Loading...
HomeMy WebLinkAbout1991-09-10 - AGENDA REPORTS - AGMT ENVIRONMENTAL IMPACT RPT (2)AGENDA REPORT City Manager Item to be presented CONSENT CALENDAR DATE: September 10, 1991 SUBJECT: Authorization for City to Enter Into a Professional Services Agreement for the Preparation of an Environmental. Impact --Report for the Civic Center Project. DEPARTMENT: Community Development BACKGROUND: The City of Santa Clarita has initiated the process that will result in the construction of a new civic center on a portion of the City -owned property located southeast of the intersection of Soledad Canyon Road and Bouquet Canyon Road. Community Development staff has determined, through the Initial Study dated July 6, 1990, that an Environmental Impact Report (EIR) is required for the analysis of this project. Pursuant to Section B(B) of the Santa Clarita CEQA Resolution, City Council Resolution No. 91-50, the Department of Community Development solicited proposals from eight environmental planning consultants for preparation of the EIR on July 12, 1990. Requests for proposals were sent to eight environmental consulting firms, and four responses were received. Based upon staff .review of all proposals, and background checks .of the three leading consultants, the firm of Robert Bein, William Frost and Associates (RBF) was selected. The not -to -exceed cost for preparing .the EIR is $64,900. In comparison, the cost proposals submitted by the other two consultants were $74,297 and $115,900. The proposed schedule anticipates the circulation of the Draft EIR in January, 1492. City Council approval is needed for the City to enter into a contract with a consulting firm for an amount greater than $20,000. The contract agreement contains provisions and explanation of the scope of work to be performed, amount and manner of compensation, schedule and time for performance, conflict of interest, indemnity and insurance, a liquidated damages clause,. and has been approved to form by the City Attorney. RBF will also file a Certificate of Insurance with the City Clerk's office as required by the Agreement. A complete copy of the Agreement and Exhibits is available for review in the City Clerk's Office. RECOMMENDATION: Staff recommends that the City Council adopt Resolution No. 91-142, authorizing and approving the attached professional services agreement between the City and RBF. ATTACHMENTS 1. Resolution No. 91-142 Adopted:Agenda Item: I RESOLUTION NO. 91-142 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA CLARITA, CALIFORNIA, ETHORIZING THE CITY TO ENTER INTO A CONTRACT.AGREEMENT FOR THE PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT FOR THE CIVIC CENTER PROJECT WHEREAS, -the City of Santa Clarita purchased an approximately 238 acre site near Bouquet Junction for the purpose of constructing a new civic center complex; and WHEREAS, the City of Santa Clarita has conducted a competition to select architectural and engineering firms to design the new civic center complex; and WHEREAS, the Department of Community Development prepared an Initial Study of the proposed Civic Center Project pursuant to the provisions of Section 15063 of the.State CEQA Guidelines; and WHEREAS, determination was made by the City's Environmental Officer that the proposed project could have a significant effect on the environment and that an Environmental Impact Report (EIR) was necessary to provide an analysis of potential project impacts; and WHEREAS, Section 8(B) of Santa Clarita CEQA Resolution, City Council Resolution No. 91-50, and Section 15084(a) of the State CEQA Guidelines require the EIR to be prepared under contract to the Lead Agency; and WHEREAS, a Request for Proposal was sent to eight qualified environmental planning. consultants, four proposals were received and reviewed by City staff, and a consultant was thereafter selected; and WHEREAS, the firm of Robert Bein, William Frost and Associates (RBF) and the Department of Community Development have agreed to a not-to=exceed cost of $64,900 (Sixty-four Thousand Nine Hundred Dollars) for the environmental services required by the City. NOV, THEREFORE, BE IT RESOLVED, that the City Council of the City of Santa Clarita does hereby consent to enter into a contractual agreement with Robert Bein, William Frost and Associates, for the preparation of an Environmental Impact Report for the Civic Center Project. PASSED, APPROVED AND ADOPTED this day of 1991. Carl Boyer, Mayor ATTEST: Donna M. Grindey, City Clerk STATE OF CALIFORNIA ) COUNTY OF LOS ANGELES) as CITY OF SANTA CLARITA) I, Donna M. Grindey, DO HEREBY CERTIFY that the above and foregoing Resolution was duly adopted by the City Council of the City of Santa.Clarita at a regular meeting thereof, held on the day of , 1991 by the following vote of Council: AYES: COUNCILMEMBERS: NOES: COUNCILMEMBERS: ABSENT: COUNCILMEMBERS: Donna M. Grindey, City Clerk V PROFESSIONAL SERVICES AGREEMENT THIS AGREEMENT IS MADE BETWEEN THE CITY OF SANTA CLARITA, A MUNICIPAL CORPORATION, (HEREAFTER THE "CITY") AND ROBERT REIN, WILLIAM FROST AND ASSOCIATES, A CALIFORNIA CORPORATION (HEREAFTER THE "CONSULTANT"): THE PARTIES HERETO AGREE AS FOLLOWS: 1. Recitals. This Agreement is based upon the following facts: (a) City desires,professional assistance in preparation of an Environmental Impact Report (the "Project") moreparticularlydescribed in Exhibit A, attached and incorporated herein by reference; (b) Consultant has been selected to perform the Project,.being fully qualified and having agreed to do so subject to the terms and conditions of this Agreement; and (c) City's legislative body has determined that the public interest, convenience and necessity.require the execution of this Agreement. 2. Services. Consultant.agrees to perform all services described in Exhibit A, and as further clarified in Exhibits B and C. Consultant shall meet and consult with representatives of City at all stages during the conduct of the work requiredpursuant to this Agreement to assure that the City's designated representative is fully and completely informed as to the nature and extent of the work being performed by.Consultant and as to the status and quality of such work. 3. Compensation. City shall compensate Consultant for its services based upon the costs set forth in Exhibit A and incorporated here by reference. The total cost of this contract.shall not exceed Sixty-four Thousand and Nine Hundred dollars ($64,900.00), which represents the total compensation to be paid to Consultant by City (the "Project Fee") for all work to be done by Consultant pursuant hereto and includes all allowable costs. Such costs shall be reimbursed only if approved by City as to nature, type and amount. The Project Fee shall include the costs of duplication for all reports and documents described in Exhibit A. Upon authorization to proceed with this project, the City shall make an initial payment of fifteen percent (15Z) of the Project Fee ($9,735.00) to the Consultant. Upon receipt of Consultant invoices submitted as work progresses, the City shall make payments based on percentage of work complete, as mutually agreed upon by the City and the Consultant, and in accordance with the work phases identified in Exhibit A. The project phase invoices shall include a breakdown of phase and tasks being billed for, and shall identify work performed by authorized project staff. The City shall withhold Ten Percent (10Z) of each progress payment, including the initial payment. The City shall pay the Consultant the 1OZ withheld on certification of the Final EIR, or within thirty (30) days of the Consultant's completion of the Final EIR, whichever is earlier. 