HomeMy WebLinkAbout2026-07-14 - AGENDA REPORTS - PIONEER OIL REFINERY RESTORATION PROJ P2018 DESIGN BUILD CONTRAgenda Item• 15 CITY OF SANTA CLARITA .` AGENDA REPORT CONSENT CALENDAR CITY MANAGER APPROVAL: DATE: July 14, 2026 SUBJECT: PIONEER OIL REFINERY RESTORATION, PROJECT P2018 - DESIGN/BUILD CONTRACT DEPARTMENT: Recreation and Community Services PRESENTER: Lance O'Keefe RECOMMENDED ACTION City Council: 1. Award a design -build contract to Spectra Company to design and build the phased rehabilitation, reinstallation, and repair of the Pioneer Oil Refinery buildings and structures, in the amount of $1,285,159, and authorize a contingency in the amount of $192,774, for a total contract amount not to exceed $1,477,933. 2. Appropriate one-time funds in the amount of $1,340,000 from the Developer Fee Fund (Fund 306) and $234,000 from the Facilities Fund (Fund 723) to the Pioneer Oil Refinery expenditure accounts P2018306-516101 and P2018723-516101, respectively, for a total appropriation of $1,574,000 for the restoration of the Pioneer Oil Refinery site. 3. Authorize the City Manager or designee to execute all contracts and associated documents, subject to City Attorney review. BACKGROUND The Pioneer Oil Refinery (Site) is a historic, inactive oil refinery located on the corner of Needham Ranch Parkway and Pioneer Way in the City of Santa Clarita (City). Built in 1876 by California Star Oil Works, a predecessor of Standard Oil Company and later Chevron, the refinery operated until 1888. The Site has received several significant historic designations. In 1935, it was designated a California State Historical Landmark as the first commercial oil refinery in California. In 1975, the American Society of Mechanical Engineers recognized the Site as the first successful oil refinery in California. In December 2020, the Pioneer Oil Refinery Page 1 Packet Pg. 119 was officially listed on the National Register of Historic Places. Chevron donated the property to the City in 1997, and the Pioneer Oil Refinery Master Plan was approved in 2013. The Master Plan was developed to transform the Site into an educational public park where visitors of all ages can learn about the oil refining process of the late 1800s. The plan includes trails, open space, interpretive features, and other park amenities. The Site contains several historic structures, including two buildings (the Pump House and Shed); seven metal tanks (Acid Tank, Wash Tank, two Rundown Tanks, Residuum Tank, Water Tank, and Oil Tank); and a set of stills consisting of two brick and metal stills, two chimneys, and a network of metal condenser pipes. As part of Phase 1, the Master Plan was updated, and the park was constructed and opened to the public in 2025. In March 2026, a Request for Qualifications (RFQual) was published via the City's e- procurement system, BidNet, inviting interested firms to submit their qualifications for Phase 2 of the project. Phase 2 includes the design and construction of the rehabilitation, reinstallation, and repair of the historic structures and equipment on the Site. The RFQual was distributed to 4,748 vendors, of which 63 downloaded the materials. The City received one submission and determined that the design -build firm, Spectra Company (Spectra), was qualified to undertake this project. After finalizing the scope of work, the City issued a Request for Proposal (RFP) inviting the pre - qualified firm to submit their proposal for the project. The City received Spectra's proposal, which was evaluated by a panel of City staff to ensure that the firm has a strong project management approach, qualified staff, and relevant experience on similar projects. The following criteria were used to evaluate the proposal: • Project Management and Schedule of Work • Staff Composition • Experience on similar projects and experience working with the Secretary of the Interior's Standards and other public agencies • Cost Proposal Following the evaluation process, Spectra received the score as outlined below. COMPANY I LOCATION JSCOPE Spectra Company I Pomona, CA 194.3 Spectra demonstrated an in-depth understanding of the project needs and provided a detailed scope of work and a comprehensive project management approach. Their team brings diverse backgrounds and decades of experience working on restoring historic structures and sites. Staff recommends awarding the design -build contract to Spectra Company for a total contract amount of $1,285,159. A 15 percent contingency is being requested to cover additional design and/or build needs for the historic structures, additional amenities identified for the park site, and any necessary modifications required during the project. Upon approval of the recommended actions, the City Council will appropriate $1,574,000 for Page 2 Packet Pg. 120 this project. The project budget will support $1,477,933 for design and construction, including contingency, and $96,067 for historic consultant services, a park monument sign, an electric vehicle charging station, and project administrative costs, including inspections, permits, and fees, and labor compliance monitoring. ALTERNATIVE ACTION Other action as determined by the City Council. FISCAL IMPACT The requested appropriations of $1,340,000 in Developer Fee Fund (Fund 306) and $234,000 in Facilities Fund (Fund 723) will create a total project budget of $1,574,000 in Pioneer Oil Refinery Expenditure Accounts P2018306-516101 and P2018723-516101, collectively. This amount will adequately provide $1,477,933 for award of the design -build contract, including contingency and $96,067 for historic consultant services, a monument sign, an electric vehicle charging station, and additional administrative costs. ATTACHMENTS RFP Response (available in the City Clerk's Reading File) Page 3 Packet Pg. 121 ()SPECTRA HISTORIC; CONSTRUCTION PROJECT RESPONSE Project Introduction The Pioneer Oil Refinery was constructed in 1876. It was added as a California Historic Landmark in 1935 and on the National Register of Historic Places in 2020. We understand the Refinery consists of two buildings (Pump House and Shed), seven metal tanks (Acid Tank, Wash Tank, two Rundown Tanks, Residuum Tank, Water Tank, and Oil Tank), and a set of Stills that consists of two brick and metal stills, two chimneys, and a set of metal condenser pipes. The Pump House and other previously salvaged tanks will be reinstalled at the new proposed locations while the Stills, Shed and Water and Oil Tank will be rehabilitated in place. The Design Build team includes an architect (Spectra Company), structural engineer (sub - consultant TYLin), general contractor (Spectra Company) and concrete subcontractor (El Camino Construction) experienced in the rehabilitation of historic structures, materials conservation and the Secretary of the Interior's Standard for the Treatment of Historic Properties. It is our understanding that a landscape architect is excluded from this proposal and will only be added later if necessary. References See requested references provided as an attachment, Plan of Study/Scope of Work TASK 1: DESIGN DEVELOPMENT SUBTASK 1.1 Preliminary Investi a o • Project kick-off meeting to discuss the scope, purpose, schedule, and pertinent details of the project. • Field reconnaissance to assess existing conditions of the project site and surrounding areas. Review and observe existing artifacts and materials in nearby off -site storage. Subtask 1.2 Design Development Meetings • Attend estimated (1) meeting with the City and City's consultant to discuss the design and repair of the Refinery buildings and structures and pertinent details of the project. Output: Meeting Minutes. Subtask 1.3 Design Development Drawings respect. restore. reuitali.ze 1 350 N Garey Ave #101 1 Pomona, CA 91767 1800.375.1771 (),xSPECTRA HISTORIC; CONSTRUCTION • Prepare conceptual design drawings for review. Output: Progress Design Development Drawings. • Revise design drawings as needed. Output: 60% Design Development Drawings. TASK 2: PROTECT MANAGEMENT Ongoing communication and coordination with the City and City's consultant from project kick-off through construction. All agendas, meeting minutes, task lists, and exhibits are to be included. Project management will be led by architect, Dick Gee, AIA, during the Design Phase and the construction project manager, Rafael Barrios, during the Build, or construction, phase. Subtask 2.1: Monthly Meetings • Monthly meetings to review project schedules, plans, and specifications. Assemble the agenda prior to each meeting, and provide and distribute meeting minutes afterwards. Meetings will be held in -person and some may be held virtually. Output: Agendas and Meeting Minutes. Subtask 2.2: Monthly Progress Reports • Prepare monthly progress reports and progress schedule updates. The progress report shall include accomplished tasks for the month, anticipated progress for the next month (4 week look ahead), pending issues, and schedule completion target dates. Output: Monthly Progress Reports. Subtask 2.3: Schedule • Within two weeks of the Notice to Proceed (NTP), a detailed project baseline schedule will be submitted indicating milestones, major activities, and deliverables to the City for review and comment. The schedule will be updated as needed. Output: Project Schedule. Subtask 2.4: Quality Control • A quality control plan will be submitted. Output: Quality Control Plan. TASK 3: CONSTRUCTION DOCUMENTS Subtask 3.1: Construction Documents (Plans, Specifications, and Estimates) • Prepare Construction Documents to include Architectural and Structural plans. (Landscape, mechanical, electrical, plumbing drawings and interpretive display drawings are not required and excluded). • Output: Construction Documents will be submitted at 60% (DD Set shall constitute the 60% submittal), 90%, and 100% (Plan Check Submittal), and final approved plans. Subtask 3.2 Plan Approvals and Permits respect. restore. reuitali.ze 1 350 N Garey Ave #101 1 Pomona, CA 91767 1800.375.1771 (),xSPECTRA HISTORIC; CONSTRUCTION • Submit for plan check approvals from all City divisions including but not limited to Planning, Engineering Services, Building and Safety, Traffic, Urban Forestry, Landscape Maintenance Division, Environmental Services, Recreation and Community Services, Arts and Events, Park Maintenance, Parks Planning, and outside agencies such as L.A. County Fire, or as needed for construction permits. • Output: An updated complete set of approved plans, specifications, and estimate will be submitted. TASK 4: CONSTRUCTION SUBTASK 4.1 Phase 1 • Pump House- A new footing will be designed and installed. The Pump House will be reconstructed using salvaged materials. In kind materials will be used if the existing is missing or deteriorated beyond reuse. It is anticipated a significant amount of framing and wood that was previously in contact with the ground would need to be replaced. Salvaged equipment will be reinstalled. • Acid Tank- A new footing and support framing will be designed and installed. The Acid Tank will be relocated and rehabilitated. In kind materials will be used if the existing is missing or deteriorated beyond reuse. It is anticipated a significant amount of the wood support frame would need to be replaced due to deterioration. • Wash Tank- A new footing and support framing will be designed and installed. The Wash Tank will be relocated and rehabilitated. In kind materials will be used if the existing is missing or deteriorated beyond reuse. It is anticipated a significant amount of the wood support frame would need to be replaced due to deterioration. • Rundown Tanks (Two Tanks)- - New footings will be designed and installed. The Rundown Tanks will be relocated and rehabilitated. • Residuum Tank- A new footing and support framing will be designed and installed. The Residuum Tank will be relocated and rehabilitated. In kind materials will be used if the existing is missing or deteriorated beyond reuse. It is anticipated a significant amount of the wood would need to be replaced due to deterioration. • Stills- The stills will be cleaned and a graffiti protective coating will be applied. The chimneys will be reconstructed to match the original in size and appearance. However, brick veneer over a support frame will be used to mitigate the challenges of a tall, heavy chimney. Some visible structural support may be visible, but will be mitigated and only as necessary for structural stability. SUBTASK 4.2 Phase 2 (Phase 2 to be completed concurrently with Phase 1) • Shed- The Shed will be rehabilitated, but a new footing was not requested. The wood structure and metal roof will be cleaned and rehabilitated. respect. restore. reuitali.ze 1 350 N Garey Ave #101 1 Pomona, CA 91767 1800.375.1771 ()SPECTRA HISTORIC; CONSTRUCTION • Oil Tank- The Oil Tank will have graffiti removal, safed off and a graffiti coating applied at the ground level. Water Tank- The Oil Tank will have graffiti removal, safed off and a graffiti coating applied at the ground level. TASK 5: MAINTENANCE AND REPAIR GUIDELINES The Design Build team will coordinate with the City and the City's Facilities Division, Graffiti Removal Team, and Consultant to develop guidelines for future work related to the Pioneer Oil Refinery. The guidelines will outline recommended treatments and methods for carrying out ongoing maintenance, as -needed repair, and graffiti removal for each building or structure, in a manner that will not cause damage to the historic fabric. Proposed Schedule Spectra Company estimates the following design and construction schedule: Estim. Date Task Jul 14, 2026 Contract Award/Notice to Proceed Issued Jul 17, 2026 Kick Off Meeting Aug 14, 2026 Monthly Meeting. Progress drawings to be reviewed with City. Aug 28, 2026 Task 1-Site Investigation/Design Development Submittal (6 weeks. Deliverable = 60% Design Development Documents). Sep 11, 2026 Monthly Meeting. Completion of Client/City Review (2 weeks review and response). Oct 23, 2026 Construction Documents (6 weeks. Deliverable = 90% Construction Documents). Review CD's in Monthly Meeting. Nov 6, 2026 Client/City Review (2 weeks review and response) Nov, Dec, Jan 2026 Monthly Meetings. Check progress of Plan Check. Jan 29, 2027 Completion of Plan Check Processing (3 months- possibly shorter if City can expedite) Feb 1, 2027 City Confirms Notice to Proceed with Construction Feb 8, 2027 Submittals/Buyout, Site Mobilization, Inspect/Organize Salvaged Materials (4 weeks, but overlap 3 weeks during plan check). Monthly Meeting upon Site Mobilization. July 26, 2027 Construction Duration (6 months). Monthly Construction Meetings. July 26, 2027 Construction Completed, Ready for Use The schedule may be shortened through several parallel efforts. These include reducing or omitting