HomeMy WebLinkAbout2026-07-14 - AGENDA REPORTS - PIONEER OIL REFINERY RESTORATION PROJ P2018 DESIGN BUILD CONTRAgenda Item• 15
CITY OF SANTA CLARITA
.` AGENDA REPORT
CONSENT CALENDAR
CITY MANAGER APPROVAL:
DATE: July 14, 2026
SUBJECT: PIONEER OIL REFINERY RESTORATION, PROJECT P2018 -
DESIGN/BUILD CONTRACT
DEPARTMENT: Recreation and Community Services
PRESENTER: Lance O'Keefe
RECOMMENDED ACTION
City Council:
1. Award a design -build contract to Spectra Company to design and build the phased
rehabilitation, reinstallation, and repair of the Pioneer Oil Refinery buildings and structures,
in the amount of $1,285,159, and authorize a contingency in the amount of $192,774, for a
total contract amount not to exceed $1,477,933.
2. Appropriate one-time funds in the amount of $1,340,000 from the Developer Fee Fund (Fund
306) and $234,000 from the Facilities Fund (Fund 723) to the Pioneer Oil Refinery
expenditure accounts P2018306-516101 and P2018723-516101, respectively, for a total
appropriation of $1,574,000 for the restoration of the Pioneer Oil Refinery site.
3. Authorize the City Manager or designee to execute all contracts and associated documents,
subject to City Attorney review.
BACKGROUND
The Pioneer Oil Refinery (Site) is a historic, inactive oil refinery located on the corner of
Needham Ranch Parkway and Pioneer Way in the City of Santa Clarita (City). Built in 1876 by
California Star Oil Works, a predecessor of Standard Oil Company and later Chevron, the
refinery operated until 1888. The Site has received several significant historic designations. In
1935, it was designated a California State Historical Landmark as the first commercial oil
refinery in California. In 1975, the American Society of Mechanical Engineers recognized the
Site as the first successful oil refinery in California. In December 2020, the Pioneer Oil Refinery
Page 1
Packet Pg. 119
was officially listed on the National Register of Historic Places.
Chevron donated the property to the City in 1997, and the Pioneer Oil Refinery Master Plan was
approved in 2013. The Master Plan was developed to transform the Site into an educational
public park where visitors of all ages can learn about the oil refining process of the late 1800s.
The plan includes trails, open space, interpretive features, and other park amenities. The Site
contains several historic structures, including two buildings (the Pump House and Shed); seven
metal tanks (Acid Tank, Wash Tank, two Rundown Tanks, Residuum Tank, Water Tank, and Oil
Tank); and a set of stills consisting of two brick and metal stills, two chimneys, and a network of
metal condenser pipes. As part of Phase 1, the Master Plan was updated, and the park was
constructed and opened to the public in 2025.
In March 2026, a Request for Qualifications (RFQual) was published via the City's e-
procurement system, BidNet, inviting interested firms to submit their qualifications for Phase 2
of the project. Phase 2 includes the design and construction of the rehabilitation, reinstallation,
and repair of the historic structures and equipment on the Site. The RFQual was distributed to
4,748 vendors, of which 63 downloaded the materials. The City received one submission and
determined that the design -build firm, Spectra Company (Spectra), was qualified to undertake
this project.
After finalizing the scope of work, the City issued a Request for Proposal (RFP) inviting the pre -
qualified firm to submit their proposal for the project. The City received Spectra's proposal,
which was evaluated by a panel of City staff to ensure that the firm has a strong project
management approach, qualified staff, and relevant experience on similar projects.
The following criteria were used to evaluate the proposal:
• Project Management and Schedule of Work
• Staff Composition
• Experience on similar projects and experience working with the Secretary of the
Interior's Standards and other public agencies
• Cost Proposal
Following the evaluation process, Spectra received the score as outlined below.
COMPANY
I LOCATION
JSCOPE
Spectra Company
I Pomona, CA
194.3
Spectra demonstrated an in-depth understanding of the project needs and provided a detailed
scope of work and a comprehensive project management approach. Their team brings diverse
backgrounds and decades of experience working on restoring historic structures and sites. Staff
recommends awarding the design -build contract to Spectra Company for a total contract amount
of $1,285,159. A 15 percent contingency is being requested to cover additional design and/or
build needs for the historic structures, additional amenities identified for the park site, and any
necessary modifications required during the project.
Upon approval of the recommended actions, the City Council will appropriate $1,574,000 for
Page 2
Packet Pg. 120
this project. The project budget will support $1,477,933 for design and construction, including
contingency, and $96,067 for historic consultant services, a park monument sign, an electric
vehicle charging station, and project administrative costs, including inspections, permits, and
fees, and labor compliance monitoring.
ALTERNATIVE ACTION
Other action as determined by the City Council.
FISCAL IMPACT
The requested appropriations of $1,340,000 in Developer Fee Fund (Fund 306) and $234,000 in
Facilities Fund (Fund 723) will create a total project budget of $1,574,000 in Pioneer Oil
Refinery Expenditure Accounts P2018306-516101 and P2018723-516101, collectively. This
amount will adequately provide $1,477,933 for award of the design -build contract, including
contingency and $96,067 for historic consultant services, a monument sign, an electric vehicle
charging station, and additional administrative costs.
ATTACHMENTS
RFP Response (available in the City Clerk's Reading File)
Page 3
Packet Pg. 121
()SPECTRA
HISTORIC; CONSTRUCTION
PROJECT RESPONSE
Project Introduction
The Pioneer Oil Refinery was constructed in 1876. It was added as a California Historic
Landmark in 1935 and on the National Register of Historic Places in 2020. We understand the
Refinery consists of two buildings (Pump House and Shed), seven metal tanks (Acid Tank,
Wash Tank, two Rundown Tanks, Residuum Tank, Water Tank, and Oil Tank), and a set of
Stills that consists of two brick and metal stills, two chimneys, and a set of metal condenser
pipes. The Pump House and other previously salvaged tanks will be reinstalled at the new
proposed locations while the Stills, Shed and Water and Oil Tank will be rehabilitated in place.
The Design Build team includes an architect (Spectra Company), structural engineer (sub -
consultant TYLin), general contractor (Spectra Company) and concrete subcontractor (El
Camino Construction) experienced in the rehabilitation of historic structures, materials
conservation and the Secretary of the Interior's Standard for the Treatment of Historic
Properties. It is our understanding that a landscape architect is excluded from this proposal and
will only be added later if necessary.
References
See requested references provided as an attachment,
Plan of Study/Scope of Work
TASK 1: DESIGN DEVELOPMENT
SUBTASK 1.1 Preliminary Investi a o
• Project kick-off meeting to discuss the scope, purpose, schedule, and pertinent details of
the project.
• Field reconnaissance to assess existing conditions of the project site and surrounding
areas. Review and observe existing artifacts and materials in nearby off -site storage.
Subtask 1.2 Design Development Meetings
• Attend estimated (1) meeting with the City and City's consultant to discuss the design and
repair of the Refinery buildings and structures and pertinent details of the project. Output:
Meeting Minutes.
Subtask 1.3 Design Development Drawings
respect. restore. reuitali.ze 1 350 N Garey Ave #101 1 Pomona, CA 91767 1800.375.1771
(),xSPECTRA
HISTORIC; CONSTRUCTION
• Prepare conceptual design drawings for review. Output: Progress Design Development
Drawings.
• Revise design drawings as needed. Output: 60% Design Development Drawings.
TASK 2: PROTECT MANAGEMENT
Ongoing communication and coordination with the City and City's consultant from project
kick-off through construction. All agendas, meeting minutes, task lists, and exhibits are to
be included.
Project management will be led by architect, Dick Gee, AIA, during the Design Phase and
the construction project manager, Rafael Barrios, during the Build, or construction, phase.
Subtask 2.1: Monthly Meetings
• Monthly meetings to review project schedules, plans, and specifications. Assemble the
agenda prior to each meeting, and provide and distribute meeting minutes afterwards.
Meetings will be held in -person and some may be held virtually. Output: Agendas and
Meeting Minutes.
Subtask 2.2: Monthly Progress Reports
• Prepare monthly progress reports and progress schedule updates. The progress report
shall include accomplished tasks for the month, anticipated progress for the next month (4
week look ahead), pending issues, and schedule completion target dates. Output: Monthly
Progress Reports.
Subtask 2.3: Schedule
• Within two weeks of the Notice to Proceed (NTP), a detailed project baseline schedule will
be submitted indicating milestones, major activities, and deliverables to the City for review
and comment. The schedule will be updated as needed. Output: Project Schedule.
Subtask 2.4: Quality Control
• A quality control plan will be submitted. Output: Quality Control Plan.
TASK 3: CONSTRUCTION DOCUMENTS
Subtask 3.1: Construction Documents (Plans, Specifications, and Estimates)
• Prepare Construction Documents to include Architectural and Structural plans.
(Landscape, mechanical, electrical, plumbing drawings and interpretive display drawings
are not required and excluded).
• Output: Construction Documents will be submitted at 60% (DD Set shall constitute the
60% submittal), 90%, and 100% (Plan Check Submittal), and final approved plans.
Subtask 3.2 Plan Approvals and Permits
respect. restore. reuitali.ze 1 350 N Garey Ave #101 1 Pomona, CA 91767 1800.375.1771
(),xSPECTRA
HISTORIC; CONSTRUCTION
• Submit for plan check approvals from all City divisions including but not limited to
Planning, Engineering Services, Building and Safety, Traffic, Urban Forestry, Landscape
Maintenance Division, Environmental Services, Recreation and Community Services, Arts
and Events, Park Maintenance, Parks Planning, and outside agencies such as L.A. County
Fire, or as needed for construction permits.
• Output: An updated complete set of approved plans, specifications, and estimate will be
submitted.
TASK 4: CONSTRUCTION
SUBTASK 4.1 Phase 1
• Pump House- A new footing will be designed and installed. The Pump House will be
reconstructed using salvaged materials. In kind materials will be used if the existing is
missing or deteriorated beyond reuse. It is anticipated a significant amount of framing and
wood that was previously in contact with the ground would need to be replaced. Salvaged
equipment will be reinstalled.
• Acid Tank- A new footing and support framing will be designed and installed. The Acid
Tank will be relocated and rehabilitated. In kind materials will be used if the existing is
missing or deteriorated beyond reuse. It is anticipated a significant amount of the wood
support frame would need to be replaced due to deterioration.
• Wash Tank- A new footing and support framing will be designed and installed. The
Wash Tank will be relocated and rehabilitated. In kind materials will be used if the existing
is missing or deteriorated beyond reuse. It is anticipated a significant amount of the wood
support frame would need to be replaced due to deterioration.
• Rundown Tanks (Two Tanks)- - New footings will be designed and installed. The
Rundown Tanks will be relocated and rehabilitated.
• Residuum Tank- A new footing and support framing will be designed and installed. The
Residuum Tank will be relocated and rehabilitated. In kind materials will be used if the
existing is missing or deteriorated beyond reuse. It is anticipated a significant amount of the
wood would need to be replaced due to deterioration.
• Stills- The stills will be cleaned and a graffiti protective coating will be applied. The
chimneys will be reconstructed to match the original in size and appearance. However,
brick veneer over a support frame will be used to mitigate the challenges of a tall, heavy
chimney. Some visible structural support may be visible, but will be mitigated and only as
necessary for structural stability.
SUBTASK 4.2 Phase 2 (Phase 2 to be completed concurrently with Phase 1)
• Shed- The Shed will be rehabilitated, but a new footing was not requested. The wood
structure and metal roof will be cleaned and rehabilitated.
respect. restore. reuitali.ze 1 350 N Garey Ave #101 1 Pomona, CA 91767 1800.375.1771
()SPECTRA
HISTORIC; CONSTRUCTION
• Oil Tank- The Oil Tank will have graffiti removal, safed off and a graffiti coating applied
at the ground level.
Water Tank- The Oil Tank will have graffiti removal, safed off and a graffiti coating
applied at the ground level.
TASK 5: MAINTENANCE AND REPAIR GUIDELINES
The Design Build team will coordinate with the City and the City's Facilities Division,
Graffiti Removal Team, and Consultant to develop guidelines for future work related to the
Pioneer Oil Refinery. The guidelines will outline recommended treatments and methods for
carrying out ongoing maintenance, as -needed repair, and graffiti removal for each building
or structure, in a manner that will not cause damage to the historic fabric.
Proposed Schedule
Spectra Company estimates the following design and construction schedule:
Estim. Date
Task
Jul 14, 2026
Contract Award/Notice to Proceed Issued
Jul 17, 2026
Kick Off Meeting
Aug 14, 2026
Monthly Meeting. Progress drawings to be reviewed with City.
Aug 28, 2026
Task 1-Site Investigation/Design Development Submittal (6 weeks.
Deliverable = 60% Design Development Documents).
Sep 11, 2026
Monthly Meeting. Completion of Client/City Review (2 weeks review
and response).
Oct 23, 2026
Construction Documents (6 weeks. Deliverable = 90% Construction
Documents). Review CD's in Monthly Meeting.
Nov 6, 2026
Client/City Review (2 weeks review and response)
Nov, Dec, Jan 2026
Monthly Meetings. Check progress of Plan Check.
Jan 29, 2027
Completion of Plan Check Processing (3 months- possibly shorter if City
can expedite)
Feb 1, 2027
City Confirms Notice to Proceed with Construction
Feb 8, 2027
Submittals/Buyout, Site Mobilization, Inspect/Organize Salvaged
Materials (4 weeks, but overlap 3 weeks during plan check). Monthly
Meeting upon Site Mobilization.
July 26, 2027
Construction Duration (6 months). Monthly Construction Meetings.
July 26, 2027
Construction Completed, Ready for Use
The schedule may be shortened through several parallel efforts. These include reducing or
omitting client and city progress reviews, expediting plan check, overlapping submittals and
site mobilization with plan check, and addressing critical path construction issues.
respect. restore. reuitali.ze 1 350 N Garey Ave #101 1 Pomona, CA 91767 1800.375.1771
()SPECTRA
HISTORIC; CONSTRUCTION
Project Management
Spectra Company will utilize a streamlined Design -Build project management approach to
efficiently manage and direct this project. This method ensures clear leadership, structured
oversight, and timely execution while minimizing unnecessary design iterations.
