental inspections and support, utility fees, and labor compliance monitoring. ALTERNATIVE ACTION Other action as determined by the City Council. FISCAL IMPACT Upon approval of the recommended actions, a total of $3,330,000 will be available in the Newhall Park Pool Pump Room Replacement project expenditure account P2021601-516101 (General Fund - Capital Projects, Fund 601) to support the recommended contract and associated project costs. ATTACHMENTS Location Map Bid Proposal for Golden Sun Enterprise, Inc. (available in the City Clerk's Reading File) Proposal for Pacific Advanced Civil Engineering, Inc. (available in the City Clerk's Reading File) Page 4 Packet Pg. 149 `"Y of SANTA CLARITA N �h. Location Map for the Newhall Park Pool Pump Room Replacement, P2021 Feet 0 25 50 - I I I Newhall Park Pool Pump Room Replacement Project Street centerlines developed&maintained Q Parcel Boundary by City of Santa Clarita GIS The City of Santa Clarita does not warrant the accuracy of the data and assumes no liability for any errors or omissions. Map prepared by: City of Santa Clarita - - GIS Division Q:\PROJECTS\PW\090525s1\73247\P2021 - Newhall Park Pool Pump Room Replacement i I � 1 , � r _ x II y f((iI t 1 _ 21.a Ids 2 O O (CC C & J A. F_ O Q a Q a J Q 2 W Z CL ti Uo pp @ k V OS S EDADU J ' W I_ a U P C - CU ANYON � Wr RD a Packet Pg. 150 DOCUMENT CHECKLIST Bid #CIP-25-26-P2021REBID Newhall Park Pool Pump Room Replacement REBID2 City Project No. P2021 City of Santa Clarita, California The following documents must be completed and submitted by the bidder as per the outlined timeframes. The following documents must be provided by ALL bidders: Uploaded via BidNet (see Section C) 5d Proposal Form Gd Notice to Bidders Regarding Contractual Requirements Alternate Bid Schedule 6d Bidder's Information and Certification Gd Bidder's Questionnaire 6d Bidder's Pre -Qualification Questionnaire G� Certification of Non -Segregated Facilities Designation of Subcontractors G� References Iran Contracting Act Certification Sd Non -Collusion Affidavit Y( All signed addendums (if any) Delivered to City Hall, Attn: Purchasing, Suite 120 prior to bid closing: 2( Proposal Guarantee Bond/Bidder's Bond (Notarized) The following documents must be provided by the AWARDEE ONLY (With Agreement) Delivered to City Hall, Attn: Peter Henne ❑ Capital Improvement Project Agreement ❑ Faithful Performance Bond (Notarized) ❑ Labor & Material Bond (Notarized) ❑ Insurance Required by Contract ❑ W9 ❑ Fringe Benefit Statement PROPOSAL FORM Bid #CIP-25-26-P2021REBID2 Newhall Park Pool Pump Room Replacement REBID2 City Project No. P2021 City of Santa Clarito, California TO THE CITY OF SANTA CLARITA, AS CITY: In accordance with CITY's NOTICE INVITING BIDS, the undersigned BIDDER hereby proposes to furnish all materials, equipment, tools, labor, and incidentals required for the above -stated project as set forth in the plans, specifications, and contract documents therefore, and to perform all work in the manner and time prescribed therein. BIDDER declares that this proposal is based upon careful examination of the work site, plans, specifications, INSTRUCTIONS TO BIDDERS, and all other contract documents. If this proposal is accepted for award, BIDDER agrees to enter into a contract with CITY at the unit and/or lump sum prices set forth in the following BID SCHEDULE. BIDDER understands that failure to enter into a contract in the manner and time prescribed will result in forfeiture to CITY of the proposal guarantee accompanying this proposal. BIDDER understands that a bid is required for the entire work that the estimated quantities set forth in BID SCHEDULE are solely for the purpose of comparing bids, and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. THE CITY RESERVES THE RIGHT TO INCREASE OR DECREASE THE AMOUNT OF ANY QUANTITY SHOWN AND TO DELETE ANY ITEM FROM THE CONTRACT. It is agreed that the unit and/or lump sum price(s) bid include all appurtenant expenses, taxes, royalties, and fees for the project's duration. In case of discrepancies in the amounts bid, unit prices shall govern over extended amounts, and words shall govern over figures. If awarded the contract, the undersigned further agrees that in the event of the Bidder's default in executing the required contract and filing the necessary bonds and insurance certificates within ten working days after the date of the CITY's notice of award of contract to the BIDDER, the proceeds of the security accompanying this bid shall become the property of the CITY and this bid and the acceptance hereof may, at the CITY's option, be considered null and void. Company Name: Golden Sun Enterprise, Inc. Company Address: 6732 White Oak Ave. Van Nuys, CA 91406 Phone: (310) 363-1015 Email: Info@gsel.us By: Mohammad Elikaee Print Name Title: President Signature: Date: 05/18/2026 NOTICE TO BIDDERS REGARDING CONTRACTUAL REQUIREMENTS Bid #CIP-25-26-P2021REBID2 Newhall Park Pool Pump Room Replacement REBID2 City Project No. P2021 City of Santa Clarita, California SUMMARY OF INDEMNITY AND INSURANCE REQUIREMENTS 1. These are the Indemnity and Insurance Requirements for Contractors providing services or supplies to City of Santa Clarita (City). By agreeing to perform the work or submitting a proposal, you verify that you comply with and agree to be bound by these requirements. If any additional Contract documents are executed, the actual Indemnity language and Insurance Requirements may include additional provisions as deemed appropriate by City's Purchasing Agent. The City reserves the sole right to accept or reject any requests for modifications to these terms. 2. You should check with your Insurance advisors to verify compliance and determine if additional coverage or limits may be needed to adequately insure your obligations under this agreement. These are the minimum required and do not in any way represent or imply that such coverage is sufficient to adequately cover the Contractor's liability under this agreement. The full coverage and limits afforded under Contractor's policies of Insurance shall be available to Buyer and these Insurance Requirements shall not in any way act to reduce coverage that is broader or includes higher limits than those required. The Insurance obligations under this agreement shall be: 1—all the Insurance coverage and limits carried by or available to the Contractor; or 2—the minimum Insurance requirements shown in this agreement, whichever is greater. Any insurance proceeds in excess of the specified minimum limits and coverage required, which are applicable to a given loss, shall be available to City. 3. Contractor shall furnish the City with original Certificates of Insurance including all required amendatory endorsements and a copy of the Declarations and Endorsement Page of the CGL policy listing all policy endorsements to City before work begins. City reserves the right to require full -certified copies of all Insurance coverage and endorsements. I. INDEMNIFICATION: City and its respective elected and appointed boards, officials, officers, agents, employees, and volunteers (individually and collectively, "Indemnitees") shall have no liability to CONTRACTOR or any other person for, and CONTRACTOR shall indemnify, defend, protect, and hold harmless Indemnitees from and against, any and all liabilities, claims, actions, causes of action, proceedings, suits, damages, judgments, liens, levies, costs, and expenses of whatever nature, including reasonable attorney's fees and disbursements (collectively, "Claims"), which Indemnitees may suffer or incur or to which Indemnitees may become subject by reason of or arising out of any injury to or death of any person(s), damage to property, loss of use of property, economic loss, or otherwise occurring as a result of or allegedly caused by the CONTRACTOR'S performance of or failure to perform any services under this Agreement, or by the negligent or willful acts or omissions of CONTRACTOR, its agents, officers, directors, or employees, committed in performing any of the services under this Agreement. If any action or proceeding is brought against Indemnitees by reason of any of the matters against which CONTRACTOR has agreed to indemnify Indemnitees as provided above, CONTRACTOR, upon notice from City, shall defend Indemnitees at its expense by counsel acceptable to City, such acceptance not to be unreasonably withheld. Indemnitees need not have first paid for any of the matters to which Indemnitees are entitled to indemnification in order to be so indemnified. The limits of the insurance required to be maintained by CONTRACTOR in this Agreement shall not limit the liability of CONTRACTOR hereunder. The provisions of this section shall survive the expiration or earlier termination of this agreement. The provisions of this section do not apply to Claims occurring as a result of the City's active negligence or acts of omission. II. INSURANCE CONTRACTOR shall maintain and submit certificates of all applicable insurance including, but not limited to, the following and as otherwise required by law. The terms of the insurance policy or policies issued to provide the above insurance coverage shall provide that said insurance may not be amended or canceled by the carrier, for non-payment of premiums or otherwise, without thirty (30) days prior written notice of amendment or cancellation to the CITY. In the event the said insurance is canceled, the CONTRACTOR shall, prior to the cancellation date, submit to the City Clerk new evidence of insurance in the amounts established. Liabilitv Insurance During the entire term of this Agreement, the CONTRACTOR agrees to procure and maintain General Liability insurance at its sole expense to protect against loss from liability imposed by law for damages on account of bodily injury, including death therefrom, suffered