HomeMy WebLinkAbout2026-09-22 - AGENDA REPORTS - GP UPDATE CONTRO Agenda Item: 5 CITY OF SANTA CLARITA .` AGENDA REPORT CONSENT CALENDAR CITY MANAGER APPROVAL: DATE: September 22, 2026 SUBJECT: GENERAL PLAN UPDATE CONTRACT DEPARTMENT: Community Development PRESENTER: Erika Iverson RECOMMENDED ACTION City Council: 1. Award a two-year contract to Michael Baker International to update elements of the City's General Plan in the amount of $348,000 and authorize a contingency in the amount of $15,000, for a total contract amount not to exceed $363,000. 2. Authorize the City Manager or designee to execute all contract and associated documents, subject to City Attorney review. BACKGROUND In June 2011, the City Council adopted the City of Santa Clarita's (City) General Plan, known as One Valley One Vision. The General Plan serves as the City's comprehensive, long-range plan for physical development and establishes goals and policies related to land use, transportation, development, open space, resource preservation, public safety, infrastructure, and other factors that guide future growth and development. The General Plan consists of multiple elements that are required to remain internally consistent and comply with applicable state law. Since adoption of the General Plan, the state has enacted additional legislation requiring local jurisdictions to address new planning requirements within their General Plans, including: • Assembly Bill (AB) 98: Requires updates to the Circulation Element related to designated truck routes. Assembly Bill (AB) 2684: Requires the Safety Element to evaluate and address extreme heat. • Assembly Bill (AB) 1889: Requires local governments to incorporate wildlife and habitat connectivity considerations into long-range land use planning. Page 1 Packet Pg. 26 O The City's Circulation Element and Conservation/Open Space Element were last comprehensively updated as part of the 2011 General Plan. In 2022, the City Council approved targeted updates to the Safety Element in conjunction with the Housing Element Update to incorporate the City's Local Hazard Mitigation Plan and address hazards including earthquakes, flooding, and wildfire. To address these requirements and maintain consistency with state law, the City must update its Circulation, Safety, and Conservation/Open Space Elements. The updates will require technical analysis, coordination among multiple City divisions, public outreach, environmental review pursuant to the California Environmental Quality Act (CEQA), and consideration by the Planning Commission and City Council. The applicable state legislation establishes January 1, 2028, as a key compliance date for the required General Plan updates. The City conducted a Request for Proposal (RFP) to solicit proposals from qualified consulting firms to update elements of the City's General Plan. The RFP was published and circulated via the City's e-procurement system, BidNet, on July 23, 2026. The City transmitted the solicitation to 3,132 vendors on BidNet, of which 66 vendors downloaded the RFP. One company provided a proposal for consideration. The proposal was reviewed and evaluated based on the company's ability to meet the specific needs of the City. An evaluation panel comprised of City staff scored the responsive proposal using the following categories of weighted criteria: • Consultant qualifications, organizational capacity, plan of study/scope of work (25 points) • Experience on similar projects (30 points) • Thoroughness of the proposal, approach to providing sound services, and ability to meet the objectives and standards of the project (30 points) • Cost (15 points) Rank Company Location Score 1 Michael Baker International San Diego, CA 88 In reviewing the proposal, the evaluation panel awarded Michael Baker International (MBI) a high overall score and determined that its proposal offered the best overall value to meet the General Plan Update project needs. Michael Baker International was the only firm to submit a proposal, and the evaluation team's determination was based on the firm's qualifications, proposed approach, and demonstrated ability to successfully complete similar projects. Staff has completed a due -diligence review of MBI's professional references and determined its work history meets the City's standards and performance expectations. Based on the above, staff recommends awarding a two-year contract to MBI for a total amount not to exceed $363,000. ALTERNATIVE ACTION Other action as determined by the City Council. Page 2 Packet Pg. 27 O FISCAL IMPACT Adequate funds from General Fund (100) have previously been appropriated as part of the Fiscal Year 2026-27 budget in Planning Expenditure Account 1003100-516101 to support the recommended contract. Funding for future fiscal years are contingent upon the appropriations of funds by the City Council in the annual budget for such fiscal year. ATTACHMENTS MBI Cost File MBI Response File (available in the City Clerk's Reading File) Page 3 Packet Pg. 28 5.a REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE CITY OF SANTA CLARITA AUGUST20,2026 I N T E R 0 N A L COSiFILE ThepropasedfeeisfixedandincludesaItreimbursableexpensesanddirectcostsasscciatedwiththeScopeo%Services.Theteescheduleandhourlyratesarebasedon2026-2027rates.MichaelBakerisopentodiscussingtheproposedfeeSandscopeofworkwiththeCityandiswillingtomakeadjush .-. needed through further cotlaboratian and discussion. Michael Baker International Fehr& Peers 3 Principal in Role Charge Staff Name Richard Beck Hourly Rate $395 TASK PROJECT INITIATION AND PROJECT MANAGEMENT Task 1.1 Project Management 5 Project Director John Bella, $294 Project Manager Valerie GLarke $206 1 Senior Planner Noefla Ande,— $202 Planner Various $156 GlS and Graphics Various $126 Senior Subject Matter Environmental Expert Environmental Planner Planner Various Various Various $223 $227 $108 Principal John Muggridge $395 Senior Engineer Various $235 Planner Various $180 GlS and Graphics Various $180 $28,118 Task 1.2 Regular Coordination Meetings 1 1 TASK2 COMMUNITY ENGAGEMENT Tasks.] Pruj,cifl,ardirg $60,565 Task 2,2 Community Meet ngs Task 2,3 Stakeholder Meetings MENNEN Task 2,4 Community Survey Task 2 5 Promotional Material TASKS CIRCULATION ELEMENT UPDATE r i 1.. ExistingTask $55,904 1 DevelopmentTask3A 3.2 Policy -.�-.■ Task 3.3 Circulation Element Draft Development TASK SAFETY ELEMENT UPDATE ExistingTask 4.1 . - , 1.. 1 $30,824 Task 4.2 Policy 1 EMN Task 4.3 Safety Element 1 De TASKS CONSERVATIONIOPEN SPACE ELEMENT UPDATE Task 5T Existing Conditions Research, Review and Data 1 30 1 1 401 $61,123 Development 20 i 50 30 40 TASK CEOA COM PLIANCE- GE NE RAL PLAN E IR ADDENDUM $69,265 Task 6.3 Prepare Notice of Determination TASK 7 PUBLIC REVIEW AND ADOPTION O F ELEMENTS Task 7.1 Internet Review of 1 I 1 $38,155 DraftTask 7.2 Public Review of I 1 Task 7.3 Public Hearings and AdDatiml TOTAL HOURS 15 67 216 90 380 171 105 160 180 76 46 198 60 E LABOR COSTS BY TASK $5,925 $19,726 $44,479 $18,214 $59,280 $21,546 $23,423 $36,368 $19,523 $30,020 $10,810 $33,840 $10,800 i SUBTOTAL $333,954 V OTHER DIRECT COSTS(DOC) $14,946 Y 1 1 $348,000 Q Description Total Boards and supplies for Comm unity Engagement $3,046 MBI travel for Community Engagement $5,000 MBI office supplies, prints, photography, etc. $1,000 Fehr & Peers travel for Community Engagement $3,000 Fehr& Peers office supplies, prints, photography, etc. $2,000 , (OtherTotat Packet Pg. 29 REQUEST FOR PP9P0gA!, CITY OF SANTA CLARITA GENERAL PLAN ELEMENTS UPDATE PROPOSAL #CD-26-27-02 AUGUST 20, 2026 Michael Baker REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE CITY OF SANTA CLARITA AUGUST 20, 2026 August 20, 2026 Jaclyn Abston Jabston@santaclarita.gov City of Santa Clarita 23920Valencia Blvd, Santa Clarita, CA91355-2196 RE: Request for Proposals (RFP)# CD-26-27-02- General Plan Element Update Dear Ms. Jaclyn Abston, I N T E R N A T 1 0 N A L On behalf of Michael Baker International, Inc. (Michael Baker), our team is pleased to submit this proposal to the City of Santa Clarita for Consultant Services related to the City's General Plan Element Update. With a strong record of accomplishment of preparing General Plan Elements and updates for jurisdictions across California, we are committed to delivering work that not only complies with applicable legislation —including Assembly Bill98, Assembly Bill 1889, Senate Bill 1425, and Assembly Bill 2684—but also exceeds the expectations of the City of Santa Clarita. By selecting the Michael Baker team, the City will benefit from the following key advantages: TRUSTED PROJECT TEAM I Michael Baker and our subconsultant Fehr & Peers bring a longstanding, trusted relationship with the City, serving as preferred providers for CEQA and mobility planning, respectively. Building on this foundation, Michael Baker is introducing dedicated long range planning expertise through Valerie Clarke,AICP, PLAand NoelleAnderson, AICP - recognized leaders in General Plan policy efforts throughout California. Together, our team combines local knowledge with planning expertise to successfully deliver the City's next generation of planning initiatives. STREAMLINED APPROACH I Michael Baker recognizes that the City's General Plan Update is focused on addressing regulatory changes and maintaining compliance through a practical, efficient process. Ourteam will leverage proven approachesto accelerate document preparation, while customizing recommendations to Santa Clarita. Planning and environmental review will be closely coordinated, allowing the updated Elements to be structured as self -mitigating policy frameworks that support a streamlined CEQA review process. This approach minimizes redundancies and delivers a focused update that achieves compliance objectives while advancing the City's long-term vision. COMMUNITY -LED PLANS I Michael Baker will implement a focused and right -sized outreach program that recognizes this General Plan Update is driven by regulatory compliance while still providing meaningful opportunities for public and stakeholder participation. Our approach emphasizes clear communication, targeted engagement, and accessible information sharing, ensuring community members have the tools and context needed to provide informed input without creating unnecessary process burdens or extending project schedules. The Michael Baker team appreciates this opportunity to work with the City of Santa Clarita on your General Plan update. This proposal shall remain effective and valid for 120 days after submittal. Richard Beck, Principal -in -Charge and Vice President/Office Executive, is an authorized representative of Michael Baker International, Inc., and has the authority to bind the firm contractually. Any questions regarding this proposal may be directed to Valerie Clarke, AICP, PLA at (949) 330- 4228 or valerie.clarke@mbakerintl.com. Sincerely, , � P,4 4, / Z Z ', §� - Richard Beck, Principal -in -Charge Vice President, Practice Executive P: (949) 855-3687 1 rbeck@mbakerintl.com Valerie Clarke, Project Manager Community and Long Range Planning Services P: (949) 330-4228 1 Valerie.clarke@mbakerintl.com TABLE OF CONTENTS Introduction 04 Relevant Experience 06 References 13 Scope of Work 15 Task 1 Project Initiation and Project Management 16 Task 2 Community Engagement 17 Task 3 Circulation Element 21 Task 4 Safety Element 24 Task 5 Conservation/Open Space Element 25 Task 6 CEQA Compliance - General Plan EIR Addendum 28 Task 7 Public Review and Adoption of Elements 29 Schedule 34 Program Management 36 Personnel, Equipment, and Facilities 39 Sub -Consultants 50 COST FILE Included Separately wry ry.lot d.� • , _ ... t x �.s 7 rN. y, A i Y SECTION 1.1.1 INTRODUCTION REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE CITY OF SANTA CLARITA AUGUST 20, 2026 FIRM BACKGROUND AND BUSINESS HISTORY Michael Baker is a leading global provider of engineering and consulting services which include planning, engineering, architectural, environmental, construction, program management, sustainability and resilience planning services as well as information technology, communications services, and outreach solutions. Headquartered and incorporated in Pittsburgh, Pennsylvania, Michael Baker has more than 4,000 employees in nearly 100 offices across the U.S., including 10 locations in California. Michael Baker has grown and prospered without losing sight of its primary purpose. Creating value for our clients by delivering innovative and sustainable solutions for infrastructure and the environment. PLANNING SERVICES: GENERAL PLANS The Michael Baker team has helped numerous communities in California and across the nation with comprehensive general plan updates and focused general plan updates. Our planners are regularly involved with various elements of general planning efforts such as open space and conservation, environmental justice, land use, transportation, mobility and infrastructure, built environment, sustainability, environmental services, community health, economic development, safety, and community outreach. We will work with City staff to tailor the process to meet their needs. Community engagement is at the core of this process and our outreach tasks are designed based on community needs and demographics to get maximum participation. 10 CA Offices (No. of Employees) Carlsbad (44) Long Beach (41) Los Angeles (20) Ontario (48) Palm Desert (25) Rancho Cordova (1! San Diego (117) Santa Ana (227) Temecula (43) Walnut Creek (7) I N T E R N A T 1 0 N A L WnlIi!I1111.1►INI1 11M THE (OP 500 DESIGN FIRMS 21 Top 500 Design Firms 18 Top 100 Pure Designers 1 Bridges 1 Dams & Reservoirs 9 Construction Management 13 Transportation 15 Water Supply 11 Airports 11 Highways 22 Mass Transit & Rail 07-15.25 MICHAEL BAKER INTERNATIONAL a,,, Founded May 1 ,� ti Form of the Organization .� Pennsytvania C Corporation r r . • • • ' • -EMPLOYEES 41 OU NATIONWIDE t;W1to It LOCAL Jf#4STAFF 587 PROFESSIONALS IN CALIFORNIA w . : - r —eu JMR mr y i a �^ jF r i4 SECTION 1.1,2 RELEVANT EXPERIENCE REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE CITY OF SANTA CLARITA AUGUST 20, 2026 CALIFORNIA GENERAL PLAN UPDATE HISTORY I N T E R N A T 1 0 N A L The following list details the past and current General Plans and General Plan Elements developed by Michael Baker within the State of California over the last eight years. Currently, Michael Baker has eight active contracts throughout Southern California involving various levels of General Plan update efforts. City of Fullerton I/ V/ V/ ongoing City of Seal Beach V/ V/ v/ v/ v/ ongoing City of Grand Terrace V/ f V/ f '/ ongoing City of Santa Clarita, Town Center V V/ ongoing City of Pinote, Housing, Safety, Env. Justice City of Hesperia, Housing, Safety, Env. Justice V V/ V/ V/ -/ V/ ongoing ongoing City of Needles, Housing and Zoning Code Updates v/ ongoing City of Eastvale V/ V/ V/ V/ ongoing Campo Road Revitalization Specific Plan V v/ v/ v/ I v/ v/ ti/ ✓ 2023 City of Rolling Hills Estates V/ V/ V/ V V/ V/ f V/ ✓ 2022 City of San Juan Capistrano, Housing Element Update V V/ V/ V/ V/ 1/ 2022 City of Laguna Woods V/ V V/ V11 f f f / 2019 City of Rancho Santa Margarita I/ V/ V/ V V/ V 1/ 2019 City of Elk Grove V/ V/ V/ V/ 2017 City of Hermosa Beach V/ V/ V/ 2017 City of Huntington Beach V/ V/ V/ V/ I/ ✓V 2017 City of Manhattan Beach, Downtown Plan City of Sunnyvale I/ V/ V/ V/ V/1 V/ 12017 2017 City of Upland V/ / V/ 2016 City of Monterey Park, South Garfield Avenue V/ 2015 City of Monterey Park V/ V/ V/ 2014 City of Murrieta V/ V/ f V f V/ V V I/ 2013 City of Watsonville V/ V/ V/ V/ V/ 2013 City of Garden Grove I/ V/ 1/ V/ V V I/ V/ V 2012 City of lone, Downtown Plan V V 2012 City of Somerton V/ V/ V 2011 City of Bakersfield V 2010 City of Hawaiian Gardens V V/ V V/ V/ V/ V/ 2010 City of Lancaster V/ V/ I/ V/ V/ VVV VVV 2010 City of Lancaster, Downtown Plan I,/ V/ V/ V/ V/ I/ 2007 City of Vista V/ f V/ v/ 2010, 2003 City of Buena Park ✓ ✓ ✓ 2009 City of Cloverdale I V/I I I�/ V 2009 City of Fullerton V V V/ V/ f V/ I/ 2009 City of Placentia V/ V/ V/ V/ 2009 City of Artesia V / v/ v/ v" v/ v/ v/ v/ 2000 City of Hollister, Downtown Plan 2000 City of Stanton V 2008 PAGE 7 REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE CITY OF SANTA CLARITA AUGUST 20, 2026 RECENT PROJECT EXPERIENCE I N T E R N A T 1 0 N A L Drop a pin and comment below Phase 2: Iterated Truck Route Network (Proposed) d Cry Council. 111— atl—.l cmnmu InpuC E g . Lmonrte, and Mission eoulcaN eart ofF y dead g imons on Ar�bongNaPry nee Lecember 2C�5, and itremwes truckrwte g ons on s e a Ente,an.�n.