HomeMy WebLinkAbout2026-07-14 - AGENDA REPORTS - ADJUST CONSOLIDATED FIRE PROTECTION DIST DEVELOPER FEESO
Agenda Item: 2
CITY OF SANTA CLARITA
W
AGENDA REPORT
PUBLIC HEARINGS
CITY MANAGER APPROVAL:
DATE: July 14, 2026
SUBJECT: ADJUST CONSOLIDATED FIRE PROTECTION DISTRICT
DEVELOPER FEES
DEPARTMENT: Community Development
PRESENTER: Patrick Sprengel
RECOMMENDED ACTION
City Council:
1. Conduct a public hearing.
2. Adopt a resolution to adjust the Consolidated Fire Protection District developer fee
from $1.6710 per square foot to $1.7601 per square foot in accordance with the
Developer Fee Agreement between the City of Santa Clarita and the Consolidated Fire
Protection District of Los Angeles County.
BACKGROUND
In accordance with the City of Santa Clarita's (City) agreement with Los Angeles County
(County) to be part of the Consolidated Fire Protection District (Fire District), the City is
required to adopt the attached updated Developer Fee Detailed Fire Station Plan within a
reasonable period. The fee is typically updated annually. The last Fire District developer fee
increase became effective May 13, 2025.
Fire District developer fees finance the construction of new (and replacement) fire stations and
related fire protection improvements within the City.
The proposed fee increases from $1.6710 per square foot to $1.7601 per square foot is consistent
with the fee increase adopted by the Los Angeles County Board of Supervisors on March 24,
2026. The proposed fee adjustment is primarily a result of cumulative fire station development
financing costs as well as increased fire apparatus and equipment costs. The Developer Fee rate
is adjusted annually to account for inflation. The adjustment is based on the lesser of two percent
Page 1
Packet Pg. 38
O
or the California Consumer Price Index (CPI) for construction, along with current equipment
costs.
The Fire District developer fee is charged on new residential buildings, new detached residential
accessory structures, new commercial buildings, and residential or commercial additions over
2,000 square feet. The fee is collected at the time of building permit issuance.
The increased fee amount will ensure the City's Fire District developer fees are consistent with
the fees collected by the County in the unincorporated areas of the Santa Clarita Valley and will
satisfy the City's agreement with the County.
Staff recommends conducting a public hearing and adopting a resolution to adjust the
Consolidated Fire Protection District developer fee, which, if approved, will go into effect
August 1, 2026.
ALTERNATIVE ACTION
Other action as determined by the City Council.
FISCAL IMPACT
There is no anticipated fiscal impact to the City as a result of this resolution. There are minor
administrative costs for collecting and transmitting Fire District developer fees to the County.
These costs will not be affected by the fee adjustment.
ATTACHMENTS
Notice of Public Hearing 2026
Resolution
Notification Letter to City Manager
Total Developer Fees Collected 2026
Page 2
Packet Pg. 39
2.a
CITY OF SANTA CLARITA
NOTICE OF A PUBLIC HEARING REGARDING A PROPOSED INCREASE IN
CONSOLIDATED FIRE PROTECTION DISTRICT DEVELOPER FEES
PUBLIC NOTICE IS HEREBY GIVEN:
A public hearing will be held before the City Council of the City of Santa Clarita to consider an
increase to Consolidated Fire Protection District developer fees from $1.6710 to $1.7601 per
square foot of new development in the Santa Clarita Valley Area of Benefit. The proposed fee
adjustment is largely a result of cumulative fire station development financing costs, as well as
increased fire apparatus and equipment costs. In accordance with the City of Santa Clarita's
agreement with the County of Los Angeles to be part of the Consolidated Fire Protection
District, the City of Santa Clarita is required to adopt the updated Developer Fee Detailed Fire
Station Plan within a reasonable period of time. The proposed fee adjustment is consistent with
the fee increase adopted by the Los Angeles County Board of Supervisors on March 24, 2026.
The public hearing will be held by the City Council in the City Hall Council Chambers, 23920
Valencia Boulevard, first floor, the 14th day of July 2026, at 6:00 p.m.
If you wish to challenge the action taken on this matter in court, you may be limited to raising
only those issues you or someone else raised at the public hearing described in this notice, or in
written correspondence delivered to the City Council at, or prior to, the public hearing.
Proponents, opponents, and any interested persons may be heard on this matter at this time.
Further information regarding the proposed fee increase may be obtained by visiting
www.santaclarita.gov/buiIding, or by contacting John Caprarelli, Building Official, at (661)
2554935.
Dated: June 9, 2026
Melody Bartlette
City Clerk
Published: The Signal, June 23, 2026 and July 7, 2026
Packet Pg. 40
2.b
RESOLUTION NO. 26-
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF SANTA CLARITA, CALIFORNIA, PERTAINING TO DEVELOPER FEES
FOR FUNDING OF FIRE PROTECTION FACILITIES
WHEREAS, on July 14, 1992, the City Council of the City of Santa Clarita adopted
Resolution No. 92-152, which established a finance plan to fund fire protection facilities in the
benefit area designated as the Santa Clarita Valley as part of the Consolidated Fire Protection
District of Los Angeles County; and
WHEREAS, on August 25, 1992, the City Council adopted Ordinance No. 92-15,
which authorized the establishment of a fee to fund fire protection facilities.
