HomeMy WebLinkAbout2026-09-22 - AGENDA REPORTS - SC AQUATICS CENTER POOL PUMP REPL PROJ M3046 EQUIP PURCHASEO
Agenda Item: 7
CITY OF SANTA CLARITA
.` AGENDA REPORT
CONSENT CALENDAR
CITY MANAGER APPROVAL:
DATE: September 22, 2026
SUBJECT: PURCHASE OF POOL PUMPS, MOTORS, AND MANWAY COVERS
FOR THE SANTA CLARITA AQUATICS CENTER POOL PUMP
REPLACEMENT, PROJECT M3046
DEPARTMENT: Public Works
PRESENTER: Carla Callahan
RECOMMENDED ACTION
City Council:
1. Approve the purchase of seven pool pumps and motors and 12 manway covers from Estate
Design and Construction for a total contract amount not to exceed $158,700.
2. Find the Santa Clarita Aquatics Center Pool Pump Replacement project exempt from review
under the California Environmental Quality Act (CEQA) pursuant to Title 14 of the
California Code of Regulations Article 19, Section 15301.
3. Authorize the City Manager or designee to execute all contracts and associated documents,
subject to City Attorney review.
BACKGROUND
This project involves the replacement of the existing pool circulation pumps, motors, and
manway covers at the Santa Clarita Aquatics Center, as shown on the attached Location Map.
The pumps and motors circulate water throughout the 25-meter, 50-meter, and activity pools,
while the manway covers provide access for manual servicing of the pool water filters. The
existing equipment is more than 22 years old and has reached the end of its useful service life.
The project will replace the existing equipment with new high -efficiency circulation pumps and
premium -efficiency motors to improve performance. The construction bids for equipment
installation will be solicited separately and the construction contract will be presented to the City
Council for consideration at a later date as required. This project supports the Sustainable Public
Infrastructure theme of the City of Santa Clarita's (City) strategic plan, Santa Clarita Pathway
Page 1
Packet Pg. 35
O
Forward.
The Santa Clarita Aquatics Center Pool Pump Replacement project is not subject to the
California Environmental Quality Act (CEQA) review pursuant to Title 14 of the California
Code of Regulations, Article 19, Section 15301, which exempts from CEQA review, projects
that consists of the operation, repair, maintenance, or minor alteration of existing public or
private facilities or mechanical equipment, involving negligible or no expansion of existing or
former use. Examples include but are not limited to, interior or exterior alterations involving
such things as plumbing, and electrical conveyances. This project meets the criteria for this
exemption because the Santa Clarita Aquatics Center Pool Pump Replacement project will be
performing repairs and maintenance to existing mechanical and electrical systems located in the
same facilities and performing at the same capacity.
An invitation to bid was published and circulated via the City's e-procurement system, BidNet,
on August 14, 2026. The City transmitted the solicitation to 216 vendors on BidNet, of which 34
vendors downloaded materials. A total of six bids were submitted and opened on September 1,
2026. The results of the bids are shown below.
Company
Estate Design and Construction
National Boiler Supply
Knorr Systems, Inc.
WMS Aquatics
Kijero, LLC
Levon Construction Group
Location
Bid Amount
Culver City, CA
$
158,700
Gulf Breeze, FL
$
178,120
Santa Ana, CA
$
197,719
Ellensburg, WA
$
202,871
Morgan Hill, CA
$
304,228
Anaheim, CA
$
312,000
Staff recommends awarding the purchase to Estate Design and Construction, the lowest
responsive and responsible bidder. The vendor's bid was reviewed for accuracy and
conformance to the contract documents and was found to be complete. The bid proposal is
available in the City Clerk's Reading File.
The City Council appropriated $424,000 for this project upon adoption of the Fiscal Year 2026-
27 budget. The project budget is $424,000, representing $158,700 for equipment and $265,300
for construction and project administration costs. Project administrative costs include staff time,
project management, inspection, permits, and labor compliance monitoring.
ALTERNATIVE ACTION
Other action as determined by the City Council.
FISCAL IMPACT
The amount of $424,000 is available in project expenditure account M3046601-516101 (General
Fund - Capital) to support the recommended action and associated project costs.