or alleged to be suffered by any person or persons whomsoever, resulting directly or indirectly from any act or activities, errors or omissions, of the CITY, or CONTRACTOR or any person acting for the CITY, or under its control or direction, and also to protect against loss from liability imposed by law for damages to any property of any person caused directly or indirectly by or from acts or activities of the CITY, or CONTRACTOR or any person acting for the CITY, or under its control or direction. Such public liability and property damage insurance shall also provide for and protect the CITY against incurring any legal cost in defending claims for alleged loss. Such General, Public and Professional liability and property damage insurance shall be maintained in full force and effect throughout the term of the Agreement and any extension thereof in the amount indicated above or the following minimum limits: Commercial General Liability Insurance, including coverage for Premises and Operations, Contractual Liability, Personal Injury Liability, Products/Completed Operations Liability, and Independent Contractors' Liability (if applicable), in an amount of not less than two million dollars ($2,000,000.00) per occurrence, four million dollars ($4,000,000.00) annual aggregate, written on an occurrence form. Products/Completed Operations coverage shall extend a minimum of three (3) years after project completion. Coverage shall be included on behalf of the CONTRACTOR for covered claims arising out of the actions of independent contractors. If the CONTRACTOR is using subcontractors, the policy must include work performed "by or on behalf" of the CONTRACTOR. Policy shall contain no language that would invalidate or remove the CONTRACTOR'S duty to defend or indemnify for claims or suits expressly excluded from coverage. Policy shall specifically provide for a duty to defend on the part of the CONTRACTOR. Worker's Compensation Insurance The CONTRACTOR shall procure and maintain, at its sole expense, Worker's Compensation Insurance in the amount of $1,000,000 per occurrence or in such amount as will fully comply with the laws of the State of California and which shall indemnify, insure and provide legal defense for both the CONTRACTOR and the CITY against any loss, claim or damage arising from any injuries or occupational diseases happening to any worker employed by the CONTRACTOR in the course of carrying out the work within the Agreement. Such insurance shall also contain a waiver of subrogation naming the City of Santa Clarita. Automotive Insurance The CONTRACTOR shall procure and maintain, at its sole expense, throughout the term of this Agreement, and any extension thereof, public liability and property damage insurance coverage for automotive equipment with coverage limits of not less than $1,000,000 combined single limit for each accident. All such insurance shall be primary insurance and shall name the City of Santa Clarita as an additional insured. Waiver of Subroeation All insurance coverage maintained or procured pursuant to this Agreement shall be endorsed to waive subrogation against the CITY, its elected or appointed officers, agents, officials, employees and volunteers or shall specifically allow CONTRACTOR or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. CONTRACTOR hereby waives its own right of recovery against the CITY, and shall require similar written express waivers and insurance clauses from each of its subconsultants. Separation of Insureds A severability of interests provision must apply for all additional insureds ensuring that CONTRACTOR'S insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the insurer's limits of liability. The policy(ies) shall not contain any cross -liability exclusions. Pass Throueh Clause CONTRACTOR agrees to ensure that its subconsultants, subcontractors, and any other party involved with the project who is brought onto or involved in the project by CONTRACTOR, provide the same minimum insurance coverage and endorsements required of CONTRACTOR. CONTRACTOR agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. CONTRACTOR agrees that upon request, all Agreements with consultants, subcontractors, and others engaged in the project will be submitted to the CITY for review. Self -Insured Retentions Any self -insured retentions must be declared to and approved by the CITY. The CITY reserves the right to require that self -insured retentions be eliminated, lowered, or replaced by a deductible. Self-insurance will not be considered to comply with these specifications unless approved by the CITY. Primary and Additional Insured All of such insurance shall be primary and shall name the City of Santa Clarita as additional insured. A Certificate of Insurance and an additional insured endorsement (for general and automobile liability), evidencing the above insurance coverage with a company acceptable to the City's Purchasing Agent shall be submitted to the CITY prior to execution of this Agreement on behalf of the CITY. Requirements Should CONTRACTOR, for any reason, fail to obtain and maintain the insurance required by this Agreement, CITY may obtain coverage at CONTRACTOR'S expense and deduct the cost of such insurance from payments due to CONTRACTOR under this Agreement or terminate. In the alternative, should CONTRACTOR fail to meet any of the insurance requirements under this Agreement, CITY may cancel the Agreement immediately with no penalty. Should CONTRACTOR'S insurance required by this Agreement be canceled at any point prior to expiration of the policy, CONTRACTOR must notify CITY within 24 hours of receipt of notice of cancelation. Furthermore, CONTRACTOR must obtain replacement coverage that meets all contractual requirements within 10 days of the prior insurer's issuance of notice of cancelation. CONTRACTOR must ensure that there is no lapse in coverage. If the operation under this Agreement results in an increased or decreased risk in the opinion of the City's Purchasing Agent, then the CONTRACTOR agrees that the minimum limits herein above designated shall be changed accordingly upon request by the City's Purchasing Agent. The CONTRACTOR agrees that provisions of this paragraph as to maintenance of insurance shall not be construed as limiting in any way the extent to which the CONTRACTOR may be held responsible for the payment of damages to persons or property resulting from the CONTRACTOR'S activities or the activities of any person or persons for which the CONTRACTOR is otherwise responsible. I have read and understand the above requirements and agree to be bound by them for any work performed for the City. Authorized Signature: Date: 05/18/2026 Printed Name: Mohammad Elikaee Newhall Park Pool Pump Room Replacement REBID2 Estimated Contract Value ($2000000) P2021 Code Description UOM 1 Mobilization, Site prep (identify all Lump -Sum components for 'selective demolition'— pool equipment, concrete, mechanical, electrical, underground utilities; Pool Deck Protection measures); Required Permit(s); Required insurances 2 Pool Plaster Protection Measures Lump -Sum 3 Equipment Relocation Cost Lump -Sum (remove, store, re -install saved equipment) 4 Demolition and hauling of existing Lump -Sum landscaping 5 Demolition and hauling of vertical Lump -Sum structures (including, but not limited to: existing pump station building and footing, chain -link fences, existing canopy above chemical tanks, storage shed, and gates) 6 Demolition and hauling of the Lump -Sum concrete slab sections (per callout D1 and D9 on sheet D1.0 of the plan set) 7 Demolition and hauling of electrical Lump -Sum materials (including, but not limited to: electrical panels, wires, conduits, lights, receptacles, and junction boxes) (Sheets E1.01) & E2.0D) 8 Demolition and hauling of Lump -Sum mechanical materials/systems (including, but not limited to: pipes, valves, fittings, chemical tubing, backwash pit, and pipe supports) 9 Renovate Inside of Existing Wet Square Foot/Feet Well [Interior Roof, Interior Walls, Interior Floor Slab] — includes repairing spalled concrete, crack repairs (Detail 12/Sheet 50.3), and the application of a waterproof coating on the interior floor and walls (Xypex or approved equal) 10 Site grading per plan (Including Lump -Sum landscape grading and site preparation for concrete footings and flatwork) 11 Containment Wall (Retaining Wall Linear Foot/Feet and curb for grade change) 12 Pump Station Floor Drains (per Each plans) P2021 Line Items (Bid Schedule) Code Quantity Price Total Cost Bid Rank Vendor Comment 1 1 157077 157077 3 2 1 50000 50000 2 3 1 150000 150000 3 4 1 30000 30000 3 5 1 50000 50000 2 6 1 50000 50000 2 7 1 20000 20000 1 8 1 20000 20000 2 9 875 40 35000 2 10 1 30000 30000 2 11 45 300 13500 1 12 5 5000 25000 3 13 Concrete Flat Work (including, but Square Foot/Feet not limited to: concrete slab, housekeeping pads, walkway, concrete deck, chemical containment curbs) 14 Wet well regrading (Sheet C2.0 and Square Foot/Feet per Detail B sheet C3.2) 15 CMU Building (including, but not Square Foot/Feet limited to: Concrete Foundation/Slab, Structural Walls, Fiberglass Doors, Roof, Roof Drains, Footing, Roll -up Door) 16 Covered Canopy Structure Lump -Sum (including, but not limited to: steel beams, steel columns, fiber -cement siding, shade structure, and cantilevered shade structure at front of pump station) 17 Access Hatch in Roof for Vertical Each Turbine Pump Removal 18 Wet Well Access Hatch Each 19 10"Insulated Heater Pipe Linear Foot/Feet 20 14" Insulated Heater Pipe Linear Foot/Feet 21 8" Pipe Linear Foot/Feet 22 6" Pipe Linear Foot/Feet 23 4" Pipe Linear Foot/Feet 24 3" Sewer Drain Pipe Linear Foot/Feet 25 2" Water Line Connection Linear Foot/Feet 26 Gas Line Connection Linear Foot/Feet 27 Valves and Fittings Lump -Sum 28 Backwash Piping and Associated