client and city progress reviews, expediting plan check, overlapping submittals and site mobilization with plan check, and addressing critical path construction issues. respect. restore. reuitali.ze 1 350 N Garey Ave #101 1 Pomona, CA 91767 1800.375.1771 ()SPECTRA HISTORIC; CONSTRUCTION Project Management Spectra Company will utilize a streamlined Design -Build project management approach to efficiently manage and direct this project. This method ensures clear leadership, structured oversight, and timely execution while minimizing unnecessary design iterations. Project Oversight and Roles: a The project will be led by Dick Gee, AIA, as Project Manager during the initial design phase, and Rafael Barrios as Construction Project Manager. a Responsibilities include project planning, schedule development, task coordination, quality assurance, and ongoing communication with the City and its consultant. a Monthly progress meetings and concise status reports will maintain alignment with project objectives, schedule, and deliverables. a Opportunities to overlap tasks such as submittals, procurement and other tasks can be investigated. Personnel, Equipment, and Facilities Spectra Company has assembled an experienced Design -Build team with expertise in historic preservation, structural rehabilitation, and rehabilitation of historic resources. Dick Gee, AIA will serve as Project Manager during the design phase and will be responsible for overall project coordination, design development, permitting support, and communication with the City and its consultant. Rafael Barrios will serve as Construction Project Manager and will oversee construction activities, subcontractor coordination, scheduling, quality control, and project delivery. TYLin will provide structural engineering services for foundations, support framing, and rehabilitation of the historic structures and tanks. El Camino Construction will perform concrete work associated with new foundations and support systems. Resumes for all key personnel are included in the proposal attachments and summarize each individual's qualifications, experience, and role on the project. Subconsultants Structural Engineer. TYLin. respect. restore. reuitali.ze 1 350 N Garey Ave #101 1 Pomona, CA 91767 1800.375.1771 DICK GEE AIA, LIED AP Architect EDUCATION BA, Architecture U.C. Berkeley (1988) PROFESSIONAL REGISTRATION CA License - C26515 EXP. 6/30/27 AZ License - 44293 Exp. 6/30/27 ()SPECTRA HISTORIC; CONSTRUCTION EXPERIENCE & QUALIFICATIONS Dick Gee is a licensed architect in California and Arizona with more than 34 years of experience specializing in historic preservation. Now serving as both Architect and Project Manager with Spectra Company, he oversees preservation consulting, design -build, and historic construction projects — bringing a broad perspective that strengthens collaboration among owners, architects, engineers, and consultants. A graduate of U.C. Berkeley, Dick previously served as Lead Principal of the Los Angeles office for JAG Architects. His preservation career began with landmark rehabilitation projects such as the Eastern Columbia Building, the Los Angeles Coliseum, and multiple structures at El Pueblo de Los Angeles. Over the years, he has contributed to the restoration of numerous National Register buildings, California State Historic Resources, and local landmarks. Notable projects include the El Capitan Office Building and Theatre, San Gabriel Mission, Crystal Cove Cottages, Vibiana in Los Angeles, Frank Lloyd Wright's Ennis House, several John Lautner residences, and the restoration of most historic buildings at the Pechanga and Pala tribal reservations. With deep expertise spanning design, regulatory approvals, historic tax credit applications, construction, and development, Dick offers a comprehensive understanding of the preservation process. His leadership has guided projects that have earned multiple honors from the California Preservation Foundation, the Los Angeles Conservancy, and other preservation organizations. Dick currently serves on the board of the California Preservation Foundation (CPF) and the Western Chapter of the Association for Preservation Technology (WCAPT). Area of Specialization: Preservation Architect Dick meets and exceeds the Secretary of the Interior's Professional Qualifications Standards for Historic Architecture. respect. restore. reuitali.ze 1 350 N Garey Ave #101 1 Pomona, CA 91767 1800.375.1771 3►11 'III] Senior Preservation Estimator Historic Material Treatment Specialist EDUCATION Fine Art, MFA Fine Art, BFA Otis College of Art and Design (1995) PROFESSIONAL REGISTRATION Member of WCAPT, APTI, CPF, LA Conservancy, APF (Arizona Preservation Foundation) and ACI (American Concrete Institute) Y' ``SPECTRA HISTORIC; CONSTRUCTION EXPERIENCE & QUALIFICATIONS Reuben Lombardo brings over 20 years of experience in the preservation field and is a key member of Spectra Company's Historic Division. His expertise spans ornamental concrete and plaster, granite and marble, tile, stone and ceramics, historic murals and decorative painting, sculpture, mold making, wood restoration, and metals. While knowledgeable in many areas of historic restoration, Reuben has a particular passion for the artistic elements of preservation. An artist by trade, he combines his creative background with practical expertise in construction and project management. He is a graduate of Otis College of Art and Design and holds a Master of Fine Arts from UCLA. Reuben has contributed his skills to numerous landmark restoration and waterproofing projects, including the Hoover Dam in Boulder City, Nevada; the Catalina Island Casino in Avalon; Hearst Castle in San Simeon; the Hollywood Bowl; the El Capitan Theatre in Hollywood; the Fine Arts Building in Los Angeles; Greystone Mansion in Beverly Hills; the Millennium Biltmore Hotel in Los Angeles; the Anaheim Citrus Packing House; the Santa Barbara Mission; Mission Basilica San Diego de Alcala; Mission Santa Ines; Mission San Luis Rey; and multiple university projects at UCLA, Chapman University, Mount Saint Mary's, and Caltech. As part of Spectra's project teams, Reuben has helped secure more than 100 preservation awards for work across the Western United States. He has also served two terms on the Board of Directors for the Western Chapter of APTI (Association of Preservation Technologies International) and has led numerous presentations and workshops on historic materials restoration for WCAPT, APTI, CPF, the LA Conservancy, APF (Arizona Preservation Foundation), and ACI (American Concrete Institute). Area of Specialization: Preservation Estimator and Historic Material Treatment Specialist Rueben meets and exceeds the Secretary of the Interior's Professional Qualifications Standards for Historic Architecture. respect. restore. reuitali.ze 1 350 N Garey Ave #101 1 Pomona, CA 91767 1800.375.1771 MARK GREEN 1121[1111;ill]91;11►11111111211 ()SPECTRA HISTORIC; CONSTRUCTION EXPERIENCE & QUALIFICATIONS Mark Green brings over 35 years of experience in the construction industry, with the majority of his career focused on historic construction. As a Superintendent for Spectra Company, Mark manages owner liaison responsibilities, weekly production meetings, scheduling, workforce coordination, layout of work, and compliance with applicable building codes and standards. He serves as a key point of contact, ensuring necessary communication between Project Managers, field teams, and clients. Mark has also held a licensed General Contractor designation for 30 years, giving him a broad command of both the technical and administrative sides of construction. Mark has contributed to numerous historic rehabilitation and restoration projects across Southern California, including full building rehabilitations with seismic and ADA improvements, exterior envelope and masonry restoration, new MEP systems, and tenant improvements across residential, civic, and commercial uses. His proficiency spans diverse project scales, typologies, fabrics, and sectors. Mark's background as both a licensed contractor and experienced historic superintendent makes him a practical and dependable leader in the field. Area of Specialization: Historic Construction Superintendent respect. restore. reuitali.ze 1 350 N Garey Ave #101 1 Pomona, CA 91767 1800.375.1771 RAFAEL BARRIOS PROJECT MANAGER Estimator ("'),SPECTRA HISTORIC; CONSTRUCTION EXPERIENCE & QUALIFICATIONS Rafael Barrios brings over 30 years of experience in the construction industry. His comprehensive knowledge in the finishing trades informs and enriches his role as a manager and supervisor of large crews and projects. He is both a Project Manager and Estimator for Spectra Company and is a former construction supervisor. He is very well -versed in painting, drywall, carpentry, masonry, tile and granite, waterproofing, glazing, antique restoration and preservation. Throughout his career, Rafael has applied his expertise across a broad range of landmark restoration and construction projects in California, Nevada and Arizona. His fluency in the finishing trades — from ornamental masonry and tile work to waterproofing, glazing, and antique restoration — contribute to his versatility as a field professional and project leader. Rafael brings a level of craft knowledge and practical judgment that is rare at the management level. Rafael's combined background in estimating, supervision, and hands-on trade work makes him a reliable and effective leader on complex historic projects. Area of Specialization: Finishing Trades/Historic Materials Restoration respect. restore. reuitali.ze 1 350 N Garey Ave #101 1 Pomona, CA 91767 1800.375.1771 UYLin YEARS OF EXPERIENCE 65 Years YEARS WITH FIRM 3 Years EDUCATION University of California Los Angeles, Loyola University, and the University of Southern California (post -graduate studies) BS, University of Arizona, Tucson, Civil Engineering,1960 LICENSE Professional Engineer, CA, AZ, NV, NM, OR Structural Engineer, CA, AZ, NV, NM, OR CERTIFICATIONS NCEE Certificate Holder AWARDS Governor's Heritage Preservation Honor Award Empire Ranch, AZ 2016 Career Achievement Award - City of Las Vegas, NV 2016 Historic Hawaii Foundation Honor Award - Doris Duke - Jali Pavilion 2014 Los Angeles Conservancy Award - 2008 Frank Lloyd Wright's Ennis House Earthquake Damage Repair Project. RECENT PUBLICATIONS "Building Codes for Existing and Historic Buildings;" John Wiley & Sons, Pub. 2012 FEMA Incremental Rehabilitation Series (FEMA 395-399). 2004-2006 Melvyn Green, PE, SE SENIOR STRUCTURAL ENGINEER AND PRESERVATION CONSULTANT Melvyn (Mel) Green has over 60 years of experience in the structural engineering industry, with an expertise in historic structures. Mel is experienced in seismic rehabilitation, struc- tural engineering design, and materials conservation. His focus is on seismic rehabilitation for timber and masonry structures, including adobe structures. Mel joined TYLin in 2021 as a Senior Preservation Consultant. Mel has been a member or chair of a number of standards committees for the American Society of Civil Engineers (ASCE). He is also a past president of the Structural Engineers Asso- ciation of California (SEAOC). As the previous Director of Building and Safety for El Segundo, California, he is active in building code development and education and has served on the drafting committee of the International Existing Building Code (IEBC). He is the author of Building Codes for Existing and Historic Buildings. PROJECT EXPERIENCE Tesoro de Valle (Harry Carey Ranch) I Santa Clarita, CA After damage due to the 1994 earthquake, the site was repaired and strengthened as part of a development. Fern Dell Nature Trail Bridge Repair I Los Angeles, CA The pedestrian bridge at Fern Dell underwent a significant restoration led by Friends of Griffith Park (FoGP). Mel assessed the bridge's condition, and a ground -penetrating radar revealed that the original 1920s foundations were still structurally sound. Collaborating with preservation architect Michelle McDonough, the team developed restoration plans that rein- stated the bridge's original arched design and distinctive railings and added modern safety enhancements. The project received approval from the City's Office of Historic Preservation, and construction commenced in 2019. The bridge reopened to the public in December 2019. University of California, Los Angeles, Powell Library (1928) Los Angeles, CA Consultant for preservation of the historic stenciled plaster ceiling including repair, cleaning and seismic stabilization. Golden Gate Bridge (1937) 1 San Francisco, CA Historic preservation engineer to the project team undertaking the seismic rehabilitation of the bridge. Frink Adobe — Single Family Dwelling I Loma Linda, CA In collaboration with The City of Loma Linda and the Two Canyons Conservancy, the Frink Adobe, one of the oldest buildings in the Inland Empire, is subject to restoration. Plans in- clude preserving the structure and surrounding land for a living history museum and park. Ft. Churchill Adobe Buildings - Structural Repairs Ft. Churchill State Park, NV Restoration efforts at Fort Churchill have focused on stabilizing the historic adobe structures using like materials to preserve the original fort layout. These efforts are part of a long-term preservation strategy for the state park. Empire Ranch I Pima County, AZ Historic adobe barn structure. Site was studied and improved over time, including seismic retrofit of barn. Shoring, adobe and timber repair, and preservation recommendations. De- sign strengthening for the existing barn as a public assembly area. UYLin YEARS OF EXPERIENCE 17 Years YEARS WITH TYLIN 17 Years EDUCATION MS, Architecture, emph. Structural Engineering, California Polytechnic State University BS, Architectural Engineering, California Polytechnic State University LICENSE Professional and Structural Engineer: AL, AZ, DC, HI, ID, KS, MT, NV Nathan Hicks, PE, SE PRINCIPAL, SECTOR MANAGER Structural Engineer Nathan joined TYLin in 2009 as the recipient of the Silman Fellowship for Preservation Engineering. As a part of the fellowship, he spent six months at the National Trust for Historic Preservation, working at the headquarters in Washington, DC with the Historic Sites Depart- ment. Since returning to TYLin, Nathan's projects range from large to small, including reno- vations and modernizations of historic buildings, new construction, schools and residential projects. In 2021, Nathan relocated to TYLin's new Los Angeles office. PROJECT EXPERIENCE. Darling Hotel I Visalia, CA This historic former courthouse annex was transformed into a boutique hotel, preserving the original 1930s Art Deco style. The four-story, 28,000 sf structure features 32 suites, meet- ing spaces, a pool, and a rooftop