1 o 6 Within fifteen (15) days after receipt of a project phase invoice, City shall either approve such invoice or return it to the Consultant specifying any objections. Invoices shall be paid within sixty (60) 'days after approval, as set forth in the attached Demand Warrant Register Schedule (Attachment A). Upon submission of Consultant's final work products under this.agreement, in a scope, nature, and form satisfactory to the City, all final monies shall be paid to the Consultant. 4. Time for Performance. Consultant shall in good faith utilize its best efforts to perform all of the work required under this Agreement in accordance with the Time Schedule Summary attached as Exhibit B and incorporated herein by reference. During the preparation of the draft(s) of the EIR, the consultant shall,provide a complete response to all staff -comments, concerns, and corrections within fifteen (15) working days of all comments being received. 5. Consultant Staff. The Consultant Project Staff identified in Exhibit C shall be responsible for completing the activities identified in Exhibit A. Changes of Consultant Project Staff members or other modifications to Consultant's staffing, including subconsultants for this project, shall be made only with the prior written approval of the City. 6. Status of Consultant. Consultant shall be deemed for all purposes to be an independent contractor in the performance of work pursuant to this Agreement. This Agreement shall not be deemed, for any purpose, to have created between the parties hereto a partnership, joint venture or other relationship other than that of independent contractor insofar as Consultant is concerned. Consultant shall be responsible for obtaining the services of all persons required to perform the work required by this Agreement, including, but not limited to, such subcontractors as Consultant desires to employ as such. Consultant shall advise all such subcontractors that the City bears no obligation for the payment of fees for their services or costs incurred and that such are the exclusive obligation of Consultant. 7. Changes. The City and Consultant may make changes in the work only if mutually agreed upon. If such changes cause an increase or decrease in the Consultant's cost of, or time required for, performance of any services under this agreement, whether or not changed by an order, an equitable adjustment in compensation to Consultant shall be made and this agreement shall be accordingly modified in writing. No such change shall be effectuated except in writing, executed by each party hereto, expressing such changes and reducing or increasing Consultant's compensation based upon such change or changes. 8. Litigation. If City becomes involved in litigation regarding the Project and desires Consultant's assistance or testimony, City shall compensate Consultant for its services according to the normal hourly rates. 9. Ovnership of Documents. All documents, studies, surveys, drawings, maps, models, photographs and reports as prepared by Consultant, or any of its subcontractors, pursuant to this Agreement, shall be deemed for all purposes to be the property of the City. All such materials, including originals, shall be transmitted to the City upon completion of the work by Consultant hereunder, or upon sooner termination of this 2 of 6 Agreement. No person,.including Consultant, shall be permitted to utilize any of the material referred to in this paragraph without City's prior written consent. 10. Indemnity. Consultant does hereby agree to defend, indemnify, and hold harmless the -City of Santa Clarita and the respective appointed and elected officers, boards and commissions, agents and employees ("Indemnified Parties") from and against any and all claims and losses, costs or expenses -for any damage due to death or injury to a person and injury to any property proximately resulting from any willful misconduct or negligent act or omission of Consultant or any of its officers, employees, servants, agents, or subcontractors in the performance of work pursuant to this Agreement. Liability shall be limited to the amount paid under this contract. Such costs and expenses shall include, but not be limited to, reasonable attorney fees. Consultant does hereby agree to defend, indemnify and hold harmless Indemnified Parties from and against any damages, liability; loss, costs or expenses which arise out of Consultant's negligent performance of the.work under this Agreement provided that such liability, loss, cost or expense is caused by the act or omission of Consultant, or any of its officers, employees, servants, agents, or subcontractors in performance of this Agreement. Consultant's obligation to the Indemnified Parties shall include reasonable attorney fees, costs -and expenses incurred by the Indemnified Parties in such defense, if Consultant is found to have been negligent in performance of work under this Agreement. The provision of liability insurance coverage as required by Paragraph 11 of this Agreement shall not affect Consultant's obligations under the indemnity provisions of this Paragraph 10. 11. Insurance. Consultant shall take out and provide, contemporaneously with the commencement of work pursuant to this Agreement, liability insurance coverage in an amount not less than $500,000.00. Such coverage shall be maintained in full force and effect at all times during the term of this Agreement. Consultant shall take out and maintain in full force and effect during the term of this Agreement all other insurance coverage required by law, including, but not limited to, workers' compensation coverage. All such insurance shall expressly name the City and its agents, officers, and employees as additional insureds. Consultant shall supply to City upon execution of this Agreement, a valid certificate of insurance evidencing the existence of all required insurance coverages. Additional or replacement certificates shall be filed with City evidencing the.existence of such coverage at all times during the term of this Agreement. The certificates of insurance shall contain a provision to the effect that the coverage cannot be cancelled or substantially altered or reduced except upon at least thirty (30) days prior written notice to City. ' 12. Termination. This Agreement may be terminated at any time prior to the completion of the Project, and without cause, in accordance with the following: a. By City upon fifteen (15) working days written notice, mailed 3 of 6 first class, postage prepaid, or by personal service to Consultant; and b. By Consultant upon fifteen (15) working days written notice, mailed first class, postage prepaid, or by personal service to City. Notices given pursuant to this paragraph shall be deemed to be effective on the tenth (10th) day following the giving of notice of such termination whether mailed or delivered. In the event of termination pursuant to this paragraph, Consultant shall be compensated by City pro rata for work performed as of the day of giving of such notice. 13. Notices. Notices to be given pursuant to this Agreement shall be in writing and shall be personally served upon the party to be notified or shall be deposited in the United States Postal Service, postage pre -paid, certified and registered, and addressed to the parties as follows: A. CITY: Donald M. Williams, Contract Manager Department of Community Development 23920 Valencia Boulevard, Suite 300 Santa Clarita, CA 91355 CC: Carl Newton, City Attorney Burke, Williams, and Sorenson 624 W. Grand, 11th Floor Los Angeles, CA 90017 B. CONSULTANT: Robert Bein, William Frost, and Associates P. 0. Box 19739 Irvine, CA 92713-9739 Attention: Michael J. Burke Except as otherwise provided in Section 12 above, notices given pursuant to this Agreement shall be deemed given on the date of personal service or the fifth (5th).consecutive calendar day following the deposit of the same in the United States Postal Service, or its successor. The individuals named in this paragraph shall be deemed, for all purposes, to be the representatives of the parties to this Agreement and empowered to act, pursuant to the terms of this Agreement, for and on behalf of that party. Either party hereto may, in writing, change the designation of the responsible representative for that party. 