Project Oversight and Roles:
a The project will be led by Dick Gee, AIA, as Project Manager during the initial design
phase, and Rafael Barrios as Construction Project Manager.
a Responsibilities include project planning, schedule development, task coordination,
quality assurance, and ongoing communication with the City and its consultant.
a Monthly progress meetings and concise status reports will maintain alignment with
project objectives, schedule, and deliverables.
a Opportunities to overlap tasks such as submittals, procurement and other tasks can be
investigated.
Personnel, Equipment, and Facilities
Spectra Company has assembled an experienced Design -Build team with expertise in
historic preservation, structural rehabilitation, and rehabilitation of historic resources.
Dick Gee, AIA will serve as Project Manager during the design phase and will be
responsible for overall project coordination, design development, permitting support, and
communication with the City and its consultant.
Rafael Barrios will serve as Construction Project Manager and will oversee construction
activities, subcontractor coordination, scheduling, quality control, and project delivery.
TYLin will provide structural engineering services for foundations, support framing, and
rehabilitation of the historic structures and tanks. El Camino Construction will perform
concrete work associated with new foundations and support systems.
Resumes for all key personnel are included in the proposal attachments and summarize
each individual's qualifications, experience, and role on the project.
Subconsultants
Structural Engineer. TYLin.
respect. restore. reuitali.ze 1 350 N Garey Ave #101 1 Pomona, CA 91767 1800.375.1771
DICK GEE
AIA, LIED AP Architect
EDUCATION
BA, Architecture
U.C. Berkeley (1988)
PROFESSIONAL REGISTRATION
CA License - C26515 EXP. 6/30/27
AZ License - 44293 Exp. 6/30/27
()SPECTRA
HISTORIC; CONSTRUCTION
EXPERIENCE & QUALIFICATIONS
Dick Gee is a licensed architect in California and Arizona with more than 34
years of experience specializing in historic preservation. Now serving as both
Architect and Project Manager with Spectra Company, he oversees
preservation consulting, design -build, and historic construction projects —
bringing a broad perspective that strengthens collaboration among owners,
architects, engineers, and consultants. A graduate of U.C. Berkeley, Dick
previously served as Lead Principal of the Los Angeles office for JAG
Architects.
His preservation career began with landmark rehabilitation projects such as
the Eastern Columbia Building, the Los Angeles Coliseum, and multiple
structures at El Pueblo de Los Angeles. Over the years, he has contributed to
the restoration of numerous National Register buildings, California State
Historic Resources, and local landmarks. Notable projects include the El
Capitan Office Building and Theatre, San Gabriel Mission, Crystal Cove
Cottages, Vibiana in Los Angeles, Frank Lloyd Wright's Ennis House, several
John Lautner residences, and the restoration of most historic buildings at the
Pechanga and Pala tribal reservations.
With deep expertise spanning design, regulatory approvals, historic tax credit
applications, construction, and development, Dick offers a comprehensive
understanding of the preservation process. His leadership has guided projects
that have earned multiple honors from the California Preservation
Foundation, the Los Angeles Conservancy, and other preservation
organizations.
Dick currently serves on the board of the California Preservation Foundation
(CPF) and the Western Chapter of the Association for Preservation
Technology (WCAPT).
Area of Specialization: Preservation Architect
Dick meets and exceeds the Secretary of the Interior's Professional
Qualifications Standards for Historic Architecture.
respect. restore. reuitali.ze 1 350 N Garey Ave #101 1 Pomona, CA 91767 1800.375.1771
3►11 'III]
Senior Preservation Estimator
Historic Material Treatment Specialist
EDUCATION
Fine Art, MFA
Fine Art, BFA
Otis College of Art and Design (1995)
PROFESSIONAL REGISTRATION
Member of WCAPT, APTI, CPF, LA Conservancy,
APF (Arizona Preservation Foundation)
and ACI (American Concrete Institute)
Y'
``SPECTRA
HISTORIC; CONSTRUCTION
EXPERIENCE & QUALIFICATIONS
Reuben Lombardo brings over 20 years of experience in the preservation field and is a key
member of Spectra Company's Historic Division. His expertise spans ornamental concrete
and plaster, granite and marble, tile, stone and ceramics, historic murals and decorative
painting, sculpture, mold making, wood restoration, and metals. While knowledgeable in many
areas of historic restoration, Reuben has a particular passion for the artistic elements of
preservation. An artist by trade, he combines his creative background with practical expertise
in construction and project management. He is a graduate of Otis College of Art and Design
and holds a Master of Fine Arts from UCLA.
Reuben has contributed his skills to numerous landmark restoration and waterproofing
projects, including the Hoover Dam in Boulder City, Nevada; the Catalina Island Casino in
Avalon; Hearst Castle in San Simeon; the Hollywood Bowl; the El Capitan Theatre in
Hollywood; the Fine Arts Building in Los Angeles; Greystone Mansion in Beverly Hills; the
Millennium Biltmore Hotel in Los Angeles; the Anaheim Citrus Packing House; the Santa
Barbara Mission; Mission Basilica San Diego de Alcala; Mission Santa Ines; Mission San Luis
Rey; and multiple university projects at UCLA, Chapman University, Mount Saint Mary's, and
Caltech.
As part of Spectra's project teams, Reuben has helped secure more than 100 preservation
awards for work across the Western United States. He has also served two terms on the
Board of Directors for the Western Chapter of APTI (Association of Preservation Technologies
International) and has led numerous presentations and workshops on historic materials
restoration for WCAPT, APTI, CPF, the LA Conservancy, APF (Arizona Preservation
Foundation), and ACI (American Concrete Institute).
Area of Specialization: Preservation Estimator and Historic Material
Treatment Specialist
Rueben meets and exceeds the Secretary of the Interior's Professional Qualifications
Standards for Historic Architecture.
respect. restore. reuitali.ze 1 350 N Garey Ave #101 1 Pomona, CA 91767 1800.375.1771
MARK GREEN
1121[1111;ill]91;11►11111111211
()SPECTRA
HISTORIC; CONSTRUCTION
EXPERIENCE & QUALIFICATIONS
Mark Green brings over 35 years of experience in the construction industry, with the majority
of his career focused on historic construction. As a Superintendent for Spectra Company, Mark
manages owner liaison responsibilities, weekly production meetings, scheduling, workforce
coordination, layout of work, and compliance with applicable building codes and standards. He
serves as a key point of contact, ensuring necessary communication between Project Managers,
field teams, and clients. Mark has also held a licensed General Contractor designation for 30
years, giving him a broad command of both the technical and administrative sides of
construction.
Mark has contributed to numerous historic rehabilitation and restoration projects across
Southern California, including full building rehabilitations with seismic and ADA improvements,
exterior envelope and masonry restoration, new MEP systems, and tenant improvements across
residential, civic, and commercial uses. His proficiency spans diverse project scales, typologies,
fabrics, and sectors.
Mark's background as both a licensed contractor and experienced historic superintendent makes
him a practical and dependable leader in the field.
Area of Specialization: Historic Construction Superintendent
respect. restore. reuitali.ze 1 350 N Garey Ave #101 1 Pomona, CA 91767 1800.375.1771
RAFAEL BARRIOS
PROJECT MANAGER
Estimator
("'),SPECTRA
HISTORIC; CONSTRUCTION
EXPERIENCE & QUALIFICATIONS
Rafael Barrios brings over 30 years of experience in the construction industry. His
comprehensive knowledge in the finishing trades informs and enriches his role as a manager
and supervisor of large crews and projects. He is both a Project Manager and Estimator for
Spectra Company and is a former construction supervisor. He is very well -versed in painting,
drywall, carpentry, masonry, tile and granite, waterproofing, glazing, antique restoration and
preservation.
Throughout his career, Rafael has applied his expertise across a broad range of landmark
restoration and construction projects in California, Nevada and Arizona. His fluency in the
finishing trades — from ornamental masonry and tile work to waterproofing, glazing, and
antique restoration — contribute to his versatility as a field professional and project leader.
Rafael brings a level of craft knowledge and practical judgment that is rare at the
management level.
Rafael's combined background in estimating, supervision, and hands-on trade work makes
him a reliable and effective leader on complex historic projects.
Area of Specialization: Finishing Trades/Historic Materials Restoration
respect. restore. reuitali.ze 1 350 N Garey Ave #101 1 Pomona, CA 91767 1800.375.1771
UYLin
YEARS OF EXPERIENCE
65 Years
YEARS WITH FIRM
3 Years
EDUCATION
University of California Los
Angeles, Loyola University, and
the University of Southern
California (post -graduate
studies)
BS, University of Arizona,
Tucson, Civil Engineering,1960
LICENSE
Professional Engineer, CA, AZ,
NV, NM, OR
Structural Engineer, CA, AZ, NV,
NM, OR
CERTIFICATIONS
NCEE Certificate Holder
AWARDS
Governor's Heritage
Preservation Honor Award
Empire Ranch, AZ 2016
Career Achievement Award -
City of Las Vegas, NV 2016
Historic Hawaii Foundation
Honor Award - Doris Duke - Jali
Pavilion 2014
Los Angeles Conservancy
Award - 2008 Frank Lloyd
Wright's Ennis House
Earthquake Damage Repair
Project.
RECENT PUBLICATIONS
"Building Codes for Existing
and Historic Buildings;" John
Wiley & Sons, Pub. 2012
FEMA Incremental
Rehabilitation Series (FEMA
395-399). 2004-2006
Melvyn Green, PE, SE
SENIOR STRUCTURAL ENGINEER AND PRESERVATION CONSULTANT
Melvyn (Mel) Green has over 60 years of experience in the structural engineering industry,
with an expertise in historic structures. Mel is experienced in seismic rehabilitation, struc-
tural engineering design, and materials conservation. His focus is on seismic rehabilitation
for timber and masonry structures, including adobe structures. Mel joined TYLin in 2021 as a
Senior Preservation Consultant.
Mel has been a member or chair of a number of standards committees for the American
Society of Civil Engineers (ASCE). He is also a past president of the Structural Engineers Asso-
ciation of California (SEAOC). As the previous Director of Building and Safety for El Segundo,
California, he is active in building code development and education and has served on the
drafting committee of the International Existing Building Code (IEBC). He is the author of
Building Codes for Existing and Historic Buildings.
PROJECT EXPERIENCE
Tesoro de Valle (Harry Carey Ranch) I Santa Clarita, CA
After damage due to the 1994 earthquake, the site was repaired and strengthened as part of
a development.
Fern Dell Nature Trail Bridge Repair I Los Angeles, CA
The pedestrian bridge at Fern Dell underwent a significant restoration led by Friends of
Griffith Park (FoGP). Mel assessed the bridge's condition, and a ground -penetrating radar
revealed that the original 1920s foundations were still structurally sound. Collaborating with
preservation architect Michelle McDonough, the team developed restoration plans that rein-
stated the bridge's original arched design and distinctive railings and added modern safety
enhancements. The project received approval from the City's Office of Historic Preservation,
and construction commenced in 2019. The bridge reopened to the public in December 2019.
University of California, Los Angeles, Powell Library (1928)
Los Angeles, CA
Consultant for preservation of the historic stenciled plaster ceiling including repair, cleaning
and seismic stabilization.
Golden Gate Bridge (1937) 1 San Francisco, CA
Historic preservation engineer to the project team undertaking the seismic rehabilitation of
the bridge.
Frink Adobe — Single Family Dwelling I Loma Linda, CA
In collaboration with The City of Loma Linda and the Two Canyons Conservancy, the Frink
Adobe, one of the oldest buildings in the Inland Empire, is subject to restoration. Plans in-
clude preserving the structure and surrounding land for a living history museum and park.
Ft. Churchill Adobe Buildings - Structural Repairs
Ft. Churchill State Park, NV
Restoration efforts at Fort Churchill have focused on stabilizing the historic adobe structures
using like materials to preserve the original fort layout. These efforts are part of a long-term
preservation strategy for the state park.
Empire Ranch I Pima County, AZ
Historic adobe barn structure. Site was studied and improved over time, including seismic
retrofit of barn. Shoring, adobe and timber repair, and preservation recommendations. De-
sign strengthening for the existing barn as a public assembly area.
UYLin
YEARS OF EXPERIENCE
17 Years
YEARS WITH TYLIN
17 Years
EDUCATION
MS, Architecture, emph.
Structural Engineering,
California Polytechnic State
University
BS, Architectural Engineering,
California Polytechnic State
University
LICENSE
Professional and Structural
Engineer: AL, AZ, DC, HI, ID, KS,
MT, NV
Nathan Hicks, PE, SE
PRINCIPAL, SECTOR MANAGER
Structural Engineer
Nathan joined TYLin in 2009 as the recipient of the Silman Fellowship for Preservation
Engineering. As a part of the fellowship, he spent six months at the National Trust for Historic
Preservation, working at the headquarters in Washington, DC with the Historic Sites Depart-
ment. Since returning to TYLin, Nathan's projects range from large to small, including reno-
vations and modernizations of historic buildings, new construction, schools and residential
projects. In 2021, Nathan relocated to TYLin's new Los Angeles office.
PROJECT EXPERIENCE.
Darling Hotel I Visalia, CA
This historic former courthouse annex was transformed into a boutique hotel, preserving the
original 1930s Art Deco style. The four-story, 28,000 sf structure features 32 suites, meet-
ing spaces, a pool, and a rooftop bar and restaurant. TYLin provided structural engineering
design services for the interior and exterior rehabilitation. A seamlessly designed stair tower
is the only exterior addition.
Millard Sheets Mosaic Mural I Orange, CA
TYLin collaborated with preservationists, art restoration specialists, and architects to provide
support and anchorage for Millard's large (approximately 17'x40') "Pleasures Along the
Beach," mosaic. The project included the preservation and reconstruction of the mosaic,
which had been disassembled due to a building demolition. The work of art will now be on
display outside of the Hilbert Museum in Orange, CA.
St. Elizabeths West Campus Department of Homeland Security
AFFILIATIONS
Headquarters, Design -Build I Washington, DC
American Society of Civil
Structural engineering bridging documents for the DHS Headquarters project, providing over
g g g g q p J p g
Engineers (ASCE), Member
500,000 sf of office space through a combination of adaptive reuse and new construction.
Association for Preservation
TYLin has provided extensive probe testing and nondestructive evaluation work for a majority
Technology (APT) Western
of the historic structures on the campus. In addition, TYLin provided bridging documents for
Chapter, Member
the Center Building, Creamery, Holly, and Administrative Buildings. The preservation engi-
DC Preservation League,
neering required the design to incorporate seismic and security requirements into the new
Member
use of these buildings.