bar and restaurant. TYLin provided structural engineering design services for the interior and exterior rehabilitation. A seamlessly designed stair tower is the only exterior addition. Millard Sheets Mosaic Mural I Orange, CA TYLin collaborated with preservationists, art restoration specialists, and architects to provide support and anchorage for Millard's large (approximately 17'x40') "Pleasures Along the Beach," mosaic. The project included the preservation and reconstruction of the mosaic, which had been disassembled due to a building demolition. The work of art will now be on display outside of the Hilbert Museum in Orange, CA. St. Elizabeths West Campus Department of Homeland Security AFFILIATIONS Headquarters, Design -Build I Washington, DC American Society of Civil Structural engineering bridging documents for the DHS Headquarters project, providing over g g g g q p J p g Engineers (ASCE), Member 500,000 sf of office space through a combination of adaptive reuse and new construction. Association for Preservation TYLin has provided extensive probe testing and nondestructive evaluation work for a majority Technology (APT) Western of the historic structures on the campus. In addition, TYLin provided bridging documents for Chapter, Member the Center Building, Creamery, Holly, and Administrative Buildings. The preservation engi- DC Preservation League, neering required the design to incorporate seismic and security requirements into the new Member use of these buildings. National Trust for Historic Decatur House I Washington, DC Preservation (NTHP), Member Federal style house built 1818, currently owned by the National Trust for Historic Preserva- Preservation Roundtable, tion and occupied by the White House Historical Association. A partial collapse of a ceiling Member prompted a structural assessment to survey the building for structural deficiencies, evaluate Structural Engineers load capacities, identify unsafe occupancies, and provide recommendations for repairs. The Association of San Diego investigation work was tailored to prevent damage to the historic fabric of the building. (SEACSD), Existing Building pope-Leighey House (Frank Lloyd Wright) I Alexandria, VA Committee Member As part of the Silman Fellowship for Preservation Engineering with the National Trust for PUBLICATIONS Historic Preservation, conducted structural investigations of this relocated Usonian residence Kirk Mettam, Christopher Ruiz, now situated on the Woodlawn site. Work included evaluation of the foundations, assess- & Nathan Hicks. "Balancing ment of wood framing and masonry elements, and coordination with preservation staff to Emotions" Structural Engineer support long-term stabilization and stewardship planning. Magazine, 13:5, 2012: 40-43 Tel 909.599.0760 Fax 909.599.7762 SPECTRASpectraCompany.com HISTORIC CONSTRUCTION 350 N Garey Ave. Suite #101 Pomona, CA 91767 CA License # 605280 AZ License # 285689 NV License # 75007 DIR Number:1000006472 PROPOSAL / CONTRACT Attention: Lance O'Keefe City of Santa Clarita 23920 Valencia Blvd., Ste 295 Rec&CS - Administration Santa Clarita, CA 90245 Work: 661-250-3716 Mobile: 661-305-3138 E-Mail: Lokeefe@santa-clarita.com Project Name: Pioneer Oil Refinery 23802 Pine St Santa Clarita, CA 91321 Project # 109752 Date: 06/10/26 TABLE OF CONTENTS Scope of Work Page GENERAL QUALIFICATIONS - HISTORIC..............................................................................2 01. PHASE #1- DESIGN.....................................................................................................................3 02. PHASE #1- GENERAL CONDITIONS.....................................................................................3 03. PHASE #1- EQUIPMENT............................................................................................................4 04. PHASE #1- CONSTRUCTION...................................................................................................5 05. PHASE #1- INSURANCE.............................................................................................................9 06. PHASE #1- BONDING.................................................................................................................9 07. PHASE #2 - DESIGN.....................................................................................................................9 08. PHASE #2 - GENERAL CONDITIONS.....................................................................................9 09. PHASE #2 - EQUIPMENT..........................................................................................................10 10. PHASE #2 - CONSTRUCTION.................................................................................................10 11. PHASE #2 - INSURANCE...........................................................................................................12 12. PHASE #2 - BONDING...............................................................................................................12 SUMMARYOF ESTIMATES...........................................................................................................13 PRESERVE'S PROTECT' RESTORE Page 2 of 13 Project Name: Pioneer Oil Refinery 6/15/2026 Scope of Work * GENERAL QUALIFICATIONS - HISTORIC QUALITY ASSURANCE Historic Restoration shall conform to the "Secretary of the Interior's Standards for Rehabilitation" published in the most current edition of the United States National Park Service in "The Secretary of the Interior's Standards for the Treatment of Historic Properties." GENERAL INCLUSIONS 1. Work with local, state, and federal governing historic agencies to ensure restoration is performed in compliance with established guidelines. 2. Maintain digital photo documentation for archival purposes. 3. Provide product submittals/samples. 4. AM Best Rated - A+ or higher - Liability/Bonding/Workers Compensation Insurance. S. Restoration product specifications and material safety data sheets (MSDS). 6. Proposal based on prevailing wage rates, one move -in and work to be performed during normal daytime hours, Monday thru Friday. 7. Coordination with trades. 8. Historic Restoration - Statement of Qualification - (see attached). 9. Pollution Insurance Coverage - Insured for Lead Paint, Asbestos and Mold Remediation - (see attached). PRESERVE PROTECT RESTORE Page 3 of 13 Project Name: Pioneer Oil Refinery 6/15/2026 GENERAL EXCLUSIONS Permits fees, power, water, deputy inspections, more than one (1) move in, parking expenses, final protection, and any unforeseen conditions. 01. PHASE #1 - DESIGN Provide design drawings for phase one of the project to include structural engineering Sub Total - $79,815.00 02. PHASE #1 - GENERAL CONDITIONS REQUIRED GENERAL CONDITIONS A. Duration 365 days (congruently) a. Six (6) Months for design/plan check b. Six (6) months for construction B. Obtain permit(s) as required - Owner to reimburse cost of permits (if required). C. Photo document existing conditions and restoration work throughout the project. D. Provide and implement a protection plan. Plan to include documentation and safe off of utilities. E. Provide a Project Schedule with two week look ahead throughout the project. F. Coordinate required inspections. G. Provide onsite superintendent for duration of project. PRESERVE PROTECT RESTORE Page 4 of 13 6/15/2026 H. Provide OSHA certified Safety program. I. Coordination of trades/subcontractors Sub Total - $86,400.00 03. PHASE #1 - EQUIPMENT Equipment Project Name: Pioneer Oil Refinery *Based on up to a one hundred eighty three (183) calendar day completion schedule 1. Provide lift equipment to access work area including exterior facade and interior walls/ceilings 2. Provide portable wash stations. 3. Supply and install spider box, cord/string lights for temporary power and lighting. 4. Provide storage containers for equipment, materials storage, office. S. Provide dumpsters and disposal. 6. Provide site fencing. 7. Provide reach fork lift. Sub Total - $41,400.00 PRESERVE PROTECT RESTORE Page 5 of 13 Project Name: Pioneer Oil Refinery 6/15/2026 04. PHASE #1 - CONSTRUCTION AREAS/ SURFACES Restoration/reinstallation of the historic equipment on the lower level of the park to specifically include: A. Pump House B. Acid Tank C. Wash Tank D. Rundown Tanks (two tanks) E. Residuum Tank F. East Sill G. East Chimney H. West Sill West Chimney I. Condenser pipes HISTORIC RESTORATION TREATMENT PROCEDURES - AS REQUIRED 1. Restoration to All Phase 1 Buildings and Structures to specifically include: a. Install temporary shoring as needed to prevent hazard or inadvertent damage to building/structure during work. b. Apply corrosion -inhibiting treatment to metal(s) as appropriate while maintaining existing patina. (Everbrite Protectaclear metal coating) c. Secure openings against dumping, vandalism, moisture accumulation, unauthorized entry, etc. (use of wire mesh screens at openings) d. All work will carry out any necessary chemical or physical treatments using gentlest means possible. e. Secure and address potential safety or tripping hazards such as loose materials and sharp edges. f. Provide anti -graffiti protection on all exterior surfaces. g. Clean, restore, and/or rehabilitate the structures as necessary. 2. Pump House a. Provide new footing and stem wall PRESERVE PROTECT RESTORE Page 6 of 13 Project Name: Pioneer Oil Refinery 6/15/2026 b. Reassemble disassembled components including wood beams, trellis and rafters; steel posts; corrugated metal roof panels; corrugated metal wall panels; and pump equipment/artifacts. c. Inspect and repair wood, corrugated metal, steel, and pump equipment as needed. d. Where individual elements are missing or deteriorated beyond repair, replace in kind. e. Securely anchor corrugated metal wall and roof panels to wood structure. f. Restore and replace the water pump motor and pipes to replicate the original design. 3. Acid Tank a. Provide slab to install tank on b. Clear debris from interior of tank, if any. c. Relocate to proposed location on site. d. Stabilize/reconstruct non -original timber support platform as needed. e. Anchor tank to timber support platform. f. Inspect and repair steel tank as needed. 4. Wash Tank a. Provide slab to install tank on b. Clear debris from interior of tank, if any. c. Relocate to proposed location on site. d. Stabilize/reconstruct non -original timber support platform as needed e. Anchor tank to timber support platform. f. Inspect and repair steel tank as needed. S. Rundown Tanks (Two Tanks) a. Provide slab to install tanks on b. Clear debris from interior of tank, if any. c. Relocate to proposed location on site. d. Stabilize/reconstruct non -original timber support platforms as needed. e. Anchor tanks to timber support platform. f. Inspect and repair steel tanks as needed. PRESERVE PROTECT RESTORE Page 7 of 13 Project Name: Pioneer Oil Refinery 6/15/2026 6. Residuum Tank a. Provide slab to install tank on b. Clear debris from interior of tank, if any. c. Relocate to proposed location on site. d. Stabilize/reconstruct non -original timber support platform as needed. e. Inspect and repair wood boards/staves and metal hoops as needed. f. Where individual elements are missing or deteriorated beyond repair, replace in kind. g. Reset boards/staves and hoops to original positions and brace tank internally for stability. 7. East Still a. Carefully excavate accumulated earth around base of still. b. Clear debris from interior of still, if any. c. If feasible, restore shifted metal still to its original position on furnace. d. Inspect, repair and repoint brick furnace as needed, including: repair mortar cap; remove and reinstall loose bricks; replace broken and missing bricks in kind; test existing mortar to identify appropriate mortar composition. e. Replace missing lintel at furnace door to hold brick in place. f. Inspect and repair metal still components as needed. 8. East Chimney a. Carefully excavate accumulated earth around base of chimney. b. Clear debris from interior of chimney stack, if any. c. Brace against collapse (adding metal angle iron at corners of chimney embedded in concrete base). d. Inspect, repair, and repoint brick as needed. Test existing mortar to identify appropriate mortar composition. e. Propose and design alternative measures to restore (if required). 9. West Still a. Carefully excavate accumulated earth around base of still. PRESERVE PROTECT RESTORE Page 8 of 13 Project Name: Pioneer Oil Refinery 6/15/2026 b. Clear debris from interior of still, if any. c. Inspect, repair and repoint brick furnace as needed, including: repair mortar cap; remove and reinstall loose bricks; replace broken and missing bricks in kind; test existing mortar to identify appropriate mortar composition. d. Inspect and repair metal still components as needed. 10. West Chimney a. Carefully excavate accumulated earth around base of chimney. b. Clear debris from interior of chimney stack, if any. c. Reconstruct fallen chimney with matching brick veneer. d. Inspect, repair, and repoint brick as needed using appropriate mortar. Replace broken or missing bricks in kind. e. Brace reconstructed chimney against collapse (adding metal angle iron at corners of chimney embedded in concrete base). f. Propose and design alternative measures to restore (if required). 11. Condenser a. Reconstruct condenser pipes. b. Inspect and repair metal still components as needed. c. Where individual elements are missing or deteriorated beyond repair, replace in kind. 12. Brick Pillars at fencing of sills a. Replace missing bricks with new matching bricks b. Replace missing mortar with new matching mortar Specific Exclusions: Working equipment. Sub Total - $881,510.49 PRESERVE PROTECT RESTORE Page 9 of 13 6/15/2026 05. PHASE #1 - INSURANCE To be 1% of total construction cost Sub Total - $10,891.00 06. PHASE #1 - BONDING To be 2% of total construction cost Sub Total - $22,000.00 07. PHASE #2 - DESIGN Provide design drawings for phase two of the project Sub Total - $20,415.00 08. PHASE #2 - GENERAL CONDITIONS REQUIRED GENERAL CONDITIONS Project Name: Pioneer Oil Refinery *WORK TO BE PERFORMED CONGRUENTLY TO PHASE #1 A. Obtain permit(s) as required - Owner to reimburse cost of permits (if required). B. Photo document existing conditions and restoration work throughout the project. C. Provide and implement a protection plan. Plan to include documentation and safe off of utilities. D. Provide a Project Schedule with two week look ahead throughout the project. E. Coordinate required inspections. PRESERVE'S PROTECT' RESTORE Page 10 of 13 Project Name: Pioneer Oil Refinery 6/15/2026 F. Provide onsite superintendent for duration of project. G. Provide OSHA certified Safety program. H. Coordination of trades/subcontractors Sub Total - $7,200.00 09. PHASE #2 - EQUIPMENT Equipment - Additional Equipment Required for Phase #2 *Based on up to a one hundred eighty three (183) calendar day completion schedule 1. Provide lift equipment to access work area including exterior facade and interior walls/ceilings 2. Supply and install spider box, cord/string lights for temporary power and lighting to the top of the hill, 3. Provide dumpsters and disposal. 