14. Conflict of Interest. Consultant covenants that neither the Consultant, nor any officer thereof, has any interest, nor shall acquire any interest, directly or indirectly, which will conflict in any manner with the performance of the Consultant services under this Agreement. Consultant further covenants that in the performance of this Agreement, no person having such interest shall be employed by Consultant. Consultant further covenants that Consultant has not contracted with nor is the Consultant performing any services directly or.indirectly, with any.developer and/or property owners and/or firms, and/or partnerships owning property in the City; and further covenants and agrees that consultant and/or its subcontractors shall provide no service or enter into any contract with any developer and/or property owner and/or firms, 4of6 and/or partnerships owning property in the City prior to the completion of this Agreement. 15. Construction. This Agreement shall be construed under the laws of he State of California and shall not be construed against, or in favor of, either party by reason of the fact that it was prepared.by one party or the other. 16. Entire Agreement. This Agreement, with attachment(s) and exhibits, constitutes the entire agreement between the parties and each party acknowledges that it is not relying on any prior, or contemporaneous, other agreements or representations, oral or written, in entering into this Agreement. 17. Captions. Numerals. and Headings. Gender and Number. The captions, numerals and headings used herein are for the purpose of identification and location of the terms and for ease of reading and shall not be used to alter, amend or otherwise change the plain meaning of the language in the text or the intention of the parties. Wherever gender or number is used, it shall include that gender or number which is appropriate to the context of the language wherein such gender or number is used. 18. Attorneys Fees. Should any party hereto reasonably retain counsel for the purpose of enforcing or preventing the breach of any.provision hereof, including but not limited to the institution of any action or proceeding to enforce any provision hereof, for damages by reason of any alleged breach of any provision hereof, for a declaration of such party's rights or obligations hereunder or for any other remedy, then if said matter is adjudicated (which term includes arbitration) the prevailing party shall be entitled, in addition to such other relief as may be granted, to be reimbursed by the losing party for all costs and expenses incurred thereby, including but not limited to reasonable attorney's fees and costs for the services rendered to such prevailing party. 19. Amendment. This Agreement may be amended only by a.writing executed by all of the parties. 20. Counterparts. This Agreement has been executed in two counterparts either of which may -be used as an original. One such counterpart shall -be delivered to the Obligee when fully executed and the other to the Obligor when fully executed. 21. Waivers. A waiver of any default of an obligation required by this Agreement shall not constitute a waiver of any subsequent default of same, or any other obligation under this Agreement. 22. Time of the Essence. Time is of the essence to this Agreement. 23. Effective Date. The effective date of this Agreement shall be September. _, 1991. 24. Severability. If any portionofthis agreement is deemed to be void or is held to be invalid, other sections, or portions thereof, of this Agreement shall remain valid and in force, and shall be interpreted as though the void or invalid portion(s) had not been incorporated herein. 5 of 6 25. Liquidated Damages. Should the Consultant fail to complete the work due solely to the Contractor's performance within ten (10) days of the time provided for in Exhibit B or within an extended period of time authorized in writing.by the City, or as may be allowed due to delays or for additional scope of work as authorized, the City will deduct and retain, out of amounts due and owing and any withheld monies which may be due, as,liquidated damages, but not as penalty, the sum of One Hundred Dollars ($100.00) per day for each and every day that the work period exceeds the total working days allotted following the period agreed upon the completion of the Project or as extended by the City. Should the Consultant complete the work more than ten (10) days earlier than the time provided in Exhibit B, or more than ten (10) days earlier than an extended period of time authorized in writing by the City as may be allowed for additional Scope of work authorized, the City will pay, as part of the final invoice, the sum of One Hundred Dollars ($100.00) per day for each and every day that the work is completed prior to the days allotted as stated in Exhibit B or as extended by the City. In no event shall the liquidated damages or incentive exceed Five Thousand Dollars ($5000.00). 26. Execution of Agreement. This Agreement must be first executed by the Consultant, or its representative, and approved to form by the City Attorney before it may be executed on behalf of the City of Santa Clarita. This Agreement, consisting of seven (7) pages, one (1) attachment, and three (3) exhibits attached hereto, has been executed as of the _ day of September, 1991. VHEREFORE, the parties hereto have caused this Agreement to be executed on the dates set opposite their names below: ROBERT BEIN, VILLIAM FROST AND ASSOCIATES: CITY OF SANTA CLARITA: Date: By: George Caravalho, City Manager Attest: Date By:_ Donna M. Grindey, City Clerk Approved as to form: Date: By: City Attorney 6of6 SCOPE OF WORK The following is a description of the Specific Work Tasks and an explanation of their scope and content: This proposal encompasses RBF's work program for a full -scope EIR on the Civic Center Project. Task I: PROJECT MANAGEMENT AND MEETING ATTENDANCE Subtask 1: RBF Will Provide Meeting Attendance and Management for the Civic Center Project EIR Preparation of the EIR will be under the management and daily supervision of Ms. Rica Weber who will serve as Project Manager. The EIR will be overseen and reviewed for CEQA compliance by Mr. Kevin Thomas, Director of Environmental Services. Mr. Thomas and/or Ms. Weber shall meet with the City's Project Team for a maximum of up to four meetings to discuss the status of the environmental document and technical reports. In addition, members of the Project Team will attend a minimum of two public hearings. A total of 35 hours of meeting time has been allocated under this Scope of Work as well as 40 hours. of project management time. This management time will allow RBF to work closely with City staff throughout the course of document preparation. Should the City request additional meeting or management time, this will be provided under a separate Scope of Work. Hours Allocated: 75 Estimated Budget: $ 3,750 Output: Schedule adherence, project organization and meeting representation. Task II: RESEARCH AND ANALYSIS Subtask 1: RBF Will Provide Research and Environmental Analysis for the Civic Center Project EIR RBF will evaluate the necessary information