NOW THEREFORE, the City Council of the City of Santa Clarita, California, does
hereby resolve as follows:
SECTION 1. Repeal all fees set forth by prior resolutions for the Consolidation Fire
Protections District of Los Angeles County as originally established in Resolution No. 92-152.
SECTION 2. Establish said Consolidated Fire Protection District fee of 1.7601 per
square foot of new development in the Santa Clarita Valley Area of Benefit, calculated as
provided for in Resolution No. 92-152.
SECTION 3. Except as herein modified, Resolution No. 92-152 shall remain in full
force and effect.
SECTION 4. This resolution shall go into full force and effect on July 1, 2026.
SECTION 5. The City Clerk shall certify to the adoption of this resolution.
PASSED, APPROVED, AND ADOPTED this day of 2026.
ATTEST:
CITY CLERK
DATE:
MAYOR
Page 1 of 2
Packet Pg. 41
2.b
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss.
CITY OF SANTA CLARITA )
I, Melody Bartlette, City Clerk of the City of Santa Clarita, do hereby certify that the
foregoing Resolution No. 26- was duly adopted by the City Council of the City of Santa Clarita
at a regular meeting thereof, held on the day of 2026, by the following vote:
AYES: COUNCILMEMBERS:
NOES: COUNCILMEMBERS:
ABSENT: COUNCILMEMBERS:
CITY CLERK
Page 2 of 2
Packet Pg. 42
ANTHONY C. MARRONE
FIRE CHIEF
FORESTER & FIRE WARDEN
"Proud Protectors of Life,
the Environment, and Property"
March 24, 2026
COUNTY OF LOS ANGELES
FIRE DEPARTMENT
2.c
pF LOs'%,
J�A ®F
r
CALIFORN�P
1320 NORTH EASTERN AVENUE
BOARD OF SUPERVISORS
LOS ANGELES, CALIFORNIA 90063-3294
(323) 881-2401
HILDAL. SOUS, CHAIR
www.fire.lacounty.aov
FIRST DISTRICT
HOLLY J. MITCHELL LINDSEY P. HORVATH
SECOND DISTRICT THIRD DISTRICT
JANICE HAHN KATHRYN BARGER
FOURTH DISTRICT FIFTH DISTRICT
ADOPTED
BOARD OF SUPERVISORS
COUNTY OF LOS ANGELES
The Honorable Board of Supervisors
County of Los Angeles 3 March 24, 2026
383 Kenneth Hahn Hall of Administration
500 West Temple Street
Los Angeles, CA 90012
EDWARD YEN
Dear Supervisors: EXECUTIVE OFFICER
APPROVE AND ADOPT THE RESOLUTION
TO INCREASE THE DEVELOPER FEE FOR THE CONSOLIDATED
FIRE PROTECTION DISTRICT OF LOS ANGELES COUNTY
(3RD AND 5TH DISTRICTS) (3-VOTES)
SUBJECT
The Consolidated Fire Protection District of Los Angeles County (District) has completed its
annual review of the Developer Fee Program (DFP) and is making recommendations to
increase the DFP rates in the three Areas of Benefit and the City of Calabasas.
IT IS RECOMMENDED THAT YOUR BOARD, AFTER THE PUBLIC HEARING:
Acting as the governing body of the Consolidated Fire Protection District of Los Angeles
County, is recommended that your Board:
1. Approve and adopt the enclosed Resolution and the 2025 DFP rate increase for the three
Areas of Benefit, Area 1 (Malibu/Santa Monica Mountains/City of Calabasas): $1.2417
(+$0.0565); Area 2 (Santa Clarita Valley): $1.7601 (+$0.0891); and Area 3 (Antelope
Valley): $1.2010 (+$0.0603).
2. Find that updating the DFP is exempt from the California Environmental Quality Act
(CEQA) Guidelines Section 15273(a)(4) in that it involves the collection of fees for capital
projects necessary to maintain services within the Areas of Benefit.