4. Provide site fencing. Sub Total - $12,600.00 10. PHASE #2 - CONSTRUCTION AREAS/ SURFACES Restoration/reinstallation of the historic equipment on the upper level of the park to specifically include: PRESERVE PROTECT RESTORE Page 11 of 13 Project Name: Pioneer Oil Refinery 6/15/2026 A. Shed B. Water Tank C. Oil Tank HISTORIC RESTORATION TREATMENT PROCEDURES - AS REQUIRED 1. Restoration to All Phase 2 Buildings and Structures to specifically include: a. Install temporary shoring as needed to prevent hazard or inadvertent damage to building/structure during work. b. Apply corrosion -inhibiting treatment to metal(s) as appropriate while maintaining existing patina. (Everbrite Protectaclear metal coating) c. Secure openings against dumping, vandalism, moisture accumulation, unauthorized entry, etc. (use of wire mesh screens at openings) d. All work will carry out any necessary chemical or physical treatments using gentlest means possible. e. Secure and address potential safety or tripping hazards such as loose materials and sharp edges. f. Provide anti -graffiti protection on all exterior surfaces. g. Clean, restore, and/or rehabilitate the structures as necessary. 2. Shed a. Clear debris from interior of shed, if any. b. Reinstall any loose or missing metal roof/wall panels; panels may be elsewhere on site due to high winds. c. Inspect and repair wood, sheet metal, and corrugated metal as needed, including electrical panel and enclosure. d. Where individual elements are missing or deteriorated beyond repair, replace in kind. e. Securely anchor metal wall and roof panels to wood structure. f. Improve lateral bracing with additional diagonal brace on interior of each wall. 3. Water Tank -Inspect and repair steel tank as needed. PRESERVE PROTECT RESTORE Page 12 of 13 Project Name: Pioneer Oil Refinery 6/15/2026 4. Oil Tank - Inspect and repair steel tank as needed. Specific Exclusions: Working equipment, electrical. Sub Total - $118,144.02 11. PHASE #2 - INSURANCE To be 1% of total construction cost Sub Total - $1,584.00 12. PHASE #2 - BONDING To be 2% of total construction cost Sub Total - $3,199.00 PRESERVE'S PROTECT' RESTORE Page 13 of 13 Project Name: Pioneer Oil Refinery 6/15/2026 SUMMARY OF ESTIMATES 01. PHASE #1 - DESIGN........................................................................................................... $79,815.00 02. PHASE #1 - GENERAL CONDITIONS ............................................................................. $86,400.00 03. PHASE #1 - EQUIPMENT.................................................................................................. $41,400.00 04. PHASE #1 - CONSTRUCTION........................................................................................$881,510.49 05. PHASE #1 - INSURANCE................................................................................................... $10,891.00 06. PHASE #1 - BONDING....................................................................................................... $22,000.00 07. PHASE #2 - DESIGN........................................................................................................... $20,415.00 08. PHASE #2 - GENERAL CONDITIONS ................................................................................ $7,200.00 09. PHASE #2 - EQUIPMENT.................................................................................................. $12,600.00 10. PHASE #2 - CONSTRUCTION........................................................................................$118,144.02 11. PHASE #2 - INSURANCE......................................................................................................$1,584.00 12. PHASE #2 - BONDING..........................................................................................................$3,199.00 Grand Total - $1,285,158.51 CONDITIONS We propose to furnish material, equipment, supplies, labor and tax, complete in accordance with the above specifications. This proposal may be withdrawn if not accepted within 90 days. Respectfully submitted by: Reuben Lombardo - Senior Preservation Estimator Mobile: 310-614-5592 Work: 909-599-0760 x115 E-mail: rlombardo@spectracompany.com Authorized by: Ray Adamyk - President Acceptance Signature: _ Printed Name: Title: Date of Acceptance: PRESERVE'S PROTECT' RESTORE NOTICE TO PROPOSERS REGARDING CONTRACTUAL REQUIREMENTS PROPOSAL # RCS-25-26-P2018 Design & Build Project for Pioneer Oil Refinery City Project No. P2018 City of Santa Clarita, California SUMMARY OF INDEMNITY AND INSURANCE REQUIREMENTS 1. These are the Indemnity and Insurance Requirements for DB Entity providing services or supplies to City of Santa Clarita (City). By agreeing to perform the work or submitting a proposal, you verify that you comply with and agree to be bound by these requirements. If any additional Contract documents are executed, the actual Indemnity language and Insurance Requirements may include additional provisions as deemed appropriate by City's Purchasing Agent. The City reserves the sole right to accept or reject any requests for modifications to these terms. 2. You should check with your Insurance advisors to verify compliance and determine if additional coverage or limits may be needed to adequately insure your obligations under this agreement. These are the minimum required and do not in any way represent or imply that such coverage is sufficient to adequately cover the DB Entity's liability under this agreement. The full coverage and limits afforded under DB Entity's policies of Insurance shall be available to Buyer and these Insurance Requirements shall not in any way act to reduce coverage that is broader or includes higher limits than those required. The Insurance obligations under this agreement shall be: 1 — all the Insurance coverage and limits carried by or available to the DB Entity; or 2 — the minimum Insurance requirements shown in this agreement, whichever is greater. Any insurance proceeds in excess of the specified minimum limits and coverage required, which are applicable to a given loss, shall be available to City. 3. DB Entity shall furnish the City with original Certificates of Insurance including all required amendatory endorsements and a copy of the Declarations and Endorsement Page of the CGL policy listing all policy endorsements to City before work begins. City reserves the right to require full -certified copies of all Insurance coverage and endorsements. I. INDEMNIFICATION: City and its respective elected and appointed boards, officials, officers, agents, employees, and volunteers (individually and collectively, "Indemnitees") shall have no liability to DB ENTITY or any other person for, and DB ENTITY shall indemnify, defend, protect, and hold harmless Indemnitees from and against, any and all liabilities, claims, actions, causes of action, proceedings, suits, damages, judgments, liens, levies, costs, and expenses of whatever nature, including reasonable attorney's fees and disbursements (collectively, "Claims"), which Indemnitees may suffer or incur or to which Indemnitees may become subject by reason of or arising out of any injury to or death of any person(s), damage to property, loss of use of property, economic loss, or otherwise occurring as a result of or allegedly caused by the DB ENTITY'S performance of or failure to perform any services under this Agreement, or by the negligent or willful acts or omissions of DB ENTITY, its agents, officers, directors, or employees, committed in performing any of the services under this Agreement. If any action or proceeding is brought against Indemnitees by reason of any of the matters against which DB ENTITY has agreed to indemnify Indemnitees as provided above, DB ENTITY, upon notice from City, shall defend Indemnitees at its expense by counsel acceptable to City, such acceptance not to be unreasonably withheld. Indemnitees need not have first paid for any of the matters to which Indemnitees are entitled to indemnification in order to be so indemnified. The limits of the insurance required to be maintained by DB ENTITY in this Agreement shall not limit the liability of DB ENTITY hereunder. The provisions of this section shall survive the expiration or earlier termination of this agreement. The provisions of this section do not apply to Claims occurring as a result of the City's active negligence or acts of omission. II. INSURANCE DB ENTITY shall maintain and submit certificates of all applicable insurance including, but not limited to, the following and as otherwise required by law. The terms of the insurance policy or policies issued to provide the above insurance coverage shall provide that said insurance may not be amended or canceled by the carrier, for non-payment of premiums or otherwise, without thirty (30) days prior written notice of amendment or cancellation to the CITY. In the event the said insurance is canceled, the DB ENTITY shall, prior to the cancellation date, submit to the City Clerk new evidence of insurance in the amounts established. Liabilitv Insurance During the entire term of this Agreement, the DB ENTITY agrees to procure and maintain General Liability insurance at its sole expense to protect against loss from liability imposed by law for damages on account of bodily injury, including death therefrom, suffered or alleged to be suffered by any person or persons whomsoever, resulting directly or indirectly from any act or activities, errors or omissions, of the CITY, or DB ENTITY or any person acting for the CITY, or under its control or direction, and also to protect against loss from liability imposed by law for damages to any property of any person caused directly or indirectly by or from acts or activities of the CITY, or DB ENTITY or any person acting for the CITY, or under its control or direction. Such public liability and property damage insurance shall also provide for and protect the CITY against incurring any legal cost in defending claims for alleged loss. Such General, Public and Professional liability and property damage insurance shall be maintained in full force and effect throughout the term of the Agreement and any extension thereof in the amount indicated above or the following minimum limits: Commercial General Liability Insurance, including coverage for Premises and Operations, Contractual Liability, Personal Injury Liability, Products/Completed Operations Liability, and Independent Contractors' Liability (if applicable), in an amount of not less than two million dollars ($2,000,000.00) per occurrence, four million dollars ($4,000,000.00) annual aggregate, written on an occurrence form. Products/Completed Operations coverage shall extend a minimum of three (3) years after project completion. Coverage shall be included on behalf of the DB ENTITY for covered claims arising out of the actions of independent contractors. If the DB ENTITY is using subcontractors, the policy must include work performed "by on or behalf" of the DB ENTITY. Policy shall contain no language that would invalidate or remove the DB ENTITY's duty to defend or indemnify for claims or suits expressly excluded from coverage. Policy shall specifically provide for a duty to defend on the part of the DB ENTITY. Worker's Compensation Insurance The DB ENTITY shall procure and maintain, at its sole expense, Worker's Compensation Insurance in the amount of $1,000,000 per occurrence or in such amount as will fully comply with the laws of the State of California and which shall indemnify, insure and provide legal defense for both the DB ENTITY and the CITY against any loss, claim or damage arising from any injuries or occupational diseases happening to any worker employed by the DB ENTITY in the course of carrying out the work within the Agreement. Such insurance shall also contain a waiver of subrogation naming the City of Santa Clarita. Automotive Insurance The DB ENTITY shall procure and maintain, at its sole expense, throughout the term of this Agreement, and any extension thereof, public liability and property damage insurance coverage for automotive equipment with coverage limits of not less than $1,000,000 combined single limit for each accident. All such insurance shall be primary insurance and shall name the City of Santa Clarita as an additional insured. Pollution Liabilitv and/or Asbestos Pollution Liabilitv and/or Errors & Omissions DB Entity's Pollution Liability and/or Asbestos Pollution Liability and/or Errors & Omissions with limit no less than $2,000,000 per claim or occurrence and $2,000,000 aggregate per policy period of one year. Coverage must be included for bodily injury and property damage, including coverage for loss of use and/or diminution in property value, and for clean-up costs arising out of, pertaining to, or in any way related to the actual or alleged discharge, dispersal, seepage, migration, release or escape of contaminants or pollutants, arising out of or pertaining to the services provided by DB ENTITY under this Agreement, including the transportation of hazardous materials or contaminants. Professional Liabilitv (if Design -Build Professional Liability Insurance, insuring against professional errors and omissions arising from DB ENTITY'S work on the Project, in an amount not less than [$2,000,000] combined single limit for each occurrence. If DB ENTITY cannot provide an occurrence policy, DB ENTITY shall provide insurance covering claims made as a result of performance of work on this Project and shall maintain such insurance in effect for not less than three years following final completion of the Project. Waiver of Subrogation All insurance coverage maintained or procured pursuant to this Agreement shall be endorsed to waive subrogation against the CITY, its elected or appointed officers, agents, officials, employees and volunteers or shall specifically allow DB ENTITY or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. DB ENTITY hereby waives its own right of recovery against the CITY, and shall require similar written express waivers and insurance clauses from each of its subconsultants. Ser)aration of Insureds A severability of interests provision must apply for all additional insureds ensuring that DB ENTITY's insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the insurer's limits of liability. The policy(ies) shall not contain any cross -liability exclusions. Pass Through Clause DB ENTITY