with respect to the Existing Conditions, Impacts, Mitigation Measures, Cumulative Impacts, and Unavoidable Adverse Impacts associated with areas identified by the City of Santa Clarita, the Initial Study, NOP Responses, and any other relevant and valid information sources. These analyses will be performed by qualified Environmental Analysts, Civil Engineers, Transportation Engineers, and Planners. RBF will prepare all research pursuant to CEQA, and as instructed by the City of Santa Clarita. The Project research will include coordination with the City of Santa Clarita in acquiring the necessary relevant Environment Impact Reports in the area, the previous EIR conducted on the project site and other appropriate reference documents. In addition, RBF will acquire specific references for the Project from the following sources, as available: Air Quaft Data. Air Pollution Control District. Air Quaft Handbook for Preparing Environmental Tmpact Reports, SCAQMD (Revised 4/87) Altematives Intpact Model, RBF, 1988. AQAT--2: Air Oualt , Tools. ARB, 1987. Audubon Society Field Guides. Cagfomia Air Quality Data, ARB. Califomia Flora and Fauna Supplement, Munz. C4LINE4-A Dispersion Model for Predicting Air Pollutant Concentrations Near Roadways. CALTRANS. CEOA: The Caltfomia Environmental Quality Act -Law and Guidelines, OPR, June 1986. Cjt! of Santa Clarita General Plan. qty of Santa Clarita Zoning Ordinance. Correspondence/Communication with Public Services and Utilities Agencies. Countyof Los Angeles General Plan. FHWA Highway Noise Prediction Model RD -77-108, 1978. Flood Insurance Rate Map, FEMA. Geology, Soils and Seismic Maps, California Division of Mines and Geology Master Drainage Plans. Site Photos. RBF, 1989. U.SUS.G.S. Topographic Map. Additional Material as Determined Necessary. This information will become a part of the foundation of the EIR and will be analyzed carefully to determine the environmental impacts involved with the implementation of the proposed Project. This technical data will then be summarized and presented in the EIR. Hours Allocated: 30 Estimated Budget: $ 11500 Output: Baseline Data for use in EIR. Task III: ENVIRONMENTAL ANALYSIS/SCREENCHEE EIR PREPARATION RBF will create a clear and concise environmental document pursuant to CEQA, which will include summary tables and exhibits where beneficial, with the intent on focusing each discussion on relevant issues. Subtask 1: Executive Summary The Executive Summary of the EIR will contain a Project Description and Setting Summary, Environmental Summary, and Summary of Project Alternatives. Additionally, in compliance with CEQA, RBF will identify Areas of Controversy and Issues to be Resolved. The Environmental Summary, which will be prepared for the Draft EIR, will include Unavoidable Adverse Impacts, Impacts Subject to Mitigation, and Mitigation Measures in 2 columnar format. This section of the Executive Summary will be published on colored text for ease in locating the summary section. Hours Allocated: 24 Estimated Budget: $ 500 Subtask 2: Introduction and Purpose The Introduction and Purpose section of the EIR will contain information relating to the Project's CEQA compliance, documenting sections of the California Environmental Quality Act which apply to the Project, as proposed. In addition, the Introduction and Purpose will outline the sections to be discussed in the EIR. The section will provide a discussion of requirements for a Program EIR as is stated under Section 15168 of the CEQA Guidelines. Hours Allocated: 6 Estimated Budget: $ 300 Subtask 3: Project Description The Project Description will be based on available Project information, to be provided by the City. Topics in this. section will include Project Location, Background and History, Project Characteristics; Project Objectives, Project Phasing and Agreements, Permits and Approvals Required. RBF will provide a Regional Location exhibit, Site Vicinity exhibit and a Land Use Plan exhibit (based upon land use plan information provided by the City. Hours Allocated: 15 Estimated Budget: $ 750 Subtask 4: Description of Existing Conditions, Project Impacts, Mitigation Measures, and Levels of Significance After Mitigation A. Geology, Soils and Hydrology RBF will address existing conditions, analyze potential impacts and identity mitigation measures based on existing available Geotechnical Analyses and additional study proposed by the City. This section will examine existing soil types, physical characteristics, and landform conditions of the Project site. The EIR will evaluate the proposed grading concepts and standards, potential cut and fill requirements of the grading and cumulative landform alterations. In addition, the EIR will determine the level and significance of the impacts resulting from modification of the ridgelines onsite. The discussion will also focus on Project impacts associated with long-term wind and water erosion on graded slope faces. Seismic issues associated with the San Gabriel Fault, which traverses the site, will be evaluated and mitigation measures will be recommended based on additional geologic testing. It is assumed that additional geologic testing will be performed and a final report will be complete by time of the publication of the Preliminary EIR. This Proposal includes environmental analysis of previously prepared geotechnical studies and planned geotechnical studies, but does not include additional studies by an independent source. The Hydrology portion of this section will be based on a Study prepared by RBF Hydrology and Drainage Engineers. The study will provide an analysis of the drainage and flooding condition at the project site to be used in the Environmental Impact Report (EIR) preparation. The analysis will be completed in compliance with the California Environmental Quality Act (CEQA) of 1970, as amended, and all the City of Santa Clarita environmental guidelines. The hydrologic assessments would be analyzed in accordance with the Los Angeles County Department of Public Works Hydrology Manual guidelines. The following tasks would be examined: 1. Existing Conditions A preliminary investigation will be conducted to document existing literature and available drainage studies at the project site and its near vicinity. This will include contact with responsible agencies and review of existing guidelines and constraints. Biogenics will be contacted to ascertain if any information on hydrological data is available. The existing hydrology conditions at both the project site and tributary areas will be examined. This would include a general examination of the topographic features, drainage patterns, land uses, geology and soils conditions of the area. This investigation will be used to perform hydrologic analysis to determine L.A. County's 10 -year and 50 -year design (Capital Storm) runoff. Existing drainage facilities within the project site and immediately downstream of it will be located, and their capacities will be assessed. The Federal Emergency Management Agency's (FEMA) Federal Insurance Rate Maps (FIRM) will be used to show the zones of flooding at the project site and its near vicinity. A hydrologic exhibit summarizing the results will be prepared. 2. Project Impacts Hydrologic impacts from possible alteration of the drainage pattern associated with the project would be examined, and 10 -year and 50 - year design (Capital Storm) flowrates would be determined based upon the proposed development site plan provided by City. Any alteration to the tributary basins (if any) would be documented, and altered (if any) offsite runoff would be quantified. 4 A hydrologic exhibit summarizing the results will be prepared. This task excludes quantitative hydraulic investigation of downstream impacts. 