HomeMy WebLinkAbout1991-05-14 - AGENDA REPORTS - PROJ 90 01 PROJ ACCEPTANCE (2)CONSENT CALENDAR
DATE: May 14, 1991
AGENDA REPORT
City Manager Approa '
Item to be presented by:
John E. Medina
SUBJECT: WINTERDALE DRIVE, ET AL
PROJECT N0. 9pr—01 — PROJECT ACCEPTANCE
DEPARTMENT: Public Worksl�
BACKGROUND
On January 29, 1991, Council awarded a contract for the subject project to Roy
Allan Slurry Seal, Inc. This project was completed to the satisfaction of the
Director of Public Works on April 2, 1991 for a total construction cost of
$41,437.40.
RECOMMENDATION
1. That Council accept the work performed by Roy Allan Slurry Seal, Inc.
2. That Council direct the City Clerk to file the. attached Notice of
Completion for the project.
3. That Staff be directed to release the 10 percent retention 35 days after
the Notice of Completion is recorded, provided no stop notices as provided
by law have been filed.
ATTACHMENT
Notice of Completion of Public Improvement and Work
hds/433
APPROVED
Agenda Item:
. When recorded please return to:
Donna Grindey, City Clerk
City of Santa Clarita
23920 Valencia Boulevard, Suite 301
Santa Clarita, California 91355
NOTICE OF COMPLETION OF
PUBLIC IMPROVEMENT AND WORK
NOTICE IS HEREBY GIVEN that the City of Santa Clarita, Los Angeles County,
California, has caused a public improvement, to wit:
PROJECT NO. 90-01
WINTERDALE DRIVE, ET AL
to be constructed upon the property hereinafter described. The contract for
furnishing of all plant, labor, services, materials and equipment and all
utilities and transportation, including power, fuel and water, and performing
all work necessary to construct and complete, in a good and workmanlike manner
in strict accordance with the specifications, plans, and drawings therefore on
file in the office of the City Clerk of the City of Santa Clarita, for the
construction, installation, and completion of the above described public
improvement and work, was heretofore made and entered into with Roy Allan Slurry
Seal, Inc. on the 20th day of February 1991, and filed for record in the office
of the City Clerk of the City of Santa Clarita; that the work upon said public
improvement was actually completed on the 2nd day of April 1991 and that the
Director of Public Works has notified the City Council that he has made and
completed a final inspection of the materials furnished and installed and the
work performed in the construction, installation and completion of said public
improvement hereinabove more particularly described and set forth, and has
certifiedin: writing to the City Council that all of the provisions of the
contract and contract documents for the furnishing of all plant, labor,
services, materials and equipment, and the performing of all work necessary for
the construction, installation and completion of said public improvement above
described have been fully complied with to his satisfaction as required by the
contract documents; that final acceptance of the construction, installation and
completion of said public improvement above described was made on the 2nd day of
April 1991 that the nature of the title to said property of said City of Santa
Clarita is as follows — that is to say, it owns said public improvement in fee
except for the right-of-way upon which it is constructed, and that it owns an
easement upon, over and along said right-of-way for the purpose of the
construction, installation, and completion of said public improvement
hereinabove described and the use thereof after said completion; that the
property hereinabove referred to and on which said public improvement is
situated is described as follows:
0
WINTERDALE DRIVE, ET AL
NAME OF SURETY ON MATERIAL.AND LABOR BOND:
Fidelity and Deposit Company of Maryland
225 South Lake Avenue
Pasadena, CA 91101
DATED this day of , 19
CARL BOYERy Mayor
City of Santa Clarita
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES) as
CITY OF SANTA CLARITA)
I certify or declare that under penalty of perjury that the foregoing is
true and correct.
ATTEST:
9
1
Donna M. Grindey, City Clerk
City of Santa Clarita
0
Date