SERVING THE UNINCORPORATED AREAS OF LOS ANGELES COUNTY AND THE CITIES OF
AGOURA HILLS
CARSON
EL MONTE
INGLEWOOD
LAWNDALE
PICO RIVERA
SIGNAL HILL
ARTESIA
CERRITOS
GARDENA
IRWINDALE
LOMITA
POMONA
SOUTH EL MONT
AZUSA
CLAREMONT
GLENDORA
LA CANADA-FLINTRIDGE
LYNWOOD
RANCHO PALOS VERDES
SOUTH GATE
BALDWIN PARK
COMMERCE
HAWAIIAN GARDENS
LA HABRA
MALIBU
ROLLING HILLS
TEMPLE CITY
BELL
COVINA
HAWrHORNE
LA MIRADA
MAYWOOD
ROLLING HILLS ESTATES
VERNON
BELL GARDENS
CUDAHY
HERMOSA BEACH
LA PUENTE
NORWALK
ROSEMEAD
WALNUT
BELLFLOWER
DIAMOND BAR
HIDDEN HILLS
LAKEWOOD
PALMDALE
SAN DIMAS
WEST HOLLYWOOD
BRADBURY
DUARTE
HUNTINGTON PARK
LANCASTER
PALOS VERDES ESTATES
SANTA CLARITA
CALABASAS
INDUSTRY
PARAMOUNT
Packet Pg. 43
The Honorable Board of Supervisors 2'c
March 24, 2026
Page 2
PURPOSE/JUSTIFICATION OF RECOMMENDED ACTION
On July 12, 1990, your Honorable Board adopted a resolution establishing a County of
Los Angeles DFP for the District. The DFP was implemented August 1, 1990, to fund the
acquisition, construction, improvement, and equipping of fire station facilities in the
high -growth, urban -expansion areas of the District. The purpose of this program, as adopted
by the Board, is to ensure these additional resources are made available to protect the lives
of residents and maintain efficient fire protection and life -safety services in the Areas of
Benefit where population is increasing based on urban expansion. The Developer Fee rate is
adjusted annually to account for inflation. The adjustment is based on the lesser of two
percent or the California Consumer Price Index (CPI) for construction, along with current
equipment costs. Pursuant to Government Codes 66001 and 66002, the resolution instructs
the District to conduct annual evaluations of the DFP and make appropriate
recommendations to your Honorable Board.
Also, on September 4, 2007, your Honorable Board adopted a Joint Exercise of Powers
Agreement between the County of Los Angeles and the City of Calabasas wherein the
parties agreed to exercise the power to levy the DFP in the City of Calabasas and the City
Council authorized your Honorable Board to conduct all proceedings in connection with the
levy of the fee, and any modifications of the fee amount, within the city boundaries.
Implementation of Strategic Plan Goals
Approval of the recommended actions is consistent with the County's Strategic Plan:
Focus Area Goal North Star 3, Strategies is Customer Service: Support departmental
efforts to improve customer service and to enhance efficiency and responsiveness to
meet the needs of all residents.
FISCAL IMPACT/FINANCING
The District is funded independently from the County's General Fund and relies primarily on
property tax revenue to provide essential fire protection and emergency medical services.
The DFP provides an additional revenue source to fund essential fire station facilities and
equipment in the areas of urban growth. Increasing the fee rates in the unincorporated areas
of the three Areas of Benefit and the City of Calabasas will enable the District to fund the
development of new fire stations proportionate to the need necessitated by growth.
The DFP generates approximately $4.1 million in revenue annually and subject to change
based on variability in the construction of homes and land acquisition in the Areas of Benefit.
These funds are deposited into the District's Developer Fee Accumulated Capital Outlay
Fund and can only be used to fund the development of new fire stations within specific
geographic areas.
There is no impact to net County cost.
Packet Pg. 44
The Honorable Board of Supervisors 2'c
March 24, 2026
Page 3
FACTS AND PROVISIONS/LEGAL REQUIREMENTS
Pursuant to Government Code Sections 66000, 66001, 66002, 66006, and 66018, the District
has prepared three attachments to the Resolution. Enclosure A, Developer Fee Detailed Fire
Station Plan to the Resolution depicts the status of completed and proposed fire stations, and
helispots, as well as costs, and funding sources. Enclosure B, Developer Fee for the
Consolidated Fire Protection District of Los Angeles County Developer Fee Funds 2024-25
Fiscal Year (FY)-End Report, identifies the beginning DFP Fund balance for FY 2024-25,
including variances due to interest, advertisement, refunds, etc. Enclosure C, Developer Fee
for the Consolidated Fire Protection District of Los Angeles County 2025 Developer Fee
Calculation Summary, breaks down the cost and finance (Area 2) associated with the
construction of a fire station, purchase of apparatus, and administration cost. These costs
are necessary to finalize the new DFP rate for the respective Areas of Benefit. County
Counsel has approved as to form the attached Resolution updating the DFP.
IMPACT ON CURRENT SERVICES (OR PROJECTS)
The updated rates will be imposed in the unincorporated areas in the three DFP Areas of
Benefit and the City of Calabasas effective June 1, 2026. As a result, the updated Developer
Fee rates will be imposed in the cities of Malibu, Santa Clarita, and Lancaster upon adoption
of a resolution updating the fee amounts by each respective city.
ENVIRONMENTAL DOCUMENTATION
This project is statutorily exempt per Section 15273 (a)(4) of the CEQA Guidelines developed
by the State Office of Planning Research in that it involves the collection of fees for capital
projects necessary to maintain services within existing service areas.
CONCLUSION
Upon conclusion of the public hearing and approval by your Honorable Board, please instruct
the Executive Officer to return an adopted stamped copy of this letter with the adopted
Resolution to the following office:
Consolidated Fire Protection District of Los Angeles County
Attention: Marcia Velasquez, Head, Planning & Executive Support
1320 North Eastern Avenue
Los Angeles, CA 90063
Marcia.Velasguez(a)fire.lacounty.gov
The District contact may be reached at (213) 466-5596.