Lump -Sum Piping (including, but not limited to: backwash standpipe, 10-inch DWV pipe, and fittings) (Sheets M2.1 and M4.1) 29 Heater Intake and Exhaust Pipe Lump -Sum (including, but not limited to: 10" PVC intake pipe, 14" Double -wall Type B Vent, Insulated Wall Fittings, and Vent Cap) 30 Water Level Sensor Each 31 Flow Meter and Associated Each Transmitter (Sheet M4.2) 32 Storm Drain System (including, but Lump -Sum not limited to: 4" floor drain, 4" DWV pipe and fittings, 12" HDPE storm drain, 12" perforated storm drain, gravel, and nonwoven geofabric) 33 Pressure Gauges and Transducers Each (Detail F/Sheet M4.4) 34 Air Relief Valve (Detail D/Sheet Each M4.1) 35 Pipe Pressure Test — all water lines Lump -Sum and drain lines 36 Control/Electrical Panels — provide Lump -Sum and install (Sheets E1.0, E3.0, E4.0, E4.1, E6.0) 37 Electrical Component Installations Lump -Sum (including, but not limited to: Conduits, cables, junction boxes, outlets, switches, linear lights, exit signs, outdoor wall packs, grounding system, and safety devices) 13 1020 35 35700 1 14 280 100 28000 3 15 1300 450 585000 1 16 1 200000 200000 2 17 1 20000 20000 3 18 1 20000 20000 3 19 45 100 4500 1 20 15 120 1800 1 21 80 150 12000 1 22 20 120 2400 1 23 40 100 4000 1 24 80 150 12000 2 25 120 200 24000 3 26 40 300 12000 3 27 1 120000 120000 3 28 1 25000 25000 2 29 1 30000 30000 2 30 1 25000 25000 3 31 1 25000 25000 2 32 1 30000 30000 2 33 1 30000 30000 2 34 2 8000 16000 3 35 1 10000 10000 3 36 1 50000 50000 1 37 1 100000 100000 1 38 550 CFM Exhaust Fan, Ducting, & Each Vent Piping —provide & install 39 100 CFM Exhaust Fan, Ducting, & Each Vent Piping —provide & install 40 Chemical Controller — provideand Each Install (Sheets M1.0 and M3.0) 41 Acid Fume Scrubber, including, but Each not limited to: acid fume scrubber, wall mount kit, tubing, and tank connection) 42 Wrought Iron Fence* (Around Linear Foot/Feet Pump Station, including, but not limited to: fence, posts, and post footings) [*— does not include Pool Perimeter Fencing] 43 Wrought Iron Gate - Single Each (including, but not limited to: gate, posts, and post footings) 44 Wrought Iron Gate - Double Each (including, but not limited to: gate, posts, and post footings) 45 Pool EquipmentStart-up—Testing, Lump -Sum Function adjustments, Calibration as needed 46 Operations & Maintenance — Lump -Sum Manual, 30-Day Break-in Period 38 2 7000 14000 3 39 5 5000 25000 3 40 1 60000 60000 3 41 1 20000 20000 1 42 176 300 52800 2 43 2 20000 40000 44 2 25000 50000 45 1 60000 60000 46 1 50000 50000 Group Total: $ 2424777 Project Total : $ 2424777 3 3 2 3 ALTERNATE BID SCHEDULE Bid #CIP-25-26-P2021REBID2 City Project No. P2021 Newhall Park Pool Pump Room Replacement REBID2 City of Santa Clarita, California Do NOT include this pricing in the total base bid amount. Fill out this form completely and upload it with your bid. In the event any mathematical discrepancies are found in the pricing forms submitted, the unit price shall govern. Do NOT enter this pricing on BidNet. ITEM NO. DESCRIPTION QTY. UNIT UNIT PRICE TOTAL Demolition and hauling of existing pool 1 perimeter fence enclosure (including, but 1 LS $ 50,000 $ 50,000 not limited to: chain link fence, gates, osts, and associated footings) 2 Wrought Iron Fence — Perimeter of Pool 154 LF $ 300 $ 46,200 Complex 3 Single Wrought Iron Gate 1 EA $ 20,000 $ 20,000 Concrete Flat Work (including the new 4 access road per Construction Note 1 LS $ 50,000 $ 50,000 Al7/Sheet C1.0 and associated excavation required) 5 Double Door Egress Gate (Detail D Sheet 2 EA $ 35,000 $ 70,000 C3.0 Eye Wash Drench Hose (including, but not 6 limited to: eye wash drench hose, wall 2 EA $ 10,000 $ 20,000 mount, 20 feet of 2" PVC pipe and associated fittings) Purchase new GOULDS VIT-DITM 11 CLC 7 15 HP, 600 GPM @ 59' TDH vertical 1 LS $ 80,000 $ 80,000 turbine pump, 208/120V 3-Phase power 8 Install Vertical Turbine Pump 1 LS $ 40,000 $ 40,000 ALTERNATE ITEMS GRAND TOTAL: $ 376,200.00 TOTAL ALTERNATE ITEMS BID AMOUNT IN WORDS: Three Hundred Seventy Six Thousand, Two Hundred and 00/100 The award of contract, if made, will be to the lowest responsive BIDDER determined solely by the AGENCY. The AGENCY also reserves the right to add/delete the quantities to the existing bid items, or delete the entire bid item if they are found not required by the Agency during the course of the construction, or add new bid items or scope of work by Contract Change Order at any time during the project up to the last contract working day. All bids, including all pricing, shall be effective/valid for a minimum period of 120 calendar days after the date of bid closing. In the event a final contract has not been awarded within this period, the City reserves the right to negotiate extensions to this period. The BIDDER agrees to hold all unit prices in this Alternate Bid Schedule constant throughout the duration of the project up to the last contract working day. BIDDER'S INFORMATION AND CERTIFICATION Bid #CIP-25-26-P2021REBID2 Newhall Park Pool Pump Room Replacement REBID2 City Project No. P2021 City of Son to Clorito, CA Bidder certifies that the representations of the bid are true and correct and made under penalty of perjury. EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE Bidder certifies that in all previous contracts or subcontracts, all reports which may have been due under the requirements of any CITY, State, or Federal equal employment opportunity orders have been satisfactorily filed, and that no such reports are currently outstanding. AFFIRMATIVE ACTION CERTIFICATION Bidder certifies that affirmative action has been taken to seek out and consider minority business enterprises for those portions of the work to be subcontracted, and that such affirmative actions have been fully documented, that said documentation is open to inspection, and that said affirmative action will remain in effect for the life of any contract awarded hereunder. Furthermore, Bidder certifies that affirmative action will be taken to meet all equal employment opportunity requirements of the contract documents. CERTIFICATION REGARDING DIR CONTRACTOR/SUBCONTRACTOR REGISTRATION By my signature hereunder, as the Contractor, I certify that Contractor, and all Subcontractors listed on the Subcontractor Designations form are the subject of current and active contractor registrations pursuant to Division 2, Part 7, Chapter 1 (commencing with section 1720) of the California Labor Code. Contractor's registration number is indicated below. Subcontractors' registration numbers are indicated on the Subcontractor Designations form. Bidder's Name: Golden Sun Enterprise, Inc. Business Address: 6732 White Oak Ave., Van Nuys, CA 91406 Telephone No.: (310) 363-1015 State CONTRACTOR's License No. & Class: 1052941- A, B, C10, C20, C27 & C36 DIR No.: 1000569894 Original Date: 04/29/2019 Expiration Date: 04/30/2027 The following are the names, titles, addresses, and phone numbers of all individuals, firm members, partners, joint ventures, and/or corporate officers having a principal interest in this proposal: Mohammad Elikaee - President, 9718 HEnsal Rd., Beverly Hills CA 90210- (310) 363-1015 The dates of any voluntary or involuntary bankruptcy judgments against any principal having an interest in this proposal, or any firm, corporation, partnership or joint venture of which any principal having an interest in this proposal was an owner, corporate officer, partner or joint venture areas follows: N/A All current and prior DBAs, alias, and/or fictitious business names for any principal having an interest in this proposal are as follows: N/A IN WITNESS WHEREOF, BIDDER executes and submits this proposal with the names, title, hands, and seals of all aforementioned principals this 18 day of May 2026 . BIDDER: Signature Mohammad Elikaee- President Name and Title of Signatory Golden Sun Enterprise, Inc. Legal Name of Bidder 6732 White Oak Ave., Van Nuys, CA 91406 Address (310) 363-1015 83-1895596 Telephone Number Federal Tax I.D. No. BIDDER'S QUESTIONNAIRE Bid #CIP-25-26-P2021REBID2 Newhall Park Pool Pump Room Replacement REBID2 City Project No. P2021 City of Santa Clorito, California 1. Submitted by: Golden Sun Enterprise, InCTelephone: (310) 363-1015 Principal office Address: 6732 White Oak Ave., Van Nuys, CA 91406 2. Type of Firm: ❑ C Corporation S Corporation ❑ Individual/Sole Proprietor or Single —Member LLC ❑ Partnership ❑ Limited Liability Company "C" C-Corp ❑ Limited Liability Company "S" S-Corp ❑ Limited Liability Company "P" Partnership ❑ Other 3a. If a corporation, answer these questions: Date of Incorporation: 08/22/2018 State of Incorporation: California President's Name: Mohammad Elikaee Vice -President's Name: Sara J. Jafarl Secretary or Clerk's Name: Mohammad Elikaee Treasurer's Name: Mohammad Elikaee 3b. If a partnership, answer these questions: Date of organization: State Organized in: Name of all partners holding more than a 10% interest: Designate which are General or Managing Partners. 4. BIDDER'S QUESTIONNAIRE (cont'd) Bid #CIP-25-26-P2021REBID2 Newhall Park Pool Pump Room Replacement REBID2 City Project No. P2021 City of Santa Clorito, California Name of person holding CONTRACTOR'S license: Mohammad Elikaee 1052941 A, C-10, C-20, C-27, C-36 License number: Class: Expiration Date: D.I.R. Registration # 1000569894 5. CONTRACTOR's Representative: Mohammad Elikaee Title: President Alternate: Sara J. Jafari Title: Vice -President 04/30/2027 6. List the major construction projects your organization has in progress as of this date: A. Owner: Please see attached. Project Location: Type of Project: B. Owner: Project Location: Type of Project: C. Owner: Project Location: Type of Project: BIDDER PRE -QUALIFICATION QUESTIONNAIRE Bid #CIP-25-26-P2021REBID2 Newhall Park Pool Pump Room Replacement REBID2 City Project No. P2021 City of Santa Clarita, California In accordance with the California Public Contract Code Section 20101, the City of Santa Clarita will review this completed bidder's pre -qualification questionnaire immediately following bid closing, starting with the apparent low bidder. If the apparent low bidder answers in the negative OR does not meet the requirements outlined in this questionnaire, the City will find the apparent low bidder unresponsive, and will move on to the next apparent low bidder, and so and so forth. 