Loading...
HomeMy WebLinkAbout1991-02-26 - AGENDA REPORTS - CITY YARD RPT (2)w . AGENDA REPORT City Manager Approval Item to be presented y: NEW BUSINESS George A. Caravalho DATE: February.26, 1991 SUBJECT: CITY YARD REPORT DEPARTMENT: City Manager BACKGROUND On June 12, 1990, Council approved the concept of procuring the property located at 25663 Avenue Stanford (Satellite Truck Body Company) for use as -the City Yard, and on July 24, 1990, Council approved staff's recommendation to purchase this property for $3.6 million. Staff returned to Council on October 30, 1990 with a report discussing modifications necessary to support the housing of maintenance operations for the Parks and Recreation and Public Works Departments. Council approved a concept to construct these modifications in phases and authorized a budget in the amount of $325,000 for Phase I. Council also authorized entering into a contract with A.C. Martin & Associates for architect—engineering services related to overall master planning as well as for a detailed design of Phase I. Additional scope of work for master planning purposes, along with potential budgetary impacts over the next four fiscal years is presented at this time for Council consideration. The scope of work discussed at the. October 30, 1990 Council meeting provided for only those modifications necessary to support maintenance operations for Parks and Recreation and Public Works field personnel. The revised scope presented in this, agenda item provides for transfer of the entire Parks and Recreation Department (not just maintenance personnel), provides for transit bus maintenanceoperations, and provides for vehicle maintenance operations. As stated above, $325,000 is currently budgeted for the initial scope of work. Staff seeks approval at this time for an additional $160,000 for the current fiscal year ($5,000 for Master Planning and Phase I, and $155,000 for Phase II design);.however, it is emphasized that the total fiscal impact for construction of the expanded scope of work, as proposed, is expected to run approximately $2.7 million. Since this impact will significantly affect the budgetary process over the next several years, the proposed conceptual use of the facility is being brought before Council forconsiderationat this time. 1 �N -- CITY YARD REPORT Page 2 February 26, 1991 1. Receive, review, and approve the attached City Yard Status Report. 2. Direct staff to proceed. with development of the master plan general arrangement drawing, design of Phase I. construction of Phase I, and design of Phase II based upon the revised master plan scope. 3. Appropriate additional budget in the amount of $160,000 from Contingency Account No. 01-4101-290 to City Yard Account No. 25-94002-227 to cover design services related to the revised master plan scope of work and for Phase II design. ATTACHMENT City Yard Status Report AGN 383 Ll SUMMARY CITY YARD STATUS REPORT 0 As authorized, staff has proceeded with the purchase' of the property located at 26553 Avenue Stanford (Satellite Truck Body) for use as a City Yard. Staff has also retained the services of Albert C. Martin & Associates for architectural -engineering services related to master planning and Phase I design of city yard modifications. As originally perceived, the City Yard was to be used to support Parks and Recreation and Public Works maintenance operations only. However, it has become clear from the space study report for the new City Hall that existing space at the current City Hall location will rapidly be taxed. This, coupled .with the Parks and Recreation Department desire to keep all personnel at one location, has led to staff's recommendation to include provisions in the master plan for housing the entire Parks and Recreation Department. Staff further recommends that the master plan also include provisions for maintenance operations of the City's transit buses which are scheduled for delivery in July of 1991, as well as for maintenance operations.of City vehicles. A.C. Martin has completed their building survey of the facility, and have noted the as -built conditions. In addition, a conceptual layout has been prepared based on staff's recommendation to expand the master planning effort. Rough -order -of -magnitude construction costs (based on $ per square foot) have also been developed based on expanded use of the facility. It is emphasized that these cost estimates are preliminary in nature and are generally considered conservative. Once the master plan general arrangement drawing is completed and the. details of each phase are finalized, a more definitive estimate will be developed. Staff continues to recommend that facility modifications be phased over the next several years. It is anticipated that as