SUBJECT: Continued Public Hearing on the Palmer Development Agreement,
including the following:
1) Tentative Tract Map No. 31236 and related applications for
the project known as Santa Catarina;
2) Vesting Tentative Tract Map No. 45023 and related
applications for the project known as The Colony;
3) An agreement to allow the affordable housing requirement (226
units) for the applicant's Westcreek Project to be transferred to
a nearby, existing multi -family residential project which is also
owned by the applicant.
DEPARTMENT: Community DevelopmentCA�
BACKGROUND
The City Council at its meeting of May 2, 1990, conducted a Public Hearing on
the Santa Catarina project, took public testimony, closed the hearing to the
floor, directed staff to examine specific reductions and modifications to the
proposal, and continued this closed portion of the Public Hearing to May 15,
1990. The Public Hearings on The Colony, and Westcreek affordable housing
transfer, and Development Agreement were also continued to May 15, 1990, as open
Public Hearings. The Development Agreement is a package which has evolved over
the past several months into what has been presented to the Council. The major
components of the Development Agreement include the various road improvements
requested by the City, the proposed development by the applicant, and the ten
year approval specifying the terms of the Agreement.
The Council directed staff to develop a revised proposal for the Santa Catarina
project to include the following:
1. A reduced density to between 600 and 800 dwelling units for the Santa
Catarina project.
2. Preservation of riparian habitat.
3. An alignment for Golden Valley Road which minimizes the impact on the
Stanford/McCoy property.
Agenda Item:.
As directed, an analysis was conducted to address the direction that,Golden
Valley be aligned to avoid the Stanford/McCoy property and that development be
planned to minimize the impact on the riparian area. Staff is prepared to
present the analysis performed for Council's review which will demonstrate to
Council that the obstructions, such as the crossing point at Soledad Canyon,
aqueduct, transmission towers and elevation, establish very serious constraints
on the alignment of the roadway.
A search was conducted to determine the limits of the riparian waterway of
concern and efforts to minimize impact on that area. It was noted that the
waterway is not a natural water course but rather water generated from
irrigation north-east of the area. In effect, a riparian area could be created
at any location by the establishment of a continuous or intermittent flow of
water.
The City has requested that BSI, Inc., do a study examining the Santa Catarina
riparian corridor in relation to the Santa Clara River. BSI is the City's
consultant conducting a study of the Santa Clara River. This study will assess
the opportunities and constraints of the available river resources relating to
the creation of additional water features and recreational opportunities. The
biologist working on this project shall perform a general biological survey to
determine the status of the riparian habitat present on the Santa Catarina site,
and whether it could be relocated and re-established.
The applicant has stated that reductions in the density of the Santa Catarina
project can be considered only after he is assured of a favorable dispensation
on The Colony project and on his request for the affordable housing obligation
on the Westcreek project.
Colony Project
The Colony project involves an application for subdivision, pre -zoning and
annexation of a 46.2 acre site adjacent to the Antelope Valley Freeway, Santa
Clara River, and Southern Pacific railroad. This proposal also includes a
request for the vested right to construct 800 condominium units, in 100
eight-plex buildings, with appurtenant parking, landscaping, and recreational
facilities. The pre -zoning requested is to the R -3 -17U -DP zoning, meaning
Limited Multiple -Family Residential, 17 dwelling units per acre, Development
Program zone. The density conforms to the other approved projects in the area.
A conditional use permit (CUP) would be necessary to implement the project.
The Planning Commission denied this project by a 4-0 vote. The applicant has
appealed the denial. That denial was made in consideration that the property
could be better used as an industrial park.
Since that time, the City has contracted with a consultant to further analyze
industrial use. The resulting report considers an industrial use to be a risky
venture because of access problems. Based on this report, staff is recommending
approval of the residential project subject to the conditions as prepared.
Westcreek Project
The applicant has halted construction on his Westcreek project in anticipation
of the possible realignment of Rio Vista Road through the project. In exchange
for allowing this realignment through his property, the applicant has requested
the transfer of the affordable housing obligation on this project to another
nearby residential development owned by the applicant. The staff has had
difficulty in placing a value on any possible benefit to the applicant
concerning the transfer of the affordable housing obligation on the Westcreek
project, but it is reasonable to assume some fiscal benefit accrues in the form
of increased value of units on the Westcreek site since all units will be market
rate housing in the project.
The Planning Commission indicated that the affordable housing transfer for the
Westcreek project is an acceptable component of the Development Agreement.
Development Agreement
The Development Agreement is the method initiated by the City to detail the
various agreements between the parties in a legal, enforceable document.
Approval of a Development Agreement allows the project(s) to proceed, regardless
of any future City actions that could affect the properties, such as general
plan amendments, zone changes, moratoriums or construction based on land use
zoning concerns, whether or not construction has actually started. The
Agreement "vests" a project at time of approval for the period of the
Agreement. Ten years has been discussed as the length of time the subject
agreement would be in effect.
Because of the complex interrelationships between these projects and the number
of unresolved issues, staff has not prepared any amendments to the Development
Agreement for this meeting. We propose the Council first achieve a consensus on
the issues at hand and then direct staff to prepare an amended agreement as
appropriate.
DISCUSSION
Staff suggests the City Council give consideration to and discuss the following
points:
1. Is The Colony project an acceptable residential development in terms of
density, access, safety, and location?
2. Determine whether or not to allow the affordable housing transfer to remain
in the Development Agreement, as proposed by the applicant.
3. With the reductions in the Santa Catarina project, do the reductions in the
road improvements make this entire Development Agreement (and related
projects) beneficial to the City?
4. Discuss the sensitive issues and concerns regarding the environmental
impacts identified with all projects related to the Development Agreement.
5. If Council decides to approve any of the proposed projects (Santa Catarina,
The Colony, Affordable Housing Transfer for Westcreek), should a Development
Agreement be prepared?
6. Any other concerns addressed by the applicant, the public, and the Council.
RECOMMENDATION
Staff recommends the City Council conduct the public hearing and provide further