1. In the past five years has any claim against your firm concerning your firm's work on a construction project been filed in court or arbitration? Yes ❑ No 1Z If "yes," on separate signed sheets of paper identify the claim{s) by providing the project name, date of the claim, name of the claimant, a brief description of the nature of the claim, the court in which the case was filed and a brief description of the status of the claim (pending or, if resolved, a brief description of the resolution). 2. In the past five years has your firm made any claim against a project owner concerning work on a project or payment for a contract and filed that claim in court or arbitration? Yes ❑ No 0 If "yes," on separate signed sheets of paper identify the claim by providing the project name, date of the claim, name of the entity for entities) against whom the claim was filed, a brief description of the nature of the claim, the court in which the case was filed and a brief description of the status of the claim (pending, or if resolved, a brief description of the resolution). 3. Has CAL OSHA for Fed/OSHA) cited and assessed penalties against your firm for any "serious," "willful" or "repeat" violations of its safety or health regulations in the past five years? NOTE: If you have filed an appeal of a citation, and the Occupational Safety and Health Appeals Board has not yet ruled on your appeal, you need not include information about it. Yes ❑ No 0 If "yes," attached a separate signed page describing the citations, including information about the dates of the citations, the nature of the violation, the project on which the citation{s) was or were issued, and the amount of penalty paid, if any. If the citation was appealed to the Occupational Safety and Health Appeals Board and a decision has been issued, state the case number and the date of the decision. 4. List your firm's Experience Modification Rate {EMR) {California workers' compensation insurance) for each of the past three premium years: NOTE: An Experience Modification Rate is issued to your firm annually by your workers' compensation insurance carrier. Current year:.95 Previous year- .95 Year prior to previous year:.95 If your EMR for any of these three years is or was 1.00 or higher you may, if you wish, attach a letter of explanation. 5. Indicate your firm's capacity to complete this project based on any present commitments to other projects, whether that be pre -construction, post -construction, or ongoing construction. In other words, is your firm capable of performing or complying with the required delivery or performance schedules, considering all existing commercial and governmental business commitments? The construction window "constraint" is to have 'substantial completion of the Work' by February 7, 2027. Please elaborate on separate signed sheets of paper. 6. Does your firm have the adequate financial capabilities including bonding capacity (up to $3,000,000) to perform the contract in question, together with all other pending work, or have the ability to obtain adequate financial resources in a timely manner? Please elaborate on separate signed sheets of paper, and provide confirmation letter from Surety. 7. Does your firm have a valid California Class A, Class B, or C-53 Contractors License? Yes V No ❑ 8. Has your firm completed a minimum of two projects valued between $21VI and $31VI? Please elaborate on separate signed sheets of paper. 9. Has your firm successfully constructed a Pool Equipment Room? Please elaborate on separate signed sheets of paper. 10. Does your firm have insurance coverage of the following type and limits? Yes • $2MM per Occurrence (General Liability or Excess) • $41VIM annual General Aggregate (General Liability or Excess) • Workers' Comp (statutory limits) Indicate your firm's capacity to complete this project based on any present commitments to other projects, whether that be pre -construction, post -construction, or ongoing construction. In other words, is your firm capable of performing or complying with the required delivery or performance schedules, considering all existing commercial and governmental business commitments? The construction window "constraint" is to have 'substantial completion of the Work' by February 7, 2027. Please elaborate on separate signed sheets of paper. Our firm currently maintains a balanced workload of active and upcoming projects, allowing us to allocate the necessary resources, personnel, and management oversight to complete this project within the required delivery and performance schedule. We have established project management systems and staffing plans that ensure proper scheduling, coordination, and quality control across all phases of work — whether pre -construction, construction, or post -construction. Our current commitments have been scheduled to maintain sufficient capacity for new projects, and we have both the technical and administrative staff available to mobilize immediately upon award. Based on our present commitments, our firm is fully capable of performing and complying with the required project delivery timelines without compromising quality, safety, or contractual obligations. Mohammad Elikaee 6'� President Does your firm have the adequate financial capabilities including bonding capacity (up to $3,000,000) to perform the contract in question, together with all other pending work, or have the ability to obtain adequate financial resources in a timely manner? Please elaborate on separate signed sheets of paper, and provide confirmation letter from Surety. Yes. Our firm possesses the financial strength and resources necessary to successfully perform the contract in question while maintaining all existing project commitments. We have established financial stability supported by long-term banking relationships and a proven track record of managing multi -million -dollar projects concurrently. Our current bonding capacity exceeds the required $12,000,000 threshold, and we maintain an excellent relationship with our surety provider, enabling us to obtain performance and payment bonds promptly as needed. In addition, we have the ability to secure any additional financial resources in a timely manner to support the project's successful execution. Mohammad Elikaee President SURETY BOND Insurance Services, Inc. able November 6 h, 2025 Mr. Arsen Elikaee Golden Sun. Enterprise, Inc. 6732 White Oak Ave Van Nuys, CA 91406 Re: Surety Program To Whom It May Concern: Bonding the Building Industry One Relationship of a Time.�°" KPS Insurance Services, Inc. is proud to be handling the surety bonding needs of Golden Sun Enterprise, Inc. as its broker with United Fire & Casualty Company ("United Fire"). We have established a surety line of $10,000,000 for single projects and $35,000,000 in aggregate bonded backlog for this contractor. United Fire would be inclined to support jobs up to $12,000,000. Please note that this is a working line of credit and not an indication of the maximum limits that we would consider. United Fire & Casualty Company is rated A- (Excellent) with a financial size of X ($60,779,000) by AM Best. Please be aware that the execution of payment and performance bonds by United Fire is subject to the positive review of all standard underwriting considerations at the time of the request and satisfactory review of any contracts, terms, conditions, specifications, bond forms, and owner financing tendered to the principal and the surety at the time of award. Additionally, the issuance of bonds is a matter between the surety and the principal. If for any reason we do not issue bonds on an awarded project, no third -party liability is assumed by the surety company, the principal, or their agent. In no way does this letter replace or constitute a bid bond and is for informational purposes only. As such, this letter is not contractually binding. If you have any questions, or require additional information, please do not hesitate to contact the undersigned. Sincerely - �r Lid 6 Ucmipo� Attorney -In -Fact Direct Line:, ,�58-538-8822 License N-a. OF 17016 s UNITED FIRE & CASUALTY COMPANY, CEDAR RAPIDS, IA Inquiries: Surety Department UNITED FIRE & INDEMNITY COMPANY, WEBSTER, TX 118 Second Ave SE `19 FINANCIAL PACIFIC INSURANCE COMPANY, LOS ANGELES, CA Cedar Rapids, IA 52401 INSURANCE CERTIFIED COPY OF POWER OF ATTORNEY (original on file at Home Office of Company — See Certification) KNOW ALL PERSONS BY THESE PRESENTS, That United Fire & Casualty Company, a corporation duly organized and existing under the laws of the State of Iowa; United Fire & Indemnity Company, a corporation duly organized and existing under the laws of the State of Texas; and Financial Pack Insurance Company, a corporation duly organized and existing under the laws of the State of California (herein collectively called the Companies), and having their corporate headquarters in Cedar Rapids, State of Iowa, does make, constitute and appoint MICHAEL R. STRAHAN, E.B. STRAHAN, ALLISON OCAMPO, EACH INDIVIDUALLY their true and lawful Attotney(s)-in-Fact with power and authority hereby conferred to sign, seal and execute in its behalf all lawful bonds, undertakings and other obligatory in,,trurnents of similar nature provided that no single obligation shall exceed $50, 000, 000. 