Packet Pg. 45
The Honorable Board of Supervisors
March 24, 2026
Page 4
Respectfully submitted,
ANTHONY C. MARRONE, FIRE CHIEF
ACM:mn
Enclosures
c: Chief Executive Officer
County Counsel
Auditor -Controller
2.c
Packet Pg. 46
2.c
RESOLUTION OF THE BOARD OF SUPERVISORS
OF THE COUNTY OF LOS ANGELES TO UPDATE THE
DEVELOPER FEE PROGRAM FOR THE BENEFIT OF
THE CONSOLIDATED FIRE PROTECTION DISTRICT AND TO CONSIDER
THE DEVELOPER FEE FUNDS 2024-25 FISCAL YEAR-END REPORT
WHEREAS, on July 12, 1990, the Board of Supervisors of the County of
Los Angeles approved and adopted a County of Los Angeles Developer Fee Program
(DFP) for the benefit of the Consolidated Fire Protection District of Los Angeles County
(DISTRICT) in Area of Benefit 1, Malibu/Santa Monica Mountains, Area of Benefit 2,
Santa Clarita Valley, and Area of Benefit 3, Antelope Valley (collectively, "Areas of
Benefit") effective August 1, 1990, which DFP is to be updated annually thereafter; and
WHEREAS, on September 4, 2007, the City of Calabasas, located in the
Malibu/Santa Monica Mountains Area of Benefit, and the City Council of the City of
Calabasas entered into a Joint Powers Agreement with the County of Los Angeles in
which the City and County jointly agreed to exercise the power to levy the DFP in the
City and to authorize the Board of Supervisors to conduct all proceedings in connection
with the levy of fees and modifications of the fee amount within the City; and
WHEREAS, the County of Los Angeles desires to update the DFP rate in the
three Areas of Benefit, in accordance with Government Code Section 66002; and
WHEREAS, the rate increase is due to proposed developments in areas which
are designated in the Los Angeles County General Plan as high -growth areas and
require fire protection resources.
that:
NOW, THEREFORE, the Board of Supervisors resolves, finds, and determines
The foregoing recitals are true and correct.
2. The DFP is for the purpose of generating funds for capital projects necessary to
maintain fire protection services within the existing service areas of the DISTRICT,
and is statutorily exempt per Section 15273(a)(4) of the California Environmental
Quality Act Guidelines developed by the State Office of Planning and Research.
3. On March 24, 2026, a public hearing was held to update and consider:
Attachment A, the Developer Fee Detailed Fire Station Plan dated October 2025
attached hereto and incorporated herein, which serves as the DFP capital
improvement plan and describes the acquisition, construction, installation, and
equipping of fire stations to be funded with developer fee revenue; Attachment B,
Developer Fee Funds 2024-25 Fiscal Year -End Report; and Attachment C, 2025
Developer Fee Calculation Summary attached hereto and incorporated herein,
which imposes a separate fee calculation for each Area of Benefit based upon the
actual fire station development costs experienced in each of the three areas;
4. The Board of Supervisors approves and adopts the updated DFP in the Areas of
Benefit of the DISTRICT as follows:
Packet Pg. 47
2.c
a. The updated DFP Detailed Fire Station Plan dated October 2025 is
approved.
b. The DFP Funds 2024-25 Fiscal Year -End Report is approved.
c. The updated DFP rates per square foot of new developments of $1.2417
in Area of Benefit 1 and the City of Calabasas, $1.7601 in Area of Benefit
2, and $1.2010 in Area of Benefit 3 are approved and shall become
effective in the unincorporated areas within Areas of Benefit and the City
of Calabasas on June 1, 2026.
d. The 2025 DFP Calculation Summary is approved.
e. All other terms and provisions of the DFP as previously adopted by the
Board of Supervisors of the County of Los Angeles shall remain
unchanged and in full force and effect.
The foregoing resolution was adopted on the 24th day of March , 2026,
by the BOARD OF SUPERVISORS OF THE COUNTY OF LOS ANGELES.
EDWARD YEN, Executive Officer
Clerk of the Board of Supervisors
OF LOS
VOA
q,ycF
!�N
By Depu � y
:41
,
RA
�'ALlFOR�\P
APPROVED AS TO FORM:
DAWYN HARRISON, COUNTY COUNSEL
By�for
Jenny Tam
Senior Deputy County Counsel
Packet Pg. 48
2.c
ENCLOSURE A
DEVELOPER FEE FOR THE CONSOLIDATED FIRE PROTECTION DISTRICT
OF LOS ANGELES COUNTY
DEVELOPER FEE DETAILED FIRE STATION PLAN
FISCAL YEAR 2025-26
OCTOBER 2025
Packet Pg. 49
2.c
DEVELOPER FEE DETAILED FIRE STATION PLAN
Fiscal Year 2026-26
PREFACE
This Developer Fee Detailed Fire Station Plan (Plan) reflects the Consolidated Fire Protection District's (District) fire service requirements as of October 2025
based upon growth projections and contacts with cities and developers who have shared their development plans with the District.
The Plan identifies 6 completed fire stations, 18 proposed fire stations, 4 helispots, and the necessary capital equipment that will be required in the Areas of
Benefit as well as the anticipated costs and time frames provided that development occurs as expected. The anticipated costs identified in the Plan will be
funded by Developer Fee revenues and/or funds which the District has advanced from other sources. These advances will be repaid to the District when
sufficient Developer Fee revenue is generated.