-s. o e Categories ---------- -- 731,11,11 •• ' M l FI nnId. J. J4nlPAVP{InY / r �����•�. ��III City of Jurupa Valley Citywide Freight Analysis Jurupa Valley, California Fehr & Peers is currently assisting the City of Jurupa Valley with a citywide freight analysis and truck route planning effort aimed at balancing the region's critical goods movement function with neighborhood quality of life. The project focused on updating the City's truck route network and Mobility Element to address truck -related impacts such as noise, vibration, traffic safety concerns, and air quality effects in residential areas and other sensitive locations. The effort was driven, in part, by new State legislation, including AB 98 and SB 415, which require local agencies to evaluate and update truck route maps and implement measures that minimize impacts on nearby communities. The project included a comprehensive review of existing truck travel patterns, identification of sensitive land uses such as schools, parks, and residential neighborhoods, and analysis of community -reported concerns. Based on technical analysis, stakeholder coordination, and public input, the team developed proposed truck routes and supporting policies designed to accommodate freight movement while reducing conflicts with neighborhoods. A key component of the project was community engagement. The City hosted public open houses where residents, business owners, commuters, and truck operators could review existing conditions, learn about state requirements, evaluate proposed truck routes, and provide feedback on draft recommendations. The resulting truck route plan was intended to support regional economic activity while improving safety, livability, and environmental conditions for Jurupa Valley residents. PAGE 8 REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE CITY OF SANTA CLARITA AUGUST 20, 2026 Flood Hazard Zones FEMA, approved November 11, 2023 ON,Grand Ta,•%tCITY OF GRAND TERRACE _ ]. r r Barian Rd • r N 1 De Barr/ S1 • 46 • 1 s' Van Buren St • $ I • • Pico St . • i T � t • r W 7�in Sf Main St • LEGEND Grand Terrace m 1.0%Annual Chance — — Municipal Boundary Flood Hazard Critical Facilities 0.2%Annual Chance Flood Hazard Impacted Critical Gage Canal Facilities Impacted Railroads W 0; tI.25 0.5 lmile Source: FEMA. City oP G,end Terzace. Een P,ajection: Catiferma Slate Plane Caw,dinete . Zane 5. NAD 83 I N T E R N A T 1 0 N A L Fire Hazard Severity Zones CA ➢eptortment of Forestry & Fire Protection, LRA March 24, 2025 �ra ly Grand Ti 'l CITY OF r ® GRAND TERRACE` i' � r • • r gallon Rd 00 ', • De Berry ' van Buren St T r • • Pico 51 � , � s r • 3e —N Main St LEGEND Grand Terrace Municipal Boundary 4, Critical Facilities 0 Impacted Critical Faalities 0- 0.25 0.5 1 mile City of Grand Terrace Safety Element Update Grand Terrace, California Gage Canal — Railroads Fire Hazard Severity Zone Loco! RespansibDity Area Very High High Moderate Sauce: Cal Fire Local P-P—ibli[y Area, City of Grand Terrace, Esd PNjeeila,Cetiron,ip Slat, Plane Coo'dinote System. ZO 5„ NAD 33 Michael Baker served as the lead author of both the City of Grand Terrace Safety Element and the recently updated Local Hazard Mitigation Plan (LHMP), providing the City with a fully integrated approach to hazard resilience, emergency preparedness, and long- range community safety planning. The Safety Element was prepared in compliance with the latest State requirements, including the wildfire, climate adaptation, environmental justice, evacuation, and resilience planning considerations, while leveraging findings from the City's FEMA-approved LHMP to ensure consistency across planning documents. The Element also incorporated the most current CAL FIRE Fire Hazard Severity Zone maps and associated policies, supporting State review and streamlining the approval process through CAL FIRE. PAGE 9 O� BETA O� 7 yOEe rs uECEMskp. REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE CITY OF SANTA CLARITA AUGUST 20, 2026 Dam Inundation Zones EP ®; ®-� G I I mlw, r, I 0 I Legend soar Bead, 13 - + Munidpul Boundary c Criricel fecilnies Impaead Crib -I Facilities Whiltier Narrows Dom and Reservoir I ... defi.n Zen. S-6.90 Creek Darn Inund.rion Zan. TPre City of Seal Beach is updating its current Open Space. Recreet- andConsary bF Elemerd of the Genera! Pfan. The General Pfan is a long-term hluepint fhat guides fhe nrfy's phy4io7 dowlAl: ftn4 Thy Open 5p 0, Roveo 0 0. Wd ConWN01iou EWrmerif idO Ous cunatf and lulus open spats needs and s=Wa hes rneMods m —1 thoso Hoods. PRESENTATION INFORMATION 1 O R..m.fion and Park f� Commission Public Meeting m DA%IL D A b., 22, 2025 M M Time. 6.00 PM Location: City Hall, 211 ath St., Seal Beach, CA 90740 The Elarnard upd.ko process . just beginningt Learn meta about wbat's als®ad and share your Irapu[. ry .7 unable to attend, a pu6lm survey W41 be available soap so you ran still contribute yow teaWbsck. PURPOSE OF THE UPDATE Sonata 6311 bill This senate hill requires titles go inCalifornia topdate Hteir Open Space Element to: 11 Ensure equitetl[e eeceas for eil residents 2) Incof1=. dimata r96iliance straleg.ies 3i Idenbfr W pommi[ias for rewAd�ng anu connecling wildlife mnl:lm. Pit Fnrf3 M14C 4'LfiEM1 Oe 3F!•LE: Fe in­nyhcul lM Cl1ri6—.1 n�rRw...�.,,a„rk a*�-ia��a=sx�r.•...nhr. M�:nr+ns�.+;,3.o��rr.�racr,.,.,'am L.- ! eaY g� I N T E R N A T 1 0 N A L City of Seal Beach Open Space, Recreation, and Conservation Element Update; and Safety Element Update Seal Beach, California Michael Baker prepared the City of Seal Beach Safety Element concurrently with the City's 2025 Local Hazard Mitigation Plan (LHMP), creating a coordinated and internally consistent framework for hazard resilience, emergency preparedness, climate adaptation, and long-range community safety planning. The Safety Element was updated to reflect the latest State requirements, including wildfire resilience, climate change adaptation, evacuation planning, environmental justice, and hazard vulnerability considerations, while leveraging the FEMA- compliant LHMP and supporting future AB 2140 integration by reference. The Safety Element also incorporates the most current hazard and risk assessment data available, including updated wildfire mapping and vulnerability analyses, positioning the City to efficiently navigate State agency review and maintain compliance with evolving regulatory requirements. Following that effort, Michael Baker has been selected by the City of Seal Beach to lead the update of its Open Space, Recreation, and Conservation Element, aligning with California Senate Bill 1425 and Assembly Bill 1889 to advance climate resilience, equitable access, and habitat connectivity. As part of this comprehensive update, Michael Baker is collaborating with the city's Community Services/Recreation Department to assess existing open space resources, evaluate community needs, and identify gaps in recreational amenities. Seal Beach is home to a diverse array of open spaces, including the Los Cerritos Wetlands and the Seal Beach National Wildlife Refuge. These areas are central to the city's conservation efforts and provide a strong foundation for enhancing habitat connectivity, climate resilience, and recreational access through the Open Space, Recreation, and Conservation Element update. The team is preparing revised illustrative maps and conducting spatial analysis to support informed policy development. PAGE 10 O� BETA O� 7 oc �° �O"O �s °¢ccNskp. REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE CITY OF SANTA CLARITA AUGUST 20, 2026 E.Nbh 2-a Open Space Access by a Half Mile Buffer ® Coha -- I' , 6ry of Fu!lenon' - -- d m • Exhibit 2-5: Essential Habitat Connectivity AW r.n w .i. lyof �A t.�o„�n.,m • I N T E R N A T 1 0 N A L Open Space/Conservation and Environmental Justice Elements Fullerton, California Michael Baker was selected by the City of Fullerton to lead the update of its Open Space and Conservation and Environmental Justice Elements, to reflect evolving community needs, environmental priorities, and state mandates. In collaboration with the City's Planning Department, Michael Baker is conducting a comprehensive assessment of Fullerton's open space inventory, evaluating existing parks, identifying gaps in outdoor amenities, and preparing updated illustrative maps. The update addresses equitable access to open space, climate resilience, and rewilding opportunities. Michael Baker is refining goals and policies to support beneficial uses such as habitat conservation, recreation, water management, and aesthetics. The team will also develop an Action Plan, establishing enforceable, metric -based directives with clear timelines, responsibilities, and implementation strategies. This plan will be incorporated into the Implementation Strategy of the General Plan. PAGE 99 REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE CITY OF SANTA CLARITA AUGUST 20, 2026 I N T E R N A T 1 0 N A L "The MBl team demonstrated a high level of �- - flexibility in adapting to changes in project scope as directed by City staff, elected �•,� w�� officials, and the GPAC." —v ���• Jeannie Naughton Community Development Director, City of Rolling Hills Estates Rolling Hills Estates General Plan and EIR Rolling Hills Estates, California Michael Baker updated the General Plan for the City of Rotting Hills Estates, including the Open Space and Conservation Elements, to ensure alignment with the City's vision. The update emphasizes sustainability, compliance with evolving state laws, and enhanced usability of the Plan. Fehr & Peers updated the Circulation Element. Together, our two teams worked together to provide a comprehensive update. Figure 6-5:Access to Parks. Recreation, and Transit �'�.p. GENERAL PLAN UPGRTE The Open Space Element is closely tied to the City's commitment to preserving its natural topography, scenic vistas, and equestrian character. It supports the City's California ranch lifestyle, with neighborhoods like Dapplegray and Montecillo exemplifying low -intensity, open -space -oriented development. The General Plan Update (GPU) includes strategies to protect biological resources, such as habitats for the Palos Verdes Blue Butterfly and California Gnatcatcher. Open space planning also promotes equestrian traits, parks, and scenic corridors, reinforcing the City's identity and quality of life. The Circulation Element addresses key challenges such as high traffic volumes on narrow, two-lane roads like Palos Verdes Drive North. The GPU introduces performance -based modeling to assess and improve circulation. It also adopts a holistic approach to sustainability by incorporating Vehicle Miles Traveled (VMT) analysis into transportation planning. Recognizing the City's limited public transit options, the plan proposes strategies to enhance muttimodat connectivity. PAGE 12 �N lid))) i III II� II III A. 'tifliMG ! �- " Rp ;� '�F• o '�' h � A 'dam' _ `"� 'yam_ � e m t � { SECTION 1.1.3 REFERENCES REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE CITY OF SANTA CLARITA AUGUST 20, 2026 REFERENCES CITY OF FULLERTON 303 W. Commonwealth Avenue I Fullerton, CA 92832 Contact: Yan Gao, Senior Planner, Community and Economic Development Department Phone: (714) 738-68541 Email: yan.gao@cityoffullerton.com I N T E R N A T 1 0 N A L Services Provided: Michael Baker has partnered closely with the City of Fullerton on a range of comprehensive planning and resilience initiatives year over year that advance environmental quality, equity, and long-term community health. The team is leading coordinated updates to the City's Open Space and Conservation Element and its first -ever Environmental Justice Element, conducting detailed open space inventory and access analyses, developing illustrative mapping, and facilitating robust community outreach to align with state mandates. Michael Baker is supporting Fullerton's climate resilience efforts through preparation of the Local Hazard Mitigation Plan, working with multiple City departments to assess risks, update policies, and engage stakeholders. Dates of Work Performed: 2022 — Ongoing �F F ut4 c'9ClFOR��P CITY OF SEAL BEACH Hof SEa� e• 211 8th St I Seal Beach, CA90740 f Contact: Shaun Temple, Community Development Director _ Phone: (562) 431-25271 Email: stemple@sealbeachca.gov Services Provided: Michael Baker is currently leading the City of Seal Beach's Open Space, Recreation, and Conservation Element Update. The project includes evaluating existing open space resources, parks, recreation facilities, and conservation areas; conducting GIS-based mapping and spatial analysis; assessing community needs and access to recreational amenities; and developing updated goals, policies, and implementation measures. The effort also includes community engagement, and stakeholder outreach. Dates of Work Performed: 2025 — Ongoing CITY OFJURUPAVALLEY � owaen � 8930 Limonite Avenue I Jurupa Valley, CA 92509 Contact: Steve Loriso, Deputy Director of Public Works creYOF,U Phone:951-332-6464 I Emait:sloriso@jurupavalley.org1116, Services Provided: Fehr & Peers is currently assisting the City of Jurupa Valley with a citywide freight analysis and truck route planning effort aimed at balancing the region's critical goods movement function with neighborhood quality of life. The project focused on updating the City's truck route network and Mobility Element to address truck -related impacts such as noise, vibration, traffic safety concerns, and air quality effects in residential areas and other sensitive locations. Dates of Work Performed: 2025- Ongoing <-,,... ,�1�„ .,tr�.� I h .�..�. �.• .�wtuiQuo�iw,ao ��'aun -wdr U /�i r i ,u,. r ,-—,�.-__ _ -.—�ii' .� - :.. `tip":r •—r :w ` — - '._e- "� : 4 _ `w r� r W r m Al .. R '" - 'r 1 -ION 1 .1.4, SCOPE OF WORK REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE CITY OF SANTA CLARITA AUGU5T2q 2026 1 N T E R N A T 1 0 N A L PROJECT UNDERSTANDING The Michael Baker team understands that the Circulation, Safety, and Conservation/Open Space Elements must be completed by January 1, 2028. To meet this deadline, Michael Baker will revisit all three Elements to ensure compliance with relevant legislation, including Senate Bill 1425 (Open Space Element Updates), Assembly Bill 1889 (Room to Roam), Assembly Bill 98 (Logistics Use & Freight Movement), and Assembly Bill2684 (Safety Element Update). The team will also verify the accuracy and relevance of existing terminology and descriptions within each Element. Climate resiliency will be a consistent theme throughout the analysis. The following tasks have been structured to complete these Elements within the specified timeframe: • Task 1 Project Initiation and Project Management • Task 2 Community Engagement • Task Circulation Element • Task 4 Safety Element • Task 5 Conservation/Open Space Element • Task 6 CEGA Compliance - General Plan EIR Addendum • Task 7 Public Review and Adoption of Elements Task 1 Project Initiation and Project Management The Michael Baker team will gather all necessary information to deliver the services outlined in this proposal and will work collaboratively with the City to define project goals. Committed to staying within the agreed -upon budget and schedule, the Michael Baker team will actively monitor progress to ensure key milestones are met. Michael Baker remains flexible and can adjust the scope of work as needed to align with the City's evolving requirements. Task 1.1 Project Management Ms. Clarke will be responsible for the day-to-day management and overall supervision of the Planning, Circulation, Landscape Architecture, Natural Resources, and Environmental Teams. This task will include coordination of Michael Baker's internal teams, Fehr & Peers, and City leadership through progress monitoring, invoicing, progress reports, maintenance of project files, and maintaining scope and schedule. It is Michael Baker's goal to serve as an extension of City staff throughout the Project. Task 1.2 Regular Coordination Meetings Michael Baker will conduct ongoing virtual coordination meetings with the City. Michael Baker recommends meeting on a twice -monthly basis. It is anticipated that the meeting attendees will include the City's Project Manager and Ms. Clarke. However, Michael Baker will work with the City to determine the appropriate method, format and attendees for each coordination meeting. Advisorsand Subject Matter Experts (SME) may participate in these meetings on an as -needed basis, according to the project progress. During these meetings, key items of discussion that objectives and milestones will be tracked within the project schedule. The status meetings shall occur to ensure the project remains on time and within budget, and expectations are defined. Michael Baker shall develop a summary of meeting notes to be distributed to the City. The meeting notes will be concise, and will include a defined list of decisions, actions, and responsible party. PAGE 16 REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE CITY OF SANTA CLARITA AUGUST20,2026 INTERNATIONAL Task 1.3 Kick -Off Meeting The Michael Baker team will conduct a virtual kick-off meeting with the City's Project Management team. Each of the Element leads, John Muggridge (Circulation), Noelle Anderson (Safety), and Valerie Clarke (Conservation/Open Space), will be in attendance. At this meeting, Michael Baker will review and refine the proposed scope of work, project schedule, communications protocol and deliverables, and branding material. This meeting will also be used to discuss staff expectations, data needs, preliminary community outreach approach and content framing regarding the requirements of various senate and assembly bills. The outcome of this discussion will be a comprehensive, clear, and actionable framework for moving the project forward. Task 1 Deliverables • Confirm project schedule • Up to 28 coordination meetings • Monthly invoices • Meeting agenda and summaries with action items Task 2 Community Engagement Michael Baker understands that community engagement is an ongoing dialogue and is to be integrated throughout the entire Project. Engaging local community members can be challenging for a variety of reasons, such as work schedules, family commitments, mobility and accessibility constraints, etc.The Michael Baker team's approach is based on the principle that a successful project requires support from local stakeholders and community members. To achieve this, the Michael Baker team utilizes a multi -faceted approach to public engagement. Various tools, including a community meeting, stakeholder interviews, a survey, and media material are used to reach the widest possible audience. Michael Baker is well-equipped to create a safe and welcoming environment for community members to express their opinions and concerns. Feedback gathered from public engagement and the client team will be assessed for common themes and any potential conflicts discussed before undertaking final documentation. Task2.1 Projecteranding Michael Baker will collaborate with City staff to develop a cohesive branding concept for the General Plan Elements. This branding will be guided by the City's established standards, along with any supplemental direction provided. The Michael Baker team will create theming elements such as project names or taglines, logos, graphics, and report templates to ensure consistency throughout the planning process. All deliverables will align with the City's overall branding. If preferred, the Michael Baker team can retain the existing General Plan Element style and formatting or offer updated design options that build upon the current layout. Task2.2 Community Meeting To ensure a readily accessible public engagement experience, Michael Baker will coordinate, schedule, host, and lead up to two (2) in -person Community Meeting to discuss all three (3) Elements, Circulation, Safety, and Conservation/Open Space. The intent is that the in -person meetings will be focused on broad ideas from the community and existing conditions and Limitations. The community will have the opportunity to express their