National Trust for Historic
Decatur House I Washington, DC
Preservation (NTHP), Member
Federal style house built 1818, currently owned by the National Trust for Historic Preserva-
Preservation Roundtable,
tion and occupied by the White House Historical Association. A partial collapse of a ceiling
Member
prompted a structural assessment to survey the building for structural deficiencies, evaluate
Structural Engineers
load capacities, identify unsafe occupancies, and provide recommendations for repairs. The
Association of San Diego
investigation work was tailored to prevent damage to the historic fabric of the building.
(SEACSD), Existing Building
pope-Leighey House (Frank Lloyd Wright) I Alexandria, VA
Committee Member
As part of the Silman Fellowship for Preservation Engineering with the National Trust for
PUBLICATIONS
Historic Preservation, conducted structural investigations of this relocated Usonian residence
Kirk Mettam, Christopher Ruiz,
now situated on the Woodlawn site. Work included evaluation of the foundations, assess-
& Nathan Hicks. "Balancing
ment of wood framing and masonry elements, and coordination with preservation staff to
Emotions" Structural Engineer
support long-term stabilization and stewardship planning.
Magazine, 13:5, 2012: 40-43
Tel 909.599.0760
Fax 909.599.7762
SPECTRASpectraCompany.com
HISTORIC CONSTRUCTION 350 N Garey Ave. Suite #101 Pomona, CA
91767
CA License # 605280 AZ License # 285689 NV License # 75007 DIR Number:1000006472
PROPOSAL / CONTRACT
Attention: Lance O'Keefe
City of Santa Clarita
23920 Valencia Blvd., Ste 295 Rec&CS -
Administration
Santa Clarita, CA 90245
Work: 661-250-3716
Mobile: 661-305-3138
E-Mail: Lokeefe@santa-clarita.com
Project Name: Pioneer Oil Refinery
23802 Pine St
Santa Clarita, CA 91321
Project # 109752
Date: 06/10/26
TABLE OF CONTENTS
Scope of Work Page
GENERAL QUALIFICATIONS - HISTORIC..............................................................................2
01. PHASE #1- DESIGN.....................................................................................................................3
02. PHASE #1- GENERAL CONDITIONS.....................................................................................3
03. PHASE #1- EQUIPMENT............................................................................................................4
04. PHASE #1- CONSTRUCTION...................................................................................................5
05. PHASE #1- INSURANCE.............................................................................................................9
06. PHASE #1- BONDING.................................................................................................................9
07. PHASE #2 - DESIGN.....................................................................................................................9
08. PHASE #2 - GENERAL CONDITIONS.....................................................................................9
09. PHASE #2 - EQUIPMENT..........................................................................................................10
10. PHASE #2 - CONSTRUCTION.................................................................................................10
11. PHASE #2 - INSURANCE...........................................................................................................12
12. PHASE #2 - BONDING...............................................................................................................12
SUMMARYOF ESTIMATES...........................................................................................................13
PRESERVE'S PROTECT' RESTORE
Page 2 of 13
Project Name: Pioneer Oil Refinery
6/15/2026
Scope of Work
* GENERAL QUALIFICATIONS - HISTORIC
QUALITY ASSURANCE
Historic Restoration shall conform to the "Secretary of the Interior's Standards for
Rehabilitation" published in the most current edition of the United States National Park Service
in "The Secretary of the Interior's Standards for the Treatment of Historic Properties."
GENERAL INCLUSIONS
1. Work with local, state, and federal governing historic agencies to ensure restoration is
performed in compliance with established guidelines.
2. Maintain digital photo documentation for archival purposes.
3. Provide product submittals/samples.
4. AM Best Rated - A+ or higher - Liability/Bonding/Workers Compensation Insurance.
S. Restoration product specifications and material safety data sheets (MSDS).
6. Proposal based on prevailing wage rates, one move -in and work to be performed during
normal daytime hours, Monday thru Friday.
7. Coordination with trades.
8. Historic Restoration - Statement of Qualification - (see attached).
9. Pollution Insurance Coverage - Insured for Lead Paint, Asbestos and Mold Remediation -
(see attached).
PRESERVE PROTECT RESTORE
Page 3 of 13
Project Name: Pioneer Oil Refinery
6/15/2026
GENERAL EXCLUSIONS
Permits fees, power, water, deputy inspections, more than one (1) move in, parking expenses,
final protection, and any unforeseen conditions.
01. PHASE #1 - DESIGN
Provide design drawings for phase one of the project to include structural engineering
Sub Total - $79,815.00
02. PHASE #1 - GENERAL CONDITIONS
REQUIRED GENERAL CONDITIONS
A. Duration 365 days (congruently)
a. Six (6) Months for design/plan check
b. Six (6) months for construction
B. Obtain permit(s) as required - Owner to reimburse cost of permits (if required).
C. Photo document existing conditions and restoration work throughout the project.
D. Provide and implement a protection plan. Plan to include documentation and safe off of
utilities.
E. Provide a Project Schedule with two week look ahead throughout the project.
F. Coordinate required inspections.
G. Provide onsite superintendent for duration of project.
PRESERVE PROTECT RESTORE
Page 4 of 13
6/15/2026
H. Provide OSHA certified Safety program.
I. Coordination of trades/subcontractors
Sub Total - $86,400.00
03. PHASE #1 - EQUIPMENT
Equipment
Project Name: Pioneer Oil Refinery
*Based on up to a one hundred eighty three (183) calendar day completion schedule
1. Provide lift equipment to access work area including exterior facade and interior
walls/ceilings
2. Provide portable wash stations.
3. Supply and install spider box, cord/string lights for temporary power and lighting.
4. Provide storage containers for equipment, materials storage, office.
S. Provide dumpsters and disposal.
6. Provide site fencing.
7. Provide reach fork lift.
Sub Total - $41,400.00
PRESERVE PROTECT RESTORE
Page 5 of 13
Project Name: Pioneer Oil Refinery
6/15/2026
04. PHASE #1 - CONSTRUCTION
AREAS/ SURFACES
Restoration/reinstallation of the historic equipment on the lower level of the park to specifically
include:
A. Pump House
B. Acid Tank
C. Wash Tank
D. Rundown Tanks (two tanks)
E. Residuum Tank
F. East Sill
G. East Chimney
H. West Sill West Chimney
I. Condenser pipes
HISTORIC RESTORATION TREATMENT PROCEDURES - AS REQUIRED
1. Restoration to All Phase 1 Buildings and Structures to specifically include:
a. Install temporary shoring as needed to prevent hazard or inadvertent
damage to building/structure during work.
b. Apply corrosion -inhibiting treatment to metal(s) as appropriate while
maintaining existing patina. (Everbrite Protectaclear metal coating)
c. Secure openings against dumping, vandalism, moisture accumulation,
unauthorized entry, etc. (use of wire mesh screens at openings)
d. All work will carry out any necessary chemical or physical treatments
using gentlest means possible.
e. Secure and address potential safety or tripping hazards such as loose
materials and sharp edges.
f. Provide anti -graffiti protection on all exterior surfaces.
g. Clean, restore, and/or rehabilitate the structures as necessary.
2. Pump House
a. Provide new footing and stem wall
PRESERVE PROTECT RESTORE
Page 6 of 13
Project Name: Pioneer Oil Refinery
6/15/2026
b. Reassemble disassembled components including wood beams, trellis and
rafters; steel posts; corrugated metal roof panels; corrugated metal wall
panels; and pump equipment/artifacts.
c. Inspect and repair wood, corrugated metal, steel, and pump equipment as
needed.
d. Where individual elements are missing or deteriorated beyond repair,
replace in kind.
e. Securely anchor corrugated metal wall and roof panels to wood structure.
f. Restore and replace the water pump motor and pipes to replicate the
original design.
3. Acid Tank
a. Provide slab to install tank on
b. Clear debris from interior of tank, if any.
c. Relocate to proposed location on site.
d. Stabilize/reconstruct non -original timber support platform as needed.
e. Anchor tank to timber support platform.
f. Inspect and repair steel tank as needed.
4. Wash Tank
a. Provide slab to install tank on
b. Clear debris from interior of tank, if any.
c. Relocate to proposed location on site.
d. Stabilize/reconstruct non -original timber support platform as needed
e. Anchor tank to timber support platform.
f. Inspect and repair steel tank as needed.
S. Rundown Tanks (Two Tanks)
a. Provide slab to install tanks on
b. Clear debris from interior of tank, if any.
c. Relocate to proposed location on site.
d. Stabilize/reconstruct non -original timber support platforms as needed.
e. Anchor tanks to timber support platform.
f. Inspect and repair steel tanks as needed.
PRESERVE PROTECT RESTORE
Page 7 of 13
Project Name: Pioneer Oil Refinery
6/15/2026
6. Residuum Tank
a. Provide slab to install tank on
b. Clear debris from interior of tank, if any.
c. Relocate to proposed location on site.
d. Stabilize/reconstruct non -original timber support platform as needed.
e. Inspect and repair wood boards/staves and metal hoops as needed.
f. Where individual elements are missing or deteriorated beyond repair,
replace in kind.
g. Reset boards/staves and hoops to original positions and brace tank
internally for stability.
7. East Still
a. Carefully excavate accumulated earth around base of still.
b. Clear debris from interior of still, if any.
c. If feasible, restore shifted metal still to its original position on furnace.
d. Inspect, repair and repoint brick furnace as needed, including: repair
mortar cap; remove and reinstall loose bricks; replace broken and missing
bricks in kind; test existing mortar to identify appropriate mortar
composition.
e. Replace missing lintel at furnace door to hold brick in place.
f. Inspect and repair metal still components as needed.
8. East Chimney
a. Carefully excavate accumulated earth around base of chimney.
b. Clear debris from interior of chimney stack, if any.
c. Brace against collapse (adding metal angle iron at corners of chimney
embedded in concrete base).
d. Inspect, repair, and repoint brick as needed. Test existing mortar to
identify
appropriate mortar composition.
e. Propose and design alternative measures to restore (if required).
9. West Still
a. Carefully excavate accumulated earth around base of still.
PRESERVE PROTECT RESTORE
Page 8 of 13 Project Name: Pioneer Oil Refinery
6/15/2026
b. Clear debris from interior of still, if any.
c. Inspect, repair and repoint brick furnace as needed, including: repair
mortar cap; remove and reinstall loose bricks; replace broken and missing
bricks in kind; test existing mortar to identify appropriate mortar
composition.
d. Inspect and repair metal still components as needed.
10. West Chimney
a. Carefully excavate accumulated earth around base of chimney.
b. Clear debris from interior of chimney stack, if any.
c. Reconstruct fallen chimney with matching brick veneer.
d. Inspect, repair, and repoint brick as needed using appropriate mortar.
Replace broken or missing bricks in kind.
e. Brace reconstructed chimney against collapse (adding metal angle iron at
corners of chimney embedded in concrete base).
f. Propose and design alternative measures to restore (if required).
11. Condenser
a. Reconstruct condenser pipes.
b. Inspect and repair metal still components as needed.
c. Where individual elements are missing or deteriorated beyond repair,
replace in kind.
12. Brick Pillars at fencing of sills
a. Replace missing bricks with new matching bricks
b. Replace missing mortar with new matching mortar
Specific Exclusions: Working equipment.
Sub Total - $881,510.49
PRESERVE PROTECT RESTORE
Page 9 of 13
6/15/2026
05. PHASE #1 - INSURANCE
To be 1% of total construction cost
Sub Total - $10,891.00
06. PHASE #1 - BONDING
To be 2% of total construction cost
Sub Total - $22,000.00
07. PHASE #2 - DESIGN
Provide design drawings for phase two of the project
Sub Total - $20,415.00
08. PHASE #2 - GENERAL CONDITIONS
REQUIRED GENERAL CONDITIONS
Project Name: Pioneer Oil Refinery
*WORK TO BE PERFORMED CONGRUENTLY TO PHASE #1
A. Obtain permit(s) as required - Owner to reimburse cost of permits (if required).
B. Photo document existing conditions and restoration work throughout the project.
C. Provide and implement a protection plan. Plan to include documentation and safe off of
utilities.
D. Provide a Project Schedule with two week look ahead throughout the project.
E. Coordinate required inspections.
PRESERVE'S PROTECT' RESTORE
Page 10 of 13
Project Name: Pioneer Oil Refinery
6/15/2026
F. Provide onsite superintendent for duration of project.
G. Provide OSHA certified Safety program.
H. Coordination of trades/subcontractors
Sub Total - $7,200.00
09. PHASE #2 - EQUIPMENT
Equipment - Additional Equipment Required for Phase #2
*Based on up to a one hundred eighty three (183) calendar day completion schedule
1. Provide lift equipment to access work area including exterior facade and interior
walls/ceilings
2. Supply and install spider box, cord/string lights for temporary power and lighting to the
top of the hill,
3. Provide dumpsters and disposal.
4. Provide site fencing.
Sub Total - $12,600.00
10. PHASE #2 - CONSTRUCTION
AREAS/ SURFACES
Restoration/reinstallation of the historic equipment on the upper level of the park to specifically
include:
PRESERVE PROTECT RESTORE
Page 11 of 13
Project Name: Pioneer Oil Refinery
6/15/2026
A. Shed
B. Water Tank
C. Oil Tank
HISTORIC RESTORATION TREATMENT PROCEDURES - AS REQUIRED
1. Restoration to All Phase 2 Buildings and Structures to specifically include:
a. Install temporary shoring as needed to prevent hazard or inadvertent
damage to building/structure during work.
b. Apply corrosion -inhibiting treatment to metal(s) as appropriate while
maintaining existing patina. (Everbrite Protectaclear metal coating)
c. Secure openings against dumping, vandalism, moisture accumulation,
unauthorized entry, etc. (use of wire mesh screens at openings)
d. All work will carry out any necessary chemical or physical treatments
using gentlest means possible.
e. Secure and address potential safety or tripping hazards such as loose
materials and sharp edges.
f. Provide anti -graffiti protection on all exterior surfaces.
g. Clean, restore, and/or rehabilitate the structures as necessary.
2. Shed
a. Clear debris from interior of shed, if any.
b. Reinstall any loose or missing metal roof/wall panels; panels may be
elsewhere on site due to high winds.
c. Inspect and repair wood, sheet metal, and corrugated metal as needed,
including electrical panel and enclosure.
d. Where individual elements are missing or deteriorated beyond repair,
replace in kind.
e. Securely anchor metal wall and roof panels to wood structure.
f. Improve lateral bracing with additional diagonal brace on interior of each
wall.
