HomeMy WebLinkAbout1990-06-12 - AGENDA REPORTS - LANDSCAPE SOLEDAD CANYON RD (2)0
CONSENT CALENDAR
DATE: June 12, 1990
0
AGENDA REPORT
City Manager Approval
Item to be presented by:
John E. Medina
SUBJECT: SOLEDAD CANYON ROAD LANDSCAPE FROM WHITES CANYON ROAD TO
CROSSGLADE AVENNU�EE
ACCEPTANCE OF P%ZOJECT 89-10
DEPARTMENT: Public
BACKGROUND
This project was for landscape improvements on the north side of Soledad Canyon
Road from Whites Canyon Road to Crossglade Avenue. Bids were opened on January
18, 1990, and the Council awarded the.bid to Liquid Flow Engineering, Inc. on
January 23, 1990.
Construction of the project was completed to the satisfaction of the Director of
Public Works on May 17, 1990.
The construction quantities and total construction cost of $53,179.52 have been
approved by the contractor and the Director of Public Works.
RECOMMENDATION
The City Council accept the work performed by Liquid Flow Engineering, Inc. and
authorize payment of the 10 percent retention 35 days after acceptance, provided
no stop notices, as provided by law, have been filed.
The City Council also direct the City Clerk to file the notice of completion for
the project.
Notice of completion of public improvement and work.
Map
�Aiapp,R,0 WED-
Agendaltem:—Zl'
When recorded please return to:
George A. Caravalho, City Clerk
City of Santa Clarita
23920 Valencia Boulevard, Suite 300
Santa Clarita, CA 91355
NOTICE OF COMPLETION OF
PUBLIC IMPROVEMENT AND WORK
NOTICE IS HEREBY GIVEN that the City of Santa Clarita, Los Angeles
County, California, has caused a.public improvement, to wit:
PROJECT NO. 89-10
NORTH SIDE OF SOLEDAD CANYON ROAD
FROM WHITES CANYON ROAD TO CROSSGLADE AVENUE
to be constructed upon the property hereinafter described. The contract for
furnishing of all plant, labor, services, materials and equipment and all
utilities and transportation, including power, fuel and water, and performing
all work necessary to .construct and complete, in a good and workmanlike manner
in strict accordance with the specifications, plans and drawings therefore on
file in the office of the City Clerk of the City of Santa Clarita, for the
construction, installation, and completion of the above described public
Improvement and work, was heretofore made and entered into with Liquid Flow
Engineering, Inc. on the 13th day of February, 1990 and filed for record in
the office of the City Clerk of the City of Santa Clarita; that the work upon
said public improvement was actually completed on the 17th day of May, 1990
and that the Director of Public Works has notified the City Council that he
has made and completed a final inspection of the materials furnished and
installed and the, work performed in the construction, installation and
completion of said public improvement hereinabove more particularly described
and set forth, and has certified in writing to the City Council that all of
work necessary for the construction, installation and completion of said
public improvement above described have been fully complied with to his
satisfaction as required by the contract documents; that final acceptance of
the construction, installation and completion of said public improvement above
described was made on the 17th day of May, 1990 that the nature of the title
to said property of said City of Santa Clarita is as follows -- that is to
say, it owns said public improvement in fee except for the right-of-way upon
which it 'is constructed, and that it owns an easement upon, over and along
said right-of-way for the purpose of the construction, installation, and
completion of said public improvement hereinabove described and the -use
thereof after said completion; that the property hereinabove referred to and
• on which said public improvement is situated is described as follows:
North side of Soledad Canyon Road
from Whites Canyon Road to Crossglade Avenue
NAME OF SURETY ON LABOR AND MATERIAL BOND:
American Motorists Insurance Company
7470 N. Figueroa Street
Los Angeles, CA 90041
DATED this day of , 19 _
CITY OF SANTA CLARITA
BY:
JO ANNE DARCY, MAYOR
City of Santa Clarita
ATTEST:
George A. Caravalho, City Clerk
City of Santa Clarita
the provisions of
the contract and contract documents
for the furnishing' of
all plant, labor,
services, materials and equipment, and
the performing of all
work necessary for the construction, installation and completion of said
public improvement above described have been fully complied with to his
satisfaction as required by the contract documents; that final acceptance of
the construction, installation and completion of said public improvement above
described was made on the 17th day of May, 1990 that the nature of the title
to said property of said City of Santa Clarita is as follows -- that is to
say, it owns said public improvement in fee except for the right-of-way upon
which it 'is constructed, and that it owns an easement upon, over and along
said right-of-way for the purpose of the construction, installation, and
completion of said public improvement hereinabove described and the -use
thereof after said completion; that the property hereinabove referred to and
• on which said public improvement is situated is described as follows:
North side of Soledad Canyon Road
from Whites Canyon Road to Crossglade Avenue
NAME OF SURETY ON LABOR AND MATERIAL BOND:
American Motorists Insurance Company
7470 N. Figueroa Street
Los Angeles, CA 90041
DATED this day of , 19 _
CITY OF SANTA CLARITA
BY:
JO ANNE DARCY, MAYOR
City of Santa Clarita
ATTEST:
George A. Caravalho, City Clerk
City of Santa Clarita