3. Mitigation Measures The drainage improvements and other measures necessary to mitigate for the possible increased runoff rates will be assessed. Alternative drainage improvement systems will be discussed and a preliminary recommended drainage system master plan will be provided. A preliminary master plan exhibit will show the recommended system. 4. Report Preparation A report summarizing the findings of Task 1 through 3 will be prepared. The technical support data will be attached to this report as a Technical Appendix. The format of the report will be suitable for use in the EIR. Hydrology Report: $11,000 RBF Hours Allocated: 50 RBF Estimated Budget: $ 2.500 A. Subtotal: $13,500 B. Air Quality RBF will prepare this section in conformance with the South Coast Air Quality Management District (SCAQMD) Air Quality Handbook for preparing EIRs (April, 1987). The Existing Conditions discussion will be based on monitored Air Quality Data form the nearest SCAQMD monitoring station (1987-1990). Existing air quality will be summarized in a table, clearly indicating days exceeding State and Federal Standards for all monitored pollutants. Short-term air quality impacts will be discussed, focusing on dust generation, construction vehicle emissions and possible odors. If sufficient construction details are available from the City, RBF will estimate tons per day of dust generated and daily construction vehicle emissions. Using our inhouse computer modelling capabilities and extensive experience in air quality analysis, Project daily emissions will be clearly indicated in table form for vehicle emissions, (mobile sources) and natural gas and power plant emissions (stationary sources). Project total emissions will be compared to South Coast Air Basin (SOCAB) emissions and Project impacts will be discussed. In addition, Project consistency with the Final 1988 Air Quality Management Plan will be evaluated 5 C. F13 based on the City General Plan and SCAG forecasts. A worst-case analysis will be assumed using 1992 emission factors (higher due to projected improvements in vehicle exhaust emission controls). RBF engineers familiar with Sewer Treatment and Technology will be utilized to ascertain the composition and danger of fumes associated with Sewer Treatment. In addition, RBF will interview employees of the treatment facility to determine the frequency and duration of noxious episodes. RBF will consider mitigation such as closed ventilation for the impact. Hours Allocated: 40 Estimated Budget: $ 2,000 Potential biological impacts resulting from the proposed Project will be analyzed based on the biological study prepared by Pacific Southwest Biological Services under the direction of R. Mitchell Beauchamp. Mr. Beauchamp has completed preliminary work on the Route 126 realignment in the area in anticipation of a bond issue funding the road, and therefore is familiar with the area. Potential impacts to be analyzed include the impact on rare and endangered plant and animal species, if any, and the loss of vegetation and habitat. Mitigation measures addressing these impacts shall be discussed along with the effectiveness of the measures. This Scope of Work includes a biological survey and report. Biological Survey & Report $ 5,250 RBF Hours Allocated: 24 RBF Estimated Budget: 1,200 C. Subtotal $ 6,450 1. - Initial Meeting The RBF Traffic Division will initiate a working meeting with the RBF Project Manager and City of Santa Clarita staff within five days after receipt of a signed copy of the contract and notice to proceed with the Project. The meeting will define available data, discuss details of the traffic studies, and determine preliminary data needs. Other working meetings will be held with the City of Santa Clarita staff (traffic engineering and planning), if required (not to exceed a total of two), to discuss the City's traffic study requirements and . obtain information concerning the City's existing and proposed transportation system in the Study Area. Such elements as the City's Comprehensive Land Use and Transportation Plans would be discussed and information obtained concerning the traffic growth rate and other approved zoning and/or proposed projects in the Study Area. The Study Area for the traffic study is defined as the area bounded by the individual site plan for the Civic Center Project and the approved and/or pending projects within an approximate one mile radius of the Project Site. 2. Data Collection and Verification RBF traffic engineers will collect from the City of Santa Clarita and the County of Los Angeles (as appropriate and necessary) available plans of current and proposed improvements, land use maps, existing aerial photos of the site, past traffic studies, existing hourly and daily traffic volumes for the impacted intersections, roads and expressways, and approved and/or pending projects within the Project Study Area. We will also make a field review of the Project site to verify the existing field conditions. Based on a review of the Request for Proposal (RFP), we understand. that new traffic count data is required for the Study Area. Therefore, for purposes of this Proposal, RBF will use a subconsultant to collect peak hour turning movement counts at the nine assumed intersections which are in close proximity to the Project site and 24-hour total volume counts on the adjacent roadways. The traffic counts will measure the existing traffic volumes generated by the existing land uses in the Study Area during the peak hours of operation. In the event that additional counts are required by the City of Santa Clarita they would be considered as extra work and billed at cost plus fifteen (15) percent. The following traffic volume counts have been assumed for the nine assumed intersections and adjacent roadways: 8 single tube counts (dual counters) 36 hours of manual counts 3. Evaluation of Existing. Conditions Trip Generation for Study Area Under this task, RBF traffic engineers will utilize the information collected above to evaluate the vehicular trip generation volumes for the various land uses and approved zoning that. are located within the Study Area. These estimated offsite generated traffic volumes will be based on previous studies for the area (if available). The results will be quantified and incorporated into the final report. 4. Traffic Distribution and Assignment The offsite generated vehicular trips will be distributed and assigned to the adjacent roadway network using the minimum path technique. The specific distribution percentages will be based on the new manual turning movement counts and discussions with City staff. 7 5. Circulation To determine how well the existing circulation system operates within the Study Area without the Project, intersection capacity analyses (Using the Intersection Capacity Utilization Method) will be performed for the intersections where manual counts were taken and the Level of Service (LOS) calculated. The results will be analyzed and compared to any planned improvements for the public streets and intersections within the Study Area. The LOS for the impacted street segments will also be calculated (as appropriate). 