DATE: August 14, 1990
SUBJECT: SOLEDAD CANYON ROAD
FROM 600 FEET WE TE
ACCEPTANCE OF P OJE
DEPARTMENT: Public Works
BACKGROUND
John E. Medina
RLY TO 200 FEET EASTERLY OF CAMP PLENTY ROAD
CT NO. 89-4
This project was for the modification of traffic signals and the reconstruction
of the median on Soledad Canyon Road to provide dual left -turn lanes for
eastbound traffic onto Camp Plenty Road. Bids were opened on July 20, 1989 and
the Council awarded the bid to Steiny and Company, Inc, on August 8, 1989.
Construction of the project was completed to the satisfaction of the Director of
Public Works on March 21, 1990. Final acceptance has been awaiting
determination and verification the al quantities of work installed by the
contractor.
The total construction cos of $77,763. i8 as been approved by the contractor
and the Director of Public Wor
RECOMMENDATION
The City Council accept the work constructed by Steiny and Company, Inc. and
authorize payment of the 10 percent retention 35 days after acceptance, provided
no stop notices, as provided by law, have been filed.
The City Council also direct the City Clerk to file the Notice of Completion for
the project.
ATTACHMENT
Notice of Completion of Public Improvement and Work
/ce
Ancnaaltem: /9
0
0
When recorded please return to:
Donna M. Grindey, City Clerk
City of Santa Clarita
23920 Valencia Boulevard, Suite 300
Santa Clarita, California 91355
NOTICE OF COMPLETION OF
PUBLIC IMPROVEMENT AND WORK
NOTICE IS HEREBY GIVEN that the City of Santa Clarita, Los Angeles County,
California, has caused a public improvement, to wit:
PROJECT NO. 89-4
SOLEDAD CANYON ROAD FROM 600 FEET WESTERLY
TO 200 FEET EASTERLY OF CAMP PLENTY ROAD
to be constructed upon the property hereinafter described. The contract for
furnishing of all plant, labor, services, materials and equipment and all
utilities and transportation, including power, fuel and water, and performing all
work necessary to construct.and complete, in a good and workmanlike manner in
strict accordance with the specifications, plans and drawings therefore.on file
in the office of the City Clerk of the City of Santa Clarita, for the
construction, installation, and completion of the above described public
improvement and -work, was heretofore made and entered into with Steiny and
Company, Inc. on the 5th day of September, 1989 and filed for record in the
office of the City Clerk of the City of Santa Clarita; that the work upon said
public improvement was actually completed on the 21st day of March, 1990 and
that the Director of Public Works has notified the City Council that he has made
and completed a final inspection of the materials furnished and installed and the
work performed in the construction, installation and completion of said public
improvement hereinabove more .particularly described and set forth, and has
certified in writing to the City Council that all of the provisions of the
contract and contract documents for the furnishing of all plant, labor, services,
. materials and equipment, and the performing of all work necessary for the
construction, installation and completion of said public improvement above
described have been fully complied with to his satisfaction as required by the
contract documents; that final acceptance of the construction, installation and
completion of said public improvement above described was made on the 21st day
of March, 1990 that the nature of the title to said property of said City of
Santa Clarita is as follows -- that is to say, it owns said public improvement
in fee except for the right of way upon which it is constructed, and that it owns
an easement upon, over and along said right of way for the purpose of the
construction, installation, and completion of said public improvement hereinabove
described and the use thereof after said completion; that the property
hereinabove referred to and on which said public improvement is situated is
described a follows:
SOLEDAD CANYON ROAD FROM 600 FEET WESTERLY
TO 200 FEET EASTERLY OF CAMP PLENTY ROAD
NAME OF SURETY ON LABOR AND MATERIAL BOND:
SAFECO INSURANCE COMPANY OF AMERICA
17570 Brookhurst Street
Fountain Valley, California 92708
DATED.this _ day of 19
CITY OF SANTA CLARITA
JO ANNE DARCY, Mayor
City of Santa Clarita
ATTEST:
Donna M. Grindey, City Clerk
City of Santa Clarita
0