Terms Used in Plan Explanation
Fire Station/Location In most cases a site has not yet been acquired; the locations are therefore approximate.
Anticipated Capital Where actual costs are not yet available, the anticipated capital projects costs are based upon the District's current cost
Project Costs experienced for construction, land and equipment.
Apparatus cost includes the full cost of the apparatus as well as outfitting and equipment costs.
No District overhead costs nor an inflation factor have been applied; all figures are based on current costs.
Developer Fee credit may be granted for the conveyance of a site, apparatus, or construction of a fire station to help offset the
impact of development on the District.
Project Cost Estimate Based on average costs for fire stations recently completed and stations under development; includes plans, specifications,
consultant services, plan check, permit and inspection fees, construction, project management, furnishings, and equipment.
Amount Budgeted The amount budgeted could be from Developer Fee funds collected or advanced from District general revenues or certificates of
participation. All advances made and/or interest incurred by the District to finance station development are to be repaid when
Developer Fee revenues are sufficient. If no amount is budgeted, the development of the fire station may be delayed until
Developer Fee revenues are sufficient to fund the site acquisition and/or construction of the fire station.
Equipment and Staffing This plan reflects the proposed staffing and equipment to be implemented when each station and the development served by each
station are built out in the respective areas of benefit. In many instances, a transitional staffing configuration will be utilized until
build out occurs.
Fiscal Year The Fiscal Year period begins July 1 and ends June 30. .o
z
Initiating Priority Year Refers to the fiscal year that the land acquisition or construction of the fire station is anticipated to begin.
E
Target Occupancy Target occupancy is approximately one to two years from the actual start of construction. o
a
Page 1
Packet Pg. 50
2.c
DEVELOPER FEE DETAILED FIRE STATION PLAN
Fiscal Year 2026-26
STATIONS OPERATIONAL: REIMBURSEMENT PENDING & IN -PROGRESS*
Station Size, Equip.
Facility
Capital Project Costs
Funding Source*
and Staffing
Comments
Fire Station 128
Station Development Costs $ 9,066,972
Commercial Paper
9,976 sq. ft.
The site was conveyed to the District by Shappell Industries
28450 Whites Canyon Rd.
**Principal Paid (1,065,000)
Proceeds
Engine
for developer fee credit. Partial funding totaling $3.6 million was
Santa Clarita (City)
Balance $ 8,001,972
provided by the American Recovery and Reimbursement Act.
The fire station was completed and operational March 1, 2012.
Fire Station 132
Station Development Costs $ 8,127,873
Commercial Paper
9,746 sq. ft.
The site was conveyed to the District by K. Hovnanian
Wes Thompson Ranch
**Principal Paid (1,710,000)
Proceeds
Engine
(VTTM 49621). Apparatus for this permanent station was
29310 Sand Canyon. Rd.
Balance $ 6,417,873
transferred from temporary Fire Station 132. The permanent
Santa Clarita (City)
station was completed and operational March 12, 2012.
Fire Station 143
Station Development Costs $ 7,913,986
Commercial Paper
9,700 sq. ft.
The land was conveyed by the developer, Newhall Land and
28580 Hasley Canyon Rd
Principal Paid (485,000)
Proceeds
Engine
Farming, for developer fee credit. The fire station was completed
Santa Clarita Valley
Balance $ 7,428,986
and operational in November 2016.
(Unincorporated)
Fire Station 160
Station Development Costs $ 11,483,583
Commercial Paper
19,935 sq. ft.
The site was conveyed to the District by Pardee Homes for
19190 Golden Valley Rd.
Principal Paid (2,660,000)
Proceeds
Haz. Mat. Task Force
developer fee credit. A Hazardous Materials Task Force
Santa Clarita (City)
Balance $ 8,823,583
(Engine and Squad)
assigned to Fire Station 76 was reassigned to staff this station.
BC/AC HQ
The fire station was completed and operational February 1, 2013.
Fire Station 166
Station Development Costs $ 7,512,226
Commercial Paper
11,152 sq. ft.
The site was conveyed to the District from Newhall Land and
24505 Copper Hill Drive
Principal Paid (1,575,000)
Proceeds
Engine
Farming for developer fee credit. Apparatus was transferred
Rye Canyon Area
Balance $ 5,937,226
from temporary Fire Station 156. The station was completed and
Santa Clarita (City)
operational in 2011.
Fire Station 104
Project cost est. $ 13,247,645
$234,000
11,450 sq. ft.
This station replaces temporary Fire Station 104. The land was
26901 Golden Valley Road
Principal Paid $ (485,000)
100% Commercial
Engine
purchased by the District in December 2010 and the station
(at Soledad Canyon)
Apparatus 1,191,053
Paper Proceeds
was completed in 2020.
Santa Clarita (City)
Total $ 13,953,698
*The District is financing costs that exceed the developer fee funds available within Area 2. The District will be reimbursed the costs it advanced, including interest and, administrative
charges from Area 2 as revenues are collected and from the City of Santa Clarita for the City's proportionate share of fire station facilities financing.