00 and to bind the Companies thereby as fuKy and to the same extent as if such instruments were signed by the duly authorized officers of the Companies and all of the acts of said Attorney, put suant to the authority hereby given and hereby ratified and confirmed. The Authority hereby granted shall expire the 31 st day of January, 2026 unless sooner revoked by United Fire & Casualty Company, United Fire & Indemnity Company, and Financial Pack Insurance Company. This Power of Attorney is made and executed pursuant to and by authority of the following bylaw duly adopted by the Boards of Directors of United Fire & Casualty Company, United Fire & Indemnity Company, and Financial Pacific Insurance Company. "Article VI — Sur•et} fronds and undertakings" Section 2, Appointment of Attomey-in-Fact. "The President or any Vice Presidem or any other officer of the Cnnpanies allay. from time in tune- appoint by written certificates attomeys-in-fact to act in behalf of the Companies in the cxurution 0i nnli;ic, of insurance, bonds, undCl7aKIJ2� and otltc: old rnn is t,.ment. w lithe nature. The signature of any officer authorized hereby, and the Corporate seal. tray be. affixed Iry i'ac imile to am you cr of a:10!!lC: m +racial poorer of attorney or rcn ification of either authorized hereby; such signature and seal, when so used, being atiopted Ins the L0111}7allio, t:. the „rsgtnal �1211a['6rc of ,uuh officer and the origutal seal of the Companies, to be valid and binding upon the Companies with the same fV:Cc and cftcrt 6 hlr,,ah ,Itantc111V affixed. Su, a at:o,ncyc-in-fact, subject to the limr.:ations set of forth in their respective certificates of authority shall have fall power to bind the t4omp;mie+ hy their signature and exec irion oI .any such instruments and to attach the seal the Companies thereto. The President or any Vice President, the Roarer o!' Dircttor, o3 ally other officer of the Companic, m ay at gut. time revoke all power and authority previously given to any attorney -in -fact. „ IN WITNESS WHEREOF, the COMPANIES have each caused these presents to be signed by its ��`4�1%tNo N }b� °+pG41GP048 C),uIQ% vice president and its corporate seal to be hereto, affixed this 31 St day of January, 2024 z W CORPORAiT /ram r` Q ' OP Rf �° mORPORAiE `} �'a°t�Y '"o' Q` if!�I"I I;D FIR[ '& C'�ASTIA .TY CC( NIP_ANY SEAT �- 'tea Lll`I'I7'll I'I121' c INDEMNITY CO\11'ANY '`�a e�.•' s $ FI ���"cIfIFCR�� t=:` NANC'I:A1. PACTIC INSURANCI- C'O PANY lry6rn ralpl„ �IIrFl7R„11 yrnnuu,n`dtP`+ By: State of Iowa, County of Linn ss: Vice President On 31st day of January, 2024, before me personally Came Kyanna M. Saylor to me known, who being by me duly sworn, did depose and say; that she resides in Cedar Rapids, State of Iowa; that she is a Vice President of United Fire & Casualty Company, a Vice President of United Fire & Indemnity Company, and a Vice President of Financial Pacific Insurance Company the corporations described in and which executed the above instrument; that she knows the seal of said corporations; that the seal affixed to the said instrument is such corporate seal; that it oval so affixed pursuant to authority given by the Board of Directors of said corporations and that she signed her name thereto pursuant to like authority, and acknowledges same to be the act and deed of said corporations. �yN ra Judith A. Jones Iowa Notarial Seal Commission number 173041 Notary Public osr, My Commission Expires 04123/2027 My commission expires: 04/23/2027 I. Mary A. Bcilsch, Assistant Secretary of United Fire & Casualty Company and Assistant Secretary of United Fire & Indemnity Company, and Assistant Secretary of l inmtcial P:acii is Insurance Company, do hereby certify that I have compared the foregoing copy of the Power of Attorney and affidavit, and the copy of tltr 4— tion of the bylaws and resolutions of said Corporation, as set forth in said Power of Attorney, with the ORIGINALS ON FILE IN THE HOME 01-I IC'I; OF SAID CORPORATIONS, and that the same arc co--iect transcripts thereof, and of the whole of the said originals, and that the said Power of Attorney ha,, not been revoked and is now in frill litrce and ei f,:ct In testimony whereof I have ltcrcltuto '111h"cribeci n:` e 1111 AFLi affrxed 61C corporate seal of the said Corporations this 6th day of November 10 >5 •`vq,�„elru,--b�r� . `eti,~iiioEyp4i '°+PG\, 21P0''.w9' �� n� Q !VO Rij'•.G;c r co.art} ,g 771Y1AA7F: t ' Ta Q CORPORATE g,'s ?•c,.2 57 SEAt. aP SEAL ASSlstffiTt Secretary, rn�,rnr,u,•, arrruiol„ OF&C & OF&I & FPIC BPOA0045 122017 ACKNOWLEDGMENT A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of San Diego On 14 �G IW275 before me, E.B. Strahan, Notary Public (insert name and title of the officer) personally appeared Allison Ocampo who proved to me on the basis of satisfactory evidence to be the person(s) whose nameO is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. *My E. B. STRAHAN Notary public •Californiaan Diego CountyCommissfon : Ll 282Signature (Seal) Comm. Expires 5. 2025 Has your firm completed a minimum of two projects valued between $2M and $3M? Please elaborate on separate signed sheets of paper. We have successfully delivered multiple projects in the $3,000,000— $6,000,000 range, each involving complex scopes, stringent schedules, and coordination with multiple stakeholders. Our project management systems, experienced personnel, and proven financial and bonding capacities position us to effectively perform projects of larger scale. We have the necessary resources, subcontractor relationships, and management infrastructure in place to ensure successful execution of projects of $12,000,000 and above. Mohammad Elikaee President Has your firm successfully constructed a Pool Equipment Room? Please elaborate on separate signed sheets of paper. Yes. While Golden Sun Enterprise, Inc. has not self -performed the specialized pool equipment installation directly under its own license classification, our designated pool subcontractor has successfully completed multiple similar public and private pool projects, including construction and installation of Pool Equipment Rooms, mechanical systems, pumps, filtration systems, underground utilities, and associated electrical and plumbing components. Mohammad Elikaee President NationalPools To Whom It May Concern, Per the RFP, proposal documents, and your request, please find attached five similar past performance projects for your review. Please let us know if you have any questions or require any additional information. PROJECT NAME VALENCIA COMMUNITY CENTER POOL RENOVATION PROJECT CUSTOMER: City of Santa Clarita CONTACT NAME: Juan Martinez CONTACT NUMBER: (661) 290-2229 CONTACT EMAIL: JJ MARTI NEZ@santa-clarita.com PROJECT DESCRIPTION/VALUE Pool renovation and new equipment installation $371,890 COMPLETION DATE: 12/20/2023 PROJECT NAME EASTGATE POOL REPLASTERING PROJECT CUSTOMER: City of Garden Grove CONTACT NAME: Luis Tapia CONTACT NUM BER: (714)741-5386 CONTACT EMAIL: luist@ggcity.org PROJECT DESCRIPTION/VALUE Pool replastering, new lights and skimmers $225,000 COMPLETION DATE: 6/30/2024 PROJECT NAME MILK JR POOL RENOVATION PROJECT CUSTOMER: City of Long Beach CONTACT NAME: Kimvy Nguyen CONTACT NU M BER: 714.481.7939 CONTACT EMAIL: kimvy.nguyen@psomas.com PROJECT DESCRIPTION/VALUE: Pool renovation and new mechanical equipment $978,000 COMPLETION DATE: 6/3/2025 PROJECT NAME: CAMP KILPATRICK POOL RENOVATION PROJECT CUSTOMER: LA County CONTACT NAME: Daryl Lew CONTACT NUMBER: (562) 385-0084 CONTACT EMAIL: DLew@isd.lacounty.gov PROJECT DESCRIPTION/VALUE: Pool renovation and new mechanical equipment $413,000 COMPLETION DATE: 2/1/2026 PROJECT NAME LASC POOL RENOVATION PROJECT CUSTOMER: Los Angeles Community College District CONTACT NAME: Mario Bonilla CONTACT NU M BER: 213-891-2397 CONTACT EMAIL: BONILLM3@EMAIL.LACCD.EDU PROJECT DESCRIPTION/VALUE: Pool renovation and new mechanical equipment $3,475,000 COMPLETION DATE: 6/30/2026 National Pools Inc dba NPI Concrete CA LIC# 963509,A, B, C-8, C53 DIR#1001005100 DBE# 51275 4419 Van Nuys Blvd. Suite 302 Sherman Oaks, CA 91403 1 818-367-9340 info@nationalpoolsconstruction.com contact@npiconrete.com CERTIFICATION OF NON -SEGREGATED FACILITIES Bid #CIP-25-26-P2021REBID2 Newhall Park Pool Pump Room Replacement REBID2 City Project No. P2021 City of Santa Clarito, California The BIDDER certifies that it does not maintain or provide for its employees any segregated facilities at any of its establishments, and that it does not permit its employees to perform their services at any location, under its control, where segregated facilities are maintained. The BIDDER certifies further that it will not maintain or provide for its employees any segregated facilities at any of its establishments, and that it will not permit its employees to perform their services at any location, under its control, where segregated facilities are maintained. The BIDDER agrees that a breach of this certification is a violation of the Equal Opportunity clause in this Contract. As used in this certification, the term "segregated facilities" means any waiting rooms, work areas, rest rooms, and wash rooms, restaurants and other eating areas, time clocks, locker rooms and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees which are segregated by explicit directive or are in fact segregated on the basis of race, creed, color, or national origin, because of habit, local custom, or otherwise. The BIDDER agrees that (except where it has obtained identical certifications from proposed subcontractors for specific time periods) it will obtain identical certifications from proposed subcontractors prior to the award of subcontracts exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity clause, and that it will retain such certifications in its files. Golden Sun Enterprise, Inc. �9 ; Required by the May 19, 1967 order on Elimination of Segregated Facilities, by the Secretary of Labor — 32 F.R. 7439, May 19, 1967 (F.R. Vol. 33, No. 33 — Friday, February 16, 1968 — p. 3065). DESIGNATION OF SUBCONTRACTORS Bid # CIP-25-26-P2021REBID2 Newhall Park Pool Pump Room Replacement REBID2 City Project No. P2021 City of Santa Clorito, California Listed below are the names and locations of the places of business of each subcontractor, supplier, and vendor who will perform work or labor or render service in excess of/: of 1 percent, or $10,000 (whichever is greater) of the prime contractor's total bid. If no Subcontractors will be used fill out the form with NA. Add addt. sheets if needed. Subcontractor DIR Registration No.