3. Water Tank -Inspect and repair steel tank as needed.
PRESERVE PROTECT RESTORE
Page 12 of 13
Project Name: Pioneer Oil Refinery
6/15/2026
4. Oil Tank - Inspect and repair steel tank as needed.
Specific Exclusions: Working equipment, electrical.
Sub Total - $118,144.02
11. PHASE #2 - INSURANCE
To be 1% of total construction cost
Sub Total - $1,584.00
12. PHASE #2 - BONDING
To be 2% of total construction cost
Sub Total - $3,199.00
PRESERVE'S PROTECT' RESTORE
Page 13 of 13 Project Name: Pioneer Oil Refinery
6/15/2026
SUMMARY OF ESTIMATES
01. PHASE #1 - DESIGN........................................................................................................... $79,815.00
02. PHASE #1 - GENERAL CONDITIONS
............................................................................. $86,400.00
03. PHASE #1 - EQUIPMENT..................................................................................................
$41,400.00
04. PHASE #1 - CONSTRUCTION........................................................................................$881,510.49
05. PHASE #1 - INSURANCE...................................................................................................
$10,891.00
06. PHASE #1 - BONDING.......................................................................................................
$22,000.00
07. PHASE #2 - DESIGN...........................................................................................................
$20,415.00
08. PHASE #2 - GENERAL CONDITIONS
................................................................................ $7,200.00
09. PHASE #2 - EQUIPMENT..................................................................................................
$12,600.00
10. PHASE #2 - CONSTRUCTION........................................................................................$118,144.02
11. PHASE #2 - INSURANCE......................................................................................................$1,584.00
12. PHASE #2 - BONDING..........................................................................................................$3,199.00
Grand Total - $1,285,158.51
CONDITIONS
We propose to furnish material, equipment, supplies, labor and tax, complete in accordance with the above
specifications.
This proposal may be withdrawn if not accepted within 90 days.
Respectfully submitted by: Reuben Lombardo - Senior Preservation Estimator
Mobile: 310-614-5592
Work: 909-599-0760 x115
E-mail: rlombardo@spectracompany.com
Authorized by: Ray Adamyk - President
Acceptance Signature: _ Printed Name:
Title:
Date of Acceptance:
PRESERVE'S PROTECT' RESTORE
NOTICE TO PROPOSERS REGARDING CONTRACTUAL REQUIREMENTS
PROPOSAL # RCS-25-26-P2018
Design & Build Project for Pioneer Oil Refinery
City Project No. P2018
City of Santa Clarita, California
SUMMARY OF INDEMNITY AND INSURANCE REQUIREMENTS
1. These are the Indemnity and Insurance Requirements for DB Entity providing services or supplies to City
of Santa Clarita (City). By agreeing to perform the work or submitting a proposal, you verify that you comply
with and agree to be bound by these requirements. If any additional Contract documents are executed,
the actual Indemnity language and Insurance Requirements may include additional provisions as deemed
appropriate by City's Purchasing Agent.
The City reserves the sole right to accept or reject any requests for modifications to these terms.
2. You should check with your Insurance advisors to verify compliance and determine if additional coverage
or limits may be needed to adequately insure your obligations under this agreement. These are the
minimum required and do not in any way represent or imply that such coverage is sufficient to adequately
cover the DB Entity's liability under this agreement. The full coverage and limits afforded under DB Entity's
policies of Insurance shall be available to Buyer and these Insurance Requirements shall not in any way act
to reduce coverage that is broader or includes higher limits than those required. The Insurance obligations
under this agreement shall be: 1 — all the Insurance coverage and limits carried by or available to the DB
Entity; or 2 — the minimum Insurance requirements shown in this agreement, whichever is greater. Any
insurance proceeds in excess of the specified minimum limits and coverage required, which are applicable
to a given loss, shall be available to City.
3. DB Entity shall furnish the City with original Certificates of Insurance including all required amendatory
endorsements and a copy of the Declarations and Endorsement Page of the CGL policy listing all policy
endorsements to City before work begins. City reserves the right to require full -certified copies of all
Insurance coverage and endorsements.
I. INDEMNIFICATION:
City and its respective elected and appointed boards, officials, officers, agents, employees, and volunteers
(individually and collectively, "Indemnitees") shall have no liability to DB ENTITY or any other person for,
and DB ENTITY shall indemnify, defend, protect, and hold harmless Indemnitees from and against, any and
all liabilities, claims, actions, causes of action, proceedings, suits, damages, judgments, liens, levies, costs,
and expenses of whatever nature, including reasonable attorney's fees and disbursements (collectively,
"Claims"), which Indemnitees may suffer or incur or to which Indemnitees may become subject by reason
of or arising out of any injury to or death of any person(s), damage to property, loss of use of property,
economic loss, or otherwise occurring as a result of or allegedly caused by the DB ENTITY'S performance
of or failure to perform any services under this Agreement, or by the negligent or willful acts or omissions
of DB ENTITY, its agents, officers, directors, or employees, committed in performing any of the services
under this Agreement.
If any action or proceeding is brought against Indemnitees by reason of any of the matters against which
DB ENTITY has agreed to indemnify Indemnitees as provided above, DB ENTITY, upon notice from City, shall
defend Indemnitees at its expense by counsel acceptable to City, such acceptance not to be unreasonably
withheld. Indemnitees need not have first paid for any of the matters to which Indemnitees
are entitled to indemnification in order to be so indemnified. The limits of the insurance required to be
maintained by DB ENTITY in this Agreement shall not limit the liability of DB ENTITY hereunder. The
provisions of this section shall survive the expiration or earlier termination of this agreement.
The provisions of this section do not apply to Claims occurring as a result of the City's active negligence or
acts of omission.
II. INSURANCE
DB ENTITY shall maintain and submit certificates of all applicable insurance including, but not limited to,
the following and as otherwise required by law. The terms of the insurance policy or policies issued to
provide the above insurance coverage shall provide that said insurance may not be amended or canceled
by the carrier, for non-payment of premiums or otherwise, without thirty (30) days prior written notice of
amendment or cancellation to the CITY. In the event the said insurance is canceled, the DB ENTITY shall,
prior to the cancellation date, submit to the City Clerk new evidence of insurance in the amounts
established.
Liabilitv Insurance
During the entire term of this Agreement, the DB ENTITY agrees to procure and maintain General Liability
insurance at its sole expense to protect against loss from liability imposed by law for damages on account
of bodily injury, including death therefrom, suffered or alleged to be suffered by any person or persons
whomsoever, resulting directly or indirectly from any act or activities, errors or omissions, of the CITY, or
DB ENTITY or any person acting for the CITY, or under its control or direction, and also to protect against
loss from liability imposed by law for damages to any property of any person caused directly or indirectly
by or from acts or activities of the CITY, or DB ENTITY or any person acting for the CITY, or under its control
or direction. Such public liability and property damage insurance shall also provide for and protect the CITY
against incurring any legal cost in defending claims for alleged loss. Such General, Public and Professional
liability and property damage insurance shall be maintained in full force and effect throughout the term of
the Agreement and any extension thereof in the amount indicated above or the following minimum limits:
Commercial General Liability Insurance, including coverage for Premises and Operations, Contractual
Liability, Personal Injury Liability, Products/Completed Operations Liability, and Independent Contractors'
Liability (if applicable), in an amount of not less than two million dollars ($2,000,000.00) per occurrence,
four million dollars ($4,000,000.00) annual aggregate, written on an occurrence form.
Products/Completed Operations coverage shall extend a minimum of three (3) years after project
completion. Coverage shall be included on behalf of the DB ENTITY for covered claims arising out of the
actions of independent contractors. If the DB ENTITY is using subcontractors, the policy must include work
performed "by on or behalf" of the DB ENTITY. Policy shall contain no language that would invalidate or
remove the DB ENTITY's duty to defend or indemnify for claims or suits expressly excluded from coverage.
Policy shall specifically provide for a duty to defend on the part of the DB ENTITY.
Worker's Compensation Insurance
The DB ENTITY shall procure and maintain, at its sole expense, Worker's Compensation Insurance in the
amount of $1,000,000 per occurrence or in such amount as will fully comply with the laws of the State of
California and which shall indemnify, insure and provide legal defense for both the DB ENTITY and the CITY
against any loss, claim or damage arising from any injuries or occupational diseases happening to any
worker employed by the DB ENTITY in the course of carrying out the work within the Agreement. Such
insurance shall also contain a waiver of subrogation naming the City of Santa Clarita.
Automotive Insurance
The DB ENTITY shall procure and maintain, at its sole expense, throughout the term of this Agreement, and
any extension thereof, public liability and property damage insurance coverage for automotive equipment
with coverage limits of not less than $1,000,000 combined single limit for each accident. All such insurance
shall be primary insurance and shall name the City of Santa Clarita as an additional insured.
Pollution Liabilitv and/or Asbestos Pollution Liabilitv and/or Errors & Omissions
DB Entity's Pollution Liability and/or Asbestos Pollution Liability and/or Errors & Omissions with limit no
less than $2,000,000 per claim or occurrence and $2,000,000 aggregate per policy period of one year.
Coverage must be included for bodily injury and property damage, including coverage for loss of use and/or
diminution in property value, and for clean-up costs arising out of, pertaining to, or in any way related to
the actual or alleged discharge, dispersal, seepage, migration, release or escape of contaminants or
pollutants, arising out of or pertaining to the services provided by DB ENTITY under this Agreement,
including the transportation of hazardous materials or contaminants.
Professional Liabilitv (if Design -Build
Professional Liability Insurance, insuring against professional errors and omissions arising from DB ENTITY'S
work on the Project, in an amount not less than [$2,000,000] combined single limit for each occurrence. If
DB ENTITY cannot provide an occurrence policy, DB ENTITY shall provide insurance covering claims made
as a result of performance of work on this Project and shall maintain such insurance in effect for not less
than three years following final completion of the Project.
Waiver of Subrogation
All insurance coverage maintained or procured pursuant to this Agreement shall be endorsed to waive
subrogation against the CITY, its elected or appointed officers, agents, officials, employees and volunteers
or shall specifically allow DB ENTITY or others providing insurance evidence in compliance with these
specifications to waive their right of recovery prior to a loss. DB ENTITY hereby waives its own right of
recovery against the CITY, and shall require similar written express waivers and insurance clauses from
each of its subconsultants.
Ser)aration of Insureds
A severability of interests provision must apply for all additional insureds ensuring that DB ENTITY's
insurance shall apply separately to each insured against whom claim is made or suit is brought, except with
respect to the insurer's limits of liability. The policy(ies) shall not contain any cross -liability exclusions.
Pass Through Clause
DB ENTITY agrees to ensure that its subconsultants, subcontractors, and any other party involved with the
project who is brought onto or involved in the project by DB ENTITY, provide the same minimum insurance
coverage and endorsements required of DB ENTITY. DB ENTITY agrees to monitor and review all such
coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the
requirements of this section. DB ENTITY agrees that upon request, all Agreements with consultants,
subcontractors, and others engaged in the project will be submitted to the CITY for review.
Self -Insured Retentions
Any self -insured retentions must be declared to and approved by the CITY. The CITY reserves the right to
require that self -insured retentions be eliminated, lowered, or replaced by a deductible. Self-insurance will
not be considered to comply with these specifications unless approved by the CITY.
Primary and Additional Insured
All of such insurance shall be primary and shall name the City of Santa Clarita as additional insured. A
Certificate of Insurance and an additional insured endorsement (for general and automobile liability),
evidencing the above insurance coverage with a company acceptable to the City's Purchasing Agent shall
be submitted to the CITY prior to execution of this Agreement on behalf of the CITY.
Requirements
Should DB ENTITY, for any reason, fail to obtain and maintain the insurance required by this Agreement,
CITY may obtain coverage at DB ENTITY'S expense and deduct the cost of such insurance from payments
due to DB ENTITY under this Agreement or terminate. In the alternative, should DB ENTITY fail to meet any
of the insurance requirements under this Agreement, CITY may cancel the Agreement immediately with
no penalty.
Should DB ENTITY's insurance required by this Agreement be canceled at any point prior to expiration of
the policy, DB ENTITY must notify CITY within 24 hours of receipt of notice of cancelation. Furthermore, DB
ENTITY must obtain replacement coverage that meets all contractual requirements within 10 days of the
prior insurer's issuance of notice of cancelation. DB ENTITY must ensure that there is no lapse in coverage.
If the operation under this Agreement results in an increased or decreased risk in the opinion of the City's
Purchasing Agent, then the DB ENTITY agrees that the minimum limits herein above designated shall be
changed accordingly upon request by the City's Purchasing Agent.
The DB ENTITY agrees that provisions of this paragraph as to maintenance of insurance shall not be
construed as limiting in any way the extent to which the DB ENTITY may be held responsible for the
payment of damages to persons or property resulting from the DB ENTITY'S activities or the activities of
any person or persons for which the DB ENTITY is otherwise responsible.
I have read and understand the above requirements and agree to be bound by them for any work
performed for the City.
Authorized Signature: V(T( Date: 6 / 11 / 2 6
Printed Name: Reuben Lombardo
DESIGNATION OF SUBCONTRACTORS/SUBCONSULTANTS
PROPOSAL # RCS-25-26-P2018
Design & Build Project for Pioneer Oil Refinery
City Project No. P2018
City of Santa Clarita, California
Listed below are the names and locations of the places of business of each subcontractor, supplier, and vendor who will perform work or labor or render service
in excess of Y: of 1 percent, or $10,000 (whichever is greater) of the prime contractor's total bid. If no Subcontractors will be used fill out the form with NA.
Please add additional sheets if needed.
Subcontractor
El Camino
DIR Registration No.
1000001647
Dollar Value of Work
$148,000
Location and Place of Business
2001 W 14st Unit B, Long Beach CA 90813
Bid Schedule Item No's.
Phase #1
Description of Work
Concrete work
License No.
922197
Exp. Date: / /
09/30/2610
Phone ( )
(562) 225-2419
Subcontractor
DIR Registration No.
Dollar Value of Work
Location and Place of Business
Bid Schedule Item No's:
Description of Work
License No.
Exp. Date: / /
Phone ( )
Subcontractor
DIR Registration No.
Dollar Value of Work
Location and Place of Business
Bid Schedule Item No'5:
Description of Work
License No.