interests, needs, and concerns. The Michael Bakerteam will collaborate with the City to identify appropriate methods, locations, and timings to optimize community participation. The Community Meetings can be a standalone event or be co -located at a pop-up booth at a community event such as farmer's markets, summer concert series and night block parties to cultural festivals and charity cook -offs. As facilitators, the Michael Baker team will guide participants through the agenda and activities while fostering a collaborative and inclusive atmosphere. Community Meeting activities may include: PAGE 17 REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE CITY OF SANTA CLARITA AUGUST20,2026 INTERNATIONAL • An icebreaker activity to help participants become acquainted and feel comfortable sharing ideas, • A presentation to share relevant data, research findings, case studies, or examples to inform and inspire participants about circulation, mobility, parks, recreation, conservation, sustainability, etc. • A brainstorming session for participants to generate ideas, solutions, and recommendations. • Group discussions that divide participants into smaller, more manageable groups to tackle topics. In the Community Meetings, the materials and engagement activities will address the entire project area oriented for participants with a wide range of backgrounds, perspectives, and interests. Up to three (3) Michael Baker team members will participate in the Community Meetinsg, depending on the specific location, timing, and approach chosen. All outreach efforts will be documented thoroughly, including sign -in sheets, summaries, and photographs. Michael Baker will compile, summarize, and synthesize input collected through the Community Meetings. Input will be evaluated to determine common themes, areas of consensus, and differing perspectives, with consideration given to the varying needs of residents across geographic areas, age groups, and user types. The resulting findings will be documented in a clear and concise summary and will directly inform the needs assessment, strategic recommendations, and prioritization the three General Plan Elements. Task2.3 Stakeholder Meetings In our experience, Circulation Element updates benefit from direct meetings with stakeholders to discuss the planning process.There are three primary stakeholder groups that must be part of the process to ensure continuity in truck routes across jurisdictionalboundaries: I)the local community, 2) business/industry operators in the City that require truck access, and 3) adjacent jurisdictions. In addition, direct coordination with local non -governmental organizations, including those representing environmentaljustice and disadvantaged communities, is essential. The team willwork with the City to identify a list of stakeholders, develop a stakeholder engagement schedule, and develop content for each of the stakeholder group engagement activities. Public outreach is a critical compliance factor for designating truck routes and is required by AB 98/SB 415. We are aware of three agencies that have been directly contacted by the Attorney General's Office requesting detailed information about their public engagement plans and efforts to obtain community input in the truck route planning process. The team will work with the City to identify key businesses and industrial developers (if applicable) that require, or will require, Class 7 and 8 truck access. One-on-one interviews with up to five (5) industry stakeholders will be conducted. A critical element of implementation and enforcement is ensuring that truck routes do not start or stop at jurisdictional limits. When this occurs, it is challenging for truck drivers to comply and difficult for police officers to enforce. The City is surrounded by unincorporated Los Angeles County who will be contacted as part of this effort. The County of Los Angeles has not yet adopted truck routes. It is recommended that the City meet with the County to discuss interjurisdictional truck routes. For this effort, we are planning for up to two (2) virtual calls. PAGE 18 REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE CITY OF SANTA CLARITA AUGUST 20, 2026 1 N T E R N A T 1 0 N A L Task2.4 Community Survey Michael Baker will utilize Social Pinpoint, SurveyMonkey, or a similar engagement platform to develop and administer a community survey throughout the planning process. The survey will focus on identifying community priorities, opportunities, needs, and concerns related to all three (3) Elements, Circulation, Safety, and Conservation/Open Space. The survey will be launched in conjunction with the first Community Meeting and will be made available through the City's website, social media platforms, and other outreach channels. This survey will be provided in English and Spanish. Example survey questions or opportunities include: An option to ask key questions followed by an option to drop pins on a map and leave comments about truck -related problems that respondents are experiencing. A matrix question asking respondents to identify the safety concerns, such as wildfire, flooding, extreme heat, earthquakes, or other hazards. A map feature to drop pins on areas that can benefit from improved community access to parks and open space or areas where the community has seen wildlife. Following the close of the survey, Michael Baker will prepare a memorandum summarizing the survey findings and community input. The summarywill include narrative descriptions, charts, infographics, and othervisual materials to clearly communicate key findings and increase accessibility of the information. Visual communication techniques help improve understanding and encourage broader community engagement by presenting information in a clear and memorable format. The analysis will consider principles of equity, inclusivity, and environmental stewardship, ensuring that a variety of community perspectives are represented. While not all recommendations generated through the outreach process may ultimately be incorporated into the Element, the project team will be prepared to clearly communicate how community input informed the planning process and the rationale behind key policy and planning decisions. Task2.5 Promotional Material The Michael Baker team will design up to three (3) visually compelling promotional flyers tailored for multi -channel distribution. Each flyer will available for email blasts, embedded on the project website, and/or adapted for social media platforms. The Michael Baker team can include OR codes to direct viewers to the City's website or to the directions for the Community Meetings or launch of the Survey. The Michael Baker team can either create this flyer in Illustrator or Canva formats to allow for easy updates by the City if preferred. The City will be responsible for distributing the promotional content through its website, social media channels, newsletters, printed mailings, and other relevant outlets. Task Deliverables • Meeting presentation and content for two (2) Community Meetings • Outreach collateral including boards, agendas, sign -in sheet and meeting summary • Up to five (5) industry stakeholder interviews • Two (2) virtual meetings with Los Angeles County • One (1) virtual coordination meeting with SCAG (MPO) • Community Survey and Survey summary narrative, up to five (5) pages MS Word and Adobe PDF • Branding guidelines for the three (3) Elements, up to six (6) pages, in MS Word or Adobe PDF format • Three (3) promotional material to advertise the Community Meeting created in Illustrator or Canva PAGE 19 REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE CITY OF SANTA CLARITA AUGUST 20, 2026 I N T E R N A T 1 0 N A L Top images: The Michael Baker team hosting outdoor Community Meetings at existing events for a General Plan Element Updates; Bottom images: The Michael Baker team hosting Community Meetings through formal presentations and acitivity boards. PAGE 20 REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE CITY OF SANTA CLARITA -� AUGUST 2q 2026 INTERNATIONAL Task 3 Circulation Element Update Senate Bill 415 (SB 415), signed into law October 3, 2025, requires cities to re-evaluate and designate truck routes, as well as adopt new siting and building standards for logistics uses. The key intent of the legislation is to minimize freight impacts on sensitive receptors. Truck routes have always been a sensitive topic: goods movement is necessary to serve residents and businesses alike, but moving goods by trucks and trains often creates environmental nuisances such as pollution, dust and noise. The City designated its truck route network in the 2011 General Plan Circulation Element, not through a specific truck route ordinance as it broadly classifies "all streets designated as Major and Secondary Highways" as approved truck routes (Objective C 2.4). This approach is different to many Cities that identify discrete, individually analyzed travel routes. This does not comply with what AB 98/SB 415 (Gov. Code § 65302.02) requires: those laws mandate that the circulation element affirmatively identify and establish specific truck routes that maximize use of interstate/state highways first, avoid residential areas and sensitive receptors, and only use arterials/collectors when state highways aren't available. This is more of a route by route, impact conscious designation, not a blanket policy. While the City's truck route network is contained in its General Plan Mobility Element, it has not been formally adopted by ordinance and codified. Under AB 98, all cities were required to amend their general plan mobility elements to incorporate a truck route map. SB 415 subsequently added an alternative compliance path, permitting non -Warehouse Concentration Region jurisdictions, which includes Santa Clarita, to adopt a truck route ordinance in lieu of amending their circulation element. This scope is structured around a full Circulation Element amendment, which will identify and establish specific truck routes, update roadway classifications, and incorporate the necessary goals, policies, and implementation measures directly into the Circulation Element consistent with AB 98/SB 415 (Gov. Code § 65302.02). Task 3.1 Existing Conditions Research, Review, and Data Collection Fehr & Peers will evaluate the existing truck routes. We will conduct a field inventory of truck route -related signage within City limits and document the exact location of the signs, sign type, size, condition, retroreflectivity, mounting height, orientation, and visibility, as well as the sign's compliance with the California Manual on Uniform Traffic Control Devices (CAMUTCD). A GIS layer of the sign locations and a photo -database of all signs, including installation context, will be prepared. As part of this effort, missing, damaged, non -compliant, and obsolete signs will be flagged. AB 981SB 415 Compliance Review There are four key steps for evaluating existing truck routes for AB 98/SB 415 compliance: 1. Roadway Classification 2. Design 3. Land Use Considerations 4. Access First, Fehr & Peers will prepare a GIS map to compare the City's General Plan roadway classifications to Caltrans' functional classifications and flag any inconsistencies. If the City's designation exceeds Caltrans' functional classification, we will coordinate with Public Works to determine next steps. For example, for the City of Ontario, Fehr & Peers identified two major six -lane arterials constructed per the City's General Plan buildout classification that Caltrans continued to functionally classify as two-lane local roadways. We worked with the City to provide Caltrans with the necessary documentation to change the functional classifications consistent with the City's General Plan classification and their designation as truck routes. PAGE 21 REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE CITY OF SANTA CLARITA AUGUST20,2026 INTERNATIONAL Second, we will meet with Santa Clarita Public Works staff to confirm that existing truck routes are designed to accommodate heavy-duty trucks and determine if there are any existing truck routes with design deficiencies. As part of this step, we will also review the City's minimum street design standards and standard roadway cross sections against the latest state and federal design guidance (e.g., Caltrans Highway Design Manual, AASHTO Green Book, and applicable Complete Streets requirements) to confirm the cross sections proposed for designated truck routes remain current and adequate for heavy - vehicle turning movements, pavement loading, and multimodal accommodation. Third, we will add a GIS layer of sensitive receptors. This layer will depict the different types of sensitive receptors, such as schools, parks, hospitals, daycare facilities, etc. Lastly, Fehr & Peers will layer additional GIS data depicting logistics and industrial land uses, as well as any parcels zoned for industrial uses. We will also map existing truck routes, including freeways. Together, these four pieces will provide the initial basis for evaluating existing truck routes and identifying needed updates. Truck Route NetworkAnalysis Fehr & Peers will evaluate truck routing pursuant to AB 98/SB 415 requirements for designating truck routes throughout the City. The analysis will consider existing and planned "logistics uses" as defined in AB 98/SB 415 to ensure they are accessible by a designated truck route. Truck routes will also be assessed pursuant to AB 98/SB 415 requirements relating to proximity to sensitive receptors. Interjurisdictional truck access will also be considered. We will analyze truck routing activity in the City through a two-step approach. We will begin by using the truck GPS data, which uses fleet telematics. This analysis will provide a snapshot of where trucks are moving in the community. Next, we will identify truck -generating uses and delve into the corridors to analyze temporal and seasonal factors associated with trucks moving through your community. However, it's important to understand that truck GPS data is a sample, so it only represents anywhere from one percent to 25 percent of the total truck traffic on a corridor. If changes to truck routes are proposed, we will collect classification counts on the routes that will be impacted by the change. These counts will assist with understanding how representative the GPS data is on the affected corridor and also provide the basis for analyzing potential impacts of changing the City's truck routes. For example, if an existing truck route is removed, it will be necessary to understand how many trucks would be shifted to an alternative route. If there are sensitive receptors on a proposed route that would be receiving the additional truck traffic, we will need to analyze the potential air quality, noise and safety impacts. Classification counts would be needed on both the existing truck route and the proposed alternative truck route. Next, we will assess the compatibility of land uses and zoning along the existing truck routes. We will map the sensitive receptors as defined by AB 98/SB 415 and work closely with the City to identify routes that avoid sensitive receptors to the extent feasible. As part of this exercise, we will also consider the roadway design findings to assess the roadway's compatibility for accommodating trucks, such as pavement type and thickness, lane widths, intersection turning radii, and facilities, such as bike lanes, sidewalks, and transit stops, that serve other modes. In parallel with the GPS and classification count analysis, we will review the City's completed traffic studies and the latest City travel demand model to identify forecast truck and heavy -vehicle volumes on candidate truck routes, ensuring our recommendations are consistent with the City's existing planning -level traffic data and do not conflict with previously studied intersection or corridor improvements. Understanding truck access needs and overall truck patterns is also important for coordinating with neighboring jurisdictions, as well as with Caltrans and the Southern California Association of Governments (SLAG), the region's Metropolitan Planning Organization (MPO), to ensure consistency with regional goods movement and mobility plans. Without a coordinated effort, truck routes cannot be effectively enforced, so it is critical that agencies work together. We will facilitate meetings between agencies, including SCAG, to coordinate truck routing decisions. Information gathered will be used to identify potential changes to truck routes. Alternative truck routes will be analyzed using the same information. PAGE 22 REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE CITY OF SANTA CLARITA AUGUST 20, 2026 1 N T E R N A T 1 0 N A L Task3.2 Policy Development Fehr & Peers will prepare the Circulation Element amendment that carries forward the technical findings from the previous tasks such as the truck route designations, roadway classification updates, and supporting analysis into General Plan goals, policies, and implementation measures that comply with AB 98/SB 415. Based on the technical analysis conducted in Task 3 and the Stakeholder Engagement input received in Task 2, Fehr & Peers will prepare a set of truck route recommendations that meet the following legislative requirements: • Identify travel routes for the transport of goods, materials, or freight for storage, transfer, or redistribution to safely accommodate additional truck traffic and avoid residential areas and sensitive receptors; • Maximize the use of interstate or state divided highways as preferred routes for truck routes. Maximize the use of arterial roads, major thoroughfares, and predominantly commercially oriented local streets when state or interstate highways are not utilized; • Ensure that truck routes comply with the following: o Major or minor collector streets and roads that predominantly serve commercially oriented uses must be used for truck routes only when strictly necessary to reach existing industrial zones; o Trucks must be routed via transportation arteries that minimize exposure to sensitive receptors; and o On and after January 1, 2028, all proposed development of a logistics use development must be accessible via arterial roads, major thoroughfares, or roads the