SUBJECT: SOLEDAD CANYON RO.D LANDSCAPE (PROJECT 89-10)
WHITES CANYON ROAO TO CROSSGLADE AVENUE
DEPARTMENT: Public Works
BACKGROUND
On November 28, 1989, the City Council authorized the advertising for bids for
the construction of landscape improvements on the north side of Soledad Canyon
Road from Whites Canyon Road to Crossglade Avenue.
On January 18, 1990, bids were received by the City of Santa Clarita and were
for the following amounts:
Company Bid Amounts
1.
Liquid Flow Engineering, Inc.
$
51,850.00
2.
ABC Lawn Sprinkler Co., Inc.
$
52,900.00
3.
American Landscape
$
55,275.50
4.
California Landscape
$
55,641.00
5.
F.R. Peacock
$
55,724.50
6.
S&M Landscape
$
58,365.00
7.
Engineer's Estimate
$
63,300.00
8.
Thomsen Landscape
$
68,840.00
9.
Spiess Construction Co., Inc.
$
80,840.00
10.
J&H Engineering
$
84,357.00
The low bid submitted by Liquid Flow Engineering, Inc., is well below the
engineer's estimate of $63,300. It .was reviewed for accuracy and conformance to
the contract documents and was found to be complete. The Contractor's Licensing
Board has verified that Liquid Flow Engineering's license is current and in good
standing. Liquid Flow Engineering, Inc. has adequately performed similar work
for other agencies in Southern California, including Caltrans and the County of
Los Angeles.
Funds in the amount of $90,000 are budgeted in Fiscal Year 1989-90 in Account
Number 25-96006-227 and are sufficient to cover the cost of this project.
RECOMMENDATIONS
1. Award the contract to the low bidder, Liquid Flow Engineering, Inc., in the
amount of $51,850.00.
2. Authorize the Mayor to execute the contract with Liquid Flow Engineering,
Inc., in the amount of $51,850.00, after the required bonds and insurance
forms have been submitted by th1,o r ED �� Agenda Item: -Z
•
•
0 •
CITY OF SANTA CLARITA
CONTRACT AGREEMENT
FOR
LANDSCAPE IMPROVEMENTS ON SOLEDAD CANYON ROAD
(NORTH SIDE) FROM WHITES CANYON ROAD TO CROSSGLADE AVENUE
PROJECT NO. 89-10
IN THE CITY OF SANTA CLARITA
This. Contract Agreement is
stated project this
BETWEEN the City
Engineering, Inc.,
California, 91304,
made and entered into for the above -
day of
of Santa Clarita, as
22019 Vanowen Street,
as CONTRACTOR.
19 , BY AND
AGENCY, and Liquid Flow
Suite "D", Canoga Park,
WITNESSETH that AGENCY and CONTRACTOR have mutually agreed as
follows:
ARTICLE I
The contract documents for the aforesaid project shall consist of
the Notice Inviting Sealed Bids, Instructions to Bidders, Proposal,
General Specifications, Standard Specifications, Special
Provisions, Plans, and all referenced specifications, details,
standard drawings, and appendices; together with this Contract
Agreement and all required bonds, insurance certificates, permits,
notices, and affidavits; and also including any and all addenda or
supplemental agreements clarifying, or extending the work
contemplated as may be required to insure its completion in an
acceptable manner. All of the provisions of said contract
documents are made a part hereof as though fully set forth herein.
ARTICLE II
For and in consideration of the payments and agreements to be made
and performed by AGENCY, CONTRACTOR agrees to furnish all materials
and perform all work required for the above -stated project, and to
fulfill all other obligations as set forth in the aforesaid
contract documents.
ARTICLE III
CONTRACTOR agrees to receive and accept the prices set forth in the
Proposal as full compensation for furnishing all materials,
performing all work, and fulfilling all obligations hereunder.
Said compensation shall cover all expenses, losses, damages, and
consequences arising out of the nature of the work during its
progress or prior to its acceptance including those for well and
faithfully completing the work and the whole thereof in the manner
and time specified in the aforesaid contract documents; and also
including those arising from actions of the elements, unforeseen
difficulties or obstructions encountered in the prosecution of the
0
work, suspension or discontinuance of the work, and all other
unknowns or risks of any description connected with the work.
ARTICLE IV
AGENCY hereby promises and agrees to employ, and does hereby
employ, CONTRACTOR to provide the materials, do the work and
fulfill the obligations according to the terms and conditions
herein contained and referred to, for the prices aforesaid, and
hereby contracts to pay the same at the time, in the manner, and
upon the conditions set forth in the contract documents.
ARTICLE V
CONTRACTOR acknowledges the provisions of the State Labor Code
requiring every employer to be insured against liability for
Worker's Compensation, or to undertake self-insurance in accordance
with the provisions of that code, and certifies compliance with
such provisions.
ARTICLE VI
CONTRACTOR agrees to indemnify, defend and hold harmless AGENCY and
all of its officers and agents from any claims, demands, or causes
of .action, including related expenses, attorney's fees, and costs,
based on, arising out of, or in any way related to the work
undertaken by CONTRACTOR hereunder.