Exp. Date: / /
Phone ( )
NOTE: A contractor or subcontractor shall not be qualified to propose on, be listed in a proposal, subject to the requirements of Section 4104 of the Public Contract
Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work
pursuant to Section 1725.5 of the Labor Code. It is not a violation of this section for an unregistered contractor to submit a proposal that is authorized by Section
7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public
work pursuant to Section 1725.5 of the Labor Code at the time the contract is awarded.
REFERENCES
PROPOSAL # RCS-25-26-P2018
Design & Build Project for Pioneer Oil Refinery
City Project No. P2018
City of Santa Clarita, California
The following are the names, addresses, and telephone numbers of three public agencies for which
proposer has performed work of a similar scope and size within the past 3 years. If the instructions on this
form conflict with the references requested in the scope of work, the scope of work shall govern. Complete
this form accordingly. Fill out this form completely and submit it with your proposal.
I. Merced County 2222 M St, Merced, CA 95340
Name and Address of Owner / Agency
Spenser Ivancich, CM, Merced County Department of Public Works; (209)385-7602
Name and Telephone Number of Person Familiar with Project
$3,300,000.00 Restoration of historic windows, facade and stone 09/14/2025
Contract Amount
Type of Work
2. Pasadena Civic Center, 300 E Green St, Pasadena, CA 91 101
Name and Address of Owner/ Agency
Date Completed
Naz Sabripour, Executive Director, Pasadena Center Operating Company (626)395-021 3
Name and Telephone Number of Person Familiar with Project
$1 ,322,539.00 Window and facade restoration 04/30/2025
Contract Amount
Type of Work
Date Completed
3. Santa Ana City Council, 20 Civic Center Plaza, Santa Ana, CA 92701
Name and Address of Owner / Agency
Ishan Patel, Project Manager (81 8)246-3481
Name and Telephone Number of Person Familiar with Project
$1,620,171.00 Marble facade restoration 04/02/2025
Contract Amount Type of Work Date Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties from whom
Proposer intends to procure insurance bonds:
Gray Casualty & Surety Company, 1 225 W Causeway Approach, Mandeville, LA 70471 ; (504)780-7440
Proposer Warranty Statement:
Standard State of California One (1) Year Construction
Warranty.
If there should be a difference between The City of Santa Clarita's minimum warranty and the Proposer's
best warranty, the Proposer agrees to be bound by the warranty, which is most advantageous to the City
of Santa Clarita.
Contractor's License. The California Contractor's license number listed above has been issued to the
undersigned Proposer. This license has not been revoked or suspended and is in full force and effect and
authorizes the undersigned Proposer to perform the Work under these Contract Documents. If Proposer is
a joint venture and has not yet been issued a license, indicate the license number to be used for the joint
venture and attach documentation providing assurances that the license will be issued on or before the
award of the Contract.
The undersigned is/are a legally authorize representative(s) of the Design -Build Entity, and hereby certify
that I am/we are submitting this Proposal in response to the Request for Proposals (RFP) issued by the City
of Santa Clarita to design, manage and construct and the Project in accordance with the Contract
Documents. I am/we are duly authorized to sign this Proposal on behalf of the above -named firm; that the
Proposal has been checked for errors and omissions; I/we have read all the answers herein and know all of
their contents; and that all information set forth in this Proposal and all attachments hereto are, to the
best of my/our knowledge, true, accurate, current and complete as of its submission date
The undersigned certifies and declares under penalty of perjury under the laws of the State of California,
that the foregoing is true and correct, and that this declaration was executed in Los Angeles® County,
California, on 6110/26 (Date).
Tim Harris, Chief Operating Officer
Signature Name and Title
DESIGN -BUILD SIGNATURES
PROPOSAL # RCS-25-26-P2018
Design & Build Project for Pioneer Oil Refinery
City Project No. P2018
City of Santa Clarita, California
No Proposal shall be accepted which has not been signed in ink in the appropriate space below. Select the
appropriate legal structure for execution of the certification.
1. If Design -Build Entity is an INDIVIDUAL, sign here (include a notarized affidavit attesting to the
authenticity of said signature):
Printed Name:
Signature:
Title:
Date:
2. If Design -Build Entity is a PARTNERSHIP or JOINT VENTURE, all general partners or members shall
sign here (include a notarized affidavit attesting to the authenticity of said signatures).
Partnership/Joint Venture Name:
Member/Partner Name:
Member/Partner Signature:
Member/Partner Name:
Member/Partner Signature:
Member/Partner Name:
Member/Partner Signature:
Title:
Date:
Title:
Date:
Title:
Date:
3. If Design -Build Entity is a CORPORATION, the duly authorized officer(s) shall sign as follows:
The undersigned certify that they are respectively Chief Operating Officer (Title) and
(Title) of the corporation named below; that they are designated to
sign this SOQ Transmittal Cover Page by a resolution (attach a certified copy, with corporate seal, if
applicable, notarized as to its authenticity or Secretary's Certificate of Authorization) for and on
behalf of the below named CORPORATION, and that they are authorized to execute same for and
on behalf of said CORPORATION.
Corporation Name: Spectra Company
Printed Name: Tim Harris
Signature: _
Title: Gnn
Date: 6 / 11 / 2 6
4. If Respondent is an OTHER legal entity, an authorized representative of the entity shall sign here
(include a notarized affidavit attesting to the authenticity of said signatures).
Entity Name:
Printed Name:
Signature: Date:
5. If the Design -Build Entity is a FIRM THAT HAS NOT YET BEEN FORMED, all entities and other parties
proposed to comprise such Design -Build Entity shall sign here (include a notarized affidavit
attesting to the authenticity of said signatures), the individual signatories making the certification
described above on behalf of such entities/parties:
Proposed Design -Build Entity Name:
On Behalf of Proposed Member/ Partner Name:
Printed Name:
Title:
Signature:
Date:
On Behalf of Proposed Member/ Partner Name:
Printed Name:
Title:
Signature:
Date:
On Behalf of Proposed Member/ Partner Name:
Printed Name:
Title:
Signature:
Date:
ACKNOWLEDGMENT & ACCEPTANCE OF SCOPE OF WORK
PROPOSAL # RCS-25-26-P2018
Design & Build Project for Pioneer Oil Refinery
City Project No. P2018
City of Santa Clarita, California
By providing the three (3) required signatures below, the Contractor acknowledges full understanding,
complete agreement to, and accepts in its entirety, all Scope of Work for the Design and Build Project for
Pioneer Oil Refinery. The Contractor will be expected to perform maintenance practices and uphold the
standards herein to the established Scope of Work throughout the length of the contract.
*Supervisor's Signature: Date:
* Estimator's Signature: p�lrC r,
* Owner's Signature:
* All three signatures required
6/11/26
Date: 6 / 11 / 2 6
Date: 6 / 11 / 2 6
CITY OF SANTA CLARITA DISCLOSURE STATEMENT
PROPOSAL # RCS-25-26-P2018
Design & Build Project for Pioneer Oil Refinery
City Project No. P2018
City of Santa Clarita, California
The following information must be disclosed:
1. Ust the names of all persons having a financial interest in the Request for Proposals.
Ray Adamyk, Tim Harris
2. If any person identified pursuant to No. 1 above is a corporation or partnership, list the names of all
individuals owning more than ten percent of the shares in the corporation or owning any partnership
interest in the partnership.
N/A
3. If any person identified pursuant to No. 1 above is a non-profit organization or a trust, list the names of
any persons serving as a director of the non-profit organization or as a trustee or beneficiary or trustor
of the trust.
N/A
4. Has the offeror had more than $250.00 worth of business transacted with any member of the City of
Santa Clarita staff, boards, commissions, committees, and Council within the past twelve months? If
yes, please indicate the person(s) with whom you have conducted business.
NO
NOTE: Attach additional pages as necessary.
Signature of Offeror
Tim Harris
Print or Type Name of Offeror
6/10/26
Date
EQUAL OPPORTUNITY/ AFFIRMATIVE ACTION STATEMENT
PROPOSAL # RCS-25-25-P2018
Design & Build Project for Pioneer Oil Refinery
City Project No. P2018
City of Santa Clarita, California
The offeror hereafter described will not discriminate against any employee or applicant for employment
because of race/color, national origin, sex, sexual preference, religion, age, or handicapped status in
employment or the provisions of services.
Signature
Tim Harris, Chief Operating Officer
Typed Name and Title
SPECTRA
HISTORIC CONSTRUCTION
wm
Company Profile
Information, Licenses and Services . . . . . . . . . 3-4
Featured Projects
Hearst Castle . . . . . . . . . . . . . . .
. . . . . . . 5
Apple Tower Theatre . . . . . . . . . .
. .. . . . . . 6
Santa Barbara Mission . .. . . . . . . .
. . . . . . . 7
Pantages Theatre . . . . . . . . . . . . .
. . . . . . . 8
El Capitan Theatre . . . . . . . . . . . .
. . . . . . . 9
Catalina Casino . . . . . . . . . . . . . .
. . . . . . 10
Gamble House . . . . . . . . . . . . . .
. . . . . . 11
Hollywood Bowl . . . . . . . . . . . . . .
. . . . . . 12
Culver Studios . . . . . . . . . . . . . .
. . . . . . 13
Ennis House . . . . . . . . . . . . . . . .
. . . . . . 14
Brand Library . . . . . . . . . . . . . . .
. . . . . . 15
Irvine Ranch Historic Park . . . . . . .
. . . . . . 16
Villa Riviera . . . . . . . . . . . . . . . .
. . . . . . 17
Millennium Biltmore Hotel . . . . . . . .
. . . . . . 18
Commercial Exchange . . . . . . . . . .
. . . . . . 19
NoMad Hotel . . . . . . . . . . . . . . .
. . . . . . 20
Urth Caffe . .. .. .. .. .. .. .. . ..
.. .. . 21
Hercules Campus . . . . . . . . . . . . .
. . . . . . 22
Museum of Man . . . . . . . . . . . . . .
. . . . . . 23
Lopez Adobe . . . . . . . . . . . . . . . .
. . . . . . 24
Team Biographies . . . . . . . . . . . . 25-30
Historic Projects List ......... 31-32
� I
J
SPECTRA SPECTRACOMPANY.COM • (800) 375-1771 PAGE 2
TSTORIC CONSTRUCTION
Company Information
Founded in 1985, Spectra Company is the leader in historic preser-
vation, restoration and rehabilitation in the western United States
offering a wide range of services including historic construction,
materials restoration and preservation consulting. For over 30
years, Spectra Company has been entrusted with the rehabilitation
of over 300 of the most cherished, historical, architectural and
cultural landmarks in the country.
Spectra is one of the few construction companies that self -per-
form the entire spectrum of restoration services, which allows us
to ensure skill, expertise, and quality control on every project. Our
award -winning team includes over 150 in-house builders, craftsmen,
and preservation professionals. Together we work to meet a shared
goal to respect, restore, and revitalize our communities, one build-
ing at a time.
Spectra Company Headquarters
350 N Gorey Avenue, Pomona, CA
West Coast's #1 "Historic" Contractor
Preservation Award Winning Company
Excellent Job Safety Record
SPECTRA SPECTRACOMPANY.COM • (800) 375-1771
TSTORIC CONSTRUCTION
Services I Historic
CONSTRUCTION • DESIGN
• General Contracting
• Historic Construction
• Design -Build
• Adaptive Reuse
• Structural Retrofit
• Facade Rehabilitation
MATERIALS RESTORATION
• Stone
• Marble
• Granite
• Terra -Gotta
• Masonry
• Brick
• Adobe
• Concrete
• Bronze
• Brass
• Copper
• Ornamental Metal
• Ornamental Plaster
• Architectural Woodwork
• Finish Carpentry
• Decorative Tile
• Mosaics
• Doors
• Windows
• Sculptures
• Fountains
• Decorative Painting
• Murals
• Conservation
• Gilding
• Faux Finishing
PRESERVATION CONSULTING
• Preconstruction Services
• Building Assessment and Investigation
• Budget and Cost Estimating
• Surveys and Feasibility Reports
• Salvaging and Cataloging
• Licensed Drone Investigation
License Classifications
General Contractor Licenses
CALIFORNIA — 605280
NEVADA — 0075007
ARIZONA — 285869
Masonry License
HAWAI I
Architect Licenses
CALIFORNIA
ARIZONA
LEED Accredited Professional
California Classifications
B-1
General Contractor
C-17
Glazing
C-29
Masonry/Adobe
C-33
Painting and Decorating
C-35
Lathing and Plastering
C-39
Roofing and Waterproofing
C-54
Tile (Ceramic and Mosaic)
Lead and Mold Certified
SPECTRA SPECTRACOMPANY.COM • (800) 375-1771 PAGE 4
TSTORIC CONSTRUCTION
i
Hearst Castle
Hearst Castle was built by newspaper magnate William Randolph Hearst and de-
signed by architect Julia Morgan. Construction began on the 250,000-acre estate in
1919 and the mansion became famous for hosting the Hollywood and political elite
of the day. After Hearst left due to his ailing heath, the mansion was donated and
is currently operated by the California Department of Parks and Recreation which
offers daily tours of the estate.
Spectra worked on the castle to complete stone restoration at the window sills and
door thresholds, stained glass restoration, preservation consulting, preconstruction
documentation, and construction monitoring.
SCOPE OF WORK
Materials Restoration
Preconstruction & Design
Preservation Consulting
Self -Perform
Stone
Wood Windows
San Simeon, CA
California Deptartment of
Parks & Recreation
SPECTRA
TUSTORIC CONSTRUCTION
El
Apple Tower Theatre
The Tower Theatre was designed in 1927 by architect Charles Lee, who modeled
the interior after the Paris Opera House. It was the first theater in Los Angeles
to be wired for talking pictures, as well as the first to have air conditioning. After
the theater's closure in 1988, it sat abandoned for nearly 30 years. Today, after a
3-year renovation, it serves as the flagship Apple store for Los Angeles.
Spectra catalogued, removed and reinstalled the historic plaster ceilings, railings
and decorative elements in over 1,200 separate pieces. Spectra also surveyed and
rehabilitated the terra-cotta exterior facade, including the previously removed clock
tower.
SCOPE OF WORK
Building Condition Assessment
Facade Rehabilitation
Materials Restoration
Ornamental Plaster
Preservation Consulting
Self -Perform
Terra -Gotta
Gruen and Associates
SPECTRA
TUSTORIC CONSTRUCTION
PAGE 6
Santa Barbara Mission
The Santa Barbara Mission was established on the Feast of Santa Barbara on
December 4, 1786 as the tenth of the twenty-one California Missions to be founded
by the Spanish Franciscans. A series of four missions have been built on the site.