agrees to ensure that its subconsultants, subcontractors, and any other party involved with the project who is brought onto or involved in the project by DB ENTITY, provide the same minimum insurance coverage and endorsements required of DB ENTITY. DB ENTITY agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. DB ENTITY agrees that upon request, all Agreements with consultants, subcontractors, and others engaged in the project will be submitted to the CITY for review. Self -Insured Retentions Any self -insured retentions must be declared to and approved by the CITY. The CITY reserves the right to require that self -insured retentions be eliminated, lowered, or replaced by a deductible. Self-insurance will not be considered to comply with these specifications unless approved by the CITY. Primary and Additional Insured All of such insurance shall be primary and shall name the City of Santa Clarita as additional insured. A Certificate of Insurance and an additional insured endorsement (for general and automobile liability), evidencing the above insurance coverage with a company acceptable to the City's Purchasing Agent shall be submitted to the CITY prior to execution of this Agreement on behalf of the CITY. Requirements Should DB ENTITY, for any reason, fail to obtain and maintain the insurance required by this Agreement, CITY may obtain coverage at DB ENTITY'S expense and deduct the cost of such insurance from payments due to DB ENTITY under this Agreement or terminate. In the alternative, should DB ENTITY fail to meet any of the insurance requirements under this Agreement, CITY may cancel the Agreement immediately with no penalty. Should DB ENTITY's insurance required by this Agreement be canceled at any point prior to expiration of the policy, DB ENTITY must notify CITY within 24 hours of receipt of notice of cancelation. Furthermore, DB ENTITY must obtain replacement coverage that meets all contractual requirements within 10 days of the prior insurer's issuance of notice of cancelation. DB ENTITY must ensure that there is no lapse in coverage. If the operation under this Agreement results in an increased or decreased risk in the opinion of the City's Purchasing Agent, then the DB ENTITY agrees that the minimum limits herein above designated shall be changed accordingly upon request by the City's Purchasing Agent. The DB ENTITY agrees that provisions of this paragraph as to maintenance of insurance shall not be construed as limiting in any way the extent to which the DB ENTITY may be held responsible for the payment of damages to persons or property resulting from the DB ENTITY'S activities or the activities of any person or persons for which the DB ENTITY is otherwise responsible. I have read and understand the above requirements and agree to be bound by them for any work performed for the City. Authorized Signature: V(T( Date: 6 / 11 / 2 6 Printed Name: Reuben Lombardo DESIGNATION OF SUBCONTRACTORS/SUBCONSULTANTS PROPOSAL # RCS-25-26-P2018 Design & Build Project for Pioneer Oil Refinery City Project No. P2018 City of Santa Clarita, California Listed below are the names and locations of the places of business of each subcontractor, supplier, and vendor who will perform work or labor or render service in excess of Y: of 1 percent, or $10,000 (whichever is greater) of the prime contractor's total bid. If no Subcontractors will be used fill out the form with NA. Please add additional sheets if needed. Subcontractor El Camino DIR Registration No. 1000001647 Dollar Value of Work $148,000 Location and Place of Business 2001 W 14st Unit B, Long Beach CA 90813 Bid Schedule Item No's. Phase #1 Description of Work Concrete work License No. 922197 Exp. Date: / / 09/30/2610 Phone ( ) (562) 225-2419 Subcontractor DIR Registration No. Dollar Value of Work Location and Place of Business Bid Schedule Item No's: Description of Work License No. Exp. Date: / / Phone ( ) Subcontractor DIR Registration No. Dollar Value of Work Location and Place of Business Bid Schedule Item No'5: Description of Work License No. Exp. Date: / / Phone ( ) NOTE: A contractor or subcontractor shall not be qualified to propose on, be listed in a proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5 of the Labor Code. It is not a violation of this section for an unregistered contractor to submit a proposal that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 of the Labor Code at the time the contract is awarded. REFERENCES PROPOSAL # RCS-25-26-P2018 Design & Build Project for Pioneer Oil Refinery City Project No. P2018 City of Santa Clarita, California The following are the names, addresses, and telephone numbers of three public agencies for which proposer has performed work of a similar scope and size within the past 3 years. If the instructions on this form conflict with the references requested in the scope of work, the scope of work shall govern. Complete this form accordingly. Fill out this form completely and submit it with your proposal. I. Merced County 2222 M St, Merced, CA 95340 Name and Address of Owner / Agency Spenser Ivancich, CM, Merced County Department of Public Works; (209)385-7602 Name and Telephone Number of Person Familiar with Project $3,300,000.00 Restoration of historic windows, facade and stone 09/14/2025 Contract Amount Type of Work 2. Pasadena Civic Center, 300 E Green St, Pasadena, CA 91 101 Name and Address of Owner/ Agency Date Completed Naz Sabripour, Executive Director, Pasadena Center Operating Company (626)395-021 3 Name and Telephone Number of Person Familiar with Project $1 ,322,539.00 Window and facade restoration 04/30/2025 Contract Amount Type of Work Date Completed 3. Santa Ana City Council, 20 Civic Center Plaza, Santa Ana, CA 92701 Name and Address of Owner / Agency Ishan Patel, Project Manager (81 8)246-3481 Name and Telephone Number of Person Familiar with Project $1,620,171.00 Marble facade restoration 04/02/2025 Contract Amount Type of Work Date Completed The following are the names, addresses, and telephone numbers of all brokers and sureties from whom Proposer intends to procure insurance bonds: Gray Casualty & Surety Company, 1 225 W Causeway Approach, Mandeville, LA 70471 ; (504)780-7440 Proposer Warranty Statement: Standard State of California One (1) Year Construction Warranty. If there should be a difference between The City of Santa Clarita's minimum warranty and the Proposer's best warranty, the Proposer agrees to be bound by the warranty, which is most advantageous to the City of Santa Clarita. Contractor's License. The California Contractor's license number listed above has been issued to the undersigned Proposer. This license has not been revoked or suspended and is in full force and effect and authorizes the undersigned Proposer to perform the Work under these Contract Documents. If Proposer is a joint venture and has not yet been issued a license, indicate the license number to be used for the joint venture and attach documentation providing assurances that the license will be issued on or before the award of the Contract. The undersigned is/are a legally authorize representative(s) of the Design -Build Entity, and hereby certify that I am/we are submitting this Proposal in response to the Request for Proposals (RFP) issued by the City of Santa Clarita to design, manage and construct and the Project in accordance with the Contract Documents. I am/we are duly authorized to sign this Proposal on behalf of the above -named firm; that the Proposal has been checked for errors and omissions; I/we have read all the answers herein and know all of their contents; and that all information set forth in this Proposal and all attachments hereto are, to the best of my/our knowledge, true, accurate, current and complete as of its submission date The undersigned certifies and declares under penalty of perjury under the laws of the State of California, that the foregoing is true and correct, and that this declaration was executed in Los Angeles® County, California, on 6110/26 (Date). Tim Harris, Chief Operating Officer Signature Name and Title DESIGN -BUILD SIGNATURES PROPOSAL # RCS-25-26-P2018 Design & Build Project for Pioneer Oil Refinery City Project No. P2018 City of Santa Clarita, California No Proposal shall be accepted which has not been signed in ink in the appropriate space below. Select the appropriate legal structure for execution of the certification. 1. If Design -Build Entity is an INDIVIDUAL, sign here (include a notarized affidavit attesting to the authenticity of said signature): Printed Name: Signature: Title: Date: 2. If Design -Build Entity is a PARTNERSHIP or JOINT VENTURE, all general partners or members shall sign here (include a notarized affidavit attesting to the authenticity of said signatures). Partnership/Joint Venture Name: Member/Partner Name: Member/Partner Signature: Member/Partner Name: Member/Partner Signature: Member/Partner Name: Member/Partner Signature: Title: Date: Title: Date: Title: Date: 3. If Design -Build Entity is a CORPORATION, the duly authorized officer(s) shall sign as follows: The undersigned certify that they are respectively Chief Operating Officer (Title) and (Title) of the corporation named below; that they are designated to sign this SOQ Transmittal Cover Page by a resolution (attach a certified copy, with corporate seal, if applicable, notarized as to its authenticity or Secretary's Certificate of Authorization) for and on behalf of the below named CORPORATION, and that they are authorized to execute same for and on behalf of said CORPORATION. Corporation Name: Spectra Company Printed Name: Tim Harris Signature: _ Title: Gnn Date: 6 / 11 / 2 6 4. If Respondent is an OTHER legal entity, an authorized representative of the entity shall sign here (include a notarized affidavit attesting to the authenticity of said signatures). Entity Name: Printed Name: Signature: Date: 5. If the Design -Build Entity is a FIRM THAT HAS NOT YET BEEN FORMED, all entities and other parties proposed to comprise such Design -Build Entity shall sign here (include a notarized affidavit attesting to the authenticity of said signatures), the individual signatories making the certification described above on behalf of such entities/parties: Proposed Design -Build Entity Name: On Behalf of Proposed Member/ Partner Name: Printed Name: Title: Signature: Date: On Behalf of Proposed Member/ Partner Name: Printed Name: Title: Signature: Date: On Behalf of Proposed Member/ Partner Name: Printed Name: Title: Signature: Date: ACKNOWLEDGMENT & ACCEPTANCE OF SCOPE OF WORK PROPOSAL # RCS-25-26-P2018 Design & Build Project for Pioneer Oil Refinery City Project No. P2018 City of Santa Clarita, California By providing the three (3) required signatures below, the Contractor acknowledges full understanding, complete agreement to, and accepts in its entirety, all Scope of Work for the Design and Build Project for Pioneer Oil Refinery. The Contractor will be expected to perform maintenance practices and uphold the standards herein to the established Scope of Work throughout the length of the contract. *Supervisor's Signature: Date: * Estimator's Signature: p�lrC r, * Owner's Signature: * All three signatures required 6/11/26 Date: 6 / 11 / 2 6 Date: 6 / 11 / 2 6 CITY OF SANTA CLARITA DISCLOSURE STATEMENT PROPOSAL # RCS-25-26-P2018 Design & Build Project for Pioneer Oil Refinery City Project No. P2018 City of Santa Clarita, California The following information must be disclosed: 1. Ust the names of all persons having a financial interest in the Request for Proposals. Ray Adamyk, Tim Harris 2. If any person identified pursuant to No. 1 above is a corporation or partnership, list the names of all individuals owning more than ten percent of the shares in the corporation or owning any partnership interest in the partnership. N/A 3. If any person identified pursuant to No. 1 above is a non-profit organization or a trust, list the names of any persons serving as a director of the non-profit organization or as a trustee or beneficiary or trustor of the trust. N/A 4. Has the offeror had more than $250.00 worth of business transacted with any member of the City of Santa Clarita staff, boards, commissions, committees, and Council within the past twelve months? If yes, please indicate the person(s) with whom you have conducted business. NO NOTE: Attach additional pages as necessary. Signature of Offeror Tim Harris Print or Type Name of Offeror 6/10/26 Date EQUAL OPPORTUNITY/ AFFIRMATIVE ACTION STATEMENT PROPOSAL # RCS-25-25-P2018 Design & Build Project for Pioneer Oil Refinery City Project No. P2018 City of Santa Clarita, California The offeror hereafter described will not discriminate against any employee or applicant for employment because of race/color, national origin, sex, sexual preference, religion, age, or handicapped status in employment or the provisions of services. Signature Tim Harris, Chief Operating Officer Typed Name and Title SPECTRA HISTORIC CONSTRUCTION wm Company Profile Information, Licenses and Services . . . . . . . . . 3-4 Featured Projects Hearst Castle . . . . . . . . . . . . . . . . . . . . . . 5 Apple Tower Theatre . . . . . . . . . . . .. . . . . . 6 Santa Barbara Mission . .. . . . . . . . . . . . . . . 7 Pantages Theatre . . . . . . . . . . . . . . . . . . . . 8 El Capitan Theatre . . . . . . . . . . . . . . . . . . . 9 Catalina Casino . . . . . . . . . . . . . . . . . . . . 10 Gamble House . . . . . . . . . . . . . . . . . . . . 11 Hollywood Bowl . . . . . . . . . . . . . . . . . . . . 12 Culver Studios . . . . . . . . . . . . . . . . . . . . 13 Ennis House . . . . . . . . . . . . . . . . . . . . . . 14 Brand Library . . . . . . . . . . . . . . . . . . . . . 15 Irvine Ranch Historic Park . . . . . . . . . . . . . 16 Villa Riviera . . . . . . . . . . . . . . . . . . . . . . 17 Millennium Biltmore Hotel . . . . . . . . . . . . . . 18 Commercial Exchange . . . . . . . . . . . . . . . . 19 NoMad Hotel . . . . . . . . . . . . . . . . . . . . . 20 Urth Caffe . .. .. .. .. .. .. .. . .. .. .. . 21 Hercules Campus . . . . . . . . . . . . . . . . . . . 22 Museum of Man . . . . . . . . . . . . . . . . . . . . 23 Lopez Adobe . . . . . . . . . . . . . . . . . . . . . . 24 Team Biographies . . . . . . . . . . . . 25-30 Historic Projects List ......... 