ARTICLE VII
CONTRACTOR affirms that the signatures, titles, and seals set forth
hereinafter in execution of this Contract Agreement represent all
individuals, firm members, partners, joint venturers, and/or
corporate officers having principal interest herein.
IN WITNESS WHEREOF the parties hereto for themselves, their heirs,
executors, administrators, successors, and assigns do hereby agree
to the full performance of the covenants herein contained and have
caused this Contract Agreement to be executed in triplicate by
setting hereunto their names, titles, hands, and seals this
day of , 19
•
•
•
CONTRACTOR: Liquid Flow Engineering, Inc.
22019 Vanowen Street, Suite "D"
Canoga Park, California, 91304
Rhonda Soroudi, President, Treasurer
Farid Soroudi, Vice President, Secretary
Contractor's License No. 517034 Class A
CITY Business License No.
Federal Tax Identification No.
Subscribed and sworn to this day of
NOTARY PUBLIC
AGENCY:
Mayor of the City of Santa Clarita
19
Attested ,
City Clerk of the City of Santa Clarita Date
Approved as to form ,
City Attorney of the City of Santa Clarita Date
0 •
CITY OF SANTA CLARITA
FAITHFUL PERFORMANCE BOND
FOR
LANDSCAPE IMPROVEMENTS ON SOLEDAD CANYON ROAD
(NORTH SIDE) FROM WHITES CANYON ROAD TO CROSSGLADE AVENUE
PROJECT NO. 89-10
IN THE CITY OF SANTA CLARITA
KNOW ALL MEN BY THESE PRESENT that Liquid Flow Engineering, Inc.,
22019 Vanowen Street, Suite "D", Canoga Park,. California, 91304,
as CONTRACTOR and
as SURETY, are held
and firmly bound unto the City of Santa Clarita, as AGENCY, in the
penal sum of Fifty-one thousand, eight hundred and fifty dollars
and 00/100 dollars ($51,850.00), which is one -hundred percent of
the total contract amount for the above -stated project, for the
payment of which sum, CONTRACTOR and SURETY agree to be bound,
jointly and severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas CONTRACTOR
has been awarded and is about to enter into the annexed Contract
Agreement with AGENCY for the above -stated project, if CONTRACTOR
faithfully performs and fulfills all obligations under the contract
documents in the manner and time specified therein, then this
obligation shall be null and void, otherwise it shall remain in
full force and effect in favor of AGENCY; provided that any
alterations in the obligations or time for completion made pursuant
to the terms of the contract documents shall not in any way release
either CONTRACTOR or SURETY, and notice of such alterations is
hereby waived by SURETY.
IN WITNESS WHEREOF the parties hereto have set their names, titles,
hands, and seals this day of , 19
CONTRACTOR* Liquid Flow Engineering, Inc.
22019 Vanowen Street, Suite "D"
Canoga Park, California 91304
Rhonda Soroudi, President
(818)704-1835
SURETY*
Subscribed and sworn to this day of 19
NOTARY PUBLIC
* Provide CONTRACTOR/SURETY name, address and telephone number
and the name, title, address and telephone number of
authorized representative.
CITY OF SANTA CLARITA
MATERIAL AND LABOR BOND
FOR
LANDSCAPE IMPROVEMENTS ON SOLEDAD CANYON ROAD
(NORTH SIDE) FROM WHITES CANYON ROAD TO CROSSGLADE AVENUE
PROJECT NO. 89-10
IN THE CITY OF SANTA CLARITA
KNOW ALL MEN BY THESE PRESENT that Liquid Flow Engineering, Inc.,
22019 Vanowen Street, Suite "D", Canoga Park, California, 91304,
as CONTRACTOR, and
, as SURETY, are held
and firmly bound unto the City of Santa Clarita, as AGENCY, in the
penal sum of Twenty-five thousand, nine hundred and twenty-five
dollars and 00/100 dollars ($25,925.00), which is fifty percent of
the total contract amount for the above -stated project, for the
payment of which sum, CONTRACTOR and SURETY agree to be bound,
jointly and severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas CONTRACTOR
has been awarded and is about to enter into the annexed Contract
Agreement with -AGENCY for.the above -stated project, if CONTRACTOR
or any subcontractor fails to pay for any labor or material of any
kind used in the performance of the work to be done under said
contract, or fails to submit amounts due under the State
Unemployment Insurance Act with respect to said labor, SURETY will
pay for the same in an amount not exceeding the sum set forth
above, which amount shall inure to the benefit of all persons
entitled to file claims under the State Code of Civil Procedures;
provided that any alterations in the work to be done, materials to
be furnished, or time for completion made pursuant to the terms of
the contract documents shall not in any way release either
CONTRACTOR or SURETY, and notice of said alterations is hereby
waived by SURETY.
IN WITNESS WHEREOF the parties hereto have set their names, titles,
hands, and seals this day of 19
CONTRACTOR* Liquid Flow Engineering, Inc.
22019 Vanowen Street, Suite "D"
Canoga Park, California 91304
Rhonda Soroudi, President
(818)704-1835
SURETY*
Subscribed and sworn to this day of
NOTARY PUBLIC
. 19
* Provide CONTRACTOR/SURETY name, address and telephone number
and the name, title, address and telephone number for
authorized representative.
Pi
17J