Santa Barbara Mission is the only mission to remain under the leadership of the
Franciscan Friars since its founding. Today, the mission is a parish church of the
Archdiocese of Los Angeles.
The church underwent restoration and Spectra joined the design team to complete
the rehabilitation. Spectra performed masonry and adobe restoration as well as
sandstone, lime wash, and lime plaster restoration.
SCOPE OF WORK
Adobe
Facade Rehabilitation
Masonry
Plaster
Self -Perform
2201 Laguna Street
Santa Barbara, CA
California Preservation Foundation
Governor's Award
SPECTRA
TUSTORIC CONSTRUCTION
Pantages Theater
Designed by B. Marcus Priteca, the almost 2,700-seat Art Deco Pantages The-
atre opened in Hollywood in 1930. The lavish auditorium and stunning lobby of
the theatre has attracted touring musicals and concerts, and became a symbol of
Hollywood's golden age where the Academy Awards and multiple movie premieres
have taken place.
Spectra Company completed the facade restoration and restoration of many other
historic materials.
SCOPE OF WORK
Architectural Woodwork
Plaster
Concrete Repair
Restoration Painting & Coatings
Decorative Metal
Selective Demolition/Abatement
Facade Rehabilitation
Self -Perform
Materials Restoration
Stone
Metal Door
Tile
Metal Windows
Wood Doors
Ornamental Plaster
6233 Hollywood Boulevard
geles, CA
eaerianaer
SPECTRA
SPECTRACOMPANY.COM (800) 375-1771
HiSTURIC COYtlTkI1GTIUN
".GE 8
E1 Capitan Theatre
The "Father of Hollywood', Charles Toberman, and his associate Sid Grauman
built the El Capitan Theatre and Office Building in 1926 as well as the famous
Egyptian and Chinese Theatres. The cast concrete Spanish Colonial Churri-
gueresque facade makes this historic building stand out amidst the National
Register Hollywood Boulevard Commercial and Entertainment District. Within
its first ten years of existence, one hundred and twenty plays were produced at
the theatre. The El Capitan Theatre is now home to "Disney' world premieres
and other special events.
Spectra has completed a wide variety of services on the El Capitan in recent years
including restoration of damaged cast stone figures and recasting of missing
portions of damaged statues, preservation consulting, metal restoration, decorative
paint finishes, and restoration painting as well as ongoing annual maintenance.
SCOPE OF WORK
Concrete Repair
Decorative Concrete
Decorative Metal
Decorative Paintings & Murals
Estimating & Value Engineering
Facade Rehabilitation
General Contracting
Materials Restoration
Metal Windows
Plaster
Preconstruction & Design
Preservation Consulting
Restoration Painting & Coatings
Self -Perform
Waterproofing/Roofing
6838 Hollywood Boulevard
Hollywood, CA
•
aPornia Capital EC, LLC
G. Albert Lansburgh & Stiles 0. Clements
JAG Architects
, Inc.
SPECTRA
SPECTRACOMPANY.COM (800) 375-1771
HiSTURIC COYtlTkI1GTIUN
Catalina Casino
Built by chewing gum magnate William Wrigley Jr, the Catalina Casino is an
Art Deco/Mediterranean Revival style circular building. The casino, meaning
gathering place', was originally designed as a movie theater for films with sound.
The 12-story building also has a ballroom on the upper level, adorned with
sterling silver and gold -leaf accents.
Spectra completed a wide variety of services as part of its rehabilitation, includ-
ing facade restoration, ornamental cast stone, decorative painting, faux finish,
structural repairs, and preservation consulting.
SCOPE OF WORK
Brick
Concrete Repair
Decorative Metal
Decorative Paintings & Murals
Facade Rehabilitation
Lighting & Chandeliers
Materials Restoration
Ornamental Plaster
Plaster
Preservation Consulting
Restoration Painting & Coatings
Self -Perform
Stone
Structural Retrofit
Waterproofing/Roofing
Wood Doors
Wood Windows
-
SPECTRA
TUSTORIC CONSTRUCTION
SPECTRACOMPANY.COM • (800) 375-1771
NAM
i
Gamble House
Often described as "Americas Arts and Crafts masterpiece", the Gamble House
stands today as one of the most famous and beloved historic houses in America.
David and Mary Gamble commissioned the house to be built in 1908 by archi-
tects Charles and Henry Greene. The Greene brothers presented a breakthrough
in American architectural design featuring Japanese woodwork and inspiration
drawn from nature. The house features wide terraces, sleeping porches, and large
overhanging eaves.
The home underwent a complete exterior rehabilitation that was overseen by an
experienced team of historic architects, consultants and conservators. Some of
the finest examples of architectural woodwork exists at the Gamble House. The
Spectra team on this restoration project consisted of expert artisans who worked
to restore, replicate and refinish the most intricate of architectural woodwork.
SCOPE OF WORK
Architectural Woodwork
Conservation
Materials Restoration
Selective Demolition/Abatement
Self -Perform
Waterproofing/Roofing
Wood Doors
Wood Windows
.,
4 Westmoreland Place
Pasadena, CA
•
City of Pasadena
• ' • mm m GI
Greene and Greene Architects
No •• •
re, Inc.,
Griswold Conservation Associates. LLC
SPECTRA
SPECTRACOMPANY.COM (800) 375-1771
HiSTURIC COYtlTkI1GTIUN
,E 11
Hollywood Bowl
The Hollywood Bowl is the world's largest outdoor amphitheater. It may be the
official summer home to the Los Angeles Philharmonic, but it is famously known
for hosting famous musicians, dancers, and entertainers throughout the year.
The original Hollywood Bowl, which opened on July 11 in 1922, was a wooden
platform with a canvas top, surrounded by moveable benches for the audience. In
2004, after continued degradation of the shell's acoustics, the architectural firm
of Hodgetts and Fung designed a replacement shell incorporating the prominent
front arch of the 1926 design, the wide layout of the 1928 shell, and the white
finish of the 1929 design.
Spectra completed concrete restoration of the buttress, metal restoration, and tile
restoration.
SCOPE OF WORK
Concrete Repair Self -Perform
Decorative Metal Tile
Materials Restoration
2301 N Highland Avenue
geles, CA
Philharmonic Association
Allied Architects
Bill Caskey & Associates, Inc.
(Buttress and Railing Restoration to Scope)
rrrrri
HISTORIC PRESERVATION ARCHITECT
ENEARL TOR
1 • •
SPECTRA
SPECTRACOMPANY.COM (800) 375-1771
HiSTURIC COYtlTkI1GTIUN
PAGE 12
Culver Studios
Culver Studios is a movie studio lot originally created by silent movie pioneer
Thomas H. Ince in 1918. The first structure to go up on the lot was `The Man-
sion', which is a colonial style building that was modeled after George Washing-
ton's home at Mount Vernon. Over the years, a theater, multiple bungalows and
a blacklot for outdoor sets were added to the property. The lot went through a
redevelopment and Culver Studios is now home to Amazon's Los Angeles area
operations.
Spectra Company rehabilitated the main mansion, including a major structural
retrofit that was carefully concealed. In addition, four of the historic bungalows
were relocated and rehabilitated along with several more historic buildings.
SCOPE OF WORK
Architectural Woodwork
Building Relocation
Facade Rehabilitation
Self -Perform
Structural Retrofit
Kaplan Chen Kaplan
r
r
NIff
SPECTRA
TUSTORIC CONSTRUCTION
PAGE 13
tea.
Frank Lloyd Wright's
Ennis House
Frank Lloyd Wright's Ennis House is one of four `textile block' homes in Los Angeles,
constructed with patterned concrete blocks that give a unique texture to the exterior
facade. The house consists of an estimated 27,000 to 40,000 of these concrete blocks.
After the condition of the house deteriorated from earthquake and rain damage, it
was listed on the National Trust for Historic Preservation's most endangered places.
Spectra Company contributed to the restoration, which included structural
upgrades, materials restoration and new roofing, conservation of the textile blocks,
window and door restoration, exterior cleaning, and hardware restoration.
SCOPE OF WORK
Architectural Woodwork
Concrete Repair
Decorative Concrete
Decorative Metal
Facade Rehabilitation
Materials Restoration
Metal Door
Restoration Painting & Coatings
Selective Demolition/Abatement
Self -Perform
Stone
Waterproofing/Roofing
Wood Doors
Wood Windows
2607 Glendower Avenue
John Fidler Preservation Technoloav
SPECTRA
SPECTRACOMPANY.COM (800) 375-1771
HiSTURIC COYtlTkI1GTIUN
w � s a ��� ���i ►��1 F*�1 IFwa r��j ►*1w�i � e � i s�a� her r a i ' r �. F .:,! :., ,.
1'E!! ►# i # F.i E. F# ! # P# IF# Ip # Fit F! M F i
.i.. i, .i.. • is •iY. � rl- •i. .*- .� i iL. ■ •
.yp. r!a ems' .M. * .�. .Rp W ..
Brand Library
At the base of the Verdugo Mountains lays a 5,000 square foot mansion built by
Leslie Coombs Brand in 1904. Otherwise known as El Miradero, which means
"vantage point", the mansion represents the unique Indo-Saracenic architectural
style influenced by Islamic and Indian design, including repeated scalloped
arches. When Brand passed away in 1925, he donated the house and its
surrounding 488 acres to the City of Glendale to be used as a public library and
public park. By 1956, the house was converted into the library that still stands
today.
Spectra proudly completed restoration work of its historic features during the
project including exterior ornamental plaster and re-creation of the historic
ceiling murals found throughout the library. The murals were rediscovered upon
removal of suspended ceilings that kept them hidden for decades.
SCOPE OF WORK
Architectural Woodwork
Conservation
Decorative Paintings & Murals
Facade Rehabilitation
Materials Restoration
Ornamental Plaster
Plaster
Restoration Painting & Coatings
Self -Perform
Wood Doors
Wood Windows
0
qL0
"1II
1601 W Mountain Street
Glendale, CA
ndale
111I Leslie C. Brand
Gruen and Associates
Spectra Company
SPECTRA
TUSTORIC CONSTRUCTION
SPECTRACOMPANY.COM • (800) 375-1771
Conservancy
Irvine Ranch Historic Park
The Irvine Ranch was established by James Irvine in the 1860's. Over the years,
multiple buildings were added to accommodate the success of farming operations
that took place on the property. Irvine Ranch was once California's largest produc-
ers of Valencia oranges, beans and barley.
Spectra Company oversaw the rehabilitation of seven of the original Office build-
ings as the General Contractor including: Mess Hall, Bath House, Early Office and
several structures on Foreman's Row. The project included structural, site and
accessibility improvements, and restoration of an original wallpaper mural. These
structures now house the offices for the OC Parks Department.
SCOPE OF WORK
Architectural Woodwork
Decorative Paintings & Murals
Facade Rehabilitation
General Contracting
Restoration Painting & Coatings
Selective Demolition/Abatement
Self -Perform
Structural Retrofit
Wall -Coverings
Waterproofing/Roofing
Wood Doors
Wood Windows
SPECTRA
SPECTRACOMPANY.COM (800) 375-1771
HiSTURIC COYtlTkI1GTIUN
Villa Riviera
The Villa Riviera was completed in 1929 as a residential stock co-operative apart-
ment building. At the time, it was the second tallest building in Southern California
only after Los Angeles City Hall. The building is one of the most significant
landmarks in Long Beach and serves as the visual focal point and entrance to
downtown Long Beach.
Spectra completed a facade rehabilitation with a wide scope of restoration services
including a complete re-creation of the ornate original bronze doors, based on
historic photographs. Many of the grotesques were re-created from molds made
from extant figures.
SCOPE OF WORK
Architectural Woodwork
Concrete Repair
Decorative Concrete
Decorative Metal
Decorative Paintings & Murals
Facade Rehabilitation
Lighting & Chandeliers
Masonry
Metal Door
Ornamental Plaster
Plaster
Selective Demolition/Abatement
Self -Perform
Structural Retrofit
Waterproofing/Roofing
Wood Windows
800 E Ocean Boulevard
Long Beach, CA
Qm"
ong eac Heritage
Los Angeles Conservancy
California Preservation Foundation
SPECTRA
TUSTORIC CONSTRUCTION
SPECTRACOMPANY.COM • (800) 375-1771
Millennium Biltmore Hotel
The Millennium Biltmore Hotel was built in 1923 by Schultze & Weaver. The exte-
rior facade beautifully incorporates a combination of Spanish -Italian Renaissance
Revival, Mediterranean Revival, and Beaux Arts styles. The detail of the interior is
exquisite, with hand painted frescos, murals, carved marble fountains, lead crystal
chandeliers, and caste bronze stairwells.
Spectra completed decorative painting services including gilded finishes, metallic
leaf, aging and color wash, faux bois, and stone finishes. The scope of the entire
project includes conservation, cleaning, decorative painting, ornamental plaster,
gilding -gold leaf, faux finish, mural restoration, and preservation consulting.
SCOPE OF WORK
Conservation
Decorative Paintings & Murals
Ornamental Plaster
Plaster
Preservation Consulting
Restoration Painting & Coatings
Self -Perform
SPECTRA
SPECTRACOMPANY.COM (800) 375-1771
HiSTURIC COYtlTkI1GTIUN
Commercial Exchange
The 13-story Commercial Exchange Building was designed by the architectural
firm of Walker and Eisen. Completed in 1924, the building served as the headquar-
ters of the Owl Drug Co., and housed the publishing company of "Tarzan" author
Edgar Rice Burroughs. It was the tallest building in its area at the time and also
boasted three high-speed elevators, offices with abundant light, elegant mahogany
trim and millwork, and coveted two-hour street parking.
Vacant since the mid-1980s, the building has now been converted by NY -based
hotel developer Sydell Group into their new trendy hostels concept called "Free-
hand." The iconic Commercial Exchange neon sign, one of the tallest in LA, was
also restored as part of the project. Spectra performed the facade rehabilitation and
restored historic ceilings, replicated and restored historic terra-cotta and brick unit
masonry, restored and repainted decoratively painted plaster ceilings, and restored
original building entrances that had been significantly altered.