**Based on Bond Debt Service provided by Financial Manaqement Division, cumulative principal cost.
Page 2
Packet Pg. 51
2.c
DEVELOPER FEE DETAILED FIRE STATION PLAN
Fiscal Year 2025-26
LAND ACQUISITION ONLY:
Early land acquisition will ensure that the future fire stations will be optimally placed when these areas develop in the future. The progress of development in these areas will be monitored for
timing of the future construction of these stations:
Facility
Anticipated
Capital Project Costs
Station Size (Sq. Ft.)
and Equipment
Comments/Status
Fire Station O (formerly 138)
Land $ 361,548
10,000
The City of Palmdale expressed interest in assisting with site acquisition. The
Avenue S and Tierra Subida
Project cost est.* $ 9,500,000
District will pursue City participation, however, fire station development will not
(Unincorporated Palmdale Area)
Total $ 9,861,548
commence until development in the area warrants additional coverage.
Fire Station P (formerly 195)
Land $ 361,548
10,000
The City of Palmdale expressed interest in assisting with site acquisition. In addition,
Pearblossom Hwy/47th St. E.
Project cost est.* $ 9,500,000
there is a proposed development project within this location for which the Fire District
(Unincorporated Palmdale Area)
may negotiate a station site. Fire station development will not commence until
Total $ 9,861,548
development in the area warrants additional coverage.
'Based on an average cost per square foot of $950.
Page 3
Packet Pg. 52
2.c
DEVELOPER FEE DETAILED FIRE STATION PLAN
Fiscal Year 2025-26
PROPOSED FIRE STATIONS
Anticipated
Station Size (Sq. Ft.)
Facility
Capital Project Costs
and Equipment
Comments/Status
Fire Station 46 (formerly 177)
Land
$ 1,646,568
13,500
Newhall Land to construct and equip according to a MOU for the Newhall Ranch
Newhall Ranch
Project cost est.*
16,245,000
"'
3,600
Specific Plan area. This station will be located in Mission Village. Newhall
Santa Clarita Valley (Unincorporated)
Apparatus
2,739,138
Engine (2)
will also construct a smaller auxiliary building on the same site
Total
$ 20,630,706
Squad
of the Fire Station (Tract No. 61105). Apparatus Storage Building will be 3,600 sq. ft.
Fire Station 113 (formerly 175)
Land
$ 1,646,568
9,800
Newhall Land to construct and equip according to a MOU for the
Newhall Ranch
Project cost est.*
9,310,000
Engine
Newhall Ranch Specific Plan area. This station will be located in
Santa Clarita Valley (Unincorporated)
Apparatus
2,218,464
Squad
Landmark Village (Tract No. 53108).
Total
$ 13,175,032
Fire Station 109 (formerly 176)
Land
$ 1,646,568
9,800
Newhall Land to construct and equip according to a MOU for the
Newhall Ranch
Project cost est.*
9,310,000
Engine
Newhall Ranch Specific Plan area. This station will be located in
Santa Clarita Valley (Unincorporated)
Apparatus
1,712,457
Portrero/Homestead (Tract No. 60678).
Total
$ 12,669,025
Fire Station B (formerly 109)
Land
$ 361,548
10,000
Development in this area is limited at this time and construction
Fox Field - vicinity of 40th St. W
Station Dev. Costs'
9,500,000
Engine
will not commence until substantial development occurs.
and Avenue G
Apparatus
1,712,457
City of Lancaster (City)
Total
$ 11,574,005
Fire Station C (formerly 113)
Land
$ 361,548
10,000
The developer is to provide a site within the Avanti South Project area to
Avanti South Project
Station Dev. Costs'
9,500,000
Engine
the District for developer fee credits (Tract No. 74312).
70th Street West and Ave. K-8
Apparatus
1,712,457
City of Lancaster (City)
Total
$ 11,574,005
Fire Station D (formerly 133)
Land
$ 4,190,456
10,000
Agreement with developer, City of Santa Clarita for the site executed on
Needham Ranch Parkwy
Project cost est.*
10,000,000
Engine
9/9/2019. The site was conveyed to the District by Needham Ranch for
near Eternal Valley Mem. Park
Apparatus
1,712,457
developer fee credit (Tract No. 50283).
Santa Clarita (City)
Total
$ 15,902,913
(Helispot)
Helispot is completed and station construction will commence when significant
development in the vicinity occurs.
'Based on an average cost per square foot of $950.
"Additional $500,000 added for cost of helispot preparation costs.
"' Based on current project cost estimates.
Page 4
Packet Pg. 53
2.c
DEVELOPER FEE DETAILED FIRE STATION PLAN
Fiscal Year 2025-26
PROPOSED FIRE STATIONS
Anticipated
Station Size (Sq. Ft.)
Facility
Capital Project Costs
and Equipment
Comments/Status
Fire Station E (formerly 600)
Land
$ 1,646,568
10,000
The developer, Pardee Homes, is to convey a station site to the
Valley Cyn. Road at Spring Canyon
Project cost est.*
9,500,000
Engine
District for developer fee credits (Tract No. 48086).
Santa Clarita Valley (Unincorporated)
Apparatus
1,712,457
Total
$ 12,859,025
Fire Station F (formerly 174)
Land
$ 361,548
4,982
Development in this area is limited at this time and construction
Neenach Fire Station
Project cost est.*
4,732,900
Engine
will not commence until substantial development occurs.
