HomeMy WebLinkAbout1991-04-23 - AGENDA REPORTS - FRIENDLY VALLEY PROJ 90 10 BID (2)AGENDA REPORT
City Manager Approval
Item to be presented by:
CONSENT CALENDAR John E. Medina/Jeff Kolin
DATE: April 23, 1991
SUBJECT: FRIENDLY VALLEY/SKY BLUE MESA AREAS
. PROJECT NO. 90 -LO - ADVERTISE FOR BIDS
DEPARTMENT: Public Works
BACKGROUND V
Project No. 90-10 provides for sidewalk rehabilitation in the Friendly Valley and
Sky Blue Mesa areas of .the City. This project consists of permanent concrete
replacement of previously asphalt -repaired and displaced sections of sidewalk,
curb and gutter; the vast majority of which have been caused by tree root damage.
The purpose of the project is to supplement the existing resident "call-in"
program on an area -wide basis, and citizens of the community as a whole.
In prioritizing qualifying locations, the following criteria was used for this
project:
1. Except as described in Item 2 below, only those trees that are diseased, dying
or non -conforming will be removed.
2. Where, in the opinion of the arborist, tree root pruning will have an adverse
affect on the tree, a permanent concrete ramped sidewalk will be installed.
For each location where a permanent concrete ramped sidewalk is proposed, the
resident whose property fronts this location will be advised of the City's
intent. (See attached sketch)
3. In the case where trees on private property are the cause of sidewalk damage,
the resident whose property fronts this location will be advised of the City's
intent and given the option of having a permanent concrete ramp placed at no
cost to the resident. Should the resident object to a permanently ramped
concrete ramped sidewalk, tree removal, root pruning or grinding and sidewalk
replacement will be performed in accordance with procedures established under
Ordinance 89-20, Chapter 13.80 and the resident will be charged,for the
replacement costs accordingly.
A total of 372 locations have been identified as qualifying for. permanent
concrete replacements. Since replacement of all 372 locations will exceed the
budget by approximately $155,600, Staff recommends limiting concrete replacement
to those locations of top priority. Based on budget constraints, Staff
recommends limiting the project to 96 locations. Of these 96 locations, Staff
recommends that non -conforming trees be removed at 3 locations, and that
permanent concrete ramped sidewalks be constructed at 9 locations. Staff further
advises that there are an additional 19 locations which may have to be
permanently ramped, pending root inspection by the arborist after the existing
sidewalk is removed. There are six locations where private trees.will have to
be.addressed. 'Three of these locations call for root grinding. Two locations
will havAr psJI py the arborist and one location wAvdaltem�will 1
have to be removed. At all other locations, root pruning or grinding will be
performed and the sidewalk will be replaced as specified in the contract.
Plans and -Specifications for this project have been completed and are available
for review in the offices of the City Clerk and the Director of Public Works. It
should be noted that these projects wire initially identified as two separate
projects in the FY 90-91 Annual Budget; however, Staff recommends that it will
be more cost-effective if they are bid as one project. Total budget in the
amount of $100,000 is available for design, construction, and contract
administration of this project, and Account No. 25-96046-227 has been established -
to track all costs associated with the project.
In addition to the Public Works recommendation, the Parks and Recreation
Department, who handles street tree maintenance, is requesting of Council an
additional $30,000 to be added to the existing Golden Bear Tree Pruning Contract,
P.O. # 6655. The $30,000 will cover the cost to root prune in conjunction with
canopy prune and remove trees as needed for the proposed sidewalk rehabilitation
project.
The funds are presently available in Parks Account No. 01-9200-227. The
available monies. in Account No. 01-9200-227 are made possible due to a four month
lag period between tree prune contracts in Fiscal year 1990-91. Provisions in
the existing tree maintenance contract between the City and Golden Bear Arborist
allows the City, through Council recommendation to exceed the contract price
through a written supplemental agreement between the City and the Contractor.
RECOMMENDATION
1. Approve the Plans and Specifications.for the project and authorize the
advertising for bids.
2. Approve additional $30,000 towards Golden Bear Arborist -tree prune contact,
P.O..# 6655 from Parks Account No. 01-9200-227.
ATTACHMENT
Sketch
Key Map
o _
L 8' TYP. _
r
.A .,� .•. - :.:0.: •:e;.' `. .:.:•.a.:'.'d: -.� .'e cd.: ".D 4° TYP.
ORIGINAL SIDEWALK
TEMPORARY A.C. RAMP\ O
MINI"_
PERMANENT CONCRETE RAMP O
AI
RAMPED SIDEWALK IMPROVEMENT WITHOUT DAMAGING ROOTS
4
4
O-- ROOT
♦•
UPLIFTED
SIDEWALK
CAUSED BY
TREE
ROOTS
PERMANENT CONCRETE RAMP O
AI
RAMPED SIDEWALK IMPROVEMENT WITHOUT DAMAGING ROOTS
PRDJEC T NO. 9D - /O
,y� -o
CT o fT -Y/
AAND1 �a
CT
S LEAv£s
SNE
�I
lv
NOT TO SCAL 6
r
At
DA
.4 —A
QAOLRT
� V �
C
6
ada ABOALC S7
OR
VALLEY
P��
a,
1E
0�
G
� v 3
� Q4A'BAR
P
4 ~
ti Q
2 i a
V � �
� V
V
PASS RD
..�uA17A�u
C ITY
of
SANTA CLARITA
�'--COUNTY OF
' as, LOS ANGELES
w F N AV�E
i L)
NO CT
HUFF wr h> & H
I TLI ac
�srs�lENDO T wr Lu
JESL Y g ri
�jTRE
HUF I w Q �j`> �t� z �• A�`m. P
WEND I
m z a z
KELS.tLP�wJ
I fi '�' Z 3 SAN vR3' C
VIEW DR s2 yE 1 1 i
ERN
M1T VIEW CT ��+ ¢
OCK LN
ASS LN pR
Ti� i
�� s 1
!SE LN ,OZ�C�!�f x 23
w S O LN
Q �I 3yyE+E1Wq'}�.Y� 1t
> 15 A 14
atvvv fv�
SIDEWALK
REPAIR PROJECT
SKY BLUE MESA AREA
wm� -INDICATES STREET WHERE
SIDEWALK CONSTRUCTION IS
TO BE DONE-
SO�EDAO CANYON
I
1 �
d —f RKtTN
l�0 BASEL S
cj A
A�
/CAI+YON CONT
� ,0TN. KS HS
27 i
N.T S
•..A