6. Evaluation of Future Conditions Trip Generation for Project Site + Approved Projects RBF traffic engineers will obtain from the City of Santa Clarita available future planned and approved development projects not yet generating traffic in the Study Area only. This information, along with the appropriate trip generation rates will be used to evaluate future traffic conditions for the Study_ Area including the Project site. The ultimate buildout conditions within the Study Area will be identified based upon available City of Santa Clarita data. It is assumed that the ultimate development plans for any proposed projects in the Study Area will be available from the City of Santa Clarita. Further, it is assumed that the proposed Project will be built and fully occupied within a four year period (1995). Therefore, in order to account for normal growth, a growth factor of an appropriate percentage will be applied to the four year period to establish the background traffic. This four year period growth factor will be obtained from the City of Santa Clarita traffic engineering staff. 7. Traffic Distribution and Assignment Traffic generated by the Project site and surrounding project trips (as appropriate) will be distributed and assigned to the existing roadway network. Population distribution forecasts for the City of Santa Clarita as well as the new manual turning movement counts will be reviewed and used to determine reasonable employee and resident origins and hence, appropriate assignment percentages for the roadway network. Also, previous traffic studies for the Study Area will be reviewed. For estimation purposes of this proposal, it is assumed that there will be no more than one forecast circulation scenario for the EIR traffic study analyses. Any additional scenarios would be on a time and. material basis. 8. Circulation For the forecast scenario, RBF traffic engineers will determine how well the circulation system within the Study Area will operate with the addition of site generated traffic, normal growth traffic, plus approved projects to existing 0 traffic. This will be accomplished by calculating the. appropriate Level of Service for the identified intersections and the impacted roadway segments within the Study Area (as appropriate). 9. Site Plan Analysis - Mitigation Measures The forecast circulation scenario established for the Project site will be analyzed for its ability to serve the anticipated traffic demands. The analysis will identity any adverse impacts . and address street functions, access opportunities provided/lost with the scenario, increased travel time for the scenario, emergency access provisions, need for traffic signals, as well as circulation. After the adverse impacts have been identified, a number of alternative mitigation measures will be developed as appropriate. The mitigation measures will be related to the identified problem and/or issue, degree of mitigation, and generalized cost (where applicable). 10. Consultation with Client and Other Responsible Agencies RBF traffic engineers will provide ongoing consultation with the Project Manager and the City of Santa Clarita staff (if necessary) relative to the progress of the traffic studies. Telephone and written correspondence will be initiated as needed. 11. Prepare Final Report RBF traffic engineers will prepare a bound report for the EIR that documents the study effort and includes schematic drawings as appropriate and discussion of the following: study methodology used, supporting analysis data, access to the site, internal circulation, and mitigation measures. The report will also include the results of one set of review comments from the City of Santa Clarita. The RBF traffic division will submit the first copies to the Project Manager for use in the EIR Appendix. Traffic Report: $13,800 RBF Hours Allocated: 30 RBF Estimated Budget: $ 1.500 D. Subtotal: $15,300 E. Noise RBF will evaluate potential noise impacts of the Saugus Speedway and the Southern Pacific Railroad on the proposed Project. The existing conditions discussion will be based on the City of Santa Clarita General Plan Noise Elements and 1991 traffic volumes. In addition, day and night ambient noise levels will be measured at the project site using a hand-held noise meter, including peak sound level readings. 0 Project noise impacts will be assessed based on the frequency and duration of noise episodes. This task will be accomplished by RBF Environmental Analysts contacting the Saugus Speedway and Southern Pacific Railway. The significance of these impacts will be assessed based on the potential exceedances of City noise standards. RBF will provide tables and/or exhibits to identify, potential Project Noise Impacts. RBF will identify mitigation measures necessary to achieve City Noise Standards. Hours Allocated: 32 Estimated Budget: $ 1,600 F. Light and Glare Site and architecture plans to be submitted by the City of Santa Clarita will be evaluated. Impacts of light and glare from construction material, building lighting, street and site lighting orientation or other sources associated with the proposed Civic Center Project will be identified. Hours Allocated: 10 Estimated Budget: $ 500 G. Risk of Upset/Mmt-Made Hazanis/Health RBF will analyze the potential safety hazards onsite, including: seismic activity, limited onsite access, fire danger, potential soils and ground water contamination, and risk of upset/man-made hazards from land uses on adjacent properties (i.e., Southern Pacific Railroad, Keysor-Century Plant, Thatcher Glass Plant, Saugus Speedway, the Bermite property and the Sewage Treatment Plant): The basis of this section is anticipated to be provided by additional study to be completed by Applied Biogenics. Hours Allocated: 30 Estimated Budget: $ 1,500 H. Public Services and Utilities After consulting with City staff, RBF will contact potentially affected agencies to identify relevant Existing Conditions, Project Impacts and recommended mitigation measures. The discussion will focus on the potential alteration of existing facilities, extension or expansion of new facilities and the increased demand on utilities and services based on the proposed land uses. RBF will evaluate the ability of the Project to receive adequate service based on City standards and measures. Issues expected to be discussed will include fire, police, electricity, natural gas, schools, communication systems, water, sewer, storm water drainage and solid waste service. RBF will devote special attention to the following potentially significant Project impacts: fire hazards including response time and water pressure; response time for police; availability of electricity, gas, communications and solid waste service. RBF will estimate the potential demand for energy resources by both the anticipated 10 development and, if possible, quantity the amount of energy which can be saved through the use of appropriate energy saving devices and programs. Based on agency responses and RBF's extensive experience with similar projects, RBF will recommend mitigation measures to substantially reduce or avoid potential impacts, including water and energy conservation measures. Hours Allocated: 12 Estimated Budget: $ 600 I. Aesthetics RBF will address potential aesthetic impacts and identify mitigation measures to the Project, with respect -to transforming the existing undeveloped ridgelines in association with the development of the proposed Civic Center Project. RBF will characterize the existing aesthetic environment and visual resources, including a discussion of views within the site and views from offsite vantage points. A color exhibit with photographs from the adjacent view corridors will be included in this discussion. The aesthetic section will also identity the potential aesthetic impacts which could result from hillside grading of the project site. Project impacts will be addressed based on changing onsite aesthetics. RBF will recommend mitigation measures to reduce potential aesthetic impacts to acceptable levels, where possible. Hours Allocated: 12 Estimated Budget: $ 600 J. Cultural mut Scientific Resources RBF will review the previous archaeological study prepared on the