Loading...
HomeMy WebLinkAbout1990-05-08 - AGENDA REPORTS - BUS SHELTER PGM (2)NEW BUSINESS DATE: May.8, 1990 SUBJECT: BUS SHELTER DEPARTMENT: Public Works BACKGROUND AGENDA REPORT City Manager Approval Item to be presented by: John E. Medina On. July 11, 1989, the Council approved a "phase-out program" of privately owned bus benches to be replaced with either.City owned bus benches or bus shelters. At that time, there was a proliferation of privately owned bus benches throughout the City. The .City had received complaints from citizens regarding the random placement, excessive number, and improperly, maintained bus benches. In addition to the complaints received from citizens regarding bus benches, advertisement on the bus benches had become a negative issue. The approved 1989=90 budget earmarked $76,800 of Proposition A funds for the installation of four bus shelters, and approximately 80 bus benches at scheduled bus stops throughout the City. Also, on July 11, 1989, the Council adopted Ordinance No. 89-17, amending Ordinance No. 87-9 that had imposed a. moratorium on the construction.. of billboards in the City. This newly adopted Ordinance explicitly defined outdoor advertising and determined that outdoor advertising has a direct impact on the visual, aesthetics of the City and on traffic safety. Explicit and exact criteria were established to, regulate the placement, erection, and maintenance of signs within the City. Advertising on bus shelters may be considered outdoor advertising. On April 17, 1990, the City approved the Transit Needs Study which was prepared for the Los Angeles County Transportation Commission by Comsis Corporation: The plan presented a recommended new bus shelter program. The program is divided into. two phases - short range (FY 1991-92 through FY 1994-95), long range (FY 1995-96 through FY 1999-2000). The short-range goals indicate that the City could have an inventory of 45 bus shelters by the end of FY 1995 and by the end of FY 2000 the City -will have a total inventory of 62 bus shelters. Currently, the City owns seven, -advertising, bus shelters. These existing shelters are cleanedand maintained on a contractual basis with the County. A Ar oda Item: - Bus Shelter,Program May 8, 1990 Page 2 The obvious question that comes to"mind are costs. Capital outlay costs for installation of new she and, of course, the continuing costs of maintenance and cleaning. The estimated initial capital cost of installing, each shelter is approximately $7,000* and an estimated maintenance cost of $1,400 annually. * This cost does not include any right-of-way improvement, such.as, cement sidewalk under each shelter where full width sidewalk does not exist. An alternative to installing and maintaining bus shelters is to implement a bus shelter program .that uses shelters that contain advertisement. 'A shelter contractor would install the shelters, clean them,• and return 10% of the advertising fees to the City. This would allow the City to use $76,800 budgeted for other transit purposes. However, advertising on bus shelters would require an amendment to Ordinance No. 89-17. According to the Los Angeles County Transportation Commission, any of the revenues' received from advertisement must be used for transit purposes. Attached are Exhibits "A", "B", and "C". Exhibit "A" illustrates the pros and cons of Bus Shelter Advertising vs. Non -Advertising Shelters. Exhibit "B" is a map that indicates the locations of the proposed shelters. Exhibit "C" is a rendering of 'the proposed bus shelters. These shelters will have the following features: a. Illumination - by solar power (for evening lighting). b. Glazing - bronze tint, 3/8 inch tempered safety glass. C. Shelter Color - bronze d. Size - to be determined depending upon ridership. RECOMMENDATION 1. Approve the installation of nine advertising bus shelters. 2. Direct staff. to prepare plans. and specifications for the installation of nine tea -advertising bus shelters. 3. Continue the "phase-out" .program of privately owned bus benches with City owned bus shelters. ATTACHMENT Exhibit A Exhibit B Exhibit C EXHIBIT "A" 7 BUS SHELTER ADVERTISING vs. NON -ADVERTISING BUS SHELTER YEARLY REVENUE VS. YEARLY COSTS FOR NINE (9) BUS SHELTERS ADVERTISING PROS NON -ADVERTISING CONS Costs: Costs: Initial Capital Outlay $ 0 Initial Capital Outlay $68,000 Maintenance: Maintenance: (Shelter cleaned twice (Shelter cleaned twice .a.week) $ 0 a week by private vendor) $12,600 Repair: $ 0 Repair: $ 3,400 Revenue: Revenue: Received (projected) $8,640 Received (projected) $ 0 Annual Revenue: $8,640 Annual Cost $16,000 ADVERTISING.CONS 1. Visual aesthetics of the City less pleasing. 2. Possible public complaints on advertising. NON -ADVERTISING PROS 1. City `does not• contribute to sign proliferation. 2. Public complaints are not received regarding the shelter advertisements. 3. Maintenance costs may be reduced by utilizing the "Paid Work Crew Program" provided by the County Probation Department. 0 . il � Woo M °LL �— N m i5 29 x w A. H H 0 w Cl) U m (L) G' •n O O •ri H 4.) a � a) m a) O a) lj 4 r -I i 41) m cd � a H .0 m ti m •d � •r1 4-) $4 p O P O a0 b a) a� •r1 •ri $4 ani a(Ui � a) cd w Pa � O •rl •rl 1� U Cd O w . I H CL) cd W 3 m 4.) cd a) � m a 64 c0) Q)) b � N � cd a3 p r.I~64 O O o •rl w cid Q) 'd V N a) O •.-1 m r -i i� •ri •r4 41 a) N ii m O a) a) •,A H a'0 0 m N a� �+ •d En Qi w m O 0 H H a) a) p .0 O 0 N r-1 r -I r-1 '-1 1-1 ri 1-1 r -I r-1 -1 r -I r -I r-1 ami x Cd cd a� N Ts It •d 'd O O a~ cd k N a $4 c� a P" > > > > m a) 0 a) a) a) a) o0 on >, >1 W •r1 r1 r-1 r -I r-1 cd cd cd cd cd cd m cd 0 0 :3 :3 r-1 r1 3 3 O O 41 O O O O r-1 r-1 A r '�, O U ' ' - rl co0 Cd cd co x x U i� 2" -H -H .r1 M 'd 'd U m U U u U sa is cd cd m r -I cd cd a) tJ 0 0 A 0 cd cd $a Ia a) >, cd $4 w $4 •r1 a) a) a) a) 4 4 !a H ij a) H k Cd ho r -I r-1 r -I r -I U V a) a) -H 3 a) a) Cd z > > > > o o vii n 3 z n n Cd 3 b b x b cd cd b b 'd ti Cd0 04 W 10 •d 0 0 0 cd P4 ca cx a q q o o a 0 0 04 04 CdW 0 a •d° � a ai r. +� w cd U U 9 0 0 cd >~ ti cd cd 0 U U c� U r -I > > Fd.' 0 > C w .'d O 3 3 m m Gti W d m a) v b N r-1 bo :3 U V O O r-1 O to H .-I Cd cd O O O >% >% aS ni O A cd O O P4 P4 A a V3 ti W A 2: w W O r -I N M 4 r-1 N Cl; 4 r-1 —4 r-1 r--1 t / C 1 \.py y� EXHIBIT NC11