predominantly serve commercially oriented uses. For purposes of the mobility element, local roads shall be considered to predominantly serve commercial uses if more the 50 percent of the properties fronting the road within 1,000 feet are designated for commercial or industrial use according to the local zoning ordinance Fehr & Peers will prepare a GIS map that will be published on the City's website and made available pursuant to the requirements of AB 98/SB 415. Task3.3 Circulation Element Draft Development The Fehr & Peers team will prepare administrative draft amendments to the Circulation Element incorporating the findings, maps, policies, and implementation measures developed through the preceding tasks. The draft amendments will include updated circulation, mobility, and goods movement information necessary to address applicable AB 98/SB 415. requirements, while remaining consistent with the City's existing General Plan framework and recently adopted planning efforts. Task Deliverables: • Technical memorandum summarizing existing conditions findings, data sources, and mapping products (Word Document, with figures produced in GIS and Adobe Creative Suite) o Truck Route Sign Inventory Photo Database and GIS layer o Existing Truck Routes o Draft truck route alternatives and recommendations o Existing and proposed truck routes in GIS (compatible with the City of Santa Clarita's existing GIS system) Administrative Draft policy framework (Word Document) o GIS Truck Route Map Internal Draft Circulation Element Amendment (Microsoft Word and PDF) PAGE 23 REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE CITY OF SANTA CLARITA AUGUST 20, 2026 1 N T E R N A T 1 0 N A L Task 4 Safety Element Update Task 4.1 Existing Conditions Research, Review and Data Collection The Michael Baker team will conduct a targeted review of the City's existing Safety Element, 2021 Local Hazard Mitigation Plan (LHMP), and 2026 LHMP Update to identify existing policies, hazard assessments, and vulnerability information related to extreme heat. Michael Baker will compile and evaluate relevant state, regional, and localdatasets (including the California Heat Assessment Tool, California Extreme Heat Scoring System, Healthy Places Index) and other internal City sources to characterize community exposure, vulnerability, and sensitivity to extreme heat hazards. The Michael Baker team will coordinate data development with the Conservation/Open Space Element Update to ensure consistency across General Plan elements where topics intersect, including urban forestry, tree canopy coverage, heat island effects, open space resources, and related resilience indicators. Michael Baker will document historic extreme heat events and occurrences affecting the planning area and prepare maps, figures, and supporting graphics illustrating key extreme heat vulnerabilities, geographic risk patterns, and disadvantaged or disproportionately affected populations, as appropriate. The team will summarize the findings into a Technical Memorandum, which will identify areas requiring revisions and provide recommendations to guide preparation of the Element, including recommendations on the incorporation of environmental justice policies where applicable. Task4.2 Policy Development Using information developed through Task 4.1 and the City's current LHMP, the Michael Baker team will prepare recommendations for Safety Element goals, policies, and implementation measures addressing extreme heat hazards. Recommendations will build upon the City's existing Safety Element framework, maintain consistency with the 2026 LHMP Update, and support integration with applicable climate adaptation, resilience, public health, emergency preparedness, and open space planning efforts. As a value-added service, the Michael Baker team will also coordinate the Safety Element update with the City's 2026 Local Hazard Mitigation Plan (LHMP) Update adoption process and incorporate the LHMP by reference in accordance with AB 2140. By integrating these efforts into the AB 2684 update process, the City can efficiently position itself to maintain eligibility for enhanced State cost -share assistance for eligible Public Assistance projects following a presidentially declared disaster, while avoiding the need for a separate Safety Element amendment in the future. Michael Baker will prepare a draft policy framework designed to address applicable requirements of AB 2684 and AB 2140, while maintaining consistency across General Plan elements. Policy recommendations will be provided in a Word Document, identifying proposed additions, modifications, and updates to Safety Element goals, policies and implementation measures related to extreme heat and AB 2684. Task 4.3 Safety Element Draft Development The Michael Baker team will prepare administrative draft amendments to the Safety Element incorporating the findings, maps, policies, and implementation measures developed through Tasks 4.1 and 4.2. The draft amendments will include updated extreme heat hazard information, vulnerability analysis, and policy content necessary to address applicable AB 2684 requirements, while remaining consistent with the City's existing General Plan framework and recently updated LHMP. The Safety Element will be prepared as a focused amendment to the Safety Element, emphasizing clear, concise updates that integrate new extreme heat information and resilience strategies without unnecessarily restructuring the existing document. Michael Baker will provide a draft Safety Element for internal review, assuming one round of comments. PAGE 24 REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE Michael = CITY OF SANTA CLARITA f AUGU5T2q 2026 I N T E R N A T I O N A L Task4 Deliverables: • Technical memorandum summarizing existing conditions findings, data sources, and mapping products (Word Document, with figures produced in GIS and Adobe Creative Suite) • Administrative Draft policy framework (Word Document) • Internal Draft Safety Element Amendment (Microsoft Word and PDF) Tasks Conservation/Open Space Element Update Task 5.1 Existing Conditions Research, Review, and Data Collection Michael Baker has extensive experience preparing and updating Conservation and Open Space Elements throughout California and will work closely with the City of Santa Clarita to develop an updated Conservation and Open Space Element that reflects current conditions, regulatory requirements, and community priorities. Building upon the City's 2011 Conservation and Open Space Element, the interdisciplinary team will evaluate existing open space resources, parks, trails, biological resources, wildlife corridors, groundwater recharge areas, scenic resources, and recreational assets throughout the Santa Clarita Valley. Particular attention will be given to topics identified in the current Element, including environmental sustainability, habitat connectivity, climate resilience, open space preservation, recreational trail systems, and protection of the Santa Clara River corridor and surrounding natural resource areas. To gain a thorough understanding of existing conditions, Michael Baker will collect and review available plans, studies, GIS datasets, technical reports, and resource inventories prepared since the adoption of the 2011 Conservation and Open Space Element. The team will assess how conditions have changed over the past fifteen years, including open space acquisitions, trail expansions, habitat conservation efforts, park improvements, climate adaptation initiatives, and evolving environmental regulations. Using GIS and other analytical tools, the team will prepare updated base maps and supporting documentation to evaluate existing conditions and identify opportunities, constraints, and data gaps. This assessment will serve as the foundation for the Conservation and Open Space Element update and help ensure that future policies, goals, and implementation strategies continue to support Santa Clarita's vision for a sustainable, resilient, connected, and environmentally responsible community. The team will summarize the findings into a Technical Memorandum, which will identify areas requiring revisions and provide recommendations to guide preparation of the Element, including recommendations on the incorporation of environmental justice policies where applicable. Potential new maps may include: • Proximity: Analysis of community access to various parks within a specified walking radius of the City. • Accessibility and Connectivity: Ensuring the maps depict how parks and open spaces are interconnected to promote accessibility and encourage the use of greenways and trails. • Tree Inventory Map: noting the locations of trees through a density map or highlighting gaps of canopy coverage. • Urban Heat Island Mapping (vegetated/non-vegetated): Pulling in any relevant existing vegetation mapping or using aerial imagery to outline vegetated vs. non -vegetated. • Wildlife/Corridor Movement: looking at statewide wildlife movement layers (will include local layers where available) to understand wildlife movement in the City. Review Existing Element Michael Baker will conduct a review of the City of Santa Clarita's existing Conservation and Open Space Element to evaluate whetherthe existing conditions, trends, and planning issues identified in the 2011 General Plan remain accurate and relevant or require updates to reflect current conditions. The review will focus on key topic areas including Environmental Sustainability, Biological Resources (including wildlife corridors, habitat connectivity, and rewilding opportunities), Climate Change and greenhouse gas reduction initiatives, Open Space Resources and preservation efforts, and Recreational Trails and trail system conditions. This assessment will identify changes in regulatory requirements, environmental conditions, PAGE 25 REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE CITY OF SANTA CLARITA AUGUST20,2026 INTERNATIONAL conservation priorities, and community needs that have occurred since adoption of the 2011 Element and will inform recommendations for updates to policies, goals, and implementation measures Accessibility Ana laysis Michael Baker will evaluate the accessibility, connectivity, and overa[If unction of Santa Clarita's extensive network of parks, open spaces, trails, and natural resource areas identified in the Conservation and Open Space Element. The assessment will consider how residents access and use these resources, the connectivity between major open space areas, wildlife corridors, recreation facilities, and trail systems, and how these assets support community health, recreation, habitat conservation, and environmental sustainability. Building upon the City's existing inventory of parks, open spaces, trail corridors, and conservation lands, the team will document changes that have occurred since adoption of the 2011 Conservation and Open Space Element, including acquisitions of open space, trail expansions, park improvements, habitat preservation efforts, and other recreational amenities. The analysis will incorporate available community input and City staff feedback to identify priorities, opportunities, and gaps related to open space access, trail connectivity, scenic resources, and recreation opportunities. Findings will help inform updates to the Conservation and Open Space Element and provide a framework for future management and preservation efforts that support Santa Clarita's goals for a resilient, connected, and sustainable open space system. Rewilding Opportunities Analysis Michael Baker will conduct a high-level assessment of rewilding and ecological restoration opportunities throughout Santa Clarita, building upon the extensive network of open space areas, wildlife corridors, natural canyons, and habitat linkages identified in the City's existing Conservation and Open Space Element. The assessment will focus on opportunities to enhance habitat connectivity between key resource areas, including the Santa Clara River corridor, Santa Clarita Woodlands, Whitney Canyon, Elsmere Canyon, Placerita Canyon, and other designated open space lands and wildlife movement corridors. The team will evaluate opportunities to restore native vegetation communities, improve ecosystem function, enhance biodiversity, and strengthen connections between existing habitat areas to support wildlife movement and long- term ecological resilience. Using GIS and available environmental data, Michael Baker will prepare mapping and geospatial analyses to identify priority restoration and rewilding opportunities, potential habitat gaps, and areas where ecological enhancements could complement the City's open space preservation goals. The assessment will be informed by available data and coordination with City staff and will build upon existing Conservation and Open Space Element policies related to biological resources, wildlife corridors, open space preservation, and environmental sustainability. This effort will consist of a high-level desktop analysis and does not include field verification, protocol -level biological surveys, orspecies-specific studies. Task5.2 Policy Development Using information developed through Task 5.1 and the City's current Conservation/Open Space Element, the Michael Baker team will prepare recommendations to clearly respond to Government Code 65560 through 65562, SB 1425, and AB 1889, To ensure the Conservation and Open Space Element complies with SB 1425 and AB 1889, Michael Baker will analyze and research the required components, update the existing General Plan Elements, and make policy recommendations in line with the requirements. Michael Baker will address the potential policy recommendations for the following items as noted in the Legislative text: SB 1425: Access to open space for residents that considers social, economic, and racial equity. Climate resilience policies or best practices and other co -benefits of open space, correlated with the Safety Element within the City's General Plan. Rewilding opportunities and policies, correlated with the Land Use Element within the City's General Plan. PAGE 26 REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE CITY OF SANTA CLARITA AUGUST20,2026 INTERNATIONAL • May include policies to preserve, enhance, and expand an integrated network of open space to support beneficial uses, such as habitat, recreation, natural resources, historic and tribal resources, water management, and aesthetics. May include a natural resources conservation plan to provide for coordinated mitigation of the impacts of new development within the City. AB 1889: • Policies to minimize adverse impacts by development and human activities to wildlife in the City. • Address shifts to wildlife due to climate change. • Policy targets for the City to conserve a percentage of land and coastal waters by 2030 to combat the climate and biodiversity crisis, in relation to California's goals. • Policies to protect, restore, and improve fish and wildlife and habitat connectivity. • Policy targets to avoid, minimize, and mitigate impacts to fish, wildlife, and habitat connectivity from existing and planned land uses within the City. Rewilding Opportunities: Rather than focusing on species reintroduction, the assessment will emphasize practical and achievable strategies for habitat enhancement, landscape connectivity, native vegetation restoration, watershed health, and long-term stewardship of the City's natural resources. Following the analysis, Michael Baker will prepare a technical memorandum summarizing findings, opportunities, and recommendations related to habitat conservation, wildlife connectivity, ecological restoration, and environmental resilience. The memorandum will include maps, GIS analyses, graphics, and tabular summaries to support updates to the Conservation and Open Space Element and provide recommendations for future goals, policies, implementation measures, and resource management priorities. This effort will consist of a high-level desktop assessment and will not include field verification, protocol -level biological surveys, or species -specific investigations. Task 5.3 Conservation/Open Space Element Draft Development The Michael Baker team will prepare administrative draft updates to Santa Clarita's Conservation and Open Space Element that incorporate the findings, mapping, analyses, goals, policies, and implementation measures developed through the existing conditions, resource assessment, open space, trail, and habitat connectivity tasks. The update will focus on ensuring that the Element reflects current conditions and community priorities while building upon the framework established in the City's 2011 Conservation and Open Space Element. Areas of emphasis will include environmental sustainability, biological resources, wildlife corridors and habitat connectivity, climate resilience, open space preservation, recreational trails, scenic resources, and stewardship of the Santa Clara River corridor and surrounding natural resource areas. Michael Baker understands the importance of preparing a concise, visually engaging, and user-friendly planning document that will serve as a valuable resource for City staff, decision -makers, stakeholders, and the public over the coming years. The updated Element will be supported by high -quality mapping, graphics, charts, photographs, GIS-based analyses, and technical illustrations that clearly communicate key findings and recommendations. The document will include updated inventories and assessments of open space resources, parks, trails, biological resources, Significant Ecological Areas, wildlife corridors, groundwater recharge areas, and scenic resources, along with recommendations for conservation, habitat enhancement, ecological connectivity, climate adaptation, and recreational access. The draft Element will also include recommended goals, policies, implementation programs, and priority actions designed to support the City's long-term vision for environmental stewardship, open space conservation, biodiversity protection, recreational opportunities, and sustainable growth. Recommendations wilt build upon existing Conservation and Open Space Element policies while addressing changes in environmental conditions, conservation priorities, open space acquisitions, PAGE 27 REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE CITY OF SANTA CLARITA AUGUST20,2026 INTERNATIONAL trail system expansions, habitat preservation efforts, and climate resilience initiatives that have occurred since adoption of the current Element. The result will be a modernized Conservation and Open Space Element that provides a clear policy framework for preserving Santa Clarita's unique natural resources, extensive open space system, and interconnected network of parks, trails, wildlife corridors, and recreational assets. Tasks Deliverables: • Technical memorandum summarizing existing conditions findings, data sources, and mapping products (Word Document, with figures produced in GIS and Adobe Creative Suite) • Administrative Draft policy framework (Word Document) • Internal Draft Conservation/Open Space Element Amendment (Microsoft Word and PDF) Task 6 CEQA Compliance - General Plan EIR Addendum CV]AApproach Michael Baker will prepare the appropriate California Environmental Quality Act (CEQA) documentation for the adoption of the Circulation, Safety, and Conservation/Open Space Elements Update (Elements Update). We understand the Elements Update includes identifying a truck route network in the Circulation Element; addressing extreme heat risks and vulnerabilities in the Safety Element; and identification of wildlife habitat connectivity areas, natural landscapes, and landscape permeability and implementation measures addressing wildlife movement and habitat connectivity in the Conservation/Open Space Element. While the updates to the Safety and Conservation/Open Space Elements alone would likely be exempt from CEQA (e.g., Common Sense Exemption, Class 8 Actions by Regulatory Agencies for Protection of the Environment), the inclusion of the Circulation Element Update in the project may preclude the use of an exemption. While no CEQA exemption appears to clearly apply, as part of our CEQA scope, Michael Baker's CEQA team will review potential alternative CEQA pathways, including potential CEQA exemptions, in consultation with the Community Development Department and City Attorney (as appropriate). Based on our preliminary review of the project, an Addendum to the City's General Plan Environmental Impact Report (EIR) (SCH #2008071133) appears to be an appropriate and streamlined CEQA option for the proposed Elements Update. We have successfully used this approach on other similar non-exempt, but minor -to -modest in scope, General Plan Element updates and zoning ordinance revisions. Hence, our proposed scope and fee assume the preparation of an Addendum to the City's General Plan EIR. In addition, since we assume that the establishment of a truck route network in the Circulation Element will not include the identification of any specific roadway improvements, we assume that the analysis in the Addendum will be qualitative and that no technical studies will be needed to support the Addendum. Task6.1 Meetings and Task Management A virtual kickoff meeting with City staff will be conducted to initiate the work effort, review project information, and discuss the details of the project description and CEQA schedule. Michael Baker will engage in regular communications with City staff, as necessary. This is anticipated to include emails and up to three (3) virtual meetings to expedite the completion of the Addendum. Task6.2 Prepare Addendum Report Michael Baker will prepare administrative draft, proof -check draft, and final iterations of an Addendum to the City's General Plan EIR. We anticipate the Addendum will include the following sections: PAGE 28 REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE CITY OF SANTA CLARITA AUGUST20,2026 INTERNATIONAL • Background and Introduction: This section will introduce the Addendum; provide background on the statutory requirements of CEQA; and describe the history of the City's General Plan and the purpose of the proposed updates to the Circulation, Safety, and Conservation/Open Space Elements. • Project Description: Michael Baker will prepare a detailed description of the proposed updates to the Circulation, Safety, and Conservation/Open Space Elements. • Comparative environmental impact analysis: Michael Baker will qualitatively evaluate the proposed Elements Update and compare its potential environmental effects to those of the General Plan for all impact topics analyzed in the certified EIR. This proposal assumes that there will not be any new significant impacts beyond those identified in the General Plan EIR or a substantial increase in the severity of any of the previously identified significant impacts. Should any such impacts be identified, we will consult with City staff regarding next steps. • Determination statement to support approval of the Addendum: Michael Baker will provide a determination statement that none of the circumstances identified in CEQA Guidelines Section 15162 have occurred (generally, no changes in the project, changes in the circumstances, or new information that result in new significant environmental effects or a substantial increase in the severity of previously identified significant effects), and that the Addendum will satisfy CEQA requirements for the proposed updates to the Circulation, Safety, and Conservation/Open Space Elements. Task6.3 Prepare Notice of Determination Michael Baker will prepare a Notice of Determination (NOD) for the project. Once the proposed Elements Update is adopted by the City Council, it is assumed that the City will provide a signed and dated version of the NOD to Michael Baker for filing with the Los Angeles County Clerk's Office, and for uploading it to State Clearinghouse via CEOAnet. Michael Baker assumes that the City will provide either proof of prior payment of CA Department of Fish and Wildlife fees from the General Plan EIR NOD or a check for the payment of such fees. Task 6 Deliverables: • Administrative Draft Addendum (electronic) • Proof -check Addendum (electronic) • Final Addendum (electronic) • Notice of Determination (electronic) • Filing of NOD with the Los Angeles County Clerk • Uploading NOD to the State Clearinghouse Task 7 Public Review and Adoption of Elements Task7.1 Internal Review of Draft Elements The Michael Baker team will facilitate one (1) internal review cycle of the Administrative Draft Elements, including the Circulation, Safety, and Conservation/Open Space Elements. Draft documents will be provided electronically in Microsoft Word format utilizing redline and track changes functionality and made available through a secure SharePoint site or other mutually agreed -upon file sharing platform. Review participants will provide comments directly within the draft documents during the established review period. Upon completion of the review period, the Michael Baker team will consolidate all comments into a single, coordinated set of review comments and identify conflicting or duplicative feedback for resolution. The Michael Baker team will evaluate proposed revisions for consistency with applicable State laws, General Plan requirements, adopted City policies, regional PAGE 29 REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE CITY OF SANTA CLARITA AUGUST20,2026 INTERNATIONAL planning documents, and relevant regulatory guidance. Based on this review, the Michael Baker team will incorporate appropriate revisions into the Public Review Draft Elements and prepare responses to significant policy or technical comments, as needed. Task7.2 Public Review of Draft Elements Michael Baker will incorporate internal review and comment from Task 7.1 above, to prepare the Public Review Drafts of the Circulation, Safety, and Conservation/Open Space Elements. These drafts will be submitted electronically to the City for a 30- day public review period. The City will be responsible for collecting and consolidating any public comments into a single set to be shared with Michael Baker at the conclusion of the review period. Upon receipt, the team will review the comments and make any necessary revisions to finalize the Elements for presentation to the Planning Commission and City Council. The project schedule outlining these timelines is provided in the following section. Task7.3 Public Hearings andAdoption Michael Baker will assist the City in presenting the Elements and CEQA documentation at both Planning Commission and City Council for public hearing and adoption. This scope assumes two informational study sessions (one with the Planning Commission and one with the City Council) in advance of the formal adoption hearing. These study sessions will allow the Michael Baker team to present the project, discuss the planning process, and discuss preliminary policy directives. The study sessions will be attended by a minimum of three Michael Baker team members, including the Project Manager, CEQA lead and Circulation Element lead. At this stage, it is anticipated that the study sessions will be scheduled in advance of the adoption hearings, to allow for input or minor changes/comments to be incorporated into each element. After the study sessions have concluded, Michael Baker will attend two public hearings (one with the Planning Commission and once with the City Council) to present each element for approval and adoption. Each public hearing will be attended by a minimum of three Michael Baker team members, including the Project Manager, CEQA lead, and Circulation Element Lead. At this stage, it is anticipated that feedback from the Planning Commission and City Council will not result in significant revisions. For both the study sessions and public hearing, the Michael Baker team will prepare presentation materials and supporting handouts that outline statutory requirements, the collaborative planning process, community feedback received, and final policy recommendations. Michael Baker will also provide one round of review and comments on the staff reports prepared by City staff. Task7.4 Project Closeout Following receipt of final comments, the team will address all feedback and submit the Final Circulation, Safety, and Conservation/Open Space Elements in electronic formats for final distribution. At the conclusion of the project, Michael Baker will conduct a comprehensive closeout process to ensure all deliverables are finalized and aligned with the City's expectations. This will include a final review of all work products, incorporation of any remaining feedback, and delivery of all approved documents in both editable and final formats. In addition to providing a PDF version of the Final Element for easy on -screen viewing and distribution, Michael Baker can also develop an interactive, web -based version of the plan. Built on the same platform as the PDF to avoid maintaining two separate versions, the digital plan will feature interactive maps, intuitive navigation, and exploration tools. This format offers flexible layouts and user-friendly features tailored to the unique needs of the community. Michael Baker will also provide a copy of all completed work products on an external drive or similar medium at project completion. PAGE 30 REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE CITY OF SANTA CLARITA AUGUST20,2026 INTERNATIONAL Examples of web -based plans include: • https://www.gilbertaz.gov/departments/development-services/planning/general-plan • https://www.goodyearaz.gov/qovernment/departments/development-services/planninq-zoning/goodyear- 2035-general-plan Task 7 Deliverables: Circulation Element • One (1) Public Review Draft Circulation Element (MS Word and Adobe PDF) • Two (2) Planning Commission Hearings for the Circulation Element to present the draft and then the final Element • Two (2) City Council Hearings for the Circulation Element to present the draft and then the final Element • Informational presentation and handouts in support of Planning Commission/City Council Hearings • Final Circulation Element with integrated changes from the Public Review • Web -based Circulation Element Safety Element • One (1) Public Review Draft Safety Element (MS Word and Adobe PDF) • Two (2) Planning Commission Hearings for the Safety Element to present the draft and then the final Element • Two (2) City Council Hearings for the Safety Element to present the draft and then the final Element • Informational presentation and handouts in support of Planning Commission/City Council Hearings • Final Safety Element with integrated changes from the Public Review • Web -based Safety Element Conservation/Open Space Element • One (1) Public Review Draft Conservation/Open Space Element (MS Word and Adobe PDF) • Two (2) Planning Commission Hearings forthe Conservation/Open Space Element to present the draft and then the final Element • Two (2) City Council Hearings for the Conservation/Open Space Element to present the draft and then the final Element • Informational presentation and handouts in support of Planning Commission/City Council Hearings • Final Conservation/Open Space Element with integrated changes from the Public Review • Web -based Conservation/Open Space Element PAGE 31 REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE CITY OF SANTA CLARITA AUGUST 20, 2026 1 N T E R N A T 1 0 N A L Optional Tasks- Not Included within the Baseline Fee 1. Truck Route Signage Plan (OPTIONAL) Building on the signage inventory collected in the Circulation section and the recommended truck routes identified, Fehr & Peers will develop a truck route signage plan for the City, complete with sign types, installation locations, a phasing plan, and cost estimate for use in bidding out the work. Deliverables Signage Installation Package consisting of: • Sign location maps • Sign schedule • Detailed installation drawings • Installation phasing plan • Cost estimate 2. Municipal Code Update for Logistics Uses (OPTIONAL) AB 98/SB 415 does not explicitly require cities to update their zoning codes; however, the legislation requires that all new warehouse and logistics development meet 21 st-Century Warehouse standards related to truck circulation, loading, Landscaping, lighting, and community protection measures. While city staff can apply these standards through conditions of approval on a case -by -case basis, the absence of codified standards creates an additional administrative burden and increases the risk of inconsistent application across development applications. To streamline the development review process and ensure durable, consistent implementation of AB 98/SB 415 requirements, Fehr & Peers will coordinate with a specialized land use and zoning firm to review the City's existing zoning ordinance and prepare draft zoning code language that incorporates 21 st-Century Warehouse standards as codified development regulations. This task is optional but recommended, as updated code language significantly reduces staff review time, minimizes legal exposure from inconsistent application, and provides applicants with clear, predictable standards at the outset of the entitlement process. Existing Code Review The team will review the City's current zoning ordinance, including all applicable industrial and commercial/industrial zoning districts, overlay zones, and any existing truck route, loading, or landscaping standards. The review will identify gaps between existing code language and the requirements of AB 98/SB 415, including but not limited to: • Truck access and on -site circulation standards • Loading dock quantity, orientation, and setback requirements • Truck queuing and staging area provisions • Landscaping and screening buffers adjacent to sensitive receptors • Lighting standards for truck courts and loading areas • Prohibited uses and operating hour restrictions where applicable • Any defined thresholds triggering 21 st-Century Warehouse compliance (e.g., minimum square footage) 3. Draft Zoning Code Language (OPTIONAL) The team will prepare draft zoning code amendments that incorporate AB 98/SB 415 21 st-Century Warehouse standards into the City's development regulations. Draft language will be formatted to match the City's existing code structure and PAGE 32 REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE CITY OF SANTA CLARITA AUGUST20,2026 INTERNATIONAL style, and will include definitions, applicability thresholds, development standards, and any required findings or findings templates that city staff must make during project review. Draft code language will be provided to city staff and the City Attorney for review and comment. Final Zoning Code Language The team will incorporate comments from city staff and the City Attorney to prepare a final version of the proposed zoning code amendments. The final code language will be ready for introduction through the City's standard ordinance adoption process, including any required Planning Commission and City Council hearings. Fehr & Peers can provide staff report support and attend up to two public hearings as part of this task; additional hearing attendance will be billed as additional services. Assumptions • The City will provide all existing zoning ordinance documents, municipal code sections, and • any previously adopted warehouse or industrial development standards in digital format. • Legal review and formal adoption of the ordinance are the responsibility of the City and City • Attorney; this scope covers technical drafting support only. • This task assumes one consolidated round of review comments from city staff and the City • Attorney. Additional revision cycles beyond one round will be billed as additional services. • Translation of code language into languages other than English is not included in this scope. Deliverables • Existing Code Gap Analysis Memorandum • Draft Zoning Code Amendments (for staff and City Attorney review) • Final Zoning Code Amendments (incorporating one round of consolidated comments) • Staff Report Language Support (up to two public hearings) , i I NI% M. 2 �� SECTION 1.1.5 SCHEDULE REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE Michael Baker CITY OF SANTA CLARITA AUGUST 20, 2026 I N T E R N A T 1 0 N A L PROPOSED PROJECT TIMELINE The Michael Baker team is equipped to accommodate changes to the schedule, including adjustments to start or end dates, project duration, or the sequence of tasks. The following project timeline assumes a tentative start date of September 2026 and with the team's ability to