Antelope Valley (Unincorporated)
Apparatus
1,712,457
Total
$ 6,806,905
Fire Station G (formerly 142)
Fire Station
$ 361,548
10,000
Development in this area is limited at this time and construction
Sierra Highway/Clanfield
Project cost est.*
10,000,000
Engine
will not commence until substantial development occurs.
Antelope Valley (Unincorporated)
Apparatus
1,712,457
(Helispot)
Total
$ 12,074,005
Fire Station H (formerly 139)
Land
$
"'
10,000
Per the developer agreement for the Anaverde/City Ranch Project, the
Anaverde/City Ranch
Project cost est.
"'
Engine
developer is required to provide land and construct a permanent fire
Palmdale (City)
Apparatus
1,712,457
station to be conveyed to the District.
Total
$ 1,712,457
Fire Station I (formerly 190)
Land
$
"'
10,000
Under a 1992 developer agreement for the Ritter Ranch Project, the
Ritter Ranch
Project cost est.
"'
Engine
developer is required to provide land and construct a permanent fire
Palmdale (City)
Apparatus
1,712,457
station to be conveyed to the District.
Total
$ 1,712,457
Fire Station J (formerly Northlake/180)
Land
$ 1,646,568
10,000
Developer to construct the proposed project R2018-00408-(5) with a future
North of Lake Hughes, East of 1-5, West
Project cost est.*
9,500,000
Engine
fire station to be built as part of Phase 2 in the future (Tract No. 73336).
ofCastaic Lake
Apparatus
1,712,457
Castaic Canyon (Unincorporated)
Total
$ 12,859,025
'Based on an average cost per square foot of $950.
"Additional $500,000 added for cost of helispot preparation costs.
"'Cost will be updated once project start date has been established.
Page 5
Packet Pg. 54
2.c
DEVELOPER FEE DETAILED FIRE STATION PLAN
Fiscal Year 2025-26
PROPOSED FIRE STATIONS
Anticipated
Station Size (Sq. Ft.)
Facility
Capital Project Costs
and Equipment
Comments/Status
Centennial Fire Station K
Land
$
13,000
Centennial Project
Project cost est.
Engine
Gorman (City)
Apparatus
1,712,457
Total
$ 1,712,457
Centennial Fire Station L
Land $
10,000
Centennial Project
Project cost est.
Engine
Gorman (City)
Apparatus
1,712,457
Total
$ 1,712,457
Developer to enter into a Development Impact Mitigation Agreement with the District to
construct and equip up to four fire stations, as determined by the District, to serve the
Centennial Fire Station M
Land $ -
10,000
Centennial Development Project.
Centennial Project
Project cost est.
-
Engine
Gorman (City)
Apparatus
1,712,457
Total
$ 1,712,457
Centennial Fire Station N
Land $ -
10,000
Centennial Project
Project cost est.
-
Engine
Gorman (City)
Apparatus
1,712,457
Total
$ 1,712,457
Fire Station TBD
Land
$
1,306,800
10,000
Development in this area is limited at this time and construction
East Calabasas area between
Project cost est.*
9,500,000
Engine
will not commence until substantial development occurs.
Stations 68 and 69
Apparatus
1,712,457
Total
$ 12,519,257
Fire Station Q
Land
$
-
10,000
The District is currently working with the City of Lancaster to draft an agreement
Lancaster
Project cost est.*
9,500,000
Engine
for the construction of this Fire Station.
Apparatus
2,218,464
Squad
Total
$ 11,718,464
'Based on an average cost per square foot of $950.
"Cost will be updated once project start date has been established.
Page 6
Packet Pg. 55
2.c
DEVELOPER FEE DETAILED FIRE STATION PLAN
Fiscal Year 2025-26
HELISPOTS:
Facility
Anticipated
Capital Project Costs
Station Size (Sq. Ft.)
and Equipment
Comments/Status
Fire Station G (formerly 142)
Land $ 1,365,288
10,000
The land was acquired by the District in July 2010. A
Sierra Highway/Clanfield
Project cost est.* 10,000,000
Engine
helispot is planned to be constructed at this station site.
Antelope Valley (Unincorporated)
Apparatus 1,712,457
Total $ 13,077,745
Val Verde
Land $ -
The District has requested that a helispot be provided within the
Santa Clarita Valley (Unincorporated)
Helispot 500,000
Val Verde Development Project (Tract No. 60665).
Total $ 500,000
'Based on an average cost per square foot of $950.
"Additional $500,000 added for cost of helispot preparation costs.
a
w
w
LL
W
w
a-
O
J
W
w
0
U
0
0
Page 7
Packet Pg. 56
ENCLOSURE2.c
DEVELOPER FEE FOR THE CONSOLIDATED FIRE PROTECTION DISTRICT OF LOS ANGELES COUNTY
DEVELOPER FEE FUNDS
2024-25 FISCAL YEAR-END REPORT
Fiscal Year 2024-25 Beginning Balance
Total Developer Fee Revenue Collected cd>
Interest Earned
Adjustment
Fund Expenditures (Advertisement)
NSF Checks
Refunds
Fiscal Year 2024-25 Ending Balance
Area of Benefit 1
Malibu/Santa Monica Mtns. (a)
City of Calabasas
$6,198,417.05
163,461.96
283,473.56
(408.90)
$6,644,943.67 ce>
(a) Includes unincorporated areas within Area of Benefit 1 and the Cities of Calabasas and Malibu.
