Loading...
HomeMy WebLinkAbout1990-10-23 - AGENDA REPORTS - AWARD OF TREE TRIMMING CONTR (2)AGENDA REPORT City Manager Approval Item to be presented CONSENT CALENDAR DATE: October 23, 1990 SUBJECT: Award of Tree T DEPARTMENT: Parks and Recreation I BACKGROUND Jeff Kolin On September 20, 1990, the City Clerk opened bids for the 1990-91 Comprehensive Street Tree Pruning Contract. The contract is a one-year contract with the option to renew at term of contract for two additional one-year periods. There are approximately 4,000 trees- that will be serviced in the first year of the contract throughout the City. The lowest responsible bidder is a Monrovia based company, Golden Bear.Arborist, at $195,400 and the only other bidder, Porshia Tree Maintenance came in at $269,824. The budget for fiscal 1990-91 street tree services is '.$250,000, of -which $25,000 has been used to date for emergency tree work. Golden Bear Arborist successfully performed tree services for our City in fiscal year 1989-90, and we have been very happy with the results of their services thus far. Golden Bear comes to us with a long list of references, including the City of Los Angeles, Los Angeles County and the City of Beverly Hills. FISCAL IMPACT Funds have been budgeted in account number 01-9200-227 in the amount of $250,000 for this contract, and the low bid is within the budget parameters, including the $25,000 already spent for emergency services. It is recommended that the City Council award the contract Golden Bear Arborist, Inc. in the amount of $195,400 and Manager to execute the contract after the required bonds have been submitted by the contractor. ATTACHMENTS Contract Proposal Bid List Golden Bear Total Bid Price For The Entire Contract �to the low bidder, authorize the City and insurance forms t Agendaltemip— CITY OF SANTA CLARITA RECORD OF BID OPENING BID FOR: Tree Trimirlq —DATE: 9/20/90 TIME OF BID OPENING: 11:00 a.m. PERSONS PRESENT: Geri Miller -Davis, Deputy City Clerk, Krystyna Chahremanit Clerk Typist, Egy Miramontez, Park 242=1say- Arharist, Porshia Tree Maintenanoe APPARENT LOW BIDDER: G01clen Bear ArbOrists Inc. BUDGETED ESTIMATEs ATTEST: ae=L& DdNNA M. GRINDEY, CITY CLERK CITY OF SANTA CLARITA AMOUNT $149,640 - Alt. B $269,824 - A $236,840 - Alt'- 13 9 0 GOLDEN BEAR TOTAL BID PRICE TOTAL BID PRICE FOR THE ENTIRE CONTRACT VORK including cost of labor, material, equipment, parts, implements and supplies necessary to complete the project, as based an the City Parks and Recreation Department estimate of quantities of work to be done. (See 2-04A. page 15) c(ST A OD (Words) and �_CENTS Additional Quotes: As an alternative to 2-04 A, Daily Personnel 4 -person crew, the City is requesting an alternative bid to reflect the use of a 3 -person crew. The alternative section is 2-04B. Please submit TOTAL BID PRICE FOR THE ENTIRE CONTRACT WORK including cost of labor, material, equipment, parts, implements and supplies necessary to complete the project, as based on the City Parks and Recreation Department estimate of quantities of work to be done. (See page 15) �L�C( ) (o 'A U (Words) and'- --------CENTS Extra work, emergency or after hour rates to be used for work -rendered by the Contractor above and beyond the specifications of the contract. Personnel Certified Arborist Journeyman Trimmer Apprentice Trimmer Groundsperson Clam loader/ Tractor Operator Truck Driver Regular Hours S95-00 per hour 29-00 per hour 27 -SO per hour 2S-00 per hour 25-00 per hour 25-()0 per hour - .5 - After Hours S95.00 per hour '13 - �o per hour 41 -IS per hour S7 - -SO per hour 37.50 per hour 37 SO per hour 0 Eguipment Aerial tower $25.00 per hour P/u truck 5.00 per hour Stump Grinder 20.00 per hour Clam loader/Tractor 90-00 per hour Large capacity dump truck 70-00 Pei hour Chipper truck and chipper 20-00 per hour Stump grinder in -on per hour Root pruner io -00 per hour Diagnosis 9S 00 per hour 0 Sunday and holiday percentage factor over after hours rate 100 z All blank spaces appearing in the foregoing must be filled in. In case of discrepancy between words and figures, the words shall prevail. TIME FOR COMPLETION - If awarded the contract, the undersigned agrees to start the work within ten calendar days from the date of written 'Notice to Proceed". And shall complete the contract exactly one year later. The period of performance will be 12 months unless sooner terminated under terms of the contract. LIQUIDATED DAMAGES - A Contractor shall start up no later than the allotted ten day 'Notice to Proceed,m therefore should a Contractor fail to start up within the ten day period, liquidation damages of $100.00 per day will be deducted from monies otherwise payable to the Contractor for services rendered. Should a Contractor fail to appear an a designated work day though the duration of the contract. For each day missed the Contractor will be required to double the man power and equipment necessary on proceeding work days to make up equivalent day/s missed. The Contractor shall not be assessed with liquidated damages during the delay or completion of the work caused by acts of god or of the Public Enemy, acts of the State, fire not due to acts of Contractors of subcontractors, floods, epidemics, quarantine, restrictions, strikes, freight embargo or unusually severe weather, or delays of subcontractors due to such causes provided that the Contractor shall. within ten (10) days from the beginning of such delay, notify the City, in writing of the cause of the delay. The city will ascertain the facts and the extent of the delay, and the findings thereon shall be final and conclusive. - 6 -