complete the project prior to the January 1, 2028 statutory deadline. Task 1.1 Project Management Task 1.2 Regular Coordination Meetings Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Task 1.3 Kick -Off Meetin W re Task 2.1 Project Branding Task 2.2 Community Meetings Task 2.3 Stakeholder Meetings Task 2.4 Community Survey Task 2.5 Promotional Material Task 3.1 Existing Conditions Research, Review, and Data Collection Task 3.2 Policy Development Task 3.3 Circulation Element Draft Development TASK 4 SAFETY ELEMENT Task 4.1 Existing Conditions Research, Review and Data Collection Task 4.2 Policy Development Task 5.1 Existing Conditions Research, Review and Data Collection Task 5.2 Policy Development Task 4.3 Conservation/0 en S ace Element Draft Develo ment Task 6.1 Meetings and Task Management Task 6.2 Prepare Addendum Report Task 7.1 Internal Review of Draft Elements Task 7.2 Public Review of Draft Elements Task 7.3 Public Hearings and Adoption Informational Study Session Formal Adoption ga, � �W* A-' r. . . . . . . . . . . . . ;rz ow PROGRAM MANAGEMENT m REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE CITY OF SANTA CLARITA AUGUST20,2026 INTERNATIONAL PROGRAM MANAGEMENT As our Project Manager, Valerie Clarke, AICP, PLA has considerable experience managing both long range and community planning projects in southern California. Ms. Clarke will manage the Scope by starting with a clear and in-depth understanding of the project and then translating this into a comprehensive work plan, manage the schedule by utilizing the resources of our team to meet the project -specific needs and by rigorously holding ourselves to interim milestones so that key delivery dates are met, and manage the budget by developing detailed man-hour estimates for each task and vigilantly monitoring weekly timesheets and status reports to determine if there are areas of the project that require extra attention. Contract Management - Michael Baker has assembled the resources and developed the procedures needed to properly execute this agreement. Members of the Michael Baker team have worked together extensively in the past, establishing a strong and well -functioning Project Team for these Element Updates. Our management approach is to efficiently complete the assignments within budget and on schedule with complete and transparent client coordination. Managing Project Scope - Through open communication, documentation of the project goals and objectives in a concept plan and establishing a clear understanding of project deliverables at the outset, scope creep can be avoided throughout the execution of the project. Should out -of -scope work be requested or identified, the Project Manager will immediately notify the liaison staff in writing prior to performing the task. If approved, a formal technical and price proposal will be prepared and submitted. Managing Project Costs - After an assignment is received, our Project Manager will establish a budget for the assignment in Michael Baker's Enterprise Resource Planning (Oracle ERP) system. The budget will be broken down as necessary into individual tasks (Work Breakdown Structure - WBS) to better track the expenditures on the assignment. In addition to tracking assignment budgets, the ERP system is used to capture timesheet charges and produce invoices on a monthly basis for each assignment. ERP has many reports, including the Project Management Report that allows a manager to view weekly updates to project charges against the established budget, see details on all charges, and provide expected budget variances based on calculated percent complete estimates for each task of an assignment. Through this vigilant weekly monitoring of expenditures combined with the monthly senior management Project Status Reviews, adjustments to the work plan can be made rapidly to keep the project on budget. Managing Project Schedule -The Michael Bakerteam's overall effort will be controlled by following a detailed Critical Path Method' schedule driven' Work Plan. By understanding where critical and near -critical activities lie in the schedule (and where activities with substantial float exist), we can dedicate resources toward attacking production activities with the greatest overall schedule efficiency. The schedule will identify the total project duration from receipt of NTP to the submission of the final project deliverables. Major activities, durations, submission dates, required review times, interdependencies, and critical path items will be identified in this schedule. Michael Bakerwill review and update the project schedule on a regular basis and provide monthly updates with progress reports. When necessary, Michael Bakerwill develop and provide a recovery plan/schedule if unanticipated factors affect the originally planned project schedule. Managing Sub -consultants - The team provides overall project management and coordination of the consultant team throughout the planning process. As the prime consultant, Michael Baker oversees subconsultant contracts, schedules, budgets, quality control reviews, and deliverable integration, ensuring that all technical disciplines work collaboratively and that project milestones are completed on time and within budget. Regular coordination meetings, clear communication protocols, and ongoing progress tracking help maintain alignment among team members and provide the client with a single point of contact throughout the project. Progress Reporting and Invoicing - Progress reports will include a summary of work completed in the previous month, work to be performed, actions/decisions required, and an updated project budget summary for the entire project that indicates the percent of work completed by task and overall. Michael Baker will submit invoices monthly, no later than the 15th of each month (or as requested), and we will comply with Invoicing Procedures. PAGE 37 REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE CITY OF SANTA CLARITA AUGUST20,2026 INTERNATIONAL The success of any project is dependent on clear, concise, and consistent communication between all members of the Project Team. The Michael Baker team will be constructed of planners and engineers that have experience coordinating meetings and maintaining effective communication within the Project Team for analysis and design. While doing so, our approach is to continually strive to develop ways to deliver projects better, cheaper, and faster while adhering to the original goals and objectives. Quality Controt/Assurance Program — Michael Baker has a well -established and standardized company -wide Project and Quality Management Program called Project Management - The Michael Baker Way. Project Management - The Michael Baker Wayserves to clearly define the process forwhich all projects are managed throughout Michael Baker. The ultimate objective is to improve project performance and product delivery excellence through better organization, tools and methods to monitor budgets, an emphasis on communication, and a structured approach to delivering quality. The key features of Project Management - The Michael Baker Way include: • Improving project performance through consistency, organization, and efficiency. • Defining project management processes for every project that are consistent yet scalable. • Serving as a one -stop reference for forms, policies, references, and procedures. • Leveraging existing best practices throughout Michael Baker, as well as referencing accepted and established practices from outside sources. • Providing management tools, procedures, and references at the fingertips of project managers through a user- friendly, intuitive site. We Make a Di f ferertce 401T Michael Baker helps clients with branding and style guides for high profile planning documents. American Planning Association (APA) standards and reference documents including Planning Advisory Service (PAS) Reports that will guide the team's best practices and quality control standards. PAGE 33 F- F SF(-TION 1 . 1 .7 PERSONNEL, EQUIPMENT, AND FACILITIES REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE CITY OF SANTA CLARITA AUGUST 2q 2026 I N T E R N A T 1 0 N A L PERSONNEL, EQUIPMENTAND FACILITIES Michael Baker has identified the project team organizational chart on the following page. This team is available to initiate the work program immediately and remain active throughout the term of the contract. Team members will not be replaced or removed from the team without priorwritten approval from the City. Principal -in -charge, Richard Beck, CEP, PXS, CPESC, CERP, is authorized to negotiate the contract on behalf of Michael Baker. Project Manager, Valerie Clarke, AICP, PLA will be the main point of contact and brings 12 years of long range community planning and design to the benefit of the Circulation, Safety, and Conservation/Open Space Elements preparation process. Ms. Clarke regularly leads the development of long range community planning projects across southern California, utilizing her experience as both a registered landscape architect and certified planner. As the Project Manager, Ms. Clarke brings significant experience in managing multi -disciplinary projects with complex scopes, tight schedules, and defined budgets. Ms. Clarke will be supported by John Muggridge and Noelle Anderson, AICP who will lead the Circulation Element and Safety Element, respectively. Mr. Muggridge's skillset spans a variety of multi -disciplinary transportation planning and research topics, including travel demand modeling, parking studies, environmental and CEOA services, and multimodal planning. He frequently manages complex projects and has retained relationships with key clients for a number of decades. Ms. Anderson provides planning and comprehensive community planning services across California, with a strong emphasis on community engagement, stakeholder collaboration, and inclusive public processes. She is highly skilled in preparing public policy related to land use, safety, conservation, technology, and environmental justice, and in translating complex technical topics into materials that are accessible and meaningful to the public. She brings deep expertise in hazard mitigation planning, Safety Element updates, and Local Coastal Programs, all grounded in current State and federal guidelines. Client manager and CEOA technical director, John Bellas, will oversee quality assurance and quality control on all aspects of the project and will serve as the lead for the environmental review, With more than 25 years of experience, Mr. Bellas is a recognized expert in the environmental planning field in California. He has managed the preparation of numerous CEOA and NEPA documents for a wide range of projects, including land use plans/programs, land development/entitlement projects, and capital improvement projects. In addition, he served as an in-house/on-call environmental administrator/coordinator for several prominent California cities. PAGE 40 REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE Michael CITY OF SANTA CLARITA AUGUST20,2026 INTERNATIONAL ORGANIZATION CHART The organization chart below shows the responsibility of the project team. Key project team resumes are provided. Supportive team members are available to assist as needed, offering specialized skills and additional capacity when project demands arise. John Muggridge, AICP Noelle Anderson, AICP Valerie Clarke, PLA, AICP (Circulation Lead) __________________________ (Safety Lead) O en S ace Lead) (Cons ervation/p-P _------_--_---_---_----- Jolene Hayes, AICP Jake Poland (Planner) Anisha Malik, SITES AP, CERP (Principal) Casey Marchese (Senior Biologist) Jongyang Lin (Planner) Ryan Phaneuf, WAS, CERPIT, CAE (Senior Transportation Engineer/Planner) Jeffrey Karmazin, CFM (Re -wilding Lead) Gavin Derleth, AICP (G!S Lead) Jeffrey Karmazin, CFM (G!S Lead) (Transportation Planner) John Bellas, LEER AP (Technical Director) Frankie H. Tong (Senior Environmental Planner) Vicky S. Rosen, AICP (Environmental Planner) Emily Morrison (Environmental Associate) Noelle Anderson, AICP (Engagement Lead) Valerie Clarke, PLA, AICP- _ _ _ _ _ (Conservation) Open Space Lead) Jongyang Lin (Senior Transportation Engineer/Planner) Natasha Victa (Planner) PAGE 41 REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE CITY OF SANTA CLARITA AUGU5T 20, 2026 I N T E R N A T I O N A L PROJECT MANAGER I CONSERVATION/ OPEN SPACE LEAD Valerie Clarke, AICP, PLA Ms. Clarke brings extensive experience in long-range planning, master planning, urban design, and landscape architecture with a strong emphasis on translating community vision into clear, actionable policy frameworks. Her work integrates land use, urban design, and sustainable planning with regulatory implementation tools, ensuring thathigh -level goals are effectively codified into plans, ordinances, and actionable programs. Her multidisciplinary background supports a systems - based approach that aligns policy, infrastructure, public investment, and development standards to achieve equitable and sustainable outcomes.She has led the development of planning documents and frameworks for complex, multi -phase initiatives with a strong emphasis on high -quality graphics, visual communication, and compelling storytelling. Her experience includes drafting goats, policies, and implementation measures; coordinating across agencies and stakeholders; and ensuring consistency with state requirements and bestpractices. RELEVANT EXPERIENCE The City of Fullerton Open Space and Conservation Update and Environmental Justice Element, Fullerton, California. City ofFulierton. PROJECT MANAGER. Ms. Clarke is managing the Element updatesto address equitable accessto open space, climate resilience, environmentaljustice, and rewilding opportunities, Ms. Clarke's role includes managing document production, including the existing conditions assessment, mapping exhibits, and updated goals and policies. She is also directing and implementing a robust community engagement program. Community outreach included interactive pop-up events featuring hands-on engagement activities, along with a project surveyto gather inputfrom residents and stakeholders. Interactive socialmedia posts, digital display boards, and email blasts were used to build awareness of the project. More than 650 participants responded to the survey. The City of Seal Beach Open Space, Recreation, and Conservation Element, Seal Beach, California. City of Seat Beach. PROJECT MANAGER. Responsible for day-to-day oversight, Ms. Clarke is leading the comprehensive update of the Open Space, Recreation, and Conservation Element. She is also overseeing the community engagement strategy and plan development, including the review of existing documents and the creation of GIS-based mapping exhibits. The updated Element will refine existing goals and policies to preserve and expand the open space network of Seal Beach. Ms. Clarke led an open house forum to garner interest, raise awareness of the project, and encourage community members to engage with one another. San Pedro Waterfront Mobility Plan, Los Angeles, California. Pnrt of l n..Anoa[eS. PLAN N E R Ms. Clarke was tasked with transforming San Pedro's historically underutilized and fragmented waterfront into a cohesive, accessible, and vibrant destination. The plan outlines public transportation connectivity improvements that build upon existing public access while strategically integrating future private development within the Port of Los Angeles. It re -envisions haw the public will access and experience the waterfront through new goals, policies, and a comprehensive mobility framework. The proposed network of connected pedestrian paths, bike routes, trolleys, and water taxis is designed to function not only as transportation infrastructure but as an engaging, continuous waterfront experience. Ms. Clarke facilitated stakeholder charrettes and community engagement events to gather input and build consensus around the plan's recommendations. The City of Poway Safety Element, Poway, California. Cityof Poway. PLANNER. The Safety Element is a key component of the General Plan, designed to protect public health, safely, and welfare by addressing risks from natural and human -made hazards such as wildfires, floods, earthquakes, and climate change. It integrates findings from the Multi Jurisdictional Hazard Mitigation Plan and other emergency planning documentsto guide preparedness, response, and recovery efforts. The Safety Element outlines goals and policies that promote low-densily development, preserve open space, and enhance environmental quality, while also incorporating climate adaptation strategies. Lake Forest Mixed -Use Zoning Codes, Lake Forest, California. CityofLake Forest PLANNER. The City of Lake Forest worked to implement its General Plan Update 2040 by developing and adopting code for Mixed - Use Zones. Specifically, the City's General Plan included a mixed -use category with five distincttypes of mixed - use designations, allowing fora blend of residential and complementary retail, hotel, office, and/or industrial uses at varying densities and intensities in key locations throughout the City. The Mixed -Use codes were developed as clear, user- friendly documents that allowed the General Plan's intent to be realized through development standards. The goal was to encourage the development of new, high -quality mixed -use projects that blended residential with non-residential uses. This was accomplished through form -based codes. N T E R N A T I 0 N A L Years of Experience 13 Education M.L.A., Landscape Architecture, Illinois Institute of Technology B.A., Urban and Regional Planning, University s of Illinois at Urbana -Champaign Licenses/Certifications Landscape Architect s 11096115-2202 Certified Planner (AICP), 37368 Professional Affiliations American Planning Association (APA) American Society of Landscape Architects (ASLA) Commercial Real Estate for Women (CREW) PAGE 42 REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE CITY OF SANTA CLARITA AUGU5T 20, 2026 I N T E R N A T I O N A L 1W PRINCIPAL IN CHARGE Richard Beck, CEP, P.w.s, cPEsc, CERP Mr. Beck wouldserve as the Principal -in -Charge providing high-level leadership, strategic oversight, and accountability for the successful delivery of the project. Mr. Beck