project site for accuracy and thoroughness. If determined inadequate, RBF will subcontract RMW Paleo Associates to make the necessary revisions to make the report adequate to be included in the EIR. (If revisions or additional work is required by RMW Paleo Associates, this work effort will be covered under a separate Scope of Work). This section of the EIR will include an evaluation of the archaeological and historic resource potential of the site, identify potential impacts and recommend additional mitigation measures, if any. Hours Allocated: 10 Estimated Budget: $ 500 Subtask 5: Long-term Implications "The Relationship Between Local Short -Term Use of Man's Environment and the Maintenance and Enhancement of Long-term Productivity", "Irreversible and Irretrievable 11 Commitment of Resources" and "Growth Inducing Impacts of the Proposed Project" will be analyzed per CEQA Guidelines as part of the EIR. Hours Allocated: 8 Estimated Budget: $ 400 Subtask 6: Growth Inducement and Cumulative Effects In accordance with CEQA Guidelines Section 15130, RBF will provide an assessment of the cumulative effect of each issue area addressed in the EIR and will take into consideration projects from within the City and North Los Angeles County as determined necessary, which are in the preliminary planning and/or implementation stages. A quantitative cumulative impact analysis will be provided in the areas of circulation and traffic, noise, air quality, and public services (including fire and police protection and schools) and utilities (including water, sewer and solid waste service), based on consumption and generation factors provided by contacted agencies (or "typical' figures provided by the City). Hours Allocated: 18 Estimated Budget: $ 900 Subtask 7. Alternatives Pursuant to CEQA Guidelines Section 15126(d), RBF will provide an analysis of a "reasonable range" of alternatives, comparing environmental impacts of each alternative in each impact area to the Project. The alternatives to be discussed are expected to include: 1) 'No Project" alternative; 2) "A Reduce Intensity" alternative; 3) Alternative Land Use" alternative, (i.e. parkland, open space or non -urban residential) and 4) "Alternative Site" alternative, pursuant to Goleta vs. County of Santa Barbara, Hours Allocated: 15 Estimated Budget: $ 750 Subtask 8: Effects Found Not To Be Significant This section will be provided to discuss the finding of issues identified as "no" responses in the Initial Study, pursuant to CEQA. Hours Allocated: 2 Estimated Budget: $ 100 Subtask 9: Organizations and Persons Consulted RBF will provide a complete .list of organizations, agencies and persons contacted during EIR preparation. Hours Allocated: 2 Estimated Budget: $ 100 12 Subtask 10: Bibliography RBF will provide a complete list of reference materials used in preparation of the EIR. The EIR will be footnoted with page references to allow the City to document sources and rationale for EIR conclusions. Output: Screencheck EIR for City review. Hours Allocated: 2 Estimated Budget: $ 100 Subtotal Task 11I: $46,450 0 ' • 1' • It INIZI 1' ' • ' t__ ' • • Subtask 1: Draft EIR for Distribution RBF will respond to City comments on the Screencheck EIR to develop the Draft EIR. As the Screencheck EIR will be completed with maximum detail and information available, 40 hours has been allocated for the revisions. The Draft EIR will be double -sided and bound with section dividers for each major section. This task does not include preparation of the Notice of Completion or distribution of the EIR. These tasks can be provided under a separate scope of work for an additional fee. Hours Allocated: 40 Estimated Budget: $ 2,000 Output: Draft EIR for public distribution by the City. IMMM1 1' • I ' • ' • • /OO_ _ • • • �• I 1 Subtask 1: Responses to Comments and Final EIR Preparation RBF will respond to all comments received on the Draft EIR during the Public Review Period. RBF will prepare thorough, reasoned and sensitive responses to relevant environmental issues. The Final EIR will consist of the Comments and Responses section and the revised Draft EIR text. RBF has allocated 40 hours to prepare responses to comments (based on Initial Study) and the Final EIR. Should the Project carry extreme controversy which requires Final EIR preparation work beyond the maximum 40 hours budgeted, RBF will provide this additional work under a separate Scope of Work. Output: Final EIR for certification. 13 Hours Allocated: 40 Estimated Budget: $ 2,000 Task VI: GRAPHIC EXHIBITS Subtask 1: Preparation of Visual Graphic Exhibits for Inclusion in the EBR The EIR will include exhibits to enhance the written text and clarify the proposed Project and potential environmental impacts. The RBF inhouse graphic design team will create professional quality, black and white, or colored exhibits, dividers and cover for the EIR. Hours Allocated: 80 Estimated Budget: $ 4,000 Output: Graphic Exhibits/Depictions of project conditions. Task VII: REPROGRAPHICS All Draft Final EIR text will be double -sided, with the exception of the reproducible originals. In addition to miscellaneous reproductions, RBF's inhouse Reprographic Services Department will provide the following documents: Output: Screencheck (Preliminary) Draft EIR 10 copies Appendices 2 copies Draft EIR 50 copies Reproducible Master of Draft EIR 1 copy Draft EIR Appendices 20 copies Final EIR 50 copies Reproducible Master of Final EIR 1 copy Final EIR Appendices 20 copies Estimated Budget: $ 4,200 Task VIII: MITIGATION MONITORING PROGRAM To comply with the Public Resources Code Section 21081.6 and AB 3180, RBF has formulated a Scope of Work for Mitigation Monitoring Programs. The Mitigation Monitoring Program will be defined through working with City staff and contacting Responsible Agencies to identify appropriate monitoring steps/procedures in order to provide a basis for monitoring such measures during and upon Project implementation. 14 Based on information obtained above and RBF experience in developing monitoring programs for public agencies, RBF will develop a Draft Mitigation Monitoring Program for City review. Hours Allocated: 20 Estimated Budget: $ 1,000 Output: Mitigation monitoring program. Not to Exceed Total EIR Cost: $64,900 Task IX: OPTIONAL TASK - PHASE I SITE ASSESSMENT If determined necessary by City staff, RBF has retained Leighton and Associates to prepare a Phase I Site Assessment for the project site. The Phase I Site Assessment would focus on areas proposed for development. The issues anticipated to be analyzed include existing substances, existing groundwater quality and the impact of the proposed development. Estimated Budget: $ 5,535 15 19,1101 try WYel"l og1I ti �1 RBF will attend scoping meetings and initiate research and investigation immediately upon formal authorization to proceed from the City: RBF will provide 10 copies of a Screencheck EIR on or before twelve (12) weeks from authorization to proceed. RBF will submit a Draft EIR 10 working days from transmittal of City comments on the Screencheck EIR. RBF will provide 50 copies of the Draft EIR for the 45 Day Public Review Period. A Final EIR will be submitted by or before three weeks after the close of the public comment period. RBF will prepare up to 50 copies of the Final EIR, which will include Comments and Responses and other appropriate information. In addition, one camera ready original of the Final EIR will be provided. Schedule Authorization. Research and Investigation Site Visit/Meeting with City Screencheck EIR Preparation City Review of Screencheck Draft Review Preparation (responses to City Comments) Publication and Distribution of Draft EIR 45 Day Public Review Period