* Dollar Value of Work National Pool, Inc. �1001005100 $400K Location and Place of Business 15439 Monte St., Sylmar, CA 91342 Bid Schedule Item No's: Description of Work 2,3,21,22,23,26,27,28,30,31,32, Pool Works 34,35,40,50 License No. Exp. Date:06 /30/ 2026 Phone ( ) 963509 (818) 367-9340 Subcontractor DIR Registration No.* Dollar Value of Work Cybertech Construction Company 1000030859 $200K Location and Place of Business 6732 White Oak Ave., Van Nuys, CA 91406 Bid Schedule Item No's: Description of Work 13,15 Concrete Works License No. Exp. Date: 08/31 / 2026 Phone ( ) 921223 (818) 330- 3379 Subcontractor DIR Registration No.* Dollar Value of Work Location and Place of Business Bid Schedule Item No's: Description of Work License No, Exp. Date: / / Phone ( ) NOTE: A BIDDER or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 ofthe Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5 ofthe Labor Code. It is not a violation ofthis section for an unregistered BIDDER to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the BIDDER is registered to perform public work pursuant to Section 1725.5 ofthe Labor Code at the time the contract is awarded. *Pursuant to Division 2, Part 7, Chapter 1 (commencing with section 1720) of the California Labor Code. RFFFRFNrFC Bid #CIP-25-26-P2021REBID2 Newhall Park Pool Pump Room Replacement REBID2 City Project No. P2021 City of Santa Clorito, California The following are the names, addresses, and telephone numbers of three public agencies for which bidder has performed and completed work of a similar scope and size within the past 3 years. If the scope of work/specifications requests references different than instructions above, the scope of work/specifications shall govern: 1 Please see attached. Name and Address of Owner / Agency Name and Telephone Number of Person Familiar with Project Contract Amount Type of Work Date Completed 2. Name and Address of Owner / Agency Name and Telephone Number of Person Familiar with Project Contract Amount Type of Work Date Completed 3. Name and Address of Owner / Agency Name and Telephone Number of Person Familiar with Project Contract Amount Type of Work Date Completed The following are the names, addresses, and telephone numbers of all brokers and sureties from whom bidder intends to procure insurance bonds: KPS Bonding- Michael Strahan- 555 W Beech St Suite 503, San Diego, CA 92101- (858) 538-8822 Project Name: Lamanda Park Library Pocket Park Project Type: Government Location: 140 South Altadena Drive, Pasadena, CA 91107 Owner: City of Pasadena Architect or Engineer: N/A Construction Manager: Jeff Khun Construction Manager Contact (Name and Current Phone #): (626) 744-7389, JKhun@cityofpasadena.net Description of Project, Scope of Work Performed: Playground Renovation & Site Works Date of Completion: 10/07/2022 Contract Amount: $364,431 Project Name: Central Park Dog Park Project Type: Government Location: 11200 Base Line Rd., Rancho Cucamonga, CA 91701 Owner: City of Rancho Cucamonga Architect or Engineer: CWDG Construction Manager: Michael Parmer Construction Manager Contact (Name and Current Phone #): (909) 774 —2006, Michael. Parmer@cityofrc.us Description of Project, Scope of Work Performed: 4.7 Acre Dog Park Ground -up Date of Completion: 12/30/2023 Contract Amount: $3,757,098 Project Name: Greenhouse Projects at S El Monte HS and Arroyo HS Project Type: Government Location: 1001 Durfee Ave., S El Monte, CA 91733 Owner: South El Monte Union High School District Architect or Engineer: CSDA Design Group Construction Manager: Lena Luna Construction Manager Contact (Name and Current Phone #): (626) 444-9005, Lena.luna@emuhsd.org Description of Project, Scope of Work Performed: Building 2 Greenhouse Structures with Equipment Date of Completion: 01/30/2024 Contract Amount: $831,689 Project Name: Victory Park Restroom Replacement Project Type: Government Location: 2575 Paloma Street, Pasadena, CA 91107 Owner: City of Pasadena Architect or Engineer: Onyx Construction Manager: Tiffiny Chen Construction Manager Contact (Name and Current Phone #): (626) 744 —6771, ttran@cityofpasadena.net Description of Project, Scope of Work Performed: Building Park Restroom, Office and Storage Date of Completion: 01/27/2021 Contract Amount: $1,345,777 pg. 1 Project Name: Jefferson School Pickleball Courts Project Project Type: Government Location: 1500 E Villa St., Pasadena, CA 91106 Owner: City of Pasadena Architect or Engineer: N/A Construction Manager: Jeff Khun Construction Manager Contact (Name and Current Phone #): (626) 744-7389, JKhun@cityofpasadena.net Description of Project, Scope of Work Performed: 2 Pickleball Courts Construction Date of Completion: 09/30/2023 Contract Amount: $169,871 Project Name: Brenner Park Renovation Project Type: Government Location: 235 Barthe Dr., Pasadena, CA 91103 Owner: City of Pasadena Architect or Engineer: N/A Construction Manager: Jeff Khun Construction Manager Contact (Name and Current Phone #): (626) 744-7389, JKhun@cityofpasadena.net Description of Project, Scope of Work Performed: Tennis, Basketball and Baseball Field Renovation Date of Completion: 12/30/2023 Contract Amount: $409,401 Project Name: Palm Crest Site Utilities Improvement Project Type: Public Education Location: 5025 Palm Drive, La Canada, CA 91011 Owner: La Canada Unified School District Architect or Engineer: LPA Construction Manager: Frank Navaro Construction Manager Contact (Name and Current Phone #): (562) 980-2515, Fnavarro@linikcorp.com Description of Project, Scope of Work Performed: Underground Utilities Replacement Date of Completion: 07/31/2020 Contract Amount: $451,909 Project Name: Fencing & Wayfinding at LCHS Project Type: Public Education Location: 4463 Oak Grove Dr., La Canada, CA 91011 Owner: La Canada Unified School District Architect or Engineer: A4E Construction Manager: Frank Navaro Construction Manager Contact (Name and Current Phone #): (562) 980-2515, Fnavarro@linikcorp.com Description of Project, Scope of Work Performed: Fencing, Ramp, Stairs, and Paving Date of Completion: 11 /01 /2020 Contract Amount: $549,548 pg. 2 Project Name: Portable Removal PH1-7 Sites Project Type: Public Education Location: 39139 10th Street East Palmdale, CA 93550 Owner: Palmdale School District Architect or Engineer: N/A Construction Manager: Tom Brown Construction Manager Contact (Name and Current Phone #): (661) 373-4312, tbrown@hple.co Description of Project, Scope of Work Performed: Classroom Removal Date of Completion: 07/31/2020 Contract Amount: $139,777 Project Name: Underground Utility Replacement at Lee Elementary School Project Type: Public Education Location: 550 N. Cerritos Ave., Azusa, CA 91702 Owner: Azusa Unified School District Architect or Engineer: Architects MSP, Inc. Construction Manager: Brian Allen Construction Manager Contact (Name and Current Phone #): (626) 506-6586, ballen@azusa.org Description of Project, Scope of Work Performed: Underground Utility Replacement Date of Completion: 03/31 /2024 Contract Amount: $3,459,390 Other Projects: Palmdale Unified School District- Joshua Hills ES Future Learning Spaces- Completed in 2018. Palmdale Unified School District- Sage Academy Kitchen Remodel- Completed in 2018. Palmdale Unified School District- Sage Academy Emergency Kitchen Restoration- Completed in 2018. Glendale Unified School District- Window Replacement at Franklin ES- Completed in 2018. Glendale Unified School District- Play Area Improvements at Muir ES- Completed in 2018. Glendale Unified School District- LED Lighting Upgrade at Various School Sites- Completed in 2018. City of Alhambra- Stoneman Avenue Parking Lot Pavement Rehabilitation and Lid Improvements - Completed in 2018. Glendale Unified School District- Cafe Wall & Window Repair - Verdugo Woodlands ES- Completed in 2019. City of Pasadena- Installation of Restroom Building at Desiderio Park- Completed in 2020. City of Santa Clarita- Mountain View Park Play Area Phase II- Completed in 2021. pg. 3 Los Angeles Community Development Authority- Ocean Park Unit Flooring Replacement- Completed in 2021. State of California- Department of General Services- Exposition Park Parking Gates and Kiosks - Completed in 2021. Palmdale Water District — Conservation Garden Phase 1- Completed in 2022. William S. Hart Union High School District- Bowman HS Resource Center- Completed in 2024. City of Duarte- Beardslee Park Restroom Replacement- Completed in 2024. City of Industry- Fire Damage Repair of EV and Solar Energy System at Metrolink Station- Completed in 2025. City of Pasadena- Historic YWCA Column Repair- Completed in 2025. Mountains Recreation and Conservation Authority (MRCA)- Caballero Creek Park- In Progress. City of Santa Clarita- Old Orchard Park Construction Phase 1- In Progress. pg. 4 IRAN CONTRACTING ACT CERTIFICATION (Public Contract Code Sections 2200 etseq.) Bid #CIP-25-26-P2021REBID2 Newhall Park Pool Pump Room Replacement REBID2 City Project No. P2021 City of Santa Clarita, California As required by California Public Contract Code section 2204, Proposer certifies that the option checked below relating to Proposer's status in regard to the Iran Contracting Act of 2010 (Public Contract Code