SCOPE OF WORK
Adaptive Reuse Ornamental Plaster
Decorative Concrete Plaster
Decorative Metal Restoration Painting & Coatings
Facade Rehabilitation Self -Perform
Masonry Terra -Gotta
4 . s..m
ell
44I A ''
416 W 8th Stre
Los Angeles, CA
SPECTRA
SPECTRACOMPANY.COM (800) 375-1771
HiSTURIC COYtlTkI1GTIUN
Los Angeles Conservancy
it
NoMad Hotel
Located at the corner of Olive and 7th Street in Downtown Los Angeles, Giannini
Place was the Los Angeles headquarters for the Bank of Italy. Acclaimed architec-
ture firm Morgan, Walls & Clements was commissioned to design the new bank.
Designed in the neoclassical style, the 12-story building features Doric columns,
marble floors and an ornate golden -coffered ceiling in the main lobby.
In 2015, the New York -based development firm Sydell Group purchased the
abandoned office building. They launched an extensive project to adaptively re-
habilitate the building into the chic NoMad Hotel. The space accommodates 250
guest rooms, a rooftop pool, an event deck, and street level restaurant and retail
space. Spectra collaborated with Sydell Group, RD Olson, and KFA to restore the
1920's-era structure.
SCOPE OF WORK
Adaptive Reuse
Metal Windows
Brick
Plaster
Decorative Metal
Restoration Painting & Coatings
Facade Rehabilitation
Self -Perform
Masonry
Stone
Materials Restoration
Terra -Gotta
Metal Door
Wood Windows
SPECTRA
SPECTRACOMPANY.COM (800) 375-1771
HiSTURIC COYtlTkI1GTIUN
�riri�Ml
Urth Caffe
The Urth Caffe is located in the Old Town Historic District in Orange, which is
California's largest National Register district. The building that houses it is one
of the oldest contributing historic buildings within the district, with historic sites
constructed there as early as 1888.
Spectra Company, working as both the General and Restoration Contractor,
performed several historic rehabilitation services including structural retrofit,
facade rehabilitation, and restoration of original openings that were missing.
Other services included ornamental metal restoration, sign fabrication, roof re-
placement, both the restaurant and office tenant improvements, and restoring
the entire storefront of the building, as close as possible, to its early 1900's period
of significance.
SCOPE OF WORK
Adaptive Reuse
Architectural Woodwork
Brick
Conservation
Decorative Metal
Decorative Paintings
& Murals
Design Build
Estimating & Value
Engineering
Facade Rehabilitation
Fountains
General Contracting
Lighting & Chandeliers
Masonry
Materials Restoration
Preconstruction & Design
Preservation Consulting
Restoration Painting
& Coatings
Selective Demolition/
Abatement
Self -Perform
Structural Retrofit
Themed Construction
Tile
Waterproofing/Roofing
Wood Doors
Wood Windows
100 W Chapman A
JiNfige, CA
Towne Development, LLC
Grimm & Chen Structural Engineering, Inc.
servation Foundation
SPECTRA
SPECTRACOMPANY.COM (800) 375-1771
HiSTURIC COYtlTkI1GTIUN
—7
Hercules Campus
Hercules Campus, formerly known as Hughes Aircraft Company, was built in 1941
by Howard Hughes. This large 28-acre campus with 530,000 combined square
feet of space was used to produce aircraft, atmospheric entry probes, and guided
missiles, to name a few. The campus underwent restoration in recent years to
adaptively reuse it for corporate office use.
Spectra started working on the campus in 2015 to restore the metal and wood
windows and continued to finish a wide scope of work on many of the buildings on
campus including the interior restoration of Howard Hughes' office.
SCOPE OF WORK
Adaptive Reuse
Self -Perform
Architectural Woodwork
Waterproofing/Roofing
Facade Rehabilitation
Wood Doors
Metal Door
Wood Windows
Metal Windows
Restoration Painting & Coatings
12101 Bluff
�+
Creek Drive ........ ......... ......
Los Angeles. CA
geles
Los Angeles Conservancy
ructural Focus
SPECTRA
TUSTORIC CONSTRUCTION
Museum of Man
In 1915 The Story of Man through the Ages exhibit showed at the Panama -California
Exposition. The museum's name was later changed to the San Diego Museum of
Man due to the museum's concentration on anthropology. During World War II,
the museum was converted into a hospital and later returned to its original state
in 1951.
Spectra Company assisted with the museum's facade restoration including
restoring wood windows, timber beam restoration, replication of ornamental cast
stone, ceramic tile, and restoration on the dome.
SCOPE OF WORK
Concrete Repair
Decorative Concrete
Facade Rehabilitation
Masonry
Materials Restoration
Self -Perform
Tile
Waterproofing/Roofing
Wood Windows
Spectra Company >-
n`14nn n T n imm M
American Public Works Association
SPECTRA
SPECTRACOMPANY.COM (800) 375-1771
HiSTURIC COYtlTkI1GTIUN
Lopez Adobe
The Lopez Adobe was completed in 1883 by Valentin Lopez. It is one of the oldest
private residences, and the first two-story adobe built as a residence in the
San Fernando Valley.
Spectra Company assisted with the restoration of the Lopez Adobe by replicating,
repairing and structurally stabilizing the adobe walls, as well as other wood
restoration.
SCOPE OF WORK
Adobe
Architectural Woodwork
Facade Rehabilitation
Materials Restoration
Plaster
Restoration Painting & Coatings
Self -Perform
Structural Retrofit
Wood Doors
Wood Windows
Governor's Award
SPECTRA
TUSTORIC CONSTRUCTION
Ray Adamyk
Chief Executive Officer
Ray Adamyk began his career in construction at the young age of 15, working with
his uncle in Canada. At 25, he visited the state of California to train for a triathlon
and ultimately decided to call the golden state home. Ray then utilized his adept
construction and business experience, combined with his love for historic structures,
to start Spectra Company in 1985. He has since grown Spectra into the largest
historic construction company on the West Coast.
Ray believes historic structures are the key to defining and preserving the character
and legacies of communities. His philosophy has become both the company's culture
and mission: Respect, Restore & Revitalize. He served on the Board of Trustees for
the CaliformaPreservation Foundation from 2008 to 2014, holds memberships in the
Association for Preservation Technology International, National Trust for Historic
Preservation, California Preservation Foundation, Los Angeles Conservancy, Western
Association for Art Conservation, and AIA LA Affiliation. His historic preservation
projects have received recognition from the National Trust of Historic Preservation,
California Preservation Foundation, Los Angeles Conservancy, Long Beach Heritage,
and Pasadena Heritage.
Tim Harris
Chief Financial Officer
Tim Harris works as the Chief Financial Officer for Spectra Company. Tim is
responsible for the oversight and management of Spectra Company personnel.
He manages the logistics of the company, oversees systems development, organiza-
tional structure, and has more than 10 years of experience with historic preserva-
tion projects and with Spectra Company. Tim is a graduate of Western Michigan
University and holds a Degree in Business Management.
As the manager of the project management, administration and scheduling staff, he
is integrally responsible for the successful completion of all Spectra projects. Tim is
also directly accessible to all clients, coordinating with them to foster great working
relationships and client satisfaction.
4
£ry .
rw
u
SPECTRA SPECTRACOMPANY.COM • (800) 375-1771
TSTORIC CONSTRUCTION
Reuben Lombardo
Senior Preservation Estimator
Reuben Lombardo works as the Senior Preservation Estimator for Spectra
Company. He has extensive experience, and is a key team member of developing
and maintaining Spectra's high standards of preservation practices. Having
a Master of Fine Art from UCLA and being a hands-on restoration crafts-
man for many years, his areas of expertise include ornamental concrete and plaster,
terra-cotta and tile, historic murals and decorative painting, sculptures, mold -mak-
ing, stone, wood, and metal restoration. He has shared his expertise in the historic
field by serving two terms on the Board of Directors for WCAPTI (Western Chapter
of the Association of Preservation Technologies) and participated in multiple pre-
sentations and workshops on the restoration/preservation of historic structures for
WCAPT, APTI, CPF, LA Conservancy, APF (Arizona Preservation Foundation) and
ACI (American Concrete Institute). Reuben's numerous restoration projects include:
• Hoover Dam Exhibit Hall, Boulder City, NV
• Catalina Casino, Avalon, CA
• Museum of Man, San Diego, CA
• Greystone Mansion, Beverly Hills, CA
• Millennium Biltmore Hotel, Los Angeles, CA
Dick Gee, AIA, Leed AP
Historic Architect and Project Manager
Hearst Castle, San Simeon, CA
Calte(h Linde Robinson Lab, Pasadena, CA
Pantages Theatre, Hollywood, CA
Ennis House, Los Angeles, CA
Santa Barbara Mission, Santa Barbara, CA
Dick Gee works as the Lead Architect as well as a Project Manager for Spectra
Company. Having spent most of his career as an architect, he has over 32 years of
experience in architecture and is qualified as a Historic Preservation Architect
under the Secretary of Interior's Professional Qualifications Standards. He is a
licensed architect in California and Arizona, and has previously served as the lead
principal of the Los Angeles office for JAG Architects. As a Project Manager for
Spectra, Dick oversees preservation consulting, design -build and historic
construction projects, adding a broad range of experience to enhance owner,
architect, engineer and historic consultant collaboration. All in all, he has over 30
years of experience working on historic projects. Dick has been awarded California
Preservation Foundation, Los Angeles Conservancy, and local preservation awards
for numerous projects. He brings a unique comprehensive understanding to
preservation projects, having worked on every aspect from design, approvals,
preparing historic tax credit applications, construction and development. Some of
his preservation projects at Spectra include:
Commercial Exchange Building, Los Angeles, CA Ocean Center Building, Long Beach, CA
Crystal Cove Cottages, Newport Coast, CA Porter Hall at Pilgrim Place, Claremont, CA
• Culver Studios, Culver City, CA San Ysidro Land Port of Entry, San Ysidro, CA
El Capitan Theatre, Hollywood, CA Urth Caffe, Orange, CA
George Key Ranch Historic Park, Placentia, CA San Gabriel Mission, San Gabriel, CA
NoMad Hotel, Los Angeles, CA Pala Tribe Historic Buildings, Pala, CA
SPECTRA
SPECTRACOMPANY.COM 800) 3/5-1;
HiSTURIC COYtlTkI1GTIUN
John Tiersma
Director of Construction
John Tiersma has 39+ years -experience as a project manager and scheduler, adher-
ing to plans and specifications, developing schedules, estimating, and preparing and
negotiating contracts. He is responsible for all aspects of design and construction,
from start to finish, as well as managing team members and supporting staff. As
Director of Construction, John works directly with Spectra's project managers, su-
perintendents and project engineers on developing and bidding general contracting
projects. John has been the lead on many incredible projects such as:
• Crystal Cove Cottages, Newport Coast, CA
• YMCA'The Village', Pomona, CA
• Hearst Castle, San Simeon, CA
San Diego Police Department, San Diego, CA
University House, San Diego, CA
mmYV9Y"""
Justin Warren
Senior Project Manager
Justin Warren works as the Senior Project Manager for Spectra Company. He joined
the company in 2015 and came with over 20 years of experience in the construction
industry. Having started in the residential arena, he soon transitioned to the
commercial side of the industry. Although Justin's expertise is varied, his specialty
and interest has always been architectural woodwork and finish carpentry. While
most of his knowledge comes from hands-on experience, Justin holds a General
Contractor license and previously managed his own General Contracting company.
He has gone from a carpenter, to a foreman, onto a superintendent, and ultimately a
project manager. His impeccable work ethic coupled with his experience and knowl-
edge make him a key team member for Spectra Company. Justin has been involved
with the following projects:with the following projects:
• Crystal Cove Cottages, Newport Coast, CA
• Beverly Hills High School, Beverly Hills, CA
• CBS Columbia Square, Hollywood, CA
• Clark Memorial Library of UCLA, Westwood, CA
• Ford Theatre, Hollywood, CA
• Ford Factory, Los Angeles, CA
McKinley High School, Honolulu, HI
Monterey Government Center, Salinas, CA
NoMad Hotel, Los Angeles, CA
Pigeon Point Lighthouse, Pes(adero, CA
San Ysidro Customs House, San Ysidro, CA
Tesoro Adobe, Valencia, CA
SPECTRA
SPECTRACOMPANY.COM SUU) 3/5-1;
HiSTURIC COYtlTkI1GTIUN
John Gonzalez
Senior Estimator and Project Manager
John Gonzalez works as a Senior Estimator and Project Manager for Spectra`
Company specializing in waterproofing and production. John has worked in the 1000
restoration and waterproofing field for over 20 years. His reputation in the industry
is unmatched as an expert in application and creative problem solving. His areas of
specialty include waterproofing, leak analysis, deck coatings, wall coatings, epoxy/
grout injection, elastomeric coatings, below -grade and negative -side waterproofing.
His knowledge and expertise make him a favorite of customers and consultants.
Some of his projects with Spectra Company include:
Alex Theatre, Glendale, CA
Broadway Trade Center, Los Angeles, CA
California African American Museum, Los Angeles, CA
El Capitan Theatre, Hollywood, CA
Greystone Mansion, Beverly Hills, CA
Millennium Biltmore Hotel, Los Angeles, CA
One Colorado, Pasadena, CA
Mark Green
Senior Superintendent
• Pantages Theatre, Hollywood, CA
Santa Barbara Mission, Santa Barbara, CA
Villa Riviera, Long Beach, CA
Mark Green works as a Senior Superintendent for Spectra Company and has over 30
years in the specialty historic construction industry. He has worked as owner liaison
for field operations, leading weekly production meetings, developing and maintaining
schedules, means and methods of production, subcontractor field management,
layout of work, andensuring compliance with applicable building codes and standards.
Mark is responsible for smooth and consistent transfer of information between
company field team, project managers, and owner clients. During his tenure, he has
overseen the following projects:
Crystal Cove Cottages, Newport Beach, CA
San Gabriel Mission, San Gabriel, CA
Pomona YMCA, Pomona, CA
Irvine Ranch Historic Park, Irvine, CA
Breed Street Shul, Los Angeles, CA
Leo Carrillo Ranch, Carlsbad, CA
Los Penasquitos Ranch House, San Diego, CA
Mother Colony House, Anaheim, CA
Montanez Adobe, San Juan Capistrano, CA
Porter Hall, Claremont, CA
University House Adobe, La Jolla, CA
Warner Springs Ranch, Warner Springs, CA
Walker House, San Dimas, CA
Culver Studios, Culver City, CA
SPECTRA
`�'' FUSTORIC CONSTRUCTION
Andrew Franco
Project Manager
Andrew Franco works as a Project Manager for Spectra Company. He brings
extensive management past and current experience from over 600 projects in
the southwest region. His experience covers several bullet -resistant and security
industries including financial institutions such as Bank of America and government
buildings. Andrew's experience with financial and government projects is balanced
with knowledge in healthcare, higher education, and utility facilities. Andrew
developed his foundation in management at the San Joaquin Valley College where
he received his degree in Construction Management and graduated as the Construc-
tion Management Salutatorian.