31-32 � I J SPECTRA SPECTRACOMPANY.COM • (800) 375-1771 PAGE 2 TSTORIC CONSTRUCTION Company Information Founded in 1985, Spectra Company is the leader in historic preser- vation, restoration and rehabilitation in the western United States offering a wide range of services including historic construction, materials restoration and preservation consulting. For over 30 years, Spectra Company has been entrusted with the rehabilitation of over 300 of the most cherished, historical, architectural and cultural landmarks in the country. Spectra is one of the few construction companies that self -per- form the entire spectrum of restoration services, which allows us to ensure skill, expertise, and quality control on every project. Our award -winning team includes over 150 in-house builders, craftsmen, and preservation professionals. Together we work to meet a shared goal to respect, restore, and revitalize our communities, one build- ing at a time. Spectra Company Headquarters 350 N Gorey Avenue, Pomona, CA West Coast's #1 "Historic" Contractor Preservation Award Winning Company Excellent Job Safety Record SPECTRA SPECTRACOMPANY.COM • (800) 375-1771 TSTORIC CONSTRUCTION Services I Historic CONSTRUCTION • DESIGN • General Contracting • Historic Construction • Design -Build • Adaptive Reuse • Structural Retrofit • Facade Rehabilitation MATERIALS RESTORATION • Stone • Marble • Granite • Terra -Gotta • Masonry • Brick • Adobe • Concrete • Bronze • Brass • Copper • Ornamental Metal • Ornamental Plaster • Architectural Woodwork • Finish Carpentry • Decorative Tile • Mosaics • Doors • Windows • Sculptures • Fountains • Decorative Painting • Murals • Conservation • Gilding • Faux Finishing PRESERVATION CONSULTING • Preconstruction Services • Building Assessment and Investigation • Budget and Cost Estimating • Surveys and Feasibility Reports • Salvaging and Cataloging • Licensed Drone Investigation License Classifications General Contractor Licenses CALIFORNIA — 605280 NEVADA — 0075007 ARIZONA — 285869 Masonry License HAWAI I Architect Licenses CALIFORNIA ARIZONA LEED Accredited Professional California Classifications B-1 General Contractor C-17 Glazing C-29 Masonry/Adobe C-33 Painting and Decorating C-35 Lathing and Plastering C-39 Roofing and Waterproofing C-54 Tile (Ceramic and Mosaic) Lead and Mold Certified SPECTRA SPECTRACOMPANY.COM • (800) 375-1771 PAGE 4 TSTORIC CONSTRUCTION i Hearst Castle Hearst Castle was built by newspaper magnate William Randolph Hearst and de- signed by architect Julia Morgan. Construction began on the 250,000-acre estate in 1919 and the mansion became famous for hosting the Hollywood and political elite of the day. After Hearst left due to his ailing heath, the mansion was donated and is currently operated by the California Department of Parks and Recreation which offers daily tours of the estate. Spectra worked on the castle to complete stone restoration at the window sills and door thresholds, stained glass restoration, preservation consulting, preconstruction documentation, and construction monitoring. SCOPE OF WORK Materials Restoration Preconstruction & Design Preservation Consulting Self -Perform Stone Wood Windows San Simeon, CA California Deptartment of Parks & Recreation SPECTRA TUSTORIC CONSTRUCTION El Apple Tower Theatre The Tower Theatre was designed in 1927 by architect Charles Lee, who modeled the interior after the Paris Opera House. It was the first theater in Los Angeles to be wired for talking pictures, as well as the first to have air conditioning. After the theater's closure in 1988, it sat abandoned for nearly 30 years. Today, after a 3-year renovation, it serves as the flagship Apple store for Los Angeles. Spectra catalogued, removed and reinstalled the historic plaster ceilings, railings and decorative elements in over 1,200 separate pieces. Spectra also surveyed and rehabilitated the terra-cotta exterior facade, including the previously removed clock tower. SCOPE OF WORK Building Condition Assessment Facade Rehabilitation Materials Restoration Ornamental Plaster Preservation Consulting Self -Perform Terra -Gotta Gruen and Associates SPECTRA TUSTORIC CONSTRUCTION PAGE 6 Santa Barbara Mission The Santa Barbara Mission was established on the Feast of Santa Barbara on December 4, 1786 as the tenth of the twenty-one California Missions to be founded by the Spanish Franciscans. A series of four missions have been built on the site. Santa Barbara Mission is the only mission to remain under the leadership of the Franciscan Friars since its founding. Today, the mission is a parish church of the Archdiocese of Los Angeles. The church underwent restoration and Spectra joined the design team to complete the rehabilitation. Spectra performed masonry and adobe restoration as well as sandstone, lime wash, and lime plaster restoration. SCOPE OF WORK Adobe Facade Rehabilitation Masonry Plaster Self -Perform 2201 Laguna Street Santa Barbara, CA California Preservation Foundation Governor's Award SPECTRA TUSTORIC CONSTRUCTION Pantages Theater Designed by B. Marcus Priteca, the almost 2,700-seat Art Deco Pantages The- atre opened in Hollywood in 1930. The lavish auditorium and stunning lobby of the theatre has attracted touring musicals and concerts, and became a symbol of Hollywood's golden age where the Academy Awards and multiple movie premieres have taken place. Spectra Company completed the facade restoration and restoration of many other historic materials. SCOPE OF WORK Architectural Woodwork Plaster Concrete Repair Restoration Painting & Coatings Decorative Metal Selective Demolition/Abatement Facade Rehabilitation Self -Perform Materials Restoration Stone Metal Door Tile Metal Windows Wood Doors Ornamental Plaster 6233 Hollywood Boulevard geles, CA eaerianaer SPECTRA SPECTRACOMPANY.COM (800) 375-1771 HiSTURIC COYtlTkI1GTIUN ".GE 8 E1 Capitan Theatre The "Father of Hollywood', Charles Toberman, and his associate Sid Grauman built the El Capitan Theatre and Office Building in 1926 as well as the famous Egyptian and Chinese Theatres. The cast concrete Spanish Colonial Churri- gueresque facade makes this historic building stand out amidst the National Register Hollywood Boulevard Commercial and Entertainment District. Within its first ten years of existence, one hundred and twenty plays were produced at the theatre. The El Capitan Theatre is now home to "Disney' world premieres and other special events. Spectra has completed a wide variety of services on the El Capitan in recent years including restoration of damaged cast stone figures and recasting of missing portions of damaged statues, preservation consulting, metal restoration, decorative paint finishes, and restoration painting as well as ongoing annual maintenance. SCOPE OF WORK Concrete Repair Decorative Concrete Decorative Metal Decorative Paintings & Murals Estimating & Value Engineering Facade Rehabilitation General Contracting Materials Restoration Metal Windows Plaster Preconstruction & Design Preservation Consulting Restoration Painting & Coatings Self -Perform Waterproofing/Roofing 6838 Hollywood Boulevard Hollywood, CA • aPornia Capital EC, LLC G. Albert Lansburgh & Stiles 0. Clements JAG Architects , Inc. SPECTRA SPECTRACOMPANY.COM (800) 375-1771 HiSTURIC COYtlTkI1GTIUN Catalina Casino Built by chewing gum magnate William Wrigley Jr, the Catalina Casino is an Art Deco/Mediterranean Revival style circular building. The casino, meaning gathering place', was originally designed as a movie theater for films with sound. The 12-story building also has a ballroom on the upper level, adorned with sterling silver and gold -leaf accents. Spectra completed a wide variety of services as part of its rehabilitation, includ- ing facade restoration, ornamental cast stone, decorative painting, faux finish, structural repairs, and preservation consulting. SCOPE OF WORK Brick Concrete Repair Decorative Metal Decorative Paintings & Murals Facade Rehabilitation Lighting & Chandeliers Materials Restoration Ornamental Plaster Plaster Preservation Consulting Restoration Painting & Coatings Self -Perform Stone Structural Retrofit Waterproofing/Roofing Wood Doors Wood Windows - SPECTRA TUSTORIC CONSTRUCTION SPECTRACOMPANY.COM • (800) 375-1771 NAM i Gamble House Often described as "Americas Arts and Crafts masterpiece", the Gamble House stands today as one of the most famous and beloved historic houses in America. David and Mary Gamble commissioned the house to be built in 1908 by archi- tects Charles and Henry Greene. The Greene brothers presented a breakthrough in American architectural design featuring Japanese woodwork and inspiration drawn from nature. The house features wide terraces, sleeping porches, and large overhanging eaves. The home underwent a complete exterior rehabilitation that was overseen by an experienced team of historic architects, consultants and conservators. Some of the finest examples of architectural woodwork exists at the Gamble House. The Spectra team on this restoration project consisted of expert artisans who worked to restore, replicate and refinish the most intricate of architectural woodwork. SCOPE OF WORK Architectural Woodwork Conservation Materials Restoration Selective Demolition/Abatement Self -Perform Waterproofing/Roofing Wood Doors Wood Windows ., 4 Westmoreland Place Pasadena, CA • City of Pasadena • ' • mm m GI Greene and Greene Architects No •• • re, Inc., Griswold Conservation Associates. LLC SPECTRA SPECTRACOMPANY.COM (800) 375-1771 HiSTURIC COYtlTkI1GTIUN ,E 11 Hollywood Bowl The Hollywood Bowl is the world's largest outdoor amphitheater. It may be the official summer home to the Los Angeles Philharmonic, but it is famously known for hosting famous musicians, dancers, and entertainers throughout the year. The original Hollywood Bowl, which opened on July 11 in 1922, was a wooden platform with a canvas top, surrounded by moveable benches for the audience. In 2004, after continued degradation of the shell's acoustics, the architectural firm of Hodgetts and Fung designed a replacement shell incorporating the prominent front arch of the 1926 design, the wide layout of the 1928 shell, and the white finish of the 1929 design. Spectra completed concrete restoration of the buttress, metal restoration, and tile restoration. SCOPE OF WORK Concrete Repair Self -Perform Decorative Metal Tile Materials Restoration 2301 N Highland Avenue geles, CA Philharmonic Association Allied Architects Bill Caskey & Associates, Inc. (Buttress and Railing Restoration to Scope) rrrrri HISTORIC PRESERVATION ARCHITECT ENEARL TOR 1 • • SPECTRA SPECTRACOMPANY.COM (800) 375-1771 HiSTURIC COYtlTkI1GTIUN PAGE 12 Culver Studios Culver Studios is a movie studio lot originally created by silent movie pioneer Thomas H. Ince in 1918. The first structure to go up on the lot was `The Man- sion', which is a colonial style building that was modeled after George Washing- ton's home at Mount Vernon. Over the years, a theater, multiple bungalows and a blacklot for outdoor sets were added to the property. The lot went through a redevelopment and Culver Studios is now home to Amazon's Los Angeles area operations. Spectra Company rehabilitated the main mansion, including a major structural retrofit that was carefully concealed. In addition, four of the historic bungalows were relocated and rehabilitated along with several more historic buildings. SCOPE OF WORK Architectural Woodwork Building Relocation Facade Rehabilitation Self -Perform Structural Retrofit Kaplan Chen Kaplan r r NIff SPECTRA TUSTORIC CONSTRUCTION PAGE 13 tea. Frank Lloyd Wright's Ennis House Frank Lloyd Wright's Ennis House is one of four `textile block' homes in Los Angeles, constructed with patterned concrete blocks that give a unique texture to the exterior facade. The house consists of an estimated 27,000 to 40,000 of these concrete blocks. After the condition of the house deteriorated from earthquake and rain damage, it was listed on the National Trust for Historic Preservation's most endangered places. Spectra Company contributed to the restoration, which included structural upgrades, materials restoration and new roofing, conservation of the textile blocks, window and door restoration, exterior cleaning, and hardware restoration. SCOPE OF WORK Architectural Woodwork Concrete Repair Decorative Concrete Decorative Metal Facade Rehabilitation Materials Restoration Metal Door Restoration Painting & Coatings Selective Demolition/Abatement Self -Perform Stone Waterproofing/Roofing Wood Doors Wood Windows 2607 Glendower Avenue John Fidler Preservation Technoloav SPECTRA SPECTRACOMPANY.COM (800) 375-1771 HiSTURIC COYtlTkI1GTIUN w � s a ��� ���i ►��1 F*�1 IFwa r��j ►*1w�i � e � i s�a� her r a i ' r �. F .:,! :., ,. 1'E!! ►# i # F.i E. F# ! # P# IF# Ip # Fit F! M F i .i.. i, .i.. • is •iY. � rl- •i. .*- .� i iL. ■ • .yp. r!a ems' .M. * .�. .Rp W .. Brand Library At the base of the Verdugo Mountains lays a 5,000 square foot mansion built by Leslie Coombs Brand in 1904. Otherwise known as El Miradero, which means "vantage point", the mansion represents the unique Indo-Saracenic architectural style influenced by Islamic and Indian design, including repeated scalloped arches. When Brand passed away in 1925, he donated the house and its surrounding 488 acres to the City of Glendale to be used as a public library and public park. By 1956, the house was converted into the library that still stands today. Spectra proudly completed restoration work of its historic features during the project including exterior ornamental plaster and re-creation of the historic ceiling murals found throughout the library. The murals were rediscovered upon removal of suspended ceilings that kept them hidden for decades. SCOPE OF WORK Architectural Woodwork Conservation Decorative Paintings & Murals Facade Rehabilitation Materials Restoration Ornamental Plaster Plaster Restoration Painting & Coatings Self -Perform Wood Doors Wood Windows 0 qL0 "1II 1601 W Mountain Street Glendale, CA ndale 111I Leslie C. Brand Gruen and Associates Spectra Company SPECTRA TUSTORIC CONSTRUCTION SPECTRACOMPANY.COM • (800) 375-1771 Conservancy Irvine Ranch Historic Park The Irvine Ranch was established by James Irvine in the 1860's. Over the years, multiple buildings were added to accommodate the success of farming operations that took place on the property. Irvine Ranch was once California's largest produc- ers of Valencia oranges, beans and barley. Spectra Company oversaw the rehabilitation of seven of the original Office build- ings as the General Contractor including: Mess Hall, Bath House, Early Office and several structures on Foreman's Row. The project included structural, site and accessibility improvements, and restoration of an original wallpaper mural. These structures now house the offices for the OC Parks Department. SCOPE OF WORK Architectural Woodwork Decorative Paintings & Murals Facade Rehabilitation General Contracting Restoration Painting & Coatings Selective Demolition/Abatement Self -Perform Structural Retrofit Wall -Coverings Waterproofing/Roofing Wood Doors Wood Windows SPECTRA SPECTRACOMPANY.COM (800) 375-1771 HiSTURIC COYtlTkI1GTIUN Villa Riviera The Villa Riviera was completed in 1929 as a residential stock co-operative apart- ment building. At the time, it was the second tallest building in Southern California only