sections 2200 et seq.) is true and correct: Proposer is not: (i) identified on the current list of persons and entities engaging in investment activities in Iran prepared by the California Department of General Services in accordance with subdivision (b) of Public Contract Code section 2203; or (ii) a financial institution that extends, for 45 days or more, credit in the amount of $20,000,000 or more to any other person or entity identified on the current list of persons and entities engaging in investment activities in Iran prepared by the California Department of General Services in accordance with subdivision (b) of Public Contract Code section 2203, if that person or entity uses or will use the credit to provide goods or services in the energy sector in Iran. ❑ Los Angeles County has exempted Proposer from the requirements of the Iran Contracting Act of 2010 after making a public finding that, absent the exemption, Los Angeles County will be unable to obtain the goods and/or services to be provided pursuant to the Contract. ❑ The amount of the Contract payable to Proposer for the Project is less than $1,000,000. CERTIFICATION I, the official named below, CERTIFY UNDER PENALTY OF PERJURY, that I am duly authorized to legally bind the Proposer to the above selected option. This certification is made under the laws of the State of California. Contractor Golden Sun Enterprise, Inc. Firm 05/18/2026 Date Signed Mohammad Elikaee- President Name/Title Note: In accordance with Public Contract Code section 2205, false certification of this form shall be reported to the California Attorney General and may result in civil penalties equal to the greater of $250,000 or twice the Contract amount, termination of the Contract and/or ineligibility to bid on contracts for three years. END OF DOCUMENT NON -COLLUSION AFFIDAVIT (Title 23 United States Code Section 112 and Public Contract Code Section 7106) Bid #CIP-25-26-P2021REBID2 Newhall Park Pool Pump Room Replacement REBID2 City Project No. P2021 City of Santa Clorito, California To the CITY OF SANTA CLARITA: In conformance with Title 23 United States Code Section 112 and Public Contract Code 7106, the Bidder declares that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the Bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the Bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the Bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. THE BIDDER'S EXECUTION ON THE SIGNATURE PORTION OF THE "BIDDER'S CERTIFICATION" SHALL ALSO CONSTITUTE AN ENDORSEMENT AND EXECUTION OF THOSE CERTIFICATIONS WHICH FORM A PART OF THE PROPOSAL. BIDDERS ARE CAUTIONED THAT MAKING A FALSE CERTIFICATION MAY SUBJECT THE CERTIFIER TO CRIMINAL PROSECUTION. NON -COLLUSION AFFIDAVIT Bid #CIP-25-26-P2021REBID2 Newhall Park Pool Pump Room Replacement REBID2 City Project No. P2021 City of Santa Clorito, California TO BE EXECUTED BY EACH BIDDER OF A PRINCIPAL CONTRACT STATE OF CALIFORNIA ) COUNTY OF LOS ANGELES ) Mohammad Elikaee being first duly sworn deposes and says that he/she is the President (sole owner, a partner, president, etc.) of Golden Sun Enterprise, Inc. the party making the foregoing bid; that such bid is not made in the interest of or behalf of any undisclosed person, partnership, company, association, organization or corporation, that such bid is genuine and not collusive or sham, that said BIDDER has not directly or indirectly induced or solicited any other BIDDER to put in a false or sham bid, or that anyone shall refrain from bidding, that said BIDDER has not in any manner, directly or indirectly sought by agreements, communication or conference with anyone to fix the bid price of said BIDDER or of any other BIDDER, or to fix the overhead, profit, or cost element of such bid price, or of that of any other BIDDER, or to secure any advantage against the public body awarding the Contract or anyone interested in the proposed Contract; that all statements contained in such bid are true, and further, that said BIDDER has not, directly or indirectly, submitted its bid price, or any breakdown thereof, or the contents thereof, or divulged information or date relative thereto, or paid and will not pay any fee in connection, therewith to any corporation, partnership, company, association, organization, bid depository, or to any member or CITY thereof, or to any other individual information or date relative thereto, or paid and will not pay any fee in connection, therewith to any corporation, partnership, company association, organization, bid depository, or to any member or CITY thereof, or to any other individual, except to such person or persons as have a partnership or other financial interest with said BIDDER in his general business. Bidder: Signature Title Mohammad Elikaee- President O� SANTA CL U� IN oGryOE016 uECEM®�9 Addendum No. 1 Invitation for Bid CIP-25-26-P2021REBID2 Newhall Park Pool Pump Room Repalcement REBID2 City of Santa Clarita, California Addendum No. 1 May 13, 2026 This addendum must be acknowledged via BidNet and should be included with the bid response. I. PRE -BID MEETING There was a non -mandatory, pre -bid meeting on May 5, 2026, beginning at 9:OOAM (PDT). The meeting was conducted via Zoom. Attending Staff: • Peter Henne —Administrator, Public Works • Cassidy Skelton —Administrator, Neighborhood Services • Bardya Cyrous — Project Development Coordinator, Public Works • Gonzalo Hernandez — Public Works Inspector, Public Works • Rafael Macias -Gonzalez — Public Works Inspector, Public Works • David Mattice —Supervisor, Neighborhood Services • Samantha Shere — Office Assistant, Recreation and Community Services • Jaclyn Abston — Buyer, Administrative Services • Patricia Lacsamana — PTS Office Administrative Support, Administrative Services Attending Vendors: • Eric Reifman, AMG & Associates, Inc. • Carlos Quirarte, National Pools Inc. • Arsen Elikaee, Golden Sun Enterprise, Inc. The following questions were asked and answered: Q1) I see the bid guidelines call for an A or B or C-53 license, but the majority of the work is above a pool contractor's ability. Will the City examine this and reconsider the licensing required for this project? Al) The City determined this project — demolishing and replacing the pump station, installing mechanical and filtration systems, reconnecting utilities, and replacing pool plumbing — falls within the scope "integral and incidental" to swimming pool construction and associated aquatic facilities. C-53 bidders must subcontract any specialty work exceeding their license classification, for example, to a C-10 electrical contractor or a C-36 plumbing contractor. The following was reviewed: • Project scope of work • Bidding Guidelines Invitation for Bid #CIP-25-26-P2021REBID2 — Newhall Park Pool Pump Room Replacement REBID2 O. 5 NT4 CL P 'SGryO 4'a1 � rs osct�� II. SITE PLAN Please see attached site plan. END OF ADDENDUM Addendum No. 1 May 13, 2026 This addendum must be acknowledged via BidNet and should be included with the response. Mohammad Elikaee- President05/18/2026 Contractor's Representative Date Golden Sun Enterprise, Inc. Company Name Invitation for Bid #CIP-25-26-P2021REBID2 — Newhall Park Pool Pump Room Replacement REBID2 ALTERNATE BID SCHEDULE Bid #CIP-25-26-P2021REBID2 City Project No. P2021 Newhall Park Pool Pump Room Replacement REBID2 City of Santa Clarita, California Do NOT include this pricing in the total base bid amount. Fill out this form completely and upload it with your bid. In the event any mathematical discrepancies are found in the pricing forms submitted, the unit price shall govern. Do NOT enter this pricing on BidNet. ITEM NO. DESCRIPTION QTY. UNIT UNIT PRICE TOTAL Demolition and hauling of existing pool 1 perimeter fence enclosure (including, but 1 LS $ 50,000 $ 50,000 not limited to: chain link fence, gates, osts, and associated footings) 2 Wrought Iron Fence — Perimeter of Pool 154 LF $ 300 $ 46,200 Complex 3 Single Wrought Iron Gate 1 EA $ 20,000 $ 20,000 Concrete Flat Work (including the new 4 access road per Construction Note 1 LS $ 50,000 $ 50,000 Al7/Sheet C1.0 and associated excavation required) 5 Double Door Egress Gate (Detail D Sheet 2 EA $ 35,000 $ 70,000 C3.0 Eye Wash Drench Hose (including, but not 6 limited to: eye wash drench hose, wall 2 EA $ 10,000 $ 20,000 mount, 20 feet of 2" PVC pipe and associated fittings) Purchase new GOULDS VIT-DITM 11 CLC 7 15 HP, 600 GPM @ 59' TDH vertical 1 LS $ 80,000 $ 80,000 turbine pump, 208/120V 3-Phase power 8 Install Vertical Turbine Pump 1 LS $ 40,000 $ 40,000 ALTERNATE ITEMS GRAND TOTAL: $ 376,200.00 TOTAL ALTERNATE ITEMS BID AMOUNT IN WORDS: Three Hundred Seventy Six Thousand, Two Hundred and 00/100 The award of contract, if made, will be to the lowest responsive BIDDER determined solely by the AGENCY. The AGENCY also reserves the right to add/delete the quantities to the existing bid items, or delete the entire bid item if they are found not required by the Agency during the course of the construction, or add new bid items or scope of work by Contract Change Order at any time during the project up to the last contract working day. All bids, including all pricing, shall be effective/valid for a minimum period of 120 calendar days after the date of bid closing. In the event a final contract has not been awarded within this period, the City reserves the right to negotiate extensions to this period. The BIDDER agrees to hold all unit prices in this Alternate Bid Schedule constant throughout the duration of the project up to the last contract working day. PACE Advanced Water Engineering October 27, 2025 (October 16, 2025 — revised) Peter Henne Public Works Administrator — CIP Department of Public Works City of Santa Clarita Phone: (661) 284-1427 Cell: (661) 510-0161 Re: Newhall Park Pool Pump Room Replacement Revised Professional Engineering Services