San Gabriel Mission, San Gabriel, CA
Hotel Del Coronado, Coronado, CA
Ocean Center Building, Long Beach, CA
Breakers Building, Long Beach, CA
Davis-Monthan Air Force Base, Tucson, AZ
Rafael Barrios
Project Manager and Estimator
Las Vegas Metropolitan Police Department,
Las Vegas, NV
Orange County Sheriff's Department, Orange, CA
Seattle Police Department Headquarters,
Seattle, WA
Rafael Barrios works as both a Project Manager and Estimator for Spectra Company.
Rafael has been a professional in the construction industry for over 25 years. He
is very wellversed in painting, drywall, carpentry, masonry, tile and granite,
waterproofing, glazing, antique restoration and preservation. Rafael's dedication to
his hands-on work lead him to managing and supervising large crews and projects,
as well as estimating. His wide range of skills makes him an integral part of the
Spectra Company team and his past experience as a construction supervisor
enables him to bring intimate knowledge of what is required to be successful in
the field. Rafael oversees significant construction and restoration projects for
Spectra, such as:
Bob Hope Patriotic Hall, Los Angeles, CA
Broadway Trade Center, Los Angeles, CA
Ennis House, Los Angeles, CA
Globe Theatre, Los Angeles, CA
Hollywood Palladium, Hollywood, CA
Hoover Dam Exhibit Hall, Boulder City, NV
Scotty's Castle, Death Valley, CA
California Club, Los Angeles, CA
Naco Land Port of Entry, Naco, AZ
Douglas Land Port of Entry, Douglas, AZ
Pioneer Oil Refinery, Santa Clarita, CA
EM
SPECTRA
TUSTORIC CONSTRUCTION
Historic Projects List
Agua Dolce, CA
Ranger Residence — Vasquez Rocks
Alhambra, CA
LA Department of Public Works HQ
Sacred Heart House
Amador City, CA
Amador City Firehouse
Anaheim, CA
Anaheim Cemetery
Anaheim Packing House
Mother Colony House of
Founders' Park
Packard Building
Arcadia, CA
LA County Arboretum
Santa Anita Racetrack
Avalon, CA
Catalina Casino
Elmer Gray House
Berkeley, CA
UC Berkeley Bowles Hall
Beverly Hills, CA
421 N Beverly Drive
Beverly Hills City Hall
Beverly Hills Electric Fountain
Beverly Hills High School
First Bank of Beverly Hills
Golden Triangle Building
Greystone Mansion
Saban Theater/Fox Wilshire Theater
North Linden Drive
Peninsula Hotel
Tiffany & Co.
Virginia Robinson Gardens
Wallis Annenberg Center for the
Performing Arts (Beverly Hills
Post Office)
Boulder City, NV
100 & 200 Date Street
Hoover Dam Exhibit Hall
Hoover Dam Penstock Anchors
Burbank, CA
303 N Glen Oaks Boulevard
Calabasas, CA
King Gillette Ranch
Calexico, CA
Calexico Customs House Cupola
Carlsbad, CA
Carlsbad Community Church
Century City, CA
Fox Studios
Claremont, CA
Padua Hills Theatre
Porter Hall (Pilgrim Place)
Coronado, CA
Hotel Del Coronado
Culver City, CA
Culver Studios - Presidio
Kirk Douglas Theatre
Eureka, CA
Carson Block
Eureka Veterans Memorial Hall
Humboldt County Courthouse
El Toro, CA
El Toro Memorial Park
Flintridge, CA
Flintridge Sacred Heart Academy
Fullerton, CA
Fullerton Fox Theatre
John Hetebrink House
Muckenthaler Cultural Center
Union Bridge
Glendale, CA
527 Whiting Woods Road
Alex Theatre
Brand Library
Forest Lawn Cemetery
Glendale Masonic Temple
Hunter Residence
John Lautner House — Schaffer
Residence
Guasti, CA
Guasti Mansion
Hancock Park, CA
Dorothy Chandler House
Hollywood, CA
Assistance League Theater
Baby Banana Tree Sculpture
CBS Columbia Square
Celebrity Theatre/Sunset & Vine
El Capitan Theatre & Office Building
Fonda Theater
Ford Theatre
Frolic Room Bar
Hollywood Bowl
Hollywood Bungalows
Hollywood Celebrity Center
Hollywood Heritage Museum
Hollywood Masonic Temple
Hollywood Musicians Union
Hollywood Palladium
Louis B. Mayer Building
Pantages Theatre
Roosevelt Hotel
Second Home Hollywood
Security Pacific Building
Sunset Bronson Studios
Sunset Church
Taft Building
Television Center
Vine Campus
Honolulu, HI
Jah Pavilion
McKinley High School
Inglewood, CA
Inglewood Park Cemetery
Irvine, CA
Irvine Historical Museum
Irvine Ranch
Jurupa Valley, CA
Crestmore Manor
La Jolla, CA
Shops at La Jolla Village
St. James by -the -Sea
Episcopal Church
Wisteria College
La Verne, CA
Price House
Laguna Beach, CA
Casa Laguna Hotel & Spa
Victoria Beach Tower
Las Vegas, NV
Westside School
Lincoln Heights, CA
Lincoln Park Gateway
Long Beach, CA
110 E Ocean Boulevard
144 N Savona Walk
All Saints Anglican Cathedral
Breakers of Long Beach
Christian Outreach in Action Center
Famous Department Store
Farmers & Merchants Bank
Jergins Pillars
Jergins Trust Building
Ocean Center Building
Polytechnic High School
Villa Riviera
Walker Building
Los Altos Hills, CA
Stegner Studio
Los Angeles, CA
11753 San Vicente
15th Street Middle School
1850 N Cherokee
28th Street YMCA
2500 W 7th Street
440 Seaton
6381 Hollywood Boulevard
740 S Broadway
960 N La Brea Avenue
AC Hotel Beverly Hills
Ace Hotel
African American Museum
Alameda Square Building
Aon Center
Biltmore Hotel
Biscuit Company Lofts
Bixel House
Blackwelder Building
Bob Hope Patriotic Hall
Boyle Heights City Hall
Bradbury Building
Brentwood Country Club
Broadway Trade Center
Bruin Theater
Bryson Apartments
California Market Center
Cherokee Hotel
Commercial Exchange
Desmond Building
Downtown Women's Center
Ebell of Los Angeles
El Dorado Lofts
Ennis House
Fine Arts Building
Ford Factory
FourFortyFour South Flower
Gas Company Lofts
George C. Page Museum
Globe Theatre
Golden State Insurance Building
Hall of Justice
Hall of Justice - Charles Manson Cell
Hilton Checkers Hotel
Hollenbeck Terrace
(Santa Fe Coast Lines Hospital)
Hotel Figueroa
Hoxton Hotel
La Marquise
Los Angeles Law Library
Los Angeles Times Center
Metropolitan Lofts
Metro Water District HQ
Morissette Residence
Mount St. Mary's College
Mount St. Mary's College -
Doheny Mansion
Museum of Natural History
National City Lofts
NoMad Hotel (Bank of Italy)
Norton Building
Occidental College —
James Swan Hall
Occidental College —
McKinnon Center
Olympic Theatre
One Bunker Hill
Pacific Gas & Electric Building
Paramount Plaza
Public Storage Building
Robertson Plaza
Roosevelt High School
Roosevelt Lofts
ROW DTLA
Rowan Building
Santa Fe Lofts
Schaber Cafeteria
Schindler House
Schindler House — MAK Center
Southwest Museum
St. Cecilia's Church
St. James Park Apartments
St. Paul's Lutheran Church
Standard Hotel
Starbucks Highland
(Gilmore Gas Station)
Superior Courthouse
Temple Beth
Temple Beth AM Sanctuary
The Bloc —Mr. G s
The MacArthur
SPECTRA SPECTRACOMPANY.COM • (800) 375-1771 PAGE 31
TUSTORIC CONSTRUCTION
Historic Projects List (CONTINUED)
The Olympic Building
Title Insurance and Trust Building
Trademark Apartments
Trademark Building
UCLA Clark Memorial Library
UCLA Hershey Hall
UCLA Weyburn Hall
Union Oil Building
Union Station
USC McDonald's Swim Stadium
USC Tutor Campus Center
VA Governor's Mansion
VA LA National Cemetery Chapel
Van Nuys Apartments
Variety Arts Theater
Venice High School
Village Fox Theatre, Westwood
Western Pacific Building
Malibu, CA
Adamson House
Marina Del Rey, CA
Marina Del Rey Seawall
Monrovia, CA
Monrovia Santa Fe Depot
Monterey, CA
California's First Theatre
Hermann Hall
Monterey Park, CA
F&A Credit Union
Needles, CA
El Garces Harvey House
Hotel & Depot
Newell, CA
Tule Lake Segregation Center
Newport Coast, CA
Crystal Cove Cottages
North Hollywood, CA
NoHo Weddington House
Oakwood School
Norwalk, CA
Hargitt House
Sproul House Museum
Oak Park, CA
Oak Park High School
Oakland, CA
Brick House Lofts
Oceanside, CA
Marine Corps Recruit Depot
Ontario, CA
Bank of Italy
Frankish Building
Orange, CA
101 E Chapman Avenue
Bank of Italy
Chapman Univ Digital Media
Arts Center
Chapman Univ Packing House
Chapman Univ Smith Hall
Cigar Mural
Orange Grove Masonic Temple
Orange Public Library Fountain
Packing House of Chapman
University
Smith and Ebert Building
Urth Caffe
Wells Fargo Bank
Woolworth Store
Pala, CA
Blacktooth House
Calac Adobe
Pasadena, CA
24 E Union Street
39 W Colorado Boulevard
595 E Colorado Boulevard
Ambassador College
Baby Banana Tree Sculpture
Bank of the West
(First Trust Bank Building)
Bear Building
Caltech —Alles Building
Caltech —Baxter Building
Caltech —Beckman Lab
Caltech — Bridge Annex
Caltech — Crellin Laboratory
Caltech — Seeley G. Mudd Building
Caltech — Thomas Lab
Caltech — Tolman Bacher Compound
Caltech — Linde + Robinson Lab
Constance Hotel
Gamble House
Glenarm Power Plant
Mayfield Senior School
One Colorado
Pasadena Federal Courthouse
Robert Pitcairn, Jr. House
Santa Fe Depot (Del Mar Station)
Union Savings Building
Western Asset Plaza
Pescadero, CA
Pigeon Point Lighthouse
Penn Valley, CA
South Yuba River Bridge
Placentia, CA
George Key Ranch House
Kraemer Residence
Playa Del Rey, CA
Dickinson and Gillespie Building
Playa Vista, CA
Hercules Campus
Pomona, CA
The Lassie House
Rancho Cucamonga, CA
Etiwanda Pacific Electric Depot
Toews Residence
Redlands, CA
Redlands Santa Fe Depot
Render Building
Reno, NV
El Cortez Hotel
University of Reno - Thompson
Building
Reseda, CA
Mat House
Riverside, CA
California Baptist University —
James Building
Camp Anza
Jensen -Alvarado Historic Ranch
March Air Reserve Base
Riverside County Courthouse
Ryan Bonamino Park
Stalder Building
Salinas, CA
Monterey Government Center
San Bernardino, CA
Santa Fe Depot
San Clemente, CA
Bartlett Building
Casa Romantica
San Diego, CA
1st Presbyterian Church of San Diego
Andaz San Diego
Bow Wave Fountain
Broadway Fountain at Horton Plaza
Casa de Balboa
Christ United Presbyterian Church
Guild Hotel
Hotel Anza
Hotel Churchill
Kettner Lofts
Museum of Man
New Vision Church
Old Police HQ
Plaza Hotel
Remmen House
San Diego County
Administration Center
San Diego Gas & Electric
San Diego Marine Base
San Diego Marine Recruit Depot
Scripps College Building
Scripps Mercy Chapel
Sempra Energy HQ
Spreckels Organ Pavilion
St. George Serbian Orthodox Church
Weinberger Courthouse
Wilkinson Building
San Fernando, CA
Lopez Adobe
San Fernando Middle School
San Francisco, CA
888 Brannan Street Building
San Marino, CA
San Marino Community Church
San Simeon, CA
Hearst Castle
San Ysidro, CA
San Ysidro Land Port of Entry
Santa Ana, CA
Old Orange County Courthouse
Unknown Soldier Monument
Building
Santa Barbara, CA
Santa Barbara Airport
Santa Barbara Mission
Santa Clarita, CA
Santa Clarita Historic Jail House
Santa Monica, CA
1305 2nd Street
2600 Colorado Avenue
2663 Main Street
3002 Main Street
3008 Main Street
423-429 Ocean Avenue
Bradbury House
Colorado Campus
Marion Davies Guesthouse
Mendota Block
Oracle HQ
Santa Monica City Hall
Santa Monica Police Station
Santa Monica Post Office
Shotgun House
Santa Paula, CA
Hardison House Historic Barn
Stanford, CA
Stanford University
Studio City, CA
Sportsmen's Lodge
Sylmar, CA
Sylmar Women's Bridge Housing
Tempe, AZ
ASU University Club
Torrance, CA
Torrance High School
Tustin, CA
St. Cecilias Church
Upland, CA
Grove Theater
Valencia, CA
Tesoro Adobe
Venice, CA
Venice Suites — The Potter
West Hollywood, CA
8899 Beverly Boulevard
Westminster, CA
Cathay Bank
White Sands Missile Range, NM
The Army Blockhouse
Whittier, CA
Andrews Elementary School
Fred C. Nelles School
SPECTRA SPECTRACOMPANY.COM • (800) 375-1771 PAGE 32
TUSTORIC CONSTRUCTION
SPECTRA
HISTORIC CONSTRUCTION
respect.
restore. revitalize,
SPECTRA COMPANY
350 N GAREY AVE #101
POMONA, CA 91767
SPECTRACOMPANY.COM
z '5
(800) 375-1771