Loading...
HomeMy WebLinkAbout1990-08-14 - AGENDA REPORTS - CALTRANS FETSIM GRANT (2)AGENDA REPORT City Manager Approval Item to.be presented by: CONSENT CALENDAR John E. Medina DATE: AUGUST 14, 1990 SUBJECT: APPLICATION TO T CALIFORNIA DEPARTMENT OF TRANSPORTATION FOR A FUEL-EFFI ENNT�►TRAFFIC SIGNAL MANAGEMENT GRANT Resolution N0.19D-351 1$1 ' DEPARTMENT: Public Works / 1 BACKGROUND The California Energy Commission has set aside funds for a statewide program to maximize the efficiency of traffic signal systems in the State. This program, administered by. the California. Department of Transportation (Caltrans), is called the Fuel -Efficient Traffic Signal Management (FETSIM) Grant Program. It provides funds to cities and counties to study,. evaluate and revise the coordinated traffic signal timing within their jurisdictions. The City of Santa Clarita has several interconnected signal systems which would be eligible for funding in the FETSIM program. The systems include 47 traffic signals .on Valencia Boulevard, McBean Parkway, Soledad Canyon Road, Seco Canyon Road and Whites. Canyon Road. Improved traffic signal coordination could significantly reduce travel delays on these major routes. The proposed FETSIM project has a total budget of $65,800, with a local share of $160500 (25 percent of the total). The local share funds have been budgeted for Fiscal Year 1990-91 as a part of signal synchronization projects for Soledad Canyon Road and.Lyons Avenue. These funds are available for this project. Authorization is requested to apply to the California Department of Transportation for FETSIM Grant funds. The program will begin in the latter part of this year and end in the Fall of 1991. Attached for your information is a copy of the grant application. RECOMMENDATION Adopt Resolution No. 90-151 authorizing. the submittal of a FETSIM grant application and authorizing the Director of Public Works to enter into an agreement with Caltrans to implement the study. ATTACHMENTS Resolution No. 90-151 µopted: FETSIM Grant Application Agenda Item: RESOLUTION NUMBER 90-151 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA CLARITA, CALIFORNIA, AUTHORIZING A FUEL-EFFICIENT TRAFFIC SIGNAL MANAGEMENT GRANT APPLICATION WHEREAS, the City of Santa Clarita recognizes that it is in the interest of the national economy to promote the conservation of energy resources and to reduce our nation's dependence on costly foreign oil; and WHEREAS, fuel-efficient traffic signal management by the City of Santa Clarita will provide benefits to the local community in the form of improved traffic flow, reduced fuel consumption, reduced vehicle operating costs, reduced air pollutant emissions, and improved safety due to . smoother flow; and WHEREAS,funds have been established and are available through the California Department of Transportation for grants to local governments for efficient traffic signal management projects; and WHEREAS, the City of Santa Clarita has reviewed and considered the environmental implications of the proposed project; THEREFORE, the City Council of the City of Santa Clarita does resolve as follows: Section 1. That the submittal of an application to the California Department of Transportation for a Fuel -Efficient Traffic Signal Management (FETSIM) grant is hereby authorized. Section 2. That the Director of Public Works of the City of Santa Clarita is hereby authorized and empowered to execute in the name of the City of Santa Clarita all necessary applications, contracts and agreements to implement and carry out the purposes specified in this resolution. Section 3. That the project is in compliance with the California Environmental Quality Act of 1970 and that the project is categorically exempt under Section 15301(C). PASSED, APPROVED AND ADOPTED this day of , 1990. MAYOR ATTEST: CITY CLERK I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the City Council of the City of Santa Clarita at a regular meeting thereof, held on the day of , 1990 by the following vote of Council: AYES: COUNCILMEMBERS NOES: ABSENT: COUNCILMEMBERS ATTEST: City Clerk -2- Mayor 0 0 1. 2. 3. El 5. A 7 ATTACHMENT 1 APPLICATION SUMMARY Check Type of Application X Retiming Project Hardware/Retiming Demonstration Project Applicant Name and Address: City of Santa Clarita Applicant Population: Project Technical Contact: Phone: Project Contract Manager: Phone: Budget Summary: Total Project Cost: State Share (Grant): Local Share: Consultant Budget (If Applicable): Number of Signalized Intersection: In Your Jurisdiction: Currently Operating Coordinated: Capable of Being Coordinated, but Not Currently Operating Coordinated: In Your Proposed Project: A-1 23920 Valencia Blvd., Suite 300 Santa Clarita. CA 91355 147.000 George Fares/Mario Sanchez (213)908-6200 Ken Johnson (213) 908-6200 $65.800 $49.300 $16500 66 47 CITY OF SANTA CLARITA F"""" WILLDAN ASSOCIATESCITY OF SANTA CLARITA PROPOSED FETSIM SIGNAL LOCATIONS ENMEM AND "HERS POUR NETWORKS QP \ �' 9r \\ A• Pi \ a \ 2 2 1 4lAM w CJ{� .SOY / 1 2 WQ, P QCZ "P `�4.� I 4 RD ARD JRP'/ ' DFL MO DR p \ Oq 5 6 P FN DR / 7 2 \ 1 F' A+ \ 126 S 1 \ w Y\\ SERRA NWy J�Oe y \ 2 RO 'V ARi��E VAIy J 9 \� 14 72 \ 4 — \ 6 1 CITY OF SANTA CLARITA F"""" WILLDAN ASSOCIATESCITY OF SANTA CLARITA PROPOSED FETSIM SIGNAL LOCATIONS ENMEM AND "HERS POUR NETWORKS