Page 2
Packet Pg. 36
O
ATTACHMENTS
Location Map
Proposal for Estate Design and Construction (available in the City Clerk's Reading File)
Page 3
Packet Pg. 37
N
`iry Of SANTA GLARITA A
[Legend
Location Map forFeet
Aquatics Center Pool Pump 0 so 100 200
Replacement, Project M3046 Street centerlines developed & maintained
by City of Santa Clarita GIS
The City of Santa Clarita does not warrant
Pools the accuracy of the data and assumes no
liability for any errors or omissions.
Santa Clarita Aquatic Center
Map prepared by: City of Santa Clarita
0 Existing Parcel Boundary GIS Division
Q:\PROJECTS\P=260902gl\80026\Aquatic Center Repairs.aprx
0
0
7.a
z
LU
' LJJ
ANx f
W
— LU
d
i d
- " o
H
a
oA EN R,� U
g o
CU
C.)
io�EOAo�Po J
c
d
E
{ v
Ip
Q
°NRo
Packet Pg. 38
ACKNOWLEDGEMENT AND ACCEPTANCE OF SPECIFICATIONS
Bid #CIP-26-27-M3046
Santa Clarita Aquatics Center Pool Pump Replacement
City Project No. M3046
City of Santa Clarita, California
By signing below, the undersigned acknowledges that they have:
Received and reviewed this bid package including all specifications as issued by the City of Santa
Clarita;
Fully understood the requirements, specifications, and expectations contained therein;
Accepted the bid documents including all specifications as the basis for providing a responsive
bid
The undersigned certifies that all goods and/or services proposed will conform to the specifications and
requirements contained in these bid documents, unless specifically noted otherwise in the bid response.
Signature: Date: Sept 1, 2026
Name: Benjamin Tvizer
Title: CEO
Company Name: Estate Design and Construction
PROPOSAL FORM
Bid #CIP-26-27-M3046
Santa Clarita Aquatics Center Pool Pump Replacement
City Project No. M3046
City of Santa Clarita, California
TO THE CITY OF SANTA CLARITA, AS CITY:
In accordance with CITY's NOTICE INVITING BIDS, the undersigned BIDDER hereby proposes to furnish all
materials, equipment, tools, labor, and incidentals required for the above -stated project as set forth in
the plans, specifications, and contract documents therefore, and to perform all work in the manner and
time prescribed therein.
BIDDER declares that this proposal is based upon careful examination of the work site, plans,
specifications, INSTRUCTIONS TO BIDDERS, and all other contract documents. If this proposal is accepted
for award, BIDDER agrees to enter into a contract with CITY at the unit and/or lump sum prices set forth
in the electronic BID SCHEDULE.
BIDDER understands that a bid is required for the entire work that the estimated quantities set forth in
the electronic BID SCHEDULE are solely for the purpose of comparing bids, and that final compensation
under the contract will be based upon the actual quantities of work satisfactorily completed. THE CITY
RESERVES THE RIGHT TO INCREASE OR DECREASE THE AMOUNT OF ANY QUANTITY SHOWN AND TO
DELETE ANY ITEM FROM THE CONTRACT. It is agreed that the unit and/or lump sum price(s) bid include
all appurtenant expenses, taxes, royalties, and fees for the project's duration. In case of discrepancies in
the amounts bid, unit prices shall govern over extended amounts, and words shall govern over figures.
If awarded the contract, the undersigned further agrees that in the event of the Bidder's default in
executing the required contract and filing the necessary bonds and insurance certificates within ten
working days after the date of the CITY's notice of award of contract to the BIDDER, the proceeds of the
security accompanying this bid shall become the property of the CITY and this bid and the acceptance
hereof may, at the CITY's option, be considered null and void.