has extensive experience in the regulatoryand environmental disciplines. He successfully leads federal, state, local, and private -sector clients through the Clean Water Act, California Porter -Cologne Act, California Fish and Game Code, Endangered Species Act, and the California Coastal Act. Mr. Beck, a Professional Wetland Scientist, has conducted hundreds of jurisdictional delineations throughout the southwest. Mr. Beck proactively leads delineation field crews and regulatory specialists that effectively draft, coordinate, and process regulatory agency applications. As a key component of the above processes, Mr. Beckalso prepares environmental documents with respect to the California Environmental LlualityAct (CEQA) and the National Environmental Policy Act (NEPA). RELEVANT EXPERIENCE General Plan and Local Coastal Program Update, Carlsbad, California. Cityof Carlsbad, PROJECT MANAGER. Responsible for leading a studyto assess vulnerable infrastructure and property in the City from sea level rise as part of preparing the first comprehensive revision of the City'sZoning Ordinance since the 1950s, Conducted extensive background research and best - practices recommendationsfor policy revisions relating to sea level rise. Additionally, low-cost visitorserving uses and accommodations policies were updated. Acoastl'me vulnerability study was also produced forthe City that identifies coastalareas susceptible to damage from SLR. The project implemented the 2015 General Plan Update and the revised Local Coastal Program and involved a full reorganization of the code consistent with best practices, including the consolidation and streamlining of much of the redundant provisions, new and amended definitions including graphics, and substantial reformatting to make the code userfriendly and easy to navigate. Michael Baker also produced a coastline vulnerability studyforthe citythat identifies coastal areas most susceptible to sea level rise and provides adaptation strategiesfor mitigation. Santiago Creek Bicycle Trail Regulatory Services, Orange, California. City of Orange. PROJECT MANAGER. Michael Baker performed the delineation of jurisdictional waters for the construction of the Santiago Creek Bicycle Trail. Michael Baker identified state and federal jurisdictional waters on -site, prepared an impact analysis, and provided a permit recommendation to better define the future regulatory process, and obtained all regulatory permits. Michael Baker also processed permits for the restoration of Santiago Creek. Peters Canyon Regional Park - Regulatory Services, Orange County, California. Orange County. PROJECT MANAGER. Michael Baker provided regulatory services for improvements to Peters Canyon Regional Park. Michael Baker's services included identification of channel and trail improvements to alleviate sediment issues, delineation of jurisdictional waters, development of site plans, and preparation of regulatory agency applications for the proposed improvements. Michael Baker also coordinated the on -site mitigation, which included exotic species removal nearthe northern portion of the reservoir. Aliso / Woods Canyon Mathis Trait Restoration Project - Biotogical and Regulatory Services, Aliso Viejo, California. CilyofAliso Viejo. TECHNICAL MANAGER. Michael Baker provided professional services for the Mathis Trail and Creek Restoration Project, located inthe sensitive AlisofWoada Canyon Wilderness Park. The project site had been impacted by erasion and invasive species. Michael Ba ker processed regulatory agency permits, conducted biological monitoring, and photo -monitored the site. Michael Baker biologists and landscape architects designed a native plant palette appropriate for each habitat type. Stormwater Management Plan for California State Parks, Statewide, California. California 0epartmentof Parks and Recreation. ENVIRONMENTAL MANAGER. Responsible for environmental engineering. Michael Baker developed a stormwater management plan (SWMP) forthe Off -Highway MotorVehicle Recreation Division of California State Parks. Two of the division's parks (PismofOceano and Carnegie) were named as nontraditional MS4s in the most recent Phase II National Pollutant Discharge Elimination System (NPDES) permit released by the state board. Michael Baker and the division determined that a SWMP should be developed and describe the requirements and best management practices (BMPs) for the two named parks and could also be applied at the other non -enrolled parks to demonstrate good stewardship of public lands. N T E R N A T I D N A L Years of Experience 26 Education B.A., Environmental Studies, University of California, Santa Cruz Certificate, Ecological Restoration, Saddleback College LicenseslCertifications Certified Ecological Restoration Practitioner, #0099 Certified Environmental Professional, 10050455 EPA Watershed Management Academy Certified Professional in Erosion and Sediment Control, California, 5611 Wetland Delineator Certification Program Professional Wetland Scientist, 2160 CRAM for Riverine Wetlands -Certified Practitioner PAGE 43 REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE _ TWO CITY OF SANTA CLARITA AUGUST20,2026 I N T E R N A T I O N A L CLIENT MANAGER I CEQA TECHNICAL DIRECTOR John Bellas, LEEDAP With more than 25 years of experience, Mr. Bellas is a recognized expert in the environmental planning field in California. He has managed the preparation of numerous CEQA and NEPA documents fora wide range of projects, including land use plans/programs, land development/entitlement projects, and capital improvement projects. In ,li ,may, addition, he served as an in-house/on-call environmental administrator/coordinator for several prominent California cities. He has also conducted specialized CEQA training programs for client cities, served as an instructor in AEP'sAdvanced CEQA and CEQA Essentials series, contributed j to a variety ofAEP CEQA topic papers, andpresented on multiple CEQA topics atAEPandAPA RELEVANT EXPERIENCE CEQA Document Project Manager/Project Director Experience Mc Bellas has managed and directed the preparation of numerous CEQA documents. A limited sample of his relevant experience leading the preparation of CEQA documents for land use plans/programs includes: • Rolling Hills Estates Comprehensive General Plan Update and EIR, City of Rolling Hills Estates, Project Director • George F. Canyon Nature Center ISIMNO, City of Rolling Hills Estates, Project Director • Chandler Ranch/Rolling Hills Country Club Project EIR, City of Rolling Hills Estates, Project Manager • Open Space, Conservation, and Recreation Elements ISIMND, City of Glendale, Project Director • Grandview Park Master Plan ISIMND, City of Rancho Palos Verdes, Project Manager • Lower Hesse Park Master Plan ISIMND, City of Rancho Palos Verdes, Project Manager • Via Princessa Park ISIMND, City of Santa Clarita, Project Director • Town Center Specific Plan and EIR, City of Santa Clarita, Project Director • Haskell Canyon Bike Park ISIMND, City of Santa Clarita, Project Director • Canyon Country Community Center & Park Project ISIMN D, City of Santa Clarita, Project Manager • Hahamongna Watershed Park Annex Master Plan CEOA Document, City of Pasadena, Project Manager • Urban Wildlife Management Plan ISIMND, City of Pasadena, Project Director • Lower Arroyo Trailhead and Sunset Overlook ISIMND, City of Pasadena, Project Manager • Eastside-JPLConnector TraiIISIMND.City of Pasadena. Project Manager. • Westlake Village Park/Triunfo YMCA Project SEIR, City of Westlake Village, Project Manager • South Pasadena Dog Park ISIMND, City of South Pasadena, Project Manager • Descanso Trail Project ISIMND, City of La Canada-Flintridge, Project Manager I N T E R N A T 1 0 N A L Years of Experience 27 Education B.S., Environmental i Resource Management/ Marine Science, The I Pennsylvania State University of%,t,ri?f'Ons American Planning Association (APA) Association of Environmental Professionals (AEP) Leadership in Energy and Environmental Design (LEED) PAGE 44 REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE CITY OF SANTA CLARITA AUGUST 20, 2026 I N T E R N A T I O N A L ENGAGEMENT LEAD Noellekderson,AICP Ms. Anderson provides planning and comprehensive community planning services across California, with a strong emphasis on community engagement, stakeholder collaboration, and inclusive public processes. She is highly skilled in preparing public policy related to land use, safety, conservation, technology, and environmental justice, and in translating complex technical topics into materials that are accessible and meaningful to the public. She brings deep expertise in hazard mitigation planning, Safety Element updates, and Local Coastal Programs, all grounded in current State and federal guidelines. Nerbackground includes managing both local and multi jurisdictional hazard mitigation plans in compliance with California Governor's Office of Emergency Services and FEMA guidelines, as well as emergency action plans focused on dam and reservoir infrastructure failure. Ms. Anderson is also highly experienced in conducting PONinteractive and inclusive public engagement, applying her training in the international Association of Public Participation framework to ensure meaningful input from diverse communities, Her multidisciplinary approach and technical proficiency support the development of actionable planning solutions tailored to project needs. RELEVANT EXPERIENCE Safety Element Updates, California. PROJECT MANAGER. Responsible for managing Safety Element Updatesas required by the 6th and 7th Cycle Housing Element Updates far a variety of clients across California. Policy updates focused an compliance with new state requirements including AB 747 and SB 99,to evaluate evacuation route capacity and viability; SB 379, to incorporate climate vulnerability, climate adaptation and resilience strategies; and, AB 2140, to incorporate LHMP findings by reference. Incorporated relevant community outreach strategies to receive policyfeedback. Forclients with jurisdiction within the Very High Fire Hazard Severity Zone, facilitated review between Cal FIRE and the Board of Forestry for policy review and concurrence. An abbreviated list of clients and deliverables is included, below: ■ City ofYorba Linda Safety Element Update,Yorba Linda, CA ■ City of Poway Safety Element Update, Poway, CA ■ City of South Gate Safety Element Update, South Gate, CA • City of Pinole Safety Element Update, Pinole, CA ■ City of LosAltos Safety Element Update, LosAltos, CA ■ City ofLosAltosHillsSafetyElement Update, LosAltos Hills, CA ■ City of Seal Beach Safety Element Update, Seal Beach, CA Hazard Mitigation Plans and Engagement, West Region, United States. Various Clients. PROJECT MANAGER. Responsible for facilitating a comprehensive, community -centered planning process focused on natural and human -caused disasters in accordance with Federal Emergency Management Agency (FEMA) guidelines. Led preparation of thefirst city -prepared hazard mitigation plan in California completed under updated FEMApolicyand guidance in 2023, with a strong emphasis on inclusive public engagement, stakeholder collaboration, and consensus building. Actively collaborated with internal representatives from the lead jurisdiction and a wide range of external stakeholders, including utilities, school districts, community groups, homeowners associations, and nonprofit and nongovernmental organizations, to ensure community priorities, local knowledge, and lived experience informed the planning process. This engage me nt-driven approach helped build community capacity and shared ownership of future resilience and mitigation actions. An abbreviated list of clients and deliverables is included below. • Local Hazard Mitigation Plan, City of Fullerton, CA ■ Local Hazard Mitigation Plan, Seal Beach, CA. ■ Local Hazard Mitigation Plan, Beverly Hills, CA ■ Local Hazard Mitigation Plan, San Clemente, CA General Plans, Comprehensive Plans, Long -Range Planning, California. Vac in-c clients. PROJECT f,10A.GFR 4NO TASK MANAGFP. Manage comprehensive planning initiativesthat emphasize inclusive visioning and equitable community engagement. Her expertise in public participation, policy development, and strategic implementation, delivering plansthat advance sustainability, resilience, and community well-being. By fostering collaboration and applying data driven approaches, she champions planning excellence and creates frameworks that serve the entire community. NT ER N AT I U N AL Years of Experience 12 Education M.U.P., Urban Planning and Developmentr University of Southern California B.A., Environmental Studies/ Environmental Planning, University of California, Santa Barbara Licenses/Certifications American Institute of Certified Planners (AICP),37980 ^rs,; American Planning Association (APA) California Emergency Services Association (CESA) PAGE 45 REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE CITY OF SANTA CLARITA AUGUST 20, 2026 I N T E R N A T I O N A L 1W SENIOR BIOLOGIST Anisha Malik SITES AP, CERP Ms. Malik would serve as a Restoration Ecologist with experience in voluntary restoration projects for wetlands, riparian systems, and coastal sage scrub habitats, as well as a wide variety of compensatory mitigation projects required for jurisdictional impacts, With a background in chemistry, Ms. Malik brings a unique analytical skill set to herprojects. Ms. Malik identifies mitigation site opportunities and designs site plans that will provide beneficial results for stakeholders involved as well as the local watershed. She identifies native species to be included in the plant palette and works with landscape contractors to design the placement of plants. Additionally, she is responsible forbaseline studies, including conducting jurisdictional delineations, vegetation mapping, and California RapidAssessment Method (CRAM) analysis at projectsites. RELEVANT EXPERIENCE Yorba Linda Fuel Reduction Project, Yorba Linda, California. Cityof YorbaLinda. PROJECT MANAGER. Managed the CAL FIRE grant -funded fuel reduction project spanning over 15 acres. Worked with the City to prepare environmental documents, conduct baseline studies of each site, determine prioritization of methodologies to implement the proposed work, and oversaw the contractor during implementation. Responsible for state reporting and coordination with local agencies. Prepared community outreach materials and conducted annual workshopsto educate the public on the project and general fire safety in partnership with OC Fire Authority. As part of the project, a Restoration and Sustainability Plan iscurrently underwayto help manage the sitesfor long-term public safety and ecological value. Buck Gutty Canyon Restoration, Buck Gully Channel, Newport Beach, California. City of Newport Beach. RESTORATION SPECIALIST. Responsible for supporting with the monitoring program of the Buck Gully Canyon Restoration project. Conducted plant survival assessments as well as identified any unknown species on -site. In addition, prepared the annual reportr providing suggestions for future success. Michael Baker provided engineering and environmental services forthe stabilization and restoration of Lower Buck Gully, Michael Baker's services included planning, hydrologic and hydraulic analyses, right-of-way support, design, and permitting forthe construction of erosion control improvements, and preparing annual monitoring reports. Ballona Wetlands Restoration Project, Playa del Rey, California. LosAngeles Department of Reachesand Harhors_ PRFIJFCT HAN,ACFR. Currently developing a restoration program for 0.5 acres of compensatory mitigation. Conducted baseline studies of the mitigation site, requiring identification of potential access paths and temporary impacts associated with the restoration effort. The project requires close collaboration with California Department of Fish and Wildlife who are the managers of the Reserve. Morrison Creek Revitalization Study, Sacramento, California. City of Sacramento. LEAD RESTORATION ECOLOGIST. Created multiple restoration approaches for Morrison Creek to meet requirements stated in the DWR grant funding forthe feasibility study. Provided materials for constructive community outreach in order to curate restoration approachesto meet ecological and social needs of the community. Michael Baker is preparing a feasibility study for the construction of a bike and pedestrian path adjacent to Morrison Creek in Sacramento, California. The study includes analysis and evaluation of alternativesfor improved bicycle and pedestrian connectivity, improved pedestrian crossings of local roadways, and restoration of the natural environment along the creek corridor. INTERNATIONAL Years of Experience 10 Education M.N.R.S., 2023, Ecological Restoration, Colorado State University A.S., 2013, Biological Sciences, College of San Mateo A.A., 2013, Interdisciplinary Studies: Science and Society, College of San Mateo B.S., 2012, Chemistry, Santa Clara University Licenses/Certifications CRAM for Riverine Wetlands -Certified Practitioner, California, 2016 SITES Accredited Professional, 2017, 00001261-SITES Wetland Delineator Certification Program, California, 2016 Certified Ecological Restoration Practitioner, 2017, 0123 Professional Affiliations Ecological Society of America (ESA) Society for Ecological Restoration (SER) U.S. Green Building Council (USGBC) PAGE 46 REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE = CITY OF SANTA CLARITA AUGUST 20, 2026 I N T E R N A T I O N A L SENIOR ENVIRONMENTAL PLANNER Frankie H. Tong Ms. Tong is a Senior Environmental Planner experienced in environmental planning. She specializes in preparing California Environmental QualityAct (CEQA) documents for mixed -use projects. Ms. Tong is highly organized and has worked successfully with development teams and lead agencies to produce deliverables with multiple deadlines. Ms. Tong also maintains project schedules and budgets, reviews entitlement sets and technical reports, and performs internal quality control reviews to ensure the accuracy and consistency of deliverables. RELEVANT EXPERIENCE Altamira Canyon Creek Restoration Project and Point View Property Addenda, Rancho Palos Verdes, California. Cityof Rancho Palos Verdes. TEAM MEMBER. Responsible forwriting a