after Los Angeles City Hall. The building is one of the most significant landmarks in Long Beach and serves as the visual focal point and entrance to downtown Long Beach. Spectra completed a facade rehabilitation with a wide scope of restoration services including a complete re-creation of the ornate original bronze doors, based on historic photographs. Many of the grotesques were re-created from molds made from extant figures. SCOPE OF WORK Architectural Woodwork Concrete Repair Decorative Concrete Decorative Metal Decorative Paintings & Murals Facade Rehabilitation Lighting & Chandeliers Masonry Metal Door Ornamental Plaster Plaster Selective Demolition/Abatement Self -Perform Structural Retrofit Waterproofing/Roofing Wood Windows 800 E Ocean Boulevard Long Beach, CA Qm" ong eac Heritage Los Angeles Conservancy California Preservation Foundation SPECTRA TUSTORIC CONSTRUCTION SPECTRACOMPANY.COM • (800) 375-1771 Millennium Biltmore Hotel The Millennium Biltmore Hotel was built in 1923 by Schultze & Weaver. The exte- rior facade beautifully incorporates a combination of Spanish -Italian Renaissance Revival, Mediterranean Revival, and Beaux Arts styles. The detail of the interior is exquisite, with hand painted frescos, murals, carved marble fountains, lead crystal chandeliers, and caste bronze stairwells. Spectra completed decorative painting services including gilded finishes, metallic leaf, aging and color wash, faux bois, and stone finishes. The scope of the entire project includes conservation, cleaning, decorative painting, ornamental plaster, gilding -gold leaf, faux finish, mural restoration, and preservation consulting. SCOPE OF WORK Conservation Decorative Paintings & Murals Ornamental Plaster Plaster Preservation Consulting Restoration Painting & Coatings Self -Perform SPECTRA SPECTRACOMPANY.COM (800) 375-1771 HiSTURIC COYtlTkI1GTIUN Commercial Exchange The 13-story Commercial Exchange Building was designed by the architectural firm of Walker and Eisen. Completed in 1924, the building served as the headquar- ters of the Owl Drug Co., and housed the publishing company of "Tarzan" author Edgar Rice Burroughs. It was the tallest building in its area at the time and also boasted three high-speed elevators, offices with abundant light, elegant mahogany trim and millwork, and coveted two-hour street parking. Vacant since the mid-1980s, the building has now been converted by NY -based hotel developer Sydell Group into their new trendy hostels concept called "Free- hand." The iconic Commercial Exchange neon sign, one of the tallest in LA, was also restored as part of the project. Spectra performed the facade rehabilitation and restored historic ceilings, replicated and restored historic terra-cotta and brick unit masonry, restored and repainted decoratively painted plaster ceilings, and restored original building entrances that had been significantly altered. SCOPE OF WORK Adaptive Reuse Ornamental Plaster Decorative Concrete Plaster Decorative Metal Restoration Painting & Coatings Facade Rehabilitation Self -Perform Masonry Terra -Gotta 4 . s..m ell 44I A '' 416 W 8th Stre Los Angeles, CA SPECTRA SPECTRACOMPANY.COM (800) 375-1771 HiSTURIC COYtlTkI1GTIUN Los Angeles Conservancy it NoMad Hotel Located at the corner of Olive and 7th Street in Downtown Los Angeles, Giannini Place was the Los Angeles headquarters for the Bank of Italy. Acclaimed architec- ture firm Morgan, Walls & Clements was commissioned to design the new bank. Designed in the neoclassical style, the 12-story building features Doric columns, marble floors and an ornate golden -coffered ceiling in the main lobby. In 2015, the New York -based development firm Sydell Group purchased the abandoned office building. They launched an extensive project to adaptively re- habilitate the building into the chic NoMad Hotel. The space accommodates 250 guest rooms, a rooftop pool, an event deck, and street level restaurant and retail space. Spectra collaborated with Sydell Group, RD Olson, and KFA to restore the 1920's-era structure. SCOPE OF WORK Adaptive Reuse Metal Windows Brick Plaster Decorative Metal Restoration Painting & Coatings Facade Rehabilitation Self -Perform Masonry Stone Materials Restoration Terra -Gotta Metal Door Wood Windows SPECTRA SPECTRACOMPANY.COM (800) 375-1771 HiSTURIC COYtlTkI1GTIUN �riri�Ml Urth Caffe The Urth Caffe is located in the Old Town Historic District in Orange, which is California's largest National Register district. The building that houses it is one of the oldest contributing historic buildings within the district, with historic sites constructed there as early as 1888. Spectra Company, working as both the General and Restoration Contractor, performed several historic rehabilitation services including structural retrofit, facade rehabilitation, and restoration of original openings that were missing. Other services included ornamental metal restoration, sign fabrication, roof re- placement, both the restaurant and office tenant improvements, and restoring the entire storefront of the building, as close as possible, to its early 1900's period of significance. SCOPE OF WORK Adaptive Reuse Architectural Woodwork Brick Conservation Decorative Metal Decorative Paintings & Murals Design Build Estimating & Value Engineering Facade Rehabilitation Fountains General Contracting Lighting & Chandeliers Masonry Materials Restoration Preconstruction & Design Preservation Consulting Restoration Painting & Coatings Selective Demolition/ Abatement Self -Perform Structural Retrofit Themed Construction Tile Waterproofing/Roofing Wood Doors Wood Windows 100 W Chapman A JiNfige, CA Towne Development, LLC Grimm & Chen Structural Engineering, Inc. servation Foundation SPECTRA SPECTRACOMPANY.COM (800) 375-1771 HiSTURIC COYtlTkI1GTIUN —7 Hercules Campus Hercules Campus, formerly known as Hughes Aircraft Company, was built in 1941 by Howard Hughes. This large 28-acre campus with 530,000 combined square feet of space was used to produce aircraft, atmospheric entry probes, and guided missiles, to name a few. The campus underwent restoration in recent years to adaptively reuse it for corporate office use. Spectra started working on the campus in 2015 to restore the metal and wood windows and continued to finish a wide scope of work on many of the buildings on campus including the interior restoration of Howard Hughes' office. SCOPE OF WORK Adaptive Reuse Self -Perform Architectural Woodwork Waterproofing/Roofing Facade Rehabilitation Wood Doors Metal Door Wood Windows Metal Windows Restoration Painting & Coatings 12101 Bluff �+ Creek Drive ........ ......... ...... Los Angeles. CA geles Los Angeles Conservancy ructural Focus SPECTRA TUSTORIC CONSTRUCTION Museum of Man In 1915 The Story of Man through the Ages exhibit showed at the Panama -California Exposition. The museum's name was later changed to the San Diego Museum of Man due to the museum's concentration on anthropology. During World War II, the museum was converted into a hospital and later returned to its original state in 1951. Spectra Company assisted with the museum's facade restoration including restoring wood windows, timber beam restoration, replication of ornamental cast stone, ceramic tile, and restoration on the dome. SCOPE OF WORK Concrete Repair Decorative Concrete Facade Rehabilitation Masonry Materials Restoration Self -Perform Tile Waterproofing/Roofing Wood Windows Spectra Company >- n`14nn n T n imm M American Public Works Association SPECTRA SPECTRACOMPANY.COM (800) 375-1771 HiSTURIC COYtlTkI1GTIUN Lopez Adobe The Lopez Adobe was completed in 1883 by Valentin Lopez. It is one of the oldest private residences, and the first two-story adobe built as a residence in the San Fernando Valley. Spectra Company assisted with the restoration of the Lopez Adobe by replicating, repairing and structurally stabilizing the adobe walls, as well as other wood restoration. SCOPE OF WORK Adobe Architectural Woodwork Facade Rehabilitation Materials Restoration Plaster Restoration Painting & Coatings Self -Perform Structural Retrofit Wood Doors Wood Windows Governor's Award SPECTRA TUSTORIC CONSTRUCTION Ray Adamyk Chief Executive Officer Ray Adamyk began his career in construction at the young age of 15, working with his uncle in Canada. At 25, he visited the state of California to train for a triathlon and ultimately decided to call the golden state home. Ray then utilized his adept construction and business experience, combined with his love for historic structures, to start Spectra Company in 1985. He has since grown Spectra into the largest historic construction company on the West Coast. Ray believes historic structures are the key to defining and preserving the character and legacies of communities. His philosophy has become both the company's culture and mission: Respect, Restore & Revitalize. He served on the Board of Trustees for the CaliformaPreservation Foundation from 2008 to 2014, holds memberships in the Association for Preservation Technology International, National Trust for Historic Preservation, California Preservation Foundation, Los Angeles Conservancy, Western Association for Art Conservation, and AIA LA Affiliation. His historic preservation projects have received recognition from the National Trust of Historic Preservation, California Preservation Foundation, Los Angeles Conservancy, Long Beach Heritage, and Pasadena Heritage. Tim Harris Chief Financial Officer Tim Harris works as the Chief Financial Officer for Spectra Company. Tim is responsible for the oversight and management of Spectra Company personnel. He manages the logistics of the company, oversees systems development, organiza- tional structure, and has more than 10 years of experience with historic preserva- tion projects and with Spectra Company. Tim is a graduate of Western Michigan University and holds a Degree in Business Management. As the manager of the project management, administration and scheduling staff, he is integrally responsible for the successful completion of all Spectra projects. Tim is also directly accessible to all clients, coordinating with them to foster great working relationships and client satisfaction. 4 £ry . rw u SPECTRA SPECTRACOMPANY.COM • (800) 375-1771 TSTORIC CONSTRUCTION Reuben Lombardo Senior Preservation Estimator Reuben Lombardo works as the Senior Preservation Estimator for Spectra Company. He has extensive experience, and is a key team member of developing and maintaining Spectra's high standards of preservation practices. Having a Master of Fine Art from UCLA and being a hands-on restoration crafts- man for many years, his areas of expertise include ornamental concrete and plaster, terra-cotta and tile, historic murals and decorative painting, sculptures, mold -mak- ing, stone, wood, and metal restoration. He has shared his expertise in the historic field by serving two terms on the Board of Directors for WCAPTI (Western Chapter of the Association of Preservation Technologies) and participated in multiple pre- sentations and workshops on the restoration/preservation of historic structures for WCAPT, APTI, CPF, LA Conservancy, APF (Arizona Preservation Foundation) and ACI (American Concrete Institute). Reuben's numerous restoration projects include: • Hoover Dam Exhibit Hall, Boulder City, NV • Catalina Casino, Avalon, CA • Museum of Man, San Diego, CA • Greystone Mansion, Beverly Hills, CA • Millennium Biltmore Hotel, Los Angeles, CA Dick Gee, AIA, Leed AP Historic Architect and Project Manager Hearst Castle, San Simeon, CA Calte(h Linde Robinson Lab, Pasadena, CA Pantages Theatre, Hollywood, CA Ennis House, Los Angeles, CA Santa Barbara Mission, Santa Barbara, CA Dick Gee works as the Lead Architect as well as a Project Manager for Spectra Company. Having spent most of his career as an architect, he has over 32 years of experience in architecture and is qualified as a Historic Preservation Architect under the Secretary of Interior's Professional Qualifications Standards. He is a licensed architect in California and Arizona, and has previously served as the lead principal of the Los Angeles office for JAG Architects. As a Project Manager for Spectra, Dick oversees preservation consulting, design -build and historic construction projects, adding a broad range of experience to enhance owner, architect, engineer and historic consultant collaboration. All in all, he has over 30 years of experience working on historic projects. Dick has been awarded California Preservation Foundation, Los Angeles Conservancy, and local preservation awards for numerous projects. He brings a unique comprehensive understanding to preservation projects, having worked on every aspect from design, approvals, preparing historic tax credit applications, construction and development. Some of his preservation projects at Spectra include: Commercial Exchange Building, Los Angeles, CA Ocean Center Building, Long Beach, CA Crystal Cove Cottages, Newport Coast, CA Porter Hall at Pilgrim Place, Claremont, CA • Culver Studios, Culver City, CA San Ysidro Land Port of Entry, San Ysidro, CA El Capitan Theatre, Hollywood, CA Urth Caffe, Orange, CA George Key Ranch Historic Park, Placentia, CA San Gabriel Mission, San Gabriel, CA NoMad Hotel, Los Angeles, CA Pala Tribe Historic Buildings, Pala, CA SPECTRA SPECTRACOMPANY.COM 800) 3/5-1; HiSTURIC COYtlTkI1GTIUN John Tiersma Director of Construction John Tiersma has 39+ years -experience as a project manager and scheduler, adher- ing to plans and specifications, developing schedules, estimating, and preparing and negotiating contracts. He is responsible for all aspects of design and construction, from start to finish, as well as managing team members and supporting staff. As Director of Construction, John works directly with Spectra's project managers, su- perintendents and project engineers on developing and bidding general contracting projects. John has been the lead on many incredible projects such as: • Crystal Cove Cottages, Newport Coast, CA • YMCA'The Village', Pomona, CA • Hearst Castle, San Simeon, CA San Diego Police Department, San Diego, CA University House, San Diego, CA mmYV9Y""" Justin Warren Senior Project Manager Justin Warren works as the Senior Project Manager for Spectra Company. He joined the company in 2015 and came with over 20 years of experience in the construction industry. Having started in the residential arena, he soon transitioned to the commercial side of the industry. Although Justin's expertise is varied, his specialty and interest has always been architectural woodwork and finish carpentry. While most of his knowledge comes from hands-on experience, Justin holds a General Contractor license and previously managed his own General Contracting company. He has gone from a carpenter, to a foreman, onto a superintendent, and