During Construction Proposal #C258 Dear Peter, PACE is pleased to provide our revised proposal for services during construction for the Newhall Park Pool Pump Room Replacement project. Our enclosed proposal includes scope of work, work required from our sub -consultant, and the fee breakdown. We appreciate the opportunity to be of service to the City of Santa Clarita and look forward to the successful completion of the pump room replacement construction. Please contact me if there are any questions or if we may provide any additional information. Sincerely, i Zirang Song, PE Vice President - Recreational Water Division ZSicn Enclosures: Professional Services Proposal and fee breakdown. R:IC25813-Contracts - Proposalsl1. ProposaA2025-10-16 Proposal for Services During Constructionl1. PHenne Cov Ltr 10-16- 25. doc PROPOSAL FOR PROFESSIONAL ENGINEERING SERVICES NEWHALL PARK POOL EQUIPMENT BUILDING CONSTRUCTION #C258 BACKGROUND: Based on recent discussions and emails from the City of Santa Clarita, we provided the following scope for the services during construction phase. The scope of work below will include effort and time required by our subconsultants. It is assumed the construction period shall be 5 — 7 months. SECTION A - SCOPE OF SERVICES: A. Consultant agrees to provide the following services: Task 01 — Construction Meetings and Coordination 1. PACE shall provide correspondence and feedback on questions related to the design including site civil, mechanical / equipment, electrical system, building and structural, and coordination with our sub -consultants as required. 2. Attend pre -construction meetings and kick-off meetings. 3. attend up to 30 construction meetings (average one hour) via ZOOM or MS TEAM online platforms, or phone conferences. 4. Coordinate with the City and vendors for any changes required during construction. Task 02 — Site Observations and Inspections PACE and our sub -consultant shall provide site observations and soil inspections during construction. (5) Soil inspections to be provided by American Geotechnical Inc. (2) Site observations to be provided by Spire Structural Engineering (2) Site observations to be provided by PACE 2. PACE shall provide (1) for preliminary punch walk and (1) final inspection. Task 03 — Construction Submittal Reviews and RFI Responses 1. PACE shall review submittal for construction materials, equipment and shop drawings 2. Respond to Requests For Information (RFIs) and Clarification requests by the Contractor and provide additional details as necessary to complete the project as designed. Task 04 — Project Close -Out and Final Inspection Report 1. PACE shall review Contractor provided O&M manuals for new project equipment and systems. 2. PACE shall provide the services of the design engineer for the purpose of start-up and commissioning. The PACE will review the work of the Contractor and Mechanical Equipment supplier to ensure that the system is operating properly, and functions as designed. 000ft%-� PACE City of Santa Clarita - Newhall Park Pool Equipment Building October 27, 2025 Scope and Compensation for C258 Pape 2 of 3 3. PACE shall review the final, operating installation and provide to the Client a letter certifying that the project is complete and in compliance with the Construction Documents. Task 05 — As -Built Drawings and O&M Manual 1. Compile all documents provided by contractor affecting the final configuration of the building and equipment. These include contractor's as -built drawings, survey records, and plan changes. Consultant shall produce record drawings in AutoCAD and produce updated plan for future reference. 2. An operations and maintenance (O&M) manual will be provided (hardcopy and digital) for final operation of pool equipment, recirculation and water quality treatments, and overall controls systems. The manuals will consist of a sequence of operation, equipment contacts; equipment cut sheets and vendor information for properly maintaining equipment and in case of repair or replacement. A pool management plan will also be created for long term maintenance including physical, and chemical means of maintaining and enhancing water quality and aesthetics. Only one hard copy and one digital copy will be provided. SECTION B - COMPENSATION: PACE will complete the work outlined herein and invoice Client monthly on a percentage of completion basis, a fixed fee of $89,194, plus the reimbursable expense of $2,000, for a total sum of $91,194 billed in accordance with the attached "Hourly Labor and Expenses Rates Schedule". Task Description 01 Construction Meetings and Coordination 02 Site Observations and Inspections 03 Construction Submittal Reviews and RFI Responses 04 Project Close -Out and Final Inspection Report 05 As -Built Drawings and O&M Manual Fixed Fee Sub -Total: Reimbursable Expenses Allowance: TOTAL ENGINEERING FEE: ASSUMPTIONS AND EXCLUSIONS: Professional Fee $ 17,642 $ 20,256 $ 27,070 $ 12,462 11,764 $ 89,194 $ 2,000 11 H 1. The Client's responsibilities shall include providing PACE with the base data and project information in a timely manner, coordination and management of other team consultants to assure that the project schedule can be met, and prompt payment of invoices in accordance with the terms and conditions included herein. The specific items that are to be provided by the Client or other consultants include the following: a. Client input pertaining to project design issues and requirements including scheduling. 000ftft-� PACE City of Santa Clarita - Newhall Park Pool Equipment Building October 27, 2025 Scope and Compensation for C258 Pape 3 of 3 b. Site land -use base plans with existing and proposed elevation contours in transferable computer format. c. Geologic and soils investigation reports. d. Existing and proposed hydrologic and drainage data, maps, and reports. e. Any other data that directly impacts PACE ability to perform the design in an efficient and economic manner. 2. Any proposed project changes which affect work in progress or previously completed will be justification for additional compensation. 3. All required aerial topography and base mapping will be paid for and supplied by Client, or others. Base topo and site information will be provided in digital (electronic) format compatible with AUTOCAD or C3D version 2019 or earlier. 4. No environmental documentation or support, including no environmental permitting. 5. No surveying or construction staking is included. 6. Local government approval meetings, hearings, etc., and preparation of presentation graphics will be under separate work authorization, if required. 7. Existing utility information research and mapping is not included and will be provided by Client. 8. For all the data delivered to PACE for the purpose of digital mapping, including but not limited to GIS and AutoCAD, PACE requires said data be delivered in one of the recognized standard coordinate systems such as the Stateplane Coordinate System or the Universe Transverse Mercator (UTM). In addition, PACE requires all datums, vertical and horizontal, be documented in a metadata sheet and be included along with the delivered data. If the coordinate system is in what is often referred to as a "Local Coordinate System," and the deliverer does not have the capability to convert data into one of the recognized standard coordinate systems, PACE requires a Control Conversion document (CCD) be included in the deliverable. The CCD will include all the necessary coordinate transformation information and scale factors needed to make an accurate translation of the data to PACE's acceptable coordinate systems. If this information is not available, PACE will require an addendum to this proposal to include Time and Materials used to translate the delivered data into the appropriate standard coordinate system. 9. The fees proposed herein shall apply until one year from date of proposal. Due to ever - changing costs, Consultant will increase those portions of the contract fee for which work must still be completed after one year from date of proposal, as negotiated with the Client up to a maximum of ten -percent (10%). PACE PACE Advanced Water Engineering ENGINEERING FEE ESTIMATE PROJECT WORKSHEET Project Data Project Name: Newhall Park Pool Equipment BLDG Client: City of Santa Clarita PACE Job Number: C258 Estimate Date: 10/27/25 2025 PACE Hourly Rate Schedule Description Rate Principal $312 Sr. Proj. Mgr./Sr. Consulting Engr. $270 Project Manager/Consulting Engr./Sr. I&C Specialist $260 Sr. GIS Analyst/Manager $265 Sr. Electrical Engineer $255 Sr. Project Engineer / Sr. Design Engineer $220 Project Engr / Design Engr II / Electrical Engr $198 Instrumentation & Controls Specialist $192 Sr. CAD Designer $182 Design Engineer $156 CAD Designer/GIS Analyst $151 Technical Editor $130 Graphic Designer $130 Project Coordinator $109 Administrative Support $104 Assistant Designer $88 G.P.S. Survey Unit (w/Operator) $302 Expert Witness/Legal Consultation Total Fee Amount: $91,194 Item No. Work Item Description Estimated Manhours Man -Power Subtotal Reimburs. Ex enses Total Task Costs Pri JCo:nItina_EUgLL__Engr Project ager/Sr. Architect/ Sr. Structural Geotechnical Consultant Sr. Electrical En ineer Sr. Project Engineer/Sr. Desi n En r. Project Engineer /Design Engr. II /Elec. Engr I&C S ecialist Sr. CAD Designer Design Engineer Project Coordinator $312 $270 $260 $275 $255 $220 $198 $192 $182 $156 $109 000 1 Construction Meetings and Coordination 8 2 40 40 4 $17,642 $17,642 2 Site Visits and Inspections 12 24 8 24 24 $20,256 $2,000 $22,256 3 Construction Submittal Reviews and RFI Responses 4 24 2 8 48 48 $27,070 $27,070 4 Project Close -Out and Final Inspection Report 2 2 32 32 $12,462 $12,462 5 As -Built Drawings and O&M Manual 32 32 4 $11,764 $11,764 TOTALS 14 0 36 28 18 0 176 �� 176 ® $89,194 $2,000 $91,194