Company Name: Estate Design and Construction
Company Address: 5701 Buckingham Pkwy UNIT C
Culver City, CA 90230
Phone:
310-810-7319
Email:
bids@estatednc.com
By:
Benjamin Tvizer
Print Name
Title:
CEO
Signature:
Date:
Sept 1, 2026
NON -COLLUSION AFFIDAVIT
(Title 23 United States Code Section 112 and Public Contract Code Section 7106)
Bid #CIP-26-27-M3046
Santa Clarita Aquatics Center Pool Pump Replacement
City Project No. M3046
City of Santa Clarita, California
To the CITY OF SANTA CLARITA:
In conformance with Title 23 United States Code Section 112 and Public Contract Code 7106, the
Bidder declares that the bid is not made in the interest of, or on behalf of, any undisclosed person,
partnership, company, association, organization, or corporation; that the bid is genuine and not
collusive or sham; that the Bidder has not directly or indirectly induced or solicited any other bidder
to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed
with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that
the Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or
conference with anyone to fix the bid price of the Bidder or any other bidder, or to fix any overhead,
profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage
against the public body awarding the contract of anyone interested in the proposed contract; that all
statements contained in the bid are true; and, further, that the Bidder has not, directly or indirectly,
submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged
information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership,
company association, organization, bid depository, or to any member or agent thereof to effectuate
a collusive or sham bid.
THE BIDDER'S EXECUTION ON THE SIGNATURE PORTION OF THE "BIDDER'S CERTIFICATION" SHALL
ALSO CONSTITUTE AN ENDORSEMENT AND EXECUTION OF THOSE CERTIFICATIONS WHICH FORM A
PART OF THE PROPOSAL. BIDDERS ARE CAUTIONED THAT MAKING A FALSE CERTIFICATION MAY
SUBJECT THE CERTIFIER TO CRIMINAL PROSECUTION.
NON -COLLUSION AFFIDAVIT
Bid #CIP-26-27-M3046
Santa Clarita Aquatics Center Pool Pump Replacement
City Project No. M3046
City of Santa Clarita, California
TO BE EXECUTED BY EACH BIDDER OF A PRINCIPAL CONTRACT
STATE OF CALIFORNIA
Z
COUNTY OF LOS ANGELES
Benjamin Tvizer being first duly sworn deposes and says that he/she is
the k.-rZU (sole owner, a partner, president, etc.) of
Sae Design and Construction the party making the foregoing bid; that such
bid is not made in the interest of or behalf of any undisclosed person, partnership, company, association,
organization or corporation, that such bid is genuine and not collusive or sham, that said BIDDER has not
directly or indirectly induced or solicited any other BIDDER to put in a false or sham bid, or that anyone shall
refrain from bidding, that said BIDDER has not in any manner, directly or indirectly sought by agreements,
communication or conference with anyone to fix the bid price of said BIDDER or of any other BIDDER, or to
fix the overhead, profit, or cost element of such bid price, or of that of any other BIDDER, or to secure any
advantage against the public body awarding the Contract or anyone interested in the proposed Contract;
that all statements contained in such bid are true, and further, that said BIDDER has not, directly or indirectly,
submitted its bid price, or any breakdown thereof, or the contents thereof, or divulged information or date
relative thereto, or paid and will not pay any fee in connection, therewith to any corporation, partnership,
company, association, organization, bid depository, or to any member or CITY thereof, or to any other
individual information or date relative thereto, or paid and will not pay any fee in connection, therewith to
any corporation, partnership, company association, organization, bid depository, or to any member or CITY
thereof, or to any other individual, except to such person or persons as have a partnership or other financial
interest with said BIDDER in his general business.
Bidder:
Signature
Title Sept 1, 2026
Santa Clarita Aquatics Center Pool Pump Replacement
Estate Design and Construction
Project 1 Project 1
Code Description UOM
1 PACO # 8015 - Counterclockwise Each
Rotation
2 PACO # 5012 - Clockwise Rotation Each
3 PACO # 4012 - Clockwise Rotation Each
4 PACO # 50123 - Clockwise Rotation Each
5 PACO # 80123 - Clockwise Rotation Each
6 Manway Covers Kit Each
7 Delivery to City of Santa Clarita, FOB Lump -Sum
Quantity
Price Total Cost
2
30000
60000
2
21500
43000
1
17000
17000
1
11000
11000
1
15500
15500
12
600
7200
1
5000
5000
Group Total: $158700
Project Total: $ 158700