ultimately a project manager. His impeccable work ethic coupled with his experience and knowl- edge make him a key team member for Spectra Company. Justin has been involved with the following projects:with the following projects: • Crystal Cove Cottages, Newport Coast, CA • Beverly Hills High School, Beverly Hills, CA • CBS Columbia Square, Hollywood, CA • Clark Memorial Library of UCLA, Westwood, CA • Ford Theatre, Hollywood, CA • Ford Factory, Los Angeles, CA McKinley High School, Honolulu, HI Monterey Government Center, Salinas, CA NoMad Hotel, Los Angeles, CA Pigeon Point Lighthouse, Pes(adero, CA San Ysidro Customs House, San Ysidro, CA Tesoro Adobe, Valencia, CA SPECTRA SPECTRACOMPANY.COM SUU) 3/5-1; HiSTURIC COYtlTkI1GTIUN John Gonzalez Senior Estimator and Project Manager John Gonzalez works as a Senior Estimator and Project Manager for Spectra` Company specializing in waterproofing and production. John has worked in the 1000 restoration and waterproofing field for over 20 years. His reputation in the industry is unmatched as an expert in application and creative problem solving. His areas of specialty include waterproofing, leak analysis, deck coatings, wall coatings, epoxy/ grout injection, elastomeric coatings, below -grade and negative -side waterproofing. His knowledge and expertise make him a favorite of customers and consultants. Some of his projects with Spectra Company include: Alex Theatre, Glendale, CA Broadway Trade Center, Los Angeles, CA California African American Museum, Los Angeles, CA El Capitan Theatre, Hollywood, CA Greystone Mansion, Beverly Hills, CA Millennium Biltmore Hotel, Los Angeles, CA One Colorado, Pasadena, CA Mark Green Senior Superintendent • Pantages Theatre, Hollywood, CA Santa Barbara Mission, Santa Barbara, CA Villa Riviera, Long Beach, CA Mark Green works as a Senior Superintendent for Spectra Company and has over 30 years in the specialty historic construction industry. He has worked as owner liaison for field operations, leading weekly production meetings, developing and maintaining schedules, means and methods of production, subcontractor field management, layout of work, andensuring compliance with applicable building codes and standards. Mark is responsible for smooth and consistent transfer of information between company field team, project managers, and owner clients. During his tenure, he has overseen the following projects: Crystal Cove Cottages, Newport Beach, CA San Gabriel Mission, San Gabriel, CA Pomona YMCA, Pomona, CA Irvine Ranch Historic Park, Irvine, CA Breed Street Shul, Los Angeles, CA Leo Carrillo Ranch, Carlsbad, CA Los Penasquitos Ranch House, San Diego, CA Mother Colony House, Anaheim, CA Montanez Adobe, San Juan Capistrano, CA Porter Hall, Claremont, CA University House Adobe, La Jolla, CA Warner Springs Ranch, Warner Springs, CA Walker House, San Dimas, CA Culver Studios, Culver City, CA SPECTRA `�'' FUSTORIC CONSTRUCTION Andrew Franco Project Manager Andrew Franco works as a Project Manager for Spectra Company. He brings extensive management past and current experience from over 600 projects in the southwest region. His experience covers several bullet -resistant and security industries including financial institutions such as Bank of America and government buildings. Andrew's experience with financial and government projects is balanced with knowledge in healthcare, higher education, and utility facilities. Andrew developed his foundation in management at the San Joaquin Valley College where he received his degree in Construction Management and graduated as the Construc- tion Management Salutatorian. San Gabriel Mission, San Gabriel, CA Hotel Del Coronado, Coronado, CA Ocean Center Building, Long Beach, CA Breakers Building, Long Beach, CA Davis-Monthan Air Force Base, Tucson, AZ Rafael Barrios Project Manager and Estimator Las Vegas Metropolitan Police Department, Las Vegas, NV Orange County Sheriff's Department, Orange, CA Seattle Police Department Headquarters, Seattle, WA Rafael Barrios works as both a Project Manager and Estimator for Spectra Company. Rafael has been a professional in the construction industry for over 25 years. He is very wellversed in painting, drywall, carpentry, masonry, tile and granite, waterproofing, glazing, antique restoration and preservation. Rafael's dedication to his hands-on work lead him to managing and supervising large crews and projects, as well as estimating. His wide range of skills makes him an integral part of the Spectra Company team and his past experience as a construction supervisor enables him to bring intimate knowledge of what is required to be successful in the field. Rafael oversees significant construction and restoration projects for Spectra, such as: Bob Hope Patriotic Hall, Los Angeles, CA Broadway Trade Center, Los Angeles, CA Ennis House, Los Angeles, CA Globe Theatre, Los Angeles, CA Hollywood Palladium, Hollywood, CA Hoover Dam Exhibit Hall, Boulder City, NV Scotty's Castle, Death Valley, CA California Club, Los Angeles, CA Naco Land Port of Entry, Naco, AZ Douglas Land Port of Entry, Douglas, AZ Pioneer Oil Refinery, Santa Clarita, CA EM SPECTRA TUSTORIC CONSTRUCTION Historic Projects List Agua Dolce, CA Ranger Residence — Vasquez Rocks Alhambra, CA LA Department of Public Works HQ Sacred Heart House Amador City, CA Amador City Firehouse Anaheim, CA Anaheim Cemetery Anaheim Packing House Mother Colony House of Founders' Park Packard Building Arcadia, CA LA County Arboretum Santa Anita Racetrack Avalon, CA Catalina Casino Elmer Gray House Berkeley, CA UC Berkeley Bowles Hall Beverly Hills, CA 421 N Beverly Drive Beverly Hills City Hall Beverly Hills Electric Fountain Beverly Hills High School First Bank of Beverly Hills Golden Triangle Building Greystone Mansion Saban Theater/Fox Wilshire Theater North Linden Drive Peninsula Hotel Tiffany & Co. Virginia Robinson Gardens Wallis Annenberg Center for the Performing Arts (Beverly Hills Post Office) Boulder City, NV 100 & 200 Date Street Hoover Dam Exhibit Hall Hoover Dam Penstock Anchors Burbank, CA 303 N Glen Oaks Boulevard Calabasas, CA King Gillette Ranch Calexico, CA Calexico Customs House Cupola Carlsbad, CA Carlsbad Community Church Century City, CA Fox Studios Claremont, CA Padua Hills Theatre Porter Hall (Pilgrim Place) Coronado, CA Hotel Del Coronado Culver City, CA Culver Studios - Presidio Kirk Douglas Theatre Eureka, CA Carson Block Eureka Veterans Memorial Hall Humboldt County Courthouse El Toro, CA El Toro Memorial Park Flintridge, CA Flintridge Sacred Heart Academy Fullerton, CA Fullerton Fox Theatre John Hetebrink House Muckenthaler Cultural Center Union Bridge Glendale, CA 527 Whiting Woods Road Alex Theatre Brand Library Forest Lawn Cemetery Glendale Masonic Temple Hunter Residence John Lautner House — Schaffer Residence Guasti, CA Guasti Mansion Hancock Park, CA Dorothy Chandler House Hollywood, CA Assistance League Theater Baby Banana Tree Sculpture CBS Columbia Square Celebrity Theatre/Sunset & Vine El Capitan Theatre & Office Building Fonda Theater Ford Theatre Frolic Room Bar Hollywood Bowl Hollywood Bungalows Hollywood Celebrity Center Hollywood Heritage Museum Hollywood Masonic Temple Hollywood Musicians Union Hollywood Palladium Louis B. Mayer Building Pantages Theatre Roosevelt Hotel Second Home Hollywood Security Pacific Building Sunset Bronson Studios Sunset Church Taft Building Television Center Vine Campus Honolulu, HI Jah Pavilion McKinley High School Inglewood, CA Inglewood Park Cemetery Irvine, CA Irvine Historical Museum Irvine Ranch Jurupa Valley, CA Crestmore Manor La Jolla, CA Shops at La Jolla Village St. James by -the -Sea Episcopal Church Wisteria College La Verne, CA Price House Laguna Beach, CA Casa Laguna Hotel & Spa Victoria Beach Tower Las Vegas, NV Westside School Lincoln Heights, CA Lincoln Park Gateway Long Beach, CA 110 E Ocean Boulevard 144 N Savona Walk All Saints Anglican Cathedral Breakers of Long Beach Christian Outreach in Action Center Famous Department Store Farmers & Merchants Bank Jergins Pillars Jergins Trust Building Ocean Center Building Polytechnic High School Villa Riviera Walker Building Los Altos Hills, CA Stegner Studio Los Angeles, CA 11753 San Vicente 15th Street Middle School 1850 N Cherokee 28th Street YMCA 2500 W 7th Street 440 Seaton 6381 Hollywood Boulevard 740 S Broadway 960 N La Brea Avenue AC Hotel Beverly Hills Ace Hotel African American Museum Alameda Square Building Aon Center Biltmore Hotel Biscuit Company Lofts Bixel House Blackwelder Building Bob Hope Patriotic Hall Boyle Heights City Hall Bradbury Building Brentwood Country Club Broadway Trade Center Bruin Theater Bryson Apartments California Market Center Cherokee Hotel Commercial Exchange Desmond Building Downtown Women's Center Ebell of Los Angeles El Dorado Lofts Ennis House Fine Arts Building Ford Factory FourFortyFour South Flower Gas Company Lofts George C. Page Museum Globe Theatre Golden State Insurance Building Hall of Justice Hall of Justice - Charles Manson Cell Hilton Checkers Hotel Hollenbeck Terrace (Santa Fe Coast Lines Hospital) Hotel Figueroa Hoxton Hotel La Marquise Los Angeles Law Library Los Angeles Times Center Metropolitan Lofts Metro Water District HQ Morissette Residence Mount St. Mary's College Mount St. Mary's College - Doheny Mansion Museum of Natural History National City Lofts NoMad Hotel (Bank of Italy) Norton Building Occidental College — James Swan Hall Occidental College — McKinnon Center Olympic Theatre One Bunker Hill Pacific Gas & Electric Building Paramount Plaza Public Storage Building Robertson Plaza Roosevelt High School Roosevelt Lofts ROW DTLA Rowan Building Santa Fe Lofts Schaber Cafeteria Schindler House Schindler House — MAK Center Southwest Museum St. Cecilia's Church St. James Park Apartments St. Paul's Lutheran Church Standard Hotel Starbucks Highland (Gilmore Gas Station) Superior Courthouse Temple Beth Temple Beth AM Sanctuary The Bloc —Mr. G s The MacArthur SPECTRA SPECTRACOMPANY.COM • (800) 375-1771 PAGE 31 TUSTORIC CONSTRUCTION Historic Projects List (CONTINUED) The Olympic Building Title Insurance and Trust Building Trademark Apartments Trademark Building UCLA Clark Memorial Library UCLA Hershey Hall UCLA Weyburn Hall Union Oil Building Union Station USC McDonald's Swim Stadium USC Tutor Campus Center VA Governor's Mansion VA LA National Cemetery Chapel Van Nuys Apartments Variety Arts Theater Venice High School Village Fox Theatre, Westwood Western Pacific Building Malibu, CA Adamson House Marina Del Rey, CA Marina Del Rey Seawall Monrovia, CA Monrovia Santa Fe Depot Monterey, CA California's First Theatre Hermann Hall Monterey Park, CA F&A Credit Union Needles, CA El Garces Harvey House Hotel & Depot Newell, CA Tule Lake Segregation Center Newport Coast, CA Crystal Cove Cottages North Hollywood, CA NoHo Weddington House Oakwood School Norwalk, CA Hargitt House Sproul House Museum Oak Park, CA Oak Park High School Oakland, CA Brick House Lofts Oceanside, CA Marine Corps Recruit Depot Ontario, CA Bank of Italy Frankish Building Orange, CA 101 E Chapman Avenue Bank of Italy Chapman Univ Digital Media Arts Center Chapman Univ Packing House Chapman Univ Smith Hall Cigar Mural Orange Grove Masonic Temple Orange Public Library Fountain Packing House of Chapman University Smith and Ebert Building Urth Caffe Wells Fargo Bank Woolworth Store Pala, CA Blacktooth House Calac Adobe Pasadena, CA 24 E Union Street 39 W Colorado Boulevard 595 E Colorado Boulevard Ambassador College Baby Banana Tree Sculpture Bank of the West (First Trust Bank Building) Bear Building Caltech —Alles Building Caltech —Baxter Building Caltech —Beckman Lab Caltech — Bridge Annex Caltech — Crellin Laboratory Caltech — Seeley G. Mudd Building Caltech — Thomas Lab Caltech — Tolman Bacher Compound Caltech — Linde + Robinson Lab Constance Hotel Gamble House Glenarm Power Plant Mayfield Senior School One Colorado Pasadena Federal Courthouse Robert Pitcairn, Jr. House Santa Fe Depot (Del Mar Station) Union Savings Building Western Asset Plaza Pescadero, CA Pigeon Point Lighthouse Penn Valley, CA South Yuba River Bridge Placentia, CA George Key Ranch House Kraemer Residence Playa Del Rey, CA Dickinson and Gillespie Building Playa Vista, CA Hercules Campus Pomona, CA The Lassie House Rancho Cucamonga, CA Etiwanda Pacific Electric Depot Toews Residence Redlands, CA Redlands Santa Fe Depot Render Building Reno, NV El Cortez Hotel University of Reno - Thompson Building Reseda, CA Mat House Riverside, CA California Baptist University — James Building Camp Anza Jensen -Alvarado Historic Ranch March Air Reserve Base Riverside County Courthouse Ryan Bonamino Park Stalder Building Salinas, CA Monterey Government Center San Bernardino, CA Santa Fe Depot San Clemente, CA Bartlett Building Casa Romantica San Diego, CA 1st Presbyterian Church of San Diego Andaz San Diego Bow Wave Fountain Broadway Fountain at Horton Plaza Casa de Balboa Christ United Presbyterian Church Guild Hotel Hotel Anza Hotel Churchill Kettner Lofts Museum of Man New Vision Church Old Police HQ Plaza Hotel Remmen House San Diego County Administration Center San Diego Gas & Electric San Diego Marine Base San Diego Marine Recruit Depot Scripps College Building Scripps Mercy Chapel Sempra Energy HQ Spreckels Organ Pavilion St. George Serbian Orthodox Church Weinberger Courthouse Wilkinson Building San Fernando, CA Lopez Adobe San Fernando Middle School San Francisco, CA 888 Brannan Street Building San Marino, CA San Marino Community Church San Simeon, CA Hearst Castle San Ysidro, CA San Ysidro Land Port of Entry Santa Ana, CA Old Orange County Courthouse Unknown Soldier Monument Building Santa Barbara, CA Santa Barbara Airport Santa Barbara Mission Santa Clarita, CA Santa Clarita Historic Jail House Santa Monica, CA 1305 2nd Street 2600 Colorado Avenue 2663 Main Street 3002 Main Street 3008 Main Street 423-429 Ocean Avenue Bradbury House Colorado Campus Marion Davies Guesthouse Mendota Block Oracle HQ Santa Monica City Hall Santa Monica Police Station Santa Monica Post Office Shotgun House Santa Paula, CA Hardison House Historic Barn Stanford, CA Stanford University Studio City, CA Sportsmen's Lodge Sylmar, CA Sylmar Women's Bridge Housing Tempe, AZ ASU University Club Torrance, CA Torrance High School Tustin, CA St. Cecilias Church Upland, CA Grove Theater Valencia, CA Tesoro Adobe Venice, CA Venice Suites — The Potter West Hollywood, CA 8899 Beverly Boulevard Westminster, CA Cathay Bank White Sands Missile Range, NM The Army Blockhouse Whittier, CA Andrews Elementary School Fred C. Nelles School SPECTRA SPECTRACOMPANY.COM • (800) 375-1771 PAGE 32 TUSTORIC CONSTRUCTION SPECTRA HISTORIC CONSTRUCTION respect. restore. revitalize, SPECTRA COMPANY 350 N GAREY AVE #101 POMONA, CA 91767 SPECTRACOMPANY.COM z '5 (800) 375-1771