part of the budget preparation process for each fiscal year, specific work defined on the master plana general arrangement drawing will be _presented to Council for consideration. At this time, staff recommends that Council approve proceeding with the development of a master plan general arrangement drawing based on the revised scope described above. Staff also recommends that Council approve proceeding with. detailed design of both Phases I and II at this time, and to approve a transfer of $160,000- from Contingency Account No. 01-4101-290 to City Yard Account No. 25-94002-227 to cover this additional work. FISCAL ANALYSIS Building renovation costs necessary to support construction of Parks. and Recreation Department. offices could conservatively run as high as $45 per square foot. Alternatively, lease costs for office space runs approximately $14.50 per square foot per year. Since the new City Hall is not expected to be occupied before 1994, and since projections show that additional City Hall space will be required within that time frame, staff recommends that it is more advantageous to relocate the Parks and Recreation Department to the City -own City Yard than to lease the additional space elsewhere. CITY YARD STATUS REPORT Page 2 Likewise, it is expected that construction of bus and vehicle maintenance facilities will be more economical than leasing space for these facilities. For example, staff has received estimates from local bus operators that lease costs for maintenance space would run in the $100,000 to $150,000 per year range. Since construction costs for the bus maintenance area are estimated at $220,000 payback would be achieved within 3 years. In addition, the City would enjoy tighter review and audit capabilities if maintenance were to be performed in a City facility. With respect to funding sources, it is proposed that detailed funding source analyses be provided during the budgetary process prior to each fiscal year, and that Council -take action with respect to proceeding with a specific phase of work at -the time that the annual budget is presented for consideration. It should be noted that it is expected that the bulk of the monies required to support this project will be provided from the General Fund; however, staff proposes to investigate (at the time of budget preparation) whether supplemental funds such as roads or transportation monies will be available to support the project. RECOMMENDATION Staff recommends that Council approve: 1. Proceeding with the development of the master plan general arrangement drawing based upon the attached conceptual layout and work tasks; 2. Proceeding with detailed design and subsequent construction of Phase I; 3. Proceeding with detailed design of Phase II; and 4. A fund transfer in the amount of $160,000 from the Contingency account to the City Yard account for this purpose. Aamlo, ra. PAp*JIY> " 53 Auras, Pnwcs I iavlk,es•, fEc• I I A -69H I gu6 NAIKgU MCE F -YE caM(oiJ ruel.k-, MIM ATE .' �•`! 'CONCEPTUAL LAYOUT i • CONSTRUCTION SCHEDULE AND COST BREAKDOWN FISCAL YEAR AND DESCRIPTION CONSTRUCTION COST FISCAL YEAR 1990-91 PHASE I: • Office Space for Maintenance Personnel $15,000 • Restroom, Shower and Locker Facilities $140,000 • Miscellaneous Site Work $10,000 $165,000 FISCAL YEAR 1991-92 PHASE II• • Motorized Cates $30,000 • Public Works Area $160,000 • Assembly Areas $ 80,000 • Bus Maintenance Facility $200,000 • Lunch Area $ 30,000 • Parks and Recreation Offices $280,000 $780,000 PHASE III• • Fuel Pumps and Underground Tanks $1000000 • Wash Rack $130,000 • Site Work and Utilities $50,000 • Warehouse, Storage Areas, and Shops $135,000 • Vehicle Maintenance Area $150,000 • Reroofing $60,000 $625,000 POTENTIAL FUTURE EXPANSION PHASE IV: • Expansion of Vehicle Maintenance Area $150,000 • Upgrade Site Lighting $10,000 $160,000 PHASE V• • Additional Offices and Restrooms $160,000 • Miscellaneous Items 05,000 $195,000 TOTAL CONSTRUCTION COST . . . . . . . . . . . . . . . . . . . . $1.925.000 TOTAL PROJECTED COSTS - CITY YARD AS-BUILTS,- MASTER PHASE II PHASE III PHASE IV PHASE V TOTAL PLAN, AND PHASE I DESIGN ENGINEERING $75,000 $155,000 $140,000 $40,000 $45,000 = $455,000 CONSTRUCTION $165,000 $780,000 $625,000 $160,000 $195,000 $1,925,000 CONSIRUCTION ENGINEERING $10,000 $45,000 $30,000 $10,000 $10,000 = $105,000 FURNITURE,.FIXTURES, $10,000 $150,000 $25,000 $25,000 $15,000 = $225,000 OFFICE EQUIPMENT, ETC. SUBTOTAL: $260,000 $1,130,000 $820,000 $235,000 $265,000 = $2,710,000 ANNUAL BUILDING SERVICE $70,000 $155,000 $160,000 $165,000 $170,000 COSTS (UTILITIES, ETC.) TOTAL (INCLUDING $330,000 $1,285,000 ^^ $980,000 $400,000 $435,000 ANNUAL BUILDING COSTS) FUNDS CURRENTLY APPROPRIATED $325,000 $0 $0 $0 $0 TOTAL PROJECTED COSTS: $2.710.000 •