(b) Includes unincorporated areas within Area of Benefit 2 and the City of Santa Clarita.
(c) Includes unincorporated areas within Area of Benefit 3 and the City of Lancaster.
(d) The developer fee rates during FY 2024-25 were as follows:
Area of Benefit 2 Area of Benefit 3
Santa Clarita Valley (b) Antelope Valley (°)
$22,642,603.81
1, 929, 371.76
1,075,612.42
$35,871,318.44
2,527,843.05
1,670,052.82
ch>
(6,952.70)
$25,647,587.99 cf> $40,062,261.61 c9>
Area 1 = 1.1851
Area 2 = 1.6710
Area 3 = 1.1407
(e) Funds to be used to develop a fire station in the East Calabasas area when development in the area warrants additional coverage needed.
(f) Funds used to fund the construction of permanent Fire Station 104 and to reimburse the District for the costs incurred in the development
and financing of fire stations 128, 132, 143, 150, and 156.
(g) Funds to be used for land acquisition for Fire Stations 138 and 195 in the unincorporated Palmdale area, and
construction of additional stations as detailed in the 2024 Fire Station Plan update.
Packet Pg. 57
ENCLO 2.c
Developer Fee
Cost Component
Average Land Cost
Station Development Costs
Financing Costs
Engine Cost
Quint Cost
Squad Cost
DEVELOPER FEE FOR THE CONSOLIDATED FIRE PROTECTION DISTRICT OF LOS ANGELES COUNTY
2025 DEVELOPER FEE CALCULATION SUMMARY
AREA OF BENEFIT 1 -
MALIBU/SANTA MONICA MTNS.,
CITY OF CALABASAS
2025
Cost
Proportionate
Fire Station
Share
2025 Cost
Applied
$ 1,306,800
100.00%
$
1,306,800
$ 10,525,100
100.00%
$
10,525,100
N/A
-
-
$ 1,712,457
100.00%
$
1,712,457
$ 3,001,390
20.95%
$
628,791
$ 506,007
32.80%
$
165,970
Total Cost Per Station
$
14,339,119
Administrative Costs
$
105,553
Total Area 1 Costs
$
14,444,672
Total Square Feet of
Development per Station
11,633,307
Developer Fee Amount
Per Square Foot
$
1.2417
AREA OF BENEFIT 2 -
SANTA CLARITA VALLEY
2025
Cost
Proportionate
Fire Station
Share
2025 Cost
Applied
$ 1,646,568
100.00%
$
1,646,568
$ 10,898,741
100.00%
$
10,898,741
$ 25,641,575
20.00%
$
5,128,315
$ 1,712,457
100.00%
$
1,712,457
$ 3,001,390
20.95%
$
628,791
$ 506,007
32.80%
$
165,970
Total Cost Per Station
$
20,180,843
Administrative Costs
$
294,983
Total Area 2 Costs
$
20,475,826
Total Square Feet of
Development per Station
11,633,307
Developer Fee Amount
Per Square Foot
$
1.7601
AREA OF BENEFIT 3 -
ANTELOPE VALLEY
I Cost I Fire t tionteIare 2025Cos
Applied t
$ 361,548
$ 10,898,741
N/A
$ 1,712,457
$ 3,001,390
$ 506,007
Total Cost Per Station
administrative Costs
100.00%I $ 361,54E
100.00% $ 10,898,74' j
100.00%I $ 1,712,451 N
Total Area 3 Costs
Total Square Feet of
Development per Station
Developer Fee Amount
Per Square Foot
Note: The calculated costs for the apparatus listed above (Engine, Quint, Squad) are inclusive of the base unit purchase price plus outfitting, equipment, and communications costs.
Z
20.95% $ 628,79' O
32.80% $ 165 97( F j
$
13,767,50E p
$
203,73' Q
$
L
13,971,23(
c�
c
c�
11,6,33,301
U
$
1.201(
L
Packet Pg. 58
2.d
TOTAL CONSOLIDATED FIRE PROTECTION DISTRICT
DEVELOPER FEES
COLLECTED SINCE LAST ADJUSTMENT
The last adjustment to the Consolidated Fire Protection District developer fee occurred on May
14, 2025. The fee implemented on that date was $1.7601 per square foot of floor area of new
buildings. The following fees were collected during the noted fiscal years:
Fiscal Year 2018-19 - $2,813,513
Fiscal Year 2019-20 - $1,389,163
Fiscal Year 2020-21 - $2,628,813
Fiscal Year 2021-22 - $1,163,527
Fiscal Year 2022-23 - $1,367,714
Fiscal Year 2023-24 - $3,359,128
Fiscal Year 2024-25 - $3,755,496
Fiscal Year 2025-26 - $1,432,571
The Consolidated Fire Protection District developer fee is charged on new residential buildings,
new detached residential accessory structures, new commercial buildings, and new commercial
additions over 2,000 square feet at the time the building permit is issued.