portion of the Altamira Canyon Creek Project CEQAdocumant and coordinating with the Project Manageron data needsand impactanalysis. Michael Baker is preparing an initial study/mitigated negative declaration (ISIMND) forthe Altamira Canyon Creek Restoration Project in the city of Rancho PatosVerdes, California. A property owner along the creek installed gabions without proper permits from regulatory agencies a nd received a notice of violation forfailure to obtain a Section 401 Water Quality Certification. The purpose of this project is to make corrections in response to the notice of violation. Michael Baker is also preparing two addenda for proposed revisions to prior approvals and entitlements granted for improvements on the Point View property in Rancho Palos Verdes, California. City of Pasadena Environmental Coordination and Planning, Pasadena, California. Cityof Pasadena, ralifornia. REVIEWER. Responsible for peer review, of California Environmental Quality (CEQA) documents (e.g., Environmental Impact Reports, Initial Studies, Mitigated Negative Declarations) for projects submitted tothe Cityof Pasadena Planning Department. Michael Baker is providing environmental coordination and planning services to the City of Pasadena. Since 2013, Michael Baker has undertaken a variety of assignments under this contract including preparing California Environmental QualityAct (CEQA) and National EnvironmentalPolicyAct (NEPA) documents, reviewing and processing CEQA documents, and providing contract staff assistance. On -Call EnvironmentaLConsutting and EIR Review Services, LosAngeles, California. City of LosAngeles. REVIEWER. Responsible for peer review of California Environmental Quality (CEQA) documents (e.g., Environmental Impact Reports, Initial Studies, Mitigated Negative Declarations) for projects submitted to the City of LosAngeles Planning Department. Michael Baker has provided on -call environmental consulting and environmental impact report (EIR) peer review services to the cityof LosAngeles Departmentof City Planning since March 2017. In this capacity, Michael Baker has reviewed initialstudies, draft and flnalEIRs, and California Environmental Quality Act (CEQA) findings and statements of overriding considerations prior to public release. Michael Baker has overseen the FIR process for development projects, ensured compliance with CEQA requirements, and frequently offered strategic CEQA advice to the city. Scattergood EIR Support, LosAngeles, California. Los Angeles Department of Waterand Power. TEAM MEMBER. Responsible fordrafting portionsof the Draft FIR and participating in meetingswith LADWP. Michael Baker is preparing the environmental impact report (EIR) and supporting technical analyses for the Scattergood Generating Station Units 1 and 2 Green Hydrogen -Ready Modernization Project. The purpose of the project isto constructand operate a rapid -response combined -cycle generation system capable of operating on a fuel mixture of natural gas and a minimum of 30 percent hydrogen gas. This project is part of a current on -call environmental services contract to provide environmental support services on a diverse range of energy and water infrastructure projects for the LosAngeles Department of Water and Power, a prominent utility provider in LosAngeles County. Rolling Hills Estates General Ptan Update, Rolling Hills Estates, California. CilyofRoflingHills Estates. REAR WFR. Responsibilities included reviewing the CEQA documentation for submittal to the City. Michael Baker is updating the general plan for the city of Rolling Hills Estates, ensuring that it reflects the City'svision of tomorrow and includes a strong focus on enhancing sustainability, complying with changes in state law, and improving the plan's usefulness. The general plan is focused and organized around "placemaking" and sustainability, while maintaining the guiding principles needed to preservethe unique characterand identityof Rolling Hills Estatesand the neighborhood areasthat make upthe community. INTERNATIONAL Years of Experience 10 Ed�rrahnr? M.P.A., 2016, Environmental Policy and Management, University of Washington B.A., 2012, Environmental Studies, University of California, Santa Barbara B.A., 2012, Global Studies, University of California, Santa Barbara Professional Affiliations Association of Environmental Professionals (AEP) PAGE 47 REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE = CITY OF SANTA CLARITA 1 AU G U5T 20, 2026 I N T E R N A T I O N A L CIRCULATION LEAD John Muggridge,AICP John is a principal, senior market leader, and skilled project manager with over28 years of experience in transportation planning and engineering. John serves as a trusted consultant to private clients and public agencies across southern California and Hawaii. John's skillset spans a variety of multi -disciplinary transportation planning and research topics, including travel demand modeling, parking studies, environmental and CEQA services, and multimodal planning. He frequently manages complex projects and has retained relationships with key clients fora number of decades, due to the expertise and quality he provides. John has extensive experience working on various projects in Ventura County and regularly support City of Oxnard on various transportation engineering and planning tasks. RELEVANT EXPERIENCE City of Rolling Hills Estates 2040 General Plan Mobility Element Update. Rolling Hills Estate, CA, LEAD. Fehr & Peers helped the City of Rolling Hills Estates develop their Mobility Element as part of their 2040 General Plan Update. The element was co -created with the City's General Plan Advisory Committee (GPAC), comprised of the City Mayor and City Manager, as well as several Commissioners and local residents. Additionally, Fehr & Peers modified the 2016 SCAG RTPfSCS regionaltravel demand model information to better reflect the existing and future conditions in the City in order to establish a more accurate baseline to assess future growth in the General Plan. Lastly, Fehr& Peers analyzed the General Plan buildout scenarios using the new CEQAVMT metrics, which are required per SB 743. City of Carson 2030 General Plan Mobility Element Update. Carson, CA. LEAD. Fehr & Peers assisted the team with the Carson 2030 General Plan Update. Fehr & Peers completed the existing conditions review, including data collection and analysis, with particular attention to multimodaltransportation and goods movement in the City of Carson. Following the existing conditions analysis, the focus shifted to development of the General Plan Mobility Element and preparing the environmental analysis for CEQA clearance of the project. Through the development of analysis tools and utilization of the regional travel model, Fehr & Peers identified the future roadway network to serve future anticipated development provided by the project team. Due to the varied nature of land uses, neighborhoods, travel patterns, and individual preferences for travel, Fehr& Peers also developed a set of policy and project recommendations for active transportation networks and goods movement that are intended to advance quality of life through mobility options, increased opportunities for physical activity, increasing accessto services and goods, and helping reduce the impact of vehicle travels. City of LosAngeles General Plan Citywide Housing Element. LosAngeles, CA. LEAD. Fehr & Peers assisted the City of LosAngeles in the preparation of an environmental analysis forthe citywide housing element of the General Plan. One of the first tasks the City was interested in completlog was an EIR addendum evaluation to determine if the housing growth estimatesAocations were comparable to the information and assumptions contained in the City of LosAngeles General Plan Framework and the 2016 SCAG SCSiRTP. City of Malibu Safety Element Update. Malibu, CA. LEAD. Fehr & Peers is currently supporting the City of Malibu'sSafety Element update to identify opportunities on the existing Transportation Plan for Wildfire and Tsunami Evacuation Study (Transportation Plan). As part of this effort, John is coordinating with City staff and emergency response staff to determine whetherany additional facilities orevacuations scenarios need to be considered. Following the review and interview, ourteam will develop recommendations that are supplementary and complimentaryto the Transportation Plan. City of Los Angeles OTLA 2040: Downtown Los Angeles Community Plan Update. LosAngeles, CA. LEAD. Fehr& Peers finalized the Downtown Community Plan Update forthe City of Los Angeles. This community plan was initiated as part of an ongoing processto update a1135 community plans in the city and serves as an example to future community plan updates in both analysis format and integration of latest city initiatives. City of Pasadena General Plan EIR. Pasadena, CA. TECHNICAL SUPPORT As part of a team, Fehr & Peers assisted with the City of Pasadena General Plan Update. Ourarea of responsibility was the EIR for the land use and Mobility Elements. As part of this effort, John oversaw the development of a mobility performance measures and metrics for use in the General Plan Environmental Impact Review (EIR) and Revised Traffic Study Guidelines. Years of Experience i 30 Fdracafion Master of Science, Transportation Planning and Engineering, University of Leeds Bachelor of Engineering, Mechanical and Process Engineering, University of Sheffield Wealions American Institute of Certified Planners (AICP) No. 021874 Professional Affiliations California Association of Environmental Professionals (AEP) American Planning Association (APA) PAGE 48 REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE = CITY OF SANTA CLARITA AU G U5T 20, 2026 I N T E R N A T I O N A L PRINCIPAL- CIRCULATION Jolene HayeS,AICP Jolene has more than two decades of experience in local, regional, andstatewide transportation, land use and goods movement planning, environmental analysis, and implementation. With a focus on stakeholder input, Jolene focuses on the JW development of sustainable transportation solutions. Her current work requires a deep level of understanding community concerns, industry needs, and State economic and environmental sustainability goals to develop cross -cutting solutions that improve community livability and foster economic vitality. Jolene is a national expert on supply chains and currently serves as t f the Freight Group Chairon the National Academies of Science's Technical Activities Council, Transportation Research Board's Intermodal Freight Transportation Committee. RELEVANT EXPERIENCE San Bernardino County Transportation Authority/Western Riverside Council of Governments Assembly BILL 98 (AB 98) Guidance. San Bernardino & Riverside Counties, CA. LEAD. Following the passage of AB 98 an September 30, 2024, Jolene led a reg ional effo rt for SBCTA and WRCOG member agencies to assist tham with implementation. AB 98 requires jurisdictions to adopt truck routes consistent with the legislation, such as using roadwaysthat avoid sensitive receptors. Forthis effort, her team mapped all existing truck routes and developed guidance on updating development standards and codes to comply. City of Colton AB 98/SB 415 Implementation. Colton, CA. LEAD. Jolene led the implementation of Senate Bit1415 (SB 415), which superseded AB 98 on October 3, 2025, for the City of Colton. This effort included public outreach and inter -jurisdictional coordination effort combined with data analysisto identify preferred truck routes throughout the community. Pursuant to the legislation, Colton was required to incorporate truck routes into its General Plan byJanuary 1, 2026. Doing so also required an addendum to the General Plan EIR and tribal consultation. Currently, Jolene is ensuring the code amendments comply with the law's zoning and building standards. City of Jurupa Valley Freight Study. Jurupa Valley, CA. LEAD. Jolene is currently leading the City's AB 98 compliance and Mobility Element Update with a special focus on improving safety by reducing truck - involved collisions and conflicts. This effort consists of a robust public outreach process to identify areas of concern, such asbikelped concerns, a deep analysis of truck movements throughout the City, and a full update to the City's Mobility Element. Orange County Transportation Authority Goods Movement Vision Strategic Plan. Orange County, CA. LEAD. Jolene led the 2026 update to Orange County's Goods MovementVision. The plan identified truck activity associated with major freight generators nearJohn Wayne Airport, Anaheim, Irvine, and along 1-5 at the Los Angeles County border. Using Social Pinpoint to gather input from localjurisdictions, primary concerns focused on truck staging near industrial facilities, lack of available truck parking, and truck routing concerns, which raised the need for developing new policies to assist Vocal jurisdictions to comply with AB 98 and SB 415. County of Sacramento AB 98 Implementation. Sacramento County, CA. TECHNICAL LEAD. Fehr& Peerssupported Sacramento County in the development of a truck routing plan, perAB 98 requirements. Our team established analysis criteria forevaluating route alternatives, prioritizing minimal impacts on sensitive receptors, alignment with noise and air quality standards legal considerations, and community input gathered through outreach efforts.Jolene provided technical expertise and strategic advisoryto help screen potential routes, identify constraints, and develop planning -level cast estimates far up to three alternatives. Caltrans Southern California Strategic Freight Plan. California. PROJECT MANAGER. Jolene was the Project Managerforthis studyfor Caltransthat covers Districts 7, 8 and 12. The study delved deeper into local issues, projectsand programsto furtherthe implementation of the California Freight Mobility Plan and the Governor's Executive Order20-04, isto identify strategies for greening freightto reduce greenhouse gas emissions and air quality impacts on local communities. Caltrans California Freight Mobility Plan Update. California. TECHNICAL EXPERT.Jolene served as a technical expert on port intermodal operations, stakeholder engagement, and policy development far Caltrans' California Fright Mobility Plan Update. She conducted interviews with 25 industry stakeholders and obtained survey responsesfrom another100 stakeholders, including governmental agencies, industry (rail, trucking, ports, airports, 3PLs, BCOs, etc.), and community groups and coordinated with the technical team to develop the policy recommendations section. Years of Experience 27 Educa tion Master of City & Regional Planning, University of Texas at Arlington Bachelor of Arts, Political Science, University of Texas at Arlington Licenses/Certifications American Institute of Certified Planners (AICP) No. 26392 Affiliations Transportation Research Board Technical Activities Council, Freight Group Chair American Planning Association Urban Land Institute Women'sTransportation Seminar Presentations Cal APA 2024, Supply Chain Shifts & Warehousing AB 98 Implementation — SBCTA (2025) AB 98 Implementation — AEP Conference (2025) PAGE 49 1, r• �f�( a � st � ^ 4 I� a o.� , u _ 11l r �r I a t '.. " _ t rya•' rl� a , gg a. i y .. •: .. .M yr. t Y � IM SF( TION 1.! P SUB -CONSULTANTS REQUEST FOR PROPOSAL FOR GENERAL PLAN ELEMENTS UPDATE CITY OF SANTA CLARITA AUGUST 20, 2026 SUB -CONSULTANTS Michael Baker will be supported by our sub -consultant Fehr & Peers, which will lead the Circulation Element update and support community engagement. FEHR & PEERS FIRM PROFILE Fehr & Peers is a transportation planning and engineering firm with 25 offices and over 400 staff nationwide. Since 1985, Fehr & Peers has partnered with public and private clients to design safer, more effective ways for people and goods to move. Fehr & Peers continues to successfully create spaces where everyone can thrive, today and for generations to come. Bringing together data, technology, and the lived experiences of the communities they serve, Fehr & Peers helps clients make confident, well-informed decisions. Along the way, they have earned national recognition for raising the bar on how transportation projects are planned, designed, and delivered. Fehr & Peers doesn't just follow trends —they help clients anticipate what is next. With a blend of multimodal expertise, national perspective, and local insight fueled by strong and longstanding relationships, Fehr & Peers tailors their solutions across a wide range of services to meet each community's unique needs. I N T E R N A T 1 0 N A L Fehr & Peers has performed numerous transportation studies for projects throughout California. The knowledge of the requirements and expectations for transportation studies allows Fehr & Peers to perform defensible transportation analyses in support of any project. Fehr & Peers has also been extensively involved in the development and implementation of the CEQA transportation analysis guidelines associated with the passage of Senate Bill 743 (SB 743). SB 743 fundamentally alters the methods of conducting CEQA transportation analysis, moving CEQA away from traditional level of service (LOS) roadway analysis and towards vehicle -miles traveled (VMT) analysis. Fehr & Peers has developed, and successfully applied, VMT analysis tools to projects throughout California to comply with SB 743. Fehr & Peers has retained its role in being a leader in LOS roadway analysis to comply with requests from Cities, Counties or Caltrans to continue to analyze roadway capacity for operational analysis purposes. Fehr & Peers has expertise in both freight and environmental compliance related to transportation. We have been working intimately with state and local agencies on how to be compliant with AB 98 - Warehouse Standards (2024, Reyes and Carrillo). Beginning a week after the bill became law, larger transportation MPOs have tasked us with assisting their member agencies named in the legislation as being in the "Warehouse Concentration Region", with the tools to comply with the law in advance of the January 1, 2026 deadline. More recently, Fehr & Peers has continued to assist numerous Cities and Counties to adopt new truck routes. PAGE 51 INTERNATIONAL Michael Baker International 801 S Grand Ave Suite 250, Los Angeles, CA 90017