Responses to Comments/Screencheck Final EIR City Review of Screencheck Final EIR Final EIR Preparation/Publication 16 Week 1 Week 1-4 Week 1-2 Week 1-12 Week 12-13 Week 14-15 Week 16 Week 16-23 Week 23-26 Week 27 Week 28 PROJECT TEAM - KEY PERSONNEL The organization of the RBF Project Team are indicated below. This section -will provide a brief background description and project role for each of the key professionals involved in the Santa Clarita Civic Center Project. Ms. Barbara Eljenholm Vice President, Environmental Services Ms. Eljenholm has been actively involved in the coordination, preparation and processing of environmental documents at RBF since 1980. As Vice President of the Environmental Services Department, she is responsible for the completion of all environmental documents and CEQA compliance for RBF. During Ms. Eljenholm's 12 years at RBF, she has provided management, technical review and detailed analysis, research, writing, and the editing of Environmental Impact Reports, as well as Negative Declarations, Initial Studies and other various planning studies. Ms. Eljenholm's role in this Project will be to provide quality review for the EIR work effort. Mr. Kevin Thomas Director, Environmental Services Mr. Thomas received his B.A. Degree in Environmental Engineering from the University of California, Los Angeles. At RBF, Mr. Thomas is the Director of the Environmental Services Department and oversees the preparation of Environmental Impact Reports and other environmental documents for public and private sector clients. Recent project experience includes serving as the Project Manager for the 2,500 -acre Irvine Business Complex Rezoning Project Program EIR for the City of Irvine, the 10,625 -acre Ritter Ranch Specific Plan EIR for the City of Palmdale, and the Amargosa Creek Improvement Project for the City of Palmdale. Mr. Thomas's role in this Project will be. to provide CEQA compliance review. Ms. Rica Weber Project Manager Ms. Weber graduated from California Polytechnic State University in San Luis Obispo with a degree in Natural Resources Management with a concentration in Environmental Services. Ms. Weber, who will serve as Project Manager, has provided project management and/or technical analysis for several environmental projects in California including the 10,625 -acre Ritter Ranch Specific Plan EIR for the City of Palmdale which involved hillside residential development, the Whiteface Specific Plan EIR for the City of Simi Valley which involved development of a 2,686 -acre master planned community, and the Riverglen Specific Plan EIR for the City of Perris which involved 333 acres of a master planned community. Ms. Weber assisted in the preparation of the Center for the Performing and Fine Arts and Justice Center of North San Diego County EIR:for the City of Escondido. As Project Manager, Ms. Weber will be responsible for the daily management and supervision of the Project Team and coordination with City staff in the preparation of the Santa Clarita Civic Center EIR. 17 Mr. William Ryan Em4ronmental Analyst Mr. Ryan graduated from the University of California, Los Angeles, with a degree in Geography, and is currently pursuing a Master's Degree in Biology - Wetland Restoration from the California State University, Fullerton. Mr. Ryan is responsible for the preparation of Environmental Impact Reports, with emphasis on the research and analysis of biological resources. Mr. Ryan's experience includes environmental analysis for the Chapman Heights Planned Development for the City of Yucaipa/County of San Bernardino, the Planning Area 23 EIR for the City of Irvine, and the Palmdale Trade and Commerce Center EIR for the City of Palmdale. Mr. Ryan's role in this Project will be to research, analyze and write portions of the Environmental Impact Report. Ms. Melanie Smith Environmental Analyst Ms. Smith graduated from California State University, Long Beach, with a degree in Political Science with concentrations in Public Policy and Administration and Environmental Law. Her duties include research and reporting on recent CEQA Legislation and case law. Her experience includes environmental analysis of the Vincent Hills Specific Plan EIR for the City of Palmdale involving critical hydrological and biological constraints, and the Police Headquarters and Fire Administration Facility EIR within the City of Clovis involving concerns relating to relocation of existing onsite residences and church/classroom facilities, traffic and noise constraints and public health and safety. Additional experience includes analysis and coordination of the 14,000 -acre Willow Springs_ Specific Plan Update EIR within the County of Kern. Ms. Smith's role in this Project will be to research, analyze and write portions of the Environmental Impact Report. Ms. Trina Rice Environmental Analyst Ms. Rice graduated from the University of California, Irvine, with a B.A. Degree in Social Ecology. Ms. Rice is responsible for the preparation of Environmental Impact Reports and related environmental documents. Her work experience includes the Irvine Business Complex Rezoning Project Program EIR for the City of Irvine and the Ritter Ranch Specific Plan EIR for the City of Palmdale. Ms. Rice's role in this Project will be to research, analyze and write portions of the Environmental Impact Report. Ms. Alison Green Environmental Analyst Ms. Alison Green graduated from California State University, Chico, with a degree in Microbiology. Her duties include research and preparation of Environmental Impact Reports with emphasis on traffic and circulation issues and related noise impacts resulting from surrounding land uses. Ms Green's experience includes environmental analysis for the City of Davis Transportation and Circulation Element, as well as the preparation of a Year IF, 2010 Noise Contour Map, City of Vista Transportation Element and several County of Orange residential developments. Ms. Green's role in this Project will be to research, analyze and write portions of the Environmental Impact Report., Ms. Holly Weatherby Environmental Analyst At RBF Ms. Weatherby is responsible for research, environmental analysis, planning review and conducting feasibility studies for project administered out of the Temecula Office. Ms. Weatherby is currently involved in the EIR for the proposed Riverglen Spec Plan, a 333 - acre specific plan located in the City of Perris. Ms. Weatherby is also actively involved in the production of the EIR for the Wastewater Treatment Facility expansion for the Cambria Community Services District (CCSD). This EIR involves coordination of the CCSD as well as the State Water Quality Control Board, the Department of Fish and Game and the consideration of an existing NPDES permit. Ms. Weatherby graduated from California Polytechnic State University, San Luis Obispo with a B.S. degree in City and Regional Planning. Ms. Weatherby's role in this Project will be analysis, writing and the production of the Environmental Impact Report. Trevor Smith Environmental Analyst As an Environmental Analyst at RBF, Mr. Smith's duties include research, analysis, and writing of Environmental Impact Reports and related documents including Initial Studies for a wide range of projects. Mr. Smith's project experience includes research and analysis for the Escondido Performing and Fine Arts Center and Justice Center EIR for the City of Escondido, the Rancho Palos Verdes Subregion 7 & 8 EIR for the City of Rancho Palos Verdes and the Wastewater Treatment Facility Expansion EIR for Cambria Community Services District. Mr. Smith's responsibilities for this project include research, technical analysis and preparation of the Environmental Impact Report. 19